WO2018051511A1 - 作業機械 - Google Patents

作業機械 Download PDF

Info

Publication number
WO2018051511A1
WO2018051511A1 PCT/JP2016/077567 JP2016077567W WO2018051511A1 WO 2018051511 A1 WO2018051511 A1 WO 2018051511A1 JP 2016077567 W JP2016077567 W JP 2016077567W WO 2018051511 A1 WO2018051511 A1 WO 2018051511A1
Authority
WO
WIPO (PCT)
Prior art keywords
control signal
boom
work machine
target surface
control
Prior art date
Application number
PCT/JP2016/077567
Other languages
English (en)
French (fr)
Inventor
井村 進也
石川 広二
坂本 博史
靖彦 金成
Original Assignee
日立建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立建機株式会社 filed Critical 日立建機株式会社
Priority to JP2018508782A priority Critical patent/JP6526321B2/ja
Priority to PCT/JP2016/077567 priority patent/WO2018051511A1/ja
Priority to EP16912870.9A priority patent/EP3514288B1/en
Priority to KR1020197027600A priority patent/KR20190110641A/ko
Priority to US15/753,246 priority patent/US10794046B2/en
Priority to CN201680048287.2A priority patent/CN108055855B/zh
Priority to KR1020187004795A priority patent/KR102189225B1/ko
Publication of WO2018051511A1 publication Critical patent/WO2018051511A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/261Surveying the work-site to be treated
    • E02F9/262Surveying the work-site to be treated with follow-up actions to control the work tool, e.g. controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/261Surveying the work-site to be treated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60YINDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
    • B60Y2200/00Type of vehicle
    • B60Y2200/40Special vehicles
    • B60Y2200/41Construction vehicles, e.g. graders, excavators
    • B60Y2200/412Excavators

Definitions

  • the present invention relates to a work machine capable of executing area restriction control.
  • the hydraulic shovel may be provided with a control system that assists the operator in the digging operation. Specifically, when a digging operation (for example, an instruction of an arm cloud) is input via the operation device, the tip of the working machine is based on the positional relationship between the target surface and the tip of the working machine (for example, the tip of the bucket). Control for forcibly operating at least the boom cylinder of the boom cylinder, the arm cylinder and the bucket cylinder for driving the work machine so that the position of the target is maintained in the region above and on the target surface (for example, the boom cylinder There is a control system that performs extension and forced boom raising operation).
  • a digging operation for example, an instruction of an arm cloud
  • the tip of the working machine is based on the positional relationship between the target surface and the tip of the working machine (for example, the tip of the bucket).
  • control system that limits the movable area of the tip of such a working machine facilitates the finishing operation of the excavated surface and the molding operation of the slope.
  • this type of control may be referred to as “area limited control” or “machine control”.
  • Patent Document 1 calculates the position of the tip of the bucket based on rotation angle information output from an angle detector attached to each of the boom, arm and bucket, and sets a preset area Discloses a hydraulic shovel that controls the boom so that the vertical velocity component of the bucket tip decreases as the distance between the bucket tip and the boundary approaches.
  • processing for calculating the target speed of the hydraulic cylinder and converting the target speed into the pilot pressure (control signal) of the flow control valve of the hydraulic cylinder may be performed. If there is a gap between the target speed and pilot pressure conversion table and the actual characteristics of the hydraulic cylinder and flow control valve, etc., the control accuracy of the bucket toe will be lowered.
  • the pilot pressure calculated in the process may be generated by the variable throttle of the solenoid proportional valve, the calculated pilot pressure can not be generated if the control accuracy of the solenoid proportional valve is not sufficient. Control accuracy of the bucket tip is reduced.
  • the control accuracy of the front end of the working machine is lowered due to various errors and accumulation thereof, and the construction accuracy of the target surface may be lowered.
  • An object of the present invention is to provide a working machine capable of improving the construction accuracy of a target surface even when the detection accuracy of the detector and the control accuracy of the front end of the working machine are not sufficient. It is to provide.
  • the present application includes a plurality of means for solving the above problems, and one example is an articulated work machine including a boom, an arm and a bucket, and a boom for driving the boom, the arm and the bucket, respectively.
  • a control device for outputting a first control signal according to the operation of the operator to at least one of a cylinder, an arm cylinder and a bucket cylinder, the boom cylinder, the arm cylinder, and a flow control valve of the bucket cylinder; At least one of the boom cylinder, the arm cylinder, and the bucket cylinder so that the tip of the work implement moves along the target surface when the tip of the work implement approaches the target surface according to a control signal.
  • Control that generates a second control signal for operating the second control signal newly or by correcting the first control signal
  • a working machine having a signal operation unit and a control device that controls flow control valves of the boom cylinder, the arm cylinder and the bucket cylinder based on the first control signal or the second control signal.
  • the position information of the finished form formed by the work machine driven based on the second control signal is calculated based on the landform information input from the landform measurement device which measures the surrounding landform of the work machine
  • the system further comprises a terrain operation unit, and the control signal operation unit corrects the second control signal so that the finished shape approaches the target surface based on the finished position information.
  • the construction accuracy of the target surface can be enhanced.
  • FIG. 3 is a detailed view of a front control hydraulic unit 160 in FIG. 2;
  • the hardware constitutions of the control controller of the hydraulic shovel of FIG. The figure which shows the coordinate system and target surface in the hydraulic shovel of FIG.
  • the functional block diagram of the control controller of the hydraulic shovel of FIG. FIG. 7 is a functional block diagram of an area limit control unit 43 in FIG. 6;
  • FIG. 14 is a functional block diagram of an area restriction control unit 43 in the second embodiment.
  • FIG. 10 is a flowchart of a series of processes executed by the correction value calculation unit 43i.
  • 5 is a flowchart of a series of processes executed by the controller 40.
  • FIG. 1 is a block diagram of a hydraulic excavator according to a first embodiment of the present invention
  • FIG. 2 is a diagram showing a controller of the hydraulic excavator according to the first embodiment of the present invention together with a hydraulic drive
  • 3 is a detailed view of the front control hydraulic unit 160 in FIG.
  • the hydraulic shovel 1 is configured of an articulated work machine 1 ⁇ / b> A and a vehicle body 1 ⁇ / b> B.
  • the vehicle body 1B includes a lower traveling body 11 traveling by the left and right traveling motors 3a and 3b, and an upper swing body 12 rotatably mounted on the lower traveling body 11.
  • the front work machine 1A is configured by connecting a plurality of driven members (the boom 8, the arm 9, and the bucket 10) that respectively rotate in the vertical direction, and the base end of the boom 8 of the front work machine 1A is pivoted upward It is supported by the front of the body 12.
  • the engine 18 mounted on the upper revolving superstructure 12 drives the hydraulic pump 2 and the pilot pump 48.
  • the hydraulic pump 2 is a variable displacement pump whose capacity is controlled by the regulator 2a, and the pilot pump 48 is a fixed displacement pump.
  • a shuttle block 162 is provided in the middle of the pilot lines 144, 145, 146, 147, 148, 149. Hydraulic pressure signals output from the operating devices 45, 46, 47 are also input to the regulator 2a via the shuttle block 162.
  • a hydraulic pressure signal is input to the regulator 2a via the shuttle block 162, and the discharge flow rate of the hydraulic pump 2 is controlled according to the hydraulic pressure signal.
  • a pump line 148a which is a discharge pipe of the pilot pump 48, passes through the lock valve 39, and then branches into a plurality of branches and is connected to the valves in the operation devices 45, 46, 47 and the hydraulic unit 160 for front control.
  • the lock valve 39 is an electromagnetic switching valve in this example, and the electromagnetic drive unit is electrically connected to a position detector of a gate lock lever (not shown) disposed in the driver's cab (FIG. 1). The position of the gate lock lever is detected by a position detector, and a signal corresponding to the position of the gate lock lever is input to the lock valve 39 from the position detector.
  • the lock valve 39 When the position of the gate lock lever is in the lock position, the lock valve 39 is closed and the pump line 148a is shut off, and when in the lock release position, the lock valve 39 is opened and the pump line 148a is opened. That is, in the state where the pump line 148a is shut off, the operation by the operation devices 45, 46, 47 is invalidated, and the operation such as turning or digging is prohibited.
  • the boom 8, the arm 9, the bucket 10 and the upper swing body 12 constitute driven members respectively driven by the boom cylinder 5, the arm cylinder 6, the bucket cylinder 7 and the swing hydraulic motor 4 (hydraulic actuator).
  • Operation instructions to these driven members 8, 9, 10, 12 are as follows: a traveling right lever 23a, a traveling left lever 23b, an operation right lever 1a and an operation left lever 1b mounted in the cab on the upper swing body 12 (these Is output according to the operation by the operator of the operation levers 1 and 23).
  • An operating device 47a having a traveling right lever 23a, an operating device 47b having a traveling left lever 23b, operating devices 45a and 46a sharing the operating right lever 1a, and an operating device sharing the operating left lever 1b in the cab 45b and 46b are installed.
  • the operating devices 45, 46 and 47 are hydraulic pilot systems, and based on the pressure oil discharged from the pilot pump, the operating amounts (e.g., lever strokes) and operations of the operating levers 1 and 23 operated by the operator, respectively.
  • a pilot pressure (sometimes referred to as operating pressure) is generated in accordance with the direction.
  • the pilot pressure thus generated is supplied to the hydraulic drive units 150a to 155b of the corresponding flow control valves 15a to 15f (see FIG. 2) in the control valve unit 20 via the pilot lines 144a to 149b (see FIG. 2). And used as control signals for driving the flow control valves 15a to 15f.
  • the pressure oil discharged from the hydraulic pump 2 passes through the flow control valves 15a, 15b, 15c, 15d, 15e, 15f (see FIG. 2), the traveling right hydraulic motor 3a, the traveling left hydraulic motor 3b, the turning hydraulic motor 4,
  • the boom cylinder 5, the arm cylinder 6, and the bucket cylinder 7 are supplied.
  • the swing hydraulic motor 4 is rotated by the supplied pressure oil, so that the upper swing structure 12 swings with respect to the lower traveling body 11.
  • the traveling right hydraulic motor 3a and the traveling left hydraulic motor 3b are rotated by the supplied pressure oil, whereby the lower traveling body 11 travels.
  • the boom angle sensor 30 is mounted on the boom pin
  • the arm angle sensor 31 is mounted on the arm pin
  • the bucket link 13 is mounted on the bucket link 13 so that the pivot angles ⁇ , ⁇ and ⁇ (see FIG. 5) of the boom 8 and arms 9 and 10 can be measured.
  • An angle sensor 32 is attached, and a vehicle body inclination angle sensor 33 for detecting an inclination angle ⁇ (see FIG. 5) of the upper structure 12 (vehicle body 1B) with respect to a reference plane (for example, horizontal surface) is attached to the upper structure 12 It is done.
  • a terrain measurement device 96 (see FIGS. 1 and 8) for measuring the topography around the hydraulic shovel 1 is attached to the front upper end of the cab.
  • a three-dimensional laser scanner can be used as the topography measurement device 96.
  • the three-dimensional laser scanner outputs the irradiation angle of the laser beam and the time until the laser beam returns, and converts the time, and the positional information of each point on the ground surface based on the distance and the irradiation angle ( Three-dimensional coordinates) are calculated.
  • the position information of each point is used by the controller 40 as topography information around the hydraulic shovel.
  • the topography measurement device 96 as long as the distance to the measurement target can be grasped, for example, a stereo camera using parallax of two cameras, a millimeter wave scanner using radio waves, or the like can also be used. Further, the installation position of the topography measurement device 96 can be appropriately changed as long as it is a position at which the measurement of the surrounding topography can be made without being limited to the front upper end portion of the cab.
  • the hydraulic shovel of the present embodiment is provided with a control system that assists the operator in the digging operation. Specifically, when the digging operation (specifically, at least one instruction of an arm cloud, a bucket cloud, and a bucket dump) is input through the operation device 45b, 46a, the target surface 60 (see FIG. 5) and Based on the positional relationship of the tip of the work implement 1A (in this embodiment, the tip of the bucket 10), the hydraulic actuator is held so that the position of the tip of the work implement 1A is within the area on the target surface 60 and above. Output a control signal for forcibly operating at least one of 5, 6 and 7 (for example, extend the boom cylinder 5 and forcibly perform the boom raising operation) to the corresponding flow control valves 15a, 15b and 15c.
  • a control signal for forcibly operating at least one of 5, 6 and 7 for example, extend the boom cylinder 5 and forcibly perform the boom raising operation
  • a drilling control system is provided.
  • this control may be referred to as "area limited control” or “machine control”. Since this control prevents the tip of the bucket 10 from exceeding the target surface 60, excavation along the target surface 60 becomes possible regardless of the level of the operator's skill.
  • the control point relating to the area restriction control is set to the tip of the bucket 10 of the hydraulic shovel (the tip of the work machine 1A).
  • the control point can be changed to anything other than the bucket tip as long as it is a point at the tip end portion of the work machine 1A.
  • the bottom of the bucket 10 and the outermost part of the bucket link 13 can also be selected.
  • the pilot pressure generated by the operation of the operating devices 45a, 45b and 46a is referred to as "first control signal", and the controller 40 controls the solenoid proportional valves 54b, 55a,
  • the pilot pressure newly generated separately may be referred to as a "second control signal”.
  • the excavation control system capable of executing area restriction control is a machine control ON / OFF switch 17 installed at a position not obstructing the operator's view such as above the operation panel in the cab and switching on / off of area restriction control, area restriction A controller (control device) 40, which is a computer capable of executing control, is provided.
  • the front control hydraulic unit 160 is provided on the pilot lines 144 a and 144 b of the operating device 45 a for the boom 8 and detects a pilot pressure (first control signal) as an operation amount of the operation lever 1 a.
  • Pressure sensors 70a and 70b see FIG. 3
  • an electromagnetic proportional valve 54a see FIG.
  • an electromagnetic proportional valve 54c (see FIG. 3) that is connected to the pilot pump 48 on the primary port side to reduce and output the pilot pressure from the pilot pump 48, and pilot pressure in the pilot line 144b
  • a shuttle valve 82b (see FIG. 3) is provided which selects the high pressure side of the control pressure output from the solenoid proportional valve 54c and leads it to the hydraulic drive unit 150b of the flow control valve 15a.
  • the front control hydraulic unit 160 is installed on the pilot lines 145a and 145b for the arm 9, and is a pressure sensor that detects a pilot pressure (first control signal) as an operation amount of the control lever 1b and outputs it to the controller 40.
  • an electromagnetic proportional valve 55a (see FIG. 3) which is disposed in the pilot line 145a and reduces and outputs the pilot pressure (first control signal) in the pilot line 145a based on the control signal from the controller 40 (see FIG.
  • the port side is connected to the pilot pump 48 to reduce the pilot pressure from the pilot pump 48
  • a shuttle that selects the high pressure side of the proportional solenoid valve 55c (see FIG. 3), the pilot pressure in the pilot line 145a and the control pressure output from the proportional solenoid valve 55c, and guides it to the hydraulic drive unit 151a of the flow control valve 15b.
  • a valve 84a (see FIG. 3) is provided.
  • the front control hydraulic unit 160 also detects a pilot pressure (first control signal) as an operation amount of the control lever 1a on the pilot lines 146a and 146b for the bucket 10 and outputs the pressure sensor 72a to the controller 40. , 72b (see FIG. 3), and solenoid proportional valves 56a and 56b (see FIG. 3) that reduce and output the pilot pressure (first control signal) based on the control signal from the controller 40, and the primary port side is the pilot
  • the solenoid proportional valves 56c and 56d (see FIG.
  • the solenoid proportional valves 54a, 54c, 55c, 56c, 56d are driven by outputting control signals from the controller 40, the operator of the operation devices 45a, 45b, 46a Since the pilot pressure (second control signal) can be generated even when there is no operation, the boom raising operation, the boom lowering operation, the arm cloud operation, the bucket cloud operation or the bucket dump operation can be forcibly generated.
  • the solenoid proportional valves 54b, 55a, 55b, 56a, 56b are driven by the controller 40, the pilot pressure (first control signal) generated by the operator operation of the operating devices 45a, 45b, 46a is reduced.
  • the pilot pressure (second control signal) can be generated, and the speed of the boom lowering operation, the arm cloud / dump operation, and the bucket cloud / dump operation can be forcibly reduced compared to the operator operation.
  • the controller 40 includes shape information and position information of the target surface 60 stored in the ROM 93 or RAM 94 described later, detection signals of the angle sensors 30 to 32 and the inclination angle sensor 33, and detection signals of the pressure sensors 70 to 72. It is input. Further, the controller 40 outputs an electric signal for correcting the control signal (pilot pressure) for performing the area limitation control to the solenoid proportional valves 54 to 56.
  • the hardware configuration of the controller 40 is shown in FIG.
  • the controller 40 has an input unit 91, a central processing unit (CPU) 92 as a processor, a read only memory (ROM) 93 and a random access memory (RAM) 94 as a storage device, and an output unit 95. ing.
  • CPU central processing unit
  • ROM read only memory
  • RAM random access memory
  • the input unit 91 is a signal from the angle sensors 30 to 32 and the inclination angle sensor 33 which are the working machine posture detection device 50, a signal from the target surface setting device 51 which is a device for setting the target surface 60, and a machine Input a signal from the control ON / OFF switch 17 and a signal from the operator operation detection device 52a which is a pressure sensor (including the pressure sensors 70, 71, 72) for detecting the operation amount from the operation devices 45a, 45b, 46a And perform A / D conversion.
  • the ROM 93 is a recording medium storing a control program for executing area restriction control including processing according to a flowchart to be described later, and various information and the like necessary for executing the flowchart.
  • the CPU 92 stores the information in the ROM 93 Predetermined arithmetic processing is performed on the signals taken in from the input unit 91 and the memories 93 and 94 according to the control program.
  • the output unit 95 generates a signal for output according to the calculation result in the CPU 92 and outputs the signal to the solenoid proportional valves 54 to 56 or the notification device 53 to drive and control the hydraulic actuators 5 to 7. Or displays the images of the vehicle body 1B, the bucket 10, the target surface 60, etc. on the display screen of the monitor which is the notification device 53.
  • the notification device 53 is a display (display device) that displays the positional relationship between the target surface 60 and the work machine 1A to the operator, or at least a speaker that communicates the positional relationship between the target surface 60 and the work machine 1A by sound (including sound). It consists of one.
  • controller 40 in FIG. 4 includes semiconductor memories such as the ROM 93 and the RAM 94 as storage devices, any storage device can be substituted in particular.
  • a magnetic storage device such as a hard disk drive may be included.
  • FIG. 6 is a functional block diagram of the controller 40 according to the embodiment of the present invention.
  • the controller 40 includes an area limit control unit 43 and an electromagnetic proportional valve control unit 44.
  • the area restriction control unit 43 of the present embodiment The control signal (second control signal) of the boom cylinder 5 (flow control valve 15a) is forcibly generated so that the toe of the bucket 10 moves along the target surface 60, and the generated control signal is the flow control valve 15a.
  • the processing of controlling the working machine 1A is executed by outputting to.
  • the work machine posture detection device 50, the target surface setting device 51, and the machine control ON / OFF switch 17 are connected to the area restriction control unit 43.
  • the working machine attitude detection device 50 is configured of a boom angle sensor 30, an arm angle sensor 31, a bucket angle sensor 32, and a vehicle body inclination angle sensor 33.
  • the target surface setting device 51 is an interface capable of inputting information on the target surface 60 (including position information and tilt angle information of each target surface).
  • the input of the target surface via the target surface setting device 51 may be performed manually by the operator or may be taken from the outside via a network or the like.
  • a satellite communication antenna (not shown) such as a GNSS receiver is connected to the target surface setting device 51. If data communication with the external terminal storing the three-dimensional data of the target surface defined on the global coordinate system (absolute coordinate system) is possible, the shovel based on the global coordinates of the shovel specified by the satellite communication antenna A target plane corresponding to the position can be searched and captured in the three-dimensional data of the external terminal.
  • the operator operation detection device 52a is a pressure sensor 70a, 70b, 71a, 71b, which acquires an operation pressure generated in the pilot lines 144, 145, 146 by the operation of the operation levers 1a, 1b (operation devices 45a, 45b, 46a) by the operator. It consists of 72a and 72b. That is, the operation on the hydraulic cylinders 5, 6, 7 related to the working machine 1A is detected.
  • FIG. 7 is a functional block diagram of the area limit control unit 43 in FIG.
  • the area restriction control unit 43 includes an operation amount calculation unit 43a, a posture calculation unit 43b, a target surface calculation unit 43c, a topography calculation unit 43m, a boom pilot pressure calculation unit by arm angle 43n, and a digging operation determination unit 43o.
  • the target pilot pressure calculator 43h, the correction value calculator 43i, and the correction value storage 43j are provided.
  • the operation amount calculator 43a calculates the amount of operation of the operation devices 45a, 45b, 46a (the operation levers 1a, 1b) based on the input from the operator operation detection device 52a. From the detection values of the pressure sensors 70, 71, 72, the amount of operation of the operating devices 45a, 45b, 46a can be calculated.
  • the calculation of the operation amount by the pressure sensors 70, 71, 72 is only an example, and the operation levers are detected by, for example, a position sensor (for example, a rotary encoder) that detects the rotational displacement of the operation levers of the operation devices 45a, 45b, 46a.
  • the amount of operation of may be detected.
  • a stroke sensor for detecting the amount of expansion and contraction of each hydraulic cylinder 5, 6, 7 is attached, and the operation speed of each cylinder is calculated based on the detected time change of the amount of expansion and contraction.
  • the configuration to calculate is also applicable.
  • the posture calculation unit 43 b calculates the posture of the work machine 1 ⁇ / b> A and the position of the tip of the bucket 10 based on the information from the work machine posture detection device 50.
  • the posture of the work implement 1A can be defined on the shovel coordinate system of FIG.
  • the shovel coordinate system of FIG. 5 is a coordinate system set to the upper swing body 12, and a base portion of the boom 8 rotatably supported by the upper swing body 12 is an origin, and the vertical direction in the upper swing body 12 is Z axis, X axis was set horizontally.
  • the inclination angle of the boom 8 with respect to the X axis is the boom angle ⁇
  • the inclination angle of the arm 9 with respect to the boom 8 is the arm angle ⁇
  • the inclination angle of the bucket toe with respect to the arm is the bucket angle ⁇ .
  • the inclination angle of the vehicle body 1B (upper revolving unit 12) with respect to the horizontal plane (reference plane) is taken as the inclination angle ⁇ .
  • the boom angle ⁇ is detected by the boom angle sensor 30, the arm angle ⁇ is detected by the arm angle sensor 31, the bucket angle ⁇ is detected by the bucket angle sensor 32, and the inclination angle ⁇ is detected by the vehicle body inclination angle sensor 33.
  • the coordinates of the position of the bucket tip in the shovel coordinate system and the posture of the working machine 1A are L1, L2 and L3. , ⁇ , ⁇ , ⁇ .
  • the target surface calculation unit 43 c calculates the position information of the target surface 60 based on the information from the target surface setting device 51, and stores this in the ROM 93.
  • a cross-sectional shape obtained by cutting a three-dimensional target surface at a plane (working plane of the working machine) along which the working machine 1A moves is used as a target plane 60 (two-dimensional target plane).
  • the terrain computing unit 43m computes positional information (coordinates) of each point on the ground surface based on the information of the plurality of irradiation angles and distances input from the terrain measuring device 96, and stores this in the ROM 93 as terrain information. Do. That is, the terrain computing unit 43m inputs position information of the terrain formed by the work machine 1A that is machine-controlled based on the second control signal (hereinafter, may be referred to as "finished") from the terrain measuring device 96. Calculated based on the topographical information to be
  • the digging operation determination unit 43o inputs a digging operation (in the present embodiment, an arm cloud operation, that is, an extension operation of the arm cylinder 6) via the operation device 45b based on the operation amount input from the operation amount calculation unit 43a. It is determined whether or not it is determined, and the determination result is output to the target pilot pressure calculation unit 43h.
  • a digging operation in the present embodiment, an arm cloud operation, that is, an extension operation of the arm cylinder 6
  • the arm pilot by arm angle 43n receives an arm cloud operation of a predetermined pilot pressure (for example, a pilot pressure when the operation amount of the control lever 1b is maximum) in the posture of the work machine 1A at that time (during process execution) And the boom pilot pressure to be output at each arm angle ⁇ to realize movement of the bucket toe along the target surface 60 by interposing the forced operation of the boom by the machine control to the arm cloud operation It is a part which calculates a series of values of (second control signal). The calculation result is stored in the ROM 93. In place of the calculation of the boom pilot pressure for each arm angle, an equation expressing the boom pilot pressure as a function of the arm angle may be derived and stored in the ROM 93.
  • a predetermined pilot pressure for example, a pilot pressure when the operation amount of the control lever 1b is maximum
  • the boom pilot pressure to be output at each arm angle ⁇ to realize movement of the bucket toe along the target surface 60 by interposing the forced operation of the boom by the machine control to the arm cloud
  • the boom pilot pressure calculator 43n for each arm angle calculates the posture information of the work machine 1A calculated by the posture calculator 43b and the position information of the tip of the bucket 10, and the target surface 60 calculated by the target surface calculator 43c. Based on the position information, the positional relationship between the bucket toe and the target surface 60 at that time and the posture of the work implement 1A are grasped. As a result, it is assumed that at the start of processing, the bucket toe (P1), the arm pivoting center (Ca1), and the target surface 60 can be grasped to be in the positional relationship shown in FIG.
  • the boom pilot pressure calculator 43 n by arm angle assumes that an arm cloud operation of a predetermined value (for example, a pilot pressure value when the operation amount of the control lever 1 b is maximum) is input.
  • An arc Tr1 which is a locus of the bucket toe, is calculated.
  • the intersection of the arc Tr1 and the target surface 60 is calculated.
  • boom control (machine control) by machine control is added to arm cloud operation by pilot pressure of predetermined value about an arm angle after intersection P2 and a bucket toe 10 is assumed to be moved along the target surface (ie, moved on the straight line TL in FIG. 9), in which case the boom pilot pressure to be output by the machine control is calculated for each arm angle.
  • the boom pilot pressure is set to 0 for all arm angles, and machine control is not performed.
  • the boom pilot pressure calculation unit by arm angle 43n is the target of the velocity vector of the bucket toe (vector in the tangential direction of the arc at the point where the toe is located) resulting from the arm operation for the arm angle after the intersection point (P2).
  • Search for a point where the component perpendicular to the plane 60 (downward in the figure is negative and upward is positive) changes from negative to positive calculates the pilot pressure of boom up from P2 to that point, and from that point onwards Calculates the pilot pressure for boom lowering.
  • the boom raising pilot pressure generated by the solenoid proportional valve 54a from point P2 to point P3 is from point P3 to point P4.
  • FIG. 10 is a diagram showing the calculation results of the boom pilot pressure for each arm angle in the case of FIG. 9 by the boom pilot pressure calculator 43 n classified by arm angle.
  • the arm angles at points P2, P3 and P4 in FIG. 9 are respectively ⁇ 2, ⁇ 3 and ⁇ 4.
  • the boom raising pilot pressure is generated at point P2, and once it becomes zero at point P3, the boom lowering pilot pressure is generated up to point P4.
  • the arm rotation center located at Ca1 at point P2 moves upward by boom raising and reaches Ca2 at point P3, and then moves downward by boom lowering to point P4. Reaches Ca3.
  • the correction value calculator 43i is a part that calculates a correction value of the boom pilot pressure (second control signal) at the time of machine control activation. Based on the information on the target surface 60 of the target surface computing unit 43c and the topography information of the topography computing unit 43m, the correction value computing unit 43i grasps the vertical relationship between the target surface 60 and the finished shape on the same coordinate system A coordinate system or a global coordinate system is grasped, and if necessary, coordinate conversion is appropriately performed (the same applies to the following similar processing), and a correction value is calculated according to the distance between the target surface 60 and the finished shape. An example of the target surface 60 and the finished shape 97 is shown in FIG.
  • the distance between the target surface 60 and the finished shape 97 is the distance between the target surface 60 and the finished shape 97 in the vertical direction of the target surface 60, with the position of the target surface 60 as a reference (zero).
  • the lower side of the target surface 60 is positive, and the upper side is negative. Therefore, it is positive in the case of FIG.
  • the finished shape 97 is formed from a plurality of points having different vertical distances from the target surface 60, in the present embodiment, the distance to the target surface 60 is calculated for each of the plurality of points forming the finished shape 97.
  • the average value of the calculated plurality of distances is taken as the distance between the target surface 60 and the finished shape 97.
  • the calculation of the “distance” between the target surface 60 and the finished shape 97 is not limited to this method.
  • the distance between a point arbitrarily selected from a plurality of points forming the finished shape 97 and the target surface 60 Alternatively, the finished shape 97 may be approximated as a straight line parallel to the target surface 60, and the distance between the straight line and the target surface may be used as the "distance".
  • the correction value calculation unit 43i calculates correction values of pilot pressure (second control signal) for both boom raising and boom lowering using the calculated distance between the target surface 60 and the finished shape 97 and FIGS. 12 and 13.
  • the two calculated correction values are stored in the correction value storage unit 43j.
  • FIG. 12 is a correlation diagram of the distance between the target surface 60 and the finished shape 97 and the correction value of the boom raising pilot pressure, and the correction value of the boom raising pilot pressure increases as the distance between the target surface 60 and the finished shape 97 increases.
  • FIG. 13 is a correlation diagram of the distance between the target surface 60 and the finished shape 97 and the correction value of the boom lowering pilot pressure, and the correction value of the boom lowering pilot pressure decreases as the distance between the target surface 60 and the finished shape 97 increases. It is set to
  • the correction value storage unit 43j is a portion that stores the calculation result of the correction value calculation unit 43i.
  • the stored correction value is overwritten each time the correction value is calculated by the correction value calculation unit 43i, and is referred to by the target pilot pressure calculation unit 43h at the timing when the machine control is activated.
  • the target pilot pressure calculation unit 43h When the arm cloud operation is performed, the target pilot pressure calculation unit 43h outputs a predetermined arm cloud pilot pressure as the target pilot pressure of the flow control valve 15b to the electromagnetic proportional valve control unit 44, and calculates boom pilot pressure by arm angle The boom pilot pressure determined based on the calculation result of the unit 43n is output to the solenoid proportional valve control unit 44 as the target pilot pressure of the flow control valve 15a.
  • the target pilot pressure calculation unit 43 h receives the arm cloud by the operating device 45 b.
  • the constant value is output to the solenoid proportional valve control unit 44 as the arm cloud pilot pressure regardless of the operation amount of The boom at the arm angle at that time is calculated based on the boom pilot pressure (second control signal) for each arm angle calculated by the arm pilot for each arm angle 43n and the arm angle calculated by the posture calculation unit 43b. Determine pilot pressure.
  • the correction value stored in the correction value storage unit 43j is referred to and the determination is made.
  • a value obtained by adding the correction value to the value of the boom pilot pressure is output to the solenoid proportional valve control unit 44 as the boom pilot pressure.
  • the target pilot pressure calculation unit 43h follows the operator operation based on the calculation result of the operation amount calculation unit 43a.
  • the pilot pressure is configured to be output to the corresponding flow control valve 15.
  • the solenoid proportional valve control unit 44 calculates commands to the respective solenoid proportional valves 55 c, 54 a, 54 c based on the target pilot pressures to the flow control valves 15 a, 15 b calculated by the target pilot pressure calculation unit 43 h.
  • the boom pilot pressure calculator 43n for each arm angle calculates the posture of the work machine 1A and the position of the tip of the bucket 10 calculated by the posture calculator 43b based on the information from the work machine posture detection device 50, and the target The position of the target surface 60 calculated by the target surface calculation unit 43 c is input based on the information from the surface setting device 51.
  • the boom pilot pressure calculation unit by arm angle 43n performs arm crowding at a predetermined arm pilot pressure (for example, a pilot pressure value when the operation amount of the control lever 1b is maximum).
  • the boom pilot pressure for each arm angle is calculated so that the toe of the bucket 10 moves along the target surface 60 when it is desired. It should be noted that there is no need to activate the machine control when the bucket toe does not reach the target surface 60 even if the arm cloud is reached (when the trajectory of the toe at the arm cloud does not intersect with the target surface 60), all arm angles Set the boom pilot pressure to 0 for.
  • the digging operation determination unit 43o determines whether an arm cloud operation is input through the operating device 45b based on the operation amount input from the operation amount calculation unit 43a.
  • the process proceeds to S140, and when it is determined that the arm cloud operation is not input, the process proceeds to S220.
  • the target pilot pressure calculation unit 43h calculates the target pilot pressure of each hydraulic cylinder in accordance with the operation amount input from the operation amount calculation unit 43a, and outputs the target pilot pressure to the solenoid proportional valve control unit 44.
  • the working machine 1A operates in accordance with the input operation on the operation devices 45 and 46.
  • boom pilot pressure calculation unit by arm angle 43n receives the arm angle ⁇ at that time from posture calculation unit 43b, and based on the boom pilot pressure for each arm angle calculated in S120, according to the input arm angle ⁇ The boom pilot pressure is calculated, and the process proceeds to S150.
  • the target pilot pressure calculation unit 43h determines whether the boom pilot pressure calculated in S140 is zero. If it is determined in S150 that the boom pilot pressure is not 0 (that is, if the machine control is activated), the process proceeds to S160.
  • the target pilot pressure calculation unit 43h determines whether the boom pilot pressure calculated in S140 is for boom raising or boom lowering. Then, a correction value corresponding to the determination result among the boom raising correction value and the boom lowering correction value stored in the correction value storage unit 43j is acquired, and the correction value is added to the boom pilot pressure calculated in S140, Go to S170.
  • the target pilot pressure calculation unit 43h outputs a command to generate the arm pilot pressure in S120 (in the present embodiment, a command to fully open the solenoid proportional valve 55c) to the solenoid proportional valve control unit 44.
  • the boom pilot pressure in S160 is electromagnetic waves, and when not passing through the S160 (that is, when the machine control does not activate) It outputs to the proportional valve control unit 44.
  • the pilot pressure corresponding to when the electromagnetic proportional valve 55c is fully open and the arm cloud operation amount is maximum acts on the drive portion 151a of the flow control valve 15b, and the arm cloud operation is performed.
  • the solenoid proportional valve 54a or 54c is opened to generate the boom pilot pressure in S160, and the boom operation is performed by the machine control.
  • the combination of the boom operation and the arm cloud operation realizes horizontal pulling of the bucket toe along the target surface 60, and accurate excavation along the target surface 60 is realized regardless of the level of the operator's skill.
  • the boom pilot pressure is 0, so only the arm cloud operation is performed.
  • the digging operation determination unit 43o determines whether an arm cloud operation is input based on the operation amount input from the operation amount calculation unit 43a. Here, if it is determined that the arm cloud operation is input (that is, the arm cloud operation is continuing), the process returns to S140 and the machine control is continued. On the other hand, if it is determined that the arm cloud operation has not been input (that is, the arm cloud operation has ended), the process proceeds to S190.
  • the correction value calculation unit 43i determines whether excavation of the terrain by the bucket 10 has been performed. As a method of this determination, there is a method of comparing the presence or absence of the change of the topography before and after the arm cloud operation based on the measurement result of the topography measurement device 96. In addition, when machine control is activated (that is, when the boom pilot pressure is output to the solenoid proportional valve control unit 44 via S160), a method may be adopted in which it is considered that the terrain has been excavated.
  • the topography information (terrain data) calculated by the topography calculation unit 43m in S200 is input, and the process proceeds to S210. On the other hand, when it is determined in S190 that there is no digging, the next control cycle is waited and the processing after S110 is repeated.
  • the correction value calculation unit 43i first sets the target surface 60 for each of the plurality of points forming the finished form 97 based on the information on the target surface 60 of the target surface calculation unit 43c and the topography information of the topography calculation unit 43m. Calculate the distance between Then, the average value of the calculated plurality of distances is set as the distance between the target surface 60 and the finished shape 97. Next, the correction value calculation unit 43i is made based on the calculated distance between the target surface 60 and the finished shape 97 and the correlation between the distance defined in FIGS. 12 and 13 and the boom pilot pressure (second control signal). The correction values of the pilot pressure at both the boom raising and boom lowering are calculated so that the shape approaches the target surface 60, and the calculation result is stored in the correction value storage unit 43j.
  • the correction value calculation unit 43i calculates a correction value that reduces the pilot pressure by lowering the boom.
  • the boom pilot pressure in S140 is corrected with such a correction value, the locus drawn by the tip of the toe moves upward at the time of the next processing of S170 more than before correction, and over digging is prevented. It can be approached.
  • the correction value calculator 43i calculates a correction value that decreases the pilot pressure and increases the pilot pressure by lowering the boom. If the boom pilot pressure is corrected with such a correction value, the locus drawn by the tip of the toe moves downward as compared to before correction, and the occurrence of undigging is prevented, so the finished shape can be brought closer to the target surface 60.
  • the articulated work machine 1A including the boom 8, the arm 9 and the bucket 10, the boom cylinder 5, the arm cylinder 6 and the bucket cylinder 7 for driving the boom 8, the arm 9 and the bucket 10, respectively
  • An operating device 45a, 45b, 46a for outputting a control signal (first control signal) according to the operation of the operator to at least one of the flow control valves 15a, 15b, 15c of these hydraulic cylinders 5, 6, 7
  • the tip (bucket toe) of the working machine 1A approaches the target surface 60 according to the control signal (first control signal) output from 45a, 45b, 46a
  • the tip of the working machine 1A is along the target surface 60
  • Target pilot pressure calculation unit (control signal calculation unit) 4 that newly generates a control signal (second control signal) for operating boom cylinder 5 to move a hydraulic excavator 1 having a controller 40 for controlling the flow control valves 15a, 15b, 15c of the boom cylinder 5, the arm cylinder 6, and the
  • the target pilot pressure calculation unit 43 h corrects the second control signal so that the difference between the position information of the finished form 97 and the position information of the target surface 60 becomes small. It was decided to.
  • the control signal (second control signal) of the boom cylinder 5 (flow control valve 15a) is corrected so that the finished product 97 approaches the target surface 60 each time excavating. Since the difference between the position information on the target surface 60 and the position information on the target surface 60 is small, the detection accuracy of the angle sensors 30, 31 and 32 may not be sufficient, or the control accuracy of the front end of the working machine may not be sufficient Also, drilling can be performed while aligning the tip of the bucket 10 with the target surface 60. As a result, the construction accuracy of the target surface 60 can be enhanced.
  • the control signal (second control signal) of the boom cylinder 5 is moved by the machine control so that the bucket toe moves along the target surface 60.
  • the control signal (second control signal) generated at the time of machine control is not limited to that of the boom cylinder 5, but generates control signals (second control signals) for the arm cylinder 6 and the bucket cylinder 7. It is good. That is, as long as the bucket toe moves along the target surface 60, at least one control signal of the boom cylinder 5, the arm cylinder 6, and the bucket cylinder 7 may be generated to control the work implement 1A. In this case, it goes without saying that it is the control signal related to the hydraulic cylinder (that is, at least one of the hydraulic cylinders 5, 6, 7) that has generated the control signal to calculate the correction value. There is not.
  • the conditions for activating the machine control are the arm cloud operation by the operator and the intersection of the trajectory of the bucket toe and the target surface, but a boom lowering operation by the operator may be added to this.
  • the boom lowering pilot pressure by the operator operation is canceled by closing the solenoid proportional valve 54b by the controller 40, and the required boom pilot pressure is generated by the solenoid proportional valve 54a.
  • it is necessary to lower the boom by machine control for example, it is sufficient to similarly cancel the boom lowering pilot pressure by the operator operation and generate the pilot pressure necessary for the machine control by the solenoid proportional valve 54c. If the boom lowering pilot pressure required for the machine control is smaller than the pilot pressure by the operator operation, the opening degree of the solenoid proportional valve 54b may be appropriately reduced to generate the necessary pilot pressure.
  • a hydraulic shovel may be constituted so that one of boom raising and lowering may be performed.
  • FIG. 15 is a functional block diagram of the area restriction control unit 43 according to the present embodiment.
  • the area limit control unit 43 includes an operation amount calculation unit 43a, an attitude calculation unit 43b, a target surface calculation unit 43c, a cylinder speed calculation unit 43d, a bucket tip speed calculation unit 43e, and a target bucket tip speed calculation unit 43f.
  • the target cylinder speed calculation unit 43g, the target pilot pressure calculation unit 43h, the topography calculation unit 43m, the correction value calculation unit 43i, and the correction value storage unit 43j are the same as in the first embodiment, and thus the description thereof is omitted.
  • the cylinder speed calculator 43d calculates the operating speed (cylinder speed) of each hydraulic cylinder 5, 6, 7 based on the operation amount (first control signal) calculated by the operation amount calculator 43a.
  • the operating speeds of the hydraulic cylinders 5, 6, 7 are calculated from the operating amounts calculated by the operating amount calculator 43a, the characteristics of the flow control valves 15a, 15b, 15c, and the sectional areas of the hydraulic cylinders 5, 6, 7.
  • the displacement can be calculated from the pump flow rate (discharge amount) obtained by multiplying the displacement (tilt angle) of the hydraulic pump 2 and the rotational speed.
  • the bucket tip speed calculator 43e operates the operator based on the operating speeds of the hydraulic cylinders 5, 6, 7 calculated by the cylinder speed calculator 43d and the attitude of the work machine 1A calculated by the attitude calculator 43b.
  • a velocity vector B of the bucket tip (tip) according to (first control signal) is calculated.
  • the velocity vector B at the tip of the bucket can be decomposed into a component by which is horizontal to the component bx horizontal to the target surface 60 based on the information on the target surface 60 input from the target surface calculation unit 43c.
  • the target bucket tip speed calculator 43f calculates a target speed vector T of the bucket tip (tip). For that purpose, the target bucket tip speed calculator 43f first sets the target surface 60 of the speed vector of the bucket tip based on the distance D (see FIG. 5) from the bucket tip to the target surface 60 to be controlled and the graph of FIG. Calculate the limit value ay of the vertical component. The calculation of the limit value ay is stored in the ROM 93 of the controller 40 in the form of a function or a table that defines the relationship between the limit value ay and the distance D as shown in FIG. .
  • the distance D can be calculated from the position of the tip of the bucket 10 (coordinates) calculated by the posture calculation unit 43 b and the distance of a straight line including the target surface 60 stored in the ROM 93.
  • the relationship between the limit value ay and the distance D preferably has a characteristic that the limit value ay monotonically decreases with an increase in the distance D, but is not limited to the one shown in FIG.
  • the limit value ay may be held at an individual predetermined value when the distance D is equal to or greater than a positive predetermined value or equal to or smaller than a predetermined negative value, and the relationship between the limit value ay and the distance D is defined by a curve. Also good.
  • the target bucket tip speed calculation unit 43f acquires a component by of the velocity vector B of the tip of the bucket perpendicular to the target surface 60, and based on the magnitude relationship between the positive and negative of absolute component and this vertical component by and limit value ay.
  • the equation necessary to calculate the component cy perpendicular to the target surface 60 of the velocity vector C of the bucket tip to be generated by the operation of the boom 8 by machine control is selected (the equation selection process will be described later with reference to FIG. To do).
  • the vertical component cy is calculated from the selected equation, and when generating the vertical component cy, the horizontal component cx is calculated from the movement permitted by the boom, and the target velocity is obtained from the velocity vectors B and C and the limit value ay.
  • Calculate the vector T In the following, a component perpendicular to the target surface 60 in the target velocity vector T is ty and a horizontal component is tx, and the process of deriving the target vector T will be described later with reference to FIG.
  • the target cylinder speed calculator 43g calculates the target speeds of the hydraulic cylinders 5, 6, 7 based on the target speed vector T (tx, ty) calculated by the target bucket tip speed calculator 43f.
  • the target velocity vector T is defined by the sum of the velocity vector B by operator operation and the velocity vector C by machine control, the target velocity of the boom cylinder 5 can be calculated from the velocity vector C.
  • the target velocity vector T at the tip of the bucket becomes a composite value of the velocity vectors appearing at the tip of the bucket when the hydraulic cylinders 5, 6, 7 are operated at the target velocity.
  • the target cylinder speed calculator 43g determines the hydraulic cylinders 5, 6, 6, based on the speed vector B at the bucket tip calculated by the bucket tip speed calculator 43e. Calculate the target speed of 7.
  • the target cylinder speed calculator 43g determines the calculation result of the cylinder speed calculation unit 43d as the target pilot pressure calculation unit 43h. Output to
  • the correction value calculation unit 43i is a part that calculates a correction value of the boom pilot pressure (second control signal) when the machine control is activated, as in the first embodiment.
  • the correction value calculation unit 43i includes position information (a position information is input from the posture calculation unit 43b) of a trajectory of movement of the tip (bucket tip) of the work machine 1A by machine control. Based on 43 m of topographical information, the upper and lower relationship between the locus and the finished form 97 is grasped on the same coordinate system, and the correction value is calculated according to the distance between the locus and the finished form 97.
  • the "locus” mentioned here is the locus of the bucket toe, which is input from the posture calculation unit 43b, and for example, the locus of the toe measured on a coordinate system independent of the shovel coordinate system by a three-dimensional laser scanner etc. Rather, it is a set of toe position information that the controller 40 is grasping.
  • FIG. 17 shows an example of a locus 98 of the bucket tip and a finished shape 97.
  • the target surface 60 is eventually obtained due to the influence of a decrease in sensor accuracy or control accuracy.
  • the case where the final form 97 is formed below is shown typically.
  • the distance between the trajectory 98 and the finished shape 97 is the distance between the trajectory 98 and the finished shape 97 in the vertical direction of the target surface 60, and the position of the trajectory 98 is taken as a reference (zero).
  • the lower side of the locus 98 is positive, and the upper side is negative. Therefore, in the case of FIG.
  • trajectory 98 and finished shape 97 are formed from a plurality of points having different vertical distances from target surface 60, so in the present embodiment, target surface 60 is formed for each of a plurality of points forming trajectory 98 and finished shape 97.
  • the positions of the locus 98 and the finished figure 97 are specified from the average value of the calculated plural distances, and the distances between the locus 98 and the finished figure 97 are calculated from the positions.
  • the calculation of the “distance” between the target surface 60 and the finished shape 97 is not limited to this method, for example, it is arbitrary from the plurality of points forming the finished shape 97 and the plurality of points forming the locus 98.
  • the distance between the two selected points may be used as the “distance”, or the locus 98 and the finished form 97 may be approximated as a straight line parallel to the target surface 60, and the distance between the two approximate straight lines may be used as the “distance”. You may use it.
  • the correction value calculation unit 43i of this embodiment calculates the correction value of pilot pressure for boom raising using the calculated distance between the trajectory 98 and the finished figure 97 and FIG. 12, and the calculated correction value is used as a correction value. It is stored in the storage unit 43j.
  • the target pilot pressure calculation unit 43h sends the flow rate control valves 15a, 15b, 15c of the hydraulic cylinders 5, 6, 7 to the flow rates based on the target speeds of the cylinders 5, 6, 7 calculated by the target cylinder speed calculation unit 43g. Calculate the target pilot pressure.
  • the target pilot pressures of the arm cylinder 6 and the bucket cylinder 7 are output to the solenoid proportional valve control unit 44 as they are.
  • the target pilot pressure of the remaining boom cylinder 5 is determined with reference to the correction value stored in the correction value storage unit 43 j when the value is not zero (that is, when machine control is activated). A value obtained by adding the correction value to the value of the boom pilot pressure is output to the solenoid proportional valve control unit 44 as the boom pilot pressure.
  • the solenoid proportional valve control unit 44 computes commands to the respective solenoid proportional valves 54 to 56 based on the target pilot pressures to the flow control valves 15a, 15b, 15c calculated by the target pilot pressure computing unit 43h. If the pilot pressure (first control signal) based on the operator's operation matches the target pilot pressure calculated by the target pilot pressure calculator 43h, the current value to the corresponding solenoid proportional valve 54 to 56 (command Value) becomes zero, and the operation of the corresponding solenoid proportional valves 54 to 56 is not performed.
  • FIG. 18 is a flowchart of processing executed by the correction value calculator 43i. This flowchart is started when the arm cloud operation is detected by the operation amount calculation unit 43a.
  • the correction value calculation unit 43i determines whether the arm cloud operation has ended based on the input value from the operation amount calculation unit 43a. If it is determined that the arm cloud operation has ended, the process proceeds to S320, and the terrain information calculated by the topography calculation unit 43m and the information on the target surface 60 calculated by the target surface calculation unit 43c are input, and the process proceeds to S330. On the other hand, when it is determined in S310 that the arm cloud operation is continuing, the processing of S310 is repeated.
  • the correction value calculator 43i determines, based on the topography information input in S320 and the information on the target surface 60, whether or not the finished shape 97 is located below the target surface 60 on the same coordinate system.
  • the position of the finished form 97 can be specified by the same method as that used for calculating the distance between the locus 98 and the finished form 97 described above.
  • the process proceeds to S340. If it is determined that the finished product 97 is located above the target surface 60, the process is ended and the next start is started. Wait until the timing.
  • the reason why the correction value is not calculated when the finished shape 97 is located above the target surface 60 is that if the target surface 60 can be excavated by one digging operation due to the size of the bucket 10 and the digging force etc. In the case where the finished form 97 is located above the target surface 60, it is not based on the idea that it is not possible to judge the accuracy.
  • the correction value calculation unit 43i acquires, from the posture calculation unit 43b, a set of position data in which the tip of the bucket 10 has moved between the start of the flowchart and the determination of YES in S310.
  • the track of the tip of the bucket 10 at the time of the digging operation (trajectory information).
  • the correction value calculation unit 43i first performs the finished form 97 and the trajectory 98 based on the information of the target surface 60 of the target surface calculation unit 43c, the topography information of the topography calculation unit 43m, and the trajectory information of the posture operation unit 43b.
  • the distances to the target surface 60 are calculated on the same coordinate system for each of a plurality of points forming the.
  • the positions of the finished figure 97 and the locus 98 are specified from the calculated average value of the plurality of distances, and the distance from the locus 98 to the finished figure 97 is calculated.
  • the correction value calculation unit 43i corrects the pilot pressure correction value at the boom raising based on the calculated distance between the trajectory 98 and the finished shape 97 and the correlation between the distance defined in FIG. 12 and the boom pilot pressure. The calculation is performed, and the calculation result is stored in the correction value storage unit 43 j.
  • the correction value calculation unit 43i calculates a correction value that reduces the pilot pressure by lowering the boom.
  • FIG. 19 is a flowchart of processing executed by the controller 40.
  • the controller 40 starts the flowchart of FIG. 19 when the operation amount calculator 43a detects an operation by the operator.
  • the cylinder speed calculator 43d calculates the operation speeds (cylinder speeds) of the hydraulic cylinders 5, 6, 7 based on the operation amount calculated by the operation amount calculator 43a.
  • bucket tip speed calculation unit 43e determines the operating speed of each hydraulic cylinder 5, 6, 7 calculated by cylinder speed calculation unit 43d and the attitude of work implement 1A calculated by attitude calculation unit 43b. Calculate the velocity vector B of the bucket tip (toe) by the operator's operation.
  • the bucket tip speed calculator 43e controls the bucket tip from the tip of the bucket from the distance of the straight line including the target surface 60 stored in the ROM 93 and the position (coordinates) of the tip of the bucket 10 calculated by the posture calculator 43b.
  • the distance D (see FIG. 5) to the target surface 60 is calculated.
  • the limit value ay of the component perpendicular to the target surface 60 of the velocity vector of the bucket tip is calculated.
  • the bucket tip speed calculation unit 43e acquires a component by perpendicular to the target surface 60 in the speed vector B of the bucket tip by the operator operation calculated in S420.
  • the target bucket tip speed calculation unit 43f determines whether the limit value ay calculated in S430 is 0 or more.
  • xy coordinates are set. In the xy coordinates, the x axis is parallel to the target surface 60 and positive in the right direction in the drawing, and the y axis is perpendicular to the target surface 60 and positive in the upper direction in the drawing.
  • the vertical component by and the limit value ay are negative, and the horizontal component bx and the horizontal component cx and the vertical component cy are positive. And it is clear from FIG.
  • the target bucket tip speed calculation unit 43f determines whether the vertical component by of the speed vector B of the toe by the operator's operation is 0 or more. When by is positive, it indicates that the vertical component by of the velocity vector B is upward, and when by is negative, it indicates that the vertical component by of the velocity vector B is downward. If it is determined in S460 that the vertical component by is 0 or more (ie, if the vertical component by is upward), the process proceeds to S470, and if the vertical component by is less than 0, the process proceeds to S500.
  • the target bucket tip speed calculation unit 43f compares the limit value ay with the absolute value of the vertical component by, and proceeds to S500 if the absolute value of the limit value ay is greater than or equal to the absolute value of the vertical component by. On the other hand, if the absolute value of the limit value ay is less than the absolute value of the vertical component by, the process proceeds to S530.
  • the vertical component cy is calculated based on the equation and the limit value ay of S430 and the vertical component by of S440.
  • a velocity vector C capable of outputting the calculated vertical component cy is calculated, and its horizontal component is set to cx (S510).
  • the target bucket tip speed calculation unit 43f determines whether the vertical component by of the speed vector B of the toe by the operator's operation is 0 or more. If it is determined in S480 that the vertical component by is greater than or equal to 0 (ie, if the vertical component by is upward), the process proceeds to S530, and if the vertical component by is less than 0, the process proceeds to S490.
  • the target bucket tip speed calculator 43f compares the limit value ay with the absolute value of the vertical component by, and proceeds to S530 if the absolute value of the limit value ay is greater than or equal to the absolute value of the vertical component by. On the other hand, if the absolute value of the limit value ay is less than the absolute value of the vertical component by, the process proceeds to S500.
  • the target bucket tip speed calculator 43f sets the speed vector C to zero.
  • the target cylinder speed calculation unit 43g calculates the target speeds of the hydraulic cylinders 5, 6, 7 based on the target speed vector T (ty, tx) determined in S520 or S540.
  • the target pilot pressure calculation unit 43h sets the target pilots to the flow control valves 15a, 15b, 15c of the hydraulic cylinders 5, 6, 7 based on the target speeds of the cylinders 5, 6, 7 calculated in S550. Calculate the pressure.
  • the target pilot pressure calculation unit 43h determines whether or not the velocity vector C of the bucket tip to be generated by the operation of the boom 8 by machine control is zero. If the velocity vector C is not zero (ie, machine control is activated), the process proceeds to S580, and if the velocity vector C is zero (ie, machine control is not activated), the process proceeds to S590 without adding a correction value in S580. move on.
  • target pilot pressure calculation unit 43h acquires the boom raising correction value stored in correction value storage unit 43j, and adds the correction value to the target pilot pressure to flow control valve 15a of boom cylinder 5 Go to S590.
  • the target pilot pressure calculator 43h outputs the target pilot pressures to the flow control valves 15a, 15b, 15c of the hydraulic cylinders 5, 6, 7 to the solenoid proportional valve controller 44.
  • the solenoid proportional valve control unit 44 controls the solenoid proportional valves 54, 55, and 56 such that the target pilot pressure acts on the flow control valves 15a, 15b, and 15c of the hydraulic cylinders 5, 6, and 7, whereby the working machine Drilling by 1A is performed.
  • the correction value calculation unit 43i Based on the flowchart of FIG. 18, the pilot pressure is increased by raising the boom, and the correction value is calculated to decrease the pilot pressure by lowering the boom.
  • the boom pilot pressure calculated in S560 is corrected with the correction value calculated in this way and machine control is activated, the trajectory drawn by the toe moves upward at the time of the processing of S590 compared to the previous excavating, and digging too much As a result, the finished shape can be brought closer to the target surface 60.
  • the operation amount calculator 43a waits until the lever operation by the operator is detected.
  • the articulated work machine 1A including the boom 8, the arm 9 and the bucket 10, the boom cylinder 5, the arm cylinder 6 and the bucket cylinder 7 for driving the boom 8, the arm 9 and the bucket 10, respectively
  • An operating device 45a, 45b, 46a for outputting a control signal (first control signal) according to the operation of the operator to at least one of the flow control valves 15a, 15b, 15c of these hydraulic cylinders 5, 6, 7
  • the tip (bucket toe) of the working machine 1A approaches the target surface 60 according to the control signal output from the 45a, 45b, 46a
  • the boom cylinder moves the tip of the working machine 1A along the target surface 60
  • a target pilot pressure calculation unit (control signal calculation unit) 43h for newly generating a control signal (second control signal) for operating 5;
  • the hydraulic excavator 1 including the control controller 40 that controls the flow control valves 15a, 15b and 15c of the boom cylinder 5, the arm cylinder 6 and the bucket
  • the control signal (pilot pressure) of the boom cylinder 5 is corrected so that the finished product 97 approaches the track 98 each time excavating, and the difference between the position information of the finished product 97 and the track 98 Therefore, the toe of the bucket 10 can be used as the target surface 60 even when the detection accuracy of the angle sensors 30, 31, 32 is not sufficient, or when the control accuracy of the front end of the work machine is not sufficient due to individual differences or aging. You can dig along the way. As a result, the construction accuracy of the target surface 60 can be enhanced.
  • the second control signal may be corrected based on the distance between the finished shape 97 and the target surface 60 as in the first embodiment, even in the hydraulic excavator provided with the area restriction control unit 43 having the configuration of FIG. .
  • the occurrence of the deviation between the trajectory 98 and the finished shape 97 means that the coordinate system (the shovel coordinate system) used by the controller 40 for controlling the toe (the work machine 1A) is set on the ground (global It means that it deviates from the coordinate system). Therefore, the correction may be performed by calibrating the shovel coordinate system so that the trajectory 98 approaches the finished shape 97.
  • the terrain measurement device 96 may be attached to the vehicle body 1B (hydraulic shovel 1) as shown in FIG. 1, or independently to the outside of the vehicle body 1B as shown in FIG. It may be installed, or may be mounted on a flying object 99 such as a drone as shown in FIG.
  • the terrain information can be input to the controller 40 on the vehicle body 1B wirelessly or by wire. If the terrain measurement device 96 is attached to the construction machine as shown in FIG. 1, the communication connection configuration between the terrain measurement device 96 and the controller 40 is simple. On the other hand, as shown in FIG. 21 and FIG. 22, when the terrain measurement device 96 is made independent from the construction machine, the same terrain measurement device 96 can output terrain information to a plurality of construction machines.
  • the correction value is not calculated when the distance is close to zero, and predetermined values from zero to positive and negative sides are given.
  • a threshold value may be set, and a correction value may be calculated when the threshold value is exceeded.
  • the distance may be divided into a plurality of sections, and a fixed correction value may be taken in each section, and the correction value may be configured to increase or decrease stepwise.
  • a predetermined correction value is calculated regardless of the magnitude of deviation from the threshold value, and the calculated correction value is added to the sum of the correction values thus far. May be adopted.
  • the target pilot pressure is calculated from the target cylinder speed as in the second embodiment, for example.
  • correction equivalent to the method of increasing or decreasing the pilot pressure may be performed by changing the characteristics of the conversion table.
  • the position information of the target surface calculated by the target surface calculation unit 43c and the position information of each point on the ground surface calculated by the topography calculation unit 43m are acquired in either the shovel coordinate system or the global coordinate system. Also good.
  • the operating devices 45, 46, 47 are hydraulic pilot systems in the above description
  • the electric pilots use control signals for controlling the flow control valves 15a, 15b, 15c of the hydraulic cylinders 5, 6, 7 as electric signals. You may use a method.
  • the correction value is calculated each time the excavation is performed, but the timing for calculating the correction value is not particularly limited. Therefore, for example, the operation to calculate the correction value before or after the start of the work on one day, calculate at a predetermined cycle, or calculate during the finishing work to excavate near the target surface (that is, during digging) You may.
  • toe of the bucket 10 was selected as a reference
  • the area restriction control unit 43 in the controller 40 is mounted on the hydraulic shovel 1
  • the area restriction control unit 43 is separated from the hydraulic shovel 1 and input data from the operator operation detection device 52a or the like
  • the input may be wirelessly / wired
  • the result calculated from the input data (the target pilot pressure of each of the hydraulic cylinders 5, 6, 7) may be output to the proportional solenoid valve control unit 44 wirelessly / wired.
  • the area restriction control unit 43 may be configured by a single computer or may be configured by a plurality of computers.
  • the present invention is not limited to the above-described embodiment, and includes various modifications within the scope of the present invention.
  • the present invention is not limited to the one provided with all the configurations described in the above embodiment, but also includes one in which a part of the configuration is deleted.
  • a part of the configuration according to an embodiment can be added to or replaced with the configuration according to another embodiment.
  • the components of the controller 40 described above and the functions and execution processes of the components are realized by hardware (for example, designing logic for executing each function by an integrated circuit). Also good.
  • the configuration according to the controller 40 may be a program (software) in which each function according to the configuration of the controller 40 is realized by being read and executed by an arithmetic processing unit (for example, a CPU).
  • the information related to the program can be stored, for example, in a semiconductor memory (flash memory, SSD, etc.), a magnetic storage device (hard disk drive, etc.), a recording medium (magnetic disk, optical disc, etc.), and the like.

Abstract

操作装置(45a,45b,46a)から出力されたパイロット圧により作業機(1A)の先端が目標面(60)に接近している場合、作業機の先端が目標面に沿って移動するようにブームシリンダ(5)の制御信号を生成し、当該生成した制御信号をブームシリンダ(5)の流量制御弁(15a)に出力することで作業機(1A)を制御する制御コントローラ(40)を備える油圧ショベル(1)において、制御コントローラは、作業機によって形成された出来形(97)の位置情報を、作業機械の周辺地形を測定する地形計測装置(96)から入力される地形情報を基に算出し、その算出した出来形の位置情報に基づいて出来形が目標面に近づくように制御信号を補正することとした。

Description

作業機械
 本発明は領域制限制御が実行可能な作業機械に関する。
 油圧ショベルには、オペレータの掘削操作を補助する制御システムが備えられることがある。具体的には、操作装置を介して掘削操作(例えば、アームクラウドの指示)が入力された場合、目標面と作業機の先端(例えばバケットの爪先)の位置関係を基に、作業機の先端の位置が目標面上及びその上方の領域内に保持されるように、作業機を駆動するブームシリンダ、アームシリンダ及びバケットシリンダのうち少なくともブームシリンダを強制的に動作させる制御(例えば、ブームシリンダを伸ばして強制的にブーム上げ動作を行う)を実行する制御システムがある。このような作業機の先端の動き得る領域を制限する制御システムの利用により掘削面の仕上げ作業や法面の成型作業が容易になる。以下では、この種の制御を「領域制限制御」または「マシンコントロール」と称することがある。
 この種の技術に関連して、特許文献1は、ブーム、アームおよびバケットのそれぞれに取り付けた角度検出器から出力される回動角情報に基づいてバケット先端の位置を演算し、予め設定した領域の境界(目標面)の近傍にバケット先端がある時、バケット先端と当該境界の距離が近づくほどバケット先端の垂直速度成分が減少するようにブームを制御する油圧ショベルを開示している。
特開2002-167794号公報
 しかしながら、領域制限制御に際して、特許文献1のようにブーム、アーム、バケットの角度検出器の情報からバケット先端の位置を演算する場合、その演算精度は各角度検出器の検出精度に依存する。その結果、領域制限制御によるバケット爪先の制御精度も角度検出器の精度に依存することとなり、角度検出器の精度が充分でない場合には目標面の施工精度を高めることができない。
 また、領域制限制御では、油圧シリンダの目標速度を算出し、その目標速度を当該油圧シリンダの流量制御弁のパイロット圧(制御信号)に変換する処理が行われることがあるが、当該処理に用いられる目標速度とパイロット圧の変換テーブルと、実際の油圧シリンダや流量制御弁等の機器の特性にズレがあると、バケット爪先の制御精度が低下する。さらに、当該処理で算出したパイロット圧を電磁比例弁の可変絞りで発生させることがあるが、当該電磁比例弁の制御精度が充分でない場合には、算出したパイロット圧を発生させることができず、バケット爪先の制御精度が低下する。
 さらに、経年変化等で可動部にガタが発生した場合に出荷時と同じ制御を継続して利用すると、制御が想定している可動部の動作が実際のものとズレるので、バケット爪先の制御精度が低下する。作業機械の個体差に起因した制御精度の低下も同様である。
 このように領域制限制御は種々の誤差及びその蓄積により作業機先端の制御精度が低下し、目標面の施工精度が低下するおそれがある。
 本発明の目的は、領域制限制御が実行可能な作業機械において、検出器の検出精度や作業機先端の制御精度等が充分でない場合にも、目標面の施工精度を高めることができる作業機械を提供することにある。
 本願は上記課題を解決する手段を複数含んでいるが、その一例を挙げるならば、ブーム、アーム及びバケットを含む多関節型の作業機と、前記ブーム、前記アーム及び前記バケットをそれぞれ駆動するブームシリンダ、アームシリンダ及びバケットシリンダと、前記ブームシリンダ、前記アームシリンダ及び前記バケットシリンダの流量制御弁のうち少なくとも1つにオペレータの操作に応じた第1制御信号を出力する操作装置と、前記第1制御信号により前記作業機の先端が目標面に接近している場合、前記作業機の先端が前記目標面に沿って移動するように前記ブームシリンダ、前記アームシリンダ及び前記バケットシリンダのうち少なくとも1つを動作させる第2制御信号を新たに又は前記第1制御信号を補正することで生成する制御信号演算部を有し、前記第1制御信号又は前記第2制御信号に基づいて前記ブームシリンダ、前記アームシリンダ及び前記バケットシリンダの流量制御弁を制御する制御装置を備える作業機械において、前記制御装置は、前記第2制御信号を基に駆動された前記作業機によって形成された出来形の位置情報を、前記作業機械の周辺地形を測定する地形計測装置から入力される地形情報を基に算出する地形演算部をさらに有し、制御信号演算部は、前記出来形の位置情報に基づいて前記出来形が目標面に近づくように前記第2制御信号を補正することを特徴とする。
 本発明によれば目標面の施工精度を高めることができる。
本発明の第1の実施形態に係る油圧ショベルの構成図。 図1の油圧ショベルの制御コントローラを油圧駆動装置と共に示す図。 図2中のフロント制御用油圧ユニット160の詳細図。 図1の油圧ショベルの制御コントローラのハードウェア構成。 図1の油圧ショベルにおける座標系および目標面を示す図。 図1の油圧ショベルの制御コントローラの機能ブロック図。 図6中の領域制限制御部43の機能ブロック図。 地形計測装置96の設置箇所および計測範囲を示す図。 マシンコントロール時のアームの動作及びバケット爪先の移動軌跡の説明図。 アーム角度別ブームパイロット圧演算部43nによるアーム角度ごとのブームパイロット圧の算出結果を示した図。 目標面60と出来形97の一例を示す図。 目標面60と出来形97の距離とブーム上げパイロット圧の補正値との相関図。 目標面60と出来形97の距離とブーム下げパイロット圧の補正値との相関図。 制御コントローラ40で実行される一連の処理のフローチャート。 第2の実施形態における領域制限制御部43の機能ブロック図。 バケット爪先速度の垂直成分の制限値ayと距離Dとの関係を示す図。 目標面60と出来形97と軌跡98の一例を示す図。 補正値演算部43iで実行される一連の処理のフローチャート。 制御コントローラ40で実行される一連の処理のフローチャート。 目標面に対する爪先の位置と垂直成分byの組み合わせごとの目標速度ベクトルTの垂直成分tyの違いを示す図。 地形計測装置96の設置箇所および計測範囲を示す図。 地形計測装置96の設置箇所および計測範囲を示す図。
 以下、本発明の実施形態について図面を用いて説明する。なお、以下では、作業機の先端のアタッチメントとしてバケット10を備える油圧ショベルを例示するが、バケット以外のアタッチメントを備える油圧ショベルで本発明を適用しても構わない。さらに、複数の被駆動部材(アタッチメント、アーム、ブーム等)を連結して構成され、所定の動作平面上で動作する多関節型の作業機を有するものであれば油圧ショベル以外の作業機械への適用も可能である。
 また、本稿では、或る形状を示す用語(例えば、目標面、制御対象面等)とともに用いられる「上」、「上方」又は「下方」という語の意味に関し、「上」は当該或る形状の「表面」を意味し、「上方」は当該或る形状の「表面より高い位置」を意味し、「下方」は当該或る形状の「表面より低い位置」を意味することとする。また、以下の説明では、同一の構成要素が複数存在する場合、符号(数字)の末尾にアルファベットを付すことがあるが、当該アルファベットを省略して当該複数の構成要素をまとめて表記することがある。例えば、3つのポンプ300a、300b、300cが存在するとき、これらをまとめてポンプ300と表記することがある。
 <第1実施形態>
 図1は本発明の第1の実施形態に係る油圧ショベルの構成図であり、図2は本発明の第1の実施形態に係る油圧ショベルの制御コントローラを油圧駆動装置と共に示す図であり、図3は図2中のフロント制御用油圧ユニット160の詳細図である。
 図1において、油圧ショベル1は、多関節型のフロント作業機1Aと車体1Bで構成されている。車体1Bは、左右の走行モータ3a,3bにより走行する下部走行体11と、下部走行体11の上に旋回可能に取り付けられた上部旋回体12とからなる。フロント作業機1Aは、垂直方向にそれぞれ回動する複数の被駆動部材(ブーム8、アーム9及びバケット10)を連結して構成されており、フロント作業機1Aのブーム8の基端は上部旋回体12の前部に支持されている。
 上部旋回体12に搭載された原動機であるエンジン18は、油圧ポンプ2とパイロットポンプ48を駆動する。油圧ポンプ2はレギュレータ2aによって容量が制御される可変容量型ポンプであり、パイロットポンプ48は固定容量型ポンプである。本実施形態においては、パイロットライン144,145,146,147,148,149の途中にシャトルブロック162が設けられている。操作装置45,46,47から出力された油圧信号が、このシャトルブロック162を介してレギュレータ2aにも入力される。シャトルブロック162の詳細構成は省略するが、油圧信号がシャトルブロック162を介してレギュレータ2aに入力されており、油圧ポンプ2の吐出流量が当該油圧信号に応じて制御される。
 パイロットポンプ48の吐出配管であるポンプライン148aはロック弁39を通った後、複数に分岐して操作装置45,46,47及びフロント制御用油圧ユニット160内の各弁に接続している。ロック弁39は本例では電磁切換弁であり、その電磁駆動部は運転室(図1)に配置されたゲートロックレバー(不図示)の位置検出器と電気的に接続している。ゲートロックレバーのポジションは位置検出器で検出され、その位置検出器からロック弁39に対してゲートロックレバーのポジションに応じた信号が入力される。ゲートロックレバーのポジションがロック位置にあればロック弁39が閉じてポンプライン148aが遮断され、ロック解除位置にあればロック弁39が開いてポンプライン148aが開通する。つまり、ポンプライン148aが遮断された状態では操作装置45,46,47による操作が無効化され、旋回や掘削等の動作が禁止される。
 ブーム8、アーム9、バケット10及び上部旋回体12はブームシリンダ5、アームシリンダ6、バケットシリンダ7及び旋回油圧モータ4(油圧アクチュエータ)によりそれぞれ駆動される被駆動部材を構成する。これら被駆動部材8,9,10,12への動作指示は、上部旋回体12上の運転室内に搭載された走行右レバー23a、走行左レバー23b、操作右レバー1aおよび操作左レバー1b(これらを操作レバー1、23と総称することがある)のオペレータによる操作に応じて出力される。
 運転室内には、走行右レバー23aを有する操作装置47aと、走行左レバー23bを有する操作装置47bと、操作右レバー1aを共有する操作装置45a、46aと、操作左レバー1bを共有する操作装置45b、46bが設置されている。操作装置45,46,47は、油圧パイロット方式であり、パイロットポンプから吐出される圧油をもとに、それぞれオペレータにより操作される操作レバー1、23の操作量(例えば、レバーストローク)と操作方向に応じたパイロット圧(操作圧と称することがある)を発生する。このように発生したパイロット圧は、コントロールバルブユニット20内の対応する流量制御弁15a~15f(図2参照)の油圧駆動部150a~155bにパイロットライン144a~149b(図2参照)を介して供給され、これら流量制御弁15a~15fを駆動する制御信号として利用される。
 油圧ポンプ2から吐出された圧油は、流量制御弁15a、15b、15c、15d、15e、15f(図2参照)を介して走行右油圧モータ3a、走行左油圧モータ3b、旋回油圧モータ4、ブームシリンダ5、アームシリンダ6、バケットシリンダ7に供給される。供給された圧油によってブームシリンダ5、アームシリンダ6、バケットシリンダ7が伸縮することで、ブーム8、アーム9、バケット10がそれぞれ回動し、バケット10の位置及び姿勢が変化する。また、供給された圧油によって旋回油圧モータ4が回転することで、下部走行体11に対して上部旋回体12が旋回する。さらに、供給された圧油によって走行右油圧モータ3a、走行左油圧モータ3bが回転することで、下部走行体11が走行する。
 一方、ブーム8、アーム9、バケット10の回動角度α、β、γ(図5参照)を測定可能なように、ブームピンにブーム角度センサ30、アームピンにアーム角度センサ31、バケットリンク13にバケット角度センサ32が取付けられ、上部旋回体12には基準面(例えば水平面)に対する上部旋回体12(車体1B)の前後方向の傾斜角θ(図5参照)を検出する車体傾斜角センサ33が取付けられている。
 運転室の前方上端部には、油圧ショベル1の周辺地形を測定する地形計測装置96(図1及び図8参照)が取り付けられている。地形計測装置96としては3次元レーザースキャナが利用できる。3次元レーザースキャナは、レーザー光線の照射角度と、そのレーザー光線が返ってくるまでの時間を出力し、その時間を変換して得られる距離と照射角度を基に地表面上の各点の位置情報(3次元座標)が算出される。当該各点の位置情報は油圧ショベル周辺の地形情報として制御コントローラ40で利用される。なお、地形計測装置96としては、測定対象までの距離が把握できれば良いので、例えば、2台のカメラの視差を利用したステレオカメラや、電波を用いるミリ波スキャナ等も利用可能である。また、地形計測装置96の設置位置は運転室の前方上端部に限らず周辺地形の測定が可能な位置であれば適宜変更可能である。
 本実施形態の油圧ショベルには、オペレータの掘削操作を補助する制御システムが備えられている。具体的には、操作装置45b,46aを介して掘削操作(具体的には、アームクラウド、バケットクラウド及びバケットダンプの少なくとも1つの指示)が入力された場合、目標面60(図5参照)と作業機1Aの先端(本実施形態ではバケット10の爪先とする)の位置関係を基に、作業機1Aの先端の位置が目標面60上及びその上方の領域内に保持されるように油圧アクチュエータ5,6,7のうち少なくとも1つを強制的に動作させる制御信号(例えば、ブームシリンダ5を伸ばして強制的にブーム上げ動作を行う)を該当する流量制御弁15a,15b,15cに出力する掘削制御システムが備えられている。本稿ではこの制御を「領域制限制御」または「マシンコントロール」と称することがある。この制御によりバケット10の爪先が目標面60を越えることが防止されるので、オペレータの技量の程度に関わらず目標面60に沿った掘削が可能となる。本実施形態では、領域制限制御に係る制御点を、油圧ショベルのバケット10の爪先(作業機1Aの先端)に設定している。制御点は作業機1Aの先端部分の点であればバケット爪先以外にも変更可能である。例えば、バケット10の底面や、バケットリンク13の最外部も選択可能である。
 本稿では、流量制御弁15a~15cに対する制御信号のうち、操作装置45a,45b,46aの操作によって発生したパイロット圧を「第1制御信号」と称し、制御コントローラ40で電磁比例弁54b,55a,55b,56a,56bを駆動して第1制御信号を補正(低減)して生成したパイロット圧と、制御コントローラ40で電磁比例弁54b,55a,55b,56a,56bを駆動して第1制御信号とは別に新たに生成したパイロット圧を「第2制御信号」と称することがある。
 領域制限制御の実行が可能な掘削制御システムは、運転室内の操作パネルの上方などオペレータの視界を遮らない位置に設置され領域制限制御の有効無効を切り替えるマシンコントロールON/OFFスイッチ17と、領域制限制御が実行可能なコンピュータである制御コントローラ(制御装置)40とを備えている。
 図3に示すように、フロント制御用油圧ユニット160は、ブーム8用の操作装置45aのパイロットライン144a、144bに設けられ、操作レバー1aの操作量としてパイロット圧(第1制御信号)を検出する圧力センサ70a、70b(図3参照)と、一次ポート側がポンプライン148aを介してパイロットポンプ48に接続されパイロットポンプ48からのパイロット圧を減圧して出力する電磁比例弁54a(図3参照)と、ブーム8用の操作装置45aのパイロットライン144aと電磁比例弁54aの二次ポート側に接続され、パイロットライン144a内のパイロット圧と電磁比例弁54aから出力される制御圧(第2制御信号)の高圧側を選択し、流量制御弁15aの油圧駆動部150aに導くシャトル弁82a(図3参照)と、ブーム8用の操作装置45aのパイロットライン144bに設置され、制御コントローラ40からの制御信号を基にパイロットライン144b内のパイロット圧(第1制御信号)を低減して出力する電磁比例弁54b(図3参照)と、一次ポート側がパイロットポンプ48に接続されパイロットポンプ48からのパイロット圧を減圧して出力する電磁比例弁54c(図3参照)と、パイロットライン144b内のパイロット圧と電磁比例弁54cから出力される制御圧の高圧側を選択し、流量制御弁15aの油圧駆動部150bに導くシャトル弁82b(図3参照)を備えている。
 また、フロント制御用油圧ユニット160は、アーム9用のパイロットライン145a、145bに設置され、操作レバー1bの操作量としてパイロット圧(第1制御信号)を検出して制御コントローラ40に出力する圧力センサ71a、71b(図3参照)と、パイロットライン145bに設置され、制御コントローラ40からの制御信号を基にパイロット圧(第1制御信号)を低減して出力する電磁比例弁55b(図3参照)と、パイロットライン145aに設置され、制御コントローラ40からの制御信号を基にパイロットライン145a内のパイロット圧(第1制御信号)を低減して出力する電磁比例弁55a(図3参照)と、一次ポート側がパイロットポンプ48に接続されパイロットポンプ48からのパイロット圧を減圧して出力する電磁比例弁55c(図3参照)と、パイロットライン145a内のパイロット圧と電磁比例弁55cから出力される制御圧の高圧側を選択し、流量制御弁15bの油圧駆動部151aに導くシャトル弁84a(図3参照)が設けられている。
 また、フロント制御用油圧ユニット160は、バケット10用のパイロットライン146a、146bには、操作レバー1aの操作量としてパイロット圧(第1制御信号)を検出して制御コントローラ40に出力する圧力センサ72a、72b(図3参照)と、制御コントローラ40からの制御信号を基にパイロット圧(第1制御信号)を低減して出力する電磁比例弁56a、56b(図3参照)と、一次ポート側がパイロットポンプ48に接続されパイロットポンプ48からのパイロット圧を減圧して出力する電磁比例弁56c,56d(図3参照)と、パイロットライン146a、146b内のパイロット圧と電磁比例弁56c,56dから出力される制御圧の高圧側を選択し、流量制御弁15cの油圧駆動部152a,152bに導くシャトル弁83a,83b(図3参照)とがそれぞれ設けられている。なお、図3では、圧力センサ70、71、72と制御コントローラ40との接続線は紙面の都合上省略している。
 上記のように構成されるフロント制御用油圧ユニット160において、制御コントローラ40から制御信号を出力して電磁比例弁54a,54c,55c,56c,56dを駆動すると、操作装置45a,45b,46aのオペレータ操作が無い場合にもパイロット圧(第2制御信号)を発生できるので、ブーム上げ動作、ブーム下げ動作、アームクラウド動作、バケットクラウド動作又はバケットダンプ動作を強制的に発生できる。また、これと同様に制御コントローラ40により電磁比例弁54b,55a,55b,56a,56bを駆動すると、操作装置45a,45b,46aのオペレータ操作により発生したパイロット圧(第1制御信号)を減じたパイロット圧(第2制御信号)を発生することができ、ブーム下げ動作、アームクラウド/ダンプ動作、バケットクラウド/ダンプ動作の速度をオペレータ操作よりも強制的に低減できる。
 制御コントローラ40には、後述のROM93又はRAM94に記憶された目標面60の形状情報と位置情報、角度センサ30~32と傾斜角センサ33の検出信号、および圧力センサ70~72の検出信号、が入力される。また制御コントローラ40は領域制限制御を行うための制御信号(パイロット圧)の補正を行う電気信号を電磁比例弁54~56に出力する。
 図4に、制御コントローラ40のハードウェア構成を示す。制御コントローラ40は、入力部91と、プロセッサである中央処理装置(CPU)92と、記憶装置であるリードオンリーメモリ(ROM)93及びランダムアクセスメモリ(RAM)94と、出力部95とを有している。入力部91は、作業機姿勢検出装置50である角度センサ30~32及び傾斜角センサ33からの信号と、目標面60を設定するための装置である目標面設定装置51からの信号と、マシンコントロールON/OFFスイッチ17からの信号と、操作装置45a,45b,46aからの操作量を検出する圧力センサ(圧力センサ70,71,72を含む)であるオペレータ操作検出装置52aからの信号を入力し、A/D変換を行う。ROM93は、後述するフローチャートに係る処理を含め領域制限制御を実行するための制御プログラムと、当該フローチャートの実行に必要な各種情報等が記憶された記録媒体であり、CPU92は、ROM93に記憶された制御プログラムに従って入力部91及びメモリ93、94から取り入れた信号に対して所定の演算処理を行う。出力部95は、CPU92での演算結果に応じた出力用の信号を作成し、その信号を電磁比例弁54~56または報知装置53に出力することで、油圧アクチュエータ5~7を駆動・制御したり、車体1B、バケット10及び目標面60等の画像を報知装置53であるモニタの表示画面上に表示させたりする。
 報知装置53は、オペレータに目標面60と作業機1Aの位置関係を表示するディスプレイ(表示装置)、あるいは目標面60と作業機1Aの位置関係を音(音声も含む)により通達するスピーカの少なくとも一つから構成される。
 なお、図4の制御コントローラ40は、記憶装置としてROM93及びRAM94という半導体メモリを備えているが、記憶装置であれば特に代替可能であり、例えばハードディスクドライブ等の磁気記憶装置を備えても良い。
 図6は、本発明の実施形態に係る制御コントローラ40の機能ブロック図である。制御コントローラ40は、領域制限制御部43と、電磁比例弁制御部44を備えている。
 本実施形態の領域制限制御部43は、操作装置45bから出力されたアーム8のクラウド動作を指示する制御信号(第1制御信号)によりバケット10の爪先が目標面60に接近している場合、バケット10の爪先が目標面60に沿って移動するようにブームシリンダ5(流量制御弁15a)の制御信号(第2制御信号)を強制的に生成し、当該生成した制御信号を流量制御弁15aに出力することで作業機1Aをマシンコントロールする処理を実行する。
 領域制限制御部43には、作業機姿勢検出装置50、目標面設定装置51及びマシンコントロールON/OFFスイッチ17が接続されている。
 作業機姿勢検出装置50は、ブーム角度センサ30、アーム角度センサ31、バケット角度センサ32、車体傾斜角センサ33、から構成される。
 目標面設定装置51は、目標面60に関する情報(各目標面の位置情報や傾斜角度情報を含む)を入力可能なインターフェースである。目標面設定装置51を介した目標面の入力は、オペレータが手動で行っても、ネットワーク等を介して外部から取り込んでも良い。また、目標面設定装置51にはGNSS受信機等の衛星通信アンテナ(図示せず)が接続されている。グローバル座標系(絶対座標系)上に規定された目標面の3次元データを格納した外部端末とショベルがデータ通信可能な場合には、当該衛星通信アンテナにより特定したショベルのグローバル座標を基にショベル位置に対応する目標面を当該外部端末の3次元データ内で探索して取り込むことができる。
 オペレータ操作検出装置52aは、オペレータによる操作レバー1a、1b(操作装置45a,45b,46a)の操作によってパイロットライン144,145,146に生じる操作圧を取得する圧力センサ70a,70b,71a,71b,72a,72bから構成される。すなわち、作業機1Aに係る油圧シリンダ5,6,7に対する操作を検出している。
 図7は図6中の領域制限制御部43の機能ブロック図である。領域制限制御部43は、操作量演算部43aと、姿勢演算部43bと、目標面演算部43cと、地形演算部43mと、アーム角度別ブームパイロット圧演算部43nと、掘削操作判定部43oと、目標パイロット圧演算部43hと、補正値演算部43iと、補正値記憶部43jを備えている。
 操作量演算部43aは、オペレータ操作検出装置52aからの入力を基に操作装置45a,45b,46a(操作レバー1a,1b)の操作量を算出する。圧力センサ70,71,72の検出値から操作装置45a,45b,46aの操作量が算出できる。
 なお、圧力センサ70,71,72による操作量の算出は一例に過ぎず、例えば各操作装置45a,45b,46aの操作レバーの回転変位を検出する位置センサ(例えば、ロータリーエンコーダ)で当該操作レバーの操作量を検出しても良い。また、操作量から動作速度を算出する構成に代えて、各油圧シリンダ5,6,7の伸縮量を検出するストロークセンサを取り付け、検出した伸縮量の時間変化を基に各シリンダの動作速度を算出する構成も適用可能である。
 姿勢演算部43bは作業機姿勢検出装置50からの情報に基づき、作業機1Aの姿勢およびバケット10の爪先の位置を演算する。作業機1Aの姿勢は図5のショベル座標系上に定義できる。図5のショベル座標系は、上部旋回体12に設定された座標系であり、上部旋回体12に回動可能に支持されているブーム8の基底部を原点とし、上部旋回体12における垂直方向にZ軸、水平方向にX軸を設定した。X軸に対するブーム8の傾斜角をブーム角α、ブーム8に対するアーム9の傾斜角をアーム角β、アームに対するバケット爪先の傾斜角をバケット角γとした。水平面(基準面)に対する車体1B(上部旋回体12)の傾斜角を傾斜角θとした。ブーム角αはブーム角度センサ30により、アーム角βはアーム角度センサ31により、バケット角γはバケット角度センサ32により、傾斜角θは車体傾斜角センサ33により検出される。図5中に規定したようにブーム8、アーム9、バケット10の長さをそれぞれL1,L2,L3とすると、ショベル座標系におけるバケット爪先位置の座標および作業機1Aの姿勢はL1,L2,L3,α,β,γで表現できる。
 目標面演算部43cは、目標面設定装置51からの情報に基づき目標面60の位置情報を演算し、これをROM93内に記憶する。本実施形態では、図5に示すように、3次元の目標面を作業機1Aが移動する平面(作業機の動作平面)で切断した断面形状を目標面60(2次元の目標面)として利用する。
 地形演算部43mは、地形計測装置96から入力される複数の照射角度及び距離の情報に基づき、地表面上の各点の位置情報(座標)を演算し、これを地形情報としてROM93内に記憶する。つまり、地形演算部43mは、第2制御信号を基にマシンコントロールされた作業機1Aにより形成された地形(以下、「出来形」と称することがある)の位置情報を地形計測装置96から入力される地形情報を基に算出する。
 掘削操作判定部43oは、操作量演算部43aから入力される操作量を基に、掘削操作(本実施形態では、アームクラウド操作、つまりアームシリンダ6の伸び操作)が操作装置45bを介して入力されているかどうかを判定し、その判定結果を目標パイロット圧演算部43hに出力する。
 アーム角度別ブームパイロット圧演算部43nは、その時(処理実行時)の作業機1Aの姿勢において所定のパイロット圧(例えば操作レバー1bの操作量が最大のときのパイロット圧)のアームクラウド操作が入力されたと仮定し、そのアームクラウド操作に対してマシンコントロールによるブームの強制動作を介入させて目標面60に沿ったバケット爪先の移動を実現するために、各アーム角度βで出力すべきブームパイロット圧(第2制御信号)の一連の値を算出する部分である。算出結果はROM93内に記憶される。なお、アーム角度ごとのブームパイロット圧の算出に代えて、ブームパイロット圧をアーム角度の関数で表した式を導出し、それをROM93に記憶しても良い。
 図9を用いてアーム角度別ブームパイロット圧演算部43nによる処理の具体例の1つを説明する。なお、ここでは説明を簡略化するためバケット10は動作しないものとする。
 まず、アーム角度別ブームパイロット圧演算部43nは、姿勢演算部43bで算出された作業機1Aの姿勢情報及びバケット10の爪先の位置情報と、目標面演算部43cで演算された目標面60の位置情報とを基に、その時のバケット爪先と目標面60の位置関係と作業機1Aの姿勢を把握する。これにより、処理開始時に、バケット爪先(P1)、アーム回動中心(Ca1)および目標面60が図9に示した位置関係に在ると把握できたとする。アーム角度別ブームパイロット圧演算部43nは、この状態からパイロット圧が所定値(例えば操作レバー1bの操作量が最大のときのパイロット圧力値)のアームクラウド操作が入力されたと仮定し、そのときのバケット爪先の軌跡である円弧Tr1を算出する。次に円弧Tr1と目標面60の交点を算出する。図9の場合、両者の交点としてP2が存在するので、その交点P2以降のアーム角度について、所定値のパイロット圧によるアームクラウド動作に対してマシンコントロールによるブーム制御(マシンコントロール)を加えてバケット爪先10が目標面に沿って移動させること(すなわち、図9の直線TL上を移動させること)を想定し、その場合にマシンコントロールにより出力すべきブームパイロット圧をアーム角度ごとに算出する。なお、爪先の軌跡(円弧)と目標面60が交差しない場合は、すべてのアーム角度についてブームパイロット圧を0とし、マシンコントロールは行わないものとする。
 また、アーム角度別ブームパイロット圧演算部43nは、交点(P2)以降のアーム角度について、アーム動作に起因するバケット爪先の速度ベクトル(爪先が位置する点での円弧の接線方向のベクトル)の目標面60に垂直な成分(図中の下向きを負、上向きを正とする)が負から正に変化する点を探索し、P2からその点まではブーム上げのパイロット圧を算出し、その点以降はブーム下げのパイロット圧を算出する。図9の場合、当該速度ベクトルの垂直成分は点P3で負から正に変わるので、点P2から点P3までは電磁比例弁54aにより発生させるブーム上げのパイロット圧を、点P3から点P4までは電磁比例弁54cにより発生させるブーム下げのパイロット圧を算出する。なお、図9中のTr2は点P3での円弧であり、Tr3は点p4での円弧である。
 図10は、アーム角度別ブームパイロット圧演算部43nによる図9の場合のアーム角度ごとのブームパイロット圧の算出結果を示した図である。図10では、図9の点P2、P3、P4におけるアーム角度をそれぞれβ2、β3、β4としている。この図に示すように点P2でブーム上げパイロット圧が発生し、点P3で一旦ゼロになった後は、点P4までブーム下げパイロット圧が発生している。これにより、図9に示すように、点P2でCa1に在ったアーム回動中心はブーム上げによって上方に移動して点P3でCa2に達し、その後、ブーム下げによって下方に移動して点P4でCa3に達する。
 補正値演算部43iは、マシンコントロール発動時のブームパイロット圧(第2制御信号)の補正値を算出する部分である。補正値演算部43iは、目標面演算部43cの目標面60の情報と地形演算部43mの地形情報を基に、目標面60と出来形の上下関係を同じ座標系上で把握し(すなわちショベル座標系又はグローバル座標系で把握し、必要があれば適宜座標変換を行う(以下の同様の処理でも同様とする))、目標面60と出来形の距離に応じて補正値を演算する。図11に目標面60と出来形97の一例を示す。目標面60と出来形97の距離は、目標面60の垂直方向における目標面60と出来形97の距離とし、目標面60の位置を基準(ゼロ)とする。目標面60より下方を正、上方を負とする。したがって図11の場合は正となる。通常、出来形97は目標面60からの垂直距離の異なる複数の点から形成されるため、本実施の形態では出来形97を形成する複数の点のそれぞれについて目標面60との距離を算出し、その算出した複数の距離の平均値を目標面60と出来形97の距離とする。ただし、目標面60と出来形97の「距離」の算出はこの方法に限らず、例えば、出来形97を形成する複数の点から任意に選択した点と目標面60との距離を「距離」として利用しても良いし、出来形97を目標面60に平行な直線に近似し、当該直線と目標面の距離を「距離」として利用しても良い。
 補正値演算部43iは、算出した目標面60と出来形97の距離と、図12及び図13を利用してブーム上げとブーム下げ双方のパイロット圧(第2制御信号)の補正値を算出し、算出した2つの補正値を補正値記憶部43jに記憶する。図12は目標面60と出来形97の距離とブーム上げパイロット圧の補正値との相関図であり、ブーム上げパイロット圧の補正値は、目標面60と出来形97の距離が増加するほど増加するように設定されている。図13は目標面60と出来形97の距離とブーム下げパイロット圧の補正値との相関図であり、ブーム下げパイロット圧の補正値は、目標面60と出来形97の距離が増加するほど減少するように設定されている。
 補正値記憶部43jは、補正値演算部43iによる演算結果を記憶する部分である。記憶された補正値は、補正値演算部43iによる補正値演算の度に上書きされ、マシンコントロールが発動するタイミングで目標パイロット圧演算部43hに参照される。
 目標パイロット圧演算部43hは、アームクラウド操作がされている場合、所定のアームクラウドパイロット圧を流量制御弁15bの目標パイロット圧として電磁比例弁制御部44に出力し、アーム角度別ブームパイロット圧演算部43nの演算結果を基に決定したブームパイロット圧を流量制御弁15aの目標パイロット圧として電磁比例弁制御部44に出力する。
 具体的には、目標パイロット圧演算部43hは、掘削操作判定部43oからアームクラウド操作がされているという判定結果が入力されたら、その判定結果が入力されている間、操作装置45bによるアームクラウドの操作量に関わらず一定値をアームクラウドパイロット圧として電磁比例弁制御部44に出力する。そして、アーム角度別ブームパイロット圧演算部43nで算出したアーム角度別のブームパイロット圧(第2制御信号)と、姿勢演算部43bで算出したアーム角度とを基に、そのときのアーム角度におけるブームパイロット圧を決定する。さらに、当該決定したブームパイロット圧(第2制御信号)がゼロでない場合(すなわち、マシンコントロールが発動される場合)には、補正値記憶部43jに記憶された補正値を参照し、当該決定したブームパイロット圧の値に当該補正値を加えた値をブームパイロット圧として電磁比例弁制御部44に出力する。
 なお、目標パイロット圧演算部43hは、アームクラウド操作がされていないという判定結果が掘削操作判定部43oから入力された場合には、操作量演算部43aの演算結果に基づいてオペレータ操作に従ったパイロット圧を対応する流量制御弁15に出力するように構成されている。
 電磁比例弁制御部44は、目標パイロット圧演算部43hで算出された各流量制御弁15a,15bへの目標パイロット圧を基に、各電磁比例弁55c,54a,54cへの指令を演算する。
 <動作>
 次に上記のように構成される油圧ショベルの動作について図14のフローチャートを用いて説明する。制御コントローラ40は所定の制御周期で図14のフローチャートを実行する。
 まず、S110で、アーム角度別ブームパイロット圧演算部43nは、作業機姿勢検出装置50からの情報に基づき姿勢演算部43bで演算された作業機1Aの姿勢およびバケット10の爪先の位置と、目標面設定装置51からの情報に基づき目標面演算部43cで演算された目標面60の位置を入力する。
 S120では、アーム角度別ブームパイロット圧演算部43nは、S110で入力した情報を基に、所定のアームパイロット圧(例えば、操作レバー1bの操作量が最大のときのパイロット圧力値)でアームクラウドしたときに目標面60に沿ってバケット10の爪先が移動するように、アーム角度ごとのブームパイロット圧を算出する。なお、アームクラウドしても目標面60にバケット爪先が到達しない場合(アームクラウド時の爪先の軌跡が目標面60と交差しない場合)にはマシンコントロールを発動する必要がないので、全てのアーム角度についてブームパイロット圧を0に設定する。
 S130では、掘削操作判定部43oは、操作量演算部43aから入力した操作量を基にアームクラウド操作が操作装置45bを介して入力されているかどうかの判定を行う。ここでアームクラウド操作が入力されていると判定された場合にはS140に進み、アームクラウド操作は入力されていないと判定された場合にはS220に進む。
 S220では、目標パイロット圧演算部43hは、操作量演算部43aから入力した操作量に即した各油圧シリンダの目標パイロット圧を演算し、電磁比例弁制御部44に出力する。これにより操作装置45,46に対する入力操作に即して作業機1Aが動作する。
 S140では、アーム角度別ブームパイロット圧演算部43nは、姿勢演算部43bからその時のアーム角βを入力し、S120で算出したアーム角度ごとのブームパイロット圧を基に、入力したアーム角度βに応じたブームパイロット圧を算出し、S150に進む。
 S150では、目標パイロット圧演算部43hは、S140で算出されたブームパイロット圧が0かどうかを判定する。S150でブームパイロット圧が0でないと判定された場合(すなわちマシンコントロールが発動する場合)にはS160に進む。
 S160では、目標パイロット圧演算部43hは、S140で算出されたブームパイロット圧がブーム上げのものかブーム下げのものかを判定する。そして、補正値記憶部43jに記憶されたブーム上げの補正値とブーム下げの補正値のうち判定結果に対応する補正値を取得し、その補正値をS140で算出したブームパイロット圧に加算し、S170に進む。
 一方、S150でブームパイロット圧が0と判定された場合には、マシンコントロールによるブーム制御が行われないため、S160で補正値を加算することなくS170に進む。
 S170では、目標パイロット圧演算部43hは、S120のアームパイロット圧を発生させる指令(本実施形態では、電磁比例弁55cが全開する指令)を電磁比例弁制御部44に出力する。また、S160を経由した場合(つまりマシンコントロールが発動した場合)はS160のブームパイロット圧を、S160を経由しなかった場合(つまりマシンコントロールが発動しなかった場合)はブームパイロット圧としてゼロを電磁比例弁制御部44に出力する。
 これにより、電磁比例弁55cが全開してアームクラウド操作量が最大時に相当するパイロット圧が流量制御弁15bの駆動部151aに作用し、アームクラウド動作が行われる。そして、S160を経由した場合には、電磁比例弁54aまたは54cが開いてS160のブームパイロット圧が発生しマシンコントロールによるブーム動作が行われる。そしてこのブーム動作とアームクラウド動作が組み合わさることで目標面60に沿ったバケット爪先の水平引きが実現され、オペレータの技量の程度に依らず目標面60に沿った正確な掘削が実現される。一方、S160を経由しなかった場合にはブームパイロット圧は0なので、アームクラウド動作のみが行われることになる。
 S180では、掘削操作判定部43oは、操作量演算部43aから入力した操作量を基にアームクラウド操作が入力されているかどうかの判定を行う。ここでアームクラウド操作が入力されている(すなわちアームクラウド操作は継続している)と判定された場合にはS140に戻りマシンコントロールを継続する。一方、アームクラウド操作は入力されていない(すなわちアームクラウド操作が終了した)と判定された場合にはS190に進む。
 S190では、補正値演算部43iは、バケット10による地形の掘削があったか否かの判定を行う。この判定の方法としては、アームクラウド操作の前後で地形の変化の有無を地形計測装置96の測定結果を基に比較するものがある。また、マシンコントロールが発動した場合(すなわち、S160を経由して電磁比例弁制御部44にブームパイロット圧が出力された場合)には地形の掘削があったとみなす方法を採用しても良い。S190で掘削が有ったと判定された場合には、S200で地形演算部43mが演算した地形情報(地形データ)を入力してS210に進む。一方、S190で掘削が無かったと判定された場合には、次回の制御周期を待ってS110以降の処理を繰り返す。
 S210では、補正値演算部43iは、まず、目標面演算部43cの目標面60の情報と地形演算部43mの地形情報を基に、出来形97を形成する複数の点のそれぞれについて目標面60との距離を算出する。そして、その算出した複数の距離の平均値を目標面60と出来形97の距離とする。次に補正値演算部43iは、算出した目標面60と出来形97の距離と、図12及び図13で定義された距離とブームパイロット圧(第2制御信号)の相関関係を基に、出来形が目標面60に近づくようにブーム上げ時とブーム下げ時の両方のパイロット圧の補正値を演算し、その演算結果を補正値記憶部43jに記憶する。
 例えば、目標面60と出来形97の距離が正の場合は、目標面60の下方に出来形97が位置するいわゆる掘り過ぎの場面であるが、この場合には、ブーム上げでパイロット圧を増加し、ブーム下げでパイロット圧を減少する補正値が補正値演算部43iにより算出される。このような補正値でS140のブームパイロット圧を補正すると、次回のS170の処理時に補正前よりも爪先の描く軌跡が上方に移動して掘り過ぎが防止されるので、出来形を目標面60に近づけることができる。一方、目標面60と出来形97の距離が負の場合は、目標面60の上方に出来形97が位置するいわゆる掘り残しが存在する場面であるが、この場合には、ブーム上げでパイロット圧を減少し、ブーム下げでパイロット圧を増加する補正値が補正値演算部43iにより算出される。このような補正値でブームパイロット圧を補正すると補正前よりも爪先の描く軌跡が下方に移動して掘り残しの発生が防止されるので、出来形を目標面60に近づけることができる。
 S210の処理が終了したら、次回の制御周期を待ってS110以降の処理を繰り返す。
 <効果>
 次の本実施形態の効果を説明する。上記の実施形態では、ブーム8、アーム9及びバケット10を含む多関節型の作業機1Aと、ブーム8、アーム9及びバケット10をそれぞれ駆動するブームシリンダ5、アームシリンダ6及びバケットシリンダ7と、これら油圧シリンダ5,6,7の流量制御弁15a,15b,15cの少なくとも1つにオペレータの操作に応じた制御信号(第1制御信号)を出力する操作装置45a,45b,46aと、操作装置45a,45b,46aから出力された制御信号(第1制御信号)により作業機1Aの先端(バケット爪先)が目標面60に接近している場合、作業機1Aの先端が目標面60に沿って移動するようにブームシリンダ5を動作させる制御信号(第2制御信号)を新たに生成する目標パイロット圧演算部(制御信号演算部)43hを有し、第1制御信号又は第2制御信号に基づいてブームシリンダ5、アームシリンダ6及びバケットシリンダ7の流量制御弁15a,15b,15cを制御する制御コントローラ40を備える油圧ショベル1において、制御コントローラ40は、第2制御信号を基に駆動された作業機1Aによって形成された出来形97の位置情報を、油圧ショベル1の周辺地形を測定する地形計測装置96から入力される地形情報を基に算出する地形演算部43mをさらに有し、目標パイロット圧演算部43hは、出来形97の位置情報に基づいて出来形97が目標面60に近づくように第2制御信号を補正することとした。そして、この第2制御信号の補正に際して、本実施形態では、目標パイロット圧演算部43hが、出来形97の位置情報と目標面60の位置情報の差が小さくなるように第2制御信号を補正することとした。
 このように構成した油圧ショベルによれば、掘削の都度、出来形97が目標面60に近づくようにブームシリンダ5(流量制御弁15a)の制御信号(第2制御信号)が補正され、出来形97と目標面60の位置情報の差が小さくなるので、角度センサ30,31,32の検出精度が充分でない場合や、個体差・経年変化等により作業機先端の制御精度が充分でない場合等にも、バケット10の爪先を目標面60に沿わせながら掘削できる。その結果、目標面60の施工精度を高めることができる。
 <付記>
 なお、上記では、アームクラウド動作中にバケット爪先が目標面60に接近した場合、マシンコントロールによりバケット爪先が目標面60に沿って移動するようにブームシリンダ5の制御信号(第2制御信号)を生成する場合について説明したが、マシンコントールに際して生成する制御信号(第2制御信号)はブームシリンダ5のものに限らず、アームシリンダ6及びバケットシリンダ7の制御信号(第2制御信号)を生成しても良い。すなわち、バケット爪先が目標面60に沿って移動するものであれば、ブームシリンダ5、アームシリンダ6及びバケットシリンダ7の少なくとも1つの制御信号を生成して作業機1Aを制御しても良い。この場合、補正値を算出するのは、マシンコントロールの実現のために制御信号を生成した油圧シリンダ(すなわち油圧シリンダ5,6,7の少なくとも1つ)に係る制御信号であることは言うまでも無い。
 上記では、マシンコントロールの発動の条件を、オペレータによるアームクラウド操作と、バケット爪先の軌跡と目標面の交差としたが、これにオペレータによるブーム下げ操作を加えても良い。この場合、マシンコントロールによるブーム上げが必要になったときには、オペレータ操作によるブーム下げパイロット圧は制御コントローラ40により電磁比例弁54bを閉じてキャンセルし、必要なブームパイロット圧を電磁比例弁54aで発生すれば良い。また、マシンコントロールによるブーム下げが必要になったときには、例えば、オペレータ操作によるブーム下げパイロット圧を同様にキャンセルするとともに電磁比例弁54cでマシンコントロールに必要なパイロット圧を発生させるようにすれば良いし、マシンコントロールに必要なブーム下げパイロット圧がオペレータ操作によるパイロット圧より小さければ、電磁比例弁54bの開度を適宜低減してその必要なパイロット圧を発生させても良い。
 上記では、マシンコントロールによる掘削に際して、ブームの上げと下げの双方を実施する例を説明したが、ブームの上げと下げのうち一方を行うように油圧ショベルを構成しても良い。
 <第2実施形態>
 続いて本発明の第2の実施形態について説明する。本実施形態は、図1-4及び図6に示した第1の実施形態と同じハードウェア構成を備えており、主に制御コントローラ40の機能が第1の実施形態と異なる。以下では第1実施形態と異なる部分について主に説明する。
 図15は本実施形態に係る領域制限制御部43の機能ブロック図である。領域制限制御部43は、操作量演算部43aと、姿勢演算部43bと、目標面演算部43cと、シリンダ速度演算部43dと、バケット先端速度演算部43eと、目標バケット先端速度演算部43fと、目標シリンダ速度演算部43gと、目標パイロット圧演算部43hと、地形演算部43mと、補正値演算部43iと、補正値記憶部43jを備えている。このうち、操作量演算部43a、姿勢演算部43b、目標面演算部43c、地形演算部43m及び補正値記憶部43jについては第1実施形態と同じなので説明は省略する。
 シリンダ速度演算部43dは、操作量演算部43aで演算された操作量(第1制御信号)を基に各油圧シリンダ5,6,7の動作速度(シリンダ速度)を演算する。各油圧シリンダ5,6,7の動作速度は、操作量演算部43aで演算された操作量と、流量制御弁15a,15b,15cの特性と、各油圧シリンダ5,6,7の断面積と、油圧ポンプ2の容量(傾転角)と回転数を乗じて得られるポンプ流量(吐出量)等から算出できる。
 バケット先端速度演算部43eは、シリンダ速度演算部43dで演算された各油圧シリンダ5,6,7の動作速度と、姿勢演算部43bで演算された作業機1Aの姿勢とを基に、オペレータ操作(第1制御信号)によるバケット先端(爪先)の速度ベクトルBを演算する。バケット先端の速度ベクトルBは、目標面演算部43cから入力される目標面60の情報を基に、目標面60に水平な成分bxと垂直な成分byに分解できる。
 目標バケット先端速度演算部43fは、バケット先端(爪先)の目標速度ベクトルTを演算する。そのために、目標バケット先端速度演算部43fは、まず、バケット先端から制御対象の目標面60までの距離D(図5参照)と図16のグラフを基にバケット先端の速度ベクトルの目標面60に垂直な成分の制限値ayを算出する。制限値ayの計算は、図16に示すような制限値ayと距離Dとの関係を定義した関数又はテーブル等の形式で制御コントローラ40のROM93に記憶しておき、この関係を適宜読み出して行う。距離Dは、姿勢演算部43bで演算したバケット10の爪先の位置(座標)と、ROM93に記憶された目標面60を含む直線の距離から算出できる。なお、制限値ayと距離Dとの関係は、距離Dの増加とともに制限値ayが単調減少する特性を有することが好ましいが、図16に示したものに限らない。例えば、距離Dが正の所定値以上または負の所定値以下で制限値ayが個別の所定値に保持されるようにしても良いし、制限値ayと距離Dの関係を曲線で定義しても良い。
 次に目標バケット先端速度演算部43fは、バケット先端の速度ベクトルBの目標面60に垂直な成分byを取得し、この垂直成分byと制限値ayの正負と絶対値の大小関係を基に、マシンコントロールによるブーム8の動作で発生すべきバケット先端の速度ベクトルCの目標面60に垂直な成分cyを算出するために必要な式を選択する(式の選択過程については図19を用いて後述する)。そして、その選択した式から垂直成分cyを算出し、その垂直成分cyを発生する際にブームに許容される動作から水平成分cxを算出するとともに、速度ベクトルB,Cと制限値ayから目標速度ベクトルTを算出する。以下では、目標速度ベクトルTにおいて目標面60に垂直な成分をty、水平な成分をtxとし、目標ベクトルTの導出過程についても図19を用いて後述する。
 目標シリンダ速度演算部43gは、目標バケット先端速度演算部43fで算出された目標速度ベクトルT(tx,ty)を基に各油圧シリンダ5,6,7の目標速度を演算する。本実施形態では、目標速度ベクトルTを、オペレータ操作による速度ベクトルBと、マシンコントロールによる速度ベクトルCの和で定義しているので、ブームシリンダ5の目標速度は速度ベクトルCから演算できる。これにより、バケット先端の目標速度ベクトルTは、各油圧シリンダ5,6,7を目標速度で動作させたときにバケット先端に表れる速度ベクトルの合成値となる。なお、マシンコントロールによる速度ベクトルCの垂直成分cyがゼロの場合、目標シリンダ速度演算部43gは、バケット先端速度演算部43eで算出したバケット先端の速度ベクトルBを基に各油圧シリンダ5,6,7の目標速度を算出する。
 マシンコントロールON/OFFスイッチ17の切り換え位置が領域制限制御の有効を示すON位置の場合には、目標シリンダ速度演算部43gは上記の演算結果を目標パイロット圧演算部43hに出力する。しかし、マシンコントロールON/OFFスイッチ17の切り換え位置が領域制限制御の無効を示すOFF位置の場合には、目標シリンダ速度演算部43gは、シリンダ速度演算部43dの演算結果を目標パイロット圧演算部43hに出力する。
 補正値演算部43iは、第1実施形態と同様に、マシンコントロール発動時のブームパイロット圧(第2制御信号)の補正値を算出する部分である。ただし、本実施形態の補正値演算部43iは、マシンコントロールにより作業機1Aの先端(バケット爪先)が移動した軌跡の位置情報(この位置情報は姿勢演算部43bから入力する)と、地形演算部43mの地形情報とを基に、軌跡と出来形97の上下関係を同一座標系上で把握し、当該軌跡と出来形97の距離に応じて補正値を演算する。なお、ここでいう「軌跡」とは、姿勢演算部43bから入力したバケット爪先の軌跡であり、例えば3次元レーザースキャナ等によりショベル座標系と独立した座標系上で爪先の軌跡を計測したもの等ではなく、あくまで制御コントローラ40が把握している爪先の位置情報の集合である。
 図17にバケット爪先の軌跡98と出来形97の一例を示す。図17の例は、制御コントローラ40内の演算では目標面60に沿った軌跡98で掘削を行っているつもりであるが、センサ精度や制御精度の低下等の影響により結果的に目標面60の下方に出来形97が形成された場合を模式的に示している。軌跡98と出来形97の距離は、目標面60の垂直方向における軌跡98と出来形97の距離とし、軌跡98の位置を基準(ゼロ)とする。軌跡98より下方を正、上方を負とする。したがって図17の場合は正となる。通常、軌跡98及び出来形97は目標面60からの垂直距離の異なる複数の点から形成されるため、本実施の形態では軌跡98及び出来形97を形成する複数の点のそれぞれについて目標面60との距離を算出し、その算出した複数の距離の平均値から軌跡98と出来形97の位置を特定し、その位置から軌跡98と出来形97の距離を算出する。ただし、目標面60と出来形97の「距離」の算出はこの方法に限らず、例えば、出来形97を形成する複数の点から任意に選択した点と軌跡98を形成する複数の点から任意に選択した点との距離を「距離」として利用しても良いし、軌跡98及び出来形97を目標面60に平行な直線に近似し、当該2本の近似直線の距離を「距離」として利用しても良い。
 ところで、後述する図19のフローチャートによる処理の関係上、本実施形態ではマシンコントロールによりブーム上げのみが行われ、ブーム下げは行われない。そこで、本実施形態の補正値演算部43iは、算出した軌跡98と出来形97の距離と、図12を利用してブーム上げのパイロット圧の補正値を算出し、算出した補正値を補正値記憶部43jに記憶する。
 目標パイロット圧演算部43hは、目標シリンダ速度演算部43gで算出された各シリンダ5,6,7の目標速度を基に各油圧シリンダ5,6,7の流量制御弁15a,15b,15cへの目標パイロット圧を演算する。このうちアームシリンダ6及びバケットシリンダ7の目標パイロット圧はそのまま電磁比例弁制御部44に出力する。残りのブームシリンダ5の目標パイロット圧については、その値がゼロでない場合(すなわち、マシンコントロールが発動される場合)には、補正値記憶部43jに記憶された補正値を参照し、当該決定したブームパイロット圧の値に当該補正値を加えた値をブームパイロット圧として電磁比例弁制御部44に出力する。
 電磁比例弁制御部44は、目標パイロット圧演算部43hで算出された各流量制御弁15a,15b,15cへの目標パイロット圧を基に、各電磁比例弁54~56への指令を演算する。なお、オペレータ操作に基づくパイロット圧(第1制御信号)と、目標パイロット圧演算部43hで算出された目標パイロット圧が一致する場合には、該当する電磁比例弁54~56への電流値(指令値)はゼロとなり、該当する電磁比例弁54~56の動作は行われない。
 <動作>
 次に上記のように構成される油圧ショベルの動作について図18及び図19のフローチャートを用いて説明する。
 図18は補正値演算部43iで実行される処理のフローチャートである。このフローチャートは操作量演算部43aでアームクラウド操作が検出されたら開始される。
 S310では、補正値演算部43iは、操作量演算部43aからの入力値を基にアームクラウド操作が終了したか否かを判定する。アームクラウド操作が終了したと判定した場合にはS320に進み、地形演算部43mが演算した地形情報と、目標面演算部43cが演算した目標面60の情報とを入力してS330に進む。一方、S310でアームクラウド操作が継続していると判定した場合にはS310の処理を繰り返す。
 S330では、補正値演算部43iは、S320で入力した地形情報と目標面60の情報を基に出来形97が目標面60の下方に位置するか否かを同一の座標系上で判定する。なお、出来形97の位置は、先述の軌跡98と出来形97の距離の演算に利用するものと同じ方法で特定できる。
 S330で出来形97が目標面60の下方に位置すると判定された場合にはS340に進み、出来形97が目標面60の上方に位置すると判定された場合には処理を終了して次回の開始タイミングまで待機する。なお、ここで、出来形97が目標面60の上方に位置する場合に補正値を算出しないのは、バケット10の大きさや掘削力等の関係で1回の掘削動作で目標面60まで掘れるとは限らず、出来形97が目標面60の上方に位置する場合には精度の良し悪しの判断がつかないという考え方に基づくものである。
 S340では、補正値演算部43iは、フローチャートの開始からS310でYESと判定されるまでの間にバケット10の爪先が移動した位置データの集合を姿勢演算部43bから取得し、その位置データの集合を掘削作業に際してのバケット10の爪先の軌跡(軌跡情報)とする。
 S350では、補正値演算部43iは、まず、目標面演算部43cの目標面60の情報と地形演算部43mの地形情報と姿勢演算部43bの軌跡情報とを基に、出来形97及び軌跡98を形成する複数の点のそれぞれについて目標面60との距離を同一座標系上で算出する。そして、その算出した複数の距離の平均値から出来形97と軌跡98の位置を特定し、軌跡98から出来形97までの距離を算出する。次に補正値演算部43iは、算出した軌跡98と出来形97の距離と、図12で定義された距離とブームパイロット圧の相関関係とを基に、ブーム上げ時のパイロット圧の補正値を演算し、その演算結果を補正値記憶部43jに記憶する。
 例えば、軌跡98と出来形97の距離の距離が正の場合は、軌跡98の下方に出来形97が位置するいわゆる掘り過ぎの場面であるが、この場合には、ブーム上げでパイロット圧を増加し、ブーム下げでパイロット圧を減少する補正値が補正値演算部43iにより算出される。
 補正値記憶部43jへの補正値の記録処理が完了したら図18の一連の処理を終了し、次にアームクラウド操作が検出されるまで補正値演算部43iは待機する。
 図19は制御コントローラ40で実行される処理のフローチャートである。制御コントローラ40は操作量演算部43aによりオペレータによる操作が検出されたら図19のフローチャートを開始する。
 S410では、シリンダ速度演算部43dは、操作量演算部43aで演算された操作量を基に各油圧シリンダ5,6,7の動作速度(シリンダ速度)を演算する。
 S420では、バケット先端速度演算部43eは、シリンダ速度演算部43dで演算された各油圧シリンダ5,6,7の動作速度と、姿勢演算部43bで演算された作業機1Aの姿勢とを基に、オペレータ操作によるバケット先端(爪先)の速度ベクトルBを演算する。
 S430では、バケット先端速度演算部43eは、姿勢演算部43bで演算したバケット10の爪先の位置(座標)と、ROM93に記憶された目標面60を含む直線の距離から、バケット先端から制御対象の目標面60までの距離D(図5参照)を算出する。そして、距離Dと図16のグラフを基にバケット先端の速度ベクトルの目標面60に垂直な成分の制限値ayを算出する。
 S440では、バケット先端速度演算部43eは、S420で算出したオペレータ操作によるバケット先端の速度ベクトルBにおいて、目標面60に垂直な成分byを取得する。
 S450では、目標バケット先端速度演算部43fは、S430で算出した制限値ayが0以上か否かを判定する。なお、図19の右上に示したようにxy座標を設定する。当該xy座標では、x軸は目標面60と平行で図中右方向を正とし、y軸は目標面60に垂直で図中上方向を正とする。図19中の凡例では垂直成分by及び制限値ayは負であり、水平成分bx及び水平成分cx及び垂直成分cyは正である。そして、図16から明らかであるが、制限値ayが0のときは距離Dが0、すなわち爪先が目標面60上に位置する場合であり、制限値ayが正のときは距離Dが負、すなわち爪先が目標面60より下方に位置する場合であり、制限値ayが負のときは距離Dが正、すなわち爪先が目標面60より上に位置する場合である。S450で制限値ayが0以上と判定された場合(すなわち、爪先が目標面60上またはその下方に位置する場合)にはS460に進み、制限値ayが0未満の場合にはS480に進む。
 S460では、目標バケット先端速度演算部43fは、オペレータ操作による爪先の速度ベクトルBの垂直成分byが0以上か否かを判定する。byが正の場合は速度ベクトルBの垂直成分byが上向きであることを示し、byが負の場合は速度ベクトルBの垂直成分byが下向きであることを示す。S460で垂直成分byが0以上と判定された場合(すなわち、垂直成分byが上向きの場合)にはS470に進み、垂直成分byが0未満の場合にはS500に進む。
 S470では、目標バケット先端速度演算部43fは、制限値ayと垂直成分byの絶対値を比較し、制限値ayの絶対値が垂直成分byの絶対値以上の場合にはS500に進む。一方、制限値ayの絶対値が垂直成分byの絶対値未満の場合にはS530に進む。
 S500では、目標バケット先端速度演算部43fは、マシンコントロールによるブーム8の動作で発生すべきバケット先端の速度ベクトルCの目標面60に垂直な成分cyを算出する式として「cy=ay-by」を選択し、その式とS430の制限値ayとS440の垂直成分byを基に垂直成分cyを算出する。そして、算出した垂直成分cyを出力可能な速度ベクトルCを算出し、その水平成分をcxとする(S510)。
 S520では、目標速度ベクトルTを算出する。目標速度ベクトルTの目標面60に垂直な成分をty、水平な成分txとすると、それぞれ「ty=by+cy、tx=bx+cx」と表すことができる。これにS500の式(cy=ay-by)を代入すると目標速度ベクトルTは結局「ty=ay、tx=bx+cx」となる。つまり、S520に至った場合の目標速度ベクトルの垂直成分tyは制限値ayに制限され、マシンコントロールによる強制ブーム上げが発動される。
 S480では、目標バケット先端速度演算部43fは、オペレータ操作による爪先の速度ベクトルBの垂直成分byが0以上か否かを判定する。S480で垂直成分byが0以上と判定された場合(すなわち、垂直成分byが上向きの場合)にはS530に進み、垂直成分byが0未満の場合にはS490に進む。
 S490では、目標バケット先端速度演算部43fは、制限値ayと垂直成分byの絶対値を比較し、制限値ayの絶対値が垂直成分byの絶対値以上の場合にはS530に進む。一方、制限値ayの絶対値が垂直成分byの絶対値未満の場合にはS500に進む。
 S530に至った場合、マシンコントロールでブーム8を動作させる必要が無いので、目標バケット先端速度演算部43fは、速度ベクトルCをゼロとする。この場合、目標速度ベクトルTは、S520で利用した式(ty=by+cy、tx=bx+cx)に基づくと「ty=by、tx=bx」となり、オペレータ操作による速度ベクトルBと一致する(S540)。
 ここでは、図20に示した(1)-(4)の4つの場合に上記のS450からS540の処理を適用したときの目標速度ベクトルT(ty,tx)について説明する。
 (1)の場合、目標面60の下方にバケット先端が在るため、距離Dが負になり制限値ayは図16より上向き((+)方向)となる。そして、演算部43eで演算された速度ベクトルBの垂直成分byは下向き((-)方向)である。そのため、S450、S460、S500というルートを通るので、目標速度ベクトルTは「ty=ay、tx=bx+cx」となる。
 (2)の場合、目標面60の下方にバケット先端が在るため、距離Dが負になり制限値ayは図16より上向き((+)方向)となる。そして、垂直成分byは上向き((+)方向)である。そのため、S450、S460、S470を通る。したがって、S4470で制限値ayと垂直成分byの絶対値を比較し、制限値ayの方が大きい場合には、目標速度ベクトルTは「ty=ay、tx=bx+cx」となり(S500,510,520)、垂直成分byの方が大きい場合には「ty=by、tx=bx」となる(S530,540)。つまり、目標ベクトルTの垂直成分tyとしては、制限値ayと垂直成分byのうち絶対値が大きい方が選択される。
 (3)の場合、目標面60の上方にバケット先端が在るため、距離Dが正になり制限値ayは図16より下向き((-)方向)となる。そして、垂直成分byは下向き((-)方向)である。そのため、S450、S480、S490を通る。したがって、S4490で制限値ayと垂直成分byの絶対値を比較し、制限値ayの方が大きい場合には、目標速度ベクトルTは「ty=by、tx=bx」となり(S530,540、垂直成分byの方が大きい場合には「ty=ay、tx=bx+cx」となる)(S500,510,520)。つまり、目標ベクトルTの垂直成分tyとしては、制限値ayと垂直成分byのうち絶対値が小さい方が選択される。
 (4)の場合、目標面60の上方にバケット先端が在るため、距離Dが正になり制限値ayは図16より下向き((-)方向)となる。そして、垂直成分byは上向き((+)方向)である。そのため、S450、S480、S530を通るので、目標速度ベクトルTは「ty=by、tx=bx」となる。なお、ここでは説明を簡略化するために、S480でYESの場合にS530に進むように構成したが、S530に代えてS500に進むように構成を変更しても良い。このように構成すると、アームクラウド操作中に先の図9の点P3に相当する点を超えたところでマシンコントロールによる強制ブーム下げが発動し目標面60に沿った掘削が行われることになるので、目標面60に沿った掘削距離を長くできる。なお、このようにマシンコントロールによりブーム下げを行う場合に補正が必要になったときには、第1実施形態と同様に図13を利用して算出した補正値を利用することは言うまでも無い。
 図19の説明に戻る。S550では、目標シリンダ速度演算部43gは、S520またはS540で決定した目標速度ベクトルT(ty,tx)を基に各油圧シリンダ5,6,7の目標速度を演算する。
 S560では、目標パイロット圧演算部43hは、S550で算出された各シリンダ5,6,7の目標速度を基に各油圧シリンダ5,6,7の流量制御弁15a,15b,15cへの目標パイロット圧を演算する。
 S570では、目標パイロット圧演算部43hは、マシンコントロールによるブーム8の動作で発生すべきバケット先端の速度ベクトルCがゼロか否かの判定を行う。速度ベクトルCがゼロでない場合(すなわちマシンコントロールが発動する場合)にはS580に進み、速度ベクトルCがゼロの場合(すなわちマシンコントロールが発動しない場合)にはS580で補正値を加えることなくS590に進む。
 S580では、目標パイロット圧演算部43hは、補正値記憶部43jに記憶されたブーム上げの補正値を取得し、その補正値をブームシリンダ5の流量制御弁15aへの目標パイロット圧に加算してS590に進む。
 S590では、目標パイロット圧演算部43hは、各油圧シリンダ5,6,7の流量制御弁15a,15b,15cへの目標パイロット圧を電磁比例弁制御部44に出力する。電磁比例弁制御部44は、各油圧シリンダ5,6,7の流量制御弁15a,15b,15cに目標パイロット圧が作用するように電磁比例弁54,55,56を制御し、これにより作業機1Aによる掘削が行われる。例えば、前回の掘削時に軌跡98と出来形97の距離が正の値だった場合(すなわち、軌跡98の下方に出来形97が位置するいわゆる掘り過ぎの場合)には、補正値演算部43iが、図18のフローチャートに基づいて、ブーム上げでパイロット圧を増加させ、ブーム下げでパイロット圧を減少させる補正値を算出する。このように算出された補正値でもってS560で算出したブームパイロット圧を補正してマシンコントロールを発動させると、S590の処理時に前回の掘削時よりも爪先の描く軌跡が上方に移動して掘り過ぎが防止されるので、出来形を目標面60に近づけることができる。
 S590の処理が終了したら、操作量演算部43aでオペレータによるレバー操作が検出されるまで待機する。
 <効果>
 次の本実施形態の効果を説明する。上記の実施形態では、ブーム8、アーム9及びバケット10を含む多関節型の作業機1Aと、ブーム8、アーム9及びバケット10をそれぞれ駆動するブームシリンダ5、アームシリンダ6及びバケットシリンダ7と、これら油圧シリンダ5,6,7の流量制御弁15a,15b,15cの少なくとも1つにオペレータの操作に応じた制御信号(第1制御信号)を出力する操作装置45a,45b,46aと、操作装置45a,45b,46aから出力された制御信号により作業機1Aの先端(バケット爪先)が目標面60に接近している場合、作業機1Aの先端が目標面60に沿って移動するようにブームシリンダ5を動作させる制御信号(第2制御信号)を新たに生成する目標パイロット圧演算部(制御信号演算部)43hを有し、第1制御信号又は第2制御信号に基づいてブームシリンダ5、アームシリンダ6及びバケットシリンダ7の流量制御弁15a,15b,15cを制御する制御コントローラ40を備える油圧ショベル1において、制御コントローラ40は、第2制御信号を基に駆動された作業機1Aによって形成された出来形97の位置情報を、油圧ショベル1の周辺地形を測定する地形計測装置96から入力される地形情報を基に算出する地形演算部43mと、第2制御信号を基に駆動された作業機1Aの先端が移動した軌跡98の位置情報を算出する姿勢演算部43bをさらに備え、目標パイロット圧演算部43hは、出来形97の位置情報と軌跡98の位置情報の差が小さくなるように第2制御信号を補正することとした。
 このように構成した油圧ショベルによれば、掘削の都度、出来形97が軌跡98に近づくようにブームシリンダ5の制御信号(パイロット圧)が補正され、出来形97と軌跡98の位置情報の差が小さくなるので、角度センサ30,31,32の検出精度が充分でない場合や、個体差・経年変化等により作業機先端の制御精度が充分でない場合等にも、バケット10の爪先を目標面60に沿わせながら掘削できる。その結果、目標面60の施工精度を高めることができる。
 <付記>
 なお、図15の構成を有する領域制限制御部43を備える油圧ショベルにおいても、第1実施形態のように出来形97と目標面60の距離に基づいて第2制御信号の補正を行っても良い。
 また、上記の第2実施形態では、出来形97が目標面60近傍の軌跡98に近づくようにパイロット圧を補正する例について説明した。ここで、軌跡98と出来形97にズレが生じるということは、制御コントローラ40が爪先(作業機1A)の制御に利用している座標系(ショベル座標系)が地上に設定した座標系(グローバル座標系)とズレていることを意味する。そこで、軌跡98が出来形97に近づくようにショベル座標系を校正することで補正を行っても良い。
 また、上記の2つの実施形態では、地形計測装置96は、図1に示すように車体1B(油圧ショベル1)に取り付けても良いし、図21に示すように車体1Bの外部に独立して設置しても良いし、図22に示すようにドローン等の飛行体99に搭載しても良い。図21や図22のように車体1Bに取り付けない場合には、地形情報は無線または有線で車体1B上の制御コントローラ40に入力できる。図1のように建設機械に地形計測装置96を取り付けると、地形計測装置96と制御コントローラ40の通信接続構成が簡便である。一方、図21及び図22のように地形計測装置96を建設機械から独立させると、同一の地形計測装置96から複数台の建設機械に対して地形情報を出力することができる。
 また、図12及び図13に示したように距離と補正値が比例する場合を説明したが、距離がゼロに近い場合には補正値を算出せず、ゼロから正側と負側に所定の閾値値をそれぞれ設定し、当該閾値を越えた場合に補正値を算出するようにしても良い。また、距離を複数の区間に分割し、各区間で一定の補正値をとるようにし、階段状に補正値が増加又は減少するように構成しても良い。また、距離が所定の閾値を越えた場合には、当該閾値との偏差の大小に関わらず所定の補正値を算出し、その算出した補正値をそれまでの補正値の合計に加算するという構成を採用しても良い。この場合、例えば、目標面60の下方に閾値を超えた位置に出来形がある場合、「所定の補正値」のブーム上げパイロット圧補正値として1MPaを加算し、ブーム下げパイロット圧補正値として1MPaを減算する。このように構成すると前回の制御との乖離を少なくできるので制御を安定化できる。
 さらに、上記では、ブーム制御(マシンコントロール)の補正としてパイロット圧を増減する方法を説明したが、例えば、第2実施形態のように目標シリンダ速度から目標パイロット圧を算出しており、その算出に際して目標シリンダ速度から目標パイロット圧への変換テーブルを利用している場合には、当該変換テーブルの特性を変更することでパイロット圧を増減する方法と同等の補正を行っても良い。
 また、目標面演算部43cで演算される目標面の位置情報と、地形演算部43mで演算される地表面上の各点の位置情報は、ショベル座標系及びグローバル座標系のいずれで取得しても良い。
 また、上記では、操作装置45,46,47は油圧パイロット方式であったが、各油圧シリンダ5,6,7の流量制御弁15a,15b,15cを制御する制御信号を電気信号とする電気パイロット方式を利用しても良い。
 上記では、掘削の都度、補正値を演算するように構成したが、補正値を演算するタイミングに特に限定はない。したがって、例えば、1日の作業開始前や作業終了後に補正値を演算したり、所定の周期で演算したり、目標面付近を掘削する仕上げ作業中(すなわち掘削中)に演算したりする運用をしても良い。
 また、上記では、作業機1Aの制御の基準(制御点)としてバケット10の爪先を選択したが、バケット10上の点及びバケット近傍の作業機1A上の点であれば代替可能である。
 また、上記では制御コントローラ40内の領域制限制御部43を油圧ショベル1に搭載する場合について説明したが、領域制限制御部43は油圧ショベル1から切り離し、オペレータ操作検出装置52a等からの入力データを無線・有線で入力し、当該入力データから演算した結果(各油圧シリンダ5,6,7の目標パイロット圧)を電磁比例弁制御部44に無線・有線で出力するように構成しても良い。この場合、領域制限制御部43は単独のコンピュータで構成しても良いし、複数のコンピュータで構成しても良い。
 なお、本発明は、上記の実施の形態に限定されるものではなく、その要旨を逸脱しない範囲内の様々な変形例が含まれる。例えば、本発明は、上記の実施の形態で説明した全ての構成を備えるものに限定されず、その構成の一部を削除したものも含まれる。また、ある実施の形態に係る構成の一部を、他の実施の形態に係る構成に追加又は置換することが可能である。
 上記の制御コントローラ40に係る各構成や当該各構成の機能及び実行処理等は、それらの一部又は全部をハードウェア(例えば各機能を実行するロジックを集積回路で設計する等)で実現しても良い。また、上記の制御コントローラ40に係る構成は、演算処理装置(例えばCPU)によって読み出し・実行されることで当該制御コントローラ40の構成に係る各機能が実現されるプログラム(ソフトウェア)としてもよい。当該プログラムに係る情報は、例えば、半導体メモリ(フラッシュメモリ、SSD等)、磁気記憶装置(ハードディスクドライブ等)及び記録媒体(磁気ディスク、光ディスク等)等に記憶することができる。
 1A…フロント作業機、8…ブーム、9…アーム、10…バケット、17…マシンコントロールON/OFFスイッチ17、30…ブーム角度センサ、31…アーム角度センサ、32…バケット角度センサ、40…制御コントローラ、43…領域制限制御部、43a…操作量演算部、43b…姿勢演算部、43c…目標面演算部、43d…シリンダ速度演算部、43e…バケット先端速度演算部、43f…目標バケット先端速度演算部、43g…目標シリンダ速度演算部、43h…目標パイロット圧演算部、43i…補正値演算部、43j…補正値記憶部、43m…地形演算部、43n…アーム角度別ブームパイロット圧演算部、44…電磁比例弁制御部、45…操作装置(ブーム、アーム)、46…操作装置(バケット、旋回)、47…操作装置(走行)、50…作業機姿勢検出装置、51…目標面設定装置、52a,52b…オペレータ操作検出装置、54,55,56…電磁比例弁、96…地形計測装置、97…出来形、98…バケット爪先の軌跡

Claims (6)

  1.  ブーム、アーム及びバケットを含む多関節型の作業機と、
     前記ブーム、前記アーム及び前記バケットをそれぞれ駆動するブームシリンダ、アームシリンダ及びバケットシリンダと、
     前記ブームシリンダ、前記アームシリンダ及び前記バケットシリンダの流量制御弁のうち少なくとも1つにオペレータの操作に応じた第1制御信号を出力する操作装置と、
     前記第1制御信号により前記作業機の先端が目標面に接近している場合、前記作業機の先端が前記目標面に沿って移動するように前記ブームシリンダ、前記アームシリンダ及び前記バケットシリンダのうち少なくとも1つを動作させる第2制御信号を新たに又は前記第1制御信号を補正することで生成する制御信号演算部を有し、前記第1制御信号又は前記第2制御信号に基づいて前記ブームシリンダ、前記アームシリンダ及び前記バケットシリンダの流量制御弁を制御する制御装置を備える作業機械において、
     前記制御装置は、前記第2制御信号を基に駆動された前記作業機によって形成された出来形の位置情報を、前記作業機械の周辺地形を測定する地形計測装置から入力される地形情報を基に算出する地形演算部をさらに有し、
     前記制御信号演算部は、前記出来形の位置情報に基づいて前記出来形が前記目標面に近づくように前記第2制御信号を補正することを特徴とする作業機械。
  2.  請求項1に記載の作業機械において、
     前記制御信号演算部は、前記出来形の位置情報と前記目標面の位置情報の差が小さくなるように前記第2制御信号を補正することを特徴とする作業機械。
  3.  請求項1に記載の作業機械において、
     前記制御装置は、前記第2制御信号を基に駆動された前記作業機の先端が移動した軌跡の位置情報を算出する姿勢演算部をさらに有し、
     前記制御信号演算部は、前記出来形の位置情報と前記軌跡の位置情報の差が小さくなるように前記第2制御信号を補正することを特徴とする作業機械。
  4.  請求項1に記載の作業機械において、
     前記制御信号演算部は、前記アームのクラウド動作を指示する制御信号が前記第1制御信号として前記操作装置から出力されて前記作業機の先端が前記目標面に接近している場合、前記作業機の先端が前記目標面に沿って移動するように前記ブームシリンダを動作させる制御信号を前記第2制御信号として生成することを特徴とする作業機械。
  5.  請求項1に記載の作業機械において、
     前記地形計測装置は、前記作業機械に搭載されていることを特徴とする作業機械。
  6.  請求項1に記載の作業機械において、
     前記地形計測装置は、前記作業機械の外部に備えられており、
     前記地形計測装置で計測された地形情報は無線または有線により前記作業機械の前記制御装置に入力されていることを特徴とする作業機械。
PCT/JP2016/077567 2016-09-16 2016-09-16 作業機械 WO2018051511A1 (ja)

Priority Applications (7)

Application Number Priority Date Filing Date Title
JP2018508782A JP6526321B2 (ja) 2016-09-16 2016-09-16 作業機械
PCT/JP2016/077567 WO2018051511A1 (ja) 2016-09-16 2016-09-16 作業機械
EP16912870.9A EP3514288B1 (en) 2016-09-16 2016-09-16 Work machinery
KR1020197027600A KR20190110641A (ko) 2016-09-16 2016-09-16 작업 기계
US15/753,246 US10794046B2 (en) 2016-09-16 2016-09-16 Work machine
CN201680048287.2A CN108055855B (zh) 2016-09-16 2016-09-16 作业机械
KR1020187004795A KR102189225B1 (ko) 2016-09-16 2016-09-16 작업 기계

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/077567 WO2018051511A1 (ja) 2016-09-16 2016-09-16 作業機械

Publications (1)

Publication Number Publication Date
WO2018051511A1 true WO2018051511A1 (ja) 2018-03-22

Family

ID=61619408

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/077567 WO2018051511A1 (ja) 2016-09-16 2016-09-16 作業機械

Country Status (6)

Country Link
US (1) US10794046B2 (ja)
EP (1) EP3514288B1 (ja)
JP (1) JP6526321B2 (ja)
KR (2) KR20190110641A (ja)
CN (1) CN108055855B (ja)
WO (1) WO2018051511A1 (ja)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019183382A (ja) * 2018-03-31 2019-10-24 住友建機株式会社 ショベル及びショベルの管理装置
JP2019218766A (ja) * 2018-06-20 2019-12-26 シナノケンシ株式会社 建設工事方法及び3dレーザースキャナ
JP2020029717A (ja) * 2018-08-23 2020-02-27 株式会社神戸製鋼所 掘削作業機械の油圧駆動装置
WO2020039833A1 (ja) * 2018-08-23 2020-02-27 株式会社神戸製鋼所 掘削作業機械の油圧駆動装置
KR20200092852A (ko) * 2019-01-25 2020-08-04 베이징 바이두 넷컴 사이언스 앤 테크놀로지 코., 엘티디. 굴착기 제어 방법 및 장치
JP2021524893A (ja) * 2018-05-30 2021-09-16 ローベルト ボツシユ ゲゼルシヤフト ミツト ベシユレンクテル ハフツングRobert Bosch Gmbh 掘削機の自動制御方法
WO2022210613A1 (ja) * 2021-03-30 2022-10-06 住友重機械工業株式会社 ショベル及びショベルの制御装置

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6886258B2 (ja) 2016-08-31 2021-06-16 株式会社小松製作所 ホイールローダおよびホイールローダの制御方法
US10815640B2 (en) 2016-08-31 2020-10-27 Komatsu Ltd. Wheel loader and method for controlling wheel loader
JP7200124B2 (ja) * 2017-11-10 2023-01-06 住友建機株式会社 ショベル
CN109782767B (zh) * 2019-01-25 2022-06-07 北京百度网讯科技有限公司 用于输出信息的方法和装置
JP7283910B2 (ja) * 2019-02-01 2023-05-30 株式会社小松製作所 建設機械の制御システム、建設機械、及び建設機械の制御方法
JP7025366B2 (ja) * 2019-03-26 2022-02-24 日立建機株式会社 作業機械
WO2020194620A1 (ja) * 2019-03-27 2020-10-01 日立建機株式会社 作業機械
US11124942B2 (en) * 2019-05-03 2021-09-21 Caterpillar Inc. System for controlling the position of a work implement
JP7269143B2 (ja) * 2019-09-26 2023-05-08 日立建機株式会社 作業機械
US11408449B2 (en) 2019-09-27 2022-08-09 Topcon Positioning Systems, Inc. Dithering hydraulic valves to mitigate static friction
US11828040B2 (en) * 2019-09-27 2023-11-28 Topcon Positioning Systems, Inc. Method and apparatus for mitigating machine operator command delay
KR102580772B1 (ko) * 2019-09-30 2023-09-20 히다찌 겐끼 가부시키가이샤 작업 기계
JP7237792B2 (ja) * 2019-10-03 2023-03-13 日立建機株式会社 建設機械
US20220333342A1 (en) * 2019-10-11 2022-10-20 Komatsu Ltd. Work machine and control method for work machine
CN114341436B (zh) * 2020-03-24 2023-08-08 日立建机株式会社 作业机械
JP2021155980A (ja) * 2020-03-26 2021-10-07 株式会社小松製作所 作業機械および作業機械の制御方法
CN114809174B (zh) * 2022-04-12 2023-07-04 三一重机有限公司 液压系统控制方法、装置及挖掘机

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002167794A (ja) 2000-12-04 2002-06-11 Hitachi Constr Mach Co Ltd 油圧ショベルのフロント制御装置
WO2015194601A1 (ja) * 2014-06-20 2015-12-23 住友重機械工業株式会社 ショベル及びその制御方法

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5054832B2 (ja) * 2011-02-22 2012-10-24 株式会社小松製作所 油圧ショベルの表示システム及びその制御方法
JP5349710B2 (ja) * 2011-03-24 2013-11-20 株式会社小松製作所 掘削制御システムおよび建設機械
JP5476450B1 (ja) * 2012-11-19 2014-04-23 株式会社小松製作所 掘削機械の表示システム及び掘削機械
JP5952244B2 (ja) * 2013-09-12 2016-07-13 日立建機株式会社 掘削領域制限制御の基礎情報の演算装置及び建設機械
US9458598B2 (en) * 2014-04-24 2016-10-04 Komatsu Ltd. Work vehicle
WO2015181990A1 (ja) * 2014-05-30 2015-12-03 株式会社小松製作所 作業機械の制御システム、作業機械、油圧ショベルの制御システム及び作業機械の制御方法
WO2015186180A1 (ja) * 2014-06-02 2015-12-10 株式会社小松製作所 建設機械の制御システム、建設機械、及び建設機械の制御方法
US20170121930A1 (en) * 2014-06-02 2017-05-04 Komatsu Ltd. Construction machine control system, construction machine, and method of controlling construction machine
KR101658325B1 (ko) * 2014-09-10 2016-09-22 가부시키가이샤 고마쓰 세이사쿠쇼 작업 차량
US9447562B2 (en) * 2014-09-10 2016-09-20 Komatsu Ltd. Work vehicle and method of controlling work vehicle
CN104541001B (zh) * 2014-09-10 2015-12-09 株式会社小松制作所 作业车辆
WO2016035898A1 (ja) * 2015-09-25 2016-03-10 株式会社小松製作所 作業機械の制御装置、作業機械、及び作業機械の制御方法
JP6925775B2 (ja) * 2015-10-05 2021-08-25 株式会社小松製作所 施工管理システム
DE112016000064B4 (de) * 2016-03-29 2020-10-22 Komatsu Ltd. Steuervorrichtung für Arbeitsmaschine, Arbeitsmaschine und Verfahren zur Steuerung der Arbeitsmaschine
WO2017170651A1 (ja) * 2016-03-31 2017-10-05 住友重機械工業株式会社 建設機械用作業管理システム及び建設機械
JP6674846B2 (ja) * 2016-05-31 2020-04-01 株式会社小松製作所 形状計測システム、作業機械及び形状計測方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002167794A (ja) 2000-12-04 2002-06-11 Hitachi Constr Mach Co Ltd 油圧ショベルのフロント制御装置
WO2015194601A1 (ja) * 2014-06-20 2015-12-23 住友重機械工業株式会社 ショベル及びその制御方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3514288A4

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7114302B2 (ja) 2018-03-31 2022-08-08 住友建機株式会社 ショベル及びショベルの管理装置
JP2019183382A (ja) * 2018-03-31 2019-10-24 住友建機株式会社 ショベル及びショベルの管理装置
JP2021524893A (ja) * 2018-05-30 2021-09-16 ローベルト ボツシユ ゲゼルシヤフト ミツト ベシユレンクテル ハフツングRobert Bosch Gmbh 掘削機の自動制御方法
JP7101825B2 (ja) 2018-05-30 2022-07-15 ローベルト ボツシユ ゲゼルシヤフト ミツト ベシユレンクテル ハフツング 掘削機の自動制御方法
JP2019218766A (ja) * 2018-06-20 2019-12-26 シナノケンシ株式会社 建設工事方法及び3dレーザースキャナ
JP2020029716A (ja) * 2018-08-23 2020-02-27 株式会社神戸製鋼所 掘削作業機械の油圧駆動装置
WO2020039833A1 (ja) * 2018-08-23 2020-02-27 株式会社神戸製鋼所 掘削作業機械の油圧駆動装置
JP2020029717A (ja) * 2018-08-23 2020-02-27 株式会社神戸製鋼所 掘削作業機械の油圧駆動装置
WO2020039834A1 (ja) * 2018-08-23 2020-02-27 株式会社神戸製鋼所 掘削作業機械の油圧駆動装置
JP7096105B2 (ja) 2018-08-23 2022-07-05 株式会社神戸製鋼所 掘削作業機械の油圧駆動装置
JP7082011B2 (ja) 2018-08-23 2022-06-07 株式会社神戸製鋼所 掘削作業機械の油圧駆動装置
US11286644B2 (en) 2018-08-23 2022-03-29 Kobe Steel, Ltd. Hydraulic actuator for excavation work machine
US11293163B2 (en) 2018-08-23 2022-04-05 Kobe Steel, Ltd. Hydraulic drive device for excavation work machines
KR102364764B1 (ko) 2019-01-25 2022-02-18 베이징 바이두 넷컴 사이언스 앤 테크놀로지 코., 엘티디. 굴착기 제어 방법 및 장치
JP6991641B2 (ja) 2019-01-25 2022-01-12 ベイジン バイドゥ ネットコム サイエンス テクノロジー カンパニー リミテッド 掘削機を制御するために用いられる方法及び装置
KR20200092852A (ko) * 2019-01-25 2020-08-04 베이징 바이두 넷컴 사이언스 앤 테크놀로지 코., 엘티디. 굴착기 제어 방법 및 장치
US11401698B2 (en) 2019-01-25 2022-08-02 Beijing Baidu Netcom Science And Technology Co., Ltd. Method and apparatus for controlling excavator
JP2020118018A (ja) * 2019-01-25 2020-08-06 ベイジン バイドゥ ネットコム サイエンス アンド テクノロジー カンパニー リミテッド 掘削機を制御するために用いられる方法及び装置
WO2022210613A1 (ja) * 2021-03-30 2022-10-06 住友重機械工業株式会社 ショベル及びショベルの制御装置

Also Published As

Publication number Publication date
JPWO2018051511A1 (ja) 2018-09-13
CN108055855B (zh) 2020-11-10
EP3514288A4 (en) 2020-08-05
KR20190110641A (ko) 2019-09-30
US10794046B2 (en) 2020-10-06
US20190226181A1 (en) 2019-07-25
JP6526321B2 (ja) 2019-06-05
EP3514288A1 (en) 2019-07-24
CN108055855A (zh) 2018-05-18
KR102189225B1 (ko) 2020-12-09
EP3514288B1 (en) 2021-11-10
KR20180044274A (ko) 2018-05-02

Similar Documents

Publication Publication Date Title
JP6526321B2 (ja) 作業機械
JP6633464B2 (ja) 作業機械
KR102125282B1 (ko) 작업 기계
KR102137469B1 (ko) 작업 기계
KR102024701B1 (ko) 작업 기계
JP6889579B2 (ja) 作業機械
CN111032962B (zh) 工程机械
KR102154581B1 (ko) 작업 기계
KR102314498B1 (ko) 작업 기계
KR20200028993A (ko) 작업 기계
WO2020194878A1 (ja) 作業機械
WO2022201905A1 (ja) 作業機械
WO2020065739A1 (ja) 作業機械
JP2023138083A (ja) 作業機械

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 2018508782

Country of ref document: JP

ENP Entry into the national phase

Ref document number: 20187004795

Country of ref document: KR

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16912870

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE