CN102393319A - 煤块自动压力仪 - Google Patents

煤块自动压力仪 Download PDF

Info

Publication number
CN102393319A
CN102393319A CN2011102495683A CN201110249568A CN102393319A CN 102393319 A CN102393319 A CN 102393319A CN 2011102495683 A CN2011102495683 A CN 2011102495683A CN 201110249568 A CN201110249568 A CN 201110249568A CN 102393319 A CN102393319 A CN 102393319A
Authority
CN
China
Prior art keywords
motor
lifting shafts
crucible
frame
automatic pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102495683A
Other languages
English (en)
Other versions
CN102393319B (zh
Inventor
班书昊
陈建芳
胡爱萍
蒋学东
李晓艳
赵蛟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yangxian Technology Co ltd
Original Assignee
Changzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou University filed Critical Changzhou University
Priority to CN 201110249568 priority Critical patent/CN102393319B/zh
Publication of CN102393319A publication Critical patent/CN102393319A/zh
Application granted granted Critical
Publication of CN102393319B publication Critical patent/CN102393319B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Solid Fuels And Fuel-Associated Substances (AREA)

Abstract

本发明公开了一种煤块自动压力仪,包括固定于机架上的定位板、安装在机架上的电机、可以放置6个坩埚的坩埚托盘、固定在坩埚托盘上的控制机构、6个平行的升降轴、分别放置在6个平行升降轴上端的6个配重、分别固定在6个平行升降轴下端的6个压块、与电机相连接的丝杠、套在丝杠上的螺母通过6根牵引索分别与套在6个平行升级轴上的6个套筒相连,用来实现6个平行升降轴的上升与下降,定位板用来保证升降轴的运动为直线运动。本发明是一种结构简单紧凑、操作简单、同时实现6个坩埚中无烟煤的煤块压制过程,从而提高无烟煤煤块批量制作的自动化仪器。

Description

煤块自动压力仪
技术领域
本发明涉及分析无烟煤粘结指数所需的煤块样品制作仪器领域,特指一种煤块自动压力仪。
背景技术
烟煤的粘结指数测定所需要的煤块样品是将一定质量的试验煤样和专用无烟煤,在规定的条件下混合,以6kg质量压紧实验煤样30s,然后放入马弗炉内快速加热成焦,所得焦块即煤块样品。因此在煤块样品的制作过程中,压紧的力道与时间对样品的制作至关重要。
现有技术中,对煤样进行压紧(参见图1所示)需要人工参与,即操作员按下手动杆4,升降轴2上升,在机架6上放置装有混合好煤样的坩埚5,然后轻轻抬起手动杆4,当升降轴2接触到坩埚5中的煤样时,操作员松开手动杆4,升降轴2在压块1的自重作用下压紧坩埚5内的煤样30s后,操作员要立即把手动杆4按下,取出坩埚5。整个过程中,操作员需要守候在压力器旁,且操作手动杆4的时间要求比较严,否则会影响样品的制作。由上述操作方式可知,现有技术需要大量人工参与环节,劳动强度大、工作效率低、煤样压紧可能有人为误差,不能适应烟煤粘结指数测定所需样品的精度要求。
发明内容
本发明要解决的技术问题是:针对现有技术存在的劳动强度大等问题,本发明提供一种结构紧凑、无需人工参与、能够一次压紧6个坩埚煤样,从而提高煤样批量压紧的自动压力仪。
为解决上述技术问题,本发明提出的解决方案为:一种煤块自动压力仪,它包括固定于机架上的定位板、电机、可以放置6个坩埚的坩埚托盘、固定在坩埚托盘上的控制机构、升降轴、放置在升降轴上端的配重、固定在升降轴下端的压块、与电机相连接的丝杠、螺母和牵引索,套在升降轴上的套筒通过牵引索与丝杠上的螺母相连,用来实现升降轴的上升与下降。
本发明包括机架、定位板、电机、坩埚、坩埚托盘、控制机构、升降轴、压块、电机、丝杠、螺母、牵引索、套筒;所述定位板固定于机架中部,所述电机安装在机架上方、所述坩埚托盘安装在机架下方,所述坩埚托盘上放置6个坩埚,所述控制机构固定在坩埚托盘上;6个平行的升降轴的上端分别放置6个配重,在6个平行升降轴的下端分别固定6个压块,丝杆上端与电机的轴相连,下端放置于止推轴承上,止推轴承放置在坩埚托盘的阶梯孔内,套在丝杆上的螺母分别通过6根牵引索与6个套筒相连,6个套筒分别套在6个相互平行的升降轴上;定位板定位升降轴直线运动。 
与现有技术相比,本发明的优点在于: 本发明的煤样自动压力仪装设有6个平行的升级轴,升降轴的正下方是可以放置6个坩埚的坩埚托盘,从而提高了压紧煤样的工作效率。升级轴凭借配重压紧坩埚内的煤样,30s后升降轴自动上升。由此可知,本发明结构简单、运动平稳、无需人工干预,且实现了批量煤样压紧过程,降低了劳动强度和人工误差,提高了样品制作的质量和数量。
附图说明
图1是现有技术的手动煤块压力仪的结构示意图。
图2是本发明的煤块自动压力仪主视图。
图3是本发明的煤块自动压力仪俯视图。
图中,1-压块;2- 升降轴;3-定位板;4-手动杆;5-坩埚;6-机架;7-套筒;8-牵引索; 9-丝杠; 10-螺母; 11-止推轴承; 12-电机; 13-坩埚托盘; 14-配重;15-控制机构。
具体实施方式
以下将结合附图和具体实施例对本发明作进一步详细说明。
结合图2和图3,本发明的煤块自动压力仪,包括固定于机架6上的定位板3、安装在机架6上的电机12、可以放置6个坩埚5的坩埚托盘13、固定在坩埚托盘13上的控制机构15、6个平行的升降轴2、分别放置在6个平行升降轴2上端的6个配重14、分别固定在6个平行升降轴2下端的6个压块1、与电机12相连接的丝杠9、套在丝杠9上的螺母10通过6根牵引索8分别与套在6个平行升级轴2上的6个套筒7相连,用来实现6个平行升降轴2的上升与下降,定位板3用来保证升降轴2的运动为直线运动。
结合图2和图3,丝杆9上端与电机12的轴相连,下端放置在止推轴承11上,止推轴承11放置在坩埚托盘13的阶梯孔内,套在丝杆9上的螺母10分别通过6根牵引索8与6个套筒7相连,6个套筒7分别套在6个相互平行的升降轴2上。当控制机构15启动电机12反转时,电机12带动丝杠9旋转,套在丝杠9上的螺母10由于受到6根牵引索8的作用不能旋转,故可沿丝杆9向上运动。当螺母10上升时,6根牵引索8处于拉紧状态,并分别通过套在6个升级轴2上的6个套筒7带动6个升降轴2上升,6个升降轴2分别沿着定位板3的6个孔向上运动。同理,当电机12正转时,电机12带动丝杠9正向旋转,套在丝杠9上的螺母10在6根牵引索8的作用下只能向下运动,6根牵引索8松弛,升降轴2分别在6个配重14的重力作用下向下运动并分别拉紧6根牵引索8。因此,只有6根牵引索8处于松弛状态,6个相互平行升级轴2就会向下运动。当螺母10下降到一定位置时,电机12停止,6根牵引索8再次松弛,此时6个配重14分别通过6个升降轴2上的6个压块1分别压紧6个坩埚5内的煤样。
工作过程: 先将装有煤样的6个坩埚5放置在坩埚托盘13上,控制机构15启动电机12正转,电机12带动丝杠9旋转,套在丝杠9上的螺母10由于受到牵引索8的作用下不能旋转只能下降,升级轴2在配重14的重力作用下向下运动,当升级轴2下端的压块1接触到煤样时,控制机构15关闭电机12,坩埚5内的煤样在配重14的作用下静压30s,之后控制机构15启动电机12反转,电机12带动丝杠9旋转,套在丝杠9上的螺母10受到牵引索8作用不能旋转只能上升,并通过牵引索8带动套筒7上升,套在升降轴2上的套筒7带动升级轴2上升,煤样压紧过程结束。

Claims (1)

1. 一种煤块自动压力仪,其特征在于:包括机架(6)、定位板(3)、电机(12)、坩埚(5)、坩埚托盘(13)、控制机构(15)、升降轴(2)、压块(1)、电机(12)、推轴承(11)、丝杠(9)、螺母(10)、牵引索(8)和套筒(7);所述定位板(3)固定于机架(6)中部,所述电机(12)安装在机架(6)上方、所述坩埚托盘(13)安装在机架(6)下方,所述坩埚托盘(13)上放置6个坩埚(5),所述控制机构(15)固定在坩埚托盘(13)上;6个平行的升降轴(2)的上端分别放置6个配重(14),在6个平行升降轴(2)的下端分别固定6个压块(1),丝杆(9)上端与电机(12)的轴相连,下端放置于止推轴承(11)上,止推轴承(11)放置在坩埚托盘(13)的阶梯孔内,套在丝杆(9)上的螺母(10)分别通过6根牵引索(8)与6个套筒(7)相连,6个套筒(7)分别套在6个相互平行的升降轴(2)上;定位板(3)定位升降轴(2)直线运动。
CN 201110249568 2011-08-29 2011-08-29 煤块自动压力仪 Active CN102393319B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110249568 CN102393319B (zh) 2011-08-29 2011-08-29 煤块自动压力仪

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110249568 CN102393319B (zh) 2011-08-29 2011-08-29 煤块自动压力仪

Publications (2)

Publication Number Publication Date
CN102393319A true CN102393319A (zh) 2012-03-28
CN102393319B CN102393319B (zh) 2013-06-19

Family

ID=45860679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110249568 Active CN102393319B (zh) 2011-08-29 2011-08-29 煤块自动压力仪

Country Status (1)

Country Link
CN (1) CN102393319B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104749012A (zh) * 2015-04-09 2015-07-01 常州大学 烟煤样品块高效制作设备
CN104792590A (zh) * 2015-04-09 2015-07-22 常州大学 烟煤样品块简易制作设备
CN105115806A (zh) * 2015-09-30 2015-12-02 常州大学 一种艾氏煤样实验样品简易制作设备
CN105241732A (zh) * 2015-10-02 2016-01-13 常州大学 一种操作器升降的烟煤灼烧物并行环向搅松设备
CN105300779A (zh) * 2015-09-30 2016-02-03 常州大学 一种具有称量和搅拌功能的艾氏煤样并行制作设备
CN105300778A (zh) * 2015-09-30 2016-02-03 常州大学 一种具有配制和搅拌功能的艾氏煤样简易制作设备
CN105353073A (zh) * 2015-10-22 2016-02-24 常州大学 一种用于艾氏测硫仪的双升降平动坩埚串行称量装置
CN105352839A (zh) * 2015-10-24 2016-02-24 常州大学 一种用于艾氏测硫仪的双升降直线并行称量装置
CN108152739A (zh) * 2017-12-27 2018-06-12 横店集团英洛华电气有限公司 轮椅左右驱动轮电机通用加载负载测试装置
CN105333933B (zh) * 2015-10-24 2019-01-29 常州大学 一种用于艾氏测硫仪的双升降周向并行称量装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2053139U (zh) * 1989-09-30 1990-02-21 刘昌元 节能藕煤机
JPH09276726A (ja) * 1996-04-10 1997-10-28 Nippon Steel Corp 微粉炭ミルの圧下力制御装置
CN201704269U (zh) * 2010-01-22 2011-01-12 武汉焦耐工程技术有限公司 试验焦炉用压实捣固机
CN202256311U (zh) * 2011-08-29 2012-05-30 常州大学 煤块自动压力仪

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2053139U (zh) * 1989-09-30 1990-02-21 刘昌元 节能藕煤机
JPH09276726A (ja) * 1996-04-10 1997-10-28 Nippon Steel Corp 微粉炭ミルの圧下力制御装置
CN201704269U (zh) * 2010-01-22 2011-01-12 武汉焦耐工程技术有限公司 试验焦炉用压实捣固机
CN202256311U (zh) * 2011-08-29 2012-05-30 常州大学 煤块自动压力仪

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王琪: "制样方法对测定烟煤粘结指数的影响", 《燃料与化工》, vol. 40, no. 6, 30 November 2009 (2009-11-30), pages 26 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104792590B (zh) * 2015-04-09 2018-02-02 常州大学 烟煤样品块简易制作设备
CN104792590A (zh) * 2015-04-09 2015-07-22 常州大学 烟煤样品块简易制作设备
CN104749012A (zh) * 2015-04-09 2015-07-01 常州大学 烟煤样品块高效制作设备
CN105115806A (zh) * 2015-09-30 2015-12-02 常州大学 一种艾氏煤样实验样品简易制作设备
CN105300779A (zh) * 2015-09-30 2016-02-03 常州大学 一种具有称量和搅拌功能的艾氏煤样并行制作设备
CN105300778A (zh) * 2015-09-30 2016-02-03 常州大学 一种具有配制和搅拌功能的艾氏煤样简易制作设备
CN105241732A (zh) * 2015-10-02 2016-01-13 常州大学 一种操作器升降的烟煤灼烧物并行环向搅松设备
CN105353073A (zh) * 2015-10-22 2016-02-24 常州大学 一种用于艾氏测硫仪的双升降平动坩埚串行称量装置
CN105352839A (zh) * 2015-10-24 2016-02-24 常州大学 一种用于艾氏测硫仪的双升降直线并行称量装置
CN105352839B (zh) * 2015-10-24 2018-10-19 常州大学 一种用于艾氏测硫仪的双升降直线并行称量装置
CN105333933B (zh) * 2015-10-24 2019-01-29 常州大学 一种用于艾氏测硫仪的双升降周向并行称量装置
CN108152739A (zh) * 2017-12-27 2018-06-12 横店集团英洛华电气有限公司 轮椅左右驱动轮电机通用加载负载测试装置
CN108152739B (zh) * 2017-12-27 2024-05-10 浙江联宜电机有限公司 轮椅左右驱动轮电机通用加载负载测试装置

Also Published As

Publication number Publication date
CN102393319B (zh) 2013-06-19

Similar Documents

Publication Publication Date Title
CN102393319B (zh) 煤块自动压力仪
CN104792590B (zh) 烟煤样品块简易制作设备
CN203758861U (zh) 冲击试验检测机
CN206095373U (zh) 一种称重用重力传感器
CN102380328A (zh) 带传动式多坩埚搅拌设备
CN104749012A (zh) 烟煤样品块高效制作设备
CN202894343U (zh) 一种车床的自动上料装置
CN202412286U (zh) 机械手臂上下位置调整装置
CN202256311U (zh) 煤块自动压力仪
CN202208537U (zh) 全自动抓砖码坯机
CN204584847U (zh) 一种自动机械手的框架式升降机构
CN203981251U (zh) 一种自动称量及放料系统
CN104807708A (zh) 一种全自动的洛氏硬度计及控制方法
CN201138317Y (zh) 全自动铁矿球团抗压强度检测装置的压溃机构
CN103344444A (zh) 轮胎试验机自动上胎装置及方法
CN203163871U (zh) 一种地上衡测试装置
CN202865277U (zh) 一种淬火设备的机械手抓料移料装置
CN202676560U (zh) Pcd控制橡胶高温疲劳龟裂试验机
CN204545209U (zh) 一种抓取移动装置
CN2502261Y (zh) 杠杆式定载荷材料试验机
CN202329488U (zh) 垫片厚度检测装置
CN105352570A (zh) 一种用于艾氏测硫仪的双动模式单坩埚称量装置
CN205751943U (zh) 行程开关配件装配机的开关座供料机构
CN216031707U (zh) 炭砖运动式炭砖切割设备
CN213875327U (zh) 一种自动加砝码硬度标准机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151014

Address after: Daitou town of Liyang City Ferry Street 213311 Jiangsu city of Changzhou province 8-2 No. 7

Patentee after: Liyang Chang Technology Transfer Center Co.,Ltd.

Address before: Gehu Lake Road Wujin District 213164 Jiangsu city of Changzhou province No. 1

Patentee before: Changzhou University

TR01 Transfer of patent right

Effective date of registration: 20201119

Address after: 214500 building a, Wandu hardware and electrical Expo City, Jingjiang City, Taizhou City, Jiangsu Province

Patentee after: Jingjiang Zhongtian boiler pump valve Sales Co.,Ltd.

Address before: Daitou town of Liyang City Ferry Street 213311 Jiangsu city of Changzhou province 8-2 No. 7

Patentee before: Liyang Chang Technology Transfer Center Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240516

Address after: No. 99, Suyuan Thermal Circuit, Jingjiang City, Taizhou City, Jiangsu Province, 214500

Patentee after: Jiangsu Yangxian Technology Co.,Ltd.

Country or region after: China

Address before: 214500 35, building a, Wandu hardware and electrical Expo City, Chengnan Park, Jingjiang City, Taizhou City, Jiangsu Province

Patentee before: Jingjiang Zhongtian boiler pump valve Sales Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right