WO2023127641A1 - 三重殻タンクの施工方法 - Google Patents

三重殻タンクの施工方法 Download PDF

Info

Publication number
WO2023127641A1
WO2023127641A1 PCT/JP2022/047106 JP2022047106W WO2023127641A1 WO 2023127641 A1 WO2023127641 A1 WO 2023127641A1 JP 2022047106 W JP2022047106 W JP 2022047106W WO 2023127641 A1 WO2023127641 A1 WO 2023127641A1
Authority
WO
WIPO (PCT)
Prior art keywords
tank
roof
side plate
triple
tank side
Prior art date
Application number
PCT/JP2022/047106
Other languages
English (en)
French (fr)
Inventor
豊孝 小松
雅人 寺林
亮 中山
Original Assignee
川崎重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 川崎重工業株式会社 filed Critical 川崎重工業株式会社
Publication of WO2023127641A1 publication Critical patent/WO2023127641A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D88/00Large containers
    • B65D88/02Large containers rigid
    • B65D88/06Large containers rigid cylindrical
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/04Containers for fluids or gases; Supports therefor mainly of metal
    • E04H7/06Containers for fluids or gases; Supports therefor mainly of metal with vertical axis

Definitions

  • This disclosure relates to a construction method for a triple-shell tank that stores low-temperature liquefied gas.
  • a flat-bottomed tank with a multi-shell structure is known as a facility for storing low-temperature liquefied gas.
  • the construction of this type of multi-shell tank generally requires a long construction period because the building itself is large-scale and requires the application of a heat-insulating structure.
  • Patent Literatures 1 and 2 disclose a construction method for a double-shell tank having an inner tank and an outer tank for the purpose of shortening the construction period.
  • a triple-shell flat-bottom tank having an intermediate tank between an inner tank and an outer tank has been studied as a storage facility for cryogenic liquefied gas.
  • a triple-shell tank naturally has a more complicated structure than a double-shell tank, so the construction period tends to be longer.
  • An object of the present disclosure is to provide a construction method that can shorten the construction period when constructing a triple-shell tank having an inner tank, an intermediate tank, and an outer tank.
  • a method of constructing a triple-shell tank is a method of constructing a triple-shell tank comprising an inner tank, an intermediate tank, and an outer tank, each having a roof and a side plate, wherein By temporarily fixing the tank roof and further temporarily fixing the outer tank roof on the intermediate tank roof, a roof connecting body is formed, and an outer tank side plate of a predetermined height is constructed around the roof connecting body, A sealing process is performed between the outer peripheral edge of the outer tank roof and the inner surface of the outer tank side plate to form a sealed space, and air is supplied to the sealed space to aerate the roof connecting body, and The tank roof and the outer tank side plate are fixed, the inner tank side plate and the intermediate tank side plate are constructed, the temporary fixing of the roof connector is released, and the inner tank roof and the inner tank side plate are fixed.
  • the intermediate tank roof and the intermediate tank side plate are fixed.
  • FIG. 1 is a vertical cross-sectional view showing the structure of a triple-hull tank to which the present disclosure is applied.
  • FIG. 2 is a process chart of a method for constructing a triple-hull tank according to the present disclosure.
  • FIG. 3 is a diagram showing one step of the construction method of the triple-hulled tank in a cross section of half of the tank.
  • FIG. 4 is a diagram showing one step of the construction method of the triple-hull tank.
  • FIG. 5 is a diagram showing one step of the construction method of the triple-hull tank.
  • FIG. 6 is a diagram showing one step of the construction method for the triple-hull tank.
  • FIG. 7 is a diagram showing one step of the construction method of the triple-hull tank.
  • FIG. 1 is a vertical cross-sectional view showing the structure of a triple-hull tank to which the present disclosure is applied.
  • FIG. 2 is a process chart of a method for constructing a triple-hull tank according to the present disclosure.
  • FIG. 3 is
  • FIG. 8 is a diagram showing one step of the construction method of the triple-hull tank.
  • FIG. 9 is a diagram showing one step of the construction method of the triple-hull tank.
  • FIG. 10 is a diagram showing one step of the construction method of the triple-hull tank.
  • FIG. 11 is a diagram showing one step of the construction method for the triple-hull tank.
  • FIG. 12 is a diagram showing one step of the construction method of the triple-hull tank.
  • FIG. 13 is a diagram showing one step of the construction method for the triple-hull tank.
  • FIG. 14 is a diagram showing one step of the construction method of the triple-hull tank.
  • FIG. 15 is a diagram showing one step of the construction method of the triple-hull tank.
  • FIG. 16 is a diagram showing one step of the construction method of the triple-hull tank.
  • the triple-shell tank which is the construction object of the present disclosure, is a tank for storing low-temperature liquefied gas, and is a flat-bottomed tank with a triple-shell structure that is stationary on the ground.
  • the stored liquefied gas is, for example, liquefied hydrogen or liquid helium.
  • FIG. 1 illustrates a triple-shell tank 1 that stores liquid hydrogen LH.
  • the triple shell tank 1 comprises a tank foundation 10, an outer tank 2 erected on the tank foundation 10, an intermediate tank 3 enclosed in the outer tank 2, and an inner tank 4 enclosed in the intermediate tank 3. including.
  • the outer tank 2, the intermediate tank 3, and the inner tank 4 all have a circular shape when viewed from above, and are arranged concentrically.
  • the tank foundation 10 is a concrete layer forming the foundation of the triple-shell tank 1.
  • the tank foundation 10 has a size larger than the outer diameter of the outer tank 2.
  • the outer tank 2 is a sealed body made of metal such as carbon steel, and includes an outer tank bottom plate 21 , an outer tank side plate 22 and an outer tank roof 23 .
  • the outer tank bottom plate 21 is laid directly above the tank foundation 10 and has a disk shape.
  • the outer tank side plate 22 is erected from the peripheral edge of the outer tank bottom plate 21 and has a cylindrical shape.
  • the outer tank roof 23 is attached to the upper end of the cylindrical outer tank side plate 22 so as to close the top opening of the outer tank side plate 22, and has a dome shape.
  • the intermediate tank 3 is a closed body made of metal such as SUS, and is arranged inside the outer tank 2 .
  • the intermediate tank 3 includes an intermediate tank bottom plate 31 , an intermediate tank side plate 32 and an intermediate tank roof 33 .
  • the intermediate tank bottom plate 31 has a disc shape with a smaller diameter than the outer tank bottom plate 21 .
  • the intermediate tank side plate 32 is erected from the peripheral edge of the intermediate tank bottom plate 31 and has a cylindrical shape.
  • the intermediate tank roof 33 is attached to the upper end of the intermediate tank side plate 32 and has a dome shape.
  • the first level concrete layer 24 is a flat concrete layer constructed on the outer tank bottom plate 21 .
  • the first ring portion 25 is a high-strength concrete layer arranged in a ring shape on the vicinity of the peripheral edge of the first level concrete layer 24 .
  • a reinforced concrete layer 251 is arranged at a portion of the first ring portion 25 that directly receives the load of the intermediate tank side plate 32 .
  • the outer bottom cold insulation layer 26 is a layer having heat insulation properties, which is arranged on the first level concrete layer 24 and inside the first ring portion 25 .
  • the first ring portion 25 may be formed by an array of insulating concrete blocks, such as perlite concrete blocks.
  • the outer bottom insulation layer 26 may be formed by an array of insulating inorganic blocks, such as foam glass.
  • a plate material of, for example, lightweight aerated concrete may be laid on the outer bottom cooling layer 26 .
  • the inner tank 4 is a tank that actually stores liquid, is a closed body made of metal such as SUS, and is arranged inside the intermediate tank 3 .
  • the inner tank 4 includes an inner tank bottom plate 41 , an inner tank side plate 42 and an inner tank roof 43 .
  • the inner tank bottom plate 41 has a disc shape with a smaller diameter than the intermediate tank bottom plate 31 .
  • the inner tank side plate 42 is erected from the peripheral edge of the inner tank bottom plate 41 and has a cylindrical shape.
  • the inner tank roof 43 is attached to the upper end of the inner tank side plate 42 and has a dome shape. Liquid hydrogen LH is stored inside the inner tank 4 .
  • a second level concrete layer 34 is constructed on the intermediate tank bottom plate 31 .
  • the second ring portion 35 is a high-strength concrete layer arranged in a ring shape on the vicinity of the peripheral edge of the second level concrete layer 34 .
  • a reinforced concrete layer 351 is arranged at a portion of the second ring portion 35 that directly receives the load of the inner tank side plate 42 .
  • the inner bottom cold insulation layer 36 is a layer having heat insulation properties, which is arranged on the second level concrete layer 34 and inside the second ring portion 35 .
  • the second ring portion 35 can be made of perlite concrete blocks, and the inner bottom cooling layer 36 can be made of foamed glass blocks or the like.
  • a plate material of lightweight aerated concrete may be laid on the inner bottom cooling layer 36.
  • a gap of a predetermined width is provided between the inner tank 4 and the intermediate tank 3, and between the intermediate tank 3 and the outer tank 2, a gap of a predetermined width is provided.
  • a first tank gap 11 between the inner tank 4 and the intermediate tank 3 and a second tank gap 12 between the intermediate tank 3 and the outer tank 2 are filled with a heat insulating material. Perlite or glass wool can be used as the heat insulating material.
  • the first inter-tank space 11 is filled with a low-boiling-point gas, such as hydrogen gas, which is equivalent to the liquid hydrogen LH stored in the inner tank 4 .
  • the second chamber 12 is filled with nitrogen gas, for example.
  • FIG. 2 is a process chart showing one embodiment of a construction method for the triple-hull tank 1 according to the present disclosure.
  • FIG. 2 shows the relationship between the steps S1 to S14 performed during the construction period of the triple-shell tank 1 and the construction timing of each part of the triple-shell tank 1.
  • FIG. Specifically, for each of the bottom plates 21, 31, 41, the roofs 23, 33, 43, and the side plates 22, 32, 42 of the outer tank 2, the intermediate tank 3, and the inner tank 4, there is a construction period during which the main construction work is actually performed. Solid arrows and dotted lines for the period after installation are shown in FIG. 2, respectively.
  • the opening timing of the opening for construction work is indicated as "open”, and the closing timing of the construction opening is indicated as “closed”. Note that the steps S1 to S14 are not necessarily divided into process units that are one division of the tank construction procedure, and there are cases where the progress of the construction is simply divided into "processes”.
  • the characteristic point of the construction method of this embodiment is that the roof connecting body formed by temporarily fixing the intermediate tank roof 33 and the inner tank roof 43 to the outer tank roof 23 is used for ground work. (step S6), and the roof connecting body is floated by air lasing (step S8).
  • 3 to 16 are diagrams schematically showing construction states of the triple-shell tank 1 in steps S1 to S14 shown in FIG. 2, respectively. In FIGS. 3 to 16, a section corresponding to half from the radial center RC of the triple-shell tank 1 is shown. Each of the steps S1 to S14 will be described below with reference to FIGS. 3 to 16. FIG.
  • FIG. 3 shows the construction status of step S1.
  • a part of the outer tank 2 is installed on the tank base 10 in step S1.
  • an outer tank annular 211 forming part of the outer tank bottom plate 21 and an outer tank side plate piece 22P1 forming part of the outer tank side plate 22 are installed near the periphery of the tank base 10. be done.
  • the outer tank annular 211 constitutes an annular portion near the outer circumference of the disk-shaped outer tank bottom plate 21 and is a portion positioned below the first ring portion 25 .
  • the outer tank annular 211 is thicker than the other parts of the outer tank bottom plate 21 in order to improve load resistance.
  • the outer tank side plate 22 is assembled using a plurality of side plate pieces each made of a rectangular plate gently curved in an arc shape. Specifically, the side plate pieces are arranged in an annular shape, and adjacent side plate pieces are welded to form one annular step.
  • the outer tank side plate 22 is constructed by stacking a plurality of such annular stages.
  • the outer tank side plate piece 22P1 shown in FIG. 3 is a side plate piece that forms the lowermost annular step of the outer tank side plate 22 .
  • the outer tank side plate piece 22P1 is erected vertically upward from a slightly inner side of the outer circumferential edge of the outer tank annular 211 in the radial direction.
  • FIG. 4 shows the construction status of step S2.
  • step S2 the outer tank bottom plate 21 and the outer tank side plate 22 are constructed.
  • the radially inner portion of the outer tank annular 211 is laid. This inner portion is the portion located directly below the outer bottom cold insulation layer 26 .
  • the first level concrete layer 24 shown in FIG. 1 is placed on the outer tank bottom plate 21 after laying.
  • a portion of the first level concrete layer 24 is placed on the outer tank annular 211 .
  • the remaining part of the first level concrete layer 24 is placed in the inner part of the outer tank annular 211 .
  • the outer tank side plate piece 22P2 forming the second annular step is installed on top of the outer tank side plate piece 22P1 forming the lowermost annular step.
  • the lowermost annular stage is provided with a first opening OP1 that serves as a construction opening.
  • the first opening OP1 is opened by removing one or more of the plurality of outer tank side plate pieces 22P1 that form the lowermost annular stage.
  • only the outer tank side plate piece 22P1 corresponding to the position of the first opening OP1 is not welded to the adjacent piece, and the adjacent piece is not welded. Remove from the annular stage.
  • a central roof mount 51 is installed near the radial center RC of the outer tank bottom plate 21 .
  • the central roof pedestal 51 is a pedestal for enabling the dome-shaped inner tank roof 43 to be constructed on the ground side before air lasing.
  • FIG. 5 shows the construction status of step S3.
  • step S3 construction of the outer tank side plate 22 is continued and construction of the inner tank roof 43 is started.
  • the outer tank side plate piece 22P3 forming the third annular stage is installed on the outer tank side plate piece 22P2 forming the second annular stage.
  • one or more outer tank side plate pieces 22P2 in the second annular stage are removed to open the first opening OP1 that serves as a construction opening. be done.
  • the removed outer tank side plate piece 22P2 is a piece positioned directly above the outer tank side plate piece 22P1 removed for opening the first opening OP1 in the lowermost annular stage.
  • the reason why the first opening OP1 is formed in the outer tank side plate 22 at a height corresponding to two annular stages is that the construction is started in the intermediate tank side plate 32 and the inner tank side plate 42 from a position higher than the outer tank side plate 22. This is to match the opening height with the construction opening.
  • an inner tank roof piece 43P constituting the vicinity of the center in the radial direction of the inner tank roof 43 is installed on the central roof mount frame 51 installed in the previous step S2.
  • an outer peripheral roof frame 52 is installed on the upper surface of the outer tank bottom plate 21 in the vicinity of the outer periphery in the radial direction.
  • the outer peripheral roof frame 52 is a frame that temporarily supports the outer peripheral lower edges of the inner tank roof 43 and the intermediate tank roof 33 .
  • An inner tank knuckle plate 44 is installed on the upper surface of the outer perimeter roof mount 52 .
  • the inner tank knuckle plate 44 is a plate that connects the upper end of the inner tank side plate 42 and the outer peripheral lower edge of the inner tank roof 43 .
  • FIG. 6 shows the construction status of step S4.
  • step S4 construction of the inner tank roof 43 is continued, and construction of the intermediate tank roof 33 is started.
  • the inner tank roof 43 the inner tank roof piece 43P installed in the center in the radial direction in step S3 and the inner tank knuckle plate 44 are connected by the inner tank roof block pre-assembled in the ground work.
  • a dome-shaped inner tank roof 43 is formed.
  • the inner tank roof block is composed of a roof frame serving as a support frame and a plurality of roof plates attached to the roof frame.
  • An outer peripheral edge 43 ⁇ /b>E of the inner tank roof 43 is fixed to the upper end of the inner tank knuckle plate 44 .
  • the inner tank roof 43 is supported by the outer perimeter roof pedestal 52 and becomes independent, so the central roof pedestal 51 is removed.
  • an intermediate tank roof piece 33P constituting the vicinity of the radial center of the intermediate tank roof 33 is installed on the radial center portion of the inner tank roof 43 completed in step S3.
  • an intermediate tank roof support 61 (first temporary support) is used.
  • the intermediate tank roof support 61 is interposed between the inner tank roof 43 and the intermediate tank roof 33 to temporarily fix them with a predetermined gap therebetween.
  • a rigid member such as H steel can be used.
  • the temporary fixing is, for example, a mode in which the lower end of the H steel is welded and fixed to the inner tank roof 43 via a predetermined patch plate, and the intermediate tank roof piece 33P is placed and fixed to the upper end of the H steel.
  • FIG. 6 shows a state in which the outer tank side plate piece 22P4 that constitutes the fourth annular stage is installed.
  • An intermediate tank knuckle plate 37 is installed on the upper surface of the outer perimeter roof mount 52 .
  • the intermediate tank knuckle plate 37 is a plate that connects the upper end of the intermediate tank side plate 32 and the outer peripheral lower edge of the intermediate tank roof 33 .
  • a block forming the first ring portion 25 is laid on the upper surface of the outer tank bottom plate 21 near the radial outer periphery.
  • FIG. 7 shows the construction status of step S5.
  • step S5 construction of the intermediate tank roof 33 is continued, and construction of the outer tank roof 23 is started. Also, the construction of the intermediate tank bottom plate 31 and the intermediate tank side plate 32 is started.
  • the intermediate tank roof 33 the intermediate tank roof piece 33P in the center in the radial direction installed in step S4 and the intermediate tank knuckle plate 37 are connected by the intermediate tank roof block pre-assembled in the ground work.
  • a domed intermediate tank roof 33 is formed.
  • the intermediate tank roof block is composed of a roof frame and a plurality of roof plates in the same manner as the inner tank roof block described above.
  • an intermediate tank roof support 61 is placed between the intermediate tank roof 33 and the inner tank roof 43 to temporarily fix them.
  • An outer peripheral edge 33 ⁇ /b>E of the intermediate tank roof 33 is fixed to the upper end of the intermediate tank knuckle plate 37 .
  • an outer tank roof piece 23P constituting the vicinity of the radial center of the outer tank roof 23 is installed on the radial center portion of the intermediate tank roof 33 completed in step S4.
  • the outer tank roof center support 62 (second temporary support) is used.
  • the outer tank roof center support 62 is interposed between the intermediate tank roof 33 and the outer tank roof piece 23P at the center in the radial direction, and temporarily fixes them with a predetermined gap therebetween.
  • the outer tank roof central support 62 a frame made of H-steel or steel material assembled into a truss structure can be used.
  • the lower end of the H steel or the like is welded and fixed to the intermediate tank roof 33 via a predetermined patch plate, and the outer tank roof piece 23P is placed and fixed on the upper end of the H steel or the like.
  • the intermediate tank annular 311 forming part of the intermediate tank bottom plate 31 and the intermediate tank side plate piece 32P1 (part of the intermediate tank side plate 32) are placed. piece) is installed.
  • the intermediate tank annular 311 is an annular portion near the outer periphery of the disk-shaped intermediate tank bottom plate 31 and has a plate thickness greater than the other portions of the intermediate tank bottom plate 31 .
  • the intermediate tank side plate 32 is also assembled by stacking a plurality of annular stages formed by arranging a plurality of side plate pieces in an annular shape.
  • the intermediate tank side plate piece 32P1 shown in FIG. 7 is a side plate piece that constitutes the lowest annular step of the intermediate tank side plate 32 .
  • the intermediate tank side plate piece 32P1 stands vertically upward from the radially outer peripheral edge of the intermediate tank annular 311 .
  • the intermediate tank side plate piece 32P1 is also a side plate piece that matches the height of the second annular step of the intermediate tank side plate 32 and the lowest annular step of the inner tank side plate 42 to be constructed later.
  • FIG. 8 shows the construction status of step S6.
  • step S6 the construction of the outer tank roof 23 is continued, and finally the roof connecting body 20 is formed by integrating the three roofs.
  • the outer tank side plate 22 is installed up to a predetermined height.
  • the outer tank roof block pre-assembled in the ground work is connected to the outer tank roof piece 23P installed in the center in the radial direction in step S5, thereby finally forming a dome-shaped outer tank roof 23. is formed.
  • an outer tank roof peripheral support 63 (second temporary support) made of H-steel or the like is placed between the intermediate tank roof 33 and the outer tank roof 23 to temporarily fix them.
  • the roof connecting body 20 has the intermediate tank roof 33 temporarily fixed on the inner tank roof 43 by the intermediate tank roof support 61, and the outer tank roof 23 on the intermediate tank roof 33, the outer tank roof center support 62 and the outer tank roof 23 on the intermediate tank roof 33. It is formed by being temporarily fixed by the tank roof peripheral support 63 .
  • the roof connecting body 20 in this manner, three roofs can be aerated integrally.
  • the above-mentioned supports 61, 62, and 63 serve as support members for the upper roof until the air razing is completed, but after the air razing, they serve as suspension members for the lower roof.
  • the gap between the inner tank roof 43 and the intermediate tank roof 33 and the gap between the intermediate tank roof 33 and the outer tank roof 23 are the same as the gaps between the two in the completed triple-shell tank 1. is set slightly narrower than the gap between This is to facilitate the work of fixing the inner tank roof 43 to the inner tank side plate 42 and the work of fixing the intermediate tank roof 33 to the intermediate tank side plate 32, which are performed after air lasing.
  • the construction of the outer tank side plate 22 is completed by stacking a predetermined number of annular steps formed by the side plate pieces. As a result, the outer tank side plate 22 having a predetermined height is constructed around the roof connecting body 20, and the preparation for aeraging is ready.
  • a peripheral corridor 27 is installed on the top portion 22T of the outer tank side plate 22 .
  • a part of the second level concrete layer 34 (not shown) is placed on the intermediate tank annular 311, and blocks constituting the second ring portion 35 are laid.
  • FIG. 9 shows the construction status of step S7.
  • step S7 preparation work for air lasing is mainly performed.
  • the outer peripheral edge 23E of the outer tub roof 23 is subjected to a sealing process for attaching a sealing material 28.
  • the sealing material 28 seals the gap between the outer peripheral edge 23E and the inner surface of the outer tank side plate 22 .
  • a blower 7 for supplying air for aeraging is provided outside the outer tub side plate 22 .
  • a fan duct is connected to the air outlet of the blower 7, and this fan duct is drawn into the outer tank side plate 22 through the first opening OP1.
  • the first opening OP1 is also subjected to a sealing process for sealing the periphery of the air duct. Since the outer tank bottom plate 21 has already been completed before step S7, the sealing process for the bottom portion is not particularly required. Therefore, at this point, the space surrounded by the outer tank bottom plate 21, the outer tank side plate 22 and the outer tank roof 23 is hermetically sealed.
  • the inner tank annular 411 is installed on the upper surface of the second ring portion 35 in parallel with the air lasing preparatory work described above.
  • the inner tank annular 411 is an annular portion near the outer circumference of the disk-shaped inner tank bottom plate 41 .
  • FIG. 10 shows the state after the air lasing in step S8.
  • the blower 7 shown in FIG. 9 is operated to supply air to the closed space surrounded by the outer tank bottom plate 21, the outer tank side plate 22 and the outer tank roof 23.
  • the supply of air increases the air pressure in the closed space, and the roof connecting body 20 floats due to the pressure.
  • the outer tub side plate 22 serves as a guide for the floating roof connecting body 20 .
  • the inner tank roof 43 and the intermediate tank roof 33 are integrated in advance with the outer tank roof 23 by temporary supports 61 , 62 , 63 . Therefore, the inner tank roof 43 and the intermediate tank roof 33 are also suspended from the outer tank roof 23 and float integrally. That is, since the roof connecting body 20 is formed in advance, the three roofs 23, 33, and 43 forming the triple shell structure can be floated at once by one air razing. It should be noted that, during air lasing, the balance wire is used to control the floating attitude of the roof connecting body 20 .
  • the outer peripheral edge 23E of the outer tank roof 23 is fixed to the upper end of the outer tank side plate 22.
  • the temporary fixing of the roof connecting member 20 is not released, and the inner tank roof 43 and the intermediate tank roof 33 remain suspended from the outer tank roof 23 .
  • Equipment for aerating is removed. That is, the sealing member 28 attached near the outer peripheral edge 23E of the outer tank roof 23 is removed, and the blower 7 and the air duct are removed.
  • FIG. 11 shows the construction status of step S9.
  • step S9 construction of the inner tank side plate 42 is started.
  • the inner tank side plate 42 is also assembled by stacking a plurality of annular stages formed by arranging a plurality of side plate pieces in an annular shape.
  • an inner tank side plate piece 42P1 (side plate piece) that constitutes the lowermost annular step of the inner tank side plate 42 is installed.
  • the inner tank side plate piece 42P1 stands vertically upward from the radially outer peripheral edge of the inner tank annular 411 .
  • FIG. 11 shows a state in which the inner tank side plate piece 42P2 that forms the second annular stage is installed on the lowermost inner tank side plate piece 42P1.
  • a second opening OP2 is provided as a construction opening when the inner tank side plate 42 is constructed.
  • the second opening OP2 is opened by removing one or more of the plurality of inner tank side plate pieces 42P1 forming the lowermost annular stage.
  • the opening position of the second opening OP2 is a position corresponding to the first opening OP1 opened in the outer tank side plate 22 .
  • the second opening OP2 and the first opening OP1 are opened at substantially the same position in the circumferential direction of the triple-hull tank 1 and at substantially the same height position.
  • the inner tank side plate piece 42P1 and the second stage outer tank side plate piece 22P2 are located at approximately the same height.
  • the outer tank side plate 22 not only the lowermost outer tank side plate piece 22P1 but also the second outer tank side plate piece 22P2 are pulled out, so that the height positions of the second opening OP2 and the first opening OP1 are aligned.
  • FIG. 12 shows the construction status of step S10.
  • the inner tank side plate 42 and the intermediate tank side plate 32 are constructed.
  • the inner tank side plate piece 42P3 forming the third annular stage is installed on the inner tank side plate piece 42P2 forming the second annular stage.
  • the fourth inner tank side plate piece 42P4 is installed thereon, and the height of the side plate is gradually increased.
  • the intermediate tank side plate pieces 32P2, 32P3, 32P2, 32P3, 32P2, 32P3, 32P2, 32P3, 32P2, 32P3, 32P2, 32P3, 32P3, 32P3, 32P3, 32P3, 32P3, 32P3, 32P4, are stacked one after another.
  • the inner tank side plate piece 42Pn and the intermediate tank side plate piece 32Pn (excluding the height matching piece 32P1) have the same height and width. Therefore, the inner tank side plate pieces 42P1, 42P2 and 43P3 shown in FIG. 12 and the intermediate tank side plate pieces 32P2, 32P3 and 32P4 are at the same height position.
  • step S10 the annular stage of either the inner tank side plate 42 or the intermediate tank side plate 32 may be stacked first, and then the other annular stage may be stacked. It is desirable to build up the annular stages concurrently. For example, after stacking the second inner tank side plate piece 42P2 of the inner tank side plate 42, the third intermediate tank side plate piece 32P3 of the intermediate tank side plate 32 is stacked, and then the third inner tank side plate piece 42P3 of the inner tank side plate 42 is stacked. Stack the side plate pieces 42P3.
  • the scaffolding can be shared, and work efficiency can be improved.
  • a third opening OP3 is also provided as a construction opening when constructing the intermediate tank side plate 32 .
  • the third opening OP3 is opened by removing one or more of the intermediate tank side plate pieces 32P2 forming the second annular step. As indicated by "open” in the chart of FIG. 2, the second opening OP2 is opened in the inner tank side plate 42 and the third opening OP3 is opened in the intermediate tank side plate 32 at the time of step S10.
  • the opening position of the third opening OP3 is a position corresponding to the second opening OP2 of the inner tank side plate 42. More specifically, the second opening OP2 and the third opening OP3 are opened at substantially the same position in the circumferential direction and at substantially the same height position. As described above, the second opening OP2 is formed in the outer tank side plate 22 at a position corresponding to the first opening OP1. Therefore, the first opening OP1, the second opening OP2 and the third opening OP3 are formed at substantially the same circumferential position and height position. Therefore, it is possible to efficiently carry out the passage of workers inside and outside the tank under construction, and the carrying in and out of materials and construction equipment.
  • step S10 a first level concrete layer 24 (not shown in FIG. 12) and an outer bottom cold insulation layer 26 are sequentially laid on the outer tank bottom plate 21 . Since the first level concrete layer 24 has been constructed on the outer tank annular 211 in step S2, the remainder is constructed. As described above, the outer bottom cold insulation layer 26 is constructed by lining the inner side of the first ring portion 25 with a heat insulating block material such as bubble glass.
  • FIG. 13 shows the construction status of step S11.
  • step S11 the construction of the inner tank side plate 42 and the intermediate tank side plate 32 is continued, the inner tank side plate 42 and the inner tank roof 43 are fixed, and the intermediate tank bottom plate 31 is laid.
  • the inner tank side plate 42 and the intermediate tank side plate 32 are installed from the middle stage to the upper stage of each annular stage. 13 shows a state in which the inner tank side plate 42 precedes the intermediate tank side plate 32 by one step and the inner tank side plate piece 42PT constituting the uppermost annular step is assembled.
  • annular stage of the inner tank side plate 42 is assembled to the uppermost stage prior to the intermediate tank side plate 32 is as follows.
  • "outside lifting" is performed by arranging the crane radially outward of the side plates. This is because both the inner tank side plate 42 and the intermediate tank side plate 32 have assembly jigs including scaffolds on the inner surface side, and the inner surface side is accessible to workers. If the intermediate tank side plate 32 is assembled first, it becomes difficult to lift the inner tank side plate piece 42P due to the scaffolding on the inner surface of the intermediate tank side plate 32 . For this reason, it is desirable to first assemble the inner tank side plate 42 and create a foothold inside the intermediate tank side plate 32, and then lift the intermediate tank side plate piece 32P from the outside.
  • the work of fixing the outer peripheral edge of the inner tank roof 43 to the upper end of the inner tank side plate 42 is carried out.
  • a re-suspension work is performed to replace the intermediate tank roof support 61 connecting the intermediate tank roof 33 and the inner tank roof 43 with the first jack 64 .
  • the inner tank roof 43 is at a position higher than the regular height position, and the intermediate tank It is suspended from the intermediate tank roof 33 by a roof support 61 . This is to secure an adjustment space when connecting the inner tank roof 43 to the inner tank side plate 42 .
  • the first jack 64 is arranged at a proper place between the intermediate tank roof 33 and the inner tank roof 43, and supports the inner tank roof 43 so that it can be lifted and lowered after the suspension change.
  • the lower end of the inner tank knuckle plate 44 and the upper end of the uppermost inner tank side plate piece 42PT are aligned while jacking down the inner tank roof 43 by the first jack 64 by the amount corresponding to the lowering adjustment space. After the alignment, both are fixed, and the construction of the inner tank 4 is almost completed.
  • step S11 the remainder of the intermediate tank bottom plate 31 is laid on the outer bottom cold insulation layer 26.
  • the intermediate tank bottom plate 31 since the intermediate tank annular 311 constituting the outer peripheral portion has already been installed, the intermediate tank bottom plate 31 of the inner portion is laid.
  • FIG. 14 shows the construction status of step S12.
  • step S12 the fixing of the intermediate tank side plate 32 and the intermediate tank roof 33 and the laying of the inner bottom cooling layer 36 are performed.
  • the intermediate tank roof 33 is also fixed using a jack-down method.
  • the intermediate tank side plate piece 32PT constituting the uppermost annular step of the intermediate tank side plate 32 is installed.
  • the work of replacing the outer tank roof central support 62 and the outer tank roof peripheral support 63 connecting the outer tank roof 23 and the intermediate tank roof 33 with the second jacks 65 is performed.
  • the intermediate tank roof 33 is also suspended from the outer tank roof 23 at a position higher than the regular height position by the adjustment space.
  • the second jack 65 is arranged at a proper place between the outer tank roof 23 and the intermediate tank roof 33, and suspends and supports the intermediate tank roof 33 so as to be able to move up and down after the suspension change.
  • the lower end of the intermediate tank knuckle plate 37 and the upper end of the uppermost intermediate tank roof piece 33PT are aligned while jacking down the intermediate tank roof 33 by the second jack 65 by the adjustment space. After the alignment, both are fixed, and the construction of the intermediate tank 3 is almost completed.
  • step S12 the inner bottom cold insulation layer 36 is further laid on the intermediate tank bottom plate 31 (second level concrete layer 34).
  • the inner bottom cold insulation layer 36 is constructed by lining the inner side of the second ring portion 35 with a heat insulating block material such as bubble glass.
  • FIG. 15 shows the construction status of step S13.
  • step S13 the inner tank bottom plate 41 is laid, the second opening OP2 is sealed, and the deck is installed.
  • the inner tank bottom plate 41 is laid on the inner bottom cold insulation layer 36 .
  • the inner tank bottom plate 41 since the inner tank annular 411 constituting the outer peripheral portion has already been installed, the inner tank bottom plate 41 of the inner portion is laid.
  • FIG. 15 shows a state in which the second opening OP2 is sealed.
  • a shoulder deck 231 and a top deck 232 are installed on the outer tank roof 23 .
  • the shoulder deck 231 is arranged on the radially outer periphery of the outer tank roof 23 .
  • the top deck 232 is arranged in the radial center of the outer tank roof 23 .
  • the work of filling the first tank space 11 and the second tank space 12 with a heat insulating material, and the work of installing various pipes and accessories are also performed.
  • FIG. 16 shows the construction status of step S14.
  • sealing of the third opening OP3 and the first opening OP1 is performed.
  • the third opening OP3 of the intermediate tank side plate 32 is sealed after the work inside the intermediate tank 3 is completed and the scaffolding installed inside the intermediate tank 3 is removed.
  • the intermediate tank side plate piece 32P2 extracted in step S10 is fitted into the third opening OP3, and the intermediate tank side plate piece 32P2 is welded to the surrounding side plate pieces.
  • the first opening OP1 of the outer tank side plate 22 is sealed.
  • the outer tank side plate pieces 22P1 and 22P2 extracted in steps S2 and S3 are fitted so as to close the first opening OP1 and are welded together.
  • the construction opening is closed in order of the inner second opening OP2, the middle third opening OP3, and the outer first opening OP1, when the work inside each side plate is completed.
  • the roof connecting body 20 is formed by temporarily fixing the inner tank roof 43, the intermediate tank roof 33, and the outer tank roof 23 to each other before aeraging. be done.
  • the intermediate tank roof 33 is temporarily fixed on the inner tank roof 43 by the intermediate tank roof support 61, and further, on the intermediate tank roof 33 by the outer tank roof center support 62 and the outer tank roof peripheral support 63.
  • the roof connector 20 is created.
  • the roof connecting body 20 is aerated.
  • each roof of the triple shell is created by ground-based work, temporarily fixed and integrated, and floated at once by one air glazing. Therefore, most of the construction work for each roof of the triple shell can be carried out in low places in parallel with the construction work for the side panels, etc., which contributes to shortening the construction period.
  • the inner tank side plate 42 and the intermediate tank side plate 32 can be constructed after the outer tank roof 23 is fixed to the outer tank side plate 22 to form the outer tank 2 .
  • construction work of the inner tank side plate 42 and the intermediate tank side plate 32 can be performed in the space covered by the outer tank 2 . Therefore, there is the advantage that the construction work can be carried out without being affected by the weather, and the deterioration of welding quality due to the inclusion of moisture can be avoided.
  • a liquid barrier may be erected around the triple-shell tank 1 to prevent diffusion of the liquid in the tank when it leaks in the event of a disaster or the like.
  • the dike can be constructed of PC (prestressed concrete), for example.
  • the dike may be constructed integrally with the outer tank 2 made of metal. Specifically, it may be constructed in a state in which the PC constituting the liquid barrier is in close contact with the outer peripheral surface of the outer tank side plate 22 . In this case, the strength of the outer tank side plate 22, which serves as a guide during air lasing of the roof connecting body 20, can be increased.
  • a communication pipe may be attached to the inner tank roof 43 to allow communication between the inner space of the inner tank 4 and the space between the first tanks 11 .
  • the hydrogen gas vaporized from the liquid hydrogen LH stored in the inner tank 4 can be circulated through the first tank gap 11 . That is, the stored liquid hydrogen LH can be used to enhance the cooling effect.
  • the first opening OP1, the second opening OP2, and the third opening OP3 are provided at the same position in the circumferential direction of the triple-shell tank 1 at approximately the same height. These openings OP1, OP2, and OP3 may be opened at different positions in the circumferential direction of the triple shell tank 1, and may be opened at different heights.
  • a construction method for a triple-shell tank according to the present disclosure is a construction method for a triple-shell tank having an inner tank, an intermediate tank, and an outer tank, each having a roof and a side plate, wherein the intermediate tank roof is placed on the inner tank roof.
  • a roof connecting body is formed, an outer tank side plate of a predetermined height is constructed around the roof connecting body, and the outer tank Sealing treatment is performed between the outer periphery of the roof and the inner surface of the outer tank side plate to form a sealed space, and air is supplied to the sealed space to aerate the roof connecting body, and the outer tank roof and The outer tank side plate is fixed, the inner tank side plate and the intermediate tank side plate are constructed, the temporary fixing of the roof connecting body is released, the inner tank roof and the inner tank side plate are fixed, and the intermediate tank is fixed. The roof and the intermediate tank side plate are fixed.
  • a roof connecting body is formed in which the inner tank roof, the intermediate tank roof and the outer tank roof are temporarily fixed to each other before air glazing. Subsequently, after forming the outer tank side plate around the roof connecting body, the roof connecting body is air-lazed. Although the outer tank roof is directly aerated, the inner tank roof and the intermediate tank roof are also held by the outer tank roof and floated integrally. In other words, each roof of the triple shell is created on the ground, temporarily fixed and integrated, and floated at once by one air glazing. Therefore, most of the construction work for each roof of the triple shell can be carried out in low places, which contributes to shortening the construction period.
  • the side plates of the inner tank and the side plates of the intermediate tank are constructed.
  • the inner tank side plate and the intermediate tank side plate can be constructed while being covered with the outer tank, there is also the advantage of being unaffected by the weather.
  • the outer tank bottom plate which constitutes the bottom portion of the area surrounded by the outer tank side plates, before the aeraging.
  • a roof mount is installed on the outer tank bottom plate, the inner tank roof is installed on the roof mount, and the inner tank roof is installed.
  • a first temporary support is installed on top
  • the intermediate tank roof is installed on the first temporary support
  • a second temporary support is installed on the intermediate tank roof
  • the second temporary support is installed on the second temporary support. It is desirable to form the roof connector by installing the outer tank roof.
  • the roof connecting body is formed by sequentially installing the intermediate tank roof and the outer tank roof on the innermost layer of the inner tank roof. Therefore, the roof connecting body can be formed with good working efficiency.
  • the inner tank side plate and the intermediate tank side plate are assembled by stacking a plurality of annular stages formed by arranging a plurality of side plate pieces in an annular shape, and Preferably, the annular stage and the annular stage of the intermediate vessel side plate are stacked in parallel.
  • the scaffolding when constructing the inner tank side plate and the intermediate tank side plate, for example, the scaffolding can be shared, and work efficiency can be improved, which in turn contributes to shortening the construction period.
  • the inner tank side plate and the intermediate tank side plate are assembled by stacking a plurality of annular stages formed by arranging a plurality of side plate pieces in an annular shape, and It is desirable to assemble the annular stage up to the uppermost stage prior to the intermediate tank side plate, and to fix the uppermost annular stage to the outer peripheral edge of the inner tank roof.
  • a first construction opening which is an entrance for construction
  • a first construction opening is provided in the inner tank side plate
  • two construction openings are formed in the intermediate tank side plate at the time of construction of the intermediate tank side plate, and the second construction opening is sealed after the work inside the inner tank is completed, and then the intermediate tank is constructed. It is desirable to seal the third construction opening after the work inside the outer tank is completed, and then seal the first construction opening after the work inside the outer tank is completed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

それぞれ屋根と側板とを有する内槽、中間槽及び外槽を備えた三重殻タンクの施工方法は次の手順を含む。内槽屋根の上に中間槽屋根を仮固定し、さらに当該中間槽屋根の上に外槽屋根を仮固定することで、屋根連結体を形成する。前記屋根連結体の周囲に所定高さの外槽側板を構築する。前記外槽屋根の外周縁と前記外槽側板の内面との間にシール処理を施して密閉空間を形成すると共に、当該密閉空間にエアを供給して前記屋根連結体をエアレージングする。前記外槽屋根と前記外槽側板とを固定する。内槽側板及び中間槽側板を構築し、前記屋根連結体の前記仮固定を解除して、前記内槽屋根と前記内槽側板とを固定すると共に前記中間槽屋根と前記中間槽側板とを固定する。

Description

三重殻タンクの施工方法
 本開示は、低温の液化ガスを貯留する三重殻タンクの施工方法に関する。
 低温の液化ガスを貯留する施設として、多重殻構造を備えた平底タンクが知られている。この種の多重殻タンクの施工は、建造物自体が大掛かりであると共に断熱構造の施与などが求められるため、一般に長期間の工期を要する。例えば特許文献1及び2には、工期の短縮化を目的とした、内槽と外槽とを備えた二重殻構造のタンクの施工方法が開示されている。近年では、内槽と外槽との間に中間槽を備えた三重殻構造の平底タンクが、極低温の液化ガスの貯留施設として検討されている。
 三重殻タンクは、二重殻タンクに比べて自ずと構造が複雑化するため、その施工の工期がより長期化する傾向がある。
特許第6127453号公報 特許第5672787号公報
 本開示の目的は、内槽、中間槽及び外槽を備えた三重殻タンクの建造にあたり、その工期を短縮することができる施工方法を提供することにある。
 本開示の一局面に係る三重殻タンクの施工方法は、それぞれ屋根と側板とを有する内槽、中間槽及び外槽を備えた三重殻タンクの施工方法であって、内槽屋根の上に中間槽屋根を仮固定し、さらに当該中間槽屋根の上に外槽屋根を仮固定することで、屋根連結体を形成し、前記屋根連結体の周囲に所定高さの外槽側板を構築し、前記外槽屋根の外周縁と前記外槽側板の内面との間にシール処理を施して密閉空間を形成すると共に、当該密閉空間にエアを供給して前記屋根連結体をエアレージングし、前記外槽屋根と前記外槽側板とを固定し、内槽側板及び中間槽側板を構築し、前記屋根連結体の前記仮固定を解除して、前記内槽屋根と前記内槽側板とを固定すると共に前記中間槽屋根と前記中間槽側板とを固定する。
 本開示によれば、内槽、中間槽及び外槽を備えた三重殻タンクの建造にあたり、その工期を短縮可能な施工方法を提供することができる。
図1は、本開示の施工対象となる三重殻タンクの構造を示す縦断面図である。 図2は、本開示に係る三重殻タンクの施工方法の工程チャートである。 図3は、前記三重殻タンクの施工方法の一つの工程を、タンクの半分の断面で示す図である。 図4は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図5は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図6は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図7は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図8は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図9は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図10は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図11は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図12は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図13は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図14は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図15は、前記三重殻タンクの施工方法の一つの工程を示す図である。 図16は、前記三重殻タンクの施工方法の一つの工程を示す図である。
 以下、図面を参照して、本開示に係る三重殻タンクの施工方法の実施形態を詳細に説明する。本開示の施工対象である三重殻タンクは、低温の液化ガスを貯留するタンクであって、地上据え置き式の三重殻構造を備えた平底タンクである。貯留される液化ガスは、例えば液化水素、液体ヘリウムである。
 [三重殻タンクの構造]
 まず、本開示の施工対象となる三重殻タンク1の構造を、図1に示す縦断面図に基づいて説明する。図1では、液体水素LHを貯留する三重殻タンク1を例示している。三重殻タンク1は、タンク基礎10と、このタンク基礎10の上に立設された外槽2と、外槽2に内包された中間槽3と、中間槽3に内包された内槽4とを含む。外槽2、中間槽3及び内槽4は、いずれも上面視で円形の形状を有し、同心円状に配置されている。
 タンク基礎10は、三重殻タンク1の基礎部分を構成するコンクリート層である。タンク基礎10は、外槽2の外径よりも大きいサイズを有している。外槽2は、炭素鋼等の金属で構成された密閉体であり、外槽底板21、外槽側板22及び外槽屋根23を含む。外槽底板21は、タンク基礎10の直上に敷設され、円板型の形状を有している。外槽側板22は、外槽底板21の周縁から立設され、円筒状の形状を有している。外槽屋根23は、円筒状の外槽側板22の上面開口を塞ぐように当該外槽側板22の上端に取り付けられ、ドーム型の形状を有している。
 中間槽3は、SUS等の金属で構成された密閉体であり、外槽2の内部に配置されている。中間槽3は、中間槽底板31、中間槽側板32及び中間槽屋根33を含む。中間槽底板31は、外槽底板21よりも径の小さい円板型の形状を有している。中間槽側板32は、中間槽底板31の周縁から立設され、円筒状の形状を有している。中間槽屋根33は、中間槽側板32の上端に取り付けられ、ドーム型の形状を有している。
 外槽底板21と中間槽底板31との間には、第1レベルコンクリート層24、第1リング部25及び外側底部保冷層26が介在されている。第1レベルコンクリート層24は、外槽底板21の上に施工された平面出しのコンクリート層である。第1リング部25は、第1レベルコンクリート層24の周縁付近の上にリング状に配置された、強度の高いコンクリート層である。第1リング部25において中間槽側板32の荷重を直接受ける箇所には、強化コンクリート層251が配置されている。外側底部保冷層26は、第1レベルコンクリート層24の上であって、第1リング部25の内側に配置された、断熱性を有する層である。第1リング部25は、例えばパーライトコンクリートブロックのような、断熱コンクリートブロックの配列体により形成できる。外側底部保冷層26は、例えば泡ガラスのような、断熱性の無機ブロック材の配列体により形成できる。外側底部保冷層26の上に、例えば軽量気泡コンクリートの板材を敷設しても良い。
 内槽4は、実際に液体を貯留する槽であり、SUS等の金属で構成された密閉体であって、中間槽3の内部に配置されている。内槽4は、内槽底板41、内槽側板42及び内槽屋根43を含む。内槽底板41は、中間槽底板31よりも径の小さい円板型の形状を有している。内槽側板42は、内槽底板41の周縁から立設され、円筒状の形状を有している。内槽屋根43は、内槽側板42の上端に取り付けられ、ドーム型の形状を有している。内槽4の内部には液体水素LHが貯留されている。
 中間槽底板31と内槽底板41との間には、第2レベルコンクリート層34、第2リング部35及び内側底部保冷層36が介在されている。第2レベルコンクリート層34は、中間槽底板31の上に施工されている。第2リング部35は、第2レベルコンクリート層34の周縁付近の上にリング状に配置された、強度の高いコンクリート層である。第2リング部35において内槽側板42の荷重を直接受ける箇所には、強化コンクリート層351が配置されている。内側底部保冷層36は、第2レベルコンクリート層34の上であって、第2リング部35の内側に配置された、断熱性を有する層である。例えば、第2リング部35はパーライトコンクリートブロック、内側底部保冷層36は泡ガラスブロック等で形成できる。内側底部保冷層36の上に、例えば軽量気泡コンクリートの板材を敷設しても良い。
 内槽4と中間槽3との間、並びに中間槽3と外槽2との間には、各々所定幅の間隙が設けられている。内槽4と中間槽3との間隙である第1槽間11、及び、中間槽3と外槽2との間隙である第2槽間12には、断熱材が充填されている。前記断熱材としては、パーライトやグラスウールを用いることができる。第1槽間11には、内槽4に貯留されている液体水素LHと同等の低沸点ガス、例えば水素ガスが充填される。第2槽間12には、例えば窒素ガスが充填される。
 [三重殻タンクの施工方法]
 続いて、図1に例示した三重殻タンク1の施工方法について説明する。図2は、本開示に係る三重殻タンク1の施工方法の一実施形態を示す工程チャートである。図2には、三重殻タンク1の建造工期中に行われる工程S1~S14と、三重殻タンク1の各部分の施工時期との関係が示されている。詳しくは、外槽2、中間槽3及び内槽4の底板21、31、41、屋根23、33、43及び側板22、32、42の各々について、主たる施工作業が実際に行われる施工期間が実線の矢印で、施工後の期間が点線で、各々図2に示されている。側板22、32、42については、工事用の出入り口である工事口の開口タイミングを「開」、工事口の封止タイミングを「閉」として付記されている。なお、工程S1~S14は、必ずしもタンク施工手順の一区切りとなる工程単位で区分されておらず、単に工事の進捗状況を「工程」として区分している場合もある。
 図2にも付記されているが、本実施形態の施工方法において特徴的な点は、外槽屋根23に中間槽屋根33及び内槽屋根43を仮固定してなる屋根連結体を地上作業にて形成し(工程S6)、当該屋根連結体をエアレージングにて浮上させる(工程S8)点にある。図3~図16は、図2に示す工程S1~S14における三重殻タンク1の施工状態を、それぞれ模式的に示す図である。図3~図16では、三重殻タンク1の径方向中心RCからの半分に相当する部分が断面で示されている。以下、図3~図16を参照して、工程S1~S14の各々を説明する。
 <工程S1>
 図3は、工程S1の施工状況を示す。工程S1では、タンク基礎10の上に外槽2の一部が据え付けられる。具体的には、タンク基礎10の周縁部付近の上に、外槽底板21の一部を構成する外槽アニュラ211と、外槽側板22の一部を構成する外槽側板ピース22P1とが据え付けられる。外槽アニュラ211は、円板形の外槽底板21の外周付近の環状部分を構成し、第1リング部25の下側に位置する部分となる。外槽アニュラ211は、耐荷重性を向上させるため、外槽底板21の他の部分より厚い板厚を有している。
 外槽側板22は、緩く円弧状に湾曲した矩形板からなる側板ピースを複数枚用いて組み立てられる。詳しくは、前記側板ピースを円環状に並べて、隣接する側板ピース間を溶接して一つの環状段を形成する。このような環状段を複数段積み上げることによって、外槽側板22は構築される。図3に示されている外槽側板ピース22P1は、外槽側板22の最下段の環状段を構成する側板ピースである。外槽側板ピース22P1は、外槽アニュラ211の径方向外側の周縁のやや内側から鉛直上方へ立設されている。
 <工程S2>
 図4は、工程S2の施工状況を示している。工程S2では、外槽底板21及び外槽側板22の施工が行われる。外槽底板21については、外槽アニュラ211の径方向内側部分が敷設される。この内側部分は、外側底部保冷層26の直下に位置する部分である。図4では記載を省いているが、敷設後の外槽底板21の上には、図1で示した第1レベルコンクリート層24が打設される。先ず、外槽アニュラ211の上に第1レベルコンクリート層24の一部が打設される。その後、内槽屋根43及び中間槽屋根33が構築されて雨水の浸入の怖れが解消された後に、外槽アニュラ211の内側部分に第1レベルコンクリート層24の残部が打設される。
 外槽側板22については、最下段の環状段を構成する外槽側板ピース22P1の上に、二段目の環状段を構成する外槽側板ピース22P2が据え付けられる。なお、二段目の環状段の構築後に、最下段の環状段には、工事口となる第1開口OP1が設けられる。第1開口OP1は、最下段の環状段を構成している複数の外槽側板ピース22P1のうちの1枚又は複数枚を抜くことによって開設される。具体的には、複数の外槽側板ピース22P1を環状に並べて一旦環状段を形成した後、第1開口OP1の位置に対応する外槽側板ピース22P1だけは隣接ピースと溶接せず、これを当該環状段から抜き取る。
 外槽底板21の径方向中心RC付近には、中央屋根架台51が設置される。中央屋根架台51は、エアレージング前にドーム型の内槽屋根43を地上サイドで構築可能とするための架台である。
 <工程S3>
 図5は、工程S3の施工状況を示している。工程S3では、外槽側板22の施工が継続されると共に、内槽屋根43の構築が開始される。外槽側板22については、二段目の環状段を構成する外槽側板ピース22P2の上に、三段目の環状段を構成する外槽側板ピース22P3が据え付けられる。上記と同様に、三段目の環状段の構築後に、二段目の環状段の中の一枚又は複数枚の外槽側板ピース22P2を抜くことで、工事口となる第1開口OP1が開設される。抜かれる外槽側板ピース22P2は、最下段の環状段において第1開口OP1の開設のために抜いた外槽側板ピース22P1の直上に位置するピースである。外槽側板22に環状段の二段分の高さで第1開口OP1を開設するのは、外槽側板22よりも高い位置から構築が開始される中間槽側板32及び内槽側板42に開設する工事口に開口高さを合わせるためである。
 内槽屋根43については、先の工程S2で設置した中央屋根架台51の上に、内槽屋根43の径方向中央付近を構成する内槽屋根ピース43Pが据え付けられる。一方、外槽底板21の径方向外周付近の上面には、外周屋根架台52が設置される。外周屋根架台52は、内槽屋根43及び中間槽屋根33の外周下縁を仮支持する架台である。外周屋根架台52の上面には、内槽ナックルプレート44が据え付けられる。内槽ナックルプレート44は、内槽側板42の上端と内槽屋根43の外周下縁とを繋ぐプレートである。
 <工程S4>
 図6は、工程S4の施工状況を示している。工程S4では、内槽屋根43の構築が継続され、中間槽屋根33の構築が開始される。内槽屋根43については、工程S3で設置した径方向中央の内槽屋根ピース43Pと内槽ナックルプレート44との間を、地上作業で予め組み立てた内槽屋根ブロックで繋ぐことで、最終的にドーム型の内槽屋根43が形成される。前記内槽屋根ブロックは、支持フレームとなる屋根骨と、この屋根骨に取り付けられた複数枚の屋根プレートとからなる。内槽屋根43の外周縁43Eは、内槽ナックルプレート44の上端に固定される。この時点で、内槽屋根43が外周屋根架台52で支持されて自立した状態となるので、中央屋根架台51が撤去される。
 中間槽屋根33については、工程S3で完工した内槽屋根43の径方向中央部上に、中間槽屋根33の径方向中央付近を構成する中間槽屋根ピース33Pが据え付けられる。この据え付けに際しては、中間槽屋根サポート61(第1仮設サポート)が用いられる。中間槽屋根サポート61は、内槽屋根43と中間槽屋根33との間に介在され、両者を所定間隔を置いて仮固定する。中間槽屋根サポート61としては、H鋼などの剛性を有する部材を用いることができる。前記仮固定は、例えば、H鋼の下端部を内槽屋根43に所定の当て板を介して溶接して固定し、H鋼の上端部に中間槽屋根ピース33Pを載置すると共に固定する態様で実施することができる。
 外槽側板22の構築も適時継続される。図6では、四段目の環状段を構成する外槽側板ピース22P4が据え付けられた状態を示している。また、外周屋根架台52の上面には、中間槽ナックルプレート37が据え付けられる。中間槽ナックルプレート37は、中間槽側板32の上端と中間槽屋根33の外周下縁とを繋ぐプレートである。さらに、外槽底板21の径方向外周付近の上面に、第1リング部25を構成するブロックが敷設される。
 <工程S5>
 図7は、工程S5の施工状況を示している。工程S5では、中間槽屋根33の構築が継続され、外槽屋根23の構築が開始される。また、中間槽底板31及び中間槽側板32の構築が開始される。中間槽屋根33については、工程S4で設置した径方向中央の中間槽屋根ピース33Pと中間槽ナックルプレート37との間を、地上作業で予め組み立てた中間槽屋根ブロックで繋ぐことで、最終的にドーム型の中間槽屋根33が形成される。前記中間槽屋根ブロックは、上述の内槽屋根ブロックと同様に、屋根骨と複数枚の屋根プレートとからなる。この中間槽屋根ブロックの設置の際、中間槽屋根サポート61が中間槽屋根33と内槽屋根43との間の適所に配設され、両者が仮固定される。中間槽屋根33の外周縁33Eは、中間槽ナックルプレート37の上端に固定される。
 外槽屋根23については、工程S4で完工した中間槽屋根33の径方向中央部上に、外槽屋根23の径方向中央付近を構成する外槽屋根ピース23Pが据え付けられる。この据え付けに際しては、外槽屋根中央サポート62(第2仮設サポート)が用いられる。外槽屋根中央サポート62は、中間槽屋根33と径方向中央の外槽屋根ピース23Pとの間に介在され、両者を所定間隔を置いて仮固定する。外槽屋根中央サポート62としては、H鋼や鋼材をトラス構造に組んだ架台などを用いることができる。前記仮固定は、H鋼等の下端部を中間槽屋根33に所定の当て板を介して溶接して固定し、H鋼等の上端部に外槽屋根ピース23Pを載置して固定する態様で実施することができる。
 先の工程S4で設置した第1リング部25の上には、中間槽底板31の一部を構成する中間槽アニュラ311と、中間槽側板32の一部を構成する中間槽側板ピース32P1(側板ピース)とが据え付けられる。中間槽アニュラ311は、円板形の中間槽底板31の外周付近の環状部分であって、中間槽底板31の他の部分より厚い板厚を有している。中間槽側板32も、複数の側板ピースを円環状に並べて形成した環状段を複数段積み上げることにより組み立てられる。図7に示されている中間槽側板ピース32P1は、中間槽側板32の最下段の環状段を構成する側板ピースである。中間槽側板ピース32P1は、中間槽アニュラ311の径方向外側の周縁から鉛直上方へ立設されている。中間槽側板ピース32P1は、中間槽側板32の二段目の環状段と、後に構築する内槽側板42の最下段の環状段との高さを合わせる側板ピースでもある。
 <工程S6>
 図8は、工程S6の施工状況を示している。工程S6では、外槽屋根23の構築が継続され、最終的に3つの屋根が一体化された屋根連結体20が形成される。また、外槽側板22の所定高さまでの据え付けが行われる。外槽屋根23については、工程S5で設置した径方向中央の外槽屋根ピース23Pに対して、地上作業で予め組み立てた外槽屋根ブロックを繋ぐことで、最終的にドーム型の外槽屋根23が形成される。この延伸の際、H鋼等からなる外槽屋根周辺サポート63(第2仮設サポート)が、中間槽屋根33と外槽屋根23との間の適所に配設され、両者が仮固定される。
 外槽屋根23の構築が完了した時点で、屋根連結体20の形成が完了した状態となる。すなわち、屋根連結体20は、内槽屋根43の上に中間槽屋根33が中間槽屋根サポート61によって仮固定され、中間槽屋根33の上に外槽屋根23が外槽屋根中央サポート62及び外槽屋根周辺サポート63によって仮固定されることで形成されている。このような屋根連結体20の形成により、3つの屋根を一体的にエアレージングさせることが可能となる。上述のサポート61、62、63は、エアレージング完了までは上段の屋根の支持部材となるが、エアレージング後は下段の屋根の懸垂部材となる。
 なお、屋根連結体20の形成状態において、内槽屋根43と中間槽屋根33との間、並びに、中間槽屋根33と外槽屋根23との間隙は、完工後の三重殻タンク1における両者間の間隙よりもやや狭く設定されている。これは、エアレージング後に実行される内槽屋根43の内槽側板42への固定作業、並びに、中間槽屋根33の中間槽側板32への固定作業を容易化するためである。
 外槽側板22については、側板ピースで形成される環状段が所定の段数だけ積み上げられることで、構築が完工する。これにより、屋根連結体20の周囲に所定高さの外槽側板22が構築されたことになり、エアレージングの準備が可能な状態となる。外槽側板22の頂部22Tには、外周歩廊27が据え付けられる。また、中間槽アニュラ311の上には、ここでは図示を省いている第2レベルコンクリート層34の一部が打設され、さらに第2リング部35を構成するブロックが敷設される。
 <工程S7>
 図9は、工程S7の施工状況を示している。工程S7では、主にエアレージングの準備作業が行われる。密封空間の形成のため、外槽屋根23の外周縁23Eには、シール材28を取り付けるシール処理が施される。シール材28は、外周縁23Eと外槽側板22の内面との間の隙間を封止する。外槽側板22の外側には、エアレージング用のエアを供給するブロワー7が準備される。ブロワー7のエア送り出し口に送風ダクトが接続され、この送風ダクトが第1開口OP1を通して外槽側板22の内側に引き込まれる。なお、第1開口OP1についても前記送風ダクトの周囲を封止するシール処理が施される。外槽底板21は工程S7の前にすでに完工しているので、底面部分のシール処理は特に不要である。従って、この時点で、外槽底板21、外槽側板22及び外槽屋根23で囲まれる空間が密閉化される。
 以上のエアレージング準備作業と並行して、第2リング部35の上面に内槽アニュラ411が据え付けられる。内槽アニュラ411は、円板形の内槽底板41の外周付近の環状部分である。
 <工程S8>
 図10は、工程S8のエアレージングの実施後の状態を示している。エアレージングの実行に際しては、図9に示したブロワー7が稼働され、外槽底板21、外槽側板22及び外槽屋根23で囲まれる密閉空間にエアが供給される。エア供給により前記密閉空間内の空気圧が上昇し、その圧力で屋根連結体20が浮上する。この際、外槽側板22は浮上する屋根連結体20のガイドとしての役目を果たす。
 エアレージングにより直接的に浮上するのは外槽屋根23である。しかし、内槽屋根43及び中間槽屋根33は、仮設のサポート61、62、63にて予め外槽屋根23と一体化されている。従って、内槽屋根43及び中間槽屋根33も、外槽屋根23に吊り止めされた態様で、一体的に浮上する。つまり、事前に屋根連結体20が形成されているので、三重殻構造を形成する3つの屋根23、33、43を、1回のエアレージングで一気に浮上させることができる。なお、エアレージングの際、バランスワイヤーを用いて屋根連結体20の浮上姿勢が制御される。
 エアレージング後、外槽屋根23の外周縁23Eが外槽側板22の上端に固定される。この時点では屋根連結体20の仮止めは解除されず、内槽屋根43及び中間槽屋根33は、外槽屋根23に吊られた状態のままである。エアレージング用の設備は除去される。すなわち、外槽屋根23の外周縁23E付近に取り付けられたシール材28が取り外され、ブロワー7及び送風ダクトが撤去される。
 <工程S9>
 図11は、工程S9の施工状況を示している。工程S9では、内槽側板42の構築が開始される。内槽側板42も、複数の側板ピースを円環状に並べて形成した環状段を複数段積み上げることにより組み立てられる。内槽アニュラ411の上に、内槽側板42の最下段の環状段を構成する内槽側板ピース42P1(側板ピース)が据え付けられる。内槽側板ピース42P1は、内槽アニュラ411の径方向外側の周縁から鉛直上方へ立設されている。図11では、最下段の内槽側板ピース42P1の上に、二段目の環状段を構成する内槽側板ピース42P2が据え付けられている状態を示している。
 内槽側板42の構築時に、工事口として第2開口OP2が設けられる。第2開口OP2は、最下段の環状段を構成している複数の内槽側板ピース42P1のうちの1枚又は複数枚を抜くことによって開設される。第2開口OP2の開設位置は、外槽側板22に開設される第1開口OP1に対応する位置である。詳しくは、第2開口OP2と第1開口OP1とは、三重殻タンク1の周方向の略同じ位置に開設され、且つ、高さ位置も略同一となるように開設される。本実施形態では、内槽側板ピース42P1と二段目の外槽側板ピース22P2とが略同じ高さ位置にある。外槽側板22において、最下段の外槽側板ピース22P1だけでなく二段目の外槽側板ピース22P2も抜き取ることで、第2開口OP2と第1開口OP1との高さ位置が合わされている。
 <工程S10>
 図12は、工程S10の施工状況を示している。工程S10では、内槽側板42及び中間槽側板32が構築される。内槽側板42については、二段目の環状段を構成する内槽側板ピース42P2の上に、三段目の環状段を構成する内槽側板ピース42P3が据え付けられる。さらにその上に四段目の内槽側板ピース42P4が据え付けられるというように、側板高さが順次嵩上げされてゆく。
 同様に、中間槽側板32についても、据え付け済の最下段の中間槽側板ピース32P1の上に、二段目、三段目、四段目の環状段を構成する中間槽側板ピース32P2、32P3、32P4が順次積まれてゆく。本実施形態では、内槽側板ピース42Pnと中間槽側板ピース32Pn(高さ合わせのピース32P1は除く)とは、同じ高さ幅を有している。従って、図12に記載されている内槽側板ピース42P1、42P2、43P3と、中間槽側板ピース32P2、32P3、32P4とは、それぞれ同じ高さ位置にある。
 工程S10において、内槽側板42及び中間槽側板32のいずれか一方の環状段を先に積み上げた後、他方の環状段を積み上げるようにしても良いが、内槽側板42及び中間槽側板32の環状段を同時並行的に積み上げることが望ましい。例えば、内槽側板42の二段目の内槽側板ピース42P2を積んだ後に中間槽側板32の三段目の中間槽側板ピース32P3を積み、続いて内槽側板42の三段目の内槽側板ピース42P3を積む。このような構築手法を採用すれば、内槽側板42及び中間槽側板32の構築に際し、足場を共用できるなど、作業の効率化を図ることができる。また、側板ピースのクレーン吊り作業や組み付け作業の便宜上、径方向内側に位置する内槽側板ピース42Pnの積み上げを、中間槽側板ピース32Pnの積み上げよりも先行させることが望ましい。
 中間槽側板32の構築時にも、工事口として第3開口OP3が設けられる。第3開口OP3は、二段目の環状段を構成している中間槽側板ピース32P2のうちの1枚又は複数枚を抜くことによって開設される。図2のチャートに「開」と付記している通り、工程S10の時点で、内槽側板42には第2開口OP2が、中間槽側板32には第3開口OP3が開設される。
 第3開口OP3の開設位置は、内槽側板42の第2開口OP2に対応する位置である。詳しくは、第2開口OP2と第3開口OP3とは、周方向の略同じ位置に開設され、且つ、高さ位置も略同一となるように開設される。既述の通り、第2開口OP2は外槽側板22の第1開口OP1に対応した位置に開設される。従って、第1開口OP1、第2開口OP2及び第3開口OP3は、略同一の周方向位置及び高さ位置に開設されることになる。このため、建造中のタンク内外への作業者の通行、資材や工事機材の搬入・搬出を効率的に行わせることができる。
 工程S10では、さらに外槽底板21の上に、図12では図略の第1レベルコンクリート層24と、外側底部保冷層26とが順次敷設される。第1レベルコンクリート層24は、工程S2で外槽アニュラ211上の部分が施工済であるので、残部が施工される。既述の通り、外側底部保冷層26は、例えば泡ガラス等の断熱性ブロック材を、第1リング部25の内側に敷き詰めることで構築される。
 <工程S11>
 図13は、工程S11の施工状況を示している。工程S11では、内槽側板42及び中間槽側板32の構築継続、内槽側板42と内槽屋根43との固定、並びに中間槽底板31の敷設が行われる。内槽側板42及び中間槽側板32については、各々の環状段の中段から上段の据え付けが行われる。図13では、内槽側板42は、中間槽側板32に一段だけ先んじて、最上段の環状段を構成する内槽側板ピース42PTが組み立てられた状態を示している。
 内槽側板42の環状段を最上段まで中間槽側板32よりも先に組み立てるのは、次の理由による。側板ピース32P、42Pの吊り上げの際、クレーンを側板の径方向外側に配置して前記吊り上げを行う「外側吊り上げ」が実施される。これは、内槽側板42及び中間槽側板32のいずれも内面側に足場を含む組立治具があり、また内面側は作業員のアクセスがあることを考慮している。中間槽側板32が先に組み立てられてしまうと、中間槽側板32の内面足場があるために、内槽側板ピース42Pの吊上げが難しくなる。このため先に内槽側板42を組み立て、中間槽側板32の内側に足場を作った後に、中間槽側板ピース32Pを外側から吊り上げることが望ましい。
 最上段の内槽側板ピース42PTの据え付け後、内槽屋根43の外周縁を内槽側板42の上端に固定する作業が実施される。この固定作業に先立ち、中間槽屋根33と内槽屋根43とを繋いでいる中間槽屋根サポート61を、第1ジャッキ64に置換する吊り換え作業が行われる。エアレージング後、屋根連結体20の仮固定が解除されずに外槽屋根23が外槽側板22に固定された状態では、内槽屋根43は正規の高さ位置よりも高い位置で、中間槽屋根サポート61にて中間槽屋根33に吊り止めされている。これは、内槽屋根43を内槽側板42に接続する際の調整空間を確保するためである。
 第1ジャッキ64は、中間槽屋根33と内槽屋根43との間の適所に配置され、前記吊り換え後は内槽屋根43を昇降可能に吊り支持している。前記下降調整空間の分だけ第1ジャッキ64で内槽屋根43をジャッキダウンさせながら、内槽ナックルプレート44の下端と最上段の内槽側板ピース42PTの上端との位置合わせが行われる。位置合わせ後、両者が固定され、内槽4が略完工する。
 さらに工程S11では、外側底部保冷層26の上に中間槽底板31の残部が敷設される。中間槽底板31については、外周部分を構成する中間槽アニュラ311を据え付け済みであるので、その内側部分の中間槽底板31が敷設される。
 <工程S12>
 図14は、工程S12の施工状況を示している。工程S12では、中間槽側板32と中間槽屋根33との固定と、内側底部保冷層36の敷設とが行われる。内槽屋根43と同様に、中間槽屋根33の固定にもジャッキダウン方式が採用される。内槽屋根43が内槽側板42に固定された後、中間槽側板32の最上段の環状段を構成する中間槽側板ピース32PTが据え付けられる。一方、外槽屋根23と中間槽屋根33とを繋いでいる外槽屋根中央サポート62及び外槽屋根周辺サポート63を、第2ジャッキ65に置換する吊り換え作業が行われる。中間槽屋根33も、前記調整空間の分だけ正規の高さ位置よりも高い位置で外槽屋根23に吊り止めされている。
 第2ジャッキ65は、外槽屋根23と中間槽屋根33との間の適所に配置され、前記吊り換え後は中間槽屋根33を昇降可能に吊り支持している。前記調整空間の分だけ第2ジャッキ65で中間槽屋根33をジャッキダウンさせながら、中間槽ナックルプレート37の下端と最上段の中間槽屋根ピース33PTの上端との位置合わせが行われる。位置合わせ後、両者が固定され、中間槽3が略完工する。
 工程S12では、さらに中間槽底板31(第2レベルコンクリート層34)の上に内側底部保冷層36が敷設される。内側底部保冷層36は、例えば泡ガラス等の断熱性ブロック材を、第2リング部35の内側に敷き詰めることで構築される。
 <工程S13>
 図15は、工程S13の施工状況を示している。工程S13では、内槽底板41の敷設、第2開口OP2の封止、デッキの据え付けなどが行われる。内槽底板41は、内側底部保冷層36の上に敷設される。内槽底板41については、外周部分を構成する内槽アニュラ411を据え付け済みであるので、その内側部分の内槽底板41が敷設される。
 内槽4の内側での作業が完了し、内槽4の内側に設置された足場などを撤去した後、内槽側板42の第2開口OP2が封止される。この封止作業は、工程S9において最下段の環状段から抜き出した内槽側板ピース42P1を第2開口OP2に嵌め込むと共に、当該内槽側板ピース42P1を周囲の側板ピースに溶接する作業である。図15では、第2開口OP2が封止された状態が示されている。
 外槽屋根23の上には、肩部デッキ231及び頂部デッキ232が据え付けられる。肩部デッキ231は、外槽屋根23の径方向外周部に配置される。頂部デッキ232は、外槽屋根23の径方向中央に配置される。なお、第1槽間11及び第2槽間12に断熱材を充填する作業や、各種の配管や付属品の取り付け等の作業も行われる。
 <工程S14>
 図16は、工程S14の施工状況を示している。工程S14では、第3開口OP3及び第1開口OP1の封止が行われる。中間槽側板32の第3開口OP3は、中間槽3の内側での作業が完了し、中間槽3の内側に設置された足場などを撤去した後に封止される。この封止作業では、工程S10において抜き出した中間槽側板ピース32P2を第3開口OP3に嵌め込むと共に、当該中間槽側板ピース32P2を周囲の側板ピースに溶接する。
 続いて、外槽2の内側での作業が完了し、外槽2の内側に設置された足場などを撤去した後、外槽側板22の第1開口OP1が封止される。この封止作業では、工程S2、S3において抜き出した外槽側板ピース22P1、22P2を、第1開口OP1を塞ぐように嵌め込むと共に、これらを溶接する。以上の通り、工事口は、内側の第2開口OP2、中間の第3開口OP3及び外側の第1開口OP1の順に、各側板内での作業が完了したら順次封止される。
 [作用効果]
 以上説明した本開示に係る三重殻タンクの施工方法によれば、エアレージングの前に、内槽屋根43、中間槽屋根33及び外槽屋根23が相互に仮固定された屋根連結体20が形成される。具体的には、内槽屋根43の上に中間槽屋根サポート61で中間槽屋根33を仮固定し、さらに当該中間槽屋根33の上に外槽屋根中央サポート62及び外槽屋根周辺サポート63で外槽屋根23を仮固定することで、屋根連結体20が作成される。この屋根連結体20の周囲に浮上のガイドとなる外槽側板22を形成した後、屋根連結体20をエアレージングする。
 ここで、直接的にエアレージングされるのは外槽屋根23であるが、内槽屋根43及び中間槽屋根33も外槽屋根23に保持された態様で、一体的に浮上する。換言すると、外槽屋根23に吊られた状態で、内槽屋根43及び中間槽屋根33も浮上する。つまり、三重殻の各屋根を地上ベースの作業で作成すると共にこれらを仮固定して一体化し、1回のエアレージングで一気に浮上させる。従って、三重殻の各屋根の構築作業の大部分を、側板の構築作業等と並行して低所作業で実行できるため、工期短縮に寄与する。また、外槽屋根23を外槽側板22に固定して外槽2を形成した後に、内槽側板42及び中間槽側板32を構築できる。つまり、外槽2で覆われた空間の中で内槽側板42及び中間槽側板32の構築作業が行える。従って、天候の影響を受けずに前記構築作業が行え、水分の介在による溶接品質の低下を回避できる利点もある。
 [変形実施形態]
 以上、本開示に係る三重殻タンクの施工方法の実施形態を説明したが、本開示は上掲の実施形態に何ら限定されない。例えば、上述の三重殻タンクの施工方法について、次のような変形実施形態を取ることができる。
 (1)上述の三重殻タンク1の近傍に、所要の建造物や設備を付設しても良い。例えば、三重殻タンク1の周囲に、災害時等にタンク内の液体が漏液した際の拡散を抑止する防液堤を立設しても良い。防液堤は、例えばPC(プレストレストコンクリート)にて構築することができる。防液堤は、金属製の外槽2と一体的に構築されても良い。具体的には、外槽側板22の外周面に、防液堤を構成するPCが密接した状態で構築された態様としても良い。この場合、屋根連結体20のエアレージングの際にガイドとなる外槽側板22の強度を高めることができる。
 (2)三重殻タンク1の強度を補強する各種構造を追加しても良い。例えば、中間槽側板32及び/又は内槽側板42とタンク基礎10とを連結するアンカーストラップを具備させても良い。
 (3)内槽屋根43に、内槽4の内部空間と第1槽間11の空間とを連通させる連通管を取り付けるようにしても良い。この変形例によれば、内槽4に貯留されている液体水素LHから気化した水素ガスを、第1槽間11に流通させることができる。つまり、貯留する液体水素LHを利用して、保冷効果を高めることができる。
 (4)上記実施形態では、第1開口OP1、第2開口OP2及び第3開口OP3が、三重殻タンク1の周方向の同じ位置に略同じ高さで開設される例を示した。これら開口OP1、OP2、OP3は、三重殻タンク1の周方向の異なる位置に開設しても良いし、異なる高さで開設しても良い。
 [本開示のまとめ]
 以上説明した具体的実施形態には、以下の構成を有する開示が含まれている。
 本開示に係る三重殻タンクの施工方法は、それぞれ屋根と側板とを有する内槽、中間槽及び外槽を備えた三重殻タンクの施工方法であって、内槽屋根の上に中間槽屋根を仮固定し、さらに当該中間槽屋根の上に外槽屋根を仮固定することで、屋根連結体を形成し、前記屋根連結体の周囲に所定高さの外槽側板を構築し、前記外槽屋根の外周縁と前記外槽側板の内面との間にシール処理を施して密閉空間を形成すると共に、当該密閉空間にエアを供給して前記屋根連結体をエアレージングし、前記外槽屋根と前記外槽側板とを固定し、内槽側板及び中間槽側板を構築し、前記屋根連結体の前記仮固定を解除して、前記内槽屋根と前記内槽側板とを固定すると共に前記中間槽屋根と前記中間槽側板とを固定する。
 この施工方法によれば、エアレージングの前に、内槽屋根、中間槽屋根及び外槽屋根が相互に仮固定された屋根連結体が形成される。続いて、屋根連結体の周囲に外槽側板を形成した後、前記屋根連結体をエアレージングする。直接的にエアレージングされるのは外槽屋根であるが、内槽屋根及び中間槽屋根も外槽屋根に保持された態様で、一体的に浮上する。つまり、三重殻の各屋根を地上作業で作成すると共にこれらを仮固定して一体化し、1回のエアレージングで一気に浮上させる。従って、三重殻の各屋根の構築作業の大部分を低所作業で実行できるため、工期短縮に寄与する。また、外槽屋根を外槽側板に固定して外槽を形成した後に、内槽側板及び中間槽側板を構築する。つまり、外槽で覆われた状態で内槽側板及び中間槽側板の構築作業が行えるので、天候の影響を受けない利点もある。
 上記の三重殻タンクの施工方法において、前記外槽側板で囲まれる領域の底部を構成する外槽底板を、少なくとも前記エアレージングの前に形成することが望ましい。
 この施工方法によれば、外槽底板を予め形成しておくことで、エアレージングの際に必要な密閉空間の形成を容易化することができる。
 上記の三重殻タンクの施工方法において、前記外槽底板を形成後、当該外槽底板の上に屋根架台を設置し、前記屋根架台の上に前記内槽屋根を据え付けると共に、当該内槽屋根の上に第1仮設サポートを設置し、前記第1仮設サポートの上に前記中間槽屋根を据え付けると共に、当該中間槽屋根の上に第2仮設サポートを設置し、前記第2仮設サポートの上に前記外槽屋根を据え付けることにより、前記屋根連結体を形成することが望ましい。
 この施工方法によれば、最内層の内槽屋根の上に順次、中間槽屋根及び外槽屋根を据え付けてゆくことで、屋根連結体が形成される。従って、前記屋根連結体を作業効率良く形成することができる。
 上記の三重殻タンクの施工方法において、前記内槽側板及び前記中間槽側板は、複数の側板ピースを円環状に並べて形成した環状段を複数段積み上げることにより組み立てられ、且つ、前記内槽側板の前記環状段と前記中間槽側板の前記環状段とを並行して積み上げることが望ましい。
 この施工方法によれば、内槽側板及び中間槽側板の構築に際し、例えば足場を共用できるなど、作業の効率化を図ることができ、ひいては工期の短縮化に寄与する。
 上記の三重殻タンクの施工方法において、前記内槽側板及び前記中間槽側板は、複数の側板ピースを円環状に並べて形成した環状段を複数段積み上げることにより組み立てられ、且つ、前記内槽側板の前記環状段を最上段まで前記中間槽側板よりも先に組み立て、前記最上段の前記環状段と前記内槽屋根の外周縁とを固定することが望ましい。
 この施工方法によれば、中間槽よりも内側に位置する内槽の屋根と側板とが先に固定されるので、中間槽の屋根と側板とを先行して固定する場合に比べて作業性を良好とすることができる。
 上記の三重殻タンクの施工方法において、前記外槽側板の構築時に、工事用の出入り口である第1工事口が前記外槽側板に開設され、前記内槽側板の構築時に当該内槽側板に第2工事口が、前記中間槽側板の構築時に当該中間槽側板に第3工事口がそれぞれ開設され、前記内槽の内側での作業完了後に前記第2工事口を封止し、次いで前記中間槽の内側での作業完了後に前記第3工事口を封止し、しかる後、前記外槽の内側での作業完了後に前記第1工事口を封止することが望ましい。
 この施工方法によれば、外槽側板、中間槽側板及び内槽側板の各々に、タイムリーに工事口を開口させて、各種工事をスムースに進行させることが可能となる。

Claims (6)

  1.  それぞれ屋根と側板とを有する内槽、中間槽及び外槽を備えた三重殻タンクの施工方法であって、
     内槽屋根の上に中間槽屋根を仮固定し、さらに当該中間槽屋根の上に外槽屋根を仮固定することで、屋根連結体を形成し、
     前記屋根連結体の周囲に所定高さの外槽側板を構築し、
     前記外槽屋根の外周縁と前記外槽側板の内面との間にシール処理を施して密閉空間を形成すると共に、当該密閉空間にエアを供給して前記屋根連結体をエアレージングし、
     前記外槽屋根と前記外槽側板とを固定し、
     内槽側板及び中間槽側板を構築し、前記屋根連結体の前記仮固定を解除して、前記内槽屋根と前記内槽側板とを固定すると共に前記中間槽屋根と前記中間槽側板とを固定する、三重殻タンクの施工方法。
  2.  請求項1に記載の三重殻タンクの施工方法において、
     前記外槽側板で囲まれる領域の底部を構成する外槽底板を、少なくとも前記エアレージングの前に形成する、三重殻タンクの施工方法。
  3.  請求項2に記載の三重殻タンクの施工方法において、
     前記外槽底板を形成後、当該外槽底板の上に屋根架台を設置し、
     前記屋根架台の上に前記内槽屋根を据え付けると共に、当該内槽屋根の上に第1仮設サポートを設置し、
     前記第1仮設サポートの上に前記中間槽屋根を据え付けると共に、当該中間槽屋根の上に第2仮設サポートを設置し、
     前記第2仮設サポートの上に前記外槽屋根を据え付けることにより、前記屋根連結体を形成する、三重殻タンクの施工方法。
  4.  請求項1~3のいずれか1項に記載の三重殻タンクの施工方法において、
     前記内槽側板及び前記中間槽側板は、複数の側板ピースを円環状に並べて形成した環状段を複数段積み上げることにより組み立てられ、且つ、
     前記内槽側板の前記環状段と前記中間槽側板の前記環状段とを並行して積み上げる、三重殻タンクの施工方法。
  5.  請求項1~3のいずれか1項に記載の三重殻タンクの施工方法において、
     前記内槽側板及び前記中間槽側板は、複数の側板ピースを円環状に並べて形成した環状段を複数段積み上げることにより組み立てられ、且つ、
     前記内槽側板の前記環状段を最上段まで前記中間槽側板よりも先に組み立て、前記最上段の前記環状段と前記内槽屋根の外周縁とを固定する、三重殻タンクの施工方法。
  6.  請求項1~5のいずれか1項に記載の三重殻タンクの施工方法において、
     前記外槽側板の構築時に、工事用の出入り口である第1工事口が前記外槽側板に開設され、
     前記内槽側板の構築時に当該内槽側板に第2工事口が、前記中間槽側板の構築時に当該中間槽側板に第3工事口がそれぞれ開設され、
     前記内槽の内側での作業完了後に前記第2工事口を封止し、次いで前記中間槽の内側での作業完了後に前記第3工事口を封止し、
     しかる後、前記外槽の内側での作業完了後に前記第1工事口を封止する、三重殻タンクの施工方法。
PCT/JP2022/047106 2021-12-27 2022-12-21 三重殻タンクの施工方法 WO2023127641A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021212502A JP2023096620A (ja) 2021-12-27 2021-12-27 三重殻タンクの施工方法
JP2021-212502 2021-12-27

Publications (1)

Publication Number Publication Date
WO2023127641A1 true WO2023127641A1 (ja) 2023-07-06

Family

ID=86998999

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/047106 WO2023127641A1 (ja) 2021-12-27 2022-12-21 三重殻タンクの施工方法

Country Status (3)

Country Link
JP (1) JP2023096620A (ja)
TW (1) TW202332825A (ja)
WO (1) WO2023127641A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5677474A (en) * 1979-11-28 1981-06-25 Ishikawajima Harima Heavy Ind Method of constructing multiple shell tank
JPS6458776A (en) * 1987-08-27 1989-03-06 Ishikawajima Harima Heavy Ind Method of assembling multiple shell tank
JPH1037513A (ja) * 1996-07-29 1998-02-10 Ishii Iron Works Co Ltd 二重殻低温タンクの建設工法
JPH11182064A (ja) * 1997-12-25 1999-07-06 Ishikawajima Harima Heavy Ind Co Ltd タンク解体工法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5677474A (en) * 1979-11-28 1981-06-25 Ishikawajima Harima Heavy Ind Method of constructing multiple shell tank
JPS6458776A (en) * 1987-08-27 1989-03-06 Ishikawajima Harima Heavy Ind Method of assembling multiple shell tank
JPH1037513A (ja) * 1996-07-29 1998-02-10 Ishii Iron Works Co Ltd 二重殻低温タンクの建設工法
JPH11182064A (ja) * 1997-12-25 1999-07-06 Ishikawajima Harima Heavy Ind Co Ltd タンク解体工法

Also Published As

Publication number Publication date
TW202332825A (zh) 2023-08-16
JP2023096620A (ja) 2023-07-07

Similar Documents

Publication Publication Date Title
US9726326B2 (en) Method of constructing a storage tank for cryogenic liquids
WO2014073239A1 (ja) 円筒型タンクの構築方法
US20100154319A1 (en) Tank shell for an outer lng containment tank and method for making the same
WO2012099042A1 (ja) 円筒型タンクの構築方法
CA2888882C (en) Method for constructing cylindrical tank
CA2490422C (en) Tank for storing cryogenic fluids and method for constructing a fluid tight tank
WO2023127641A1 (ja) 三重殻タンクの施工方法
US20100154320A1 (en) Composite concrete roof for an outer lng containment tank and method of making the same
WO2023127637A1 (ja) 三重殻タンクの施工方法
WO2023127605A1 (ja) 三重殻タンクの施工方法
US20120023845A1 (en) Base Mat Assembly And Method For Constructing The Same
WO2023127606A1 (ja) 三重殻タンク
KR101978405B1 (ko) 육상용 액화가스 저장탱크의 시공방법
JP2000297476A (ja) ドーム構造物の構築方法
CN113874651B (zh) 可起吊内壳的液化气罐及液化气罐内壳的起吊方法
JPH10194377A (ja) 2重殻タンク建設方法
JP2727337B2 (ja) 複数殼貯槽の施工法
JPH0762925A (ja) コンクリート外槽低温タンクの建設工法
JPS61183575A (ja) コンクリ−ト造地下タンクの屋根構造とその構築方法
JPH03271471A (ja) 地下貯蔵タンク及びその施工方法
JP2000080666A (ja) 地下タンクの施工方法
JPH06313376A (ja) タンク屋根の建造方法
JPS6337229B2 (ja)
JPH04203596A (ja) 二重殻タンクの内槽底板昇降方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22915864

Country of ref document: EP

Kind code of ref document: A1