WO2023281567A1 - 塗装設備 - Google Patents

塗装設備 Download PDF

Info

Publication number
WO2023281567A1
WO2023281567A1 PCT/JP2021/025277 JP2021025277W WO2023281567A1 WO 2023281567 A1 WO2023281567 A1 WO 2023281567A1 JP 2021025277 W JP2021025277 W JP 2021025277W WO 2023281567 A1 WO2023281567 A1 WO 2023281567A1
Authority
WO
WIPO (PCT)
Prior art keywords
air
wind speed
chamber
coating
painting
Prior art date
Application number
PCT/JP2021/025277
Other languages
English (en)
French (fr)
Inventor
岩切広志
三輪朋孝
Original Assignee
株式会社大気社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社大気社 filed Critical 株式会社大気社
Priority to PCT/JP2021/025277 priority Critical patent/WO2023281567A1/ja
Priority to JP2021549334A priority patent/JP6959480B1/ja
Priority to KR1020217042671A priority patent/KR102463573B1/ko
Priority to CN202180004414.XA priority patent/CN114126767A/zh
Priority to US17/623,758 priority patent/US11691170B2/en
Publication of WO2023281567A1 publication Critical patent/WO2023281567A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/60Ventilation arrangements specially adapted therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/41Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by cleaning the walls of the booth
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/40Construction elements specially adapted therefor, e.g. floors, walls or ceilings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D46/00Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
    • B01D46/10Particle separators, e.g. dust precipitators, using filter plates, sheets or pads having plane surfaces
    • B01D46/103Curved filtering elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D46/00Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
    • B01D46/10Particle separators, e.g. dust precipitators, using filter plates, sheets or pads having plane surfaces
    • B01D46/12Particle separators, e.g. dust precipitators, using filter plates, sheets or pads having plane surfaces in multiple arrangements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/04Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
    • B05B13/0431Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation with spray heads moved by robots or articulated arms, e.g. for applying liquid or other fluent material to 3D-surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/43Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by filtering the air charged with excess material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/90Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth
    • B05B16/95Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth the objects or other work to be sprayed lying on, or being held above the conveying means, i.e. not hanging from the conveying means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Definitions

  • the present invention comprises a painting chamber in which an object to be painted is spray-coated, an air supply chamber for supplying air into the painting chamber through an air supply section provided in the ceiling portion of the painting chamber, and the painting chamber. and an exhaust chamber for sucking air and uncoated paint mist through a floor exhaust portion of the coating chamber.
  • One of the methods for saving energy and reducing carbon dioxide emissions when operating coating equipment is, for example, to reduce the fan power of the air supply fan connected to the air supply chamber, that is, to reduce the air volume. can be considered.
  • the main form of the air supply unit installed on the ceiling of the painting room is a flat shape that is installed almost all over the ceiling. According to this configuration, a uniform flow of air directed from the ceiling of the painting chamber to the floor discharge section can be formed throughout the painting chamber.
  • Patent Documents 1 to 5 for example, various forms of coating facilities are known that have an air supply section not on the entire ceiling of the coating room but on a localized area of the ceiling. According to these forms, uncoated paint mist (overspray) can be discharged from the painting chamber with a relatively small amount of air.
  • the coating equipment having the air supply part in a local part of the ceiling it is possible to discharge the uncoated paint mist with a smaller air volume than in the case of the coating equipment in which the air supply part is provided over the entire ceiling.
  • the effect of reducing paint adhesion to the walls of painting equipment and painting rooms and the effect of preventing color casts between objects to be painted are not necessarily sufficient, and there is room for improvement in terms of maintaining a good painting environment. is left.
  • the more complicated the structure of the air supply section the higher the initial cost.
  • the purpose of the present invention is to provide a coating facility that can maintain a better coating environment while also saving energy by reducing airflow and reducing initial costs.
  • a feature of the coating facility according to the present invention is a coating room in which the object to be coated is spray-coated, an air supply chamber for supplying air into the painting chamber through an air supply portion provided in the ceiling portion of the painting chamber;
  • a painting facility comprising an exhaust chamber for sucking air and uncoated paint mist in the painting chamber through a floor discharge section of the painting chamber,
  • the two air supply units are arranged so as to be bilaterally symmetrical about the position of the object to be coated in the width direction of the coating chamber, Air is radially ejected from each of the blowing portions of the two air supply portions,
  • the blowing part is provided with at least two types of wind speed regions in which the blowing speed differs depending on the air blowing direction.
  • the air blowing portion is provided with at least two types of air velocity regions in which the blowing speed differs depending on the air blowing direction. It becomes easy to form a flow.
  • the low-speed downward flow formed above the object to be coated makes it difficult for uncoated paint mist to diffuse and stay, thereby improving the efficiency of coating and preventing color cast between objects to be coated.
  • the high-speed downward flow formed on the side of the object to be coated causes the uncoated paint mist to flow down, thereby reducing the adhesion of the paint to the side walls of the coating device and the coating chamber.
  • the air volume can be significantly reduced. This not only reduces the fan power, but also reduces the air conditioning load and exhaust treatment load, makes the equipment more compact, and reduces the equipment cost. Furthermore, since the structure of the air supply portion is simple, the initial cost does not increase.
  • the blowing part has a low wind speed region and a high wind speed region, and the blowing speed of the air blown from the low wind speed region is smaller than the blowing speed of the air blown from the high wind speed region.
  • the high wind speed region air is blown in the horizontal direction and the downward vertical direction on the side of the object to be coated
  • In the low air velocity region air is preferably blown obliquely downward on the side of the object to be coated, obliquely downward on the side wall of the coating chamber, and horizontally on the side wall of the coating chamber.
  • the air collides with the central portion between the two air supply units to form a downward flow, and the upper part of the object to be coated.
  • the wind speed between the coating objects in the direction of movement of the coating objects is increased to prevent color fogging.
  • the coating device and the coating chamber can be controlled while preventing the generation of swirls. It is possible to prevent uncoated paint mist from reaching the side wall of the housing, thereby reducing contamination.
  • the blowing part has a low wind speed region and a high wind speed region, and the blowing speed of the air blown from the low wind speed region is smaller than the blowing speed of the air blown from the high wind speed region.
  • the high wind speed region air blows out in the horizontal direction on the side of the object to be coated
  • the low air velocity region air is preferably blown obliquely downward on the side of the object to be coated, in a downward vertical direction, obliquely downward on the side wall of the coating chamber, and in a horizontal direction on the side wall of the coating chamber.
  • the air collides with the central portion between the two air supply units to form a downward flow, and the upper part of the object to be coated.
  • the wind speed between the coating objects in the direction of movement of the coating objects is increased to prevent color fogging.
  • the air blown obliquely downward on the side of the object to be coated the air blown vertically downward, the air blown obliquely downward on the side wall of the coating chamber, and the air blown horizontally on the side wall of the coating chamber.
  • the speed of the air blown from the high wind speed region is 0.3m/s to 0.7m/s.
  • the speed of the air blown from the low wind speed region is 30% to 70% of the speed of the air blown from the high wind speed region.
  • each of the two air supply units is arranged outside the right and left ends of the object to be coated in the width direction of the coating chamber.
  • the flow of unapplied paint mist having a horizontal component velocity can be easily blocked by the downward flow from the air supply section, making it difficult to stain the side walls of the painting chamber.
  • the air supply section has a substantially semicircular vertical cross-sectional shape, and the curved portion of the substantially semicircular shape constitutes the blowout section.
  • the air can be more evenly and radially ejected along the substantially semicircular curved portion.
  • the diameter of the substantially semicircular shape of the air supply section is set so that the average wind speed in the coating chamber is 0.075 m/s to 0.25 m/s. .
  • a hanging wall portion is provided in the central portion between the two air supply portions in the ceiling portion of the coating room.
  • FIG. 1 is a schematic front view of a coating facility; FIG. It is the figure which showed typically the flow of the air from an air supply part. It is the schematic which expanded the vertical cross section of an air supply part. It is the schematic which expanded the vertical cross section of the air supply part which concerns on another embodiment.
  • FIG. 4 is a diagram schematically showing the flow of air from the air supply unit when the coating chamber has hanging walls. It is a perspective view which shows the maintenance method of an air supply part.
  • the "width direction” means the lateral direction in the front of the coating equipment as shown in FIG. transport direction).
  • the painting facility 1 includes a painting room 3 in which a painting object W such as an automobile body is spray-painted, and two air supply units provided in a ceiling portion 30 of the painting room 3.
  • An air supply chamber 2 for supplying air into the painting chamber 3 via 4a and 4b, and a lattice floor 31 (an example of a floor discharge portion) of the painting chamber 3 for discharging the air and uncoated paint mist in the painting chamber 3. It has an exhaust chamber 5 that sucks through.
  • the air supply chamber 2 is arranged directly above the painting chamber 3, and is connected to an air supply fan (not shown). Air supplied under pressure from an air supply fan is blown into the coating chamber 3 from the two air supply portions 4a and 4b.
  • the air supply chamber 2 in this embodiment employs a ceiling chamber system, it is not limited to this, and may employ, for example, a duct system.
  • the painting room 3 is equipped with a conveyor mechanism CV for carrying in and out the object to be painted W, and an articulated robot type automatic painting device 6 having a spray gun.
  • the conveyor mechanism CV is laid over the entire depth direction in the central portion of the floor in the width direction.
  • the automatic painting device 6 in this embodiment includes a mobile wall-mounted painting robot.
  • the wall-mounted painting robot is configured to be movable along rails R laid on the side walls, and the rails R are provided over the entire depth of the painting chamber 3 .
  • Predetermined paint is spray-coated by the automatic operation of the automatic coating device 6 based on a preset time schedule to the coating target W that has been brought in by the conveyor mechanism CV and stopped at a predetermined position.
  • the floor of the painting room 3 is equipped with a grid floor 31 as a floor discharge part, and is configured to allow ventilation.
  • the exhaust chamber 5 is arranged directly below the painting chamber 3 and is connected to an exhaust fan (not shown). Exhaust gas containing air and uncoated paint mist from the painting chamber 3 is sucked through the grid floor 31 .
  • the exhaust chamber 5 is equipped with a paint mist removing device (not shown) that separates and removes uncoated paint mist from the exhaust gas.
  • a paint mist removing device any known paint mist removing device may be employed, regardless of whether it is a wet type in which the paint mist is captured by the stored washing water or a dry type in which the paint mist is captured by a cardboard filter or the like.
  • the exhaust gas sucked into the exhaust chamber 5 by driving the exhaust fan is discharged to the outside of the coating equipment 1 after the uncoated paint mist is separated and removed by the paint mist removing device.
  • the two air supply parts 4a and 4b are arranged so as to be symmetrical about the position of the object to be coated W in the width direction of the coating chamber 3 (corresponding to the position of the conveyor mechanism CV, which will be described later). 3 are provided over the entire depth direction.
  • Both of the two air supply parts 4a and 4b in the present embodiment have a substantially semicircular vertical cross-sectional shape, and a semi-cylindrical portion forming a curved portion of the substantially semicircular shape is disposed on the coating chamber 3 side to blow out air.
  • a part 40 is constructed.
  • the diameter ⁇ of the substantially semicircular shape of the air supply parts 4a and 4b is desirably set so that the average wind speed in the coating chamber 3 is 0.075m/s to 0.25m/s.
  • the diameter ⁇ of the substantially semicircular shape of the air supply portions 4a and 4b is preferably 600 mm to 1000 mm. If the diameter ⁇ is too small, uncoated paint mist tends to stay in the low-speed downward flow formed above the object W to be coated. The flow speed of the downward flow increases, causing the paint to be washed away and the effect of reducing the air volume to become smaller.
  • the air blowing part 40 in the two air supply parts 4a and 4b includes a semi-cylindrical punching member 41 for air volume adjustment, a semi-cylindrical dust removal filter 42, and a semi-cylindrical filter frame 43.
  • the air volume adjusting punching member 41 is integrally formed with the rectifying plate 20 .
  • the straightening plate 20, the punching member 41 for adjusting the air volume, and the filter frame 43 are formed in a perforated shape. configured to be supplied to
  • the air volume adjusting punching member 41 is fixed to the ceiling portion 30 via a hinge portion 21 provided on one side in the width direction thereof.
  • Each of the two air supply parts 4a and 4b is desirably arranged outside the right and left ends of the object W to be coated in the width direction of the coating chamber 3. That is, as shown in FIG. 1, the right air supply portion 4b is provided in the ceiling portion 30 between the position indicated by the dashed line indicating the right end of the object W to be coated and the right side wall 32b of the coating chamber 3.
  • the left air supply part 4a is preferably provided in the ceiling part 30 between the left side wall 32a of the painting chamber 3 and the position indicated by the dashed line indicating the left end of the object W to be painted. desirable.
  • air is radially ejected from the blowing portions 40 of the two air supply portions 4a and 4b.
  • the horizontal direction d1 on the side of the object W to be painted, the oblique downward direction d2 on the side of the object W to be painted, the downward vertical direction d3, and the left side wall 32a of the painting chamber 3 Air is jetted out radially so as to include an obliquely downward direction d4 on the side of the coating chamber 3 and a horizontal direction d5 on the left side wall 32a side of the coating chamber 3 .
  • the blowing part 40 is provided with at least two types of wind speed regions in which the blowing speed differs depending on the air blowing direction.
  • the wind velocity region in the blowing part 40 means not only the part constituting the blowing part 40 but also the surroundings of that part (the space where the air blown from the part exists).
  • the blowout section 40 has two types of wind speed regions, a low wind speed region L and a high wind speed region H.
  • the blowing speed of the air blown from the low wind speed region L is set lower than the blowing speed of the air blown from the high wind speed region H.
  • the speed of the air blown in the horizontal direction d1 on the side of the object W to be coated and in the downward vertical direction d3 is 4a in the diagonally downward direction d2 on the side of the object W to be coated, in the diagonally downward direction d4 on the side of the left wall 32a of the painting chamber 3, and in the horizontal direction d5 on the side of the left wall 32a of the painting chamber 3. set large.
  • the speed of the air blown in the horizontal direction d1 on the side of the object W to be coated and in the downward vertical direction d3 is as follows: , obliquely downward direction d4 on the right side wall 32b side of the coating chamber 3 and in the horizontal direction d5 on the right side wall 32b side of the coating chamber 3.
  • the high-velocity region H of the blowout portion 40 of the left air supply portion 4a is a portion where air blows in the horizontal direction d1 and the downward vertical direction d3 on the side of the object W to be coated.
  • the low air velocity region L of is air in the diagonally downward direction d2 on the side of the painting object W, the diagonally downward direction d4 on the left side wall 32a side of the painting chamber 3, and the horizontal direction d5 on the left side wall 32a side of the painting chamber 3 is the part that blows out.
  • the high air velocity region H of the blowing portion 40 of the right air supply portion 4b is a portion where air blows in the horizontal direction d1 and the downward vertical direction d3 on the side of the object W to be coated.
  • the low air velocity region L of is diagonally downward d2 on the side of the painting object W, diagonally downward d4 on the right side wall 32b side of the painting chamber 3, and in the horizontal direction d5 on the right side wall 32b side of the painting chamber 3 is the part that blows out.
  • the high wind speed region H and the low wind speed region L in the blowing part 40 of the air supply part 4a on the left side are located in the horizontal direction d1 on the side of the object W to be coated and in the diagonally downward direction on the side of the object W to be coated.
  • the high wind speed region H and the low wind speed region L in the blowing part 40 of the right air supply part 4b are similar to the left air supply part 4a described above.
  • Obliquely downward direction d2 on the object W side, downward vertical direction d3, obliquely downward direction d4 on the right side wall 32b side of the painting chamber 3, and horizontal direction d5 on the right side wall 32b side of the painting chamber 3. from the center of the semicircle in the longitudinal section of the air supply section at a predetermined angle, for example, 30 degrees, 30 degrees, 60 degrees, 30 degrees, 30 degrees.
  • the wind speed setting for each of the high wind speed region H and the low wind speed region L in the blowing part 40 of the two air supply parts 4a and 4b can be changed, for example, by changing the type and thickness of the filter material of the dust removal filter 42, or by changing the punching for adjusting the air volume. This can be done by changing the aperture ratio of the member 41 . Specifically, for example, the thickness of the filter material of the dust removal filter 42 provided in the high wind speed region H is made thinner than the thickness of the filter medium of the dust removal filter 42 provided in the low wind speed region L, or the high wind speed region H is configured.
  • the configuration is not limited to the dust filter 42, the punching member 41 for air volume adjustment, etc., and an air velocity adjustment mechanism other than these may be provided.
  • the speed of the air blown out from the high wind speed region H is preferably 0.3m/s to 0.7m/s.
  • the speed of the air blown from the low wind speed region L is preferably 30% to 70% of the speed of the air blown from the high wind speed region H.
  • the speed of the air blown out from the low wind speed region L is less than 30% of the speed of the air blown out from the high wind speed region H, the air flow swirls above the object W to be coated, and the uncoated paint mist tends to stay. .
  • the speed of the air blown from the low wind speed region L exceeds 70% of the speed of the air blown from the high wind speed region H, the effect of reducing the air volume may become weak.
  • the air blowing portion 40 is provided with at least two types of air velocity regions in which the air blowing speed differs depending on the air blowing direction. It becomes easier to form a downward flow.
  • the low-speed descending flow formed above the object W to be coated makes it difficult for the uncoated paint mist to diffuse and stagnate. Further, the high-speed downward flow formed on the side of the object W to be coated causes the uncoated paint mist to flow down, thereby reducing the adhesion of the paint to the side walls of the coating device and the coating chamber 3 .
  • the air volume can be significantly reduced. This not only reduces the fan power, but also reduces the air conditioning load and exhaust treatment load, makes the equipment more compact, and reduces the equipment cost. Furthermore, since the structure of the air supply portion is simple, the initial cost does not increase.
  • the blowing portion 40 by increasing the speed of the air blown in the horizontal direction d1 on the side of the object W to be coated, the air collides at the central portion between the two air supply parts 4a and 4b to form a downward flow, remove the uncoated paint mist existing above the coating object W, and paint in the traveling direction of the coating object W The wind speed between the objects W is increased to prevent color cast.
  • the downward flow in the central portion (above the object to be coated W) in the width direction of the coating chamber 3 has a mountainous wind speed distribution.
  • the static pressure at the center of the mountain is reduced, and the static pressure on the left and right sides of the center is reduced. is increased to collect the airflow at the center, and the diffusion of the uncoated paint mist is prevented and the mist is quickly discharged.
  • the downward flow in the central portion (above the object W to be painted) in the width direction of the painting chamber 3 can effectively prevent color cast on the object W to be subsequently painted.
  • a low-speed downward flow of, for example, 0.1 m/s to 0.2 m/s is formed. /s to 0.25 m/s.
  • the air supply system that combines these low-speed downward flow and high-speed downward flow reduces the air volume of the entire painting room to the conventional painting equipment in which the air supply section is provided almost all over the ceiling (0.3m/s uniform 40% to 50% reduction can be achieved compared to the case where a downward flow is formed).
  • the air volume adjusting punching member 41 may be divided into a plurality of pieces in the depth direction.
  • a wall portion 7 may be provided.
  • the hanging wall portions 7 are provided corresponding to the air supply portions 4a and 4b, and may be provided over the entire depth direction of the coating chamber 3, for example.
  • the air blown from each of the two air supply portions 4a and 4b in the horizontal direction d1 on the side of the object to be coated W is distributed between the two air supply portions 4a and 4b. It collides in the central part and becomes easy to lose velocity energy.
  • the central portion between the two air supply portions 4a and 4b can be It is possible to reduce the variation in the wind speed on both the left and right sides in the painting chamber 3.
  • the air supply portion in the above-described embodiment adopts a configuration in which the vertical cross-sectional shape is semicircular, it is not limited to this.
  • a polygonal shape close to a circular arc (the number of faces constituting the blowout portion is five or more) may be used.
  • the high wind speed regions divided in the above-described embodiment do not necessarily need to be set to the same wind speed, and similarly, the divided low wind speed regions need not necessarily be set to the same wind speed. It may be changed as appropriate.
  • the blowing part adopts a configuration including two types of wind speed regions, namely, a high wind speed region and a low wind speed region where the air blowing speed is lower than that of the high wind speed region.
  • a high wind speed region and a low wind speed region where the air blowing speed is lower than that of the high wind speed region.
  • another wind speed region for example, a medium wind speed region in which the wind speed is lower than the high wind speed region but higher than the low wind speed region may be provided.
  • the configuration in which the air supply section is provided over the entire depth direction of the coating chamber is shown, but the configuration is not necessarily limited to this configuration, and the configuration is not necessarily limited to the entire depth direction of the coating chamber.
  • the air supply section may be provided only in the area where the coating process is performed in the coating chamber.
  • the coating facility of the present invention can be particularly suitably used in the technical field of coating the entire body of automobiles, railroad vehicles, construction machinery, etc. or various parts that constitute them.

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

より良好な塗装環境を維持することが可能でありながらも、風量削減による省ネルギー化と、イニシャルコストの低減化を図れる塗装設備を提供する。 塗装対象物Wにスプレー塗装が行われる塗装室3と、塗装室3の天井部分30に設けられている給気部4a,4bを介して塗装室3内にエアーを供給する給気室2と、塗装室3におけるエアーと未塗着塗料ミストとを塗装室3の床排出部を介して吸引する排気室5と、を備える塗装設備1において、塗装室3の幅方向における塗装対象物Wの位置を中心として、2つの給気部4a,4bが左右対称となるように配置されており、2つの給気部4a,4bのそれぞれの吹き出し部40から、エアーが放射状に噴出し、吹き出し部40には、エアーの吹き出し方向によって吹き出し速度が異なる、少なくとも2種類の風速領域が設けられていることを特徴とする。

Description

塗装設備
 本発明は、塗装対象物にスプレー塗装が行われる塗装室と、該塗装室の天井部分に設けられている給気部を介して前記塗装室内にエアーを供給する給気室と、前記塗装室におけるエアーと未塗着塗料ミストとを前記塗装室の床排出部を介して吸引する排気室と、を備える塗装設備に関する。
 塗装設備を稼働する際の省エネルギー化や二酸化炭素排出量を削減する方法の一つとして、例えば、給気室に接続されている給気ファンのファン動力を低減させること、即ち、風量を削減することが考えられる。
 現在、塗装室の天井に設けられる給気部の形態としては、平坦な形状のものが略天井全面に設けられている形態が主流となっている。この形態によれば、塗装室の天井から床排出部に向かうエアーの一様流を、塗装室全体に形成することができる。
 また、例えば以下の特許文献1~5に示されるように、塗装室の天井全面ではなく、天井の局所に給気部を備える塗装設備についても様々な形態が知られている。これらの形態によれば、比較的少ない風量で未塗着塗料ミスト(オーバースプレー)を塗装室から排出することができる。
特開2017-087159号公報 特開2017-087160号公報 特開2017-124357号公報 特開2018-187542号公報 特開2018-192433号公報
 給気部が略天井全面に設けられている塗装設備では、未塗着塗料ミストによる塗装装置や塗装室の壁の汚れを軽減させつつ、塗装対象物間の色かぶりを防止することができる良好な塗装環境を維持するためには、比較的高い気流流下速度(例えば、少なくとも0.25m/s以上)が必要であり、風量を低減し難いという問題を抱えている。
 また、天井の局部に給気部を備える塗装設備によれば、天井全面に給気部が設けられている塗装設備の場合よりも少ない風量で未塗着塗料ミストを排出することが可能となる。しかし、塗装装置や塗装室の壁面への塗料付着が軽減効果や、塗装対象物間の色かぶりを防止効果が必ずしも十分なものでなく、良好な塗装環境を維持するという点において、改善する余地が残されている。また、給気部の構造については、複雑化するほどイニシャルコストが嵩むため、より簡易な構成であることが望ましいという実情もある。
 本発明の目的は、より良好な塗装環境を維持することが可能でありながらも、風量削減による省ネルギー化と、イニシャルコストの低減化を図れる塗装設備を提供することにある。
 本発明に係る塗装設備の特徴は、塗装対象物にスプレー塗装が行われる塗装室と、
 該塗装室の天井部分に設けられている給気部を介して前記塗装室内にエアーを供給する給気室と、
 前記塗装室におけるエアーと未塗着塗料ミストとを前記塗装室の床排出部を介して吸引する排気室と、を備える塗装設備において、
 前記塗装室の幅方向における前記塗装対象物の位置を中心として、2つの前記給気部が左右対称となるように配置されており、
 前記2つの給気部のそれぞれの吹き出し部から、エアーが放射状に噴出し、
 前記吹き出し部には、エアーの吹き出し方向によって吹き出し速度が異なる、少なくとも2種類の風速領域が設けられている点にある。
 本構成によれば、エアーの吹き出し方向によって吹き出し速度が異なる、少なくとも2種類の風速領域が吹き出し部に設けられていることによって、塗装対象物の上方及び側方のそれぞれに低速下降流及び高速下降流を形成し易くなる。塗装対象物の上方に形成される低速下降流によって、未塗着塗料ミストの拡散と滞留が生じ難くなり、塗着効率が向上して、塗装対象物間の色かぶりも防止される。また、塗装対象物の側方に形成される高速下降流によって、未塗着塗料ミストを流下させて、塗装装置や塗装室の側壁面への塗料付着を軽減することができる。
 従って、エアーの吹き出し速度がそれぞれ異なる複数種類の風速領域を組み合わせることにより、良好な塗装環境を維持することが可能であると共に、給気部が略天井全面に設けられている従来の塗装設備と比べて、大幅に風量を低減することができる。これは、ファン動力を低減させるだけでなく、空調負荷や排気処理負荷の低減、設備のコンパクト化、設備コストの低減にもつながる。さらに、給気部の構造が簡易な構成であるため、イニシャルコストが嵩むこともない。
 本発明に係る塗装設備においては、前記吹き出し部が、低風速領域と高風速領域とを備え、前記低風速領域から吹き出すエアーの吹き出し速度は、前記高風速領域から吹き出すエアーの吹き出し速度よりも小さく設定されており、
 前記高風速領域では、前記塗装対象物の側の水平方向及び下向き鉛直方向にエアーが吹き出し、
 前記低風速領域では、前記塗装対象物の側の斜め下方向、前記塗装室の側壁側の斜め下方向、及び前記塗装室の側壁側の水平方向にエアーが吹き出すと好適である。
 本構成によれば、塗装対象物の側の水平方向に吹き出すエアーを高速にすることによって、当該エアーが2つの給気部の間の中央部分で衝突して下降流となり、塗装対象物の上方に存在する未塗着塗料ミストを除去すると共に、塗装対象物の進行方向における塗装対象物の間の風速が高められて色かぶりが防止される。
 また、下向き鉛直方向に吹き出すエアーを高速にすることによって、塗装対象物の側面を塗装する際に生じる未塗着塗料ミストを除去し易くする。
 塗装対象物の側の斜め下方向から吹き出すエアーを低速にすることによって、塗装対象物の側の水平方向に対応する高風速領域と、下向き鉛直方向に対応する高風速領域とに挟まれた部分に渦流が発生し難くなり、未塗着塗料ミストが滞留し易い淀み部をなくすことができる。
 さらに、塗装室の側壁の側の斜め下方向に吹き出すエアーと、塗装室の側壁の側の水平方向に吹き出すエアーとを低速にすることによって、渦流の発生を防止しながら、塗装装置や塗装室の側壁への未塗着塗料ミストの到達を防いで、汚れを軽減することができる。
 本発明に係る塗装設備においては、前記吹き出し部が、低風速領域と高風速領域とを備え、前記低風速領域から吹き出すエアーの吹き出し速度は、前記高風速領域から吹き出すエアーの吹き出し速度よりも小さく設定されており、
 前記高風速領域では、前記塗装対象物の側の水平方向にエアーが吹き出し、
 前記低風速領域では、前記塗装対象物の側の斜め下方向、下向き鉛直方向、前記塗装室の側壁側の斜め下方向、及び前記塗装室の側壁側の水平方向にエアーが吹き出すと好適である。
 本構成によれば、塗装対象物の側の水平方向に吹き出すエアーを高速にすることによって、当該エアーが2つの給気部の間の中央部分で衝突して下降流となり、塗装対象物の上方に存在する未塗着塗料ミストを除去すると共に、塗装対象物の進行方向における塗装対象物の間の風速が高められて色かぶりが防止される。
 さらに、塗装対象物の側の斜め下方向に吹き出すエアーと、下向き鉛直方向に吹き出すエアーと、塗装室の側壁の側の斜め下方向に吹き出すエアーと、塗装室の側壁の側の水平方向に吹き出すエアーとを低速にすることによって、渦流の発生を防止しながら、塗装装置や塗装室の側壁への未塗着塗料ミストの到達を防いで、汚れを軽減することができる。
 本発明に係る塗装設備においては、前記高風速領域から吹き出すエアーの速度は、0.3m/s~0.7m/sであると好適である。
 本構成によれば、塗装装置や塗装室の側壁面への未塗着塗料ミストの付着を軽減しながら、未塗着塗料ミストを塗装室から速やかに排出し易くなる。
 本発明に係る塗装設備においては、前記低風速領域から吹き出すエアーの速度は、前記高風速領域から吹き出すエアーの速度の30%~70%の速度であると好適である。
 本構成によれば、塗装対象物の上部で気流が渦を巻いて未塗着塗料ミストが滞留するのを防ぎつつ、風量を削減する効果を高めることができる。
 本発明に係る塗装設備においては、前記2つの給気部のそれぞれは、前記塗装室の幅方向における前記塗装対象物の右端及び左端よりも外側に配置されていると好適である。
 本構成によれば、水平成分速度を持つ未塗着塗料ミストの流れを、給気部からの下降流で遮断し易くなり、塗装室の側壁を汚れ難くすることができる。
 本発明に係る塗装設備においては、前記給気部の縦断面形状が略半円形であり、該略半円形の曲線部分が前記吹き出し部を構成していると好適である。
 本構成によれば、略半円形の曲線部分に沿って、エアーをより均等に放射状に噴出させることができる。
 本発明に係る塗装設備においては、前記給気部の略半円形の直径は、前記塗装室における平均風速が0.075m/s~0.25m/sとなるように設定されると好適である。
 本構成によれば、塗装対象物の上部に形成される低速下降流において未塗着塗料ミストが滞留し難くなると共に、塗装対象物の上部に形成される下降流の流速が高くなり過ぎないようにしつつ、風量削減効果を維持することができる。
 本発明に係る塗装設備においては、前記塗装室の天井部分における、前記2つの給気部の間の中央部分に垂れ壁部が設けられていると好適である。
 本構成によれば、特に、塗装対象物の側の水平方向に吹き出すエアーの速度エネルギーの損失を低減させつつ、2つの給気部の間の中央部分を境とする塗装室における左右両側の風速のバラツキを低減することができる。
塗装設備の正面概略構成図である。 給気部からのエアーの流れを模式的に示した図である。 給気部の縦断面を拡大した概略図である。 別実施形態に係る給気部の縦断面を拡大した概略図である。 塗装室が垂れ壁部を備える場合の給気部からのエアーの流れを模式的に示した図である。 給気部のメンテナンス方法を示す斜視図である。
 本発明に係る塗装設備の実施形態について、図面を参照しながら説明をする。
 尚、本明細書において、「幅方向」とは、例えば図1のごとく、塗装設備の正面における横方向を意味し、また「奥行方向」とは、塗装設備の側面における横方向(塗装対象物の搬送方向)を意味するものとする。
(塗装設備)
 図1に示すように、塗装設備1は、例えば自動車のボディ等の塗装対象物Wにスプレー塗装が行われる塗装室3と、塗装室3の天井部分30に設けられている2つの給気部4a,4bを介して塗装室3内にエアーを供給する給気室2と、及び塗装室3におけるエアーと未塗着塗料ミストとを塗装室3の格子製床31(床排出部の一例)を介して吸引する排気室5を備える。
 給気室2は、塗装室3の直上に配置され、そして図示しない給気ファンが接続されている。給気ファンから加圧供給されるエアーが、2つの給気部4a,4bから塗装室3内に吹き出される。尚、本実施形態における給気室2は、天井チャンバ方式を採用しているがこれに限定されるものではなく、他にも例えばダクト方式等を採用しても良い。
 塗装室3は、内部に塗装対象物Wを搬入搬出するコンベア機構CVと、スプレーガンを有する多関節ロボット型の自動塗装装置6とを備える。コンベア機構CVは、床の幅方向の中央部分において、奥行方向全体にわたって敷設される。
 本実施形態における自動塗装装置6は、移動式の壁掛け塗装ロボットを備える。壁掛け塗装ロボットは、側壁に敷設されたレールRに沿って移動可能に構成されており、レールRは、塗装室3の奥行方向全体に渡って設けられている。
 コンベア機構CVによって搬入されて所定位置に停止させた状態の塗装対象物Wに対して、予め設定されたタイムスケジュールに基づく自動塗装装置6の自動作動によって、所定の塗料がスプレー塗装される。
 塗装室3の床は床排出部としての格子製床31を備えており、通気可能に構成されている。
 排気室5は、塗装室3の直下に配置され、図示しない排気ファンが接続されている。塗装室3からのエアーと未塗着塗料ミストとを含む排気気体が、格子製床31を介して吸引される。
 排気室5は、排気気体から未塗着塗料ミストを分離除去する塗料ミスト除去装置(図示せず)を備える。尚、塗料ミスト除去装置としては、貯留洗浄水に塗料ミストを捕捉させる湿式、及び段ボールフィルタ等に塗料ミストを捕捉させる乾式を問わず、公知の塗料ミスト除去装置を採用して良い。
 排気ファンの駆動によって排気室5に吸引された排気気体は、塗料ミスト除去装置によって未塗着塗料ミストが分離除去されたのち、塗装設備1の外部に排出される。
(給気部)
 2つの給気部4a,4bは、塗装室3の幅方向における塗装対象物Wの位置(後述するコンベア機構CVの位置に相当)を中心として左右対称となるように配置されており、塗装室3の奥行方向全体にわたって設けられている。
 本実施形態における2つの給気部4a,4bの縦断面形状はいずれも略半円形であり、略半円形の曲線部分をなす半円筒形部分が塗装室3の側に配置されてエアーの吹き出し部40を構成している。
 尚、給気部4a,4bの略半円形の直径Φは、塗装室3における平均風速が0.075m/s~0.25m/sとなるように設定されることが望ましい。例えば、本発明に係る塗装設備1が乗用車を塗装対象物Wとするような場合、給気部4a,4bの略半円形の直径Φは、600mm~1000mmであることが望ましい。直径Φが小さすぎると、塗装対象物Wの上部に形成される低速下降流において未塗着塗料ミストが滞留し易くなり、逆に直径Φが大きすぎると、塗装対象物Wの上部に形成される下降流の流速が高くなって塗料が流されてしまったり、風量削減効果が小さくなる。
 2つの給気部4a,4bにおけるエアーの吹き出し部40は、半円筒形の風量調整用パンチング部材41、半円筒形の除塵フィルタ42、半円筒形のフィルタ枠43を備える。風量調整用パンチング部材41は、整流板20と一体に構成されている。整流板20、風量調整用パンチング部材41、及びフィルタ枠43は多孔形状に構成されており、給気室2のエアーが整流板20を通過して除塵フィルタ42によって除塵された後に塗装室3内に供給されるように構成されている。尚、風量調整用パンチング部材41は、その幅方向の片側に設けられているヒンジ部21を介して、天井部分30に固定されている。
 2つの給気部4a,4bのそれぞれは、塗装室3の幅方向における塗装対象物Wの右端及び左端よりも外側に配置されていることが望ましい。即ち、図1に示すように、右側の給気部4bは、塗装対象物Wの右端を示す一点鎖線にて示される位置と、塗装室3の右側壁32bとの間の天井部分30に設けられることが望ましく、また左側の給気部4aは、塗装対象物Wの左端を示す一点鎖線にて示される位置と、塗装室3の左側壁32aとの間の天井部分30に設けられることが望ましい。
 2つの給気部4a,4bが塗装対象物Wの側に互いに近づき過ぎると、水平成分速度を持つ未塗着塗料ミストの流れを給気部からの下降流で遮断し難くなるため、塗装室3の側壁が汚れやすくなる。
 図2及び図3に示すように、2つの給気部4a,4bのそれぞれの吹き出し部40から、エアーが放射状に噴出するように構成されている。
 本実施形態においては、左側の給気部4aからは、塗装対象物Wの側の水平方向d1、塗装対象物Wの側の斜め下方向d2、下向き鉛直方向d3、塗装室3の左側壁32aの側の斜め下方向d4、塗装室3の左側壁32aの側の水平方向d5を含むように、エアーが放射状に噴出する。また、右側の給気部4bからは、塗装対象物Wの側の水平方向d1、塗装対象物Wの側の斜め下方向d2、下向き鉛直方向d3、塗装室3の右側壁32bの側の斜め下方向d4、塗装室3の右側壁32bの側の水平方向d5を含むように、エアーが放射状に噴出する。
 吹き出し部40には、エアーの吹き出し方向によって吹き出し速度が異なる、少なくとも2種類の風速領域が設けられている。尚、吹き出し部40における風速領域とは、吹き出し部40を構成する部分だけでなく、その部分の周囲(当該部分から吹き出たエアーが存在する空間)をも含むものであることを意味する。
 図3に示すように、本実施形態では、吹き出し部40が、低風速領域L及び高風速領域Hという2種類の風速領域を備える。低風速領域Lから吹き出すエアーの吹き出し速度は、高風速領域Hから吹き出すエアーの吹き出し速度よりも小さく設定されている。
 高風速領域Hでは、塗装対象物Wの側の水平方向d1及び下向き鉛直方向d3にエアーが吹き出し、低風速領域Lでは、塗装対象物Wの側の斜め下方向d2、塗装室3の側壁側の斜め下方向d4、及び塗装室3の側壁側の水平方向d5にエアーが吹き出すように構成されている。
 具体的には、図1及び図2に示すように、左側の給気部4aにおいて、塗装対象物Wの側の水平方向d1及び下向き鉛直方向d3に吹き出すエアーの速度は、左側の給気部4aから塗装対象物Wの側の斜め下方向d2、塗装室3の左側壁32aの側の斜め下方向d4、及び塗装室3の左側壁32aの側の水平方向d5に吹き出すエアーの速度よりも大きく設定されている。
 また、右側の給気部4bにおいて、塗装対象物Wの側の水平方向d1及び下向き鉛直方向d3に吹き出すエアーの速度は、右側の給気部4bから塗装対象物Wの側の斜め下方向d2、塗装室3の右側壁32bの側の斜め下方向d4、及び塗装室3の右側壁32bの側の水平方向d5に吹き出すエアーの速度よりも大きく設定されている。
 左側の給気部4aの吹き出し部40の高風速領域Hは、塗装対象物Wの側の水平方向d1及び下向き鉛直方向d3にエアーが吹き出す部分であり、左側の給気部4aの吹き出し部40の低風速領域Lは、塗装対象物Wの側の斜め下方向d2、塗装室3の左側壁32aの側の斜め下方向d4、及び塗装室3の左側壁32aの側の水平方向d5にエアーが吹き出す部分である。
 右側の給気部4bの吹き出し部40の高風速領域Hは、塗装対象物Wの側の水平方向d1及び下向き鉛直方向d3にエアーが吹き出す部分であり、右側の給気部4bの吹き出し部40の低風速領域Lは、塗装対象物Wの側の斜め下方向d2、塗装室3の右側壁32bの側の斜め下方向d4、及び塗装室3の右側壁32bの側の水平方向d5にエアーが吹き出す部分である。
 図3に示すように、左側の給気部4aの吹き出し部40における高風速領域Hと低風速領域Lは、塗装対象物Wの側の水平方向d1、塗装対象物Wの側の斜め下方向d2、下向き鉛直方向d3、塗装室3の左側壁32aの側の斜め下方向d4、塗装室3の左側壁32aの側の水平方向d5のそれぞれに対応して、給気部の縦断面における半円の中心から所定の角度、例えば、θ1=30度、θ2=30度、θ3=60度、θ4=30度、θ5=30度の角度で区分けすることができる。
 図示しないが、右側の給気部4bの吹き出し部40における高風速領域Hと低風速領域Lは、上述の左側の給気部4aと同様に、塗装対象物Wの側の水平方向d1、塗装対象物Wの側の斜め下方向d2、下向き鉛直方向d3、塗装室3の右側壁32bの側の斜め下方向d4、塗装室3の右側壁32bの側の水平方向d5のそれぞれに対応して、給気部の縦断面における半円の中心から所定の角度、例えば、30度、30度、60度、30度、30度の角度で区分けすることができる。
 2つの給気部4a,4bの吹き出し部40における高風速領域Hと低風速領域Lのそれぞれの風速設定は、例えば、除塵フィルタ42の濾材の種類や厚みを変更したり、あるいは風量調整用パンチング部材41の開口率を変更することによって行うことができる。具体的には、例えば、高風速領域Hに設けられる除塵フィルタ42の濾材の厚みを、低風速領域Lに設けられる除塵フィルタ42の濾材の厚みよりも薄くしたり、あるいは高風速領域Hを構成する風量調整用パンチング部材41の開口率を、低風速領域Lを構成する風量調整用パンチング部材41の開口率よりも高く設定するなどして、風速差を生じさせることができる。勿論、除塵フィルタ42、風量調整用パンチング部材41等のような構成に限らず、これらとは別の風速調節機構を設けるようにしても良い。
 高風速領域Hから吹き出すエアーの速度は、0.3m/s~0.7m/sであることが望ましい。これにより、塗装装置や塗装室3の側壁面への未塗着塗料ミストの付着を軽減しながら、未塗着塗料ミストを塗装室3から速やかに排出し易くなる。
 また、低風速領域Lから吹き出すエアーの速度は、高風速領域Hから吹き出すエアーの速度の30%~70%の速度であることが望ましい。低風速領域Lから吹き出すエアーの速度が、高風速領域Hから吹き出すエアーの速度の30%未満の場合、塗装対象物Wの上部で気流が渦を巻いて未塗着塗料ミストが滞留し易くなる。また、低風速領域Lから吹き出すエアーの速度が、高風速領域Hから吹き出すエアーの速度の70%を超えると、風量を削減する効果が薄くなる場合がある。
 上述のように、エアーの吹き出し方向によって吹き出し速度が異なる、少なくとも2種類の風速領域が吹き出し部40に設けられていることによって、塗装対象物Wの上方及び側方のそれぞれに低速下降流及び高速下降流を形成し易くなる。塗装対象物Wの上方に形成される低速下降流によって、未塗着塗料ミストの拡散と滞留が生じ難くなり、塗着効率が向上して、塗装対象物W間の色かぶりも防止される。また、塗装対象物Wの側方に形成される高速下降流によって、未塗着塗料ミストを流下させて、塗装装置や塗装室3の側壁面への塗料付着を軽減することができる。
 従って、エアーの吹き出し速度がそれぞれ異なる複数種類の風速領域を組み合わせることにより、良好な塗装環境を維持することが可能であると共に、給気部が略天井全面に設けられている従来の塗装設備と比べて、大幅に風量を低減することができる。これは、ファン動力を低減させるだけでなく、空調負荷や排気処理負荷の低減、設備のコンパクト化、設備コストの低減にもつながる。さらに、給気部の構造が簡易な構成であるため、イニシャルコストが嵩むこともない。
 特に、吹き出し部40に高風速領域Hと低風速領域Lとが設けられている上述の実施形態の場合、塗装対象物Wの側の水平方向d1に吹き出すエアーを高速にすることによって、当該エアーが2つの給気部4a,4bの間の中央部分で衝突して下降流となり、塗装対象物Wの上方に存在する未塗着塗料ミストを除去すると共に、塗装対象物Wの進行方向における塗装対象物Wの間の風速が高められて色かぶりが防止される。
 また、下向き鉛直方向d3に吹き出すエアーを高速にすることによって、塗装対象物Wの側面を塗装する際に生じる未塗着塗料ミストを除去し易くする。
 塗装対象物Wの側の斜め下方向d2から吹き出すエアーを低速にすることによって、塗装対象物Wの側の水平方向d1に対応する高風速領域Hと、下向き鉛直方向d3に対応する高風速領域Hとに挟まれた部分に渦流が発生し難くなり、未塗着塗料ミストが滞留し易い淀み部をなくすことができる。
 さらに、塗装室3の側壁の側の斜め下方向に吹き出すエアーと、塗装室3の側壁の側の水平方向に吹き出すエアーとを低速にすることによって、渦流の発生を防止しながら、塗装装置や塗装室3の側壁への未塗着塗料ミストの到達を防いで、汚れを軽減することができる。尚、塗装室3の側壁の側の斜め下方向に吹き出すエアーと、塗装室3の側壁の側の水平方向に吹き出すエアーとを高速にすると、渦流が発生し易くなり逆効果となる場合がある。
 また、上述の実施形態においては、塗装室3の幅方向における中央部分(塗装対象物Wの上方)における下降流は、山なりの風速分布となる。つまり、山の中心の風速(動圧)を大きくして、山の中心の左右両側の風速(動圧)を小さくすることで、山の中心の静圧を小さく、中心の左右両側の静圧を大きくして、気流を中心に集めて、未塗着塗料ミストの拡散防止と速やかな排出が図られる。その結果、塗装室3の幅方向における中央部分(塗装対象物Wの上方)における下降流は、後続の塗装対象物Wへの色かぶりを効果的に防止することができる。
 上述の実施形態によれば、塗装対象物Wの上方において、例えば0.1m/s~0.2m/sほどの低速下降流が形成され、塗装対象物Wの両側方に、例えば0.20m/s~0.25m/sほどの高速下降流が形成され、当該高速下降流の隣接域に、滞留及び逆流が抑えられた低速下降流が形成される。これらの低速下降流と高速下降流とを組み合わせた給気方式により、塗装室全体の風量を、給気部が略天井全面に設けられている従来の塗装設備(0.3m/sの一様下降流を形成)と比べて40%~50%程度削減することが可能となる。
(給気部のメンテナンス方法)
 本実施形態における給気部の除塵フィルタ42を交換する場合は、図6に示すように、整流板20を有する風量調整用パンチング部材41を、ヒンジ部21を支点として上方に回転させることによって使用済の除塵フィルタ42を取り外すことができる。新たな除塵フィルタ42をフィルタ枠43に設置して、風量調整用パンチング部材41を下方に回転させることによって、除塵フィルタ42を上からおさえつけるようにして取り付けることができる。尚、図6に示すように、風量調整用パンチング部材41については、奥行方向において複数に分割して設けるようにしても良い。
(その他の実施形態)
 1.上述の実施形態において、高風速領域Hでは、塗装対象物Wの側の水平方向d1にエアーが吹き出し、低風速領域Lでは、塗装対象物Wの側の斜め下方向d2、下向き鉛直方向d3、塗装室3の側壁側の斜め下方向d4、及び塗装室3の側壁側の水平方向d5にエアーが吹き出すように構成しても良い。即ち、図4に示すように、高風速領域Hを塗装対象物Wの側の水平方向d1(θ1)のみに設定し、他の方向(θ2)を全て低風速領域Lに設定することによっても、上述の実施形態とほぼ同様の効果が発揮され得ると共に、特に、上述の実施形態の場合と同じ給気量としたときに、2つの給気部4a,4bの間の中央部分(上記実施形態においては塗装室3の天井部分30の幅方向中央部分)における未塗着塗料ミストの排出効果が向上して、塗装対象物W間の色かぶりをより確実に防止することができる。
 2.図5に示すように、塗装室3の天井部分30における、2つの給気部4a,4bの間の中央部分(本実施形態においては塗装室3の天井部分30の幅方向中央部分)に垂れ壁部7を設けるようにしても良い。垂れ壁部7は、給気部4a,4bに対応して設けられており、例えば、塗装室3の奥行方向全体にわたって設けるようにしても良い。垂れ壁部7が設けられていない場合、特に、2つの給気部4a,4bのそれぞれから塗装対象物Wの側の水平方向d1に吹き出すエアーが、2つの給気部4a,4bの間の中央部分で衝突して速度エネルギーを失い易くなる。しかし、垂れ壁部7を設けることによって、塗装対象物Wの側の水平方向d1に吹き出すエアーの速度エネルギーの損失を低減させつつ、2つの給気部4a,4bの間の中央部分を境とする塗装室3における左右両側の風速のバラツキを低減することができる。
 3.上述の実施形態における給気部は、縦断面形状が半円形である構成を採用しているが、これに限定されるものではなく、他にも例えば、縦断面形状が、半楕円形、あるいは円弧に近い多角形状(吹き出し部を構成する面の数が5面以上)であっても良い。
 4.上述の実施形態において区分けされた高風速領域では、必ずしも全て同じ風速に設定する必要はなく、また、区分けされた低風速領域についても同様に、必ずしも全て同じ風速に設定する必要はなく、必要に応じて適宜変更して良い。
 5.上述の実施形態においては、吹き出し部が、高風速領域と、高風速領域よりもエアーの吹き出し速度が小さい低風速領域という、2種類の風速領域を備える構成を採用しているが、この構成に限定されるものではなく、その他の風速領域として、例えば、風速が高風速領域よりも低いが、低風速領域よりも大きい中風速領域を設けるなどしても良い。
 6.上述の実施形態においては、塗装室の奥行方向全体にわたって給気部が設けられている構成が示されているが、必ずしもこの構成に限定されるものではなく、塗装室の奥行方向全体でなくとも、塗装室における、塗装処理が実施される区域に限定して給気部を設けるようにしても良い。
 尚、上述のように図面を参照しつつ本発明を説明したが、本発明は当該図面の構成に限定されるものではなく、本発明の要旨を逸脱しない範囲において様々な態様で実施することができることは言うまでもない。
 本発明の塗装設備は、例えば自動車、鉄道車両、建設機械などにおけるボディ全体又はこれを構成する種々のパーツについての塗装を行う技術分野において特に好適に利用することができる。
1 塗装設備
2 給気室
20 整流板
21 ヒンジ部
3 塗装室
30 天井部分
31 格子製床(床排出部の一例)
32a 左側壁
32b 右側壁
4a,4b 給気部
40 吹き出し部
41 風量調整用パンチング部材
42 除塵フィルタ
43 フィルタ枠
5 排気室
6 自動塗装装置
7 垂れ壁部
H 高風速領域
L 低風速領域
d1塗装対象物の側の水平方向
d2 塗装対象物の側の斜め下方向
d3 下向き鉛直方向
d4 塗装室の側壁側の斜め下方向
d5 塗装室の側壁側の水平方向
W 塗装対象物
CV コンベア機構
R レール
φ 直径

Claims (9)

  1.  塗装対象物にスプレー塗装が行われる塗装室と、
     該塗装室の天井部分に設けられている給気部を介して前記塗装室内にエアーを供給する給気室と、
     前記塗装室におけるエアーと未塗着塗料ミストとを前記塗装室の床排出部を介して吸引する排気室と、を備える塗装設備において、
     前記塗装室の幅方向における前記塗装対象物の位置を中心として、2つの前記給気部が左右対称となるように配置されており、
     前記2つの給気部のそれぞれの吹き出し部から、エアーが放射状に噴出し、
     前記吹き出し部には、エアーの吹き出し方向によって吹き出し速度が異なる、少なくとも2種類の風速領域が設けられていることを特徴とする塗装設備。
  2.  前記吹き出し部が、低風速領域と高風速領域とを備え、前記低風速領域から吹き出すエアーの吹き出し速度は、前記高風速領域から吹き出すエアーの吹き出し速度よりも小さく設定されており、
     前記高風速領域では、前記塗装対象物の側の水平方向及び下向き鉛直方向にエアーが吹き出し、
     前記低風速領域では、前記塗装対象物の側の斜め下方向、前記塗装室の側壁側の斜め下方向、及び前記塗装室の側壁側の水平方向にエアーが吹き出すことを特徴とする請求項1に記載の塗装設備。
  3.  前記吹き出し部が、低風速領域と高風速領域とを備え、前記低風速領域から吹き出すエアーの吹き出し速度は、前記高風速領域から吹き出すエアーの吹き出し速度よりも小さく設定されており、
     前記高風速領域では、前記塗装対象物の側の水平方向にエアーが吹き出し、
     前記低風速領域では、前記塗装対象物の側の斜め下方向、下向き鉛直方向、前記塗装室の側壁側の斜め下方向、及び前記塗装室の側壁側の水平方向にエアーが吹き出すことを特徴とする請求項1に記載の塗装設備。
  4.  前記高風速領域から吹き出すエアーの速度は、0.3m/s~0.7m/sであることを特徴とする請求項2又は3に記載の塗装設備。
  5.  前記低風速領域から吹き出すエアーの速度は、前記高風速領域から吹き出すエアーの速度の30%~70%の速度であることを特徴とする請求項2~4のいずれか一項に記載の塗装設備。
  6.  前記2つの給気部のそれぞれは、前記塗装室の幅方向における前記塗装対象物の右端及び左端よりも外側に配置されていることを特徴とする請求項1~5のいずれか一項に記載の塗装設備。
  7.  前記給気部の縦断面形状が略半円形であり、該略半円形の曲線部分が前記吹き出し部を構成していることを特徴とする請求項1~6のいずれか一項に記載の塗装設備。
  8.  前記給気部の略半円形の直径は、前記塗装室における平均風速が0.075m/s~0.25m/sとなるように設定されることを特徴とする請求項7に記載の塗装設備。
  9.  前記塗装室の天井部分における、前記2つの給気部の間の中央部分に垂れ壁部が設けられていることを特徴とする請求項1~8のいずれか一項に記載の塗装設備。
PCT/JP2021/025277 2021-07-05 2021-07-05 塗装設備 WO2023281567A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
PCT/JP2021/025277 WO2023281567A1 (ja) 2021-07-05 2021-07-05 塗装設備
JP2021549334A JP6959480B1 (ja) 2021-07-05 2021-07-05 塗装設備
KR1020217042671A KR102463573B1 (ko) 2021-07-05 2021-07-05 도장 장치
CN202180004414.XA CN114126767A (zh) 2021-07-05 2021-07-05 涂饰设备
US17/623,758 US11691170B2 (en) 2021-07-05 2021-07-05 Painting facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2021/025277 WO2023281567A1 (ja) 2021-07-05 2021-07-05 塗装設備

Publications (1)

Publication Number Publication Date
WO2023281567A1 true WO2023281567A1 (ja) 2023-01-12

Family

ID=78282129

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/025277 WO2023281567A1 (ja) 2021-07-05 2021-07-05 塗装設備

Country Status (5)

Country Link
US (1) US11691170B2 (ja)
JP (1) JP6959480B1 (ja)
KR (1) KR102463573B1 (ja)
CN (1) CN114126767A (ja)
WO (1) WO2023281567A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60216862A (ja) * 1984-04-12 1985-10-30 Taikisha Ltd 吹付塗装用ブ−ス
JPH0679207A (ja) * 1990-05-23 1994-03-22 Binks Mfg Co 吹き出し手段を備える塗料噴霧室及びその動作方法
JPH06154677A (ja) * 1992-11-26 1994-06-03 Taikisha Ltd 塗装ブース
JP2009189916A (ja) * 2008-02-13 2009-08-27 Honda Motor Co Ltd ブース構造
JP2018192432A (ja) * 2017-05-18 2018-12-06 トリニティ工業株式会社 塗装ブース

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2160639B (en) 1984-04-12 1988-05-25 Taikisha Kk Ventilating paint spraying booths
JPS6154677A (ja) 1984-08-24 1986-03-18 New Japan Radio Co Ltd リセス構造GaAsFETの製造方法
JPH049207A (ja) 1990-04-27 1992-01-14 Kawasaki Steel Corp 熱間粗圧延における圧延材の曲がり及びウエッジ制御方法並びに熱間粗圧延設備
US5173118A (en) * 1991-05-20 1992-12-22 Abb Flakt, Inc. Paint spray booth with adjustable partitions
JP2002277038A (ja) 2001-03-19 2002-09-25 Yoshihiro Kobayashi 風向風量調整用器具
JP2006187742A (ja) * 2005-01-07 2006-07-20 Toyota Motor Corp 塗装ブース、ワーク製造方法
CN103322657B (zh) * 2013-06-14 2015-08-26 石家庄奥祥医药工程有限公司 一种低稳速、辐流洁净室空调送、回风系统
JP2017064625A (ja) * 2015-09-30 2017-04-06 トリニティ工業株式会社 塗装ブース
JP2017087159A (ja) 2015-11-12 2017-05-25 トリニティ工業株式会社 塗装ブース
JP2017087160A (ja) 2015-11-12 2017-05-25 トリニティ工業株式会社 塗装ブース
JP2017124357A (ja) 2016-01-13 2017-07-20 トリニティ工業株式会社 塗装ブース
JP2018187542A (ja) 2017-04-28 2018-11-29 トリニティ工業株式会社 塗装ブース
WO2018198484A1 (ja) * 2017-04-28 2018-11-01 トリニティ工業株式会社 塗装ブース
JP2018192433A (ja) 2017-05-18 2018-12-06 トリニティ工業株式会社 塗装ブース

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60216862A (ja) * 1984-04-12 1985-10-30 Taikisha Ltd 吹付塗装用ブ−ス
JPH0679207A (ja) * 1990-05-23 1994-03-22 Binks Mfg Co 吹き出し手段を備える塗料噴霧室及びその動作方法
JPH06154677A (ja) * 1992-11-26 1994-06-03 Taikisha Ltd 塗装ブース
JP2009189916A (ja) * 2008-02-13 2009-08-27 Honda Motor Co Ltd ブース構造
JP2018192432A (ja) * 2017-05-18 2018-12-06 トリニティ工業株式会社 塗装ブース

Also Published As

Publication number Publication date
JPWO2023281567A1 (ja) 2023-01-12
US20230001439A1 (en) 2023-01-05
KR102463573B1 (ko) 2022-11-03
CN114126767A (zh) 2022-03-01
US11691170B2 (en) 2023-07-04
JP6959480B1 (ja) 2021-11-02

Similar Documents

Publication Publication Date Title
JP5422814B2 (ja) 塗料捕集システム
EP0527002B1 (en) Paint spray booth
JP2008522808A (ja) 粉体塗装室およびそのための下部構造
WO2009113244A1 (ja) 空気調和機
WO2023281567A1 (ja) 塗装設備
JP5291947B2 (ja) 塗装ブース構造
US20080134969A1 (en) Powder coating cabin for a powder coating installation
JP5842876B2 (ja) 塗装システムの集塵装置
KR870001594B1 (ko) 스프레이 도장용 부우드(booth)
JP4727339B2 (ja) 給気付塗装ブース
JP6980063B1 (ja) 塗装ブース
US4022385A (en) Water spray nozzle
WO2018198484A1 (ja) 塗装ブース
JPH1057858A (ja) 板金塗装用吸塵装置
CA2441485A1 (en) Scrubber for paint spraying booths
KR101466587B1 (ko) 클린룸의 강제배기구조
JPH039784B2 (ja)
JPH0670858U (ja) 塗料ミスト除去装置
JP2923714B2 (ja) 塗装ブース
JP3081875U (ja) 循環式塗装ブース装置
JPS58119370A (ja) 塗装ブ−ス
JP2007307543A (ja) 塗装ブース
JPS6143572Y2 (ja)
JPS641020Y2 (ja)
JPH0152064B2 (ja)

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2021549334

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21949204

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE