CN100554642C - A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining - Google Patents
A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining Download PDFInfo
- Publication number
- CN100554642C CN100554642C CNB200710132573XA CN200710132573A CN100554642C CN 100554642 C CN100554642 C CN 100554642C CN B200710132573X A CNB200710132573X A CN B200710132573XA CN 200710132573 A CN200710132573 A CN 200710132573A CN 100554642 C CN100554642 C CN 100554642C
- Authority
- CN
- China
- Prior art keywords
- coal column
- fully
- mechanized mining
- coal
- mining working
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining is hung screen between the coal column of first row coal column and air intake lane and return airway both sides of fully-mechanized mining working, form the ventilation system that can carry out longwall full-mechanized mining technique; Arrange fully-mechanized mining equipment at fully-mechanized mining working; In the 30m scope of fully-mechanized mining working the place ahead, the top board of air intake lane and return airway is carried out advance support with individual prop or grillage; Along arranging the high supporting support resistance hydraulic of a row in the bordroom of fully-mechanized mining working direction of propulsion the place ahead 5m, then carry out the recovery of first row's coal column; In reclaiming the coal column process, between the coal column of next row's fully-mechanized mining working and coal column, hang screen, form ventilation system when guaranteeing to reclaim next row's coal column; High supporting support resistance hydraulic moves with fully-mechanized mining working surface hydraulic support and mobile, and the two remains the distance about 5m, thereby constantly reclaims coal column.The recyclable room mining of this method stays the permanent coal pillar of establishing more than 85%, and its method is easy, and is with a wide range of applications.
Description
Technical field
The present invention relates to the colliery and reclaim the method for room mining coal column, especially adopt the method for long-wall integrated-extraction reclaiming room-type coal column mining.
Background technology
Reserved coal pillar has become a great problem that the western Coal Production of China is faced after the room mining.Room formula coal-mining method makes a large amount of coal be retained in the down-hole with the form of abandoned coal pillar, and coal mining rate only has about 30%, causes the serious waste of coal resources.Along with the growing tension of the energy, how to reclaim room mining and stay the coal column of establishing to become very urgent task.This situation not only can cause the great wasting of resources, mine service-life to shorten greatly as can not get effective solution, simultaneously also brings employment, a series of social concerns such as stablizes to country.
At present abroad the mode about the room mining Pillar Recovery mainly contains: split pillar, storehouse wing formula, advance formula and opening tag outward.The domestic practice about reclaiming the room mining coal column has: the Tai Feng colliery is for reclaiming the room mining reserved coal pillar, utilize the non-machine of ZZ10000/32/62 type support shield type of Tai'an coal machine factory and institute of Beijing coal section design to pick up from moving hydraulic support, 23 on the required support of fully-mechanized mining working, 30 on the required support of stope advance support.Pillar Recovery adopts the method coal breakage (big gun is adopted) of rig perforating, deep hole blasting.But above these practices and attempt that its mechanization degree is relatively low, production efficiency is poor, small scale or part be in conceptual phase.Study room a kind of maturation, that mechanization degree is high formula Pillar Recovery technology and become the great technical barrier that the room mining mine needs to be resolved hurrily.
Summary of the invention
Technical problem: the purpose of this invention is to provide a kind of mechanization degree height, the method for the long-wall integrated-extraction reclaiming room-type coal column mining that production efficiency is high.
Technical scheme: the method for long-wall integrated-extraction reclaiming room-type coal column mining of the present invention:
A. arrange between coal column and the coal column at first of fully-mechanized mining working and hang screen; Between the coal column of air intake lane and return airway both sides and coal column, hang screen, form the ventilation system of fully-mechanized mining working;
B. arrange fully-mechanized mining equipment along fully-mechanized mining working;
C. advance support is carried out in air intake lane and return airway, simultaneously between the coal column of fully-mechanized mining working direction of propulsion and coal column, high supporting support resistance hydraulic is set, this high supporting support resistance hydraulic moves with the comprehensive mining hydraulic bracket of fully-mechanized mining working, and the two distance remains unanimity;
D. first row's coal column to fully-mechanized mining working reclaims, and to hanging screen between next row's of fully-mechanized mining working coal column and the coal column, forms ventilation system to guarantee fully-mechanized mining working all the time in reclaiming the coal column process simultaneously;
When the coal seam also the difference of former state and oxidation sample be less than 15, ignition temperature needs goaf and the inflammable place of coal column are implemented thick loess grouting, annotated the nitrogen flame-retarding means, to prevent the spontaneous combustion of coal during less than 300 ℃;
When harder and thickness was big when top board, fully-mechanized mining working whenever pushed away 5~15m and takes boring to blow out to force the caving measure, make the goaf top plate inbreak, with the safety that guarantees to produce;
E. first row's coal column combine adopt reclaim finish after, fully-mechanized mining equipment and high supporting support resistance hydraulic are pushed ahead to next row's coal column, and advance support are carried out in air intake lane and return airway, carry out the recovery of next row's coal column;
F. repeat said process, constantly reclaim coal column, finish until Pillar Recovery.
The hydraulic support that is provided with between described single coal column and the coal column is 3~6.
Beneficial effect: the method for this long-wall integrated-extraction reclaiming room-type coal column mining, between the coal column of room mining, hang screen, the fully-mechanized mining working ventilation system that makes its formation can adopt fully-mechanized mining equipment to carry out, recovery by the room mining coal column, not only prolonged the length of service of mine, and can provide the important energy support for the national economy sustained, stable growth, also can realize the maximization of enterprise's number one simultaneously.Compare with existing room mining, increased substantially the rate of recovery of coal resources, coal recovery rate is brought up to more than 85% by 30%, not only solved the low problem of the colliery room mining rate of extraction, and provide technological borrowing for the recovery of conditions of similarity mining area coal column, its method is easy, easily implements, and is with a wide range of applications.
Description of drawings
Accompanying drawing is the fully-mechanized mining working arrangement diagram that fully-mechanized mining working of the present invention reclaims the room mining coal column.
Among the figure: 1-fully-mechanized mining working, the high supporting support resistance hydraulic of 2-, 3-comprehensive mining hydraulic bracket, 4-screen, 5-individual prop and grillage, 6-coal column, 8-air intake lane, 7-return airway.
The specific embodiment
Below in conjunction with accompanying drawing one embodiment of the present of invention are further described:
Carrying out longwall full-mechanized mining technique recovery coal column with the logical rich colliery of Ulan group is example, this ore deposit is positioned at east and wins the east, coalfield, the production zone coal seam is reclaimed in design, belonging to single inclined seam inclination angle is 1~3 °, average buried depth is 90m, average thickness 5.30m, the exploitation bordroom is of a size of 7.5 * 9 * 4.5m, and the fully-mechanized mining working reserved coal pillar is of a size of 9 * 9 * 4.5m.Designing fully-mechanized mining working length routinely is 120m, and it is 1400m that fully-mechanized mining working advances length.
It is as follows that it combines the method for adopting recovery room mining coal column:
(1) between first row coal column 6 and the coal column of fully-mechanized mining working 1, hangs screen 4, between the coal column of air intake lane 8 and return airway 7 both sides and coal column, hang screen 4, as shown in FIG.: fresh wind by direction shown in " → " through air intake lane 8 and fully-mechanized mining working 1, dirty wind by
Shown in flow out from return airway 7, form the ventilation system of fully-mechanized mining working 1;
(2) arrange fully-mechanized mining equipment along fully-mechanized mining working 1 direction, the comprehensive mining hydraulic bracket model of selecting for use is ZY9000/24/55, and the coal-winning machine model is MG500/1130-WD; Install scalable rubber conveyer in air intake lane 8, the conveyer model is DSJ100/63/90 * 2; The coal edge of reclaiming
Shown in direction be transported to ground;
(3) in fully-mechanized mining working 1 the place ahead 20m scope, carry out advance support with individual prop and 5 pairs of air intake lanes 8 of grillage and return airway 7; Because bordroom is of a size of 7.5 * 9 * 4.5m, consider simultaneously and will be convenient to moving of support, along 4 the high supporting support resistance hydraulic 2 of ZZ10000/32/62 that are arranged side by side between two coal columns of 1 direction of propulsion of coal work, can carry out the recovery of first row's coal column 6 then;
(4) the high supporting support resistance hydraulic 2 of the ZZ10000/32/62 between bordroom is with the moving of comprehensive mining hydraulic bracket 3, and each displacement is 0.6m (coal-winning machine cuts dark), and the two remains the distance about 5m;
(5) when fully-mechanized mining working 1 is reclaimed first row's coal column 6, next row is being hung screen 4 between the coal column of fully-mechanized mining working and coal column, guarantee that fully-mechanized mining working 1 can form ventilation system when reclaiming next row's coal column, the order of layout screen is A-B-C-D as shown in drawings Need build stifled brattice sealing with materials such as cement, flyash if any the serious location of leaking out and adopt the sky bordroom, make the broadwall fully-mechanized mining working form a closed area, to eliminate or the reduction inleakage;
Because also the difference of former state and oxidation sample is less than 15 for this pit coal layer, ignition temperature is less than 300 ℃, need carry out thick loess grouting to the goaf that longwall full-mechanized mining technique reclaims behind the room formula coal column, prevents its spontaneous combustion, otherwise, then do not need to take this measure.Concrete measure is that a certain amount of soil is sent into slip agitating tank, and adds a certain amount of water, is stirred by mixer and makes mud, and this mud advances the people again and collects stock tank, pumps to the down-hole through the slag stock pump, and the Tu Shui ratio was generally 1: 6~1: 8;
Because this ore deposit coal roof lithologic is based on argiloid, rock nature terminal compression strength of the single axle is 20~40MPa, belong to weakness~half solid rock, rock stratum compressive strength is low, steadiness is poor, but owing to implementing in the room mining process in early stage, what be installed with 0.8m protects the top coal, because ature of coal is harder, causes top board to be difficult to collapse and falls.Therefore need to adopt the roof control mode of whole caving methods, top board is implemented forced boring to blow out the caving measure to force caving.Concrete measure is: when the advance distance that reclaims coal column when fully-mechanized mining working reaches 6m, along the single layout blasting boreholes of fully-mechanized mining working, pitch of holes 8m, with the horizontal elevation angle be 35 °, use alloy tool steel bit, diameter of phi=85mm, hole depth 15~20m;
After (6) first row's coal columns 6 reclaim and finish, fully-mechanized mining equipment and high supporting support resistance hydraulic 2 are pushed ahead to next row's coal column, and advance support is carried out in air intake lane 8 and return airway 7, carry out next row's Pillar Recovery;
(7) repeat said process, constantly reclaim coal column, finish until Pillar Recovery.
Claims (2)
1. method that adopts long-wall integrated-extraction reclaiming room-type coal column mining is characterized in that:
A. fully-mechanized mining working (1) first row coal column (6) coal column and coal column between hang screen (4); Between the coal column of air intake lane (8) and return airway (7) both sides coal column and coal column, hang screen (4), form the ventilation system of fully-mechanized mining working (1);
B. arrange fully-mechanized mining equipment along fully-mechanized mining working (1);
C. advance support is carried out in air intake lane (8) and return airway (7), simultaneously between the coal column of fully-mechanized mining working (1) direction of propulsion and coal column, arrange high supporting support resistance hydraulic (2), high supporting support resistance hydraulic (2) moves with the comprehensive mining hydraulic bracket (3) of fully-mechanized mining working (1), and the two distance remains unanimity;
D. first row's coal column (6) of fully-mechanized mining working (1) is combined and adopted recovery, to hanging screen (4) between next row's of fully-mechanized mining working (1) coal column and the coal column, in recovery coal column process, form ventilation system all the time simultaneously to guarantee fully-mechanized mining working (1);
When the coal seam also the difference of former state and oxidation sample be less than 15, ignition temperature needs goaf and the inflammable place of coal column are implemented thick loess grouting, annotated the nitrogen flame-retarding means, to prevent the spontaneous combustion of coal during less than 300 ℃;
When harder and average thickness was 5.30m when top board, fully-mechanized mining working whenever pushed away 5~15m and takes boring to blow out to force the caving measure, make the goaf top plate inbreak, with the safety that guarantees to produce;
E. after first row's coal column (6) reclaims and finishes, fully-mechanized mining equipment and high supporting support resistance hydraulic (2) are pushed ahead to next row's coal column, and air intake lane (8) and return airway (7) are carried out advance support with individual prop and grillage (5), carry out next row's Pillar Recovery;
F. repeat said process, constantly reclaim coal column, finish until Pillar Recovery.
2. the method for long-wall integrated-extraction reclaiming room-type coal column mining according to claim 1, it is characterized in that: the high supporting support resistance hydraulic (2) that is provided with between single coal column and the coal column is 3~6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200710132573XA CN100554642C (en) | 2007-09-19 | 2007-09-19 | A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200710132573XA CN100554642C (en) | 2007-09-19 | 2007-09-19 | A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101126316A CN101126316A (en) | 2008-02-20 |
CN100554642C true CN100554642C (en) | 2009-10-28 |
Family
ID=39094432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB200710132573XA Active CN100554642C (en) | 2007-09-19 | 2007-09-19 | A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100554642C (en) |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101260805B (en) * | 2008-04-15 | 2011-05-11 | 吕平 | Fully-mechanized mining method for safely passing bottom board laneway rock pillar |
CN101839134B (en) * | 2010-04-22 | 2012-04-04 | 中国矿业大学 | Method for recovering irregular stagnant coal pillars left by room coal mining method |
CN101858216B (en) * | 2010-04-22 | 2012-05-23 | 中国矿业大学 | Method for recovering stagnant coal pillars left by breast type coal mining method |
CN101881167B (en) * | 2010-06-04 | 2012-01-11 | 山东华恒矿业有限公司 | Coal face stump mining method |
CN102182460A (en) * | 2011-04-14 | 2011-09-14 | 山西晋城无烟煤矿业集团有限责任公司 | High-gas multi-roadway no-coal-pillar mining method |
CN102287212B (en) * | 2011-09-09 | 2014-03-26 | 兖州煤业股份有限公司 | Y-shaped ventilation method |
CN102418525B (en) * | 2011-10-28 | 2014-07-09 | 山西晋城无烟煤矿业集团有限责任公司 | Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method |
CN102518456B (en) * | 2011-12-30 | 2013-05-22 | 大同煤矿集团有限责任公司 | Method for maintaining roof of composite bed under stress concentration regions |
CN103174451A (en) * | 2013-01-08 | 2013-06-26 | 李继水 | Fire prevention and extinguishing technology for high-gas-content fully mechanized caving face coal seam prone to spontaneous combustion and in suspension state |
CN103133027A (en) * | 2013-01-25 | 2013-06-05 | 李继水 | Fireproofing and gas explosion-proof technology used during easy self-ignition coal seam working face removing and sealing periods |
CN105240014B (en) * | 2015-11-12 | 2017-09-15 | 中国矿业大学 | A kind of reconstruction protection pillar band that fills reclaims the method that room formula leaves coal column |
CN107355224A (en) * | 2017-09-07 | 2017-11-17 | 中国矿业大学(北京) | A kind of resource high-efficiency of ilmenite and helium 3 unifies mining system and application process |
CN108087021A (en) * | 2017-11-01 | 2018-05-29 | 中国矿业大学 | A kind of method that filling coal mining recycling leaves coal column and water-resisting key strata is controlled to stablize |
CN110410076B (en) * | 2019-08-16 | 2021-06-08 | 山东科技大学 | Filling mining method for recovering left coal pillars in goaf of old house pillar |
CN111119895B (en) * | 2019-12-24 | 2022-01-11 | 中国矿业大学(北京) | Recovery method of metal ore residual column |
CN112593940A (en) * | 2020-12-16 | 2021-04-02 | 中煤能源研究院有限责任公司 | Arrangement process for remaining coal pillars and processing ground gangue by stope-type coal mining method |
CN112943343A (en) * | 2021-03-17 | 2021-06-11 | 河南理工大学 | Efficient and rapid fire extinguishing method for ground drilling of different types of fire in coal mine goaf |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3695711A (en) * | 1970-01-21 | 1972-10-03 | Wintershall Ag | Method of recovering underground deposits of soluble minerals, and apparatus for carrying out the method |
US4017121A (en) * | 1974-11-25 | 1977-04-12 | Allied Chemical Corporation | Longwall mining of trona with prefracturing to prevent slabbing |
CN1221727C (en) * | 2002-09-09 | 2005-10-05 | 神华集团有限责任公司 | Continuous miner house column type short arm mechanized coal mining process and support equipment thereof |
CN1858401A (en) * | 2006-05-31 | 2006-11-08 | 段连权 | Coal mining process including prop type mining and prop recovery |
CN1865657A (en) * | 2005-05-19 | 2006-11-22 | 兖矿集团有限公司 | Comprehensive coal-mining process by using long wall mining method |
-
2007
- 2007-09-19 CN CNB200710132573XA patent/CN100554642C/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3695711A (en) * | 1970-01-21 | 1972-10-03 | Wintershall Ag | Method of recovering underground deposits of soluble minerals, and apparatus for carrying out the method |
US4017121A (en) * | 1974-11-25 | 1977-04-12 | Allied Chemical Corporation | Longwall mining of trona with prefracturing to prevent slabbing |
CN1221727C (en) * | 2002-09-09 | 2005-10-05 | 神华集团有限责任公司 | Continuous miner house column type short arm mechanized coal mining process and support equipment thereof |
CN1865657A (en) * | 2005-05-19 | 2006-11-22 | 兖矿集团有限公司 | Comprehensive coal-mining process by using long wall mining method |
CN1858401A (en) * | 2006-05-31 | 2006-11-08 | 段连权 | Coal mining process including prop type mining and prop recovery |
Also Published As
Publication number | Publication date |
---|---|
CN101126316A (en) | 2008-02-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100554642C (en) | A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining | |
CN101725352B (en) | Method for filling solid and fully mechanizing and recovering room type coal pillar | |
CN103590831B (en) | A kind of gentle dip is thin-the novel mining methods of middle thickness orebody | |
CN102619513B (en) | Room and pillar type medium-length hole filling mining method using bottom ore withdrawal structures simultaneously arranged in original rock | |
CN101509377B (en) | High-dipping ore block house column mining method | |
CN103075157B (en) | Advance roof-cutting bottom-free structural bench breaking continuous mining method for flat inclined ore body | |
CN102392678A (en) | Gas drainage method combining surface and underground fracturing and permeability improvement | |
CN102352769A (en) | Integrated mining method for commonly mining coal and gas of high mine | |
CN102953732A (en) | Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method | |
CN103527196B (en) | Method for recovery of room-type coal pillar through loess filling | |
CN101302931B (en) | Method for extracting rim angle coal and re-extracting after warehouse coal extracting | |
CN104975868A (en) | Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling | |
CN106089205A (en) | A kind of room-and-pillar method filling mining method being applicable to very thin ore body under water body | |
CN101050709A (en) | High water pressure releasing and blocking mining method for mining area | |
CN106499396B (en) | Medium-thickness slowly-inclined waste rock-containing interlayer ore body room-column mining method | |
CN110714760B (en) | Mining method for coal-aluminum symbiotic layered induction collaborative mining | |
CN102720500A (en) | Mechanized underground mining method for sharply inclined thin ore body | |
CN105952450A (en) | Novel method for collaboratively exploiting underground double stopes of underground mine | |
CN102979526B (en) | Building process of ore removal trench by adopting filling method in medium-length hole sublevel mining | |
CN104453900A (en) | Filling mining method of near-horizontal ore body | |
CN105952453A (en) | Long wall advancing type mechanical non-roadway mining complete plant for coal seam face | |
CN201474347U (en) | Sublevel mining room | |
CN107829737A (en) | A kind of low-angle dip is as thin as middle thickness orebody recovery method | |
CN1195149C (en) | Roof bolt protection and sectioned empty field method for phosphorate rock mining | |
CN110173295A (en) | A method of utilizing concordant directional drilling mash gas extraction and fire extinguishing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |