WO2019146615A1 - 圧縮機の組立装置及び圧縮機の組立方法 - Google Patents

圧縮機の組立装置及び圧縮機の組立方法 Download PDF

Info

Publication number
WO2019146615A1
WO2019146615A1 PCT/JP2019/001992 JP2019001992W WO2019146615A1 WO 2019146615 A1 WO2019146615 A1 WO 2019146615A1 JP 2019001992 W JP2019001992 W JP 2019001992W WO 2019146615 A1 WO2019146615 A1 WO 2019146615A1
Authority
WO
WIPO (PCT)
Prior art keywords
frame
unit
welding
cylindrical body
rotor
Prior art date
Application number
PCT/JP2019/001992
Other languages
English (en)
French (fr)
Inventor
文昭 安田
桧山 昌之
國分 忍
加藤 丈晴
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2019567099A priority Critical patent/JP6785994B2/ja
Publication of WO2019146615A1 publication Critical patent/WO2019146615A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C18/00Rotary-piston pumps specially adapted for elastic fluids
    • F04C18/02Rotary-piston pumps specially adapted for elastic fluids of arcuate-engagement type, i.e. with circular translatory movement of co-operating members, each member having the same number of teeth or tooth-equivalents
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C29/00Component parts, details or accessories of pumps or pumping installations, not provided for in groups F04C18/00 - F04C28/00
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K15/00Methods or apparatus specially adapted for manufacturing, assembling, maintaining or repairing of dynamo-electric machines
    • H02K15/02Methods or apparatus specially adapted for manufacturing, assembling, maintaining or repairing of dynamo-electric machines of stator or rotor bodies

Definitions

  • the present invention relates to a compressor assembling apparatus and a compressor assembling method.
  • a disk-shaped main frame to which a main bearing for rotatably supporting a shaft having a rotor is fixed and a disk-like sub frame to which a sub-bearing is fixed is mounted on an inner wall of a compressor assembling apparatus.
  • a compressor assembling apparatus There are some which assemble a compressor by inserting into a fixed cylindrical body.
  • a mounting table having a horizontal surface on which the main frame can be mounted, a fixing table capable of fixing the sub-frame in a state in which the sub-frame is in contact with the reference surface, a mounting table and a fixing table
  • An assembly apparatus includes a press-fit unit having a holding arm that can be raised and lowered between and a cylindrical body can be held, and a welding unit that can weld a main frame and a sub-frame.
  • Patent Document 2 discloses an assembly apparatus provided with a preheating unit for preheating a cylindrical body, in addition to the mounting table, the fixing table, the press-fit unit, and the welding unit described in Patent Document 1.
  • the preheating unit preheats the cylindrical body, thermally expands the cylindrical body, and press-fits the sub-frame into the cylindrical body. Thereby, the sub-frame is fixed by the cylindrical body, and the deviation of the axis line after welding of the sub-frame and the cylindrical body is prevented.
  • the present invention has been made to solve the above-described problems, and an object of the present invention is to provide a compressor assembling apparatus and a compressor assembling method for assembling a main frame and a sub frame with high accuracy.
  • a compressor assembling apparatus comprises: a disk-shaped first frame to which a first bearing rotatably supporting a shaft having a rotor is fixed; And a shaft is inserted into the second bearing, and the first frame is inserted into the second bearing, and the disc-shaped second frame to which the bearing is fixed is inserted radially inside the cylindrical body to which the stator is fixed on the inner wall. It is an assembly device of the 2nd frame and the compressor which assembles a cylinder.
  • the compressor assembling apparatus includes a first frame insertion unit, a second frame insertion unit, a measurement unit, a storage unit, a determination unit, an adjustment unit, and a welding unit.
  • the first frame insertion portion inserts the first frame into the cylindrical body.
  • the second frame insertion portion inserts the second frame into the cylindrical body.
  • the measurement unit measures the position of the rotor with respect to the stator in a state in which the first frame insertion unit inserts the first frame into the cylindrical body and the shaft is disposed radially inward of the cylindrical body.
  • the storage unit includes first data on a position of the rotor with respect to the stator and displacement amounts of the first frame and the second frame after welding, and positions of the first frame and the second frame before welding. Second data indicating the relationship between the amount of displacement and the amount of positional displacement of the first frame and the second frame after welding is stored.
  • the determination unit determines whether to adjust the position of the second frame with respect to the first frame based on the position data measured by the measurement unit and the first data stored in the storage unit.
  • the adjusting unit determines the second frame of the first frame based on the second data stored in the storage unit. Adjust the position.
  • the weld welds the first and second frames to the cylinder.
  • the determination unit adjusts the position of the second frame with respect to the first frame based on the position data measured by the measurement unit and the first data stored in the storage unit. If it is determined that the adjustment is to be performed, the adjustment unit adjusts the position of the second frame with respect to the first frame based on the second data stored in the storage unit. And a welding part welds the 1st frame and the 2nd frame in which position was adjusted to a cylinder. Therefore, the main frame and the sub frame can be welded at the correct position. As a result, the mainframe and the subframe can be assembled with high accuracy.
  • Sectional view of a main frame, a sub frame, and a cylindrical body to be combined with a compressor assembling apparatus according to an embodiment of the present invention Cross-sectional view of a compressor assembled by a compressor assembling apparatus according to an embodiment of the present invention Sectional drawing of the assembling apparatus of the compressor based on embodiment of this invention An enlarged sectional view of the IV region shown in FIG. 3 An enlarged sectional view of the V region shown in FIG. 3 An enlarged cross-sectional view of the VI region shown in FIG. 3 Configuration diagram of the arithmetic unit provided in the compressor assembling apparatus according to the embodiment of the present invention Welding position deviation table stored in the storage unit shown in FIG.
  • FIG. 7 Flow chart of the assembling process using the compressor assembling apparatus according to the embodiment of the present invention Front view of a sub-frame positioning jig used in a compressor assembling apparatus according to an embodiment of the present invention Flow chart of insertion welding process shown in FIG. Cross-sectional view of a modification of the rotor measurement unit
  • the compressor assembling apparatus is an assembling apparatus for assembling a compressor by combining a main frame which is a component of the compressor, a sub frame, and a cylindrical body.
  • the welding position shift table is used to determine whether or not the positions of the main frame and the sub frame after welding are acceptable, before welding.
  • the position of the sub-frame with respect to the main frame is adjusted to assemble the compressor.
  • FIG. 1 is a cross-sectional view of a main frame 91, a sub frame 92, and a cylindrical body 93, which are assembled by the compressor assembling apparatus according to the embodiment of the present invention.
  • FIG. 2 is a cross-sectional view of the compressor 94 assembled by the compressor assembling apparatus according to the embodiment of the present invention.
  • the main frame 91 is a component that constitutes a frame of the compressor 94. As shown in FIG. 1, a compliant frame 912, a main bearing 913, a rotor 914, and a crankshaft 915 which is a shaft are attached to the main frame 91.
  • the main frame 91 is referred to as a first frame
  • the main bearing 913 is also referred to as a first bearing.
  • the main frame 91 is continuous with the annular plate portion 911A, the small cylindrical portion 911B continuous with the inner wall of the annular plate portion 911A, and protruding in the + Z direction, and the outer wall of the annular plate portion 911A. And a large cylindrical portion 911C protruding in the -Z direction.
  • a compliant frame 912 and a main bearing 913 which is integrally formed with the compliant frame 912 and rotatably supports a crankshaft 915 to which the motor rotor 914 is attached, are fitted on the inner wall of the main frame 91. It is done.
  • the compliant frame 912 is a frame that can move in the axial direction by receiving an axial force of the crankshaft 915.
  • the crankshaft 915 is also referred to as a shaft.
  • a crankshaft 915 extends from the main bearing 913 to the + Z side of the main frame 91.
  • the sub-frame 92 is a component that constitutes another frame of the compressor 94.
  • a sub bearing 921 is attached to the sub frame 92.
  • the sub-frame 92 is formed in the shape of a disc whose outer periphery is surrounded by a wall.
  • a sub bearing 921 rotatably supporting the + Z end of the crankshaft 915 when the compressor is assembled is fitted at the center of the sub frame 92.
  • the sub frame 92 is referred to as a second frame, and the sub bearing 921 is also referred to as a second bearing.
  • cylindrical body 93 is a part called a cylindrical shell, which constitutes a container for housing parts of the compressor.
  • a stator 932 is attached to the cylindrical body 93.
  • a stator 932 facing the rotor 914 is fixed to the inner wall of the cylindrical body 93 when the compressor is assembled.
  • the main frame 91, the sub frame 92, and the cylindrical body 93 are hereinafter simply referred to as the main frame 91, the sub frame 92, and the cylindrical body 93 even in the state where the above-described components are attached. I assume.
  • the main frame 91 and the sub frame 92 are combined by being fitted to the ⁇ end and the + Z end of the cylindrical body 93 as shown by arrows A and B. Then, as shown in FIG. 2, the combined main frame 91 and sub frame 92 are welded to the cylindrical body 93 to form a welded portion 931, whereby the compressor 94 is assembled.
  • FIG. 3 is a cross-sectional view of the compressor assembling apparatus 1 according to the embodiment of the present invention.
  • FIG. 4 is an enlarged cross-sectional view of the IV region shown in FIG.
  • FIG. 5 is an enlarged cross-sectional view of a V region shown in FIG. 6 is an enlarged cross-sectional view of a VI region shown in FIG.
  • FIG. 7 is a block diagram of the arithmetic unit 60 provided in the compressor assembling apparatus 1 according to the embodiment of the present invention.
  • FIG. 8 is a welding position deviation table stored in the storage unit 630 shown in FIG.
  • the assembling apparatus 1 in a state where the main frame 91, the sub frame 92, and the cylindrical body 93 to be assembled are mounted on the assembling apparatus 1, that is, before the compressor 94 is assembled. Is shown. Further, in FIG. 5, the power supply device 820 shown in FIG. 3 is omitted.
  • the assembling apparatus 1 includes a cylinder positioning unit 10 for positioning the cylinder 93, a main frame insertion unit 20 for raising the mounting table 200 and inserting the main frame 91 into the sub frame 92, and a main A rotor measurement unit 30 that measures the position coordinates of the rotor 914 of the frame 91, a subframe adjustment unit 40 that adjusts the position of the subframe 92, a subframe measurement unit 50 that measures the position coordinates of the subframe 92, and rotor measurement Arithmetic unit 60 for obtaining the position of the sub-frame from position coordinate data measured by the unit 30 and the sub-frame measurement unit 50, a control unit 70 for moving the sub-frame 92 to the position of the sub-frame found by the arithmetic unit 60, Main frame Weld 91 to subframe 92 A contact unit 80, in being configured.
  • a cylinder positioning unit 10 for positioning the cylinder 93
  • main frame insertion unit 20 for raising the mounting table 200 and inserting the main frame 91 into the sub frame
  • the cylindrical body positioning unit 10 includes a movable table 100 on which the cylindrical body 93 is mounted, a positioning jig 110 for positioning the cylindrical body 93 mounted on the movable table 100, and a movable
  • the table 100 includes an actuator 120 for moving the table 100 in the X, Y, and Z axes, a ⁇ axis direction around the X axis, and a ⁇ axis direction around the Y axis, and a bottom plate 130 supporting the actuator 120. ing.
  • the actuator 120 drives the movable table 100 to move the cylindrical body 93 to a fixed position where the positioning jig 110 positions the cylindrical body 93.
  • the positioning jig 110 is provided with a protrusion extending from the movable table 100 to the + Z side.
  • the positioning jig 110 positions the cylindrical body 93 by the operator bringing the cylindrical body 93 into contact with the projections.
  • the bottom plate 130 is disposed in parallel to the XY plane.
  • a through hole 131 through which the main frame 91 inserted into the cylindrical body 93 can be inserted is formed at the center of the bottom plate 130 in the X direction.
  • a support 132 extending to the + Z side is fixed to the bottom of the bottom plate 130 at the end in the X direction.
  • the support 132 supports a top plate 134 having a through hole 133 formed at the center in the X direction.
  • the column 132 arranges the top plate 134 in parallel with the bottom plate 130.
  • the main frame insertion unit 20 is disposed on the ⁇ Z side of the cylindrical body positioning unit 10 for positioning the cylindrical body 93.
  • the main frame insertion unit 20 raises and lowers the mounting table 200 in order to insert the mounting table 200 on which the main frame 91 is mounted and the main frame 91 into the main frame 91 of the cylindrical body positioning unit 10.
  • the lift table 210, the movable table 220 provided on the + Z surface side of the lift table 210 for moving the mounting table 200, the chuck member 230 for gripping the main frame 91 mounted on the mounting table 200, and the lift table 210
  • a displacement sensor 240 fixed to the attached mount 241.
  • the mainframe insertion unit 20 is also referred to as a first frame insertion part.
  • the mounting table 200 is formed with a convex portion that protrudes to the + Z side.
  • the main frame 91 is mounted on the mounting table 200, and the convex portion supports the -Z end of the crankshaft 915 provided in the main frame 91.
  • the mainframe insertion unit 20 includes a support 213 extending in the Z direction.
  • the post 213 is provided with an actuator 212 which is disposed along the post 213 and drives the block member 211 in the Z direction.
  • the lifting table 210 is supported by the block member 211 and is lifted and lowered by the actuator 212.
  • the movable table 220 is moved by another actuator 221 provided on the + Z surface side of the elevating table 210.
  • the actuator 221 drives the movable table 220 in the XYZ axial directions, the ⁇ axial direction whose rotation center is the X axis, and the ⁇ axial direction whose rotation center is the Y axis.
  • the movable table 220 is movable in these directions to move the mounting table 200 disposed on the + Z side surface.
  • the chuck member 230 is provided on the lift table 210 although not shown in FIG.
  • the chuck member 230 is provided with a plurality of protrusions extending to the + Z side of the mounting table 200.
  • the chuck member 230 holds the main frame 91 by bringing the protrusions into contact with the inner wall of the main frame 91 placed on the mounting table 200.
  • the chuck member 230 positions the main frame 91.
  • the displacement sensor 240 measures the position coordinates of the main frame 91 positioned by the chuck member 230, for example, the position coordinates of the central axis, the inclination of the outer wall, and the like.
  • the displacement sensor 240 outputs the measured position coordinate data to the arithmetic unit 60.
  • the rotor measurement unit 30 measures the position coordinates of the rotor 914 of the main frame 91 raised to the + Z side by the main frame insertion unit 20, that is, the main raised to the cylindrical body positioning unit 10 side. In order to measure the position coordinates of the rotor 914 of the frame 91, it is disposed on the + Z side of the cylindrical body positioning unit 10. As shown in FIG. 6, the rotor measuring unit 30 includes a fitting shaft 310 that can be fitted to the + Z end of the crankshaft 915 of the main frame 91 and a load sensor 320 disposed at the ⁇ Z end of the fitting shaft 310. And consists of. In the present specification, the rotor measurement unit 30 is also referred to as a measurement unit.
  • the + Z end of the fitting shaft 310 is fixed to the shaft holder 311.
  • the fitting shaft 310 is directed by the shaft holder 311 in the Z direction.
  • the shaft holder 311 has linear bushes 313 movable along the guide shaft 312 at both ends in the X direction.
  • the shaft holder 311 is fixed to a block 315 driven in the Z-axis direction by an actuator 314. Thereby, the fitting shaft 310 is raised and lowered in the Z-axis direction.
  • the ⁇ Z end side of the fitting shaft 310 is rotatably supported by a bearing 317 fitted in a support plate 316 in contact with the + Z side surface of the top plate 134 described above.
  • the fitting shaft 310 further extends to the ⁇ Z side through the bearing 317.
  • a fitting portion (not shown) that can be fitted to the + Z end of the crankshaft 915 is formed. The fitting portion will be described later in the operation of the assembling apparatus 1 described later.
  • the load sensor 320 measures the load when the fitting portion of the fitting shaft 310 is fitted to the + Z end of the crankshaft 915. That is, the load sensor 320 measures the load of the crankshaft 915.
  • the load sensor 320 outputs the measured load data, that is, the load data to the arithmetic unit 60.
  • the sub-frame adjusting unit 40 is a so-called aligning unit that inserts the sub-frame 92 into the cylindrical body 93 and adjusts its position.
  • the subframe adjusting unit 40 is disposed near the top plate 134 of the cylinder positioning unit 10 as shown in FIG. 4 in order to insert the subframe 92 into the + Z end of the cylinder 93.
  • the subframe adjustment unit 40 includes a movable table 400 disposed on the ⁇ Z side of the top plate 134 and on which the subframe 92 is placed.
  • the subframe adjustment unit 40 is also referred to as a second frame insertion unit or adjustment unit.
  • the adapter 95 is attached to the sub frame 92 in order to adjust the position of the sub frame 92 when the sub frame 92 and the cylindrical body 93 are inserted. Further, a measuring jig 96 is attached to the adapter 95 in order to measure the position coordinates of the sub frame 92. Specifically, the adapter 95 and the measuring jig 96 are attached to the + Z side of the sub frame 92 in the order of the adapter 95 and the measuring jig 96 toward the + Z side.
  • movable table 400 has a table surface on which a part of adapter 95 can be placed.
  • the movable table 400 is driven by the actuator 410 in the XYZ axial directions, the ⁇ axial direction with the X axis as the rotational center, and the ⁇ axial direction with the Y axis as the rotational center.
  • the movable table 400 moves the measuring jig 96 and the sub frame 92 via the adapter 95.
  • the movable table 400 adjusts the position of the sub-frame 92.
  • the actuator 410 outputs movement coordinate data from the origin position to the arithmetic unit 60.
  • the arithmetic unit 60 will be described later.
  • the sub-frame measurement unit 50 is disposed in the vicinity of the top plate 134 of the cylindrical body positioning unit 10 in the same manner as the movable table 100 in order to measure the measurement jig 96 moved by the movable table 100.
  • the sub-frame measurement unit 50 is configured of a bracket 510 extending from the top plate 134 to the ⁇ Z side, and a displacement sensor 520 installed on the bracket 510.
  • the displacement sensor 520 is disposed in the X direction of the measuring jig 96 by the bracket 510. Thereby, the displacement sensor 520 measures the position coordinates of the measuring jig 96. The displacement sensor 520 outputs the measured position coordinate data to the arithmetic unit 60.
  • the arithmetic unit 60 is realized by executing a insertion welding processing program stored in the storage unit 630 by a CPU (Central Processing Unit) included in the assembly apparatus 1.
  • the arithmetic unit 60 is, as shown in FIG. 7, a subframe position calculation unit 610 that calculates position coordinates of the subframe 92 from position coordinate data measured by the displacement sensor 520 of the subframe measurement unit 50, and a mainframe insertion unit 20.
  • Main frame position calculation unit 620 for calculating the position coordinates of the main frame 91 from the position coordinate data measured by the displacement sensor 240, the storage unit 630 in which the welding position deviation table 631 and the post welding position table 632 are stored, and rotor measurement Whether or not the load data of the load sensor 320 of the unit 30 is acceptable is determined based on the welding position shift table 631 and when it is determined that the load data is not acceptable, the position of the sub frame 92 based on the post welding position table 632
  • Subframe position adjustment amount calculation unit 640 that calculates the adjustment amount
  • the welding condition determining unit 650 determines the welding conditions of the welding unit 80, in being configured.
  • the subframe position calculation unit 610 is based on the movement coordinate data output from the actuator 410 of the subframe adjustment unit 40 and the position coordinate data output from the displacement sensor 520 of the subframe measurement unit 50. Calculate the position coordinates of the axis.
  • the mainframe position calculation unit 620 calculates position coordinates of the central axis of the mainframe 91 based on the output data of the displacement sensor 240 of the mainframe insertion unit 20.
  • load data measured by the load sensor 320 which is created in advance by experiment, and whether or not the positional deviation amount of the main frame 91 and the sub frame 92 after welding can be tolerated are associated with each other.
  • the welding position shift table 631 shown in FIG. 8 is stored. And, welding data when load data in the direction of XYZ axes, that is, loads [Fx1, Fy1, Fz1], [Fx2, Fy2, Fz2],...
  • the storage unit 630 the amount of positional deviation between the main frame 91 and the sub frame 92 before welding when the compressor 94 is assembled with high accuracy, which is created in advance by experiment, and the main frame 91 after welding.
  • a post-welding position table 632 in which the positional displacement amounts of the sub frame 92 and the sub frame 92 are associated is stored. Then, in the post-welding position table 632, the XYZ coordinates of the central axis of the main frame 91 before welding, the XYZ coordinates of the compressor 94 assembled with high accuracy, and the central axes of the XYZ coordinates and the sub-frame 92 before welding.
  • the inclination of the straight line connecting with the XYZ coordinates in the XY plane and the inclination data with respect to the Z axis that is, position coordinates before welding [ ⁇ Xb, ⁇ Yb, ⁇ Zb, ⁇ b, ⁇ b],.
  • Inclination on the XY plane of the straight line connecting the XYZ coordinates of the central axis, the XYZ coordinates and the XYZ coordinates of the central axis of the sub-frame 92 after welding, and data of the inclination with respect to the Z axis, ie position coordinates after welding [ ⁇ Xb, ⁇ Yb, ⁇ Zb, ⁇ b, ⁇ b],... are associated with each other.
  • the post-welding table 632 is also referred to as second data.
  • the subframe position adjustment amount calculation unit 640 uses the welding position deviation table 631 stored in the storage unit 630 to allow the amount of positional deviation after welding corresponding to the load data measured by the load sensor 320 to be acceptable. Determine if there is.
  • the subframe position adjustment amount calculation unit 640 is calculated by the main frame position calculation unit 620 and the position coordinates of the central axis of the subframe 92 calculated by the subframe position calculation unit 610.
  • the position of the central axis of the main frame 91 and the displacement of the central axis of the sub frame 92 with respect to the central axis of the main frame 91 are calculated, and a post welding position table 632 showing data when assembling with high accuracy. From the above, the displacement amount before welding which is closest to the calculated displacement amount is selected.
  • the positional adjustment amount of the subframe 92 is calculated by comparing the selected positional deviation amount with the calculated deviation amount. Then, the subframe position adjustment amount calculation unit 640 outputs the calculated position adjustment amount to the control unit 70.
  • the subframe position adjustment amount calculation unit 640 sets the position adjustment amount of the subframe 92 to zero, and outputs the result to the control unit 70. Also, the subframe position adjustment amount calculation unit 640 outputs the determination result as to whether or not the load data is acceptable to the welding condition determination unit 650. Note that, in the present specification, the subframe position adjustment amount calculation unit 640 is also referred to as a determination unit because it is determined whether or not load data is acceptable.
  • Welding condition determination unit 650 determines the welding condition from the determination result of subframe position adjustment amount calculation unit 640. When it is determined that the determination result is unacceptable, welding condition determination unit 650 outputs relatively high temperature, long-time welding conditions to control unit 70 in order to adjust the position of sub-frame 92. If it is determined that the determination result is acceptable, welding conditions of lower temperature and shorter time are output to the control unit 70.
  • control unit 70 instructs the operation unit 60 to perform an operation, and operates the subframe adjustment unit 40 and the welding unit 80 based on the operation result of the operation unit 60.
  • the control unit 70 drives the actuator 410 of the subframe adjustment unit 40 to move the movable table 400, for example, based on the output data of the subframe position adjustment amount calculation unit 640. Thereby, the position of the sub-frame 92 is moved. Further, the control unit 70 controls the power of the power supply device 820 of the welding unit 80 described later.
  • Welding unit 80 welds aligned sub-frame 92 and main frame 91, and as shown in FIG. 3, welding torch 810 fixed to bracket 811 and a power supply for supplying power to welding torch 810 And 820 are provided.
  • the welding unit 80 is also referred to as a welding portion.
  • the welding torch 810 is disposed on the ⁇ Z side portion and the + Z side portion of the support column 132 in order to weld the main frame 91 and the cylindrical body 93, and the sub frame 92 and the cylindrical body 93.
  • the welding torch 810 is disposed only on the post 132 located on the -X side, but the welding torch 810 similarly applies to the -Z side portion of the post 132 and the + Z for the post 132 located on the + X side. It is disposed at the side part.
  • the welding torch 810 can weld the main frame 91 and the cylindrical body 93, and the sub frame 92 and the cylindrical body 93 in the circumferential direction of the cylindrical body 93 every 120 °.
  • the power supply 820 is connected to the welding torch 810 by a cable 821.
  • the power supply device 820 is also connected to the control unit 70, and the power supplied to the welding torch 810 is controlled by the control unit 70.
  • the operation of the assembling apparatus 1 will be described with reference to FIGS. 9 to 11.
  • the cylindrical body 93 is not mounted on the movable table 100 of the cylindrical body positioning unit 10, and the main frame 91 is not mounted on the mounting table 200 of the main frame insertion unit 20.
  • the sub-frame 92 is not placed on the movable table 400 of the sub-frame adjustment unit 40.
  • the movable table 100 of the cylindrical body positioning unit 10 and the mounting table 200 of the main frame insertion unit 20 are at the positions shown in FIG. It is assumed that the movable table 100 of the cylindrical body positioning unit 10 is located on the -Z side of the position shown in FIG.
  • FIG. 9 is a flowchart of an assembling process using the compressor assembling apparatus 1 according to the embodiment of the present invention.
  • FIG. 10 is a front view of a sub-frame positioning jig 1000 used in the compressor assembling apparatus 1 according to the embodiment of the present invention.
  • FIG. 11 is a flowchart of the insertion welding process shown in FIG.
  • the main frame 91, the sub frame 92, the cylindrical body 93, the measuring jig 96, and the adapter 95 having the above-described configuration are prepared. Then, by hand, the adapter 95 is attached to the side of the sub frame 92 opposite to the side to be inserted into the cylindrical body 93, and the measuring jig 96 is attached thereon.
  • the movable table 400 with the sub-frame 92 to which the measurement jig 96 and the adapter 95 are attached is directed to the + Z side with respect to the sub-frame 92. And position the sub-frame 92 (step S1).
  • the displacement sensor 520 of the subframe measuring unit 50 measures the position coordinates of the measuring jig 96, and moves the movable table 400 based on the measured position coordinates.
  • the sub frame 92 is made horizontal.
  • the subframe 92 is disposed at the center of the subframe adjustment unit 40.
  • step S2 Positioning is performed by bringing the inner side wall of the cylindrical body 93 into contact with the positioning jig 110. Further, after positioning, the movable table 100 is raised, and the sub frame 92 is inserted into the cylindrical body 93. In the present specification, this step is called a subframe insertion step or a second frame insertion step.
  • the stator 932 of the cylindrical body 93 is positioned using the sub-frame positioning jig 1000 shown in FIG. 10 (step S3).
  • the subframe positioning jig 1000 extends from the pedestal 1010 to the + Z direction from the pedestal 1010 which can be held by the chuck member 230 of the mainframe insertion unit 20, and a cylindrical body And a cylindrical portion 1020 which can be inserted into the space formed between the stators 932 of 93.
  • the sub-frame positioning jig 1000 is placed on the mounting table 200 of the main frame insertion unit 20 shown in FIG.
  • the pedestal portion 1010 of the subframe positioning jig 1000 placed on the pedestal 2 is held by the chuck member 230 of the mainframe insertion unit 20 to position the subframe positioning jig 1000.
  • the mounting table 200 of the main frame insertion unit 20 is lifted, and the subframe positioning jig 1000 positioned is inserted into the cylindrical body 93 in the movable table 100 shown in FIG.
  • the cylindrical portion 1020 of the sub-frame positioning jig 1000 is inserted into the space formed between the stators 932 of the cylindrical body 93.
  • the stator 932 is positioned.
  • the cylindrical body 93 is fixed to the movable table 100 by fixing means (not shown), and the stator 932 is fixed at a fixed position.
  • the mounting table 200 shown in FIG. 5 is lowered to withdraw the subframe positioning jig 1000 from the cylindrical body 93.
  • the subframe positioning jig 1000 is removed from the chuck member 230 and taken out from the mounting table 200.
  • the main frame 91 is mounted on the mounting table 200, and the main frame 91 mounted on the mounting table 200 is held by the chuck member 230 to position the main frame 91 (see FIG. Step S4).
  • the control unit 70 starts the insertion welding process by the output signal of the start key (step S5).
  • the insertion welding process will be described with reference to FIG.
  • the control unit 70 raises the mounting table 200 and raises the main frame 91 to a temporary position (step S51).
  • the provisional position refers to the position of the main frame 91 where the crankshaft 915 of the main frame 91 mounted on the mounting table 200 is on the ⁇ Z side of the stator 932 of the sub frame 92.
  • the temporary position is a position at which the load sensor 320 measures the load. In the present specification, this process is called a main frame insertion process or a first frame insertion process.
  • control unit 70 drives the actuator 314 of the rotor measuring unit 30 to lower the shaft holder 311 of the fitting shaft 310. Then, the fitting portion of the fitting shaft 310 is fitted to the + Z end of the crankshaft 915 (step S52).
  • the control unit 70 measures the load by the load sensor 320 of the rotor measurement unit 30 in a state where the fitting portion of the fitting shaft 310 is fitted to the + Z end of the crankshaft 915 (step S53).
  • the crankshaft 915 is located on the ⁇ Z side relative to the stator 932, the rotor 914 of the main frame 91 is located near the stator 932.
  • a magnetic force acts between the rotor 914 and the stator 932 to exert a force on the crankshaft 915.
  • the control unit 70 uses the load sensor 320 to measure the load due to the force.
  • the control unit 70 controls the torque of the actuator 314 of the rotor measuring unit 30 to make the force applied to the fitting shaft 310 constant.
  • the load sensor 320 outputs the measured load data to the arithmetic unit 60.
  • this process is referred to as a rotor measurement process or measurement process because the load data is data indicating the position of the rotor 914 relative to the stator 932.
  • the control unit 70 After measuring the load with the load sensor 320, the control unit 70 drives the actuator 314 of the rotor measuring unit 30 to raise the shaft holder 311 of the fitting shaft 310. Subsequently, the control unit 70 raises the mounting table 200 to raise the main frame 91. The control unit 70 raises the main frame 91 to a position where the + Z end of the crankshaft 915 of the main frame 91 is inserted into the sub bearing 921 of the sub frame 92. This position is called an insertion position. Thereby, the control unit 70 attaches the main frame 91 to the sub frame 92 (step S54).
  • control unit 70 causes the sub-frame position calculation unit 610 to acquire position coordinate data measured by the displacement sensor 520 of the sub-frame measurement unit 50.
  • the sub-frame position calculation unit 610 calculates the position coordinates of the central axis of the sub-frame 92 from the acquired position coordinate data (step S55).
  • control unit 70 causes the mainframe position calculation unit 620 to acquire position coordinate data measured by the displacement sensor 240 of the mainframe insertion unit 20.
  • the mainframe position calculation unit 620 calculates the position coordinates of the central axis of the main frame 91 from the acquired position coordinate data (step S56).
  • control unit 70 causes the subframe position adjustment amount calculation unit 640 to determine whether the position adjustment of the subframe 92 is necessary based on the load data measured by the load sensor 320 of the rotor measurement unit 30. .
  • the subframe position adjustment amount calculation unit 640 calculates the position adjustment amount of the subframe 92 when it is determined that the position adjustment is necessary (step S57).
  • the sub-frame position adjustment amount calculation unit 640 determines whether the load data of the load sensor 320 is acceptable, in other words, between the crankshaft 915 of the main frame 91 and the central axis of the sub-frame 92. Whether or not the positional adjustment of the sub-frame 92 is necessary to correct the deviation is determined using the welding position deviation table 631.
  • the subframe position adjustment amount calculation unit 640 determines that the load data is not acceptable, that is, when it is determined that the position adjustment is necessary, the position coordinates of the central axis of the subframe 92 calculated in step S55
  • the position adjustment amount of the sub-frame 92 is calculated based on the position coordinates of the central axis of the main frame 91 calculated in step S56 and the post-welding position table 632. If it is determined that the load data is acceptable, that is, if it is determined that the position adjustment is not necessary, the subframe position adjustment amount calculation unit 640 sets the position adjustment amount of the subframe 92 to zero. In the present specification, this process is referred to as a determination process.
  • control unit 70 moves the subframe 92 to the appropriate position of the subframe 92 corresponding to the position adjustment amount of the subframe 92 calculated by the subframe position adjustment amount calculation unit 640 (step S58). Specifically, the control unit 70 moves the movable table 400 of the sub-frame adjustment unit 40 to move the sub-frame 92 to the proper position.
  • this process is called a sub-frame adjustment process or an adjustment process.
  • the control unit 70 After moving the sub-frame 92 to the proper position, the control unit 70 causes the welding condition determination unit 650 to determine the welding conditions. Specifically, as described above, welding conditions are determined based on the determination result of the subframe position adjustment amount calculation unit 640. Thereafter, the control unit 70 welds the main frame 91 and the cylindrical body 93, and the sub frame 92 and the cylindrical body 93 under the welding conditions determined by the welding unit 80 (step S59). In this welding, welding unit 80 welds in the circumferential direction of cylindrical body 93 every 120 °. In the present specification, this process is referred to as a welding process.
  • control unit 70 causes the chuck member 230 to release the main frame 91, and then lowers the mounting table 200 (step S60). Thus, the insertion welding process is completed.
  • the sub-frame is placed after the mounting and positioning of the main frame 91 on the mounting table 200 (step S4). It may be attached and positioned on the movable table 400 of 92 (step S1). In this case, the step of lifting the movable table 100 and inserting the sub-frame 92 into the cylindrical body 93, which is performed in step S2, may be performed in step S1.
  • the welding position determines whether the sub-frame adjustment unit 40 can accept the load data measured by the load sensor 320 of the rotor measurement unit 30. The determination is made based on the deviation table 631. Then, when it is determined that the process is not permitted, the subframe adjustment unit 40 adjusts the position of the subframe 92. Furthermore, in the assembling apparatus 1, the welding unit 80 welds the main frame 91 and the sub frame 92 to the cylindrical body 93 in a state where the position of the sub frame 92 is adjusted. For this reason, in the assembling apparatus 1, positional deviation due to welding hardly occurs. As a result, the main frame 91 and the sub frame 92 can be welded at an accurate position, and the main frame 91 and the sub frame 92 can be assembled with high accuracy.
  • the assembling apparatus 1 can easily predict whether or not the positional deviation amount between the main frame 91 and the sub frame 92 after welding can be tolerated, that is, whether or not the assembling accuracy is high simply by measuring the load data. can do.
  • the assembling apparatus 1 it is possible to adjust the position of the sub frame 92 with respect to the main frame 91 by predicting whether the main frame 91 and the sub frame 92 are assembled with high accuracy with a simple configuration.
  • the load data measured by the load sensor 320 depends on the magnetic force between the rotor 914 and the stator 932.
  • the assembling apparatus 1 since it is determined whether or not to adjust the position of the sub-frame 92 based on the load data, that is, the magnetic force between the rotor 914 and the stator 932, the assembly of the compressor with low efficiency is prevented. be able to.
  • the fitting shaft 310 is fitted to the crankshaft 915 of the main frame 91, and the load sensor 320 measures load data.
  • the present invention is not limited to this.
  • the position of the rotor 914 with respect to the stator 932 may be measured, and the position of the sub-frame 92 may be adjusted based on the measured position data of the assembling apparatus 1.
  • FIG. 12 is a cross-sectional view of a modification of the rotor measurement unit 30.
  • the rotor measuring unit 300 may be a cogging torque measuring device.
  • the rotor measurement unit 300 includes a shaft portion 301 connectable to the crankshaft 915 of the main frame 91, and a measurement portion 302 which rotates the crankshaft 915 connected to the shaft portion 301 and measures cogging torque.
  • And may be a cogging torque measuring device.
  • the rotor measurement unit 300 may be disposed in the Z direction with respect to the main frame 91.
  • the main frame 91 may be arranged in the -Z direction. In the case shown in FIG.
  • the mounting table 200 has a through hole penetrating in the Z direction, the shaft portion 301 be inserted into the through hole, and the shaft portion 301 be extensible.
  • the magnitude and direction of the magnetic force between the rotor 914 and the stator 932 are determined from the cogging torque measured by the rotor measuring unit 300, and the magnitude and direction of the determined magnetic force are determined from the stator 932 of the rotor 914. The position for can be estimated.
  • the cogging torque measuring device of the rotor measuring unit 300 may be referred to as a cogging torque measuring device, a cogging torque measuring unit or the like.
  • the load sensor of the embodiment may be referred to as a load cell, a load converter, a load measuring unit, or the like.
  • the welding position deviation table 631 is the amount of deviation in the XYZ directions between the central axis of the main frame 91 and the central axis of the sub frame 92, the inclination of the straight line connecting those central axes in the XY plane, and the Z axis Includes the slope for
  • the welding position deviation table 631 may include the amount of position deviation necessary for adjusting the sub-frame 92.
  • the amount of positional deviation after welding included in the welding positional deviation table 631 may be only data of the inclination on the XY plane and the inclination with respect to the Z axis.
  • the position of the sub-frame 92 can be adjusted from the position coordinates and the positional deviation amount with respect to the inclination on the XY plane and the inclination with respect to the Z axis included in the welding positional deviation table 631.
  • the sub-frame adjustment unit 40 includes the actuator 410 that moves the movable table 400 also in the Z-axis direction. Then, in addition to adjusting the position of the sub-frame 92, the sub-frame adjusting unit 40 also inserts the sub-frame 92 into the cylindrical body 93.
  • the present invention is not limited to this.
  • a subframe insertion unit or subframe insertion portion for inserting the subframe 92 into the cylindrical body 93 may be provided.
  • the sub-frame adjustment unit 40 may move the movable table 400 in the X and Y directions, and the sub-frame insertion unit may move the movable table 400 in the Z direction. Even in such a configuration, the subframe adjustment unit 40 can adjust the position of the subframe 92.
  • the assembling apparatus 1 includes the cylinder positioning unit 10, the main frame insertion unit 20, the rotor measurement unit 30, the subframe adjustment unit 40, the subframe measurement unit 50, the operation unit 60, the control unit 70, and welding. It is composed of a unit 80.
  • the assembling apparatus 1 in addition to the configuration called a unit, includes a cylindrical body positioning unit, a main frame insertion unit, a rotor measurement unit, a subframe adjustment unit, a subframe measurement unit, a calculation unit, a control unit, and a welding unit. It may be composed of called parts.
  • the subframe adjustment unit 40 may perform the functions of the arithmetic unit 60 and the control unit 70.
  • the computing unit 60 determines the welding conditions of high temperature, long time, or lower temperature, shorter time from the determination result of the subframe position adjustment amount calculation unit 640, and performs welding to the welding unit 80. I am doing it.
  • the present invention is not limited to this.
  • the method of determining the welding conditions is arbitrary.
  • Arithmetic unit 60 may determine welding conditions based on a database.
  • the storage unit 630 store a database indicating the relationship between the position adjustment amount calculated by the arithmetic unit 60 and the actual adjustment amount of the subframe adjustment unit 40, which has been obtained in advance by experiment. Then, the arithmetic unit 60 may read this database from the storage unit 630 and determine welding conditions based on the database. For example, when the difference between the position adjustment amount calculated by the operation unit 60 calculated from the database and the actual adjustment amount of the sub-frame adjustment unit 40 is larger than the threshold, the arithmetic unit 60 has a higher temperature than welding conditions below the threshold. It is preferable to determine the welding conditions for a long time or a wide area.
  • thermal stress is generated in the main frame 91 or sub frame 92 and the cylindrical body 93 by welding, and the main frame 91 or sub frame 92 and the cylindrical body 93 are deformed by the thermal stress,
  • the axis of the sub-frame 92 may be offset.
  • the storage unit 630 store a database indicating the amounts of deviation of the axis lines of the main frame 91 and the sub frame 92 and welding conditions, which are obtained through experiments in advance.
  • the arithmetic unit 60 may determine the welding conditions based on this database read from the storage unit 630.
  • the main frame 91 may tilt due to the magnetic force. As a result, the axes of the main frame 91 and the sub frame 92 may be shifted.
  • the holding force of the main frame 91 by the chuck member 230 be measured in advance, and the measured holding force be stored in the storage unit 630.
  • the arithmetic unit 60 may determine the welding conditions from the holding force read from the storage unit 630 and the load measured by the load sensor 320, that is, the magnitude and direction of the magnetic force between the rotor 914 and the stator 932.
  • Unit 60 may have the weld time of that particular weld location shorter than the weld times of other weld locations. Thereby, the main frame 91 can be made difficult to incline by reducing the influence of thermal strain.
  • the computing unit 60 may cause the control unit 70 to weld the particular weld point later than the welds of other weld points.
  • the welded portion previously welded becomes a support portion, and as a result, the rigidity of the main frame 91 can be enhanced and the main frame 91 can be hardly inclined.
  • the main frame 91 having the magnetized rotor 914 can be positioned and assembled with high accuracy, and a highly efficient compressor can be manufactured.
  • Reference Signs List 1 assembly apparatus 10 cylinder positioning unit, 20 main frame insertion unit, 30 rotor measurement unit, 40 subframe adjustment unit, 50 subframe measurement unit, 60 operation unit, 70 control unit, 80 welding unit, 91 main frame, 92 Sub frame, 93 cylinder, 94 compressor, 95 adapter, 96 measuring jig, 100 movable table, 110 positioning jig, 120 actuator, 130 bottom plate, 131 through hole, 132 post, 133 through hole, 134 top plate, DESCRIPTION OF SYMBOLS 200 mounting base, 210 lifting and lowering table, 211 block member, 212 actuator, 213 support

Abstract

組立装置(1)は、ロータを有するシャフトを回転可能に支持する主軸受が固定された円板状のメインフレーム(91)及び副軸受が固定された円板状のサブフレーム(92)を、内壁にステータが固定された円筒体(93)の径方向内側に挿入すると共に、シャフトを第二の軸受に挿入して、メインフレーム(91)、サブフレーム(92)及び、円筒体(93)を組み立てる。組立装置(1)は、メインフレーム挿入ユニット(20)、ロータ計測ユニット(30)、サブフレーム調整ユニット(40)及び溶接ユニット(80)を備える。

Description

圧縮機の組立装置及び圧縮機の組立方法
 本発明は圧縮機の組立装置及び圧縮機の組立方法に関する。
 圧縮機の組立装置には、ロータを有するシャフトを回転可能に支持する主軸受が固定された円板状のメインフレームと、副軸受が固定された円板状のサブフレームと、を内壁にステータが固定された円筒体に挿入して、圧縮機を組み立てるものがある。
 このような組立装置では、圧縮効率が高い圧縮機を組み立てるため、メインフレームの主軸受の軸線とサブフレームの副軸受の軸線を一致させることが必要である。そこで、メインフレームとサブフレームを高い精度で組み立てる組立装置が開発されている。
 例えば、特許文献1には、メインフレームを載置可能な水平面を有する載置台と、基準面にサブフレームを当接させた状態でサブフレームを固定可能な固定台と、載置台と固定台との間で昇降し、円筒体が保持可能な保持アームと、を有する圧入ユニットと、メインフレームとサブフレームを溶接可能な溶接ユニットと、を備える組立装置が開示されている。
 特許文献1に記載の組立装置では、固定台の基準面を水平にすることで、メインフレームの主軸受の軸線と、サブフレームの副軸受の軸線と、を平行にしている。そして、この状態のままで、溶接ユニットは、メインフレームとサブフレームを円筒体に溶接している。これにより、軸線が平行にされた圧縮機を組み立てている。
 特許文献2には、特許文献1に記載の載置台、固定台、圧入ユニット、及び溶接ユニットに加えて、円筒体を予熱する予熱部を備える組立装置が開示されている。特許文献2に記載の組立装置では、予熱部が円筒体を予熱して円筒体を熱膨張させ、サブフレームを円筒体に圧入する。これにより、サブフレームを円筒体で固定し、サブフレームと円筒体の溶接後の軸線のずれを防いでいる。
特開2005-195005号公報 特開2007-77850号公報
 特許文献1に記載の組立装置では、溶接ユニットがメインフレームと円筒体を溶接した後、溶接によるひずみが発生してメインフレームに対してサブフレームがずれることがある。このため、圧縮機を高い精度で組み立てることが難しい。
 特許文献2に記載の組立装置でも、溶接ユニットがメインフレームと円筒体を溶接した後、溶接によるひずみによってメインフレームに対してサブフレームがずれることがある。その結果、圧縮機を高い精度で組み立てることが難しい。
 本発明は上記の課題を解決するためになされたもので、メインフレームとサブフレームを高い精度で組み立てる圧縮機の組立装置及び圧縮機の組立方法を提供することを目的とする。
 上記の目的を達成するため、本発明に係る圧縮機の組立装置は、ロータを有するシャフトを回転可能に支持する第一の軸受が固定された円板状の第一のフレーム、及び、第二の軸受が固定された円板状の第二のフレームを、内壁にステータが固定された円筒体の径方向内側に挿入すると共に、シャフトを第二の軸受に挿入して、第一のフレーム、第二のフレーム及び、円筒体を組み立てる圧縮機の組立装置である。圧縮機の組立装置は、第一のフレーム挿入部、第二のフレーム挿入部、計測部、記憶部、判定部、調整部、及び溶接部を備える。第一のフレーム挿入部は、円筒体に第一のフレームを挿入する。第二のフレーム挿入部は、円筒体に第二のフレームを挿入する。計測部は、第一のフレーム挿入部が第一のフレームを円筒体に挿入し、シャフトが円筒体の径方向内側に配置された状態で、ロータのステータに対する位置を計測する。記憶部は、ロータのステータに対する位置と、溶接後の第一のフレームと第二のフレームの位置ずれ量とに関する第一のデータ、および、溶接前の第一のフレームと第二のフレームの位置ずれ量と、溶接後の第一のフレームと第二のフレームの位置ずれ量との関係を示す第二のデータが記憶されている。判定部は、計測部によって計測された位置データ、および、記憶部に記憶された第一のデータに基づき、第一のフレームに対する第二のフレームの位置を調整するか否か判定する。調整部は、判定部で第一のフレームに対する第二のフレームの位置を調整すると判定された場合に、記憶部に記憶された第二のデータに基づき、第一のフレームに対する第二のフレームの位置を調整する。溶接部は、第一のフレームと第二のフレームを円筒体に溶接する。
 本発明の構成によれば、判定部が、計測部によって計測された位置データ、および、記憶部に記憶された第一のデータに基づき、第一のフレームに対する第二のフレームの位置を調整するか否か判定し、調整部が、調整すると判定された場合に、記憶部に記憶された第二のデータに基づき、第一のフレームに対する第二のフレームの位置を調整する。そして、溶接部が、位置が調整された第一のフレームと第二のフレームを円筒体に溶接する。このため、メインフレームとサブフレームを正確な位置で溶接することができる。その結果、メインフレームとサブフレームを高い精度で組み立てることができる。
本発明の実施の形態に係る圧縮機の組立装置が組み合わせるメインフレーム、サブフレーム及び円筒体の断面図 本発明の実施の形態に係る圧縮機の組立装置が組み立てた圧縮機の断面図 本発明の実施の形態に係る圧縮機の組立装置の断面図 図3に示すIV領域の拡大断面図 図3に示すV領域の拡大断面図 図3に示すVI領域の拡大断面図 本発明の実施の形態に係る圧縮機の組立装置が備える演算ユニットの構成図 図7に示す記憶部に記憶された溶接位置ずれテーブル 本発明の実施の形態に係る圧縮機の組立装置を用いた組立処理のフローチャート 本発明の実施の形態に係る圧縮機の組立装置で使用するサブフレーム位置決め治具の正面図 図9に示す挿入溶接処理のフローチャート ロータ計測ユニットの変形例の断面図
 以下、本発明の実施の形態に係る圧縮機の組立装置及び圧縮機の組立方法について図面を参照して詳細に説明する。なお、図中、同一又は同等の部分には同一の符号を付す。図に示す直交座標系XYZにおいて、組立装置に対して作業者側を正面とした場合の、左右方向がX軸、上下方向がZ軸、X軸とZ軸とに直交する方向がY軸である。以下、適宜、この座標系を引用して説明する。
(実施の形態)
 実施の形態に係る圧縮機の組立装置は、圧縮機の部品であるメインフレームと、サブフレームと、円筒体と、を組み合わせて圧縮機を組み立てる組立装置である。この組立装置では、メインフレームとサブフレームを高い精度で組み立てるため、溶接後のメインフレームとサブフレームの位置が許容できる位置か否かを判定するための溶接位置ずれテーブルを用いて、溶接前に、メインフレームに対するサブフレームの位置が調整されて圧縮機が組み立てられる。まず図1、図2を参照して、組立装置が組み合わせるメインフレーム、サブフレーム及び円筒体の構成について説明する。続いて、図3-図8を参照して、組立装置の構成について説明する。
 図1は本発明の実施の形態に係る圧縮機の組立装置が組み合わせるメインフレーム91、サブフレーム92及び円筒体93の断面図である。図2は、本発明の実施の形態に係る圧縮機の組立装置が組み立てた圧縮機94の断面図である。
 メインフレーム91は、圧縮機94のフレームを構成する部品である。メインフレーム91には、図1に示すように、コンプライアントフレーム912、主軸受913、ロータ914及び、シャフトであるクランクシャフト915が取り付けられている。なお、本明細書では、メインフレーム91を第一のフレームといい、主軸受913を第一の軸受ともいう。
 詳細には、メインフレーム91は、円環板状部911Aと、円環板状部911Aの内壁と連続し、+Z方向に突出する小円筒部911Bと、円環板状部911Aの外壁と連続し、-Z方向に突出する大円筒部911Cと、を有する形状に形成されている。そして、メインフレーム91の内壁にはコンプライアントフレーム912と、コンプライアントフレーム912と一体的に形成され、電動機のロータ914が取り付けられたクランクシャフト915を回転可能に支持する主軸受913と、が嵌め込まれている。ここで、コンプライアントフレーム912とは、クランクシャフト915の軸方向の力を受けて軸方向に移動可能なフレームのことである。また、本明細書では、クランクシャフト915をシャフトともいう。メインフレーム91では、クランクシャフト915が主軸受913からメインフレーム91の+Z側へ延在している。
 一方、サブフレーム92は、圧縮機94のもう一つのフレームを構成する部品である。サブフレーム92には、副軸受921が取り付けられている。詳細には、サブフレーム92は、外周が壁で取り囲まれた円板の形状に形成されている。そして、サブフレーム92の中心には、圧縮機が組み立てられたときのクランクシャフト915の+Z端を回転可能に支持する副軸受921が嵌め込まれている。なお、本明細書では、サブフレーム92は、第二のフレームといい、副軸受921は、第二の軸受ともいう。
 また、円筒体93は、円筒シェルと呼ばれる、圧縮機の部品を収容する容器を構成する部品である。円筒体93には、ステータ932が取り付けられている。詳細には、円筒体93の内壁に、圧縮機が組み立てられたときにロータ914と対向するステータ932が固定されている。
 なお、本明細書では、以下、メインフレーム91、サブフレーム92、円筒体93は、上述した部品が取り付けられた状態であっても、単にメインフレーム91、サブフレーム92、円筒体93と称するものとする。
 メインフレーム91とサブフレーム92は、矢印A、Bに示すように、円筒体93の-端と+Z端とに嵌め込まれることで、組み合わされる。そして、図2に示すように、組み合わされたメインフレーム91とサブフレーム92を円筒体93に溶接して、溶接部931を形成することで圧縮機94が組み立てられる。
 圧縮機94の組立では、メインフレーム91の主軸受913とサブフレーム92の副軸受921の軸線を一致させて、圧縮効率が高い圧縮機94を組み立てることが望ましい。そこで、圧縮機94の組立には、組立装置が使用される。次に、図3-図8を参照して、組立装置の構成について説明する。
 図3は、本発明の実施の形態に係る圧縮機の組立装置1の断面図である。図4は、図3に示すIV領域の拡大断面図である。図5は、図3に示すV領域の拡大断面図である。図6は、図3に示すVI領域の拡大断面図である。図7は、本発明の実施の形態に係る圧縮機の組立装置1が備える演算ユニット60の構成図である。図8は、図7に示す記憶部630に記憶された溶接位置ずれテーブルである。
 なお、図3-図6では、組立対象のメインフレーム91、サブフレーム92、及び円筒体93が組立装置1に載置された状態、すなわち、圧縮機94が組み立てられる前の状態の組立装置1を示している。また、図5では、図3に示す電源装置820を省略している。
 図3に示すように、組立装置1は、円筒体93を位置決めする円筒体位置決めユニット10と、載置台200を上昇させてメインフレーム91をサブフレーム92に挿入するメインフレーム挿入ユニット20と、メインフレーム91のロータ914の位置座標を計測するロータ計測ユニット30と、サブフレーム92の位置を調整するサブフレーム調整ユニット40と、サブフレーム92の位置座標を計測するサブフレーム計測ユニット50と、ロータ計測ユニット30とサブフレーム計測ユニット50が計測した位置座標データからサブフレームの位置を求める演算ユニット60と、サブフレーム92を演算ユニット60が求めたサブフレームの位置に移動させる制御ユニット70と、メインフレーム91をサブフレーム92に溶接する溶接ユニット80と、で構成されている。
 円筒体位置決めユニット10は、図4に示すように、円筒体93が載置される可動テーブル100と、可動テーブル100に載置された円筒体93を位置決めするための位置決め治具110と、可動テーブル100をXYZ軸方向、X軸を回動中心とするθ軸方向、及びY軸を回動中心とするφ軸方向に可動させるアクチュエータ120と、アクチュエータ120を支持する底板130と、で構成されている。
 アクチュエータ120は、円筒体93が可動テーブル100に載置された場合に、可動テーブル100を駆動して、円筒体93を位置決め治具110によって位置決めする定位置に移動させる。
 一方、位置決め治具110は、可動テーブル100から+Z側に延在する突起を備えている。位置決め治具110は、作業者がこの突起に円筒体93を当接させることで、円筒体93を位置決めする。
 底板130は、XY平面に平行に配置されている。そして、底板130のX方向中央には、円筒体93に挿入されるメインフレーム91を挿通させることができる貫通孔131が形成されている。また、底板130には、X方向端部に+Z側へ延在する支柱132が固定されている。支柱132は、X方向中央に形成された貫通孔133を有する天板134を支持している。支柱132は、天板134を底板130と平行に配置している。
 メインフレーム挿入ユニット20は、図3に示すように、円筒体93にメインフレーム91を挿入するため、円筒体93を位置決めする円筒体位置決めユニット10の-Z側に配設されている。メインフレーム挿入ユニット20は、図5に示すように、メインフレーム91が載置される載置台200と、メインフレーム91を円筒体位置決めユニット10のメインフレーム91に挿入するため、載置台200を昇降させる昇降テーブル210と、昇降テーブル210の+Z面側に設けられ、載置台200を可動させる可動テーブル220と、載置台200に載置されるメインフレーム91を掴むチャック部材230と、昇降テーブル210に取り付けられた取り付け台241に固定された変位センサ240と、で構成されている。なお、本明細書では、メインフレーム挿入ユニット20を第一のフレーム挿入部ともいう。
 載置台200には、+Z側に突出する凸部が形成されている。載置台200には、メインフレーム91が載置され、凸部は、そのメインフレーム91が備えるクランクシャフト915の-Z端を支持する。
 メインフレーム挿入ユニット20は、Z方向に延在する支柱213を備えている。支柱213には、支柱213に沿って配設され、ブロック部材211をZ方向に駆動させるアクチュエータ212が設けられている。昇降テーブル210は、ブロック部材211に支持され、アクチュエータ212によって昇降する。
 可動テーブル220は、昇降テーブル210の+Z面側に設けられた別のアクチュエータ221によって可動される。アクチュエータ221は、可動テーブル220をXYZ軸方向、X軸を回動中心とするθ軸方向、及びY軸を回動中心とするφ軸方向に駆動する。これにより、可動テーブル220は、これらの方向に可動して、+Z側面に配設された載置台200を可動させる。
 チャック部材230は、図5に示さないが昇降テーブル210に設けられている。チャック部材230は、載置台200よりも+Z側に延在する複数の突起を備えている。チャック部材230は、それらの突起を載置台200に載置されるメインフレーム91の内壁に当接させることにより、メインフレーム91を掴持する。これにより、チャック部材230は、メインフレーム91を位置決めする。
 一方、変位センサ240は、チャック部材230によって位置決めされたメインフレーム91の位置座標、例えば、中心軸の位置座標、外壁の傾き等を測定する。変位センサ240は、測定した位置座標データを演算ユニット60に出力する。
 ロータ計測ユニット30は、図3に示すように、メインフレーム挿入ユニット20によって+Z側へ上昇したメインフレーム91のロータ914の位置座標を計測するため、すなわち、円筒体位置決めユニット10側へ上昇したメインフレーム91のロータ914の位置座標を計測するため、円筒体位置決めユニット10の+Z側に配設されている。ロータ計測ユニット30は、図6に示すように、メインフレーム91のクランクシャフト915の+Z端に嵌合可能な嵌合シャフト310と、嵌合シャフト310の-Z端に配設された荷重センサ320と、で構成されている。なお、本明細書では、ロータ計測ユニット30を計測部ともいう。
 嵌合シャフト310の+Z端は、シャフトホルダ311に固定されている。そして、嵌合シャフト310は、シャフトホルダ311によってZ方向に向けられている。
 シャフトホルダ311は、X方向両端に、ガイドシャフト312に沿って移動可能なリニアブッシュ313を有している。また、シャフトホルダ311は、アクチュエータ314によってZ軸方向に駆動されるブロック315に固定されている。これにより、嵌合シャフト310は、Z軸方向に昇降する。
 一方、嵌合シャフト310の-Z端側は、上述した天板134の+Z側面に当接する支持板316に嵌め込まれた軸受317によって回転可能に支持されている。そして、嵌合シャフト310は、軸受317を通って、さらに-Z側へ延在している。嵌合シャフト310の-Z端には、クランクシャフト915の+Z端に嵌合可能な、図示しない嵌合部が形成されている。その嵌合部については、後述する組立装置1の動作で後述する。
 荷重センサ320は、嵌合シャフト310の嵌合部がクランクシャフト915の+Z端に嵌合したときの荷重を計測する。すなわち、荷重センサ320は、クランクシャフト915の負荷を計測する。荷重センサ320は、測定した荷重データ、すなわち、負荷データを演算ユニット60に出力する。
 サブフレーム調整ユニット40は、サブフレーム92を円筒体93に挿入してその位置を調整する、いわゆる調芯ユニットである。サブフレーム調整ユニット40は、サブフレーム92を円筒体93の+Z端に挿入するため、図4に示すように、円筒体位置決めユニット10の天板134の近傍に配設されている。そして、サブフレーム調整ユニット40は、天板134の-Z側に配置された、サブフレーム92が載置される可動テーブル400を備えている。なお、本明細書では、サブフレーム調整ユニット40のことを、第二のフレーム挿入部又は調整部ともいう。
 組立装置1では、サブフレーム92と円筒体93に挿入する際に、サブフレーム92の位置を調整するため、サブフレーム92にアダプタ95が取り付けられる。また、サブフレーム92の位置座標を計測するため、アダプタ95に計測用治具96が取り付けられる。詳細には、+Z側に向かってアダプタ95、計測用治具96の順序で、アダプタ95と計測用治具96がサブフレーム92の+Z側に取り付けられる。
 可動テーブル400は、図4に示さないが、アダプタ95の一部が載置可能なテーブル面を有する。そして、可動テーブル400は、アクチュエータ410によってXYZ軸方向、X軸を回動中心とするθ軸方向、及びY軸を回動中心とするφ軸方向に駆動される。これにより、可動テーブル400は、アダプタ95を介して、計測用治具96とサブフレーム92を移動させる。その結果、可動テーブル400は、サブフレーム92の位置を調整する。なお、アクチュエータ410は、原点位置からの移動座標データを演算ユニット60に出力する。演算ユニット60については後述する。
 サブフレーム計測ユニット50は、可動テーブル100によって可動する計測用治具96を測定するため、可動テーブル100と同様に、円筒体位置決めユニット10の天板134の近傍に配設されている。サブフレーム計測ユニット50は、天板134から-Z側へ延在するブラケット510と、ブラケット510に設置された変位センサ520と、で構成されている。
 変位センサ520は、ブラケット510によって、計測用治具96のX方向に配置されている。これにより、変位センサ520は、計測用治具96の位置座標を計測する。変位センサ520は、測定した位置座標データを演算ユニット60に出力する。
 演算ユニット60は、組立装置1が備えるCPU(Central Processing Unit)が記憶部630に記憶された挿入溶接処理プログラムを実行することによって実現されている。演算ユニット60は、図7に示すように、サブフレーム計測ユニット50の変位センサ520が測定した位置座標データからサブフレーム92の位置座標を算出するサブフレーム位置算出部610と、メインフレーム挿入ユニット20の変位センサ240が測定した位置座標データからメインフレーム91の位置座標を算出するメインフレーム位置算出部620と、溶接位置ずれテーブル631と溶接後位置テーブル632が記憶された記憶部630と、ロータ計測ユニット30の荷重センサ320の負荷データが許容できるか否かを溶接位置ずれテーブル631に基づいて判定し、かつ、許容できないと判定した場合に、溶接後位置テーブル632に基づいてサブフレーム92の位置調整量を演算するサブフレーム位置調整量算出部640と、溶接ユニット80の溶接条件を決定する溶接条件決定部650と、で構成されている。
 サブフレーム位置算出部610は、サブフレーム調整ユニット40のアクチュエータ410が出力する移動座標データと、サブフレーム計測ユニット50の変位センサ520が出力する位置座標データと、に基づいて、サブフレーム92の中心軸の位置座標を算出する。
 メインフレーム位置算出部620は、メインフレーム挿入ユニット20の変位センサ240の出力データに基づいて、メインフレーム91の中心軸の位置座標を算出する。
 記憶部630には、予め実験により作成された、荷重センサ320が測定する負荷データと、溶接後のメインフレーム91とサブフレーム92の位置ずれ量が許容できるか否かの可否データと、が関連づけられた、図8に示す溶接位置ずれテーブル631が記憶されている。そして、溶接位置ずれテーブル631には、XYZ軸方向の負荷データ、すなわち、負荷[Fx1、Fy1、Fz1]、[Fx2、Fy2、Fz2]、・・と、その負荷データが取得された場合の溶接後のメインフレーム91とサブフレーム92の位置ずれ量が許容できるか否か、すなわち、メインフレーム91とサブフレーム92が適正な精度で配置されているか否か、のデータであるOK、NG、・・とが関連付けされている。なお、本明細書では、溶接位置ずれテーブル631を第一のデータともいう。
 また、記憶部630には、予め実験により作成された、高い精度で圧縮機94が組み立てられたときの、溶接前のメインフレーム91とサブフレーム92の位置ずれ量と、溶接後のメインフレーム91とサブフレーム92の位置ずれ量と、が関連づけられた溶接後位置テーブル632が記憶されている。そして、溶接後位置テーブル632には、高い精度で組み立てられた圧縮機94の、溶接前でのメインフレーム91の中心軸のXYZ座標、そのXYZ座標と溶接前でのサブフレーム92の中心軸のXYZ座標とを結ぶ直線のXY平面での傾き、及びZ軸に対する傾きのデータ、すなわち溶接前の位置座標[ΔXb、ΔYb、ΔZb、Δθb、Δφb]、・・と、溶接後のメインフレーム91の中心軸のXYZ座標、そのXYZ座標と溶接後のサブフレーム92の中心軸のXYZ座標とを結ぶ直線のXY平面での傾き、及びZ軸に対する傾きのデータ、すなわち溶接後の位置座標[ΔXb、ΔYb、ΔZb、Δθb、Δφb]、・・と、が関連づけられている。なお、本明細書では、溶接後テーブル632を第二のデータともいう。
 サブフレーム位置調整量算出部640は、記憶部630に記憶された溶接位置ずれテーブル631を用いて、荷重センサ320が測定した負荷データに対応する溶接後の位置ずれ量が許容できる位置ずれ量であるか否かを判定する。
 許容できない位置ずれ量であると判定した場合、サブフレーム位置調整量算出部640は、サブフレーム位置算出部610が算出したサブフレーム92の中心軸の位置座標と、メインフレーム位置算出部620が算出したメインフレーム91の中心軸の位置座標と、からメインフレーム91の中心軸に対するサブフレーム92の中心軸のずれ量を算出し、高い精度で組み立てられる場合のデータを示している溶接後位置テーブル632の中から、算出されたずれ量に最も近い溶接前の位置ずれ量を選定する。そして、選定された位置ずれ量と算出されたずれ量とを比較することにより、サブフレーム92の位置調整量を算出する。そして、サブフレーム位置調整量算出部640は、算出した位置調整量を制御ユニット70に出力する。
 一方、許容できると判定した場合、サブフレーム位置調整量算出部640は、サブフレーム92の位置調整量をゼロとし、その結果を制御ユニット70に出力する。また、サブフレーム位置調整量算出部640は、負荷データが許容できるか否かの判定結果を溶接条件決定部650に出力する。なお、本明細書では、サブフレーム位置調整量算出部640のことを、負荷データが許容できるか否かを判定することから、判定部ともいう。
 溶接条件決定部650は、サブフレーム位置調整量算出部640の判定結果から溶接条件を決定する。溶接条件決定部650は、判定結果が許容できないとされている場合、サブフレーム92の位置調整をするため、比較的高温、長時間の溶接条件を制御ユニット70に出力する。判定結果が許容できるとされている場合、より低温、より短時間の溶接条件を制御ユニット70に出力する。
 図3に戻って、制御ユニット70は、演算ユニット60に演算の指令を行い、演算ユニット60の演算結果に基づき、サブフレーム調整ユニット40と溶接ユニット80を動作させる。制御ユニット70は、例えば、サブフレーム位置調整量算出部640の出力データに基づいて、サブフレーム調整ユニット40のアクチュエータ410を駆動して可動テーブル400を移動させる。これにより、サブフレーム92の位置を移動させる。また、制御ユニット70は、後述する溶接ユニット80の電源装置820の電力を制御する。
 溶接ユニット80は、調芯されたサブフレーム92とメインフレーム91とを溶接するため、図3に示すように、ブラケット811に固定された溶接トーチ810と、溶接トーチ810に電力を供給する電源装置820と、を備えている。なお、本明細書では、溶接ユニット80を溶接部ともいう。
 溶接トーチ810は、メインフレーム91と円筒体93、サブフレーム92と円筒体93を溶接するため、支柱132の-Z側の部分と+Z側の部分とに配設されている。図3では、溶接トーチ810が-X側にある支柱132にだけ配設されているが、溶接トーチ810は、+X側にある支柱132にも同様に、支柱132の-Z側の部分と+Z側の部分とに配設されている。これにより、溶接トーチ810は、メインフレーム91と円筒体93、サブフレーム92と円筒体93を、円筒体93の円周方向に120°毎に溶接することが可能である。
 電源装置820は、ケーブル821によって溶接トーチ810に接続されている。電源装置820は、制御ユニット70にも接続され、制御ユニット70によって溶接トーチ810に供給する電力が制御される。
 次に、図9-図11を参照して、組立装置1の動作について説明する。以下の説明では、
円筒体位置決めユニット10の可動テーブル100に円筒体93が載置されておらず、メインフレーム挿入ユニット20の載置台200にメインフレーム91が載置されていないことを前提とする。また、サブフレーム調整ユニット40の可動テーブル400にも、サブフレーム92が載置されていないものとする。また、円筒体位置決めユニット10の可動テーブル100とメインフレーム挿入ユニット20の載置台200は、図3に示す位置にあることを前提とする。円筒体位置決めユニット10の可動テーブル100は、図3に示す位置よりも-Z側に位置することを前提とする。
 図9は、本発明の実施の形態に係る圧縮機の組立装置1を用いた組立処理のフローチャートである。図10は、本発明の実施の形態に係る圧縮機の組立装置1で使用するサブフレーム位置決め治具1000の正面図である。図11は、図9に示す挿入溶接処理のフローチャートである。
 まず、上述した構成のメインフレーム91、サブフレーム92、円筒体93、計測用治具96、アダプタ95を用意する。そして、手作業で、サブフレーム92の、円筒体93に挿入される側と反対の側にアダプタ95を取り付け、さらにその上に計測用治具96を取り付ける。
 次に、図9に示すように、計測用治具96とアダプタ95が取り付けられたサブフレーム92を、サブフレーム92に対して計測用治具96を+Z側に向けた状態で、可動テーブル400に取り付けて、サブフレーム92の位置決めをする(ステップS1)。位置決めでは、サブフレーム計測ユニット50の変位センサ520で計測用治具96の位置座標を計測し、計測された位置座標に基づいて可動テーブル400を移動させる。これにより、サブフレーム92を水平にする。また、サブフレーム92をサブフレーム調整ユニット40の中心に配置する。
 次に、円筒体93を可動テーブル100に載置する。続いて、載置された円筒体93を位置決め治具110を用いて位置決めする(ステップS2)。位置決めは、円筒体93の内側壁を位置決め治具110に当接させて行う。また、位置決め後、可動テーブル100を上昇させて、円筒体93に、サブフレーム92を挿入する。なお、本明細書では、この工程をサブフレーム挿入工程又は第二のフレーム挿入工程という。
 次に、図10に示すサブフレーム位置決め治具1000を用いて、円筒体93のステータ932の位置決めをする(ステップS3)。ここで、サブフレーム位置決め治具1000は、図10に示すように、メインフレーム挿入ユニット20のチャック部材230が掴持可能な台部1010と、台部1010から+Z方向に延在し、円筒体93のステータ932間に形成される空間に嵌入可能な円筒部1020と、で構成された治具である。
 詳細には、まず、サブフレーム位置決め治具1000を、図5に示すメインフレーム挿入ユニット20の載置台200に載置する。次に、載置台2に載置されたサブフレーム位置決め治具1000の台部1010をメインフレーム挿入ユニット20のチャック部材230で掴持して、サブフレーム位置決め治具1000の位置決めをする。次に、メインフレーム挿入ユニット20の載置台200を上昇させ、位置決めがされたサブフレーム位置決め治具1000を、図4に示す可動テーブル100にある円筒体93に挿入する。これにより、円筒体93のステータ932間に形成される空間に、サブフレーム位置決め治具1000の円筒部1020が嵌入される。その結果、ステータ932が位置決めされる。この状態で、図示しない固定手段によって、円筒体93を可動テーブル100に固定して、ステータ932を定位置に固定する。円筒体93を固定した後、図5に示す載置台200を下降させて、サブフレーム位置決め治具1000を円筒体93から抜き取る。円筒体93から抜き取った後、サブフレーム位置決め治具1000をチャック部材230から取り外して、載置台200から取り出す。
 次に、図9に示すように、メインフレーム91を載置台200に載置し、載置台200に載置されたメインフレーム91をチャック部材230で掴持してメインフレーム91の位置決めをする(ステップS4)。
 次に、作業者は、メインフレーム91を位置決めした後、組立装置1の起動キーを押す。制御ユニット70は、図9に示すように、起動キーの出力信号により、挿入溶接処理をスタートさせる(ステップS5)。次に、図11を参照して挿入溶接処理を説明する。
 制御ユニット70は、図11に示すように、載置台200を上昇させて、メインフレーム91を仮位置まで上昇させる(ステップS51)。ここで、仮位置とは、載置台200に載置されたメインフレーム91のクランクシャフト915が、サブフレーム92のステータ932よりも-Z側にあるメインフレーム91の位置のことである。後述するように、仮位置は、荷重センサ320で負荷を計測する位置である。なお、本明細書では、この工程をメインフレーム挿入工程又は第一のフレーム挿入工程という。
 次に、制御ユニット70は、ロータ計測ユニット30のアクチュエータ314を駆動して、嵌合シャフト310のシャフトホルダ311を下降させる。そして、嵌合シャフト310の嵌合部をクランクシャフト915の+Z端に嵌合させる(ステップS52)。
 次に、制御ユニット70は、嵌合シャフト310の嵌合部がクランクシャフト915の+Z端に嵌合した状態で、ロータ計測ユニット30の荷重センサ320で負荷を計測する(ステップS53)。この状態では、クランクシャフト915が、ステータ932よりも-Z側に位置しているため、メインフレーム91のロータ914がステータ932の近傍に位置している。その結果、ロータ914とステータ932との間に磁力が作用し、クランクシャフト915に力がかかる。制御ユニット70は、荷重センサ320で、その力による負荷を計測する。このとき、制御ユニット70は、ロータ計測ユニット30のアクチュエータ314をトルク制御して、嵌合シャフト310に加わる力を一定にする。荷重センサ320は、測定した負荷データを演算ユニット60に出力する。なお、本明細書では、この工程は、負荷データがロータ914のステータ932に対する位置を示すデータとなることから、ロータ計測工程又は計測工程という。
 制御ユニット70は、荷重センサ320で負荷を計測した後、ロータ計測ユニット30のアクチュエータ314を駆動して、嵌合シャフト310のシャフトホルダ311を上昇させる。続いて、制御ユニット70は、載置台200を上昇させて、メインフレーム91を上昇させる。制御ユニット70は、メインフレーム91を、メインフレーム91のクランクシャフト915の+Z端がサブフレーム92の副軸受921に挿入される位置まで上昇させる。なお、この位置を挿入位置という。これにより、制御ユニット70は、サブフレーム92にメインフレーム91を取り付ける(ステップS54)。
 次に、制御ユニット70は、サブフレーム位置算出部610にサブフレーム計測ユニット50の変位センサ520が計測した位置座標データを取得させる。サブフレーム位置算出部610は、取得した位置座標データからサブフレーム92の中心軸の位置座標を算出する(ステップS55)。
 続いて、制御ユニット70は、メインフレーム位置算出部620にメインフレーム挿入ユニット20の変位センサ240が計測した位置座標データを取得させる。メインフレーム位置算出部620は、取得した位置座標データからメインフレーム91の中心軸の位置座標を算出する(ステップS56)。
 次に、制御ユニット70は、サブフレーム位置調整量算出部640に、ロータ計測ユニット30の荷重センサ320が測定した負荷データに基づいてサブフレーム92の位置調整が必要であるか否かを判定させる。サブフレーム位置調整量算出部640は、位置調整が必要と判定した場合に、サブフレーム92の位置調整量を算出する(ステップS57)。
 詳細には、上述したように、サブフレーム位置調整量算出部640は、荷重センサ320の負荷データが許容できる否か、換言すると、メインフレーム91のクランクシャフト915とサブフレーム92の中心軸とのずれを修正するために、サブフレーム92の位置調整が必要であるか否か、を溶接位置ずれテーブル631を用いて判定する。そして、サブフレーム位置調整量算出部640は、負荷データが許容できないと判定した場合、すなわち、位置調整が必要であると判定した場合、ステップS55で算出したサブフレーム92の中心軸の位置座標と、ステップS56で算出したメインフレーム91の中心軸の位置座標と、溶接後位置テーブル632と、に基づいて、サブフレーム92の位置調整量を算出する。サブフレーム位置調整量算出部640は、負荷データが許容できると判定した場合、すなわち、位置調整が必要でないと判定した場合、サブフレーム92の位置調整量をゼロとする。なお、本明細書では、この工程を判定工程という。
 次に、制御ユニット70は、サブフレーム位置調整量算出部640が算出したサブフレーム92の位置調整量に対応するサブフレーム92の適正位置に、サブフレーム92を移動させる(ステップS58)。詳細には、制御ユニット70は、サブフレーム調整ユニット40の可動テーブル400を可動させて、サブフレーム92を適正位置に移動させる。なお、本明細書では、この工程をサブフレーム調整工程又は調整工程という。
 サブフレーム92を適正位置に移動させた後、制御ユニット70は、溶接条件決定部650に溶接条件を決定させる。詳細には、上述したように、サブフレーム位置調整量算出部640の判定結果に基づき、溶接条件を決定する。その後、制御ユニット70は、溶接ユニット80に決定された溶接条件でメインフレーム91と円筒体93、サブフレーム92と円筒体93の溶接をさせる(ステップS59)。この溶接では、溶接ユニット80は、円筒体93の円周方向に120°毎に溶接する。なお、本明細書では、この工程を溶接工程という。
 次に、制御ユニット70は、チャック部材230にメインフレーム91を解放させ、その後、載置台200を下降させる(ステップS60)。以上により、挿入溶接処理が終了する。
 挿入溶接処理が終了すると、図9に示す組立処理に戻る。メインフレーム91、サブフレーム92、及び円筒体93の組立が完了した状態であるため、組立処理も終了する。以上の処理により、圧縮機94が組み立てられる。
 なお、組立処理をステップS1、S2、S3、S4の順序で行うと説明しているが、組立処理では、メインフレーム91の載置台200への載置と位置決め(ステップS4)の後に、サブフレーム92の可動テーブル400へ取り付けと位置決め(ステップS1)をしてもよい。この場合、ステップS2で行う、可動テーブル100を上昇させて円筒体93にサブフレーム92を挿入する工程をステップS1で行えばよい。
 以上のように、本発明の実施の形態に係る圧縮機の組立装置1では、サブフレーム調整ユニット40が、ロータ計測ユニット30の荷重センサ320で計測した負荷データが許容できるか否かを溶接位置ずれテーブル631に基づいて判定する。そして、許容できないと判定した場合に、サブフレーム調整ユニット40がサブフレーム92の位置を調整する。さらに、組立装置1では、サブフレーム92の位置が調整された状態で、溶接ユニット80がメインフレーム91とサブフレーム92を円筒体93に溶接する。このため、組立装置1では、溶接による位置ずれが発生しにくい。その結果、メインフレーム91とサブフレーム92を正確な位置で溶接することができ、メインフレーム91とサブフレーム92を高い精度で組み立てることができる。
 溶接位置ずれテーブル631では、荷重センサ320が測定する負荷データと溶接後のメインフレーム91とサブフレーム92の位置ずれ量が許容できるか否かが、関連づけられている。このため、組立装置1は、負荷データを測定するだけで、溶接後のメインフレーム91とサブフレーム92の位置ずれ量が許容できるか否か、すなわち、組立精度が高いか否かを容易に予測することができる。その結果、組立装置1では、簡易な構成で、メインフレーム91とサブフレーム92を高い精度で組み立てるか否かを予測して、メインフレーム91に対するサブフレーム92の位置を調整することができる。
 また、荷重センサ320が測定する負荷データは、ロータ914とステータ932との間の磁力に依存する。組立装置1では、負荷データ、すなわち、ロータ914とステータ932との間の磁力に基づいて、サブフレーム92の位置を調整するか否かを判定するため、効率が低い圧縮機の組立を防止することができる。
 以上、本発明の実施の形態を説明したが、本発明は上記の実施の形態に限定されるものではない。例えば、実施の形態では、嵌合シャフト310をメインフレーム91のクランクシャフト915に嵌合させて、荷重センサ320で負荷データを測定している。しかし、本発明はこれに限定されない。本発明では、ロータ914のステータ932に対する位置が計測され、組立装置1が測定された位置データに基づいてサブフレーム92の位置を調整すればよい。
 図12は、ロータ計測ユニット30の変形例の断面図である。
 図12に示すように、ロータ計測ユニット300は、コギングトルク計測器であってもよい。詳細には、ロータ計測ユニット300は、メインフレーム91のクランクシャフト915に接続可能なシャフト部301と、シャフト部301に接続されたクランクシャフト915を回転させて、コギングトルクを計測する計測部302と、を備えるコギングトルク計測器であってもよい。この場合、ロータ計測ユニット300は、メインフレーム91に対してZ方向に配置されるとよい。例えば、図12に示すように、メインフレーム91に対して-Z方向に配置されてもよい。図12に示す形態の場合、載置台200がZ方向に貫通する貫通孔を有し、シャフト部301が貫通孔に挿通され、かつシャフト部301が伸縮可能であるとよい。このような形態の場合、ロータ計測ユニット300が測定したコギングトルクからロータ914とステータ932との間の磁力の大きさ、向きを求めて、求めた磁力の大きさ、向きからロータ914のステータ932に対する位置を推定することができる。
 なお、ロータ計測ユニット300のコギングトルク計測器は、コギングトルク測定器、コギングトルク計測部等と称されるものであってもよい。また、実施の形態の荷重センサは、ロードセル、荷重変換器、荷重計測部等称されるものであってもよい。
 上記実施の形態では、溶接位置ずれテーブル631が、メインフレーム91の中心軸とサブフレーム92の中心軸とのXYZ方向のずれ量、それら中心軸を結ぶ直線のXY平面での傾き、及びZ軸に対する傾きを含んでいる。しかし、溶接位置ずれテーブル631は、サブフレーム92の調整に必要な位置ずれ量を含んでいればよい。例えば、溶接位置ずれテーブル631に含まれる溶接後の位置ずれ量は、XY平面での傾きとZ軸に対する傾きのデータだけでもよい。このような位置ずれ量を含むテーブルであっても、サブフレーム位置算出部610が算出したサブフレーム92の中心軸の位置座標と、メインフレーム位置算出部620が算出したメインフレーム91の中心軸の位置座標と、溶接位置ずれテーブル631が含む、上記のXY平面での傾き及びZ軸に対する傾きの位置ずれ量と、からサブフレーム92の位置を調整することができる。
 上記実施の形態では、サブフレーム調整ユニット40が、Z軸方向にも可動テーブル400を移動させるアクチュエータ410を備えている。そして、サブフレーム調整ユニット40が、サブフレーム92の位置調整のほかに、サブフレーム92の円筒体93への挿入も行っている。しかし、本発明はこれに限定されない。本発明では、サブフレーム調整ユニット40のほかに、サブフレーム92を円筒体93に挿入するサブフレーム挿入ユニット又はサブフレーム挿入部を備えてもよい。例えば、サブフレーム調整ユニット40が可動テーブル400をXY方向に移動させ、サブフレーム挿入ユニットがZ方向に可動テーブル400を移動させてもよい。このような形態であっても、サブフレーム調整ユニット40がサブフレーム92の位置を調整することができる。
 上記の実施の形態では、組立装置1は、円筒体位置決めユニット10、メインフレーム挿入ユニット20、ロータ計測ユニット30、サブフレーム調整ユニット40、サブフレーム計測ユニット50、演算ユニット60、制御ユニット70、溶接ユニット80で構成されている。しかし、本発明では、ユニットと呼ばれる構成のほか、組立装置1が円筒体位置決め部、メインフレーム挿入部、ロータ計測部、サブフレーム調整部、サブフレーム計測部、演算部、制御部、溶接部と呼ばれる部分で構成されてもよい。また、サブフレーム調整ユニット40が演算ユニット60及び制御ユニット70の機能を果たしてもよい。
 上記の実施形態では、演算ユニット60が、サブフレーム位置調整量算出部640の判定結果から、高温、長時間の、又はより低温、より短時間の溶接条件を決定して、溶接ユニット80に溶接させている。しかし、本発明はこれに限定されない。本発明では、溶接条件の決定方法は任意である。演算ユニット60は、データベースに基づいて溶接条件を決定してもよい。
 例えば、演算ユニット60が算出したサブフレーム92の位置調整量と、実際にサブフレーム調整ユニット40が調整した調整量に差があり、その結果、メインフレーム91とサブフレーム92の中心軸、すなわち軸線がずれることがある。
 この場合、記憶部630に、予め実験をして求めた、演算ユニット60が算出した位置調整量とサブフレーム調整ユニット40の実際の調整量との関係を示すデータベースが記憶されているとよい。そして、演算ユニット60が、このデータベースを記憶部630から読み出し、このデータベースに基づいて溶接条件を決定するとよい。例えば、演算ユニット60は、データベースで求めた演算ユニット60が算出した位置調整量とサブフレーム調整ユニット40の実際の調整量との差が閾値よりも大きい場合、閾値以下の溶接条件よりも高温、長時間又は広領域の溶接条件に決定するとよい。
 また、溶接によって、メインフレーム91又はサブフレーム92と円筒体93とに熱応力が発生し、その熱応力によって、メインフレーム91又はサブフレーム92と円筒体93とが変形して、メインフレーム91とサブフレーム92の軸線がずれることがある。
 この場合、記憶部630に、予め実験をして求めた、メインフレーム91とサブフレーム92の軸線のずれ量と溶接条件とを示すデータベースが記憶されているとよい。演算ユニット60は、記憶部630から読み出した、このデータベースに基づいて溶接条件を決定するとよい。
 さらに、ロータ914とステータ932との間の磁力が、チャック部材230によるメインフレーム91の掴持力よりも大きい場合、サブフレーム調整ユニット40の可動テーブル400でサブフレーム92の位置を調整した後、その磁力によってメインフレーム91が傾斜することがある。その結果、メインフレーム91とサブフレーム92の軸線がずれることがある。
 この場合、予めチャック部材230によるメインフレーム91の掴持力を計測し、計測された掴持力が記憶部630に記憶されているとよい。演算ユニット60は、記憶部630から読み出した掴持力と、荷重センサ320が計測した負荷、すなわち、ロータ914とステータ932との間に磁力の大きさ、方向から、溶接条件を決定するとよい。
 例えば、ロータ914とステータ932との間の磁力がメインフレーム91の掴持力よりも大きく、その磁力の方向が、ロータ914の軸線に対して特定の溶接箇所の方向に向いている場合、演算ユニット60は、その特定の溶接箇所の溶接時間を他の溶接箇所の溶接時間よりも短くするとよい。これにより、熱ひずみの影響を小さくして、メインフレーム91を傾斜しにくくすることができる。或いは、演算ユニット60は、制御ユニット70に、上記特定の溶接箇所の溶接を、他の溶接箇所の溶接よりも後にさせてもよい。先に溶接した溶接箇所が支持部となり、その結果、メインフレーム91の剛性を高めて、メインフレーム91を傾斜しにくくすることができる。この場合、着磁されたロータ914を有するメインフレーム91を高い精度で位置決めして、組み立てることができ、効率の高い圧縮機を製造することができる。
 本発明は、本発明の広義の精神と範囲を逸脱することなく、様々な実施形態及び変形が可能とされるものである。また、上述した実施形態は、本発明を説明するためのものであり、本発明の範囲を限定するものではない。つまり、本発明の範囲は、実施形態ではなく、請求の範囲によって示される。そして、請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、本発明の範囲内とみなされる。
 本出願は、2018年1月24日に出願された、日本国特許出願特願2018-9307号に基づく。本明細書中に日本国特許出願特願2018-9307号の明細書、特許請求の範囲、図面全体を参照として取り込むものとする。
 1 組立装置、10 円筒体位置決めユニット、20 メインフレーム挿入ユニット、30 ロータ計測ユニット、40 サブフレーム調整ユニット、50 サブフレーム計測ユニット、60 演算ユニット、70 制御ユニット、80 溶接ユニット、91 メインフレーム、92 サブフレーム、93 円筒体、94 圧縮機、95 アダプタ、96 計測用治具、100 可動テーブル、110 位置決め治具、120 アクチュエータ、130 底板、131 貫通孔、132 支柱、133 貫通孔、134 天板、200 載置台、210 昇降テーブル、211 ブロック部材、212 アクチュエータ、213 支柱、220 可動テーブル、221 アクチュエータ、230 チャック部材、240 変位センサ、241 取り付け台、300 ロータ計測ユニット、301 シャフト部、302 計測部、310 嵌合シャフト、320 荷重センサ、311 シャフトホルダ、312 ガイドシャフト、313 リニアブッシュ、314 アクチュエータ、315 ブロック、316 支持板、317 軸受、400 可動テーブル、410 アクチュエータ、510 ブラケット、520 変位センサ、610 サブフレーム位置算出部、620 メインフレーム位置算出部、630 記憶部、631 溶接位置ずれテーブル、632 溶接後位置テーブル、640 サブフレーム位置調整量算出部、650 溶接条件決定部、810 溶接トーチ、811 ブラケット、820 電源装置、821 ケーブル、911A 円環板状部、911B 小円筒部、911C 大円筒部、912 コンプライアントフレーム、913 主軸受、914 ロータ、915 クランクシャフト、921 副軸受、932 ステータ、931 溶接部、1000 サブフレーム位置決め治具、1010 台部、1020 円筒部、A、B 矢印

Claims (5)

  1.  ロータを有するシャフトを回転可能に支持する第一の軸受が固定された円板状の第一のフレーム、及び、第二の軸受が固定された円板状の第二のフレームを、内壁にステータが固定された円筒体の径方向内側に挿入すると共に、前記シャフトを前記第二の軸受に挿入して、前記第一のフレーム、前記第二のフレーム及び、前記円筒体を組み立てる圧縮機の組立装置であって、
     前記円筒体に前記第一のフレームを挿入する第一のフレーム挿入部と、
     前記円筒体に前記第二のフレームを挿入する第二のフレーム挿入部と、
     前記第一のフレーム挿入部が前記第一のフレームを前記円筒体に挿入し、前記シャフトが前記円筒体の径方向内側に配置された状態で、前記ロータの前記ステータに対する位置を計測する計測部と、
     前記ロータの前記ステータに対する位置と、溶接後の前記第一のフレームと前記第二のフレームの位置ずれ量とに関する第一のデータ、および、溶接前の前記第一のフレームと前記第二のフレームの位置ずれ量と、溶接後の前記第一のフレームと前記第二のフレームの位置ずれ量との関係を示す第二のデータが記憶された記憶部と、
     前記計測部によって計測された位置データ、および、前記記憶部に記憶された前記第一のデータに基づき、前記第一のフレームに対する前記第二のフレームの位置を調整するか否か判定する判定部と、
     該判定部で前記第一のフレームに対する前記第二のフレームの位置を調整すると判定された場合に、前記記憶部に記憶された前記第二のデータに基づき、前記第一のフレームに対する前記第二のフレームの位置を調整する調整部と、
     前記第一のフレームと前記第二のフレームを前記円筒体に溶接する溶接部と、
     を備える、圧縮機の組立装置。
  2.  前記計測部は、前記ロータと前記ステータとの間の磁力の大きさ及び方向から前記ロータの前記ステータに対する位置を計測する、
     請求項1に記載の圧縮機の組立装置。
  3.  前記計測部は、
     前記シャフトの先端に嵌合する嵌合部と、
     前記嵌合部が前記シャフトの先端に嵌合したときの荷重を計測する荷重計測部と、
     を有し、
     前記荷重計測部が計測した荷重データから前記ロータと前記ステータとの間の磁力を求める、
     請求項2に記載の圧縮機の組立装置。
  4.  前記計測部は、前記ロータと前記ステータとの間のコギングトルクから前記ロータの前記ステータに対する位置を求める、
     請求項1に記載の圧縮機の組立装置。
  5.  ロータを有するシャフトを回転可能に支持する第一の軸受が固定された円板状の第一のフレーム、及び、第二の軸受が固定された円板状の第二のフレームを、内壁にステータが固定された円筒体の径方向内側に挿入すると共に、前記シャフトを前記第二の軸受に挿入して、前記第一のフレーム、前記第二のフレーム及び、前記円筒体を組み立てる圧縮機の組立方法であって、
     前記円筒体に前記第一のフレームを挿入する第一のフレーム挿入工程と、
     前記円筒体に前記第二のフレームを挿入する第二のフレーム挿入工程と、
     前記第一のフレーム挿入工程で前記第一のフレームが前記円筒体に挿入され、前記シャフトが前記円筒体の径方向内側に配置された状態で、前記ロータの前記ステータに対する位置を計測する計測工程と、
     該計測工程で計測された位置データと、予め求めた、前記ロータの前記ステータに対する位置と、溶接後の前記第一のフレームと前記第二のフレームの位置ずれ量とに関する第一のデータと、に基づき、前記第一のフレームに対する前記第二のフレームの位置を調整するか否か判定する判定工程と、
     該判定工程で前記第一のフレームに対する前記第二のフレームの位置を調整すると判定された場合に、予め求めた、溶接前の前記第一のフレームと前記第二のフレームの位置ずれ量と、溶接後の前記第一のフレームと前記第二のフレームの位置ずれ量との関係を示す第二のデータに基づき、前記第一のフレームに対する前記第二のフレームの位置を調整する調整工程と、
     前記判定工程で調整しないと判定された後に、又は前記判定工程で調整すると判定され、かつ前記調整工程で前記第一のフレームに対する前記第二のフレームの位置を調整した後に、前記第一のフレームと前記第二のフレームを前記円筒体に溶接する溶接工程と、
     を備える、圧縮機の組立方法。
PCT/JP2019/001992 2018-01-24 2019-01-23 圧縮機の組立装置及び圧縮機の組立方法 WO2019146615A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019567099A JP6785994B2 (ja) 2018-01-24 2019-01-23 圧縮機の組立装置及び圧縮機の組立方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018009307 2018-01-24
JP2018-009307 2018-01-24

Publications (1)

Publication Number Publication Date
WO2019146615A1 true WO2019146615A1 (ja) 2019-08-01

Family

ID=67395539

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/001992 WO2019146615A1 (ja) 2018-01-24 2019-01-23 圧縮機の組立装置及び圧縮機の組立方法

Country Status (2)

Country Link
JP (1) JP6785994B2 (ja)
WO (1) WO2019146615A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112039299A (zh) * 2020-09-08 2020-12-04 江西奥易特新材料有限公司 一种电动机转子的制造设备
CN117718720A (zh) * 2024-02-09 2024-03-19 泉州市华德机电设备有限公司 一种两级压缩螺杆压缩机内二级转子的安装紧固器

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005195005A (ja) * 2003-12-12 2005-07-21 Fujitsu General Ltd スクロール圧縮機の組立方法
JP2007077850A (ja) * 2005-09-13 2007-03-29 Fujitsu General Ltd スクロール圧縮機の組立方法
JP2008151233A (ja) * 2006-12-15 2008-07-03 Mitsubishi Electric Corp 製品組立方法
JP2011236908A (ja) * 2010-05-06 2011-11-24 Lg Electronics Inc 密閉型圧縮機及びその製造方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005195005A (ja) * 2003-12-12 2005-07-21 Fujitsu General Ltd スクロール圧縮機の組立方法
JP2007077850A (ja) * 2005-09-13 2007-03-29 Fujitsu General Ltd スクロール圧縮機の組立方法
JP2008151233A (ja) * 2006-12-15 2008-07-03 Mitsubishi Electric Corp 製品組立方法
JP2011236908A (ja) * 2010-05-06 2011-11-24 Lg Electronics Inc 密閉型圧縮機及びその製造方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112039299A (zh) * 2020-09-08 2020-12-04 江西奥易特新材料有限公司 一种电动机转子的制造设备
CN112039299B (zh) * 2020-09-08 2021-06-15 江西奥易特新材料有限公司 一种电动机转子的制造设备
CN117718720A (zh) * 2024-02-09 2024-03-19 泉州市华德机电设备有限公司 一种两级压缩螺杆压缩机内二级转子的安装紧固器
CN117718720B (zh) * 2024-02-09 2024-04-30 泉州市华德机电设备有限公司 一种两级压缩螺杆压缩机内二级转子的安装紧固器

Also Published As

Publication number Publication date
JP6785994B2 (ja) 2020-11-18
JPWO2019146615A1 (ja) 2020-07-16

Similar Documents

Publication Publication Date Title
US5842271A (en) Apparatus for assembling an electric motor employing a casing body having low dimensional accuracy
KR101796051B1 (ko) 모터
WO2019146615A1 (ja) 圧縮機の組立装置及び圧縮機の組立方法
JP5501875B2 (ja) タービン翼環の真円状態保持方法及び装置
WO2007066774A1 (ja) モータ駆動装置の製造方法及びモータ駆動装置
JP5268620B2 (ja) シリンダヘッド固定装置
JP2008213062A (ja) クランプスリーブ
JPH10138075A (ja) ワーク姿勢調整装置、調整具及び調整方法
JP2008183651A (ja) 段替えプレートのクランプ装置
US20170120405A1 (en) Rotating axis supporting device
JP2000176761A (ja) 垂直軸直動機構
CN111250974A (zh) 船用主动设备和被动设备的轴系对中方法及对中工装
JP5725473B2 (ja) 部品の挿入方法、及び、挿入装置
CN114799911B (zh) 一种用于喷注器壳体与内底的加工工装及加工方法
JP4889470B2 (ja) 製品組立方法
JP2951794B2 (ja) 調心装置及びその計測機構較正方法
CN111438440B (zh) 风扇轴套与底座的组装方法
JP3443133B2 (ja) レンズの心出し装置および心出し方法
JP2023002017A (ja) 圧入装置および圧入方法
CN114378760B (zh) 用于在空心轴中安装塞子的设备
CN216464195U (zh) 大型薄壁件的装夹工装
CN115592321B (zh) 用于焊接电机转子的支撑座
JP2014013022A (ja) 圧縮機の製造装置および圧縮機の製造方法
CN217991396U (zh) 一种螺母与板材的焊接工装
JP2005337385A (ja) 回転軸連結継手調整支援装置および回転軸連結継手調整方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19743211

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019567099

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19743211

Country of ref document: EP

Kind code of ref document: A1