CN102616276A - 曼前桥转向节与工字梁之连接机构及装配方法 - Google Patents

曼前桥转向节与工字梁之连接机构及装配方法 Download PDF

Info

Publication number
CN102616276A
CN102616276A CN2012101007390A CN201210100739A CN102616276A CN 102616276 A CN102616276 A CN 102616276A CN 2012101007390 A CN2012101007390 A CN 2012101007390A CN 201210100739 A CN201210100739 A CN 201210100739A CN 102616276 A CN102616276 A CN 102616276A
Authority
CN
China
Prior art keywords
girder
stub
kingpin bore
lock pin
front axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101007390A
Other languages
English (en)
Inventor
宋斌
张金刚
肖渝
王艳丽
蒋林涛
肖铭宇
潘孝勇
秦万涛
张少卿
范学林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI TRI-RING AXLE Co Ltd
Original Assignee
HUBEI TRI-RING AXLE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI TRI-RING AXLE Co Ltd filed Critical HUBEI TRI-RING AXLE Co Ltd
Priority to CN2012101007390A priority Critical patent/CN102616276A/zh
Publication of CN102616276A publication Critical patent/CN102616276A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Steering-Linkage Mechanisms And Four-Wheel Steering (AREA)

Abstract

本发明涉及曼前桥转向节与工字梁之连接机构及装配方法。属于汽车转向前桥制造技术领域。它主要是解决现有7.5T型前桥的生产成本过高,转向节不易拆卸的问题。它的主要特征是:包括工字梁两端的工字梁主销孔座、转向节连接端转向节主销孔座和主销;主销和工字梁主销孔座的主销孔采用过渡配合;主销上设有锁销止动边;工字梁主销孔座上设有与锁销止动边配合的锁销孔;锁销孔装有锁销;用铜棒将主销敲入工字梁主销孔座的主销孔中,使主销的止动边与工字梁主销孔座的锁销孔配合;将锁销敲入锁销孔锁紧主销。本发明具有成本低、易维护的特性,有效降低产品的生产成本及后续的维修费用,主要用于曼前桥转向节与工字梁之间的连接。

Description

曼前桥转向节与工字梁之连接机构及装配方法
技术领域
本发明属于汽车转向前桥制造技术领域。具体涉及一种改变转向节、主销和工字梁配合方式的装配方法,来降低7.5T前桥的生产成本,提高7.5T前桥的可维修性。
背景技术
随着国民经济的发展,以及各类矿山、港口及大型土建工程的开工建设,对工程车的需求不断增大,上述用车环境不仅要求整车马力大、装载大、通过性好的特点,而且车辆使用频率上也是相当的高,很多车辆都是采用多驾驶员轮流驾驶,人停车不停,对车辆的整车性能是相当大的考验。在上述用车环境中,车辆大多是在非铺装路面、高负载、高强度下运行。在重载情况下,频繁通过凹凸不平的路面,对车辆的前后桥是最直接的考验。因此曼系列7.5T前桥的出现,很好的应对了这种环境。此种前桥,单桥额定载荷达到7500Kg,工字梁采用单级落差(落差为100mm),有离地高度高、单桥承载负荷大的特点。但此种前桥主销是经过液态氮冷却后,与转向节一起以整体压装的方式装配于工字梁上。在使用过程中一旦出现转向节衬套磨损、平面阻尼轴承变形等情况,无法维修只能更换整桥,而此桥售价较高(单台售价9000-10000元),对整车的成本是很大挑战。因此目前国内仅中国重汽集团在生产和使用。
发明内容
本发明的目的就是针对上述曼前桥装配工艺复杂、成本高,且在出现转向节衬套磨损、平面阻尼轴承变形等情况时无法维修的状况,提供一种在不改变整桥性能的前提下,对转向节和主销的装配工艺做出更改,使主销易于拆卸,以便维修并降低整桥生产成本的曼前桥装配方法。
本发明曼前桥转向节与工字梁之连接机构的技术解决方案是:一种曼前桥转向节与工字梁之连接机构,包括工字梁两端的工字梁主销孔座、转向节连接端转向节主销孔座和主销,其特征是:所述的主销和工字梁主销孔座的主销孔采用过渡配合;主销上设有锁销止动边;工字梁主销孔座上设有与锁销止动边配合的锁销孔;锁销孔装有锁销。
本发明的技术解决方案中所述的主销直径为φ52mm。
本发明的技术解决方案中所述的主销上锁销止动边的宽度为12mm。
本发明曼前桥转向节与工字梁装配方法的技术解决方案是:一种曼前桥转向节与工字梁装配方法,其特征是包括以下工艺步骤:
⑴主销和工字梁主销孔座的主销孔采用过渡配合,在圆柱形主销上铣锁销止动边,在工字梁主销孔座上钻锁销孔;
⑵装配时将平面轴承、转向节、减磨垫片一次放于工字梁上,然后用铜棒将主销敲入工字梁主销孔座的主销孔中,使主销的止动边与工字梁主销孔座的锁销孔配合;
⑶将锁销敲入锁销孔锁紧主销。
本发明具体的曼前桥转向节与工字梁装配方法的技术解决方案是:一种曼前桥转向节与工字梁装配方法,其特征是包括以下工艺步骤:
⑴主销和工字梁主销孔座的主销孔采用过渡配合,主销直径为φ52mm,在圆柱形主销上铣宽度为12mm的锁销止动边,在工字梁主销孔座上钻锁销孔;
⑵装配时将平面轴承、转向节、减磨垫片一次放于工字梁上,然后用铜棒将主销敲入工字梁主销孔座的主销孔中,使主销的主销止动边与工字梁主销孔座的锁销孔配合;
⑶将锁销敲入锁销孔锁紧主销。
本发明具有先进性和创造性,其表现在:
1、将主销和工字梁的配合方式由过盈配合改为过渡配合,主销安装方式由经过液态氮冷却后压入改为铜棒敲入,减少工装投入、降低装配难度,便于维修。增大主销直径,来提高整桥的耐冲击能力。
2、在主销上增加锁销止动边,工字梁主销孔座上钻锁销孔。利用锁销将主销锁紧,防止因配合精度降低而造成主销转动,在保证了主销与工字梁配合的可靠性基础上,增加主销易拆卸性,便于维修。
3、取消了液态氮冷却设备、主销压装设备降低了装配成本,将主销与工字梁由过盈配合改为过渡配合,降低了机加成本。
4、主销与工字梁、转向节采用锁销止动这种装配方式,售后服务时可更换其中任一件有损坏的零件,不需要全部更换,降低了售后服务费用。
本发明主要用于曼前桥转向节与工字梁之间的连接。
附图说明
图1为本发明的主销结构示意图。
图2为图1的左视图。
图3为本发明的工字梁结构示意图。
图4为图3的俯视图。
图5为本发明的装配示意图。
具体实施方式
曼前桥总成额定载荷为7500Kg,轮辋安装面距2370mm,轮距2047mm,前桥单级落差为100mm,车轮分度圆φ335mm,可配装8.0-20、8.5-20轮辋(11.00-20、12.00-20轮胎)的重型前桥。本发明曼前桥转向节与工字梁之连接机构包括工字梁两端的工字梁3主销孔座、转向节6连接端转向节主销孔座和主销1。主销1和工字梁3主销孔座的主销孔5采用过渡配合,主销1上设有锁销止动边2,工字梁3主销孔座上设有与锁销止动边2配合的锁销孔4,锁销孔4装有锁销7。主销1直径为φ52mm。锁销止动边2的宽度为12mm。
具体实施方式如下:
⑴主销1和工字梁3主销孔座的主销孔5采用过渡配合,主销1直径为φ52mm,在圆柱形主销1上铣宽度为12mm的锁销止动边2,在工字梁3主销孔座上钻锁销孔4;
⑵装配时将平面轴承、转向节6、减磨垫片一次放于工字梁上,然后用铜棒将主销1敲入工字梁3主销孔座的主销孔5中,使主销1的主销止动边2与工字梁3主销孔座的锁销孔4配合;
⑶将锁销7敲入锁销孔4锁紧主销1,利用锁销防止主销转动。
该曼前桥总成按QC/T513-1999«汽车前轴疲劳寿命试验方法»进行检查,其结果满足QC/T483-1999«汽车前轴疲劳寿命限值»。

Claims (5)

1.一种曼前桥转向节与工字梁之连接机构,包括工字梁两端的工字梁主销孔座、转向节连接端转向节主销孔座和主销,其特征是:所述的主销和工字梁主销孔座的主销孔采用过渡配合;主销上设有锁销止动边;工字梁主销孔座上设有与锁销止动边配合的锁销孔;锁销孔装有锁销。
2.根据权利要求1所述的曼前桥转向节与工字梁之连接机构,其特征是:所述的主销直径为φ52mm。
3.根据权利要求1或2所述的曼前桥转向节与工字梁之连接机构,其特征是:所述的主销上锁销止动边的宽度为12mm。
4.一种根据权利要求1所述的曼前桥转向节与工字梁之连接机构装配方法,其特征是包括以下工艺步骤:
⑴主销和工字梁主销孔座的主销孔采用过渡配合,在圆柱形主销上铣锁销止动边,在工字梁主销孔座上钻锁销孔;
⑵装配时将平面轴承、转向节、减磨垫片一次放于工字梁上,然后用铜棒将主销敲入工字梁主销孔座的主销孔中,使主销的止动边与工字梁主销孔座的锁销孔配合;
⑶将锁销敲入锁销孔锁紧主销。
5.根据权利要求4所述的曼前桥转向节与工字梁之连接机构装配方法,其特征是包括以下工艺步骤:
⑴主销和工字梁主销孔座的主销孔采用过渡配合,主销直径为φ52mm,在圆柱形主销上铣宽度为12mm的锁销止动边,在工字梁主销孔座上钻锁销孔;
⑵装配时将平面轴承、转向节、减磨垫片一次放于工字梁上,然后用铜棒将主销敲入工字梁主销孔座的主销孔中,使主销的主销止动边与工字梁主销孔座的锁销孔配合;
⑶将锁销敲入锁销孔锁紧主销。
CN2012101007390A 2012-04-09 2012-04-09 曼前桥转向节与工字梁之连接机构及装配方法 Pending CN102616276A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101007390A CN102616276A (zh) 2012-04-09 2012-04-09 曼前桥转向节与工字梁之连接机构及装配方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101007390A CN102616276A (zh) 2012-04-09 2012-04-09 曼前桥转向节与工字梁之连接机构及装配方法

Publications (1)

Publication Number Publication Date
CN102616276A true CN102616276A (zh) 2012-08-01

Family

ID=46556591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101007390A Pending CN102616276A (zh) 2012-04-09 2012-04-09 曼前桥转向节与工字梁之连接机构及装配方法

Country Status (1)

Country Link
CN (1) CN102616276A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10766531B2 (en) 2018-08-31 2020-09-08 Cnh Industrial America Llc Steering sensor pin assembly

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1924586A (en) * 1932-04-12 1933-08-29 Oscar U Zerk Shaft and spindle bearing
GB1221132A (en) * 1967-04-20 1971-02-03 Nadella Improvements in or relating to stub-axle assemblies.
US4915530A (en) * 1987-08-21 1990-04-10 General Motors Corporation Kingpin assembly
CN1531493A (zh) * 2001-04-30 2004-09-22 �ӳɹ� 用于夹紧转向轴主销的双滑键装置
CN201154734Y (zh) * 2007-10-16 2008-11-26 中国重汽集团济南技术中心有限公司 汽车用前转向桥
CN202557603U (zh) * 2012-04-09 2012-11-28 湖北三环车桥有限公司 曼前桥转向节与工字梁之连接机构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1924586A (en) * 1932-04-12 1933-08-29 Oscar U Zerk Shaft and spindle bearing
GB1221132A (en) * 1967-04-20 1971-02-03 Nadella Improvements in or relating to stub-axle assemblies.
US4915530A (en) * 1987-08-21 1990-04-10 General Motors Corporation Kingpin assembly
CN1531493A (zh) * 2001-04-30 2004-09-22 �ӳɹ� 用于夹紧转向轴主销的双滑键装置
CN201154734Y (zh) * 2007-10-16 2008-11-26 中国重汽集团济南技术中心有限公司 汽车用前转向桥
CN202557603U (zh) * 2012-04-09 2012-11-28 湖北三环车桥有限公司 曼前桥转向节与工字梁之连接机构

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘相远: "卡客车前桥总成零件的常规受力分析和设计方法", 《汽车零部件》 *
肖永清,杨忠敏: "《汽车前桥及转向系统结构与维修》", 31 January 2004, 国防工业出版社 *
郑泉等: "汽车前桥力学分析与软件开发", 《拖拉机与农用运输车》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10766531B2 (en) 2018-08-31 2020-09-08 Cnh Industrial America Llc Steering sensor pin assembly

Similar Documents

Publication Publication Date Title
CN201792898U (zh) 挂车四轮转向机构
CN101665059B (zh) 高承载半挂运输车或专用运输车的车轴
CN202557603U (zh) 曼前桥转向节与工字梁之连接机构
CN102616276A (zh) 曼前桥转向节与工字梁之连接机构及装配方法
CN202896672U (zh) 一种车用转向节
CN201863671U (zh) 汽车车轴与车架连接装置
CN204736668U (zh) 一种采用斜置板簧的半独立悬架
CN202243646U (zh) 一种汽车转向节结构
CN204452586U (zh) 双横臂式悬挂系统用转向节
CN104890464A (zh) 一种采用斜置板簧的半独立悬架
CN204452585U (zh) 四驱车后转向节
CN201086610Y (zh) 大型铰接客车铰接系统中的后桁架结构
CN204549848U (zh) 一种带内法兰座的驱动机构
CN202088812U (zh) 汽车前桥总成
CN201511761U (zh) 高承载半挂运输车或专用运输车的车轴
CN203318503U (zh) 一种车用转向节
CN204415037U (zh) 用于轻型巴士底盘系统的前桥新型支撑结构
CN201390243Y (zh) 载重抢险辅助轮
CN205150026U (zh) 可首尾连接的拖车
CN202163512U (zh) 半挂车活动牵引座装置
CN203739545U (zh) 一种汽车驱动后桥车轮螺栓总成
CN215944689U (zh) 一种独立悬架全挂车底盘
CN201784727U (zh) 一种柱式结构的罐车牵引装置
CN202593618U (zh) 轻型右转向节总成
CN201863908U (zh) 一种车用多功能摇杆

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120801