WO2023233592A1 - エレベータ装置 - Google Patents

エレベータ装置 Download PDF

Info

Publication number
WO2023233592A1
WO2023233592A1 PCT/JP2022/022339 JP2022022339W WO2023233592A1 WO 2023233592 A1 WO2023233592 A1 WO 2023233592A1 JP 2022022339 W JP2022022339 W JP 2022022339W WO 2023233592 A1 WO2023233592 A1 WO 2023233592A1
Authority
WO
WIPO (PCT)
Prior art keywords
hoisting machine
hoist
main body
sheave
sheave shaft
Prior art date
Application number
PCT/JP2022/022339
Other languages
English (en)
French (fr)
Inventor
恵輔 清水
良直 高橋
大輔 岡田
晃一 本村
雅大 天野
靖征 小出
弘太 奥村
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to PCT/JP2022/022339 priority Critical patent/WO2023233592A1/ja
Publication of WO2023233592A1 publication Critical patent/WO2023233592A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables

Definitions

  • the present disclosure relates to an elevator device.
  • the vertical load acting on the newly installed hoist is supported by the hoistway via the wire and the sheave of the existing hoist. Furthermore, the newly installed hoisting machine is connected to the guide rail via a plurality of steady rests. For example, a horizontal load acting on a newly installed hoist due to an earthquake is supported by a guide rail via a plurality of steady rests (see, for example, Patent Document 1).
  • the present disclosure has been made in order to solve the above-mentioned problems, and an object of the present disclosure is to obtain an elevator device that can easily install a second hoisting machine using a first hoisting machine. do.
  • the elevator device includes a first hoisting machine and a second hoisting machine body that are installed in a hoistway and have a sheave shaft, and that are rotatable with respect to the second hoisting machine body.
  • the second hoisting machine has a second drive sheave, a suspension body wrapped around the second drive sheave, and is suspended by the suspension body.
  • the second hoisting machine includes a car that moves up and down, and the vertical load acting on the second hoisting machine from the suspension body is supported by the first hoisting machine on the sheave shaft, and the second hoisting machine further includes a steady rest.
  • the elevator device includes a first hoisting machine main body installed in the hoistway, a sheave shaft provided on the first hoisting machine main body, and a sheave shaft provided on the first hoisting machine main body. a first hoisting machine having a first hoisting machine brake; a second hoisting machine body fixed to the sheave shaft; and a second drive sheave rotatable with respect to the second hoisting machine body.
  • a second hoist having a second hoist, a suspension body wound around the second drive sheave, and a car that is suspended by the suspension body and moves up and down in the hoistway by rotation of the second drive sheave.
  • the vertical load acting on the second hoisting machine from the suspension body is supported by the first hoisting machine on the sheave shaft, and rotation of the sheave shaft is prevented by the first hoisting machine brake.
  • the elevator device includes a first hoisting machine, a second hoisting machine main body, and a second hoisting machine main body, which are installed at the bottom of a hoistway and have a rotating body.
  • a second hoisting machine has a second drive sheave that can be rotated by the second drive sheave, a suspension body that is wound around the second drive sheave, and a suspension body that is suspended by the suspension body, and is suspended by the second drive sheave.
  • the vertical load acting on the second hoisting machine from the suspension body is supported by the first hoisting machine on the rotating body, and the second hoisting machine is It further has a frame body to which the hoist body is attached, and the frame body is in contact with the bottom, so that the second hoist body rotates relative to the first hoist machine about the rotating body. is prevented from doing so.
  • the elevator apparatus of the present disclosure it is possible to easily install the second hoist using the first hoist.
  • FIG. 1 is a perspective view showing an elevator apparatus according to a first embodiment
  • FIG. FIG. 2 is a front view showing the main parts of the elevator system before renovation. It is a side view which shows the 1st hoisting machine and the 2nd hoisting machine of FIG. It is a side view which shows the 2nd hoisting machine of FIG. 3 separated from the 1st hoisting machine.
  • FIG. 2 is a front view showing a first hoisting machine and a second hoisting machine in FIG. 1.
  • FIG. It is a front view which shows the 2nd hoisting machine of FIG. 3 separated from the 1st hoisting machine.
  • FIG. 1 is a perspective view showing an elevator system according to a first embodiment, and shows the elevator system after renovation.
  • a first car guide rail 2, a second car guide rail 3, a first counterweight guide rail 4, and a second counterweight guide rail 5 are installed in the hoistway 1.
  • a first hoist 6 is installed at the bottom 1a of the hoistway 1.
  • the first hoist 6 is an existing hoist that was used before the renovation. Further, the first hoisting machine 6 is fixed to the floor surface of the bottom portion 1a by a plurality of anchor bolts (not shown) via a fixing member (not shown).
  • the first hoisting machine 6 is a gearless hoisting machine using a permanent magnet motor. Further, the first hoisting machine 6 is a long-bodied cylindrical hoisting machine. A long-bodied cylindrical hoist is a hoist whose axial dimension is larger than the dimension perpendicular to the axial direction.
  • a second hoist 7 is attached to the first hoist 6.
  • the second hoisting machine 7 is a newly installed hoisting machine that will be used after the renovation. Further, the second hoisting machine 7 is a gearless hoisting machine using a permanent magnet motor. Further, the second hoisting machine 7 is a thin hoisting machine.
  • a thin winding machine is a winding machine whose axial dimension is smaller than the dimension in the direction perpendicular to the axial direction.
  • the second hoist 7 has a second hoist main body 71 and a second drive sheave 72.
  • the second drive sheave 72 is rotatable relative to the second hoist main body 71.
  • the suspension body 10 is wrapped around the second drive sheave 72.
  • the car 11 and the counterweight 12 are suspended by a suspension body 10. Further, the car 11 and the counterweight 12 are moved up and down in the hoistway 1 by the rotation of the second drive sheave 72.
  • a first car hanging wheel 13 and a second car hanging wheel 14 are provided at the bottom of the car 11.
  • a counterweight suspension wheel 15 is provided above the counterweight 12.
  • a support frame 16 is installed at the top of the hoistway 1.
  • the support frame 16 supports a first return wheel 17, a second return wheel 18, and a third return wheel 19.
  • the suspension body 10 has a first end 10a and a second end 10b.
  • the first end 10a and the second end 10b are each connected to the support frame 16.
  • the suspension body 10 includes, in order from the first end 10a side, a first car hanging wheel 13, a second car hanging wheel 14, a first returning wheel 17, a second returning wheel 18, a second driving sheave 72, and a third returning wheel. 19, and is wound around the counterweight suspension wheel 15.
  • the elevator system of Embodiment 1 is a 2:1 roping type machine room-less elevator. A vertically upward load is applied to the second hoisting machine 7 from the suspension body 10 due to the dead weight of the car 11 and the dead weight of the counterweight 12 .
  • FIG. 2 is a front view showing the main parts of the elevator system before renovation.
  • FIG. 3 is a side view showing the first hoisting machine 6 and the second hoisting machine 7 in FIG. 1.
  • FIG. 4 is a side view showing the second hoisting machine 7 shown in FIG. 3 separated from the first hoisting machine 6.
  • FIG. 5 is a front view showing the first hoisting machine 6 and the second hoisting machine 7 in FIG. 1.
  • FIG. 4 is a front view showing the second hoisting machine 7 shown in FIG. 3 separated from the first hoisting machine 6.
  • FIG. 5 is a front view showing the first hoisting machine 6 and the second hoisting machine 7 in FIG. 1.
  • the first hoist 6 before modification includes a first hoist main body 61, a sheave shaft 62, and a first drive sheave 63.
  • the first hoist main body 61 has a first hoist motor (not shown).
  • the first drive sheave 63 is fixed to the sheave shaft 62. Further, the sheave shaft 62 and the first drive sheave 63 are rotated by the first hoist motor.
  • the first drive sheave 63 is removed from the sheave shaft 62.
  • the second hoist main body 71 is provided with a fitting hole 71a.
  • the sheave shaft 62 is inserted into the fitting hole 71a.
  • the second hoist main body 71 is fixed to the sheave shaft 62 by a fixing method similar to that of the first driving sheave 63 to the sheave shaft 62.
  • the second drive sheave 72 is placed directly above the sheave shaft 62. Further, the second drive sheave 72 is arranged directly above the position of the first drive sheave 63 before being removed. Further, the vertically upward load acting on the second hoist 7 from the suspension body 10 is supported by the first hoist 6 at the sheave shaft 62.
  • the second hoisting machine 7 further includes a steady rest 73.
  • the steady rest 73 has a pair of protrusions 74 .
  • the pair of protrusions 74 protrude from the second hoist main body 71 toward the first hoist main body 61 side. Further, each protrusion 74 is screwed into a screw hole provided in the second hoist main body 71.
  • the pair of protrusions 74 are in contact with the first hoist main body 61 and sandwich the first hoist main body 61. Thereby, the pair of protrusions 74 prevent the second hoisting machine main body 71 from rotating relative to the first hoisting machine 6 around the sheave shaft 62.
  • Each protrusion 74 is in contact with the outer surface of the leg of the first hoist main body 61. The outer surface of the leg is a vertical plane.
  • the existing suspension body 10 When installing a newly installed second hoist 7 to an existing first hoist 6, the existing suspension body 10 is removed while the car 11 and counterweight 12 are supported in the hoistway 1. Ru. Then, the first drive sheave 63 is removed from the sheave shaft 62.
  • the newly installed suspension body 10 includes the first car suspension wheel 13, the second car suspension wheel 14, the first return wheel 17, the second return wheel 18, the second drive sheave 72, the third return wheel 19, and the counterbalance. It is wound around the weight hanging wheel 15.
  • the vertical load acting on the second hoist 7 from the suspension body 10 is supported by the first hoist 6 on the sheave shaft 62. Further, the steady rest 73 is in contact with the first hoisting machine main body 61 and prevents the second hoisting machine main body 71 from rotating relative to the first hoisting machine 6 around the sheave shaft 62.
  • the second hoist 7 using the first hoist 6 7 can be easily installed. That is, the second hoisting machine 7, which is a newly installed hoisting machine, can be easily installed. This makes it possible to shorten the period of repair work and reduce the number of parts.
  • the second hoist 7 can be easily fixed to the hoistway 1.
  • the steady rest 73 has a pair of protrusions 74. Therefore, rotation of the second hoist 7 with respect to the first hoist 6 can be prevented with a simple configuration.
  • FIG. 7 is a side view showing the first hoisting machine 6 and the second hoisting machine 7 of the elevator apparatus according to the second embodiment.
  • a connecting member 8 is connected to the first hoisting machine 6 and the second hoisting machine 7.
  • the connecting member 8 prevents movement of the second hoist 7 with respect to the first hoist 6 in the axial direction of the first hoist 6 .
  • the axial direction of the first hoisting machine 6 is a direction along the axis of the sheave shaft 62, which is the left-right direction in FIG.
  • the second hoisting machine 7 is connected to the first hoisting machine 6 by a connecting member 8. Therefore, even if a horizontal load in the axial direction of the first hoisting machine 6 acts on the second hoisting machine 7 during an earthquake, for example, the movement of the second hoisting machine 7 with respect to the first hoisting machine 6 is prevented. This can be prevented more reliably.
  • FIG. 8 is a front view showing the first hoisting machine 6 and the second hoisting machine 7 of the elevator apparatus according to the third embodiment.
  • the first hoisting machine 6 and the second hoisting machine 7 are arranged at the top of the hoistway 1.
  • a machine stand 21 is installed at the top of the hoistway 1.
  • the first hoisting machine 6 is installed on a machine stand 21.
  • the second hoisting machine 7 is attached to the first hoisting machine 6 in an upside-down direction compared to the first embodiment.
  • a vertically downward load is applied to the second hoisting machine 7 from the suspension body 10 due to the dead weight of the car 11 and the dead weight of the counterweight 12 .
  • the second drive sheave 72 is arranged directly below the sheave shaft 62. Further, the second drive sheave 72 is arranged directly below the position of the first drive sheave 63 before being removed. Further, the vertically downward load acting on the second hoist 7 from the suspension body 10 is supported by the first hoist 6 at the sheave shaft 62 .
  • FIG. 9 is a front view showing the first hoisting machine 6 and the second hoisting machine 7 of the elevator apparatus according to the fourth embodiment.
  • FIG. 10 is a diagram showing the second hoist 7 separated from the first hoist 6 in FIG.
  • the first hoisting machine 6 further includes a first hoisting machine brake 64.
  • the first hoisting machine brake 64 is provided on the first hoisting machine main body 61.
  • the first hoisting machine brake 64 maintains the sheave shaft 62 and the first drive sheave 63 in a stationary state.
  • rotation of the sheave shaft 62 is prevented by a first hoist brake 64.
  • the first hoisting machine brake 64 includes a brake rotating member, a brake pad, and a brake spring.
  • the brake rotating member is fixed to the sheave shaft 62.
  • a brake drum or a brake disc is used as the brake rotating member.
  • the brake spring prevents rotation of the brake rotary member by pressing the brake pad against the brake rotary member.
  • the spring force of the brake spring may be increased or the brake pad may be fixed to the brake rotating member.
  • methods for fixing the brake pad to the brake rotating member include welding or adhesion.
  • the sheave shaft 62 is provided with a first keyway 62a.
  • the second hoist main body 71 is provided with a second keyway 71b.
  • the second keyway 71b opens into the fitting hole 71a.
  • the key 9 is inserted into the first keyway 62a and the second keyway 71b.
  • the key structure is such that the key 9 is inserted into the first key groove 62a and the second key groove 71b.
  • the steady rest 73 in the first embodiment is not used in the fourth embodiment.
  • Other configurations in the fourth embodiment are similar to those in the first embodiment.
  • the existing suspension body 10 When installing a newly installed second hoist 7 to an existing first hoist 6, the existing suspension body 10 is removed while the car 11 and counterweight 12 are supported in the hoistway 1. Ru. Then, the first drive sheave 63 is removed from the sheave shaft 62.
  • the sheave shaft 62 is inserted into the fitting hole 71a, and the second hoist 7 is attached to the first hoist 6. Then, the key 9 is inserted into the first keyway 62a and the second keyway 71b. Furthermore, the first hoisting machine brake 64 prevents the sheave shaft 62 from rotating.
  • the newly installed suspension body 10 is installed on the first car suspension wheel 13, the second car suspension wheel 14, the first return wheel 17, the second return wheel 18, the second drive sheave 72, the third return wheel 19, and the It is wound around the weight hanging wheel 15.
  • the vertical load acting on the second hoist 7 from the suspension body 10 is supported by the first hoist 6 on the sheave shaft 62. Further, the second hoist main body 71 is fixed to a sheave shaft 62, and rotation of the sheave shaft 62 is prevented by a first hoist brake 64.
  • the second hoist 7 using the first hoist 6 7 can be easily installed. That is, the second hoisting machine 7, which is a newly installed hoisting machine, can be easily installed. This makes it possible to shorten the period of repair work and reduce the number of parts.
  • the rotation of the second hoisting machine main body 71 can be suppressed by the first hoisting machine brake 64.
  • the second hoist 7 can be easily fixed to the hoistway 1.
  • the structure for preventing rotation of the second hoist main body 71 with respect to the sheave shaft 62 is not limited to the key structure.
  • FIG. 11 is a front view showing the first hoisting machine 6 and the second hoisting machine 7 of the elevator apparatus according to the fifth embodiment.
  • the first hoisting machine 6 and the second hoisting machine 7 are arranged at the top of the hoistway 1.
  • a machine stand 21 is installed at the top of the hoistway 1.
  • the first hoisting machine 6 is installed on a machine stand 21.
  • the second hoist 7 is attached to the first hoist 6 in an upside-down orientation compared to the fourth embodiment.
  • a vertically downward load is applied to the second hoisting machine 7 from the suspension body 10 due to the dead weight of the car 11 and the dead weight of the counterweight 12 .
  • the second drive sheave 72 is arranged directly below the sheave shaft 62. Further, the second drive sheave 72 is arranged directly below the position of the first drive sheave 63 before being removed. Further, the vertically downward load acting on the second hoist 7 from the suspension body 10 is supported by the first hoist 6 at the sheave shaft 62 .
  • connecting member 8 shown in the second embodiment may be connected to the first hoisting machine 6 and the second hoisting machine 7 of the third to fifth embodiments.
  • FIG. 12 is a perspective view showing the first hoisting machine 6 and the second hoisting machine 7 of the elevator apparatus according to the sixth embodiment.
  • the second hoist 7 in the sixth embodiment includes a second hoist main body 71, a second drive sheave 72, and a frame 75.
  • the second hoist main body 71 is attached to a frame 75.
  • the frame body 75 has a pair of vertical columns 76, a pair of fixing members 77, and a backing plate 78.
  • the pair of vertical columns 76 are spaced apart from each other.
  • the second hoist main body 71 is fixed to an intermediate portion of a pair of vertical columns 76 in the vertical direction.
  • Each fixing member 77 is fixed between a pair of vertical columns 76 above the second hoist main body 71.
  • the backing plate 78 is fixed between the pair of vertical columns 76 below the second hoist main body 71.
  • An arcuate receiving groove 78a is provided on the upper surface of the backing plate 78. A portion of the sheave shaft 62 is inserted into the receiving groove 78a. The vertically upward load acting on the second hoist 7 from the suspension body 10 is supported by the first hoist 6 at the sheave shaft 62.
  • the rotating body in the sixth embodiment is a sheave shaft 62.
  • each vertical column 76 is in contact with the floor surface of the bottom portion 1a. Since the frame 75 is in contact with the floor surface of the bottom portion 1a, the second hoist main body 71 is prevented from rotating relative to the first hoist 6 about the sheave shaft 62.
  • the steady rest 73 in the first embodiment is not used in the sixth embodiment.
  • Other configurations in the sixth embodiment are similar to those in the first embodiment.
  • the existing suspension body 10 When installing a newly installed second hoist 7 to an existing first hoist 6, the existing suspension body 10 is removed while the car 11 and counterweight 12 are supported in the hoistway 1. Ru. Then, the first drive sheave 63 is removed from the sheave shaft 62.
  • the second hoist 7 is placed on the floor surface of the bottom portion 1a, and a portion of the sheave shaft 62 is inserted into the receiving groove 78a.
  • the newly installed suspension body 10 is installed on the first car suspension wheel 13, the second car suspension wheel 14, the first return wheel 17, the second return wheel 18, the second drive sheave 72, the third return wheel 19, and the It is wound around the weight hanging wheel 15.
  • the vertical load acting on the second hoist 7 from the suspension body 10 is supported by the first hoist 6 on the sheave shaft 62. Further, since the frame body 75 is in contact with the bottom portion 1a, the second hoist main body 71 is prevented from rotating relative to the first hoist 6 about the sheave shaft 62.
  • the second hoist 7 using the first hoist 6 7 can be easily installed. That is, the second hoisting machine 7, which is a newly installed hoisting machine, can be easily installed. This makes it possible to shorten the period of repair work and reduce the number of parts.
  • the rotation of the second hoist main body 71 can be suppressed by the frame 75.
  • the second hoist 7 can be easily installed to the hoistway 1.
  • FIG. 13 is a side view showing the first hoisting machine 6 and the second hoisting machine 7 of the elevator apparatus according to the seventh embodiment.
  • a connecting member 8 is connected to the first hoisting machine 6 and the second hoisting machine 7.
  • the connecting member 8 is connected to the first hoist main body 61 and the vertical column 76.
  • the connecting member 8 prevents movement of the second hoist 7 with respect to the first hoist 6 in the axial direction of the first hoist 6 .
  • the second hoisting machine 7 is connected to the first hoisting machine 6 by a connecting member 8. Therefore, even if a horizontal load in the axial direction of the first hoisting machine 6 acts on the second hoisting machine 7 during an earthquake, for example, the movement of the second hoisting machine 7 with respect to the first hoisting machine 6 is prevented. This can be prevented more reliably.
  • FIG. 14 is a front view showing the first hoisting machine 6 and the second hoisting machine 7 of the elevator apparatus according to the eighth embodiment.
  • the size of the receiving groove 78a is larger than in the sixth embodiment.
  • the first drive sheave 63 remains fixed to the sheave shaft 62 even after the modification. A portion of the first drive sheave 63 is inserted into the receiving groove 78a.
  • the vertically upward load acting on the second hoist 7 from the suspension body 10 is supported by the first hoist 6 in the first drive sheave 63.
  • the rotating body in the eighth embodiment is the first drive sheave 63.
  • Embodiment 8 The other configurations in Embodiment 8 are the same as in Embodiment 6 or 7.
  • the second hoist main body 71 provided with the fitting hole 71a as in the first embodiment may be used.

Landscapes

  • Cage And Drive Apparatuses For Elevators (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

エレベータ装置において、第1巻上機は、シーブ軸を有しており、昇降路に設置されている。第2巻上機は、第2巻上機本体と、第2駆動シーブとを有している。懸架体は、第2駆動シーブに巻き掛けられている。懸架体から第2巻上機に作用する鉛直方向の荷重は、シーブ軸において第1巻上機によって支持されている。第2巻上機は、振れ止めをさらに有している。振れ止めは、第1巻上機に接しており、第2巻上機本体がシーブ軸を中心として第1巻上機に対して回転することを阻止する。

Description

エレベータ装置
 本開示は、エレベータ装置に関するものである。
 従来のエレベータ装置では、新設巻上機に作用する鉛直方向の荷重が、ワイヤーと、既設巻上機のシーブとを介して、昇降路に支持される。また、新設巻上機は、複数の振れ止めを介して、ガイドレールに接続されている。例えば地震により新設巻上機に作用する水平方向の荷重は、複数の振れ止めを介して、ガイドレールに支持される(例えば、特許文献1参照)。
特許第6020735号公報
 上記のような従来のエレベータ装置では、新設巻上機を、複数の振れ止めを介して、ガイドレールに接続する必要があるため、新設巻上機の据付に手間がかかる。
 本開示は、上記のような課題を解決するためになされたものであり、第1巻上機を利用した第2巻上機の据付を容易に行うことができるエレベータ装置を得ることを目的とする。
 本開示に係るエレベータ装置は、昇降路に設置されており、かつシーブ軸を有している第1巻上機、第2巻上機本体と、第2巻上機本体に対して回転可能な第2駆動シーブとを有している第2巻上機、第2駆動シーブに巻き掛けられている懸架体、及び懸架体によって吊り下げられており、第2駆動シーブの回転によって昇降路内を昇降するかごを備え、懸架体から第2巻上機に作用する鉛直方向の荷重は、シーブ軸において第1巻上機によって支持されており、第2巻上機は、振れ止めをさらに有しており、振れ止めは、第1巻上機に接しており、第2巻上機本体がシーブ軸を中心として第1巻上機に対して回転することを阻止する。
 また、本開示に係るエレベータ装置は、昇降路に設置されている第1巻上機本体と、第1巻上機本体に設けられているシーブ軸と、第1巻上機本体に設けられている第1巻上機ブレーキとを有している第1巻上機、シーブ軸に固定されている第2巻上機本体と、第2巻上機本体に対して回転可能な第2駆動シーブとを有している第2巻上機、第2駆動シーブに巻き掛けられている懸架体、及び懸架体によって吊り下げられており、第2駆動シーブの回転によって昇降路内を昇降するかごを備え、懸架体から第2巻上機に作用する鉛直方向の荷重は、シーブ軸において第1巻上機によって支持されており、シーブ軸の回転は、第1巻上機ブレーキによって阻止されている。
 また、本開示に係るエレベータ装置は、昇降路の底部に設置されており、かつ回転体を有している第1巻上機、第2巻上機本体と、第2巻上機本体に対して回転可能な第2駆動シーブとを有している第2巻上機、第2駆動シーブに巻き掛けられている懸架体、及び懸架体によって吊り下げられており、第2駆動シーブの回転によって昇降路内を昇降するかごを備え、懸架体から第2巻上機に作用する鉛直方向の荷重は、回転体において第1巻上機によって支持されており、第2巻上機は、第2巻上機本体が取り付けられている枠体をさらに有しており、枠体が底部に接していることにより、第2巻上機本体が回転体を中心として第1巻上機に対して回転することが阻止されている。
 本開示のエレベータ装置によれば、第1巻上機を利用した第2巻上機の据付を容易に行うことができる。
実施の形態1によるエレベータ装置を示す斜視図である。 改修前のエレベータ装置の要部を示す正面図である。 図1の第1巻上機及び第2巻上機を示す側面図である。 図3の第2巻上機を第1巻上機から切り離して示す側面図である。 図1の第1巻上機及び第2巻上機を示す正面図である。 図3の第2巻上機を第1巻上機から切り離して示す正面図である。 実施の形態2によるエレベータ装置の第1巻上機及び第2巻上機を示す側面図である。 実施の形態3によるエレベータ装置の第1巻上機及び第2巻上機を示す正面図である。 実施の形態4によるエレベータ装置の第1巻上機及び第2巻上機を示す正面図である。 図9の第1巻上機から第2巻上機を切り離して示す図である。 実施の形態5によるエレベータ装置の第1巻上機及び第2巻上機を示す正面図である。 実施の形態6によるエレベータ装置の第1巻上機及び第2巻上機を示す斜視図である。 実施の形態7によるエレベータ装置の第1巻上機及び第2巻上機を示す側面図である。 実施の形態8によるエレベータ装置の第1巻上機及び第2巻上機を示す正面図である。
 以下、実施の形態について、図面を参照して説明する。
 実施の形態1.
 図1は、実施の形態1によるエレベータ装置を示す斜視図であり、改修後のエレベータ装置を示している。図において、昇降路1内には、第1かごガイドレール2、第2かごガイドレール3、第1釣合おもりガイドレール4、及び第2釣合おもりガイドレール5が設置されている。
 昇降路1の底部1aには、第1巻上機6が設置されている。第1巻上機6は、改修前に使用されていた既設巻上機である。また、第1巻上機6は、図示しない固定部材を介して、図示しない複数のアンカーボルトによって、底部1aの床面に固定されている。
 また、第1巻上機6は、永久磁石モータを用いたギヤレス巻上機である。また、第1巻上機6は、胴長円筒形巻上機である。胴長円筒形巻上機は、軸方向寸法が軸方向に直角な寸法よりも大きい巻上機である。
 第1巻上機6には、第2巻上機7が取り付けられている。第2巻上機7は、改修後に使用される新設巻上機である。また、第2巻上機7は、永久磁石モータを用いたギヤレス巻上機である。また、第2巻上機7は、薄型巻上機である。薄型巻上機は、軸方向寸法が軸方向に直角な方向の寸法よりも小さい巻上機である。
 第2巻上機7は、第2巻上機本体71と、第2駆動シーブ72とを有している。第2駆動シーブ72は、第2巻上機本体71に対して回転可能である。
 第2駆動シーブ72には、懸架体10が巻き掛けられている。懸架体10としては、複数本のロープ又は複数本のベルトが用いられている。
 かご11及び釣合おもり12は、懸架体10によって吊り下げられている。また、かご11及び釣合おもり12は、第2駆動シーブ72が回転することによって、昇降路1内を昇降する。
 かご11の下部には、第1かご吊り車13及び第2かご吊り車14が設けられている。釣合おもり12の上部には、釣合おもり吊り車15が設けられている。
 昇降路1の頂部には、支持枠16が設置されている。支持枠16には、第1返し車17、第2返し車18、及び第3返し車19が支持されている。
 懸架体10は、第1端部10a及び第2端部10bを有している。第1端部10a及び第2端部10bは、それぞれ支持枠16に接続されている。
 懸架体10は、第1端部10a側から順に、第1かご吊り車13、第2かご吊り車14、第1返し車17、第2返し車18、第2駆動シーブ72、第3返し車19、及び釣合おもり吊り車15に巻き掛けられている。
 実施の形態1のエレベータ装置は、2:1ローピング方式の機械室レスエレベータである。第2巻上機7には、かご11の自重と釣合おもり12の自重とによって、懸架体10から鉛直方向上向きの荷重が作用している。
 図2は、改修前のエレベータ装置の要部を示す正面図である。図3は、図1の第1巻上機6及び第2巻上機7を示す側面図である。図4は、図3の第2巻上機7を第1巻上機6から切り離して示す側面図である。図5は、図1の第1巻上機6及び第2巻上機7を示す正面図である。図4は、図3の第2巻上機7を第1巻上機6から切り離して示す正面図である。
 改修前の第1巻上機6は、第1巻上機本体61と、シーブ軸62と、第1駆動シーブ63とを有している。第1巻上機本体61は、図示しない第1巻上機モータを有している。改修前の第1巻上機6において、第1駆動シーブ63は、シーブ軸62に固定されている。また、シーブ軸62及び第1駆動シーブ63は、第1巻上機モータによって回転される。エレベータ装置の改修時には、第1駆動シーブ63は、シーブ軸62から取り外される。
 第2巻上機本体71には、嵌合穴71aが設けられている。嵌合穴71aには、シーブ軸62が挿入されている。第2巻上機本体71は、シーブ軸62に対する第1駆動シーブ63の固定方式と同様の固定方式によって、シーブ軸62に固定されている。
 これにより、第2駆動シーブ72は、シーブ軸62の真上に配置されている。また、第2駆動シーブ72は、取り外される前における第1駆動シーブ63の位置の真上に配置されている。また、懸架体10から第2巻上機7に作用する鉛直方向上向きの荷重は、シーブ軸62において第1巻上機6によって支持されている。
 図1では省略したが、第2巻上機7は、振れ止め73をさらに有している。振れ止め73は、一対の突出部74を有している。一対の突出部74は、第2巻上機本体71から、第1巻上機本体61側へ突出している。また、各突出部74は、第2巻上機本体71に設けられているねじ穴にねじ込まれている。
 また、一対の突出部74は、第1巻上機本体61に接しており、第1巻上機本体61を挟み込んでいる。これにより、一対の突出部74は、第2巻上機本体71がシーブ軸62を中心として第1巻上機6に対して回転することを阻止する。各突出部74は、第1巻上機本体61における脚部の外面に接している。脚部の外面は、鉛直な平面である。
 既設の第1巻上機6に対して新設の第2巻上機7を取り付ける場合、昇降路1内にかご11及び釣合おもり12が支持された状態で、既設の懸架体10が撤去される。そして、シーブ軸62から第1駆動シーブ63が取り外される。
 この後、シーブ軸62が嵌合穴71aに挿入されて、シーブ軸62に第2巻上機7が取り付けられる。そして、新設の懸架体10が、第1かご吊り車13、第2かご吊り車14、第1返し車17、第2返し車18、第2駆動シーブ72、第3返し車19、及び釣合おもり吊り車15に巻き掛けられる。
 このようなエレベータ装置では、懸架体10から第2巻上機7に作用する鉛直方向の荷重が、シーブ軸62において第1巻上機6によって支持されている。また、振れ止め73は、第1巻上機本体61に接しており、第2巻上機本体71がシーブ軸62を中心として第1巻上機6に対して回転することを阻止する。
 このため、第2巻上機7から離れている第1釣合おもりガイドレール4に第2巻上機7を接続する場合に比べて、第1巻上機6を利用した第2巻上機7の据付を容易に行うことができる。即ち、新設巻上機である第2巻上機7の据付を容易に行うことができる。これにより、改修工事の期間の短縮、及び部品点数の削減を図ることができる。
 また、例えば地震時に第2巻上機7に水平荷重が作用した場合にも、振れ止め73によって、第2巻上機本体71の回転を抑制することができる。
 また、既設巻上機である第1巻上機6を撤去する手間を無くすことができる。
 また、昇降路1に対する第1巻上機6の固定構造を利用して、第2巻上機7を昇降路1に対して容易に固定することができる。
 また、振れ止め73は、一対の突出部74を有している。このため、簡単な構成によって、第1巻上機6に対する第2巻上機7の回転を阻止することができる。
 実施の形態2.
 次に、図7は、実施の形態2によるエレベータ装置の第1巻上機6及び第2巻上機7を示す側面図である。実施の形態2では、第1巻上機6と第2巻上機7とに、連結部材8が連結されている。連結部材8は、第1巻上機6の軸方向への第1巻上機6に対する第2巻上機7の動きを阻止する。第1巻上機6の軸方向は、シーブ軸62の軸線に沿う方向であり、図7の左右方向である。
 実施の形態2における他の構成は、実施の形態1と同様である。
 このようなエレベータ装置では、連結部材8によって第2巻上機7が第1巻上機6に連結されている。このため、例えば地震時に、第1巻上機6の軸方向への水平荷重が第2巻上機7に作用した場合にも、第1巻上機6に対する第2巻上機7の動きをより確実に阻止することができる。
 実施の形態3.
 次に、図8は、実施の形態3によるエレベータ装置の第1巻上機6及び第2巻上機7を示す正面図である。実施の形態3では、第1巻上機6及び第2巻上機7は、昇降路1の頂部に配置されている。
 昇降路1の頂部には、機械台21が設置されている。第1巻上機6は、機械台21上に設置されている。第2巻上機7は、実施の形態1とは上下逆向きに第1巻上機6に取り付けられている。第2巻上機7には、かご11の自重と釣合おもり12の自重とによって、懸架体10から鉛直方向下向きの荷重が作用している。
 第2駆動シーブ72は、シーブ軸62の真下に配置されている。また、第2駆動シーブ72は、取り外される前における第1駆動シーブ63の位置の真下に配置されている。また、懸架体10から第2巻上機7に作用する鉛直方向下向きの荷重は、シーブ軸62において第1巻上機6によって支持されている。
 実施の形態3における他の構成は、実施の形態2と同様である。
 このような構成によっても、実施の形態1と同様の効果を得ることができる。
 実施の形態4.
 次に、図9は、実施の形態4によるエレベータ装置の第1巻上機6及び第2巻上機7を示す正面図である。図10は、図9の第1巻上機6から第2巻上機7を切り離して示す図である。
 実施の形態1では省略したが、第1巻上機6は、第1巻上機ブレーキ64をさらに有している。第1巻上機ブレーキ64は、第1巻上機本体61に設けられている。改修前の第1巻上機6において、第1巻上機ブレーキ64は、シーブ軸62及び第1駆動シーブ63の静止状態を保持する。改修後の第1巻上機6において、シーブ軸62の回転は、第1巻上機ブレーキ64によって阻止されている。
 第1巻上機ブレーキ64は、ブレーキ回転部材と、ブレーキパッドと、ブレーキばねとを有している。ブレーキ回転部材は、シーブ軸62に固定されている。ブレーキ回転部材としては、例えばブレーキドラム又はブレーキディスクが用いられている。ブレーキばねは、ブレーキパッドをブレーキ回転部材に押し付けることによって、ブレーキ回転部材の回転を阻止する。
 シーブ軸62の回転をより確実に阻止するため、ブレーキばねのばね力が強くされたり、ブレーキパッドがブレーキ回転部材に固着されたりしてもよい。ブレーキパッドをブレーキ回転部材に固着する方法としては、例えば溶着又は接着が挙げられる。
 シーブ軸62には、第1キー溝62aが設けられている。第2巻上機本体71には、第2キー溝71bが設けられている。第2キー溝71bは、嵌合穴71aに開口している。第1キー溝62a及び第2キー溝71bには、キー9が挿入されている。
 これにより、シーブ軸62に対する第2巻上機本体71の回転が阻止されている。即ち、シーブ軸62に対する第2巻上機本体71の回転は、キー構造によって阻止されている。キー構造は、第1キー溝62a及び第2キー溝71bにキー9を挿入する構造である。
 実施の形態1における振れ止め73は、実施の形態4では用いられていない。実施の形態4における他の構成は、実施の形態1と同様である。
 既設の第1巻上機6に対して新設の第2巻上機7を取り付ける場合、昇降路1内にかご11及び釣合おもり12が支持された状態で、既設の懸架体10が撤去される。そして、シーブ軸62から第1駆動シーブ63が取り外される。
 この後、シーブ軸62が嵌合穴71aに挿入されて、第1巻上機6に第2巻上機7が取り付けられる。そして、第1キー溝62a及び第2キー溝71bにキー9が挿入される。また、第1巻上機ブレーキ64によって、シーブ軸62の回転が阻止される。
 この後、新設の懸架体10が、第1かご吊り車13、第2かご吊り車14、第1返し車17、第2返し車18、第2駆動シーブ72、第3返し車19、及び釣合おもり吊り車15に巻き掛けられる。
 このようなエレベータ装置では、懸架体10から第2巻上機7に作用する鉛直方向の荷重が、シーブ軸62において第1巻上機6によって支持されている。また、第2巻上機本体71はシーブ軸62に固定されており、シーブ軸62の回転は第1巻上機ブレーキ64によって阻止されている。
 このため、第2巻上機7から離れている第1釣合おもりガイドレール4に第2巻上機7を接続する場合に比べて、第1巻上機6を利用した第2巻上機7の据付を容易に行うことができる。即ち、新設巻上機である第2巻上機7の据付を容易に行うことができる。これにより、改修工事の期間の短縮、及び部品点数の削減を図ることができる。
 また、例えば地震時に第2巻上機7に水平荷重が作用した場合にも、第1巻上機ブレーキ64によって第2巻上機本体71の回転を抑制することができる。
 また、既設巻上機である第1巻上機6を撤去する手間を無くすことができる。
 また、昇降路1に対する第1巻上機6の固定構造を利用して、第2巻上機7を昇降路1に対して容易に固定することができる。
 また、シーブ軸62に対する第2巻上機本体71の回転は、キー構造によって阻止されている。このため、簡単な構成により、シーブ軸62に対する第2巻上機本体71の回転を阻止することができる。
 また、ブレーキパッドをブレーキ回転部材に固着することによって、シーブ軸62に対する第2巻上機本体71の回転をより確実に阻止することができる。
 なお、シーブ軸62に対する第2巻上機本体71の回転阻止構造は、キー構造に限らない。
 実施の形態5.
 次に、図11は、実施の形態5によるエレベータ装置の第1巻上機6及び第2巻上機7を示す正面図である。実施の形態5では、第1巻上機6及び第2巻上機7は、昇降路1の頂部に配置されている。
 昇降路1の頂部には、機械台21が設置されている。第1巻上機6は、機械台21上に設置されている。第2巻上機7は、実施の形態4とは上下逆向きに第1巻上機6に取り付けられている。第2巻上機7には、かご11の自重と釣合おもり12の自重とによって、懸架体10から鉛直方向下向きの荷重が作用している。
 第2駆動シーブ72は、シーブ軸62の真下に配置されている。また、第2駆動シーブ72は、取り外される前における第1駆動シーブ63の位置の真下に配置されている。また、懸架体10から第2巻上機7に作用する鉛直方向下向きの荷重は、シーブ軸62において第1巻上機6によって支持されている。
 実施の形態5における他の構成は、実施の形態4と同様である。
 このような構成によっても、実施の形態4と同様の効果を得ることができる。
 なお、実施の形態3~5の第1巻上機6と第2巻上機7とに、実施の形態2に示した連結部材8が連結されてもよい。
 実施の形態6.
 次に、図12は、実施の形態6によるエレベータ装置の第1巻上機6及び第2巻上機7を示す斜視図である。
 実施の形態6における第2巻上機7は、第2巻上機本体71と、第2駆動シーブ72と、枠体75を有している。第2巻上機本体71は、枠体75に取り付けられている。
 枠体75は、一対の縦柱76、一対の固定部材77、及び当て板78を有している。一対の縦柱76は、互いに間隔をおいて配置されている。第2巻上機本体71は、上下方向における一対の縦柱76の中間部に固定されている。
 各固定部材77は、第2巻上機本体71よりも上方において、一対の縦柱76間に固定されている。当て板78は、第2巻上機本体71よりも下方において、一対の縦柱76間に固定されている。
 当て板78の上面には、円弧状の受け溝78aが設けられている。受け溝78aには、シーブ軸62の一部が挿入されている。懸架体10から第2巻上機7に作用する鉛直方向上向きの荷重は、シーブ軸62において第1巻上機6によって支持されている。実施の形態6における回転体は、シーブ軸62である。
 各縦柱76の下端は、底部1aの床面に接している。枠体75が底部1aの床面に接していることにより、第2巻上機本体71がシーブ軸62を中心として第1巻上機6に対して回転することが阻止されている。
 実施の形態1における振れ止め73は、実施の形態6では用いられていない。実施の形態6における他の構成は、実施の形態1と同様である。
 既設の第1巻上機6に対して新設の第2巻上機7を取り付ける場合、昇降路1内にかご11及び釣合おもり12が支持された状態で、既設の懸架体10が撤去される。そして、シーブ軸62から第1駆動シーブ63が取り外される。
 この後、第2巻上機7が底部1aの床面上に置かれるとともに、受け溝78aにシーブ軸62の一部が挿入される。
 この後、新設の懸架体10が、第1かご吊り車13、第2かご吊り車14、第1返し車17、第2返し車18、第2駆動シーブ72、第3返し車19、及び釣合おもり吊り車15に巻き掛けられる。
 このようなエレベータ装置では、懸架体10から第2巻上機7に作用する鉛直方向の荷重が、シーブ軸62において第1巻上機6によって支持されている。また、枠体75が底部1aに接していることにより、第2巻上機本体71がシーブ軸62を中心として第1巻上機6に対して回転することが阻止されている。
 このため、第2巻上機7から離れている第1釣合おもりガイドレール4に第2巻上機7を接続する場合に比べて、第1巻上機6を利用した第2巻上機7の据付を容易に行うことができる。即ち、新設巻上機である第2巻上機7の据付を容易に行うことができる。これにより、改修工事の期間の短縮、及び部品点数の削減を図ることができる。
 また、例えば地震時に第2巻上機7に水平荷重が作用した場合にも、枠体75によって第2巻上機本体71の回転を抑制することができる。
 また、既設巻上機である第1巻上機6を撤去する手間を無くすことができる。
 また、昇降路1に対する第1巻上機6の固定構造を利用して、第2巻上機7を昇降路1に対して容易に設置することができる。
 実施の形態7.
 次に、図13は、実施の形態7によるエレベータ装置の第1巻上機6及び第2巻上機7を示す側面図である。実施の形態7では、第1巻上機6と第2巻上機7とに、連結部材8が連結されている。連結部材8は、第1巻上機本体61と縦柱76とに連結されている。連結部材8は、第1巻上機6の軸方向への第1巻上機6に対する第2巻上機7の動きを阻止する。
 実施の形態7における他の構成は、実施の形態6と同様である。
 このようなエレベータ装置では、連結部材8によって第2巻上機7が第1巻上機6に連結されている。このため、例えば地震時に、第1巻上機6の軸方向への水平荷重が第2巻上機7に作用した場合にも、第1巻上機6に対する第2巻上機7の動きをより確実に阻止することができる。
 実施の形態8.
 次に、図14は、実施の形態8によるエレベータ装置の第1巻上機6及び第2巻上機7を示す正面図である。実施の形態8では、受け溝78aの大きさが実施の形態6よりも大きくなっている。また、シーブ軸62には、改修後も第1駆動シーブ63が固定されたままとなっている。そして、受け溝78aには、第1駆動シーブ63の一部が挿入されている。
 懸架体10から第2巻上機7に作用する鉛直方向上向きの荷重は、第1駆動シーブ63において第1巻上機6によって支持されている。実施の形態8における回転体は、第1駆動シーブ63である。
 実施の形態8における他の構成は、実施の形態6又は7と同様である。
 このような構成によっても、実施の形態6と同様の効果を得ることができる。また、シーブ軸62から第1駆動シーブ63が取り外されないので、改修工事の手間をさらに軽減することができる。
 なお、実施の形態6~8において、実施の形態1と同様に嵌合穴71aが設けられている第2巻上機本体71が用いられてもよい。
 1 昇降路、1a 底部、6 第1巻上機、7 第2巻上機、8 連結部材、9 キー、10 懸架体、11 かご、61 第1巻上機本体、62 シーブ軸(回転体)、62a 第1キー溝、63 第1駆動シーブ(回転体)、64 第1巻上機ブレーキ、71 第2巻上機本体、71b 第2キー溝、72 第2駆動シーブ、73 振れ止め、74 突出部、75 枠体。

Claims (9)

  1.  昇降路に設置されており、かつシーブ軸を有している第1巻上機、
     第2巻上機本体と、前記第2巻上機本体に対して回転可能な第2駆動シーブとを有している第2巻上機、
     前記第2駆動シーブに巻き掛けられている懸架体、及び
     前記懸架体によって吊り下げられており、前記第2駆動シーブの回転によって前記昇降路内を昇降するかご
     を備え、
     前記懸架体から前記第2巻上機に作用する鉛直方向の荷重は、前記シーブ軸において前記第1巻上機によって支持されており、
     前記第2巻上機は、振れ止めをさらに有しており、
     前記振れ止めは、前記第1巻上機に接しており、前記第2巻上機本体が前記シーブ軸を中心として前記第1巻上機に対して回転することを阻止するエレベータ装置。
  2.  前記振れ止めは、
     前記第2巻上機本体から突出しており、前記第1巻上機を挟み込む一対の突出部
     を有している請求項1記載のエレベータ装置。
  3.  昇降路に設置されている第1巻上機本体と、前記第1巻上機本体に設けられているシーブ軸と、前記第1巻上機本体に設けられている第1巻上機ブレーキとを有している第1巻上機、
     前記シーブ軸に固定されている第2巻上機本体と、前記第2巻上機本体に対して回転可能な第2駆動シーブとを有している第2巻上機、
     前記第2駆動シーブに巻き掛けられている懸架体、及び
     前記懸架体によって吊り下げられており、前記第2駆動シーブの回転によって前記昇降路内を昇降するかご
     を備え、
     前記懸架体から前記第2巻上機に作用する鉛直方向の荷重は、前記シーブ軸において前記第1巻上機によって支持されており、
     前記シーブ軸の回転は、前記第1巻上機ブレーキによって阻止されているエレベータ装置。
  4.  前記シーブ軸に対する前記第2巻上機本体の回転は、キー溝にキーを挿入するキー構造によって阻止されている請求項3記載のエレベータ装置。
  5.  前記第1巻上機ブレーキは、ブレーキ回転部材と、ブレーキパッドとを有しており、
     前記ブレーキパッドは、前記ブレーキ回転部材に固着されている請求項3又は請求項4に記載のエレベータ装置。
  6.  前記第1巻上機及び前記第2巻上機は、前記昇降路内の底部又は頂部に配置されている請求項1から請求項5までのいずれか1項に記載のエレベータ装置。
  7.  昇降路の底部に設置されており、かつ回転体を有している第1巻上機、
     第2巻上機本体と、前記第2巻上機本体に対して回転可能な第2駆動シーブとを有している第2巻上機、
     前記第2駆動シーブに巻き掛けられている懸架体、及び
     前記懸架体によって吊り下げられており、前記第2駆動シーブの回転によって前記昇降路内を昇降するかご
     を備え、
     前記懸架体から前記第2巻上機に作用する鉛直方向の荷重は、前記回転体において前記第1巻上機によって支持されており、
     前記第2巻上機は、
     前記第2巻上機本体が取り付けられている枠体
     をさらに有しており、
     前記枠体が前記底部に接していることにより、前記第2巻上機本体が前記回転体を中心として前記第1巻上機に対して回転することが阻止されているエレベータ装置。
  8.  前記回転体は、第1駆動シーブである請求項7記載のエレベータ装置。
  9.  前記第1巻上機と前記第2巻上機とに連結され、前記第1巻上機の軸方向への前記第1巻上機に対する前記第2巻上機の動きを阻止する連結部材
     をさらに備えている請求項1から請求項8までのいずれか1項に記載のエレベータ装置。
PCT/JP2022/022339 2022-06-01 2022-06-01 エレベータ装置 WO2023233592A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/022339 WO2023233592A1 (ja) 2022-06-01 2022-06-01 エレベータ装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/022339 WO2023233592A1 (ja) 2022-06-01 2022-06-01 エレベータ装置

Publications (1)

Publication Number Publication Date
WO2023233592A1 true WO2023233592A1 (ja) 2023-12-07

Family

ID=89026087

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/022339 WO2023233592A1 (ja) 2022-06-01 2022-06-01 エレベータ装置

Country Status (1)

Country Link
WO (1) WO2023233592A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011073836A (ja) * 2009-09-30 2011-04-14 Hitachi Ltd ロープ式エレベータ装置
WO2015025396A1 (ja) * 2013-08-22 2015-02-26 三菱電機株式会社 エレベータ装置
WO2018207347A1 (ja) * 2017-05-12 2018-11-15 三菱電機株式会社 エレベータの巻上機ブレーキ及びエレベータ巻上機
WO2019220546A1 (ja) * 2018-05-15 2019-11-21 三菱電機株式会社 エレベーターのロープ外れ止め装置
WO2021224988A1 (ja) * 2020-05-08 2021-11-11 三菱電機株式会社 エレベータの懸架体外れ止め装置及び巻上機

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011073836A (ja) * 2009-09-30 2011-04-14 Hitachi Ltd ロープ式エレベータ装置
WO2015025396A1 (ja) * 2013-08-22 2015-02-26 三菱電機株式会社 エレベータ装置
WO2018207347A1 (ja) * 2017-05-12 2018-11-15 三菱電機株式会社 エレベータの巻上機ブレーキ及びエレベータ巻上機
WO2019220546A1 (ja) * 2018-05-15 2019-11-21 三菱電機株式会社 エレベーターのロープ外れ止め装置
WO2021224988A1 (ja) * 2020-05-08 2021-11-11 三菱電機株式会社 エレベータの懸架体外れ止め装置及び巻上機

Similar Documents

Publication Publication Date Title
JP5951104B2 (ja) エレベータの改修方法
CN1962387A (zh) 建造电梯设备的方法及用于该目的的电梯设备
CN108689283B (zh) 曳引机和电梯
WO2023233592A1 (ja) エレベータ装置
EP1717474B1 (en) Brake device and hoist for elevator
EP1431231A1 (en) MACHINE ROOM−LESS ELEVATOR
JP5930813B2 (ja) エレベータ装置及びその改修方法
KR101611112B1 (ko) 엘리베이터용 권상기 및 엘리베이터용 권상기의 제조방법
JP4443171B2 (ja) 工事用エレベータのロープ繰り出し装置
JP2003089486A (ja) エレベータの主索取替装置及び主索取替方法
JPWO2006030484A1 (ja) エレベータ装置
KR100697487B1 (ko) 엘리베이터 장치
WO2021070362A1 (ja) 機械室レスエレベータの巻上機調整装置及び巻上機据付方法
JP6485673B1 (ja) エレベータ装置
JPH04213581A (ja) リニアモータ式エレベータの据付方法
JP7134366B2 (ja) エレベータの釣合おもり装置
JP4157750B2 (ja) エレベータの主ロープ交換装置
WO2023032021A1 (ja) 工事用エレベータ装置、及び工事用エレベータ装置のガバナロープ延長方法
JP2005231837A (ja) エレベータ用巻上機の手動回転駆動装置およびエレベータ巻上機の手動回転駆動方法
JP6806660B2 (ja) 機械室レスエレベータの改修方法
WO2020194523A1 (ja) エレベータ装置及びその機械台
WO2019176106A1 (ja) エレベータ巻上機の駆動シーブ支持装置及びメンテナンス方法
JP2004168517A (ja) エレベーター装置
JP2019182665A (ja) 機械室レスエレベータの改修方法
JP4993978B2 (ja) エレベータの巻上機

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22944876

Country of ref document: EP

Kind code of ref document: A1