WO2016185596A1 - 遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラム - Google Patents

遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラム Download PDF

Info

Publication number
WO2016185596A1
WO2016185596A1 PCT/JP2015/064558 JP2015064558W WO2016185596A1 WO 2016185596 A1 WO2016185596 A1 WO 2016185596A1 JP 2015064558 W JP2015064558 W JP 2015064558W WO 2016185596 A1 WO2016185596 A1 WO 2016185596A1
Authority
WO
WIPO (PCT)
Prior art keywords
maintenance
failure
remote monitoring
failure probability
risk
Prior art date
Application number
PCT/JP2015/064558
Other languages
English (en)
French (fr)
Inventor
渉 伏見
井上 淳
敬秀 平井
恒次 阪田
準史郎 神田
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to DE112015006554.7T priority Critical patent/DE112015006554T5/de
Priority to KR1020177027163A priority patent/KR101823849B1/ko
Priority to PCT/JP2015/064558 priority patent/WO2016185596A1/ja
Priority to JP2017514594A priority patent/JP6143994B2/ja
Priority to CN201580079530.2A priority patent/CN107533733B/zh
Priority to TW104117116A priority patent/TWI574137B/zh
Publication of WO2016185596A1 publication Critical patent/WO2016185596A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Definitions

  • the present invention relates to a remote monitoring device, a remote monitoring and maintenance system, a remote monitoring method, and a remote monitoring program for calculating a failure probability of a part included in a monitoring target device.
  • the conventional remote monitoring and maintenance system calculates the future failure probability from the elapsed usage period of the parts included in the monitored device, calculates the maintenance cost for each part based on the calculated failure probability, and based on this maintenance cost
  • the maintenance staff has determined the inspection time for inspecting the monitoring target device (for example, Patent Document 1).
  • Patent Document 1 does not calculate a failure probability based on information (hereinafter referred to as maintenance information) obtained when a maintenance staff visits the site and inspects parts of the monitoring target device.
  • maintenance information information obtained when a maintenance staff inspects the failure
  • the failure probability predicted from the maintenance information obtained when the maintenance staff inspects the failure is predicted from the device information transmitted from the monitored device (for example, information such as the elapsed usage time for each part). More accurate than probability.
  • the maintenance staff checks all parts for every inspection it takes cost and time, and an efficient inspection work cannot be performed.
  • the inspection timing of the monitoring target device is determined based on the failure probability calculated only from the device information, an efficient inspection operation cannot be performed, for example, an unnecessary inspection operation occurs.
  • a remote monitoring device, a remote monitoring and maintenance system, a remote monitoring method, and a remote monitoring program according to the present invention are made to solve the above-described problems, and include device information transmitted from a monitoring target device.
  • the purpose is to calculate the failure probability using maintenance information obtained when maintenance personnel inspected.
  • the remote monitoring device includes a failure probability calculation unit that calculates a failure probability for each part of the monitored device based on device information acquired from the monitored device, and maintenance that checks the monitored device
  • a failure probability correction unit that corrects the failure probability based on maintenance information at the previous inspection of the worker, and a failure risk that calculates a failure risk at the next inspection based on the failure probability corrected by the failure probability correction unit
  • a calculating unit a failure probability calculation unit that calculates a failure probability for each part of the monitored device based on device information acquired from the monitored device, and maintenance that checks the monitored device
  • a failure probability correction unit that corrects the failure probability based on maintenance information at the previous inspection of the worker, and a failure risk that calculates a failure risk at the next inspection based on the failure probability corrected by the failure probability correction unit
  • a calculating unit is a calculating unit.
  • the remote monitoring and maintenance system of the present invention includes a device information storage unit that stores device information acquired from a monitoring target device, a maintenance information storage unit that stores maintenance information at the time of a previous inspection of a maintenance person who checks the monitoring target device, and A failure probability calculation unit that calculates a failure probability for each part of the monitored device at the next inspection based on the device information, a failure probability correction unit that corrects the failure probability based on the maintenance information, and the failure Based on the failure probability corrected by the probability correction unit, the failure risk calculation unit that calculates the failure risk, and the failure risk calculated by the failure risk calculation unit among the components of the monitored device exceeds a threshold value A maintenance item selection unit that selects a maintenance item of a part as a priority maintenance item that needs to be inspected next time.
  • a failure probability calculating step for calculating a failure probability for each part at the next inspection based on device information acquired from the monitored device, and a previous inspection of a maintenance worker who checks the monitored device
  • a failure probability correction step for correcting the failure probability based on the maintenance information in the step
  • a failure risk calculation step for calculating a failure risk based on the failure probability corrected in the failure probability correction step.
  • the remote monitoring program of the present invention includes a failure probability calculating step for calculating a failure probability for each part of the monitored device based on device information acquired from the monitored device, and maintenance for checking the monitored device
  • a failure probability correcting step for correcting the failure probability based on maintenance information at the previous inspection of the worker, and a failure risk for calculating a failure risk at the next inspection based on the failure probability corrected in the failure probability correcting step And calculating step.
  • the remote monitoring device, remote monitoring maintenance system, remote monitoring method, and remote monitoring program calculate the failure probability based on the maintenance information in addition to the device information, the failure probability calculated only by the device information More accurate failure probability can be calculated. Therefore, an accurate inspection time can be determined, and the inspection work can be performed efficiently.
  • FIG. 1 is a configuration diagram of a remote monitoring and maintenance system according to Embodiment 1.
  • FIG. 3 is a functional block diagram of a failure risk processing unit according to Embodiment 1.
  • FIG. 4 is an operation flowchart of the remote monitoring and maintenance system according to the first embodiment.
  • 6 is an operation flowchart for calculating a failure probability by the remote monitoring apparatus according to the first embodiment. It is a figure explaining the implementation aspect of the remote monitoring maintenance system which concerns on Embodiment 1.
  • FIG. It is a block diagram of the remote monitoring maintenance system which concerns on Embodiment 2.
  • FIG. 7 is an operation flowchart of the remote monitoring and maintenance system according to the second embodiment. It is a figure explaining the implementation aspect of the remote monitoring maintenance system which concerns on Embodiment 2.
  • FIG. 1 is a configuration diagram of a remote monitoring and maintenance system according to Embodiment 1.
  • FIG. 3 is a functional block diagram of a failure risk processing unit according to Embodiment 1.
  • FIG. 4 is an operation flowchart
  • FIG. 12 is an operation flowchart when the remote monitoring and maintenance system according to the third embodiment classifies device information. 12 is an operation flowchart when the remote monitoring and maintenance system according to the third embodiment selects priority maintenance items. It is a hardware block diagram of the remote monitoring apparatus which concerns on Embodiment 1 to Embodiment 3.
  • FIG. 1 is a configuration diagram of a remote monitoring and maintenance system according to the first embodiment.
  • the remote monitoring and maintenance system includes a monitoring target device 1a, a monitoring target device 1b, and a remote monitoring device 2.
  • the monitoring target devices 1 a and 1 b are connected to the remote monitoring device 2 via the network 100.
  • the monitoring target devices 1a and 1b are devices such as an elevator, for example.
  • the remote monitoring device 2 is a device that monitors the monitored devices 1a and 1b, and calculates a failure risk for each component of the monitored devices 1a and 1b. This failure risk will be described later.
  • the number of monitored devices monitored by the remote monitoring device 2 will be described using two examples 1a and 1b.
  • the remote monitoring and maintenance system includes two or more monitored devices. Even if it exists, it is feasible.
  • the monitoring target devices 1a and 1b and other monitoring target devices are collectively referred to as the monitoring target device 1.
  • the remote monitoring device 2 includes a device information storage unit 23, a maintenance information storage unit 24, a maintenance information input unit 25, a failure risk processing unit 26, and a maintenance item selection unit 27.
  • the device information storage unit 23 stores a device information DB (database).
  • the device information DB includes device information transmitted from the monitoring target device 1.
  • the device information is information transmitted from the monitoring target device 1, and corresponds to, for example, the number of times the elevator is started, the travel distance, the accumulated operation time, and the like.
  • the maintenance information storage unit 24 stores a maintenance information DB.
  • the maintenance information DB includes maintenance information obtained when a maintenance staff visits the site and inspects the parts of the monitoring target device 1.
  • the maintenance information is, for example, the remaining thickness of the brake shoes of the elevator, the amount or deterioration of the gear oil of the hoisting machine, and the like.
  • the maintenance information input unit 25 is an input unit for inputting the contents of maintenance work performed by maintenance personnel at each site as maintenance information.
  • the failure risk processing unit 26 calculates the failure risk of the monitored device 1 at each site based on the contents of the device information DB and the maintenance information DB.
  • the failure risk is an index for the maintenance personnel to determine which maintenance item should be inspected among the components constituting the monitored device 1, and is calculated for each component of the monitored device 1.
  • the failure risk is calculated by the product of the failure probability obtained from the device information and the maintenance information and a risk value predetermined for each part.
  • the failure probability obtained from the device information and the maintenance information is calculated by the failure risk processing unit 26 calculating the failure probability based on the device information and correcting the failure probability based on the maintenance information obtained by the maintenance staff at the previous inspection. Calculated.
  • the failure probability rises with time, and the failure probability calculated based on the device information may be calculated using a general method such as Weibull distribution.
  • a failure probability correction method based on maintenance information for example, a threshold value related to maintenance information at the previous inspection may be set, and the failure probability may be corrected depending on whether the value indicated by the maintenance information is greater than or less than the threshold value.
  • the failure risk processing unit 26 may reduce the failure probability by 10% if the maintenance information at the time of the previous inspection is equal to or less than the threshold, and may add 10% if the maintenance information is equal to or greater than the threshold.
  • the failure risk processing unit 26 corrects the failure probability at the next inspection calculated based only on the device information with the correction value corresponding to the threshold value, and sets it as the failure probability at the next inspection. Therefore, if it is determined that the degree of wear of the brake or rope is small and the margin of the remaining portion is large based on the maintenance information obtained by the maintenance staff at the previous inspection, the failure probability related to the corresponding part is corrected to be low.
  • the failure risk processing unit 26 does not necessarily calculate the failure probability using the threshold value. For example, a relational expression between the maintenance information and the failure probability correction value is determined in advance. It is sufficient that the failure probability can be corrected based on the maintenance information.
  • the threshold value and the relational expression may be determined based on simulations or empirical rules.
  • the risk value is a predetermined value for each part, and is set according to the risk when the part breaks down.
  • the risk value is a value that can be arbitrarily changed by the designer and administrator of the remote monitoring and maintenance system. From various points of view, such as the risk of passengers when a component breaks down, the magnitude of damage to equipment, and repair costs It can be set.
  • the failure risk processing unit 26 calculates the failure probability based on the maintenance information in addition to the device information, the failure risk processing unit 26 can calculate a more accurate failure probability than the failure probability calculated based only on the device information. .
  • FIG. 2 is a functional block diagram of the failure risk processing unit 26.
  • the failure risk processing unit 26 includes a failure probability calculation unit 261, a failure probability correction unit 262, a risk value storage unit 263, and a failure risk calculation unit 264.
  • the failure probability calculation unit 261 acquires device information from the device information DB of the device information storage unit 23 and calculates a failure probability for each part.
  • the failure probability correction unit 262 acquires maintenance information from the maintenance information DB stored in the maintenance information storage unit 24, and corrects the failure probability calculated by the failure probability calculation unit 261 based on the maintenance information.
  • the risk value storage unit 263 stores a risk value for each part.
  • the failure risk calculation unit 264 calculates a failure risk based on the failure probability for each component corrected by the failure probability correction unit 262 and the risk value stored in the risk value storage unit 263.
  • the maintenance item selection unit 27 selects maintenance items (priority maintenance items) related to parts that need to be inspected at the next inspection based on the failure risk calculated by the failure risk processing unit 26.
  • the maintenance item selection unit 27 selects a maintenance item so as to preferentially maintain an item with a high failure risk. For example, the maintenance item selection unit 27 calculates a failure risk X at the next inspection and a failure risk Y at the next inspection as the failure risk. Assuming that the failure risk threshold requiring maintenance is A, there are the following three patterns. (1) X ⁇ Y ⁇ A, (2) X ⁇ A ⁇ Y, (3) A ⁇ X ⁇ Y.
  • the risk of failure is low, and it is considered sufficient to inspect at the next inspection work. In this inspection work, the priority as a maintenance item is lowered.
  • the failure risk is low in the next inspection work, but the failure risk exceeds the threshold that requires maintenance in the next inspection work, so the priority is raised as the maintenance item for this time.
  • the priority is given the highest priority. That is, the maintenance item selection unit 27 determines the priority of the maintenance item according to the failure risk, and determines the priority maintenance item based on the priority and the threshold value. Thus, the maintenance item selection unit 27 selects the priority maintenance item based on both the failure risk X and the failure risk Y.
  • the maintenance item selection unit 27 performs the inspection one after another.
  • Priority maintenance items can be selected in consideration of sufficient items even if they are inspected from time to time, and maintenance personnel can be assigned to inspection work more efficiently.
  • the maintenance item selection unit 27 is not necessarily limited to selecting priority maintenance items based on both the failure risk X at the next inspection and the failure risk Y at the next inspection.
  • the priority maintenance item may be selected based only on the failure risk X at the time. That is, the maintenance item selection unit 27 compares the failure risk X at the next inspection calculated by the failure risk processing unit 26 with the threshold A, and selects a maintenance item related to a component with the failure risk X exceeding the threshold as a priority maintenance item. May be. Further, the maintenance item selection unit 27 may not necessarily select the priority maintenance item based on the failure risk threshold. For example, the maintenance item selection unit 27 selects priority maintenance items in order from items related to parts having a high failure risk, and appropriately determines items to be actually inspected at the next inspection according to constraints such as cost and the number of maintenance personnel. Also good.
  • FIG. 3 is an operation flowchart of the remote monitoring apparatus according to the first embodiment.
  • FIG. 4 is an operation flowchart in which the remote monitoring apparatus according to the first embodiment calculates a failure probability.
  • the device information storage unit 23 stores device information as a device information DB
  • the maintenance information storage unit 24 stores maintenance information up to the previous inspection as a maintenance information DB. It is assumed that
  • the failure probability calculation unit 261 acquires device information from the device information storage unit 23 (device information acquisition step).
  • the failure probability correction unit 262 acquires maintenance information from the maintenance information storage unit 24 (maintenance information acquisition step).
  • the failure probability calculation unit 261 calculates the failure probability X at the next inspection for each part based on the device information acquired from the device information storage unit 23 and the maintenance information acquired from the maintenance information storage unit 24. Details of ST2 will be described with reference to FIG. In ST21 of FIG. 4A, the failure probability calculation unit 261 acquires device information from the device information storage unit 23, and calculates a failure probability at the next inspection for each component (failure probability calculation step). The failure probability correction unit 262 corrects the failure probability calculated by the failure probability calculation unit 261 based on the maintenance information for each component (failure probability correction step). For example, the failure probability correction unit 262 has a threshold value related to maintenance information at the time of the previous inspection, and corrects the failure probability at the next inspection calculated based on only the device information according to the threshold value. The failure probability X is calculated.
  • the failure probability calculation unit 261 calculates the failure probability Y at the time of each subsequent inspection for each part based on the device information acquired from the device information storage unit 23 and the maintenance information acquired from the maintenance information storage unit 24. Details of ST3 will be described with reference to FIG.
  • the failure probability calculation unit 261 calculates a failure probability for each part based on the device information acquired from the device information storage unit 23 (failure probability calculation step).
  • the failure probability correction unit 262 corrects the failure probability calculated by the failure probability calculation unit 261 based on the maintenance information for each component at the time of the previous inspection (failure probability correction step).
  • the failure probability correction unit 262 has a threshold value related to maintenance information at the previous inspection, corrects the failure probability at the subsequent inspection calculated based on only the device information according to the threshold, and The failure probability Y is calculated.
  • the failure risk calculation unit 264 acquires the risk value of the component for which the failure probability has been calculated, and calculates the failure risk by multiplying the failure probability X at the next inspection with the failure probability Y at the next inspection. X, failure risk Y is calculated (failure risk calculation step). The failure risk X and the failure risk Y are calculated for each part. The failure risk calculation unit 264 outputs the calculated failure risks X and Y to the maintenance item selection unit 27.
  • the maintenance item selection unit 27 selects a priority maintenance item for each component based on the failure risk X at the next inspection calculated for each component, the failure risk Y at the subsequent inspection, and the threshold A (priority). Maintenance item selection step). The maintenance staff goes to the site where the monitoring target device 1 is installed, and performs inspection work on the priority maintenance item selected by the maintenance item selection unit 27.
  • ST2 and ST3 are not limited to this, and may be reversed. Also, ST3 does not necessarily have to be performed.
  • the remote monitoring and maintenance system calculates the failure probability based on the maintenance information in addition to the device information, the failure probability is calculated more accurately than the failure probability calculated based only on the device information. can do. Therefore, an accurate inspection time can be determined, and the inspection work can be performed efficiently.
  • the monitoring target device 1 has been described using an example of an elevator.
  • the monitoring target device 1 is not limited to an elevator, and may be a device such as a car, a railway vehicle, and a plant.
  • the configuration of the remote monitoring and maintenance system is not limited to that shown in FIG.
  • FIG. 5 is a diagram for explaining an embodiment of the remote monitoring and maintenance system according to the first embodiment.
  • the maintenance item selection unit 27 is provided in the external maintenance item selection device 3.
  • the maintenance item selection device 3 is, for example, a device managed by a maintenance company.
  • the failure risk processing unit 26 includes the device information acquired from the device information DB of the device information storage unit 23 and the maintenance information acquired from the maintenance information DB of the maintenance information storage unit 24. Based on the above, the failure risk is calculated, and the calculated failure risk is transmitted to the maintenance item selection unit 27 of the maintenance item selection device 3.
  • the maintenance information input unit 25 may be provided in any of the remote monitoring device 2 and the maintenance item selection device 3, but the maintenance information input unit 25 is When the maintenance item selection device 3 is provided, the maintenance information needs to be transmitted from the maintenance information input unit 25 to the maintenance information storage unit 24 of the remote monitoring device 2.
  • the configuration of the remote monitoring and maintenance system may be the configuration shown in FIG.
  • the device information storage unit 23 and the maintenance information storage unit 24 may be provided in the external server 4 installed outside the remote monitoring device 2.
  • the failure risk processing unit 26 acquires device information from the device information storage unit 23 of the external server 4, acquires maintenance information from the maintenance information storage unit 24, and calculates a failure risk.
  • the device information storage unit 23 and the maintenance information storage unit 24 may be provided in different servers.
  • each configuration of the remote monitoring and maintenance system according to the following embodiment is also applied. It is the same.
  • FIG. 6 is a configuration diagram of a remote monitoring and maintenance system according to the second embodiment.
  • the components corresponding to the configuration of the remote monitoring and maintenance system according to the first embodiment are denoted by the same reference numerals and the description thereof is omitted.
  • the maintenance work optimization device 5 includes a work proficiency level storage unit 51 and a maintenance work optimization unit 52.
  • the work proficiency level storage unit 51 has a work proficiency level DB.
  • the work proficiency level DB is a database in which the proficiency level of maintenance work determined from the years of maintenance work experience or the acquired skill level is associated with maintenance personnel.
  • the acquired skill level is, for example, work qualification.
  • the proficiency level may be set in advance by the administrator or designer of the remote monitoring and maintenance system.
  • the maintenance work optimization unit 52 acquires priority maintenance items from the maintenance item selection unit 27 and refers to the work proficiency level DB of the work proficiency level storage unit 51 to assign maintenance personnel to be assigned to the inspection work of the priority maintenance items. Select.
  • the maintenance work optimization unit 52 selects a maintenance person to be assigned to the inspection work of the priority maintenance item based on the failure risk of the parts related to the priority maintenance item and the proficiency level of the maintenance person. For example, parts that are not inspected at the time of the previous inspection and that have a long operation time after the inspection work (part A) are the same as parts A that have been inspected at the time of the previous inspection and that have been operated after the inspection work.
  • the maintenance item selection unit 27 is arranged so that the maintenance staff level assigned to the priority maintenance item related to the part A is higher than the maintenance level level of the maintenance staff assigned to the inspection of the priority maintenance item related to the part B. Is selected.
  • the maintenance work optimization unit 52 selects the maintenance personnel to be assigned to the priority maintenance items based on the failure risk and the level of proficiency of the maintenance personnel, but is not limited thereto.
  • the maintenance item selection unit 27 may acquire the proficiency level of the maintenance staff from the work proficiency level DB, and assign it to the inspection work of the priority maintenance items from the maintenance level with high proficiency level.
  • the maintenance work optimization unit 52 selects the maintenance staff to be assigned to the inspection work of the priority maintenance items according to the level of proficiency of the maintenance staff. Can be assigned to work.
  • the maintenance work optimization unit 52 selects maintenance personnel to be assigned to the inspection work of the priority maintenance items based on the failure risk and the level of proficiency of the maintenance personnel, so that the inspection work for the priority maintenance items with a high failure risk is selected.
  • Maintenance personnel with a high level of proficiency can be selected, maintenance personnel with a low level of proficiency can perform inspections more reliably and in a shorter time than inspection work, and more efficient and optimal maintenance can be realized. .
  • FIG. 7 is an operation flowchart of the remote monitoring and maintenance system according to the second embodiment.
  • components corresponding to the operations of the remote monitoring and maintenance system according to the first embodiment are denoted by the same reference numerals and description thereof is omitted.
  • the maintenance work optimization unit 52 acquires the priority maintenance item and the failure risk from the maintenance item selection unit 27 (priority maintenance item acquisition step). Note that the maintenance work optimization unit 52 according to the present embodiment does not necessarily need to acquire a failure risk, and may acquire at least priority maintenance items. In the following description, it is assumed that the maintenance work optimization unit 52 acquires both the priority maintenance item and the failure risk.
  • the maintenance work optimization unit 52 refers to the work proficiency level storage unit 51, and acquires the proficiency level of maintenance personnel who can perform inspection work at the next inspection (skill level acquisition step).
  • the maintenance work optimization unit 52 selects a maintenance person to be assigned to the inspection work of the priority maintenance items of the parts based on the proficiency level of the maintenance person and the failure risk (maintenance person selection step). Specifically, the maintenance work optimization unit 52 assigns maintenance personnel with a high level of proficiency in order of priority maintenance items with a high component failure risk.
  • the remote monitoring and maintenance system assigns maintenance personnel to inspection work for priority maintenance items based on the level of proficiency of maintenance personnel.
  • Maintenance personnel with a high level of proficiency can be selected, and maintenance personnel with a low level of proficiency can perform inspections more reliably and in a shorter time than when performing inspection work, thereby realizing more efficient and optimal maintenance.
  • the configuration of the remote monitoring and maintenance system is not limited to that shown in FIG.
  • FIG. 8 is a diagram for explaining an embodiment of the remote monitoring and maintenance system according to the second embodiment.
  • the remote monitoring device 2 may include a work proficiency level storage unit 51 and a maintenance work optimization 52.
  • the device information storage unit 23, the maintenance information storage unit 24, and the work proficiency level storage unit 51 may be provided in the external server 4 (see FIG. 5).
  • FIG. 9 is a configuration diagram of a remote monitoring and maintenance system according to the third embodiment.
  • components corresponding to the configuration of the remote monitoring and maintenance system according to the first or second embodiment are denoted by the same reference numerals and description thereof is omitted.
  • the configuration diagram of the failure risk processing unit 26 in FIG. 9 is the same as that in FIG.
  • the remote monitoring and maintenance system includes a similar device classification unit 28, a plurality of device information storage units 23a, 23b, and 23c, and a failure history storage unit 29.
  • the similar device classification unit 28 groups the monitoring target devices 1 for each similar device.
  • the similar device here refers to a monitoring target device having similar operating conditions such as specifications and installation environment.
  • classification may be performed by an elevator in which a person such as an apartment lives and an elevator installed in a store or the like.
  • classification may be performed depending on whether an elevator for carrying a person or an elevator for carrying luggage. Since similar devices sometimes have similar failure occurrence timings and failure probabilities, more accurate failure risk can be calculated by managing the failure risk for each similar device. Note that it is sufficient that at least one monitoring target device 1 exists in the group of similar devices.
  • the device information storage units 23a, 23b, and 23c store the device information of the monitoring target device 1 for each group classified by the similar device classification unit 28. Similar to the device information storage unit 23 according to the first embodiment, each of the device information storage units 23a, 23b, and 23c has a device information DB. Note that the device information storage units 23a, 23b, and 23c are not necessarily configured by physically separated hardware, and may be stored in one storage device. In other words, the device information storage units 23a, 23b, and 23c only need to be stored so that the device information of the monitoring target device 1 can be identified as to which group it is classified by the similar device classification unit 28.
  • the failure history storage unit 29 includes a failure history DB.
  • the failure history DB stores a failure history of each monitored device 1 for each group classified by the device information storage units 23a, 23b, and 23c.
  • a failed component and information for identifying the monitoring target device 1 including the failed component are stored in association with each other.
  • an identification ID transmitted when the monitoring target device 1 transmits device information may be used as the information for identifying the monitoring target device 1.
  • the failure risk processing unit 26 searches the failure history DB for a failure history related to the same component as the component for which the failure risk is calculated in the group to which the component for which the failure risk is calculated belongs.
  • the failure risk processing unit 26 sets a risk value for a part based on the identified failure history.
  • the failure history corresponds to, for example, the number of failures.
  • the failure risk processing unit 26 sets the risk value higher by a predetermined change value when the number of failures of the identified component A is larger than a predetermined threshold, and the number of failures of the component A is smaller than the threshold. In this case, the risk value is set low by a predetermined change value. Subsequently, the failure risk processing unit 26 calculates a failure risk based on the product of the failure probability and the risk value.
  • a plurality of failure frequency thresholds may be set.
  • the change value of the risk value corresponding to the threshold value may be stored in the risk value storage unit 263 in advance.
  • the risk value itself corresponding to the failure frequency threshold value is stored in the risk value storage unit 263 in advance, and the failure risk processing unit 26 acquires the risk value corresponding to the failure frequency threshold value from the risk value storage unit 263.
  • a failure risk may be calculated.
  • the failure risk processing unit 26 may calculate the failure risk based on the product of the risk value corresponding to the component, the risk value corresponding to the number of failures, and the failure probability.
  • the failure risk processing unit 26 may set the risk value or the changed value of the risk value based on a relational expression between the number of failures set in advance and the risk value or the changed value of the risk value.
  • the threshold value and the relational expression may be determined based on simulations or empirical rules.
  • the failure risk processing unit 26 may set a risk value corresponding to the failure history regarding the component for which the failure probability has been calculated. As described above, the failure risk processing unit 26 determines the risk value based on the failure history of the parts in the similar device, so that it is possible to calculate the failure risk corresponding to the monitored device 1.
  • FIG. 10 is an operation flowchart when the remote monitoring and maintenance system according to the third embodiment classifies device information.
  • a risk value is set based on the number of failures as an example of a failure history.
  • the similar device classification unit 28 acquires the device information transmitted from the monitoring target device 1 and the identification ID of the monitoring target device (device information acquisition step).
  • the similar device classification unit 28 determines, based on the identification ID, to which group the monitored device 1 that has transmitted the device information belongs to each similar device (group determination step).
  • group determination step the similar device classification unit 28 only needs to include a group DB (not shown) in which the group to which the monitoring target device 1 belongs and the identification ID are associated with each other.
  • the similar device classification unit 28 refers to the group DB and determines to which group the acquired identification ID belongs.
  • the similar device classification unit 28 outputs an identification ID and device information to the device information storage unit 23a, 23b, or 23c corresponding to the group obtained as a result of the determination.
  • the device information storage unit 23a, 23b, or 23c stores the acquired identification ID and device information in association with each other (device information storage step).
  • the remote monitoring device 2 executes the operations of ST11 to ST13 each time device information is acquired from the monitoring target device 1.
  • FIG. 11 is an operation flowchart when the remote monitoring and maintenance system according to the third embodiment selects priority maintenance items.
  • components corresponding to the operations of the remote monitoring and maintenance system according to the first embodiment are denoted by the same reference numerals and description thereof is omitted.
  • the failure risk calculation unit 264 searches the failure history DB, and specifies the number of failures of this component in the group of monitored devices 1 including the components for which the failure probability has been calculated in ST2 and ST3 (failure history search step) ).
  • the failure risk calculation unit 264 sets the risk value of the component based on the specified number of failures (risk value setting step). Thereafter, the failure risk is calculated based on the risk value, similarly to the operation of the remote monitoring and maintenance system according to the first or second embodiment.
  • the remote monitoring and maintenance system determines the risk value based on the failure history of the parts, it is possible to calculate the failure risk according to the specifications of the monitored device 1 and the installation environment. It becomes possible. Therefore, even when the specifications and installation environment of the monitoring target device 1 are different, the optimal failure risk can be calculated.
  • the work proficiency level storage unit 51 and the maintenance work optimization unit 52 according to the second embodiment can be applied.
  • the remote monitoring and maintenance system according to the present embodiment also uses the risk value based on the failure history other than the number of failures. Can be set. That is, the failure history is not limited to the number of failures as long as it is an element that affects the risk value.
  • FIG. 12 is a hardware configuration diagram of the remote monitoring apparatus according to the first to third embodiments.
  • the remote monitoring device 2 includes an input device 201, an output device 202, a storage device 203, and a processing device 204.
  • the input device 201 is a device in which device information transmitted from the monitoring target device 1, maintenance information output from a maintenance worker or a maintenance company device (not shown), or maintenance personnel directly input maintenance information to the remote monitoring device 2. It is. For example, as shown in FIG.
  • the output device 202 transmits information such as failure risk from the remote monitoring device 2 when the remote monitoring device 2 and other devices (maintenance item selection device 3, etc.) are separated. It is a device to do.
  • the storage device 203 is a device that executes the functions of the device information storage units 23, 23a, 23b, and 23c, the maintenance information storage unit 24, the failure history storage unit 29, the work proficiency level storage unit 51, and the risk value storage unit 263. .
  • the processing device 204 is, for example, a CPU (Central Processing Unit), and includes a failure risk processing unit 26, a maintenance item selection unit 27, a similar device classification unit 28, a work proficiency level storage unit 51, a maintenance work optimization unit 52, a failure
  • the functions of the probability calculation unit 261, failure probability correction unit 262, and failure risk calculation unit 264 are executed.
  • the device information storage unit 23, the failure risk processing unit 26, the maintenance item selection unit 27, the similar device classification unit 28, the maintenance work optimization unit 52, the failure probability calculation unit 261, the failure probability correction unit 262, and the failure risk calculation unit 264 These functions may be configured by hardware, or can be realized by causing a computer such as the processing device 204 to execute a predetermined program.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Alarm Systems (AREA)

Abstract

本発明の遠隔監視装置は、監視対象機器から取得した機器情報に基づいて、次回点検時における前記監視対象機器の部品毎の故障確率を算出する故障確率算出部と、前記監視対象機器を点検する保守員の前回点検時における保守情報に基づいて前記故障確率を補正する故障確率補正部と、前記故障確率補正部により補正された前記故障確率に基づいて、次回点検時における故障リスクを算出する故障リスク算出部と、を備えることを特徴とする。

Description

遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラム
 本発明は、監視対象機器に含まれる部品の故障確率を算出する遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラムに関する。
 従来の遠隔監視保守システムは、監視対象機器に含まれる部品の使用経過期間等から将来の故障確率を算出し、算出した故障確率に基づいて部品毎の保守コストを計算し、この保守コストに基づいて、保守員が監視対象機器を点検する点検時期を決定していた(例えば、特許文献1)。
特開2009-217718号公報
 特許文献1に記載の技術は、保守員が現場に赴いて監視対象機器の部品を点検した際に得た情報(以下、保守情報)に基づいて故障確率を算出するものではなかった。一般的に、保守員が点検した際に得た保守情報から予測される故障確率は、監視対象機器から送信される機器情報(例えば、部品毎の使用経過時間等の情報)から予測される故障確率よりも正確である。しかしながら、全ての部品を点検毎に保守員が確認する場合には、コスト及び時間がかかり、効率的な点検作業を行うことができない。一方、機器情報のみによって算出された故障確率に基づいて監視対象機器の点検時期を決定したのでは不要な点検作業が発生する等、効率的な点検作業を行うことができない。
 本発明に係る遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラムは、上記のような問題を解決するためになされたものであって、監視対象機器から送信される機器情報と、保守員が点検した際に得た保守情報とを用いて故障確率を算出することを目的とする。
 本発明の遠隔監視装置は、監視対象機器から取得した機器情報に基づいて次回点検時における前記監視対象機器の部品毎の故障確率を算出する故障確率算出部と、前記監視対象機器を点検する保守員の前回点検時における保守情報に基づいて前記故障確率を補正する故障確率補正部と、前記故障確率補正部により補正された前記故障確率に基づいて、次回点検時における故障リスクを算出する故障リスク算出部と、を備えることを特徴とする。
 本発明の遠隔監視保守システムは、監視対象機器から取得した機器情報を記憶する機器情報記憶部と、前記監視対象機器を点検する保守員の前回点検時における保守情報を記憶する保守情報記憶部と、前記機器情報に基づいて次回点検時における前記監視対象機器の部品毎の故障確率を算出する故障確率算出部と、前記保守情報に基づいて前記故障確率を補正する故障確率補正部と、前記故障確率補正部により補正された前記故障確率に基づいて、故障リスクを算出する故障リスク算出部と、前記監視対象機器の部品のうち、前記故障リスク算出部によって算出された故障リスクが閾値を超えた部品の保守項目を次回点検が必要な優先保守項目として選定する保守項目選定部と、を備えることを特徴とする。
 本発明の遠隔監視方法は、監視対象機器から取得した機器情報に基づいて次回点検時における部品毎の故障確率を算出する故障確率算出ステップと、前記監視対象機器を点検する保守員の前回点検時における保守情報に基づいて前記故障確率を補正する故障確率補正ステップと、前記故障確率補正ステップで補正された前記故障確率に基づいて、故障リスクを算出する故障リスク算出ステップと、を有することを特徴とする。
 本発明の遠隔監視プログラムは、監視対象機器から取得した機器情報に基づいて次回点検時における前記監視対象機器の部品毎の故障確率を算出する故障確率算出ステップと、前記監視対象機器を点検する保守員の前回点検時における保守情報に基づいて前記故障確率を補正する故障確率補正ステップと、前記故障確率補正ステップで補正された前記故障確率に基づいて、次回点検時における故障リスクを算出する故障リスク算出ステップと、をコンピュータに実行させることを特徴とする。
 本発明に係る遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラムは、機器情報に加えて、保守情報に基づいて故障確率を算出するため、機器情報のみによって算出された故障確率よりも正確な故障確率を算出することができる。よって、正確な点検時期を決定することができ、効率的に点検作業を実施することができる。
実施の形態1に係る遠隔監視保守システムの構成図である。 実施の形態1に係る故障リスク処理部の機能ブロック図である。 実施の形態1に係る遠隔監視保守システムの動作フローチャートである。 実施の形態1に係る遠隔監視装置が故障確率を算出する動作フローチャートである。 実施の形態1に係る遠隔監視保守システムの実施態様について説明する図である。 実施の形態2に係る遠隔監視保守システムの構成図である。 実施の形態2に係る遠隔監視保守システムの動作フローチャートである。 実施の形態2に係る遠隔監視保守システムの実施態様について説明する図である。 実施の形態3に係る遠隔監視保守システムの構成図である。 実施の形態3に係る遠隔監視保守システムが機器情報を分類する際の動作フローチャートである。 実施の形態3に係る遠隔監視保守システムが優先保守項目を選定する際の動作フローチャートである。 実施の形態1から実施の形態3に係る遠隔監視装置のハードウェア構成図である。
 実施の形態1.
 以下、図1を用いて実施の形態1に係る遠隔監視保守システムについて説明する。図1は、実施の形態1に係る遠隔監視保守システムの構成図である。
 図1において、遠隔監視保守システムは、監視対象機器1a、監視対象機器1b、遠隔監視装置2を備える。監視対象機器1a、1bは、ネットワーク100を介して遠隔監視装置2と接続される。監視対象機器1a、1bは、例えばエレベータ等の機器である。遠隔監視装置2は、監視対象機器1a、1bを監視する装置であって、監視対象機器1a、1bの部品毎の故障リスクを算出する。この故障リスクについては後述する。なお、以下の説明において、遠隔監視装置2が監視する監視対象機器の数は、1a、1bの2つである例を用いて説明するが、遠隔監視保守システムは、2以上の監視対象機器であっても実現可能である。以下、監視対象機器1a、1b及びその他の監視対象機器を総称して監視対象機器1とする。
 遠隔監視装置2は、機器情報記憶部23、保守情報記憶部24、保守情報入力部25、故障リスク処理部26、及び保守項目選定部27を備える。
 機器情報記憶部23は、機器情報DB(データベース)を記憶している。機器情報DBは、監視対象機器1から送信される機器情報を有する。機器情報は、監視対象機器1から送信される情報であって、例えば、エレベータの起動回数、走行距離、積算稼動時間等がこれに相当する。
 保守情報記憶部24は、保守情報DBを記憶している。保守情報DBは、保守員が現場に赴き、監視対象機器1の有する部品を点検した際に得た保守情報を有する。保守情報は、例えば、エレベータのブレーキシューの残存厚み、巻上機のギヤオイルの量又は劣化等である。
 保守情報入力部25は、保守員が各現場で行った保守作業の内容を保守情報として入力する入力部である。
 故障リスク処理部26は、機器情報DBと保守情報DBの内容に基づいて各現場の監視対象機器1の故障リスクを算出する。故障リスクは、監視対象機器1を構成する部品のうち、保守員がいずれの部品に関する保守項目を点検すべきかを判断するための指標であって、監視対象機器1の部品毎に算出される。
 故障リスクは、機器情報と保守情報とから得られる故障確率と、部品毎に予め定められたリスク値との積で算出される。機器情報と保守情報とから得られる故障確率は、故障リスク処理部26が機器情報に基づき故障確率を算出し、この故障確率を前回点検時に保守員が得た保守情報に基づいて補正することにより算出される。
 故障確率は、時間経過と共に上昇する事は一般的に知られており、機器情報に基づいて算出される故障確率については、ワイブル分布等の一般的な手法を用いて算出されれば良い。保守情報に基づく故障確率の補正方法については、例えば、前回点検時における保守情報に関する閾値を設定しておき、保守情報で示される値が閾値以上か閾値以下かによって故障確率を補正すればよい。具体的には、故障リスク処理部26は、前回点検時における保守情報が、閾値以下であれば故障確率を10%減じ、閾値以上であれば故障確率を10%加える等すればよい。すなわち、故障リスク処理部26は、機器情報のみに基づいて算出された次回点検時における故障確率を閾値に応じた補正値で補正し、次回点検時の故障確率とする。したがって、前回点検時に保守員が得た保守情報により、ブレーキやロープの摩耗度合いが少なく、かつ残存部の余裕が大きいと判断した場合には、該当部品に関する故障確率を低く補正される。なお、本実施の形態に係る故障リスク処理部26は、必ずしも閾値を用いて故障確率を算出するものでなくてもよく、例えば、保守情報と故障確率の補正値との関係式を予め定めておき、保守情報に基づいて故障確率を補正できればよい。上記閾値、関係式は、シミュレーションや経験則に基づき定めればよい。
 リスク値は、部品毎に予め定められた値であって、部品が故障した際のリスクに応じて設定される。リスク値は、遠隔監視保守システムの設計者、管理者によって任意に変更可能な値であって、部品が故障した場合の乗員の危険性、装置被害の大きさ、修繕コスト等、様々な観点から設定可能である。このように、故障リスク処理部26は、機器情報に加えて、保守情報に基づいて故障確率を算出するため、機器情報のみによって算出された故障確率よりも正確な故障確率を算出することができる。
 ここで、図2を用いて、故障リスク処理部26の構成について詳細に説明する。図2は、故障リスク処理部26の機能ブロック図である。図2において、故障リスク処理部26は、故障確率算出部261、故障確率補正部262、リスク値記憶部263、及び故障リスク算出部264を備える。
 故障確率算出部261は、機器情報記憶部23の機器情報DBから機器情報を取得し、部品毎の故障確率を算出する。
 故障確率補正部262は、保守情報記憶部24に記憶された保守情報DBから保守情報を取得するとともに、この保守情報に基づいて故障確率算出部261で算出された故障確率を補正する。
 リスク値記憶部263は、部品毎のリスク値を記憶する。
 故障リスク算出部264は、故障確率補正部262により補正された部品毎の故障確率と、リスク値記憶部263に記憶されたリスク値とに基づいて故障リスクを算出する。
 図1において、保守項目選定部27は、故障リスク処理部26で算出された故障リスクに基づいて、次回点検時に点検が必要な部品に関する保守項目(優先保守項目)を選定する。優先保守項目の選定の際、保守項目選定部27は故障リスクの高いものを優先的に保守するように保守項目を選定する。例えば、保守項目選定部27は、故障リスクを次回点検時における故障リスクXと、次々回点検時における故障リスクYとを算出する。保守を必要とする故障リスクの閾値をAとすると、次の3つのパターンがある。(1)X<Y<A、(2)X<A<Y、(3)A<X<Y。(1)の場合は故障リスクが低く、次々回の点検作業時に点検しても十分と考えられ、今回の点検作業においては、保守項目としての優先度を下げる。(2)の場合は、次回の点検作業では故障リスクも低いが、次々回の点検作業時には保守が必要となる閾値を超える故障リスクとなるため、今回の保守項目として優先度を上げる。(3)の場合には今回の点検作業で必須の保守項目となるため、優先度を最優先とする。すなわち、保守項目選定部27は、故障リスクに応じて保守項目の優先度を決定し、この優先度と閾値とに基づいて優先保守項目を決定する。このように、保守項目選定部27は、故障リスクXと故障リスクYとの両方に基づいて優先保守項目を選定することで、例えば、次回点検時の優先保守項目を選定する際に、次々回点検時に点検しても十分な項目を考慮して優先保守項目を選定することができ、保守員をより効率よく点検作業に割り当てることができる。
 なお、本実施の形態において、保守項目選定部27は、必ずしも次回点検時における故障リスクXと次々回点検時における故障リスクYとの両方に基づいて優先保守項目を選定することに限られず、次回点検時における故障リスクXのみに基づいて優先保守項目を選定してもよい。すなわち、保守項目選定部27は、故障リスク処理部26で算出された次回点検時における故障リスクXと閾値Aを比較し、故障リスクXが閾値を超える部品に関する保守項目を優先保守項目として選定してもよい。さらに、保守項目選定部27は、必ずしも故障リスクの閾値に基づいて優先保守項目を選定するものでなくともよい。例えば、保守項目選定部27は、故障リスクが高い部品に関する項目から順に優先保守項目として選定し、コスト、保守員数などの制約条件によって、次回点検時おいて実際に点検する項目を適宜決定してもよい。
 次に、図3、図4を用いて実施の形態1に係る遠隔監視装置の動作について説明する。図3は、実施の形態1に係る遠隔監視装置の動作フローチャートである。図4は、実施の形態1に係る遠隔監視装置が故障確率を算出する動作フローチャートである。なお、以下の説明の前提として、機器情報記憶部23には、機器情報が機器情報DBとして記憶されており、保守情報記憶部24には、前回点検時までの保守情報が保守情報DBとして記憶されているものとする。
 ST1aにおいて、故障確率算出部261は、機器情報記憶部23から機器情報を取得する(機器情報取得ステップ)。
 ST1bにおいて、故障確率補正部262は、保守情報記憶部24から保守情報を取得する(保守情報取得ステップ)。
 ST2において、故障確率算出部261は、機器情報記憶部23から取得した機器情報及び保守情報記憶部24から取得した保守情報に基づいて、次回点検時における故障確率Xを部品毎に算出する。ST2の詳細については、図4(a)を用いて説明する。図4(a)のST21において、故障確率算出部261は、機器情報記憶部23から機器情報を取得し、次回点検時における故障確率を部品毎に算出する(故障確率算出ステップ)。故障確率補正部262は、故障確率算出部261で算出された故障確率を部品毎の保守情報に基づいて補正する(故障確率補正ステップ)。例えば、故障確率補正部262は、前回点検時における保守情報に関する閾値を有しており、この閾値に応じて機器情報のみに基づいて算出された次回点検時における故障確率を補正し、次回点検時の故障確率Xを算出する。
 ST3において、故障確率算出部261は、機器情報記憶部23から取得した機器情報及び保守情報記憶部24から取得した保守情報に基づいて、次々回点検時における故障確率Yを部品毎に算出する。ST3の詳細については、図4(b)を用いて説明する。図4(b)のST31において、故障確率算出部261は、機器情報記憶部23から取得した機器情報に基づいて、次々回点検時における故障確率を部品毎に算出する(故障確率算出ステップ)。ST32において、故障確率補正部262は、故障確率算出部261で算出された故障確率を前回点検時における部品毎の保守情報に基づいて補正する(故障確率補正ステップ)。例えば、故障確率補正部262は、前回点検時における保守情報に関する閾値を有しており、この閾値に応じて機器情報のみに基づいて算出された次々回点検時における故障確率を補正し、次々回点検時の故障確率Yを算出する。
 図3のST4において、故障リスク算出部264は、故障確率を算出した部品のリスク値を取得し、次回点検時の故障確率X及び次々回点検時の故障確率Yと積をとることで、故障リスクX、故障リスクYを算出する(故障リスク算出ステップ)。なお、この故障リスクX及び故障リスクYは、部品毎に算出される。故障リスク算出部264は算出した故障リスクX、Yを保守項目選定部27に出力する。
 ST5において、保守項目選定部27は、部品毎に算出された次回点検時における故障リスクX、次々回点検時における故障リスクY、及び閾値Aに基づいて、部品毎に優先保守項目を選定する(優先保守項目選定ステップ)。保守員は、監視対象機器1が設置された現場に赴き、保守項目選定部27で選定された優先保守項目に関する点検作業を実施する。
 なお、ST2、ST3の順序はこれに限られず、逆の順序であってもよい。また、ST3は必ずしも実施されなくてもよい。
 以上のように、本発明に係る遠隔監視保守システムは、機器情報に加えて、保守情報に基づいて故障確率を算出するため、機器情報のみによって算出された故障確率よりも正確な故障確率を算出することができる。よって、正確な点検時期を決定することができ、効率的に点検作業を実施することができる。
 本実施の形態において、監視対象機器1がエレベータの例を用いて説明したが、監視対象機器1は、エレベータに限らず、車、鉄道車両、及びプラント等の機器であってもよい。
 本実施の形態において、遠隔監視保守システムの構成は、図1に示したものに限られない。図5は、実施の形態1に係る遠隔監視保守システムの実施態様について説明する図である。図5(a)において、保守項目選定部27は、外部の保守項目選定装置3に備えられる。保守項目選定装置3は、例えば、保守会社が管理する装置である。図5(a)に示す遠隔監視保守システムにおいて、故障リスク処理部26は、機器情報記憶部23の機器情報DBから取得した機器情報と、保守情報記憶部24の保守情報DBから取得した保守情報とに基づいて故障リスクを算出し、算出した故障リスクを保守項目選定装置3の保守項目選定部27に送信する。図5(a)に示す遠隔監視保守システムの場合、保守情報入力部25は遠隔監視装置2、及び保守項目選定装置3のいずれの装置に備えられていてもよいが、保守情報入力部25が保守項目選定装置3に備えられる場合には、保守情報入力部25から遠隔監視装置2の保守情報記憶部24に保守情報を送信する必要がある。
 また、本実施の形態において、遠隔監視保守システムの構成は、図5(b)に示す構成としてもよい。図5(b)において、機器情報記憶部23及び保守情報記憶部24は、遠隔監視装置2の外部に設置された外部サーバ4に備えられていてもよい。故障リスク処理部26は、外部サーバ4の機器情報記憶部23から機器情報を取得し、保守情報記憶部24から保守情報を取得して故障リスクを算出する。なお、図5(b)に示す遠隔監視保守システムにおいて、機器情報記憶部23と保守情報記憶部24とが別のサーバに備えられていてもよい。図5に示した機器情報記憶部23、保守情報記憶部24、故障リスク処理部26、保守項目選定部27の実施態様については、以下の実施の形態に係る遠隔監視保守システムの各構成についても同様である。
 実施の形態2.
 実施の形態2に係る遠隔監視保守システムは、保守員の習熟度に基づいて優先保守項目の点検作業に割り当てる保守員を選定することを特徴とする。以下、図6を用いて、実施の形態2に係る遠隔監視保守システムの構成について説明する。図6は、実施の形態2に係る遠隔監視保守システムの構成図である。図6の説明において、実施の形態1に係る遠隔監視保守システムの構成に相当するものに関しては、同じ符号を付して説明を省略する。
 図6において、保守作業最適化装置5は、作業習熟度レベル記憶部51と、保守作業最適化部52とを備える。
 作業習熟度レベル記憶部51は、作業習熟度レベルDBを有する。作業習熟度レベルDBは、保守作業経験年数、又は習得技術レベル等から決定される保守作業の習熟度と、保守員とを対応づけたデータベースである。習得技術レベルは、例えば作業資格等である。習熟度に関しては、遠隔監視保守システムの管理者、又は設計者が予め設定しておけばよい。
 保守作業最適化部52は、保守項目選定部27から優先保守項目を取得するとともに、作業習熟度レベル記憶部51の作業習熟度レベルDBを参照し、優先保守項目の点検作業に割り当てる保守員を選定する。保守作業最適化部52は、優先保守項目に関連する部品の故障リスクと保守員の習熟度とに基づいて、優先保守項目の点検作業に割り当てる保守員を選定する。例えば、前回点検時に点検作業は実施せず、かつ、点検作業後の稼働時間が多い部品(部品A)と、前回点検時に点検作業を実施し、かつ点検作業後の稼動時間が部品Aと同じ部品(部品B)とでは、部品Bよりも部品Aに関する故障リスクが相対的に高くなることが予想される。したがって、保守項目選定部27は、部品Bに関する優先保守項目の点検作業に割り当てる保守員の習熟度よりも部品Aに関する優先保守項目に割り当てる保守員の習熟度の方が高くなるように、保守員を選定する。なお、本実施の形態に係る保守作業最適化部52は、故障リスクと保守員の習熟度とに基づいて優先保守項目に割り当てる保守員を選定することとしたが、これに限られず、例えば、保守項目選定部27は、保守員の習熟度を作業習熟度DBから取得して、習熟度の高い保守員から優先保守項目の点検作業に割り当てるようにしてもよい。このように、保守作業最適化部52は、保守員の習熟度に応じて優先保守項目の点検作業に割り当てる保守員を選定するので、習熟度の高い保守員を優先して優先保守項目の点検作業に割り当てることができる。また、保守作業最適化部52は、故障リスクと保守員の習熟度とに基づいて優先保守項目の点検作業に割り当てる保守員を選定することで、故障リスクの高い優先保守項目の点検作業に対して習熟度の高い保守員を選定することができ、習熟度が低い保守員が点検作業を実施するよりも確実かつ短時間で点検ができ、より効率的で最適な保守を実現することができる。
 次に、図7を用いて実施の形態2に係る遠隔監視保守システムの動作について説明する。図7は実施の形態2に係る遠隔監視保守システムの動作フローチャートである。図7の説明において、実施の形態1に係る遠隔監視保守システムの動作に相当するものに関しては、同じ符号を付して説明を省略する。
 ST6において、保守作業最適化部52は、保守項目選定部27から優先保守項目と故障リスクとを取得する(優先保守項目取得ステップ)。なお、本実施形態に係る保守作業最適化部52は、必ずしも故障リスクを取得する必要はなく、少なくとも優先保守項目を取得すればよい。以下の説明においては、保守作業最適化部52が優先保守項目と故障リスクの両方を取得するものとする。
 ST7において、保守作業最適化部52は、作業習熟度レベル記憶部51を参照し、次回点検時に点検作業可能な保守員の習熟度を取得する(習熟度取得ステップ)。
 ST8において、保守作業最適化部52は、保守員の習熟度と、故障リスクとに基づいて、部品の優先保守項目の点検作業に割り当てる保守員を選定する(保守員選定ステップ)。具体的には、保守作業最適化部52は、部品の故障リスクが高い優先保守項目の順に、習熟度の高い保守員を割り当てていく。
 以上のように、実施の形態2に係る遠隔監視保守システムは、保守員の習熟度に基づいて優先保守項目の点検作業に保守員を割り当てるため、例えば、故障リスクの高い優先保守項目に対して習熟度の高い保守員を選定することができ、習熟度が低い保守員が点検作業を実施するよりも確実かつ短時間で点検ができより効率的で最適な保守を実現することができる。
 本実施の形態においても、遠隔監視保守システムの構成は、図6に示したものに限られない。図8は、実施の形態2に係る遠隔監視保守システムの実施態様について説明する図である。図8に示すように、遠隔監視装置2は、作業習熟度レベル記憶部51、保守作業最適化52を備えるものであってもよい。なお、機器情報記憶部23、保守情報記憶部24、及び作業習熟度レベル記憶部51は外部サーバ4(図5参照)に備えられていてもよい。
実施の形態3.
 実施の形態3に係る遠隔監視保守システムは、部品の故障履歴に基づいてリスク値を決定することを特徴とする。以下、図9を用いて、実施の形態3に係る遠隔監視保守システムの構成について説明する。図9は、実施の形態3に係る遠隔監視保守システムの構成図である。図9の説明において、実施の形態1又は2に係る遠隔監視保守システムの構成に相当するものに関しては、同じ符号を付して説明を省略する。また、図9の故障リスク処理部26の構成図に関しては、図2と同様のものとする。
 図9において、実施の形態3に係る遠隔監視保守システムは、類似機器分類部28、複数の機器情報記憶部23a、23b、23c、及び故障履歴記憶部29を備える。
 類似機器分類部28は、監視対象機器1を類似機器毎にグループ分けする。ここでいう類似機器とは、仕様、設置環境等の稼動状況が類似する監視対象機器をいう。監視対象機器1が設置される環境に応じたグループ分けの例として、例えば、マンション等の人が居住するエレベータと、店舗等に設置されるエレベータとで分類することがあげられる。監視対象機器1の仕様に応じたグループ分けの例として、例えば、人を乗せるためのエレベータか、荷物の運搬用のエレベータかによって分類することがあげられる。類似機器は、互いに故障発生タイミングや故障確率が類似することがあるため、類似機器毎に故障リスクを管理することでより正確な故障リスクを算出することができる。なお、類似機器のグループは、少なくとも監視対象機器1が1つでも存在していればよい。
 機器情報記憶部23a、23b、及び23cは、類似機器分類部28で分類されたグループ毎に監視対象機器1の機器情報を記憶する。実施の形態1に係る機器情報記憶部23と同様、それぞれの機器情報記憶部23a、23b、及び23cは、それぞれ機器情報DBを有する。なお、機器情報記憶部23a、23b、及び23cは、必ずしも物理的に分離されたハードウェアで構成されている必要はなく、1つの記憶装置内に記憶されていてもよい。すなわち、機器情報記憶部23a、23b、23cは、監視対象機器1の機器情報を類似機器分類部28で分類されたいずれのグループに属するかが識別できるように記憶されていればよい。
 故障履歴記憶部29は、故障履歴DBを備える。故障履歴DBには、機器情報記憶部23a、23b、及び23cで分類されるグループ毎に各監視対象機器1の故障履歴が記憶されている。故障履歴は、例えば、故障した部品と、この故障した部品を備える監視対象機器1を識別する情報とが対応付けられて記憶されている。監視対象機器1を識別する情報には、例えば、監視対象機器1が機器情報を送信する際に送信される識別IDを用いればよい。
 故障リスク処理部26は、故障リスクを算出する部品が属するグループにおいて、故障リスクを算出する部品と同じ部品に関する故障履歴について故障履歴DBを検索する。故障リスク処理部26は、特定した故障履歴に基づいて、部品のリスク値を設定する。故障履歴は、例えば故障回数がこれに相当する。故障リスク処理部26は、監視対象機器1aが備える部品Aの故障リスクを算出する際に、監視対象機器1aの部品A、及び監視対象機器1aと同じグループに属する他の監視対象機器(図示せず)が備える部品Aの故障回数を故障履歴DBを検索することにより特定する。故障リスク処理部26は、特定した部品Aの故障回数が予め定めた閾値よりも大きい場合には、予め決められた変更値だけリスク値を高く設定し、部品Aの故障回数が閾値よりも小さい場合には、予め決められた変更値だけリスク値を低く設定する。続いて、故障リスク処理部26は、故障確率とリスク値との積により、故障リスクを算出する。
 なお、故障リスク処理部26には、故障回数の閾値が複数設定されていてもよい。この場合においては、閾値に応じたリスク値の変更値を予めリスク値記憶部263に記憶しておけばよい。
 また、リスク値記憶部263に予め故障回数の閾値に応じたリスク値自体を記憶しておき、故障リスク処理部26が故障回数の閾値に応じたリスク値をリスク値記憶部263から取得して故障リスクを算出してもよい。この場合には、故障リスク処理部26は、部品に応じたリスク値と、故障回数に応じたリスク値と、故障確率との積により故障リスクを算出すればよい。
 故障リスク処理部26は、予め設定された故障回数とリスク値又はリスク値の変更値との関係式に基づいて、リスク値又はリスク値の変更値を設定してもよい。上記閾値、関係式は、シミュレーションや経験則に基づき定めればよい。
 すなわち、本実施の形態において、故障リスク処理部26は、故障確率を算出した部品に関する故障履歴に応じたリスク値を設定すればよい。このように、故障リスク処理部26は、類似機器における部品の故障履歴に基づいて、リスク値を決定するので、監視対象機器1に応じた故障リスクを算出することが可能となる。
 次に、図10を用いて実施の形態3に係る遠隔監視保守システムが機器情報を分類する際の動作について説明する。図10は実施の形態3に係る遠隔監視保守システムが機器情報を分類する際の動作フローチャートである。なお、以下の説明においては、故障履歴の一例として故障回数に基づいてリスク値を設定する例について説明する。
 図10のST11において、類似機器分類部28は監視対象機器1から送信される機器情報と監視対象機器の識別IDとを取得する(機器情報取得ステップ)。
 ST12において、類似機器分類部28は、識別IDに基づいて、機器情報を送信した監視対象機器1が類似機器毎に分類されたいずれのグループに属するか判定する(グループ判定ステップ)。識別IDのグループ判定においては、類似機器分類部28は、監視対象機器1の属するグループと識別IDとが対応づけられたグループDB(図示せず)を備えていればよい。類似機器分類部28は、グループDBを参照し、取得した識別IDがいずれのグループに属するものかを判定する。類似機器分類部28は、判定の結果得たグループに対応する機器情報記憶部23a、23b、又は23cに対し、識別IDと機器情報とを出力する。
 ST13において、機器情報記憶部23a、23b、又は23cは、取得した識別IDと、機器情報とを対応づけて記憶する(機器情報記憶ステップ)。遠隔監視装置2は、上記ST11からST13の動作を監視対象機器1から機器情報を取得する毎に実行する。
 次に、図11を用いて、実施の形態3に係る遠隔監視保守システムが優先保守項目を選定する際の動作について説明する。図11は、実施の形態3に係る遠隔監視保守システムが優先保守項目を選定する際の動作フローチャートである。図11の説明において、実施の形態1に係る遠隔監視保守システムの動作に相当するものに関しては、同じ符号を付して説明を省略する。
 ST1cにおいて、故障リスク算出部264は、故障履歴DBを検索し、ST2及びST3において故障確率を算出した部品を備える監視対象機器1のグループにおいて、この部品の故障回数を特定する(故障履歴検索ステップ)。
 ST1dにおいて、故障リスク算出部264は、特定した故障回数に基づいて、部品のリスク値を設定する(リスク値設定ステップ)。以降、実施の形態1又は実施の形態2に係る遠隔監視保守システムの動作と同様、リスク値に基づいて故障リスクを算出する。
 以上のように、本実施の形態に係る遠隔監視保守システムは、部品の故障履歴に基づいてリスク値を決定するので、監視対象機器1の仕様、設置環境に応じた故障リスクを算出することが可能となる。したがって、監視対象機器1の仕様、設置環境が異なる場合においても、最適な故障リスクを算出することができる。
 なお、実施の形態3に係る遠隔監視保守システムにおいても、実施の形態2に係る作業習熟度レベル記憶部51及び保守作業最適化部52を適用することができる。
 また、上記説明においては、故障履歴の一例として故障回数に基づいてリスク値を設定する例について説明したが、本実施の形態に係る遠隔監視保守システムは、故障回数以外の故障履歴によってもリスク値を設定可能である。すなわち、故障履歴はリスク値に影響を与える要素であれば故障回数に限定されない。
 以下、図12を用いて実施の形態1から実施の形態3に係る遠隔監視装置2のハードウェア構成について説明する。図12は、実施の形態1から実施の形態3に係る遠隔監視装置のハードウェア構成図である。図12において、遠隔監視装置2は入力装置201、出力装置202、記憶装置203、及び処理装置204を備える。入力装置201は、監視対象機器1から送信される機器情報、保守員や保守会社の装置(図示せず)から出力される保守情報又は保守員が直接保守情報を遠隔監視装置2に入力する装置である。出力装置202は、例えば、図5に示すように、遠隔監視装置2とその他の装置(保守項目選定装置3等)が分離している場合において、遠隔監視装置2から故障リスク等の情報を送信する装置である。記憶装置203は、機器情報記憶部23、23a、23b、23c、保守情報記憶部24、故障履歴記憶部29、作業習熟度レベル記憶部51、リスク値記憶部263の機能を実行する装置である。処理装置204は、例えばCPU(Central Processing Unit)であって、故障リスク処理部26、保守項目選定部27、類似機器分類部28、作業習熟度レベル記憶部51、保守作業最適化部52、故障確率算出部261、故障確率補正部262、故障リスク算出部264の機能を実行する。なお、機器情報記憶部23、故障リスク処理部26、保守項目選定部27、類似機器分類部28、保守作業最適化部52、故障確率算出部261、故障確率補正部262、故障リスク算出部264の各機能は、ハードウェアによって構成されてもよいし、処理装置204等のコンピュータに所定のプログラムを実行させることによっても実現することができる。
1、1a、1b 監視対象機器、2 遠隔監視装置、3 保守項目選定装置、4 外部サーバ、23 機器情報記憶部、24 保守情報記憶部、26 故障リスク処理部、27 保守項目選定部、28 類似機器分類部、29 故障履歴記憶部、51 作業習熟度レベル記憶部、52 保守作業最適化部、261 故障確率算出部、262 故障確率補正部、263 リスク値記憶部、264 故障リスク算出部、100 ネットワーク、201 入力装置、202 出力装置、203 記憶装置、204 処理装置

Claims (9)

  1. 監視対象機器から取得した機器情報に基づいて次回点検時における前記監視対象機器の部品毎の故障確率を算出する故障確率算出部と、
    前記監視対象機器を点検する保守員の前回点検時における保守情報に基づいて前記故障確率を補正する故障確率補正部と、
    前記故障確率補正部により補正された前記故障確率に基づいて、次回点検時における故障リスクを算出する故障リスク算出部と、
    を備える遠隔監視装置。
  2. 前記監視対象機器の部品のうち、前記故障リスク算出部によって算出された故障リスクが閾値を超えた部品に関する保守項目を次回点検時に点検作業が必要な優先保守項目として選定する保守項目選定部と、
    を備えることを特徴とする請求項1に記載の遠隔監視装置。
  3. 前記故障リスク算出部は、
    前記機器情報と、前記保守情報とに基づいて、前記監視対象機器の部品毎に次々回点検時における故障リスクを算出し、
    前記保守項目選定部は、
    前記次回点検時における故障リスクと、前記次々回点検時における故障リスクと、前記閾値とに基づいて前記優先保守項目を選定することを特徴とする請求項2に記載の遠隔監視装置。
  4. 前記故障リスク算出部は、
    前記故障確率補正部により補正された前記故障確率と前記部品毎のリスク値とに基づいて、前記故障リスクを算出することを特徴とする請求項1に記載の遠隔監視装置。
  5. 保守員の習熟度を記憶する作業習熟度レベル記憶部を備え、
    前記保守項目選定部は、
    前記作業習熟度レベル記憶部に記憶された前記保守員の習熟度に基づいて、選定した前記優先保守項目の点検作業に割り当てる保守員を選定することを特徴とする請求項2に記載の遠隔監視装置。
  6. 部品毎の故障履歴を記憶する故障履歴記憶部を備え、
    前記故障リスク算出部は、
    前記故障履歴記憶部に記憶された前記故障履歴に基づいて前記リスク値を設定することを特徴とする請求項4に記載の遠隔監視装置。
  7. 監視対象機器から取得した機器情報を記憶する機器情報記憶部と、
    前記監視対象機器を点検する保守員の前回点検時における保守情報を記憶する保守情報記憶部と、
    前記機器情報に基づいて次回点検時における前記監視対象機器の部品毎の故障確率を算出する故障確率算出部と、
    前記保守情報に基づいて前記故障確率を補正する故障確率補正部と、
    前記故障確率補正部により補正された前記故障確率に基づいて、故障リスクを算出する故障リスク算出部と、
    前記監視対象機器の部品のうち、前記故障リスク算出部によって算出された故障リスクが閾値を超えた部品の保守項目を次回点検が必要な優先保守項目として選定する保守項目選定部と、
    を備える遠隔監視保守システム。
  8. 監視対象機器から取得した機器情報に基づいて次回点検時における部品毎の故障確率を算出する故障確率算出ステップと、
    前記監視対象機器を点検する保守員の前回点検時における保守情報に基づいて前記故障確率を補正する故障確率補正ステップと、
    前記故障確率補正ステップで補正された前記故障確率に基づいて、故障リスクを算出する故障リスク算出ステップと、
    を有する遠隔監視方法。
  9. 監視対象機器から取得した機器情報に基づいて次回点検時における前記監視対象機器の部品毎の故障確率を算出する故障確率算出ステップと、
    前記監視対象機器を点検する保守員の前回点検時における保守情報に基づいて前記故障確率を補正する故障確率補正ステップと、
    前記故障確率補正ステップで補正された前記故障確率に基づいて、次回点検時における故障リスクを算出する故障リスク算出ステップと、
    をコンピュータに実行させることを特徴とする遠隔監視プログラム。
PCT/JP2015/064558 2015-05-21 2015-05-21 遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラム WO2016185596A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
DE112015006554.7T DE112015006554T5 (de) 2015-05-21 2015-05-21 Fernüberwachungsvorrichtung, Fernüberwachungswartungssystem, Fernüberwachungsverfahren und Fernüberwachungsprogramm
KR1020177027163A KR101823849B1 (ko) 2015-05-21 2015-05-21 원격 감시 장치, 원격 감시 보수 시스템, 원격 감시 방법, 및 기록 매체에 저장된 원격 감시 프로그램
PCT/JP2015/064558 WO2016185596A1 (ja) 2015-05-21 2015-05-21 遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラム
JP2017514594A JP6143994B2 (ja) 2015-05-21 2015-05-21 遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラム
CN201580079530.2A CN107533733B (zh) 2015-05-21 2015-05-21 远程监视装置及方法、远程监视维护系统及记录介质
TW104117116A TWI574137B (zh) 2015-05-21 2015-05-28 Remote monitoring devices, remote monitoring and maintenance systems, remote monitoring methods and remote monitoring program products

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/064558 WO2016185596A1 (ja) 2015-05-21 2015-05-21 遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラム

Publications (1)

Publication Number Publication Date
WO2016185596A1 true WO2016185596A1 (ja) 2016-11-24

Family

ID=57319562

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/064558 WO2016185596A1 (ja) 2015-05-21 2015-05-21 遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラム

Country Status (6)

Country Link
JP (1) JP6143994B2 (ja)
KR (1) KR101823849B1 (ja)
CN (1) CN107533733B (ja)
DE (1) DE112015006554T5 (ja)
TW (1) TWI574137B (ja)
WO (1) WO2016185596A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6373522B1 (ja) * 2018-03-05 2018-08-15 Tdk株式会社 Led照明評価システム
JP2018135692A (ja) * 2017-02-22 2018-08-30 日本電気株式会社 情報処理装置、判定用端末装置、情報処理システム、情報処理方法及びプログラム
WO2019167445A1 (ja) * 2018-03-01 2019-09-06 三菱電機株式会社 作業指示支援装置
EP3598258A4 (en) * 2017-09-06 2020-06-17 TLV Co., Ltd. RISK ASSESSMENT DEVICE, RISK ASSESSMENT SYSTEM, RISK ASSESSMENT PROCEDURE AND RISK ASSESSMENT PROGRAM
JP2021022184A (ja) * 2019-07-29 2021-02-18 株式会社日立ビルシステム 保全計画作成支援装置

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6920828B2 (ja) * 2017-02-17 2021-08-18 三菱パワー株式会社 プラントの診断装置および診断方法
KR102242630B1 (ko) * 2017-11-29 2021-04-20 미쓰비시덴키 가부시키가이샤 보수 계획 시스템 및 보수 계획 방법
CN108880907B (zh) * 2018-07-06 2022-03-04 上海财经大学 基于运行日志的网络设备自动化检查维修系统
CN109292569A (zh) * 2018-09-21 2019-02-01 上海光华国瑞物联网信息科技有限公司 一种电梯设备故障率的检测分析系统及分析方法
KR102362933B1 (ko) * 2019-02-14 2022-02-14 미쓰비시덴키 가부시키가이샤 고장 지원 장치, 기록 매체에 저장된 고장 지원 프로그램 및 고장 지원 방법
KR102500136B1 (ko) * 2022-08-31 2023-02-17 (주)원프랜트 원자력 발전소 유지보수 관리 장치 및 방법

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004302709A (ja) * 2003-03-31 2004-10-28 Hitachi Ltd 弁の保全管理方法及びその支援システム
JP2009217718A (ja) * 2008-03-12 2009-09-24 Toshiba Corp 保守計画支援システム
JP2012058937A (ja) * 2010-09-08 2012-03-22 Hitachi-Ge Nuclear Energy Ltd 原子力プラントの機器診断方法および機器診断装置
WO2015029150A1 (ja) * 2013-08-28 2015-03-05 株式会社 日立製作所 保守サービス方法および保守サービスシステム

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1111285C (zh) * 1997-11-12 2003-06-11 冶金工业部自动化研究院 直流电机故障专家诊断方法
JP5193533B2 (ja) * 2007-09-04 2013-05-08 株式会社東芝 遠隔監視システム及び遠隔監視方法
CN100468263C (zh) * 2007-09-05 2009-03-11 东北大学 连采机远程实时故障预测及诊断方法与装置
CN101753364B (zh) * 2008-12-11 2012-08-22 财团法人工业技术研究院 设备状态分析预测以及资源分配方法与系统
JP5299684B2 (ja) * 2009-03-03 2013-09-25 富士ゼロックス株式会社 監視装置および情報処理システムおよび監視プログラム
CN102063119B (zh) * 2010-11-11 2012-10-24 北京三博中自科技有限公司 一种基于点巡检数据和dcs在线数据的设备故障预测方法
TWI463334B (zh) * 2012-07-20 2014-12-01 Univ Nat Cheng Kung 標的裝置的基底預測保養方法與其電腦程式產品
US9262255B2 (en) * 2013-03-14 2016-02-16 International Business Machines Corporation Multi-stage failure analysis and prediction
CN104267711B (zh) * 2014-11-03 2017-01-11 四川烟草工业有限责任公司 烟草物流系统运行状态监测及故障诊断方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004302709A (ja) * 2003-03-31 2004-10-28 Hitachi Ltd 弁の保全管理方法及びその支援システム
JP2009217718A (ja) * 2008-03-12 2009-09-24 Toshiba Corp 保守計画支援システム
JP2012058937A (ja) * 2010-09-08 2012-03-22 Hitachi-Ge Nuclear Energy Ltd 原子力プラントの機器診断方法および機器診断装置
WO2015029150A1 (ja) * 2013-08-28 2015-03-05 株式会社 日立製作所 保守サービス方法および保守サービスシステム

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018135692A (ja) * 2017-02-22 2018-08-30 日本電気株式会社 情報処理装置、判定用端末装置、情報処理システム、情報処理方法及びプログラム
EP3598258A4 (en) * 2017-09-06 2020-06-17 TLV Co., Ltd. RISK ASSESSMENT DEVICE, RISK ASSESSMENT SYSTEM, RISK ASSESSMENT PROCEDURE AND RISK ASSESSMENT PROGRAM
WO2019167445A1 (ja) * 2018-03-01 2019-09-06 三菱電機株式会社 作業指示支援装置
JPWO2019167445A1 (ja) * 2018-03-01 2020-09-24 三菱電機株式会社 作業指示支援装置
JP6373522B1 (ja) * 2018-03-05 2018-08-15 Tdk株式会社 Led照明評価システム
JP2019153498A (ja) * 2018-03-05 2019-09-12 Tdk株式会社 Led照明評価システム
JP2021022184A (ja) * 2019-07-29 2021-02-18 株式会社日立ビルシステム 保全計画作成支援装置
JP7186675B2 (ja) 2019-07-29 2022-12-09 株式会社日立ビルシステム 保全計画作成支援装置

Also Published As

Publication number Publication date
CN107533733A (zh) 2018-01-02
DE112015006554T5 (de) 2018-03-01
JPWO2016185596A1 (ja) 2017-07-20
KR101823849B1 (ko) 2018-01-30
JP6143994B2 (ja) 2017-06-07
CN107533733B (zh) 2018-12-28
TWI574137B (zh) 2017-03-11
TW201642062A (zh) 2016-12-01
KR20170118222A (ko) 2017-10-24

Similar Documents

Publication Publication Date Title
JP6143994B2 (ja) 遠隔監視装置、遠隔監視保守システム、遠隔監視方法、及び遠隔監視プログラム
CN103617110B (zh) 服务器设备状态检修系统
CN103745293B (zh) 一种rcm分析方法
KR101341231B1 (ko) 발전설비의 신뢰도 중심 정비 관리방법
US10901834B2 (en) Interactive troubleshooting assistant
JP5855036B2 (ja) 設備点検順位設定装置
JP5200970B2 (ja) 品質管理システムおよび品質管理装置および品質管理プログラム
US10589764B2 (en) Determining root cause of locomotive failure
KR20180067402A (ko) 비행기 고장 처리를 위한 시스템과 방법 및 이를 달성하기 위한 컴퓨터 설비
JP6530252B2 (ja) リソース管理システム、及びリソース管理方法
KR20140038265A (ko) 고장관리장치 및 이의 고장관리방법
Azadeh et al. Selection of optimum maintenance policy using an integrated multi-criteria Taguchi modeling approach by considering resilience engineering
US11562227B2 (en) Interactive assistant
KR20210044657A (ko) 분포도를 통한 기기의 예지 보전방법
KR102603558B1 (ko) 비용효과를 포함한 소급적 신뢰도 중심 정비 시스템 및 방법
Yang et al. Inspection optimization model with imperfect maintenance based on a three-stage failure process
JP7339861B2 (ja) 故障確率評価システム
US20210232995A1 (en) System and methods for risk assessment in a multi-tenant cloud environment
JP6778032B2 (ja) 業務プロセス評価方法および装置
JP2010020573A (ja) 設備のライフサイクルマネジメントシステムおよびその方法
CN113065674B (zh) 一种确定使用可用度的方法、系统和电子设备
CN114971417A (zh) 一种基于分级管理的短循环工作排程方法及系统
Singh et al. Evaluation of maintainability index of a mechanical system using graph theoretic approach
JP2021134027A (ja) 昇降機故障復旧支援システム及び昇降機故障復旧支援方法
Burhanuddin et al. Reliability analysis of the failure data in industrial repairable systems due to equipment risk factors

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15892595

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017514594

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20177027163

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 112015006554

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15892595

Country of ref document: EP

Kind code of ref document: A1