CN201933613U - 火力发电厂烟囱钢内筒液压提升倒装施工装置 - Google Patents

火力发电厂烟囱钢内筒液压提升倒装施工装置 Download PDF

Info

Publication number
CN201933613U
CN201933613U CN2011200140988U CN201120014098U CN201933613U CN 201933613 U CN201933613 U CN 201933613U CN 2011200140988 U CN2011200140988 U CN 2011200140988U CN 201120014098 U CN201120014098 U CN 201120014098U CN 201933613 U CN201933613 U CN 201933613U
Authority
CN
China
Prior art keywords
inner cylinder
steel inner
hydraulic
construction device
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200140988U
Other languages
English (en)
Inventor
杨明福
周克明
岳喜峰
朱远江
邵立宏
梁庆纯
薛宏
郭红旗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Power tobacco Tower Engineering Co., Ltd.
Original Assignee
DONGDIAN YANTA ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGDIAN YANTA ENGINEERING Co filed Critical DONGDIAN YANTA ENGINEERING Co
Priority to CN2011200140988U priority Critical patent/CN201933613U/zh
Application granted granted Critical
Publication of CN201933613U publication Critical patent/CN201933613U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本实用新型公开了一种火力发电厂烟囱钢内筒液压提升倒装施工装置,包括沿圆周方向均布固定在钢内筒内侧且相互连接的液压支架以及液压控制系统,其特殊之处是:在液压支架上分别安装有穿心式千斤顶,在穿心式千斤顶上贯穿并卡装有提升杆,在提升杆下端固接有滑动托架,滑动托架由液压支架对应钢内筒一侧引出;该装置还设有水平环形梁以及卡在水平环形梁上并用于与钢内筒焊接的门型卡。优点是:施工成本低,结构简单,受力明确、操作简便,安全系数高,施工工期短,工程质量好。

Description

火力发电厂烟囱钢内筒液压提升倒装施工装置
技术领域
本实用新型涉及一种烟囱钢内筒施工装置,特别涉及一种火力发电厂烟囱钢内筒液压提升倒装施工装置。
背景技术
目前,火力发(热)电厂中高度在200m以上烟囱的钢内筒,国内外安装的可行方法有三种:一是“气压顶升倒装法";二是“钢索式液压提升倒装法";三是“液压顶升倒装法"。
CN101748800A公开了一种烟囱钢内筒液压顶升倒装法,它以液压千斤顶作为驱动力,通过顶在钢内筒内壁的胀圈将整个钢内筒的重量经由液压千斤顶传递给基础来实现钢内筒的顶升。这种方法为确保胀圈紧固顶靠钢内筒内壁,除了安装在两片半圆形弧梁之间缺口处的螺旋千斤顶之外,在胀圈内侧还需设置一圈沿水平方向布置的顶靠千斤顶,因此施工装备较多、费用较高;而且由于胀圈和钢内筒之间主要靠摩擦形式传力,胀圈顶压力、压力均匀性等控制难度较高。
发明内容
本实用新型所要解决的技术问题是提供一种施工成本低,结构简单,受力明确、操作简便,安全系数高、工程质量好的火力发电厂烟囱钢内筒液压提升倒装施工装置。
本实用新型的技术方案如下:它包括沿圆周方向均布固定在钢内筒内侧且相互连接的液压支架以及液压控制系统,其特殊之处是:在液压支架上分别安装有穿心式千斤顶,在穿心式千斤顶上贯穿并卡装有提升杆,在提升杆下端固接有滑动托架,滑动托架由液压支架对应钢内筒一侧引出;该装置还设有水平环形梁以及卡在水平环形梁上并用于与钢内筒焊接的门型卡。
上述的液压控制系统是由液压泵站,连接液压泵站与穿心式千斤顶的二条公共油管,均布在二条公共油管上且分别连接相邻的两个穿心式千斤顶的同步阀构成。
上述的门型卡为“凹”字形,水平环形梁是由二段弧形梁和连接二段环形梁的二个螺旋千斤顶组成。
本实用新型的优点是:
1、施工成本低。对比液压顶升倒装法所使用的施工装置,本实用新型施工装备投入少,液压支架为定型产品、可周转,现场投入的仅为水平环形梁和门型卡,一座210米高的烟囱,措施性材料仅为13吨,大大降低了施工成本。
2、结构简单,受力明确、操作简便,安全系数高。相对于液压顶升倒装法的施工装置,本施工装置荷载传递方式简单,钢内筒的受力形式由“顶升”变为“提升”,易于控制且便于操作,每个工作班2人即可完成提升。
3、施工工期短,工程质量好。由于施工装备投入少,故装拆方便,通常情况下,安装2天,拆除1天,大大缩短了施工工期。
附图说明
图1是本实用新型的结构示意图;
图2是图1的A-A剖视放大图;
图3是图2的B-B剖视放大图;
图4是本实用新型的液压控制系统的结构示意图。
图中:钢内筒1,支架基础2,液压支架3,滑道301,穿心式千斤顶4,滑动托架5,提升杆6,螺旋千斤顶7,槽钢8,门型卡9,水平环形梁10,钢内筒施工平台11,上层平台12,下层平台13,立柱14,预埋件15,同步阀16,公共油管17,液压泵站18。
具体实施方式
如图所示,该火力发电厂烟囱钢内筒液压提升倒装施工装置包括沿圆周方向均布固定在钢内筒1内侧且相互连接的液压支架3以及液压控制系统,所述的液压支架3是由底座和二根并列布置在底座上并通过钢板焊接的H型钢构成,在液压支架3上对应钢内筒1一侧留有滑道301,液压支架3的底座支撑在位于地面的支架基础2上。在钢内筒1内的中心处通过预埋件15垂直焊接有立柱14,所述的液压支架3与立柱14的上、下端之间以及相邻的液压支架3之间分别通过槽钢8焊接。在液压支架3上分别安装有穿心式千斤顶4,在液压支架3上端设置有两层平台,所述的穿心式千斤顶4及其上卡头401安装在上层平台12上,穿心式千斤顶4的下卡头402安装在下层平台13上。在穿心式千斤顶4及其上、下卡头上贯穿并卡装有提升杆6,在提升杆6下端固接有滑动托架5,滑动托架5由液压支架3的滑道301引出。液压支架3和穿心式千斤顶4的数量随钢内筒1重量的增大而增加,本实施例以10组为例。
所述的液压控制系统是由液压泵站18,连接液压泵站18与穿心式千斤顶4的二条公共油管17,均布在二条公共油管17上且分别连接相邻的两个穿心式千斤顶4的同步阀16构成。该装置还设有水平环形梁10以及卡在水平环形梁10上并用于与钢内筒1焊接的若干“凹”字型门型卡9。水平环形梁10是由二段弧形梁和连接二段环形梁的二个螺旋千斤顶7组成,水平环形梁10的直径略小于钢内筒1的内径。
施工时,将烟囱钢内筒1沿其高度方向划分成若干便于提升的筒节,每一筒节又按便于卷板制作的尺寸要求划分成大小相等的若干筒片;在钢内筒施工平台11上依次组装焊接每一筒节,组装一个筒节后将门型卡9焊接到该筒节内壁下部,通过螺旋千斤顶7将卡在门型卡9上的水平环形梁10胀紧到筒节内壁,通过液压控制系统控制穿心式千斤顶4,使穿心式千斤顶4的上、下卡头配合往复提拉提升杆6,从而通过滑动托架5提升水平环形梁10和门型卡9将已组装好的筒节提升至略高于一节筒节的高度后,继续组装焊接下一节筒节并与上一节筒节进行水平缝焊接。然后控制液压提升装置释放已组装好的筒节,使已组装好的筒节落实到钢内筒施工平台11上,割下上一节筒节内壁的门型卡9连同水平环形梁10转移安装到下一节筒节相应位置,重复提升并依次安装后续筒节,直至完成烟囱钢内筒全部筒节的安装。

Claims (3)

1.一种火力发电厂烟囱钢内筒液压提升倒装施工装置,包括沿圆周方向均布固定在钢内筒内侧且相互连接的液压支架以及液压控制系统,其特征是:在液压支架上分别安装有穿心式千斤顶,在穿心式千斤顶上贯穿并卡装有提升杆,在提升杆下端固接有滑动托架,滑动托架由液压支架对应钢内筒一侧引出;该装置还设有水平环形梁以及卡在水平环形梁上并用于与钢内筒焊接的门型卡。
2.根据权利要求1所述的火力发电厂烟囱钢内筒液压提升倒装施工装置,其特征是:所述的液压控制系统是由液压泵站,连接液压泵站与穿心式千斤顶的二条公共油管,均布在二条公共油管上且分别连接相邻的两个穿心式千斤顶的同步阀构成。
3.根据权利要求1所述的火力发电厂烟囱钢内筒液压提升倒装施工装置,其特征是:所述的门型卡为“凹”字形,所述的水平环形梁是由二段弧形梁和连接二段环形梁的二个螺旋千斤顶组成。
CN2011200140988U 2011-01-18 2011-01-18 火力发电厂烟囱钢内筒液压提升倒装施工装置 Expired - Lifetime CN201933613U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200140988U CN201933613U (zh) 2011-01-18 2011-01-18 火力发电厂烟囱钢内筒液压提升倒装施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200140988U CN201933613U (zh) 2011-01-18 2011-01-18 火力发电厂烟囱钢内筒液压提升倒装施工装置

Publications (1)

Publication Number Publication Date
CN201933613U true CN201933613U (zh) 2011-08-17

Family

ID=44445138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200140988U Expired - Lifetime CN201933613U (zh) 2011-01-18 2011-01-18 火力发电厂烟囱钢内筒液压提升倒装施工装置

Country Status (1)

Country Link
CN (1) CN201933613U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535843A (zh) * 2011-12-16 2012-07-04 马鞍山钢铁建设集团有限公司 一种圆形钢筋混凝土烟囱筒壁施工方法及液压滑模装置
CN103437589A (zh) * 2013-08-14 2013-12-11 中国十七冶集团有限公司 一种钢烟囱筒体的倒装施工方法
CN107269024A (zh) * 2016-04-08 2017-10-20 五冶集团上海有限公司 塔更换施工中消除塔底板与基础之间吸力方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535843A (zh) * 2011-12-16 2012-07-04 马鞍山钢铁建设集团有限公司 一种圆形钢筋混凝土烟囱筒壁施工方法及液压滑模装置
CN102535843B (zh) * 2011-12-16 2014-03-12 马鞍山钢铁建设集团有限公司 一种圆形钢筋混凝土烟囱筒壁施工方法及液压滑模装置
CN103437589A (zh) * 2013-08-14 2013-12-11 中国十七冶集团有限公司 一种钢烟囱筒体的倒装施工方法
CN103437589B (zh) * 2013-08-14 2015-11-18 中国十七冶集团有限公司 一种钢烟囱筒体的倒装施工方法
CN107269024A (zh) * 2016-04-08 2017-10-20 五冶集团上海有限公司 塔更换施工中消除塔底板与基础之间吸力方法

Similar Documents

Publication Publication Date Title
CN102108737A (zh) 火力发电厂烟囱钢内筒液压提升倒装施工方法
CN103243961A (zh) 火力发电厂烟囱钛板钢内筒倒装施工装置
CN102235107B (zh) 烟囱钢内筒的液压提升施工方法
WO2015021693A1 (zh) 一种钢烟囱筒体的倒装施工方法
CN201933613U (zh) 火力发电厂烟囱钢内筒液压提升倒装施工装置
CN102912736A (zh) 桁架拱桥的立拼装施工方法
CN105108395A (zh) 一种高炉炉壳内壁焊接平台及其搭设方法
CN201224671Y (zh) 储罐倒装安装的提升装置
CN205242885U (zh) 轻质混凝土预制楼梯连接结构
CN105952228A (zh) 一种内罐顶为平吊顶的双层储罐施工方法
CN203795947U (zh) 烟囱单钢内筒液压提升倒装施工装置
CN109720989B (zh) 卧式换热器管束安装方法
CN101625201B (zh) 步进式加热炉水梁检修设备及检修方法
CN211470624U (zh) 脱硫塔变径段液压顶升倒装装置
CN202881858U (zh) 用于桁架拱桥立拼装施工的胎架
CN204954202U (zh) 一种高炉炉壳内壁焊接平台
CN103924811B (zh) 一种大型圆柱形储料罐的制作方法
CN202099311U (zh) 四点悬挂式大型转炉中托圈的组装平台
CN204954201U (zh) 一种高炉炉壳外壁焊接平台
CN111039219B (zh) 脱硫塔变径段液压顶升倒装方法及装置
CN204023542U (zh) 垂直升船机平衡重块连接钢丝绳拉伸调节装置
CN104675140B (zh) 新增承重柱安装及屋架荷载转移方法
CN202543243U (zh) 四点悬挂式大型转炉托圈吊挂专用组装平台
CN105108396B (zh) 一种高炉炉壳外壁焊接平台及其搭设方法
CN202099312U (zh) 用于四点悬挂式大型转炉安装的高架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yang Mingfu

Inventor after: Zhang Zilong

Inventor after: Zhou Keming

Inventor after: Yue Xifeng

Inventor after: Zhu Yuanjiang

Inventor after: Shao Lihong

Inventor after: Liang Qingchun

Inventor after: Xue Hong

Inventor after: Guo Hongqi

Inventor before: Yang Mingfu

Inventor before: Zhou Keming

Inventor before: Yue Xifeng

Inventor before: Zhu Yuanjiang

Inventor before: Shao Lihong

Inventor before: Liang Qingchun

Inventor before: Xue Hong

Inventor before: Guo Hongqi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YANG MINGFU ZHOU KEMING YUE XIFENG ZHU YUANJIANG SHAO LIHONG LIANG QINGCHUN XUE HONG GUO HONGQI TO: YANG MINGFU ZHANG ZILONG ZHOU KEMING YUE XIFENG ZHU YUANJIANG SHAO LIHONG LIANG QINGCHUN XUE HONG GUO HONGQI

CP03 Change of name, title or address

Address after: 121011 Wenxingli 39, Linghe District, Jinzhou City, Liaoning Province

Patentee after: Northeast Power tobacco Tower Engineering Co., Ltd.

Address before: 121000 Wenxingli 39, Linghe District, Jinzhou City, Liaoning Province

Patentee before: Dongdian Yanta Engineering Company

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20110817

CX01 Expiry of patent term