CN108018877B CN201711236542.9A CN201711236542A CN108018877B CN 108018877 B CN108018877 B CN 108018877B CN 201711236542 A CN201711236542 A CN 201711236542A CN 108018877 B CN108018877 B CN 108018877B
Authority
CN
China
Prior art keywords
longitudinal
transverse
pipe gallery
steel plate
connecting steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711236542.9A
Other languages
Chinese (zh)
Other versions
CN108018877A (en
Inventor
王纯岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201711236542.9A priority Critical patent/CN108018877B/en
Publication of CN108018877A publication Critical patent/CN108018877A/en
Application granted granted Critical
Publication of CN108018877B publication Critical patent/CN108018877B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Supports For Pipes And Cables (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to a prefabricated assembly type pipe gallery assembling device and method, which comprises at least three-cabin pipe galleries, wherein the pipe galleries are assembled by horizontal sub-cabins and at most two cabins, and the pipe galleries are assembled by longitudinal sub-cabins according to 2-2.5 m. Every section of utility tunnel's outer wall bottom and top are equipped with vertical foraminiferous binding steel board, mid-partition bottom and top between the subdivision piping lane in the utility tunnel that transversely comprises 1 ~ 2 cabin piping lane are equipped with vertical foraminiferous binding steel board, vertical downthehole vertical running through along the piping lane wall body of vertical foraminiferous binding steel board keeps somewhere vertically to reserve the hole, the outside piping lane roof and the bottom plate of every section of utility tunnel vertical terminal surface both ends position are equipped with horizontal foraminiferous binding steel board, horizontal downthehole horizontal reservation hole along piping lane roof and bottom plate of horizontal foraminiferous binding steel board transversely keeps somewhere the hole, every section of utility tunnel inboard is equipped with the transverse connection wall. The invention has good anti-seismic performance and reduces the phenomenon of uneven settlement of the comprehensive pipe gallery.

Description

Prefabricated assembly type pipe gallery assembling device and assembling method
Technical Field
The invention relates to pipe gallery assembly, in particular to a prefabricated assembly type pipe gallery assembly device and an assembly method.
Background
At present, the prefabricated pipe gallery is mainly suitable for sectional and sectional installation of a comprehensive pipe gallery with 1-2 cabins, the length of each section is 2-2.5 meters, when the weight of each section of the comprehensive pipe gallery above 3 cabins is overlarge, due to the influence of crane type selection and hoisting environment, the installation is difficult to adjust and transport by adopting a large-tonnage crane on a construction site, so that the prefabricated pipe gallery structure system is not suitable for being adopted above 3 cabins. The prefabricated pipe gallery is used for single-cabin and double-cabin pipe galleries, is mainly assembled by longitudinal flexible socket joints or connected by a prestress tensioning lock, and has the defects of large unit component weight and difficult hoisting after the prefabricated pipe gallery is segmented longitudinally.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, and provides the prefabricated assembly type pipe gallery assembling device and the assembling method, which have good anti-seismic performance and reduce the phenomenon of uneven settlement of the comprehensive pipe gallery.
In order to solve the technical problem, the invention is realized as follows:
the utility model provides a device is assembled to prefabricated assembled piping lane which characterized in that: the comprehensive pipe gallery comprises at least three-cabin pipe galleries, wherein one cabin is formed into a plurality of sections in a transverse sectional mode for assembly, and one section of the comprehensive pipe gallery is assembled in a longitudinal sectional mode according to 2-2.5 m. The bottom and the top of the outer wall of each comprehensive pipe gallery are respectively provided with a first longitudinal perforated connecting steel plate, the bottom and the top of a middle partition wall between two cabin pipe galleries in the comprehensive pipe gallery consisting of the two cabin pipe galleries are respectively provided with a second longitudinal perforated connecting steel plate, longitudinal holes of the first longitudinal connecting steel plate with holes and the second longitudinal connecting steel plate with holes penetrate through and are reserved with longitudinal reserved holes along the longitudinal direction of the pipe gallery wall body, the outer side pipe gallery top plate and the bottom plate at the two ends of the longitudinal end face of each section of comprehensive pipe gallery are respectively provided with a transverse connecting steel plate with holes, transverse reserved holes are transversely reserved in the transverse holes of the transverse connecting steel plates along the pipe gallery top plate and the bottom plate, a transverse connecting wall is arranged on the inner side of each section of comprehensive pipe gallery, a space is reserved between the transverse connecting wall and the transverse connecting wall, wall body tie bars are pre-buried in the transverse connecting walls, one end of the wall tie bar is exposed and provided with a hook, and each section of comprehensive pipe gallery adopts a socket tongue-and-groove form in the longitudinal direction.
Prefabricated assembled piping lane assemble device, its characterized in that: the longitudinal and transverse bidirectional spacing of the wall tie bars is 250mm, one end of each wall tie bar is exposed by 100mm, and the bending degree of each hook is 180 degrees.
Prefabricated assembled piping lane assemble device, its characterized in that: the thickness of the transverse connecting wall is 100mm, and the exposed surface of the transverse connecting wall is roughened.
Prefabricated assembled piping lane assemble device, its characterized in that: the longitudinal holes of the first longitudinal perforated connecting steel plate and the second longitudinal perforated connecting steel plate are 200 x 200 mm.
Prefabricated assembled piping lane assemble device, its characterized in that: the diameter of a longitudinal reserved hole which is reserved along the longitudinal penetration of the pipe gallery wall body in a longitudinal hole of the first longitudinal connecting steel plate with the hole and the second longitudinal connecting steel plate with the hole is 36 mm.
Prefabricated assembled piping lane assemble device, its characterized in that: the transverse holes of the transverse perforated connecting steel plate are 200 x 200 mm.
Prefabricated assembled piping lane assemble device, its characterized in that: the diameter of a transverse reserved hole transversely reserved along the top plate and the bottom plate of the pipe rack in a transverse hole of the transverse connecting steel plate with the hole is 36 mm.
Prefabricated assembled piping lane assemble device, its characterized in that: the space left between the transverse connecting walls and the transverse connecting walls is 100 mm.
A prefabricated assembly type pipe gallery assembling method is characterized by comprising the following steps:
the method comprises the following steps: hoisting the two transversely spliced comprehensive pipe galleries to the installation position of the foundation pit bottom, and reserving a space of 100mm between the transverse connecting walls of the two comprehensive pipe galleries;
step two: longitudinal pre-stressed anchor cables and transverse pre-stressed anchor cables penetrate through the longitudinal reserved holes and the transverse reserved holes, and PVC sleeves are reserved in spaces between the two sections of comprehensive pipe gallery transverse connecting walls to penetrate through the longitudinal pre-stressed anchor cables and the transverse pre-stressed anchor cables;
step three: transverse connection: reserving a space of 100mm between the transverse connecting walls of the two sections of comprehensive pipe galleries, penetrating longitudinal and transverse horizontal reinforcing steel bars into hooks aligned with exposed tie bars of the wall body from the upper part and the left and right sides of the pipe gallery, and pouring fine aggregate concrete which is higher than the concrete of the comprehensive pipe gallery by one mark;
step four: longitudinal connection: longitudinally butting and installing each front comprehensive pipe gallery and each rear comprehensive pipe gallery in a conventional socket tongue-and-groove and rubber water stop ring mode;
step five: after the newly poured concrete between the transverse connecting walls of the comprehensive pipe gallery reaches 80% of the design strength, penetrating a longitudinal prestressed anchor cable and a transverse prestressed anchor cable into a longitudinal reserved hole and a transverse reserved hole at the positions of a first longitudinal perforated connecting steel plate, a second longitudinal perforated connecting steel plate and a transverse perforated connecting steel plate for tensioning, and arranging anchorage devices at the port positions of the first longitudinal perforated connecting steel plate, the second longitudinal perforated connecting steel plate and the transverse perforated connecting steel plate for tightly locking the anchor cables;
step six: cement grout which is higher than the design strength of a pipe gallery by one grade is injected into the space of the transverse anchor cable in the first longitudinal connecting steel plate with holes, the second longitudinal connecting steel plate with holes and the transverse connecting steel plate with holes, and the anchor positions of the first longitudinal connecting steel plate with holes, the second longitudinal connecting steel plate with holes and the transverse connecting steel plate with holes are plugged, so that the grout is prevented from leaking;
step seven: after the back slip casting liquid reaches design strength, the installation is finished, and the leakproofness in the pipe gallery is detected.
The invention has the beneficial effects that: through the prefabricated piping lane to more than 3 cabins adoption horizontal subdivision, vertical subdivision makes the hoist and mount, the prefabricated piping lane of mode installation that the prestressing force butt joint was all adopted to move about freely and quickly, thereby solved many cabin body piping lane and only vertically divide the big difficult problem that influences the hoist and mount of one's quality behind the subdivision, and guaranteed utility tunnel's wholeness and rigidity through the form of horizontal prestressing force + cast-in-place structure, the horizontal shear strength of pipe rack has been strengthened, good anti-seismic performance has, utility tunnel's inhomogeneous settlement phenomenon has been reduced.
According to the prefabricated pipe gallery assembling method, the manufacturing operation is simple, the transverse cabin prestress connection is enhanced only on the basis of the conventional prefabricated pipe gallery longitudinal prestress connection, special materials and equipment do not need to be purchased, and the implementation effect is good.
Drawings
The invention is described in further detail below with reference to the following figures and embodiments:
fig. 1 is the structure schematic diagram of the horizontal splicing of the utility model.
Fig. 2 is a partially enlarged view of fig. 1.
Fig. 3 is the structural schematic diagram of the vertical splicing of the present invention.
FIG. 4 is a schematic view of the anchor in a locked configuration.
FIG. 5 is a schematic structural view of the first longitudinal connecting steel plate with holes or the second longitudinal connecting steel plate with holes.
Detailed Description
As shown in fig. 1-5: the utility model provides a device is assembled to prefabricated assembled piping lane, it includes three cabin piping lanes at least, and horizontal segmentation is assembled according to one section of two cabin constitution at most, and the utility tunnel is assembled according to 2 ~ 2.5m one section to vertical segmentation. The bottom and the top of the outer wall of each comprehensive pipe gallery are respectively provided with a first longitudinal perforated connecting steel plate 1, the bottom and the top of a middle partition wall between two cabin pipe galleries in the comprehensive pipe gallery consisting of the two cabin pipe galleries are respectively provided with a second longitudinal perforated connecting steel plate 2, longitudinal holes of the first longitudinal perforated connecting steel plate and the second longitudinal perforated connecting steel plate penetrate through and reserve a longitudinal reserved hole 9 along the longitudinal direction of the pipe gallery wall body, the top plate and the bottom plate of the outer side pipe gallery at the two ends of the longitudinal end surface of each comprehensive pipe gallery are respectively provided with a transverse perforated connecting steel plate 3, transverse holes of the transverse perforated connecting steel plates transversely reserve transverse reserved holes 4 along the top plate and the bottom plate of the pipe gallery, the inner side of each comprehensive pipe gallery is provided with a transverse connecting wall 13, a space is reserved between the transverse connecting wall and the transverse connecting wall, a wall tie bar 6 is pre-buried in the transverse connecting wall, one end of, each section of comprehensive pipe gallery is in a socket tongue-and-groove form longitudinally.
The longitudinal and transverse bidirectional spacing of the wall tie bars is 250mm, one end of each wall tie bar is exposed by 100mm, and the hook bending degree is 180 degrees; the thickness of the transverse connecting wall is 100mm, and the exposed surface of the transverse connecting wall is roughened; the longitudinal holes of the first longitudinal perforated connecting steel plate and the second longitudinal perforated connecting steel plate are 200 x 200 mm; the diameter of a longitudinal reserved hole which is longitudinally penetrated and reserved along the pipe gallery wall body in a longitudinal hole of the first longitudinal connecting steel plate with the hole and the second longitudinal connecting steel plate with the hole is 36 mm; the transverse holes of the transverse perforated connecting steel plate are 200 x 200 mm; the diameter of a transverse reserved hole transversely reserved in a transverse hole of the transverse perforated connecting steel plate along the top plate and the bottom plate of the pipe rack is 36 mm; each section of comprehensive pipe rack is divided into sections according to the length of 2-2.5 m; the space left between the transverse connecting walls and the transverse connecting walls is 100 mm.
A prefabricated assembly type pipe gallery assembling method comprises the following steps:
the method comprises the following steps: hoisting the two transversely spliced comprehensive pipe galleries to the installation position of the foundation pit bottom, and reserving a space of 100mm between the transverse connecting walls of the two comprehensive pipe galleries;
step two: longitudinal pre-stressed anchor cables and transverse pre-stressed anchor cables penetrate through the longitudinal reserved holes and the transverse reserved holes, and PVC sleeves are reserved in spaces between the two sections of comprehensive pipe gallery transverse connecting walls to penetrate through the longitudinal pre-stressed anchor cables and the transverse pre-stressed anchor cables;
step three: transverse connection: reserving a space of 100mm between the transverse connecting walls of the two sections of comprehensive pipe galleries, penetrating a hook aligned with the exposed lacing wire of the wall body from the upper part and the left and right sides of the pipe gallery into a longitudinal and transverse horizontal reinforcing steel bar 7, and pouring fine stone concrete 8 which is higher than the concrete of the comprehensive pipe gallery by one mark;
step four: longitudinal connection: longitudinally butting and installing each front comprehensive pipe gallery and each rear comprehensive pipe gallery in a conventional socket tongue-and-groove and rubber water stop ring mode;
step five: after the newly poured concrete between the transverse connecting walls of the comprehensive pipe gallery reaches 80% of the design strength, penetrating a longitudinal prestressed anchor cable 10 and a transverse prestressed anchor cable 5 into a longitudinal reserved hole and a transverse reserved hole at the positions of a first longitudinal perforated connecting steel plate, a second longitudinal perforated connecting steel plate and a transverse perforated connecting steel plate for tensioning, and arranging an anchorage 12 at the port positions of the first longitudinal perforated connecting steel plate, the second longitudinal perforated connecting steel plate and the transverse perforated connecting steel plate for tightly locking the anchor cables;
step six: cement grout which is higher than the design strength of the pipe gallery by one grade is injected into the space of the transverse anchor cable 5 in the first longitudinal connecting steel plate with holes, the second longitudinal connecting steel plate with holes and the transverse connecting steel plate with holes, and the anchor positions of the first longitudinal connecting steel plate with holes, the second longitudinal connecting steel plate with holes and the transverse connecting steel plate with holes are plugged, so that the grout is prevented from leaking;
step seven: after the back slip casting liquid reaches design strength, the installation is finished, and the leakproofness in the pipe gallery is detected.

Claims (9)

1. The utility model provides a device is assembled to prefabricated assembled piping lane which characterized in that: it comprises at least three cabin pipe galleries, transverse sections and longitudinal sections,
wherein at most two transverse cabins form the comprehensive pipe gallery, the comprehensive pipe gallery is assembled in longitudinal sections according to a section of 2-2.5m,
the bottom and the top of the outer wall of each comprehensive pipe gallery are respectively provided with a first longitudinal connecting steel plate with holes, the bottom and the top of an intermediate wall between cabin-divided pipe galleries in the comprehensive pipe gallery consisting of 1-2 cabin pipe galleries are respectively provided with a second longitudinal connecting steel plate with holes, longitudinal holes of the first longitudinal connecting steel plate with holes and the second longitudinal connecting steel plate with holes penetrate through and are reserved with longitudinal reserved holes along the longitudinal direction of the pipe gallery wall body, the outer side pipe gallery top plate and the bottom plate at the two ends of the longitudinal end face of each section of comprehensive pipe gallery are respectively provided with a transverse connecting steel plate with holes, transverse reserved holes are transversely reserved in the transverse holes of the transverse connecting steel plates along the pipe gallery top plate and the bottom plate, a transverse connecting wall is arranged on the inner side of each section of comprehensive pipe gallery, a space is reserved between the transverse connecting wall and the transverse connecting wall, wall body tie bars are pre-buried in the transverse connecting walls, one end of the wall tie bar is exposed and provided with a hook, and each section of comprehensive pipe gallery adopts a socket tongue-and-groove form in the longitudinal direction.
2. The prefabricated assembled pipe gallery assembly device of claim 1, wherein: the longitudinal and transverse bidirectional spacing of the wall tie bars is 250mm, one end of each wall tie bar is exposed by 100mm, and the bending degree of each hook is 180 degrees.
3. The prefabricated assembled pipe gallery assembly device of claim 1, wherein: the thickness of the transverse connecting wall is 100mm, and the exposed surface of the transverse connecting wall is roughened.
4. The prefabricated assembled pipe gallery assembly device of claim 1, wherein: the longitudinal holes of the first longitudinal perforated connecting steel plate and the second longitudinal perforated connecting steel plate are 200 x 200 mm.
5. The prefabricated assembled pipe gallery assembly device of claim 1, wherein: the diameter of a longitudinal reserved hole which is reserved along the longitudinal penetration of the pipe gallery wall body in a longitudinal hole of the first longitudinal connecting steel plate with the hole and the second longitudinal connecting steel plate with the hole is 36 mm.
6. The prefabricated assembled pipe gallery assembly device of claim 1, wherein: the transverse holes of the transverse perforated connecting steel plate are 200 x 200 mm.
7. The prefabricated assembled pipe gallery assembly device of claim 1, wherein: the diameter of a transverse reserved hole transversely reserved along the top plate and the bottom plate of the pipe rack in a transverse hole of the transverse connecting steel plate with the hole is 36 mm.
8. The prefabricated assembled pipe gallery assembly device of claim 1, wherein: the space left between the transverse connecting walls and the transverse connecting walls is 100 mm.
9. A method of assembling a prefabricated pipe gallery assembly as defined in claim 1, including the steps of:
the method comprises the following steps: hoisting the two transversely spliced comprehensive pipe galleries to the installation position of the foundation pit bottom, and reserving a space of 100mm between the transverse connecting walls of the two comprehensive pipe galleries;
step two: longitudinal pre-stressed anchor cables and transverse pre-stressed anchor cables penetrate through the longitudinal reserved holes and the transverse reserved holes, and PVC sleeves are reserved in spaces between the two sections of comprehensive pipe gallery transverse connecting walls to penetrate through the longitudinal pre-stressed anchor cables and the transverse pre-stressed anchor cables;
step three: transverse connection: reserving a space of 100mm between the transverse connecting walls of the two sections of comprehensive pipe galleries, penetrating longitudinal and transverse horizontal reinforcing steel bars into hooks aligned with exposed tie bars of the wall body from the upper part and the left and right sides of the pipe gallery, and pouring fine aggregate concrete which is higher than the concrete of the comprehensive pipe gallery by one mark;
step four: longitudinal connection: longitudinally butting and installing each front comprehensive pipe gallery and each rear comprehensive pipe gallery in a conventional socket tongue-and-groove and rubber water stop ring mode;
step five: after the newly poured concrete between the transverse connecting walls of the comprehensive pipe gallery reaches 80% of the design strength, penetrating a longitudinal prestressed anchor cable and a transverse prestressed anchor cable into a longitudinal reserved hole and a transverse reserved hole at the positions of a first longitudinal perforated connecting steel plate, a second longitudinal perforated connecting steel plate and a transverse perforated connecting steel plate for tensioning, and arranging anchorage devices at the port positions of the first longitudinal perforated connecting steel plate, the second longitudinal perforated connecting steel plate and the transverse perforated connecting steel plate for tightly locking the anchor cables;
step six: cement grout which is higher than the design strength of a pipe gallery by one grade is injected into the space of the transverse anchor cable in the first longitudinal connecting steel plate with holes, the second longitudinal connecting steel plate with holes and the transverse connecting steel plate with holes, and the anchor positions of the first longitudinal connecting steel plate with holes, the second longitudinal connecting steel plate with holes and the transverse connecting steel plate with holes are plugged, so that the grout is prevented from leaking;
step seven: after the back slip casting liquid reaches design strength, the installation is finished, and the leakproofness in the pipe gallery is detected.
CN201711236542.9A 2017-11-30 2017-11-30 Prefabricated assembly type pipe gallery assembling device and assembling method Active CN108018877B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711236542.9A CN108018877B (en) 2017-11-30 2017-11-30 Prefabricated assembly type pipe gallery assembling device and assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711236542.9A CN108018877B (en) 2017-11-30 2017-11-30 Prefabricated assembly type pipe gallery assembling device and assembling method

Publications (2)

Publication Number Publication Date
CN108018877A CN108018877A (en) 2018-05-11
CN108018877B true CN108018877B (en) 2020-03-06

Family

ID=62077991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711236542.9A Active CN108018877B (en) 2017-11-30 2017-11-30 Prefabricated assembly type pipe gallery assembling device and assembling method

Country Status (1)

Country Link
CN (1) CN108018877B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678008A (en) * 2018-07-05 2018-10-19 南京联众建设工程技术有限公司 Steel-concrete combined structure wall and preparation method thereof and the spelling more cabin underground pipe galleries of cabin formula
CN112878365B (en) * 2021-01-22 2022-02-22 青岛中科坤泰装配建筑科技有限公司 Prefabricated utility tunnel guiding orientation device of assembled

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105626098A (en) * 2015-12-21 2016-06-01 南京联众建设工程技术有限公司 Combination type tunnel lining, culvert or underground comprehensive pipe gallery
CN105672355A (en) * 2016-03-17 2016-06-15 上海同预建筑科技有限公司 Plate type prefabricated concrete comprehensive pipe gallery
CN105756089A (en) * 2016-03-17 2016-07-13 上海同预建筑科技有限公司 Transverse laminated connection type single compartment precast multiple-compartment assembled comprehensive pipe gallery
CN205446924U (en) * 2016-03-31 2016-08-10 福建美益预制构件有限公司 Pipeline support's mounting structure can be dismantled to utility tunnel bolt formula
CN206128119U (en) * 2016-09-27 2017-04-26 明达地下空间科技发展有限公司 Prefabricated assembled multi -deck utility tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105626098A (en) * 2015-12-21 2016-06-01 南京联众建设工程技术有限公司 Combination type tunnel lining, culvert or underground comprehensive pipe gallery
CN105672355A (en) * 2016-03-17 2016-06-15 上海同预建筑科技有限公司 Plate type prefabricated concrete comprehensive pipe gallery
CN105756089A (en) * 2016-03-17 2016-07-13 上海同预建筑科技有限公司 Transverse laminated connection type single compartment precast multiple-compartment assembled comprehensive pipe gallery
CN205446924U (en) * 2016-03-31 2016-08-10 福建美益预制构件有限公司 Pipeline support's mounting structure can be dismantled to utility tunnel bolt formula
CN206128119U (en) * 2016-09-27 2017-04-26 明达地下空间科技发展有限公司 Prefabricated assembled multi -deck utility tunnel

Also Published As

Publication number Publication date
CN108018877A (en) 2018-05-11

Similar Documents

Publication Publication Date Title
CN103572755B (en) Prestressed concrete prefabricated pile
CN108343257B (en) Construction method for additionally installing elevator in existing multi-storey house
CN102031784A (en) Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN106869012B (en) Using the prefabricated thin-wall bent cap of prestressing with bond system
CN105201012A (en) Casting cable trench after assembly of L-shaped precast concrete and construction method of casting cable trench
CN107245953B (en) A kind of crossed construction method of multilayer bridge structure
US11002004B2 (en) Method for erecting framework of structures
CN105133726A (en) Assembled monolithic concrete frame structure system and frame shear structure system formed by assembled monolithic concrete frame structure system
CN103726589A (en) H-shaped steel and steel pipe framework assembly shear wall with protruding interfaces and bent steel bars and manufacturing method
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN107201792A (en) High-rise assembled single row of holes precast shear wall and its assembling structure and construction method
CN108018877B (en) Prefabricated assembly type pipe gallery assembling device and assembling method
KR20140108353A (en) Improving structure integrity with topping concrete and improved shear load carrying of hollow slab structure using shear reinforcing bar and constructing method using the same
CN203499226U (en) Binding beam type steel cantilever scaffold
CN203769116U (en) Prefabricated through hole assembly type reinforced concrete shear wall
CN108951642B (en) Reinforced structure capable of preventing foundation pit from rising and crossing existing tunnel and construction method
CN110552706A (en) Permanent-temporary combined shield hoisting hole sealing structure and method
CN110644662A (en) Prefabricated flat slab composite slab based on stress and splitting method thereof
CN113417300A (en) Slope support system and construction method thereof
CN218346208U (en) Permanent side slope supporting structure based on reinforced concrete pile
CN102852279A (en) Prestressed reinforced concrete superposed beam having convex-concave superposed surfaces
CN215926040U (en) Assembled plate type foundation adopting post-cast strip mode
CN214272076U (en) Lattice beam
CN211057843U (en) Semi-prefabricated counterfort retaining wall
CN114457949A (en) Laminated slab bottom plate with concave and convex plate ends and without ribs and mounting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant