WO2020158073A1 - 情報処理方法、及び情報処理システム - Google Patents

情報処理方法、及び情報処理システム Download PDF

Info

Publication number
WO2020158073A1
WO2020158073A1 PCT/JP2019/041703 JP2019041703W WO2020158073A1 WO 2020158073 A1 WO2020158073 A1 WO 2020158073A1 JP 2019041703 W JP2019041703 W JP 2019041703W WO 2020158073 A1 WO2020158073 A1 WO 2020158073A1
Authority
WO
WIPO (PCT)
Prior art keywords
delivery
plan
charging
delivery plan
electric vehicles
Prior art date
Application number
PCT/JP2019/041703
Other languages
English (en)
French (fr)
Inventor
篤佳 北
圭介 岩田
Original Assignee
パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ filed Critical パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ
Priority to CN201980050608.6A priority Critical patent/CN112512943B/zh
Priority to JP2020569373A priority patent/JP7455073B2/ja
Publication of WO2020158073A1 publication Critical patent/WO2020158073A1/ja
Priority to US17/165,209 priority patent/US20210158291A1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • G06Q10/0835Relationships between shipper or supplier and carriers
    • G06Q10/08355Routing methods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/63Monitoring or controlling charging stations in response to network capacity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/13Maintaining the SoC within a determined range
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/16Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to battery ageing, e.g. to the number of charging cycles or the state of health [SoH]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G61/00Use of pick-up or transfer devices or of manipulators for stacking or de-stacking articles not otherwise provided for
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D1/00Control of position, course or altitude of land, water, air, or space vehicles, e.g. automatic pilot
    • G05D1/02Control of position or course in two dimensions
    • G05D1/021Control of position or course in two dimensions specially adapted to land vehicles
    • G05D1/0212Control of position or course in two dimensions specially adapted to land vehicles with means for defining a desired trajectory
    • G05D1/0217Control of position or course in two dimensions specially adapted to land vehicles with means for defining a desired trajectory in accordance with energy consumption, time reduction or distance reduction criteria
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/047Optimisation of routes or paths, e.g. travelling salesman problem
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/80Time limits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2250/00Driver interactions
    • B60L2250/16Driver interactions by display
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/126Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]

Definitions

  • the present disclosure relates to an information processing method and an information processing system.
  • Patent Document 1 Conventionally, a method of creating a charging plan for an electric vehicle has been proposed (for example, see Patent Document 1).
  • Patent Document 1 since only the charging plan is output, there is a possibility that the delivery plan of the delivery by the electric vehicle such as an electric vehicle and the output charging plan may not match.
  • the present disclosure aims to provide an information processing method and an information processing system capable of creating a delivery plan that is consistent with a charging plan.
  • An information processing method is a method of causing a computer to execute a delivery plan of a delivery by a plurality of electric vehicles based on a constraint regarding movement of each of the plurality of electric vehicles.
  • the power consumption is calculated for each of the plurality of electric vehicles
  • the charge amount is calculated from the power consumption and the remaining power amount for each of the plurality of electric vehicles
  • a charging plan for the plurality of electric vehicles is created from the charge amounts of each of the plurality of electric vehicles, and the delivery plan and the charging plan are used until the charging of the plurality of electric vehicles starts to be delivered. Whether or not the charging is completed before the delivery is started, and the delivery plan is recreated by strengthening the constraint for the electric vehicle that is determined not to be charged by the delivery start, and the created delivery plan is output. ..
  • An information processing system includes a delivery plan creation unit that creates a delivery plan for deliveries by a plurality of electric vehicles, based on constraints regarding movement of each of the plurality of electric vehicles. Based on a delivery plan, a power consumption calculation unit that calculates power consumption for each of the plurality of electric vehicles, and a charge that calculates a charge amount from the power consumption and the amount of remaining power for each of the plurality of electric vehicles.
  • a charging plan creation unit that creates a charging plan for the plurality of electric vehicles from the charging amounts of the plurality of electric vehicles, the delivery plan and the charging plan, The determination unit for determining whether or not charging of the electric vehicle is completed by the start of delivery, and an output unit for outputting the created delivery plan, the delivery plan creation unit Then, the restriction is strengthened for the electric vehicle that is determined not to be completely charged, and the delivery plan is recreated.
  • FIG. 1 is a block diagram showing the configuration of the information processing system according to the embodiment.
  • FIG. 2 is a flowchart of the first delivery plan creation process according to the embodiment.
  • FIG. 3 is a flowchart of the second delivery plan creation process according to the modification.
  • a delivery plan of a delivery by an electric vehicle such as an electric vehicle
  • the delivery plan may not be executed.
  • the charging completion time is too early as compared to the start of delivery, storage deterioration may increase depending on the amount of charge. Therefore, the inventor has conducted extensive studies and experiments on a method of creating a delivery plan that is consistent with the charging plan. As a result, the inventor has come up with the following information processing method and information processing system.
  • An information processing method is a method of causing a computer to execute a delivery plan of a delivery by a plurality of electric vehicles, based on constraints regarding movement of each of the plurality of electric vehicles.
  • Created, based on the delivery plan the power consumption is calculated for each of the plurality of electric vehicles, the charge amount is calculated from the power consumption and the remaining power amount for each of the plurality of electric vehicles,
  • a charging plan for the plurality of electric vehicles is created from the charge amounts of each of the plurality of electric vehicles, and the delivery plan and the charging plan are used until the charging of the plurality of electric vehicles starts to be delivered. Whether or not the charging is completed before the delivery is started, and the delivery plan is recreated by strengthening the constraint for the electric vehicle that is determined not to be charged by the delivery start, and the created delivery plan is output. ..
  • the delivery plan in the once created delivery plan, if there is an electric vehicle that is not fully charged by the start of delivery, the delivery plan is re-created by strengthening the restrictions of the vehicle. Therefore, according to the above information processing method, it is possible to create a delivery plan that is consistent with the charging plan.
  • the constraint may be an upper limit of the mileage, and the upper limit of the mileage of the electric vehicle for which charging is determined not to be completed by the start of delivery may be reduced to recreate the delivery plan. .. Thereby, it is possible to control the re-creation of the delivery plan by using the upper limit of the mileage. For example, in the once created delivery plan, if there is an electric vehicle that is not completely charged by the start of delivery, the delivery plan can be recreated so that the traveling distance of the vehicle is shortened.
  • a battery deterioration level is acquired for each of the plurality of electric moving bodies, and a battery charging that falls within a predetermined deterioration acceleration degree range specified from the deterioration degree is acquired for each of the plurality of electric moving bodies. It is also possible to calculate a usable power amount based on the amount and to calculate the constraint for each of the plurality of electric vehicles based on the usable power amount. This makes it possible to create a delivery plan that can suppress deterioration of the battery.
  • the delivery plan may be recreated by further weakening the restriction on the electric vehicle that is completely charged by the start of delivery. Good. This makes it possible to create a delivery plan that is more consistent with the charging plan.
  • the delivery plan may be re-created by tightening the constraint. As a result, it is possible to create a delivery plan that suppresses the occurrence of electric vehicles that run out of electricity.
  • the charging plan may include a charging plan in which deterioration of the battery is suppressed. Thereby, deterioration of the battery can be suppressed.
  • An information processing system includes a delivery plan creation unit that creates a delivery plan for deliveries by a plurality of electric vehicles, based on constraints regarding movement of each of the plurality of electric vehicles. Based on a delivery plan, a power consumption calculation unit that calculates power consumption for each of the plurality of electric vehicles, and a charge that calculates a charge amount from the power consumption and the amount of remaining power for each of the plurality of electric vehicles.
  • a charging plan creation unit that creates a charging plan for the plurality of electric vehicles from the charging amounts of the plurality of electric vehicles, the delivery plan and the charging plan, The determination unit for determining whether or not charging of the electric vehicle is completed by the start of delivery, and an output unit for outputting the created delivery plan, the delivery plan creation unit Then, the restriction is strengthened for the electric vehicle that is determined not to be completely charged, and the delivery plan is recreated.
  • the delivery plan is re-created by strengthening the restrictions of the vehicle. Therefore, according to the above information processing system, it is possible to create a delivery plan that is consistent with the charging plan.
  • a recording medium such as a system, a method, an integrated circuit, a computer program, or a computer-readable CD-ROM, and the system, the method, the integrated circuit, the computer. It may be realized by any combination of the program and the recording medium.
  • This information processing system is a delivery plan for deliveries by a plurality of electric vehicles, and creates a delivery plan that is consistent with the charging plan.
  • the electric vehicle is described as a battery-driven self-driving vehicle, but the electric vehicle is not necessarily limited to the battery-driven self-driving vehicle as long as it can deliver a delivery item. You don't have to.
  • the electric vehicle may be, for example, an autonomous flight type or a remote control type drone, or a vehicle manually driven by a driver on board.
  • FIG. 1 is a block diagram showing the configuration of the information processing system 1 according to the embodiment.
  • the information processing system 1 includes a server 100, a mobile unit 200, a terminal 300, and a charger 400.
  • the information processing system 1 is illustrated as if it includes one moving body 200, but in reality, the information processing system 1 includes a plurality of moving bodies 200. Composed of.
  • the information processing system 1 is illustrated as if it is configured to include one terminal 300, but in reality, the information processing system 1 does not include one terminal 300. It may be configured to include, a configuration including a plurality of terminals 300, or a configuration including no terminal 300.
  • the information processing system 1 is illustrated as if it is configured to include one charger 400, but in reality, the information processing system 1 does not include one charger 400.
  • the configuration may include, or may include a plurality of chargers 400.
  • the mobile body 200 is a mobile body that runs by electric power.
  • the mobile unit 200 includes a communication unit 210, an automatic travel control unit 220, a battery management unit 230, and a battery 240.
  • the battery 240 is a secondary battery that supplies electric power to an electric drive device (for example, a motor, not shown) that drives the moving body 200.
  • the battery 240 is charged by the charger 400 that is detachable from the battery 240.
  • the battery management unit 230 manages the state of the battery 240. More specifically, the battery management unit 230 manages the SOC (State Of Charge) of the battery 240 at the present time and the SOH (State Of Health) of the battery 240 at the present. To do.
  • SOC State Of Charge
  • SOH State Of Health
  • the communication unit 210 communicates with other communicable devices.
  • the other device includes the server 100.
  • the communication unit 210 receives, for example, the delivery plan (described later) transmitted from the server 100.
  • the communication unit 210 also transmits the SOC and SOH managed by the battery management unit 230 to the server 100 in response to a request from the server 100, for example.
  • the communication unit 210 may include, for example, a wireless communication device, and may communicate with other devices wirelessly.
  • the automatic traveling control unit 220 controls the automatic traveling of the moving body 200. For example, when the communication unit 210 receives the delivery plan, the automatic traveling control unit 220 controls the automatic traveling of the mobile body 200 according to the delivery plan.
  • the automatic travel control unit 220 may be realized by, for example, dedicated hardware, or may be realized by including a processor and a memory and causing the processor to execute a program stored in the memory, for example.
  • the moving body 200 may be a moving body of a type manually operated by a boarding driver.
  • the mobile unit 200 may be, for example, a control unit for manually operating the mobile unit 200 instead of the automatic travel control unit 220, and a display unit for displaying the contents of the delivery plan transmitted from the server 100.
  • the configuration may include and.
  • the driver operates the manipulating unit according to the contents of the delivery plan displayed on the display unit to steer the moving body 200, and causes the moving body 200 to travel along the delivery plan.
  • the terminal 300 is a terminal owned by a user who uses the information processing system 1.
  • the terminal 300 includes a communication unit 310 and a display unit 320.
  • the communication unit 310 communicates with other communicable devices.
  • the other device includes the server 100.
  • the communication unit 310 receives, for example, the delivery plan and the charging plan (described later) transmitted from the server 100.
  • the communication unit 310 may include, for example, a wireless communication device, and may wirelessly communicate with another device.
  • the display unit 320 displays an image to the user who uses the terminal 300. For example, when the communication unit 310 receives the delivery plan or the charging plan, the display unit 320 displays an image showing the contents of the delivery plan or the charging plan.
  • the display unit 320 may include a display device such as a liquid crystal display, and may display an image on the display device.
  • the charger 400 charges the battery 240.
  • the charger 400 includes a communication unit 410, a charge control unit 420, and a charging module 430.
  • the charging module 430 includes a charging circuit that is detachably attached to the battery 240 and charges the battery 240.
  • the communication unit 410 communicates with other communicable devices.
  • the other device includes the server 100.
  • the communication unit 410 receives, for example, the charging plan transmitted from the server 100.
  • the communication unit 410 may include, for example, a wireless communication device and communicate with other devices wirelessly.
  • the charging control unit 420 controls charging of the battery 240 by the charging module 430. For example, when the communication unit 410 receives the charging plan, the charging control unit 420 controls the charging of the battery 240 by the charging module 430 according to the charging plan.
  • the charge control unit 420 may be implemented by, for example, dedicated hardware, or may be implemented by including a processor and a memory and causing the processor to execute a program stored in the memory.
  • the server 100 is a server used by an operating company (for example, a courier) that operates the information processing system 1.
  • the server 100 includes a communication unit 110, a constraint calculation unit 120, a delivery plan creation unit 130, a power consumption calculation unit 140, a first determination unit 150, a charge amount calculation unit 160, a charge plan creation unit 170, It is configured to include a second determination unit 180 and an output unit 190.
  • the server 100 is, for example, a computer including a processor and a memory, and the processor may implement various functions by executing a program stored in the memory.
  • the communication unit 110 communicates with other communicable devices. Other devices include the mobile unit 200, the terminal 300, and the charger 400.
  • the communication unit 110 transmits, for example, to each mobile unit 200, a request indicating a transmission request for SOC and SOH.
  • the communication unit 110 receives, for example, the SOC and SOH transmitted from each mobile body 200 in response to the request transmitted by the communication unit 110.
  • the communication unit 110 transmits the delivery plan to each mobile unit 200 and each terminal 300.
  • the communication unit 110 transmits the charging plan to each terminal 300 and each charger 400.
  • the communication unit 110 receives, for example, a delivery list of deliverables to be delivered from another server (not shown) that is an external device.
  • the constraint calculation unit 120 calculates a constraint regarding movement for each of the plurality of moving bodies 200.
  • the constraint calculation unit 120 may calculate, for each of the moving bodies 200, a charge amount with which deterioration of the battery 240 is suppressed, and calculate a constraint from the calculated charge amount. More specifically, the constraint calculation unit 120 acquires, for example, the SOH at the present time, which is the deterioration degree of the battery 240, received by the communication unit 110 for each mobile unit 200, and is specified from the acquired SOH at the present time.
  • the constraint calculation unit 120 may calculate, for example, the upper limit of the travel distance as a constraint from the available electric energy and the average electricity cost.
  • the constraint calculation unit 120 calculates, for each mobile unit 200, a charge amount obtained by adding a certain amount of charge amount to the SOH at the current time received by the communication unit 110, and based on the calculated charge amount and the average current.
  • the upper limit of the travel distance may be calculated as a constraint.
  • the constraint calculation unit 120 may calculate the upper limit of the time from the start to the end of travel for each of the moving bodies 200 as a constraint. In addition, for example, the constraint calculation unit 120 may calculate the upper limit of the power consumption amount from the start to the end of travel for each of the moving bodies 200 as a constraint. In addition, the constraint calculation unit 120 may calculate the constraint based on a combination of these, for example.
  • the delivery plan creation unit 130 based on the constraint regarding the movement of each of the plurality of moving bodies 200 calculated by the constraint calculating unit 120, the delivery plan of the deliverables by the plurality of moving bodies 200 (the parcel allocation for each moving body 200). , A delivery route for each mobile unit 200, an unallocated baggage list, etc.).
  • the delivery plan creation unit 130 may further create a delivery plan based on the delivery list received by the communication unit 110 and the mobile body list of the plurality of mobile bodies 200 stored in advance.
  • the delivery plan creation unit 130 may create the delivery plan so that the total travel distances of the plurality of mobile bodies 200 are minimized, for example.
  • the delivery plan creation unit 130 may create the delivery plan so that the total deterioration amount of the batteries 240 of the plurality of mobile bodies 200 is minimized.
  • the delivery plan creation unit 130 may create the delivery plan so that the total power consumption of the plurality of mobile bodies 200 is minimized, for example.
  • the delivery plan creation unit 130 may create a delivery plan so that the total required delivery time of the plurality of mobile bodies 200 is minimized, for example.
  • the delivery plan creation unit 130 may create a delivery plan by combining these, for example.
  • the delivery plan creation unit 130 may create a delivery plan so as to leave a reserve amount of power, for example, in order to reduce the possibility that the mobile unit 200 will run out of power during delivery. Further, the delivery plan creation unit 130 may create the delivery plan in consideration of the fact that the traveling distance of the mobile body 200 is increased by using the regenerated electric power.
  • the power consumption calculation unit 140 calculates the power consumption of each of the plurality of mobile bodies 200 based on the delivery plan created by the delivery plan creation unit 130.
  • the first determination unit 150 determines, for each of the plurality of mobile bodies 200, whether the remaining power amount is below a predetermined threshold value. Specifically, the first determination unit 150 calculates the remaining power amount from the calculated power consumption amount and the power amount before traveling. The first determination unit 150 determines whether or not each of the plurality of moving bodies 200 is in a power shortage by comparing the calculated remaining power amount with a predetermined threshold value.
  • the predetermined threshold may be, for example, the amount of electric power that causes the moving body 200 to be in the power-off state.
  • the first determination unit 150 causes the constraint calculation unit 120 to strengthen the constraint for each of the moving bodies 200 for which the remaining power amount is determined to be below the predetermined threshold, and re-sets the constraint for movement for each of the plurality of moving units. Let it be calculated. In this case, for example, the first determination unit 150 further causes the constraint calculation unit 120 to weaken the constraint for each of the mobile bodies 200 for which it is determined that the remaining power amount does not fall below the predetermined threshold, and the plurality of movements are performed. The constraint for each body 200 may be calculated again.
  • the first determination unit 150 may perform the above determination, for example, in consideration of the amount of power for the spare in order to reduce the possibility that the mobile unit 200 will run out of electricity during delivery. For example, the first determination unit 150 may make the determination in consideration of the fact that the traveling distance of the mobile body 200 is increased by utilizing the regenerative power.
  • the charge amount calculation unit 160 calculates the charge amount for each of the plurality of mobile bodies 200 from the power consumption calculated by the power consumption calculation unit 140 and the remaining power amount.
  • the charge amount calculation unit 160 may calculate the charge amount for each of the plurality of moving bodies 200 so as to suppress deterioration of the battery 240 due to overcharge or overdischarge.
  • the charge amount calculation unit 160 may calculate, as the charge amount, a value obtained by adding the minimum usable charge amount (for example, 20%) to the power consumption amount obtained from the delivery plan for each of the plurality of mobile bodies 200.
  • the charge amount calculation unit 160 may calculate, as the charge amount, a value obtained by adding a half of the power consumption amount obtained from the delivery plan to the central charge amount (for example, 50%) for each of the plurality of mobile bodies 200. Good.
  • the charging plan creation unit 170 uses the charging amounts of the plurality of moving bodies 200 calculated by the charging amount calculating unit 160 to plan charging of the plurality of moving bodies 200 (charging target SOC for each battery 240, charging for each battery 240). Start/end time etc.) is created.
  • the charging plan created by the charging plan creating unit 170 may include, for example, a charging plan in which deterioration of the battery 240 is suppressed. More specifically, the charging plan creation unit 170 may create the charging plan so as to minimize deterioration of the batteries 240 of the plurality of mobile bodies 200, for example.
  • the second determination unit 180 determines from the delivery plan created by the delivery plan creation unit 130 and the charging plan created by the charging plan creation unit 170 whether charging of the plurality of mobile bodies 200 is completed by the start of delivery. Determine whether.
  • the second determination unit 180 causes the constraint calculation unit 120 to reinforce the constraint for the moving body 200 that is determined to be not charged by the start of delivery, and re-calculates the constraint regarding the movement of each of the plurality of moving bodies 200.
  • the second determination unit 180 calculates, for example, the insufficient charge amount of each of the mobile bodies 200 that are determined to be not charged by the time the delivery is started, and the constraint calculation unit 120 notifies the charge before the delivery is started.
  • the constraint for each moving body 200 that is determined not to be completed may be strengthened according to the insufficient charge amount, and the constraint regarding the movement for each of the plurality of moving bodies 200 may be calculated again.
  • the second determination unit 180 determines that the constraint calculation unit 120 lowers the upper limit of the travel distance for each of the mobile bodies 200 that are not charged by the start of delivery. Good.
  • the second determination unit 180 weakens, for example, the constraint calculation unit 120 on the constraint on the moving body 200 that is determined to be charged before the delivery starts, and the constraint on the movement of each of the plurality of moving units 200. May be calculated again.
  • the output unit 190 when the second determination unit 180 determines that charging of the plurality of mobile bodies 200 is completed by the start of delivery, the delivery plan created by the delivery plan creation unit 130 and the charging plan creation unit 170.
  • the charging plan created by is output to the communication unit 110.
  • the information processing system 1 having the above configuration performs a first delivery plan creation process for creating a delivery plan for deliveries by the plurality of mobile bodies 200.
  • FIG. 2 is a flowchart of the first delivery plan creation process.
  • the first delivery plan creation process is started, for example, when a user who uses the information processing system 1 performs an operation to the server 100 to start the first delivery plan creation process.
  • the communication unit 110 transmits a request indicating a transmission request of SOC and SOH at the present time of the battery 240 to each mobile body 200. Then, the communication unit 110 receives the current SOC and SOH of the battery 240 from each mobile body 200.
  • the constraint calculation unit 120 calculates the constraint regarding the movement of each of the plurality of mobile units 200 (step S100). More specifically, the constraint calculation unit 120 sets, for each of the mobile units 200, a charge amount of the battery within a predetermined deterioration acceleration degree range specified by the SOH of the battery 240 received by the communication unit 110 at the present time. Based on this, the available electric energy is calculated, and the upper limit of the travel distance is calculated as a constraint from the calculated available electric energy and the average electricity cost.
  • the delivery plan creation unit 130 creates a delivery plan of the delivery by the plurality of mobile bodies 200 based on the calculated constraint on the movement of each of the plurality of mobile bodies 200. Yes (step S105). More specifically, the delivery plan creation unit 130 creates a delivery plan so that the total travel distance of the plurality of moving bodies 200 is minimized within the range where the constraint is satisfied.
  • the power consumption calculation unit 140 calculates the power consumption of each of the plurality of mobile bodies 200 based on the created delivery plan (step S110).
  • the first determination unit 150 determines whether the remaining power amount of each of the plurality of mobile units 200 is below a predetermined threshold value. Is determined (step S115).
  • the predetermined threshold value is the amount of electric power with which the moving body 200 is in the power-off state.
  • step S115 when it is determined that there is a moving body 200 whose remaining power amount is below the predetermined threshold value (step S115: Yes), the constraint calculation unit 120 determines that the remaining power amount is below the predetermined threshold value.
  • the constraint for each of the mobile units 200 thus obtained is strengthened, and the constraint for each of the plurality of mobile units 200 is calculated again (step S130).
  • the delivery plan creation unit 130 recreates the delivery plan of the deliverables by the plurality of mobile bodies 200 based on the recalculated constraints (step S135).
  • the process of step S135 ends, the first delivery plan creation process proceeds to the process of step S110 again.
  • step S115 when it is determined that there is no moving body 200 whose remaining power amount is less than the predetermined threshold value (step S115: No), the charge amount calculation unit 160 determines the power consumption of each of the plurality of moving bodies 200. The charge amount is calculated from the power consumption calculated by the calculation unit 140 and the remaining power amount (step S120).
  • the charge plan creation unit 170 creates a charge plan for the plurality of mobile units 200 from the calculated charge amounts for the plurality of mobile units 200 (step S125). .. More specifically, the charging plan creation unit 170 creates a charging plan so as to minimize deterioration of the batteries 240 of each of the plurality of mobile bodies 200.
  • the second determination unit 180 determines a plurality of delivery plans created by the delivery plan creation unit 130 and the charging plan created by the charging plan creation unit 170. It is determined whether or not the charging of the moving body 200 is completed before the delivery is started (step S140).
  • step S140 when it is determined that the charging of the plurality of moving bodies 200 is not completed by the start of delivery, that is, when it is determined that there is a moving body 200 that is not completed by the start of delivery (step S140: No), the second determination unit 180 calculates the insufficient charge amount for each of the moving bodies 200 that are determined not to be charged by the start of delivery (step S150).
  • the constraint calculation unit 120 determines that the charging is not completed before the delivery is started.
  • the constraint on each of the determined moving bodies 200 is strengthened according to the insufficient charge amount, and the constraint on the moving about each of the plurality of moving bodies 200 is calculated again (step S155).
  • the delivery plan creation unit 130 recreates the delivery plan of the deliverables by the plurality of mobile bodies 200 based on the recalculated constraints (step S160).
  • the process of step S160 ends, the first delivery plan creation process proceeds to the process of step S110 again.
  • step S140 when it is determined that the charging of the plurality of mobile bodies 200 is completed before the delivery is started, that is, when it is determined that there is no mobile body 200 that is not completely charged by the delivery start (step S140: Yes). ), the output unit 190 outputs the delivery plan created by the delivery plan creation unit 130 and the charging plan created by the charging plan creation unit 170 to the communication unit 110 (step S145).
  • step S145 the information processing system 1 ends the first delivery plan creation process.
  • the information processing system 1 has been described as performing the first delivery plan creation process as the process of creating the delivery plan of the deliverables by the plurality of mobile bodies 200.
  • the information processing system 1 may perform the second delivery plan creation process instead of the first delivery plan creation process as the process of creating the delivery plan of the delivery by the plurality of mobile bodies 200.
  • FIG. 3 is a flowchart of the second delivery plan creation process.
  • the second delivery plan creation process is different from the first delivery plan creation process (see FIG. 2) according to the embodiment in that the process of step S130 is changed to the process of step S230.
  • the process of S231 is added, the process of step S155 is changed to the process of step S255, and the process of step S256 is added. Therefore, here, the processing of step S230 to processing of step S231 and the processing of step S255 to processing of step S256 will be mainly described.
  • step S115 when it is determined that there is a moving body 200 whose remaining power amount is below the predetermined threshold value (step S115: Yes), the constraint calculation unit 120 determines that the remaining power amount is below the predetermined threshold value.
  • the constraint for each of the plurality of moving bodies 200 is strengthened (step S230), and further, the constraint for each of the moving bodies 200 determined that the remaining power amount does not fall below the predetermined threshold is weakened, so that each of the plurality of moving bodies 200 is reduced. Is calculated again (step S231).
  • step S231 ends, the second delivery plan creation process proceeds to the process of step S135.
  • step S150 the constraint calculation unit 120 strengthens the constraint for each of the mobile bodies 200 determined to be not charged by the start of delivery according to the insufficient charge amount (step S255), and further. Then, the constraint on each of the moving bodies 200 determined to be charged by the start of delivery is weakened, and the constraint on the movement of each of the plurality of moving bodies 200 is calculated again (step S256).
  • step S231 When the process of step S231 ends, the second delivery plan creation process proceeds to the process of step S160.
  • the information processing system 1 may output the constraint if the delivery plan creation process is successful. Specifically, after the processing of the second determination unit 180, when the output unit 190 outputs the delivery plan and the charging plan, the output unit 190 outputs the constraint.
  • the output constraint is transmitted to an external device such as the terminal 300 via the communication unit 110. Then, the constraint is output by an output device such as the display unit 320.
  • the output constraints are updated constraints, in other words, recalculated constraints. For example, the constraint is output by the output unit 190 in step S145 of FIG.
  • Part or all of the constituent elements included in the information processing system 1 may be configured by one system LSI (Large Scale Integration).
  • the system LSI is an ultra-multifunctional LSI manufactured by integrating a plurality of components on one chip, and specifically, a microprocessor, a ROM (Read Only Memory), a RAM (Random Access Memory), etc. It is a computer system configured to include. A computer program is stored in the ROM. The system LSI achieves its function by the microprocessor operating according to the computer program.
  • the system LSI is used here, but it may also be called IC, LSI, super LSI, or ultra LSI depending on the degree of integration. Further, the method of circuit integration is not limited to LSI, and it may be realized by a dedicated circuit or a general-purpose processor. A programmable programmable gate array (FPGA) after the LSI is manufactured, or a reconfigurable processor capable of reconfiguring the connection and setting of circuit cells inside the LSI may be used.
  • FPGA programmable programmable gate array
  • One aspect of the present disclosure is not limited to such an information processing system, and may be an information processing method in which a characteristic configuration unit included in the information processing system has steps. Further, one aspect of the present disclosure may be a computer program that causes a computer to execute each characteristic step included in the information processing method. Further, one aspect of the present disclosure may be a computer-readable non-transitory recording medium in which such a computer program is recorded.
  • the present disclosure can be widely used for devices and the like that create a delivery plan for deliveries.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Sustainable Energy (AREA)
  • Sustainable Development (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Automation & Control Theory (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

情報処理方法は、コンピュータに実行させる方法であって、複数の電動の移動体(200)による配送物の配送計画を、複数の電動の移動体(200)それぞれについての移動に関する制約に基づき作成し、配送計画に基づき、複数の電動の移動体(200)それぞれについて消費電力を算出し、複数の電動の移動体(200)のそれぞれについて、消費電力と残電力量とから充電量を算出し、複数の電動の移動体(200)のそれぞれの充電量から、複数の電動の移動体(200)の充電計画を作成し、配送計画と充電計画とから、複数の電動の移動体(200)の充電が配送開始までに完了するか否かを判定し、配送開始までに充電が完了しないと判定された電動の移動体(200)についての制約を強めて配送計画を再作成し、作成された配送計画を出力する。

Description

情報処理方法、及び情報処理システム
 本開示は、情報処理方法、及び情報処理システムに関する。
 従来、電気自動車の充電計画を作成する方法が提案されている(例えば、特許文献1参照)。
特開2018-64413号公報
 しかし、特許文献1では、充電計画のみが出力されるため、電気自動車等の電動の移動体による配送物の配送計画と出力された充電計画とで整合が取れないおそれがある。
 そこで、本開示は、充電計画と整合が取れた配送計画を作成することができる情報処理方法、情報処理システムを提供することを目的とする。
 本開示の一態様に係る情報処理方法は、コンピュータに実行させる方法であって、複数の電動の移動体による配送物の配送計画を、前記複数の電動の移動体それぞれについての移動に関する制約に基づき作成し、前記配送計画に基づき、前記複数の電動の移動体それぞれについて消費電力を算出し、前記複数の電動の移動体それぞれについて、前記消費電力と残電力量とから充電量を算出し、前記複数の電動の移動体それぞれの前記充電量から、前記複数の電動の移動体の充電計画を作成し、前記配送計画と前記充電計画とから、前記複数の電動の移動体の充電が配送開始までに完了するか否かを判定し、配送開始までに充電が完了しないと判定された電動の移動体についての前記制約を強めて前記配送計画を再作成し、作成された前記配送計画を出力する。
 本開示の一態様に係る情報処理システムは、複数の電動の移動体による配送物の配送計画を、前記複数の電動の移動体それぞれについての移動に関する制約に基づき作成する配送計画作成部と、前記配送計画に基づき、前記複数の電動の移動体それぞれについて消費電力を算出する消費電力算出部と、前記複数の電動の移動体それぞれについて、前記消費電力と残電力量とから充電量を算出する充電量算出部と、前記複数の電動の移動体それぞれの前記充電量から、前記複数の電動の移動体の充電計画を作成する充電計画作成部と、前記配送計画と前記充電計画とから、前記複数の電動の移動体の充電が配送開始までに完了するか否かを判定する判定部と、作成された前記配送計画を出力する出力部と、を備え、前記配送計画作成部は、配送開始までに充電が完了しないと判定された電動の移動体についての前記制約を強めて前記配送計画を再作成する。
 本開示の一態様に係る情報処理方法、及び情報処理システムによれば、充電計画と整合が取れた配送計画を作成することができる配送計画を作成することができる。
図1は、実施の形態に係る情報処理システムの構成を示すブロック図である。 図2は、実施の形態に係る第1配送計画作成処理のフローチャートである。 図3は、変形例に係る第2配送計画作成処理のフローチャートである。
 (本開示の一態様を得るに至った経緯)
 電気自動車等の電動の移動体による配送物の配送計画を作成した場合において、配送計画で運用予定の電動の移動体に上記従来の充電方法を適用すると、配送計画が実行できないおそれがある。例えば、配送開始までに充電が完了しない電動の移動体が発生することがある。また、例えば、配送開始よりも充電完了時点が早すぎると充電量によっては保存劣化が大きくなるおそれもある。そこで、発明者は、充電計画と整合が取れた配送計画を作成する方法について、鋭意検討、実験を重ねた。その結果、発明者は、下記情報処理方法、及び情報処理システムに想到した。
 本開示の一態様に係る情報処理方法は、コンピュータに実行させる方法であって、複数の電動の移動体による配送物の配送計画を、前記複数の電動の移動体それぞれについての移動に関する制約に基づき作成し、前記配送計画に基づき、前記複数の電動の移動体それぞれについて消費電力を算出し、前記複数の電動の移動体それぞれについて、前記消費電力と残電力量とから充電量を算出し、前記複数の電動の移動体それぞれの前記充電量から、前記複数の電動の移動体の充電計画を作成し、前記配送計画と前記充電計画とから、前記複数の電動の移動体の充電が配送開始までに完了するか否かを判定し、配送開始までに充電が完了しないと判定された電動の移動体についての前記制約を強めて前記配送計画を再作成し、作成された前記配送計画を出力する。
 上記情報処理方法によると、一旦作成した配送計画において、配送開始までに充電が完了しない電動の移動体がある場合には、その移動体の制約を強めて配送計画を再作成する。このため、上記情報処理方法によると、充電計画と整合が取れた配送計画を作成することができる。
 また、前記制約は、走行距離の上限であって、配送開始までに充電が完了しないと判定された電動の移動体についての走行距離の上限を引き下げて、前記配送計画を再作成するとしてもよい。これにより、走行距離の上限を用いて配送計画の再作成を制御することができる。例えば、一旦作成した配送計画において、配送開始までに充電が完了しない電動の移動体がある場合には、その移動体の走行距離が短くなるように、配送計画を再作成することができる。
 また、前記複数の電動の移動体それぞれについて、バッテリの劣化度を取得し、前記複数の電動の移動体それぞれについて、前記劣化度から特定される所定の劣化促進度の範囲内に収まるバッテリの充電量に基づいて、使用可能な電力量を算出し、前記複数の電動の移動体それぞれについて、前記使用可能な電力量に基づいて、前記制約を算出するとしてもよい。これにより、バッテリの劣化を抑制できる配送計画を作成することができる。
 また、配送開始までに充電が完了しない電動の移動体がある場合には、さらに、配送開始までに充電が完了する電動の移動体についての前記制約を弱めて前記配送計画を再作成するとしてもよい。これにより、さらに充電計画と整合が取れた配送計画を作成することができる。
 また、前記複数の電動の移動体それぞれについて、前記残電力量が所定の閾値を下回るか否かを判定し、前記残電力量が前記所定の閾値を下回ると判定された電動の移動体についての前記制約を強めて、前記配送計画を再作成するとしてもよい。これにより、電欠する電動の移動体の発生を抑制する配送計画を作成することができる。
 また、前記充電計画は、バッテリの劣化が抑制される充電計画を含むとしてもよい。これにより、バッテリの劣化を抑制することができる。
 本開示の一態様に係る情報処理システムは、複数の電動の移動体による配送物の配送計画を、前記複数の電動の移動体それぞれについての移動に関する制約に基づき作成する配送計画作成部と、前記配送計画に基づき、前記複数の電動の移動体それぞれについて消費電力を算出する消費電力算出部と、前記複数の電動の移動体それぞれについて、前記消費電力と残電力量とから充電量を算出する充電量算出部と、前記複数の電動の移動体それぞれの前記充電量から、前記複数の電動の移動体の充電計画を作成する充電計画作成部と、前記配送計画と前記充電計画とから、前記複数の電動の移動体の充電が配送開始までに完了するか否かを判定する判定部と、作成された前記配送計画を出力する出力部と、を備え、前記配送計画作成部は、配送開始までに充電が完了しないと判定された電動の移動体についての前記制約を強めて前記配送計画を再作成する。
 上記情報処理システムによると、一旦作成した配送計画において、配送開始までに充電が完了しない電動の移動体がある場合には、その移動体の制約を強めて配送計画を再作成する。このため、上記情報処理システムによると、充電計画と整合が取れた配送計画を作成することができる。
 以下、本開示の一態様に係る情報処理方法、及び情報処理システムの具体例について、図面を参照しながら説明する。ここで示す実施の形態は、いずれも本開示の一具体例を示すものである。従って、以下の実施の形態で示される数値、形状、構成要素、構成要素の配置及び接続形態、並びに、ステップ(工程)及びステップの順序等は、一例であって本開示を限定するものではない。各図は、模式図であり、必ずしも厳密に図示されたものではない。
 なお、本開示の包括的又は具体的な態様は、システム、方法、集積回路、コンピュータプログラム又はコンピュータ読み取り可能なCD-ROMなどの記録媒体で実現されてもよく、システム、方法、集積回路、コンピュータプログラム及び記録媒体の任意な組み合わせで実現されてもよい。
 (実施の形態1)
 以下、実施の形態に係る情報処理システムについて説明する。この情報処理システムは、複数の電動の移動体による配送物の配送計画であって、充電計画と整合が取れた配送計画を作成する。
 ここでは、一例として、電動の移動体は、バッテリ駆動の自動運転車両であるとして説明するが、電動の移動体は、配送物を配送することができれば、必ずしもバッテリ駆動の自動運転車両に限定される必要はない。電動の移動体は、例えば、自律飛行型又は遠隔操縦型のドローンであってもよいし、搭乗する運転手が手動で運転する車両であってもよい。
 [1.情報処理システムの構成]
 図1は、実施の形態に係る情報処理システム1の構成を示すブロック図である。
 図1に示されるように、情報処理システム1は、サーバ100と、移動体200と、端末300と、充電器400とを含んで構成される。図1では、情報処理システム1は、あたかも1台の移動体200を含んで構成されるかのように図示されているが、実際には、情報処理システム1は、複数の移動体200を含んで構成される。また、図1では、情報処理システム1は、あたかも1台の端末300を含んで構成されるかのように図示されているが、実際には、情報処理システム1は、1台の端末300を含む構成であってもよいし、複数台の端末300を含む構成であってもよいし、さらには、1台も端末300を含まない構成であってもよい。また、図1では、情報処理システム1は、あたかも1つの充電器400を含んで構成されるかのように図示されているが、実際には、情報処理システム1は、1つの充電器400を含む構成であってもよいし、複数の充電器400を含む構成であってもよい。
 移動体200は、電動で走行する移動体である。移動体200は、通信部210と、自動走行制御部220と、バッテリ管理部230と、バッテリ240とを含んで構成される。
 バッテリ240は、移動体200を駆動する電動の駆動装置(例えば、モータ。図示されず。)に電力を供給する二次電池である。バッテリ240は、バッテリ240に着脱自在な充電器400によって充電される。
 バッテリ管理部230は、バッテリ240の状態を管理する。より具体的には、バッテリ管理部230は、バッテリ240の現時点におけるSOC(State Of Charge:バッテリの残電力量)と、バッテリ240の現時点におけるSOH(State Of Health:バッテリの劣化度)とを管理する。
 通信部210は、通信可能な他の機器と通信する。他の機器には、サーバ100が含まれる。通信部210は、例えば、サーバ100から送信された配送計画(後述)を受信する。また、通信部210は、例えば、サーバ100からのリクエストに応じて、バッテリ管理部230により管理されるSOCとSOHとをサーバ100に送信する。通信部210は、例えば、無線通信機を備え、無線を利用して他の機器と通信するとしてもよい。
 自動走行制御部220は、移動体200の自動走行を制御する。自動走行制御部220は、例えば、通信部210により配送計画が受信された場合には、その配送計画に沿って移動体200の自動走行を制御する。自動走行制御部220は、例えば、専用ハードウエアにより実現されてもよいし、例えば、プロセッサとメモリとを備え、メモリに記憶されたプログラムをプロセッサが実行することで実現されてもよい。
 なお、前述したように、移動体200は、搭乗する運転手が手動で操縦するタイプの移動体であってもよい。この場合には、移動体200は、例えば、自動走行制御部220の替わりに、移動体200を手動で操縦するための操縦部と、サーバ100から送信された配送計画の内容を表示する表示部とを含む構成であってもよい。この場合には、運転手は、表示部に表示された配送計画の内容に合わせて操縦部を操作して移動体200を操縦し、移動体200を配送計画に沿って走行させる。
 端末300は、情報処理システム1を利用するユーザが所有する端末である。端末300は、通信部310と、表示部320とを含んで構成される。
 通信部310は、通信可能な他の機器と通信する。他の機器には、サーバ100が含まれる。通信部310は、例えば、サーバ100から送信された配送計画と充電計画(後述)とを受信する。通信部310は、例えば、無線通信機を備え、無線を利用して他の機器と通信するとしてもよい。
 表示部320は、端末300を利用するユーザに対して、画像を表示する。表示部320は、例えば、通信部310により配送計画又は充電計画が受信された場合には、それら配送計画又は充電計画の内容を示す画像を表示する。表示部320は、例えば、液晶ディスプレイ等の表示デバイスを備え、表示デバイスに画像を表示するとしてもよい。
 充電器400は、バッテリ240を充電する。充電器400は、通信部410と、充電制御部420と、充電モジュール430とを含んで構成される。
 充電モジュール430は、バッテリ240に着脱自在な充電回路を含み、バッテリ240を充電する。
 通信部410は、通信可能な他の機器と通信する。他の機器には、サーバ100が含まれる。通信部410は、例えば、サーバ100から送信された充電計画を受信する。通信部410は、例えば、無線通信機を備え、無線を利用して他の機器と通信するとしてもよい。
 充電制御部420は、充電モジュール430によるバッテリ240への充電を制御する。充電制御部420は、例えば、通信部410により充電計画が受信された場合には、その充電計画に沿って、充電モジュール430によるバッテリ240への充電を制御する。充電制御部420は、例えば、専用ハードウエアにより実現されてもよいし、例えば、プロセッサとメモリとを備え、メモリに記憶されたプログラムをプロセッサが実行することで実現されてもよい。
 サーバ100は、情報処理システム1を運用する運用会社(例えば、宅配業者)が利用するサーバである。サーバ100は、通信部110と、制約算出部120と、配送計画作成部130と、消費電力算出部140と、第1判定部150と、充電量算出部160と、充電計画作成部170と、第2判定部180と、出力部190とを含んで構成される。サーバ100は、例えば、プロセッサとメモリとを備えるコンピュータであって、プロセッサがメモリに記憶されるプログラムを実行することで、各種機能を実現してもよい。
 通信部110は、通信可能な他の機器と通信する。他の機器には、移動体200と、端末300と、充電器400とが含まれる。通信部110は、例えば、各移動体200に対して、SOCとSOHとの送信要求を示すリクエストを送信する。通信部110は、例えば、通信部110が送信したリクエストに応じて各移動体200から送信されたSOCとSOHとを受信する。通信部110は、例えば、出力部190から配送計画が出力されると、その配送計画を、各移動体200と、各端末300とに送信する。通信部110は、例えば、出力部190から充電計画が出力されると、その充電計画を、各端末300と、各充電器400とに送信する。通信部110は、例えば、外部機器である他のサーバ(図示されず。)から、配送対象となる配送物の配送リストを受信する。
 制約算出部120は、複数の移動体200それぞれについての移動に関する制約を算出する。制約算出部120は、例えば、移動体200それぞれについて、バッテリ240の劣化が抑制される充電量を算出し、算出した充電量から制約を算出するとしてもよい。より具体的には、制約算出部120は、例えば、移動体200それぞれについて、通信部110により受信された、バッテリ240の劣化度である現時点におけるSOHを取得し、取得した現時点におけるSOHから特定される所定の劣化促進度の範囲内(例えば、0.01%以内)に収まるバッテリの充電量に基づいて、使用可能な電力量を算出し、算出した利用可能な電力量に基づいて制約を算出するとしてもよい。ここで、制約算出部120は、例えば、利用可能な電力量と平均電費とから走行距離上限を制約として算出してもよい。また、制約算出部120は、例えば、移動体200それぞれについて、通信部110により受信された現時点におけるSOHに一定値の充電量を加えた充電量を算出し、算出した充電量と平均電流とから走行距離上限を制約として算出してもよい。また、制約算出部120は、例えば、移動体200それぞれについて、走行開始から終了までの時間の上限を制約として算出してもよい。また、制約算出部120は、例えば、移動体200それぞれについて、走行開始から終了までの消費電力量の上限を制約として算出してもよい。また、制約算出部120は、例えば、これらの組み合わせにより制約を算出するとしてもよい。
 配送計画作成部130は、制約算出部120によって算出された、複数の移動体200それぞれについての移動に関する制約に基づいて、複数の移動体200による配送物の配送計画(移動体200毎の荷物割り当て、移動体200毎の配送ルート、未割当荷物リスト等)を作成する。配送計画作成部130は、例えば、さらに、通信部110により受信された配送リストと、予め記憶する複数の移動体200の移動体リストとに基づいて、配送計画を作成してもよい。配送計画作成部130は、例えば、複数の移動体200の総走行距離が最小化されるように、配送計画を作成してもよい。配送計画作成部130は、例えば、複数の移動体200のバッテリ240の総劣化量が最小化されるように、配送計画を作成してもよい。配送計画作成部130は、例えば、複数の移動体200の総消費電力量が最小化されるように、配送計画を作成してもよい。配送計画作成部130は、例えば、複数の移動体200の総配送所要時間が最小化されるように、配送計画を作成してもよい。配送計画作成部130は、例えば、これらの組み合わせにより配送計画を作成してもよい。
 また、配送計画作成部130は、例えば、移動体200が配送中に電欠してしまう可能性を低減するために、予備分の電力量を残すように配送計画を作成してもよい。また、配送計画作成部130は、例えば、移動体200が回生電力を利用することで走行距離が延びることを考慮して配送計画を作成してもよい。
 消費電力算出部140は、配送計画作成部130によって作成された配送計画に基づいて、複数の移動体200それぞれについての消費電力を算出する。
 第1判定部150は、複数の移動体200それぞれについて、残電力量が所定の閾値を下回るか否かを判定する。具体的には、第1判定部150は、算出された消費電力量と走行前の電力量とから残電力量を算出する。第1判定部150は、算出された残電力量と所定の閾値とを比較することにより、複数の移動体200それぞれについて、電欠するか否かを判定する。ここで、所定の閾値は、例えば、移動体200が電欠状態となる電力量であってもよい。
 第1判定部150は、制約算出部120に、残電力量が所定の閾値を下回ると判定された移動体200それぞれについての制約を強めさせて、複数の移動体それぞれについての移動に関する制約を再度算出させる。この場合において、第1判定部150は、例えば、制約算出部120に、さらに、残電力量が所定の閾値を下回らないと判定された移動体200それぞれについての制約を弱めさせて、複数の移動体200それぞれについての制約を再度算出させてもよい。
 第1判定部150は、例えば、移動体200が配送中に電欠してしまう可能性を低減するために、予備分の電力量を考慮して上記判定を行ってもよい。第1判定部150は、例えば、移動体200が回生電力を利用することで走行距離が延びることを考慮して上記判定を行ってもよい。
 充電量算出部160は、複数の移動体200それぞれについて、消費電力算出部140によって算出された消費電力と残電力量とから充電量を算出する。充電量算出部160は、例えば、複数の移動体200それぞれについて、過充電又は過放電によるバッテリ240の劣化を抑制するように充電量を算出してもよい。充電量算出部160は、例えば、複数の移動体200それぞれについて、最低使用可能充電量(例えば20%)に、配送計画から求まる消費電力量を加算した値を充電量として算出してもよい。充電量算出部160は、例えば、複数の移動体200それぞれについて、中心充電量(例えば50%)に、配送計画から求まる消費電力量の半分の値を加算した値を充電量として算出してもよい。
 充電計画作成部170は、充電量算出部160によって算出された、複数の移動体200それぞれの充電量から、複数の移動体200の充電計画(バッテリ240毎の充電目標SOC、バッテリ240毎の充電開始終了時刻等)を作成する。ここで、充電計画作成部170が作成する充電計画は、例えば、バッテリ240の劣化が抑制される充電計画を含むとしてもよい。より具体的には、充電計画作成部170は、例えば、複数の移動体200それぞれのバッテリ240の劣化を最小化するように充電計画を作成してもよい。
 第2判定部180は、配送計画作成部130によって作成された配送計画と、充電計画作成部170によって作成された充電計画とから、複数の移動体200の充電が配送開始までに完了するか否かを判定する。
 第2判定部180は、制約算出部120に、配送開始までに充電が完了しないと判定された移動体200についての制約を強めさせて、複数の移動体200それぞれについての移動に関する制約を再度算出させる。この場合、第2判定部180は、例えば、配送開始までに充電が完了しないと判定された移動体200それぞれについての不足する充電量を算出し、制約算出部120に、配送開始までに充電が完了しないと判定された移動体200それぞれについての制約を、不足する充電量に応じて強めさせて、複数の移動体200それぞれについての移動に関する制約を再度算出させてもよい。ここで、制約が走行距離の上限である場合には、第2判定部180は、制約算出部120に、配送開始までに充電が完了しない移動体200それぞれについての走行距離の上限を引き下げさせるとしてもよい。また、第2判定部180は、例えば、制約算出部120に、配送開始までに充電が完了すると判定された移動体200についての制約を弱めさせて、複数の移動体200それぞれについての移動に関する制約を再度算出させるとしてもよい。
 出力部190は、第2判定部180によって、複数の移動体200の充電が配送開始までに完了すると判定された場合に、配送計画作成部130によって作成された配送計画と、充電計画作成部170によって作成された充電計画とを通信部110に出力する。
 [2.情報処理システムの動作]
 上記構成の情報処理システム1は、複数の移動体200による配送物の配送計画を作成する第1配送計画作成処理を行う。
 以下、図面を用いて、情報処理システム1が行う第1配送計画作成処理の一例について説明する。
 図2は、第1配送計画作成処理のフローチャートである。
 第1配送計画作成処理は、例えば、情報処理システム1を利用するユーザが、サーバ100に対して、第1配送計画作成処理を開始する旨の操作を行うことで開始される。
 第1配送計画作成処理が開始されると、通信部110は、各移動体200に対して、バッテリ240の現時点におけるSOCとSOHとの送信要求を示すリクエストを送信する。そして、通信部110は、各移動体200から、バッテリ240の現時点におけるSOCとSOHとを受信する。
 通信部110によって各移動体200からバッテリ240の現時点におけるSOCとSOHとが受信されると、制約算出部120は、複数の移動体200それぞれについての移動に関する制約を算出する(ステップS100)。より具体的には、制約算出部120は、移動体200それぞれについて、通信部110により受信されたバッテリ240の現時点におけるSOHから特定される所定の劣化促進度の範囲内に収まるバッテリの充電量に基づいて、使用可能な電力量を算出し、算出した利用可能な電力量と平均電費とから走行距離上限を制約として算出する。
 制約算出部120によって制約が算出されると、配送計画作成部130は、算出された複数の移動体200それぞれについての移動に関する制約に基づいて、複数の移動体200による配送物の配送計画を作成する(ステップS105)。より具体的には、配送計画作成部130は、制約が満たされる範囲内において、複数の移動体200の総走行距離が最小化されるように、配送計画を作成する。
 配送計画作成部130によって配送計画が作成されると、消費電力算出部140は、作成された配送計画に基づいて、複数の移動体200それぞれについての消費電力を算出する(ステップS110)。
 消費電力算出部140によって、複数の移動体200それぞれについての消費電力が算出されると、第1判定部150は、複数の移動体200それぞれについて、残電力量が所定の閾値を下回るか否かを判定する(ステップS115)。ここで、所定の閾値は、より具体的には、移動体200が電欠状態となる電力量である。
 ステップS115の処理において、残電力量が所定の閾値を下回る移動体200があると判定した場合には(ステップS115:Yes)、制約算出部120は、残電力量が所定の閾値を下回ると判定された移動体200それぞれについての制約を強めて、複数の移動体200それぞれについての制約を再度算出する(ステップS130)。
 制約算出部120によって制約が再度算出されると、配送計画作成部130は、再度算出された制約に基づいて、複数の移動体200による配送物の配送計画を再作成する(ステップS135)。ステップS135の処理が終了すると、第1配送計画作成処理は、再びステップS110の処理へ進む。
 ステップS115の処理において、残電力量が所定の閾値を下回る移動体200がないと判定した場合には(ステップS115:No)、充電量算出部160は、複数の移動体200それぞれについて、消費電力算出部140によって算出された消費電力と残電力量とから充電量を算出する(ステップS120)。
 充電量算出部160によって充電量が算出されると、充電計画作成部170は、算出された複数の移動体200それぞれの充電量から、複数の移動体200の充電計画を作成する(ステップS125)。より具体的には、充電計画作成部170は、複数の移動体200それぞれのバッテリ240の劣化を最小化するように充電計画を作成する。
 充電計画作成部170によって充電計画が作成されると、第2判定部180は、配送計画作成部130によって作成された配送計画と、充電計画作成部170によって作成された充電計画とから、複数の移動体200の充電が配送開始までに完了するか否かを判定する(ステップS140)。
 ステップS140の処理において、複数の移動体200の充電が配送開始までに完了しないと判定した場合、すなわち、配送開始までに充電が完了しない移動体200があると判定した場合には(ステップS140:No)、第2判定部180は、配送開始までに充電が完了しないと判定された移動体200それぞれについての不足する充電量を算出する(ステップS150)。
 第2判定部180によって、配送開始までに充電が完了しないと判定された移動体200それぞれについての不足する充電量が算出されると、制約算出部120は、配送開始までに充電が完了しないと判定された移動体200それぞれについての制約を、不足する充電量に応じて強めて、複数の移動体200それぞれについての移動に関する制約を再度算出する(ステップS155)。
 制約算出部120によって制約が再度算出されると、配送計画作成部130は、再度算出された制約に基づいて、複数の移動体200による配送物の配送計画を再作成する(ステップS160)。ステップS160の処理が終了すると、第1配送計画作成処理は、再びステップS110の処理へ進む。
 ステップS140の処理において、複数の移動体200の充電が配送開始までに完了すると判定した場合、すなわち、配送開始までに充電が完了しない移動体200がないと判定した場合には(ステップS140:Yes)、出力部190は、配送計画作成部130によって作成された配送計画と、充電計画作成部170によって作成された充電計画とを通信部110に出力する(ステップS145)。
 ステップS145の処理が終了すると、情報処理システム1は、その第1配送計画作成処理を終了する。
 [3.考察]
 上記構成の情報処理システム1によると、一旦作成した配送計画において、配送開始までに充電が完了しない移動体200がある場合には、配送開始までに充電が完了しない移動体200それぞれの制約を強めて配送計画を再作成する。このため、上記構成の情報処理システム1によると、充電計画と整合が取れた配送計画を作成することができる。
 (補足)
 以上、本開示の一態様に係る情報処理システムについて、実施の形態に基づいて説明したが、本開示は、本実施の形態に限定されるものではない。本開示の趣旨を逸脱しない限り、当業者が思いつく各種変形を本実施の形態に施したものや、異なる実施の形態における構成要素を組み合わせて構築される形態も、本開示の1つまたは複数の態様の範囲内に含まれてもよい。
 (1)実施の形態において、情報処理システム1は、複数の移動体200による配送物の配送計画を作成する処理として、第1配送計画作成処理を行うとして説明した。これに対して、情報処理システム1は、複数の移動体200による配送物の配送計画を作成する処理として、第1配送計画作成処理に替えて、第2配送計画作成処理を行ってもよい。
 以下、第2配送計画作成処理について、図面を用いて説明する。
 図3は、第2配送計画作成処理のフローチャートである。
 図3に示されるように、第2配送計画作成処理は、実施の形態に係る第1配送計画作成処理(図2参照)に対して、ステップS130の処理がステップS230の処理に変更され、ステップS231の処理が追加され、ステップS155の処理がステップS255の処理に変更され、ステップS256の処理が追加された処理となっている。このため、ここでは、ステップS230の処理~ステップS231の処理、及び、ステップS255の処理~ステップS256の処理を中心に説明する。
 ステップS115の処理において、残電力量が所定の閾値を下回る移動体200があると判定した場合には(ステップS115:Yes)、制約算出部120は、残電力量が所定の閾値を下回ると判定された移動体200それぞれについての制約を強めて(ステップS230)、さらに、残電力量が所定の閾値を下回らないと判定された移動体200それぞれについての制約を弱めて、複数の移動体200それぞれについての制約を再度算出する(ステップS231)。
 ステップS231の処理が終了すると、第2配送計画作成処理は、ステップS135の処理に進む。
 ステップS150の処理が終了すると、制約算出部120は、配送開始までに充電が完了しないと判定された移動体200それぞれについての制約を、不足する充電量に応じて強めて(ステップS255)、さらに、配送開始までに充電が完了すると判定された移動体200それぞれについての制約を弱めて、複数の移動体200それぞれについての移動に関する制約を再度算出する(ステップS256)。
 ステップS231の処理が終了すると、第2配送計画作成処理は、ステップS160の処理に進む。
 (2)情報処理システム1は、配送計画作成処理に成功した場合、制約を出力してもよい。具体的には、第2判定部180の処理の後、出力部190が配送計画と充電計画を出力する際に、出力部190は、制約を出力する。出力された制約は、通信部110を介して、端末300等の外部装置に送信される。そして、制約は表示部320等の出力装置により出力される。出力される制約は、更新された制約、言い換えると再算出された制約である。例えば、図2のステップS145において制約は出力部190により出力される。
 このように、更新された制約が出力されることにより、次回以降の配送計画処理の制約の初期値が配送計画作成に適した値に近い値になる可能性を高めることができる。したがって、処理量を削減することが可能となる。
 (3)情報処理システム1が備える構成要素の一部又は全部は、1個のシステムLSI(Large Scale Integration:大規模集積回路)から構成されているとしてもよい。システムLSIは、複数の構成部を1個のチップ上に集積して製造された超多機能LSIであり、具体的には、マイクロプロセッサ、ROM(Read Only Memory)、RAM(Random Access Memory)などを含んで構成されるコンピュータシステムである。ROMには、コンピュータプログラムが記憶されている。マイクロプロセッサが、コンピュータプログラムに従って動作することにより、システムLSIは、その機能を達成する。
 なお、ここでは、システムLSIとしたが、集積度の違いにより、IC、LSI、スーパーLSI、ウルトラLSIと呼称されることもある。また、集積回路化の手法はLSIに限るものではなく、専用回路または汎用プロセッサで実現してもよい。LSI製造後に、プログラムすることが可能なFPGA(Field Programmable Gate Array)、あるいはLSI内部の回路セルの接続や設定を再構成可能なリコンフィギュラブル・プロセッサを利用してもよい。
 さらには、半導体技術の進歩または派生する別技術によりLSIに置き換わる集積回路化の技術が登場すれば、当然、その技術を用いて機能ブロックの集積化を行ってもよい。バイオ技術の適用等が可能性としてありえる。
 (4)本開示の一態様は、このような情報処理システムだけではなく、情報処理システムに含まれる特徴的な構成部をステップとする情報処理方法であってもよい。また、本開示の一態様は、情報処理方法に含まれる特徴的な各ステップをコンピュータに実行させるコンピュータプログラムであってもよい。また、本開示の一態様は、そのようなコンピュータプログラムが記録された、コンピュータ読み取り可能な非一時的な記録媒体であってもよい。
 本開示は、配送物の配送計画を作成する装置等に広く利用可能である。
 1 情報処理システム
 100 サーバ
 110、210、310、410 通信部
 120 制約算出部
 130 配送計画算出部
 140 消費電力算出部
 150 第1判定部
 160 充電量算出部
 170 充電計画作成部
 180 第2判定部
 190 出力部
 200 移動体
 220 自動走行制御部
 230 バッテリ管理部
 240 バッテリ
 300 端末
 320 表示部
 400 充電器
 420 充電制御部
 430 充電モジュール

Claims (8)

  1.  コンピュータに実行させる方法であって、
     複数の電動の移動体による配送物の配送計画を、前記複数の電動の移動体それぞれについての移動に関する制約に基づき作成し、
     前記配送計画に基づき、前記複数の電動の移動体それぞれについて消費電力を算出し、
     前記複数の電動の移動体それぞれについて、前記消費電力と残電力量とから充電量を算出し、
     前記複数の電動の移動体それぞれの前記充電量から、前記複数の電動の移動体の充電計画を作成し、
     前記配送計画と前記充電計画とから、前記複数の電動の移動体の充電が配送開始までに完了するか否かを判定し、
     配送開始までに充電が完了しないと判定された電動の移動体についての前記制約を強めて前記配送計画を再作成し、
     作成された前記配送計画を出力する
     情報処理方法。
  2.  前記制約は、走行距離の上限であって、
     配送開始までに充電が完了しないと判定された電動の移動体についての走行距離の上限を引き下げて、前記配送計画を再作成する
     請求項1に記載の情報処理方法。
  3.  前記複数の電動の移動体それぞれについて、バッテリの劣化度を取得し、
     前記複数の電動の移動体それぞれについて、前記劣化度から特定される所定の劣化促進度の範囲内に収まるバッテリの充電量に基づいて、使用可能な電力量を算出し、
     前記複数の電動の移動体それぞれについて、前記使用可能な電力量に基づいて、前記制約を算出する
     請求項1又は2に記載の情報処理方法。
  4.  配送開始までに充電が完了しない電動の移動体がある場合には、さらに、配送開始までに充電が完了する電動の移動体についての前記制約を弱めて前記配送計画を再作成する
     請求項1~3のいずれか1項に記載の情報処理方法。
  5.  前記複数の電動の移動体それぞれについて、前記残電力量が所定の閾値を下回るか否かを判定し、
     前記残電力量が前記所定の閾値を下回ると判定された電動の移動体についての前記制約を強めて、前記配送計画を再作成する
     請求項1~4のいずれか1項に記載の情報処理方法。
  6.  前記充電計画は、バッテリの劣化が抑制される充電計画を含む
     請求項1~5のいずれか1項に記載の情報処理方法。
  7.  強められた前記制約を出力する
     請求項1~6のいずれか1項に記載の情報処理方法。
  8.  複数の電動の移動体による配送物の配送計画を、前記複数の電動の移動体それぞれについての移動に関する制約に基づき作成する配送計画作成部と、
     前記配送計画に基づき、前記複数の電動の移動体それぞれについて消費電力を算出する消費電力算出部と、
     前記複数の電動の移動体それぞれについて、前記消費電力と残電力量とから充電量を算出する充電量算出部と、
     前記複数の電動の移動体それぞれの前記充電量から、前記複数の電動の移動体の充電計画を作成する充電計画作成部と、
     前記配送計画と前記充電計画とから、前記複数の電動の移動体の充電が配送開始までに完了するか否かを判定する判定部と、
     作成された前記配送計画を出力する出力部と、を備え、
     前記配送計画作成部は、配送開始までに充電が完了しないと判定された電動の移動体についての前記制約を強めて前記配送計画を再作成する
     情報処理システム。
PCT/JP2019/041703 2019-02-01 2019-10-24 情報処理方法、及び情報処理システム WO2020158073A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201980050608.6A CN112512943B (zh) 2019-02-01 2019-10-24 信息处理方法及信息处理系统
JP2020569373A JP7455073B2 (ja) 2019-02-01 2019-10-24 情報処理方法、及び情報処理システム
US17/165,209 US20210158291A1 (en) 2019-02-01 2021-02-02 Information processing method and information processing system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US201962799992P 2019-02-01 2019-02-01
US62/799,992 2019-02-01
JP2019-115342 2019-06-21
JP2019115342 2019-06-21

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US17/165,209 Continuation US20210158291A1 (en) 2019-02-01 2021-02-02 Information processing method and information processing system

Publications (1)

Publication Number Publication Date
WO2020158073A1 true WO2020158073A1 (ja) 2020-08-06

Family

ID=71840040

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/041703 WO2020158073A1 (ja) 2019-02-01 2019-10-24 情報処理方法、及び情報処理システム

Country Status (4)

Country Link
US (1) US20210158291A1 (ja)
JP (1) JP7455073B2 (ja)
CN (1) CN112512943B (ja)
WO (1) WO2020158073A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7270715B1 (ja) 2021-12-20 2023-05-10 楽天グループ株式会社 情報処理装置、実施内容決定方法、及び配送システム
EP4239291A4 (en) * 2020-10-27 2024-04-03 Panasonic Ip Man Co Ltd CALCULATION SYSTEM, PROGRAM FOR CREATING A LOADING PLAN AND PROGRAM FOR CREATING A DISCHARGE PLAN

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111527641A (zh) * 2017-12-26 2020-08-11 松下知识产权经营株式会社 电池管理装置、电池系统、及车辆用电源系统
CN116205554B (zh) * 2023-04-26 2024-02-09 浙江天柜科技有限公司 一种移动自助售货设备及售货控制方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012154781A (ja) * 2011-01-26 2012-08-16 Hitachi Automotive Systems Ltd ナビゲーションシステム、センタサーバ、車載装置
JP5578124B2 (ja) * 2011-03-29 2014-08-27 株式会社デンソー 電力供給システム
JP2015138501A (ja) * 2014-01-24 2015-07-30 株式会社東芝 運行計画作成支援装置

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5017398B2 (ja) * 2010-03-09 2012-09-05 日立オートモティブシステムズ株式会社 経路計画装置及び経路計画システム
JP5506943B2 (ja) * 2010-10-05 2014-05-28 三菱電機株式会社 充電制御装置
WO2012057307A1 (ja) * 2010-10-29 2012-05-03 三洋電機株式会社 電力管理用の制御装置
JP5803547B2 (ja) * 2011-10-13 2015-11-04 日産自動車株式会社 充電配車計画システム
DE112013007295T5 (de) * 2013-09-27 2016-04-28 Hitachi, Ltd. Elektroleistungssystem-Steuervorrichtung, Elektroleistungssystem und Elektroleistungssystem-Steuerverfahren
WO2019023324A1 (en) * 2017-07-26 2019-01-31 Via Transportation, Inc. SYSTEMS AND METHODS FOR MANAGING AND ROUTING COOPERATING VEHICLES
CN107817792B (zh) * 2017-09-19 2020-09-29 中车工业研究院有限公司 一种智能公共运输系统
CN107679802A (zh) * 2017-09-29 2018-02-09 广州唯品会研究院有限公司 无人车充电方法、装置及计算机可读存储介质
ES2837001T3 (es) * 2017-11-30 2021-06-29 Einride Ab Método de planificación de transporte para optimización del paquete de baterías
JP7176376B2 (ja) * 2018-11-30 2022-11-22 トヨタ自動車株式会社 車両の制御装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012154781A (ja) * 2011-01-26 2012-08-16 Hitachi Automotive Systems Ltd ナビゲーションシステム、センタサーバ、車載装置
JP5578124B2 (ja) * 2011-03-29 2014-08-27 株式会社デンソー 電力供給システム
JP2015138501A (ja) * 2014-01-24 2015-07-30 株式会社東芝 運行計画作成支援装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4239291A4 (en) * 2020-10-27 2024-04-03 Panasonic Ip Man Co Ltd CALCULATION SYSTEM, PROGRAM FOR CREATING A LOADING PLAN AND PROGRAM FOR CREATING A DISCHARGE PLAN
JP7270715B1 (ja) 2021-12-20 2023-05-10 楽天グループ株式会社 情報処理装置、実施内容決定方法、及び配送システム
JP2023091351A (ja) * 2021-12-20 2023-06-30 楽天グループ株式会社 情報処理装置、実施内容決定方法、及び配送システム

Also Published As

Publication number Publication date
CN112512943A (zh) 2021-03-16
JP7455073B2 (ja) 2024-03-25
JPWO2020158073A1 (ja) 2021-12-02
CN112512943B (zh) 2023-12-08
US20210158291A1 (en) 2021-05-27

Similar Documents

Publication Publication Date Title
WO2020158073A1 (ja) 情報処理方法、及び情報処理システム
US10663526B2 (en) Battery management terminal and battery management system
US11577620B2 (en) Information calculation system for battery degradation
CN109941148A (zh) 提供剩余电量百分比的方法、装置、电子设备、存储介质
US20230150396A1 (en) A method for monitoring ageing of a battery unit
CN103101445B (zh) 增程器的工作模式控制方法
US11458863B2 (en) Vehicle
CN108698607A (zh) 用于运行机动车的方法、用于驱动系统的控制单元以及驱动系统
CN102612784B (zh) 对储能系统中的储备能量的确定和使用
CN104977541A (zh) 用于估算电池堆容量的系统和方法
JP2005237064A (ja) 車両コントローラ
CN109311396A (zh) 用于控制车辆中的能量存储系统的操作的方法和设备
CN108233445B (zh) 用于交通工具的充电控制方法和装置
KR101543040B1 (ko) 하이브리드 차량의 연비 산출 시스템 및 그의 구동 방법
KR102417889B1 (ko) 전기차량의 보조배터리 충전 제어장치 및 그 방법
CN105313715A (zh) 用于在电量维持使用期间估计电池组容量的系统和方法
US20220097672A1 (en) Vehicle
WO2018236608A1 (en) BATTERY CHARGE IN SITUATION
JP2019030157A (ja) 無人搬送システム
JP2016144392A (ja) バッテリーパック及びその駆動方法
CN113682197A (zh) 充电装置、机动车和用于给机动车的蓄能器充电的方法
JP7320027B2 (ja) システム、プログラム、及び管理方法
WO2021142592A1 (zh) 无人飞行器及控制方法、电子设备及电池功率状态管理方法
WO2024020749A1 (zh) 充电方法、装置和移动载体
US20240034182A1 (en) Computing device, vehicle, management server, and computing method

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19912305

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020569373

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19912305

Country of ref document: EP

Kind code of ref document: A1