CN102373715A - 基础平面部位和地下部位外墙后浇带超前止水施工方法 - Google Patents

基础平面部位和地下部位外墙后浇带超前止水施工方法 Download PDF

Info

Publication number
CN102373715A
CN102373715A CN2011102141994A CN201110214199A CN102373715A CN 102373715 A CN102373715 A CN 102373715A CN 2011102141994 A CN2011102141994 A CN 2011102141994A CN 201110214199 A CN201110214199 A CN 201110214199A CN 102373715 A CN102373715 A CN 102373715A
Authority
CN
China
Prior art keywords
steel plate
sealing water
reinforcing bar
ater
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102141994A
Other languages
English (en)
Other versions
CN102373715B (zh
Inventor
苏源源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
China 22MCC Group Corp Ltd
Original Assignee
1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP, China 22MCC Group Corp Ltd filed Critical 1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
Priority to CN 201110214199 priority Critical patent/CN102373715B/zh
Publication of CN102373715A publication Critical patent/CN102373715A/zh
Application granted granted Critical
Publication of CN102373715B publication Critical patent/CN102373715B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明涉及施工方法,具体是一种基础平面部位和地下部位外墙后浇带超前止水施工方法。基础平面部位施工步骤:混凝土垫层、防水及保护层施工、下侧固定钢筋绑扎、预留空隙填充、放置止水钢板、上侧固定钢筋绑扎、预留空隙填充、附加层混凝土浇筑、上部预留空隙填充沥青麻丝、沥青油膏填封、基础钢筋绑扎、后浇带模板施工、后浇带混凝土施工;地下部分外墙部位施工步骤:外侧固定钢筋绑扎、预留空隙填充、放置止水钢板、内侧固定钢筋绑扎、预留空隙填充、外墙墙体钢筋绑扎、后浇带模板施工、墙体混凝土浇筑、外侧预留空隙填充沥青麻丝、沥青油膏填封、外墙防水及保护层施工、后浇带混凝土施工。本发明可防止后浇带混凝土浇筑完毕后出现的渗漏问题。

Description

基础平面部位和地下部位外墙后浇带超前止水施工方法
技术领域:
本发明涉及后浇带止水施工方法,具体是一种基础平面部位和地下部位外墙后浇带超前止水施工方法。
背景技术:
目前,后浇带处止水材料一般选用橡胶止水带、PVC止水带、遇水膨胀止水条、止水钢板等,其中遇水膨胀止水条宜使用在地下水较少的环境中;橡胶、PVC止水带宜使用在后浇带与基础施工周期间隔较短、结构尺寸偏小处;止水钢板受施工环境影响较小且利于成品保护,但是不利于后浇带后续清理施工。无论采用何种材料,其施工方法均按照设计图纸要求进行,而没有根据现场施工环境和地勘报告进行选择,导致后浇带使用的止水材料无法满足现场施工需求;其次无论采取何种成品保护措施,后浇带在浇筑之前的二次清理无法把杂物清理彻底。
发明内容:
本发明旨在解决因后浇带在浇筑前杂物清理不彻底、止水材料没有根据现场实际情况选用,导致后浇带混凝土在浇筑完毕后出现渗漏的问题,而提供一种可以根治后浇带处渗漏、有利于后浇带止水材料的成品保护,减轻后浇带内后续杂物清理难度,方便后续施工的基础平面部位和地下部位外墙后浇带超前止水施工方法。
本发明解决所述问题采用的技术方案是:
一种基础平面部位后浇带超前止水施工方法,按如下步骤进行:
a.基础垫层施工之前在宽于基础后浇带500mm部位处,下挖400mm,按照45度扩散角施工,待垫层浇筑完毕后,按常规方法进行防水层和防水保护层施工;
b.从基础后浇带一侧开始绑扎止水钢板下部固定钢筋,在后基础浇带中部位置处预留50-80mm的空隙;
c.在固定钢筋预留空隙处填塞容重为20kg/m3,阻燃等级为B2级保温板;
d.加设止水钢板,中间和两边的凹槽顶部朝临水方向止水钢板连接处焊缝满焊;
e.绑扎固定止水钢板的上部钢筋,在中间预留80mm空隙,加添保温板或者竹胶板作为填充物,待附加层混凝土浇筑完毕后剔出;
f.后浇带底部附加层处混凝土浇筑,在浇筑时预留混凝土凹槽;
g.把止水钢板上部预留空隙内的模板取出,然后填塞麻丝沥青并在顶部预留30mm空隙;
h.在麻丝沥青顶部满嵌油膏,厚度至少30mm;
i.按照设计图纸要求绑扎基础钢筋;
j.基础钢筋绑扎完毕后,采用快易收口网在后浇带两侧支设模板;
k.基础混凝土浇筑完毕后,对后浇带进行覆盖措施,防止后期杂物进入后浇带内。
一种地下部位外墙后浇带超前止水施工方法,按如下步骤进行:
a. 地下部分外墙后浇带处用以固定止水钢板的固定钢筋在基础钢筋绑扎完毕后且外墙钢筋绑扎之前进行;
b. 在止水钢板外侧固定钢筋绑扎时预留80mm的空隙,预留空隙内填充保温板作为模板进行预留施工;
c. 止水钢板由基础平面焊接至墙体后浇带处,止水钢板焊接时采用搭接焊和满焊,止水钢板中部凹槽朝向迎水面;
d. 绑扎固定止水钢板的内侧钢筋,在固定止水钢板的内侧钢筋上焊接或绑扎单面带丝螺杆;
e. 按照设计图纸要求绑扎地下部分外墙的墙体钢筋,固定止水钢板的内侧钢筋与墙体钢筋绑扎在一起;
f. 在设计图纸要求的后浇带宽度范围内,采用快易收口网作为模板进行支设及固定;
g. 在墙体混凝土浇筑完毕后,及时把固定止水钢板外侧钢筋处的预留空隙内保温板取出,进行封闭保护,待地下部分外墙外侧防水卷材施工时,把预留空隙内杂物清理干净进行填塞麻丝沥青施工,同时在空隙最外侧预留30mm空隙;
h. 在麻丝沥青外侧满嵌30mm厚的沥青油膏,保证预留空隙防水效果及与防水卷材的结合;
i. 地下部分墙体防水卷材施工时,在预留空隙处增加一道附加层,确保后期防水效果。
与现有技术相比,本发明能有效防止后浇带混凝土浇筑完毕后出现的渗漏问题,且不会额外增加施工措施(如当地下部分外墙防水前于后浇带施工、后浇带模板加固措施等)而影响后期施工进度。
附图说明:
图1是超前后浇带底部构造示意图。
图2是止水钢板下部固定钢筋示意图。
图3是固定钢筋预留空隙处填塞保温板示意图。
图4是止水钢板放置示意图。
图5是止水钢板上部固定钢筋示意图。
图6是后浇带底部附加层处混凝土浇筑示意图。
图7是预留空隙内填塞麻丝沥青示意图。
图8是麻丝沥青顶部满嵌油膏示意图。
图9是绑扎基础钢筋示意图。
图10是后浇带两侧模板支设示意图。
图11是后浇带超前止水施工效果图。
图12是止水钢板外侧固定钢筋示意图。
图13是预留空隙处填塞保温板示意图。
图14是止水钢板放置示意图。
图15是止水钢板内侧固定钢筋示意图。
图16是地下部分外墙墙体钢筋绑扎示意图。
图17是地下部分外墙后浇带模板示意图。
图18是预留空隙处填塞麻丝沥青示意图。
图19是麻丝沥青外侧满嵌沥青油膏示意图。
图20是地下部分外墙外侧防水层示意图。
图21是地下部分外墙防水保护层示意图。
图中:基础垫层1,防水层2,防水保护层3,止水钢板下部固定钢筋4,保温板5,止水钢板6,止水钢板上部固定钢筋7,附加层混凝土8,混凝土凹槽9,麻丝沥青10,沥青油膏11,基础钢筋12,快易收口网13,基础混凝14,止水钢板外侧固定钢筋15,外墙墙边线16,止水钢板内侧固定钢筋17,单面带丝螺杆18,墙体钢筋19,外墙外侧防水层20,防水附加层21,外墙防水保护层22。
具体实施方式:
下面结合附图所示实施例详述本发明。
参见图1-图11,本发明所述基础平面部位后浇带超前止水施工方法,按如下步骤进行:
1.基础垫层1施工之前在宽于基础后浇带500mm部位处,下挖400mm,按照45度扩散角施工。待基础垫层1浇筑完毕后,进行防水层2、防水保护层3施工,具体施工方法同基础防水层及防水保护层施工(见图1)。
2.从基础后浇带一侧开始绑扎止水钢板下部固定钢筋4,在后基础浇带中部位置处预留50-80mm的空隙(确保后浇带底部附加层混凝土浇筑完毕后预留空隙在50mm)(见图2)。
3.在固定钢筋预留空隙处填塞容重为20kg/m3,阻燃等级为B2级的保温板5(见图3)。
4.加设止水钢板6时中间和两边的凹槽顶部要朝临地下水方向且止水钢板6连接处要满焊,焊缝要饱满(见图4)。
5.绑扎止水钢板上部固定钢筋7,并且在中间预留80mm空隙,加添保温板或者竹胶板等作为填充物,待附加层混凝土8浇筑完毕后剔出(见图5)。
6.进行后浇带底部附加层处混凝土8浇筑,并且在浇筑时预留混凝土凹槽9,以便与后浇带混凝土保持紧密结合(见图6)。
7.把止水钢板6上部预留空隙内的模板取出,然后填塞麻丝沥青10且在顶部预留30mm,以便后续施工(见图7)。
8.在麻丝沥青10顶部满嵌沥青油膏11,保证厚度在30mm,在沥青油膏11施工之前必须把空隙内杂物清理干净,特别是松散混凝土(见图8)。
9.按照设计图纸要求绑扎基础钢筋12,应注意后浇带部位是否有附加钢筋(见图9)。
10.基础钢筋12绑扎完毕后,采用快易收口网13在后浇带两侧进行模板支设(见图10)。
11.基础混凝土14浇筑完毕后,一定要对后浇带进行覆盖措施,防止后期杂物进入后浇带内(见图11)。
参见图12-图21,本发明所述地下部位外墙后浇带超前止水施工方法,按如下步骤进行:
1.由于地下部分墙体钢筋必须在基础钢筋绑扎完毕后(基础砼浇筑前)进行基础插筋,因此地下部分外墙后浇带处用以固定止水钢板的止水钢板外侧固定钢筋15必须在基础钢筋绑扎完毕后且外墙钢筋绑扎之前进行施工(见图12)。
2.在止水钢板外侧固定钢筋15绑扎时必须预留80mm的空隙,预留空隙内可以填充保温板5作为模板进行预留施工,以便在外墙混凝土浇筑完毕后取出(预留空隙作用是保证墙体砼之间存在空隙以便于楼座沉降变形)(见图13)。
3.止水钢板6由基础平面焊接至墙体后浇带处,止水钢板6焊接时尽量采用搭接焊和满焊,同样止水钢板6中部凹槽朝向迎水面(见图14)。
4.绑扎固定止水钢板内侧钢筋17,要考虑到墙体后浇带后续模板支设时的加固困难,因此在固定止水钢板内侧钢筋17上焊接或绑扎单面带丝螺杆18(最好在螺杆中部加设止水钢片)(见图15)。
5.按照设计图纸要求绑扎地下部分外墙的墙体钢筋19,固定止水钢板内侧钢筋17要与墙体钢筋18绑扎在一起(见图16)。
6.在设计图纸要求的后浇带宽度范围内采用快易收口网13作为模板进行支设及固定(见图17)。
7.在墙体混凝土浇筑完毕后要及时把固定止水钢板外侧钢筋处15的预留空隙内模板(保温板5)取出,进行封闭保护,待地下部分   外墙外侧防水卷材施工时,把预留空隙内杂物清理干净进行填塞麻丝沥青10施工,同时在空隙最外侧预留30mm空隙(见图18)。
8.在麻丝沥青10外侧满嵌30mm厚的沥青油膏11,以便保证预留空隙防水效果及与防水层的结合(见图19)。
9地下部分外墙外侧防水层20施工时尽量在预留空隙处增加一道防水附加层21,确保后期防水效果(见图20)。
10.考虑到施工周期通常在后浇带施工之前已进行基础防水施工,因此采用后浇带超前止水措施后,外墙防水保护层22施工时不必考虑保护层所用材料(因为后浇带附加层可以提供足够的强度以保证后浇带混凝土浇筑时不出现涨模而影响防水效果)(见图21)。

Claims (2)

1.一种基础平面部位后浇带超前止水施工方法,按如下步骤进行:
a.基础垫层施工之前在宽于基础后浇带500mm部位处,下挖400mm,按照45度扩散角施工,待垫层浇筑完毕后,按常规方法进行防水层和防水保护层施工;
b.从基础后浇带一侧开始绑扎止水钢板下部固定钢筋,在后基础浇带中部位置处预留50-80mm的空隙;
c.在固定钢筋预留空隙处填塞容重为20kg/m3,阻燃等级为B2级保温板;
d.加设止水钢板,中间和两边的凹槽顶部朝临水方向止水钢板连接处焊缝满焊;
e.绑扎固定止水钢板的上部钢筋,在中间预留80mm空隙,加添保温板或者竹胶板作为填充物,待附加层混凝土浇筑完毕后剔出;
f.后浇带底部附加层处混凝土浇筑,在浇筑时预留混凝土凹槽;
g.把止水钢板上部预留空隙内的模板取出,然后填塞麻丝沥青并在顶部预留30mm空隙;
h.在麻丝沥青顶部满嵌油膏,厚度至少30mm;
i.按照设计图纸要求绑扎基础钢筋;
j.基础钢筋绑扎完毕后,采用快易收口网在后浇带两侧支设模板;
k.基础混凝土浇筑完毕后,对后浇带进行覆盖措施,防止后期杂物进入后浇带内。
2.一种地下部位外墙后浇带超前止水施工方法,按如下步骤进行:
a. 地下部分外墙后浇带处用以固定止水钢板的固定钢筋在基础钢筋绑扎完毕后且外墙钢筋绑扎之前进行;
b. 在止水钢板外侧固定钢筋绑扎时预留80mm的空隙,预留空隙内填充保温板作为模板进行预留施工;
c. 止水钢板由基础平面焊接至墙体后浇带处,止水钢板焊接时采用搭接焊和满焊,止水钢板中部凹槽朝向迎水面;
d. 绑扎固定止水钢板的内侧钢筋,在固定止水钢板的内侧钢筋上焊接或绑扎单面带丝螺杆;
e. 按照设计图纸要求绑扎地下部分外墙的墙体钢筋,固定止水钢板的内侧钢筋与墙体钢筋绑扎在一起;
f. 在设计图纸要求的后浇带宽度范围内,采用快易收口网作为模板进行支设及固定;
g. 在墙体混凝土浇筑完毕后,及时把固定止水钢板外侧钢筋处的预留空隙内保温板取出,进行封闭保护,待地下部分外墙外侧防水卷材施工时,把预留空隙内杂物清理干净进行填塞麻丝沥青施工,同时在空隙最外侧预留30mm空隙;
h. 在麻丝沥青外侧满嵌30mm厚的沥青油膏,保证预留空隙防水效果及与防水卷材的结合;
i. 地下部分墙体防水卷材施工时,在预留空隙处增加一道附加层,确保后期防水效果。
CN 201110214199 2011-07-29 2011-07-29 基础平面部位和地下部位外墙后浇带超前止水施工方法 Active CN102373715B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110214199 CN102373715B (zh) 2011-07-29 2011-07-29 基础平面部位和地下部位外墙后浇带超前止水施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110214199 CN102373715B (zh) 2011-07-29 2011-07-29 基础平面部位和地下部位外墙后浇带超前止水施工方法

Publications (2)

Publication Number Publication Date
CN102373715A true CN102373715A (zh) 2012-03-14
CN102373715B CN102373715B (zh) 2013-08-14

Family

ID=45792889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110214199 Active CN102373715B (zh) 2011-07-29 2011-07-29 基础平面部位和地下部位外墙后浇带超前止水施工方法

Country Status (1)

Country Link
CN (1) CN102373715B (zh)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720216A (zh) * 2012-07-11 2012-10-10 南通市达欣工程股份有限公司 基础后浇带模板施工方法
CN103485423A (zh) * 2013-09-26 2014-01-01 中国华冶科工集团有限公司 后浇带留置的方法
CN103572784A (zh) * 2013-11-21 2014-02-12 中建二局第三建筑工程有限公司 一种超厚筏板后浇带模板支撑系统及其施工方法
CN103590427A (zh) * 2013-11-14 2014-02-19 苏州工业园区设计研究院股份有限公司 基础板后浇混凝土带构造
CN104594387A (zh) * 2013-11-04 2015-05-06 永升建设集团有限公司 改进的后浇带超前止水施工方法
CN105862928A (zh) * 2016-05-31 2016-08-17 中国冶集团有限公司 一种后浇带外墙超前止水处理结构及其施工工艺
CN106759517A (zh) * 2016-12-07 2017-05-31 北京首钢建设集团有限公司 后浇带超前止水方法
CN106869188A (zh) * 2017-04-07 2017-06-20 黄以恒 一种基础底板后浇带防渗漏水的施工结构及其施工方法
CN107119727A (zh) * 2017-06-29 2017-09-01 遵化市水务局 附加钢筋固定止水带的混凝土结构及其连续浇筑施工方法
CN107574842A (zh) * 2016-07-04 2018-01-12 五冶集团上海有限公司 地下室后浇带超前止水施工方法
CN108343092A (zh) * 2017-11-30 2018-07-31 宁波二十冶建设有限公司 一种现浇企口式外墙后浇带防护结构及施工方法
CN109736361A (zh) * 2019-01-17 2019-05-10 浙江展诚建设集团股份有限公司 一种用于基础施工时的剪力墙临时防水结构
CN109797874A (zh) * 2019-03-13 2019-05-24 秦山伟业建设集团有限公司 一种高层大底盘多塔楼后浇带超前止水施工方法
CN110029628A (zh) * 2019-05-24 2019-07-19 郑州水务建筑工程股份有限公司 一种水工筏板伸缩缝防水结构
CN110130405A (zh) * 2019-05-28 2019-08-16 中铁一局集团有限公司 一种地下结构分期施工结构缝防水施工方法
CN110344447A (zh) * 2019-07-15 2019-10-18 广东电白建设集团有限公司 一种地下室底板后浇带结构及其施工方法
CN110644523A (zh) * 2019-09-26 2020-01-03 北京崇建工程有限公司 一种塔吊基础与车库筏板一体化施工方法
CN112376624A (zh) * 2020-10-19 2021-02-19 中国一冶集团有限公司 地下室底板后浇带二次浇筑留置超前止水结构及施工方法
CN112695806A (zh) * 2020-12-22 2021-04-23 亚都建设集团有限公司 超前止水后浇带施工方法
CN113338476A (zh) * 2021-06-16 2021-09-03 重庆渝能建筑安装工程有限公司 装配式剪力墙拼接缝防水结构
CN114032967A (zh) * 2021-12-24 2022-02-11 中国二冶集团有限公司 地下室外墙后浇带提前封闭的模板装置及模板支设方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008075246A (ja) * 2006-09-19 2008-04-03 Kajima Corp 止水構造
DE102006053186A1 (de) * 2006-11-09 2008-05-15 Hochtief Construction Ag Verfahren zur Abdichtung eines Tunnels und Tunnelabdichtung
CN101298781A (zh) * 2008-06-13 2008-11-05 浙江省一建建设集团有限公司 地下室底板后浇带施工方法
CN101519881A (zh) * 2009-03-23 2009-09-02 中设建工集团有限公司 地下室后浇带施工工艺
CN201581510U (zh) * 2009-12-05 2010-09-15 山东天齐置业集团股份有限公司 一种基础底板超前止水后浇带
CN201598645U (zh) * 2009-12-11 2010-10-06 江苏双楼建设集团有限公司 基础底板超前止水后浇带
CN201865127U (zh) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 地下室底板加强防水型后浇带

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008075246A (ja) * 2006-09-19 2008-04-03 Kajima Corp 止水構造
DE102006053186A1 (de) * 2006-11-09 2008-05-15 Hochtief Construction Ag Verfahren zur Abdichtung eines Tunnels und Tunnelabdichtung
CN101298781A (zh) * 2008-06-13 2008-11-05 浙江省一建建设集团有限公司 地下室底板后浇带施工方法
CN101519881A (zh) * 2009-03-23 2009-09-02 中设建工集团有限公司 地下室后浇带施工工艺
CN201581510U (zh) * 2009-12-05 2010-09-15 山东天齐置业集团股份有限公司 一种基础底板超前止水后浇带
CN201598645U (zh) * 2009-12-11 2010-10-06 江苏双楼建设集团有限公司 基础底板超前止水后浇带
CN201865127U (zh) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 地下室底板加强防水型后浇带

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李东驰: "后浇带超前止水技术的工程应用", 《建材技术与应用》, no. 03, 30 June 2004 (2004-06-30), pages 39 - 40 *
肖华锋: "基础底板、外墙后浇带超前止水施工技术", 《第十七届华东六省一市建筑施工技术交流会论文集》, 31 December 2008 (2008-12-31), pages 465 - 467 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720216A (zh) * 2012-07-11 2012-10-10 南通市达欣工程股份有限公司 基础后浇带模板施工方法
CN103485423A (zh) * 2013-09-26 2014-01-01 中国华冶科工集团有限公司 后浇带留置的方法
CN103485423B (zh) * 2013-09-26 2015-12-02 中国华冶科工集团有限公司 后浇带留置的方法
CN104594387A (zh) * 2013-11-04 2015-05-06 永升建设集团有限公司 改进的后浇带超前止水施工方法
CN103590427A (zh) * 2013-11-14 2014-02-19 苏州工业园区设计研究院股份有限公司 基础板后浇混凝土带构造
CN103572784A (zh) * 2013-11-21 2014-02-12 中建二局第三建筑工程有限公司 一种超厚筏板后浇带模板支撑系统及其施工方法
CN103572784B (zh) * 2013-11-21 2015-09-30 中建二局第三建筑工程有限公司 一种超厚筏板后浇带模板支撑系统及其施工方法
CN105862928A (zh) * 2016-05-31 2016-08-17 中国冶集团有限公司 一种后浇带外墙超前止水处理结构及其施工工艺
CN107574842A (zh) * 2016-07-04 2018-01-12 五冶集团上海有限公司 地下室后浇带超前止水施工方法
CN106759517A (zh) * 2016-12-07 2017-05-31 北京首钢建设集团有限公司 后浇带超前止水方法
CN106869188A (zh) * 2017-04-07 2017-06-20 黄以恒 一种基础底板后浇带防渗漏水的施工结构及其施工方法
CN107119727A (zh) * 2017-06-29 2017-09-01 遵化市水务局 附加钢筋固定止水带的混凝土结构及其连续浇筑施工方法
CN108343092A (zh) * 2017-11-30 2018-07-31 宁波二十冶建设有限公司 一种现浇企口式外墙后浇带防护结构及施工方法
CN109736361A (zh) * 2019-01-17 2019-05-10 浙江展诚建设集团股份有限公司 一种用于基础施工时的剪力墙临时防水结构
CN109797874A (zh) * 2019-03-13 2019-05-24 秦山伟业建设集团有限公司 一种高层大底盘多塔楼后浇带超前止水施工方法
CN110029628A (zh) * 2019-05-24 2019-07-19 郑州水务建筑工程股份有限公司 一种水工筏板伸缩缝防水结构
CN110130405A (zh) * 2019-05-28 2019-08-16 中铁一局集团有限公司 一种地下结构分期施工结构缝防水施工方法
CN110344447A (zh) * 2019-07-15 2019-10-18 广东电白建设集团有限公司 一种地下室底板后浇带结构及其施工方法
CN110644523A (zh) * 2019-09-26 2020-01-03 北京崇建工程有限公司 一种塔吊基础与车库筏板一体化施工方法
CN112376624A (zh) * 2020-10-19 2021-02-19 中国一冶集团有限公司 地下室底板后浇带二次浇筑留置超前止水结构及施工方法
CN112695806A (zh) * 2020-12-22 2021-04-23 亚都建设集团有限公司 超前止水后浇带施工方法
CN113338476A (zh) * 2021-06-16 2021-09-03 重庆渝能建筑安装工程有限公司 装配式剪力墙拼接缝防水结构
CN114032967A (zh) * 2021-12-24 2022-02-11 中国二冶集团有限公司 地下室外墙后浇带提前封闭的模板装置及模板支设方法

Also Published As

Publication number Publication date
CN102373715B (zh) 2013-08-14

Similar Documents

Publication Publication Date Title
CN102373715B (zh) 基础平面部位和地下部位外墙后浇带超前止水施工方法
CN107326940B (zh) 一种地下室超前止水后浇带结构及其施工方法
CN207987983U (zh) 一种用于地下工程主体施工缝及后浇带的防水结构
CN106677440A (zh) 一种屋面女儿墙泛水结构及其施工方法
CN204000956U (zh) 一种地下室底板后浇带结构
CN103774663B (zh) 地下室抗浮锚筋的防水构造及施工方法
CN107489167A (zh) 一种地下综合管廊承插变形缝结构及其施工方法
CN204676609U (zh) 一种地下室底板后浇带加强型防水结构
CN201588207U (zh) 施工缝处混凝土浇筑装置
CN103161176B (zh) 主楼连体车库内塔吊基础施工方法
CN108867850A (zh) 一种预制式楼房及其施工方法
CN106988440A (zh) 一种用于地铁车站主体与附属接口处的防水结构及其施工方法
CN207110817U (zh) 卫生间门槛防水结构
CN104846935B (zh) 高位水池渗漏治理改造方法
CN110295630A (zh) 多层约束防渗漏的后浇带结构
CN109778916A (zh) 一种基于抗水板的地下室外墙后浇带防渗漏方法
CN201473974U (zh) 一种新型钢板止水带
CN206635820U (zh) 一种基础底板后浇带防渗漏水的施工结构
CN104831820A (zh) 一种厨房结构的防水系统
CN209603277U (zh) 地下室防水结构
CN203834477U (zh) 地下室抗浮锚筋的防水构造
CN204174629U (zh) 一种地下建筑轻型降水井点后浇带多道设防封堵结构
CN208122041U (zh) 一种ips现浇砼剪力墙自保温体系结构系统
CN212103924U (zh) 一种叠瓦式排水急流槽
CN204608839U (zh) 后浇带防锈蚀结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant