WO2018205544A1 - Procédé de gestion de projets de logiciels, appareil, terminal et support de stockage informatique - Google Patents

Procédé de gestion de projets de logiciels, appareil, terminal et support de stockage informatique Download PDF

Info

Publication number
WO2018205544A1
WO2018205544A1 PCT/CN2017/111639 CN2017111639W WO2018205544A1 WO 2018205544 A1 WO2018205544 A1 WO 2018205544A1 CN 2017111639 W CN2017111639 W CN 2017111639W WO 2018205544 A1 WO2018205544 A1 WO 2018205544A1
Authority
WO
WIPO (PCT)
Prior art keywords
project
information
participant
progress
software
Prior art date
Application number
PCT/CN2017/111639
Other languages
English (en)
Chinese (zh)
Inventor
王宇栋
Original Assignee
平安科技(深圳)有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 平安科技(深圳)有限公司 filed Critical 平安科技(深圳)有限公司
Publication of WO2018205544A1 publication Critical patent/WO2018205544A1/fr

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Definitions

  • the invention relates to the field of software project development, in particular to a software project management method, device, terminal and computer storage medium.
  • the existing enterprise software system development and test program development mainly depends on the project manager.
  • the project manager analyzes, plans and controls the development project. First, the project manager formulates the overall strategy, and then implements the overall project management and related project tasks according to the overall strategy. Assignment work, in the assignment process management of project tasks, can not make special work arrangements for each designer and tester, but from the project as a whole, which will lead to uneven distribution of human resources. It is also impossible to do a systematic analysis and comprehensive review of the problems in the software development process.
  • the main object of the present invention is to provide a software project management method, which aims to solve the problem of one-sided management of software projects and improve the efficiency of project work management.
  • the software project management method is to preset a project management platform (or a test sharing platform) on a software and system development project, and the software project management method includes the following steps:
  • the information entry box is displayed according to the software development project layout, so that the user sets the project information and the project participant information;
  • the step of reviewing the project information and the project participant information according to the preset rule, and establishing the relationship between the project and the project participant includes:
  • the step of reviewing the project information and the project participant information according to the preset rule, and establishing the relationship between the project and the project participant includes:
  • the project task assignment information is sent to the project participant corresponding terminal.
  • the step of reviewing the project information and the project participant information according to the preset rule, and establishing the relationship between the project and the project participant includes:
  • the project participant When the project progress update in the project information is detected, the project participant is prompted to upload the project document according to the project task assignment information, so that the project participant can share the project resource.
  • the steps of detecting and obtaining the progress of the project in the project information and analyzing the work of the project participant according to the progress of the project include:
  • the project schedule is provided with a plurality of project nodes
  • the step of detecting and obtaining the project progress in the project information and analyzing the work of the project participants according to the project progress includes:
  • the step of detecting and obtaining the progress of the project in the project information and analyzing the work of the project participant according to the progress of the project includes:
  • the project quality is calculated and a project analysis report is generated to evaluate the project quality.
  • the method further includes:
  • the abnormal factors of the project progress are analyzed to improve the quality of the project.
  • the present invention provides a software project management apparatus, and the software project management apparatus includes:
  • the monitoring input module is configured to display an information input box according to the layout of the software development project when the information input request is detected, so that the user sets the project information and the project participant information;
  • a relationship establishing module configured to review project information, project participant information according to a preset rule, and establish an association relationship between the project and the project participant;
  • the monitoring acquisition module is used for detecting and obtaining the progress of the project in the project information, and analyzing the work of the project participants according to the progress of the project.
  • the present invention provides a software project management terminal, the software project management terminal comprising: a memory, a processor, and a software project management computer program stored on the memory and operable on the processor, The steps of the method as described above are implemented when the computer program is executed by the processor.
  • the present invention further provides a computer storage medium on which a software project management program is stored, and when the software project management program is executed by a processor, the software project management method as described above is implemented. step.
  • the invention provides a software project management method, and builds a project management platform (test sharing platform) on the project system through project management work in the software development process, realizes task assignment and quality management, and improves project development efficiency.
  • the project development test is systematically quantitatively managed, and the problems, progress, and resource sharing in the software development test process are not completely dependent on the project manager for project analysis, planning, and control during project management; Objectively use data analysis to achieve comprehensive and objective management control, improve the efficiency of project participants, and avoid waste of unnecessary time; project participants can better obtain the experience resources of other colleagues and reduce the risk of the project.
  • the resources are completely preserved, which can be used for reference and learning in the future, which promotes the progress of the team, facilitates the development of the team, records the defects of the project, and avoids the high incidence of defects to improve the quality of project development.
  • FIG. 1 is a schematic structural diagram of a terminal in a hardware operating environment according to an embodiment of the present invention
  • FIG. 2 is a schematic diagram of a specific scenario of a software project management method of the present invention.
  • FIG. 3 is a schematic diagram showing the interface display of the software project management terminal of the present invention.
  • FIG. 4 is a schematic flowchart of a first embodiment of a software project management method according to the present invention.
  • step S20 of the software project management method of FIG. 4 is a schematic diagram of a refinement process of step S20 of the software project management method of FIG. 4;
  • FIG. 6 is a schematic flowchart of a second embodiment of a software project management method according to the present invention.
  • FIG. 8 is a schematic flowchart of a third embodiment of a software project management method according to the present invention.
  • FIG. 9 is a schematic diagram of functional modules of an embodiment of a software project management apparatus according to the present invention.
  • the main solution of the embodiment of the present invention is: constructing a project management platform on the software development system (the project management platform and the test sharing platform in the present invention are replaceable), and input project information and project participant information into the project management platform. According to the project information and project participant information, the project work is distributed, and the project participants' work and project quality are evaluated according to the project overall analysis report.
  • the invention provides a software project management method, which follows on the progress of the project and adjusts the project indicators in real time, and performs multi-dimensional project evaluation on the project related information.
  • FIG. 1 is a schematic structural diagram of software project management (also called terminal) of a hardware operating environment involved in an embodiment of the present invention.
  • the terminal may be a PC, or may be a portable terminal device having a display function, such as a smart phone, a tablet computer, or a portable computer.
  • the terminal may include a processor 1001, such as a CPU, a network interface 1004, a user interface 1003, a memory 1005, and a communication bus 1002.
  • the communication bus 1002 is used to implement connection communication between these components.
  • the user interface 1003 may include a display, an input unit such as a keyboard, and the optional user interface 1003 may further include a standard wired interface and a wireless interface, and the user interface 1003 has different permissions for different project participants ( For example, the project manager can input project information, project participant information through the user interface, and confirm the project work assignment after the project is associated. Other participants of the project can upload corresponding project materials and view the corresponding work evaluation report).
  • the network interface 1004 can optionally include a standard wired interface, a wireless interface (such as a WI-FI interface).
  • the memory 1005 may be a high speed RAM memory or a stable memory (non-volatile) Memory), such as disk storage.
  • the memory 1005 can also optionally be a storage device independent of the aforementioned processor 1001.
  • the terminal may further include a camera, RF (Radio) Frequency, RF) circuits, sensors, audio circuits, WiFi modules, and more.
  • sensors such as light sensors, motion sensors, and other sensors.
  • the light sensor may include an ambient light sensor and a proximity sensor, wherein the ambient light sensor may adjust the brightness of the display according to the brightness of the ambient light, and the proximity sensor may turn off the display and/or when the mobile terminal moves to the ear. Backlighting.
  • the gravity acceleration sensor can detect the magnitude of acceleration in each direction (usually three axes), and can detect the magnitude and direction of gravity when stationary, and can be used to identify the posture of the mobile terminal (such as horizontal and vertical screen switching, Related games, magnetometer attitude calibration), vibration recognition related functions (such as pedometer, tapping), etc.; of course, the mobile terminal can also be equipped with other sensors such as gyroscope, barometer, hygrometer, thermometer, infrared sensor, etc. No longer.
  • terminal structure shown in FIG. 1 does not constitute a limitation to the terminal, and may include more or less components than those illustrated, or a combination of certain components, or different component arrangements.
  • an operating system may be included in the memory 1005 as a computer storage medium.
  • a network communication module may be included in the memory 1005 as a computer storage medium.
  • a user interface module may be included in the memory 1005 as a computer storage medium.
  • a software project management application may be included in the memory 1005 as a computer storage medium.
  • the method of the software project management method of the present invention can be applied to multiple terminals, the terminal is connected to the server, the server is connected with the database information, and the terminal can be used to display the interface as shown in FIG. 3 (shown in FIG. 3).
  • the interface is uniquely determined.
  • the interface shown in FIG. 3 is only an example for understanding the present invention.
  • the corresponding information can be accessed through the corresponding button on the interface to display detailed information.
  • the network interface 1004 is mainly used to connect to the background server and perform data communication with the background server;
  • the user interface 1003 is mainly used to connect the client (user end), and perform data communication with the client, and the user interface 1003
  • the project participant sets different viewing operation rights (for example, the project manager can input project information, project participant information, etc. through the user interface); and the processor 1001 can be used to call the software project management application stored in the memory 1005. And do the following:
  • the information entry box is displayed according to the software development project layout, so that the user sets the project information and the project participant information;
  • processor 1001 can call the software project management application stored in the memory 1005, and also performs the following operations:
  • processor 1001 can call the software project management application stored in the memory 1005, and also performs the following operations:
  • the steps of establishing the relationship between the project and the project participants include:
  • the project task assignment information is sent to the project participant corresponding terminal.
  • the processor 1001 may call the software project management application stored in the memory 1005, review the project information, the project participant information according to the preset rule, and establish the relationship between the project and the project participant, and then perform the following operations:
  • the project participant When the project progress update in the project information is detected, the project participant is prompted to upload the project document according to the project task assignment information, so that the project participant can share the project resource.
  • the processor 1001 may invoke the software project management application stored in the memory 1005, and further execute, the step of detecting and acquiring the project progress in the project information, and analyzing the work of the project participant according to the project progress includes:
  • the processor 1001 may call the software project management application stored in the memory 1005, and further execute, detect and acquire the project progress in the project information, and analyze the work of the project participant according to the project progress, and then include:
  • processor 1001 can call the software project management application stored in the memory 1005, and also performs the following operations:
  • the following steps include:
  • the project quality is calculated and a project analysis report is generated to evaluate the project quality.
  • processor 1001 can call the software project management application stored in the memory 1005, and also performs the following operations:
  • the following steps include:
  • the abnormal factors of the project progress are analyzed to improve the quality of the project.
  • a first embodiment of a software project management method of the present invention provides a software project management method, where the software project management method includes:
  • step S10 when the information entry request is detected, the information entry box is displayed according to the software development project layout, so that the user sets the project information and the project participant information.
  • the test sharing platform (project management platform) is installed on the project system, and when the request for detecting the entry of the item is detected on the shared platform, the server control terminal displays the information input item, and displays the information input box according to the layout of the software development project, and the management personnel of the test sharing platform will Project information (project information: project time, preset project progress, project nodes, other related project details) and project participants (project management personnel, project developers, project testers, etc.) information is entered into the project management platform.
  • Project information project information: project time, preset project progress, project nodes, other related project details
  • project participants project management personnel, project developers, project testers, etc.
  • step S20 the project information and the project participant information are reviewed according to the preset rule, and the relationship between the project and the project participant is established.
  • the project management platform is pre-set with project analysis rules (project analysis rules: after determining the progress of the project, determining the project time for the project progress, analyzing the project time and the project participant time and the nature of the project participants' work, if the project information If the project task is matched with the project participants, the relationship between the project and the project participants is established; for example, if the project is in the project testing phase and the project tester is required to test the project, the project test personnel are searched according to the project analysis rules, if the project tester If the time matches the project test time and other information, the project test task will be associated with the project tester. When the project information and the project participants' information meet the preset rule review rules, the project and the project participants will be established. relationship.
  • project analysis rules after determining the progress of the project, determining the project time for the project progress, analyzing the project time and the project participant time and the nature of the project participants' work, if the project information If the project task is matched with the project participants, the relationship between the project and the project participants is established;
  • step S30 the progress of the project in the project information is detected and acquired, and the work of the project participant is analyzed according to the progress of the project.
  • the project management platform detects the progress of the project in the project information in real time. Specifically, the project management platform presets the average project schedule according to the project progress of the same type of project, and the project management platform analyzes the work of the project participants according to the change of the project schedule (analysis Project participant's work: around project quality, project time, and other quantifiable work indicators).
  • a project management platform is built on the software system development, the project progress is monitored in real time, and the project work is adjusted according to the progress of the project, and the management of the project to the project participants is realized through the information entry management, and the server and the terminal are realized.
  • the project can be systematically quantified and managed, and problems and progress resources in the software system development process can be shared. It is entirely dependent on the project manager for project analysis, planning, and control, which is conducive to the overall evaluation of the project.
  • the software project management method step S20 of the present invention includes:
  • Step S21 judging the project information and the project participant information according to the preset rule, and determining whether to establish an association relationship between the project and the project participant.
  • the server control terminal reviews the project information on the project management platform according to a preset rule (predetermined rule: project information, analysis and matching criteria of the project participant information), and determines whether to establish the project and the project participant according to the judgment connection relation.
  • a preset rule predetermined rule: project information, analysis and matching criteria of the project participant information
  • step S22 if the project task in the project information matches the time information of the project participant, the relationship between the project and the project participant is established.
  • the project task is assigned. Specifically, the project task is determined according to the project information, and the project task is matched with the project participant information, and the project can be set for different stages of the project.
  • the task and the project participants corresponds to the project development work during the development period of the project, and the project test personnel correspond to the project test work during the project test phase; for example, if some test work in the project needs to be arranged, The start time and the estimated end time of the test work are entered in the system, and the testers A, B, C, and D who are idle in the corresponding time period are detected, and the work arrangement B is excluded for the first time, and further according to the test personnel A, C, and D. Expertise in the field, exclude tester C, and associate the task of test work with testers A, D.
  • the project tasks of each stage of the project are corresponding to the project participants.
  • the project management platform performs the relationship between the project work and the project participants according to the project tasks, so as to arrange the assignment of the project tasks. Not only does it rely on manual scheduling, the project management system more systematically integrates the project with the project participants.
  • the method includes:
  • step S40 the association information of the project and the project participant is sent to the management terminal, so that the project leader allocates the project task according to the association relationship.
  • the project management personnel can determine the assignment of the project tasks according to the association relationship. Specifically, the project management personnel receives the correspondence between the project test and the test personnel sent by the project management platform, and the project management personnel can In combination with other factors, confirm whether the project task is assigned to the corresponding personnel, that is, if the project management platform establishes a test task with two testers, the project manager can combine the nature of the project task or the personal reasons of the project participants. Other factors determine the assignment of project tasks to the participation of other project participants to finalize the allocation of project work.
  • Step S50 when it is detected that the project leader assigns a project task, the project task assignment information is sent to the project participant corresponding terminal.
  • the project management platform when the project management platform receives the project task assignment based on the project association relationship, the project management platform sends the project task assignment notification to the terminal corresponding to the project participant, and prevents the project corresponding participant from receiving the system.
  • Work schedule and delay of office hours that is, when the project manager confirms the allocation of project work on the project management platform, the project management platform sends the corresponding project allocation information to the project participant corresponding terminal (project allocation information may include: project task, Project time, project details and other related project information).
  • the project management platform sends the project and the project participants who have established the relationship to the terminal corresponding to the project manager, and the project manager manually confirms the assignment of the project task, and the project management platform comprehensively and scientifically considers the project.
  • the project management personnel should understand the arrangement of the project work and realize the overall management and implementation of the project work.
  • the project participants who work on the assigned project can receive the project allocation information and prevent the omission of the project task.
  • the embodiment is further proposed on the basis of the second embodiment.
  • the method includes:
  • step S60 when the item progress update in the item information is detected, the project participant is prompted to upload the project document according to the project task assignment information, so that the project participant shares the project resource.
  • the project management platform when the project progress update of the project information is detected on the project management platform, the project management platform according to the project work schedule, that is, the test management personnel confirming the test of the project when the test work is completed, and sending the prompt information to the project
  • the tester prompts the project tester to upload the project test document; the project management platform organizes the project documents uploaded by the project tester (ie, classifies the project document), so that other project participants can find the project data correspondingly.
  • the corresponding project leader is inquired, and the project leader is prompted to upload the project document to realize the sharing of the project resources, thereby reducing the cumbersome work of the current person in order to manage the project document, and improving the project leader.
  • Work efficiency avoiding waste of unnecessary time, project participants can better obtain the experience resources of other colleagues, reduce the risk of testing, and improve their work ability by communicating with other colleagues; project resource information is completely saved For future reference and learning.
  • the step S30 in the software project management method includes:
  • Step S31 detecting the progress of the item in the acquired item information, and inputting the item progress into the item schedule for the project participant to view.
  • the project management platform obtains the progress of the project in the project information in real time, and inputs the project progress into the corresponding project schedule (project schedule: a message corresponding to the time of the project and the progress of the project), and the project participant can intuitively View the project schedule and master your project work in order to adjust the status of the work in a timely manner.
  • project schedule a message corresponding to the time of the project and the progress of the project
  • step S32 the work of the project participants is analyzed according to the progress of the project, and the project tasks of the project participants are adjusted.
  • the project management platform analyzes the work of the project participants according to the progress of the project (specifically, it can analyze the work saturation of the project participants and contribute to the project), and adjust the work arrangements of the project participants according to the progress of the project, for example, In the process of system testing, if a system tester has not conducted feedback on the test work for a period of time, that is, the project progress is not updated in real time, then the test task is communicated with the project tester for the test task to determine whether Need to increase system testers.
  • the project process is detected in real time, and the project process is input into the project schedule for the project participants to view the work progress, and based on the project progress, the work of the project participants is analyzed around the project progress, real-time. Testing the progress of the project helps to improve the efficiency of the project participants.
  • a third embodiment of the present invention is further provided on the basis of the first embodiment of the present invention. After the step S30 in the third embodiment of the present invention, the method further includes:
  • Step S70 when it is detected that the project progress reaches the project node, the work of the project participant is counted and a work analysis report is generated.
  • the project management platform on the terminal detects that the project arrives at the project node, it searches for project related information (project related information: integrates the project status of the project node in the development process, the test defect in the project testing process, the level of the defect, and Fix the basic data such as speed), integrate the project information with the project participant information, and generate project reports for different project participants.
  • project related information integrates the project status of the project node in the development process, the test defect in the project testing process, the level of the defect, and Fix the basic data such as speed
  • integrate the project information with the project participant information and generate project reports for different project participants.
  • the analysis report may be different types such as dashboards, different tables or system analysis charts.
  • step S80 according to the work analysis report of the project participant, the project indicator is adjusted and the work of the project participant is evaluated.
  • the project management platform evaluates the work of the project participants. For example, there are no systematic management of different project defects during the project testing process, which is not conducive to circumvention in the future. It should be noted that the eye-catching management platform not only evaluates the project participants personally. For project teams, etc., systematic multi-dimensional evaluation, according to the project evaluation to further adjust the project work schedule and new indicators, the evaluation of the project team is conducive to the construction of the project team.
  • step S90 when it is detected that the project progress reaches the project node, the project quality is calculated and a project analysis report is generated to evaluate the project quality.
  • the statistical project quality is also statistically recorded for the problems occurring in the project, and the project analysis report is generated.
  • the project analysis report the overall project analysis is performed, that is, according to the project analysis report. Specific issues improve the areas that need to be optimized to improve project quality and speed up the project development process.
  • step S100 when the abnormality of the project progress is detected, the abnormal factors of the project progress are analyzed to improve the quality of the project.
  • the project progress is abnormal (the project is abnormal: it can be understood as the project development speed is too fast, or the project development speed is slow), the abnormal factors of the project schedule are analyzed, and if the project has defects, the test maintenance has not found an effective solution. Or the project appears in one part by speeding up the project development or project testing progress by referring to special algorithms.
  • the work of the project participant is generated to generate a work analysis report, and according to the work analysis report of the project participant, the corresponding indicator is adjusted and the work of the project participant is evaluated, and the existing team needs Analysts, there is no set of rules for scoring, which is not conducive to the progress of the entire team. It helps the project team to build through the individual evaluation of the project participants and the work evaluation of the team.
  • the project arrives at the project node, it also needs to calculate the project quality, generate project analysis report, conduct project quality assessment, and help the development of the later project. Through the project management platform systematic project analysis, it is conducive to avoiding the late development risk.
  • the abnormality of the progress of the project is determined to determine the progress of the project to improve the quality of the project; by recording the defect, the high rate of defects is avoided to a certain extent, the quality of development is improved, and significant progress factors are recorded by recording the project.
  • an embodiment of the present invention further provides a software project management apparatus, where the software project management apparatus includes:
  • the monitoring input module 10 is configured to display an information input box according to the software development project layout when the information input request is detected, so that the user sets the project information and the project participant information;
  • the relationship establishing module 20 is configured to review project information and project participant information according to a preset rule, and establish an association relationship between the project and the project participant;
  • the monitoring acquisition module 30 is configured to detect and obtain the progress of the project in the project information, and analyze the work of the project participant according to the progress of the project.
  • an embodiment of the present invention further provides a computer storage medium
  • a software project management program is stored on the computer storage medium, and the software project management program is executed by the processor to implement the steps of the software project management method as described above.
  • portions of the technical solution of the present invention that contribute substantially or to the prior art may be embodied in the form of a software product stored in a storage medium (such as a ROM/RAM as described above). , a disk, an optical disk, including a number of instructions for causing a terminal device (which may be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to perform the methods described in various embodiments of the present invention.
  • a terminal device which may be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

La présente invention concerne un procédé de gestion de projets de logiciels comprenant les étapes suivantes : lorsqu'une demande d'entrée d'informations est détectée, l'affichage d'une boîte d'entrée d'informations selon la conception d'un procédé de développement de logiciels afin qu'un utilisateur configure des informations de projet et des informations de participant au projet ; l'examen des informations de projet et des informations de participant au projet selon une règle prédéfinie afin d'établir une relation d'association entre le projet et les participants au projet ; la détection et l'acquisition d'un état d'avancement du projet à partir des informations de projet et de l'analyse du travail des participants au projet selon l'état d'avancement du projet. La présente invention concerne en outre un appareil et un terminal correspondants de gestion de projets de logiciels, ainsi qu'un support de stockage informatique. Le chargement d'une plateforme de gestion de projets sur un système de projet permet d'attribuer des tâches de projet et de gérer des évaluations du projet et des membres du projet, ce qui augmente la qualité du développement du projet.
PCT/CN2017/111639 2017-05-10 2017-11-17 Procédé de gestion de projets de logiciels, appareil, terminal et support de stockage informatique WO2018205544A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710327645.X 2017-05-10
CN201710327645.XA CN107679818A (zh) 2017-05-10 2017-05-10 软件项目管理方法、终端及计算机可读存储介质

Publications (1)

Publication Number Publication Date
WO2018205544A1 true WO2018205544A1 (fr) 2018-11-15

Family

ID=61134112

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/111639 WO2018205544A1 (fr) 2017-05-10 2017-11-17 Procédé de gestion de projets de logiciels, appareil, terminal et support de stockage informatique

Country Status (2)

Country Link
CN (1) CN107679818A (fr)
WO (1) WO2018205544A1 (fr)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108596471A (zh) * 2018-04-19 2018-09-28 平安科技(深圳)有限公司 项目评估信息处理方法、装置、计算机设备和存储介质
CN108846564A (zh) * 2018-05-31 2018-11-20 康键信息技术(深圳)有限公司 服务器、排期的方法及存储介质
CN109726975A (zh) * 2018-06-01 2019-05-07 平安普惠企业管理有限公司 基于工作流的项目开发方法、装置、设备及可读存储介质
CN109118060A (zh) * 2018-07-24 2019-01-01 武汉空心科技有限公司 基于时效控制的快速开发方法、平台及系统
CN109190888A (zh) * 2018-07-27 2019-01-11 平安科技(深圳)有限公司 项目评估分配方法、装置、终端设备及存储介质
CN109165931A (zh) * 2018-09-25 2019-01-08 阿里巴巴集团控股有限公司 项目流程管理方法及装置
CN109388376B (zh) * 2018-09-29 2023-08-11 平安科技(深圳)有限公司 软件开发风险评估方法、装置、设备及可读存储介质
CN111222520A (zh) * 2018-11-23 2020-06-02 中移(杭州)信息技术有限公司 一种分类模型训练方法、分类方法及系统
CN109683859B (zh) * 2018-12-04 2022-02-18 郑州云海信息技术有限公司 一种计算机软件开发管理平台,设备及可读存储介质
CN109683860B (zh) * 2018-12-04 2022-02-18 郑州云海信息技术有限公司 一种计算机软件项目管理平台,设备及可读存储介质
CN110335004A (zh) * 2019-05-08 2019-10-15 重庆天蓬网络有限公司 一种基于责任制的产品和工程关系解决方法
CN110264042A (zh) * 2019-05-25 2019-09-20 深圳市元征科技股份有限公司 一种项目管理的方法及相关装置
CN110210759A (zh) * 2019-05-31 2019-09-06 北京银企融合技术开发有限公司 一种对象评估方法、装置及电子设备
CN110275708B (zh) * 2019-06-06 2023-04-18 江西理工大学 一种计算机软件视图的可视软件建模方法
CN110610350A (zh) * 2019-08-30 2019-12-24 深圳市元征科技股份有限公司 一种项目管理方法、装置及设备
CN110750299A (zh) * 2019-09-25 2020-02-04 恒大智慧科技有限公司 智能软件质量跟踪系统、方法及存储介质
CN111104331B (zh) * 2019-12-20 2023-05-09 广州唯品会信息科技有限公司 软件管理方法、终端设备及计算机可读存储介质
CN112085471B (zh) * 2020-09-10 2024-05-07 北京百度网讯科技有限公司 任务分发方法、装置、电子设备及存储介质
CN112950138B (zh) * 2020-09-11 2024-03-12 深圳市明源云科技有限公司 协同开发的状态管理方法、装置和服务器
CN112286984B (zh) * 2020-09-29 2021-06-22 卓尔智联(武汉)研究院有限公司 区块数据处理方法、装置、计算机设备和存储介质
CN113361909A (zh) * 2021-06-03 2021-09-07 杭州推啊网络科技有限公司 一种互联网项目管理方法和系统
CN113392420A (zh) * 2021-07-06 2021-09-14 山东电力工程咨询院有限公司 一种智慧化项目数据管理方法及系统
CN113592439B (zh) * 2021-07-14 2024-03-26 青岛海尔科技有限公司 软件项目流程管理系统及方法
CN116523263A (zh) * 2023-06-06 2023-08-01 深圳明辉智能技术有限公司 智能数据处理方法、系统及存储介质
CN116993286B (zh) * 2023-07-24 2024-04-12 北京泰策科技有限公司 基于测试进度反推项目进度的测试管理系统及方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1372091A2 (fr) * 2002-06-12 2003-12-17 Siemens Gebäudesicherheit GmbH & Co. OHG Système d'ordinateur pour le contrôle de projets
CN105139103A (zh) * 2015-07-24 2015-12-09 广州支点网络科技有限公司 项目管理的流程流转控制方法、装置及终端设备
CN106447161A (zh) * 2016-08-29 2017-02-22 上海青睐商务咨询有限公司 项目管理系统

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003073234A2 (fr) * 2002-02-27 2003-09-04 Levy Scott Systeme, procedes et produit de programme execute par logiciel pour gerer des ressources d'organisation
CN1719462A (zh) * 2004-07-09 2006-01-11 千乡万才科技(中国)有限公司 资源管理系统以及方法
CN102592195A (zh) * 2011-12-28 2012-07-18 Tcl集团股份有限公司 基于产品开发的项目控制系统和方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1372091A2 (fr) * 2002-06-12 2003-12-17 Siemens Gebäudesicherheit GmbH & Co. OHG Système d'ordinateur pour le contrôle de projets
CN105139103A (zh) * 2015-07-24 2015-12-09 广州支点网络科技有限公司 项目管理的流程流转控制方法、装置及终端设备
CN106447161A (zh) * 2016-08-29 2017-02-22 上海青睐商务咨询有限公司 项目管理系统

Also Published As

Publication number Publication date
CN107679818A (zh) 2018-02-09

Similar Documents

Publication Publication Date Title
WO2018205544A1 (fr) Procédé de gestion de projets de logiciels, appareil, terminal et support de stockage informatique
WO2018107610A1 (fr) Procédé, système et dispositif de traitement de données de service, et support d'informations lisible par ordinateur
WO2019019493A1 (fr) Procédé et dispositif de partage de données et support d'informations lisible par ordinateur
WO2019037396A1 (fr) Procédé, dispositif et équipement de suppression de compte et support d'informations
WO2018149300A1 (fr) Procédé, appareil et dispositif de détection de probabilité de maladie, et support de stockage lisible par ordinateur
WO2019218444A1 (fr) Procédé, appareil et dispositif de génération de rapport d'essai, et support de stockage
WO2018068405A1 (fr) Procédé et système de test de performance wifi
WO2019061614A1 (fr) Procédé de mise en correspondance de produits de prêt, appareil et support d'informations lisible par ordinateur
WO2019100638A1 (fr) Procédé, dispositif et équipement de synchronisation de données, et support d'informations
WO2018166314A1 (fr) Procédé, appareil et dispositif d'autorisation de plafond et support d'informations lisible par ordinateur
WO2019109520A1 (fr) Procédé d'attribution de travail d'entretien vidéo, appareil et dispositif, et support d'informations lisible
WO2018223418A1 (fr) Procédé, dispositif et système d'essai de panneaux d'affichage
WO2015158297A1 (fr) Procédé, appareil et système de commande de tâche de distribution dans une plate-forme de réseautage social
WO2019104877A1 (fr) Procédé, appareil et dispositif de connexion à un contrat d'assurance par l'intermédiaire d'un site web, et support
WO2018201699A1 (fr) Procédé, dispositif et appareil d'évaluation de client, et support de stockage lisible par ordinateur
WO2018233301A1 (fr) Procédé, appareil et dispositif de recommandation de produit et support d'informations lisible par ordinateur
WO2019001087A1 (fr) Serveur, dispositif, procédé de demande d'indemnisation, et support d'informations lisible par ordinateur
WO2019196213A1 (fr) Procédé, appareil et dispositif de test d'interface, et support d'informations lisible par ordinateur
WO2019000800A1 (fr) Procédé, appareil et dispositif de préparation de justificatifs d'identité, et support de stockage lisible par ordinateur
WO2019140804A1 (fr) Procédé de surveillance de transaction suspecte, dispositif, et appareil, et support d'informations
WO2019161597A1 (fr) Procédé, appareil et dispositif d'envoi d'informations sur la base d'une messagerie instantanée, et support d'informations
WO2015144089A1 (fr) Procédé et appareil de recommandation d'application
WO2019109521A1 (fr) Procédé, appareil et dispositif de validation d'identité pour un entretien vidéo et support d'enregistrement lisible
WO2018188342A1 (fr) Procédé, appareil et dispositif permettant de générer un fichier de script, et support d'informations lisible par ordinateur
WO2018076811A1 (fr) Dispositif électronique, support d'informations, système, dispositif et procédé de partage de données

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17909342

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17909342

Country of ref document: EP

Kind code of ref document: A1

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 13/03/2020)

122 Ep: pct application non-entry in european phase

Ref document number: 17909342

Country of ref document: EP

Kind code of ref document: A1