WO2016152608A1 - Bog処理装置 - Google Patents
Bog処理装置 Download PDFInfo
- Publication number
- WO2016152608A1 WO2016152608A1 PCT/JP2016/057921 JP2016057921W WO2016152608A1 WO 2016152608 A1 WO2016152608 A1 WO 2016152608A1 JP 2016057921 W JP2016057921 W JP 2016057921W WO 2016152608 A1 WO2016152608 A1 WO 2016152608A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- bog
- spray
- liquid
- cooling
- lng
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25J—LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
- F25J1/00—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
- F25J1/0002—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the fluid to be liquefied
- F25J1/0022—Hydrocarbons, e.g. natural gas
- F25J1/0025—Boil-off gases "BOG" from storages
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C9/00—Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
- F17C9/02—Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure with change of state, e.g. vaporisation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25J—LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
- F25J1/00—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
- F25J1/006—Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the refrigerant fluid used
- F25J1/008—Hydrocarbons
- F25J1/0092—Mixtures of hydrocarbons comprising possibly also minor amounts of nitrogen
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C13/00—Details of vessels or of the filling or discharging of vessels
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2201/00—Vessel construction, in particular geometry, arrangement or size
- F17C2201/01—Shape
- F17C2201/0104—Shape cylindrical
- F17C2201/0109—Shape cylindrical with exteriorly curved end-piece
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2205/00—Vessel construction, in particular mounting arrangements, attachments or identifications means
- F17C2205/03—Fluid connections, filters, valves, closure means or other attachments
- F17C2205/0302—Fittings, valves, filters, or components in connection with the gas storage device
- F17C2205/0323—Valves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/03—Mixtures
- F17C2221/032—Hydrocarbons
- F17C2221/033—Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/01—Propulsion of the fluid
- F17C2227/0128—Propulsion of the fluid with pumps or compressors
- F17C2227/0135—Pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/01—Propulsion of the fluid
- F17C2227/0128—Propulsion of the fluid with pumps or compressors
- F17C2227/0157—Compressors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/03—Heat exchange with the fluid
- F17C2227/0337—Heat exchange with the fluid by cooling
- F17C2227/0339—Heat exchange with the fluid by cooling using the same fluid
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2265/00—Effects achieved by gas storage or gas handling
- F17C2265/03—Treating the boil-off
- F17C2265/032—Treating the boil-off by recovery
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2265/00—Effects achieved by gas storage or gas handling
- F17C2265/03—Treating the boil-off
- F17C2265/032—Treating the boil-off by recovery
- F17C2265/033—Treating the boil-off by recovery with cooling
Definitions
- the present invention relates to a BOG processing apparatus for processing boil-off gas (BOG) generated from liquefied gas.
- BOG boil-off gas
- BOG treatment methods include a method of sending it directly to the utilization system for direct consumption as fuel, a method of re-liquefying it and returning it to the storage tank, and a method of re-liquefaction and mixing with the liquefied gas to send it to the utilization system. There are ways to do it.
- BOG is introduced into a BOG drum, LNG taken out from the LNG tank is ejected into the BOG drum, and the BOG is cooled and liquefied by contact with the LNG.
- the liquefied BOG is returned from the BOG drum to the LNG tank as a mixed solution mixed with LNG.
- the BOG cooled by the contact with the LNG is sent from the top of the BOG drum to the BOG compressor, and is compressed by the BOG compressor before being sent to the utilization system.
- the BOG processing method described in Patent Document 2 is provided with a mist separator in the middle of a BOG pipe from an LNG tank to a BOG compressor, and separates the mist from the BOG by a liquid draining drum of the mist separator, The separated mist is pumped from the drain pipe at the bottom of the liquid draining drum to the LNG tank via the drain pump, and sprayed back into the LNG tank.
- the BOG that has passed through the mist separator is sent from the BOG discharge pipe to the BOG compressor and compressed, and then supplied to a utilization system such as a thermal power generation unit connected downstream thereof.
- the draining drum introduces BOG into its internal space, lowers its flow rate, sinks the mist downward, and drains the liquid.
- In the upper part of the draining drum there is a mist provided with a mesh filter. An eliminator is provided, and the mist that has not settled is brought into contact with the mesh filter and separated.
- the BOG is compressed by a compressor, cooled by a cooler, supplied into the mixing drum, and a part of LNG is decompressed and then injected into the mixing drum.
- the LNG and the BOG that are atomized by this injection are brought into gas-liquid contact to reliquefy the BOG.
- the BOG that has not been liquefied is returned to the compressor from the blower line.
- the re-liquefied mixture of BOG and LNG is respread on the mixing drum, or after being pressurized and supplied to the cooler, merged with LNG from the LNG tank and supplied to the vaporizer, After being vaporized, it is sent to the user system.
- the BOG processing method described in Patent Document 4 sends BOG generated in the storage tank to the reliquefaction device after compressing it with a compressor, and also supplies the liquefied gas discharged from the storage tank to the reliquefaction device,
- the BOG is reliquefied by heat exchange with the liquefied gas.
- the liquid mixture of BOG and liquefied gas reliquefied by the reliquefaction device is sent to a heat exchanger via a pump, and is used as a refrigerant for cooling BOG by this heat exchanger and then sent to a vaporizer.
- the vaporized gas vaporized by the vaporizer is supplied to the utilization system.
- the amount of BOG generated in the storage tank is not constant but fluctuates greatly. Therefore, equipment design that can cope with the maximum amount of BOG generated is required. Yes.
- the demand for gas in the utilization system is not constant, and the supply amount of the liquefied gas discharged from the storage tank varies greatly. Therefore, when the BOG (re-liquefied BOG) is sent to the utilization system by joining the liquefied gas
- the consumption of BOG is not stable, and an extra device design is required to balance the amount of BOG generated and the amount of consumption.
- An object of the present invention is to provide a BOG processing apparatus capable of eliminating the waste of each part device and improving the energy efficiency of device operation.
- the BOG processing apparatus of the present invention is a BOG processing apparatus that processes boil-off gas (BOG) generated from a liquefied gas, the cooling means for cooling the BOG by the cold heat of the liquefied gas, and the cooling means used for cooling Recovery means for recovering the remaining liquid of the liquefied gas remaining or the mixed liquid of the liquefied gas mixed with the liquid of the BOG cooled and liquefied by the cooling means, and the cooling means Includes a cooling drum that is formed in a cylindrical shape that extends vertically and distributes the BOG from below to above, a BOG introduction portion that introduces the BOG into the inside from the bottom of the cooling drum, and the BOG introduction portion A first spray that sprays the liquefied gas upward, and a liquefied gas and the BOG that are provided above the first spray.
- BOG boil-off gas
- the cooling means includes the cooling drum, and the BOG introduction portion, the first spray, the first packed bed, and the second spray are provided in this cooling drum in order from the bottom.
- the contact efficiency between the liquefied gas and the BOG in the first packed bed can be increased. That is, by spraying liquefied gas upward from the first spray along the flow direction and spraying liquefied gas downward from the second spray to the BOG introduced from the lower part of the cooling drum and circulated upward.
- the liquefied gas can be spread over and under the first packed bed located between the first spray and the second spray, and the BOG passing through the first packed bed can be brought into contact with many liquefied gases. Accordingly, while maintaining a predetermined cooling performance for cooling the BOG (or for further liquefying the BOG), the thickness of the first packed bed is reduced and the amount of liquefied gas sprayed from each spray is reduced. Can be reduced.
- a third spray provided above the second spray to spray the liquefied gas downward, and a mist in the BOG provided above the third spray.
- a second packed bed to be adsorbed; and a mist eliminator provided above the second packed bed to remove mist in the BOG that has passed through the second packed bed; It is preferable to spray the liquefied gas in which the droplets are mist-like compared to the second spray.
- the third spray, the second packed layer, and the mist eliminator are sequentially provided above the second spray in the cooling drum, and the liquefied gas in the form of a mist having smaller droplets than the second spray is supplied to the first spray.
- the cooling performance of cooling the BOG and adjusting the BOG temperature (or re-liquefying the BOG) can be improved.
- the mist in the BOG is adsorbed by the second packed bed provided above the third spray, and the mist in the BOG that has passed through the second packed bed is removed by the mist eliminator, so that the mist is not contained as much as possible.
- the BOG can be sent out from the BOG deriving unit and a compressor is provided ahead of the BOG, the BOG can be compressed without degrading the function of the compressor.
- the recovery means introduces the liquefied gas and sucks the residual liquid or the mixed liquid by an injection pressure of the liquefied gas, and the liquefied gas and the residual liquid or It is preferable to include an ejector that mixes and feeds the mixed solution.
- the recovery means includes the ejector, and the ejector is operated by external power by sucking and sending out the remaining liquid or the mixed liquid from the liquid outlet portion of the cooling drum by the liquefied gas injection pressure.
- the liquid can be recovered without using a pump or the like, and the equipment configuration can be simplified.
- the recovery means is configured using driving parts such as a pump and a valve for sending out the liquid, it is necessary to use those having a cryogenic specification as these driving parts, and a plurality of parts are prepared for inspection and failure. It is also necessary to install driving parts of the system, and the collection means becomes complicated and large, resulting in a large installation cost.
- the recovery means is configured by an ejector that uses the pressure of the liquefied gas, so that it is not necessary to use driving parts such as a pump and a valve, and the structure of the recovery means is simplified and miniaturized. At the same time, the cost of the equipment can be reduced.
- the amount of sprayed liquefied gas can be reduced while maintaining a predetermined cooling performance for cooling (or cooling and re-liquefying) the BOG. It is possible to eliminate the waste of each part device and increase the energy efficiency of device operation.
- the BOG processing apparatus 1 of the present embodiment is installed in, for example, liquefied natural gas (LNG) production equipment, storage equipment, receiving equipment, and the like, and boil-off gas (BOG) generated by vaporizing LNG in the LNG storage tank.
- LNG liquefied natural gas
- BOG boil-off gas
- the BOG is cooled and the remaining liquid (or mixed liquid containing the re-liquefied liquid) is returned to the LNG storage tank, and the BOG is sent to the utilization system as fuel gas.
- the utilization system a thermal power generation facility for generating power by burning BOG as a fuel gas can be exemplified.
- the BOG processing apparatus 1 includes an LNG supply line A for supplying LNG from the LNG storage tank, a BOG supply line B for supplying BOG from the LNG storage tank, and a liquid ( Alternatively, a liquid return line C for returning the liquefied BOG and LNG to the LNG storage tank, and a BOG delivery line for delivering the processed BOG to the utilization system. D are connected.
- the LNG supply line A is extracted from the bottom of the LNG storage tank and is supplied with LNG boosted by a pump through the flow rate adjusting valve A1.
- the BOG supply line B is supplied with BOG extracted from the upper part of the LNG storage tank, pressurized by a compressor, and cooled by a precooling device.
- the BOG processing apparatus 100 includes a cooling unit 101 that cools BOG with the cold heat of LNG, a compression unit 102 that compresses the BOG cooled by the cooling unit 101, and a second cooling unit that cools the BOG compressed by the compression unit 102. 103, and a recovery means 104 for recovering the remaining liquid (or a mixed liquid in which the re-liquefied BOG liquid and LNG are mixed) ML used for cooling by the cooling means 101. Yes.
- the cooling means 101 is formed in a cylindrical shape that extends vertically, and circulates the BOG from below to above, a BOG introduction portion 111 that introduces BOG into the interior from the bottom of the cooling drum 110, and the BOG A filling layer 112 provided above the introduction unit 111 to contact the LNG and the BOG, a spray 113 provided above the filling layer 112 to spray LNG downward, and provided above the spray 113 in the BOG A mist eliminator 114 that removes the mist from the cooling drum 110, a BOG derivation unit 115 that leads the cooled BOG to the compression means 102, and a liquid ML that is provided at the bottom of the cooling drum 110. And a liquid lead-out part 116 that leads out toward the recovery means 104.
- the cooling drum 110 is formed as a sealed container, in which a BOG introduction part 111, a packed bed 112, a spray 113, and a mist eliminator 114 are installed, and a storage part 117 for storing the liquid ML is formed in the lower part thereof.
- the reservoir 117 is formed of a 2: 1 semi-ellipsoid that swells downward to store a large amount of liquid ML.
- the BOG introduction unit 111 includes a rectifying plate for diffusing the BOG supplied from the BOG supply line B into the cooling drum 110 evenly.
- the BOG introduced from the BOG introduction part 111 rises inside the cooling drum 110 and passes through the packed bed 112 and the mist eliminator 114.
- the packed bed 112 causes the BOG introduced into the cooling drum 110 from the BOG introduction part 111 and the LNG sprayed from the spray 113 to come into gas-liquid contact to cool the BOG with the cold heat of the LNG (or the BOG by cooling). Part of the liquid).
- the filling layer 112 is composed of, for example, one filled with a metal molding ring or one overlaid with a metal net-like molded body, It is formed in a layer shape with a height dimension of about 2 m.
- the mist eliminator 114 removes mist from the BOG that rises while the packed bed 112 is in a vapor state, and is composed of a metal or ceramic filter having a fine mesh for adsorbing and dropping the mist. .
- the compression unit 102 compresses the BOG cooled by the cooling unit 101 and derived from the BOG deriving unit 115, and for example, a turbo compressor is used.
- the second cooling means 103 cools the BOG boosted by the compression means 102, and for example, an air-cooled air fin cooler is used.
- the BOG derived from the BOG deriving unit 115 is cooled to, for example, ⁇ 100 ° C. to ⁇ 120 ° C., and this BOG is compressed by the compression means 102 and heated to 60 ° C. to 70 ° C. After being cooled to room temperature of about 30 ° C. by the cooling means 103, it is sent to the utilization system.
- the BOG delivery line D that delivers BOG to the usage system is provided with a BOG valve D1 that adjusts the flow rate according to the demand of BOG in the usage system and closes the distribution of the BOG, and is upstream of this BOG valve D1.
- a BOG circulation line E is connected to the side (second cooling means 103 side). The BOG circulation line E connects the BOG delivery line D and the BOG supply line B. In the middle of the BOG circulation line E, the flow of the BOG to be circulated to the BOG supply line B is adjusted, or the circulation of the BOG is closed.
- a BOG valve E1 is provided.
- the BOG valve D1 is throttled and the BOG valve E1 is opened to circulate BOG from the BOG circulation line E to the BOG supply line B, and from the compression means 102 to the BOG delivery line D And the BOG circulating from the cooling means 101 to the compression means 102 is increased, so that the operation of the compression means 102 can be processed without delay.
- the collection means 104 extracts the liquid ML stored in the storage unit 117 of the cooling drum 110 and returns the extracted liquid ML from the liquid return line C to the LNG storage tank.
- This recovery means 104 is connected to the liquid lead-out portion 116 of the cooling means 101 and is connected to two extraction pipes 121 and 122, pumps 123 and 124 provided in the respective extraction pipes 121 and 122, and each pump. And pipes 125 and 126 extending from the liquid return lines C to the liquid return line C. Gas pipes 127 and 128 for returning BOG vaporized from the liquid ML to the cooling drum 110 are connected to the extraction pipes 121 and 122.
- a pair of switching valves 129 and 130 for switching the flow of the liquid ML and adjusting the flow rate are provided in the middle of the pipes 125 and 126.
- Such a recovery means 104 switches the switching valves 129 and 130 and drives either one of the pumps 123 and 124 to extract the liquid ML from the cooling drum 110 using the path on one side to return the liquid. Send to line C.
- a small amount of liquid ML is also caused to flow through the other path by the switching valves 129 and 130.
- the other side path is made to stand by as a backup, and the one side and the other side are appropriately switched and used, so that maintenance can be performed without stopping the operation. And equipment exchange is possible.
- the other path is always available.
- the liquid return line C as the LNG liquid (or the mixed liquid of BOG and LNG re-liquefied) remaining after being used for cooling by the cooling means 101 is obtained. Can be returned to the LNG storage tank. Further, the mist is removed from the BOG cooled by the cooling means 101, compressed by the compression means 102, cooled by the second cooling means 103, and then sent to the utilization system as a fuel gas via the BOG delivery line D. it can. Therefore, BOG generated in the LNG storage tank can be effectively used without waste.
- the BOG and LNG are brought into gas-liquid contact, and the BOG is cooled by the cold heat of LNG (or the BOG is reliquefied), and the packed bed 112 becomes excessive.
- the amount of LNG sprayed from the spray 113 tends to increase. That is, since the BOG introduced from the BOG introduction part 111 below the filling layer 112 and the LNG sprayed from the spray 113 above the filling layer 112 are brought into gas-liquid contact, the contact area is increased.
- the thickness dimension of the packed bed 112 is increased, and the supply amount of LNG sprayed to spread the LNG over the thick packed bed 112 is increased.
- the BOG processing apparatus 1 includes a cooling unit 2, a compression unit 3, a second cooling unit 4, and a recovery unit 5.
- the cooling means 2 and the recovery means 5 are improved from the cooling means 101 and the recovery means 104 of the BOG processing apparatus 100, and the compression means 3 and the second cooling means 4 are the compression means 102 and the second cooling means.
- the same as 103 is used.
- the cooling means 2 is formed in a vertically extending cylindrical shape and circulates the BOG from the bottom to the top, the BOG introduction portion 11 for introducing the BOG into the inside from the bottom of the cooling drum 10, and the BOG
- a first spray 12 that is provided above the introduction portion 11 and sprays LNG upward, a first filling layer 13 that is provided above the first spray 12 and that contacts LNG and BOG, and a first filling layer 13.
- a third spray 15 is provided above the second spray 14 and sprays LNG downward, and is provided above the third spray 15.
- a second packed layer 16 for adsorbing mist in the BOG; and a mist eliminator 17 provided above the second packed layer 16 for removing the mist in the BOG. That.
- a BOG deriving unit 18 for deriving BOG toward the compression unit 3 is provided at the upper part of the cooling drum 10, and a liquid deriving unit for deriving the liquid ML toward the recovery unit 5 at the lower part of the cooling drum 10. 19 is provided.
- the cooling drum 10 is formed as a hermetic container, in which a BOG introduction part 11, a first spray 12, a first filling layer 13, a second spray 14, a third spray 15, a second filling layer 16, and a mist eliminator 17 are provided.
- the storage part 20 for storing the liquid ML which LNG and BOG mixed is formed in the lower part.
- the storage unit 20 is formed in a substantially conical shape that protrudes downward in order to store the mixed liquid ML.
- the BOG introduction unit 11 includes a rectifying plate for uniformly diffusing the BOG supplied from the BOG supply line B into the cooling drum 10.
- the BOG introduced from the BOG introduction part 11 rises inside the cooling drum 10 and passes through the first packed bed 13, the second packed bed 16 and the mist eliminator 17.
- the first spray 12 sprays LNG upward, that is, sprays LNG along the flow of BOG introduced and raised from the BOG introduction unit 11, and BOG is applied to the LNG toward the first packed bed 13. Raise while entraining.
- the first filling layer 13 is formed in a layered shape in which metal rings and metal nets are stacked. Unlike the filling layer 112, the first filling layer 13 is thinned to a height dimension of about 600 mm, for example.
- the second spray 14 sprays LNG downward, but the amount of LNG sprayed from the second spray 14 is significantly smaller than that of the spray 113.
- the third spray 15 sprays LNG in the form of a mist having a smaller droplet diameter than the second spray 14.
- the LNG sprayed from the first spray 12, the second spray 14, and the third spray 15 and the BOG introduced from the BOG introduction unit 11 are in gas-liquid contact in the first packed bed 13,
- the BOG is cooled by the cold heat of the LNG (or part of the BOG is reliquefied by cooling).
- the BOG that is cooled in the first packed bed 13 and rises as a vapor is adsorbed when passing through the second packed bed 16, and is removed when passing through the mist eliminator 17.
- the liquid ML in the first packed bed 13 falls and is stored in the lower storage unit 20.
- the second packed layer 16 is formed in a layered shape formed by stacking a metal molded ring or a metal net-shaped molded body, but the size of the ring or mesh is the first packed layer 13. It is formed smaller than this, and is thereby configured to easily adsorb mist.
- the mist eliminator 17 is composed of a metal or ceramic filter having a fine mesh for adsorbing and dropping the mist in the BOG. As described above, the mist of LNG adsorbed by the second packed bed 16 and the mist eliminator 17 is combined with the mist to increase the size of the liquid droplet, and falls into the storage section 20 below and stored together with the liquid ML.
- the recovery means 5 extracts the liquid ML stored in the storage unit 20 of the cooling drum 10 and returns the extracted liquid ML from the liquid return line C to the LNG storage tank.
- the recovery means 5 includes an ejector 21 connected to the liquid outlet 19 of the cooling means 2, a branch pipe A2 connecting the flow control valve A1 of the LNG supply line A and the ejector 21, and a branch pipe A2. And an adjustment valve A3 for adjusting the flow rate of the LNG.
- the ejector 21 introduces the liquid ML extracted from the liquid outlet 19 and sucks the liquid ML by the LNG injection pressure supplied from the branch pipe A2, and mixes and pressurizes the LNG and the liquid ML, This liquid ML is sent from the liquid return line C to the LNG storage tank.
- the liquid ML is sucked by the LNG injection pressure supplied from the LNG storage tank, and sent out from the liquid return line C to the LNG storage tank. Therefore, it is possible to reduce power for driving a pump or the like. Furthermore, by using LNG as a drive medium and returning the liquid ML to the LNG storage tank, the energy efficiency of the entire BOG processing process can be improved without adding a separation device or the like required when using another drive medium. Can be increased.
- the BOG processing apparatus 1 of the present embodiment there are the following effects. That is, spraying LNG upward from the first spray 12 along the flow direction and spraying LNG downward from the second spray 14 to the BOG introduced from the lower part of the cooling drum 10 and flowing upward.
- LNG can be spread over and under the first packed bed 13 positioned between the first spray 12 and the second spray 14, and the BOG passing through the first packed bed 13 can be brought into contact with many LNG. Therefore, while maintaining a predetermined cooling performance for cooling BOG (or cooling and re-liquefying BOG), the thickness of the first packed bed 13 is reduced, and the LNG sprayed from the sprays 12 and 14 is used. Can be reduced to the minimum necessary.
- the third spray 15 is provided above the second spray 14, and the BOG is cooled by spraying mist LNG from the third spray 15 (or the BOG is cooled and reliquefied). Can be increased. Further, the mist in the BOG is adsorbed by the second packed layer 16 provided above the third spray 15, and the mist in the BOG that has passed through the second packed layer 16 is removed by the mist eliminator 17. A BOG that is not included as much as possible can be sent from the BOG deriving unit 18 to the compression means 3, and the BOG can be compressed without causing a deterioration in the function of the compression means 3.
- the recovery means 5 includes the ejector 21 using LNG as a drive medium, the recovery means 5 can recover compared to the case where drive parts such as pumps 123 and 124 and valves 129 and 130 such as the BOG processing apparatus 100 before improvement are used.
- the structure of the means 5 can be simplified and reduced in size, and the cost of the equipment can be reduced.
- the collection means 104 is complicated and large, and the installation cost has become large.
- the recovery means 5 is configured by including the ejector 21 using LNG as a drive medium, thereby simplifying the structure and eliminating the mechanical movable part. Therefore, the configuration of the standby device can be reduced.
- the present invention is not limited to the above-described embodiment, and includes other configurations and the like that can achieve the object of the present invention, and the following modifications and the like are also included in the present invention.
- this invention is not restricted to liquefied natural gas, liquefied petroleum gas (LPG), liquefied nitrogen, liquefied oxygen, liquid hydrogen and other liquefied gas production facilities can be used as a BOG treatment apparatus.
- the thing provided with the 3rd spray 15 and the 2nd filling layer 16 was illustrated as the cooling means 2, these 3rd spray 15 and the 2nd filling layer 16 raise the cooling effect of BOG. Therefore, it is not an essential configuration in the present invention and can be omitted as appropriate.
- recovery means 5 was comprised with the ejector 21, as a collection
- the collecting unit 5 includes the single ejector 21. However, the collecting unit 5 is divided into a plurality of systems like the collecting unit 104 before improvement. It may be provided.
- the BOG processing apparatus 1 of the said embodiment was comprised so that the liquid ML might be returned to the LNG storage tank by the collection
- the LNG remaining liquid (or a remixed liquid of BOG and LNG) may be joined to a line for paying out LNG to the utilization system.
- the BOG processing apparatus 1 of the above embodiment is configured such that the BOG cooled by the cooling means 2 is compressed by the compression means 3, cooled by the second cooling means 4, and then sent to the utilization system.
- the configuration is not limited to the one in which the BOG cooled by the means 2 is sent to the utilization system, but may be a configuration in which almost the entire amount of BOG is re-liquefied and the remaining small amount of BOG is released into the atmosphere via a flare stack or the like.
- the compression means 3 and the second cooling means 4 can be omitted.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- General Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
2 冷却手段
3 圧縮手段
5 回収手段
10 冷却ドラム
11 BOG導入部
12 第一スプレー
13 第一充填層
14 第二スプレー
15 第三スプレー
16 第二充填層
17 ミストエリミネーター
18 BOG導出部
19 液導出部
21 エジェクター
Claims (3)
- 液化ガスから発生するボイルオフガス(BOG)を処理するBOG処理装置であって、
前記液化ガスの冷熱によって前記BOGを冷却する冷却手段と、
前記冷却手段で冷却に使用されて残存した前記液化ガスの残存液、あるいは、前記冷却手段で冷却されて液化した前記BOGの液分と前記液化ガスとが混合した混合液を回収する回収手段と、を備え、
前記冷却手段は、
上下に延びる筒状に形成されるとともに下方から上方に向かって前記BOGを流通させる冷却ドラムと、
前記冷却ドラムの下部からその内部に前記BOGを導入するBOG導入部と、
前記BOG導入部の上方に設けられて前記液化ガスを上向きに噴霧する第一スプレーと、
前記第一スプレーの上方に設けられて前記液化ガスと前記BOGとを接触させる第一充填層と、
前記第一充填層の上方に設けられて前記液化ガスを下向きに噴霧する第二スプレーと、
前記冷却ドラムの上部に設けられて冷却された前記BOGを導出するBOG導出部と、
前記冷却ドラムの下部に設けられて前記残存液あるいは前記混合液を前記回収手段に向かって導出する液導出部と、
を備えたことを特徴とするBOG処理装置。 - 前記第二スプレーの上方に設けられて前記液化ガスを下向きに噴霧する第三スプレーと、
前記第三スプレーの上方に設けられて前記BOG中のミストを吸着させる第二充填層と、
前記第二充填層の上方に設けられて該第二充填層を通過した前記BOG中のミストを除去するミストエリミネーターと、
をさらに備え、
前記第三スプレーは、前記第二スプレーと比較して液滴が小さいミスト状にした前記液化ガスを噴霧することを特徴とする請求項1に記載のBOG処理装置。 - 前記回収手段は、前記液化ガスを導入し、この液化ガスの噴射圧によって前記残存液あるいは前記混合液を吸引するとともに、これらの液化ガスと前記残存液あるいは前記混合液とを混合して送出するエジェクターを備えて構成されることを特徴とする請求項1又は2に記載のBOG処理装置。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/559,363 US11029085B2 (en) | 2015-03-20 | 2016-03-14 | BOG processing apparatus |
| CA2979324A CA2979324C (en) | 2015-03-20 | 2016-03-14 | Bog processing apparatus |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015-057309 | 2015-03-20 | ||
| JP2015057309A JP6423297B2 (ja) | 2015-03-20 | 2015-03-20 | Bog処理装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2016152608A1 true WO2016152608A1 (ja) | 2016-09-29 |
Family
ID=56977488
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2016/057921 Ceased WO2016152608A1 (ja) | 2015-03-20 | 2016-03-14 | Bog処理装置 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US11029085B2 (ja) |
| JP (1) | JP6423297B2 (ja) |
| CA (1) | CA2979324C (ja) |
| WO (1) | WO2016152608A1 (ja) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7834227B1 (ja) * | 2025-07-17 | 2026-03-23 | 東京瓦斯株式会社 | Bog再液化装置 |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6347003B1 (ja) | 2017-01-25 | 2018-06-20 | デウ シップビルディング アンド マリン エンジニアリング カンパニー リミテッド | Lng船の蒸発ガス再液化方法及びシステム |
| JP6347004B1 (ja) * | 2017-01-25 | 2018-06-20 | デウ シップビルディング アンド マリン エンジニアリング カンパニー リミテッド | Lng船の蒸発ガス再液化方法及びシステム |
| KR101858514B1 (ko) * | 2017-01-25 | 2018-05-17 | 대우조선해양 주식회사 | Lng 선의 증발가스 재액화 방법 및 시스템 |
| JP7623981B2 (ja) * | 2022-06-02 | 2025-01-29 | 株式会社神戸製鋼所 | 圧縮機ユニット |
| WO2025050479A1 (zh) * | 2023-09-08 | 2025-03-13 | 舟山市质量技术监督检测研究院 | 一种基于lng冷能发电系统的超压气体冷凝回收装置 |
| US20240102613A1 (en) * | 2023-09-08 | 2024-03-28 | Zhoushan Institute Of Calibration And Testing For Quality And Technology Supervision | Condensation-recovery device for overpressure gas based on liquefied natural gas (lng) cold energy |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5733298A (en) * | 1980-07-31 | 1982-02-23 | Mitsubishi Heavy Ind Ltd | Liquefaction/recovery device for evaporated gas in ship's tank |
| JPS5751098A (en) * | 1980-09-12 | 1982-03-25 | Ishikawajima Harima Heavy Ind Co Ltd | Method and apparatus for delivering low temperature liquefied gas |
| JPH068900U (ja) * | 1992-05-14 | 1994-02-04 | 石川島播磨重工業株式会社 | Lngからのbog冷却装置 |
| JP2003227608A (ja) * | 2002-02-05 | 2003-08-15 | Mitsubishi Heavy Ind Ltd | 液化天然ガスの処理装置および液化天然ガスの運搬船 |
| JP2012122554A (ja) * | 2010-12-09 | 2012-06-28 | Mitsubishi Heavy Ind Ltd | 液化ガス貯蔵再ガス化設備およびボイルオフガス再液化方法 |
Family Cites Families (76)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1848945A (en) * | 1932-03-08 | center | ||
| DE732138C (de) * | 1941-10-17 | 1943-02-22 | Ig Farbenindustrie Ag | Verfahren zum Umfuellen und zur Lagerung von verfluessigten Gasen |
| US2889005A (en) * | 1954-07-19 | 1959-06-02 | Ajem Lab Inc | Gas-liquid contact apparatus |
| US2938360A (en) * | 1957-12-23 | 1960-05-31 | Chemical Construction Corp | Anhydrous ammonia storage tank |
| US3714790A (en) * | 1971-04-13 | 1973-02-06 | Fmc Corp | Apparatus and method for handling volatile liquids |
| US3738353A (en) * | 1971-05-26 | 1973-06-12 | Thermal Res & Eng Corp | Vaporizing apparatus |
| US3733838A (en) * | 1971-12-01 | 1973-05-22 | Chicago Bridge & Iron Co | System for reliquefying boil-off vapor from liquefied gas |
| US3947258A (en) * | 1972-05-25 | 1976-03-30 | Ingersoll-Rand Company | Vapor stripping and recovery method and apparatus |
| US4157250A (en) * | 1972-09-22 | 1979-06-05 | Ulrich Regehr | Scrubber apparatus for washing gases and having a coarse and fine droplet separator |
| US3897194A (en) * | 1974-04-18 | 1975-07-29 | Heat Res Corp | Method for vaporizing a sensitive liquid |
| US3981156A (en) * | 1975-02-03 | 1976-09-21 | Ecology Control, Inc. | Vapor recovery system and method |
| JPS5496819A (en) * | 1978-01-17 | 1979-07-31 | Hitachi Zosen Corp | Method of suppressing pressure rise in low temperature liquefied gas tank |
| JPS5632009A (en) | 1979-08-24 | 1981-04-01 | Toshiba Corp | Control system for steam turbine |
| JPS58500812A (ja) * | 1981-05-25 | 1983-05-19 | ヤコブセン,アンケル ヤ−ル | ガソリン蒸気と空気の混合物からガソリンを回収する方法、およびその方法に使用する装置 |
| GB2099566A (en) * | 1981-05-29 | 1982-12-08 | Thurley John Ltd | Fog prevention |
| JPS5919799A (ja) * | 1982-07-22 | 1984-02-01 | Ishikawajima Harima Heavy Ind Co Ltd | 低温液化ガス貯蔵設備における冷熱回収保持、供給装置 |
| US4637216A (en) * | 1986-01-27 | 1987-01-20 | Air Products And Chemicals, Inc. | Method of reliquefying cryogenic gas boiloff from heat loss in storage or transfer system |
| JPH068900Y2 (ja) * | 1988-09-22 | 1994-03-09 | 日産ディーゼル工業株式会社 | ブレーキエネルギ回生装置 |
| US5156006A (en) * | 1990-10-25 | 1992-10-20 | Liquid Carbonic Corporation | Apparatus for cooling a heat transfer fluid |
| JPH05279677A (ja) | 1992-04-01 | 1993-10-26 | Ishikawajima Harima Heavy Ind Co Ltd | ドレン排出装置 |
| US5230725A (en) * | 1992-12-11 | 1993-07-27 | Munters Corporation | Mutli-layer type mist eliminator |
| US5635149A (en) * | 1994-06-09 | 1997-06-03 | Abb Environmental Systems Division Of Abb Flakt, Inc. | Wet scrubbing method and apparatus for removing sulfur oxides from combustion effluents |
| US5486318A (en) * | 1994-12-29 | 1996-01-23 | The Boc Group, Inc. | Liquid-vapor contact column |
| US5672323A (en) * | 1995-01-26 | 1997-09-30 | The Babcock & Wilcox Company | Activated carbon flue gas desulfurization systems for mercury removal |
| JP3716003B2 (ja) * | 1995-02-13 | 2005-11-16 | 大陽日酸株式会社 | 白煙発生装置 |
| US5649433A (en) * | 1995-06-29 | 1997-07-22 | Daido Hoxan Inc. | Cold evaporator |
| US5570644A (en) * | 1995-08-21 | 1996-11-05 | Cheng; Sio L. | Anti-pollution system |
| US5925291A (en) * | 1997-03-25 | 1999-07-20 | Midwest Research Institute | Method and apparatus for high-efficiency direct contact condensation |
| TW366409B (en) * | 1997-07-01 | 1999-08-11 | Exxon Production Research Co | Process for liquefying a natural gas stream containing at least one freezable component |
| TW402520B (en) * | 1997-11-05 | 2000-08-21 | Mitsubishi Heavy Ind Ltd | Wet flue gas desulfurizer and oxygen-containing gas blowing device for use therein |
| US6083302A (en) * | 1998-08-13 | 2000-07-04 | Abb Environmental Systems, Division Of Abb Flakt, Inc. | Mist eliminator for wet gas scrubbing |
| WO2000079179A1 (en) * | 1999-06-23 | 2000-12-28 | Chicago Bridge & Iron Company | System and apparatus for condensing boil-off vapor from a liquified natural gas container |
| JP3564366B2 (ja) * | 1999-08-13 | 2004-09-08 | 三菱重工業株式会社 | 除塵装置 |
| US7310971B2 (en) * | 2004-10-25 | 2007-12-25 | Conocophillips Company | LNG system employing optimized heat exchangers to provide liquid reflux stream |
| US6899289B2 (en) * | 1999-12-06 | 2005-05-31 | National Research Council Of Canada | Atomizing nozzle for fine spray and misting applications |
| JP2001254898A (ja) | 2000-03-08 | 2001-09-21 | Ishikawajima Harima Heavy Ind Co Ltd | Lng受入基地におけるbog中のミスト分離装置 |
| TWI232803B (en) * | 2001-05-11 | 2005-05-21 | Benq Corp | Jet and method thereof for ejecting droplets of different sizes |
| US6936231B2 (en) * | 2001-12-06 | 2005-08-30 | Powerspan Corp. | NOx, Hg, and SO2 removal using ammonia |
| JP2004076825A (ja) * | 2002-08-13 | 2004-03-11 | Nippon Gas Kaihatsu Kk | 液化ガス処理装置 |
| US6745576B1 (en) * | 2003-01-17 | 2004-06-08 | Darron Granger | Natural gas vapor recondenser system |
| US20050046052A1 (en) * | 2003-07-11 | 2005-03-03 | Kenichi Okada | Exhaust gas treating tower |
| GB0320474D0 (en) * | 2003-09-01 | 2003-10-01 | Cryostar France Sa | Controlled storage of liquefied gases |
| NO20035047D0 (no) * | 2003-11-13 | 2003-11-13 | Hamworthy Kse Gas Systems As | Apparat og metode for temperaturkontroll av kondensering av gass |
| CN1894537B (zh) * | 2003-12-15 | 2010-06-09 | Bp北美公司 | 液化天然气的汽化系统和方法 |
| US7165423B2 (en) * | 2004-08-27 | 2007-01-23 | Amec Paragon, Inc. | Process for extracting ethane and heavier hydrocarbons from LNG |
| CN100510574C (zh) * | 2004-11-15 | 2009-07-08 | 株式会社前川制作所 | 深冷液化/制冷方法和系统 |
| US20060185517A1 (en) * | 2005-02-22 | 2006-08-24 | Nagel Daniel J | Multi-stage odor scrubber |
| JP2007155060A (ja) | 2005-12-07 | 2007-06-21 | Chubu Electric Power Co Inc | ボイルオフガスの再液化方法 |
| US7484384B2 (en) * | 2006-03-18 | 2009-02-03 | Technip Usa Inc. | Boil off gas condenser |
| US7493778B2 (en) * | 2006-08-11 | 2009-02-24 | Chicago Bridge & Iron Company | Boil-off gas condensing assembly for use with liquid storage tanks |
| US20080264492A1 (en) * | 2006-12-28 | 2008-10-30 | Hyun Cho | Methods for pressurizing boil off gas |
| US8028724B2 (en) * | 2007-02-12 | 2011-10-04 | Daewoo Shipbuilding & Marine Engineering Co., Ltd. | LNG tank and unloading of LNG from the tank |
| KR20080097141A (ko) * | 2007-04-30 | 2008-11-04 | 대우조선해양 주식회사 | 인-탱크 재응축 수단을 갖춘 부유식 해상 구조물 및 상기부유식 해상 구조물에서의 증발가스 처리방법 |
| CA2686134A1 (en) * | 2007-05-24 | 2008-12-18 | Fluor Technologies Corporation | Configurations and methods for ambient air vaporizers |
| US7645430B2 (en) * | 2007-10-08 | 2010-01-12 | Alcoa Inc. | Systems and methods for removing gaseous pollutants from a gas stream |
| EP2072885A1 (en) * | 2007-12-21 | 2009-06-24 | Cryostar SAS | Natural gas supply method and apparatus. |
| JP2009191945A (ja) | 2008-02-14 | 2009-08-27 | Ihi Corp | 液化ガス貯蔵設備とその運転方法 |
| US8597412B2 (en) * | 2008-02-22 | 2013-12-03 | Mitsubishi Heavy Industries, Ltd. | CO2 recovery apparatus and CO2 recovery method |
| FR2938498B1 (fr) * | 2008-11-17 | 2012-02-03 | Gaztransp Et Technigaz | Navire ou support flottant equipe d'un dispositif d'attenuation des mouvements de carenes liquides |
| US8309047B2 (en) * | 2009-09-15 | 2012-11-13 | Alstom Technology Ltd | Method and system for removal of carbon dioxide from a process gas |
| US8784761B2 (en) * | 2009-11-20 | 2014-07-22 | Alstom Technology Ltd | Single absorber vessel to capture CO2 |
| NO334725B1 (no) * | 2009-11-02 | 2014-05-12 | Wärtsilä Oil & Gas Systems As | LNG-brenseltanksystem for minst én gassmotor for skipsfremdrift |
| EP2361667B1 (en) * | 2010-02-25 | 2015-04-01 | Alstom Technology Ltd | A wet scrubber and a method of cleaning a process gas |
| PL2463014T3 (pl) * | 2010-12-10 | 2018-10-31 | General Electric Technology Gmbh | Płuczka wodna zawierająca płytki odchylające i sposób oczyszczania gazu technologicznego |
| WO2012118317A2 (ko) * | 2011-02-28 | 2012-09-07 | 한국과학기술원 | Lng주유시스템 및 증발가스 처리방법 |
| KR101278144B1 (ko) * | 2011-04-25 | 2013-06-27 | 한국과학기술원 | 선박의 액화 천연가스 주유 시 발생되는 증발가스 처리 장치 및 처리 방법 |
| NO335213B1 (no) * | 2011-09-02 | 2014-10-20 | Wärtsilä Oil & Gas Systems As | System og fremgangsmåte for å øke trykket i avkokingsgass i et LNG-drivstoffsystem |
| US9927068B2 (en) * | 2011-12-02 | 2018-03-27 | Fluor Technologies Corporation | LNG boiloff gas recondensation configurations and methods |
| CN203082526U (zh) * | 2013-02-05 | 2013-07-24 | 石家庄安瑞科气体机械有限公司 | 高效节能的立式低温储罐 |
| JP5708702B2 (ja) * | 2013-05-10 | 2015-04-30 | Jfeエンジニアリング株式会社 | 蒸発ガス再液化方法 |
| KR101640765B1 (ko) * | 2013-06-26 | 2016-07-19 | 대우조선해양 주식회사 | 선박의 증발가스 처리 시스템 및 방법 |
| KR102082362B1 (ko) * | 2013-09-27 | 2020-02-27 | 익셀러레이트 에너지 리미티드 파트너쉽 | 극저온 저장 선박에 있는 보일 오프 가스 속의 잠열의 수집, 이용, 배출을 위한 장치, 시스템, 방법 |
| US9364781B2 (en) * | 2013-10-11 | 2016-06-14 | Alstom Technology Ltd | Method and apparatus for wet desulfurization spray towers |
| US20150114315A1 (en) * | 2013-10-31 | 2015-04-30 | Ampac Fine Chemicals Llc | Evaporator-feeder system and method |
| JP6082724B2 (ja) * | 2014-11-13 | 2017-02-15 | 株式会社いけうち | スプレーノズルおよび該スプレーノズルを備えた加湿器 |
| JP6723635B2 (ja) * | 2016-01-25 | 2020-07-15 | 三菱重工エンジニアリング株式会社 | Co2回収装置及びco2回収方法 |
-
2015
- 2015-03-20 JP JP2015057309A patent/JP6423297B2/ja not_active Expired - Fee Related
-
2016
- 2016-03-14 CA CA2979324A patent/CA2979324C/en active Active
- 2016-03-14 WO PCT/JP2016/057921 patent/WO2016152608A1/ja not_active Ceased
- 2016-03-14 US US15/559,363 patent/US11029085B2/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5733298A (en) * | 1980-07-31 | 1982-02-23 | Mitsubishi Heavy Ind Ltd | Liquefaction/recovery device for evaporated gas in ship's tank |
| JPS5751098A (en) * | 1980-09-12 | 1982-03-25 | Ishikawajima Harima Heavy Ind Co Ltd | Method and apparatus for delivering low temperature liquefied gas |
| JPH068900U (ja) * | 1992-05-14 | 1994-02-04 | 石川島播磨重工業株式会社 | Lngからのbog冷却装置 |
| JP2003227608A (ja) * | 2002-02-05 | 2003-08-15 | Mitsubishi Heavy Ind Ltd | 液化天然ガスの処理装置および液化天然ガスの運搬船 |
| JP2012122554A (ja) * | 2010-12-09 | 2012-06-28 | Mitsubishi Heavy Ind Ltd | 液化ガス貯蔵再ガス化設備およびボイルオフガス再液化方法 |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7834227B1 (ja) * | 2025-07-17 | 2026-03-23 | 東京瓦斯株式会社 | Bog再液化装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| US20180172345A1 (en) | 2018-06-21 |
| JP2016176534A (ja) | 2016-10-06 |
| JP6423297B2 (ja) | 2018-11-14 |
| CA2979324C (en) | 2019-01-15 |
| US11029085B2 (en) | 2021-06-08 |
| CA2979324A1 (en) | 2016-09-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6423297B2 (ja) | Bog処理装置 | |
| KR102242784B1 (ko) | 극저온 탱크로부터 증기를 회수하기 위한 장치 | |
| KR102649053B1 (ko) | 액화 가스 및/또는 액화 가스로부터 나오는 자연 증발 가스를 냉각시키는 장치 및 방법 | |
| CN104321581B (zh) | Lng蒸发气体再冷凝配置和方法 | |
| CN101421554B (zh) | Lng蒸汽的处理配置和方法 | |
| JP4526188B2 (ja) | コンテナからの圧縮液化天然ガスの排出方法 | |
| CN103857955B (zh) | 储槽的压力上升抑制装置、抑制系统及抑制方法、液化气体运输船及储藏设备 | |
| JP2022046685A (ja) | 混合冷媒液化システム及び方法 | |
| JP3586501B2 (ja) | 低温液体及びそのボイルオフガスの処理方法及び装置 | |
| KR20130056294A (ko) | 통합형 액체 저장조 | |
| KR101701713B1 (ko) | 연료공급시스템 | |
| RO120220B1 (ro) | Procedeu pentru producerea unui lichid presurizat, bogat în metan, dintr- un flux de alimentare cu mai mulţi componenţi, conţinând metan şi un component solidificabil, având o volatilitate relativă mai mică decât cea a metanului | |
| KR20100118564A (ko) | 기체 팽창 공정을 통한 냉각 시스템의 냉각 용량 조절 방법 및 시스템 | |
| KR102590259B1 (ko) | 액화 가스 및/또는 액화 가스의 자연 증발 가스를 냉각시키는 장치 및 방법 | |
| NO20181643A1 (en) | Volatile organic compound recovery apparatus | |
| JP7393607B2 (ja) | ガス液化方法およびガス液化装置 | |
| US20130305744A1 (en) | Cng delivery system with cryocooler and method of supplying purified cng | |
| KR20180000288A (ko) | 휘발성유기화합물 회수장치 | |
| JP2007147113A (ja) | 窒素製造方法及び装置 | |
| CN101198834B (zh) | 氮生成方法以及用于该方法的装置 | |
| WO2019224951A1 (ja) | 天然ガスの前処理設備 | |
| TWI403354B (zh) | Recovery device and method for gas - like hydrocarbon | |
| JP6827964B2 (ja) | 再ガス化ターミナル及びそのような再ガス化ターミナルを動作させる方法 | |
| KR101722368B1 (ko) | 연료가스 공급시스템 | |
| JP6345965B2 (ja) | 気化ガス再液化設備、及び、気化ガス再液化方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 16768511 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2979324 Country of ref document: CA |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 15559363 Country of ref document: US |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 16768511 Country of ref document: EP Kind code of ref document: A1 |