WO2022014476A1 - 工作機械システム - Google Patents

工作機械システム Download PDF

Info

Publication number
WO2022014476A1
WO2022014476A1 PCT/JP2021/025878 JP2021025878W WO2022014476A1 WO 2022014476 A1 WO2022014476 A1 WO 2022014476A1 JP 2021025878 W JP2021025878 W JP 2021025878W WO 2022014476 A1 WO2022014476 A1 WO 2022014476A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
priority
machining
order
machine tool
Prior art date
Application number
PCT/JP2021/025878
Other languages
English (en)
French (fr)
Inventor
賀彦 樽井
Original Assignee
ファナック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ファナック株式会社 filed Critical ファナック株式会社
Priority to US18/013,441 priority Critical patent/US20230297087A1/en
Priority to DE112021001618.0T priority patent/DE112021001618T5/de
Priority to JP2022536316A priority patent/JP7498276B2/ja
Priority to CN202180035811.3A priority patent/CN115769158A/zh
Publication of WO2022014476A1 publication Critical patent/WO2022014476A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4183Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by data acquisition, e.g. workpiece identification
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q41/00Combinations or associations of metal-working machines not directed to a particular result according to classes B21, B23, or B24
    • B23Q41/08Features relating to maintenance of efficient operation
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
    • G05B19/409Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by using manual data input [MDI] or by using control panel, e.g. controlling functions with the panel; characterised by control panel details or by setting parameters
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32266Priority orders
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • This disclosure relates to a machine tool system.
  • Machine tools that process workpieces according to a production schedule are known (see, for example, Patent Document 1).
  • the work priority is stored in the production schedule in advance, and when the work according to the production schedule cannot be processed, the work with the next highest priority is processed first.
  • a processing system including a tracking file for managing the movement of a work is known (see, for example, Patent Document 2). Editing such as moving, deleting, and adding data in the tracking file is possible, the processing order in the tracking file is changed, and the work is interrupted in the middle of the process.
  • the machining order of a plurality of workpieces is set in advance before the start of machining, but when there are multiple types of workpieces, it may be necessary to urgently preferentially process the workpieces in the subsequent machining order after the start of machining. be. In such a case, the work of exchanging the data in the file as in Patent Document 2 is troublesome and cannot be carried out in a short time. Therefore, it is desired to easily and quickly replace the machining order generated after the start of machining.
  • One aspect of the present disclosure is to allow a user to specify a schedule storage unit that stores machining schedule information including machining sequences of a plurality of workpieces, and one of the workpieces in the machining schedule information stored in the schedule storage unit.
  • the work is provided with a priority setting unit for setting the priority of the designated work, and the work for which the priority is set by the priority setting unit is processed according to the priority and the priority is set.
  • the work is a machine tool system that processes the work according to the processing order after processing the work for which the priority is set.
  • FIG. 1 It is an overall block diagram which shows the machine tool system which concerns on one Embodiment of this disclosure. It is a block diagram which shows the machine tool system of FIG. It is a figure which shows an example of the machining schedule information used for the machine tool system of FIG. It is a figure which shows the display example of the monitor of the initial state in the machine tool system of FIG. It is a flowchart explaining the operation of the machine tool system of FIG. It is a flowchart explaining the processing routine of the work of the flowchart of FIG. It is a figure which shows the display example of the monitor in the state where the first work from the state of FIG. 4 is being machined or has been machined. It is a figure which shows the display example of the monitor in the state which the priority is set in the state of FIG.
  • FIG. 7 is a diagram showing a display example of a monitor in a state in which the work having the first priority in FIG. 7 is machined before the work Nos. 2 and 3. It is a figure which shows the display example of the monitor in the state where the work of the second priority of FIG. 7 is machined before the work of the 5th to 7th.
  • the machine tool system 1 includes a machine tool 2 for processing a work W, a robot 3 for loading and unloading the work W to the machine tool 2. It includes a control device 4 that controls a machine tool 2 and a robot 3.
  • reference numeral 5 is a work stocker that accommodates a plurality of work Ws supplied to the machine tool 2.
  • the work stocker 5 is housed in a state in which nine work Ws are arranged in a 3 ⁇ 3 row on the upper surface thereof, for example.
  • the work W on the work stocker 5 is numbered 1 to 9 (identification information) depending on the position on the work stocker 5.
  • Robot 3 is a 6-axis articulated robot in the example shown in FIG.
  • the robot 3 is provided with a hand 6 capable of gripping the work W at its tip.
  • the structure of the robot 3 may be arbitrary.
  • the control device 4 includes at least one processor 7, a memory (schedule storage unit) 8 in which machining schedule information is stored, and any of the machining schedule information stored in the memory 8. It is provided with a priority setting unit 9 for causing the user to specify the work W and set the priority of the designated work W.
  • the priority setting unit 9 includes a monitor 10 and a keyboard (input device) 11.
  • the machining schedule information includes, for example, the number of the work W, the presence or absence of the work W on the work stocker 5, the state of the work W, and the priority order, as shown in FIG. In the present embodiment, the number of the work W means the processing order of the work W as it is.
  • the number of each work W is associated with information on the presence or absence of work W and a priority.
  • the presence or absence of the work W is input to the machining schedule information by the user, for example, when the work W is set on the work stocker 5.
  • the presence / absence of the work W in the machining schedule information is set to “Yes”.
  • the presence / absence of the work W is "absent" when the work W is being machined and after the machining is completed.
  • the priority order can be input by the user, for example, by a number, if necessary. For example, if the priority of the 4th work W is set to the 1st place and the priority of the 8th work W is set to the 2nd place, the priority corresponding to the 4th work W is set as shown in FIG. Is 1, and the priority corresponding to the 8th work W is 2.
  • control device 4 displays the arrangement of the work W on the work stocker 5 and the machining schedule information on the monitor 10.
  • the initial state before the start of machining as shown in FIG. 4, it is assumed that all the works W are arranged on the work stocker 5 and the priority is not set.
  • the control device 4 updates the machining schedule information stored in the memory 8 to the machining schedule information to which the input priority is added.
  • the control device 4 confirms whether or not the priority is set in the machining schedule information stored in the memory 8 at the start of machining of each work W. If the priority order is not set, the work W is machined in the machining order of the work W in numerical order. On the other hand, when the priority is set, the work W is processed according to the priority, and after all the work W for which the priority is set is processed, the work W for which the priority is not set is processed in numerical order. Work W is processed in the processing order.
  • control device 4 reads the machining schedule information in the memory 8 by the processor 7 before starting the machining of the Nth work W, and confirms whether or not the priority is set (step S2). If the priority is not set, it is determined whether or not the Nth work W is present (step S3).
  • step S4 If there is no Nth work W, the number N is incremented (step S4), and the process from step S2 is repeated. If there is an Nth work W, the work W is processed (step S5). In the initial state of FIG. 4, the priority is not set and all the work W exists on the work stocker 5, so that the machining process of the Nth work W is performed (step S5).
  • control device 4 controls the robot 3 to grip the Nth work W on the work stocker 5 and load it on the machine tool 2. (Step S51). With the work W loaded, the control device 4 controls the machine tool 2 to process the work W (step S52).
  • the control device 4 controls the robot 3 to unload the machined work W from the machine tool 2 (step S53). After that, the information on the presence / absence of the work W of the number N is changed to “none” (step S54). As a result, the display of the monitor 10 is changed as shown in FIG.
  • the user can enter the priority at any time.
  • the keyboard 11 is operated to specify the number of the work W that is raw and exists on the work stocker 5, and the priority is given. Enter the ranking.
  • the machining schedule information is changed. For the work W number that does not exist on the work stocker 5, the designation of the priority may be prohibited.
  • step S7 the work W having the highest priority, that is, the work W having the smallest priority number and the raw work W number Np is used.
  • search step S7.
  • the machining process of the work W of FIG. 6 is carried out (step S5).
  • the machining process of the work W is sequentially performed according to the machining order in the preset machining schedule information.
  • the priority is set for the unmachined work W
  • the presence or absence of the priority is determined before the start of machining of each work W, so that the machining of the work W to which the priority is added is given priority. Can be carried out.
  • the priority is set after the start of machining of the work W and the unmachined work W is given priority. Can be processed into.
  • the priority is set separately from the machining order preset in the machining schedule information, it is not necessary to edit the set machining order, and the machining order can be easily and quickly replaced. There is an advantage.
  • the processed work W may be returned to the original position on the work stocker 5.
  • the information on whether it is unprocessed or processed may be displayed.
  • the arrangement of the work W on the work stocker 5 and the processing schedule information are displayed on the monitor 10, but the present invention is not limited to this.
  • Machine tool system 7 Processor 8 Memory (schedule storage unit) 9 Priority setting unit 10 Monitor 11 Keyboard (input device) W work

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Numerical Control (AREA)
  • General Factory Administration (AREA)

Abstract

複数のワークの加工順序を含む加工スケジュール情報を記憶するスケジュール記憶部(8)と、スケジュール記憶部(8)に記憶されている加工スケジュール情報内のいずれかのワークをユーザに指定させ、指定されたワークの優先順位を設定させる優先順位設定部(9)とを備え、優先順位設定部(9)により優先順位が設定されたワークについては優先順位に従って加工し、優先順位が設定されていないワークについては、優先順位が設定されているワークの加工の後に、加工順序に従って加工する工作機械システム(1)である。

Description

工作機械システム
 本開示は、工作機械システムに関するものである。
 生産スケジュールに従ってワークの加工を行う工作機械が知られている(例えば、特許文献1参照。)。
 生産スケジュールに、ワークの加工の優先順位を予め記憶しておき、生産スケジュールに従うワークの加工ができなかった場合に、次に高い優先順位のワークから加工を行うこととしている。
 また、ワークの移動を管理するトラッキングファイルを備える加工システムが知られている(例えば、特許文献2参照。)。
 トラッキングファイル内のデータの移動、削除および追加等の編集を可能として、トラッキングファイル内の加工順序を入れ替えたり、途中の工程にワークを割り込ませたりしている。
国際公開第2018/138870号 特開昭63-163904号公報
 複数のワークの加工順序は、加工開始前に予め設定されているが、ワークの品種が複数ある場合に、加工開始後に、後ろの加工順序のワークを急遽優先的に加工する必要が生ずる場合がある。このような場合に、特許文献2のようにファイル内のデータを入れ替える作業は煩わしく、短時間に実施することができない。
 したがって、加工開始後に発生した加工順序の入替を簡易かつ短時間に実施することが望まれている。
 本開示の一態様は、複数のワークの加工順序を含む加工スケジュール情報を記憶するスケジュール記憶部と、該スケジュール記憶部に記憶されている前記加工スケジュール情報内のいずれかのワークをユーザに指定させ、指定された前記ワークの優先順位を設定させる優先順位設定部とを備え、該優先順位設定部により前記優先順位が設定された前記ワークについては前記優先順位に従って加工し、前記優先順位が設定されていない前記ワークについては、前記優先順位が設定されている前記ワークの加工の後に、前記加工順序に従って加工する工作機械システムである。
本開示の一実施形態に係る工作機械システムを示す全体構成図である。 図1の工作機械システムを示すブロック図である。 図1の工作機械システムに用いられる加工スケジュール情報の一例を示す図である。 図1の工作機械システムにおける初期状態のモニタの表示例を示す図である。 図1の工作機械システムの動作を説明するフローチャートである。 図5のフローチャートのワークの加工処理ルーチンを説明するフローチャートである。 図4の状態から1番目のワークが加工中または加工終了した状態のモニタの表示例を示す図である。 図7の状態で優先順位が設定された状態のモニタの表示例を示す図である。 図7の優先順位1位のワークが、2番および3番のワークよりも先に加工された状態のモニタの表示例を示す図である。 図7の優先順位2位のワークが、5番から7番のワークよりも先に加工された状態のモニタの表示例を示す図である。
 本開示の一実施形態に係る工作機械システム1について、図面を参照して以下に説明する。
 本実施形態に係る工作機械システム1は、図1および図2に示されるように、ワークWを加工する工作機械2と、工作機械2に対しワークWのロードおよびアンロードを行うロボット3と、工作機械2およびロボット3を制御する制御装置4とを備えている。図1中、符号5は、工作機械2に供給する複数のワークWを収容するワークストッカである。
 ワークストッカ5は、例えば、その上面に、9個のワークWを3×3列に配列した状態に収容している。ワークストッカ5上のワークWには、ワークストッカ5上の位置によって、それぞれ1番から9番までの番号(識別情報)が付されている。
 ロボット3は、図1に示す例では6軸多関節型ロボットである。ロボット3は、先端に、ワークWを把持可能なハンド6を備えている。ロボット3の構造は任意でよい。
 制御装置4は、図2に示されるように、少なくとも1つのプロセッサ7と、加工スケジュール情報が記憶されているメモリ(スケジュール記憶部)8と、メモリ8に記憶されている加工スケジュール情報内のいずれかのワークWをユーザに指定させ、指定されたワークWの優先順位を設定させる優先順位設定部9とを備えている。
 優先順位設定部9は、モニタ10と、キーボード(入力装置)11とを備えている。
 加工スケジュール情報は、例えば、図3に示されるように、ワークWの番号と、ワークストッカ5上におけるワークWの有無と、ワークWの状態と、優先順位とを含んでいる。本実施形態においては、ワークWの番号がそのままワークWの加工順序を意味している。
 各ワークWの番号には、ワークWの有無の情報と、優先順位とが対応付けられている。
 ワークWの有無は、例えば、ワークストッカ5上にワークWをセットしたときに、ユーザが加工スケジュール情報に入力する。ワークストッカ5上にワークWがある場合には、加工スケジュール情報のワークWの有無は「有」と設定される。そして、ワークWの有無は、ワークWが加工中である場合および加工が終了した後には加工スケジュール情報のワークWの有無は「無」となる。
 優先順位は、必要に応じてユーザが、例えば、数字により入力することができる。例えば、4番のワークWの優先順位を1位に設定し、8番のワークWの優先順位を2位に設定すると、図3に示されるように、4番のワークWに対応する優先順位が1となり、8番のワークWに対応する優先順位が2となる。
 制御装置4は、例えば、図4に示されるように、ワークストッカ5上のワークWの配列と、加工スケジュール情報とをモニタ10に表示する。加工開始前の初期状態においては、図4に示されるように、ワークストッカ5上に全てのワークWが配列され、優先順位は設定されていないものとする。
 ユーザは、ワークWの加工開始前および加工中の任意の時点において、未加工のワークW内に加工順序を早めたいワークWがある場合には、キーボード11によって、対応するワークWの番号を指定し、その優先順位に数字を入力することができる。制御装置4は、優先順位が入力されたときには、メモリ8に記憶されている加工スケジュール情報を、入力された優先順位が加えられた加工スケジュール情報に更新する。
 制御装置4は、各ワークWの加工開始時点において、メモリ8に記憶されている加工スケジュール情報内に、優先順位が設定されているか否かを確認する。優先順位が設定されていない場合には、ワークWの番号順の加工順序でワークWを加工する。一方、優先順位が設定されている場合には、優先順位に従ってワークWを加工し、優先順位が設定されている全てのワークWの加工後に、優先順位が設定されていないワークWを番号順の加工順序でワークWを加工する。
 さらに具体的には、制御装置4は、図5に示されるように、ワーク番号NをN=1に初期化する(ステップS1)。次いで、制御装置4は、N番のワークWの加工開始前に、プロセッサ7によってメモリ8内の加工スケジュール情報を読み出して、優先順位が設定されているか否かを確認する(ステップS2)。優先順位が設定されていない場合には、N番のワークWの有無を判定する(ステップS3)。
 N番のワークWがない場合には、番号Nをインクリメントして(ステップS4)、ステップS2からの工程を繰り返す。
 N番のワークWがある場合には、ワークWの加工処理を実施する(ステップS5)。
 図4の初期状態では、優先順位が設定されておらず、ワークストッカ5上に全てのワークWが存在するので、N番目のワークWの加工処理が実施される(ステップS5)。
 ステップS5のワークWの加工処理工程では、図6に示されるように、制御装置4が、ロボット3を制御してワークストッカ5上のN番のワークWを把持させ、工作機械2にロードさせる(ステップS51)。
 ワークWがロードされた状態で、制御装置4は、工作機械2を制御してワークWの加工を実施する(ステップS52)。
 加工が終了すると、制御装置4は、ロボット3を制御して、工作機械2から加工済のワークWをアンロードさせる(ステップS53)。この後に、番号NのワークWの有無の情報を「無」に変更する(ステップS54)。これにより、モニタ10の表示は、図7に示されるように変更される。
 制御装置4は、ワークWの加工処理が終了したときには、全てのワークWの加工が終了したか否か(ワークWの番号Nが最大値Nmaxか否か)を判定する(ステップS6)。終了していない場合には、ステップS4に進み、N=2にインクリメントされてからステップS2に戻る。
 ユーザは、任意の時点で優先順位を入力可能である。例えば、図7に示されたモニタ10の表示の状態において、優先順位を入力するには、キーボード11を操作して、未加工かつワークストッカ5上に存在するワークWの番号を指定し、優先順位を入力する。これにより、例えば、図8に示されるように、加工スケジュール情報が変更される。ワークストッカ5上に存在しないワークWの番号については、優先順位の指定が禁止されてもよい。
 ステップS2に戻った時点において、優先順位が設定されている場合には、優先順位が高いワークW、すなわち、優先順位の数字が最も小さいワークWであって、未加工のワークWの番号Npを検索する(ステップS7)。
 例えば、図8の場合には、番号Npとして、優先順位1位の「4番」が検索されるので、ワーク番号N(=2)を一時的にNtempに退避し(ステップS8)、ワーク番号Nを、検索された番号Np(=4)に置き換える(ステップS9)。この状態で、図6のワークWの加工処理を実施する(ステップS5)。
 4番のワークWの加工処理が終了したときには、制御装置4は、退避しておいたNtemp(=2)をワーク番号Nに戻す(ステップS10)。そして、制御装置4は、モニタ10の表示を図9に示されるように変更し、ステップS2からの工程を繰り返す。ステップS2に戻った時点において、優先順位が高くかつ未加工のワークWは、優先順位2位の「8番」であるため、ワーク番号N(=2)を一時的にNtempに退避し(ステップS8)、ワーク番号Nを、検索された番号Np(=8)に置き換える(ステップS9)。この状態で、図6のワークWの加工処理を実施する(ステップS5)。
 8番のワークWの加工処理が終了したときには、制御装置4は、退避しておいたNtemp(=2)をワーク番号Nに戻す(ステップS10)。そして、制御装置4は、モニタ10の表示を図10に示されるように変更し、ステップS2からの工程を繰り返す。ステップS2に戻った時点において、優先順位が設定された未加工のワークWは存在しないので、ステップS3に進んで、N(=2)番目のワークWの有無が判断され、2番目のワークWの加工処理が行われる。その後、N=3,5,6,7,9の順序で、残りのワークWの加工処理が行われる。
 このように、本実施形態に係る工作機械システム1によれば、優先順位が設定されていない状態においては、予め設定された加工スケジュール情報における加工順序に従ってワークWの加工処理が順次行われる。一方、未加工のワークWに優先順位が設定された場合には、各ワークWの加工開始前に優先順位の有無が判定されるので、優先順位が後付けされたワークWの加工を優先的に実施することができる。
 すなわち、全てのワークWの加工開始前に予め加工スケジュール情報に優先順位を設定しておかなくても、ワークWの加工開始後に未加工のワークWについて優先順位を後付けで設定して、優先的に加工することができる。この場合において、加工スケジュール情報に予め設定されている加工順序とは別に優先順位を設定するので、設定されている加工順序を編集する必要がなく、簡易かつ短時間に加工順序を入れ替えることができるという利点がある。
 特に、ワークWの品種が複数ある場合に、いずれかのワークWの加工開始後に、後ろの加工順序のワークWを急遽優先的に加工する必要が生じた場合に、簡易かつ短時間に加工順序を入れ替えることができる。
 なお、本実施形態においては、ワークストッカ5上に3×3=9個のワークWが配列されている場合を例示したが、ワークWの数および配列は任意でよい。
 また、加工済のワークWをワークストッカ5上の元の位置に戻さないことにより、ワークWの有無の情報を用いて、ユーザが優先順位を設定可能なワークWを判断できることとした。これに代えて、加工済のワークWをワークストッカ5上の元の位置に戻してもよい。この場合には、ワークWの有無の情報に代えて、未加工か加工済かの情報を表示することにしてもよい。
 また、本実施形態においては、モニタ10上にワークストッカ5上のワークWの配列および加工スケジュール情報を表示したが、これに限定されるものではない。
 1 工作機械システム
 7 プロセッサ
 8 メモリ(スケジュール記憶部)
 9 優先順位設定部
 10 モニタ
 11 キーボード(入力装置)
 W ワーク

Claims (3)

  1.  複数のワークの加工順序を含む加工スケジュール情報を記憶するスケジュール記憶部と、
     該スケジュール記憶部に記憶されている前記加工スケジュール情報内のいずれかのワークをユーザに指定させ、指定された前記ワークの優先順位を設定させる優先順位設定部とを備え、
     該優先順位設定部により前記優先順位が設定された前記ワークについては前記優先順位に従って加工し、前記優先順位が設定されていない前記ワークについては、前記優先順位が設定されている前記ワークの加工の後に、前記加工順序に従って加工する工作機械システム。
  2.  前記優先順位設定部が、前記スケジュール記憶部に記憶されている前記ワークの識別情報および前記加工順序を表示するモニタと、該モニタ上に表示されたいずれかの前記ワークの前記識別情報を前記ユーザに選択させて前記優先順位を入力させる入力装置とを備え、
     入力された前記優先順位を前記識別情報に対応付けた新たな前記加工スケジュール情報を前記スケジュール記憶部に記憶させる請求項1に記載の工作機械システム。
  3.  少なくとも1つのプロセッサを備え、
     該プロセッサが、各前記ワークの加工を開始する時点において、前記スケジュール記憶部に記憶されている前記加工スケジュール情報のいずれかの前記ワークに前記優先順位が設定されているか否かを確認する請求項1または請求項2に記載の工作機械システム
PCT/JP2021/025878 2020-07-14 2021-07-09 工作機械システム WO2022014476A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US18/013,441 US20230297087A1 (en) 2020-07-14 2021-07-09 Machine tool system
DE112021001618.0T DE112021001618T5 (de) 2020-07-14 2021-07-09 Werkzeugmaschinensystem
JP2022536316A JP7498276B2 (ja) 2020-07-14 2021-07-09 工作機械システム
CN202180035811.3A CN115769158A (zh) 2020-07-14 2021-07-09 机床系统

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020-120586 2020-07-14
JP2020120586 2020-07-14

Publications (1)

Publication Number Publication Date
WO2022014476A1 true WO2022014476A1 (ja) 2022-01-20

Family

ID=79555459

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/025878 WO2022014476A1 (ja) 2020-07-14 2021-07-09 工作機械システム

Country Status (4)

Country Link
US (1) US20230297087A1 (ja)
CN (1) CN115769158A (ja)
DE (1) DE112021001618T5 (ja)
WO (1) WO2022014476A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03170256A (ja) * 1989-11-28 1991-07-23 Yamazaki Mazak Corp 工作機械設備及び該工作機械設備における加工制御方法
JPH05274016A (ja) * 1992-03-27 1993-10-22 Amada Co Ltd Nc加工機械のスケジュール運転システム
JPH11239922A (ja) * 1998-02-26 1999-09-07 Fanuc Ltd ワイヤカット放電加工用加工順序編集方法及び装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10684606B2 (en) 2017-01-27 2020-06-16 Mitsubishi Electric Corporation Selection apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03170256A (ja) * 1989-11-28 1991-07-23 Yamazaki Mazak Corp 工作機械設備及び該工作機械設備における加工制御方法
JPH05274016A (ja) * 1992-03-27 1993-10-22 Amada Co Ltd Nc加工機械のスケジュール運転システム
JPH11239922A (ja) * 1998-02-26 1999-09-07 Fanuc Ltd ワイヤカット放電加工用加工順序編集方法及び装置

Also Published As

Publication number Publication date
CN115769158A (zh) 2023-03-07
JPWO2022014476A1 (ja) 2022-01-20
US20230297087A1 (en) 2023-09-21
DE112021001618T5 (de) 2022-12-29

Similar Documents

Publication Publication Date Title
US4549270A (en) Method of controlling selection of tools in a quadriaxial numerical control lathe
JP2884816B2 (ja) 移動ロボットシステムにおける制御方法
JP6427866B2 (ja) フレキシブル生産システム
JPH0321299B2 (ja)
EP0148273B1 (en) Numerical control apparatus
JP4216808B2 (ja) 数値制御装置
WO2022014476A1 (ja) 工作機械システム
KR102182204B1 (ko) 공작기계 가공조건 자동선택방법
EP0154028A2 (en) Working method in numerical control machine
EP1394642B1 (en) Multi-system numerical control device
JPH10161723A (ja) 金属シート移動方法及び金属シート移動ロボット
JPH08137533A (ja) Ncネスティング加工方法
JP3467811B2 (ja) Ncデータ作成方法及びnc加工方法
JP2003340674A (ja) 工作機械、及びそのティーチング方法
JP2824984B2 (ja) 工作機械設備及び該工作機械設備における加工制御方法
JP2006079561A (ja) 数値制御装置、数値制御方法、制御プログラム及び記録媒体
JPH1063323A (ja) 横形工作機械のnc加工プログラム作成方法および装置
JPH0351550B2 (ja)
KR100358187B1 (ko) 공작물에 대응하는 가공프로그램 선택 제어장치
JPH10249559A (ja) レーザ加工設備
JPH05333912A (ja) Dncシステムにおける加工スケジュール設定方法
JPH058156A (ja) マシニングセンタにおけるパレツト上複数ワークの加工スケジユール制御方法
JP3072918B2 (ja) スケジュール運転方法
CN115401613A (zh) 磨床、连续加工方法及程序生成方法
JPH02205454A (ja) ワークテーブルを伴った部品加工システム及びその制御方式

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21841523

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022536316

Country of ref document: JP

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 21841523

Country of ref document: EP

Kind code of ref document: A1