CN100441779C - 空中预制平移就位的桥梁施工方法 - Google Patents
空中预制平移就位的桥梁施工方法 Download PDFInfo
- Publication number
- CN100441779C CN100441779C CNB2006102003669A CN200610200366A CN100441779C CN 100441779 C CN100441779 C CN 100441779C CN B2006102003669 A CNB2006102003669 A CN B2006102003669A CN 200610200366 A CN200610200366 A CN 200610200366A CN 100441779 C CN100441779 C CN 100441779C
- Authority
- CN
- China
- Prior art keywords
- construction
- bridge
- precast beam
- precast
- steel truss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006102003669A CN100441779C (zh) | 2006-04-19 | 2006-04-19 | 空中预制平移就位的桥梁施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006102003669A CN100441779C (zh) | 2006-04-19 | 2006-04-19 | 空中预制平移就位的桥梁施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1837485A CN1837485A (zh) | 2006-09-27 |
CN100441779C true CN100441779C (zh) | 2008-12-10 |
Family
ID=37014983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006102003669A Expired - Fee Related CN100441779C (zh) | 2006-04-19 | 2006-04-19 | 空中预制平移就位的桥梁施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100441779C (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102012313A (zh) * | 2010-10-29 | 2011-04-13 | 中国一冶集团有限公司 | 牵引行走移动式预制构件对桥梁支撑架进行加载试验的方法 |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102002913B (zh) * | 2010-11-16 | 2013-09-18 | 中铁二十四局集团有限公司 | 预制t梁移梁台车 |
CN102493666A (zh) * | 2011-12-22 | 2012-06-13 | 北京首钢建设集团有限公司 | 一种超大超重构件高空平移安装施工方法 |
CN102943440A (zh) * | 2012-11-06 | 2013-02-27 | 天津二十冶建设有限公司 | 一种桥梁的施工方法 |
CN102912737B (zh) * | 2012-11-16 | 2015-02-04 | 上海市机械施工集团有限公司 | 可升降高支架台车及桥梁隔跨成形整跨纵移安装工艺 |
CN103866692A (zh) * | 2012-12-07 | 2014-06-18 | 宏润建设集团股份有限公司 | 新型盖梁承重架拼装方法 |
CN103352437A (zh) * | 2013-06-19 | 2013-10-16 | 北京市政路桥管理养护集团有限公司 | 基于桥梁同步顶升和整体置换的快速降梁方法 |
CN103711078A (zh) * | 2013-12-17 | 2014-04-09 | 北京工业大学 | 一种桥梁施工中临时梁式支架及其拆除方法 |
CN104060546A (zh) * | 2014-07-11 | 2014-09-24 | 四川川交路桥有限责任公司 | 连续梁桥箱型梁现浇支撑架整体纵移施工方法 |
CN104631332B (zh) * | 2015-01-16 | 2016-08-24 | 中国电建集团成都勘测设计研究院有限公司 | 预应力混凝土t梁原位预制架设施工方法 |
CN105442452B (zh) * | 2015-11-13 | 2017-12-29 | 中铁大桥局集团第一工程有限公司 | 一种用于拼装双幅桥梁钢梁的装置及方法 |
CN105625194B (zh) * | 2016-03-03 | 2017-05-17 | 中铁第六勘察设计院集团有限公司 | 斜拉桥横向平移就位的工法 |
CN108118619A (zh) * | 2017-12-29 | 2018-06-05 | 上海市机械施工集团有限公司 | 一种u梁安装施工结构及方法 |
CN108517785B (zh) * | 2018-05-11 | 2020-08-21 | 中国二十二冶集团有限公司 | 桥梁预制梁板平移安装方法 |
CN110344330B (zh) * | 2019-06-26 | 2020-09-01 | 中铁二十三局集团第三工程有限公司 | 一种使用小型机械架设t型梁的方法 |
CN112376918A (zh) * | 2020-10-13 | 2021-02-19 | 中国石油化工股份有限公司 | 一种预制钢筋混凝土梁快速就位方法 |
CN114232483A (zh) * | 2021-12-03 | 2022-03-25 | 中铁九局集团第二工程有限公司 | 一种横移预应力t梁的方法及装置 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2258657B1 (de) * | 1972-11-30 | 1974-02-07 | Dyckerhoff & Widmann Ag | Traegerelement zum herstellen von ruesttraegern |
GB1472466A (en) * | 1973-04-27 | 1977-05-04 | Ahlgren N | Framework structures |
JPH01322064A (ja) * | 1988-06-25 | 1989-12-27 | Toki Eng:Kk | 足場用鋼管を用いて一括上架仮設を行なう建設工事用足場架設工法 |
CA2083551A1 (en) * | 1992-11-23 | 1994-05-24 | Harold R. Minty | Installation system for bridge girders |
DE29617977U1 (de) * | 1996-03-01 | 1997-01-16 | Kehl Roland | Traggerüst zur Stützung von Massivbauwerken |
JPH09195227A (ja) * | 1996-01-17 | 1997-07-29 | Kawatetsu Kizai Kogyo Kk | 橋脚補強工事用組立式架台およびその使用方法 |
CN2712993Y (zh) * | 2004-07-20 | 2005-07-27 | 彭功根 | 吊运架一体式架桥机 |
-
2006
- 2006-04-19 CN CNB2006102003669A patent/CN100441779C/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2258657B1 (de) * | 1972-11-30 | 1974-02-07 | Dyckerhoff & Widmann Ag | Traegerelement zum herstellen von ruesttraegern |
GB1472466A (en) * | 1973-04-27 | 1977-05-04 | Ahlgren N | Framework structures |
JPH01322064A (ja) * | 1988-06-25 | 1989-12-27 | Toki Eng:Kk | 足場用鋼管を用いて一括上架仮設を行なう建設工事用足場架設工法 |
CA2083551A1 (en) * | 1992-11-23 | 1994-05-24 | Harold R. Minty | Installation system for bridge girders |
JPH09195227A (ja) * | 1996-01-17 | 1997-07-29 | Kawatetsu Kizai Kogyo Kk | 橋脚補強工事用組立式架台およびその使用方法 |
DE29617977U1 (de) * | 1996-03-01 | 1997-01-16 | Kehl Roland | Traggerüst zur Stützung von Massivbauwerken |
CN2712993Y (zh) * | 2004-07-20 | 2005-07-27 | 彭功根 | 吊运架一体式架桥机 |
Non-Patent Citations (4)
Title |
---|
崖门大桥西岸50m预应力T梁预制吊装施工. 黄顺祥,周锡海,卓文泽.国外桥梁,第3期. 2001 |
崖门大桥西岸50m预应力T梁预制吊装施工. 黄顺祥,周锡海,卓文泽.国外桥梁,第3期. 2001 * |
预应力混凝土T梁横移技术在施工中的应用. 刘万非.黑龙江交通科技,第1期. 2006 |
预应力混凝土T梁横移技术在施工中的应用. 刘万非.黑龙江交通科技,第1期. 2006 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102012313A (zh) * | 2010-10-29 | 2011-04-13 | 中国一冶集团有限公司 | 牵引行走移动式预制构件对桥梁支撑架进行加载试验的方法 |
CN102012313B (zh) * | 2010-10-29 | 2012-01-25 | 中国一冶集团有限公司 | 牵引行走移动式预制构件对桥梁支撑架进行加载试验的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN1837485A (zh) | 2006-09-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100441779C (zh) | 空中预制平移就位的桥梁施工方法 | |
CN102979041B (zh) | 下穿铁路道岔群顶进大跨度箱桥施工的软架空加固顶进法 | |
CN108729354B (zh) | 一种顺水桥移动模架及其施工方法 | |
CN111424570A (zh) | 箱涵施工用装配式台车及其施工方法 | |
CN102943440A (zh) | 一种桥梁的施工方法 | |
CN112267369A (zh) | 一种无跨中立柱钢栈桥结构及顶推安装装置和施工方法 | |
CN109594581B (zh) | 跨河段管道结构及其安装方法 | |
WO2022142193A1 (zh) | 大跨度薄壁混凝土声屏障浇筑台车的施工方法 | |
CN105019357B (zh) | 一种拱桥敞口格构式钢梁上异形预制桥面板的安装方法 | |
CN212714544U (zh) | 一种菱形挂篮后退拆除横向加长加固施工结构 | |
CN109778700B (zh) | 一种跨越既有道路的现浇槽形梁三点滑移顶推施工方法 | |
CN112726411A (zh) | 一种单孔大悬臂钢桁梁整体拖拉施工方法 | |
CN111485500A (zh) | 一种菱形挂篮后退拆除横向加长加固施工方法及结构 | |
CN112211112A (zh) | 一种在既有桥梁上采用双导梁架桥机的钢箱梁安装方法 | |
CN111042003A (zh) | 一种斜拉桥混凝土梁组合式挂篮施工方法 | |
CN115961549A (zh) | 一种斜拉桥大吨位整节段钢梁后喂梁式架设施工方法 | |
CN215104790U (zh) | 既有铁路下穿框架桥施工的加固结构 | |
CN104213512B (zh) | 运架铁路d梁一体台车及d梁安装方法 | |
CN212316712U (zh) | 箱涵施工用装配式台车 | |
CN211872669U (zh) | 现有桥梁上部结构不均匀顶升系统 | |
CN204224995U (zh) | 运架铁路d梁一体台车 | |
CN211285076U (zh) | 一种铁路轨道架空加固结构 | |
CN209759904U (zh) | 小半径曲线铁路整体折线架空装置 | |
CN112012095A (zh) | 一种梁板原位预制安装系统及其施工方法 | |
CN207027858U (zh) | 一种适用不同长度和截面形状的后张法预制梁台座 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA CONSTRUCTION SECOND ENGINEERING BUREAU LTD. Free format text: FORMER OWNER: CHINA CONSTRUCTION SECOND ENGINEERING BUREAU LTD. Effective date: 20081114 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20081114 Address after: North Yang Wa 251, Beijing, Tongzhou District: 101101 Co-patentee after: Third Construction Engineering Co., Ltd. of China Construction Second Engineering Bureau Patentee after: China Construction Second Engineering Bureau Co., Ltd. Address before: Beijing, Beijing, Tongzhou District North Yang Wa No. 251, zip code: 101101 Patentee before: China Construction Second Engineering Bureau Co., Ltd. |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081210 Termination date: 20140419 |