CN102108737A - 火力发电厂烟囱钢内筒液压提升倒装施工方法 - Google Patents

火力发电厂烟囱钢内筒液压提升倒装施工方法 Download PDF

Info

Publication number
CN102108737A
CN102108737A CN 201110009759 CN201110009759A CN102108737A CN 102108737 A CN102108737 A CN 102108737A CN 201110009759 CN201110009759 CN 201110009759 CN 201110009759 A CN201110009759 A CN 201110009759A CN 102108737 A CN102108737 A CN 102108737A
Authority
CN
China
Prior art keywords
inner cylinder
steel inner
shell ring
jack
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110009759
Other languages
English (en)
Inventor
杨明福
周克明
岳喜峰
朱远江
邵立宏
梁庆纯
薛宏
郭红旗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGDIAN YANTA ENGINEERING Co
Original Assignee
DONGDIAN YANTA ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGDIAN YANTA ENGINEERING Co filed Critical DONGDIAN YANTA ENGINEERING Co
Priority to CN 201110009759 priority Critical patent/CN102108737A/zh
Publication of CN102108737A publication Critical patent/CN102108737A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明公开了一种火力发电厂烟囱钢内筒液压提升倒装施工方法,其步骤如下:(1)将钢内筒划分成多节筒节,每一筒节划分成多个筒片;(2)首先在钢内筒内制作千斤顶支架基础,在千斤顶支架基础上安装液压提升装置并安装施工平台;(3)开始组装钢内筒第一节筒节,在第一节筒节内壁沿圆周方向焊接有多组门型卡,并通过门型卡卡装水平环形梁;(4)通过液压提升装置提升已装好的筒节至一节筒节的高度后,继续组装下一节筒节并与上一节筒节焊接;(5)割下门型卡连同水平环形梁转移安装到下一节筒节相应位置;(6)重复循环第(4)、(5)步,依次安装后续筒节。优点是:施工成本低;受力明确、操作简便、安全系数高;工期短,工程质量好。

Description

火力发电厂烟囱钢内筒液压提升倒装施工方法
技术领域
本发明涉及一种烟囱钢内筒施工方法,特别涉及一种火力发电厂烟囱钢内筒液压提升倒装施工方法。
背景技术
目前,火力发(热)电厂中高度在200m以上烟囱的钢内筒,国内外可行的安装方法有以下三种:1、“气压顶升倒装法";2、“钢索式液压提升倒装法";3、“液压顶升倒装法"。
1、气压顶升倒装法:以压缩空气为动力,以特制的内底座为支撑,将顶端密封的钢内筒与内底座组成“气缸与活塞”的关系。这种方法现场焊接工作量大,卷扬机牵引与气压顶升难以同步协调,顶升高度增加,钢内筒重心上升,易产生扭、晃现象,稳定性较差。
2、钢索式液压提升倒装法:以烟囱外筒顶部钢平台(或自制钢梁)为支撑,利用布置在其上的千斤顶,通过柔性钢绞线将钢内筒提升,但施工装备一次费用较高,对外筒、顶部钢平台、千斤顶支撑钢梁要求较高,施工人员上下不方便。
3、液压顶升倒装法:如CN101748800A,它以液压千斤顶作为驱动力,通过顶在钢内筒内壁的胀圈将整个钢内筒的重量经由液压千斤顶传递给基础来实现钢内筒的顶升。这种方法为确保胀圈紧固顶靠钢内筒内壁,除了安装在两片半圆形弧梁之间缺口处的螺旋千斤顶之外,在胀圈内侧还需设置一圈沿水平方向布置的顶靠千斤顶,因此施工装备较多、费用较高;而且由于胀圈和钢内筒之间主要靠摩擦形式传力,胀圈顶压力、压力均匀性等控制难度较高。
发明内容
本发明所要解决的技术问题是提供一种施工成本低,结构简单,受力明确、操作简便,安全系数高、工程质量好的火力发电厂烟囱钢内筒液压提升倒装施工方法。
本发明的技术方案如下:
(1)将烟囱钢内筒沿其高度方向划分成多节高度相等的筒节,每一筒节又按便于卷板制作的尺寸要求划分成大小相等的多个筒片;
(2)首先在烟囱钢内筒的预定安装位置内制作千斤顶支架基础,在千斤顶支架基础上安装液压提升装置并安装钢内筒施工平台;液压提升装置是由沿圆周均布在千斤顶支架基础上且相互连接的千斤顶支架,安装在千斤顶支架上的穿心式千斤顶,贯穿穿心式千斤顶的提升杆和固定在提升杆下端的滑动托架,以及控制穿心式千斤顶工作的液压控制系统构成;
(3)开始组装烟囱钢内筒顶端第一节筒节,将组成该筒节的多个筒片布置在钢内筒施工平台上围成第一节筒节并焊接,在第一节筒节内壁下部通过焊接沿圆周方向布置的多组门型卡安装水平环形梁;
(4)通过液压提升装置提升水平环形梁将已组装好的筒节提升至略高于一节筒节的高度后,在钢内筒施工平台上继续组装焊接下一节筒节并与上一节筒节焊接;
(5)控制液压提升装置释放已组装好的筒节,使已组装好的筒节完全落到钢内筒施工平台上,割下上一节筒节内壁的门型卡连同水平环形梁转移安装到下一节筒节相应位置;
(6)重复循环第(4)、(5)步,依次安装后续筒节,直至完成烟囱钢内筒全部筒节的安装。
上述的火力发电厂烟囱钢内筒液压提升倒装施工方法,所述的液压控制系统是由液压泵站,连接液压泵站与穿心式千斤顶的二条主油管路,均布在二条主油管路上且分别连接相邻的两个穿心式千斤顶的同步阀构成。
上述的火力发电厂烟囱钢内筒液压提升倒装施工方法,所述的门型卡为“凹”字形,水平环形梁是由二段弧形梁和连接二段环形梁的二个螺旋千斤顶组成。
本发明的优点是:
1、施工成本低。相对于气压顶升和液压顶升倒装法等工艺,本工艺施工装备投入少,千斤顶支架为定型产品,可周转,现场投入的仅为水平环形梁和门型卡,一座210米高的烟囱,措施性材料仅为13吨,大大降低了施工成本。
2、结构简单,受力明确、操作简便,安全系数高。相对于气压顶升和液压顶升倒装法,本工艺所使用的装置荷载传递方式简单,钢内筒的受力形式由“顶升”变为“提升”,关键部件门型卡采用焊接方式,操作和检验均便于控制;提升过程中,各关键部件便于观察和检查,同时便于操作,每个工作班2人操作即可完成提升。
3、施工工期短,工程质量好。由于本工艺投入少,故装拆方便,通常情况下,安装2天,拆除1天,大大缩短了施工工期;在工期紧张的情况下,通过在液压提升装置上部布置操作平台可同时完成钢内筒内侧贴砖工作,实现钢内筒提升与内部贴砖同时进行,可缩短烟囱工期30天。
附图说明
图1是本发明的结构示意图;
图2是图1的A-A剖视放大图;
图3是图2的B-B剖视放大图;
图4是本发明所涉及的液压控制系统的结构示意图。
图中:钢内筒1,筒节101,千斤顶支架基础2,千斤顶支架3,滑道301,穿心式千斤顶4,滑动托架5,提升杆6,螺旋千斤顶7,槽钢8,门型卡9,水平环形梁10,钢内筒施工平台11,上层平台12,下层平台13,钢板14,工字钢15,金属预埋件16,地基17,同步阀18,主油管路19,液压泵站20。
具体实施方式
该火力发电厂烟囱钢内筒液压提升倒装施工方法步骤如下:
1、将烟囱钢内筒1沿其高度方向划分成多节高度相等的筒节101,每一筒节101又按便于卷板制作的尺寸要求划分成大小相等的多个筒片。
2、如图1—图3所示,首先在烟囱钢内筒1的预定安装位置内的地基17上制作千斤顶支架基础2,千斤顶支架基础2采用混凝土浇注成圆柱形,其直径和深度需经过基础抗弯、抗剪、抗冲切、承载力验算,在千斤顶支架基础2内设置上、下两层钢筋且在其上表面中心设有金属预埋件16,在千斤顶支架基础2上安装液压提升装置,并安装钢内筒施工平台11。该液压提升装置是由沿圆周均布在千斤顶支架基础2上且相互连接的千斤顶支架3,安装在千斤顶支架3上的穿心式千斤顶4,贯穿穿心式千斤顶4的提升杆6和固定在提升杆6下端的滑动托架5,以及控制穿心式千斤顶4工作的液压控制系统构成。本实施例中千斤顶支架3和穿心式千斤顶4的数量各以10个为例。千斤顶支架3支撑在千斤顶支架基础2上,在千斤顶支架3上对应钢内筒1一侧留有滑道301,所述的滑动托架5由滑道301引出。在千斤顶支架3上端设置有两层平台,分别为上层平台12和下层平台13。所述的穿心式千斤顶4及其上卡头401安装在上层平台12上,穿心式千斤顶4的下卡头402安装在下层平台13上。在金属预埋件16上垂直焊接有工字钢15,在工字钢15顶端焊接有钢板14,所述的千斤顶支架3的上、下两端与钢板14和金属预埋件16分别通过槽钢8焊接,相邻千斤顶支架3的上、下两端也分别通过槽钢8焊接。如图4所示,所述的液压控制系统是由液压泵站20,连接液压泵站20与穿心式千斤顶4的二条主油管路19,均布在二条主油管路19上且分别连接相邻的两个穿心式千斤顶4的同步阀18构成。
3、开始组装烟囱钢内筒1顶端第一节筒节101,将组成该筒节101的多个筒片布置在钢内筒施工平台11上围成第一节筒节101并焊接成一体,在第一节筒节101内壁下部沿圆周方向焊接有多组门型卡9,并通过门型卡9卡装水平环形梁10。门型卡9为“凹”字形钢板制成,其数量根据所要提升的钢内筒的总重量确定,为缩短施工工期,在开始组装时载荷较小,可适当减少门型卡9数量,在组装后期载荷较大时再增加门型卡9数量。所述的水平环形梁10是由二段半圆形的弧形梁和连接二段弧形梁的二个螺旋千斤顶7组成。水平环形梁10卡在门型卡9的凹槽内并通过螺旋千斤顶7顶胀在筒节101内壁上。
4、如图2所示,通过液压控制系统控制穿心式千斤顶4,使穿心式千斤顶4的上、下卡头配合往复提升提升杆6,从而通过滑动托架5提升水平环形梁10将已组装好的筒节101提升至略高于一节筒节的高度,高度之差为5~10mm即可;在钢内筒施工平台上继续组装焊接下一节筒节并与上一节筒节进行水平缝焊接。
5、控制液压提升装置释放已组装好的筒节101,使已组装好的筒节101落实到钢内筒施工平台11上,割下上一节筒节内壁的门型卡9连同水平环形梁10转移安装到下一节筒节相应位置。
6、重复循环第4、5步操作,依次安装后续筒节101,直至完成烟囱钢内筒1全部筒节的安装。最后割下焊接在最下端筒节上的门型卡9,便可卸下全部提升工具。

Claims (3)

1.一种火力发电厂烟囱钢内筒液压提升倒装施工方法,其特征在于步骤如下:
(1)将烟囱钢内筒沿其高度方向划分成多节高度相等的筒节,每一筒节又按便于卷板制作的尺寸要求划分成大小相等的多个筒片;
(2)首先在烟囱钢内筒的预定安装位置内制作千斤顶支架基础,在千斤顶支架基础上安装液压提升装置并安装钢内筒施工平台;液压提升装置是由沿圆周均布在千斤顶支架基础上且相互连接的千斤顶支架,安装在千斤顶支架上的穿心式千斤顶,贯穿穿心式千斤顶的提升杆和固定在提升杆下端的滑动托架,以及控制穿心式千斤顶工作的液压控制系统构成;
(3)开始组装烟囱钢内筒顶端第一节筒节,将组成该筒节的多个筒片布置在钢内筒施工平台上围成第一节筒节并焊接,在第一节筒节内壁下部通过焊接沿圆周方向布置的多组门型卡安装水平环形梁;
(4)通过液压提升装置提升水平环形梁将已组装好的筒节提升至略高于一节筒节的高度后,在钢内筒施工平台上继续组装焊接下一节筒节并与上一节筒节焊接;
(5)控制液压提升装置释放已组装好的筒节,使已组装好的筒节落到钢内筒施工平台上,割下上一节筒节内壁的门型卡连同水平环形梁转移安装到下一节筒节相应位置;
(6)重复循环第(4)、(5)步,依次安装后续筒节,直至完成烟囱钢内筒全部筒节的安装。
2.根据权利要求1所述的火力发电厂烟囱钢内筒液压提升倒装施工方法,其特征是:所述的液压控制系统是由液压泵站,连接液压泵站与穿心式千斤顶的二条主油管路,均布在二条主油管路上且分别连接相邻的两个穿心式千斤顶的同步阀构成。
3.根据权利要求1所述的火力发电厂烟囱钢内筒液压提升倒装施工方法,其特征是:所述的门型卡为“凹”字形,水平环形梁是由二段弧形梁和连接二段环形梁的二个螺旋千斤顶组成。
CN 201110009759 2011-01-18 2011-01-18 火力发电厂烟囱钢内筒液压提升倒装施工方法 Pending CN102108737A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110009759 CN102108737A (zh) 2011-01-18 2011-01-18 火力发电厂烟囱钢内筒液压提升倒装施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110009759 CN102108737A (zh) 2011-01-18 2011-01-18 火力发电厂烟囱钢内筒液压提升倒装施工方法

Publications (1)

Publication Number Publication Date
CN102108737A true CN102108737A (zh) 2011-06-29

Family

ID=44173008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110009759 Pending CN102108737A (zh) 2011-01-18 2011-01-18 火力发电厂烟囱钢内筒液压提升倒装施工方法

Country Status (1)

Country Link
CN (1) CN102108737A (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243961A (zh) * 2013-03-15 2013-08-14 东北电业管理局烟塔工程公司 火力发电厂烟囱钛板钢内筒倒装施工装置
WO2015021693A1 (zh) * 2013-08-14 2015-02-19 中国十七冶集团有限公司 一种钢烟囱筒体的倒装施工方法
CN104481194A (zh) * 2014-10-29 2015-04-01 天津二十冶建设有限公司 一种直立式筒状设备的倒装方法
CN104499762A (zh) * 2015-01-19 2015-04-08 江西建工第二建筑有限责任公司 一种烟囱单钢内筒液压提升装置的安装结构
CN104563590A (zh) * 2015-01-16 2015-04-29 江西建工第二建筑有限责任公司 烟囱钢内筒液压提升施工装置及其方法
CN105776067A (zh) * 2016-05-25 2016-07-20 中国能源建设集团湖南火电建设有限公司 提升装置和变径吸收塔的倒装方法
CN105836678A (zh) * 2016-05-25 2016-08-10 中国能源建设集团湖南火电建设有限公司 大型罐体提升装置及大型罐体提升方法
CN106115474A (zh) * 2016-08-29 2016-11-16 共享钢构有限责任公司 超高层钢结构塔架的提升方法
CN107263025A (zh) * 2017-06-08 2017-10-20 中国化学工程第十建设有限公司 一种圆形筒体非标设备的制作工艺
CN107476441A (zh) * 2017-09-26 2017-12-15 浙江诸安建设集团有限公司 烟囱多管集束式钛钢内筒液压钢绞线提升倒装施工方法
CN110306864A (zh) * 2019-06-19 2019-10-08 河南省工建集团有限责任公司 一种基于倒装法的烟囱钛钢钢内管液压提升装置及方法
CN110847616A (zh) * 2019-11-27 2020-02-28 山东国舜建设集团有限公司 大体积钢架烟道安装方法
CN110847687A (zh) * 2019-11-19 2020-02-28 山东国舜建设集团有限公司 一种锥形直排烟囱的快速安装方法
CN112338484A (zh) * 2020-10-30 2021-02-09 西安热工研究院有限公司 一种钢套钢保温管套管工具
CN113279620A (zh) * 2021-04-21 2021-08-20 北京崇建工程有限公司 一种套筒式多管烟囱施工工法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3694893A (en) * 1969-06-11 1972-10-03 Hitachi Shipbuilding Eng Co Method for constructing cylindrical structures such as steel chimneys
CN1095980A (zh) * 1993-06-04 1994-12-07 中国化学工程第三建设公司 贮罐液压提升倒装法及其液压提升装置
WO2001007731A1 (de) * 1999-07-23 2001-02-01 Ed. Züblin Ag Verfahren zur herstellung von türmen grosser höhe und grossen durchmessers in gleitschalung
CN1477332A (zh) * 2003-07-04 2004-02-25 谢锡增 一种钢烟囱的制作、安装工艺及专用支撑架
CN101619630A (zh) * 2009-06-30 2010-01-06 武汉京冶地基基础工程有限责任公司 钢烟囱的安装方法及其实施的顶升装置
CN101748800A (zh) * 2009-12-30 2010-06-23 河南四建股份有限公司 烟囱钢内筒液压顶升倒装法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3694893A (en) * 1969-06-11 1972-10-03 Hitachi Shipbuilding Eng Co Method for constructing cylindrical structures such as steel chimneys
CN1095980A (zh) * 1993-06-04 1994-12-07 中国化学工程第三建设公司 贮罐液压提升倒装法及其液压提升装置
WO2001007731A1 (de) * 1999-07-23 2001-02-01 Ed. Züblin Ag Verfahren zur herstellung von türmen grosser höhe und grossen durchmessers in gleitschalung
CN1477332A (zh) * 2003-07-04 2004-02-25 谢锡增 一种钢烟囱的制作、安装工艺及专用支撑架
CN101619630A (zh) * 2009-06-30 2010-01-06 武汉京冶地基基础工程有限责任公司 钢烟囱的安装方法及其实施的顶升装置
CN101748800A (zh) * 2009-12-30 2010-06-23 河南四建股份有限公司 烟囱钢内筒液压顶升倒装法

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243961B (zh) * 2013-03-15 2015-05-13 东北电业管理局烟塔工程公司 火力发电厂烟囱钛板钢内筒倒装施工装置
CN103243961A (zh) * 2013-03-15 2013-08-14 东北电业管理局烟塔工程公司 火力发电厂烟囱钛板钢内筒倒装施工装置
WO2015021693A1 (zh) * 2013-08-14 2015-02-19 中国十七冶集团有限公司 一种钢烟囱筒体的倒装施工方法
CN104481194A (zh) * 2014-10-29 2015-04-01 天津二十冶建设有限公司 一种直立式筒状设备的倒装方法
CN104481194B (zh) * 2014-10-29 2016-08-24 中冶天工集团天津有限公司 一种直立式筒状设备的倒装方法
CN104563590A (zh) * 2015-01-16 2015-04-29 江西建工第二建筑有限责任公司 烟囱钢内筒液压提升施工装置及其方法
CN104499762A (zh) * 2015-01-19 2015-04-08 江西建工第二建筑有限责任公司 一种烟囱单钢内筒液压提升装置的安装结构
CN105776067A (zh) * 2016-05-25 2016-07-20 中国能源建设集团湖南火电建设有限公司 提升装置和变径吸收塔的倒装方法
CN105836678A (zh) * 2016-05-25 2016-08-10 中国能源建设集团湖南火电建设有限公司 大型罐体提升装置及大型罐体提升方法
CN106115474B (zh) * 2016-08-29 2018-03-23 共享钢构有限责任公司 超高层钢结构塔架的提升方法
CN106115474A (zh) * 2016-08-29 2016-11-16 共享钢构有限责任公司 超高层钢结构塔架的提升方法
CN107263025A (zh) * 2017-06-08 2017-10-20 中国化学工程第十建设有限公司 一种圆形筒体非标设备的制作工艺
CN107476441A (zh) * 2017-09-26 2017-12-15 浙江诸安建设集团有限公司 烟囱多管集束式钛钢内筒液压钢绞线提升倒装施工方法
CN107476441B (zh) * 2017-09-26 2019-08-27 浙江诸安建设集团有限公司 烟囱多管集束式钛钢内筒液压钢绞线提升倒装施工方法
CN110306864A (zh) * 2019-06-19 2019-10-08 河南省工建集团有限责任公司 一种基于倒装法的烟囱钛钢钢内管液压提升装置及方法
CN110847687A (zh) * 2019-11-19 2020-02-28 山东国舜建设集团有限公司 一种锥形直排烟囱的快速安装方法
CN110847687B (zh) * 2019-11-19 2021-06-15 山东国舜建设集团有限公司 一种锥形直排烟囱的快速安装方法
CN110847616A (zh) * 2019-11-27 2020-02-28 山东国舜建设集团有限公司 大体积钢架烟道安装方法
CN112338484A (zh) * 2020-10-30 2021-02-09 西安热工研究院有限公司 一种钢套钢保温管套管工具
CN113279620A (zh) * 2021-04-21 2021-08-20 北京崇建工程有限公司 一种套筒式多管烟囱施工工法

Similar Documents

Publication Publication Date Title
CN102108737A (zh) 火力发电厂烟囱钢内筒液压提升倒装施工方法
US4064616A (en) Method for constructing a blast furnace
CN103243961B (zh) 火力发电厂烟囱钛板钢内筒倒装施工装置
CN100572673C (zh) 一种中跨连续梁造桥机
CN102235107B (zh) 烟囱钢内筒的液压提升施工方法
CN109231007B (zh) 一种电炉本体吊运、安装工艺
CN102587281A (zh) 步履式多点顶推施工方法
CN101486091A (zh) 上方吊装空间有限的大包回转台整体更换方法
CN201224671Y (zh) 储罐倒装安装的提升装置
CN102912736A (zh) 桁架拱桥的立拼装施工方法
CN104727545A (zh) 大型水塔筒身液压滑模垂直运输系统及方法
CN109055637B (zh) 一种高炉大修中炉壳安装的液压提升工艺
CN102190249A (zh) 位于多层框架平台底层设备的吊装方法
CN201933613U (zh) 火力发电厂烟囱钢内筒液压提升倒装施工装置
CN101625201B (zh) 步进式加热炉水梁检修设备及检修方法
CN204958963U (zh) 一种转炉托圈更换的顶升装置
CN2937233Y (zh) 一种中跨连续梁造桥机
CN211470624U (zh) 脱硫塔变径段液压顶升倒装装置
CN207158740U (zh) 移动式检修平台
CN203795947U (zh) 烟囱单钢内筒液压提升倒装施工装置
CN111039219B (zh) 脱硫塔变径段液压顶升倒装方法及装置
CN202881858U (zh) 用于桁架拱桥立拼装施工的胎架
CN113356056A (zh) 一种大跨径钢桥工厂装配化整体制造方法
CN204954202U (zh) 一种高炉炉壳内壁焊接平台
CN202099311U (zh) 四点悬挂式大型转炉中托圈的组装平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110629