CN102888998A - 一种支撑钢柱的吊装方法及结构 - Google Patents
一种支撑钢柱的吊装方法及结构 Download PDFInfo
- Publication number
- CN102888998A CN102888998A CN2012101150632A CN201210115063A CN102888998A CN 102888998 A CN102888998 A CN 102888998A CN 2012101150632 A CN2012101150632 A CN 2012101150632A CN 201210115063 A CN201210115063 A CN 201210115063A CN 102888998 A CN102888998 A CN 102888998A
- Authority
- CN
- China
- Prior art keywords
- steel post
- brace
- brace steel
- steel column
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种
支撑
钢柱的吊装方法及结构。该方法包括吊装前的准备,吊装和调校。本发明在吊装过程中,塔吊的吊钩与钢索之间通过平衡装置与支撑钢柱上焊接的吊装梁连接,可保证在吊装过程中支撑钢柱保持基本垂直,然后将支撑钢柱重量的30-40%载荷垂直坐落在基础钢柱顶面;在不松钩的情况下通过和揽风板连接的揽风绳对支撑钢柱的垂直度进行初步调整,并在支撑钢柱底部通过千斤顶对位置和垂直度进行微调。边调节边观测,然后先用连接板和螺栓进行固定,然后再进行焊接,以确保安装精度和施工质量。
Description
技术领域
本发明涉及一种支撑钢柱的吊装方法及结构,属于钢框架建筑结构技术领域。
背景技术
目前,随着我国经济的不断发展,建筑风格和结构不断创新,建筑施工的难度和复杂性也不断增高,特别是一些新兴高层建筑,在外观上推陈出新,如上海钢铁交易大厦的建筑结构为内筒外框式,中间为钢筋混凝土核心筒,外围是蜂窝网格柱结构钢框架。蜂窝网格柱钢结构的安装属首例复杂的钢结构施工工艺,钢构件的加工和安装精度要求高,如采用常规的吊装方法很难确保安装精度。
发明内容
本发明的目的在于,提供一种支撑钢柱的吊装方法及结构。以提高核心筒外围蜂窝网格柱钢框架的安装精度,以确保施工质量,克服现有技术的不足。
本发明的技术方案:
支撑钢柱的吊装方法,按以下步骤进行实施:
①、在基础钢柱顶面加工定位凸台;并在基础钢柱的四个侧面标记中心线和基准标高;然后在基础钢柱上部相对的两个侧面焊接临时固定板;
②、在支撑钢柱底部的四个侧面加工焊接坡口;并在支撑钢柱的四个侧面标记中心线和校正标高;在支撑钢柱底部焊接临时固定板,支撑钢柱上临时固定板的位置与基础钢柱上临时固定板的位置相对应;在支撑钢柱顶部的四个侧面焊接吊装梁和揽风板,然后将四根揽风绳栓在揽风板上;
③、在塔吊吊钩上安装平衡装置,平衡装置上设有两个互为垂直的滑轮,两个滑轮上分别设有钢索,两根钢索两端分别与支撑钢柱上相对的两个吊装梁连接;
④、起动塔吊将支撑钢柱吊起,采用单机回转法将支撑钢柱重量的30-40%载荷垂直坐落在基础钢柱顶面;
⑤、在塔吊不松钩的状态下,通过栓在支撑钢柱顶部揽风板上的四根揽风绳对支撑钢柱的垂直度进行粗调;调整过程用两台经纬仪在支撑钢柱纵横两个轴线上同时对支撑钢柱的垂直度进行观测,调整完毕后与地面上的锚固杆固定;
⑥、在塔吊不松钩的状态下,对支撑钢柱底部进行校正,校正包括位置校正和垂直度精调;位置校正是使支撑钢柱四个侧面的中心线与基础钢柱上四个侧面的中心线对齐;
⑦、通过设在地面的水准仪利用设在基础钢柱底部以上1米处的基准标高校核支撑钢柱上的校正标高;
⑧、用连接板和螺栓将支撑钢柱和基础钢柱上的临时固定板连接在一起;
⑨、在未设临时固定板的支撑钢柱的焊接坡口和基础钢柱之间的焊口内堆满焊料;
⑩、拆除连接板和螺栓并用切割机切除支撑钢柱和基础钢柱上的临时固定板;然后在切除临时固定板的两面的焊口内堆满焊料;最后将塔吊完全卸载,拆除钢索和揽风绳。
前述支撑钢柱的吊装方法中,所述步骤②中的支撑钢柱上设有临时爬梯,在步骤⑩中可以通过爬梯拆除支撑钢柱顶部的钢索和揽风绳。
前述支撑钢柱的吊装方法中,所述步骤⑥中位置校正是在基础钢柱上临时焊接一个L形槽钢架,在L形槽钢架上固定一个或两个千斤顶,通过千斤顶将支撑钢柱推正。
前述支撑钢柱的吊装方法中,所述步骤⑥中垂直度精调是在基础钢柱和支撑钢柱相对的两侧分别焊接临时槽钢,在基础钢柱与支撑钢柱的临时槽钢之间通过千斤顶进行调整。
按照前述吊装方法形成的吊装结构,包括固定在地基上的基础钢柱、待吊装的支撑钢柱和平衡装置;其特征在于:基础钢柱顶面设有定位凸台;基础钢柱的四个侧面设有中心线、基准标高;基础钢柱上部相对的两个侧面设有临时固定板;支撑钢柱的四个侧面设有中心线和校正标高;支撑钢柱底部设有临时固定板,支撑钢柱顶部的四个侧面设有吊装梁和揽风板;吊装梁经钢索和平衡装置与塔吊上的吊钩连接。
前述结构中,所述支撑钢柱底部的四个侧面加工焊接坡口。
前述结构中,所述揽风板经揽风绳与地面上的锚固杆连接。
前述结构中,所述支撑钢柱上临时固定板的位置与基础钢柱上临时固定板的位置相对应;并经连接板和螺栓连接。
与现有技术相比,本发明在吊装过程中,塔吊的吊钩与钢索之间通过平衡装置与支撑钢柱上焊接的吊装梁连接,可保证在吊装过程中支撑钢柱保持基本垂直,然后将支撑钢柱重量的30-40%载荷垂直坐落在基础钢柱顶面;在不松钩的情况下通过和揽风板连接的揽风绳对支撑钢柱的垂直度进行初步调整,并在支撑钢柱底部通过千斤顶对位置和垂直度进行微调。边调节边观测,然后先用连接板和螺栓进行固定,然后再进行焊接,以确保安装精度和施工质量。
附图说明
图1是本发明的示意图;
图2是吊装前对基础钢柱的准备示意图;
图3是吊装前对支撑钢柱的准备示意图;
图4是平衡装置的结构示意图;
图5是用千斤顶调节支撑钢柱的位置示意图;
图6是用千斤顶调节支撑钢柱垂直度的示意图。
附图中的标记为: 1-基础钢柱、2-定位凸台、3-中心线、4-基准标高、5-临时固定板、6-支撑钢柱、7-焊接坡口、8-校正标高、9-吊装梁、10-揽风板、11-揽风绳、12-吊钩、13-平衡装置、14-滑轮、15-钢索、16 -经纬仪、17-轴线、18-锚固杆、19-水准仪、20-连接板、21-螺栓、22-爬梯、23-L形槽钢架、24-千斤顶、25-临时槽钢。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明,但不作为对本发明的任何限制。
实施例。支撑钢柱的吊装方法,如图1所示,该方法按以下步骤进行实施:
①、在基础钢柱1顶面加工定位凸台2;并在基础钢柱1的四个侧面标记中心线3和基准标高4;然后在基础钢柱1上部相对的两个侧面焊接临时固定板5;(见图2)
②、在支撑钢柱6底部的四个侧面加工焊接坡口7;并在支撑钢柱6的四个侧面标记中心线3和校正标高8;在支撑钢柱6底部焊接临时固定板5,支撑钢柱6上临时固定板5的位置与基础钢柱1上临时固定板5的位置相对应;在支撑钢柱6顶部的四个侧面焊接吊装梁9和揽风板10,然后将四根揽风绳11栓在揽风板10上;支撑钢柱6上设有临时爬梯22。(见图3)
③、在塔吊吊钩12上安装平衡装置13,平衡装置13上设有两个互为垂直的滑轮14,两个滑轮14上分别设有钢索15,两根钢索15两端分别与支撑钢柱6上相对的两个吊装梁9连接;(见图4)
④、起动塔吊将支撑钢柱6吊起,采用单机回转法将支撑钢柱6重量的30-40%载荷垂直坐落在基础钢柱1顶面;
⑤、在塔吊不松钩的状态下,通过栓在支撑钢柱6顶部揽风板10上的四根揽风绳11对支撑钢柱6的垂直度进行粗调;调整过程用两台经纬仪16在支撑钢柱纵横两个轴线17上同时对支撑钢柱6的垂直度进行观测,调整完毕后与地面上的锚固杆18固定;
⑥、在塔吊不松钩的状态下,对支撑钢柱6底部进行校正,校正包括位置校正和垂直度精调;位置校正如图5所示,是在基础钢柱1上临时焊接一个L形槽钢架23,在L形槽钢架23上固定一个或两个千斤顶24,通过千斤顶24将支撑钢柱6推正,使支撑钢柱6四个侧面的中心线3与基础钢柱1上四个侧面的中心线3对齐;垂直度精调如图6所示,是在基础钢柱1和支撑钢柱6相对的两侧分别焊接临时槽钢25,在基础钢柱1与支撑钢柱6的临时槽钢25之间通过千斤顶24进行调整。
⑦、通过设在地面的水准仪19利用设在基础钢柱1底部以上1米处的基准标高4校核支撑钢柱6上的校正标高8;
⑧、用连接板20和螺栓21将支撑钢柱6和基础钢柱1上的临时固定板5连接在一起;
⑨、在未设临时固定板5的支撑钢柱6的焊接坡口7和基础钢柱1之间的焊口内堆满焊料;
⑩、拆除连接板20和螺栓21并用切割机切除支撑钢柱6和基础钢柱1上的临时固定板5;然后在切除临时固定板5的两面的焊口内堆满焊料;最后将塔吊完全卸载,通过爬梯22拆除支撑钢柱6顶部的钢索15和揽风绳11。拆除钢索15和揽风绳11。
按照前述吊装方法形成的吊装结构,包括固定在地基上的基础钢柱1、待吊装的支撑钢柱6和平衡装置13;基础钢柱1顶面设有定位凸台2;基础钢柱1的四个侧面设有中心线3、基准标高4;基础钢柱1上部相对的两个侧面设有临时固定板5;支撑钢柱6的四个侧面设有中心线3和校正标高8;支撑钢柱6底部设有临时固定板5,支撑钢柱6顶部的四个侧面设有吊装梁9和揽风板10;吊装梁9经钢索15和平衡装置13与塔吊上的吊钩12连接。支撑钢柱6底部的四个侧面加工焊接坡口7。揽风板10经揽风绳11与地面上的锚固杆18连接。支撑钢柱6上临时固定板5的位置与基础钢柱1上临时固定板5的位置相对应;并经连接板20和螺栓21连接。
对本例的补充说明
吊点设置在支撑钢柱6上的吊装梁9上,采用带有平衡装置13的吊具进行安装,平衡装置13包括两个互为垂直的滑轮14,支撑钢柱6的起吊采用塔吊单机回转法,起吊时在支撑钢柱6根部垫好枕木,以免柱与地面接触。起吊时钢柱必须垂直,尽量做到回转扶直。起吊回转过程应避免同其他已安装的钢柱碰撞,吊索应预留有效高度。基础钢柱1和支撑钢柱6制作时,在基础钢柱1和支撑钢柱6的四个侧面用钢冲标出钢柱的中心线。
支撑钢柱6就位时首先利用基础钢柱1上的轴线确定好支撑钢柱6位置,此时可令吊车将30%--40%荷载落在基础钢柱1上,在塔吊不松钩的情况下,将支撑钢柱6下部的中心线3与基础钢柱1的中心线3对齐,如果支撑钢柱6下部的中心线3与基础钢柱1上的中心线3有微小偏差,可适当将连接板上的螺孔放大,保证确保钢柱的安装。
首层支撑钢柱6的标高主要依赖于基础钢柱1标高的准确,安装前要严格测量基础钢柱1的标高,因首层支撑钢柱6还要与上一层的支撑钢柱6或蜂窝网格柱连接,所以基准标高的控制设在基础钢柱1上,在进行支撑钢柱6吊装前应采用水准仪19复测支撑钢柱6的柱顶标高。测标高时可利用柱底上1米处的标高十安线标记进行校核。
如图1所示,支撑钢柱6垂直度校正可用两台经纬仪16在基础钢柱1的纵横两个轴线上同时观测.支撑钢柱6如图5和图6所示,依靠千斤顶进行调整。支撑钢柱6顶部如图1所示,依靠揽风绳葫芦调整柱顶部,无误后固定柱脚,并牢固栓紧揽风绳。
支撑钢柱6的校正一般分四步进行:初拧时初校;终拧前复校;焊接过程中跟踪监测;焊接后的最终测量。初拧前可先用长水平尺粗略控制垂直度,待形成框架后进行精确校正。此时要考虑偏差预留,焊接后应进行复测,并与终拧时的测量结果相比较,经此作为上节钢柱校正的依据。
Claims (8)
1. 支撑钢柱的吊装方法,其特征在于,该方法按以下步骤进行实施:
①、在基础钢柱顶面加工定位凸台;并在基础钢柱的四个侧面标记中心线和基准标高;然后在基础钢柱上部相对的两个侧面焊接临时固定板;
②、在支撑钢柱底部的四个侧面加工焊接坡口;并在支撑钢柱的四个侧面标记中心线和校正标高;在支撑钢柱底部焊接临时固定板,支撑钢柱上临时固定板的位置与基础钢柱上临时固定板的位置相对应;在支撑钢柱顶部的四个侧面焊接吊装梁和揽风板,然后将四根揽风绳栓在揽风板上;
③、在塔吊吊钩上安装平衡装置,平衡装置上设有两个互为垂直的滑轮,两个滑轮上分别设有钢索,两根钢索两端分别与支撑钢柱上相对的两个吊装梁连接;
④、起动塔吊将支撑钢柱吊起,采用单机回转法将支撑钢柱重量的30-40%载荷垂直坐落在基础钢柱顶面;
⑤、在塔吊不松钩的状态下,通过栓在支撑钢柱顶部揽风板上的四根揽风绳对支撑钢柱的垂直度进行粗调;调整过程用两台经纬仪在支撑钢柱纵横两个轴线上同时对支撑钢柱的垂直度进行观测,调整完毕后与地面上的锚固杆固定;
⑥、在塔吊不松钩的状态下,对支撑钢柱底部进行校正,校正包括位置校正和垂直度精调;位置校正是使支撑钢柱四个侧面的中心线与基础钢柱上四个侧面的中心线对齐;
⑦、通过设在地面的水准仪利用设在基础钢柱底部以上1米处的基准标高校核支撑钢柱上的校正标高;
⑧、用连接板和螺栓将支撑钢柱和基础钢柱上的临时固定板连接在一起;
⑨、在未设临时固定板的支撑钢柱的焊接坡口和基础钢柱之间的焊口内堆满焊料;
⑩、拆除连接板和螺栓并用切割机切除支撑钢柱和基础钢柱上的临时固定板;然后在切除临时固定板的两面的焊口内堆满焊料;最后将塔吊完全卸载,拆除钢索和揽风绳。
2.根据权利要求1所述支撑钢柱的吊装方法,其特征在于:所述步骤②中的支撑钢柱上设有临时爬梯,在步骤⑩中可以通过爬梯拆除支撑钢柱顶部的钢索和揽风绳。
3.根据权利要求1所述支撑钢柱的吊装方法,其特征在于:所述步骤⑥中位置校正是在基础钢柱上临时焊接一个L形槽钢架,在L形槽钢架上固定一个或两个千斤顶,通过千斤顶将支撑钢柱推正。
4.根据权利要求1所述支撑钢柱的吊装方法,其特征在于:所述步骤⑥中垂直度精调是在基础钢柱和支撑钢柱相对的两侧分别焊接临时槽钢,在基础钢柱与支撑钢柱的临时槽钢之间通过千斤顶进行调整。
5.按照权利要求1-4任一权利要求所述吊装方法形成的吊装结构,包括固定在地基上的基础钢柱(1)、待吊装的支撑钢柱(6)和平衡装置(13);其特征在于:基础钢柱(1)顶面设有定位凸台(2);基础钢柱(1)的四个侧面设有中心线(3)、基准标高(4);基础钢柱(1)上部相对的两个侧面设有临时固定板(5);支撑钢柱(6)的四个侧面设有中心线(3)和校正标高(8);支撑钢柱(6)底部设有临时固定板(5),支撑钢柱(6)顶部的四个侧面设有吊装梁(9)和揽风板(10);吊装梁(9)经钢索(15)和平衡装置(13)与塔吊上的吊钩(12)连接。
6.根据权利要求5所述结构,其特征在于:所述支撑钢柱(6)底部的四个侧面加工焊接坡口(7)。
7.根据权利要求5所述结构,其特征在于:所述揽风板(10)经揽风绳(11)与地面上的锚固杆(18)连接。
8.根据权利要求5所述结构,其特征在于:所述支撑钢柱(6)上临时固定板(5)的位置与基础钢柱(1)上临时固定板(5)的位置相对应;并经连接板(20)和螺栓(21)连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210115063.2A CN102888998B (zh) | 2012-04-19 | 2012-04-19 | 一种支撑钢柱的吊装方法及结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210115063.2A CN102888998B (zh) | 2012-04-19 | 2012-04-19 | 一种支撑钢柱的吊装方法及结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102888998A true CN102888998A (zh) | 2013-01-23 |
CN102888998B CN102888998B (zh) | 2015-01-07 |
Family
ID=47532662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210115063.2A Expired - Fee Related CN102888998B (zh) | 2012-04-19 | 2012-04-19 | 一种支撑钢柱的吊装方法及结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102888998B (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105649348A (zh) * | 2016-03-23 | 2016-06-08 | 中冶建工集团有限公司 | 一种钢管柱筒吊运安装方法 |
CN105798491A (zh) * | 2016-03-23 | 2016-07-27 | 中冶建工集团有限公司 | 一种钢管柱的钢管柱筒焊接施工方法 |
CN106150105A (zh) * | 2015-03-26 | 2016-11-23 | 五冶集团上海有限公司 | 一种劲性柱安装方法 |
CN106320720A (zh) * | 2016-09-09 | 2017-01-11 | 中国核工业二三建设有限公司 | 核电站压力容器筒体和蒸汽发生器的找正、调平装置 |
CN106760197A (zh) * | 2016-12-02 | 2017-05-31 | 江苏沪宁钢机股份有限公司 | 一种钢柱结构及其控制安装允许误差的方法 |
CN107447990A (zh) * | 2016-05-30 | 2017-12-08 | 五冶集团上海有限公司 | 一种两台经纬仪同步控制钢梁两端高差的钢梁吊装方法 |
CN109138459A (zh) * | 2018-09-19 | 2019-01-04 | 中国十七冶集团有限公司 | 一种型钢柱焊接对接垂直度控制器 |
CN112792491A (zh) * | 2021-02-03 | 2021-05-14 | 中铁十七局集团城市建设有限公司 | 一种h型钢结构的焊接方法及水平定位联结装置 |
CN114134993A (zh) * | 2021-12-16 | 2022-03-04 | 中国能源建设集团安徽电力建设第一工程有限公司 | 一种用于地下室钢结构的安装方法 |
CN114809654A (zh) * | 2022-06-02 | 2022-07-29 | 合肥工业大学 | 一种h型钢柱的分段施工方法 |
CN115126268A (zh) * | 2022-07-29 | 2022-09-30 | 中国化学工程第六建设有限公司 | 杯口式基础钢结构立柱快速找正工具及其施工方法 |
CN117657955A (zh) * | 2024-02-02 | 2024-03-08 | 河北中铸爱军建设集团股份有限公司 | 一种框架核心筒建筑施工吊装方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05105388A (ja) * | 1991-10-18 | 1993-04-27 | Ohbayashi Corp | クレーン用吊荷装置 |
JPH0894785A (ja) * | 1994-09-26 | 1996-04-12 | Hitachi Plant Eng & Constr Co Ltd | 筒状巨大構造物の組立方法及び吊り天秤機構付き 屋根体 |
CN101691815A (zh) * | 2009-09-03 | 2010-04-07 | 中国建筑第四工程局有限公司 | 一种大型钢架快速吊装对正方法及钢架底座结构 |
CN101818575A (zh) * | 2010-02-10 | 2010-09-01 | 中国建筑第七工程局有限公司 | 十字形型钢柱施工工艺 |
CN101906849A (zh) * | 2010-07-14 | 2010-12-08 | 中建钢构有限公司 | 钢柱对接的连接装置及安装方法 |
CN102051918A (zh) * | 2011-01-17 | 2011-05-11 | 甘秀明 | 建筑钢竖柱节点结构 |
CN102320531A (zh) * | 2011-08-24 | 2012-01-18 | 大连华锐股份有限公司 | 高定位精度的起重机用起升机构 |
-
2012
- 2012-04-19 CN CN201210115063.2A patent/CN102888998B/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05105388A (ja) * | 1991-10-18 | 1993-04-27 | Ohbayashi Corp | クレーン用吊荷装置 |
JPH0894785A (ja) * | 1994-09-26 | 1996-04-12 | Hitachi Plant Eng & Constr Co Ltd | 筒状巨大構造物の組立方法及び吊り天秤機構付き 屋根体 |
CN101691815A (zh) * | 2009-09-03 | 2010-04-07 | 中国建筑第四工程局有限公司 | 一种大型钢架快速吊装对正方法及钢架底座结构 |
CN101818575A (zh) * | 2010-02-10 | 2010-09-01 | 中国建筑第七工程局有限公司 | 十字形型钢柱施工工艺 |
CN101906849A (zh) * | 2010-07-14 | 2010-12-08 | 中建钢构有限公司 | 钢柱对接的连接装置及安装方法 |
CN102051918A (zh) * | 2011-01-17 | 2011-05-11 | 甘秀明 | 建筑钢竖柱节点结构 |
CN102320531A (zh) * | 2011-08-24 | 2012-01-18 | 大连华锐股份有限公司 | 高定位精度的起重机用起升机构 |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106150105A (zh) * | 2015-03-26 | 2016-11-23 | 五冶集团上海有限公司 | 一种劲性柱安装方法 |
CN105798491A (zh) * | 2016-03-23 | 2016-07-27 | 中冶建工集团有限公司 | 一种钢管柱的钢管柱筒焊接施工方法 |
CN105649348A (zh) * | 2016-03-23 | 2016-06-08 | 中冶建工集团有限公司 | 一种钢管柱筒吊运安装方法 |
CN105649348B (zh) * | 2016-03-23 | 2018-04-13 | 中冶建工集团有限公司 | 一种钢管柱筒吊运安装方法 |
CN107447990B (zh) * | 2016-05-30 | 2019-06-14 | 五冶集团上海有限公司 | 一种两台经纬仪同步控制钢梁两端高差的钢梁吊装方法 |
CN107447990A (zh) * | 2016-05-30 | 2017-12-08 | 五冶集团上海有限公司 | 一种两台经纬仪同步控制钢梁两端高差的钢梁吊装方法 |
CN106320720A (zh) * | 2016-09-09 | 2017-01-11 | 中国核工业二三建设有限公司 | 核电站压力容器筒体和蒸汽发生器的找正、调平装置 |
CN106320720B (zh) * | 2016-09-09 | 2023-12-15 | 中国核工业二三建设有限公司 | 核电站压力容器筒体和蒸汽发生器的找正、调平装置 |
CN106760197A (zh) * | 2016-12-02 | 2017-05-31 | 江苏沪宁钢机股份有限公司 | 一种钢柱结构及其控制安装允许误差的方法 |
CN109138459B (zh) * | 2018-09-19 | 2020-04-14 | 中国十七冶集团有限公司 | 一种型钢柱焊接对接垂直度控制器 |
CN109138459A (zh) * | 2018-09-19 | 2019-01-04 | 中国十七冶集团有限公司 | 一种型钢柱焊接对接垂直度控制器 |
CN112792491A (zh) * | 2021-02-03 | 2021-05-14 | 中铁十七局集团城市建设有限公司 | 一种h型钢结构的焊接方法及水平定位联结装置 |
CN114134993A (zh) * | 2021-12-16 | 2022-03-04 | 中国能源建设集团安徽电力建设第一工程有限公司 | 一种用于地下室钢结构的安装方法 |
CN114809654A (zh) * | 2022-06-02 | 2022-07-29 | 合肥工业大学 | 一种h型钢柱的分段施工方法 |
CN115126268A (zh) * | 2022-07-29 | 2022-09-30 | 中国化学工程第六建设有限公司 | 杯口式基础钢结构立柱快速找正工具及其施工方法 |
CN117657955A (zh) * | 2024-02-02 | 2024-03-08 | 河北中铸爱军建设集团股份有限公司 | 一种框架核心筒建筑施工吊装方法 |
CN117657955B (zh) * | 2024-02-02 | 2024-05-03 | 河北中铸爱军建设集团股份有限公司 | 一种框架核心筒建筑施工吊装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102888998B (zh) | 2015-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102888998B (zh) | 一种支撑钢柱的吊装方法及结构 | |
CN106120559B (zh) | 一种桥梁少支架施工方法以及桥梁 | |
CN104141318B (zh) | 一种大直径钢管柱柱脚安装施工方法 | |
CN109763569B (zh) | 一种悬挑罩棚施工方法 | |
CN103410335B (zh) | 前撑后拉大悬挑梁整体嵌入式吊装施工方法 | |
CN209114332U (zh) | 一种长悬挑大截面盖梁托架体系 | |
CN205558304U (zh) | 一种大型钢连廊桁架的吊装系统 | |
CN114215170B (zh) | 一种超高空巨型吊挂多层连体结构提升方法 | |
CN202544423U (zh) | 一种支撑钢柱的吊装结构 | |
CN204024092U (zh) | 一种新型型钢柱定位组件 | |
CN105040591B (zh) | 一种波形钢腹板的定位装置及其定位方法 | |
CN113668873A (zh) | 一种倾斜支撑钢柱的安装方法 | |
CN103216103A (zh) | 环形屋盖的斜弧形组合钢结构柱安装预变形施工方法 | |
CN102777044B (zh) | 尿素造粒塔钢结构喷淋层吊装方法 | |
CN109440942B (zh) | 一种厂房屋面网架安装结构及施工工艺 | |
CN205933000U (zh) | 一种超高层外挂动臂塔吊爬升支撑装置 | |
CN109252526A (zh) | 基于预应力鱼腹梁支撑技术的装配式支护结构施工工艺 | |
CN103669957B (zh) | V形构架吊装施工方法 | |
CN206625585U (zh) | 一种檩条安装的扁担装置 | |
CN114654173A (zh) | 一种架桥机移动模架主梁侧卧组装方法 | |
CN113215992B (zh) | 一种钢桁拱桥斜拉扣挂法施工用吊索塔架拼装控制方法 | |
CN214459664U (zh) | 一种无落地式墩柱盖梁模板拆装设备 | |
CN114876209A (zh) | 用于吊装受限的钢骨梁分段施工方法 | |
CN114033204A (zh) | 既有单柱雨棚改造施工方法 | |
CN114086665A (zh) | 一种型钢组合结构梁柱节点区钢筋连接施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150107 Termination date: 20160419 |