WO2022185537A1 - エレベーターの遠隔点検装置 - Google Patents

エレベーターの遠隔点検装置 Download PDF

Info

Publication number
WO2022185537A1
WO2022185537A1 PCT/JP2021/008741 JP2021008741W WO2022185537A1 WO 2022185537 A1 WO2022185537 A1 WO 2022185537A1 JP 2021008741 W JP2021008741 W JP 2021008741W WO 2022185537 A1 WO2022185537 A1 WO 2022185537A1
Authority
WO
WIPO (PCT)
Prior art keywords
remote inspection
elevator
disaster
unit
remote
Prior art date
Application number
PCT/JP2021/008741
Other languages
English (en)
French (fr)
Inventor
剛樹 引地
Original Assignee
三菱電機ビルテクノサービス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機ビルテクノサービス株式会社 filed Critical 三菱電機ビルテクノサービス株式会社
Priority to CN202180095102.4A priority Critical patent/CN116897134B/zh
Priority to JP2023503326A priority patent/JP7302758B2/ja
Priority to PCT/JP2021/008741 priority patent/WO2022185537A1/ja
Priority to KR1020237032970A priority patent/KR102604348B1/ko
Publication of WO2022185537A1 publication Critical patent/WO2022185537A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/0006Monitoring devices or performance analysers
    • B66B5/0018Devices monitoring the operating condition of the elevator system
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/02Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
    • B66B5/021Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions the abnormal operating conditions being independent of the system

Definitions

  • the present disclosure relates to a remote inspection device for elevators.
  • Patent Document 1 discloses a remote inspection device for elevators. According to the remote inspection device, remote inspection operation can be periodically performed on the elevator.
  • the remote inspection device described in Patent Document 1 when a preset time arrives, the remote inspection device transmits a signal for executing remote inspection operation. Such a signal is sent multiple times until the elevator receives the signal. Therefore, when a disaster occurs, a load is applied to the communication line.
  • An object of the present disclosure is to provide a remote inspection device for elevators that can suppress the load on communication lines when a disaster occurs.
  • the elevator remote inspection device includes a remote inspection unit that performs a remote inspection operation that acquires elevator operation information from a monitoring device provided in the elevator at a set timing, and an elevator that is installed based on disaster information. It is time for the remote inspection unit and the disaster judgment unit, which determines that a disaster has occurred in at least one of the area where the communication base station is installed to mediate communication with the monitoring device, and the remote inspection unit.
  • the remote inspection unit determines that a disaster has occurred in at least one of the area where the elevator is installed and the area where the communication base station is installed, the remote inspection unit is instructed to perform remote inspection at another timing. and an inspection deferment unit for deferring to.
  • the remote inspection device determines that a disaster has occurred, it postpones the timing of performing the remote inspection operation to another timing. Therefore, it is possible to suppress the load on the communication line when a disaster occurs.
  • FIG. 1 is a block diagram showing an overview of a remote monitoring system to which the elevator remote inspection device according to Embodiment 1 is applied;
  • FIG. 4 is a flow chart for explaining an outline of processing of the elevator remote inspection device according to Embodiment 1.
  • FIG. 2 is a hardware configuration diagram of the elevator remote inspection device according to Embodiment 1.
  • FIG. 1 is a block diagram showing an overview of a remote monitoring system to which a remote inspection device for elevators according to Embodiment 1 is applied.
  • the elevator 1 is installed in a building (not shown).
  • the elevator 1 has a control panel 2 .
  • the control panel 2 is provided in the same building as the elevator 1 .
  • a control panel 2 is provided to control the overall operation of the elevator 1 .
  • the monitoring device 3 is installed in the same building as the elevator 1.
  • the monitoring device 3 is electrically connected with the control panel 2 .
  • a monitoring device 3 is provided to collect operating information of the elevator 1 from the control panel 2 .
  • the monitoring device 3 is provided so as to accumulate the driving information.
  • the monitoring device 3 is provided so as to transmit a power failure notification when a power failure occurs in the building in which the elevator 1 is installed.
  • the monitoring device 3 is provided so as to transmit a recovery notification when the power failure is recovered.
  • the communication base station 4 is installed in a different location from the building where the elevator 1 is installed.
  • the communication base station 4 mediates communication.
  • the remote inspection device 5 is installed in a building different from the building in which the elevator 1 is installed.
  • the remote inspection device 5 is installed in the building of the elevator 1 maintenance company.
  • the remote inspection device 5 can communicate with the monitoring device 3 by using existing communication systems such as priority telephone lines, wireless communication lines, and the like. At this time, the remote inspection device 5 can communicate with the monitoring device 3 via the communication base station 4 .
  • the remote inspection device 5 is provided so that it can acquire disaster information from an external organization via communication. Specifically, the remote inspection device 5 can acquire disaster information on disasters such as heavy rains, typhoons, earthquakes, etc. in a specific area from an external organization. The remote inspection device 5 can acquire information on power outages that have occurred in a specific area from an external organization as disaster information.
  • disaster information such as heavy rains, typhoons, earthquakes, etc. in a specific area from an external organization.
  • the remote inspection device 5 can acquire information on power outages that have occurred in a specific area from an external organization as disaster information.
  • the remote inspection device 5 includes a remote inspection unit 6, an information processing unit 7, a disaster determination unit 8, a power failure determination unit 9, and an inspection postponement unit 10.
  • the remote inspection unit 6 performs a remote inspection operation to acquire the accumulated operating information of the elevator 1 from the monitoring device 3 at a regular date and time as a set timing. Specifically, for example, the remote inspection unit 6 performs a remote inspection operation on a set date and time every month. In the remote inspection operation, the remote inspection unit 6 transmits a command to perform the remote inspection operation to the monitoring device 3 . After that, the remote inspection unit 6 performs an operation of acquiring operation information from the monitoring device 3 when receiving a response signal from the monitoring device 3 .
  • the remote inspection unit 6 When the remote inspection unit 6 does not receive a response signal from the monitoring device 3 after transmitting the command to start the remote inspection operation, the remote inspection unit 6 transmits a command to perform the remote inspection operation to the monitoring device 3 with the set retry count as the upper limit. . Specifically, the remote inspection unit 6 transmits a command to start the remote inspection operation to the monitoring device 3 with an upper limit of 20 retries.
  • the remote inspection unit 6 When the remote inspection unit 6 receives a command to postpone the remote inspection operation to another date and time at the set date and time, the remote inspection unit 6 postpones the date and time for the remote inspection operation for a specified period. Specifically, for example, when the remote inspection unit 6 receives the command, the remote inspection unit 6 postpones the date and time for performing the remote inspection operation by 6 hours.
  • the information processing unit 7 performs fault diagnosis of the elevator 1 using the operation information acquired by the remote inspection unit 6.
  • the information processing unit 7 uses the operation information acquired by the remote inspection unit 6 to create report information for the owner of the elevator 1 .
  • the disaster determination unit 8 acquires disaster information from external organizations. When the date and time for remote inspection by the remote inspection unit 6 come, the disaster determination unit 8 determines whether a disaster has occurred in at least one of the area where the elevator 1 is installed and the area where the communication base station 4 is installed based on the disaster information. Determine whether or not For example, when a heavy rain warning is issued for an area where the elevator 1 is installed, the disaster determination unit 8 determines that a disaster has occurred in the area based on the disaster information of the heavy rain warning.
  • the power failure determination unit 9 receives the power failure notification sent by the monitoring device 3 .
  • the power failure determination unit 9 receives the restoration notification sent by the monitoring device 3 .
  • the power failure determination unit 9 determines that the elevator 1 is in a power failure state when the restoration notification is not received after receiving the power failure notification.
  • the disaster determination unit 8 determines that a disaster has occurred in at least one of the area where the elevator 1 is installed and the area where the communication base station 4 is installed. In this case, the inspection postponement unit 10 transmits a command to the remote inspection unit 6 to postpone the remote inspection operation to another date and time.
  • the inspection postponement unit 10 instructs the remote inspection unit 6 to perform the remote inspection. Send a command to postpone the action to another date and time.
  • FIG. 2 is a flow chart for explaining an outline of processing of the elevator remote inspection device according to the first embodiment.
  • step S001 the remote inspection device 5 determines whether or not it is time to perform the remote inspection operation.
  • step S001 If it is determined in step S001 that it is not the date and time for the remote inspection operation, the remote inspection device 5 repeats the operation of step S001.
  • step S001 When it is determined in step S001 that it is time to perform the remote inspection operation, the remote inspection device 5 performs the operation of step S002. In step S002, the remote inspection device 5 determines whether or not a disaster has occurred in at least one of the area where the elevator 1 is installed and the area where the communication base station 4 is installed.
  • step S002 When it is determined in step S002 that no disaster has occurred in any area, the remote inspection device 5 performs the operation of step S003. In step S003, the remote inspection device 5 determines whether or not the elevator 1 is in a power failure state.
  • step S003 When it is determined in step S003 that the elevator 1 is not in a power failure state, the remote inspection device 5 performs the operation of step S004. In step S004, the remote inspection device 5 performs a remote inspection operation.
  • the remote inspection device 5 terminates the process.
  • step S002 When it is determined in step S002 that a disaster has occurred in at least one of the area where the elevator 1 is installed and the area where the communication base station 4 is installed, or when it is determined in step S003 that the elevator 1 is in a power failure state. , the remote inspection device 5 performs the operation of step S005. In step S005, the remote inspection device 5 postpones the remote inspection operation for a prescribed period. Specifically, in step S005, the remote inspection device 5 waits for a prescribed period. After that, the remote inspection device 5 performs the operations after step S002.
  • the remote inspection device 5 includes the remote inspection unit 6, the disaster determination unit 8, and the inspection postponement unit 10.
  • the inspection postponement unit 10 causes the remote inspection unit 6 to postpone the remote inspection operation to another date and time by transmitting a command. Therefore, when communication with the monitoring device 3 is disabled due to the occurrence of a disaster, the remote inspection device 5 can avoid performing a remote inspection operation on the monitoring device 3 . Specifically, the remote inspection device 5 can suppress sending a command to perform the remote inspection operation to the monitoring device 3 for the number of retries. As a result, it is possible to suppress the load on the communication line when a disaster occurs.
  • the inspection postponement unit 10 may send a confirmation command to the remote inspection unit 6 before sending the command to postpone the remote inspection operation to another date and time.
  • the remote inspection unit 6 may perform the confirmation operation of transmitting the command to the monitoring device 3 to transmit the operation information a predetermined number of times, which is less than the number of retries.
  • the number of retries is the upper limit number of times to send a command to the monitoring device 3 when a disaster is not recognized.
  • the specified number of times is the number of times a command is transmitted to the monitoring device 3 when a disaster is recognized.
  • the remote inspection unit 6 may perform the confirmation operation of transmitting the command only twice.
  • the inspection postponement unit 10 may transmit a command to postpone the remote inspection operation to another date and time. Therefore, the remote inspection device 5 can acquire the operation information from the monitoring device 3 when the disaster information of the target area is not updated to the restored state even though the disaster has been recovered. Also, the specified number of times is smaller than the number of retries. Therefore, even if communication with the monitoring device 3 is not possible, it is possible to reduce the burden on the communication line when a disaster occurs.
  • the remote inspection device 5 determines that the elevator 1 is out of power when the date and time for the remote inspection operation come, it postpones the date and time for the remote inspection operation to another date and time. Therefore, when the elevator 1 is not restored from the power failure after the occurrence of the disaster, the remote inspection device 5 can suppress transmission of a remote inspection operation command to the monitoring device 3 by the number of retries. As a result, it is possible to suppress the load on the communication line.
  • the remote inspection device 5 may perform the remote inspection operation not only at the set date and time, but also at the set timing when the set conditions are met. In this case, the remote inspection device 5 may postpone the timing of performing the remote inspection operation for a prescribed period. Further, the remote inspection device 5 may postpone the timing of performing the remote inspection operation to another timing of performing the remote inspection operation when a specified condition is satisfied.
  • the disaster determination unit 8 may detect that the state of occurrence of a disaster has been resolved based on the operation of the operator of the maintenance company.
  • FIG. 3 is a hardware configuration diagram of the elevator remote inspection device according to the first embodiment.
  • Each function of the remote inspection device 5 can be realized by a processing circuit.
  • the processing circuitry comprises at least one processor 100a and at least one memory 100b.
  • the processing circuitry comprises at least one piece of dedicated hardware 200 .
  • each function of the remote inspection device 5 is realized by software, firmware, or a combination of software and firmware. At least one of software and firmware is written as a program. At least one of software and firmware is stored in at least one memory 100b. At least one processor 100a implements each function of the remote inspection device 5 by reading and executing a program stored in at least one memory 100b.
  • the at least one processor 100a is also referred to as a central processing unit, processing unit, arithmetic unit, microprocessor, microcomputer, DSP.
  • the at least one memory 100b is a nonvolatile or volatile semiconductor memory such as RAM, ROM, flash memory, EPROM, EEPROM, magnetic disk, flexible disk, optical disk, compact disk, mini disk, DVD, or the like.
  • processing circuitry comprises at least one piece of dedicated hardware 200
  • the processing circuitry may be implemented, for example, in single circuits, multiple circuits, programmed processors, parallel programmed processors, ASICs, FPGAs, or combinations thereof.
  • each function of the remote inspection device 5 is implemented by a processing circuit.
  • each function of the remote inspection device 5 is collectively realized by a processing circuit.
  • a part of each function of the remote inspection device 5 may be realized by dedicated hardware 200, and the other part may be realized by software or firmware.
  • the function of diagnosing the elevator 1 using operation information is realized by a processing circuit as dedicated hardware 200, and the functions other than the function of diagnosing the elevator 1 using operation information are at least one It may be realized by reading and executing a program stored in at least one memory 100b by one processor 100a.
  • the processing circuit implements each function of the remote inspection device 5 with hardware 200, software, firmware, or a combination thereof.
  • the elevator remote inspection device can be used in a system for remote diagnosis of elevators.

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)
  • Indicating And Signalling Devices For Elevators (AREA)

Abstract

災害が発生した場合に通信回線に負荷がかかることを抑制することができるエレベーターの遠隔点検装置を提供する。エレベーターの遠隔点検装置は、エレベーターに設けられた監視装置からエレベーターの運転情報を設定されたタイミングに取得する遠隔点検動作を行う遠隔点検部と、災害情報に基づいてエレベーターが設置された地域および監視装置との通信を仲介する通信基地局が設置された地域の少なくとも一方に災害が発生していると判定する災害判定部と、遠隔点検部が遠隔点検動作を行うタイミングになったときにエレベーターが設置された地域および通信基地局が設置された地域の少なくとも一方に災害が発生していると災害判定部が判定した場合、遠隔点検部に遠隔点検動作を行うタイミングを別のタイミングへ延期させる点検延期部と、を備えた。

Description

エレベーターの遠隔点検装置
 本開示は、エレベーターの遠隔点検装置に関する。
 特許文献1は、エレベーターの遠隔点検装置を開示する。当該遠隔点検装置によれば、エレベーターに対して定期的に遠隔点検運転を実行させ得る。
日本特開2019-094137号公報
 しかしながら、特許文献1に記載の遠隔点検装置において、予め設定されている時間が到来すると、遠隔点検装置は、遠隔点検運転を実行させる信号を送信する。このような信号は、エレベーターが当該信号を受信するまで複数回送信される。このため、災害が発生した場合に通信回線に負荷がかかる。
 本開示は、上述の課題を解決するためになされた。本開示の目的は、災害が発生した場合に通信回線に負荷がかかることを抑制できるエレベーターの遠隔点検装置を提供することである。
 本開示に係るエレベーターの遠隔点検装置は、エレベーターに設けられた監視装置からエレベーターの運転情報を設定されたタイミングに取得する遠隔点検動作を行う遠隔点検部と、災害情報に基づいてエレベーターが設置された地域および監視装置との通信を仲介する通信基地局が設置された地域の少なくとも一方に災害が発生していると判定する災害判定部と、遠隔点検部が遠隔点検動作を行うタイミングになったときにエレベーターが設置された地域および通信基地局が設置された地域の少なくとも一方に災害が発生していると災害判定部が判定した場合、遠隔点検部に遠隔点検動作を行うタイミングを別のタイミングへ延期させる点検延期部と、を備えた。
 本開示によれば、遠隔点検装置は、災害が発生していると判定した場合、遠隔点検動作を行うタイミングを別のタイミングに延期する。このため、災害が発生した場合に通信回線に負荷がかかることを抑制することができる。
実施の形態1におけるエレベーターの遠隔点検装置が適用される遠隔監視システムの概要を示すブロック図である。 実施の形態1におけるエレベーターの遠隔点検装置の処理の概要を説明するためのフローチャートである。 実施の形態1におけるエレベーターの遠隔点検装置のハードウェア構成図である。
 本開示を実施するための形態について添付の図面に従って説明する。なお、各図中、同一または相当する部分には同一の符号が付される。当該部分の重複説明は適宜に簡略化ないし省略される。
実施の形態1.
 図1は実施の形態1におけるエレベーターの遠隔点検装置が適用される遠隔監視システムの概要を示すブロック図である。
 図1に示される遠隔監視システムにおいて、エレベーター1は、図示されない建築物に設けられる。エレベーター1は、制御盤2を備える。制御盤2は、エレベーター1と同じ建築物に設けられる。制御盤2は、エレベーター1の全体の動作を制御し得るよう設けられる。
 監視装置3は、エレベーター1と同じ建築物に設けられる。監視装置3は、制御盤2と電気的に接続される。監視装置3は、制御盤2からエレベーター1の運転情報を収集し得るよう設けられる。監視装置3は、当該運転情報を蓄積し得るよう設けられる。監視装置3は、エレベーター1が設置された建築物において停電が発生した場合、停電通知を発信し得るよう設けられる。監視装置3は、当該停電が復旧した場合、復旧通知を発信し得るよう設けられる。
 通信基地局4は、エレベーター1が設けられた建築物とは別の場所に設けられる。通信基地局4は、通信を仲介する。
 遠隔点検装置5は、エレベーター1が設けられた建築物とは別の建築物に設けられる。例えば、遠隔点検装置5は、エレベーター1の保守会社の建築物に設けられる。遠隔点検装置5は、優先の電話回線、無線通信回線、等の既存の通信システムを利用することで監視装置3と通信し得る。この際、遠隔点検装置5は、通信基地局4を介して監視装置3と通信し得る。
 遠隔点検装置5は、外部機関から通信を介して災害情報を取得し得るよう設けられる。具体的には、遠隔点検装置5は、外部機関から特定の地域に関する大雨、台風、地震、等の災害に関する災害情報を取得し得る。遠隔点検装置5は、外部機関から特定の地域で発生した停電の情報を災害情報として取得し得る。
 遠隔点検装置5は、遠隔点検部6と情報処理部7と災害判定部8と停電判定部9と点検延期部10とを備える。
 遠隔点検部6は、設定されたタイミングとして定期的な日時に監視装置3から蓄積されたエレベーター1の運転情報を取得する遠隔点検動作を行う。具体的には、例えば、遠隔点検部6は、毎月設定された日時に遠隔点検動作を行う。遠隔点検部6は、遠隔点検動作において、監視装置3へ遠隔点検動作を行う指令を送信する。その後、遠隔点検部6は、監視装置3から応答の信号を受信した場合に、監視装置3から運転情報を取得する動作を行う。
 遠隔点検部6は、遠隔点検動作を開始する指令を送信した後に監視装置3から応答の信号を受信しない場合、設定されたリトライ回数を上限として監視装置3へ遠隔点検動作を行う指令を送信する。具体的には、遠隔点検部6は、20回のリトライ回数を上限として監視装置3へ遠隔点検動作を開始する指令を送信する。
 遠隔点検部6は、設定された日時になったときに遠隔点検動作を別の日時に延期させる指令を受信した場合、規定の期間だけ遠隔点検動作を行う日時を延期する。具体的には、例えば、遠隔点検部6は、当該指令を受信した場合、6時間だけ遠隔点検動作を行う日時を延期する。
 情報処理部7は、遠隔点検部6が取得した運転情報を用いてエレベーター1の故障診断を行う。情報処理部7は、遠隔点検部6が取得した運転情報を用いてエレベーター1の所有者に向けた報告書情報を作成する。
 災害判定部8は、外部機関から災害情報を取得する。遠隔点検部6が遠隔点検を行う日時になったとき、災害判定部8は、災害情報に基づいてエレベーター1が設置された地域および通信基地局4が設置された地域の少なくとも一方に災害が発生しているか否かを判定する。例えば、エレベーター1が設置された地域を対象とした大雨警報が発令されている場合、災害判定部8は、当該大雨警報の災害情報に基づいて当該地域に災害が発生していると判定する。
 停電判定部9は、監視装置3が発信した停電通知を受信する。停電判定部9は、監視装置3が発信した復旧通知を受信する。停電判定部9は、停電通知を受信した後に復旧通知を受信していない場合、エレベーター1が停電状態であると判定する。
 遠隔点検部6が遠隔点検を行う日時になったときに、エレベーター1が設置された地域および通信基地局4が設置された地域の少なくとも一方に災害が発生していると災害判定部8が判定した場合、点検延期部10は、遠隔点検部6に対して遠隔点検動作を別の日時に延期させる指令を送信する。
 遠隔点検部6が遠隔点検を行う日時になったときに、エレベーター1が停電状態であると停電判定部9が判定している場合、点検延期部10は、遠隔点検部6に対して遠隔点検動作を別の日時に延期させる指令を送信する。
 次に、図2を用いて、遠隔点検装置5が行う処理を説明する。
 図2は実施の形態1におけるエレベーターの遠隔点検装置の処理の概要を説明するためのフローチャートである。
 図2に示されるように、ステップS001において、遠隔点検装置5は、遠隔点検動作を行う日時であるか否かを判定する。
 ステップS001で、遠隔点検動作を行う日時でないと判定した場合、遠隔点検装置5は、ステップS001の動作を繰り返す。
 ステップS001で、遠隔点検動作を行う日時であると判定した場合、遠隔点検装置5は、ステップS002の動作を行う。ステップS002において、遠隔点検装置5は、エレベーター1が設置された地域および通信基地局4が設置された地域の少なくとも一方に災害が発生しているか否かを判定する。
 ステップS002で、いずれの地域にも災害が発生していないと判定した場合、遠隔点検装置5は、ステップS003の動作を行う。ステップS003において、遠隔点検装置5は、エレベーター1が停電状態であるか否かを判定する。
 ステップS003で、エレベーター1が停電状態でないと判定した場合、遠隔点検装置5は、ステップS004の動作を行う。ステップS004において、遠隔点検装置5は、遠隔点検動作を行う。
 その後、遠隔点検装置5は、処理を終了する。
 ステップS002でエレベーター1が設置された地域および通信基地局4が設置された地域の少なくとも一方に災害が発生していると判定した場合、またはステップS003でエレベーター1が停電状態であると判定した場合、遠隔点検装置5は、ステップS005の動作を行う。ステップS005において、遠隔点検装置5は、遠隔点検動作を規定の期間だけ延期する。具体的には、ステップS005において、遠隔点検装置5は、規定の期間だけ待機する。その後、遠隔点検装置5は、ステップS002以降の動作を行う。
 以上で説明した実施の形態1によれば、遠隔点検装置5は、遠隔点検部6と災害判定部8と点検延期部10とを備える。点検延期部10は、指令を送信することで遠隔点検部6に遠隔点検動作を別の日時に延期させる。このため、災害の発生によって監視装置3と通信ができない場合に、遠隔点検装置5は、当該監視装置3に関する遠隔点検動作を行うことを回避することができる。具体的には、遠隔点検装置5は、リトライ回数だけ監視装置3へ遠隔点検動作を行う指令を送信することを抑制できる。その結果、災害が発生した場合に通信回線に負荷がかかることを抑制することができる。
 なお、点検延期部10は、遠隔点検動作を別の日時に延期させる指令を送信する前に、遠隔点検部6に対して確認指令を送信してもよい。遠隔点検部6は、確認指令を受信した場合、監視装置3に対して運転情報を送信させる指令をリトライ回数よりも少ない規定の回数だけ送信する確認動作を行ってもよい。リトライ回数は、災害が認識されていない場合に監視装置3に対して指令を送信する上限の回数である。一方、当該規定の回数は、災害が認識されている場合に監視装置3に対して指令を送信する回数である。具体的には、遠隔点検部6は、2回だけ当該指令を送信する確認動作を行ってもよい。確認動作において遠隔点検部6が運転情報を取得できなかった場合に、点検延期部10は、遠隔点検動作を別の日時に延期させる指令を送信してもよい。このため、災害から復旧しているにも関わらず対象の地域の災害情報が復旧した状態に更新されていない場合に、遠隔点検装置5は、監視装置3から運転情報を取得することができる。また、当該規定の回数は、リトライ回数よりも少ない。このため、監視装置3と通信ができない場合でも、災害が発生した場合に通信回線に負担がかかることを抑制することができる。
 また、遠隔点検装置5は、遠隔点検動作を行う日時になったときにエレベーター1が停電していると判定した場合、遠隔点検動作を行う日時を別の日時に延期する。このため、災害が発生した後、エレベーター1が停電から復旧していない場合に、遠隔点検装置5は、リトライ回数だけ監視装置3へ遠隔点検動作を行う指令を送信することを抑制できる。その結果、通信回線に負荷がかかることを抑制することができる。
 なお、遠隔点検装置5は、設定された日時になった場合だけでなく、設定された条件が満たされた場合に設定されたタイミングになったとして遠隔点検動作を行ってもよい。この場合、遠隔点検装置5は、規定の期間だけ遠隔点検動作を行うタイミングを延期してもよい。また、遠隔点検装置5は、遠隔点検動作を行うタイミングを規定の条件が満たされた場合に行うという別のタイミングに延期してもよい。
 なお、災害判定部8は、保守会社のオペレーターからの操作に基づいて災害が発生した状態が解消したことを検知してもよい。
 次に、図3を用いて、遠隔点検装置5を構成するハードウェアの例を説明する。
 図3は実施の形態1におけるエレベーターの遠隔点検装置のハードウェア構成図である。
 遠隔点検装置5の各機能は、処理回路により実現し得る。例えば、処理回路は、少なくとも1つのプロセッサ100aと少なくとも1つのメモリ100bとを備える。例えば、処理回路は、少なくとも1つの専用のハードウェア200を備える。
 処理回路が少なくとも1つのプロセッサ100aと少なくとも1つのメモリ100bとを備える場合、遠隔点検装置5の各機能は、ソフトウェア、ファームウェア、またはソフトウェアとファームウェアとの組み合わせで実現される。ソフトウェアおよびファームウェアの少なくとも一方は、プログラムとして記述される。ソフトウェアおよびファームウェアの少なくとも一方は、少なくとも1つのメモリ100bに格納される。少なくとも1つのプロセッサ100aは、少なくとも1つのメモリ100bに記憶されたプログラムを読み出して実行することにより、遠隔点検装置5の各機能を実現する。少なくとも1つのプロセッサ100aは、中央処理装置、処理装置、演算装置、マイクロプロセッサ、マイクロコンピュータ、DSPともいう。例えば、少なくとも1つのメモリ100bは、RAM、ROM、フラッシュメモリ、EPROM、EEPROM等の、不揮発性または揮発性の半導体メモリ、磁気ディスク、フレキシブルディスク、光ディスク、コンパクトディスク、ミニディスク、DVD等である。
 処理回路が少なくとも1つの専用のハードウェア200を備える場合、処理回路は、例えば、単一回路、複合回路、プログラム化したプロセッサ、並列プログラム化したプロセッサ、ASIC、FPGA、またはこれらの組み合わせで実現される。例えば、遠隔点検装置5の各機能は、それぞれ処理回路で実現される。例えば、遠隔点検装置5の各機能は、まとめて処理回路で実現される。
 遠隔点検装置5の各機能について、一部を専用のハードウェア200で実現し、他部をソフトウェアまたはファームウェアで実現してもよい。例えば、運転情報を用いてエレベーター1の故障診断を行う機能については専用のハードウェア200としての処理回路で実現し、運転情報を用いてエレベーター1の故障診断を行う機能以外の機能については少なくとも1つのプロセッサ100aが少なくとも1つのメモリ100bに格納されたプログラムを読み出して実行することにより実現してもよい。
 このように、処理回路は、ハードウェア200、ソフトウェア、ファームウェア、またはこれらの組み合わせで遠隔点検装置5の各機能を実現する。
 以上のように、本開示に係るエレベーターの遠隔点検装置は、エレベーターの遠隔診断を行うシステムに利用できる。
 1 エレベーター、 2 制御盤、 3 監視装置、 4 通信基地局、 5 遠隔点検装置、 6 遠隔点検部、 7 情報処理部、 8 災害判定部、 9 停電判定部、 10 点検延期部、 100a プロセッサ、 100b メモリ、 200 ハードウェア

Claims (3)

  1.  エレベーターに設けられた監視装置から前記エレベーターの運転情報を設定されたタイミングに取得する遠隔点検動作を行う遠隔点検部と、
     災害情報に基づいて前記エレベーターが設置された地域および前記監視装置との通信を仲介する通信基地局が設置された地域の少なくとも一方に災害が発生していると判定する災害判定部と、
     前記遠隔点検部が前記遠隔点検動作を行うタイミングになったときに前記エレベーターが設置された地域および前記通信基地局が設置された地域の少なくとも一方に災害が発生していると前記災害判定部が判定した場合、前記遠隔点検部に前記遠隔点検動作を行うタイミングを別のタイミングへ延期させる点検延期部と、
    を備えたエレベーターの遠隔点検装置。
  2.  前記遠隔点検部は、前記エレベーターが設置された地域および前記通信基地局が設置された地域のいずれにおいても災害が発生していないと前記災害判定部が判定した場合に、前記監視装置に対してリトライ回数を上限として前記遠隔点検動作を開始する指令を送信し、
     前記点検延期部は、前記遠隔点検部が前記遠隔点検動作を行うタイミングになったときに前記エレベーターが設置された地域および前記通信基地局が設置された地域の少なくとも一方に災害が発生していると前記災害判定部が判定した場合、前記リトライ回数よりも少ない規定の回数だけ前記監視装置から前記運転情報を取得する確認動作を前記遠隔点検部に行わせ、前記確認動作において前記監視装置から前記運転情報を取得できなかった場合に、前記遠隔点検部に前記遠隔点検動作を行うタイミングを別のタイミングへ延期させる請求項1に記載のエレベーターの遠隔点検装置。
  3.  前記エレベーターが停電したときに前記監視装置から停電通知を受信し、前記停電通知を受信してから前記監視装置から復旧通知を受信していない場合に、前記エレベーターが停電状態であると判定する停電判定部、
    を備え、
     前記点検延期部は、前記遠隔点検部が前記遠隔点検動作を行うタイミングになったときに前記エレベーターが停電状態であると前記停電判定部が判定した場合、前記遠隔点検部に対して前記遠隔点検動作を行うタイミングを別のタイミングに延期させる請求項1または請求項2に記載のエレベーターの遠隔点検装置。
PCT/JP2021/008741 2021-03-05 2021-03-05 エレベーターの遠隔点検装置 WO2022185537A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN202180095102.4A CN116897134B (zh) 2021-03-05 2021-03-05 电梯的远程点检装置
JP2023503326A JP7302758B2 (ja) 2021-03-05 2021-03-05 エレベーターの遠隔点検装置
PCT/JP2021/008741 WO2022185537A1 (ja) 2021-03-05 2021-03-05 エレベーターの遠隔点検装置
KR1020237032970A KR102604348B1 (ko) 2021-03-05 2021-03-05 엘리베이터의 원격 점검 장치

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2021/008741 WO2022185537A1 (ja) 2021-03-05 2021-03-05 エレベーターの遠隔点検装置

Publications (1)

Publication Number Publication Date
WO2022185537A1 true WO2022185537A1 (ja) 2022-09-09

Family

ID=83154158

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/008741 WO2022185537A1 (ja) 2021-03-05 2021-03-05 エレベーターの遠隔点検装置

Country Status (4)

Country Link
JP (1) JP7302758B2 (ja)
KR (1) KR102604348B1 (ja)
CN (1) CN116897134B (ja)
WO (1) WO2022185537A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009215023A (ja) * 2008-03-12 2009-09-24 Toshiba Elevator Co Ltd 非常電源用バッテリーの寿命判定システム
JP2013177212A (ja) * 2012-02-28 2013-09-09 Toshiba Elevator Co Ltd エレベータ監視装置およびエレベータ監視方法
JP2016216198A (ja) * 2015-05-20 2016-12-22 株式会社日立ビルシステム 遠隔監視システム
JP2019094137A (ja) * 2017-11-20 2019-06-20 東芝エレベータ株式会社 エレベータの遠隔診断運転方法、エレベータ制御装置、及びエレベータの遠隔診断運転プログラム
CN110155845A (zh) * 2019-06-05 2019-08-23 江苏正一物联科技有限公司 故障及灾害同时监测的电梯远程控制系统
JP2019151475A (ja) * 2018-03-06 2019-09-12 東芝エレベータ株式会社 エレベータの診断運転方法、エレベータ制御装置及びエレベータの診断運転プログラム

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5135867B2 (ja) * 2007-04-25 2013-02-06 三菱電機ビルテクノサービス株式会社 エレベータの地震時点検装置及びその改修方法
JP6002046B2 (ja) * 2013-01-09 2016-10-05 株式会社日立ビルシステム エレベータ用自動点検システム
JP6222162B2 (ja) * 2015-04-20 2017-11-01 三菱電機ビルテクノサービス株式会社 エレベータ装置及びエレベータの復旧方法
WO2018134895A1 (ja) * 2017-01-17 2018-07-26 三菱電機ビルテクノサービス株式会社 エレベーターの管制運転機能点検システム

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009215023A (ja) * 2008-03-12 2009-09-24 Toshiba Elevator Co Ltd 非常電源用バッテリーの寿命判定システム
JP2013177212A (ja) * 2012-02-28 2013-09-09 Toshiba Elevator Co Ltd エレベータ監視装置およびエレベータ監視方法
JP2016216198A (ja) * 2015-05-20 2016-12-22 株式会社日立ビルシステム 遠隔監視システム
JP2019094137A (ja) * 2017-11-20 2019-06-20 東芝エレベータ株式会社 エレベータの遠隔診断運転方法、エレベータ制御装置、及びエレベータの遠隔診断運転プログラム
JP2019151475A (ja) * 2018-03-06 2019-09-12 東芝エレベータ株式会社 エレベータの診断運転方法、エレベータ制御装置及びエレベータの診断運転プログラム
CN110155845A (zh) * 2019-06-05 2019-08-23 江苏正一物联科技有限公司 故障及灾害同时监测的电梯远程控制系统

Also Published As

Publication number Publication date
JP7302758B2 (ja) 2023-07-04
KR102604348B1 (ko) 2023-11-20
CN116897134A (zh) 2023-10-17
CN116897134B (zh) 2024-02-23
JPWO2022185537A1 (ja) 2022-09-09
KR20230148248A (ko) 2023-10-24

Similar Documents

Publication Publication Date Title
RU2368563C2 (ru) Лифтовая установка и способ осуществления потенциально корректирующей операции в отношении нее
EP1837763A2 (en) Protection of devices in a redundant configuration
WO2022185537A1 (ja) エレベーターの遠隔点検装置
KR102348616B1 (ko) 엘리베이터의 원격 감시 시스템
JP2001005692A (ja) 計算機システムおよびその保守管理システム並びに障害通知方法
KR102163762B1 (ko) 자율 주행 제어기의 에러 처리를 위한 방법
JP6838568B2 (ja) 情報処理システム及び情報処理方法
JP4708211B2 (ja) エレベータ装置及びエレベータの制御方法
JP4028989B2 (ja) 遠隔監視システム
JP6162440B2 (ja) プラント監視システム
JPS596735A (ja) 障害通知方式
JP2002281495A (ja) デジタル防犯カメラレコーダ装置
JPH1039920A (ja) 監視通報制御装置
KR102597102B1 (ko) 제어모듈과 통신 이중화 기능을 갖고 있는 cctv 카메라시스템
JP2735681B2 (ja) 遠隔監視装置
JP2536264B2 (ja) 空気調和管理装置
JP2006344023A (ja) 制御装置
JP3480881B2 (ja) 遠隔監視装置
JP2005073075A (ja) 遠隔監視制御システム
JP2683090B2 (ja) ビル遠隔監視装置
JP2740351B2 (ja) 防災システムのデータチェック方式
JP6066633B2 (ja) 警備システム
JP2024136120A (ja) 監視制御装置、監視制御方法および監視制御プログラム
KR100969207B1 (ko) 자가 진단이 가능한 p형 수신기
JPS61121551A (ja) 遠隔監視制御装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21929109

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2023503326

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 202180095102.4

Country of ref document: CN

ENP Entry into the national phase

Ref document number: 20237032970

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21929109

Country of ref document: EP

Kind code of ref document: A1