WO2019187065A1 - 作業機のレンタル管理装置、作業機のレンタル管理方法、作業機のレンタル管理プログラム - Google Patents

作業機のレンタル管理装置、作業機のレンタル管理方法、作業機のレンタル管理プログラム Download PDF

Info

Publication number
WO2019187065A1
WO2019187065A1 PCT/JP2018/013804 JP2018013804W WO2019187065A1 WO 2019187065 A1 WO2019187065 A1 WO 2019187065A1 JP 2018013804 W JP2018013804 W JP 2018013804W WO 2019187065 A1 WO2019187065 A1 WO 2019187065A1
Authority
WO
WIPO (PCT)
Prior art keywords
maintenance
rental
work machine
cost
information
Prior art date
Application number
PCT/JP2018/013804
Other languages
English (en)
French (fr)
Inventor
昭史 藤間
崇 橋爪
圭一朗 豊後
久倫 金山
Original Assignee
本田技研工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 本田技研工業株式会社 filed Critical 本田技研工業株式会社
Priority to JP2020508837A priority Critical patent/JP7075989B2/ja
Priority to DE112018007415.3T priority patent/DE112018007415T5/de
Priority to PCT/JP2018/013804 priority patent/WO2019187065A1/ja
Priority to US17/042,399 priority patent/US20210142395A1/en
Publication of WO2019187065A1 publication Critical patent/WO2019187065A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0645Rental transactions; Leasing transactions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/02Reservations, e.g. for tickets, services or events
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination

Definitions

  • the present invention relates to a work machine rental management apparatus, a work machine rental management method, and a work machine rental management program.
  • Patent Document 1 As a method of setting the rental cost when renting work machines powered by engines such as generators, pumps, outboard motors, lawn mowers, etc., civil engineering work machines, transport vehicles, or snowplows, for example, There are those disclosed in Patent Document 1 and Patent Document 2.
  • Patent Document 1 describes a method of determining a rental cost in consideration of not only the period of use of the construction machine but also the degree of wear when calculating the rental cost of the construction machine.
  • Patent Document 2 describes a method for determining a construction machine rental cost according to a user's past maintenance results of a construction machine and a load condition and a use condition of the construction machine to be rented from now on.
  • Patent Document 1 does not set rental expenses considering the maintenance status of construction machines.
  • the present invention has been made in view of the above circumstances, and provides a work machine rental management apparatus, a work machine rental management method, and a work machine rental program capable of appropriately determining the rental cost of the work machine.
  • the purpose is to do.
  • a work machine rental management apparatus is a work machine rental management apparatus for managing a rental cost of a work machine including an engine, the total working time and maintenance performance of the work machine during a rental period of the work machine.
  • Information, information on the cumulative operating time of the work machine at the start of the rental period, and maintenance management information including information on maintenance required for the work machine and information on the cost of the maintenance are acquired from the storage unit.
  • An information output unit for outputting information of Le expenses are those comprising a.
  • a work machine rental management method is a work machine rental management method for managing a rental cost of a work machine including an engine, the total working time and maintenance performance of the work machine during a rental period of the work machine.
  • Information, information on the cumulative operating time of the work machine at the start of the rental period, and maintenance management information including information on maintenance required for the work machine and information on the cost of the maintenance are acquired from the storage unit. Determining a maintenance cost required for maintenance of the work implement required in the rental period based on the total operating time, the cumulative operating time, and the maintenance management information; and the total operating time and the A step of determining a rental cost during the rental period of the work machine based on a maintenance record and the maintenance cost, and outputting the rental cost information.
  • the work machine rental program of the present invention is a work machine rental management program for managing the rental cost of a work machine including an engine, and the total working time and maintenance results of the work machine during the rental period of the work machine.
  • Storage management information including information on the total working time of the work machine at the start of the rental period, maintenance information necessary for the work machine, and information on the cost of the maintenance.
  • the present invention it is possible to provide a work machine rental management apparatus, a work machine rental management method, and a work machine rental program that can appropriately determine the work machine rental cost.
  • FIG. 1 is a schematic diagram illustrating a schematic configuration of a work machine rental system including a rental management apparatus which is an embodiment of a work machine rental management apparatus according to the present invention. It is a block diagram which shows typically an example of the detailed structure of the working machine shown in FIG. It is a block diagram which shows the internal structure of the rental management apparatus shown in FIG. It is a figure which shows an example of the maintenance management information memorize
  • FIG. 1 is a schematic diagram showing a schematic configuration of a work machine rental system 100 including a rental management apparatus 1 which is an embodiment of the rental management apparatus of the present invention.
  • the work machine rental system 100 includes a rental management apparatus 1, a work machine 2 lent by an administrator of the rental management apparatus 1, and a user terminal 3 owned by a user who rents the work machine 2, and these are the Internet. 4 is configured to be connectable.
  • the user terminal 3 is an electronic device having an Internet connection function such as a personal computer or a smartphone.
  • the work machine rental system 100 allows the user who rents the work machine 2 to perform maintenance on the work machine 2 to reduce the total cost of the work machine 2 rental. It is.
  • FIG. 2 is a block diagram schematically showing an example of a detailed configuration of the work machine 2 shown in FIG.
  • FIG. 2 shows an example in which the work machine 2 is an engine pump.
  • the work machine 2 is not limited to the engine pump, and may be any machine that executes various functions using the engine as a power source.
  • the work machine 2 may be a farm work machine such as a generator, an outboard motor, a lawn mower, a civil work machine, a transporter, or a snowplow.
  • the work machine 2 includes a liquid pump 2A and an engine device 2B.
  • the engine device 2B includes an engine 21 serving as a power source for the liquid pump 2A, a communication interface (I / F) 22, an ECU (Electronic Control Unit) 23, and an operation device 24.
  • I / F communication interface
  • ECU Electronic Control Unit
  • the engine 21 is composed of, for example, an air-cooled 2-cycle or 4-cycle single-cylinder engine using gasoline as fuel.
  • the engine 21 is connected to the bus 20 and is controlled by the ECU 23.
  • the communication I / F 22 is an interface for communicating with other devices connected to the Internet 4.
  • the communication I / F 22 is connected to the bus 20 and is controlled by the ECU 23.
  • the operation device 24 is hardware for performing various operations of the work machine 2, and is for instructing to start and stop the suction of the liquid by the liquid pump 2A and the power button for starting and stopping the engine device 2B.
  • the ECU 23 includes a microcomputer including a processor, a ROM (Read Only Memory) in which a control program executed by the processor, and the like are stored, and a RAM (Random Access Memory).
  • the ECU 23 is operated by electric power of a battery (not shown) that is charged by the power of the engine 21.
  • the ECU 23 When instructed to start by operating a power button included in the operation device 24, the ECU 23 is activated by the power supplied from the battery, and controls the communication I / F 22 to communicate with other electronic devices. Get a possible state.
  • the ECU 23 adjusts the opening degree of the throttle valve included in the engine 21 so that the liquid delivery amount per unit time of the liquid pump 2A becomes a desired target value while the engine 21 is driven.
  • the liquid pump 2A includes a pump mechanism 25.
  • the pump mechanism 25 includes a casing having two openings, a liquid inlet and a liquid discharge opening, and an impeller that is arranged in the casing and is rotated by the power of the engine 21, and the liquid inlet is operated by the action of the impeller. From the liquid discharge port.
  • the ECU 23 stores information on the usage record of the work machine 2 such as the operation history of the work machine 2 (information indicating when the work machine 2 was operated), the average rotation speed of the engine 21 in operation, and the average load of the engine 21 in operation. Store in ROM.
  • the ECU 23 transmits the usage record information stored in the ROM to the rental management device 1 via the communication I / F 22.
  • the ECU 23 when the maintenance of the work machine 2 (operation such as replacement of consumables such as oil or replacement of parts) is performed, the ECU 23 includes a maintenance record including the date and time of the maintenance and the content of the maintenance. Is generated and stored in the ROM. The ECU 23 transmits this maintenance result information to the rental management apparatus 1 via the communication interface 22.
  • FIG. 3 is a block diagram showing an internal configuration of the rental management apparatus 1 shown in FIG.
  • the rental management device 1 includes a control unit 11 that performs overall control, a ROM 12 such as a flash memory that constitutes a storage unit, a RAM 13, a communication interface (I / F) 14, an operation unit 15, and an output device 16. .
  • the ROM 12, the RAM 13, the communication I / F 14, the operation unit 15, and the output device 16 are connected to the bus 10 and controlled by the control unit 11.
  • the communication I / F 14 is an interface for communicating with other devices connected to the Internet 4.
  • the operation unit 15 is hardware for performing various operations of the rental management apparatus 1 and includes a mouse, a button, a touch panel, a keyboard, and the like for inputting information.
  • the output device 16 is hardware for outputting information to the outside, and is a display device that displays an image by a liquid crystal panel or an organic EL (electro-luminescence) panel, or a printer that prints information on a medium such as paper. Etc.
  • the control unit 11 has various hardware structures.
  • programmable logic which is a processor whose circuit configuration can be changed after manufacturing, such as a CPU (Central Processing Unit) and an FPGA (Field Programmable Gate Array), which are general-purpose processors that execute programs and perform various processes Examples include a dedicated electrical circuit that is a processor having a circuit configuration that is specifically designed to execute a specific process such as a device (Programmable Logic Device: PLD) or an ASIC (Application Specific Integrated Circuit).
  • PLD Programmable Logic Device
  • ASIC Application Specific Integrated Circuit
  • the structures of these various processors are electric circuits in which circuit elements such as semiconductor elements are combined.
  • the control unit 11 may be composed of one of various processors, or a combination of two or more processors of the same type or different types (for example, a combination of a plurality of FPGAs or a combination of a CPU and an FPGA). May be.
  • the ROM 12 stores a program including a rental management program executed by the control unit 11.
  • the ROM 12 includes a first storage area 12a, a second storage area 12b, a third storage area 12c, and a fourth storage area 12d.
  • maintenance management information including maintenance content necessary for the work machine 2, maintenance execution timing, and maintenance cost information for the maintenance is stored in advance for each work machine 2 to be lent. Has been.
  • FIG. 4 is a diagram showing an example of maintenance management information stored in the second storage area 12b.
  • the maintenance management information includes maintenance execution timing information (500 hours, 1000 hours, 1500 hours, 2000 hours) indicating how long the maintenance time of the work machine 2 should be maintained, Information indicating the contents of maintenance such as oil replacement or parts replacement, and information on maintenance costs necessary for performing maintenance are included.
  • the maintenance cost information stores a cost (for example, parts cost + labor cost) that may occur when the administrator of the rental management apparatus 1 performs the corresponding maintenance.
  • reference cost information indicating the rental cost of the work machine 2 per unit operating time (hereinafter, for example, 1 hour) is stored in advance.
  • control unit 11 In the fourth storage area 12d, individual information of the user who uses the work machine rental system 100 (including a user ID, an identification ID of the work machine 2 to be rented, information on a rental period during which the rental is performed, and the like) is included in the control unit 11. It is memorized by control.
  • This individual information is input directly to the control unit 11 by the operator operating the operation unit 15 at the timing when the user enters a rental contract, or controlled by the user via the Internet 4 from the WEB page displayed on the user terminal 3. Or input to part 11.
  • the fourth storage area 12d When the individual information is stored in the fourth storage area 12d, information on the accumulated operating time of the work machine 2 specified by the identification ID of the work machine 2 included in the individual information (stored in the first storage area 12a). Stored in the fourth storage area 12d in association with the individual information.
  • the information on the accumulated operation time stored in the fourth storage area 12d is information on the accumulated operation time of the work machine 2 at the start of the rental period of the work machine 2.
  • the control unit 11 of the rental management device 1 illustrated in FIG. 3 generates support information that prompts the user to perform maintenance on the work machine 2 based on the maintenance management information stored in the third storage area 12c. Then, this support information is transmitted to the user terminal 3 via the Internet 4.
  • control unit 11 periodically acquires information on the total operation time at that time from the work machine 2 during the rental period, and the total operation time and the total operation time stored in the first storage area 12a. From this, the latest accumulated operating time is calculated, and when the latest accumulated operating time matches the maintenance execution timing included in the maintenance management information, the maintenance corresponding to the maintenance execution timing is encouraged. An electronic mail is generated as support information and transmitted to the user terminal 3.
  • the user who owns the user terminal 3 can know from the e-mail that the time when maintenance is necessary and the content of the maintenance required.
  • this support information may be transmitted to the work machine 2.
  • a display unit may be provided in the work machine 2 and the support information may be displayed on the display unit.
  • FIG. 5 is a functional block diagram of the control unit 11 shown in FIG.
  • the control unit 11 functions as a storage control unit 11F, a first information acquisition unit 11A, a maintenance determination unit 11B, a rental cost determination unit 11C, and an information output unit 11D by executing a program including a rental management program for work machines. To do.
  • the control unit 11 is a program including a rental management program for a work machine when the work machine 2 is returned by the user and a predetermined operation (an operation for instructing the settlement of rental expenses) is performed by the operator via the operation unit 15. And functions as a storage control unit 11F, a first information acquisition unit 11A, a maintenance determination unit 11B, a rental cost determination unit 11C, and an information output unit 11D.
  • the work machine 2 transmits the usage record and maintenance record information to the rental management apparatus 1.
  • the storage control unit 11F of the control unit 11 receives the above-described usage record information from the work machine 2, the use during the rental period associated with the user ID of the user who rented the work machine 2 is included in this information.
  • the actual results are extracted, and from the extracted usage results, the total operating time during the rental period of the work machine 2, the average rotation speed during the rental period of the engine 21 of the work machine 2, and the rental period of the engine 21 of the work machine 2 An average load or the like is calculated, and these are stored in the first storage area 12a in association with the user ID and the identification ID of the work machine 2.
  • the storage control unit 11F of the control unit 11 receives the above-described usage record information from the work machine 2, the accumulated operation time corresponding to the identification ID of the work machine 2 stored in the first storage area 12a is calculated. The total operating time associated with the user ID is added to update the cumulative operating time of the work machine 2.
  • the storage control unit 11F of the control unit 11 receives the above maintenance performance information from the work machine 2, the storage control unit 11F is in the rental period associated with the user ID of the user who rented the work machine 2 out of this information.
  • the maintenance record information is extracted, and the extracted maintenance record information is stored in the first storage area 12a in association with the user ID and the work machine 2 identification ID.
  • 11 A of 1st information acquisition parts read the information of the total operation time at the time of the rental period start of the working machine 2 corresponding to the identification ID of the working machine 2 included in the individual information including the user ID of the user from the fourth storage area 12d. Get.
  • the first information acquisition unit 11A reads out and acquires information on the total operation time and the maintenance performance in the rental period of the work machine 2 corresponding to the identification ID of the work machine 2 from the first storage area 12a.
  • the first information acquisition unit 11A reads and acquires the maintenance management information of the work machine 2 from the third storage area 12c.
  • the maintenance determination unit 11B determines the work machine 2 necessary for the rental period. Determine maintenance costs for maintenance.
  • the total operation time of the work machine 2 during the rental period is 200 hours
  • the total operation time of the work machine 2 at the start of the rental period is 900 hours Will be explained.
  • the maintenance determination unit 11B determines that maintenance contents (oil replacement and part replacement) corresponding to the maintenance execution timing of “1000 hours” are necessary during the rental period.
  • the maintenance cost corresponding to the content of the maintenance is determined by the maintenance determination unit 11B as the maintenance cost for the maintenance.
  • the maintenance management information shown in FIG. 4 are determined as maintenance information necessary during the rental period. It is determined by the part 11B.
  • the rental cost determination unit 11C determines the work equipment 2 based on the total operation time and maintenance performance information acquired by the first information acquisition unit 11A and the maintenance cost determined by the maintenance determination unit 11B. Determine rental costs.
  • the information output unit 11D outputs the rental cost information determined by the rental cost determination unit 11C to the output device 16. Thereby, rental cost information is displayed on the display device or printed on paper.
  • the information output unit 11D may output rental cost information to the user terminal 3 via the communication I / F 14, and display this information on the display unit of the user terminal 3.
  • FIG. 6 is a flowchart for explaining the operation of determining the rental cost of the work machine 2 by the control unit 11 shown in FIG.
  • the storage control unit 11F of the control unit 11 performs the total operation time and engine average during the rental period of the work machine 2.
  • Information on the rotational speed and the engine average load is stored in the first storage area 12a, and the accumulated operation time in the first storage area 12a is updated with the information on the total operation time.
  • the first information acquisition unit 11A of the control unit 11 acquires information on the cumulative operation time of the work machine 2 at the start of the rental period of the work machine 2 from the fourth storage area 12d of the ROM 12 (step S1).
  • the first information acquisition unit 11A of the control unit 11 acquires information on the total operation time and maintenance performance of the work machine 2 during the rental period from the first storage area 12a of the ROM 12 (step S2).
  • the first information acquisition unit 11A of the control unit 11 acquires the maintenance management information of the work machine 2 from the second storage area 12b of the ROM 12 (step S3).
  • the maintenance determination unit 11B of the control unit 11 is based on the cumulative operation time acquired in step S1, the total operation time acquired in step S2, and the maintenance management information acquired in step S3.
  • the maintenance contents of the work machine 2 necessary during the rental period of the work machine 2 and the maintenance cost of the maintenance are determined (step S4).
  • the rental cost determination unit 11C of the control unit 11 determines whether the rental period is based on the total operating time information acquired in step S2 and the reference cost information stored in the third storage area 12c. A reference rental cost is determined (step S5).
  • the rental cost determination unit 11C of the control unit 11 determines a value obtained by multiplying the total operating time by the standard cost information as the standard rental cost.
  • This reference rental cost is a cost determined considering only the total operating time (time used by the user) of the work machine 2.
  • the rental cost determination unit 11C of the control unit 11 is obtained by multiplying the reference cost information by a coefficient (a value greater than 0 and less than or equal to 1) according to the cumulative operating time acquired in step S1.
  • the standard rental cost may be determined based on the product of the total operating time.
  • This coefficient is set to a smaller value as the cumulative operating time is larger. By doing in this way, an old work machine 2 that has been used for a long time can lower the standard rental cost.
  • the rental cost determination unit 11C of the control unit 11 determines whether or not the content of the maintenance of the work machine 2 determined in step S4 matches the maintenance result acquired in step S2 ( Step S6).
  • the maintenance content and the maintenance result match each other means that at least one maintenance content included in the maintenance result information and at least one maintenance content determined in step S4 all match.
  • step S6 the rental cost determination unit 11C of the control unit 11 determines the reference rental cost determined in step S5 as the final rental cost of the work machine 2. (Step S7).
  • step S7 the final rental cost is output by the information output unit 11D of the control unit 11 (step S9), and the final rental cost is presented to the user.
  • step S6 if the maintenance content and the maintenance record do not match (step S6: NO), the rental cost determination unit 11C of the control unit 11 determines the reference rental cost determined in step S5 in step S4. The cost obtained by adding at least a part of the maintenance cost is determined as the final rental cost of the work machine 2 (step S8). After step S8, the process of step S9 is performed.
  • step S4 For example, consider the case where the maintenance contents determined in step S4 are two maintenance contents A and B, and the maintenance contents included in the maintenance results are the maintenance contents A. In this case, since the maintenance content B is not included in the maintenance record, the determination in step S6 is NO.
  • step S8 the maintenance corresponding to the maintenance content B out of the maintenance costs corresponding to each of the maintenance content A and the maintenance content B determined in step S4 is added to the reference rental cost determined in step S5. Only the cost is added to determine the final rental cost.
  • step S4 when the maintenance contents determined in step S4 are two maintenance contents A and B, and the maintenance contents included in the maintenance results are zero (maintenance is performed by the user). If not). In this case, since the maintenance content A and the maintenance content B are not included in the maintenance result, the determination in step S6 is NO.
  • step S8 the maintenance fee corresponding to each of the maintenance content A and the maintenance content B determined in step S4 is added to the reference rental cost determined in step S5, and the final rental cost is determined. Is done.
  • the rental management device 1 when the work machine 2 needs to be maintained during the rental period of the work machine 2 and all necessary maintenance is performed by the user, only the reference rental cost is charged to the user. Will be charged.
  • the maintenance fee for the unmaintained maintenance among the necessary maintenance is added to the standard rental cost and the user is added. Be charged.
  • the maintenance of the work machine 2 is performed by the user, the total cost for the rental can be suppressed, so that the user can be strongly urged to perform the maintenance. Therefore, for the lender, the period during which the work machine 2 cannot be loaned for maintenance can be reduced, and the work machine 2 can be efficiently operated.
  • the usable time of the work machine 2 during the rental period can be increased, and the work machine 2 can be used efficiently.
  • the rental cost of the work machine 2 during the rental period is determined in consideration of the maintenance results of the work machine 2 performed by the user during the rental period. For this reason, as compared with the case where the rental cost for the future rental period is determined from the past maintenance results as in the prior art, it is possible to determine the appropriate rental cost for both the user and the lender.
  • the work machine rental system 100 when it is desired to use the work machine 2 as long as possible during the rental period, it is determined that maintenance is not performed, or when it is desired to use the work machine 2 as cheaply as possible during the rental period. It is possible for the user to make a flexible response such as making a decision to perform the maintenance by himself, and the convenience can be improved.
  • FIG. 7 is a diagram showing a modification of the functional block of the control unit 11 shown in FIG. 7, components having the same functions as those in FIG. 3 are denoted by the same reference numerals.
  • the control unit 11 shown in FIG. 7 executes a program including a rental management program for the work machine, thereby obtaining a first information acquisition unit 11A, a second information acquisition unit 11E, a maintenance determination unit 11B, a rental cost determination unit 11C, information It functions as an output unit 11D and a storage control unit 11F.
  • the second information acquisition unit 11E reads out and acquires information on the degree of wear of the work machine 2 during the rental period from the first storage area 12a of the ROM 12.
  • the degree of wear is, for example, the average value of the engine speed during the rental period of the work machine 2, or the average value of the engine load during the rental period. The higher the average engine speed and the engine load, the higher the degree of wear.
  • the rental cost determination unit 11C illustrated in FIG. 7 calculates the reference rental cost based on the total operating time during the rental period of the work machine 2 and the degree of wear of the work machine 2. For example, it is assumed that the degree of wear is a value greater than 0 and less than or equal to 1, and a value obtained by multiplying the reference cost information, the degree of wear, and the total operation time is determined as the reference rental cost.
  • the reference rental cost can be set to a more appropriate value according to the use state of the work machine 2, and the rental cost appropriate for both the user and the lender can be obtained. Decisions can be made.
  • a work equipment rental management device for managing rental costs of work machines including engines, Information on the total operating time and maintenance performance of the work machine in the rental period of the work machine, information on the cumulative operating time of the work machine at the start of the rental period, content of maintenance necessary for the work machine, and Maintenance management information including information on costs for maintenance, a first information acquisition unit for acquiring from the storage unit, A maintenance determination unit for determining a maintenance cost required for maintenance of the work machine required in the rental period based on the total operation time, the cumulative operation time, and the maintenance management information; A rental cost determination unit that determines a rental cost during the rental period of the work machine based on the total operating time, the maintenance record, and the maintenance cost; A work equipment rental management device comprising: an information output unit that outputs information on the rental cost.
  • the rental cost of the work machine is determined based on the total operation time, the maintenance record, and the maintenance cost.
  • the maintenance cost and the maintenance cost are added to the determination of the rental cost.
  • the user who has performed the maintenance is not charged for the maintenance and the maintenance is not performed.
  • It is possible to set a flexible cost such as charging the user with the cost required for the maintenance included in the rental cost.
  • the total cost for the rental of the work machine can be reduced by reducing the maintenance cost.
  • the work machine lender since the user can be urged to perform maintenance, the period during which the work machine is being maintained cannot be rented, and efficient operation becomes possible. Further, since the rental cost is determined based on the maintenance performance in the rental period, it is possible to determine the appropriate rental cost for both the user and the lender.
  • the work machine rental management apparatus further determines the content of maintenance of the work machine necessary for the rental period,
  • the rental cost determination unit determines a reference rental cost based on at least the total operating time information, and further, whether the maintenance content of the work machine determined by the maintenance determination unit matches the maintenance result
  • the standard rental cost is determined as the rental cost of the work machine, and the maintenance content and the maintenance result do not match
  • a work machine rental management apparatus that determines a cost obtained by adding at least a part of the determined maintenance cost to the reference rental cost as a rental cost of the work machine.
  • the user who has performed maintenance is not charged for the cost required for the maintenance, and for the user who has not performed the maintenance, the cost required for the maintenance is included in the rental cost.
  • Flexible cost setting such as charging is possible. For this reason, there are advantages such as reducing the total cost for renting the work equipment for the user and extending the usage time of the work equipment during the rental period, and efficient operation for the work equipment lender. The merit that it becomes possible is obtained.
  • a work equipment rental management device determines the cost to be added to the reference rental cost based on a difference between the maintenance result and the maintenance content when the maintenance content and the maintenance result do not match. Rental management device for work equipment.
  • (4) (2) or (3) is a work machine rental management device, A second information acquisition unit for acquiring information on the degree of wear of the work machine during the rental period from the storage unit;
  • the rental cost determination unit is a rental management device for a working machine that determines the reference rental cost based on the information on the total operating time and the information on the degree of wear.
  • a work machine rental management method for managing a rental cost of a work machine including an engine, Information on the total operating time and maintenance performance of the work machine in the rental period of the work machine, information on the cumulative operating time of the work machine at the start of the rental period, content of maintenance necessary for the work machine, and Obtaining maintenance management information including information on costs for maintenance from the storage unit; Determining a maintenance cost required for maintenance of the work machine required in the rental period based on the total operating time, the cumulative operating time, and the maintenance management information; Determining a rental cost during the rental period of the work implement based on the total operating time, the maintenance record, and the maintenance cost; A rental machine management method comprising: a step of outputting information on the rental cost.
  • the rental cost of the work machine is determined based on the total operation time, the maintenance record, and the maintenance cost.
  • the maintenance cost and the maintenance cost are added to the determination of the rental cost.
  • the user who has performed the maintenance is not charged for the maintenance and the maintenance is not performed.
  • It is possible to set a flexible cost such as charging the user with the cost required for the maintenance included in the rental cost.
  • the total cost for the rental of the work machine can be reduced by reducing the maintenance cost.
  • the work machine lender since the user can be urged to perform maintenance, the period during which the work machine is being maintained cannot be rented, and efficient operation becomes possible.
  • the rental cost is determined based on the maintenance performance during the rental period, it is possible to determine the appropriate rental cost for both the user and the lender.
  • a work machine rental management program for managing the rental cost of work machines including engines, Information on the total operating time and maintenance performance of the work machine in the rental period of the work machine, information on the cumulative operating time of the work machine at the start of the rental period, content of maintenance necessary for the work machine, and Obtaining maintenance management information including information on costs for maintenance from the storage unit; Determining a maintenance cost required for maintenance of the work machine required in the rental period based on the total operating time, the cumulative operating time, and the maintenance management information; Determining a rental cost during the rental period of the work implement based on the total operating time, the maintenance record, and the maintenance cost; A rental machine management program for a work machine for causing a computer to execute the rental cost information output step.
  • the rental cost of the work machine is determined based on the total operation time, the maintenance record, and the maintenance cost.
  • the maintenance cost and the maintenance cost are added to the determination of the rental cost.
  • the user who has performed the maintenance is not charged for the maintenance and the maintenance is not performed.
  • It is possible to set a flexible cost such as charging the user with the cost required for the maintenance included in the rental cost.
  • the total cost for the rental of the work machine can be reduced by reducing the maintenance cost.
  • the work machine lender since the user can be urged to perform maintenance, the period during which the work machine is being maintained cannot be rented, and efficient operation becomes possible. Further, since the rental cost is determined based on the maintenance performance in the rental period, it is possible to determine the appropriate rental cost for both the user and the lender.
  • the present invention it is possible to provide a work machine rental management apparatus, a work machine rental management method, and a work machine rental program that can appropriately determine the work machine rental cost.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Accounting & Taxation (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Finance (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

作業機のレンタル費用を適正に決定することのできる作業機のレンタル管理装置、作業機のレンタル管理方法、及び作業機のレンタルプログラムを提供する。レンタル管理装置1の制御部11は、作業機2のレンタル期間における総稼働時間及び保守実績と、レンタル期間の開始時における作業機2の累計稼働時間と、作業機2に必要な保守の内容及びその保守にかかる費用を含む保守管理情報とをROM12から取得し、総稼働時間と累計稼働時間と保守管理情報とに基づいてレンタル期間において必要な作業機2の保守にかかる保守費用を判定し、判定した保守費用と総稼働時間と保守実績とに基づいて、作業機2のレンタル期間中のレンタル費用を決定する。

Description

作業機のレンタル管理装置、作業機のレンタル管理方法、作業機のレンタル管理プログラム
 本発明は、作業機のレンタル管理装置、作業機のレンタル管理方法、作業機のレンタル管理プログラムに関する。
 発電機、ポンプ、船外機、芝刈り機等の農作業機、土木用作業機、運搬車、又は除雪機等のエンジンを動力とする作業機を貸与する場合のレンタル費用の設定方法として、例えば特許文献1及び特許文献2に開示されたものがある。
 特許文献1には、建設機械のレンタル費用を算出するにあたり、建設機械の使用期間だけでなく、その消耗度を考慮してレンタル費用を決定する方法が記載されている。
 特許文献2には、ユーザのこれまでの建設機械の保守実績と、これからレンタルする建設機械の負荷条件及び使用条件等に応じて、建設機械のレンタル費用を決定する方法が記載されている。
日本国特開2002-109027号公報 日本国特開2002-183511号公報
 作業機は保守が必要であるため、作業機を貸与する業者にとっては、この保守にかかる時間をなるべく短くして、作業機が貸与できなくなる期間を短くすることが望まれる。
 そこで、作業機のレンタル期間中に、ユーザに作業機の保守を行わせることが考えられる。例えば、特許文献2では、ユーザの過去の保守実績を考慮して、保守を適切に行うユーザに対してはレンタル費用を低くするといった優遇を行っている。
 しかし、この方法では、過去の保守実績からレンタル費用が増減される。このため、これからレンタルしようとする作業機についてのレンタル費用がユーザと業者の双方にとって適正となっているとは言えない。また、特許文献1は、建設機械の保守状況を考慮したレンタル費用の設定は行っていない。
 本発明は、上記事情に鑑みてなされたものであり、作業機のレンタル費用を適正に決定することのできる作業機のレンタル管理装置、作業機のレンタル管理方法、及び作業機のレンタルプログラムを提供することを目的とする。
 本発明の作業機のレンタル管理装置は、エンジンを含む作業機のレンタル費用を管理する作業機のレンタル管理装置であって、前記作業機のレンタル期間における前記作業機の総稼働時間及び保守実績の情報と、前記レンタル期間の開始時における前記作業機の累計稼働時間の情報と、前記作業機に必要な保守の内容及び前記保守にかかる費用の情報を含む保守管理情報と、を記憶部から取得する第一情報取得部と、前記総稼働時間と前記累計稼働時間と前記保守管理情報とに基づいて、前記レンタル期間において必要な前記作業機の保守にかかる保守費用を判定する保守判定部と、前記総稼働時間と前記保守実績と前記保守費用とに基づいて、前記作業機の前記レンタル期間中のレンタル費用を決定するレンタル費用決定部と、前記レンタル費用の情報を出力する情報出力部と、を備えるものである。
 本発明の作業機のレンタル管理方法は、エンジンを含む作業機のレンタル費用を管理する作業機のレンタル管理方法であって、前記作業機のレンタル期間における前記作業機の総稼働時間及び保守実績の情報と、前記レンタル期間の開始時における前記作業機の累計稼働時間の情報と、前記作業機に必要な保守の内容及び前記保守にかかる費用の情報を含む保守管理情報と、を記憶部から取得するステップと、前記総稼働時間と前記累計稼働時間と前記保守管理情報とに基づいて、前記レンタル期間において必要な前記作業機の保守にかかる保守費用を判定するステップと、前記総稼働時間と前記保守実績と前記保守費用とに基づいて、前記作業機の前記レンタル期間中のレンタル費用を決定するステップと、前記レンタル費用の情報を出力するステップと、を備えるものである。
 本発明の作業機のレンタルプログラムは、エンジンを含む作業機のレンタル費用を管理するための作業機のレンタル管理プログラムであって、前記作業機のレンタル期間における前記作業機の総稼働時間及び保守実績の情報と、前記レンタル期間の開始時における前記作業機の累計稼働時間の情報と、前記作業機に必要な保守の内容及び前記保守にかかる費用の情報を含む保守管理情報と、を記憶部から取得するステップと、前記総稼働時間と前記累計稼働時間と前記保守管理情報とに基づいて、前記レンタル期間において必要な前記作業機の保守にかかる保守費用を判定するステップと、前記総稼働時間と前記保守実績と前記保守費用とに基づいて、前記作業機の前記レンタル期間中のレンタル費用を決定するステップと、前記レンタル費用の情報を出力するステップと、をコンピュータに実行させるためのものである。
 本発明によれば、作業機のレンタル費用を適正に決定することのできる作業機のレンタル管理装置、作業機のレンタル管理方法、及び作業機のレンタルプログラムを提供することができる。
本発明の作業機のレンタル管理装置の一実施形態であるレンタル管理装置を含む作業機レンタルシステムの概略構成を示す模式図である。 図1に示す作業機の詳細構成の一例を模式的に示すブロック図である。 図1に示すレンタル管理装置の内部構成を示すブロック図である。 図3に示すROMの第二記憶領域に記憶されている保守管理情報の一例を示す図である。 図3に示す制御部の機能ブロック図である。 図3に示す制御部による作業機のレンタル費用の決定動作を説明するためのフローチャートである。 図3に示す制御部11の機能ブロックの変形例を示す図である。
 以下、本発明の実施形態について図面を参照して説明する。
 図1は、本発明のレンタル管理装置の一実施形態であるレンタル管理装置1を含む作業機レンタルシステム100の概略構成を示す模式図である。
 作業機レンタルシステム100は、レンタル管理装置1と、レンタル管理装置1の管理者によって貸与される作業機2と、作業機2をレンタルするユーザの所有するユーザ端末3と、を備え、これらがインターネット4に接続可能に構成されている。
 ユーザ端末3は、パーソナルコンピュータ又はスマートフォン等のインターネット接続機能を持った電子機器である。
 作業機レンタルシステム100は、作業機2をレンタルしたユーザに、この作業機2の保守を行ってもらうことで、この作業機2のレンタルにかかるトータルの費用を安価にすることを可能にするものである。
 図2は、図1に示す作業機2の詳細構成の一例を模式的に示すブロック図である。図2においては、作業機2がエンジンポンプである例を示している。しかし、作業機2は、エンジンポンプに限らず、エンジンを動力源として各種機能を実行する機械であればよい。例えば、作業機2は、発電機、船外機、芝刈り機等の農作業機、土木用作業機、運搬車、又は除雪機等であってもよい。
 図2に示すように、作業機2は、液体ポンプ2Aと、エンジン装置2Bと、を備える。エンジン装置2Bは、液体ポンプ2Aの動力源となるエンジン21と、通信インタフェース(I/F)22と、ECU(Electronic Control Unit)23と、操作装置24と、を備える。
 エンジン21は、例えばガソリンを燃料とする空冷2サイクル又は4サイクルの単気筒エンジン等で構成される。エンジン21はバス20に接続されており、ECU23によって制御される。
 通信I/F22は、インターネット4に接続された他の機器と通信を行うためのインタフェースである。通信I/F22は、バス20に接続されており、ECU23によって制御される。
 操作装置24は、作業機2の各種操作を行うためのハードウェアであり、エンジン装置2Bの起動及び停止を行うための電源ボタンと、液体ポンプ2Aによる液体の吸引開始及び吸引停止を指示するための吸引開始・終了ボタンと、情報を入力するためのキーボード等を含む。
 ECU23は、プロセッサと、このプロセッサが実行する制御プログラム等が格納されるROM(Read Only Memory)と、RAM(Random Accsess Memory)と、を備えるマイクロコンピュータによって構成される。ECU23は、エンジン21の動力によって充電される図示省略のバッテリの電力により動作する。
 ECU23は、操作装置24に含まれる電源ボタンの操作によって起動の指示がなされると、上記のバッテリから供給される電力によって起動し、通信I/F22を制御して、他の電子機器との通信可能な状態を得る。
 ECU23は、エンジン21の駆動中は、液体ポンプ2Aの単位時間当たりの液体の送出量が所望の目標値になるように、エンジン21に含まれるスロットルバルブの開度を調整する。
 液体ポンプ2Aは、ポンプ機構25を備える。
 ポンプ機構25は、液体流入口と液体吐出口の2つの開口部を有する筐体と、この筐体内に配置されエンジン21の動力によって回転するインペラとを有し、インペラの作用によって、液体流入口からこの筐体内に流入した液体を液体吐出口から送出する機構である。
 ECU23は、作業機2の稼働履歴(いつからいつまで稼働したかを示す情報)、稼働中のエンジン21の平均回転数、及び稼働中のエンジン21の平均負荷等の作業機2の使用実績の情報をROMに記憶する。ECU23は、ROMに記憶された使用実績の情報を、通信I/F22を介して、レンタル管理装置1に送信する。
 また、ECU23は、作業機2の保守(オイル等の消耗品の交換又は部品の交換等の作業)が行われた場合に、その保守が行われた日時とその保守の内容とを含む保守実績の情報を生成してROMに記憶する。ECU23は、この保守実績の情報を、通信インタフェース22を介して、レンタル管理装置1に送信する。
 図3は、図1に示すレンタル管理装置1の内部構成を示すブロック図である。
 レンタル管理装置1は、全体を統括制御する制御部11と、記憶部を構成するフラッシュメモリ等のROM12と、RAM13と、通信インタフェース(I/F)14と、操作部15と、出力装置16と、を備える。ROM12、RAM13、通信I/F14、操作部15、及び出力装置16は、バス10に接続され、制御部11によって制御される。
 通信I/F14は、インターネット4に接続された他の機器と通信を行うためのインタフェースである。
 操作部15は、レンタル管理装置1の各種操作を行うためのハードウェアであり、情報を入力するためのマウス、ボタン、タッチパネル、又はキーボード等を含む。
 出力装置16は、情報を外部に出力するためのハードウェアであり、液晶パネル又は有機EL(electro-luminescence)パネル等によって画像を表示する表示装置、或いは、紙等の媒体に情報を印刷するプリンタ等である。
 制御部11は、ハードウェア的な構造は、各種のプロセッサである。各種のプロセッサとしては、プログラムを実行して各種処理を行う汎用的なプロセッサであるCPU(Central Prosessing Unit)、FPGA(Field Programmable Gate Array)等の製造後に回路構成を変更可能なプロセッサであるプログラマブルロジックデバイス(Programmable Logic Device:PLD)、又はASIC(Application Specific Integrated Circuit)等の特定の処理を実行させるために専用に設計された回路構成を有するプロセッサである専用電気回路等が含まれる。
 これら各種のプロセッサの構造は、より具体的には、半導体素子等の回路素子を組み合わせた電気回路である。
 制御部11は、各種のプロセッサのうちの1つで構成されてもよいし、同種又は異種の2つ以上のプロセッサの組み合わせ(例えば、複数のFPGAの組み合わせ又はCPUとFPGAの組み合わせ)で構成されてもよい。
 ROM12は、制御部11が実行するレンタル管理プログラムを含むプログラムを記憶している。また、ROM12には、第一記憶領域12a、第二記憶領域12b、第三記憶領域12c、及び第四記憶領域12dが含まれる。
 第一記憶領域12aには、貸与対象となる作業機2毎に、その作業機2のレンタル期間中の使用実績及び保守実績の情報と、そのレンタル期間の開始時の作業機2の累計稼働時間の情報と、が記憶されている。
 第二記憶領域12bには、貸与対象となる作業機2毎に、その作業機2に必要な保守の内容、保守の実施タイミング、及び保守にかかる保守費用の情報を含む保守管理情報が予め記憶されている。
 図4は、第二記憶領域12bに記憶されている保守管理情報の一例を示す図である。
 図4に示すように、保守管理情報は、作業機2の累計稼働時間がどのくらいになると保守を実施すべきかを示す保守実施タイミングの情報(500時間、1000時間、1500時間、2000時間)と、オイル交換又は部品交換等の保守の内容を示す情報と、保守の実施に必要な保守費用の情報とが含まれている。
 保守費用の情報は、レンタル管理装置1の管理者が該当する保守を実施した場合に生じ得る経費(例えば、部品代+人件費)が記憶されている。
 ROM12の第三記憶領域12cには、単位稼働時間(以下では例えば1時間とする)あたりの作業機2のレンタル費用を示す基準費用情報が予め記憶されている。
 第四記憶領域12dには、作業機レンタルシステム100を利用するユーザの個別情報(ユーザID、レンタルする作業機2の識別ID、及びレンタルが行われるレンタル期間の情報等を含む)が制御部11の制御によって記憶される。
 この個別情報は、ユーザがレンタル契約を結ぶタイミングにて、オペレータが操作部15を操作して制御部11に直接入力したり、ユーザ端末3に表示されたWEBページからユーザがインターネット4経由で制御部11に入力したりする。
 第四記憶領域12dに個別情報が記憶されると、この個別情報に含まれる作業機2の識別IDにて特定される作業機2の累計稼働時間の情報(第一記憶領域12aに記憶されている情報)が、この個別情報に対応付けられて第四記憶領域12dに記憶される。第四記憶領域12dに記憶される累計稼働時間の情報は、作業機2のレンタル期間の開始時における作業機2の累計稼働時間の情報となる。
 図3に示すレンタル管理装置1の制御部11は、作業機2に対し、第三記憶領域12cに記憶されている保守管理情報に基づいて、作業機2の保守をユーザに促す支援情報を生成し、この支援情報を、インターネット4を介してユーザ端末3に送信する。
 例えば、制御部11は、レンタル期間中において定期的に作業機2からその時点での総稼働時間の情報を取得し、この総稼働時間と第一記憶領域12aに記憶されている累計稼働時間とから、最新の累計稼働時間を算出し、この最新の累計稼働時間が、保守管理情報に含まれる保守実施タイミングの時間と一致した場合に、この保守実施タイミングに対応する内容の保守の実施を促す支援情報として電子メールを生成してユーザ端末3に送信する。
 この電子メールによって、ユーザ端末3を所有するユーザは、保守が必要なタイミングになったことと、必要な保守の内容とを知ることができる。
 なお、この支援情報は作業機2に送信されてもよい。例えば、作業機2に表示部を設けておき、この表示部に支援情報が表示されるようにすればよい。このような仕組みにより、作業機2をレンタルしているユーザに、適切なタイミングにて作業機2の保守を行ってもらうことが可能になっている。
 図5は、図3に示す制御部11の機能ブロック図である。
 制御部11は、作業機のレンタル管理プログラムを含むプログラムを実行することにより、記憶制御部11F、第一情報取得部11A、保守判定部11B、レンタル費用決定部11C、及び情報出力部11Dとして機能する。
 制御部11は、ユーザによって作業機2が返却され、オペレータによって操作部15を介して所定の操作(レンタル費用の精算を指示する操作)が行われることで、作業機のレンタル管理プログラムを含むプログラムを実行して、記憶制御部11F、第一情報取得部11A、保守判定部11B、レンタル費用決定部11C、及び情報出力部11Dとして機能する。
 上記の所定の操作がなされると、作業機2からレンタル管理装置1に使用実績及び保守実績の情報が送信される。
 制御部11の記憶制御部11Fは、作業機2から上記の使用実績の情報を受信すると、この情報のうち、作業機2をレンタルしたユーザのユーザIDに対応付けられているレンタル期間中の使用実績を抽出し、抽出した使用実績から、作業機2のレンタル期間中の総稼働時間、作業機2のエンジン21のレンタル期間中の平均回転数、及び作業機2のエンジン21のレンタル期間中の平均負荷等を算出し、これらをユーザID及び作業機2の識別IDに対応づけて第一記憶領域12aに記憶する。
 更に、制御部11の記憶制御部11Fは、作業機2から上記の使用実績の情報を受信すると、第一記憶領域12aに記憶されている作業機2の識別IDに対応する累計稼働時間に、ユーザIDに対応づけられた上記の総稼働時間を加算して、作業機2の累計稼働時間を更新する。
 また、制御部11の記憶制御部11Fは、作業機2から上記の保守実績の情報を受信すると、この情報のうち、作業機2をレンタルしたユーザのユーザIDに対応付けられているレンタル期間中の保守実績の情報を抽出し、抽出した保守実績の情報をユーザID及び作業機2の識別IDに対応付けて第一記憶領域12aに記憶する。
 第一情報取得部11Aは、ユーザのユーザIDを含む個別情報に含まれる作業機2の識別IDに対応する作業機2のレンタル期間開始時の累計稼働時間の情報を第四記憶領域12dから読み出して取得する。
 また、第一情報取得部11Aは、作業機2の識別IDに対応する、作業機2のレンタル期間における総稼働時間及び保守実績の情報を第一記憶領域12aから読み出して取得する。
 更に、第一情報取得部11Aは、作業機2の保守管理情報を第三記憶領域12cから読み出して取得する。
 保守判定部11Bは、第一情報取得部11Aによって取得された総稼働時間、作業機2のレンタル期間開始時の累計稼働時間、及び保守管理情報に基づいて、レンタル期間において必要な作業機2の保守にかかる保守費用を判定する。
 例えば、レンタル期間が1か月であり、そのレンタル期間中の作業機2の総稼働時間が200時間であり、そのレンタル期間の開始時の作業機2の累計稼働時間が900時間であった場合を説明する。
 この場合には、レンタル期間の終了した時点にて、作業機2の累計稼働時間は1100時間となっている。このため、図4に示す保守管理情報にしたがうと、このレンタル期間中において、“1000時間”の保守実施タイミングに対応する保守の内容(オイル交換と部品交換)が必要であると保守判定部11Bにより判定され、この保守の内容に対応する保守費用が、この保守にかかる保守費用として保守判定部11Bにより判定される。
 或いは、レンタル期間中の作業機2の総稼働時間が650時間であり、そのレンタル期間の開始時の作業機2の累計稼働時間が900時間であった場合には、図4に示す保守管理情報の“1000時間”に対応する保守内容及び保守費用と、図4に示す保守管理情報の“1500時間”に対応する保守内容及び保守費用とが、レンタル期間中において必要な保守の情報として保守判定部11Bにより判定される。
 レンタル費用決定部11Cは、第一情報取得部11Aにより取得されたレンタル期間中の総稼働時間及び保守実績の情報と、保守判定部11Bにより判定された保守費用とに基づいて、作業機2のレンタル費用を決定する。
 情報出力部11Dは、レンタル費用決定部11Cにより決定されたレンタル費用の情報を、出力装置16に出力する。これにより、レンタル費用の情報が、表示装置に表示されたり、紙に印刷されたりする。
 なお、情報出力部11Dは、通信I/F14を介して、レンタル費用の情報をユーザ端末3に出力し、この情報をユーザ端末3の表示部に表示させてもよい。
 図6は、図3に示す制御部11による作業機2のレンタル費用の決定動作を説明するためのフローチャートである。
 レンタル管理装置1の操作部15によって作業機2のレンタル費用の精算のための操作が行われると、制御部11の記憶制御部11Fによって、作業機2のレンタル期間中の総稼働時間、エンジン平均回転数、及びエンジン平均負荷の情報が第一記憶領域12aに記憶され、この総稼働時間の情報によって第一記憶領域12aの累計稼働時間が更新される。
 その後、制御部11の第一情報取得部11Aは、作業機2のレンタル期間の開始時の作業機2の累計稼働時間の情報をROM12の第四記憶領域12dから取得する(ステップS1)。
 また、制御部11の第一情報取得部11Aは、レンタル期間中における作業機2の総稼働時間及び保守実績の情報をROM12の第一記憶領域12aから取得する(ステップS2)。
 更に、制御部11の第一情報取得部11Aは、この作業機2の保守管理情報をROM12の第二記憶領域12bから取得する(ステップS3)。
 次に、制御部11の保守判定部11Bは、ステップS1にて取得された累計稼働時間と、ステップS2にて取得された総稼働時間と、ステップS3にて取得された保守管理情報とに基づいて、作業機2のレンタル期間において必要な作業機2の保守の内容とその保守の保守費用とを判定する(ステップS4)。
 次に、制御部11のレンタル費用決定部11Cは、ステップS2にて取得された総稼働時間の情報と、第三記憶領域12cに記憶されている基準費用情報とに基づいて、レンタル期間中の基準レンタル費用を決定する(ステップS5)。
 具体的には、制御部11のレンタル費用決定部11Cは、総稼働時間に基準費用情報を乗じて得られる値を基準レンタル費用として決定する。この基準レンタル費用は、作業機2の総稼働時間(ユーザが使用した時間)の長さだけを考慮して決められた費用である。
 なお、制御部11のレンタル費用決定部11Cは、ステップS1にて取得された累計稼働時間の大きさに応じた係数(0より大きく1以下の値)を基準費用情報に乗じて得られる値と、総稼働時間との積によって基準レンタル費用を決定してもよい。
 この係数は、累計稼働時間が大きいほど、小さい値が設定される。このようにすることで、長く使用されている古い作業機2ほど、基準レンタル費用を低くすることができる。
 次に、制御部11のレンタル費用決定部11Cは、ステップS4にて判定された作業機2の保守の内容と、ステップS2にて取得された保守実績とが一致するか否かを判定する(ステップS6)。
 保守の内容と保守実績が一致するとは、保守実績の情報に含まれる少なくとも1つの保守の内容と、ステップS4にて判定された少なくとも1つの保守の内容とが全て一致していることを言う。
 保守の内容と保守実績とが一致する場合(ステップS6:YES)には、制御部11のレンタル費用決定部11Cは、ステップS5にて決定した基準レンタル費用を作業機2の最終レンタル費用として決定する(ステップS7)。
 ステップS7の後、制御部11の情報出力部11Dにより、この最終レンタル費用が出力されて(ステップS9)、最終レンタル費用がユーザに提示される。
 一方、保守の内容と保守実績とが不一致の場合(ステップS6:NO)には、制御部11のレンタル費用決定部11Cは、ステップS5にて決定した基準レンタル費用に、ステップS4にて判定された保守費用の少なくとも一部の費用を加算して得られる費用を、作業機2の最終レンタル費用として決定する(ステップS8)。ステップS8の後はステップS9の処理が行われる。
 例えば、ステップS4にて判定された保守の内容が保守内容Aと保守内容Bの2つであり、保守実績に含まれる保守の内容が保守内容Aであった場合を考える。この場合には、保守実績に保守内容Bが含まれないため、ステップS6の判定はNOとなる。
 そして、ステップS8においては、ステップS5にて決定された基準レンタル費用に、ステップS4にて判定された保守内容Aと保守内容Bの各々に対応する保守費用のうちの保守内容Bに対応する保守費用のみが加算されて、最終レンタル費用が決定される。
 または、例えば、ステップS4にて判定された保守の内容が保守内容Aと保守内容Bの2つであり、保守実績に含まれる保守の内容が0個であった場合(ユーザによって保守が行われてない場合)を考える。この場合には、保守実績に保守内容Aと保守内容Bが含まれないため、ステップS6の判定はNOとなる。
 そして、ステップS8においては、ステップS5にて決定された基準レンタル費用に、ステップS4にて判定された保守内容Aと保守内容Bの各々に対応する保守費用が加算されて、最終レンタル費用が決定される。
 以上のように、レンタル管理装置1によれば、作業機2のレンタル期間中に作業機2の保守が必要となり、必要な保守がユーザによって全て行われた場合には、基準レンタル費用のみがユーザに請求される。
 一方、必要な保守がユーザによって一部のみ行われた場合又は全く行われなかった場合には、基準レンタル費用に、必要な保守のうちの未実施の保守にかかる保守費用が上乗せされてユーザに請求される。
 このシステムによれば、ユーザにとっては、保守にかかる費用を工夫して安く抑えることにより、保守費用を貸与業者に支払う場合と比較すると、作業機2のレンタルにかかるトータルの費用を抑制することができる。
 特に、作業機2のレンタル期間の開始時の累計稼働時間が大きくなってくる(作業機2が使い古されている)と、保守の内容の種類や保守の頻度も増えることになる。このため、ユーザによる保守費用の削減効果を高めることができる。
 このように、作業機2の保守をユーザが行うことで、レンタルにかかるトータルの費用を抑えられるようになることから、ユーザに保守の実施を強く促すことができるようになる。したがって、貸与業者にとっては、作業機2が保守のために貸与不可となる期間を減らすことができ、作業機2の効率的な運用が可能となる。
 また、ユーザにとっては、保守にかかる時間を工夫して短縮することによって、レンタル期間中における作業機2の使用可能な時間を増やすことができ、作業機2の効率的な利用が可能となる。
 また、作業機レンタルシステム100によれば、ユーザがレンタル期間中に行った作業機2の保守の実績を考慮して、そのレンタル期間中の作業機2のレンタル費用が決定される。このため、従来技術のように、過去の保守実績から未来のレンタル期間のレンタル費用が決められる場合と比較すると、ユーザと貸与業者の双方にとって適正なレンタル費用を決定することができる。
 また、作業機レンタルシステム100によれば、レンタル期間中において作業機2をできるだけ長く使いたい場合には保守を行わない判断をしたり、レンタル期間中において作業機2をできるだけ安く使いたい場合には保守を自分で行う判断をしたり、といった柔軟な対応がユーザにとって可能になり、利便性を向上させることができる。
 図7は、図3に示す制御部11の機能ブロックの変形例を示す図である。図7において図3と同じ機能を持つ構成には同一符号を付してある。
 図7に示す制御部11は、作業機のレンタル管理プログラムを含むプログラムを実行することにより、第一情報取得部11A、第二情報取得部11E、保守判定部11B、レンタル費用決定部11C、情報出力部11D、及び記憶制御部11Fとして機能する。
 第二情報取得部11Eは、レンタル期間中の作業機2の消耗度の情報をROM12の第一記憶領域12aから読み出して取得する。
 消耗度は、例えば、作業機2のレンタル期間中のエンジン回転数の平均値、又は、レンタル期間中のエンジン負荷の平均値等である。エンジン回転数の平均値やエンジン負荷が高いほど、消耗度は高くなる。
 図7に示すレンタル費用決定部11Cは、作業機2のレンタル期間中の総稼働時間と、作業機2の消耗度とに基づいて、基準レンタル費用を算出する。例えば、消耗度が0より大きく1以下の値であるものとし、基準費用情報と、消耗度と、総稼働時間を乗じて得られる値を、基準レンタル費用として決定する。
 以上の図7に示す制御部11の構成によれば、基準レンタル費用を、作業機2の使用状態に合わせたより適正な値とすることができ、ユーザと貸与者の双方にとって適正なレンタル費用の決定が可能となる。
 本発明は、前述した実施形態に限定されるものではなく、適宜、変形、改良等が可能である。
 以上説明してきたように、本明細書には以下の事項が開示されている。
(1)
 エンジンを含む作業機のレンタル費用を管理する作業機のレンタル管理装置であって、
 前記作業機のレンタル期間における前記作業機の総稼働時間及び保守実績の情報と、前記レンタル期間の開始時における前記作業機の累計稼働時間の情報と、前記作業機に必要な保守の内容及び前記保守にかかる費用の情報を含む保守管理情報と、を記憶部から取得する第一情報取得部と、
 前記総稼働時間と前記累計稼働時間と前記保守管理情報とに基づいて、前記レンタル期間において必要な前記作業機の保守にかかる保守費用を判定する保守判定部と、
 前記総稼働時間と前記保守実績と前記保守費用とに基づいて、前記作業機の前記レンタル期間中のレンタル費用を決定するレンタル費用決定部と、
 前記レンタル費用の情報を出力する情報出力部と、を備える作業機のレンタル管理装置。
 (1)によれば、総稼働時間と保守実績と保守費用に基づいて作業機のレンタル費用が決定される。このように、レンタル費用の決定に、保守実績と保守費用が加味されることで、例えば、保守を行ったユーザに対してはその保守に必要な費用の請求を行わず、保守を行わなかったユーザに対してはその保守に必要な費用をレンタル費用に含めて請求するといった柔軟な費用設定が可能となる。ユーザにとっては保守費用を努力して下げることで、作業機のレンタルにかかるトータル費用を抑制できるというメリットがある。作業機の貸与者にとっては、ユーザに保守を促すことができるため、作業機を保守している期間のレンタル不可期間を減らすことができ、効率的な運用が可能になる。また、レンタル期間における保守実績に基づいてレンタル費用が決定されるため、ユーザと貸与者の双方にとって適正なレンタル費用を決定することができる。
(2)
 (1)記載の作業機のレンタル管理装置であって、
 前記保守判定部は、更に、前記レンタル期間において必要な前記作業機の保守の内容を判定し、
 前記レンタル費用決定部は、少なくとも前記総稼働時間の情報に基づいて基準レンタル費用を決定し、更に、前記保守判定部により判定された前記作業機の保守の内容と前記保守実績とが一致するか否かを判定し、前記保守の内容と前記保守実績とが一致する場合に、前記基準レンタル費用を前記作業機のレンタル費用として決定し、前記保守の内容と前記保守実績とが不一致の場合に、前記判定された前記保守費用の少なくとも一部の費用を前記基準レンタル費用に加算して得られる費用を前記作業機のレンタル費用として決定する作業機のレンタル管理装置。
 (2)によれば、保守を行ったユーザに対してはその保守に必要な費用の請求を行わず、保守を行わなかったユーザに対してはその保守に必要な費用をレンタル費用に含めて請求するといった柔軟な費用設定が可能となる。このため、ユーザにとっては作業機のレンタルにかかるトータル費用を抑制したり、レンタル期間中の作業機の使用時間を長くできたりといったメリットが得られ、作業機の貸与者にとっては効率的な運用が可能になるというメリットが得られる。
(3)
 (2)記載の作業機のレンタル管理装置であって、
 前記レンタル費用決定部は、前記保守の内容と前記保守実績とが不一致の場合には、前記保守実績と前記保守の内容との差に基づいて、前記基準レンタル費用に加算する前記費用を決定する作業機のレンタル管理装置。
 (3)によれば、ユーザによって保守が一部だけ実施されたような場合に、その実施した保守にかかった費用の請求をユーザに行わないといったことができる。このため、ユーザは、状況に合わせた作業機2の柔軟な運用が可能になる。
(4)
 (2)又は(3)記載の作業機のレンタル管理装置であって、
 前記レンタル期間における前記作業機の消耗度の情報を前記記憶部から取得する第二情報取得部を更に備え、
 前記レンタル費用決定部は、前記総稼働時間の情報と前記消耗度の情報とに基づいて前記基準レンタル費用を決定する作業機のレンタル管理装置。
 (4)によれば、レンタル費用をより適正化することができる。
(5)
 エンジンを含む作業機のレンタル費用を管理する作業機のレンタル管理方法であって、
 前記作業機のレンタル期間における前記作業機の総稼働時間及び保守実績の情報と、前記レンタル期間の開始時における前記作業機の累計稼働時間の情報と、前記作業機に必要な保守の内容及び前記保守にかかる費用の情報を含む保守管理情報と、を記憶部から取得するステップと、
 前記総稼働時間と前記累計稼働時間と前記保守管理情報とに基づいて、前記レンタル期間において必要な前記作業機の保守にかかる保守費用を判定するステップと、
 前記総稼働時間と前記保守実績と前記保守費用とに基づいて、前記作業機の前記レンタル期間中のレンタル費用を決定するステップと、
 前記レンタル費用の情報を出力するステップと、を備える作業機のレンタル管理方法。
 (5)によれば、総稼働時間と保守実績と保守費用に基づいて作業機のレンタル費用が決定される。このように、レンタル費用の決定に、保守実績と保守費用が加味されることで、例えば、保守を行ったユーザに対してはその保守に必要な費用の請求を行わず、保守を行わなかったユーザに対してはその保守に必要な費用をレンタル費用に含めて請求するといった柔軟な費用設定が可能となる。ユーザにとっては保守費用を努力して下げることで、作業機のレンタルにかかるトータル費用を抑制できるというメリットがある。作業機の貸与者にとっては、ユーザに保守を促すことができるため、作業機を保守している期間のレンタル不可期間を減らすことができ、効率的な運用が可能になる。また、レンタル期間における保守実績に基づいてレンタル費用が決定されるため、ユーザと貸与者の双方にとって適正なレンタル費用を決定することができる。
(6)
 エンジンを含む作業機のレンタル費用を管理するための作業機のレンタル管理プログラムであって、
 前記作業機のレンタル期間における前記作業機の総稼働時間及び保守実績の情報と、前記レンタル期間の開始時における前記作業機の累計稼働時間の情報と、前記作業機に必要な保守の内容及び前記保守にかかる費用の情報を含む保守管理情報と、を記憶部から取得するステップと、
 前記総稼働時間と前記累計稼働時間と前記保守管理情報とに基づいて、前記レンタル期間において必要な前記作業機の保守にかかる保守費用を判定するステップと、
 前記総稼働時間と前記保守実績と前記保守費用とに基づいて、前記作業機の前記レンタル期間中のレンタル費用を決定するステップと、
 前記レンタル費用の情報を出力するステップと、をコンピュータに実行させるための作業機のレンタル管理プログラム。
 (6)によれば、総稼働時間と保守実績と保守費用に基づいて作業機のレンタル費用が決定される。このように、レンタル費用の決定に、保守実績と保守費用が加味されることで、例えば、保守を行ったユーザに対してはその保守に必要な費用の請求を行わず、保守を行わなかったユーザに対してはその保守に必要な費用をレンタル費用に含めて請求するといった柔軟な費用設定が可能となる。ユーザにとっては保守費用を努力して下げることで、作業機のレンタルにかかるトータル費用を抑制できるというメリットがある。作業機の貸与者にとっては、ユーザに保守を促すことができるため、作業機を保守している期間のレンタル不可期間を減らすことができ、効率的な運用が可能になる。また、レンタル期間における保守実績に基づいてレンタル費用が決定されるため、ユーザと貸与者の双方にとって適正なレンタル費用を決定することができる。
 本発明によれば、作業機のレンタル費用を適正に決定することのできる作業機のレンタル管理装置、作業機のレンタル管理方法、及び作業機のレンタルプログラムを提供することができる。
100 作業機レンタルシステム
1 レンタル管理装置
2 作業機
3 ユーザ端末
4 インターネット
2A 液体ポンプ
2B エンジン装置
20 バス
21 エンジン
22 通信I/F
23 ECU
24 操作装置
25 ポンプ機構
10 バス
11 制御部
11A 第一情報取得部
11B 保守判定部
11C レンタル費用決定部
11D 情報出力部
11E 第二情報取得部
12 ROM
12a 第一記憶領域
12b 第二記憶領域
12c 第三記憶領域
12d 第四記憶領域
13 RAM
14 通信I/F
15 操作部
16 出力装置

Claims (6)

  1.  エンジンを含む作業機のレンタル費用を管理する作業機のレンタル管理装置であって、
     前記作業機のレンタル期間における前記作業機の総稼働時間及び保守実績の情報と、前記レンタル期間の開始時における前記作業機の累計稼働時間の情報と、前記作業機に必要な保守の内容及び前記保守にかかる費用の情報を含む保守管理情報と、を記憶部から取得する第一情報取得部と、
     前記総稼働時間と前記累計稼働時間と前記保守管理情報とに基づいて、前記レンタル期間において必要な前記作業機の保守にかかる保守費用を判定する保守判定部と、
     前記総稼働時間と前記保守実績と前記保守費用とに基づいて、前記作業機の前記レンタル期間中のレンタル費用を決定するレンタル費用決定部と、
     前記レンタル費用の情報を出力する情報出力部と、を備える作業機のレンタル管理装置。
  2.  請求項1記載の作業機のレンタル管理装置であって、
     前記保守判定部は、更に、前記レンタル期間において必要な前記作業機の保守の内容を判定し、
     前記レンタル費用決定部は、少なくとも前記総稼働時間の情報に基づいて基準レンタル費用を決定し、更に、前記保守判定部により判定された前記作業機の保守の内容と前記保守実績とが一致するか否かを判定し、前記保守の内容と前記保守実績とが一致する場合に、前記基準レンタル費用を前記作業機のレンタル費用として決定し、前記保守の内容と前記保守実績とが不一致の場合に、前記判定された前記保守費用の少なくとも一部の費用を前記基準レンタル費用に加算して得られる費用を前記作業機のレンタル費用として決定する作業機のレンタル管理装置。
  3.  請求項2記載の作業機のレンタル管理装置であって、
     前記レンタル費用決定部は、前記保守の内容と前記保守実績とが不一致の場合には、前記保守実績と前記保守の内容との差に基づいて、前記基準レンタル費用に加算する前記費用を決定する作業機のレンタル管理装置。
  4.  請求項2又は3記載の作業機のレンタル管理装置であって、
     前記レンタル期間における前記作業機の消耗度の情報を前記記憶部から取得する第二情報取得部を更に備え、
     前記レンタル費用決定部は、前記総稼働時間の情報と前記消耗度の情報とに基づいて前記基準レンタル費用を決定する作業機のレンタル管理装置。
  5.  エンジンを含む作業機のレンタル費用を管理する作業機のレンタル管理方法であって、
     前記作業機のレンタル期間における前記作業機の総稼働時間及び保守実績の情報と、前記レンタル期間の開始時における前記作業機の累計稼働時間の情報と、前記作業機に必要な保守の内容及び前記保守にかかる費用の情報を含む保守管理情報と、を記憶部から取得するステップと、
     前記総稼働時間と前記累計稼働時間と前記保守管理情報とに基づいて、前記レンタル期間において必要な前記作業機の保守にかかる保守費用を判定するステップと、
     前記総稼働時間と前記保守実績と前記保守費用とに基づいて、前記作業機の前記レンタル期間中のレンタル費用を決定するステップと、
     前記レンタル費用の情報を出力するステップと、を備える作業機のレンタル管理方法。
  6.  エンジンを含む作業機のレンタル費用を管理するための作業機のレンタル管理プログラムであって、
     前記作業機のレンタル期間における前記作業機の総稼働時間及び保守実績の情報と、前記レンタル期間の開始時における前記作業機の累計稼働時間の情報と、前記作業機に必要な保守の内容及び前記保守にかかる費用の情報を含む保守管理情報と、を記憶部から取得するステップと、
     前記総稼働時間と前記累計稼働時間と前記保守管理情報とに基づいて、前記レンタル期間において必要な前記作業機の保守にかかる保守費用を判定するステップと、
     前記総稼働時間と前記保守実績と前記保守費用とに基づいて、前記作業機の前記レンタル期間中のレンタル費用を決定するステップと、
     前記レンタル費用の情報を出力するステップと、をコンピュータに実行させるための作業機のレンタル管理プログラム。
PCT/JP2018/013804 2018-03-30 2018-03-30 作業機のレンタル管理装置、作業機のレンタル管理方法、作業機のレンタル管理プログラム WO2019187065A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2020508837A JP7075989B2 (ja) 2018-03-30 2018-03-30 作業機のレンタル管理装置、作業機のレンタル管理方法、作業機のレンタル管理プログラム
DE112018007415.3T DE112018007415T5 (de) 2018-03-30 2018-03-30 Mietverwaltungsvorrichtung für ein Arbeitsgerät, Mietverwaltungsverfahren für ein Arbeitsgerät und Mietverwaltungsprogramm für ein Arbeitsgerät
PCT/JP2018/013804 WO2019187065A1 (ja) 2018-03-30 2018-03-30 作業機のレンタル管理装置、作業機のレンタル管理方法、作業機のレンタル管理プログラム
US17/042,399 US20210142395A1 (en) 2018-03-30 2018-03-30 Rental management device for work machine, rental management method for work machine, and rental management program for work machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/013804 WO2019187065A1 (ja) 2018-03-30 2018-03-30 作業機のレンタル管理装置、作業機のレンタル管理方法、作業機のレンタル管理プログラム

Publications (1)

Publication Number Publication Date
WO2019187065A1 true WO2019187065A1 (ja) 2019-10-03

Family

ID=68060994

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/013804 WO2019187065A1 (ja) 2018-03-30 2018-03-30 作業機のレンタル管理装置、作業機のレンタル管理方法、作業機のレンタル管理プログラム

Country Status (4)

Country Link
US (1) US20210142395A1 (ja)
JP (1) JP7075989B2 (ja)
DE (1) DE112018007415T5 (ja)
WO (1) WO2019187065A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021158049A (ja) * 2020-03-30 2021-10-07 東芝ライテック株式会社 生成装置、生成方法および生成プログラム
US11467555B2 (en) * 2019-02-18 2022-10-11 Gebr. Heller Maschinenfabrik Gmbh Method for determination of an effective machine use of a machine tool as well as machine tool configured therefore
WO2024122018A1 (ja) * 2022-12-08 2024-06-13 株式会社Fuji リースシステムおよびリース方法
WO2024147776A1 (en) * 2023-01-02 2024-07-11 Borusan Maki̇na Ve Güç Si̇stemleri̇ Sanayi̇ Ve Ti̇caret Anoni̇m Şi̇rketi̇ A smart rental system and method
WO2024157732A1 (ja) * 2023-01-25 2024-08-02 トヨタ自動車株式会社 情報処理装置および情報処理方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220414757A1 (en) * 2020-04-07 2022-12-29 Yamaha Hatsudoki Kabushiki Kaisha Watercraft rental system, a watercraft rental method, and a computer for a watercraft

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000180568A (ja) * 1998-12-17 2000-06-30 Niigata Eng Co Ltd レンタル建設機械稼働時間計測装置
JP2001331735A (ja) * 2000-05-19 2001-11-30 Hitachi Constr Mach Co Ltd 営業支援システム
JP2002109027A (ja) * 2000-09-27 2002-04-12 Kobelco Contstruction Machinery Ltd 建設機械のレンタル料金算出方法、装置及びシステム
JP2004118471A (ja) * 2002-09-26 2004-04-15 Mitsubishi Heavy Ind Ltd リース事業支援システム
JP2008108108A (ja) * 2006-10-26 2008-05-08 Shin Caterpillar Mitsubishi Ltd 作業機械管理システム

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002183511A (ja) * 2000-12-11 2002-06-28 Komatsu Ltd 使用履歴を考慮した機械の販売方法
JP4520087B2 (ja) * 2002-01-16 2010-08-04 コマツレンタル株式会社 顧客とのコミュニケーションの結果を管理又は通知するためのシステム
CN1564995A (zh) * 2002-06-12 2005-01-12 日立建机株式会社 工程机械的信息提供系统以及工程机械的信息提供方法
US20070192214A1 (en) * 2006-02-01 2007-08-16 Doyle Thomas F Method and apparatus to signal rental asset use completion
US8645176B2 (en) * 2006-10-05 2014-02-04 Trimble Navigation Limited Utilizing historical data in an asset management environment
WO2013171865A1 (ja) * 2012-05-16 2013-11-21 株式会社日立製作所 管理方法及び管理システム
FR3024583B1 (fr) * 2014-07-29 2017-12-08 Airbus Surveillance d'une intervention de maintenance sur un aeronef
JP6301902B2 (ja) * 2015-12-21 2018-03-28 ファナック株式会社 保守時期予測システム及び保守時期予測装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000180568A (ja) * 1998-12-17 2000-06-30 Niigata Eng Co Ltd レンタル建設機械稼働時間計測装置
JP2001331735A (ja) * 2000-05-19 2001-11-30 Hitachi Constr Mach Co Ltd 営業支援システム
JP2002109027A (ja) * 2000-09-27 2002-04-12 Kobelco Contstruction Machinery Ltd 建設機械のレンタル料金算出方法、装置及びシステム
JP2004118471A (ja) * 2002-09-26 2004-04-15 Mitsubishi Heavy Ind Ltd リース事業支援システム
JP2008108108A (ja) * 2006-10-26 2008-05-08 Shin Caterpillar Mitsubishi Ltd 作業機械管理システム

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11467555B2 (en) * 2019-02-18 2022-10-11 Gebr. Heller Maschinenfabrik Gmbh Method for determination of an effective machine use of a machine tool as well as machine tool configured therefore
JP2021158049A (ja) * 2020-03-30 2021-10-07 東芝ライテック株式会社 生成装置、生成方法および生成プログラム
JP7484322B2 (ja) 2020-03-30 2024-05-16 東芝ライテック株式会社 生成装置、生成方法および生成プログラム
WO2024122018A1 (ja) * 2022-12-08 2024-06-13 株式会社Fuji リースシステムおよびリース方法
WO2024147776A1 (en) * 2023-01-02 2024-07-11 Borusan Maki̇na Ve Güç Si̇stemleri̇ Sanayi̇ Ve Ti̇caret Anoni̇m Şi̇rketi̇ A smart rental system and method
WO2024157732A1 (ja) * 2023-01-25 2024-08-02 トヨタ自動車株式会社 情報処理装置および情報処理方法

Also Published As

Publication number Publication date
US20210142395A1 (en) 2021-05-13
JPWO2019187065A1 (ja) 2021-01-07
DE112018007415T5 (de) 2020-12-17
JP7075989B2 (ja) 2022-05-26

Similar Documents

Publication Publication Date Title
WO2019187065A1 (ja) 作業機のレンタル管理装置、作業機のレンタル管理方法、作業機のレンタル管理プログラム
US10344455B2 (en) Replaceable component management system for construction machine
JP4856163B2 (ja) 建設機械の診断情報提供装置
AU785446B2 (en) Control system for construction machines
US20180022340A1 (en) Modular power plants for machines
KR101457286B1 (ko) 가이던스 출력 장치 및 가이던스 출력 방법
US20150301518A1 (en) Control method, control computer program, and control system for work machine
JP6985216B2 (ja) 建設機械管理システム
DE102013210047B4 (de) Steuerung der Leistungsgrenze einer Hybridbatterie
DE102021201642A1 (de) System und verfahren zur laufzeitplanung eines mit einer elektrischen batterie betriebenen arbeitsfahrzeugs
CN113902198A (zh) 一种机油寿命预测方法、装置、电子设备和存储介质
WO2015133243A1 (ja) 遠隔サーバ
DE10315928A1 (de) Ein System zur Energieversorgung eines elektrischen Systems in einem Fahrzeug
CN113445566B (zh) 挖土机的管理系统
JP5941123B2 (ja) 作業機械の管理方法、管理用コンピュータプログラム及び管理システム
WO2014136957A1 (ja) 作業機械の管理システム、クライアント端末およびサーバ、ならびに作業機械の管理方法
JP2010287069A (ja) 作業機械管理システムにおける作業機械管理方法
US11386500B2 (en) Insurance premium setting system
US8939122B2 (en) Engine starting strategy to avoid resonant frequency
CN117124869A (zh) 一种双电驱桥换挡阶段的扭矩控制方法、装置及车辆
JP2010287070A (ja) 作業機械管理システムにおける作業機械管理方法
DE112011104506T5 (de) Vorladestrategie für geschalteten Reluktanzgenerator
WO2020262661A1 (ja) 作業機械の管理システム、作業機械の管理装置、作業員用端末、施工業者用端末
JPH04252883A (ja) 真空ポンプ及びその運転方法
JP2022131338A (ja) 報知制御方法、作業機械、管理システム、管理プログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18912893

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020508837

Country of ref document: JP

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 18912893

Country of ref document: EP

Kind code of ref document: A1