CN102016511B - 公用电网的智能监测 - Google Patents
公用电网的智能监测 Download PDFInfo
- Publication number
- CN102016511B CN102016511B CN200980116630.2A CN200980116630A CN102016511B CN 102016511 B CN102016511 B CN 102016511B CN 200980116630 A CN200980116630 A CN 200980116630A CN 102016511 B CN102016511 B CN 102016511B
- Authority
- CN
- China
- Prior art keywords
- power
- customer facilities
- instrument
- exception
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D4/00—Tariff metering apparatus
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D4/00—Tariff metering apparatus
- G01D4/002—Remote reading of utility meters
- G01D4/004—Remote reading of utility meters to a fixed location
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D4/00—Tariff metering apparatus
- G01D4/002—Remote reading of utility meters
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D4/00—Tariff metering apparatus
- G01D4/10—Maximum indicating or recording apparatus, i.e. where the tariff for a period is based on a maximum demand within that period
- G01D4/14—Fixed-demand indicating or recording apparatus, i.e. where indication is made when a predetermined quantity has been consumed during a time interval greater or less than a predetermined time interval
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D9/00—Recording measured values
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/30—Smart metering, e.g. specially adapted for remote reading
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
一种管理公用电网的方法包括:在地理上把客户用电仪表的集合分组以生成电网上的精细传感器集合。被分组的集合中的每一个用电仪表均能够被远程监测,并且,每一个用电仪表沿着电力线处于不同的位置。如果在仪表子集处检测到功率异常,则调整到公用电网的功率被以纠正异常。
Description
技术领域
本公开一般地涉及公用电网(electrical utility grid)领域,并具体涉及管理公用电网。更具体地,本公开涉及利用先进仪表基础设施(Advanced Meter Infrastructure,AMI)中的智能用电仪表(intelligent electricity usage meter)来管理公用电网。
背景技术
公用电网把电力从发电机(水电、核能、煤电,等等)输送到最终客户位置。对公用电网的健康和工作的监测由检测主配电干线上的电压电平的中央传感器执行。但是,这些传感器不提供为了在客户位置层次理解和/或控制公用电网的工作所需的粒度。
发明内容
一种管理公用电网的方法包括:在地理上把沿着馈电线的客户智能用电仪表的集合分组以便在电网上生成精细传感器网络(finesensor web)。远程监测被分组的用电仪表集合中的每一个智能用电仪表以便监测功率质量。根据来自沿着馈线的被选择用于电压分析(voltage profiling)的仪表子集的电压读数,生成未补偿馈线电压简档(Uncompensated Feeder Voltage Profile)。如果在仪表的子集检测到功率异常,则调整到公用电网的功率以纠正所述异常。
本发明的上述以及其他目的、特征和益处将从下面的详细书面描述变得清晰。
从第一方面看,本发明提供了一种管理公用电网的方法,所述方法包含:在地理上把智能用电仪表的集合分组为电网上的精细传感器集合,其中,精细传感器集合中的每一个智能用电仪表均能够被远程监测,并且其中,每一个智能用电仪表均耦合到从多个客户设施选择的一个不同的客户设施;远程检测由精细传感器集合中的至少一个智能用电仪表读取的功率的异常;和响应于远程检测到异常,调整到公用电网的功率以纠正该异常。
优选地,本发明提供了一种方法,其中精细传感器集合中的全部传感器通过本地降压变压器耦合到相同的电力线。
优选地,本发明提供了一种方法,其中,异常是到多个客户设施中的第一客户设施的第一功率中断,并且其中,通过读取进入第一客户设施中的零输入电压来检测第一功率中断。
优选地,本发明提供了一种方法,其中,异常还包含到多个客户设施中的第二客户设施的第二功率中断,并且其中,第一功率中断和第二功率中断指示同一本地降压变压器的故障。
优选地,本发明提供了一种方法,还包含:远程检测第一客户设施处的断路器跳闸;检测到多个客户设施中的第二客户设施的正常功率输送;和确定第一客户设施处的第一功率中断只是因第一客户设施处的断路器跳闸所致。
优选地,本发明提供了一种方法,其中,异常是由对公用电网的电磁干扰引起的功率噪声。
优选地,本发明提供了一种方法,还包含:产生异常的数字化电压简档;和把数字化的电压简档传送到分析服务器。
优选地,本发明提供了一种方法,其中,异常是在多个客户设施中的第一客户设施和第二客户设施之间的电力线上的电压降,所述方法还包含:确定电压降是否超过预定的可接受水平;和响应于确定电压降超过了预定的可接受水平,产生纠正电压降的工作命令。
优选地,本发明提供了一种方法,还包含:确定在预定的时间段期间异常已经发生了多于预定的发生次数;和响应于确定在预定的时间段期间异常已经发生了多于预定的发生次数,监测其他的用电仪表集合以监测与所述异常匹配的类似异常。
优选地,本发明提供了一种方法,其中,异常是缺失在客户设施处接收的电功率,所述方法还包含:把询问信号从本地降压变压器传送到客户设施处的用电仪表中的询问传感器;检测用电仪表处询问信号的缺失;响应于检测到在客户设施处的用电仪表处电功率的缺失和询问信号的缺失这两者,推定从本地降压变压器到客户设施的用户引入线(drop line)已被切断。
从另一个方面看,本发明提供了一种公用电网,包含:分析服务器,用于在地理上把用电仪表的集合分组以便在电网上生成精细传感器网络,其中,精细传感器网络中的每一个用电仪表均能够被远程监测,并且其中,每一个用电仪表耦合到一个不同的电线监测点;数据收集引擎服务器,用于远程检测由精细传感器网络中的至少一个用电仪表读取的功率的异常;和电网调整逻辑,用于响应于远程检测到异常,调整到公用电网的功率以纠正该异常。
从另一个方面看,本发明提供了一种计算机可读介质,其上存储计算机程序,所述计算机程序包含计算机可执行指令,被配置用于:在地理上把用电仪表的集合分组以便生成被分组的精细电网传感器集合,其中,该被分组的精细电网传感器集合中的每一个用电仪表均能够被远程监测,并且其中,每一个用电仪表被耦合到一个不同的电力线监测点;远程检测由该被分组的精细电网传感器集合中的至少一个用电仪表读取的功率的异常;和响应于远程检测到异常,调整到公用电网的功率以纠正该异常。
优选地,本发明提供了一种计算机可读介质,其中,被分组的精细电网传感器集合中的全部传感器耦合到相同的本地降压变压器。
优选地,本发明提供了一种计算机可读介质,其中,异常是到多个客户设施中的第一客户设施的第一功率中断,并且其中,通过读取第一客户设施在预定的时间段开始和结束时所使用的功率的总量之间的零差别来检测第一功率中断。
优选地,本发明提供了一种计算机可读介质,其中,异常还包含到多个客户设施中的第二客户设施的第二功率中断,并且其中,第一功率中断和第二功率中断指示同一配电变压器的故障。
优选地,本发明提供了一种计算机可读介质,其中,计算机可执行指令还被配置用于:远程检测第一客户设施处的断路器跳闸;检测到多个客户设施中的第二客户设施的正常功率输送;和推定第一客户设施处的第一功率中断只是因第一客户设施处的断路器跳闸所致。
优选地,本发明提供了一种计算机可读介质,其中,异常是在多个客户设施中的第一客户设施和第二客户设施之间的电压降,并且其中,计算机可执行指令还被配置用于:确定电压降是否超过预定的可接受水平;和响应于确定电压降超过了预定的可接受水平,产生纠正电压降的工作命令。
优选地,本发明提供了一种计算机可读介质,其中,计算机可执行指令还被配置用于:确定在预定的时间段期间异常已经发生了多于预定的发生次数;和响应于确定在预定的时间段期间异常已经发生了多于预定的发生次数,监测其他的用电仪表集合以便监测与所述异常匹配的类似异常。
优选地,本发明提供了一种计算机可读介质,其中,计算机可读介质是远程服务器的部件,并且其中,计算机可执行指令可从远程服务器部署到监管(supervisory)计算机。
优选地,本发明提供了一种计算机可读介质,其中,计算机可执行指令能够由服务提供商按需提供给客户。
从另一个方面看,本发明提供了一种可加载到数字计算机的内部存储器中的计算机程序产品,包含用于当所述产品在计算机上运行时执行实现本发明的上述所有步骤的软件代码部分。
附图说明
在所附权利要求中给出了相信为本发明特有的新颖特征。但是,通过结合附图参考下列对说明性实施例的详细描述,将最佳地理解本发明自身以及优选使用模式、其进一步的目的和益处。
图1A示出了其中可以采用本发明的示范性计算机;
图1B绘出了用于监测基于馈线的传感器集合的示范性的基于SCADA的系统;
图2绘出了使用现有的客户用电仪表用于功能监测和管理的配电网;
图3示出了在客户设施处使用的示范性智能用电仪表;
图4是描述如何采用智能用电仪表来管理配电网的高层次流程图;
图5示出了在分析服务器显示的图形用户界面(GUI),用于显示描述被配电网上的多个远程终端单元(RTU)监测的电力的多个实时波形;
图6绘出了智能电网基础设施的替换表示;
图7示出了表明智能仪表位置的快照地图;
图8绘出了图7中所示的智能仪表的示范性电压观察器;
图9A到图9B是流程图,示出了为部署能够执行在图2到图8中描述的步骤和过程而采取的步骤;和
图10A到图10B是流程图,示出了使用按需服务提供方执行在图2到图8中示出的步骤和过程所采取的步骤。
具体实施方式
现在参考图1A,绘出了其中可以采用本发明的示范性计算机102的框图。注意,为计算机102所示的示范性架构的部分或者全部可被分析服务器150、SCADA服务器160a-n(图1B中所示)、数据收集引擎(DCE)服务器202(图2中所示)、分析服务器204(图2中所示)、智能用电仪表302(图3中所示)、门户服务器642、门户客户端646和/或在图6的数据中心中所示的服务器采用。
计算机102包括耦合到系统总线106的处理器单元104。驱动/支持显示器110的视频适配器108也耦合到系统总线106。系统总线106通过总线桥112耦合到输入/输出(I/O)总线114。I/O接口116耦合到I/O总线114。I/O接口116承担与各种I/O设备(包括键盘118、鼠标120、紧制盘只读存储器(CD-ROM)驱动器122、软盘驱动器124和发射机126)的通信。发射机126可以是有线或者无线发射机,能够在有线或者无线信号(例如无线电波)上传送信号。连接到I/O接口116的端口的格式可以是计算机架构领域技术人员已知的任何格式,包括但不限于通用串行总线(USB)端口。
计算机102能够使用网络接口130通过网络128与分析服务器150通信,网络接口130耦合到系统总线106。网络128可以是例如互联网的外部网络,或者例如以太网或者虚拟专用网(VPN)的内部网络。
硬驱动器接口132也耦合到系统总线106。硬驱动器接口132与硬驱动器134连接。在优选实施例中,硬驱动器134占据系统存储器136,系统存储器136也耦合到系统总线106。系统存储器被定义为计算机102中的最低层次的易失性存储器。这种易失性存储器包括额外的更高层次的易失性存储器(未示出),包括但不限于高速缓存存储器、寄存器和缓冲器。占据系统存储器136的数据包括计算机102的操作系统(OS)138和应用程序144。
OS 138包括外壳140,用于提供对例如应用程序144的资源的透明的用户访问。一般地,外壳140是在用户和操作系统之间提供解释器和接口的程序。更具体地,外壳140执行输入到命令行用户接口或者来自文件的命令。因此,外壳140(也称为命令处理器)一般是操作系统软件层次结构的最高层次,并且起到了命令解释器的作用。外壳提供系统提示,解释通过键盘、鼠标或者其他用户输入媒体输入的命令,并把经解释的命令发送到操作系统的适当的较低层次(例如内核142)供处理。注意,虽然外壳140是基于文本的、面向行的用户接口,但是本发明将同样很好地支持其他的用户接口模式,例如图形、语音、姿态,等等。
如所绘出的那样,OS 138也包括内核142,内核142包括OS 138的功能的较低层次,包括提供OS 138的其他部分和应用程序144所需的必要服务,包括存储器管理、进程和任务管理、盘管理,以及鼠标和键盘管理。
应用程序144包括网络门户(web portal)146。门户146包括使万维网客户端(即计算机102)能够使用超文本传输协议(HTTP)消息来发送和接收对互联网的网络消息的程序模块和指令,从而为电网用户提供了用户友好的用户接口。
计算机102的系统存储器(以及软件部署分析服务器150的系统存储器)中的应用程序144也包括电网管理逻辑(GML)148。GML148包括用于实施在图2到图10B中描述的过程的代码。在一个实施例中,计算机102能够从分析服务器150下载GML 148,包括如下面在图9A到图10B中更详细地描述那样以“按需”方式。还要注意在本发明的优选实施例中,分析服务器150执行与本发明相关联的所有功能(包括GML 148的执行),因而使计算机102不必使用其自身的内部计算资源来执行GML 148。
在计算机102中描绘的硬件元件并非旨在穷尽,而是代表性的以突出显示本发明所要求的必要部件。例如,计算机102可以包括替代的存储器存储装置,例如磁带、数字多功能盘(DVD)、伯努利盒式存储器,等等。预期这些以及其他变化在本发明的精神和范围内。
现在参考图1B,展示了用于本发明的示范性的监管控制和数据获取(Supervisory Control and Data Acquisition,SCADA)网络158。SCADA网络158可以包括多个SCADA服务器160a-n(其中“n”是整数)。SCADA服务器160a-n监测和处理来自不同馈线(包括所描绘的示范性馈线166和168)的信息。每一馈线包括多个仪表(分别是162a-n和164a-n),它们是测量客户位置处的设施的仪表。
现在参考图2,展示了具有本发明所描述的新颖特征的示范性电网200。电功率最初由发电机206产生,发电机206可以由水(水电)、化石燃料(例如煤电)、核材料(即核能)等供以动力。然后,电功率沿着沿着传输线208(通常是称作“主干线”的高压线)传送到配电变电站210,配电变电站210在把功率传递到配电线212之前把电压降低。配电线212可以是配电变电站210内的次干线,和/或从配电变电站210出来的次干线。然后,电功率传递到把最终电压降低到客户所要求的电压的配电变压器214a-n(其中“n”是整数)。每一个客户具有用电仪表216a-n,它们对来自各个用户引入线(馈线)218的功率进行计量。注意,如图所示,功率可以顺次地通过不同的配电变压器214a-n,或者,功率可以直接从配电线212传递到每一个配电变压器214a-n。
监测和收集来自各智能用电仪表216a-n的数据的数据收集引擎(Data Collection Engine,DCE)服务器202处于分析服务器204的控制之下。因此,分析服务器204最好不与智能用电仪表216a-n直接接触,而是把对信息的请求从智能用电仪表216a-n发送到DCE服务器202。注意,DCE服务器202耦合到馈线215a-n,馈线215a-n包括被分组的仪表集合216。分析服务器204根据由DCE服务器202提供的来自智能用电仪表216a-n的所请求读数来监测和管理电网200。分析服务器204包括描述沿着电网(电力线/馈线)的每一个智能用电仪表216a-n的位置的表格220。表格220也包括客户名以及与每一个用电仪表216a-n相关联的客户设施、每一个用电仪表216a-n的物理位置、可被每一个智能用电仪表216a-n测量的电学参数(例如电压、电流、瓦数、波形、功率因数、功率损耗,等等)、被每一个智能用电仪表216a-n测量的总谐波失真测量值,和/或从配电变电站和/或配电变压器214a-n之一到每一个智能用电仪表216a-n的距离。
分析服务器204也包括电网调整逻辑224,电网调整逻辑224能够响应于下面描述的对异常的分析,使用继电器、遥控开关装置等调整通过电网200分配的功率。
现在参考图3,展示了示范性智能用电仪表302(即本发明所采用的示范性远程终端单元-RTU),其架构可在每一个用电仪表216a-n中使用。智能用电仪表302包括功率传感器304,其监测从进入客户设施318的客户服务线306(例如,图2中所示的用户引入线218之一)读取的电功率的电流、电压、功率使用、相位,和/或其他特性。智能用电仪表302包含信号处理器308,处理器308能够从功率传感器304取得读数以便使用离散傅立叶变换、奇偶抽取、电压或电流的均方根、电压的总谐波失真(THD)、RMS/THD关系、电压峰值因子、电流k因子、电流的三次谐波序列、功率因数、通过点积的有效功率、电弧检测器和数字滤波器、全球定位系统(GPS)时间等识别电压和/或电流和/或功率的高级分析。上面所有这些计算可由分析服务器(例如上面图2中所示的分析服务器204)计算。
继续图3,一旦信号处理器308处理了来自与智能用电仪表302相关联的一个或更多个功率传感器304(其可以是电压传感器、电流计等)的传感器数据,则处理过的数据被发送到发射机310(例如图1中所示的发射机126),发射机310通过传输介质312(例如传输线208、无线信号等)把处理过的数据传送到DCE服务器202。
继续图3,注意智能用电仪表302也可以包括时钟322,其描述传感器数据被功率传感器304采集的精确时间。类似地,GPS接收器322能够精确定位智能用电仪表302的物理位置。所记录的时间和GPS定位这二者可被信号处理器308和发射机310打包并传送到DCE服务器202和/或分析服务器204。
智能用电仪表302也包括询问传感器316,其能够从分析服务器204(或者DCE服务器202)接收询问信号。此询问信号实质上是“你在那儿吗”信号,并被沿着客户服务线306传送。当询问传感器316接收到询问信号时,信号处理器把确认信号返回DCE服务器202和/或分析服务器204。具有询问传感器316(用于询问信号检测)和功率传感器304(用于功率检测)这两者使分析服务器204能够确定到降压变压器314(例如图2中所示的配电变压器214a-n其中之一)的客户服务线306是否已被切断。进一步考虑表1中所示的真值表:
表1
如表1中所表明的那样,如果客户并未正在使用功率(并且如所示,检测到客户位置仍可获得电压),但是仍在接收到询问信号,则可以得出客户只是并未正在抽取任何功率的结论(例如因为断路器320中的主电路已经跳闸),因为询问传感器316从客户服务线306接收询问信号。但是,如果询问传感器316未检测到询问信号并且功率传感器304未检测到功率(电压等),则可以得出到客户设施318的客户服务线306已经被切断的结论(假设存在表明本地降压变压器314仍在工作的其他证据,例如到本地降压变压器314的共同用户的功率仍在接收功率)。
注意,尽管智能用电仪表302被示为具有增强的能力(由信号处理器308、发射机310等提供),但是在本发明的一个实施例中,智能用电仪表302可以只由功率传感器304组成,使图2中所示的DCE服务器202只处理来自功率传感器304的电压和/或安培读数。
现在参考图4,展示了利用客户用电仪表来监测和控制公用电网所采取的步骤的高层次流程图。在起始块402之后,客户用电仪表集合在地理上被分组(生成沿着电力线的精细传感器网络)为形成单个馈线的分组的用电仪表集合(块404)。然后,这个分组的用电仪表集合被监测(块406)。然后确定所述用电仪表中的任何一个是否正在报告异常(查询块408)。使用例如上面图3中描述的DCE服务器208、分析服务器204,和/或信号处理器308中的逻辑进行这种确定。此外,这些先进的分析也可以实现实时波形流和显示。例如,如图5中所示,假设在分析服务器204(图2中所示)处显示的图形用户界面(GUI)502正在从多个智能用电仪表504a-n(RTU,例如上面描述的用电仪表216a-n)接收电压。从沿着馈线的仪表的所选子集的电压读数和仪表位置可以产生电压简档,然后,所述电压简档被打包。然后这些数字包被实时地流传输到GUI 502,从而得到对应的实时图形506a-n。在分析服务器204处观察GUI 502的监管员因此能够确定特定线路上的功率是否正常(例如沿着电网不具有突然较高或者较低的电压)。或者,这些数字包可以被作为更简单的电压简档实时地流传输到下面在图8中描述的GUI 802。
继续图4中的查询块408,在第一和第二客户位置处的电压测试能够提供足够的信息来推定已经发生了断电(例如在两个客户位置处的零电压能够合理地导出两个位置都在来自已发生故障的同一降压变压器的相同馈线上的结论)。或者,可以通过在第一时间(T1)读取已经使用了多少总功率,在第二时间(T2)读取已经使用了多少总功率,然后确定在时间T2和T1使用的总功率的差,来实现检测断电。如果在该客户设施处使用的功率总量在时间T1和时间T2是相同的,则得出在该客户设施处没有使用和/或接收功率的结论。在另一实施例中,来自智能仪表之一的电压读数本身能够表明是否为断电。在任一情况下,如果在这个设施和链接到相同上游点的其他仪表中电压是零,则这指示断电就在下游线的上游、坏的变压器等。如果第一和第二客户设施都未接收和/或使用功率,则得出问题存在于其共享的本地降压变压器的结论。
在查询块408处描述的活动的另一实施例中,假设第一设施正在接收/使用功率,但是第二设施没有正在接收/使用功率。由于两个设施耦合到相同的本地降压变压器,则恰当地得出本地降压变压器正在正确工作,但问题在于第一设施中的某个地方的结论。如果到第一设施的用户引入线是完好的(见上面关于使用图3中所示的询问传感器316的讨论),则恰当地得出第一设施已经使位于功率传感器之前(在电源侧)的断路器跳闸的结论。在一个实施例中,断路器的这种跳闸可被图3中所示的智能用电仪表302中的信号处理器确认。
无论是什么异常,如果其在一个或者一组用电仪表出现了太多次,则可以确定为了确定重复异常的“主要”原因,需要监测额外的用电仪表。
一旦确定了异常的原因,则采取适当的纠正步骤(块410),例如重布电力线、替换仪表、替换变压器、更新变压器和/或电力线,等等。过程在终止块412结束。
现在参考图6,展示了(和上面在图2中所示的电网200类似的)智能电网基础设施600的另一视图。电力线宽带(BPL)调制解调器602位于客户位置604。BPL调制解调器602允许通过BPL装置610直接在低压线606和/或中压线608上的数据通信。或者,BPL装置610能够从智能传感器612接收信号,智能传感器612检测电气和/或气体仪表614是否检测到异常(例如断电、尖峰,等等)。类似地,耦合到电气和/或气体仪表的小区中继器616能够把这些异常信息发送到BPL装置610。注意,BPL装置也可以直接耦合到变压器618,从而检测在变压器618是否存在异常(例如无功率去往和/或来自变压器618)。BPL装置610可以通过耦合器620耦合到中压线608,从而允许到变电站622的数据传输(描述异常)。
注意,需要BPL注入节点624来增强来自BPL装置610的BPL信号,并且通过耦合器626耦合到馈线628。此外,BPL注入节点624可以通过单独的光纤连接630耦合到变电站622。以任一方式(使用在电力线上通信的BPL方法或者通过把BPL信号转换为光纤信号),描述来自电气和/或气体仪表614的读数的数据被发送到交换机632,交换机632确保信号适宜于通过路由器636沿着光纤链路634传输。数据信号通过光纤骨干638传递到数据中心640,数据中心640包括分析服务器(例如图1中所示的分析服务器150)、数据库服务器(用于存储和/或处理数据),以及用于处理(通过BPL系统或者光纤系统)进入的数据信号的数据通信设备(DCE)服务器。然后,处理过的数据被传送到门户服务器642,这允许公用设施门户644在门户客户端646上显示描述公用设施状况的数据信息。
现在参考图7,展示了智能仪表的快照地图(从地理信息系统GIS导出)。如所描绘的那样,仪表位置A-P被示出在第一到第四街道上的特定地址。然后,在图8中的GUI 802中所示的未补偿的馈线电压简档800上可以展示在每一个被映射的位置(A-P)处的精确电压。这个简档800提供了描述在图7中被表示和映射的每一个智能仪表处的电压读数的图形表示(可以“挖掘”所述图形表示以便得到更详细的信息)。因此,电压上的任何波动或者偏离可被用来确定/预测正在发生或者将要发生的硬件和/或线路问题。
应该理解,至少本发明的某些方面可以替换地在包含程序产品的计算机可读介质中实施。限定本发明的功能的程序可以通过各种有形的信号承载介质以及非有形的通信介质被传递到数据存储系统或者计算机系统,所述信号承载介质包括但不限于非可写存储介质(例如CD-ROM)、可写存储介质(例如硬盘驱动器、读/写CD ROM、光学介质),所述通信介质例如计算机和电话网络,包括以太网、互联网、无线网络,以及类似的网络系统。因此应该理解,当携带或者编码指示本发明中的方法功能的计算机可读指令时,这些信号承载介质代表本发明的替换实施例。此外,要理解本发明可以被具有如这里所描述的及其等同的硬件、软件或者软件和硬件的组合的形式的装置的系统实施。
软件部署
如上所述,在一个实施例中,本发明描述的过程,包括GML 148的功能,可以由服务提供商分析服务器150执行。或者,GML 148和这里所描述的方法,特别如图2到图8中所示和描述的,可作为过程软件从分析服务器150部署到计算机102。更具体地,用于所描述的方法的过程软件可以被另一服务提供商服务器(未示出)部署到分析服务器150。
然后参考图9A到图9B,步骤900开始过程软件的部署。第一件事是确定是否存在当过程软件被执行时将驻留在服务器上的任何程序(查询块902)。如果情况如此,则标识将包含可执行文件的服务器(块904)。通过文件传输协议(FTP)或者某种其他协议,或者通过使用共享文件系统拷贝,用于服务器的过程软件被直接转移到服务器的存储设备(块906)。然后,过程软件被安装在服务器上(块908)。
接着,确定是否要通过使用户访问服务器上的过程软件来部署过程软件(块910)。如果用户要访问服务器上的过程软件,则标识将存储过程软件的服务器地址(块912)。
确定是否要建立代理服务器来存储过程软件(查询块914)。代理服务器是位于例如网络浏览器的客户端应用程序和真实服务器之间的服务器。它截取对真实服务器的所有请求以查看其是否能够自己满足所述请求。如果不能,则其把请求转发到真实服务器。代理服务器的两个主要好处是改善性能和过滤请求。如果要求代理服务器,则安装代理服务器(块916)。通过例如FTP的协议把过程软件发送到服务器,或者,通过文件共享把过程软件从源文件直接复制到服务器文件(块918)。另一实施例将是把包含过程软件的事务处理发送到服务器,并使服务器处理所述事务处理,然后接收并把过程软件复制到服务器的文件系统。一旦过程软件被存储在服务器,则用户通过其客户端计算机访问服务器上的过程软件,并复制到其客户端计算机文件系统(块920)。另一实施例是使服务器自动地把过程软件复制到每一客户端,然后在每一客户端计算机运行过程软件的安装程序。用户在其客户端计算机上执行安装过程软件的程序(块922),然后退出过程(终止块924)。
在查询步骤926,确定是否要通过把过程软件通过电子邮件发送到用户来部署所述过程软件。利用用户客户端计算机的地址把将部署过程软件的用户的集合一起标识(块928)。通过电子邮件把过程软件发送到每一个用户的客户端计算机(块930)。然后,用户接收电子邮件(块932),然后把过程软件从电子邮件分离到其客户端计算机上的目录(块934)。用户在其客户端计算机上执行安装过程软件的程序(块922),然后退出过程(终止块924)。
最后,确定过程软件是否将被直接发送到其客户端计算机上的用户目录(查询块936)。如果是,则标识用户目录(块938)。过程软件被直接转移到用户的客户端计算机目录(块940)。这可被以几种方式完成,例如但不限于共享文件系统目录,然后从发送者的文件系统复制到接收用户的文件系统,或者,使用例如文件传输协议(FTP)的传输协议。在准备安装过程软件时,用户访问其客户端文件系统上的目录(块942)。用户在其客户端计算机上执行安装过程软件的程序(块922),然后退出过程(终止块924)。
VPN部署
本软件可以作为服务的一部分被部署到第三方,其中,提供第三方VPN服务作为安全部署载体,或者其中,如针对特定部署所要求的按需建立VPN。
虚拟专用网(VPN)是可被用来保障通过本无保障或不可信任的网络的连接的技术的任意组合。VPN提高了安全性,并且降低了操作成本。VPN利用公众网络,通常是互联网来把远程站点或者用户连接在一起。不使用例如租用线路的专用的、真实世界连接,VPN使用通过互联网从公司的私有网络路由到远程站点或者雇员的“虚拟”连接。通过专门构造用于传递或者执行过程软件(即软件驻留于其他地方)的VPN,可以提供通过VPN对软件的访问作为服务,其中,基于支付的金额,VPN的寿命限于给定的时间段,或者给定数量的部署。
通过远程访问或者点对点VPN,可以部署、访问和执行过程软件。当使用远程访问VPN时,通过公司的私有网络和远程用户之间的经由第三方服务提供商的安全、加密的连接来部署、访问和执行过程软件。企业服务提供商(ESP)设置网络访问服务器(NAS),并为远程用户提供用于其计算机的桌面客户端软件。然后,远程工作者拨打免费号码,或者通过电缆或者DSL调制解调器直接连接以到达NAS,并使用其VPN客户端软件来访问公司网络,并访问、下载和执行过程软件。
当使用点对点VPN时,通过使用专用设备和用来在例如互联网的公众网络上连接公司的多个固定站点的大规模加密来部署、访问和执行过程软件。
过程软件通过隧穿在VPN上传输,隧穿是把整个分组放置于另一分组内并把其在网络上发送的过程。外部分组的协议被网络和称为隧道接口的两端点所理解,分组在隧道接口进入和离开网络。
软件集成
通过提供过程软件与应用程序、操作系统和网络操作系统软件共存,然后把过程软件安装在过程软件将在其中工作的环境中的客户端和服务器上,由用于实施这里描述的过程的代码组成的过程软件可以被集成到客户端、服务器和网络环境中。
第一个步骤是标识客户端和服务器上的任何软件,包括过程软件将被部署的网络操作系统,它们被过程软件要求,或者与过程软件协同工作。这包括网络操作系统,它是通过添加网络特征增强基本操作系统的软件。
接着,软件应用程序和版本号将被标识,并与已被测试以便与过程软件一起工作的软件应用程序和版本号的列表进行比较。缺失或者与正确版本不匹配的那些软件应用程序将被利用正确的版本号更新。把参数从过程软件传递到软件应用程序的程序指令将被检查,以确保参数列表与过程软件所要求的参数列表匹配。相反地,被软件应用程序传递到过程软件的参数将被检查,以确保参数与过程软件所要求的参数匹配。客户端和包括网络操作系统的服务器操作系统将被标识,并与已被测试以便与过程软件一起工作的操作系统、版本号和网络软件的列表进行比较。不与被测试的操作系统和版本号的列表匹配的那些操作系统、版本号和网络软件将在客户端和服务器上被更新到所要求的水平。
在确保过程软件将被部署的软件处于已被测试以便与过程软件一起工作的正确版本水平以后,通过把过程软件安装在客户端和服务器上完成了集成。
按需
过程软件被共享,以灵活、自动的方式同时服务多个客户。其被标准化,几乎不要求定制,并且其可扩展,按现收现付模式提供了按需的能力。
过程软件可以被存储在可从一个或更多个服务器访问的共享文件系统上。通过包含数据和服务器处理请求的事务处理执行过程软件,所述事务处理使用被访问的服务器上的CPU单位。CPU单位是时间单位,例如服务器的中央处理器上的分、秒、小时。此外,被访问的服务器可以请求要求CPU单位的其他服务器。CPU单位描述了仅代表使用的一个测量的例子。使用的其他测量包括但不限于网络带宽、存储器利用率、存储设备利用率、分组转移、完成的事务处理,等等。
当多个客户使用相同的过程软件应用程序时,其事务处理通过包括在事务处理中的参数区别,所述参数标识唯一的客户和用于该客户的服务的类型。全部CPU单位和用于每一客户的服务的使用的其他测量值被记录。当到任一服务器的事务处理的数量达到开始影响该服务器的性能的数量时,访问其他服务器以增加容量和分担工作负荷。同样地,当例如网络带宽、存储器利用率、存储设备利用率等的其他使用测量值接近影响性能的容量时,添加额外的网络带宽、存储器利用率、存储设备等来分担工作负担。
用于每一服务和客户的使用的测量值被发送到收集服务器,其把针对每一客户的用于每一服务的使用的测量值求和,所述服务被在提供过程软件的共享执行的服务器的网络中的任何地方处理。被求和的使用单位的测量值被周期性地与单位费用相乘,并且作为结果的总过程软件应用程序服务费用或者被发送到客户,和/或在客户所访问的网络站点上指示,然后客户把款项付给服务提供商。
在另一个实施例中,服务提供商从银行或者金融机构的客户帐户直接请求款项。
在另一个实施例中,如果服务提供商也是使用过程软件应用程序的客户的客户,则欠服务提供商的款项被与服务提供商所欠的款项对帐以使款项转移最少。
现在参考图10A到图10B,起始块1002开始按需过程。生成包含唯一客户标识、所请求的服务类型和进一步指定服务类型的任何服务参数的事务处理(块1004)。然后,把所述事务处理发送到主服务器(块1006)。在按需环境中,主服务器起初可能是唯一的服务器,然后,当容量被消耗时,其他的服务器被添加到所述按需环境。
按需环境中的服务器中央处理单元(CPU)容量被查询(块1008)。事务处理的CPU要求被估计,然后,按需环境中的服务器的可用CPU容量被与事务处理CPU要求进行比较,以查看在任何服务器中是否有足够的CPU可用容量来处理事务处理(查询块1010)。如果没有足够的服务器CPU可用容量,则分配额外的服务器CPU容量来处理事务处理(块1012)。如果已经有足够的可用CPU容量,则事务处理被发送到所选择的服务器(块1014)。
在执行事务处理之前,检查剩余的按需环境以确定该环境是否具有足够的可用容量用于处理事务处理。这个环境容量由例如网络带宽、处理器存储器、存储设备等项目组成但不限于此(块1016)。如果没有足够的可用容量,则容量将被添加到按需环境(块1018)。接着,处理事务处理所要求的软件被访问、加载到存储器中,然后事务处理被执行(块1020)。
使用测量值被记录(块1022)。利用率测量值由在用来处理事务处理的按需环境中的那些功能的一部分组成。例如但不限于网络带宽、处理器存储器、存储设备和CPU周期的使用是被记录的东西。使用测量值被求和,与单位费用相乘,然后作为对请求客户的收费被记录(块1024)。
如果客户请求按需费用应被发布到网络站点(查询块1026),则它们被发布(块1028)。如果客户请求按需费用通过电子邮件被发送到客户地址(查询块1030),则这些费用被发送到客户(块1032)。如果客户请求按需费用被直接从客户帐户支付(查询块1034),则从客户帐户直接接收付款(块1036)。然后,在终止块1038退出按需过程。
如这里所描述的,本发明的一个实施例根据沿着馈线电路的位置把仪表分组。有关仪表如何分布的信息可从公用设施地理信息系统或者仪表数据管理系统获取,以便把仪表标识码与实际的地理空间位置和电网连接性相连。距变电站的仪表电学距离被取为与仪表所连接到的配电变压器的相同。
一旦仪表表格已被建立,则分析服务器任务安排仪表子集的定期扫描,生成数据请求,并将其传递到仪表数据收集引擎(DCE)。分析服务器最好不直接与仪表通信,而是把交互仪表读取请求传递到DCE。当数据被DCE返回时,分析服务器把数据放入提供记录仪表标识码、数据时间标记、仪表距离和参数值的数据库表中。在这个表中的值组成了参数简档。一个例子将是沿着馈线长度取的电压值表,与到每一个感测点的电学距离一起列出。针对很多不同的参数可以用这种相同方式构建简档;参数可以是电压、电流、有功或者无功功率、功率因数、总谐波失真,等等。然后,该表格可以被各种应用程序访问,例如电网电压/VAR控制、功率质量评估、断电情报,等等。例如,通过电容器切换命令之前和之后电压简档形状上的改变,可以确定例如电容器的设备的操作。该表格可以被分析服务器利用新数据周期性地刷新。
也可能是需要特定的一次性仪表参数以支持例如断电情报的实时分析的情况。在这种情况下,分析服务器可以使用仪表表格或者包括仪表分布信息的馈线表示来确定读哪个或者哪些仪表。然后,分析服务器可以把交互读取请求发送到DCE,并获取适当的值作为回报。分析服务器可以采用各种策略来确定多少仪表以及哪些仪表请求任何给定时间的读取,以便最佳利用DCE特性,例如读延迟、响应变化、基于要被读的仪表数量的可变性能,等等。
虽然已经参考优选实施例具体示出和描述了本发明,但是本领域技术人员将会理解不偏离本发明的精神和范围可以对其做出形式和细节上的各种变化。例如,虽然本描述专注于其中开发了定制软件应用程序的优选实施例,但是,这里公开的本发明同样可应用于应用程序的开发和修改。此外,如在说明书和所附权利要求中使用的,术语“计算机”或者“系统”或者“计算机系统”或者“计算装置”包括任何数据处理系统,包括但不限于个人计算机、服务器、工作站、网络计算机、大型计算机、路由器、交换机、个人数字助理(PDA)、电话,以及能够处理、传送、接收、捕获和/或存储数据的任何其他系统。
Claims (10)
1.一种管理公用电网的方法,所述方法包含:
在地理上把智能用电仪表的集合分组为电网上的精细传感器集合,其中,精细传感器集合中的每一个智能用电仪表均能够被远程监测,并且其中,每一个智能用电仪表被耦合到从多个客户设施中选择的一个不同的客户设施;
远程检测由精细传感器集合中的至少一个智能用电仪表读取的功率的异常;和
响应于远程检测到异常,调整到公用电网的功率以纠正该异常,其中,所述异常是缺失在客户设施处接收的电功率,所述方法还包含:
把询问信号从本地降压变压器传送到客户设施处的用电仪表中的询问传感器;
检测用电仪表处询问信号的缺失;
响应于检测到在客户设施处的用电仪表处电功率的缺失和询问信号的缺失这两者,推定从本地降压变压器到客户设施的用户引入线已被切断。
2.如权利要求1所述的方法,其中,精细传感器集合中的全部传感器通过本地降压变压器耦合到相同的电力线。
3.如权利要求2所述的方法,其中,所述异常是到多个客户设施中的第一客户设施的第一功率中断,并且其中,通过读取进入第一客户设施中的零输入电压来检测第一功率中断。
4.如权利要求3所述的方法,其中,所述异常还包含到多个客户设施中的第二客户设施的第二功率中断,并且其中,第一功率中断和第二功率中断指示同一本地降压变压器的故障。
5.如权利要求4所述的方法,还包含:
远程检测第一客户设施处的断路器跳闸;
响应于检测到多个客户设施中的第二客户设施的正常功率输送,确定第一客户设施处的第一功率中断只是因第一客户设施处的断路器跳闸所致。
6.如权利要求1所述的方法,其中,所述异常是由公用电网上的电磁干扰引起的功率噪声。
7.如权利要求1所述的方法,还包含:
产生所述异常的数字化电压简档;和
把数字化电压简档传送到分析服务器。
8.如权利要求1所述的方法,其中,所述异常是在多个客户设施中的第一客户设施和第二客户设施之间的电力线上的电压降,所述方法还包含:
确定所述电压降是否超过预定的可接受水平;和
响应于确定所述电压降超过了预定的可接受水平,产生纠正该电压降的工作命令。
9.如权利要求1所述的方法,还包含:
确定在预定的时间段期间所述异常已经发生了多于预定的发生次数;和
响应于确定在预定的时间段期间所述异常已经发生了多于预定的发生次数,监测其他的用电仪表集合以便监测与所述异常匹配的类似异常。
10.一种用于管理公用电网的系统,包含:
一装置,被配置为在地理上把智能用电仪表的集合分组为电网上的精细传感器集合,其中,精细传感器集合中的每一个智能用电仪表均能够被远程监测,并且其中,每一个智能用电仪表被耦合到从多个客户设施中选择的一个不同的客户设施;
一装置,被配置为远程检测由精细传感器集合中的至少一个智能用电仪表读取的功率的异常;和
一装置,被配置为响应于远程检测到异常,调整到公用电网的功率以纠正该异常,其中,所述异常是缺失在客户设施处接收的电功率,所述系统还包含:
一装置,被配置为把询问信号从本地降压变压器传送到客户设施处的用电仪表中的询问传感器;
一装置,被配置为检测用电仪表处询问信号的缺失;
一装置,被配置为响应于检测到在客户设施处的用电仪表处电功率的缺失和询问信号的缺失这两者,推定从本地降压变压器到客户设施的用户引入线已被切断。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/118,481 US8121741B2 (en) | 2008-05-09 | 2008-05-09 | Intelligent monitoring of an electrical utility grid |
US12/118,481 | 2008-05-09 | ||
PCT/EP2009/055610 WO2009135940A2 (en) | 2008-05-09 | 2009-05-08 | Intelligent monitoring of an electrical utility grid |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102016511A CN102016511A (zh) | 2011-04-13 |
CN102016511B true CN102016511B (zh) | 2015-03-25 |
Family
ID=41228224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200980116630.2A Expired - Fee Related CN102016511B (zh) | 2008-05-09 | 2009-05-08 | 公用电网的智能监测 |
Country Status (8)
Country | Link |
---|---|
US (1) | US8121741B2 (zh) |
EP (1) | EP2238410B1 (zh) |
JP (2) | JP2011525787A (zh) |
KR (1) | KR101709795B1 (zh) |
CN (1) | CN102016511B (zh) |
BR (1) | BRPI0908698B1 (zh) |
CA (1) | CA2713171C (zh) |
WO (1) | WO2009135940A2 (zh) |
Families Citing this family (158)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7747767B2 (en) * | 2006-08-25 | 2010-06-29 | Invensys Systems, Inc. | Remote operation of process control equipment over customer supplied network |
US20080144544A1 (en) * | 2006-12-19 | 2008-06-19 | Sam Shi | Method and system of combining signals in bpl communications |
US9702923B2 (en) | 2007-09-17 | 2017-07-11 | Pål Even Gaarder | Method and apparatus for monitoring electric power transmission, disturbances and forecasts |
DK2201390T3 (da) * | 2007-09-17 | 2014-07-21 | Ably As | Fremgangsmåde og apparat til overvågning af kraftoverføring |
US20090265042A1 (en) * | 2008-04-17 | 2009-10-22 | Mollenkopf James D | System and Method for Providing Voltage Regulation in a Power Distribution System |
US20100017214A1 (en) * | 2008-07-15 | 2010-01-21 | Ronald Ambrosio | Extended services oriented architecture for distributed analytics |
US9722813B2 (en) | 2008-09-08 | 2017-08-01 | Tendril Networks, Inc. | Consumer directed energy management systems and methods |
US8301314B2 (en) * | 2009-01-29 | 2012-10-30 | S&C Electric Company | System and method for providing voltage regulation in a power distribution network |
WO2010091244A2 (en) * | 2009-02-05 | 2010-08-12 | Enphase Energy, Inc. | Method and apparatus for determining a corrected monitoring voltage |
US7778738B2 (en) * | 2009-02-11 | 2010-08-17 | Accenture Global Services Gmbh | Method and system for reducing feeder circuit loss using demand response |
US20100262393A1 (en) * | 2009-04-08 | 2010-10-14 | Manu Sharma | System and Method for Determining a Phase Conductor Supplying Power to a Device |
US20100262395A1 (en) * | 2009-04-08 | 2010-10-14 | Manu Sharma | System and Method for Determining a Phase Conductor Supplying Power to a Device |
US9037507B2 (en) * | 2009-04-28 | 2015-05-19 | GM Global Technology Operations LLC | Method to facilitate opportunity charging of an electric vehicle |
US20100280675A1 (en) * | 2009-04-30 | 2010-11-04 | Gm Global Technology Operations, Inc. | Method for managing electric vehicle charging loads on a local electric power infrastructure |
US8359126B2 (en) * | 2009-04-30 | 2013-01-22 | GM Global Technology Operations LLC | Method to resolve a remote electrical outlet for an electrically-powered vehicle |
EP3703222A1 (en) | 2009-05-07 | 2020-09-02 | Dominion Energy, Inc. | Voltage conservation using advanced metering infrastructure and substation centralized voltage control |
KR20110043305A (ko) * | 2009-10-21 | 2011-04-27 | 엘지전자 주식회사 | 전력공급네트워크 시스템 및 그 제어방법 |
US8706309B2 (en) * | 2010-04-10 | 2014-04-22 | Schweitzer Engineering Laboratories Inc | Systems and method for obtaining a load model and related parameters based on load dynamics |
US8924033B2 (en) | 2010-05-12 | 2014-12-30 | Alstom Grid Inc. | Generalized grid security framework |
US8841881B2 (en) | 2010-06-02 | 2014-09-23 | Bryan Marc Failing | Energy transfer with vehicles |
JP5126308B2 (ja) * | 2010-07-09 | 2013-01-23 | ソニー株式会社 | 電力コントロール装置 |
US8478550B2 (en) * | 2010-07-23 | 2013-07-02 | Caterpillar Inc. | Generator set calibration controller |
US8775109B2 (en) * | 2010-07-29 | 2014-07-08 | Power Monitors, Inc. | Method and apparatus for a demand management monitoring system |
US10060957B2 (en) | 2010-07-29 | 2018-08-28 | Power Monitors, Inc. | Method and apparatus for a cloud-based power quality monitor |
NZ607733A (en) * | 2010-07-30 | 2014-09-26 | Accenture Global Services Ltd | Intelligent core engine |
CA2804012A1 (en) * | 2010-08-10 | 2012-02-16 | Sensus Usa Inc. | Electric utility meter comprising load identifying data processor |
US20120050065A1 (en) * | 2010-08-30 | 2012-03-01 | Lombardi Steven A | Systems and methods for network enabled data capture |
US9030333B2 (en) * | 2010-10-20 | 2015-05-12 | Southern Company Services, Inc. | Advanced metering infrastructure network visualization |
US9000945B2 (en) * | 2010-11-23 | 2015-04-07 | Corinex Communications Corp. | System and method for communicating over power lines |
JP5214748B2 (ja) * | 2011-01-25 | 2013-06-19 | 株式会社東芝 | 電力使用量計算システム、エネルギー管理装置及びプログラム |
US8774975B2 (en) * | 2011-02-08 | 2014-07-08 | Avista Corporation | Outage management algorithm |
US8928489B2 (en) | 2011-02-08 | 2015-01-06 | Avista Corporation | Ping server |
US8392031B2 (en) * | 2011-02-28 | 2013-03-05 | General Electric Company | System and method for load forecasting |
US9589241B2 (en) | 2011-03-31 | 2017-03-07 | The United States Of America As Represented By The Secretary Of The Navy | Electrical resource controller |
WO2012142586A1 (en) | 2011-04-15 | 2012-10-18 | Power Tagging Technologies, Inc. | System and method for single and multi zonal optimization of utility services delivery and utilization |
US9026260B1 (en) * | 2011-05-23 | 2015-05-05 | Shaw Intellectual Property Holdings, Inc. | Secure microgrid |
US9450454B2 (en) | 2011-05-31 | 2016-09-20 | Cisco Technology, Inc. | Distributed intelligence architecture with dynamic reverse/forward clouding |
US20120310435A1 (en) * | 2011-05-31 | 2012-12-06 | Cisco Technology, Inc. | Control command disaggregation and distribution within a utility grid |
US8965590B2 (en) | 2011-06-08 | 2015-02-24 | Alstom Grid Inc. | Intelligent electrical distribution grid control system data |
US9641026B2 (en) | 2011-06-08 | 2017-05-02 | Alstom Technology Ltd. | Enhanced communication infrastructure for hierarchical intelligent power distribution grid |
US9281689B2 (en) | 2011-06-08 | 2016-03-08 | General Electric Technology Gmbh | Load phase balancing at multiple tiers of a multi-tier hierarchical intelligent power distribution grid |
US20120316688A1 (en) * | 2011-06-08 | 2012-12-13 | Alstom Grid | Coordinating energy management systems and intelligent electrical distribution grid control systems |
WO2013009420A1 (en) | 2011-06-09 | 2013-01-17 | Power Tagging Technologies, Inc. | System and method for grid based cyber security |
US9099890B2 (en) * | 2011-07-19 | 2015-08-04 | General Electric Company | Apparatus for decentralized coordinated Volt/Var control (CVVC) |
US20130219279A1 (en) * | 2012-02-21 | 2013-08-22 | Ambient Corporation | Aggregating nodes for efficient network management system visualization and operations |
US9048664B2 (en) | 2012-05-02 | 2015-06-02 | International Business Machines Corporation | Estimating loss rates of links in smart grids |
JP6022684B2 (ja) | 2012-07-13 | 2016-11-09 | サウジ アラビアン オイル カンパニー | 炭化水素流体中の塩を検出するための装置、方法、およびシステム |
US9285242B2 (en) * | 2012-07-31 | 2016-03-15 | International Business Machines Corporation | Determining a connectivity model in smart grids |
US10678279B2 (en) | 2012-08-01 | 2020-06-09 | Tendril Oe, Llc | Optimization of energy use through model-based simulations |
CN102798801A (zh) * | 2012-08-03 | 2012-11-28 | 江苏大学 | 电网远程检测系统 |
US9403441B2 (en) * | 2012-08-21 | 2016-08-02 | Cooper Technologies Company | Autonomous management of distribution transformer power load |
US9310416B2 (en) | 2012-09-15 | 2016-04-12 | Saudi Arabian Oil Company | GSM/GPRS based method, system and computer programs to determine and locate high impedance faults on medium voltage distribution networks in high resistivity |
US9535917B1 (en) * | 2012-09-28 | 2017-01-03 | Emc Corporation | Detection of anomalous utility usage |
JP6160624B2 (ja) | 2012-10-01 | 2017-07-12 | 富士通株式会社 | 配電管理装置、配電管理プログラム、配電管理方法、異常検出方法及び異常検出プログラム |
US9563722B2 (en) * | 2012-11-13 | 2017-02-07 | Gridquant, Inc. | Sigma algebraic approximants as a diagnostic tool in power networks |
US20140143376A1 (en) * | 2012-11-19 | 2014-05-22 | Ryan Directional Services, Inc. | Method of Data Acquisition and Multi Directional Prioritized Data Dispersal for a Remote Drilling Site |
US9594721B1 (en) | 2012-12-04 | 2017-03-14 | Amazon Technologies, Inc. | Datacenter event handling |
US9461873B1 (en) * | 2012-12-04 | 2016-10-04 | Amazon Technologies, Inc. | Layered datacenter |
US10153937B1 (en) | 2012-12-04 | 2018-12-11 | Amazon Technologies, Inc. | Layered datacenter components |
US9423779B2 (en) | 2013-02-06 | 2016-08-23 | Tendril Networks, Inc. | Dynamically adaptive personalized smart energy profiles |
US9310815B2 (en) | 2013-02-12 | 2016-04-12 | Tendril Networks, Inc. | Setpoint adjustment-based duty cycling |
US10097240B2 (en) | 2013-02-19 | 2018-10-09 | Astrolink International, Llc | System and method for inferring schematic and topological properties of an electrical distribution grid |
US10496942B2 (en) | 2013-02-28 | 2019-12-03 | P800X, Llc | Method and system for automated project management of excavation requests |
US9342806B2 (en) | 2013-02-28 | 2016-05-17 | P800X, Llc | Method and system for automated project management |
WO2014144948A1 (en) * | 2013-03-15 | 2014-09-18 | Stuart Micheal D | Visible audiovisual annotation of infrared images using a separate wireless mobile device |
US9678520B2 (en) | 2013-03-15 | 2017-06-13 | Dominion Resources, Inc. | Electric power system control with planning of energy demand and energy efficiency using AMI-based data analysis |
US9563218B2 (en) | 2013-03-15 | 2017-02-07 | Dominion Resources, Inc. | Electric power system control with measurement of energy demand and energy efficiency using t-distributions |
US9847639B2 (en) | 2013-03-15 | 2017-12-19 | Dominion Energy, Inc. | Electric power system control with measurement of energy demand and energy efficiency |
US9582020B2 (en) | 2013-03-15 | 2017-02-28 | Dominion Resources, Inc. | Maximizing of energy delivery system compatibility with voltage optimization using AMI-based data control and analysis |
US9553453B2 (en) | 2013-03-15 | 2017-01-24 | Dominion Resources, Inc. | Management of energy demand and energy efficiency savings from voltage optimization on electric power systems using AMI-based data analysis |
CN103279801B (zh) * | 2013-04-08 | 2017-05-31 | 广东电网公司信息中心 | 一种基于多目标规划的用电管理移峰策略优化方法 |
US9448608B1 (en) | 2013-04-17 | 2016-09-20 | Amazon Technologies, Inc. | Switchable backup battery for layered datacenter components |
US9910471B1 (en) | 2013-04-17 | 2018-03-06 | Amazon Technologies, Inc. | Reconfigurable array of backup battery units |
US9891685B1 (en) | 2013-04-17 | 2018-02-13 | Amazon Technologies, Inc. | Reconfigurable backup battery unit |
CN105474021A (zh) | 2013-06-13 | 2016-04-06 | 艾斯通林克国际有限责任公司 | 配电网中的非技术性损失 |
AU2014277951B2 (en) | 2013-06-13 | 2018-04-12 | Dominion Energy Technologies, Inc. | Inferring feeder and phase powering a transmitter |
US20140371929A1 (en) * | 2013-06-17 | 2014-12-18 | Schweitzer Engineering Laboratories, Inc. | Source Impedance Estimation |
US20150025659A1 (en) * | 2013-07-17 | 2015-01-22 | Google Inc. | Home Automation Network |
US9292794B2 (en) | 2013-08-15 | 2016-03-22 | International Business Machines Corporation | Voltage-based clustering to infer connectivity information in smart grids |
US9692231B2 (en) | 2013-09-06 | 2017-06-27 | Amazon Technologies, Inc. | Managing power feeds through waveform monitoring |
KR102325452B1 (ko) * | 2013-10-22 | 2021-11-15 | 빗 탈 엘엘씨 | 배전 시스템 내의 불안정성을 검출 및 정정하기 위한 방법 및 장치 |
WO2015120141A1 (en) * | 2014-02-05 | 2015-08-13 | Texas State University | Location mapping of grid devices using features of passively-observed current disturbances |
US9806973B2 (en) * | 2014-03-18 | 2017-10-31 | Ciena Corporation | Bandwidth analytics in a software defined network (SDN) controlled multi-layer network for dynamic estimation of power consumption |
JP2017515449A (ja) * | 2014-04-14 | 2017-06-08 | パワー モニターズ インコーポレイテッド | クラウドベースの電力品質モニタのための方法及び装置 |
US9503623B2 (en) | 2014-06-03 | 2016-11-22 | Applied Minds, Llc | Color night vision cameras, systems, and methods thereof |
US11063431B2 (en) * | 2014-07-04 | 2021-07-13 | Apparent Labs Llc | Hierarchical and distributed power grid control |
US10879695B2 (en) | 2014-07-04 | 2020-12-29 | Apparent Labs, LLC | Grid network gateway aggregation |
US20160087442A1 (en) | 2014-07-04 | 2016-03-24 | Stefan Matan | Modular power grid |
CA2955033A1 (en) * | 2014-07-17 | 2016-01-21 | 3M Innovative Properties Company | Systems and methods for classifying in-situ sensor response data patterns representative of grid pathology severity |
WO2016011007A1 (en) | 2014-07-17 | 2016-01-21 | 3M Innovative Properties Company | Systems and methods for maximizing expected utility of signal injection test patterns in utility grids |
US10074977B2 (en) | 2014-07-17 | 2018-09-11 | 3M Innovative Properties Company | Systems and methods for coordinating signal injections to understand and maintain orthogonality among signal injections patterns in utility grids |
KR20160022713A (ko) | 2014-08-20 | 2016-03-02 | 한전케이디엔주식회사 | 발전소 소내설비 역률정보 관리시스템 |
PE20171123A1 (es) | 2014-10-30 | 2017-08-08 | Astrolink Int Llc | Sistema y metodos para asignar intervalos y resolver conflictos de intervalos en una red de distribucion electrica |
CN107003346B (zh) | 2014-10-30 | 2019-10-25 | 艾斯通林克国际有限责任公司 | 网格位置的系统、方法和装置 |
US9829880B2 (en) * | 2014-11-20 | 2017-11-28 | General Electric Company | System and method for modelling load in an electrical power network |
US10693896B2 (en) * | 2015-01-14 | 2020-06-23 | Virta Laboratories, Inc. | Anomaly and malware detection using side channel analysis |
WO2016115002A1 (en) | 2015-01-16 | 2016-07-21 | 3M Innovative Properties Company | Systems and methods for selecting grid actions to improve grid outcomes |
US9825463B2 (en) | 2015-02-12 | 2017-11-21 | The Mitre Corporation | Devices and systems for distributed power-grid monitoring |
US9731615B2 (en) | 2015-03-24 | 2017-08-15 | Honda Motor Co., Ltd. | Grid overlay for a zip coded map system and method therefor |
JP6392155B2 (ja) * | 2015-03-27 | 2018-09-19 | 株式会社東芝 | 配電監視制御装置 |
US9652723B2 (en) | 2015-06-05 | 2017-05-16 | Sas Institute Inc. | Electrical transformer failure prediction |
US11172273B2 (en) | 2015-08-10 | 2021-11-09 | Delta Energy & Communications, Inc. | Transformer monitor, communications and data collection device |
US10055869B2 (en) | 2015-08-11 | 2018-08-21 | Delta Energy & Communications, Inc. | Enhanced reality system for visualizing, evaluating, diagnosing, optimizing and servicing smart grids and incorporated components |
US10732656B2 (en) | 2015-08-24 | 2020-08-04 | Dominion Energy, Inc. | Systems and methods for stabilizer control |
WO2017041093A1 (en) | 2015-09-03 | 2017-03-09 | Delta Energy & Communications, Inc. | System and method for determination and remediation of energy diversion in a smart grid network |
WO2017058435A1 (en) | 2015-10-02 | 2017-04-06 | Delta Energy & Communications, Inc. | Supplemental and alternative digital data delivery and receipt mesh network realized through the placement of enhanced transformer mounted monitoring devices |
WO2017070646A1 (en) | 2015-10-22 | 2017-04-27 | Delta Energy & Communications, Inc. | Data transfer facilitation across a distributed mesh network using light and optical based technology |
WO2017070648A1 (en) | 2015-10-22 | 2017-04-27 | Delta Energy & Communications, Inc. | Augmentation, expansion and self-healing of a geographically distributed mesh network using unmanned aerial vehicle technology |
US10371739B2 (en) | 2015-10-30 | 2019-08-06 | Landis+Gyr Llc | Arrangement for detecting a meter maintenance condition using winding resistance |
US10418814B2 (en) | 2015-12-08 | 2019-09-17 | Smart Wires Inc. | Transformers with multi-turn primary windings for dynamic power flow control |
US10008317B2 (en) | 2015-12-08 | 2018-06-26 | Smart Wires Inc. | Voltage or impedance-injection method using transformers with multiple secondary windings for dynamic power flow control |
US10903653B2 (en) | 2015-12-08 | 2021-01-26 | Smart Wires Inc. | Voltage agnostic power reactor |
US10180696B2 (en) | 2015-12-08 | 2019-01-15 | Smart Wires Inc. | Distributed impedance injection module for mitigation of the Ferranti effect |
US10199150B2 (en) | 2015-12-10 | 2019-02-05 | Smart Wires Inc. | Power transmission tower mounted series injection transformer |
CN105515193A (zh) * | 2015-12-24 | 2016-04-20 | 国网浙江杭州市富阳区供电公司 | 一种开关站监管系统 |
US10218175B2 (en) * | 2016-02-11 | 2019-02-26 | Smart Wires Inc. | Dynamic and integrated control of total power system using distributed impedance injection modules and actuator devices within and at the edge of the power grid |
US10097037B2 (en) | 2016-02-11 | 2018-10-09 | Smart Wires Inc. | System and method for distributed grid control with sub-cyclic local response capability |
MX2018010238A (es) | 2016-02-24 | 2019-06-06 | Delta Energy & Communications Inc | Red de malla 802.11s distribuida usando hardware de módulo de transformador para la captura y transmisión de datos. |
US10866568B2 (en) | 2016-04-01 | 2020-12-15 | Tendril Oe, Llc | Orchestrated energy |
US20170301044A1 (en) * | 2016-04-15 | 2017-10-19 | Oracle International Corporation | Systems and methods for managing outages in utility systems |
US10651633B2 (en) | 2016-04-22 | 2020-05-12 | Smart Wires Inc. | Modular, space-efficient structures mounting multiple electrical devices |
AT518598A1 (de) * | 2016-05-10 | 2017-11-15 | Siemens Ag Oesterreich | Überwachen der Inbetriebnahme und der Plausibilität von Daten eines Leistungsmesssensors in einem Verteilernetz |
CA2936212A1 (fr) | 2016-07-14 | 2018-01-14 | Hydro-Quebec | Detection de non-conformites electriques par observation d'ecarts a une modelisation de reseau |
WO2018035143A1 (en) | 2016-08-15 | 2018-02-22 | Delta Energy & Communications, Inc. | Integrated solution of internet of things and smart grid network |
US10468880B2 (en) | 2016-11-15 | 2019-11-05 | Smart Wires Inc. | Systems and methods for voltage regulation using split-conductors with loop current reduction |
KR101873655B1 (ko) * | 2016-11-30 | 2018-07-02 | 엘에스산전 주식회사 | 모니터링 화면 표시 방법 |
US10627882B2 (en) * | 2017-02-15 | 2020-04-21 | Dell Products, L.P. | Safeguard and recovery of internet of things (IoT) devices from power anomalies |
JP6907726B2 (ja) * | 2017-06-06 | 2021-07-21 | 中国電力株式会社 | データ管理システム |
US10691085B2 (en) | 2017-06-14 | 2020-06-23 | Inventus Holdings, Llc | Defect detection in power distribution system |
US10666038B2 (en) | 2017-06-30 | 2020-05-26 | Smart Wires Inc. | Modular FACTS devices with external fault current protection |
US11183878B2 (en) | 2017-08-07 | 2021-11-23 | Landis+Gyr Innovations, Inc. | Maintaining connectivity information for meters and transformers located in a power distribution network |
US10908198B2 (en) | 2017-08-07 | 2021-02-02 | Landis+Gyr Innovations, Inc. | Determining meter phase using interval voltage measurements |
US10393791B2 (en) | 2017-09-28 | 2019-08-27 | Landis+Gyr Llc | Detection of deteriorated electrical connections in a meter using temperature sensing and time-variable thresholds |
US11287285B2 (en) * | 2017-12-18 | 2022-03-29 | Landis+Gyr Innovations, Inc. | Methods and systems for distributed verification and control of a resource distribution network |
US10655984B2 (en) * | 2017-12-20 | 2020-05-19 | Florida Power & Light Company | Power state estimation for power grid serviced premises |
US10690519B2 (en) | 2018-02-23 | 2020-06-23 | Landis+Gyr Innovations, Inc. | Meter reading sensor using TMR and hall effect sensors |
US10237338B1 (en) * | 2018-04-27 | 2019-03-19 | Landis+Gyr Innovations, Inc. | Dynamically distributing processing among nodes in a wireless mesh network |
US11240310B2 (en) * | 2018-10-10 | 2022-02-01 | Itron, Inc. | Group smart sensor management service |
US20200176968A1 (en) * | 2018-12-04 | 2020-06-04 | Trippe Manufacturing Company | Power distribution unit with aggregate current control |
WO2021016397A1 (en) | 2019-07-24 | 2021-01-28 | Uplight, Inc. | Adaptive thermal comfort learning for optimized hvac control |
US11536754B2 (en) | 2019-08-15 | 2022-12-27 | Landis+Gyr Innovations, Inc. | Electricity meter with fault tolerant power supply |
US11226357B2 (en) | 2019-09-27 | 2022-01-18 | Landis+Gyr Innovations, Inc. | Electrical arc detection for electric meter socket connections |
US12050279B2 (en) | 2019-11-27 | 2024-07-30 | Rockwell Collins, Inc. | Doppler nulling spatial awareness (DNSA) solutions for non-terrestrial networks |
FR3105518B1 (fr) * | 2019-12-19 | 2022-10-07 | Electricite De France | Procédé de mise à jour d'une base de données dans laquelle sont enregistrées des valeurs de caractéristiques techniques d'équipements électriques d'un réseau de distribution électrique |
US11245260B2 (en) * | 2020-02-25 | 2022-02-08 | Landis+Gyr Innovations, Inc. | Automatic discovery of electrical supply network topology and phase |
US11429401B2 (en) | 2020-03-04 | 2022-08-30 | Landis+Gyr Innovations, Inc. | Navigating a user interface of a utility meter with touch-based interactions |
US11646602B2 (en) | 2020-03-11 | 2023-05-09 | Landis+Gyr Innovations, Inc. | Topology and phase detection for electrical supply network |
US11536745B2 (en) | 2020-03-18 | 2022-12-27 | Landis+Gyr Innovations, Inc. | Electric meter installation issue detection based on orientation change |
US11385074B2 (en) | 2020-03-18 | 2022-07-12 | Landis+Gyr Innovations, Inc. | Programming electric meter global positioning system coordinates using smart device |
US11359934B2 (en) | 2020-03-24 | 2022-06-14 | Landis+Gyr Innovations, Inc. | Variable rate monitoring in flow-based metering systems |
KR102374375B1 (ko) * | 2020-05-06 | 2022-03-15 | 주식회사 대경산전 | Lvdc 연계용 dc 파워미터 |
US11515725B2 (en) | 2020-09-21 | 2022-11-29 | Landis+Gyr Innovations, Inc. | Autonomous topology validation for electrical supply network |
JP7051017B1 (ja) * | 2020-12-22 | 2022-04-08 | 三菱電機株式会社 | 通信システム、通信管理装置、集約装置、ソフトウェア配布方法およびソフトウェア配布プログラム |
CN112885068A (zh) * | 2021-01-22 | 2021-06-01 | 国网江苏省电力有限公司电力科学研究院 | 一种电力用电信息采集终端公专网通信模块及切换方法 |
AU2022293404A1 (en) | 2021-06-15 | 2023-12-21 | Utilidata, Inc. | Distance-to-fault power outage notification |
CN114564683B (zh) * | 2022-02-25 | 2024-07-05 | 中用科技有限公司 | 园区智慧用电监测系统 |
US11573098B1 (en) * | 2022-06-08 | 2023-02-07 | King Fahd University Of Petroleum And Minerals | Method and system to detect non-technical losses in an electrical power system |
US11899516B1 (en) | 2023-07-13 | 2024-02-13 | T-Mobile Usa, Inc. | Creation of a digital twin for auto-discovery of hierarchy in power monitoring |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1815147A (zh) * | 2005-02-05 | 2006-08-09 | 上海自来水市北科技有限公司 | 远程无线抄表系统的社区数据中转管理装置 |
Family Cites Families (78)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4119948A (en) * | 1976-04-29 | 1978-10-10 | Ernest Michael Ward | Remote meter reading system |
US4567563A (en) * | 1980-12-30 | 1986-01-28 | Energy Management Corporation | Irrigation control system |
JPH0831874B2 (ja) * | 1984-02-23 | 1996-03-27 | 中部電力株式会社 | ル−ト切替方式 |
JPS61200476A (ja) * | 1985-02-28 | 1986-09-05 | Kinki Keisokki Kk | 高速現象自動記録装置 |
US5963457A (en) * | 1994-03-18 | 1999-10-05 | Hitachi, Ltd. | Electrical power distribution monitoring system and method |
JPH07334275A (ja) | 1994-06-08 | 1995-12-22 | Oki Electric Ind Co Ltd | 無停電電源装置 |
US6751562B1 (en) * | 2000-11-28 | 2004-06-15 | Power Measurement Ltd. | Communications architecture for intelligent electronic devices |
US5568399A (en) * | 1995-01-31 | 1996-10-22 | Puget Consultants Inc. | Method and apparatus for power outage determination using distribution system information |
US5627759A (en) * | 1995-05-31 | 1997-05-06 | Process Systems, Inc. | Electrical energy meters having real-time power quality measurement and reporting capability |
JPH09135543A (ja) * | 1995-11-06 | 1997-05-20 | Nissin Electric Co Ltd | 電力系統計測システム |
JPH1028128A (ja) * | 1996-07-11 | 1998-01-27 | Hitachi Ltd | 分散制御システム及びその通信方法 |
JPH10171561A (ja) * | 1996-12-13 | 1998-06-26 | Hitachi Koki Co Ltd | 電圧監視記録方法 |
US6073169A (en) * | 1997-04-08 | 2000-06-06 | Abb Power T&D Company Inc. | Automatic meter reading system employing common broadcast command channel |
JP3892547B2 (ja) | 1997-09-03 | 2007-03-14 | 株式会社東芝 | 系統連系分散型電源システム |
US6088659A (en) * | 1997-09-11 | 2000-07-11 | Abb Power T&D Company Inc. | Automated meter reading system |
US6219623B1 (en) * | 1997-11-24 | 2001-04-17 | Plug Power, Inc. | Anti-islanding method and apparatus for distributed power generation |
US6360178B1 (en) * | 1997-12-09 | 2002-03-19 | Antony Cozart Parsons | System and method for locating a disturbance in a power system based upon disturbance power and energy |
WO1999045510A2 (en) * | 1998-03-03 | 1999-09-10 | Itron, Inc. | Method and system for reading intelligent utility meters |
JP3352411B2 (ja) * | 1998-03-05 | 2002-12-03 | 株式会社東芝 | 制御システム、電力系統保護制御システムおよびプログラムを記憶した記憶媒体 |
US6486569B2 (en) * | 1998-12-04 | 2002-11-26 | Hydro-Quebec | Power flow management in an electric power grid |
US6496342B1 (en) * | 1999-02-12 | 2002-12-17 | Bitronics Inc. | Distributed monitoring and protection system for a distributed power network |
SE520838C2 (sv) * | 1999-05-19 | 2003-09-02 | Abb Ab | Anläggning för överföring av elektrisk effekt försedd med frånskiljare bestående av antiparallelt kopplade styrbara krafthalvledarelement |
US6459998B1 (en) * | 1999-07-24 | 2002-10-01 | Gary R. Hoffman | Sensing downed power lines |
JP3850184B2 (ja) * | 1999-09-10 | 2006-11-29 | 東芝メーターテクノ株式会社 | 電力量計 |
US6998962B2 (en) * | 2000-04-14 | 2006-02-14 | Current Technologies, Llc | Power line communication apparatus and method of using the same |
AU2001279241A1 (en) * | 2000-08-09 | 2002-02-18 | Statsignal Systems, Inc. | Systems and methods for providing remote monitoring of electricity consumption for an electric meter |
US6946972B2 (en) * | 2001-01-25 | 2005-09-20 | Smartsynch, Inc. | Systems and methods for wirelessly transmitting data from a utility meter |
US7085824B2 (en) * | 2001-02-23 | 2006-08-01 | Power Measurement Ltd. | Systems for in the field configuration of intelligent electronic devices |
CA2414132C (en) * | 2001-12-14 | 2012-01-24 | J.J. Mackay Canada Limited | Parking meter smart housing with electronic memory |
ITMI20012726A1 (it) * | 2001-12-20 | 2003-06-20 | Enel Distribuzione Spa | Sistema di acquisizione remota dei consumi e di telegestione di utenze distribuite anche di tipo domestico |
US20040024494A1 (en) * | 2001-12-28 | 2004-02-05 | Bayoumi Deia Salah-Eldin | On-line control of distributed resources with different dispatching levels |
US7069117B2 (en) * | 2002-04-01 | 2006-06-27 | Programmable Control Services, Inc. | Electrical power distribution control systems and processes |
KR100445226B1 (ko) * | 2002-07-24 | 2004-08-21 | 한국전력공사 | 분류형 데이터 구조를 이용한 원격 검침 시스템 |
KR100513934B1 (ko) * | 2002-09-03 | 2005-09-07 | 주식회사 케이퍼스 | 무선 검침 단말기와 그를 이용한 무선 원격 검침 시스템 |
CN100440665C (zh) * | 2002-10-25 | 2008-12-03 | S&C电力公司 | 控制电力系统以响应电路异常的方法和装置 |
US20040158417A1 (en) * | 2002-11-06 | 2004-08-12 | Bonet Antonio Trias | System and method for monitoring and managing electrical power transmission and distribution networks |
US7519506B2 (en) * | 2002-11-06 | 2009-04-14 | Antonio Trias | System and method for monitoring and managing electrical power transmission and distribution networks |
US7272516B2 (en) * | 2002-12-23 | 2007-09-18 | Abb Research | Failure rate adjustment for electric power network reliability analysis |
US6907321B2 (en) * | 2003-01-31 | 2005-06-14 | Viserge Limited | Fault control and restoration in a multi-feed power network |
WO2004070907A2 (en) * | 2003-02-04 | 2004-08-19 | Garland Charles Ii | Energy grid management method |
US20040181492A1 (en) * | 2003-03-12 | 2004-09-16 | Andrew Rybakowski | Method and apparatus for managing utility usage |
JP3954511B2 (ja) * | 2003-03-14 | 2007-08-08 | 株式会社東芝 | 配電系統監視制御装置 |
US7089125B2 (en) * | 2003-10-27 | 2006-08-08 | Itron, Inc. | Distributed asset optimization (DAO) system and method |
JP2005185028A (ja) * | 2003-12-22 | 2005-07-07 | Tm T & D Kk | 低圧配電系統監視システム |
SE0303574D0 (sv) * | 2003-12-23 | 2003-12-23 | Abb Research Ltd | Elictric power network |
SE0303619L (sv) * | 2003-12-31 | 2005-06-07 | Abb Ab | Metod och anordning för val av och dimensionering av åtgärder vid instabilitet i ett elkraftsystem |
US7283916B2 (en) * | 2004-07-02 | 2007-10-16 | Itron, Inc. | Distributed utility monitoring, such as for monitoring the quality or existence of a electrical, gas, or water utility |
JP4406346B2 (ja) * | 2004-09-30 | 2010-01-27 | 株式会社東芝 | 電力システム用広域計測サービス提供サーバとシステム、方法、およびプログラム |
US8700754B2 (en) * | 2004-10-19 | 2014-04-15 | Echelon Corporation | Automated topology discovery and management for electric meters |
US7498953B2 (en) * | 2004-11-16 | 2009-03-03 | Salser Jr Floyd Stanley | Smart transmitter for utility meters |
US7231281B2 (en) * | 2004-12-14 | 2007-06-12 | Costa Enterprises, L.L.C. | Dynamic control system for power sub-network |
US7295133B1 (en) * | 2004-12-30 | 2007-11-13 | Hendrix Wire & Cable, Inc. | Electrical circuit monitoring device |
US7308370B2 (en) | 2005-03-22 | 2007-12-11 | Elster Electricity Llc | Using a fixed network wireless data collection system to improve utility responsiveness to power outages |
US20060224335A1 (en) * | 2005-03-29 | 2006-10-05 | Elster Electricity, Llc | Collecting interval data from a relative time battery powered automated meter reading devices |
CH697927B1 (de) * | 2005-03-31 | 2009-03-31 | Alstom Technology Ltd | Leistungsschaltvorrichtung für Mehrphasen-Wechselstrom-Systeme. |
US20070063866A1 (en) * | 2005-06-02 | 2007-03-22 | Andisa Technologies, Inc. | Remote meter monitoring and control system |
US7236908B2 (en) * | 2005-11-29 | 2007-06-26 | Elster Electricity, Llc | Fuzzy time-of-use metering and consumption monitoring using load profile data from relative time transmit-only devices |
US20070168161A1 (en) * | 2006-01-18 | 2007-07-19 | Vellore Jaichander K | System and method for monitoring and configuring multiple devices in a power distribution network |
US7830874B2 (en) * | 2006-02-03 | 2010-11-09 | Itron, Inc. | Versatile radio packeting for automatic meter reading systems |
US20070222636A1 (en) * | 2006-03-09 | 2007-09-27 | Sony Corporation | System and method for a networked utility meter |
US7184903B1 (en) * | 2006-03-16 | 2007-02-27 | Vrb Power Systems Inc. | System and method for a self-healing grid using demand side management techniques and energy storage |
US7499762B2 (en) * | 2006-03-21 | 2009-03-03 | Digitalogic, Inc. | Intelligent grid system |
JPWO2007138645A1 (ja) * | 2006-05-25 | 2009-10-01 | 三菱電機株式会社 | 車両用補助電源装置 |
JP4899676B2 (ja) * | 2006-07-14 | 2012-03-21 | 日新電機株式会社 | ガス絶縁開閉装置状態監視システム |
US7747739B2 (en) * | 2006-08-10 | 2010-06-29 | Gridpoint, Inc. | Connection locator in a power aggregation system for distributed electric resources |
US20080039979A1 (en) * | 2006-08-10 | 2008-02-14 | V2 Green Inc. | Smart Islanding and Power Backup in a Power Aggregation System for Distributed Electric Resources |
US7844370B2 (en) * | 2006-08-10 | 2010-11-30 | Gridpoint, Inc. | Scheduling and control in a power aggregation system for distributed electric resources |
US20080077336A1 (en) * | 2006-09-25 | 2008-03-27 | Roosevelt Fernandes | Power line universal monitor |
US7853417B2 (en) * | 2007-01-30 | 2010-12-14 | Silver Spring Networks, Inc. | Methods and system for utility network outage detection |
US20080219239A1 (en) * | 2007-03-05 | 2008-09-11 | Grid Net, Inc. | Policy-based utility networking |
US8335595B2 (en) * | 2007-03-23 | 2012-12-18 | Bpl Global, Ltd. | System and method for adaptive islanding for stored/distributed energy devices |
US8078332B2 (en) * | 2007-07-26 | 2011-12-13 | Areva T & D, Inc. | Methods for managing high or low voltage conditions from selected areas of a power system of a utility company |
WO2009076410A1 (en) * | 2007-12-12 | 2009-06-18 | Abb Research Ltd. | Load restoration for feeder automation in electric power distribution systems |
US8000913B2 (en) * | 2008-01-21 | 2011-08-16 | Current Communications Services, Llc | System and method for providing power distribution system information |
JP4521448B2 (ja) * | 2008-01-31 | 2010-08-11 | 株式会社東芝 | 遠隔監視・診断システム |
EP2098827A1 (en) * | 2008-03-04 | 2009-09-09 | Alcatel Lucent | Method of remote metering of energy |
US20090265042A1 (en) * | 2008-04-17 | 2009-10-22 | Mollenkopf James D | System and Method for Providing Voltage Regulation in a Power Distribution System |
NZ589088A (en) * | 2008-05-09 | 2013-02-22 | Accenture Global Services Ltd | Monitoring system for a power distribution grid with communication of sensed conditions |
-
2008
- 2008-05-09 US US12/118,481 patent/US8121741B2/en active Active
-
2009
- 2009-05-08 EP EP09742158.0A patent/EP2238410B1/en not_active Not-in-force
- 2009-05-08 JP JP2011507938A patent/JP2011525787A/ja active Pending
- 2009-05-08 CN CN200980116630.2A patent/CN102016511B/zh not_active Expired - Fee Related
- 2009-05-08 KR KR1020107024970A patent/KR101709795B1/ko active IP Right Grant
- 2009-05-08 CA CA2713171A patent/CA2713171C/en active Active
- 2009-05-08 BR BRPI0908698-6A patent/BRPI0908698B1/pt active IP Right Grant
- 2009-05-08 WO PCT/EP2009/055610 patent/WO2009135940A2/en active Application Filing
-
2015
- 2015-09-25 JP JP2015188379A patent/JP2016036250A/ja active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1815147A (zh) * | 2005-02-05 | 2006-08-09 | 上海自来水市北科技有限公司 | 远程无线抄表系统的社区数据中转管理装置 |
Also Published As
Publication number | Publication date |
---|---|
BRPI0908698A2 (pt) | 2018-01-23 |
CA2713171A1 (en) | 2009-11-12 |
CN102016511A (zh) | 2011-04-13 |
EP2238410A2 (en) | 2010-10-13 |
KR20110015539A (ko) | 2011-02-16 |
JP2011525787A (ja) | 2011-09-22 |
CA2713171C (en) | 2017-01-03 |
BRPI0908698B1 (pt) | 2019-04-02 |
JP2016036250A (ja) | 2016-03-17 |
EP2238410B1 (en) | 2016-03-23 |
WO2009135940A2 (en) | 2009-11-12 |
WO2009135940A3 (en) | 2010-07-29 |
KR101709795B1 (ko) | 2017-03-08 |
US8121741B2 (en) | 2012-02-21 |
US20090281679A1 (en) | 2009-11-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102016511B (zh) | 公用电网的智能监测 | |
US10833532B2 (en) | Method and system for managing a power grid | |
JP5925774B2 (ja) | インテリジェントコアエンジン | |
US7945401B2 (en) | Distributed intelligent remote terminal units | |
RU2583703C2 (ru) | Обнаружение и анализ злоумышленной атаки | |
US20100017214A1 (en) | Extended services oriented architecture for distributed analytics | |
BRPI0923437B1 (pt) | método de determinar um tipo de falha em uma rede de energia de múltiplas fases | |
AU2012241193B2 (en) | Method and system for managing a power grid | |
AU2015230786A1 (en) | Method and system for managing a power grid | |
Kolenc et al. | Intelligent monitoring of power networks system architecture and communication network infrastructure | |
Hadjsaid et al. | Interdependent Behavior of Critical Infrastructures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150325 |