CN101906849A - 钢柱对接的连接装置及安装方法 - Google Patents

钢柱对接的连接装置及安装方法 Download PDF

Info

Publication number
CN101906849A
CN101906849A CN 201010230994 CN201010230994A CN101906849A CN 101906849 A CN101906849 A CN 101906849A CN 201010230994 CN201010230994 CN 201010230994 CN 201010230994 A CN201010230994 A CN 201010230994A CN 101906849 A CN101906849 A CN 101906849A
Authority
CN
China
Prior art keywords
steel column
butt joint
linkage
otic placode
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010230994
Other languages
English (en)
Inventor
徐重良
党保卫
陆建新
钟红春
冯长胜
汪永胜
赵东明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN 201010230994 priority Critical patent/CN101906849A/zh
Publication of CN101906849A publication Critical patent/CN101906849A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明公开一种钢柱对接的连接装置及安装方法,属钢结构施工领域。该连接装置包括:耳板、连接夹板和螺栓;耳板为两块,两块耳板上均设有螺栓孔;连接夹板为两块,两块连接夹板上也均设有与两块耳板上螺栓孔对应的螺栓孔;两块耳板设置在两块连接夹板之间通过螺栓与两块连接夹板固定连接成为一体结构。本发明还提供一种倾斜钢管柱对接的安装方法。该连接装置可用在倾斜钢管柱的对接中,固定上、下钢管柱的对接处,使上方倾斜的上钢管柱通过连接装置临时固定在下钢管柱上,不用再设置硬性支撑、拉设缆风绳等临时固定设施来对倾斜的上钢管柱进行临时固定,减少了倾斜钢管柱构件对接中所用的临时固定设施,提高了钢结构施工的安装进度,缩短了工期。

Description

钢柱对接的连接装置及安装方法
技术领域
本发明涉及钢结构施工领域,特别是涉及一种钢结构施工中的钢柱(钢管柱与箱型柱)对接的连接装置及安装方法。
背景技术
对于目前高层建筑纵向发展越来越高,且结构设计越来越新异、奇特,给超高层钢结构安装技术带来很大的挑战。高层钢结构钢柱的体积随着纵向高度的延伸、结构形式的变化不断增大,若采用目前传统的硬性支撑、拉设缆风绳等临时钢管柱固定措施进行钢构件的安装,对于施工工期无法保证,各个施工队伍的交错安全文明施工无法满足要求,给安装精度带来很大困难。
目前,对超高层钢结构钢柱临时安装采用临时钢支撑与拉设缆风绳对其支撑和稳固,需投入较大的施工措施和劳动力,增加了施工内容和工作时间,且多工种多工序的立体交叉作业相互影响,带来施工安全隐患。
发明内容
鉴于上述现有技术所存在的问题,本发明实施例提供一种钢柱对接的连接装置及安装方法,在钢柱对接时不用硬性支撑、拉设缆风绳,即可实现钢柱构件的临时固定,从而提高钢结构施工安装进度。
本发明的目的是通过下述技术方案实现的:
本发明实施例提供一种钢柱对接的连接装置,包括:
耳板和连接夹板;
耳板为两块,两块耳板上均设有螺栓孔;连接夹板为两块,两块连接夹板上也均设有与两块耳板上螺栓孔对应的螺栓孔;两块耳板设置在两块连接夹板之间通过螺栓与两块连接夹板固定连接成为一体结构。
本发明实施例还提供一种钢柱对接的安装方法,用于在已固定的下钢柱上对接安装倾斜的上钢柱,包括:
采用上述连接装置固定连接所对接的上、下钢柱的对接处;
将连接装置的耳板分别焊接到所对接的上、下钢柱的对接端;
将上钢柱吊装至已固定的下钢柱上方,调整上钢柱至安装位置,使上钢柱对接端焊接的耳板与下钢柱对接端焊接的耳板的位置相对应;
通过连接装置的连接夹板夹持上、下钢管柱对接端焊接的耳板,并通过螺栓使所述连接夹板与上、下钢柱对接端焊接的耳板固定连接,使上、下钢柱对接端通过由耳板、连接夹板和螺栓形成的连接装置固定连接。
从上述本发明实施例提供的技术方案中可以看出,本发明实施例中的连接装置通过在两块耳板上设置螺栓孔,并在两块连接夹板在设置与耳板上螺栓孔匹配的螺栓孔,通过两块连接夹板夹持并连接两块耳板再经螺栓固定后使两块耳板连接成一体结构。该连接装置可用在倾斜钢管柱的对接中,固定上、下钢管柱的对接处,使上方倾斜的上钢管柱通过连接装置临时固定在下钢管柱上,不用再设置硬性支撑、拉设缆风绳等临时固定设施来对倾斜的上钢管柱进行临时固定,减少了倾斜钢管柱构件对接中所用的临时固定设施,提高了钢结构施工的安装进度,缩短了工期,节省了措施和劳动力成本,也避免了施工交叉作业,提高了施工安全性。
附图说明
图1为本发明实施例一提供的连接装置的结构示意图;
图2为本发明实施例一提供的连接装置的耳板的结构示意图;
图3为本发明实施例一提供的连接装置的连接夹板的结构示意图;
图4为本发明实施例一提供的连接装置使用状态示意图;
图5为本发明实施例二提供的安装方法的流程图。
具体实施方式
下面结合附图和具体实施例对本发明作进一步说明。
实施例一
本实施例提供一种钢柱对接的连接装置,在钢结构建筑施工中,用来对在已固定的下钢柱上对接上钢柱(可以是竖直的或倾斜的上钢柱,使上钢柱临时固定在下钢柱上,如图2~4所示,该连接装置包括:耳板、连接夹板和螺栓;
其中,耳板为两块,耳板可采用长方形的钢板,耳板的厚度一般为20~30mm,两块耳板上均设有螺栓孔,螺栓孔为多个,均匀分布设置在耳板上;
连接夹板也为两块,连接夹板也可采用长方形的钢板,连接夹板的厚度一般为12~18mm,两块连接夹板上也均设有螺栓孔,连接夹板上的螺栓孔也为均匀分布的多个,连接夹板上的螺栓孔与两块耳板上螺栓孔的位置相对应;
两块耳板的一侧边为焊接在对接钢管柱上的焊接边,使用时两块耳板设置在两块连接夹板之间,由两块连接夹板夹持通过螺栓使两块连接夹板将两块耳板固定连接成为一体结构。
上述连接装置中,在每个耳板的一角处设有作为定位标记的缺口,以方便焊接时辩别耳板的设置方向。
如图4所示,本实施例中的连接装置使用时,两个耳板分别焊接在对接的上、下钢管柱的对接处,再通过两块连接夹板和螺栓配合,将上、下钢管柱上焊接的耳板连接固定为一体结构,从而实现上、下钢管柱的对接处形成固定连接,使上钢管柱在连接装置的作用下临时固定在下钢管柱上。实际中,采用多个连接装置设置在所连接的上、下钢管柱的对接处。
上述的连接装置,在对倾斜钢柱进行连接时,可根据钢柱的重量、倾斜度、不同高度的荷载等因素,对螺栓孔的位置、耳板大小、连接夹板可相应的调整。此连接装置适宜钢柱重量不超过32吨,钢柱直径最大1.8米,耳板厚度为30mm,夹板厚度为18mm,螺栓M24,钢柱最长21米,最大倾斜角17°;
本实施例中的连接装置,通过耳板与连接夹板和螺栓的配合,可对倾斜钢管柱的对接中,上方倾斜的上钢管柱临时固定在下钢管柱上,不用再设置硬性支撑、拉设缆风绳等临时固定设施来对倾斜的上钢管柱进行临时固定,减少了倾斜钢管柱构件对接中所用的临时固定设施,提高了钢结构施工的安装进度,缩短了工期,节省了措施和劳动力成本,也避免了施工交叉作业,提高了施工安全性。该连接装置改进了传统的吊装技术,相对缩短了安装工期,节省了措施成本和人工费,避免了立体交叉作业,提高了施工安全性与便捷性。
实施例二
本实施例提供一种钢柱对接的安装方法,用于在已固定的下钢柱上对接安装倾斜的上钢柱,如图5所示,该方法的步骤如下,具体包括:
采用上述实施例一给出的连接装置固定连接所对接的上、下钢柱的对接处;
步骤S1,将连接装置的耳板分别焊接到所对接的上、下钢柱的对接端;
步骤S2,将上钢柱吊装至已固定的下钢柱上方,调整上钢柱至安装位置,使上钢柱对接端焊接的耳板与下钢柱对接端焊接的耳板的位置相对应;
步骤S3,通过连接装置的连接夹板夹持上、下钢柱对接端焊接的耳板,并通过螺栓使所述连接夹板与上、下钢柱对接端焊接的耳板固定连接,使上、下钢柱对接端通过由耳板、连接夹板和螺栓形成的连接装置固定连接。
上述安装方法中,所用的连接装置可采用多个,各连接装置的耳板均匀分布焊接在所对接的上、下钢柱的对接端。多个连接装置形成的固定力要大于或等于上方倾斜的上钢柱的重力及风力对上钢柱的产生的力,这样可以保证上钢柱可以临时固定在下钢柱上。
下面以实际安装倾斜的上钢管柱的过程为例,对上述方法作进一步说明:
实际工程中,要根据需要临时固定对接的上钢管柱的尺寸、重量及考虑实际施工中的风力情况,选择连接装置的耳板、连接夹板和螺栓,具体如下:
连接装置的连接夹板及耳板的设计验算:
以最高13m的x形节点柱为例,安装时左右平衡稳定。直段钢管柱最长21m,成17°倾斜,自身平面内不稳定,所以选择直段钢管柱的临时固定作最不利工况验算。钢管柱下口对接连接夹板共6组,选取其中四组作受力分析,另外二组不参与受力分析作安全储备。
(1)钢管柱受力组合工况
依据《钢结构设计规范》GB50017-2003规定计算取值,单根直段钢管柱双夹板对接自平衡技术绳或临时钢支撑固定时,钢管柱自重、风荷载、施工荷载最不利工况取值、组合如下:
(2)对不同高度的钢管柱的受力经分析比较,其中管径D=1.55m,最大长度L=21m,最大自重G=348KN,钢管柱与铅垂直面之间夹角17°时的受力最为不利。
(3)连接夹板尺寸:b=117mm(耳板螺栓群形心到焊缝边),h=0.202(耳板螺栓群形心到钢管柱对接的垂直面的距离),耳板有效焊缝长度H=459mm,耳板厚度t=30mm,连接夹板t0=18mm;
(4)高强螺栓选择M24,10.9s,
Figure BSA00000196983100041
(按普通螺栓计算),
Figure BSA00000196983100042
Figure BSA00000196983100043
(5)所有钢材材质Q345B,一级焊缝,
Figure BSA00000196983100044
(6)风荷载取值:
基本风压ω0=0.3KN/m2(广州市10年一遇)
高度系数μz=2.30(200米处,地面粗糙度为C类地区)
高度z处风振系数βz=2.7(432米)
风荷载体型系数μs=1
风荷载标准值:ωk=ω0βzμzμs=0.3×2.7×2.30×1=1.863KN/m2
钢管柱迎风面积S=DL=1.55×20.8=33m2
风荷载ω=ωkS=1.863×33=61.479KN
(7)施工荷载:主要是施工人员重量,相对于风载和自重恒载可忽略不计。
(8)荷载组合:荷载组合=风荷载ω(LX)+自重荷载N+施工荷载=1.4×61.479+1.2×348+1.2×0=504KN;
(9)柱子内力计算
a、风荷载产生弯矩:M1=ω(LX)L/2(cos17°)=86.071×10.4×0.956=855.8KN·m;
b、柱子自重产生(含施工荷载)的弯矩:M2=N×L/2(Sin17°)=418×10.4×0.293=1273.7KN·m;
c、柱子承受的总弯矩:M=M1+M2=855.8+1273.7=2129.5KN·m;
V=ω(LX)=86.071KN;
N=418KN;
(10)连接夹板内力计算:
V板=V÷2=86.071/2=43.036KN;
N板=N/4+M/(D+2b)=104.5+1442.93=1298.2KN;
(11)螺栓内力计算
V栓=V/2=43.036KN
M栓=V栓×h=23.909×0.202=4.83KN·m
N栓=N/4+M/(D+2b)=104.5+1442.93=1298.2KN
(12)焊缝内力计算
V缝=N/4+M/(D+2b)=104.5+1442.93=1298.2KN
M缝=V缝×b+V栓×h=1298.2×0.117+43.036×0.202=160.6KN·m
N缝=V/2=43.036KN
(13)连接夹板强度验算
压应力σ=103×N/2t0(B-26×2)=103×1298.2/[2×18×(184-52)]=273.2N/mm2
剪应力τ=103×V/2t0(B-26×2)=103×43.036/(2×18×132)=9.05N/mm2
连接夹板强度符合验算要求。
(14)螺栓验算(按普通螺栓计算)
a、螺栓抗剪计算:
单个螺栓最大竖向剪力V竖=[N/4+M/(D+2b)]/8=1298.2/8=162.3KN
最大水平剪力V水平=86.071/8=10.759KN
弯矩引起的剪力V(17°)=M栓/h/4=4.83/0.202/4=6KN
Figure BSA00000196983100062
单个螺栓抵抗最大剪力
符合验算要求。
b、承压承载验算
Figure BSA00000196983100065
承压承载验算通过。
c、抗拉承载力验算
单个螺栓最大拉力Nt=10.7+6=16.7KN
N c t = 3.14 d 2 f t b / 4 = 3.14 × 21.1 × 21.1 × 500 ÷ 4 = 174.7 KN
Figure BSA00000196983100067
螺栓符合验算要求。
(15)焊缝验算
在对接接头和T形接头中,按照以下公式进行验算,钢材材质Q345B,一级焊缝, f t w = 295 N / m m 2 , σ 2 + 3 τ 2 ≤ 1.1 f t w
正应力σ=103×N/Ht+106×MH/2/(1/12tH3)=43036÷(459×30)+160600000×459÷2(30×4593÷12)=155.6N/mm2剪应力τ=103×V/tH=1298200÷30÷459=94.3N/mm2
焊缝通过验算要求。
验算结论:以上计算结果显示,钢管柱对接的4组连接装置能满足强度、稳定性及安全要求。实际使用6组连接装置,确保吊装固定上钢管柱施工的安全性。
综上所述,本发明实施例中的连接装置可实现倾斜的大型钢管柱的对接,可实现大型钢管柱的对接自平衡,钢管柱就位后不必再拉设缆风绳或硬性支撑等,可以根据设计计算不同的高度,采用不同强度的连接装置对钢管柱进行临时固定,由构成连接装置的耳板、连接夹板和螺栓共同承受钢管柱的自重恒载、风荷载以及施工临时荷载。该连接装置的使用可缩短施工工期,避免施工中的交错安全施工,使安装精度得到进一步的提高。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求书的保护范围为准。

Claims (10)

1.一种钢柱对接的连接装置,其特征在于,包括:
耳板、连接夹板和螺栓;
耳板为两块,两块耳板上均设有螺栓孔;连接夹板为两块,两块连接夹板上也均设有与两块耳板上螺栓孔对应的螺栓孔;两块耳板设置在两块连接夹板之间通过螺栓与两块连接夹板固定连接成为一体结构。
2.如权利要求1所述的钢柱对接的连接装置,其特征在于,所述两块耳板的一侧边为焊接在对接钢柱上的焊接边沿。
3.如权利要求1所述的钢柱对接的连接装置,其特征在于,所述两块耳板上的螺栓孔为均匀分布的多个。
4.如权利要求1所述的钢柱对接的连接装置,其特征在于,所述连接夹板上的螺栓孔为均匀分布的多个。
5.如权利要求1所述的钢柱对接的连接装置,其特征在于,所述耳板为长方形的钢板,耳板的厚度为20~30mm。
6.如权利要求1所述的钢柱对接的连接装置,其特征在于,所述耳板的一角设有作为定位标记的缺口。
7.如权利要求1所述的钢柱对接的连接装置,其特征在于,所述连接夹板为长方形的钢板,连接夹板的厚度为12~18mm。
8.一种钢柱对接的安装方法,用于在已固定的下钢柱上对接安装倾斜的上钢柱,其特征在于,包括:
采用上述权利要求1所述的连接装置固定连接所对接的上、下钢柱的对接处;
将连接装置的耳板分别焊接到所对接的上、下钢柱的对接端;
将上钢柱吊装至已固定的下钢柱上方,调整上钢柱至安装位置,使上钢柱对接端焊接的耳板与下钢柱对接端焊接的耳板的位置相对应;
通过连接装置的连接夹板夹持上、下钢柱对接端焊接的耳板,并通过螺栓使所述连接夹板与上、下钢柱对接端焊接的耳板固定连接,使上、下钢柱对接端通过由耳板、连接夹板和螺栓形成的连接装置固定连接。
9.如权利要求1所述的钢柱对接的安装方法,其特征在于,所述将连接装置的耳板分别焊接到所对接的上、下钢柱的对接端包括:
耳板与上、下钢柱焊接处的采用一级全熔透焊接,
10.如权利要求1所述的钢柱对接的安装方法,其特征在于,所述连接装置采用多个,各连接装置的耳板均匀分布焊接在所对接的上、下钢柱的对接端。
CN 201010230994 2010-07-14 2010-07-14 钢柱对接的连接装置及安装方法 Pending CN101906849A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010230994 CN101906849A (zh) 2010-07-14 2010-07-14 钢柱对接的连接装置及安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010230994 CN101906849A (zh) 2010-07-14 2010-07-14 钢柱对接的连接装置及安装方法

Publications (1)

Publication Number Publication Date
CN101906849A true CN101906849A (zh) 2010-12-08

Family

ID=43262424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010230994 Pending CN101906849A (zh) 2010-07-14 2010-07-14 钢柱对接的连接装置及安装方法

Country Status (1)

Country Link
CN (1) CN101906849A (zh)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720371A (zh) * 2012-07-04 2012-10-10 中国机械工业建设集团有限公司 钢结构模块多立柱对接方法及临时对口固定装置
CN102888998A (zh) * 2012-04-19 2013-01-23 中国建筑第四工程局有限公司 一种支撑钢柱的吊装方法及结构
CN103541576A (zh) * 2013-10-25 2014-01-29 国家电网公司 一种新型对接钢管连接件
CN103758330A (zh) * 2014-01-23 2014-04-30 中国建筑第八工程局有限公司 室内管路综合安装结构及方法
CN104018586A (zh) * 2014-06-26 2014-09-03 宁夏共享装备有限公司 用于钢结构柱的连接装置及钢结构柱
CN104018682A (zh) * 2014-06-19 2014-09-03 中国五冶集团有限公司 基于实现工地上钢骨柱拼接的方法
CN104047433A (zh) * 2014-06-20 2014-09-17 中建五局第三建设有限公司 一种钢结构工程中的型钢梁的安装方法
CN104652829A (zh) * 2015-01-23 2015-05-27 中铁四局集团钢结构有限公司 自提升折叠定位操作系统施工方法
CN104674945A (zh) * 2015-03-09 2015-06-03 中国建筑第八工程局有限公司 树形钢管柱结构及其施工方法
CN103774858B (zh) * 2012-10-19 2016-02-03 上海宝冶集团有限公司 一种多管口连接的导向式安装方法
CN105525723A (zh) * 2016-01-18 2016-04-27 江苏沪宁钢机股份有限公司 一种内置有不锈钢落水管的钢柱及其安装方法
CN105822018A (zh) * 2016-05-20 2016-08-03 西安建筑科技大学 一种采用h型连接件的多腔钢管混凝土组合柱及拼接方法
CN105839814A (zh) * 2016-05-12 2016-08-10 浙江东南网架股份有限公司 多腔体钢板剪力墙之间的纵向连接节点及其操作方法
CN106013606A (zh) * 2016-05-20 2016-10-12 西安建筑科技大学 采用内置连接板的多腔钢管混凝土组合柱及拼接方法
CN106013608A (zh) * 2016-05-20 2016-10-12 西安建筑科技大学 一种采用环形连接件的多腔钢管混凝土组合柱及拼接方法
CN106013609A (zh) * 2016-05-20 2016-10-12 西安建筑科技大学 采用双环形连接件的多腔钢管混凝土组合柱及拼接方法
CN107938858A (zh) * 2017-12-19 2018-04-20 凉山州现代房屋建筑集成制造有限公司 异形柱防错边现场拼接节点
CN108316557A (zh) * 2018-03-16 2018-07-24 江苏沪宁钢机股份有限公司 一种v形圆管柱结构及其安装方法
CN108343163A (zh) * 2018-05-08 2018-07-31 中国二十二冶集团有限公司 钢柱对接调整固定装置及方法
CN108412850A (zh) * 2018-03-28 2018-08-17 白杰 一种倾斜钢对接结构
CN108529415A (zh) * 2018-06-19 2018-09-14 中国五冶集团有限公司 用于吊装钢构件的多功能吊装耳板
CN109183987A (zh) * 2018-08-31 2019-01-11 上海二十冶建设有限公司 一种可调节钢柱安装标高的对接耳板节点及其使用方法
CN110093972A (zh) * 2018-01-31 2019-08-06 中国二十冶集团有限公司 双塔高空连廊两侧支点连接的施工方法
CN110688787A (zh) * 2019-08-28 2020-01-14 浙江工业大学 局部受横向弯矩作用的长条形基座的螺栓群受力确定方法
CN113216009A (zh) * 2021-06-25 2021-08-06 四川省公路规划勘察设计研究院有限公司 一种桁式钢管骨架节段间的临时连接构造及拱桥
CN113216694A (zh) * 2021-04-13 2021-08-06 中国一冶集团有限公司 安装装置、钢桁架箱型斜撑安装系统及安装方法
CN113323407A (zh) * 2021-06-16 2021-08-31 重庆电子工程职业学院 一种建筑设计用钢筋混凝土预制构件的钢筋定位结构

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06185114A (ja) * 1992-12-15 1994-07-05 Kajima Corp 鋼管柱の接合方法
JP2002349071A (ja) * 2001-05-24 2002-12-04 Dai Nippon Construction 柱の建方調整治具および建て込み方法
JP2002349070A (ja) * 2001-05-24 2002-12-04 Dai Nippon Construction 柱の建方調整治具およびこれを用いた柱建て込み方法
CN201420311Y (zh) * 2009-04-03 2010-03-10 山东金马工业集团股份有限公司 钢结构钢柱调节装置
CN201778497U (zh) * 2010-06-25 2011-03-30 中国二十冶集团有限公司 一种多节柱高空拼装的临时固定装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06185114A (ja) * 1992-12-15 1994-07-05 Kajima Corp 鋼管柱の接合方法
JP2002349071A (ja) * 2001-05-24 2002-12-04 Dai Nippon Construction 柱の建方調整治具および建て込み方法
JP2002349070A (ja) * 2001-05-24 2002-12-04 Dai Nippon Construction 柱の建方調整治具およびこれを用いた柱建て込み方法
CN201420311Y (zh) * 2009-04-03 2010-03-10 山东金马工业集团股份有限公司 钢结构钢柱调节装置
CN201778497U (zh) * 2010-06-25 2011-03-30 中国二十冶集团有限公司 一种多节柱高空拼装的临时固定装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《泰州职业技术学院学报》 20080229 程颖, 佘小颉 三维倾斜钢管柱结构的制作与安装 19-22 第8卷, 第1期 *
《泰州职业技术学院学报》 20080229 程颖, 佘小颉 三维倾斜钢管柱结构的制作与安装 19-22 第8卷, 第1期 2 *

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888998A (zh) * 2012-04-19 2013-01-23 中国建筑第四工程局有限公司 一种支撑钢柱的吊装方法及结构
CN102888998B (zh) * 2012-04-19 2015-01-07 中国建筑第四工程局有限公司 一种支撑钢柱的吊装方法及结构
CN102720371A (zh) * 2012-07-04 2012-10-10 中国机械工业建设集团有限公司 钢结构模块多立柱对接方法及临时对口固定装置
CN102720371B (zh) * 2012-07-04 2015-02-18 中国机械工业建设集团有限公司 钢结构模块多立柱对接方法
CN103774858B (zh) * 2012-10-19 2016-02-03 上海宝冶集团有限公司 一种多管口连接的导向式安装方法
CN103541576A (zh) * 2013-10-25 2014-01-29 国家电网公司 一种新型对接钢管连接件
CN103758330A (zh) * 2014-01-23 2014-04-30 中国建筑第八工程局有限公司 室内管路综合安装结构及方法
CN103758330B (zh) * 2014-01-23 2016-08-17 中国建筑第八工程局有限公司 室内管路综合安装结构及方法
CN104018682A (zh) * 2014-06-19 2014-09-03 中国五冶集团有限公司 基于实现工地上钢骨柱拼接的方法
CN104047433B (zh) * 2014-06-20 2016-03-02 中建五局第三建设有限公司 一种钢结构工程中的型钢梁的安装方法
CN104047433A (zh) * 2014-06-20 2014-09-17 中建五局第三建设有限公司 一种钢结构工程中的型钢梁的安装方法
CN104018586A (zh) * 2014-06-26 2014-09-03 宁夏共享装备有限公司 用于钢结构柱的连接装置及钢结构柱
CN104652829A (zh) * 2015-01-23 2015-05-27 中铁四局集团钢结构有限公司 自提升折叠定位操作系统施工方法
CN104674945A (zh) * 2015-03-09 2015-06-03 中国建筑第八工程局有限公司 树形钢管柱结构及其施工方法
CN104674945B (zh) * 2015-03-09 2016-08-17 中国建筑第八工程局有限公司 树形钢管柱结构及其施工方法
CN105525723A (zh) * 2016-01-18 2016-04-27 江苏沪宁钢机股份有限公司 一种内置有不锈钢落水管的钢柱及其安装方法
CN105839814A (zh) * 2016-05-12 2016-08-10 浙江东南网架股份有限公司 多腔体钢板剪力墙之间的纵向连接节点及其操作方法
CN106013606A (zh) * 2016-05-20 2016-10-12 西安建筑科技大学 采用内置连接板的多腔钢管混凝土组合柱及拼接方法
CN106013608A (zh) * 2016-05-20 2016-10-12 西安建筑科技大学 一种采用环形连接件的多腔钢管混凝土组合柱及拼接方法
CN106013609A (zh) * 2016-05-20 2016-10-12 西安建筑科技大学 采用双环形连接件的多腔钢管混凝土组合柱及拼接方法
CN105822018A (zh) * 2016-05-20 2016-08-03 西安建筑科技大学 一种采用h型连接件的多腔钢管混凝土组合柱及拼接方法
CN107938858B (zh) * 2017-12-19 2023-10-20 凉山州现代房屋建筑集成制造有限公司 异形柱防错边现场拼接节点
CN107938858A (zh) * 2017-12-19 2018-04-20 凉山州现代房屋建筑集成制造有限公司 异形柱防错边现场拼接节点
CN110093972A (zh) * 2018-01-31 2019-08-06 中国二十冶集团有限公司 双塔高空连廊两侧支点连接的施工方法
CN108316557A (zh) * 2018-03-16 2018-07-24 江苏沪宁钢机股份有限公司 一种v形圆管柱结构及其安装方法
CN108316557B (zh) * 2018-03-16 2024-07-09 江苏沪宁钢机股份有限公司 一种v形圆管柱结构及其安装方法
CN108412850A (zh) * 2018-03-28 2018-08-17 白杰 一种倾斜钢对接结构
CN108412850B (zh) * 2018-03-28 2020-04-21 江苏鼎立钢结构工程有限公司 一种倾斜钢对接结构
CN108343163A (zh) * 2018-05-08 2018-07-31 中国二十二冶集团有限公司 钢柱对接调整固定装置及方法
CN108529415A (zh) * 2018-06-19 2018-09-14 中国五冶集团有限公司 用于吊装钢构件的多功能吊装耳板
CN109183987A (zh) * 2018-08-31 2019-01-11 上海二十冶建设有限公司 一种可调节钢柱安装标高的对接耳板节点及其使用方法
CN110688787B (zh) * 2019-08-28 2023-06-27 浙江工业大学 局部受横向弯矩作用的长条形基座的螺栓群受力确定方法
CN110688787A (zh) * 2019-08-28 2020-01-14 浙江工业大学 局部受横向弯矩作用的长条形基座的螺栓群受力确定方法
CN113216694A (zh) * 2021-04-13 2021-08-06 中国一冶集团有限公司 安装装置、钢桁架箱型斜撑安装系统及安装方法
CN113323407A (zh) * 2021-06-16 2021-08-31 重庆电子工程职业学院 一种建筑设计用钢筋混凝土预制构件的钢筋定位结构
CN113216009A (zh) * 2021-06-25 2021-08-06 四川省公路规划勘察设计研究院有限公司 一种桁式钢管骨架节段间的临时连接构造及拱桥

Similar Documents

Publication Publication Date Title
CN101906849A (zh) 钢柱对接的连接装置及安装方法
CN106644324B (zh) 一种可用于轻钢框架梁柱节点受力性能试验的试验装置
CN104847123B (zh) 连接钢廊的搭建方法
CN105863257B (zh) 多、高层钢筋混凝土结构的板梁分离式高支模连支架搭设方法
CN107100081A (zh) 一种索塔横梁安装支撑结构
CN205999802U (zh) 一种连续梁桥零号段、现浇段支架新型预压装置
CN106703498A (zh) 一种输电线路角钢塔单双角钢过渡节点设计方法
CN104420694B (zh) 苯加氢工程塔设备通用安装方法
CN207812724U (zh) 一种用于剪力墙的箱型软钢消能阻尼器及剪力墙结构
CN207107918U (zh) 设置有水平支撑装置的输煤栈桥支座
Zheng et al. Study on anti-progressive collapse performance of cellular steel frames with different web opening shapes
CN207159819U (zh) 一种索塔横梁安装支撑结构
CN214498388U (zh) 组装式悬挑模板支撑排架
CN202401775U (zh) 电梯井安全防护平台
CN106368322A (zh) 一种用于超高层建筑转换层之间的双向对称倾斜钢柱的安装方法
CN207160599U (zh) 悬挑卸料平台
CN203429556U (zh) 一种索鞍快速安装、定位系统
CN116025170A (zh) 一种码头工程水上横梁钢筋绑扎定位装置及其施工方法
CN105975714B (zh) 一种网架支座承载力的计算方法
Williams et al. Seismic behaviour of knee braced frames
CN206051226U (zh) 一种施工电梯的附墙装置
CN209892872U (zh) 一种传感监控式抗震支架
CN107700824A (zh) 杆式附墙架
CN211689927U (zh) 一种用于桥塔塔内施工的操作平台装置
CN103754791A (zh) 利用预应力钢绞线提升水塔1000m3水箱的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20101208