WO2020261547A1 - 鋼材の冷却装置及びこの冷却装置を使用した鋼材冷却設備 - Google Patents

鋼材の冷却装置及びこの冷却装置を使用した鋼材冷却設備 Download PDF

Info

Publication number
WO2020261547A1
WO2020261547A1 PCT/JP2019/025877 JP2019025877W WO2020261547A1 WO 2020261547 A1 WO2020261547 A1 WO 2020261547A1 JP 2019025877 W JP2019025877 W JP 2019025877W WO 2020261547 A1 WO2020261547 A1 WO 2020261547A1
Authority
WO
WIPO (PCT)
Prior art keywords
cooling
steel material
cooling device
steel
pipe
Prior art date
Application number
PCT/JP2019/025877
Other languages
English (en)
French (fr)
Inventor
啓次 高木
Original Assignee
Jfeスチール株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jfeスチール株式会社 filed Critical Jfeスチール株式会社
Priority to JP2021527286A priority Critical patent/JP7006846B2/ja
Priority to PCT/JP2019/025877 priority patent/WO2020261547A1/ja
Priority to CN202010585231.9A priority patent/CN112139265B/zh
Priority to CN202021204242.XU priority patent/CN213256296U/zh
Publication of WO2020261547A1 publication Critical patent/WO2020261547A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • B21B45/0209Cooling devices, e.g. using gaseous coolants
    • B21B45/0215Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
    • B21B45/0224Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes for wire, rods, rounds, bars
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/52Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for wires; for strips ; for rods of unlimited length
    • C21D9/54Furnaces for treating strips or wire
    • C21D9/56Continuous furnaces for strip or wire
    • C21D9/573Continuous furnaces for strip or wire with cooling

Definitions

  • the present invention relates to a cooling device for cooling a long steel material such as steel bar and wire, and a steel material cooling facility using this cooling device.
  • a steel material cooling facility for cooling steel materials is installed at the rear stage of the machine.
  • the steel material cooling facility is configured by, for example, arranging a plurality of cooling devices of Patent Document 1 in series at predetermined intervals along the traveling direction of the steel material to be cooled.
  • the cooling device of Patent Document 1 includes a linear cooling pipe through which a steel material passes and a cooling water injection nozzle that injects cooling water into the inside of the cooling pipe, and the cooling water injection nozzle is one of the outer circumferences of the cooling pipe.
  • the steel material that passes through the inside of the cooling pipe of each cooling device of the steel material cooling equipment may bend downward due to the weight of the steel material and pass under the inside of the cooling pipe.
  • the cooling water is injected from the entire inner circumference of the cooling pipe through the injection slit so that the cooling water is uniformly supplied over the entire circumference of the steel material. This is to avoid the occurrence of uneven cooling in the direction.
  • the cooling capacity of the cooling water injected from the injection slit may not be uniform in the circumferential direction of the steel material, and cooling unevenness may occur. ..
  • the steel material bends downward due to its own weight in the cooling pipe and comes into contact with the inner wall on the lower side of the cooling pipe the quality may be affected.
  • the present invention has been made by paying attention to the unsolved problems of the above-mentioned conventional example, and uses a steel material cooling device capable of eliminating cooling unevenness and cooling the steel material with high quality, and this cooling device.
  • the purpose is to provide steel cooling equipment.
  • the steel material cooling device is a cooling device for cooling a long steel material such as a steel bar or a wire rod rolled by a hot rolling facility, and the steel material is inside.
  • a linear cooling pipe that passes through the steel, a cooling tank formed on a part of the outer circumference of the cooling pipe, and an injection slit that injects the cooling water stored in the cooling tank onto the steel material from the entire inner circumference of the cooling pipe.
  • a roller insertion hole penetrating the wall thickness direction is formed in the cooling pipe, and a part of the support roller rotatably supported outside the cooling pipe protrudes into the cooling pipe through the roller insertion hole.
  • the support roller supports the lower part of the steel material that passes through the inside of the cooling pipe.
  • the steel material cooling device according to the above-described aspect is referred to as a first cooling device, and the first cooling device is provided with a support roller and a roller insertion port for the support roller.
  • a cooling device without a cooling device is referred to as a second cooling device
  • a plurality of first cooling devices and a plurality of second cooling devices are connected in series along the traveling direction of the steel material with a predetermined gap between them.
  • a second cooling device is arranged in series between the adjacent first cooling devices, and the distance between the adjacent first cooling devices is set to a value of 80 times or less the inner diameter of the cooling pipe. There is.
  • the support roller provided in the cooling pipe suppresses the steel material from moving to the lower side of the cooling pipe due to its own weight. Therefore, it is possible to eliminate uneven cooling and cool the steel material with high quality.
  • FIG. 2 It is a schematic block diagram which provided the steel material cooling equipment of the steel material of 1st Embodiment in the latter stage of the finishing rolling mill of the hot rolling equipment which concerns on this invention. It is a figure which shows the steel material cooling equipment of the steel material of 1st Embodiment. It is a cooling device with a roller (first cooling device) used in the steel material cooling facility shown in FIG. 2, and is a device in which a support roller is provided on a cooling pipe. It is a rollerless cooling device (second cooling device) used in the steel material cooling facility shown in FIG. 2, and is a device in which a support roller is not provided in the cooling pipe.
  • first cooling device used in the steel material cooling facility shown in FIG. 2
  • second cooling device rollerless cooling device
  • the hot rolling equipment 1 for hot-rolling a rolling material RM such as ordinary steel, alloy steel, and stainless steel to produce, for example, a long steel material SM having a circular cross section is a rough rolling mill 2. It includes an intermediate rolling mill 3, a finish rolling mill 4, and a steel material cooling facility 5 according to the first embodiment of the present invention, which is arranged after the finish rolling mill 4.
  • a rolling material RM such as ordinary steel, alloy steel, and stainless steel
  • a plurality of cooling devices are arranged in series at predetermined intervals along the traveling direction of the steel material SM.
  • 13 cooling devices are arranged in series, and the 13 cooling devices are composed of two types of first cooling device 6 and a second cooling device 7, which will be described later.
  • the steel material cooling facility 5 extends in the traveling direction of the steel material SM so as to surround the lower side of 13 cooling devices (a plurality of first cooling devices 6 and a second cooling device 7), and the bottom plate 8a is a drain port.
  • a gutter-shaped drainage pan 8 formed with a downward slope toward 8b, and the first and second drainage pans 8 extending in the elongated direction and connected to 13 cooling devices. It is provided with water supply pipes 9 and 10.
  • FIG. 3 specifically shows the first cooling device 6 among the plurality of cooling devices arranged in series along the traveling direction of the steel material SM.
  • the first cooling device 6 is made of cast iron or cast steel, and includes a cooling pipe 11 and a cooling water injection nozzle 12.
  • the cooling pipe 11 is a cylindrical member extending in a straight line, and one end opening 11a having an enlarged diameter toward the end is used as a steel SM entrance port (hereinafter, entry port 11a), and the other end opening 11b. Is the outlet of the steel material SM (hereinafter referred to as the outlet 11b).
  • the diameter Md of the steel material SM passing through the inside of the cooling pipe 11 is set to 30% or less of the inner diameter Pd of the cooling pipe 11.
  • a suspended portion 13 having an engaging hole 13a to which the hook of the suspending tool can be engaged is formed so as to project upward.
  • a fixed connecting portion 14 is formed, which is fixed by bolting to the fixing portion 9a (10a) rising from the upper outer circumference of the first water supply pipe 9 (or the second water supply pipe 10).
  • a roller insertion hole 15 penetrating in the wall thickness direction is formed in the lower portion of the cooling pipe 11, and a bearing portion 16 is formed in the lower outer periphery of the cooling pipe 11 around the roller insertion hole 15.
  • the support roller 17 is coaxially fixed to the rotating shaft 18, and the rotating shaft 18 is rotatably supported by a bearing (not shown) provided on the bearing portion 16.
  • the rotating shaft 18 is horizontally arranged below the axis P of the cooling pipe 11, and the axis P and the rotating shaft 18 are orthogonal to each other when viewed from above.
  • the support roller 17 is a ceramic roller, and the roller surface with which the steel material SM contacts has a shape in which a concave curved surface having a radius of curvature larger than the diameter of the steel material SM is formed along the axial direction of the rotating shaft 18, or approximately 120 °. It is a shape in which a V-shaped open surface is formed along the axial direction at the angle of.
  • the cooling water injection nozzle 12 includes an annular tank 19 formed around the outer periphery of the cooling pipe 11 on the outlet 11b side, a supply port 20 for supplying cooling water to the annular tank 19, and cooling stored in the annular tank 19. It is provided with an injection slit 21 for injecting water from the entire inner circumference of the cooling pipe 11.
  • the supply port 20 of the cooling water injection nozzle 12 is connected to either the first or second water supply pipes 9 and 10.
  • the injection slit 21 is provided in a conical shape so that the injection direction of the cooling water is inclined toward the opening (entrance of the steel material SM) 11a.
  • the fixed connecting portion 14 of the cooling pipe 11 is fixed to the fixing portions 9a and (10a) of the first water supply pipe 9 (or the second water supply pipe 10), so that the first cooling device 6 becomes the first. It is fixedly arranged on the upper part of the water supply pipe 9 (or the second water supply pipe 10).
  • FIG. 4 specifically shows the second cooling device 7 among the plurality of cooling devices arranged in series along the traveling direction of the steel material SM.
  • the difference between the second cooling device 7 and the first cooling device 6 is that the roller insertion hole 15, the bearing portion 16, and the support roller 17 formed in the cooling pipe 11 of the first cooling device 6 are the second cooling device 7. This is a point that does not exist in the cooling pipe 11.
  • the other structures of the second cooling device 7 and the first cooling device 6 are all the same in size, shape, and the like.
  • the first cooling device 6 is referred to as a cooling device 6 with a roller
  • the second cooling device 7 is referred to as a cooling device 7 without a roller.
  • the roller-equipped cooling device 6 is the fourth unit from the leftmost to the right (device indicated by reference numeral 6A) and the ninth unit from the leftmost to the right (device indicated by reference numeral 6A).
  • a total of three units are arranged at the positions of the device indicated by reference numeral 6B) and the rightmost device (device indicated by reference numeral 6C).
  • rollerless cooling devices 7 are arranged on the left side of the first cooling device 6A, and four rollers are arranged between the roller-equipped cooling device 6A and the roller-equipped cooling device 6B.
  • Three units are arranged between the cooling device 6B with rollers and the cooling device 6C with rollers, for a total of ten units.
  • the 13 roller-equipped cooling devices 6A, 6B, 6C and the rollerless cooling device 7 are arranged in series with an interval L of 10 mm to 50 mm between the cooling devices and the adjacent cooling devices.
  • the distance K1 between the adjacent cooling devices 6A and 6B with rollers and the distance K2 between the adjacent cooling devices 6B and 6C are the cooling devices 6A, 6B and 6C with rollers (or the cooling device 7 without rollers).
  • Is set to a value equal to or less than the reference interval D obtained by multiplying the inner diameter Pd of the cooling pipe 11 by 80 (D Pd ⁇ 80, K1 ⁇ D, K2 ⁇ D).
  • the annular tank 19 is provided from the supply ports 20 of the plurality of roller-equipped cooling devices 6A, 6B, 6C and the rollerless cooling device 7.
  • the cooling water is stored in the tank, and the cooling water of the annular tank 19 passes through the injection slit 21 and is injected from the entire inner circumference of the cooling pipe 11.
  • the steel materials SM that have been finish-rolled by the finish rolling mill 4 and sent out to the steel material cooling facility 5 include a plurality of roller-equipped cooling devices 6A, 6B, 6C and 6Cs that are arranged in series along the traveling direction of the steel material SM.
  • the cooling pipe 11 of the rollerless cooling device 7 passes from the entrance 11a to the outlet 11b, and is cooled by contacting the cooling water injected from the entire inner circumference of each cooling pipe 11. Since the injection slit 21 is provided so that the injection direction of the cooling water is inclined toward the entrance 11a side, the cooling water injected from the injection slit 21 enters the cooling pipe after colliding with the steel material SM. It flows toward the 11a side.
  • the space between the inner peripheral surface of the cooling pipe 11 and the steel material SM is filled with cooling water, and the steel material SM is cooled while the cooling water in the cooling pipe 11 flows to the entrance 11a.
  • roller-equipped cooling devices 6A, 6B, and 6C most of the cooling water that comes into contact with the steel material SM and whose temperature rises and its cooling capacity drops passes through the inlet 11a of the cooling pipe 11 and partly exits. It passes through 11b and the roller insertion hole 15 and flows to the bottom plate 8a of the drain pan 8 and is collected from the drain port 8b. Further, in the rollerless cooling device 7, most of the cooling water in contact with the steel material SM passes through the entrance 11a of the cooling pipe 11 and partly passes through the outlet 11b, and the bottom plate 8a of the drain pan 8 It flows to the drain port 8b side.
  • the steel material SM sent from the finish rolling mill 4 cools the steel material.
  • the steel material SM may bend downward due to its own weight in the equipment 5, and the steel material SM may pass through the lower side in the cooling passage (cooling pipe 11) of the steel material cooling equipment 5. If the steel material SM passes under the cooling pipe 11 of the cooling device 7 in a biased manner, the cooling device 7 cannot uniformly cool the steel material along the circumferential direction. Further, if the deviation of the steel material SM to the lower side in the cooling pipe 11 becomes large, the steel material SM may come into contact with the inner circumference of the cooling pipe 11 and a defect may occur on the surface of the steel material SM.
  • three cooling devices 6A, 6B, 6C with rollers are arranged in a plurality of cooling devices arranged in series along the traveling direction of the steel material SM. Since the support rollers 17 of the cooling devices 6A, 6B, 6C with rollers contact the lower side of the steel SM passing through the cooling pipe 11 to support the lower part of the steel SM, the steel SM supports the lower part of the steel SM by its own weight. It is prevented from passing under the eleven.
  • the support roller 17 and the steel material SM come into contact with each other, since the support roller rotates with the movement of the steel material SM, the steel material SM is hardly damaged as compared with the case where the support roller 17 comes into contact with the inner surface of the cooling pipe 11.
  • all of the cooling devices arranged in series along the traveling direction of the steel material SM are not the roller-equipped cooling devices 6A, 6B, 6C, but the adjacent roller-equipped cooling devices 6A, 6B.
  • the value of the distance between each other is equal to or less than the reference distance D obtained by multiplying the inner diameter Pd of the cooling pipe 11 of the cooling devices 6A, 6B, 6C with rollers (or the cooling device without rollers 7) by 80.
  • the steel material SM passing through the cooling pipes 11 of the plurality of roller-equipped cooling devices 6A, 6B, 6C and the rollerless cooling device 7 of the steel material cooling facility 5 is provided with the cooling water injection nozzles 12 of the respective cooling devices 6A, 6B, 6C, 7. Since the cooling water stored in the annular tank 19 passes through the injection slit 21 and is injected from the entire inner circumference of the cooling pipe 11, the steel SM can be efficiently cooled. Further, the steel material SM sent out from the finish rolling mill 4 is deflected downward due to its own weight, and when the steel material SM passes under the cooling passage of the steel material cooling facility 5, cooling water is ejected due to this deflection.
  • the support rollers 17 of the three cooling devices 6A, 6B, and 6C with rollers come into contact with the lower side of the steel material SM passing through the cooling pipe 11, so that the steel material SM comes into contact with the lower side of the cooling pipe 11. Can be prevented from passing through. Therefore, it is possible to prevent uneven cooling. Further, it prevents the steel material SM from coming into contact with the inner wall on the lower side of the cooling pipe 11, and does not adversely affect the quality of the steel material SM.
  • a plurality of cooling devices arranged in series along the traveling direction of the steel material SM have a cooling pipe in which the intervals between the adjacent cooling devices 6A and 6B with rollers (or the intervals between the 6B and 6C) are different. Only by arranging a small number of cooling devices 6A, 6B, 6C with rollers so that the value is equal to or less than the reference interval D obtained by multiplying the inner diameter Pd of 11 by 80, the steel material SM passes under the cooling pipe 11 due to its own weight. Since this can be prevented, the equipment cost of the steel material cooling equipment 5 can be reduced.
  • the cooling devices of the plurality of cooling devices arranged in series along the traveling direction are rolled. It is conceivable that the non-cooling device 7 is used, and the distance L between the adjacent rollerless cooling devices 7 is large enough to arrange the support rollers 17. However, if this interval L is increased, the steel material SM is not cooled while the steel material SM passes through the position of the interval L.
  • the interval L between adjacent cooling devices is provided to discharge the cooling water whose cooling capacity has decreased as described above, and if the length is such that this discharge is possible, the smaller the distance, the longer the unit length of the cooling equipment.
  • the cooling capacity at the edge can be improved, and specifically, it may be 10 to 50 mm.
  • some of the plurality of cooling devices arranged in series along the traveling direction are the cooling devices 6 with rollers, so that the distance L between the adjacent cooling devices 6 or 7 can be set. It can be set small to secure the cooling capacity as a cooling device and prevent the steel material SM from passing through the lower side in the cooling pipe.
  • the steel material SM sent from the finish rolling mill 4 to the steel material cooling facility 5 is the steel material SM after the rough rolling process is performed by the rough rolling machine 2, or after the intermediate rolling process is performed by the intermediate rolling machine 3.
  • There is less vibration than the steel material SM and a large impact force is not applied to the support rollers 17 of the roller-equipped cooling devices 6A, 6B, 6C. Therefore, by using the ceramic support rollers 17, heat resistance and resistance
  • the support roller 17 has excellent wear resistance, and the roller-equipped cooling devices 6A, 6B, and 6C can be used for a long period of time.
  • the plurality of roller-equipped cooling devices 6A, 6B, 6C and the rollerless cooling device 7 constituting the steel material cooling facility 5 are formed with a suspended portion 13 having an engaging hole 13a in the cooling pipe 11.
  • the fixed connecting portion 14 of the cooling pipe 11 and the fixed portion 9a (10a) of the first water supply pipe 9 (or the second water supply pipe 10) are fixed.
  • the hook of the hanging tool (lifting device) can be easily performed.
  • FIG. 5 shows that the steel material cooling equipment 5 of the second embodiment according to the present invention is arranged after the rough rolling mill 2 of the hot rolling equipment 1.
  • three roller-equipped cooling devices 6A, 6B, 6C and ten roller-less cooling devices 7 are arranged in the same arrangement order as in FIG.
  • the steel cooling equipment 5 of the present embodiment differs from the first embodiment in that the support rollers 17 arranged in the cooling pipes 11 of the three roller-equipped cooling devices 6A, 6B, and 6C are made of cast iron or cast steel. It is a point formed by a roller.
  • the steel material SM sent from the rough rolling mill 2 to the steel material cooling facility 5 has a large vibration, and a large impact force is applied to the support rollers 17 of the cooling devices 6A, 6B, 6C with rollers. Therefore, by using the cast iron or cast steel support roller 17, the support roller 17 has excellent impact resistance, heat resistance, and wear resistance, and the roller-equipped cooling devices 6A, 6B, and 6C are used for a long period of time. can do.
  • FIG. 6 shows that the steel material cooling equipment 5 of the third embodiment according to the present invention is arranged after the intermediate rolling mill 3 of the hot rolling equipment 1.
  • three roller-equipped cooling devices 6A, 6B, 6C and ten roller-less cooling devices 7 are arranged in the same arrangement order as in FIG.
  • the steel cooling equipment 5 of the present embodiment is different from the first and second embodiments in that the support rollers 17 arranged in the cooling pipes 11 of the three roller-equipped cooling devices 6A, 6B, and 6C are cemented carbide. The point is that it is formed by a roller made of alloy (tungsten carbide).
  • the steel material SM sent from the intermediate rolling mill 2 to the steel material cooling facility 5 is not in the state of being sent out from the rough rolling mill 2, but has relatively large vibration, and the support rollers 17 of the cooling devices 6A, 6B, 6C with rollers Impact force is applied to. Therefore, by using the support roller 17 made of cemented carbide, the support roller 17 has excellent impact resistance, heat resistance, and wear resistance, and the cooling devices 6A, 6B, and 6C with rollers are used for a long period of time. can do.
  • the steel material SM passing through the inside of the cooling pipe 11 is in a direction (for example, left-right direction or upward direction) orthogonal to the traveling direction of the steel material SM.
  • Another roller here, referred to as a restraint roller
  • another restraining roller may be provided inside the cooling pipe 11 of the rollerless cooling device 7 to prevent the steel material SM from meanderingly moving in a direction orthogonal to the traveling direction of the steel material SM by contact.
  • the restraint roller is also arranged so as to project inside the cooling pipe by passing through the restraint roller insertion hole formed through the cooling pipe in the thickness direction.
  • the roller-equipped cooling device 6A is the fourth unit from the leftmost to the right in FIG. 2, and the roller-equipped cooling device 6B is one.
  • the ninth roller-equipped cooling device 6C is located at the rightmost position from the left to the right (a total of three roller-equipped cooling devices). Further, as shown in FIG.
  • rollerless cooling devices 7 are arranged between the first cooling device 6A from the leftmost, and 4 are arranged between the roller-equipped cooling device 6A and the roller-equipped cooling device 6B.
  • Three units are arranged between the cooling device 6B with rollers and the cooling device 6C with rollers, and a total of ten units are arranged.
  • the inner diameter Pd of the cooling pipe 11 constituting the cooling devices 6A, 6B, 6C with rollers and the cooling device 7 without rollers is 48 mm.
  • the diameter Md of the steel material SM sent out from the finish rolling mill 4 is 24 mm.
  • the inner diameter Pd of the cooling pipe 11 is designed to exceed 30% of the diameter Md of the steel material SM.
  • the steel material SM passes through the cooling pipes 11 of the cooling devices 6A, 6B, 6C with rollers and the cooling device 7 without rollers at a speed of 10 m / sec.
  • the rollerless cooling equipment 7 is arranged in place of the roller-equipped cooling devices 6A, 6B, 6C in the steel material cooling equipment 5 of FIG. 2, and all 13 units are arranged. Is the rollerless cooling device 7.
  • Other arrangement positions and structures are the same as those of the steel cooling equipment according to the present invention.
  • the steel material cooling equipment according to the present invention cools the cooling devices 6A, 6B, 6C, 7 to the steel material SM passing through the cooling pipes 11 of the three roller-equipped cooling devices 6A, 6B, 6C and the rollerless cooling device 7. It was confirmed that the cooling water stored in the annular tank 19 of the water injection nozzle 12 passed through the injection slit 21 and was injected from the entire inner circumference of the cooling pipe 11, and the steel material SM was cooled to about 800 ° C.
  • the steel material SM that passed through the steel material cooling equipment according to the present invention did not have uneven cooling and that the outer periphery and the like were not scratched due to contact with the inner wall of the cooling pipe 11.
  • the cooling water stored in the annular tank 19 of the cooling water injection nozzle 12 of each cooling device 7 is stored in the steel SM passing through the cooling pipe 11 of the 13 rollerless cooling devices 7. It was confirmed that the steel material SM was cooled to about 800 ° C. by being injected from the entire inner circumference of the cooling pipe 11 through the injection slit 21.
  • the steel material SM that passed through the steel material cooling equipment of the comparative example had uneven cooling, and that the outer circumference and the like had scratches due to contact with the inner wall of the cooling pipe 11. This is because the steel material SM passes under the cooling pipe 11 of each cooling device 7 due to the deflection of the steel material SM sent out from the finish rolling mill 4, and the distance between the injection slit 21 for ejecting the cooling water and the steel material SM. However, since it changes greatly depending on the circumferential position of the steel material SM, cooling unevenness along the circumferential direction of the steel material SM occurs. Further, the steel material SM comes into contact with the inner wall on the lower side of the cooling pipe 11, and the outer circumference of the steel material SM is scratched.
  • Hot rolling equipment Rough rolling machine 3 Intermediate rolling machine 4 Finishing rolling machine 5 Steel material cooling equipment 6,6A, 6B, 6C Cooling equipment with rollers (1st cooling equipment) 7 Rollerless cooling device (second cooling device) 8a Bottom plate 8b Drainage port 8 Drainage pan 9 First water supply pipe 9a, 10a Fixed part 10 Second water supply pipe 11 Cooling pipe 11a Entrance 11b Outlet 12 Cooling water injection nozzle 13 Suspended part 13a Engagement hole 14 Fixed connection part 15 Roller insertion hole 16 Bearing 17 Support roller 18 Rotating shaft 19 Circular tank 20 Supply port 21 Injection slit D Reference interval between adjacent cooling devices with rollers L Gap between a pair of cooling devices SM Steel Pd Inner diameter of cooling pipe

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Heat Treatments In General, Especially Conveying And Cooling (AREA)
  • Metal Rolling (AREA)
  • Heat Treatment Of Strip Materials And Filament Materials (AREA)

Abstract

鋼材(SM)が内部を通過する直線状の冷却パイプ(11)と、冷却パイプの外周の一部に形成された冷却タンク(19)と、冷却タンクに貯留された冷却水を冷却パイプの内周全域から鋼材に噴射させる噴射スリット(21)と、を備え、冷却パイプに、肉厚方向を貫通するローラー挿入孔(15)が形成され、冷却パイプの外側で回転自在に支持された支持ローラー17の一部が、ローラー挿入孔を通過して冷却パイプの内部に突出して配置され、冷却パイプの内部を通過する鋼材の下部を支持ローラーが支持することを特徴とする鋼材の冷却装置。

Description

鋼材の冷却装置及びこの冷却装置を使用した鋼材冷却設備
 本発明は、棒鋼、線材などの長尺な鋼材を冷却する冷却装置及びこの冷却装置を使用した鋼材冷却設備に関する。
 棒鋼、線材などの長尺な鋼材を製造する複数の圧延機(粗圧延機、中間圧延機、仕上圧延機)を備えた熱間圧延設備では、所定の一対の圧延機の間、或いは仕上げ圧延機の後段に、鋼材を冷却する鋼材冷却設備が配置されている。
 鋼材冷却設備は、例えば特許文献1の冷却装置を、冷却する鋼材の進行方向に沿って所定の間隔をあけて直列に複数配置することで構成されている。
 特許文献1の冷却装置は、鋼材が通過する直線状の冷却パイプと、冷却パイプの内部に冷却水を噴射する冷却水噴射ノズルと、を備え、冷却水噴射ノズルは、冷却パイプの外周の一部に形成された冷却タンクと、冷却タンクに貯留された冷却水を冷却パイプの内周全域から噴射させる噴射スリットと、を備えている。そして、鋼材冷却設備の挿入口から挿入された鋼材が各冷却装置の冷却パイプ内部を通過すると、各冷却装置の冷却水噴射ノズルから噴射する冷却水で鋼材が連続的に冷却される。
特開2018-123354号公報
 ところで、鋼材冷却設備の各冷却装置の冷却パイプ内部を通過する鋼材は、鋼材の自重により下方へたわみ、冷却パイプ内部の下側を通過する場合がある。上述の特許文献1に記載の技術において、冷却パイプの内周全域から噴射スリットを介して冷却水を噴射するのは、鋼材の全周にわたって均一に冷却水が供給されるようにして、鋼材周方向の冷却ムラが生じることを回避するためである。しかし、鋼材が冷却パイプの軸心からずれて下側を通過すると、噴射スリットから噴射される冷却水による冷却能力が、鋼材の周方向で均一とはならず、冷却ムラが発生するおそれがある。また、冷却パイプ内で鋼材が自重により下方向にたわみ、冷却パイプの下側の内壁に接触すると、品質に影響を及ぼすおそれがある。
 そこで、本発明は、上記従来例の未解決の課題に着目してなされたものであり、冷却ムラを無くし、高品質に鋼材を冷却することができる鋼材の冷却装置及びこの冷却装置を使用した鋼材冷却設備を提供することを目的としている。
 上記目的を達成するために、本発明の一態様に係る鋼材の冷却装置は、熱間圧延設備で圧延された棒鋼、線材などの長尺な鋼材を冷却する冷却装置であって、鋼材が内部を通過する直線状の冷却パイプと、冷却パイプの外周の一部に形成された冷却タンクと、冷却タンクに貯留された冷却水を冷却パイプの内周全域から鋼材に噴射させる噴射スリットと、を備え、冷却パイプに、肉厚方向を貫通するローラー挿入孔が形成され、冷却パイプの外側で回転自在に支持された支持ローラーの一部が、ローラー挿入孔を通過して冷却パイプの内部に突出して配置されており、冷却パイプの内部を通過する鋼材の下部を支持ローラーが支持している。
 また、本発明の一態様に係る鋼材冷却設備は、上述した態様に係る鋼材の冷却装置を第1冷却装置と称し、第1冷却装置に対して支持ローラーおよび支持ローラーのローラー挿入口を有さない冷却装置を第2冷却装置と称すると、複数台の第1冷却装置と、複数台の第2冷却装置とが、鋼材の進行方向に沿って、互いの間に所定の隙間を設けながら直列に配置され、隣り合う前記第1冷却装置の間に、第2冷却装置が直列に配置され、隣り合う前記第1冷却装置の間隔が、冷却パイプの内径の80倍以下の値に設定されている。
 本発明に係る鋼材の冷却装置及びこの冷却装置を使用した鋼材冷却設備によれば、冷却パイプに設けられている支持ローラーが、自重により鋼材が冷却パイプの下側に移動するのを抑制しているので、冷却ムラを無くし、高品質に鋼材を冷却することができる。
本発明に係る熱間圧延設備の仕上げ圧延機の後段に第1実施形態の鋼材の鋼材冷却設備を備えた概略構成図である。 第1実施形態の鋼材の鋼材冷却設備を示す図である。 図2で示した鋼材冷却設備で使用されているローラー付き冷却装置(第1冷却装置)であり、冷却パイプに支持ローラーが設けられている装置である。 図2で示した鋼材冷却設備に使用されているローラー無し冷却装置(第2冷却装置)であり、冷却パイプに支持ローラーが設けられていない装置である。 本発明に係る熱間圧延設備の粗圧延機の後段に第2実施形態の鋼材冷却設備を備えた概略構成図である。 本発明に係る熱間圧延設備の中間圧延機の後段に第3実施形態の鋼材冷却設備を備えた概略構成図である。
 次に、図面を参照して、本発明に係る実施形態を説明する。以下の図面の記載において、同一又は類似の部分には同一又は類似の符号を付している。ただし、図面は模式的なものであり、厚みと平面寸法との関係、各層の厚みの比率等は現実のものとは異なることに留意すべきである。したがって、具体的な厚みや寸法は以下の説明を参酌して判断すべきものである。また、図面相互間においても互いの寸法の関係や比率が異なる部分が含まれていることはもちろんである。
 また、以下に示す実施形態は、本発明の技術的思想を具体化するための装置や方法を例示するものであって、本発明の技術的思想は、構成部品の材質、形状、構造、配置等を下記のものに特定するものでない。本発明の技術的思想は、特許請求の範囲に記載された請求項が規定する技術的範囲内において、種々の変更を加えることができる。
 図1に示すように、普通鋼、合金鋼、ステンレス鋼等の圧延素材RMを熱間圧延し、例えば断面円形の長尺な鋼材SMを製造する熱間圧延設備1は、粗圧延機2、中間圧延機3及び仕上げ圧延機4と、仕上げ圧延機4の後段に配置されている本発明に係る第1実施形態の鋼材冷却設備5と、を備えている。
 第1実施形態の鋼材冷却設備5は、図2に示すように、鋼材SMの進行方向に沿って複数の冷却装置が所定の間隔を設けて直列に配置されている。本実施形態では、13個の冷却装置が直列配置されており、13個の冷却装置は、後述する2種類の第1冷却装置6及び第2冷却装置7で構成されている。
 そして、鋼材冷却設備5は、13台の冷却装置(複数の第1冷却装置6及び第2冷却装置7)の下側を囲むように鋼材SMの進行方向に延在し、底板8aが排水口8bに向けて下り傾斜を付けて形成されている樋形状の排水パン8と、排水パン8の内部の長尺方向に延在して13台の冷却装置に接続している第1及び第2水供給管9,10と、を備えている。
 図3は、鋼材SMの進行方向に沿って直列に配置されている複数の冷却装置のうちの第1冷却装置6を具体的に示すものである。
 第1冷却装置6は、鋳鉄又は鋳鋼で形成されており、冷却パイプ11と、冷却水噴射ノズル12と、を備えている。
 冷却パイプ11は、直線状に延在する円筒部材であり、端部に向かうに従い拡径形状とした一端開口部11aを鋼材SMの進入口(以下、進入口11a)とし、他端開口部11bを鋼材SMの出口(以下、出口11b)としている。
 ここで、冷却パイプ11内部を通過する鋼材SMの直径Mdは、冷却パイプ11の内径Pdの30%以下に設定されている。
 冷却パイプ11の上部外周には、吊り具のフックが係合可能な係合孔13aを形成した被吊り部13が上方に突出して形成されている。
 冷却パイプ11の下部外周には、第1水供給管9(或いは第2水供給管10)の上部外周から立ち上がっている固定部9a(10a)にボルト結合で固定される固定連結部14が形成されている。
 冷却パイプ11の下部には、肉厚方向に貫通するローラー挿入孔15が形成され、ローラー挿入孔15の周囲の冷却パイプ11の下部外周には、軸受け部16が形成されている。
 そして、冷却パイプ11の外部からローラー挿入孔15に支持ローラー17の一部が挿入されている。支持ローラー17は、回転軸18に同軸固定されており、回転軸18は、軸受け部16に設けたベアリング(不図示)に回転自在に支持されている。回転軸18は、冷却パイプ11の軸線Pよりも下方に水平に配置されており、且つ、上方から見ると軸線Pと回転軸18とが直交している。
 支持ローラー17はセラミック製ローラーであり、鋼材SMが接触するローラー表面は、鋼材SMの直径より大きな曲率半径の凹曲面が回転軸18の軸方向に沿って形成されている形状、或いは略120°の角度で軸方向に沿ってV字状に開いた面が形成されている形状である。
 冷却水噴射ノズル12は、冷却パイプ11の出口11b側の外周を囲んで形成されている環状タンク19と、環状タンク19に冷却水を供給する供給口20と、環状タンク19に貯留された冷却水を冷却パイプ11の内周全域から噴射させる噴射スリット21と、を備えている。冷却水噴射ノズル12の供給口20は、第1及び第2水供給管9,10の何れかに接続している。噴射スリット21は、冷却水の噴射方向が開口部(鋼材SMの進入口)11a側に傾いた方向となるように、円錐面状に設けてある。
 そして、冷却パイプ11の固定連結部14が第1水供給管9(或いは第2水供給管10)の固定部9a、(10a)に固定されることで、第1冷却装置6は、第1水供給管9(或いは第2水供給管10)の上部に固定配置される。
 次に、図4は、鋼材SMの進行方向に沿って直列に配置されている複数の冷却装置のうちの第2冷却装置7を具体的に示すものである。
 第2冷却装置7が第1冷却装置6と異なる点は、第1冷却装置6の冷却パイプ11に形成されているローラー挿入孔15、軸受け部16、支持ローラー17が、第2冷却装置7の冷却パイプ11には存在していない点である。
 そして、第2冷却装置7と第1冷却装置6とのその他の構造は、大きさ、形状などが全て同一である。
 ここで、第1冷却装置6を、ローラー付き冷却装置6と称し、第2冷却装置7を、ローラー無し冷却装置7と称する。
 ローラー付き冷却装置6は、図2で示した鋼材冷却設備5において、一番左から右に向って4台目(符号6Aで示す装置)と、一番左から右に向って9台目(符号6Bで示す装置)と、一番右(符号6Cで示す装置)との位置に合計3台配置されている。
 また、ローラー無し冷却装置7は、図2の鋼材冷却設備5において、第1冷却装置6Aの左側に3台配置され、ローラー付き冷却装置6Aとローラー付き冷却装置6Bとの間に4台配置され、ローラー付き冷却装置6Bとローラー付き冷却装置6Cとの間に3台配置され、合計10台配置されている。
 また、13台のローラー付き冷却装置6A,6B,6C及びローラー無し冷却装置7は、隣り合う冷却装置との間に10mm~50mmの間隔Lをあけて直列に配置されている。
 ここで、隣り合うローラー付き冷却装置6A,6B同士の間隔K1と、隣り合うローラー付き冷却装置6B,6C同士の間隔K2は、ローラー付き冷却装置6A,6B,6C(或いは、ローラー無し冷却装置7)の冷却パイプ11の内径Pdを80倍した基準間隔D以下の値に設定されている(D=Pd×80、K1≦D、K2≦D)。
 次に、第1実施形態の鋼材冷却設備5の動作について説明する。
 鋼材冷却設備5の第1及び第2水供給管9,10に冷却水が供給されると、複数のローラー付き冷却装置6A,6B,6C及びローラー無し冷却装置7の供給口20から環状タンク19に冷却水が溜められ、環状タンク19の冷却水が噴射スリット21を通過して冷却パイプ11の内周全域から噴射する。
 仕上げ圧延機4で仕上げ圧延が行われて鋼材冷却設備5に送り出されてきた鋼材SMは、鋼材SMの進行方向に沿って直列に配置されている複数のローラー付き冷却装置6A,6B,6C及びローラー無し冷却装置7の冷却パイプ11の進入口11aから出口11bに向けて通過していき、各冷却パイプ11の内周全域から噴射する冷却水が接触することで冷却されていく。噴射スリット21は、冷却水の噴射方向が進入口11a側へ向けて傾くように設けられているので、噴射スリット21から噴射された冷却水は、鋼材SMに衝突した後に冷却パイプ内を進入口11a側へ向けて流れる。冷却パイプ11の内周面と鋼材SMとの間の空間は冷却水で充満されるが、冷却パイプ11内の冷却水が進入口11aへと流れる間に、鋼材SMを冷却する。
 鋼材SMに接触し、温度が上昇して冷却能が低下した冷却水は、ローラー付き冷却装置6A,6B,6Cでは、そのほとんどが冷却パイプ11の進入口11aを通過して、一部は出口11b及びローラー挿入孔15を通過して排水パン8の底板8aに流れていき、排水口8bから回収される。また、ローラー無し冷却装置7では、鋼材SMに接触した冷却水はそのほとんどがが、冷却パイプ11の進入口11aを通過して、一部は出口11bを通過して排水パン8の底板8a、排水口8b側に流れていく。
 ここで、鋼材冷却設備5において鋼材SMの搬送方向に沿って直列に配列された冷却装置の全てがローラー無し冷却装置7である場合、仕上げ圧延機4から送られてきた鋼材SMは、鋼材冷却設備5内において鋼材SMの自重により下方向へたわみ、鋼材SMが、鋼材冷却設備5の冷却通路(冷却パイプ11)内の下側を通過する場合がある。鋼材SMがある冷却装置7の冷却却パイプ11内の下側に片寄って通過すると、その冷却装置7では、鋼材の周方向にそって均一に冷却が行うことができなくなる。また、冷却パイプ11内での鋼材SMの下側への片寄りが大きくなると、鋼材SMが冷却パイプ11の内周と接触し、鋼材SMの表面に疵が生ずることもある。
 そこで、本実施形態の鋼材冷却設備5は、鋼材SMの進行方向に沿って直列に配置されている複数の冷却装置の中に、3台のローラー付き冷却装置6A,6B,6Cが配置されており、これらローラー付き冷却装置6A,6B,6Cの支持ローラー17が、冷却パイプ11を通過する鋼材SMの下側に接触することで鋼材SMの下部を支持するので、自重により鋼材SMが冷却パイプ11の下側を通過することが防止される。支持ローラー17と鋼材SMとは接触するものの、支持ローラーは鋼材SMの移動にともなって回転するので、冷却パイプ11の内面と接触する場合に比べると、鋼材SMに疵が生じることはほとんどない。
 また、本実施形態の鋼材冷却設備5は、鋼材SMの進行方向に沿って直列に配置する冷却装置の全てをローラー付き冷却装置6A,6B,6Cとせず、隣り合うローラー付き冷却装置6A,6B同士の間隔(或いは、6B,6C同士の間隔)が、ローラー付き冷却装置6A,6B,6C(或いは、ローラー無し冷却装置7)の冷却パイプ11の内径Pdを80倍した基準間隔D以下の値となるように、少数のローラー付き冷却装置6A,6B,6Cを配置するだけで、自重により鋼材SMが冷却パイプ11の下側を通過することが防止される。
 次に、第1実施形態の鋼材冷却設備5の効果について説明する。
 鋼材冷却設備5の複数のローラー付き冷却装置6A,6B,6C及びローラー無し冷却装置7の冷却パイプ11を通過する鋼材SMには、各冷却装置6A,6B,6C,7の冷却水噴射ノズル12の環状タンク19に溜められた冷却水が噴射スリット21を通過して冷却パイプ11の内周全域から噴射するので、鋼材SMを効率良く冷却することができる。
 また、仕上げ圧延機4から送り出されてきた鋼材SMには自重による下方へのたわみが発生し、このたわみにより、鋼材SMが鋼材冷却設備5の冷却通路の下側を通過すると、冷却水を噴出する噴射スリット21と鋼材SMとの距離が、鋼材SMの周方向位置によって大きく変化するため、鋼材SMの周方向に沿った冷却ムラが発生するおそれがある。また、鋼材SMが冷却通路(冷却パイプ11)の下側の内壁に接触すると、鋼材SMの品質に悪影響を及ぼすおそれがある。
 そこで、本実施形態は、3台のローラー付き冷却装置6A,6B,6Cの支持ローラー17が、冷却パイプ11を通過する鋼材SMの下側に接触することで鋼材SMが冷却パイプ11の下側を通過するのを防止することができる。このため、冷却ムラを防止することができる。また、鋼材SMが冷却パイプ11の下側の内壁に接触するのを防止し、鋼材SMの品質に悪影響を与えることがない。
 また、鋼材冷却設備5において鋼材SMの進行方向に沿って直列に配置する複数の冷却装置は、隣り合うローラー付き冷却装置6A,6B同士の間隔(或いは、6B,6C同士の間隔)が冷却パイプ11の内径Pdを80倍した基準間隔D以下の値となるように、少数のローラー付き冷却装置6A,6B,6Cを配置するだけで、自重により鋼材SMが冷却パイプ11の下側を通過することを防止することができるので、鋼材冷却設備5の設備費用の低減化を図ることができる。
 ここで、鋼材SMの自重によるたわみで鋼材SMが冷却パイプ11内の下側を通過することを防止する観点からは、進行方向に沿って直列に配置する複数の冷却装置の全て冷却装置をローラー無し冷却装置7とし、隣り合うローラー無し冷却装置7の間隔Lを支持ローラー17を配置できる程度の大きな間隔にすることが考えられる。しかし、この間隔Lを大きくすると、間隔Lの位置を鋼材SMが通過する間は、鋼材SMの冷却は行われないことになる。隣り合う冷却装置間の間隔Lは、上述のとおり冷却能が低下した冷却水を排出するために設けられるものであり、この排出ができる程度の長さであれば、小さくするほど冷却設備単位長さあたりの冷却能力は向上でき、具体的には10~50mmでよい。
 本実施形態のように、進行方向に沿って直列に配置する複数の冷却装置のうちのいくつかを、ローラー付き冷却装置6とすることで、隣り合う冷却装置6あるいは7の間の間隔Lを小さく設定して冷却装置としての冷却能力を確保しつつ、かつ、鋼材SMが冷却パイプ内の下側を通過することを防止できる。
 また、仕上げ圧延機4から鋼材冷却設備5に送り出されてきた鋼材SMは、粗圧延機2で粗圧延工程を行った後の鋼材SM、或いは、中間圧延機3で中間圧延工程を行った後の鋼材SMと比較して振動が少なく、ローラー付き冷却装置6A,6B,6Cの支持ローラー17には、大きな衝撃力が加わらないので、セラミック製の支持ローラー17とすることで、耐熱性、耐摩耗性に優れた支持ローラー17とされ、ローラー付き冷却装置6A,6B,6Cを長期に渡って使用することができる。
 さらに、鋼材冷却設備5を構成する複数のローラー付き冷却装置6A,6B,6C及びローラー無し冷却装置7には、冷却パイプ11に係合孔13aを設けた被吊り部13が形成されているので、所定の冷却装置の交換作業を行う場合には、冷却パイプ11の固定連結部14と第1水供給管9(或いは第2水供給管10)の固定部9a(10a)との固定状態を解除し、被吊り部13の係合孔13aに吊り具(吊上げ装置)のフックを係合することで、交換作業を簡単に行うことができる。
 次に、図5は、熱間圧延設備1の粗圧延機2の後段に、本発明に係る第2実施形態の鋼材冷却設備5が配置されていることを示している。
 第2実施形態の鋼材冷却設備5は、図2と同様の配置順番で、3台のローラー付き冷却装置6A,6B,6Cと、10台のローラー無し冷却装置7が配置されている。
 本実施形態の鋼材冷却設備5が、第1実施形態と異なる点は、3台のローラー付き冷却装置6A,6B,6Cの冷却パイプ11に配置されている支持ローラー17が、鋳鉄又は鋳鋼製のローラーで形成されている点である。
 粗圧延機2から鋼材冷却設備5に送り出されてきた鋼材SMは振動が大きく、ローラー付き冷却装置6A,6B,6Cの支持ローラー17には大きな衝撃力が加わる。このため、鋳鉄又は鋳鋼製の支持ローラー17とすることで、耐衝撃性、耐熱性、耐摩耗性に優れた支持ローラー17とされ、ローラー付き冷却装置6A,6B,6Cを長期に渡って使用することができる。
 さらに、図6は、熱間圧延設備1の中間圧延機3の後段に、本発明に係る第3実施形態の鋼材冷却設備5が配置されていることを示している。
 第3実施形態の鋼材冷却設備5も、図2と同様の配置順番で、3台のローラー付き冷却装置6A,6B,6Cと、10台のローラー無し冷却装置7が配置されている。
 本実施形態の鋼材冷却設備5が、第1及び第2実施形態と異なる点は、3台のローラー付き冷却装置6A,6B,6Cの冷却パイプ11に配置されている支持ローラー17が、超硬合金(タングステン・カーバイト)製のローラーで形成されている点である。
 中間圧延機2から鋼材冷却設備5に送り出されてきた鋼材SMは、粗圧延機2から送り出されてきた状態ではないが比較的振動が大きく、ローラー付き冷却装置6A,6B,6Cの支持ローラー17に衝撃力が加わる。このため、超硬合金製の支持ローラー17とすることで、耐衝撃性、耐熱性、耐摩耗性に優れた支持ローラー17とされ、ローラー付き冷却装置6A,6B,6Cを長期に渡って使用することができる。
 なお、鋼材冷却設備5を構成する複数のローラー付き冷却装置6A,6B,6Cに、冷却パイプ11内部を通過する鋼材SMが鋼材SMの進行方向に直交する方向(例えば左右方向や上方向)に蛇行移動するのを接触により抑制する他のローラー(ここでは拘束ローラ-と云う)を設けてもよい。同様に、ローラー無し冷却装置7の冷却パイプ11内部に、鋼材SMが鋼材SMの進行方向に直交する方向に蛇行移動するのを接触により抑制する他の拘束ローラーを設けてもよい。拘束ローラーについても、支持ローラーと同様に、冷却パイプに肉厚方向を貫通して形成された拘束ローラー挿入孔を通過して、冷却パイプの内部に突出して配置される。
 次に、本発明に係る鋼材冷却設備と、本発明とは異なる比較例の鋼材冷却設備について、仕上げ圧延機4から送り出された鋼材SMの冷却能力、冷却される鋼材SMの品質などについて比較した。
 先ず、本発明に係る鋼材冷却設備は、図2の鋼材冷却設備5と同様に、ローラー付き冷却装置6Aが図2の一番左から右に向って4台目、ローラー付き冷却装置6Bが一番左から右に向って9台目、ローラー付き冷却装置6Cが一番右の位置に配置されている(合計3台のローラー付き冷却装置)。また、ローラー無し冷却装置7は、図2に示すように、一番左から第1冷却装置6Aとの間に3台配置され、ローラー付き冷却装置6Aとローラー付き冷却装置6Bとの間に4台配置され、ローラー付き冷却装置6Bとローラー付き冷却装置6Cとの間に3台配置され、合計10台配置されている。
 また、ローラー付き冷却装置6A,6B,6C及びローラー無し冷却装置7を構成する冷却パイプ11の内径Pdは48mmである。そして、仕上げ圧延機4から送り出されてきた鋼材SMの直径Mdは24mmである。これにより、冷却パイプ11の内径Pdは、鋼材SMの直径Mdの30%を上回る値に設計されている。
 また、鋼材SMは、10m/secの速度でローラー付き冷却装置6A,6B,6C及びローラー無し冷却装置7の冷却パイプ11を通過する。
 そして、隣り合うローラー付き冷却装置6A,6B同士の間隔K1が1820mmに設定され、隣り合うローラー付き冷却装置6B,6C同士の間隔K2が1390mmに設定されている。冷却パイプ11の内径Pdが48mmなので、間隔K1、K2は、内径Pdを80倍した基準間隔D=3840mm以下に設定されている。
 一方、比較例の鋼材冷却設備は、図2の鋼材冷却設備5においてローラー付き冷却装置6A,6B,6Cが配置されている位置に、ローラー無し冷却装置7が替わって配置され、13台の全てがローラー無し冷却装置7である。その他の配置位置や構造は、本発明に係る鋼材冷却設備と同一である。
 次に、仕上げ圧延機4から900℃で送り出されてきた鋼材SMについて、本発明に係る鋼材冷却設備と、比較例の鋼材冷却設備とを冷却した結果を述べる。
 本発明に係る鋼材冷却設備は、3台のローラー付き冷却装置6A,6B,6C及びローラー無し冷却装置7の冷却パイプ11を通過する鋼材SMに、各冷却装置6A,6B,6C,7の冷却水噴射ノズル12の環状タンク19に溜められた冷却水が噴射スリット21を通過して冷却パイプ11の内周全域から噴射され、鋼材SMは略800℃まで冷却されることが確認された。
 また、本発明に係る鋼材冷却設備を通過した鋼材SMには、冷却ムラが発生せず、外周などに冷却パイプ11の内壁との接触による傷などが発生していないことも確認された。
 一方、比較例の鋼材冷却設備も、13台のローラー無し冷却装置7の冷却パイプ11を通過する鋼材SMに、各冷却装置7の冷却水噴射ノズル12の環状タンク19に溜められた冷却水が噴射スリット21を通過して冷却パイプ11の内周全域から噴射され、鋼材SMが略800℃まで冷却されることが確認された。
 しかし、比較例の鋼材冷却設備を通過した鋼材SMには、冷却ムラがあり、外周などに冷却パイプ11の内壁との接触による傷などが発生しているのが確認された。これは、仕上げ圧延機4から送り出されてきた鋼材SMのたわみにより、鋼材SMが各冷却装置7の冷却パイプ11の下側を通過し、冷却水を噴出する噴射スリット21と鋼材SMとの距離が、鋼材SMの周方向位置によって大きく変化するため、鋼材SMの周方向に沿った冷却ムラが発生するのである。また、鋼材SMが冷却パイプ11の下側の内壁に接触してしまい、鋼材SMの外周に傷が発生してしまうからである。
1 熱間圧延設備
2 粗圧延機
3 中間圧延機
4 仕上げ圧延機
5 鋼材冷却設備
6,6A,6B,6C ローラー付き冷却装置(第1冷却装置)
7 ローラー無し冷却装置(第2冷却装置)
8a 底板
8b 排水口
8 排水パン
9 第1水供給管
9a、10a 固定部
10 第2水供給管
11 冷却パイプ
11a 進入口
11b 出口
12 冷却水噴射ノズル
13 被吊り部
13a 係合孔
14 固定連結部
15 ローラー挿入孔
16 軸受け部
17 支持ローラー
18 回転軸
19 環状タンク
20 供給口
21 噴射スリット
D 隣り合うローラー付き冷却装置同士の基準間隔
L 一対の冷却装置どうしの隙間
SM 鋼材
Pd 冷却パイプの内径

Claims (8)

  1.  熱間圧延設備で圧延された棒鋼、線材などの長尺な鋼材を冷却する冷却装置であって、
     前記鋼材が内部を通過する直線状の冷却パイプと、
     前記冷却パイプの外周の一部に形成された冷却タンクと、
     前記冷却タンクに貯留された冷却水を前記冷却パイプの内周全域から前記鋼材に噴射させる噴射スリットと、を備え、
     前記冷却パイプに、肉厚方向を貫通するローラー挿入孔が形成され、
     前記冷却パイプの外側で回転自在に支持された支持ローラーの一部が、前記ローラー挿入孔を通過して前記冷却パイプの内部に突出して配置されており、前記冷却パイプの内部を通過する前記鋼材の下部を前記支持ローラーが支持することを特徴とする鋼材の冷却装置。
  2.  前記鋼材の直径は、前記冷却パイプの内径の30%以下に設定されていることを特徴とする請求項1記載の鋼材の冷却装置。
  3.  前記冷却パイプに、吊上げ装置が係合可能な被吊り部が設けられていることを特徴とする請求項1又は2に記載の鋼材の冷却装置。
  4.  前記冷却装置は、前記熱間圧延設備を構成する仕上げ圧延機の後段に配置されており、
     前記支持ローラーがセラミック製であることを特徴とする請求項1から3の何れか1項に記載の鋼材の冷却装置。
  5.  前記冷却装置は、前記熱間圧延設備を構成する粗圧延機と中間圧延機との間に配置されており、
     前記支持ローラーが鋳鉄又は鋳鋼製であることを特徴とする請求項1から3の何れか1項に記載の鋼材の冷却装置。
  6.  前記冷却装置は、前記熱間圧延設備を構成する中間圧延機と仕上げ圧延機との間に配置されており、
     前記支持ローラーが超硬合金製であることを特徴とする請求項1から3の何れか1項に記載の鋼材の冷却装置。
  7.  請求項1から6の何れか1項に記載の冷却装置を第1冷却装置と称し、
    該第1冷却装置に対して、前記支持ローラーおよび支持ローラーのローラー挿入口を有さない冷却装置を第2冷却装置と称すると、複数台の前記第1冷却装置と、複数台の前記第2冷却装置とが、前記鋼材の進行方向に沿って、互いの間に所定の隙間を設けながら直列に配置され、
     隣り合う前記第1冷却装置の間に、前記第2の冷却装置が直列に配置され、隣り合う前記第1冷却装置の間隔が、前記冷却パイプの直径の80倍以下の値に設定されていることを特徴とする鋼材冷却設備。
  8.  複数の前記第1冷却装置、前記第2冷却装置のうちの1以上の冷却装置が、前記冷却パイプ内での前記鋼材の進行方向に直交する少なくとも一方向への移動を拘束する拘束ローラーを有し、
     該拘束ローラーは、その一部が、前記冷却パイプに肉厚方向を貫通して形成された拘束ローラー挿入孔を通過して、冷却パイプの内部に突出して配置されてなる、請求項7に記載の鋼材冷却設備。
PCT/JP2019/025877 2019-06-28 2019-06-28 鋼材の冷却装置及びこの冷却装置を使用した鋼材冷却設備 WO2020261547A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2021527286A JP7006846B2 (ja) 2019-06-28 2019-06-28 鋼材冷却設備
PCT/JP2019/025877 WO2020261547A1 (ja) 2019-06-28 2019-06-28 鋼材の冷却装置及びこの冷却装置を使用した鋼材冷却設備
CN202010585231.9A CN112139265B (zh) 2019-06-28 2020-06-24 钢材冷却设备
CN202021204242.XU CN213256296U (zh) 2019-06-28 2020-06-24 钢材冷却设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/025877 WO2020261547A1 (ja) 2019-06-28 2019-06-28 鋼材の冷却装置及びこの冷却装置を使用した鋼材冷却設備

Publications (1)

Publication Number Publication Date
WO2020261547A1 true WO2020261547A1 (ja) 2020-12-30

Family

ID=73887463

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/025877 WO2020261547A1 (ja) 2019-06-28 2019-06-28 鋼材の冷却装置及びこの冷却装置を使用した鋼材冷却設備

Country Status (3)

Country Link
JP (1) JP7006846B2 (ja)
CN (2) CN112139265B (ja)
WO (1) WO2020261547A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113118946A (zh) * 2021-04-20 2021-07-16 李丹丹 一种粉末冶金工具钢制造工艺

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112246889A (zh) * 2020-09-09 2021-01-22 江苏海洋大学 一种轧钢棒线材穿水冷却强化换热的方法及设备
CN113333707B (zh) * 2021-06-11 2022-08-05 陕钢集团汉中钢铁有限责任公司 一种r10米弧连铸机无夹持段浇注矩形坯的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52103307A (en) * 1976-02-27 1977-08-30 Mitsubishi Metal Corp Lightweight hard alloy for parts of hot rolling equipment
JPS6210906U (ja) * 1985-07-01 1987-01-23
JPH067827A (ja) * 1992-06-25 1994-01-18 Nippon Steel Corp 熱間線材圧延用サイドルーパーローラー
JP2009061460A (ja) * 2007-09-05 2009-03-26 Sanyo Special Steel Co Ltd 棒鋼の水冷装置

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL163142C (nl) * 1973-06-04 1980-08-15 Hoogovens Ijmuiden Bv Inrichting voor het met water koelen van warmgewalst staafmateriaal.
JPS50117112U (ja) * 1974-03-11 1975-09-25
SU797814A2 (ru) * 1979-02-28 1981-01-23 Орловский сталепрокатный завод им.50-летия Октября Устройство дл очистки и охлаждени пРОВОлОКи
FR2458499A1 (fr) * 1979-06-07 1981-01-02 Siderurgie Fse Inst Rech Dispositif d'entrainement de produits longs en defilement
JPS6250013A (ja) * 1985-08-30 1987-03-04 Kawasaki Steel Corp 棒鋼圧延機の冷却液遮断装置
JPS62139827A (ja) * 1985-12-16 1987-06-23 Nippon Steel Corp 鋼棒線材の冷却装置
CN101869919A (zh) * 2009-04-27 2010-10-27 江苏东方成套设备制造有限公司 高速穿水冷却器用湍流管
CN202725647U (zh) * 2012-07-27 2013-02-13 南京钢铁股份有限公司 防止水喷嘴擦伤装置
CN102912097B (zh) * 2012-10-09 2013-12-11 范华平 一种轧钢淬火用环式穿水冷却设备
CN103357677B (zh) * 2013-07-15 2015-05-20 马鞍山市双益机械制造有限公司 一种大型棒材冷却设备
JP6210906B2 (ja) 2014-02-27 2017-10-11 オムロンオートモーティブエレクトロニクス株式会社 レーザレーダ装置
CN206276728U (zh) * 2016-08-30 2017-06-27 江苏省沙钢钢铁研究院有限公司 一种棒材精轧机组间的穿水导槽
JP6658579B2 (ja) * 2017-01-30 2020-03-04 Jfeスチール株式会社 鋼材の冷却装置
CN208527709U (zh) * 2018-07-28 2019-02-22 江苏新隆机械有限公司 一种高速线材水冷喷嘴

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52103307A (en) * 1976-02-27 1977-08-30 Mitsubishi Metal Corp Lightweight hard alloy for parts of hot rolling equipment
JPS6210906U (ja) * 1985-07-01 1987-01-23
JPH067827A (ja) * 1992-06-25 1994-01-18 Nippon Steel Corp 熱間線材圧延用サイドルーパーローラー
JP2009061460A (ja) * 2007-09-05 2009-03-26 Sanyo Special Steel Co Ltd 棒鋼の水冷装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113118946A (zh) * 2021-04-20 2021-07-16 李丹丹 一种粉末冶金工具钢制造工艺

Also Published As

Publication number Publication date
CN112139265B (zh) 2023-05-05
JP7006846B2 (ja) 2022-01-24
CN213256296U (zh) 2021-05-25
CN112139265A (zh) 2020-12-29
JPWO2020261547A1 (ja) 2021-11-25

Similar Documents

Publication Publication Date Title
WO2020261547A1 (ja) 鋼材の冷却装置及びこの冷却装置を使用した鋼材冷却設備
EP1527829B1 (en) Cooling device,manufacturing method, and manufacturing line for hot rolled steel band
JP5573837B2 (ja) 熱延鋼板の冷却装置、冷却方法、製造装置、及び、製造方法
JP4788851B2 (ja) 鋼板の冷却装置、熱延鋼板の製造装置及び製造方法
TWI449579B (zh) 熱軋鋼板之製造裝置、以及鋼板之製造方法
EP2859964B2 (en) Dewatering device and dewatering method for cooling water for hot rolled steel sheet
JP5515483B2 (ja) 厚鋼板の冷却設備および冷却方法
JP3642031B2 (ja) 熱延鋼帯の冷却装置
US5758530A (en) Hot rolling mill
JP2006035311A (ja) 厚鋼板の冷却装置
JPH11347629A (ja) 高温鋼板の矯正及び冷却装置並びにその矯正及び冷却方法
TWI446975B (zh) 鋼板之冷卻裝置、熱軋鋼板之製造裝置以及鋼板之製造方法
EP1889671B1 (en) Cooling apparatus for hot rolled steel strip, manufacturing method for hot rolled steel strip, and production line for hot rolled steel strip
JP5613997B2 (ja) 熱延鋼板の冷却装置、熱延鋼板の製造装置及び製造方法
JP5428452B2 (ja) 熱延鋼帯の下面冷却方法および下面冷却装置
JPH10216822A (ja) 高温鋼板の冷却装置
JP2014083578A (ja) 熱間圧延鋼材のデスケ―リング用ノズル
EP3028783B1 (en) Rod-shaped steel material guiding device
JP4061286B2 (ja) 金属板の冷却装置および冷却方法
JP2006051513A (ja) H形鋼の冷却設備
KR101235767B1 (ko) 코일 박스
KR20090037660A (ko) 선재 권취기의 분할 곡선 가이드
JP2010064097A (ja) 鋼材の冷却設備
JP4466500B2 (ja) 鋼板の冷却装置
JP3546264B2 (ja) 高温鋼板の冷却装置及び高温鋼板の冷却方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19935732

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021527286

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19935732

Country of ref document: EP

Kind code of ref document: A1