CN103726589A - H-shaped steel and steel pipe framework assembly shear wall with protruding interfaces and bent steel bars and manufacturing method - Google Patents

H-shaped steel and steel pipe framework assembly shear wall with protruding interfaces and bent steel bars and manufacturing method Download PDF

Info

Publication number
CN103726589A
CN103726589A CN201310739726.2A CN201310739726A CN103726589A CN 103726589 A CN103726589 A CN 103726589A CN 201310739726 A CN201310739726 A CN 201310739726A CN 103726589 A CN103726589 A CN 103726589A
Authority
CN
China
Prior art keywords
wall
steel
shear wall
steel pipe
work shape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310739726.2A
Other languages
Chinese (zh)
Other versions
CN103726589B (en
Inventor
曹万林
刘程炜
陈相家
张彩红
董宏英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201310739726.2A priority Critical patent/CN103726589B/en
Publication of CN103726589A publication Critical patent/CN103726589A/en
Application granted granted Critical
Publication of CN103726589B publication Critical patent/CN103726589B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides an H-shaped steel and steel pipe framework assembly shear wall with protruding interfaces and bent steel bars and a manufacturing method, and belongs to vertical connection methods of prefabricated shear walls. The method combining section steel connection parts and lap joint steel bars is adopted, namely, H-shaped steel (4) is arranged at the lower end of an upper prefabricated shear wall (8), steel pipes (6) are arranged at the upper end of a lower prefabricated shear wall (9), connection is conducted through bolts (11) after butt joint, and binding and lap joint are adopted for reserved vertical distributing steel bars (1); the bent steel bars (7) are arranged at a post-cast strip (10); concrete is poured downwards through preformed construction holes; in addition, the protruding interfaces are formed by junction surfaces through formworks. Compared with a traditional sleeve-connection method and other traditional method, cost is reduced, speed is increased, the shear-bearing capacity of the junction surfaces is enhanced, and the overall performance of the assembly shear wall is better.

Description

Work shape steel and steel pipe framework interface drum are convexly equipped with diagonal reinforcement assembling shear wall and the practice
Technical field
The present invention relates to the vertical method of attachment of fabricated shear wall, belong to interface drum that a kind of recruitment shape steel is connected with steel pipe protruding and be provided with the vertical method of attachment of assembling shear wall of bending reinforcing steel bar.
Background technology
Connection in assembling concrete shear wall structure system between each precast shear wall member is key link, at present, the vertical modes such as main employing sleeve connects, the connection of slurry anchor of installing of assembly concrete shear wall, level of processing and the required precision of these connected modes to member is high, or work progress impact loaded down with trivial details, that be subject to construction quality is large, cost is high, and at concrete joint surface, ftracture too early, easily occur even slippage of straight joint.
Summary of the invention
The object of the present invention is to provide the vertical method of attachment of a kind of easy construction, cost fabricated shear wall relatively low, that have better performance, to solve, the work progress that traditional shear wall method of attachment exists is loaded down with trivial details, cost is high, the problems such as straight joint easily appear in concrete joint surface.
The technical solution used in the present invention is as follows:
Work shape steel and steel pipe framework interface drum are convexly equipped with diagonal reinforcement assembling shear wall, the protruding interface of drum of the work shape steel arranging bottom upper strata precast shear wall mainly comprises, the vertical distribution reinforcement of body of wall, body of wall horizontal distribution reinforcing bar, structure hole, body of wall bottom; Lower floor's precast shear wall mainly comprises the protruding interface of drum at the vertical distribution reinforcement of steel pipe, body of wall, body of wall horizontal distribution reinforcing bar that top arranges, structure hole, body of wall top; Between levels body of wall, be ater-casting, horizontal reinforcement and bending reinforcing steel bar are set in ater-casting.
Pre-buried work shape steel dimensions should be supporting with steel pipe sizes, and 45 degree breach are cut in work shape steel termination, facilitates it to insert in steel pipe.
Pre-buried work shape steel extension elongation should be identical with ater-casting height, and pre-buried steel pipe extension elongation is roughly the half of ater-casting height.
Hole is left in steel pipe both sides, and the hole length of side or diameter dimension must not be less than rear pouring concrete maximum size of coarse aggregate.
Precast wall body upper and lower surface is that new-old concrete bonding surface place arranges special matsurface, and the height of matsurface drum projection is not less than 10mm.
Reserved upper and lower elongated structure hole in precast wall body, structure bore dia is not less than 100mm.
Levels body of wall vertical reinforcement extension elongation must not be less than the colligation lap length of code requirement.
Described work shape steel and steel pipe framework interface drum are convexly equipped with the practice of diagonal reinforcement assembling shear wall, carry out as follows:
A precast wall body, the docking of b levels body of wall, c concreting.
During precast shear wall, bilateral symmetry is arranged horizontal distribution reinforcing bar and vertical distribution reinforcement, and middle part service sleeve, longitudinally connects body of wall, the pre-buried work shape steel in body of wall bottom, body of wall top embedded steel tube; Concreting, precast shear wall upper and lower surface is shaped to the interface of tape drum projection by template, then extracts sleeve pipe out, forms structure hole; By the downward concreting in structure hole in precast shear wall, form ater-casting; Before structure hole is watered completely, stop fluid concrete, wait until when more last layer body of wall is built and fill up.
When precast wall body connects, top work shape steel inserts in the steel pipe of bottom, and at corresponding bolt hole, place connects with bolt; The reserved vertical reinforcement of levels body of wall overlaps in the colligation of place, ater-casting, and becomes reinforcing cage with the horizontal reinforcement colligation arranging herein.
The method that the present invention has adopted structural steel connecting member and overlap joint reinforcing bar to combine, in upper strata precast shear wall bottom, work shape steel is set, at lower floor's precast shear wall top, steel pipe is set, after docking, with bolt, connect again, reserved vertical distribution reinforcement adopts colligation overlap joint, place, ater-casting arranges bending reinforcing steel bar, and bonding surface is shaped to the protruding interface of drum by template in addition.
Concrete joint surface shear behavior is determining structural integrity, bearing capacity and the anti-seismic performance after splicing.This precast shear wall upper and lower surface is shaped to the protruding interface of drum (concavo-convex size is not less than 10mm) by template, can be better and rear pouring concrete combination, strengthen its shearing resistance effect, and improve the integrality performance of the structure after shear wall splicing simultaneously.
Precast wall body adopt top work shape steel to insert in the steel pipe of bottom and with bolt further fixing mode connect, can not only strengthen interface shearing-resistance effect, also can make shear wall under curved scissors effect, bring into play better unbending, prevent that interface, shear wall two ends from too early tensile failure occurring and accelerating shear failure.
The vertical distribution reinforcement of levels body of wall, at place, ater-casting colligation overlap joint, has been avoided the loaded down with trivial details work progresss such as sleeve grouting, has improved speed of application.Because work shape steel is elongated at place, ater-casting, and steel pipe only some, at steel tube end part, form plane of weakness, bending reinforcing steel bar is set one herein, can make up the shear-carrying capacity of weakness, while effectively alleviating shear failure, diagonal crack carries out simultaneously.
Place, ater-casting configuration template carries out shutoff, by the structure hole concrete perfusion of upper strata body of wall, concrete fills up the space between ater-casting and work shape steel and steel pipe, before watering completely, circular hole stops concrete perfusion, wait until when more last layer body of wall is built and fill up, strengthen contacting between ater-casting and precast wall body, stop interface crack and slide under shearing action.
Accompanying drawing explanation
Fig. 1 is top body of wall elevation
Fig. 2 is top body of wall ground plan
Fig. 3 is bottom body of wall elevation
Fig. 4 is bottom body of wall top plane view
Fig. 5 is levels wall connecting schematic diagram
Fig. 6 is that place, ater-casting connects horizontal sectional drawing
The explanation of accompanying drawing code name: the vertical distribution bar of 1-, 2-horizontal distribution muscle, 3-drum nonreentrant surface, 4-work shape steel, 5-constructs hole, 6-steel pipe, 7-bending reinforcing steel bar, 8-upper strata body of wall, 9-lower floor body of wall, 10-ater-casting, 11-bolt.
The specific embodiment
Below in conjunction with drawings and the specific embodiments in detail the present invention is described in detail:
Vertical method of attachment and step that work shape steel and steel pipe framework interface drum are convexly equipped with diagonal reinforcement assembling shear wall are as follows:
Step1, precast wall body: shear wall bilateral symmetry is arranged the steel mesh reinforcement being comprised of horizontal distribution reinforcing bar 2 and vertical distribution reinforcement 1, pre-buried two sleeve pipes in middle part, longitudinally connect body of wall, the pre-buried work shape steel 4 in body of wall bottom, and stretch out surface, extension elongation is highly identical with ater-casting 10, and the extension edge of a wing is all with bolt hole, and termination cuts into 45 degree breach; Precast wall body top embedded steel tube 6, and stretch out surface, extension and bolt hole corresponding position, the i shaped steel edge of a wing be also with bolt hole, separately has the hole that facilitates concrete to enter to fill up work shape steel and steel pipe space; In shear wall both sides, by spacer, reserve thickness of concrete cover, then prop up the template that concreting is used, concreting, precast wall body upper and lower surface is shaped to the protruding interface 3 of drum by template, extracts sleeve pipe out after reaching certain condition, forms two and constructs holes 5.
Step2, levels body of wall docking: lower floor's body of wall installs, lifting upper strata body of wall 8, stretches into bottom work shape steel 4 in lower floor's body of wall 9 steel pipes 6, drops on lower floor's body of wall upper surface, passes work shape steel and steel pipe is fixed with bolt 11, and carries out firmly with bearing diagonal.The vertical distribution reinforcement 1 of upper strata body of wall and lower floor's body of wall, at 10 places, ater-casting colligation overlap joint, is arranged two-layer horizontal reinforcement 2 and is become reinforcing cage with vertical reinforcement 1 colligation, in addition at one bending reinforcing steel bar of ater-casting intermediate arrangement 7.
Step3, cast-in-situ concrete: ater-casting 10 place's configuration templates carry out shutoff, by structure hole 5 concrete perfusions of upper strata body of wall, concrete fills up the space between ater-casting and work shape steel and steel pipe, before structure hole is watered completely, stops concrete perfusion, waits until when more last layer body of wall is built and fills up; Stripping after concrete reaches some strength.
Be more than an exemplary embodiments of the present invention, enforcement of the present invention is not limited to this.

Claims (10)

1. work shape steel and steel pipe framework interface drum are convexly equipped with diagonal reinforcement assembling shear wall, it is characterized in that: work shape steel, the vertical distribution reinforcement of body of wall, the body of wall horizontal distribution reinforcing bar arranging bottom upper strata precast shear wall mainly comprises, the protruding interface of drum of constructing hole, body of wall bottom; Lower floor's precast shear wall mainly comprises the protruding interface of drum of the vertical distribution reinforcement of steel pipe, body of wall, body of wall horizontal distribution reinforcing bar that top arranges, structure hole, body of wall bottom; Between levels body of wall, be ater-casting, horizontal reinforcement and bending reinforcing steel bar are set in ater-casting.
2. work shape steel according to claim 1 and steel pipe framework interface drum are convexly equipped with diagonal reinforcement assembling shear wall, it is characterized in that: pre-buried work shape steel dimensions should be supporting with steel pipe sizes, and 45 degree breach are cut in work shape steel termination, facilitate it to insert in steel pipe.
3. work shape steel according to claim 1 and steel pipe framework interface drum are convexly equipped with diagonal reinforcement assembling shear wall, it is characterized in that: pre-buried work shape steel extension elongation should be identical with ater-casting height, and pre-buried steel pipe extension elongation is roughly the half of ater-casting height.
4. work shape steel according to claim 1 and steel pipe framework interface drum are convexly equipped with diagonal reinforcement assembling shear wall, it is characterized in that: hole is left in steel pipe both sides, and the hole length of side or diameter dimension must not be less than rear pouring concrete maximum size of coarse aggregate.
5. work shape steel according to claim 1 and steel pipe framework interface drum are convexly equipped with diagonal reinforcement assembling shear wall, it is characterized in that: precast wall body upper and lower surface is that new-old concrete bonding surface place arranges special matsurface, and the height of matsurface drum projection is not less than 10mm.
6. work shape steel according to claim 1 and steel pipe framework interface drum are convexly equipped with diagonal reinforcement assembling shear wall, it is characterized in that: reserved upper and lower elongated structure hole in precast wall body, structure bore dia is not less than 100mm.
7. work shape steel according to claim 1 and steel pipe framework interface drum are convexly equipped with diagonal reinforcement assembling shear wall, it is characterized in that: levels body of wall vertical reinforcement extension elongation must not be less than the colligation lap length of code requirement.
8. the work shape steel described in the arbitrary claim of claim 1 to 7 and steel pipe framework interface drum are convexly equipped with the practice of diagonal reinforcement assembling shear wall, carry out as follows:
A precast wall body, the docking of b levels body of wall, c concreting.
9. work shape steel according to claim 8 and steel pipe framework interface drum are convexly equipped with the practice of diagonal reinforcement assembling shear wall, it is characterized in that: during precast shear wall, bilateral symmetry is arranged horizontal distribution reinforcing bar and vertical distribution reinforcement, middle part service sleeve, longitudinally connect body of wall, the pre-buried work shape steel in body of wall bottom, body of wall top embedded steel tube; Concreting, precast shear wall upper and lower surface is shaped to the interface of tape drum projection by template, then extracts sleeve pipe out, forms structure hole; By the downward concreting in structure hole in precast shear wall, form ater-casting; Before structure hole is watered completely, stop fluid concrete, wait until when more last layer body of wall is built and fill up.
10. work shape steel according to claim 8 and steel pipe framework interface drum are convexly equipped with the practice of diagonal reinforcement assembling shear wall, it is characterized in that: when precast wall body connects, top work shape steel inserts in the steel pipe of bottom, and at corresponding bolt hole, place connects with bolt; The reserved vertical reinforcement of levels body of wall overlaps in the colligation of place, ater-casting, and becomes reinforcing cage with the horizontal reinforcement colligation arranging herein.
CN201310739726.2A 2013-12-26 2013-12-26 I-shaped steel and steel and steel pipe framework interface drum projection diagonal reinforcement assembling shear wall and the practice Expired - Fee Related CN103726589B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310739726.2A CN103726589B (en) 2013-12-26 2013-12-26 I-shaped steel and steel and steel pipe framework interface drum projection diagonal reinforcement assembling shear wall and the practice

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310739726.2A CN103726589B (en) 2013-12-26 2013-12-26 I-shaped steel and steel and steel pipe framework interface drum projection diagonal reinforcement assembling shear wall and the practice

Publications (2)

Publication Number Publication Date
CN103726589A true CN103726589A (en) 2014-04-16
CN103726589B CN103726589B (en) 2016-08-17

Family

ID=50450860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310739726.2A Expired - Fee Related CN103726589B (en) 2013-12-26 2013-12-26 I-shaped steel and steel and steel pipe framework interface drum projection diagonal reinforcement assembling shear wall and the practice

Country Status (1)

Country Link
CN (1) CN103726589B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074283A (en) * 2014-07-09 2014-10-01 长春工程学院 Novel assembled shear wall with embedded I-shaped steel and manufacturing method of novel assembled shear wall
CN105317137A (en) * 2015-10-14 2016-02-10 史世英 Prefabricated wall, prefabricated wallboard, construction method of prefabricated wall and production method of prefabricated wallboard
CN108589971A (en) * 2018-07-25 2018-09-28 哈尔滨工业大学 A kind of closed-section steel deck combined concrete shear wall connecting node and production method
CN109339281A (en) * 2018-11-16 2019-02-15 华侨大学 A kind of prefabricated assembling type reinforced concrete shear wall vertically splices node structure and its construction method
CN110565837A (en) * 2019-08-07 2019-12-13 长安大学 Suspended precast shear wall semi-buried inner wall connecting structure and method
CN111155681A (en) * 2019-12-30 2020-05-15 中冶建筑研究总院有限公司 Steel concrete composite connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof
CN111321824A (en) * 2020-03-04 2020-06-23 上海应用技术大学 Prefabricated assembled concrete shear force wall of cross

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202925716U (en) * 2012-12-06 2013-05-08 河北联合大学 Integrally assembled type concrete filled steel tube frame shear wall
CN203049832U (en) * 2013-01-22 2013-07-10 天津大学建筑设计研究院 Assembling type shear wall structure
CN203113553U (en) * 2013-02-26 2013-08-07 沈阳建筑大学建筑设计研究院 Prefabricated concrete frame-shear wall structure
CN103255853A (en) * 2013-05-15 2013-08-21 天津大学建筑设计研究院 Tooth-groove-type connection structure of upper-layer inner wallboard of assembly-type shear wall and lower-layer inner wallboard of assembly-type shear wall
JP5383166B2 (en) * 2008-12-01 2014-01-08 株式会社竹中工務店 Corrugated steel earthquake resistant wall, corrugated steel earthquake resistant wall design method, and building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5383166B2 (en) * 2008-12-01 2014-01-08 株式会社竹中工務店 Corrugated steel earthquake resistant wall, corrugated steel earthquake resistant wall design method, and building
CN202925716U (en) * 2012-12-06 2013-05-08 河北联合大学 Integrally assembled type concrete filled steel tube frame shear wall
CN203049832U (en) * 2013-01-22 2013-07-10 天津大学建筑设计研究院 Assembling type shear wall structure
CN203113553U (en) * 2013-02-26 2013-08-07 沈阳建筑大学建筑设计研究院 Prefabricated concrete frame-shear wall structure
CN103255853A (en) * 2013-05-15 2013-08-21 天津大学建筑设计研究院 Tooth-groove-type connection structure of upper-layer inner wallboard of assembly-type shear wall and lower-layer inner wallboard of assembly-type shear wall

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074283A (en) * 2014-07-09 2014-10-01 长春工程学院 Novel assembled shear wall with embedded I-shaped steel and manufacturing method of novel assembled shear wall
CN105317137A (en) * 2015-10-14 2016-02-10 史世英 Prefabricated wall, prefabricated wallboard, construction method of prefabricated wall and production method of prefabricated wallboard
CN108589971A (en) * 2018-07-25 2018-09-28 哈尔滨工业大学 A kind of closed-section steel deck combined concrete shear wall connecting node and production method
CN109339281A (en) * 2018-11-16 2019-02-15 华侨大学 A kind of prefabricated assembling type reinforced concrete shear wall vertically splices node structure and its construction method
CN110565837A (en) * 2019-08-07 2019-12-13 长安大学 Suspended precast shear wall semi-buried inner wall connecting structure and method
CN111155681A (en) * 2019-12-30 2020-05-15 中冶建筑研究总院有限公司 Steel concrete composite connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof
CN111155681B (en) * 2019-12-30 2022-02-22 中冶建筑研究总院有限公司 Steel concrete composite connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof
CN111321824A (en) * 2020-03-04 2020-06-23 上海应用技术大学 Prefabricated assembled concrete shear force wall of cross
CN111321824B (en) * 2020-03-04 2021-05-04 上海应用技术大学 Prefabricated assembled concrete shear force wall of cross

Also Published As

Publication number Publication date
CN103726589B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
US11293183B2 (en) Precast column base joint and construction method therefor
CN103726589A (en) H-shaped steel and steel pipe framework assembly shear wall with protruding interfaces and bent steel bars and manufacturing method
CN102808465B (en) Assembly connecting structure and assembly connecting method of assembled concrete frame and shear wall combination
CN202831203U (en) Assembly type concrete frame-shear wall split assembling structure and fabricative structure
CN103726586A (en) H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method
CN202831296U (en) Assembled spliced connecting structure of concrete frame-shear wall and structure constructed
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN104847014A (en) Vertical connection structure for precast concrete shear walls and construction method
CN105569224A (en) Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof
CN104746435A (en) Wide-angle Y-shaped pier column construction method
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN103541463A (en) Wallboard and shear wall allowing floor location provided with post-pouring belt comprising same and construction method for shear wall
CN105133726A (en) Assembled monolithic concrete frame structure system and frame shear structure system formed by assembled monolithic concrete frame structure system
CN107254933A (en) The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method
CN204876199U (en) Restraint overlap joint structure is concentrated to precast shear wall vertical reinforcement
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN106869333A (en) The shear wall structure and method of construction of prefabricated edge member and preparation method and composition
CN203769116U (en) Prefabricated through hole assembly type reinforced concrete shear wall
CN104929279B (en) Pre-cast shear wall vertical rebar centralized restraint lap joint construction
CN204551800U (en) A kind of novel single-row reinforcement assembling shear wall
CN102852281A (en) Prestressed precast main beam with laying gaps
KR101458435B1 (en) Half precast concrete column manufacturing method using saddle-type ties and dual hoops and constructing method using the same
CN108018877B (en) Prefabricated assembly type pipe gallery assembling device and assembling method
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN108729466B (en) Large formwork supporting method for constructing anchor-free concrete retaining wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20201226

CF01 Termination of patent right due to non-payment of annual fee