CN101748800A - 烟囱钢内筒液压顶升倒装法 - Google Patents

烟囱钢内筒液压顶升倒装法 Download PDF

Info

Publication number
CN101748800A
CN101748800A CN200910227706A CN200910227706A CN101748800A CN 101748800 A CN101748800 A CN 101748800A CN 200910227706 A CN200910227706 A CN 200910227706A CN 200910227706 A CN200910227706 A CN 200910227706A CN 101748800 A CN101748800 A CN 101748800A
Authority
CN
China
Prior art keywords
steel inner
inner cylinder
cylinder
chimney
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910227706A
Other languages
English (en)
Inventor
白由林
王雷
肖庆伟
刘斌
汪明涛
范智博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN NO4 CONSTRUCTION JOINT-STOCK Corp
Original Assignee
HENAN NO4 CONSTRUCTION JOINT-STOCK Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN NO4 CONSTRUCTION JOINT-STOCK Corp filed Critical HENAN NO4 CONSTRUCTION JOINT-STOCK Corp
Priority to CN200910227706A priority Critical patent/CN101748800A/zh
Publication of CN101748800A publication Critical patent/CN101748800A/zh
Pending legal-status Critical Current

Links

Abstract

一种烟囱钢内筒液压顶升倒装法,主要是将烟囱钢内筒筒体沿其高度方向划分成若干便于吊装的筒节,每一筒节又按便于卷板制作的要求划分成若干筒片,在此基础上,组装烟囱钢内筒筒首第一节钢内筒,然后在该节钢内筒内安装螺旋胀圈及液压顶升装置,利用液压顶升装置顶升筒首第一节钢内筒至一节钢内筒高度后,组装后续筒节并与筒首第一节钢内筒筒体进行水平缝焊接,完成筒首第一节钢内筒的安装,以后重复筒首第一节钢内筒的安装过程,使后续钢内筒筒节自上而下依次逐节安装,直至完成全部钢内筒的安装施工。这种施工方法,无高空作业,不仅操作方便、施工进度快,而且还能有效地保证施工质量和施工安全,同时,还能节约用材,降低损耗,降低成本。

Description

烟囱钢内筒液压顶升倒装法
技术领域
本发明涉及一种烟囱钢内筒的施工方法,特别是烟囱钢内筒液压顶升倒装法,它适用于套筒式烟囱钢内筒的安装施工。
背景技术
近年来,随着电力建设的发展,钢套筒烟囱已逐步替代砖砌内衬烟囱。目前,烟囱钢内筒的安装曾采用一种气压顶升倒装法,该方法虽然对烟囱外筒及基础无附加荷载,但是采用该方法需要把钢内筒顶端做成一个密闭容器状,顶升完毕后密闭容器式盖的拆除需在内筒首进行,存在着很大的安全风险;顶升高度受气压影响大,气压控制精度及难度较大,筒节对接时间长,难以保证提升的稳定性;对提升设备要求是:气压设备对仪表检定要求严格,且气压设备易失控爆炸;需要在基础筒壁上予留人孔或者高压气体管孔,会对设计图纸造成影响。还曾采用一种液压提升倒装法,该方法虽然提升稳定,易同步操作,但是,由于液压提升设备布置在混凝土外筒筒首上,高空作业不便于检查和维修;由于钢内筒重量传递到混凝土外筒筒首上,所以需要事先对钢筋混凝土外筒进行加固;又由于操作人员与提升设备不在同一操作面上,对提升设备及钢铰线、吊索的质量要求高。
发明内容
本发明的目的在于提供一种烟囱钢内筒液压顶升倒装法,它能够克服已有技术的不足,可有效地提高施工速度、保证施工质量及施工安全。
本发明的施工特点是:将烟囱钢内筒筒体沿其高度方向划分成若干便于吊装的筒节,每一筒节又按便于卷板制作的要求划分成若干筒片,安装时先由筒体上部筒节开始,通过液压顶升和焊接,顶升一节,安装一节,逐步由上到下完成全部筒节的安装工作。其荷载传递路线是:钢内筒重量→螺旋胀圈→液压千斤顶及液压支架→内筒钢筋混凝土基础。
其解决方案是:将烟囱钢内筒筒体沿其高度方向划分成便于吊装的筒节,每一筒节又按便于卷板制作的要求划分成筒片,在此基础上,先组装烟囱钢内筒筒首第一节钢内筒,然后在该节钢内筒里侧安装胀圈,于该胀圈里侧安装液压顶升装置,利用液压顶升装置顶升所述的筒首第一节钢内筒至一节钢内筒筒节的高度后,组装后续节钢内筒,并与筒首第一节钢内筒筒体进行水平缝焊接,完成筒首第一节钢内筒的安装,如此重复筒首第一节钢内筒的安装工序,使后续钢内筒筒节逐节依次进行安装,顶升,直至从上而下依次完成全部烟囱钢内筒的安装施工,且烟囱钢内筒筒节的施土均在场地附近的地面上进行。所述的液压顶升装置包括液压千斤顶和液压支架及液压泵站。所述的胀圈为螺旋胀圈,由半径与钢内筒相同的两片半圆形弧梁和两个螺旋千斤顶组成,且每片半圆形弧梁的长度略小于钢内筒的半圆弧长,而两个螺旋千斤顶对称安装在两片半圆形弧梁之间的缺口处。
本发明采用上述技术方案,由于其施工设备液压千斤顶、螺旋千斤顶以及倒链和单轨吊葫芦均属常规设备,其损耗小,周转利用率高,而采用液压顶升工艺不需要大量的措施性材料,能节约大量辅助钢材,这样,可节约用材、降低损耗,能有效地降低施工成本。由于液压顶升对建筑物基础不增加附加荷载,对烟囱钢平台及外筒混凝土筒壁没有附加影响,施工时筒体稳定性好,顶升过程由轻到重,且工序简单,容易掌握。又由于无高空作业,全部施工工序均可在施工现场附近的地面上进行作业,不仅进度快,而且还能有效地保证施工质量和施工安全。
具体实施方式
下面结合实例详细描述本发明的具体实施方式。
本发明的工艺流程是:钢板下料→剖口→除锈→底涂→卷板,制成符合规定的筒片;按照规定对第一节钢内筒筒片进行围板组对、纵向围焊;第一节钢内筒顶升;第二节钢内筒筒片围板组对、纵向围焊;第一节钢内筒与第二节钢内筒之间的水平焊接;顶升。重复以上工艺过程,直至完成全部筒节的施工;拆除顶升装置;进行钢烟道施工。
其具体操作要点是:
1、钢内筒筒首第一节的安装:首先在钢内筒底座钢板上找出钢内筒内边圆周线,作出标志并每隔300-400mm焊接靠山或定位卡,然后利用单轨吊葫芦将符合规定要求的制做好的筒片进行组装焊接,完成第一节钢内筒的组装;
2、在第一节钢内筒里侧距地面约450mm处安装胀圈、液压顶升装置和内部操作平台。所述的胀圈为螺旋胀圈,由半径与钢内筒相同的两片半圆弧梁和两个螺旋千斤顶组成,每片半圆弧梁的长度略小于钢内筒的半圆弧长,在两片半圆弧梁之间的缺口处对称安装两台螺旋千斤顶;所述的液压顶升系统包括在胀圈里侧分布安装的液压千斤顶及液压支架、液压泵站;
3、将后续筒节的弧形筒片运入,每节钢内筒由三片或四片筒片组成,将该筒片合围在第一节钢内筒的外围,把相邻筒片的三条或四条纵缝中的两条或三条焊接牢固,留下最后一条纵缝围在已组装好筒节的外围并留有适当的间距,在此间距的两侧适当位置上分别焊接两对钢板制作的锁具眼板,待第一节钢内筒顶升到位后开始用两只3t的手拉倒链把相邻筒片之间的纵缝对齐收紧;
4、操作螺旋千斤顶,使胀圈顶紧钢内筒筒体并紧密连成一体;
5、检查筒体周围,清除可能影响其顶升的障碍物;
6、打开液压千斤顶的液压泵,在严密的监视与控制下,使第一节钢内筒筒体徐徐上升;
7、当第一节钢内筒顶升到高度已超过合围在外圈的后续筒片上方约20-100mm时,关闭液压千斤顶,稳定第一节钢内筒在一定的位置上静止;
8、把两只3t的手拉倒链同步收紧,使后续筒节的最后一条纵缝靠拢,并组对焊牢,拆除手拉倒链,割去锁具眼板并打磨光滑;
9、从液压千斤顶回程下落,让第一节钢内筒缓缓下落至与后续节钢内筒的顶端相靠拢并上下垂直对接,最后组焊第一节钢内筒与后续节钢内筒之间的水平焊缝;
10、根据设计要求对焊缝进行检验;
11、卸载螺旋千斤顶,使胀圈与千斤顶同步落至后续钢内筒节上。
12、反复重复上述3-11工序过程,使后续钢内筒节依次逐节接上,直至达到设计的钢内筒筒体高度为止。最后拆除液压顶升装置及胀圈,进行钢内筒筒体与基础的安装焊接和进行钢烟道施工。

Claims (2)

1.一种烟囱钢内筒液压顶升倒装法,其特征在于如下工序:将烟囱钢内筒筒体沿其高度方向划分成便于吊装的规定筒节,每一筒节又按便于卷板制作的要求划分成规定的筒片,在此基础上,先组装烟囱钢内筒筒首第一节钢内筒,然后在该节钢内筒里侧安装胀圈,于胀圈里侧安装液压顶升装置,操纵液压顶升装置顶升筒首第一节钢内筒至一节钢内筒高度后,组装后续一节钢内筒,并与所述的第一节钢内筒筒体进行水平缝焊接,完成筒首第一节钢内筒的安装,以后重复第一节钢内筒的安装过程,使后续钢内筒筒节自上而下依次逐节安装,顶升,直至完成全部钢内筒的顶升安装施工,且钢内筒筒节的整个施工作业均在地面上进行,所述的液压顶升装置包括液压千斤顶、液压支架及液压泵站。
2.如权利要求1所述的烟囱钢内筒液压顶升倒装法,其特征在于胀圈为螺旋胀圈,由半径与钢内筒相同的两片半圆弧梁和两个螺旋千斤顶组成,且每片半圆弧梁的长度略小于钢内筒的半圆弧长,而两个螺旋千斤顶对称安装在两片半圆形弧梁之间的缺口处。
CN200910227706A 2009-12-30 2009-12-30 烟囱钢内筒液压顶升倒装法 Pending CN101748800A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910227706A CN101748800A (zh) 2009-12-30 2009-12-30 烟囱钢内筒液压顶升倒装法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910227706A CN101748800A (zh) 2009-12-30 2009-12-30 烟囱钢内筒液压顶升倒装法

Publications (1)

Publication Number Publication Date
CN101748800A true CN101748800A (zh) 2010-06-23

Family

ID=42476370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910227706A Pending CN101748800A (zh) 2009-12-30 2009-12-30 烟囱钢内筒液压顶升倒装法

Country Status (1)

Country Link
CN (1) CN101748800A (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101879399A (zh) * 2010-07-30 2010-11-10 广东火电工程总公司 一种从中段顶升吸收塔的结构及方法
CN101879407A (zh) * 2010-07-30 2010-11-10 广东火电工程总公司 从中段顶升吸收塔的结构及方法
CN102108737A (zh) * 2011-01-18 2011-06-29 东北电业管理局烟塔工程公司 火力发电厂烟囱钢内筒液压提升倒装施工方法
CN102121273A (zh) * 2011-01-27 2011-07-13 福建工程学院 一种钢筋混凝土烟囱钢内筒液压提升倒装方法
CN102168858A (zh) * 2010-12-31 2011-08-31 广州中船龙穴造船有限公司 船舶烟囱单元模块的制造工艺
WO2015021693A1 (zh) * 2013-08-14 2015-02-19 中国十七冶集团有限公司 一种钢烟囱筒体的倒装施工方法
CN104563590A (zh) * 2015-01-16 2015-04-29 江西建工第二建筑有限责任公司 烟囱钢内筒液压提升施工装置及其方法
CN105836678A (zh) * 2016-05-25 2016-08-10 中国能源建设集团湖南火电建设有限公司 大型罐体提升装置及大型罐体提升方法
CN106193780A (zh) * 2016-07-30 2016-12-07 刘继宏 一种分段高耸钢结构建筑的总体安装方法
CN107269024A (zh) * 2016-04-08 2017-10-20 五冶集团上海有限公司 塔更换施工中消除塔底板与基础之间吸力方法
CN108590322A (zh) * 2017-12-20 2018-09-28 中冶天工集团有限公司 一种自立式钢烟囱倒装法组装分段吊装的方法
CN110306864A (zh) * 2019-06-19 2019-10-08 河南省工建集团有限责任公司 一种基于倒装法的烟囱钛钢钢内管液压提升装置及方法
CN110847616A (zh) * 2019-11-27 2020-02-28 山东国舜建设集团有限公司 大体积钢架烟道安装方法
CN110847687A (zh) * 2019-11-19 2020-02-28 山东国舜建设集团有限公司 一种锥形直排烟囱的快速安装方法
CN111188526A (zh) * 2019-06-18 2020-05-22 五冶集团上海有限公司 钢内筒安装方法
CN113279620A (zh) * 2021-04-21 2021-08-20 北京崇建工程有限公司 一种套筒式多管烟囱施工工法

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101879407A (zh) * 2010-07-30 2010-11-10 广东火电工程总公司 从中段顶升吸收塔的结构及方法
CN101879407B (zh) * 2010-07-30 2013-07-17 广东火电工程总公司 从中段顶升吸收塔的结构及方法
CN101879399B (zh) * 2010-07-30 2013-11-06 广东火电工程总公司 一种从中段顶升吸收塔的结构及方法
CN101879399A (zh) * 2010-07-30 2010-11-10 广东火电工程总公司 一种从中段顶升吸收塔的结构及方法
CN102168858A (zh) * 2010-12-31 2011-08-31 广州中船龙穴造船有限公司 船舶烟囱单元模块的制造工艺
CN102168858B (zh) * 2010-12-31 2013-01-02 广州中船龙穴造船有限公司 船舶烟囱单元模块的制造工艺
CN102108737A (zh) * 2011-01-18 2011-06-29 东北电业管理局烟塔工程公司 火力发电厂烟囱钢内筒液压提升倒装施工方法
CN102121273A (zh) * 2011-01-27 2011-07-13 福建工程学院 一种钢筋混凝土烟囱钢内筒液压提升倒装方法
WO2015021693A1 (zh) * 2013-08-14 2015-02-19 中国十七冶集团有限公司 一种钢烟囱筒体的倒装施工方法
CN104563590A (zh) * 2015-01-16 2015-04-29 江西建工第二建筑有限责任公司 烟囱钢内筒液压提升施工装置及其方法
CN107269024A (zh) * 2016-04-08 2017-10-20 五冶集团上海有限公司 塔更换施工中消除塔底板与基础之间吸力方法
CN105836678A (zh) * 2016-05-25 2016-08-10 中国能源建设集团湖南火电建设有限公司 大型罐体提升装置及大型罐体提升方法
CN106193780A (zh) * 2016-07-30 2016-12-07 刘继宏 一种分段高耸钢结构建筑的总体安装方法
CN108590322A (zh) * 2017-12-20 2018-09-28 中冶天工集团有限公司 一种自立式钢烟囱倒装法组装分段吊装的方法
CN111188526A (zh) * 2019-06-18 2020-05-22 五冶集团上海有限公司 钢内筒安装方法
CN110306864A (zh) * 2019-06-19 2019-10-08 河南省工建集团有限责任公司 一种基于倒装法的烟囱钛钢钢内管液压提升装置及方法
CN110847687A (zh) * 2019-11-19 2020-02-28 山东国舜建设集团有限公司 一种锥形直排烟囱的快速安装方法
CN110847687B (zh) * 2019-11-19 2021-06-15 山东国舜建设集团有限公司 一种锥形直排烟囱的快速安装方法
CN110847616A (zh) * 2019-11-27 2020-02-28 山东国舜建设集团有限公司 大体积钢架烟道安装方法
CN113279620A (zh) * 2021-04-21 2021-08-20 北京崇建工程有限公司 一种套筒式多管烟囱施工工法

Similar Documents

Publication Publication Date Title
CN101748800A (zh) 烟囱钢内筒液压顶升倒装法
CN102086000B (zh) 超大、超重箱型吊车梁的现场拼接及安装方法
CN101126279B (zh) 圆筒仓滑模施工工艺
CN109231007B (zh) 一种电炉本体吊运、安装工艺
CN102235107B (zh) 烟囱钢内筒的液压提升施工方法
CN103801921B (zh) 竖式套筒窑窑壳安装方法
CN202398970U (zh) 钢圆筒合拢工装
CN102121273A (zh) 一种钢筋混凝土烟囱钢内筒液压提升倒装方法
CN100484700C (zh) 大型钢管自动化制造工艺
WO2015021693A1 (zh) 一种钢烟囱筒体的倒装施工方法
CN103243961A (zh) 火力发电厂烟囱钛板钢内筒倒装施工装置
CN105177202B (zh) 一种炼铁高炉大修方法
CN108895831B (zh) 模块化回转窑窑衬安装装置及方法
CN105442866A (zh) 用于大型高耸钢结构的保护性拆除和安装方法
CN105908843A (zh) 一种双层拱顶储罐同步倒装施工方法
CN112342922A (zh) 异形截面箱式钢结构流线型钢拱制造方法
CN111235333A (zh) 一种高炉本体部分炉壳的更换方法
CN208686187U (zh) 一种用于变径塔的液压顶升倒装装置
CN106812307B (zh) 一种钢筋混凝土结构的施工装置
CN106969252A (zh) 正多边形稀油密封气柜改建的单段式橡胶膜密封气柜
CN109594697B (zh) 超高层内嵌入式单元玻璃幕墙施工方法及其结构
CN101831916B (zh) 一种大型套筒螺栓框架组合式安装的方法
CN110562387A (zh) 浮式储油平台管束单元的建造方法
CN111485045A (zh) 一种高炉检修中炉底砖的砌筑方法
JP6115444B2 (ja) 構造物更新方法及び構造物建設方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100623