CN104652829A - 自提升折叠定位操作系统施工方法 - Google Patents

自提升折叠定位操作系统施工方法 Download PDF

Info

Publication number
CN104652829A
CN104652829A CN201510036608.4A CN201510036608A CN104652829A CN 104652829 A CN104652829 A CN 104652829A CN 201510036608 A CN201510036608 A CN 201510036608A CN 104652829 A CN104652829 A CN 104652829A
Authority
CN
China
Prior art keywords
lifting
construction
steel column
platform
folding positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510036608.4A
Other languages
English (en)
Other versions
CN104652829B (zh
Inventor
刘辉
曹锋
马晓光
罗再朝
李若愚
张士宝
陈广
郭进军
杨兴武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Steel Structure Construction Co Ltd of CTCE Group
Original Assignee
STEEL STRUCTURE Co Ltd OF CHINA TIESIJU CIVIL ENGINEERING GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STEEL STRUCTURE Co Ltd OF CHINA TIESIJU CIVIL ENGINEERING GROUP filed Critical STEEL STRUCTURE Co Ltd OF CHINA TIESIJU CIVIL ENGINEERING GROUP
Priority to CN201510036608.4A priority Critical patent/CN104652829B/zh
Publication of CN104652829A publication Critical patent/CN104652829A/zh
Application granted granted Critical
Publication of CN104652829B publication Critical patent/CN104652829B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种自提升折叠定位操作系统施工方法,拓为高耸塔架结构和多高层钢结构高空对接施工提供了方便,避免了每个对接位置都搭设焊接平台,保证高空对接精度和施工速度,能够广泛用于类似钢结构施工过程中。本发明提供了一种自提升折叠定位操作系统安装施工方法,解决了临时操作平台搭设、拆除难度大和高空对接精度低、效率差的难题,也降低了施工措施费的投入,节约成本,缩短工期,增加效益。

Description

自提升折叠定位操作系统施工方法
技术领域
本发明涉及高耸塔架、多高层等全焊接钢结构的的高空对接施工领域,适用于高耸塔架结构及多高层钢结构钢柱高空对接的自提升折叠定位操作系统施工方法。
背景技术
连云港徐圩港区海事与治安监控平台项目主体为钢结构工程,结构总高度94.7m。结构分为内框架及外框架两部分,内框架主要结构受力构件为钢管混凝土柱,外框架主要结构受力构件为钢管塔柱。从内到外依次为4根Ф500x20电梯内框架柱,8根Ф500x30内框架柱,8根Ф813x30外框架柱,各框架柱之间有Ф425x20水平系杆及斜向支撑。8根外框架柱环形均布围绕在内框架柱周围,外框架柱整体呈空间曲线形,高度至75.5m,塔顶为花瓣造型。
本工程电梯柱和外框架柱根据结构特点分7段吊装,每个阶段组合单元框架柱定位安装必须采取高空对接拼装平台体系,并需要满足快速定位要求。
钢管柱高空对接焊接一般采用焊接作业平台施工较多,实际施工中主要有两种形式,第一种形式为对接口处搭设落地钢管脚手架,在搭设好的脚手架上铺设木跳板做为施工平台;第二种形式为利用结构自身直接在焊接位置附近挂吊篮施工。
第一种形式需要在结构下方搭设脚手架,对于普通结构比较方便,但脚手架搭设受高度限值,不适于高层结构且搭设拆除过程中安全风险比较大;
第二种形式对结构自身要求较高,安全系数低,尤不适合用于单根柱结构安装使用。
发明内容
    本发明的目的在于提供一种简单、高效且不影响产品质量的施工方法,即能够保证结构安装精度和焊缝质量的实现,又能实现结构的快速施工。解决高耸塔架、多高层钢结构在安装过程的定位对接施工难题。
    本发明解决技术问题提供如下方案:
自提升折叠定位操作系统施工方法,包括有以下施工步骤:
a、自提升折叠定位操作系统安装
(1)在地面制作连续胎具,先将各阶段框架单元在连续胎具上制作好,并根据塔柱的实际角度调整好;
(2)先将预先加工好的自提升折叠定位操作系统与首段钢柱组装在一起;将折叠式操作平台组装成整体,沿钢柱用抱箍与首段钢柱顶端箍紧连接,将操作平台围栏插入围栏插孔并固定;将护笼爬梯箍接扁铁与钢柱安装固定好,并与操作平台上人孔固定;
b、吊装、安装施工及过程提升
(1)将首段钢柱吊装安装完毕;
(2)将自提升滑轮组与第二段钢柱顶端固定;进行第二段钢柱吊装,操作人员在平台上进行第二段钢柱定位、安装、焊接等施工作业,完成安装施工;
(3)操作人员在地面或下部平台上,采用卷扬机等动力设备对平台进行自提升工作,并随着高度增加,及时安装护笼爬梯;提升至第二吊装段柱顶位置,固定锁死操作平台,准备第三吊装段吊装准备工作;
(4)进入下一个吊装施工循环;
c、自提升折叠定位操作系统拆除
施工结束,待塔柱高空对接焊缝焊接完成后,并经检测合格后,先将快速定位装置卡箍螺栓松开,用自提升滑轮组放到建筑物平台,再利用塔吊或吊车运送至地面,松开拼接螺栓,分片折叠,用于后续结构。
本发明的自提升折叠定位操作系统具有操作简单、安装拆除方便、安全性能高、施工成本底等优点,这套装置由操作平台、上人爬梯和定位丝杆、自提升装置组成,可循环使用,现将提出的自提升折叠定位操作系统施工工艺进行总结,形成一套专利技术。
本发明的优点:
(1)对于高耸塔架、多高层钢结构钢柱高空安装施工方便、可靠。
(2)自提升折叠定位操作系统便于安拆,操作简单,可循环使用。
(3)施工简便,工效高、成本底。
(4)安全可靠,经济合理,具有较大的推广价值。
附图说明
图1 为本发明的自提升折叠定位操作系统图。
具体实施方式
参见附图,自提升折叠定位操作系统施工方法,包括有以下施工步骤:
a、自提升折叠定位操作系统安装
(1)在地面制作连续胎具,先将各阶段框架单元在连续胎具上制作好,并根据塔柱的实际角度调整好;
(2)先将预先加工好的自提升折叠定位操作系统与首段钢柱1组装在一起;将折叠式操作平台4组装成整体,沿钢柱用抱箍7与首段钢柱1顶端箍紧连接,将操作平台2围栏插入围栏插孔并固定;将护笼爬梯3箍接扁铁与钢柱安装固定好,并与操作平台上人孔固定;
b、吊装、安装施工及过程提升
(1)将首段钢柱1吊装安装完毕;
(2)将自提升滑轮组5与第二段钢柱6顶端固定;进行第二段钢柱6吊装,操作人员在平台上进行第二段钢柱6定位、安装、焊接等施工作业,完成安装施工;
(3)操作人员在地面或下部平台上,采用卷扬机8对平台进行自提升工作,并随着高度增加,及时安装护笼爬梯;提升至第二吊装段柱顶位置,固定锁死操作平台,准备第三吊装段吊装准备工作;
(4)进入下一个吊装施工循环;
c、自提升折叠定位操作系统拆除
施工结束,待塔柱高空对接焊缝焊接完成后,并经检测合格后,先将快速定位装置卡箍螺栓松开,用自提升滑轮组5放到建筑物平台,再利用塔吊或吊车运送至地面,松开拼接螺栓,分片折叠,用于后续结构。

Claims (1)

1.自提升折叠定位操作系统施工方法,其特征在于,包括有以下施工步骤:
a、自提升折叠定位操作系统安装
(1)在地面制作连续胎具,先将各阶段框架单元在连续胎具上制作好,并根据塔柱的实际角度调整好;
(2)先将预先加工好的自提升折叠定位操作系统与首段钢柱组装在一起;将折叠式操作平台组装成整体,沿钢柱用抱箍与首段钢柱顶端箍紧连接,将操作平台围栏插入围栏插孔并固定;将护笼爬梯箍接扁铁与钢柱安装固定好,并与操作平台上人孔固定;
b、吊装、安装施工及过程提升
(1)将首段钢柱吊装安装完毕;
(2)将自提升滑轮组与第二段钢柱顶端固定;进行第二段钢柱吊装,操作人员在平台上进行第二段钢柱定位、安装、焊接等施工作业,完成安装施工;
(3)操作人员在地面或下部平台上,采用卷扬机等动力设备对平台进行自提升工作,并随着高度增加,及时安装护笼爬梯;提升至第二吊装段柱顶位置,固定锁死操作平台,准备第三吊装段吊装准备工作;
(4)进入下一个吊装施工循环;
c、自提升折叠定位操作系统拆除
施工结束,待塔柱高空对接焊缝焊接完成后,并经检测合格后,先将快速定位装置卡箍螺栓松开,用自提升滑轮组放到建筑物平台,再利用塔吊或吊车运送至地面,松开拼接螺栓,分片折叠,用于后续结构。
CN201510036608.4A 2015-01-23 2015-01-23 自提升折叠定位操作系统施工方法 Active CN104652829B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510036608.4A CN104652829B (zh) 2015-01-23 2015-01-23 自提升折叠定位操作系统施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510036608.4A CN104652829B (zh) 2015-01-23 2015-01-23 自提升折叠定位操作系统施工方法

Publications (2)

Publication Number Publication Date
CN104652829A true CN104652829A (zh) 2015-05-27
CN104652829B CN104652829B (zh) 2017-04-05

Family

ID=53244413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510036608.4A Active CN104652829B (zh) 2015-01-23 2015-01-23 自提升折叠定位操作系统施工方法

Country Status (1)

Country Link
CN (1) CN104652829B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939707A (zh) * 2017-03-31 2017-07-11 中冶建工集团有限公司 一种受限空间大型钢结构支承平台的自提升方法
CN112093635A (zh) * 2020-09-18 2020-12-18 福建互华土木工程管理有限公司 一种基于钢柱施工的吊装装置、施工方法以及其监理方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007284922A (ja) * 2006-04-13 2007-11-01 Shimizu Corp 建屋の鉄骨構築方法
CN101906849A (zh) * 2010-07-14 2010-12-08 中建钢构有限公司 钢柱对接的连接装置及安装方法
CN101914952A (zh) * 2010-07-23 2010-12-15 华南理工大学 中空钢管混凝土柱与钢梁的连接节点及其施工方法
CN102979313A (zh) * 2012-11-22 2013-03-20 浙江省长城建设集团股份有限公司 转换层超重钢桁架高空吊装施工方法
CN103510712A (zh) * 2012-06-29 2014-01-15 中国有色金属工业第六冶金建设有限公司 多层h钢柱“┕┑”形空中对接施工工法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007284922A (ja) * 2006-04-13 2007-11-01 Shimizu Corp 建屋の鉄骨構築方法
CN101906849A (zh) * 2010-07-14 2010-12-08 中建钢构有限公司 钢柱对接的连接装置及安装方法
CN101914952A (zh) * 2010-07-23 2010-12-15 华南理工大学 中空钢管混凝土柱与钢梁的连接节点及其施工方法
CN103510712A (zh) * 2012-06-29 2014-01-15 中国有色金属工业第六冶金建设有限公司 多层h钢柱“┕┑”形空中对接施工工法
CN102979313A (zh) * 2012-11-22 2013-03-20 浙江省长城建设集团股份有限公司 转换层超重钢桁架高空吊装施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939707A (zh) * 2017-03-31 2017-07-11 中冶建工集团有限公司 一种受限空间大型钢结构支承平台的自提升方法
CN106939707B (zh) * 2017-03-31 2019-06-21 中冶建工集团有限公司 一种受限空间大型钢结构支承平台的自提升方法
CN112093635A (zh) * 2020-09-18 2020-12-18 福建互华土木工程管理有限公司 一种基于钢柱施工的吊装装置、施工方法以及其监理方法

Also Published As

Publication number Publication date
CN104652829B (zh) 2017-04-05

Similar Documents

Publication Publication Date Title
CN103061506B (zh) 一种钢结构穹顶的施工方法
CN106437130A (zh) 一种用于超高层建筑施工的内顶外爬式模架施工平台
CN204098463U (zh) 悬挑脚手架
WO2012027966A1 (zh) 核电站钢制安全壳的组装和安装方法
CN106400951B (zh) 一种超高层建筑的水平与竖向结构同步施工方法
US20160084220A1 (en) Arrangement to align a part of a wind turbine
CN204781887U (zh) 预制装配式建筑的无外架施工平台
CN102251483B (zh) 自提升附着式吊机吊装钢管混凝土格构桥墩的施工方法
CN102535845A (zh) 一种连廊结构承重架的施工方法
CN108360380A (zh) 一种桥梁墩柱施工作业平台及其施工方法
CN102912996B (zh) 一种钢管混凝土柱高空施工安全防护体系
CN203654702U (zh) 一种钢筋混凝土烟囱施工操作平台
CN108331336A (zh) 楼板同步施工的整体提升钢平台系统及其施工方法
CN108979131A (zh) 一种高层建筑施工钢模板及操作架整体提升平台装置
CN103173582A (zh) 高炉五通球及其导出管高空整体就位安装方法
CN104675171A (zh) 大型立式储罐铝合金拱顶整体吊装施工方法
CN103912128A (zh) 高空连体钢桁架的施工方法
CN104652829A (zh) 自提升折叠定位操作系统施工方法
CN103774838A (zh) 一种电梯井施工装配式安全操作平台及使用方法
CN106150057A (zh) 一种分片式液压提升爬架
CN111705677A (zh) 一种用于高墩柱翻模施工的滑升架
CN204401995U (zh) 一种用于穹顶结构安装的中心悬挑支撑系统
CN207332305U (zh) 一种塔柱施工内爬架
CN203497150U (zh) 一种船舶舱口围脚手架
CN203486787U (zh) 一种维金斯式煤气柜柜顶的整体提升装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 230022 China Railway Fourth Bureau Group Steel Structure Co., Ltd. No. 388 Huanhu East Road, Hefei City, Anhui Province

Patentee after: Steel structure building Co., Ltd. of the four Bureau of China Railway

Address before: 230022 China Railway Fourth Bureau Group Steel Structure Co., Ltd. No. 388 Huanhu East Road, Hefei City, Anhui Province

Patentee before: Steel Structure Co., Ltd. of China Tiesiju Civil Engineering Group

CP01 Change in the name or title of a patent holder