CN103669562A - 悬挑飘窗板混凝土整体浇筑结构及其施工方法 - Google Patents

悬挑飘窗板混凝土整体浇筑结构及其施工方法 Download PDF

Info

Publication number
CN103669562A
CN103669562A CN201310696668.XA CN201310696668A CN103669562A CN 103669562 A CN103669562 A CN 103669562A CN 201310696668 A CN201310696668 A CN 201310696668A CN 103669562 A CN103669562 A CN 103669562A
Authority
CN
China
Prior art keywords
luffer boards
window
under
wafing
coupling beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310696668.XA
Other languages
English (en)
Other versions
CN103669562B (zh
Inventor
韩建成
高文光
王晓刚
索志方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Sixth Group Co Ltd
Original Assignee
Beijing Urban Construction Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Sixth Group Co Ltd filed Critical Beijing Urban Construction Sixth Group Co Ltd
Priority to CN201310696668.XA priority Critical patent/CN103669562B/zh
Publication of CN103669562A publication Critical patent/CN103669562A/zh
Application granted granted Critical
Publication of CN103669562B publication Critical patent/CN103669562B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种悬挑飘窗板混凝土整体浇筑结构及其施工方法,所述上飘窗板与窗上连梁和上层楼板的混凝土整体浇筑成型,上飘窗板的上飘窗板钢筋内端伸入窗上连梁内锚固;所述下飘窗板与窗下连梁上部的混凝土整体浇筑成型,下飘窗板的下飘窗板钢筋内端伸入窗下连梁内锚固。本发明通过在混凝土墙体施工过程中预留出飘窗板位置,将上飘窗板与窗上连梁和上层楼板同时浇筑,下飘窗板与窗下连梁上部同时浇筑,整体性好,有效地消除了飘窗板根部开裂,以及由此造成的渗漏和安全隐患,减少了飘窗后期维修处理的费用,可广泛应用于现浇混凝土剪力墙结构住宅非落地式飘窗施工。

Description

悬挑飘窗板混凝土整体浇筑结构及其施工方法
技术领域
 本发明涉及一种现浇混凝土悬挑飘窗结构及其施工方法。
背景技术
 为了追求建筑居室的通透性,形成开阔视野空间,提高城市住宅宜居质量,飘窗作为一种特殊建筑设计形式在住宅工程中得到越来越广泛的使用。飘窗上下板作为现浇混凝土悬挑结构,传统施工方法一般采用墙体施工时预留或预埋悬挑板水平钢筋,墙体混凝土浇筑完成后,再单独浇筑悬挑构件,如附图1所示。这种施工工艺存在预埋钢筋位置不准确、水平钢筋多次弯折、施工缝竖向留置在板根部、施工缝剔凿不到位等问题,从一定程度上降低了悬挑板的承载力和耐久性,甚至形成渗漏和安全隐患。
发明内容
本发明提供一种悬挑飘窗板混凝土整体浇筑结构及其施工方法,要解决现有飘窗结构承载力和耐久性差,施工效率低的技术问题。
本发明解决其技术问题所采用的技术方案是:
这种悬挑飘窗板混凝土整体浇筑结构,包括上飘窗板和下飘窗板,所述上飘窗板与窗上连梁和上层楼板的混凝土整体浇筑成型,上飘窗板的上飘窗板钢筋内端伸入窗上连梁内锚固;
所述下飘窗板与窗下连梁上部的混凝土整体浇筑成型,下飘窗板的下飘窗板钢筋内端伸入窗下连梁内锚固。
所述上飘窗板钢筋位于上飘窗板上部。
所述下飘窗板钢筋位于下飘窗板上部。
这种悬挑飘窗板混凝土整体浇筑结构的施工方法,施工步骤如下:
步骤一,核对结构施工图和建筑施工图,确定飘窗板的尺寸和位置,根据设计图纸标识的飘窗板位置进行平面放线和标高抄测,按设计图纸加工完成上飘窗板钢筋和下飘窗板钢筋;
步骤二,墙体钢筋绑扎完成后,进行隐蔽验收;
步骤三,在窗洞口上部两侧梁窝位置预埋填充物,并与窗上连梁钢筋绑扎牢固;在窗下连梁上部位置预埋填充物,并与窗下连梁钢筋绑扎牢固;
步骤四,安装窗洞口模板;
步骤五,安装墙体模板,浇筑墙体混凝土;
步骤六,墙体模板拆除后,填充物清理干净,在预留梁窝和窗下连梁上部位置进行施工缝处理;
步骤七,飘窗板模板安装,上飘窗板与窗上连梁和上层楼板同时支模,支撑体系连成整体;
步骤八,飘窗板钢筋安装及验收;
步骤九,混凝土浇筑,上飘窗板与窗上连梁和上层楼板的混凝土整体浇筑成型,下飘窗板与窗下连梁上部的混凝土整体浇筑成型;
步骤十,混凝土养护;
步骤十一,拆模。
所述步骤三,窗下连梁上部的填充物预埋完成后,将下飘窗板钢筋内端提前预埋在窗下连梁内,下飘窗板钢筋在下飘窗板内的部分暂时竖直伸入窗洞口模板里侧,待步骤八时,再进行现场测量定位并将下飘窗板钢筋弯折90度至水平。
所述步骤四,安装窗洞口模板时,窗洞口模板采用木模或钢模制作成门式形状,窗洞口模板下部现场安装方木或钢管作为底部顶撑,并同时固定预埋的下飘窗板钢筋位置。
所述步骤六,施工缝处理时,按照预留梁窝和窗下连梁顶部位置在墙体上弹线,沿线采用云石机切割8~10mm深度,然后进行施工缝剔凿。
所述步骤七,窗上连梁底与上飘窗板底标高相同,窗上连梁和上飘窗板底模采用同一块模板,确保标高一致,不出现错台。
所述步骤九,先浇筑上飘窗板,再浇筑窗上连梁,最后浇筑上层楼板。
所述步骤十,飘窗板混凝土养护方式与楼板混凝土养护方式相同,常温下采用覆盖塑料薄膜、浇水养护,养护时间不少于14d。
本发明的特点和有益效果如下:
1、本发明通过在混凝土墙体施工过程中预留出飘窗板位置,将上飘窗板与窗上连梁和上层楼板同时浇筑,下飘窗板与窗下连梁上部同时浇筑,飘窗板根部的竖向施工缝改为水平施工缝,整体性较好,有效地消除了飘窗板根部开裂,以及由此造成的渗漏和安全隐患,取得了良好的质量效果,减少了飘窗后期维修处理的费用。
2、本发明的飘窗板钢筋在飘窗模板支设完毕后才进行绑扎,使钢筋数量和位置准确,能保证悬挑板钢筋骨架尺寸正确,有效确保悬挑结构的承载力满足设计要求。
3、本发明的上飘窗板与窗上连梁底模为同一支设体系,消除了由于墙体浇筑时窗洞口移位、变形造成的飘窗板与预留窗洞口之间的错台,为后期装修施工创造良好条件。
本发明具有的社会效益和经济效益如下:
混凝土悬挑飘窗板整体浇筑施工方法从根本上解决了飘窗板根部开裂、渗漏的通病,飘窗板钢筋位置能得到有效保证,也大大提高了悬挑板的受力性能,使结构更安全,为住宅工程飘窗板施工提供了一种新的施工工艺,可对类似工程施工提供参考,具有良好的推广价值。
混凝土悬挑飘窗板整体浇筑施工方法消除了飘窗板裂缝问题,同时能够保证窗洞口与飘窗板相对位置的准确性,减少了施工过程中由于窗洞口与飘窗板相对位置不准造成的大量剔凿返修费用和工程交用后渗漏维修费用,具有很好的经济效益。
本发明可广泛应用于现浇混凝土剪力墙结构住宅非落地式飘窗施工。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是传统飘窗结构示意图。
图2是飘窗板钢筋绑扎的示意图。
图3是混凝土浇筑的示意图。
图4是预埋填充物以及下飘窗板钢筋预埋的位置图。
图5是飘窗板模板的安装图。
附图标记:1-上飘窗板、1.1-上飘窗板钢筋、2-下飘窗板、2.1-下飘窗板钢筋、3-窗上连梁、3.1-窗上连梁钢筋、4-窗下连梁、4.1-窗下连梁钢筋、5-上层楼板、6-下层楼板、7-窗洞口、8-填充物、9-窗洞口模板、10-支撑体系、11-施工缝、12-墙体、13-窗上连梁和上飘窗板底模、14-窗上连梁侧模、15-上层楼板底模、16-下飘窗板底模。
具体实施方式
实施例参见图2、图3所示,这种悬挑飘窗板混凝土整体浇筑结构,包括上飘窗板1和下飘窗板2,所述上飘窗板1与窗上连梁3和上层楼板5的混凝土整体浇筑成型,上飘窗板1的上飘窗板钢筋1.1内端伸入窗上连梁3内锚固。
所述下飘窗板2与窗下连梁4上部的混凝土整体浇筑成型,下飘窗板2的下飘窗板钢筋2.1内端伸入窗下连梁4内锚固。
所述上飘窗板钢筋1.1位于上飘窗板1上部。下飘窗板钢筋2.1位于下飘窗板2上部。
参见图2~5所示,这种悬挑飘窗板混凝土整体浇筑结构的施工方法,施工步骤如下:
步骤一,核对结构施工图和建筑施工图,确定飘窗板的尺寸和位置,根据设计图纸标识的飘窗板位置进行平面放线和标高抄测,按设计图纸加工完成上飘窗板钢筋1.1和下飘窗板钢筋2.1(只加工端部90°弯钩);
步骤二,墙体钢筋绑扎完成后,进行隐蔽验收;
步骤三,在窗洞口7上部两侧梁窝位置预埋填充物8,并与窗上连梁钢筋3.1绑扎牢固,该填充物可以是用聚苯外裹胶带制作300mm×墙体厚度×(窗上连梁高-楼板板厚)的方形块体;在窗下连梁4上部位置预埋填充物8,并与窗下连梁钢筋4.1绑扎牢固,该填充物尺寸为下飘窗板长度×墙体厚度×下飘窗板板厚;
窗下连梁4上部的填充物8预埋完成后,将下飘窗板钢筋2.1内端提前预埋在窗下连梁4内,下飘窗板钢筋2.1在下飘窗板2内的部分暂时竖直伸入窗洞口模板9里侧,待步骤八时,再进行现场测量定位并将下飘窗板钢筋2.1弯折90度至水平;
步骤四,安装窗洞口模板9,安装窗洞口模板9时,窗洞口模板采用木模或钢模制作成门式形状,窗洞口模板下部现场安装方木或钢管作为底部顶撑,并同时固定预埋的下飘窗板钢筋2.1位置;
步骤五,安装墙体模板,浇筑墙体混凝土;
步骤六,墙体模板拆除后,填充物8清理干净,在预留梁窝和窗下连梁上部位置进行施工缝处理;施工缝处理时,按照预留梁窝和窗下连梁顶部位置在墙体上弹线,沿线采用云石机切割8~10mm深度,然后进行施工缝剔凿;
步骤七,飘窗板模板安装,上飘窗板1与窗上连梁3和上层楼板5同时支模,支撑体系10连成整体;窗上连梁底与上飘窗板底标高相同,窗上连梁和上飘窗板底模13采用同一块模板,确保标高一致,不出现错台;
步骤八,飘窗板钢筋安装及验收;
步骤九,混凝土浇筑,上飘窗板1与窗上连梁3和上层楼板5的混凝土整体浇筑成型,先浇筑上飘窗板1,再浇筑窗上连梁3,最后浇筑上层楼板5;下飘窗板2与窗下连梁4上部的混凝土整体浇筑成型;
步骤十,混凝土养护,飘窗板混凝土养护方式与楼板混凝土养护方式相同,常温下采用覆盖塑料薄膜、浇水养护,养护时间不少于14d;
步骤十一,拆模,飘窗板底模拆除应满足混凝土抗压强度达到100%以上(通过混凝土同条件试件立方体抗压强度判定)。

Claims (10)

1.一种悬挑飘窗板混凝土整体浇筑结构,包括上飘窗板(1)和下飘窗板(2),其特征在于:
所述上飘窗板(1)与窗上连梁(3)和上层楼板(5)的混凝土整体浇筑成型,上飘窗板(1)的上飘窗板钢筋(1.1)内端伸入窗上连梁(3)内锚固;
所述下飘窗板(2)与窗下连梁(4)上部的混凝土整体浇筑成型,下飘窗板(2)的下飘窗板钢筋(2.1)内端伸入窗下连梁(4)内锚固。
2.根据权利要求1所述的悬挑飘窗板混凝土整体浇筑结构,其特征在于:所述上飘窗板钢筋(1.1)位于上飘窗板(1)上部。
3.根据权利要求1所述的悬挑飘窗板混凝土整体浇筑结构,其特征在于:所述下飘窗板钢筋(2.1)位于下飘窗板(2)上部。
4.一种如权利要求1~3任意一项所述悬挑飘窗板混凝土整体浇筑结构的施工方法,其特征在于施工步骤如下:
步骤一,核对结构施工图和建筑施工图,确定飘窗板的尺寸和位置,根据设计图纸标识的飘窗板位置进行平面放线和标高抄测,按设计图纸加工完成上飘窗板钢筋(1.1)和下飘窗板钢筋(2.1);
步骤二,墙体钢筋绑扎完成后,进行隐蔽验收;
步骤三,在窗洞口(7)上部两侧梁窝位置预埋填充物(8),并与窗上连梁钢筋(3.1)绑扎牢固;在窗下连梁(4)上部位置预埋填充物(8),并与窗下连梁钢筋(4.1)绑扎牢固;
步骤四,安装窗洞口模板(9);
步骤五,安装墙体模板,浇筑墙体混凝土;
步骤六,墙体模板拆除后,填充物(8)清理干净,在预留梁窝和窗下连梁上部位置进行施工缝处理;
步骤七,飘窗板模板安装,上飘窗板(1)与窗上连梁(3)和上层楼板(5)同时支模,支撑体系(10)连成整体;
步骤八,飘窗板钢筋安装及验收;
步骤九,混凝土浇筑,上飘窗板(1)与窗上连梁(3)和上层楼板(5)的混凝土整体浇筑成型,下飘窗板(2)与窗下连梁(4)上部的混凝土整体浇筑成型;
步骤十,混凝土养护;
步骤十一,拆模。
5.根据权利要求4所述的悬挑飘窗板混凝土整体浇筑结构的施工方法,其特征在于:所述步骤三,窗下连梁(4)上部的填充物(8)预埋完成后,将下飘窗板钢筋(2.1)内端提前预埋在窗下连梁(4)内,下飘窗板钢筋(2.1)在下飘窗板(2)内的部分暂时竖直伸入窗洞口模板(9)里侧,待步骤八时,再进行现场测量定位并将下飘窗板钢筋(2.1)弯折90度至水平。
6.根据权利要求5所述的悬挑飘窗板混凝土整体浇筑结构的施工方法,其特征在于:所述步骤四,安装窗洞口模板(9)时,窗洞口模板采用木模或钢模制作成门式形状,窗洞口模板下部现场安装方木或钢管作为底部顶撑,并同时固定预埋的下飘窗板钢筋(2.1)位置。
7.根据权利要求4所述的悬挑飘窗板混凝土整体浇筑结构的施工方法,其特征在于:所述步骤六,施工缝处理时,按照预留梁窝和窗下连梁顶部位置在墙体上弹线,沿线采用云石机切割8~10mm深度,然后进行施工缝剔凿。
8.根据权利要求4所述的悬挑飘窗板混凝土整体浇筑结构的施工方法,其特征在于:所述步骤七,窗上连梁底与上飘窗板底标高相同,窗上连梁和上飘窗板底模(13)采用同一块模板,确保标高一致,不出现错台。
9.根据权利要求4所述的悬挑飘窗板混凝土整体浇筑结构的施工方法,其特征在于:所述步骤九,先浇筑上飘窗板(1),再浇筑窗上连梁(3),最后浇筑上层楼板(5)。
10.根据权利要求4所述的悬挑飘窗板混凝土整体浇筑结构的施工方法,其特征在于:所述步骤十,飘窗板混凝土养护方式与楼板混凝土养护方式相同,常温下采用覆盖塑料薄膜、浇水养护,养护时间不少于14d。
CN201310696668.XA 2013-12-18 2013-12-18 悬挑飘窗板混凝土整体浇筑结构的施工方法 Active CN103669562B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310696668.XA CN103669562B (zh) 2013-12-18 2013-12-18 悬挑飘窗板混凝土整体浇筑结构的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310696668.XA CN103669562B (zh) 2013-12-18 2013-12-18 悬挑飘窗板混凝土整体浇筑结构的施工方法

Publications (2)

Publication Number Publication Date
CN103669562A true CN103669562A (zh) 2014-03-26
CN103669562B CN103669562B (zh) 2015-09-23

Family

ID=50308272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310696668.XA Active CN103669562B (zh) 2013-12-18 2013-12-18 悬挑飘窗板混凝土整体浇筑结构的施工方法

Country Status (1)

Country Link
CN (1) CN103669562B (zh)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040974A (zh) * 2015-07-15 2015-11-11 中国建筑第二工程局有限公司 一种用于飘窗施工的弹性支撑平台及飘窗施工方法
CN105040975A (zh) * 2015-07-15 2015-11-11 中国建筑第二工程局有限公司 一种用于飘窗施工的支撑平台及飘窗施工方法
CN105064500A (zh) * 2015-07-17 2015-11-18 南通德源建设工程科技有限公司 一种阳台梁板内侧填充墙体与主体结构整体浇筑施工方法
CN105064686A (zh) * 2015-07-30 2015-11-18 中国建筑第二工程局有限公司 用于外墙空调板施工的壁挂式钢支撑平台及其使用方法
CN106368346A (zh) * 2016-10-26 2017-02-01 中国二十二冶集团有限公司 外墙板与飘窗板同时预制的夹心保温混凝土外墙板
CN106436889A (zh) * 2016-08-09 2017-02-22 泰兴市第建筑安装工程有限公司 一种混凝土空调凸窗板
CN106988468A (zh) * 2017-05-19 2017-07-28 深圳市中邦(集团)建设总承包有限公司 一种曲面屋面凸窗及其施工方法
CN107558732A (zh) * 2017-08-04 2018-01-09 中国十七冶集团有限公司 一种凸窗砼成型质量控制施工方法
CN108118780A (zh) * 2017-12-07 2018-06-05 赵东昕 一种预制钢筋混凝土飘窗构件
CN108316649A (zh) * 2018-02-01 2018-07-24 福建省南铝铝模科技有限公司 一种飘台模板
CN108412208A (zh) * 2018-04-27 2018-08-17 上海建工四建集团有限公司 一种具有异形洞口墙体的施工方法
CN108625505A (zh) * 2018-07-09 2018-10-09 中清大装配式建筑有限公司 一种自带梁槽的预制节能凸窗构件
CN109025301A (zh) * 2018-08-06 2018-12-18 武汉冶建筑安装工程有限责任公司 飘窗侧板施工方法
CN109977607A (zh) * 2019-04-16 2019-07-05 广东华坤建设集团有限公司 一种环境友好型装配式保温飘窗制作与安装施工方法
CN110863650A (zh) * 2019-11-25 2020-03-06 中国十七冶集团有限公司 一种双层悬挑板模板安装施工方法
CN111364603A (zh) * 2020-03-14 2020-07-03 山西四建集团有限公司 一种建筑外立面混凝土飘窗板施工方法
CN111927249A (zh) * 2020-09-11 2020-11-13 龙元明筑科技有限责任公司 整体预制内嵌飘窗、连接节点及制造方法
CN112112419A (zh) * 2020-08-26 2020-12-22 五冶集团上海有限公司 一种现浇悬挑飘窗板的施工方法
CN114263347A (zh) * 2022-02-11 2022-04-01 中建八局第二建设有限公司 一种住宅飘窗施工方法
CN117211397A (zh) * 2023-08-25 2023-12-12 北京城建一建设发展有限公司 一种大跨度预制飘窗与构造柱一体化结构及其施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329636A (ja) * 2000-05-24 2001-11-30 Mitsui Constr Co Ltd 出窓付壁面パネル体
CN1237247C (zh) * 2001-07-11 2006-01-18 孙运健 幕墙窗结构及全日照阳光空调
CN200952317Y (zh) * 2006-06-21 2007-09-26 邓祥青 飘窗构件
JP2008214878A (ja) * 2007-02-28 2008-09-18 Sumitomo Forestry Co Ltd 室内通風構造
CN101487290A (zh) * 2009-02-05 2009-07-22 中建三局第二建设工程有限责任公司 建筑飘窗的施工方法
CN102747838A (zh) * 2012-08-02 2012-10-24 中国二十二冶集团有限公司 飘窗板空调机位预留筋的施工方法
CN203008372U (zh) * 2013-03-06 2013-06-19 陕西建工集团第五建筑工程有限公司 飘窗板、保温板与滴水线一次成型施工结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329636A (ja) * 2000-05-24 2001-11-30 Mitsui Constr Co Ltd 出窓付壁面パネル体
CN1237247C (zh) * 2001-07-11 2006-01-18 孙运健 幕墙窗结构及全日照阳光空调
CN200952317Y (zh) * 2006-06-21 2007-09-26 邓祥青 飘窗构件
JP2008214878A (ja) * 2007-02-28 2008-09-18 Sumitomo Forestry Co Ltd 室内通風構造
CN101487290A (zh) * 2009-02-05 2009-07-22 中建三局第二建设工程有限责任公司 建筑飘窗的施工方法
CN102747838A (zh) * 2012-08-02 2012-10-24 中国二十二冶集团有限公司 飘窗板空调机位预留筋的施工方法
CN203008372U (zh) * 2013-03-06 2013-06-19 陕西建工集团第五建筑工程有限公司 飘窗板、保温板与滴水线一次成型施工结构

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040975A (zh) * 2015-07-15 2015-11-11 中国建筑第二工程局有限公司 一种用于飘窗施工的支撑平台及飘窗施工方法
CN105040974A (zh) * 2015-07-15 2015-11-11 中国建筑第二工程局有限公司 一种用于飘窗施工的弹性支撑平台及飘窗施工方法
CN105040974B (zh) * 2015-07-15 2017-06-27 中国建筑第二工程局有限公司 一种用于飘窗施工的弹性支撑平台及飘窗施工方法
CN105040975B (zh) * 2015-07-15 2017-06-27 中国建筑第二工程局有限公司 一种用于飘窗施工的支撑平台及飘窗施工方法
CN105064500B (zh) * 2015-07-17 2017-05-17 中如建工集团有限公司 一种阳台梁板内侧填充墙体与主体结构整体浇筑施工方法
CN105064500A (zh) * 2015-07-17 2015-11-18 南通德源建设工程科技有限公司 一种阳台梁板内侧填充墙体与主体结构整体浇筑施工方法
CN105064686A (zh) * 2015-07-30 2015-11-18 中国建筑第二工程局有限公司 用于外墙空调板施工的壁挂式钢支撑平台及其使用方法
CN106436889A (zh) * 2016-08-09 2017-02-22 泰兴市第建筑安装工程有限公司 一种混凝土空调凸窗板
CN106368346A (zh) * 2016-10-26 2017-02-01 中国二十二冶集团有限公司 外墙板与飘窗板同时预制的夹心保温混凝土外墙板
CN106988468A (zh) * 2017-05-19 2017-07-28 深圳市中邦(集团)建设总承包有限公司 一种曲面屋面凸窗及其施工方法
CN106988468B (zh) * 2017-05-19 2021-04-20 深圳市中邦(集团)建设总承包有限公司 一种曲面屋面凸窗及其施工方法
CN107558732A (zh) * 2017-08-04 2018-01-09 中国十七冶集团有限公司 一种凸窗砼成型质量控制施工方法
CN107558732B (zh) * 2017-08-04 2019-10-29 中国十七冶集团有限公司 一种凸窗砼成型质量控制施工方法
CN108118780A (zh) * 2017-12-07 2018-06-05 赵东昕 一种预制钢筋混凝土飘窗构件
CN108316649A (zh) * 2018-02-01 2018-07-24 福建省南铝铝模科技有限公司 一种飘台模板
CN108412208A (zh) * 2018-04-27 2018-08-17 上海建工四建集团有限公司 一种具有异形洞口墙体的施工方法
CN108625505A (zh) * 2018-07-09 2018-10-09 中清大装配式建筑有限公司 一种自带梁槽的预制节能凸窗构件
CN109025301A (zh) * 2018-08-06 2018-12-18 武汉冶建筑安装工程有限责任公司 飘窗侧板施工方法
CN109977607A (zh) * 2019-04-16 2019-07-05 广东华坤建设集团有限公司 一种环境友好型装配式保温飘窗制作与安装施工方法
CN110863650A (zh) * 2019-11-25 2020-03-06 中国十七冶集团有限公司 一种双层悬挑板模板安装施工方法
CN111364603A (zh) * 2020-03-14 2020-07-03 山西四建集团有限公司 一种建筑外立面混凝土飘窗板施工方法
CN112112419A (zh) * 2020-08-26 2020-12-22 五冶集团上海有限公司 一种现浇悬挑飘窗板的施工方法
CN111927249A (zh) * 2020-09-11 2020-11-13 龙元明筑科技有限责任公司 整体预制内嵌飘窗、连接节点及制造方法
CN111927249B (zh) * 2020-09-11 2023-11-24 龙元明筑科技有限责任公司 整体预制内嵌飘窗、连接节点及制造方法
CN114263347A (zh) * 2022-02-11 2022-04-01 中建八局第二建设有限公司 一种住宅飘窗施工方法
CN117211397A (zh) * 2023-08-25 2023-12-12 北京城建一建设发展有限公司 一种大跨度预制飘窗与构造柱一体化结构及其施工方法

Also Published As

Publication number Publication date
CN103669562B (zh) 2015-09-23

Similar Documents

Publication Publication Date Title
CN103669562B (zh) 悬挑飘窗板混凝土整体浇筑结构的施工方法
CN102116061B (zh) 框架结构中填充墙芯柱、芯梁、砌块砌筑施工方法
CN104631512B (zh) 吊模法后浇带梁板施工方法
CN103233520B (zh) 一种建筑外墙结构自防水施工方法
CN103266767A (zh) 混凝土结构与填充墙间裂缝防治施工工法
CN105484391A (zh) 轻质保温grc免拆模板制作保温防水墙体的施工方法
CN104372890A (zh) 一种复杂结构清水混凝土预制箱梁施工工法
CN203654993U (zh) 混凝土结构悬挑飘窗板
CN106801517A (zh) 一种预制多孔板砖混合结构的校舍体外加固加强方法
CN102323396B (zh) 大体积混凝土实体模拟试验装置及其试验施工方法
CN106368245A (zh) 一种易清理的后浇带支模施工方法
CN105178604A (zh) 一种装配式叠合楼板施工方法
CN114109030A (zh) 清水混凝土片墙异形结构施工方法
CN103306463B (zh) 一种金属衬里混凝土风道施工方法
CN105442629A (zh) 一种大型设备t型台隔振底座施工工法
CN103590420A (zh) 焦炉基础分烟道免支顶模施工方法
CN105484421A (zh) 圈梁模板砖及建筑物二次结构填充墙圈梁施工方法
CN203782577U (zh) 用于防撞墙沉降缝施工的模板组件
CN102936958A (zh) 工具式支架定位混凝土楼板上部钢筋的施工方法
CN203096762U (zh) 一种防冻胀地梁
CN104675138B (zh) 一种用于隔声降噪改造的板式阳台加固方法
CN103334771A (zh) 暗挖逆作法侧墙与中板、拱顶接头处的混凝土浇筑方法
CN206646549U (zh) 地下工程装配式混凝土风道
CN106638544A (zh) 寒冷地区超大型钢筋混凝土生物氧化池的防渗抗裂施工方法
CN102767284B (zh) 混凝土薄壁下返檐半预制施工工艺

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant