CN202925716U - Integrally assembled type concrete filled steel tube frame shear wall - Google Patents

Integrally assembled type concrete filled steel tube frame shear wall Download PDF

Info

Publication number
CN202925716U
CN202925716U CN 201220666456 CN201220666456U CN202925716U CN 202925716 U CN202925716 U CN 202925716U CN 201220666456 CN201220666456 CN 201220666456 CN 201220666456 U CN201220666456 U CN 201220666456U CN 202925716 U CN202925716 U CN 202925716U
Authority
CN
China
Prior art keywords
shear wall
shear
steel
welded
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220666456
Other languages
Chinese (zh)
Inventor
高林
苏幼坡
徐国强
陈建伟
陈海彬
韩建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei United University
Original Assignee
Hebei United University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei United University filed Critical Hebei United University
Priority to CN 201220666456 priority Critical patent/CN202925716U/en
Application granted granted Critical
Publication of CN202925716U publication Critical patent/CN202925716U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a reinforced concrete construction structure, in particular to an integrally assembled type concrete filled steel tube frame shear wall, which comprises a concrete filled steel tube frame, a shear wallboard and a steel tube connector, wherein a steel bar mesh consisting of horizontally distributed steel bars, longitudinally distributed steel bars and bar connectors is arranged in the shear wallboard, I steel is arranged along the whole length of an upper edge and a lower edge of the shear wallboard, two ends of the I steel are welded and fixed with concrete filled steel tube frames at two sides of the shear wallboard, the upper edge of the shear wallboard is welded and fixed with a steel bar connecting sleeve connected with the I steel, the lower edge of the shear wallboard is welded and fixed with a steel bar with an anchor plate, which is connected with the I steel, and a wedge-shaped concrete filling groove is reserved on a lower board surface of the shear wallboard; and the outer side of the concrete filled steel tube frame is provided with a stud and a shear-pin key, and the shear-pin key is welded and fixed with the horizontally distributed steel bars. According to the integrally assembled type concrete filled steel tube frame shear wall, defects of the original prefabricated concrete filled steel tube frame shear wall are overcome, a construction process is simplified, and the requirement on site construction technology is reduced.

Description

Whole assembling steel pipe concrete frame shear wall
Technical field
The utility model relates to reinforced concrete buildings, specifically a kind of whole assembling steel pipe concrete frame shear wall.
Background technology
At present, although the complete prefabricated rate of precast shear wall structure is higher, but in shear wall constrained edge member, vertical muscle and stirrup configuration are more, more complicated is constructed in the connection of precast assembly seam, difficulty of construction is larger, edge member also adopts cast-in-place form, reduced the prefabricated rate of structure, the field engineering amount is larger, and to compare advantage not obvious with cast-in-place shear wall structure.The applicant in first to file a kind of Prefabricated concrete-filled steel tube frame-shear wall, Contraction in Site is rapid, the construction quality standardization issue although improved, still there is following deficiency: 1. split type comparatively complicated with the monolithic combined system, and site construction technology is had relatively high expectations; 2. only depend on angle steel corner protector to be connected with batten plate between concrete filled steel tube constraint frame, its restriction ability is limited, can not fully satisfy the requirement of high strength, large deformation; 3. concrete filled steel tube constraint frame with design being connected of concrete wall sheet singlely, can not effectively bring into play the shearing resistance effect of steel pipe concrete frame and concrete wall sheet; 4. the part link technique is comparatively strict for the requirement of site operation technology, has the improved space of raising.
The utility model content
Technical problem to be solved in the utility model is on original Prefabricated concrete-filled steel tube frame-shear wall basis, a kind of ductility, energy consumption ability that can significantly improve reinforced concrete shear wall is provided, realizes that simultaneously Contraction in Site is rapid, the standardized whole assembling steel pipe concrete frame shear wall of construction quality.
The technical scheme that its technical problem that solves the utility model adopts is:
a kind of whole assembling steel pipe concrete frame shear wall, comprise steel pipe concrete frame, shear wall slab, steel pipe connector, dispose in shear wall slab by transversely distributed steelbar, the reinforced mesh that vertical distribution reinforcement and connecting lacing wire consist of, described along on shear wall slab, the lower limb total length is provided with i iron, the steel pipe concrete frame of i iron two ends and shear wall slab both sides is welded and fixed, be welded and fixed the reinforcing steel bar connecting sleeve tube that is connected with i iron at the shear wall slab upper limb, be welded and fixed the band anchor slab reinforcing bar that is connected with i iron at the shear wall slab lower edge, reserve wedge shape filling concrete groove at shear wall slab lower panel face, at the default peg in the steel pipe concrete frame outside and shearing resistance pin key, shearing resistance pin key and transversely distributed steelbar are welded and fixed.
Compared with prior art, the beneficial effects of the utility model are: improved the deficiency that original Prefabricated concrete-filled steel tube frame-shear wall exists, simplified construction technology, reduced the level that requires to the site operation technology.Fully merged the advantage of steel core concrete column and reinforced concrete shear wall, supporting capacity and the rigidity of shear wall have been strengthened, ductility and the energy-dissipating property of shear wall have been improved, and can guarantee the construction quality of building unit by prefabrication, on-site consolidation, improve construction operation speed, reduce labor operation intensity.
Description of drawings
Fig. 1 is the utility model example structure schematic diagram.
Fig. 2 is A-A generalized section in Fig. 1.
Fig. 3 is B point section enlarged diagram in Fig. 1.
Fig. 4 is C point section enlarged diagram in Fig. 1
Fig. 5 is D point section enlarged diagram in Fig. 1.
In figure: steel pipe concrete frame 1, shear wall slab 2, steel pipe connector 3, band anchor slab reinforcing bar 4, wedge shape filling concrete groove 5, i iron 6, peg 7, shearing resistance pin key 8, reinforcing steel bar connecting sleeve tube 9, transversely distributed steelbar 10, vertical distribution reinforcement 11, connecting lacing wire 12.
The specific embodiment
The utility model is described in further detail below in conjunction with embodiment.
Referring to Fig. 1, this whole assembling steel pipe concrete frame shear wall is comprised of both sides steel pipe concrete frame 1 and middle shear wall slab 2 and steel pipe connector 3.
Dispose the reinforced mesh that is consisted of by transversely distributed steelbar 10, vertical distribution reinforcement 11 and connecting lacing wire 12 in shear wall slab 2, be provided with i iron 6 along shear wall slab 2 upper and lower edge total length, the steel pipe concrete frame 1 of i iron 6 two ends and shear wall slab 2 both sides is welded and fixed, be welded and fixed the reinforcing steel bar connecting sleeve tube 9 that is connected with i iron 6 at shear wall slab 2 upper limbs, be welded and fixed the band anchor slab reinforcing bar 4 that is connected with i iron 6 at shear wall slab 2 lower edges, reserve wedge shape filling concrete groove 5 at shear wall slab 2 lower panel faces; At the default peg 7 in steel pipe concrete frame 1 outside and shearing resistance pin key 8, shearing resistance pin key 8 is welded and fixed with transversely distributed steelbar 10.The steel pipe two ends of steel pipe concrete frame 1 reserve the connecting length of steel pipe connector 3, and are cast-in-situ floor construction headspace.
The steel pipe concrete frame 1 of above-mentioned shear wall slab 2 and both sides thereof forms the shear wall sheet, and the shear wall sheet is prefabricated in the factory and forms, and same, steel pipe connector 3 each combiners also are prefabricated in the factory and form, and are transported to the job site during construction again.Work progress is summarized as follows:
at first the combiner with steel pipe connector 3 is connected with steel pipe concrete frame 1 upper and lower side respectively, then the shear wall sheet is lifted, make the 2 times marginal zone anchor slab reinforcing bars 4 of shear wall slab in the shear wall sheet of upper strata, aim at the shear wall slab 2 upper limb embedded bar branch sleeves 9 in lower floor's shear wall sheet, then dropping place, and the steel pipe connector 3 of 1 of levels steel pipe concrete frame is fastening locked, treat all to install with the shear wall sheet of layer, after connection, steel mesh reinforcement and formwork according to working procedure cloth cast-in-situ floor in the middle headspace of up and down shear wall sheet, then pour into a mould the concrete of cast-in-situ floor and steel pipe connector 3, after maintenance is completed, remove temporary supporting, carry out anchoring by the wedge shape filling concrete groove 10 high-strength binding materials of perfusion.The construction of the whole assembling steel pipe concrete frame shear wall sheet of other floors is carried out as stated above successively, finally forms whole assembling steel pipe concrete frame shear wall.

Claims (1)

1. whole assembling steel pipe concrete frame shear wall, comprise steel pipe concrete frame, shear wall slab, steel pipe connector, dispose in shear wall slab by transversely distributed steelbar, the reinforced mesh that vertical distribution reinforcement and connecting lacing wire consist of, it is characterized in that, described along on shear wall slab, the lower limb total length is provided with i iron, the steel pipe concrete frame of i iron two ends and shear wall slab both sides is welded and fixed, be welded and fixed the reinforcing steel bar connecting sleeve tube that is connected with i iron at the shear wall slab upper limb, be welded and fixed the band anchor slab reinforcing bar that is connected with i iron at the shear wall slab lower edge, reserve wedge shape filling concrete groove at shear wall slab lower panel face, at the default peg in the steel pipe concrete frame outside and shearing resistance pin key, shearing resistance pin key and transversely distributed steelbar are welded and fixed.
CN 201220666456 2012-12-06 2012-12-06 Integrally assembled type concrete filled steel tube frame shear wall Expired - Fee Related CN202925716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220666456 CN202925716U (en) 2012-12-06 2012-12-06 Integrally assembled type concrete filled steel tube frame shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220666456 CN202925716U (en) 2012-12-06 2012-12-06 Integrally assembled type concrete filled steel tube frame shear wall

Publications (1)

Publication Number Publication Date
CN202925716U true CN202925716U (en) 2013-05-08

Family

ID=48215691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220666456 Expired - Fee Related CN202925716U (en) 2012-12-06 2012-12-06 Integrally assembled type concrete filled steel tube frame shear wall

Country Status (1)

Country Link
CN (1) CN202925716U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726589A (en) * 2013-12-26 2014-04-16 北京工业大学 H-shaped steel and steel pipe framework assembly shear wall with protruding interfaces and bent steel bars and manufacturing method
CN103967167A (en) * 2014-05-19 2014-08-06 河北联合大学 Concrete-filled steel tube frame and shear wall vertical joint face connecting structure and construction method
CN104947831A (en) * 2015-07-07 2015-09-30 华北理工大学 Prefabricated assembly type profile steel concrete shear wall and construction method thereof
CN105332449A (en) * 2015-11-26 2016-02-17 沈阳建筑大学 Connecting piece between fabricated precast concrete shear wall and steel beam
CN105926807A (en) * 2016-06-06 2016-09-07 河北建筑工程学院 Cast-in-situ integral type concrete frame infilled wall system and construction method thereof
CN106930433A (en) * 2017-03-20 2017-07-07 张宗楼 Large-scale lateral aperture overall assembled wallboard
CN107795034A (en) * 2017-10-18 2018-03-13 天津大学 Double steel plate-concrete shear wall side column lined pipe connection joint structure
WO2019037472A1 (en) * 2017-08-21 2019-02-28 深圳市亚泰国际建设股份有限公司 Prefabricated building wall
CN109577520A (en) * 2019-01-21 2019-04-05 沈阳建筑大学 Concrete filled steel tube is keyed shear wall rod structure and assembly method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726589A (en) * 2013-12-26 2014-04-16 北京工业大学 H-shaped steel and steel pipe framework assembly shear wall with protruding interfaces and bent steel bars and manufacturing method
CN103967167A (en) * 2014-05-19 2014-08-06 河北联合大学 Concrete-filled steel tube frame and shear wall vertical joint face connecting structure and construction method
CN103967167B (en) * 2014-05-19 2016-08-17 河北联合大学 Steel pipe concrete frame and shear wall vertical composition surface attachment structure and construction method
CN104947831A (en) * 2015-07-07 2015-09-30 华北理工大学 Prefabricated assembly type profile steel concrete shear wall and construction method thereof
CN105332449A (en) * 2015-11-26 2016-02-17 沈阳建筑大学 Connecting piece between fabricated precast concrete shear wall and steel beam
CN105926807A (en) * 2016-06-06 2016-09-07 河北建筑工程学院 Cast-in-situ integral type concrete frame infilled wall system and construction method thereof
CN105926807B (en) * 2016-06-06 2019-01-15 河北建筑工程学院 A kind of cast-in-place integral concrete frame wall filled with masonry system and its construction method
CN106930433A (en) * 2017-03-20 2017-07-07 张宗楼 Large-scale lateral aperture overall assembled wallboard
WO2019037472A1 (en) * 2017-08-21 2019-02-28 深圳市亚泰国际建设股份有限公司 Prefabricated building wall
CN107795034A (en) * 2017-10-18 2018-03-13 天津大学 Double steel plate-concrete shear wall side column lined pipe connection joint structure
CN109577520A (en) * 2019-01-21 2019-04-05 沈阳建筑大学 Concrete filled steel tube is keyed shear wall rod structure and assembly method
CN109577520B (en) * 2019-01-21 2024-02-09 筑博设计股份有限公司 Steel pipe concrete key connection shear wall column structure and assembly method

Similar Documents

Publication Publication Date Title
CN102561553B (en) Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof
CN207878747U (en) A kind of laminated floor slab prefabricated board
CN102900168B (en) Splitting and assembling structure and assembling connecting method of assembled type concrete frame-shear wall
CN203113553U (en) Prefabricated concrete frame-shear wall structure
CN202831203U (en) Assembly type concrete frame-shear wall split assembling structure and fabricative structure
CN102979217B (en) Full assembly wallboard connecting structure of shearing wall
CN109680835B (en) Self-supporting precast concrete wallboard, concrete wall, structural system and construction method
CN104947831A (en) Prefabricated assembly type profile steel concrete shear wall and construction method thereof
CN106013432B (en) Node connection structure and construction method in a high ductility assembled integral frame
CN103046645A (en) Large span prefabricated monolithic casting structure and construction method
CN110005109A (en) A kind of open flume type prestressed concrete overlapped slab
CN105275096A (en) Prefabricated pieced two-way slab construction method
CN203452228U (en) Frame-shear wall architectural structure
CN203487664U (en) Suspension type flexible connection for precast concrete infilled wall
CN108086488B (en) Prefabricated frame-shear structural wall split-level connection structure and assembly method
CN104929294A (en) Concrete composite plate with built-in cross hollow square steel pipes
CN202990160U (en) Shear wall full assembling wallboard connecting structure
CN207919891U (en) A kind of assembled partial precast part external wrapping concrete combination beam
CN110735492A (en) Connecting structure of prestressed hollow composite slabs and construction method thereof
CN109680833B (en) Self-supporting prefabricated steel reinforced concrete wall plate component, wall, structural system and manufacturing method
CN201826392U (en) Reinforced concrete construction adopting precast reinforced building blocks, as well as vibration isolation and absorption system thereof
CN208472958U (en) A partially prefabricated steel-concrete giant frame structure
CN108104310A (en) Assembled frame-shear structure column splitlevel connection structure and assembling method
CN215759634U (en) Mutual anchor connection structure of shear force wall and frame post and concrete beam bracket
CN102242551B (en) Reinforcing bars building block reinforced concrete structure and shock insulation, shock absorption system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130508

Termination date: 20151206

EXPY Termination of patent right or utility model