WO2016079863A1 - 充放電制御装置、プログラム、充放電制御方法 - Google Patents
充放電制御装置、プログラム、充放電制御方法 Download PDFInfo
- Publication number
- WO2016079863A1 WO2016079863A1 PCT/JP2014/080885 JP2014080885W WO2016079863A1 WO 2016079863 A1 WO2016079863 A1 WO 2016079863A1 JP 2014080885 W JP2014080885 W JP 2014080885W WO 2016079863 A1 WO2016079863 A1 WO 2016079863A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- price
- power
- storage battery
- charge
- charging
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
Definitions
- the present invention relates to a charge / discharge control device, a program, and a charge / discharge control method.
- Patent Document 1 As a charge / discharge device for controlling charge / discharge of a storage battery, for example, a device shown in Patent Document 1 below is known.
- the charging / discharging device of Patent Document 1 controls charging / discharging of the storage battery based on the comparison result between the sales price of electric power and the reference price.
- the charging / discharging control by the charging / discharging device does not take into account the economic benefits of consumers having the charging / discharging device. Therefore, when charging / discharging a storage battery using a charging / discharging apparatus, the state which does not generate
- an object of the present invention is to provide a charging / discharging control device that controls charging / discharging of a storage battery so as to generate economic benefits for consumers.
- the main present invention for solving the above-mentioned problem is a consumer having an electric power load, a distributed power source that supplies electric power to the electric power load, and a storage battery connected to the electric power load and the distributed electric power source.
- a charging / discharging control device for controlling charging / discharging of the storage battery according to a control plan in which charging, discharging, charging and discharging of the storage battery are planned in advance for each time zone, and stopping charging and discharging of the storage battery
- the purchase price of the electric power supplied to the consumer is lower than the accumulated charge unit price corresponding to the capacity charged in the storage battery in the scheduled time zone, the charge accumulated unit price and the purchased power price
- a first comparison device that compares a first price difference with a second price difference between the power purchase price and a future power purchase price; and if the first price difference is smaller than the second price difference, Charge accumulation A difference between a power generation amount of the distributed power source and a power consumption amount of the power load when the power purchase price is higher than the
- FIG. 1 is a diagram illustrating an example of a power distribution system to which the charge / discharge control device according to the present embodiment is applied.
- the power distribution system 100 will be described with reference to FIG.
- the distribution system 100 is a power system for supplying power to the customer 10 and includes a distribution transformer 101, a distribution line L ⁇ b> 1, and the customer 10.
- the primary side of the distribution transformer 101 is supplied with electric power from a generator (not shown) installed at the upstream power plant.
- a generator (not shown) installed at the upstream power plant.
- One end of the distribution line L1 is connected to the secondary side of the distribution transformer 101.
- the distribution line L1 is extended toward the downstream side, with one end connected to the secondary side of the distribution transformer 101 as the upstream side.
- the customer 10 is a factory or a general household that is supplied with power from the distribution line L1 or supplies power to the distribution line L1.
- the customer 10 includes a measuring device M1, a charging / discharging device 11, a storage battery 12, a load R1, a charging / discharging control device 3, and a distributed power source G1.
- the customer 10 may be provided with a plurality of loads R1 and a plurality of distributed power sources G1.
- the load R1 is a power load to which power W1 corresponding to the power consumption of the load R1 is supplied.
- the measuring device M1 is, for example, a smart meter that measures the power supplied from the distribution line L1 to the consumer 10 and measures the power supplied from the consumer 10 to the distribution line L1.
- the measuring device M1 measures the power consumption amount of the load R1 and the power generation amount of the distributed power source G1, and outputs measurement information indicating each measurement result.
- the measuring device M1 outputs first price information T1 received from, for example, an electric power company or the like (not shown). Details of the first price information T1 will be described later.
- the distributed power source G1 is a power generation device that uses natural energy such as wind power or sunlight to output power W2 corresponding to the amount of power generation and supply power to the load R1 or the like.
- the storage battery 12 is connected to the distributed power source G1 and the load R1, and is charged and discharged.
- the charging / discharging device 11 is controlled by the charging / discharging control device 3 and is a device for setting the storage battery 12 to any state of charging, discharging, charging and discharging stop.
- the charge / discharge control device 3 is a device that creates a charge / discharge control plan T ⁇ b> 3 of the storage battery 12 and controls the charge / discharge device 11.
- FIG. 3 is a block diagram illustrating functions of the charge / discharge control device according to the present embodiment.
- the power distribution system 100 will be described with reference to FIGS. 2 and 3.
- the charge / discharge control device 3 includes a CPU (Central Processing Unit) 31, a communication device 32, a storage device 33, a display device 34, and an input device 35.
- the CPU 31 implements various functions of the charge / discharge control device 3 by executing a program stored in the storage device 33, and performs overall control of the charge / discharge control device 3.
- the storage device 33 stores data indicating various types of information in addition to the above programs.
- the display device 34 is a display that displays information of the charge / discharge control device 3.
- the input device 35 is, for example, a keyboard or a mouse for inputting information to the charge / discharge control device 3.
- the communication device 32 communicates with the measurement device M1 and the charge / discharge device 11 via the communication network 300.
- the communication device 32 receives the measurement information and the first price information T1 from the measurement device M1.
- the charge / discharge control device 3 includes a planning unit 36, a surplus determination unit 37, an economic determination unit 38, and a cumulative unit price calculation unit 39 as various functions realized by the CPU 31 executing a program stored in the storage device 33.
- the control unit 40 is included.
- the planning unit 36 creates a control plan T3 for the storage battery 12 based on the first price information T1.
- the surplus determination unit 37 determines the PV surplus power generated by the customer 10.
- the PV surplus power indicates the power W2 that is surplus with respect to the customer 10, and is a difference power that is generated when the value of the power W2 exceeds the value of the power W1.
- the PV surplus power is supplied from the customer 10 to the distribution line L1, for example, and sold from the customer 10 to the electric utility. Or PV surplus electric power is supplied to the storage battery 12, for example, and the storage battery 12 is charged.
- the economic determination unit 38 determines an economic merit based on controlling charging / discharging of the storage battery 12.
- the accumulated unit price calculation unit 39 calculates a charge accumulated unit price X.
- the accumulated charge unit price X represents a unit price per unit time required for charging the current charge capacity of the storage battery 12.
- the control unit 40 controls charging / discharging of the storage battery 12 by controlling the charging / discharging device 11.
- FIG. 5 is a diagram showing first price information used in the charge / discharge control device according to the present embodiment. is there.
- the first price information will be described with reference to FIGS. 4 and 5.
- the first price information T1 is information in which the planned value of the power price and the planned value of the PV purchase price are associated with each time zone.
- each time zone is 24 time zones divided in units of 1 hour in one day.
- the electricity price is determined based on real-time pricing.
- Real-time pricing refers to a power rate system in which the power price fluctuates for each time zone such as one hour in a day.
- the power price refers to the price (unit price) of power (also referred to as “purchased power”) supplied from the distribution line L1 to the customer 10 and the power supplied from the customer 10 to the distribution line L1 due to the discharge of the storage battery 12.
- Price (unit price) also referred to as “power selling power”.
- the power supplied from the customer 10 to the distribution line L1 includes the sold power and the PV surplus power different from the sold power.
- the price of the sold power and the price of the purchased power are set to the same price. For example, as the first price information T1, both the price of the sold power and the price of the purchased power in the time zone B1 are A1 (yen / kWh).
- the PV purchase price is determined based on unit price fluctuations.
- the PV purchase price indicates the unit price of the PV surplus power when the customer 10 sells the PV surplus power.
- the PV purchase price is a price that fluctuates every 24 time zones divided in units of one hour in one day. For example, as the first price information T1, the PV purchase price in the time zone B1 is E1 (yen / kWh).
- FIG. 6 is a diagram illustrating second price information used in the charge / discharge control device according to the present embodiment
- FIG. 7 is a diagram illustrating a control plan used in the charge / discharge control device according to the present embodiment.
- FIG. 8 is a flowchart showing the operation of the planning unit, which is a function of the charge / discharge control device according to the present embodiment. Incidentally, in the “control” column of the control plan T3 shown in FIG.
- the plan part 36 sets control with respect to all the time zones for 24 hours in the 1st price information T1, for example.
- the planning unit 36 creates a control plan T3 reflecting the above control settings.
- the planning unit 36 acquires the first price information T1 (step S11).
- the planning unit 36 creates the second price information T2 by rearranging the combinations of the time zone and the power price corresponding to the time zone in the order of the lowest power price for the first price information T1 (step S12). .
- the combination showing the lowest value A10 among A1 to A24 is shown at the top, and the combination showing the highest value A6 is shown at the bottom.
- the planning unit 36 sets the value of the variable K to 1 (step S13).
- the variable K is used when selecting a pair of power prices from the second price information T2.
- the value of the variable K is 1, the power prices A10 and A6 are selected by the planning unit 36.
- the value of the variable K is 2, the power prices A11 and A7 are selected.
- the planning unit 36 calculates a charge / discharge price ratio based on the selected pair of power prices A10 and A6. Specifically, the planning unit 36 uses the value of the variable K as a result of the division with the power price A10 having the lower price of the pair of power prices as the dividend and the power price A6 having the higher price as the divisor. The charge / discharge price ratio when 1 is 1.
- C k and C 24- (k ⁇ 1) shown in step S14 correspond to the power price in the second price information T2.
- K in C k and C 24- (k ⁇ 1) corresponds to the variable K.
- C k shown in step S14 is C 1 and C 24- (k ⁇ 1) is C 24 .
- the subscript C indicates the order in which the power price in the second price information T2 is low. That is, C 1 and C 24 indicate the power prices A10 and A6 in the second price information T2, respectively.
- C k indicates A10
- C 24- (k ⁇ 1) indicates A6
- C k indicates A11
- C 24- (k-1) will indicate A7.
- the planning unit 36 determines whether or not the charge / discharge price ratio is smaller than the charge / discharge efficiency (also referred to as “charge / discharge efficiency”) of the power storage system (step S14).
- the charge / discharge efficiency is the product of the charge efficiency p when charging the power to the storage battery 12 and the discharge efficiency q when discharging the power charged in the storage battery 12.
- the charging efficiency p is 0.9
- power of 1 (kWh) is supplied to the storage battery 12
- power corresponding to 0.9 (kWh) corresponding to 0.9 times 1 (kWh) Will be charged.
- the discharge efficiency q is 0.9
- the power corresponding to 1 (kWh) is charged to the storage battery 12
- the power of 0.9 (kWh) corresponding to 0.9 times (kWh) is discharged from the storage battery 12.
- step S14 When it is determined that the charge / discharge price ratio is smaller than the charge / discharge efficiency (step S14: YES), the planning unit 36 assumes that there is an economic merit for the customer 10 and time corresponding to the selected pair of power prices. Set charging and discharging for the band. Specifically, the planning unit 36 sets the time zone B10 corresponding to A10 as the power price of the lower price of the pair of power prices to the charging control, and A6 as the power price of the higher price. Is set to discharge control (step S15). At this time, the planning unit 36 reflects the setting result on the control plan T3.
- step S14 determines that there is no economic merit for the customer 10 and sets the selected pair of power prices. Both corresponding time zones are set to stop (step S17). At this time, the planning unit 36 reflects the setting result on the control plan T3.
- the surplus determination unit 37 determines whether the power generation amount of the distributed power source G1 is larger than the power consumption amount of the load R1, based on the measurement information received by the communication device 32.
- the surplus determination unit 37 determines that the power generation amount is larger than the power consumption amount, PV surplus power is generated, and thus the economic merit (economic benefit) of the customer 10 is generated using the PV surplus power. It is preferable to control charging / discharging of the storage battery 12 so that it does.
- the charge / discharge control device 3 performs control so that double power generation is not performed in the customer 10, or controls so that the amount of PV surplus power sold by the customer 10 increases, Control is performed such that the accumulated charge unit price X decreases.
- Double power generation means that both the PV surplus power and the power output by discharging the storage battery 12 are supplied to the distribution line L1.
- FIG. 9 is a diagram showing an input / output image of power to the storage battery in the distribution system to which the charge / discharge control device according to the present embodiment is applied.
- the accumulated unit price calculation unit will be described with reference to FIG.
- the accumulated unit price calculator 39 calculates the dischargeable electric energy S and the charge accumulated unit price X.
- the dischargeable power amount S corresponds to the maximum amount of power that can be discharged based on the remaining power storage amount Wb of the storage battery 12.
- the remaining power storage amount Wb corresponds to the current charge amount of the charge capacity Wc of the storage battery 12.
- the accumulated unit price calculator 39 calculates the dischargeable power amount S based on the charge power amount Wt indicating the amount of power supplied to the storage battery 12, or calculates the dischargeable power amount S based on the remaining power storage amount Wb. To do. Specifically, the accumulation calculation unit 39 calculates the dischargeable electric energy S using the equations (1) and (2).
- Dischargeable power amount S remaining power storage amount Wb * discharge efficiency q (1)
- Dischargeable power amount S total charge power amount Wt * charge efficiency p * discharge efficiency q (2)
- the charge accumulated unit price X is a price determined according to the price of purchased power accumulated for charging the storage battery 12.
- the accumulated unit price calculation unit 39 calculates the accumulated charge unit price X using Equation (3).
- Charge accumulated unit price Xb (dischargeable power amount Sa * charge accumulated unit price Xa + power price At * charge power amount Wt * charge efficiency p * discharge efficiency q) / dischargeable power amount Sb (3)
- the accumulated charge unit prices Xa and Xb indicate the accumulated charge unit price X at time A and the accumulated charge unit price X at time B after time A, respectively.
- the dischargeable power amounts Sa and Sb indicate the dischargeable power amount S at time A and the dischargeable power amount S at time B, respectively.
- the power price At indicates the power price in the time period from time A to time B.
- FIGS. 10 is a diagram illustrating a state of a customer in a power distribution system to which the charge / discharge control device according to the present embodiment is applied, control of a storage battery, and the like.
- the economy determination unit and the determination unit will be described with reference to FIGS.
- the economic determination unit 38 performs each determination on the economic merit of the customer 10.
- Time zone when storage battery charging is set In the time zone in which charging is set in the control plan T3 (also referred to as “scheduled charging time zone”), the economic determination unit 38 determines whether the power price is higher than the PV purchase price, and the PV purchase price. It is also determined whether or not is higher than the accumulated charge unit price X. Furthermore, in the scheduled charging time zone, the economic determination unit 38 determines whether the PV purchase price is higher than the sum of the accumulated charge unit price X and the predetermined unit price.
- Time zone when battery discharge is set In the time zone where discharge is set in the control plan T3 (also referred to as “scheduled discharge time zone”), the economy determination unit 38 determines whether the PV purchase price is higher than the power price, and the PV purchase price. It is also determined whether or not is higher than the accumulated charge unit price X. Furthermore, in the scheduled discharge time zone, the economy determination unit 38 determines whether or not the price corresponding to the PV purchase price is higher than the charge accumulated unit price X. Note that the price corresponding to the PV purchase price is calculated by the economic determination unit 38 based on the equation (4).
- FIG. 11 is a flowchart showing the operation of the charge / discharge control apparatus according to this embodiment.
- the operation of the charge / discharge control apparatus according to the present embodiment will be described with reference to FIGS. 1, 10, and 11.
- the charge / discharge control device 3 reads the last charge accumulated unit price X, the dischargeable electric energy S, and the control plan T3 on the previous day (step S21). Note that the information read in step S21 may be stored in advance in the storage device 33.
- the charging / discharging control device 3 determines which time zone is the scheduled charging time zone, the scheduled discharging time zone, or the scheduled stopping time zone (step S22). For example, when the current time zone is each of the time zones B2, B7, and B10 (FIG. 7), the charge / discharge control device 3 determines that the scheduled stop time zone, the scheduled discharge time zone, and the scheduled charge time zone.
- Control of scheduled charging time When it is determined that the current time zone is the scheduled charging time zone (step S22: charging), the surplus determining unit 37 determines whether the power generation amount of the distributed power source G1 is larger than the power consumption amount of the load R1. Determination is made (step S31).
- step S31: NO the control unit 40 controls the storage battery 12 to be charged within the contracted power range (step S35).
- step S31: YES the following determination and control are performed assuming that PV surplus power is generated.
- step S32 The economic determination unit 38 determines whether or not the power price is higher than the PV purchase price (step S32). If the economic determination unit 38 determines that the power price is higher than the PV purchase price (step S32: YES), it is determined that the economic advantage of the customer 10 based on the charging of the storage battery 12 occurs. This is determined by the unit 38.
- control unit 40 performs the operation of step S35.
- the amount of purchased power is reduced. Therefore, the amount of consideration paid from the customer 10 to the electric power company is reduced, and the economic merit of the customer 10 is generated.
- step S32 determines whether or not the PV purchase price is higher than the accumulated charge unit price X. Determination is made (step S33). ⁇ PV purchase price, charge unit price X> If the economic determination unit 38 determines that the PV purchase price is lower than the accumulated charge unit price X (step S33: YES), an economic determination is made when an economic merit of the customer 10 based on charging of the storage battery 12 occurs. This is determined by the unit 38. In this case, the control unit 40 performs the operation of step S35. Accordingly, the economic merit of the customer 10 occurs as in the case of step S32: YES. Furthermore, the economic merit of the customer 10 also occurs in that the amount of the accumulated charge unit price X is reduced.
- step S33 NO
- the economic determination unit 38 determines that the PV purchase price is equal to the charge accumulated unit price X and the predetermined unit price. It is determined whether it is higher than the total (step S34). ⁇ PV purchase price, total charge unit price X and the specified unit price> If the economic determination unit 38 determines that the PV purchase price is higher than the sum of the accumulated charge unit price X and the predetermined unit price (step S34: YES), the customer 10 based on the fact that charging / discharging of the storage battery 12 is stopped. If economic merit occurs, the economic determination unit 38 has determined.
- control unit 40 performs control so that charging / discharging of the storage battery 12 is stopped (step S27).
- the amount of PV surplus power sold from the consumer 10 to the electric power company can be increased. Therefore, the amount of consideration paid to the customer 10 from the electric power company increases, and the economic merit of the customer 10 occurs.
- step S34 determines that the PV purchase price is lower than the sum of the accumulated charge unit price X and the predetermined unit price (step S34: NO)
- the economic determination unit 38 determines that the PV purchase price is lower than the sum of the accumulated charge unit price X and the predetermined unit price (step S34: NO)
- the control unit 40 performs the operation of step S35.
- step S35 the charge / discharge control device 3 integrates the charge power amount Wt (step S36), calculates the dischargeable power amount S (step S37), and calculates the charge unit price X (step). S38).
- step S37 the charge / discharge control device 3 calculates the product of the charge power amount Wt integrated in step S36, the charge efficiency p, and the discharge efficiency q, and the dischargeable power amount S before being charged in step S35. Is calculated as a dischargeable electric energy S.
- the charge / discharge control device 3 determines whether or not the control is performed in all the time zones of the control plan T3 (step S58). That is, the charge / discharge control device 3 determines whether or not the control of the storage battery 12 in one day has been performed. When it is determined that the control of the storage battery 12 in one day is all performed (step S58: YES), the charge / discharge control device 3 ends the operation. On the other hand, when it is not determined that the control of the storage battery 12 in one day is all performed (step S58: NO), the charge / discharge control device 3 executes the determination in step S22 again.
- step S22 discharge
- step S22 discharge
- step S22 discharge
- step S22 discharge
- step S22 discharge
- step S22 discharge
- step S41 the surplus determination unit 37 performs the determination in step S41.
- the determination in step S41 is the same as the determination in step S31.
- the control unit 40 performs control so that the storage battery 12 is discharged within a range that does not reverse power (step S55).
- step S55 the charge / discharge control device 3 integrates the discharge power amount Pt (step S56), calculates the dischargeable power amount S (step S57), and then performs the determination of step S58.
- step S57 the charge / discharge control device 3 calculates the difference of the discharge power amount Pt accumulated in step S56 with respect to the dischargeable power amount S before being discharged in step S55 as the dischargeable power amount S.
- step S41 when the surplus determination unit 37 determines that the power generation amount is greater than the power consumption (step S41: YES), the following determination and control are performed assuming that PV surplus power is generated.
- step S42 The economic determination unit 38 determines whether or not the PV purchase price is higher than the power price (step S42).
- step S42 NO
- the control unit 40 performs the operation of step S26. Therefore, the consumer 10 can sell the PV surplus power to the electric utility while preventing the consumer 10 from entering the double power generation state. Therefore, consideration is paid to the customer 10 from the electric power company, and the economic merit of the customer 10 occurs.
- the double power generation state is a state in which both the PV surplus power and the power output by the discharge of the storage battery 12 are supplied to the distribution line L1.
- a double power generation state since it is determined by an electric contract between the customer 10 and the electric power supplier so that the amount of the PV purchase price is reduced, an economic merit of the customer 10 is generated. Therefore, it is necessary to prevent double power generation.
- step S42 determines whether or not the PV purchase price is higher than the accumulated charge unit price X. Determination is made (step S43).
- step S43 determines whether or not the PV purchase price is higher than the accumulated charge unit price X.
- step S43: NO the economic determination unit 38 generates an economic merit of the customer 10 based on the fact that charging / discharging of the storage battery 12 is stopped. It will be judged. In this case, the control unit 40 performs the operation of step S26. Accordingly, an economic merit is generated as in the case of step S42: NO.
- step S43 determines whether the price corresponding to the PV purchase price is higher than the charge accumulated unit price X.
- Step S44 determines whether the price corresponding to the PV purchase price is higher than the charge accumulated unit price X.
- step S44 determines that the price according to the PV purchase price is lower than the accumulated charge unit price X.
- step S33 an economic merit is generated as in the case of step S33: YES. Furthermore, the customer 10 is prevented from entering a double power generation state.
- the charge / discharge control device 3 performs the operation of steps S46 to S48 and then performs the determination of step S58.
- the operations in steps S46 to S48 are the same as the operations in steps S36 to S38.
- step S44 NO
- the control unit 40 performs the operation of step S26.
- Control of scheduled stop time ⁇ Electricity price, charge unit price>
- step S22: stop the economy determination unit 38 determines whether the power price is higher than the accumulated charge unit price X (step S23).
- step S23 If the power price is determined low and economical determination unit 38 than the charge accumulation unit price X (step S23: YES), economics determination unit 38, a first price and charge accumulation bid X and the current electricity price C t It is determined whether or not the difference (X ⁇ C t ) is smaller than a second price difference (C t ⁇ A 1 ) between the current power price C t and the future power price A 1 . That is, the economic determination unit 38 determines whether or not the profit based on charging is greater than the loss based on discharging of the storage battery 12 (step S24). Note that the future power prices A 1, is the power price is known in advance is set to a future time period.
- step S23 NO
- step S24 YES
- step S25 the economic determination unit 38 determines whether or not an economic merit based on the discharge of the storage battery 12 occurs.
- step S41 determines that the current power price Ct is higher than the sum of the accumulated charge unit price X and the predetermined unit price.
- step S25: NO the economic efficiency determination unit 38 determines that the current power price Ct is lower than the sum of the accumulated charge unit price X and the predetermined unit price.
- step S27 the operation of step S27 is performed.
- the economic determination unit 38 determines whether or not an economic merit based on charging of the storage battery 12 occurs (step S26).
- a value corresponding to the power price is represented by C t / (p * q) + ⁇ . ⁇ is a predetermined price. Then, when the economic determination unit 38 determines that the price corresponding to the power price is lower than the accumulated charge unit price X (step S26: YES), the operation of step S31 is performed. On the other hand, when the economic determination unit 38 determines that the price corresponding to the power price is higher than the accumulated charge unit price X (step S26: NO), the operation of step S27 is performed.
- the charge / discharge control device 3B (FIG. 3) in the second embodiment has a configuration other than the economic determination unit 38 in the charge / discharge control device 3 of the first embodiment, and plans the planning unit 36 and the control unit 40, respectively. It is changed to the part 36B and the control part 40B. Except for these configurations of the charge / discharge control device 3B, the configuration of the charge / discharge control device 3 is the same.
- the fourth price information T4 is the same information as the first price information T1 (FIG. 4).
- the PV purchase price of the fourth price information T4 is determined based on a fixed unit price.
- the fixed unit price means a unit price that does not vary in each time zone.
- the PV purchase price of the fourth price information T4 is set higher than the power price.
- the charging / discharging control device 3B includes a planning unit 36B, a surplus determination unit 37, a cumulative unit price calculation unit 39, and a control unit 40B.
- the planning unit 36B creates a predetermined control plan based on the fourth price information T4.
- the configuration in which the planning unit 36B creates a predetermined control plan is the same as the configuration in which the planning unit 36 creates the control plan T3.
- the control unit 40B controls charging / discharging of the storage battery 12 based on the determination result of the surplus determination unit 37.
- the surplus determination unit 37 performs the same determination as in steps S31 and S41 (FIG. 11) in steps S61 and S62 (FIG. 13).
- the control unit 40B performs the operations of steps S35 and S55. Do.
- the control unit 40B determines that the power generation amount of the distributed power source G1 is larger than the power consumption of the load R1 (step S61: YES, step S62: YES)
- the control unit 40B generates PV surplus power. Control is performed so that the storage battery 12 is not charged / discharged (step S27).
- step S61: YES the same economic merit as in the case of step S34: YES occurs.
- the charge / discharge control device 3 includes the consumer 10 having the load R1, the distributed power source G1 that supplies power to the load R1, and the storage battery 12 connected to the load R1 and the distributed power source G1.
- the charging / discharging of the storage battery 12 is controlled according to a control plan T3 in which charging, discharging, charging and stopping of the storage battery 12 are planned in advance for each time zone.
- the charging / discharging control device 3 corresponds to the capacity at which the current power price C t of the power supplied to the customer 10 is charged in the storage battery 12 in a time zone in which charging and discharging of the storage battery 12 are planned to stop in advance.
- the charge / discharge control device 3 compares the current power price Ct , the charge accumulated unit price X, and the total of the predetermined unit price. Further, when the current power price C t is higher than the sum of the accumulated charge unit price X and the predetermined unit price, the charge / discharge control device 3 responds to the difference between the power generation amount of the distributed power source G1 and the power consumption amount of the load R1.
- the storage battery 12 is controlled to be discharged on the assumption that the economic benefit of the customer 10 is generated. Therefore, even when the current time zone is set to the scheduled stop time zone, it is possible to control charging / discharging of the storage battery 12 so that an economic merit based on charging / discharging of the storage battery 12 occurs. Become.
- the charge / discharge control device 3 compares the power generation amount of the distributed power source G1 with the power consumption amount of the load R1, and when the power generation amount of the distributed power source G1 is smaller than the power consumption amount of the load R1, the distributed power source G1.
- the storage battery 12 is controlled to be discharged on the assumption that there is no surplus power.
- the charge / discharge control device 3 controls the storage battery 12 not to be charged / discharged when the current power price Ct is lower than the sum of the accumulated charge unit price X and the predetermined unit price.
- the charge and discharge control device 3 when the first price difference is greater than the second price difference, compares the price corresponding to the current power price C t and the charge accumulation unit price X, depending on the current power price C t If the price is lower than the accumulated charge unit price X, the storage battery 12 is controlled to be charged as an economic merit of the customer 10 occurs.
- the charge / discharge control device 3 controls the storage battery 12 to be charged on the assumption that there is no surplus power by the distributed power source G1.
- the charge and discharge control device 3 controls so as not to charge or discharge the battery 12.
- control plan T3 is planned in advance for 24 time zones in units of one hour in one day.
- the charge / discharge control device 3 controls the charge / discharge of the storage battery 12 for each of the 24 time zones.
- 1st and 2nd embodiment is for making an understanding of this invention easy, and is not for limiting and interpreting this invention.
- the present invention can be changed and improved without departing from the gist thereof, and the present invention includes equivalents thereof.
- step S31 in the case of step S31: YES, it has been described that the determinations in steps S32 to S34 and the control based on the determination results are performed, but the present invention is not limited to this.
- determination after step S31: YES determination and control of at least one of steps S32 to S34 may be performed. That is, only one of steps S32 to S34 may be provided, only steps S32 and S33, only steps S33 and S34, or only steps S32 and S34 may be provided. It is good to be.
- step S41 YES
- determination and control of at least one of the steps S42 to S44 may be performed in the same manner.
- the distributed power source G1 is a solar power generation device, but the present invention is not limited to this.
- the distributed power source G1 may be a wind power generator.
- control plan T3 is created by the planning unit 36.
- the present invention is not limited to this.
- the control plan T3 may be determined in advance, or information indicating the control plan T3 may be input via the input device 35.
- the first price information T1 indicates an hourly power price, but the present invention is not limited to this.
- the first price information T1 may indicate a power price every 30 minutes or the like.
- the price of the sold power and the price of the purchased power are the same price in the first price information T1, but the present invention is not limited to this.
- the price of sold power and the price of purchased power in the same time zone may be different from each other.
- this embodiment is for making an understanding of this invention easy, and is not for limiting and interpreting this invention.
- the present invention can be changed and improved without departing from the gist thereof, and the present invention includes equivalents thereof.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
電力負荷と、分散型電源と、蓄電池と、を有する需要家において、前記蓄電池の充電、放電、充電及び放電の停止が各時間帯に対して予め計画される制御計画に従って、前記蓄電池の充放電を制御する充放電制御装置であって、前記蓄電池の充電及び放電の停止が予め計画されている時間帯において、前記需要家に供給される電力の買電価格が前記蓄電池に充電された容量に対応する充電累積単価より低い場合、前記充電累積単価及び前記買電価格の第1価格差と前記買電価格及び将来の買電価格の第2価格差とを比較する第1比較装置と、前記第1価格差が前記第2価格差より小さい場合、前記買電価格と前記充電累積単価に応じた価格とを比較する第2比較装置と、前記買電価格が前記充電累積単価に応じた価格より高い場合、前記分散型電源の発電量と前記電力負荷の電力消費量との差に応じて、前記蓄電池を放電するように制御する制御装置と、を備える。
Description
本発明は、充放電制御装置、プログラム、充放電制御方法に関する。
蓄電池の充放電を制御する充放電装置として、例えば以下の特許文献1に示す装置が知られている。
例えば、特許文献1の充放電装置は、電力の売買価格と基準価格との比較結果に基づいて蓄電池の充放電を制御している。しかし、上記の充放電装置による充放電の制御では、充放電装置を有する需要家の経済的利益が考慮されていない。従って、充放電装置を用いて蓄電池を充放電したときに、需要家の経済的利益を発生しない状態が起こり得る。
そこで、本発明は、需要家の経済的利益が発生するように蓄電池の充放電を制御する充放電制御装置を提供することを目的とする。
前述した課題を解決する主たる本発明は、電力負荷と、前記電力負荷に電力を供給する分散型電源と、前記電力負荷及び前記分散型電源に接続される蓄電池と、を有する需要家において、前記蓄電池の充電、放電、充電及び放電の停止が各時間帯に対して予め計画される制御計画に従って、前記蓄電池の充放電を制御する充放電制御装置であって、前記蓄電池の充電及び放電の停止が予め計画されている時間帯において、前記需要家に供給される電力の買電価格が前記蓄電池に充電された容量に対応する充電累積単価より低い場合、前記充電累積単価及び前記買電価格の第1価格差と前記買電価格及び将来の買電価格の第2価格差とを比較する第1比較装置と、前記第1価格差が前記第2価格差より小さい場合、前記買電価格と前記充電累積単価に応じた価格とを比較する第2比較装置と、前記買電価格が前記充電累積単価に応じた価格より高い場合、前記分散型電源の発電量と前記電力負荷の電力消費量との差に応じて、前記需要家の経済的利益が発生するものとして、前記蓄電池を放電するように制御する制御装置と、を備える。
本発明の他の特徴については、添付図面及び本明細書の記載により明らかとなる。
本発明によれば、需要家の経済的利益が発生するように蓄電池の充放電を制御することが可能になる。
本明細書および添付図面の記載により、少なくとも以下の事項が明らかとなる。
[第1実施形態]
===配電系統===
図1は、本実施形態に係る充放電制御装置が適用される配電系統の一例を示す図である。以下、図1を参照しながら配電系統100について説明する。
[第1実施形態]
===配電系統===
図1は、本実施形態に係る充放電制御装置が適用される配電系統の一例を示す図である。以下、図1を参照しながら配電系統100について説明する。
配電系統100は、需要家10に対して電力を供給するための電力系統であって、配電用変圧器101、配電線L1、需要家10を含んで構成されている。
配電用変圧器101の一次側には、上流側の発電所に設置された発電機(不図示)から電力が供給される。配電用変圧器101の二次側には、配電線L1の一端が接続される。配電線L1は、配電用変圧器101の二次側に接続されている一端を上流側として、下流側に向かって延設されている。
需要家10は、配電線L1から電力が供給され、或いは、配電線L1に対して電力を供給する工場や一般家庭等である。需要家10は、計測装置M1、充放電装置11、蓄電池12、負荷R1、充放電制御装置3、分散型電源G1を有する。尚、需要家10には、負荷R1及び分散型電源G1が複数個ずつ設けられていることとしてもよい。
負荷R1は、負荷R1の電力消費量に応じた電力W1が供給される電力負荷である。
計測装置M1は、配電線L1から需要家10に供給される電力を計測するとともに、需要家10から配電線L1に供給される電力を計測する、例えばスマートメータである。計測装置M1は、負荷R1の電力消費量及び分散型電源G1の発電量を計測し、各計測結果を示す計測情報を出力する。更に、計測装置M1は、例えば電気事業者等(不図示)から受信した第1価格情報T1を出力する。尚、第1価格情報T1の詳細については、後述する。
分散型電源G1は、発電量に応じた電力W2を出力し、負荷R1等に電力を供給する例えば風力や太陽光等の自然エネルギーを利用する発電装置である。
蓄電池12は、分散型電源G1及び負荷R1に接続されており、充放電される。
充放電装置11は、充放電制御装置3によって制御され、蓄電池12を充電、放電、充電及び放電の停止、の何れかの状態に設定するための装置である。
充放電制御装置3は、蓄電池12の充放電の制御計画T3を作成し、充放電装置11を制御する装置である。
===充放電制御装置===
図2は、本実施形態に係る充放電制御装置のハードウエアの構成を示すブロック図であり、図3は、本実施形態に係る充放電制御装置の機能を示すブロック図である。以下、図2及び図3を参照しながら配電系統100について説明する。
===充放電制御装置===
図2は、本実施形態に係る充放電制御装置のハードウエアの構成を示すブロック図であり、図3は、本実施形態に係る充放電制御装置の機能を示すブロック図である。以下、図2及び図3を参照しながら配電系統100について説明する。
充放電制御装置3は、CPU(Central Processing Unit)31、通信装置32、記憶装置33、表示装置34、入力装置35を含んで構成される。CPU31は、記憶装置33に記憶されているプログラムを実行することにより充放電制御装置3の各種機能を実現し、充放電制御装置3を統括制御する。記憶装置33には、上記のプログラムの他に、各種情報を示すデータが記憶されている。表示装置34は、充放電制御装置3の情報を表示するディスプレイである。入力装置35は、充放電制御装置3に対して情報を入力するための例えばキーボード、マウス等である。通信装置32は、通信ネットワーク300を介して計測装置M1及び充放電装置11との間で通信を行う。通信装置32は、計測装置M1から計測情報及び第1価格情報T1を受信する。
充放電制御装置3は、CPU31が記憶装置33に記憶されているプログラムを実行することにより実現される各種機能として、計画部36、余剰判定部37、経済性判定部38、累積単価演算部39、制御部40を有する。
計画部36は、第1価格情報T1に基づいて蓄電池12の制御計画T3を作成する。
余剰判定部37は、需要家10で発生するPV余剰電力についての判定を行う。PV余剰電力は、需要家10に対して余剰であるとされる電力W2を示し、電力W2の値が電力W1の値を上回った際に発生する差分の電力である。PV余剰電力は、例えば、需要家10から配電線L1に供給されて、需要家10から電気事業者に対して売却される。或いは、PV余剰電力は、例えば、蓄電池12に供給されて蓄電池12が充電される。
経済性判定部38は、蓄電池12の充放電を制御することに基づく経済的メリットについての判定を行う。累積単価演算部39は、充電累積単価Xを算出する。尚、充電累積単価Xは、蓄電池12における現時点の充電容量を充電するために要した単位時間あたりの単価を表している。制御部40は、充放電装置11を制御することにより、蓄電池12の充放電を制御する。
===第1価格情報===
図4は、本実施形態に係る充放電制御装置で用いられる第1価格情報を示すグラフであり、図5は、本実施形態に係る充放電制御装置で用いられる第1価格情報を示す図である。以下、図4及び図5を参照しながら第1価格情報について説明する。
===第1価格情報===
図4は、本実施形態に係る充放電制御装置で用いられる第1価格情報を示すグラフであり、図5は、本実施形態に係る充放電制御装置で用いられる第1価格情報を示す図である。以下、図4及び図5を参照しながら第1価格情報について説明する。
第1価格情報T1は、各時間帯に対して電力価格の計画値及びPV買取価格の計画値が対応付けられた情報である。尚、本実施形態において、各時間帯は、1日の中で1時間を単位として分割された24個の時間帯であることとする。
電力価格は、リアルタイムプライシングに基づいて定められている。尚、リアルタイムプライシングとは、例えば、1日における1時間等の時間帯毎に電力価格が変動する電力料金制度を示している。
電力価格とは、配電線L1から需要家10に供給される電力(「買電電力」とも称する)の価格(単価)と、蓄電池12の放電により需要家10から配電線L1に供給される電力(「売電電力」とも称する)の価格(単価)とを示している。尚、需要家10から配電線L1に供給される電力には、売電電力と当該売電電力とは異なるPV余剰電力とが含まれることになる。本実施形態において、第1価格情報T1に含まれる電力価格の計画値として、売電電力の価格と買電電力の価格は同価格に設定されている。例えば、第1価格情報T1として、時間帯B1における売電電力の価格及び買電電力の価格の双方は、A1(円/kWh)である。
又、PV買取価格は、単価変動に基づいて定められている。PV買取価格とは、PV余剰電力を需要家10が売却する際の当該PV余剰電力の売却単価を示している。本実施形態において、PV買取価格は、1日の中で1時間を単位として分割された24個の時間帯毎に変動する価格である。例えば、第1価格情報T1として、時間帯B1におけるPV買取価格はE1(円/kWh)である。
又、第1価格情報T1として、時間帯B1~B11の電力価格はPV買取価格よりも高く、時間帯B12~B15の電力価格はPV買取価格よりも低く、時間帯B16~B24の電力価格はPV買取価格よりも高くなっている。
===計画部===
図6は、本実施形態に係る充放電制御装置で用いられる第2価格情報を示す図であり、図7は、本実施形態に係る充放電制御装置で用いられる制御計画を示す図であり、図8は、本実施形態に係る充放電制御装置の機能である計画部の動作を示すフローチャートである。尚、図7に示す制御計画T3の「制御」の欄において、時間帯B1~B24のうちの時間帯B2、B7、B9、B10、B12、B15以外の時間帯においても、充電、放電、(充電及び放電の)停止のうちの何れかの制御が設定されているが、説明の便宜上、記載が省略されている。そして、図7に示す制御計画T3の「制御」の欄において、充電は蓄電池12を充電させることを示し、放電は蓄電池12を放電させることを示し、停止は蓄電池12の充電及び放電を停止させることを示している。以下、図5~図8を参照しながら計画部について説明する。
<概要>
計画部36は、第1価格情報T1を並べ替えて第2価格情報T2を作成した後、第2価格情報T2における一対の時間帯を選択し、選択された一対の時間帯における制御を設定する。計画部36は、第1価格情報T1における例えば24時間分の全ての時間帯に対して制御を設定する。計画部36は、上記の制御の設定が反映された制御計画T3を作成する。
<詳細>
計画部36は、第1価格情報T1を取得する(ステップS11)。計画部36は、第1価格情報T1について、電力価格が安い順序に、時間帯と当該時間帯に対応する電力価格との組合せを並び替えて、第2価格情報T2を作成する(ステップS12)。尚、図6において、A1~A24のうちの最安値A10を示す組み合わせが最上段に示され、最高値A6を示す組み合わせが最下段に示されている。
===計画部===
図6は、本実施形態に係る充放電制御装置で用いられる第2価格情報を示す図であり、図7は、本実施形態に係る充放電制御装置で用いられる制御計画を示す図であり、図8は、本実施形態に係る充放電制御装置の機能である計画部の動作を示すフローチャートである。尚、図7に示す制御計画T3の「制御」の欄において、時間帯B1~B24のうちの時間帯B2、B7、B9、B10、B12、B15以外の時間帯においても、充電、放電、(充電及び放電の)停止のうちの何れかの制御が設定されているが、説明の便宜上、記載が省略されている。そして、図7に示す制御計画T3の「制御」の欄において、充電は蓄電池12を充電させることを示し、放電は蓄電池12を放電させることを示し、停止は蓄電池12の充電及び放電を停止させることを示している。以下、図5~図8を参照しながら計画部について説明する。
<概要>
計画部36は、第1価格情報T1を並べ替えて第2価格情報T2を作成した後、第2価格情報T2における一対の時間帯を選択し、選択された一対の時間帯における制御を設定する。計画部36は、第1価格情報T1における例えば24時間分の全ての時間帯に対して制御を設定する。計画部36は、上記の制御の設定が反映された制御計画T3を作成する。
<詳細>
計画部36は、第1価格情報T1を取得する(ステップS11)。計画部36は、第1価格情報T1について、電力価格が安い順序に、時間帯と当該時間帯に対応する電力価格との組合せを並び替えて、第2価格情報T2を作成する(ステップS12)。尚、図6において、A1~A24のうちの最安値A10を示す組み合わせが最上段に示され、最高値A6を示す組み合わせが最下段に示されている。
計画部36は、変数Kの値を1とする(ステップS13)。尚、変数Kは、第2価格情報T2から一対の電力価格を選択する際に用いられる。変数Kの値が1の場合、電力価格A10、A6が計画部36によって選択される。又、変数Kの値が2の場合、電力価格A11、A7が選択される。
計画部36は、選択された一対の電力価格A10、A6に基づいて、充放電価格比率を算出する。具体的には、計画部36は、一対の電力価格のうちの価格が安い方の電力価格A10を被除数とし、価格が高い方の電力価格A6を除数とする除算の結果を、変数Kの値が1のときの充放電価格比率とする。
尚、ステップS14に示すCk、C24-(k-1)は、第2価格情報T2における電力価格に対応している。Ck、C24-(k-1)のkは、変数Kに対応している。例えば、変数Kの値が1の場合、ステップS14に示すCkはC1となり、C24-(k-1)はC24となる。Cの添え字は、第2価格情報T2における電力価格が低い順序を示している。つまり、C1、C24は夫々、第2価格情報T2における電力価格A10、A6を示すことになる。例えば、変数Kの値が1の場合、CkはA10を示し、C24-(k-1)はA6を示すことになり、変数Kの値が2の場合、CkはA11を示し、C24-(k-1)はA7を示すことになる。
計画部36は、充放電価格比率が蓄電システムの充放電効率(「充放電効率」とも称する)よりも小さいか否かを判断する(ステップS14)。
充放電効率とは、蓄電池12に対して電力を充電するときの充電効率pと、蓄電池12に充電されている電力を放電するときの放電効率qとの積である。例えば、充電効率pが0.9である場合、蓄電池12に対して1(kWh)の電力を供給すると、1(kWh)の0.9倍に相当する0.9(kWh)に対応する電力が充電されることとなる。又、例えば、放電効率qが0.9である場合、蓄電池12に対して1(kWh)に対応する電力が充電されているときに、蓄電池12に充電されている電力を全て放電すると、1(kWh)の0.9倍に相当する0.9(kWh)の電力が蓄電池12から放電されることとなる。
充放電価格比率が充放電効率よりも小さいと判断した場合(ステップS14:YES)、計画部36は、需要家10の経済的メリットがあるものとして、選択された一対の電力価格に対応する時間帯に対して充電及び放電を設定する。具体的には、計画部36は、一対の電力価格のうちの価格が安い方の電力価格としてのA10に対応する時間帯B10を充電制御に設定し、価格が高い方の電力価格としてのA6に対応する時間帯B6を放電制御に設定する(ステップS15)。このとき、計画部36は、制御計画T3に対して設定結果を反映させる。一方、充放電価格比率が充放電効率よりも小さくないと判断した場合(ステップS14:NO)、計画部36は、需要家10の経済的メリットがないものとして、選択された一対の電力価格に対応する時間帯の双方を停止に設定する(ステップS17)。このとき、計画部36は、制御計画T3に対して設定結果を反映させる。
計画部36は、変数Kの値が12であるか否かについて判断する(ステップS16)。変数Kの値が12でないと判断した場合(ステップS16:NO)、計画部36は、第2価格情報T2において未だ全ての時間帯に対して制御が設定されていないものとして、変数Kの値に対して1を加算(ステップS18)した後、ステップS14の判断を再度実行する。一方、変数Kの値が12であると判断した場合(ステップS16:YES)、計画部36は、第2価格情報T2において全ての時間帯に対して制御が設定されているものとして動作を終了する。
===余剰判定部===
以下、図1を参照しながら余剰判定部について説明する。
===余剰判定部===
以下、図1を参照しながら余剰判定部について説明する。
余剰判定部37は、通信装置32が受信した計測情報に基づいて、分散型電源G1の発電量が負荷R1の電力消費量よりも多いか否かを判定する。
発電量が電力消費量よりも多いと余剰判定部37が判定した場合、PV余剰電力が発生しているため、当該PV余剰電力を用いて需要家10の経済的メリット(経済的利益)が発生するように蓄電池12の充放電を制御するのが好ましい。例えば、この場合、充放電制御装置3は、需要家10においてダブル発電が行われないように制御したり、需要家10によって売却されるPV余剰電力の電力量が増大するように制御したり、充電累積単価Xが低下するように制御したりする。尚、ダブル発電とは、PV余剰電力と蓄電池12の放電により出力される電力との双方が配電線L1に対して供給されることを言う。一方、発電量が消費電力量よりも少ないと余剰判定部37が判定した場合、PV余剰電力は発生していないことになる。
===累積単価演算部===
図9は、本実施形態に係る充放電制御装置が適用される配電系統内の蓄電池に対する電力の入出力のイメージを示す図である。以下、図9を参照しながら累積単価演算部について説明する。
===累積単価演算部===
図9は、本実施形態に係る充放電制御装置が適用される配電系統内の蓄電池に対する電力の入出力のイメージを示す図である。以下、図9を参照しながら累積単価演算部について説明する。
累積単価演算部39は、放電可能電力量Sと充電累積単価Xを算出する。
放電可能電力量Sは、蓄電池12の残蓄電量Wbに基づいて放電することができる電力量の最大値に対応している。残蓄電量Wbは、蓄電池12の充電容量Wcのうち現時点で充電されている充電量に対応している。累積単価演算部39は、蓄電池12に供給される電力量を示す充電電力量Wtに基づいて放電可能電力量Sを算出するか、或いは、残蓄電量Wbに基づいて放電可能電力量Sを算出する。具体的には、累積演算部39は、式(1)、式(2)を用いて放電可能電力量Sを算出する。
[数1]
放電可能電力量S=残蓄電量Wb*放電効率q・・・(1)
[数2]
放電可能電力量S=充電電力量Wtの合計*充電効率p*放電効率q・・・(2)
充電累積単価Xは、蓄電池12を充電するために累積した買電電力の価格に応じて定まる価格である。累積単価演算部39は、式(3)を用いて充電累積単価Xを算出する。
[数3]
充電累積単価Xb=(放電可能電力量Sa*充電累積単価Xa+電力価格At*充電電力量Wt*充電効率p*放電効率q)/放電可能電力量Sb・・・(3)
尚、充電累積単価Xa、Xbは夫々、時間Aにおける充電累積単価X、時間Aよりも後の時間Bにおける充電累積単価Xを示している。放電可能電力量Sa、Sbは夫々、時間Aにおける放電可能電力量S、時間Bにおける放電可能電力量Sを示している。電力価格Atは、時間Aから時間Bまでの時間帯における電力価格を示している。充電電力量Wtは、時間Aから時間Bまでの時間帯における充電電力量を示している。
===経済性判定部、制御部===
図10は、本実施形態に係る充放電制御装置が適用される配電系統内の需要家の状態や蓄電池の制御等を示す図である。以下、図7~図10を参照しながら経済性判定部及び判定部について説明する。
[数1]
放電可能電力量S=残蓄電量Wb*放電効率q・・・(1)
[数2]
放電可能電力量S=充電電力量Wtの合計*充電効率p*放電効率q・・・(2)
充電累積単価Xは、蓄電池12を充電するために累積した買電電力の価格に応じて定まる価格である。累積単価演算部39は、式(3)を用いて充電累積単価Xを算出する。
[数3]
充電累積単価Xb=(放電可能電力量Sa*充電累積単価Xa+電力価格At*充電電力量Wt*充電効率p*放電効率q)/放電可能電力量Sb・・・(3)
尚、充電累積単価Xa、Xbは夫々、時間Aにおける充電累積単価X、時間Aよりも後の時間Bにおける充電累積単価Xを示している。放電可能電力量Sa、Sbは夫々、時間Aにおける放電可能電力量S、時間Bにおける放電可能電力量Sを示している。電力価格Atは、時間Aから時間Bまでの時間帯における電力価格を示している。充電電力量Wtは、時間Aから時間Bまでの時間帯における充電電力量を示している。
===経済性判定部、制御部===
図10は、本実施形態に係る充放電制御装置が適用される配電系統内の需要家の状態や蓄電池の制御等を示す図である。以下、図7~図10を参照しながら経済性判定部及び判定部について説明する。
経済性判定部38は、需要家10の経済的メリットについての各判定を行う。
=蓄電池の充電が設定されている時間帯=
制御計画T3において充電が設定されている時間帯(「充電予定時間帯」とも称する)に、経済性判定部38は、電力価格がPV買取価格よりも高いか否かを判定し、PV買取価格が充電累積単価Xよりも高いか否かも判定する。更に、充電予定時間帯に、経済性判定部38は、PV買取価格が充電累積単価Xと所定単価との合計よりも高いか否かを判定する。
=蓄電池の放電が設定されている時間帯=
制御計画T3において放電が設定されている時間帯(「放電予定時間帯」とも称する)に、経済性判定部38は、PV買取価格が電力価格よりも高いか否かを判定し、PV買取価格が充電累積単価Xよりも高いか否かも判定する。更に、放電予定時間帯に、経済性判定部38は、PV買取価格に応じた価格が充電累積単価Xよりも高いか否かを判定する。尚、PV買取価格に応じた価格は、式(4)に基づいて経済性判定部38によって算出されることとする。
[数4]
PV買取価格に応じた価格=(PV買取価格Bt/充電効率p*放電効率q)+所定価格・・・(4)
=蓄電池の充放電の停止が設定されている時間帯=
制御計画T3において停止と設定されている時間帯(「停止予定時間帯」とも称する)に、経済性判定部38は、電力価格が充電累積単価Xよりも高いか否かを判定する。又、経済性判定部38は、電力価格が充電累積単価Xよりも低い場合、充電累積単価X及び電力価格の第1価格差と電力価格及び将来の電力価格の第2価格差との大小を比較し、第1価格差が第2価格差よりも小さいか否かを判定する。又、経済性判定部38は、第1価格差が第2価格差よりも小さい場合、電力価格が充電累積単価X及び所定単価の合計よりも高いか否かを判定する。又、経済性判定部38は、第1価格差が第2価格差よりも大きい場合、電力価格に応じた価格が充電累積単価Xよりも高いか否かを判定する。尚、電力価格に応じた価格は、式(5)に基づいて経済性判定部38によって算出されることとする。
[数5]
電力価格に応じた価格=電力価格At/(充電効率p*放電効率q)+所定価格・・・(5)
制御部40は、経済性判定部38の判定結果に基づいて、蓄電池12の充放電を制御する。尚、式(4)及び式(5)夫々の所定単価と、図11のステップS25において充電累積単価Xと合計される所定単価と、図11のステップS34において充電累積単価Xと合計される所定単価とは、0又は正の値であり、互いに異なる値であっても同じ値であってよいし、入力装置35を介して入力される情報に基づいて設定されることとしてもよい。又、これらの所定単価は、経済性判定部38による判定のマージンとしての機能を発揮する。
===充放電制御装置の動作===
図11は、本実施形態における充放電制御装置の動作を示すフローチャートである。以下、図1、図10及び図11を参照しながら、本実施形態に係る充放電制御装置の動作について説明する。
=蓄電池の充電が設定されている時間帯=
制御計画T3において充電が設定されている時間帯(「充電予定時間帯」とも称する)に、経済性判定部38は、電力価格がPV買取価格よりも高いか否かを判定し、PV買取価格が充電累積単価Xよりも高いか否かも判定する。更に、充電予定時間帯に、経済性判定部38は、PV買取価格が充電累積単価Xと所定単価との合計よりも高いか否かを判定する。
=蓄電池の放電が設定されている時間帯=
制御計画T3において放電が設定されている時間帯(「放電予定時間帯」とも称する)に、経済性判定部38は、PV買取価格が電力価格よりも高いか否かを判定し、PV買取価格が充電累積単価Xよりも高いか否かも判定する。更に、放電予定時間帯に、経済性判定部38は、PV買取価格に応じた価格が充電累積単価Xよりも高いか否かを判定する。尚、PV買取価格に応じた価格は、式(4)に基づいて経済性判定部38によって算出されることとする。
[数4]
PV買取価格に応じた価格=(PV買取価格Bt/充電効率p*放電効率q)+所定価格・・・(4)
=蓄電池の充放電の停止が設定されている時間帯=
制御計画T3において停止と設定されている時間帯(「停止予定時間帯」とも称する)に、経済性判定部38は、電力価格が充電累積単価Xよりも高いか否かを判定する。又、経済性判定部38は、電力価格が充電累積単価Xよりも低い場合、充電累積単価X及び電力価格の第1価格差と電力価格及び将来の電力価格の第2価格差との大小を比較し、第1価格差が第2価格差よりも小さいか否かを判定する。又、経済性判定部38は、第1価格差が第2価格差よりも小さい場合、電力価格が充電累積単価X及び所定単価の合計よりも高いか否かを判定する。又、経済性判定部38は、第1価格差が第2価格差よりも大きい場合、電力価格に応じた価格が充電累積単価Xよりも高いか否かを判定する。尚、電力価格に応じた価格は、式(5)に基づいて経済性判定部38によって算出されることとする。
[数5]
電力価格に応じた価格=電力価格At/(充電効率p*放電効率q)+所定価格・・・(5)
制御部40は、経済性判定部38の判定結果に基づいて、蓄電池12の充放電を制御する。尚、式(4)及び式(5)夫々の所定単価と、図11のステップS25において充電累積単価Xと合計される所定単価と、図11のステップS34において充電累積単価Xと合計される所定単価とは、0又は正の値であり、互いに異なる値であっても同じ値であってよいし、入力装置35を介して入力される情報に基づいて設定されることとしてもよい。又、これらの所定単価は、経済性判定部38による判定のマージンとしての機能を発揮する。
===充放電制御装置の動作===
図11は、本実施形態における充放電制御装置の動作を示すフローチャートである。以下、図1、図10及び図11を参照しながら、本実施形態に係る充放電制御装置の動作について説明する。
充放電制御装置3は、前日最終の充電累積単価X、放電可能電力量S及び制御計画T3を読み込む(ステップS21)。尚、ステップS21において読み込まれる情報は、記憶装置33に予め記憶されていることとしてもよい。
充放電制御装置3は、現在の時間帯が充電予定時間帯、放電予定時間帯、停止予定時間帯のうちの何れの時間帯であるかを判断する(ステップS22)。例えば、現在の時間帯が時間帯B2、B7、B10(図7)の夫々の場合、充放電制御装置3は、停止予定時間帯、放電予定時間帯、充電予定時間帯であると判断する。
=充電予定時間帯の制御=
現在の時間帯が充電予定時間帯であると判断された場合(ステップS22:充電)、余剰判定部37は、分散型電源G1の発電量が負荷R1の電力消費量よりも多いか否かを判定する(ステップS31)。発電量が電力消費量よりも少ないと余剰判定部37が判定した場合(ステップS31:NO)、制御部40は、契約電力範囲内で蓄電池12が充電されるように制御する(ステップS35)。一方、発電量が電力消費量よりも多いと余剰判定部37が判定した場合(ステップS31:YES)、PV余剰電力が発生しているものとして、以下の判定及び制御が行われる。
<電力価格、PV買取価格>
経済性判定部38は、電力価格がPV買取価格よりも高いか否かを判定する(ステップS32)。電力価格がPV買取価格よりも高いと経済性判定部38が判定した場合(ステップS32:YES)、蓄電池12が充電されることに基づく需要家10の経済的メリットが発生するものと経済性判定部38が判定したことになる。この場合、制御部40は、ステップS35の動作を行う。この場合、PV余剰電力が蓄電池12に供給されるため、買電電力の電力量が減少する。従って、需要家10から電気事業者に支払われる対価の額が減少し、需要家10の経済的メリットが発生する。
=充電予定時間帯の制御=
現在の時間帯が充電予定時間帯であると判断された場合(ステップS22:充電)、余剰判定部37は、分散型電源G1の発電量が負荷R1の電力消費量よりも多いか否かを判定する(ステップS31)。発電量が電力消費量よりも少ないと余剰判定部37が判定した場合(ステップS31:NO)、制御部40は、契約電力範囲内で蓄電池12が充電されるように制御する(ステップS35)。一方、発電量が電力消費量よりも多いと余剰判定部37が判定した場合(ステップS31:YES)、PV余剰電力が発生しているものとして、以下の判定及び制御が行われる。
<電力価格、PV買取価格>
経済性判定部38は、電力価格がPV買取価格よりも高いか否かを判定する(ステップS32)。電力価格がPV買取価格よりも高いと経済性判定部38が判定した場合(ステップS32:YES)、蓄電池12が充電されることに基づく需要家10の経済的メリットが発生するものと経済性判定部38が判定したことになる。この場合、制御部40は、ステップS35の動作を行う。この場合、PV余剰電力が蓄電池12に供給されるため、買電電力の電力量が減少する。従って、需要家10から電気事業者に支払われる対価の額が減少し、需要家10の経済的メリットが発生する。
一方、電力価格がPV買取価格よりも低いと経済性判定部38が判定した場合(ステップS32:NO)、経済性判定部38は、PV買取価格が充電累積単価Xよりも高いか否かを判定する(ステップS33)。
<PV買取価格、充電累積単価X>
PV買取価格が充電累積単価Xよりも低いと経済性判定部38が判定した場合(ステップS33:YES)、蓄電池12が充電されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、ステップS35の動作を行う。従って、ステップS32:YESの場合と同様に需要家10の経済的メリットが発生する。更に、充電累積単価Xの額が減少する点においても、需要家10の経済的メリットが発生する。
<PV買取価格、充電累積単価X>
PV買取価格が充電累積単価Xよりも低いと経済性判定部38が判定した場合(ステップS33:YES)、蓄電池12が充電されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、ステップS35の動作を行う。従って、ステップS32:YESの場合と同様に需要家10の経済的メリットが発生する。更に、充電累積単価Xの額が減少する点においても、需要家10の経済的メリットが発生する。
一方、PV買取価格が充電累積単価Xよりも高いと経済性判定部38が判定した場合(ステップS33:NO)、経済性判定部38は、PV買取価格が充電累積単価Xと所定単価との合計よりも高いか否かを判定する(ステップS34)。
<PV買取価格、充電累積単価Xと所定単価との合計>
PV買取価格が充電累積単価Xと所定単価との合計よりも高いと経済性判定部38が判定した場合(ステップS34:YES)、蓄電池12の充放電が停止されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、蓄電池12の充放電が停止されるように制御する(ステップS27)。この場合、蓄電池12に対してPV余剰電力が供給されないため、需要家10から電気事業者に対して売却されるPV余剰電力の電力量を増大させることができる。従って、電気事業者から需要家10に支払われる対価の額が増大し、需要家10の経済的メリットが発生する。
<PV買取価格、充電累積単価Xと所定単価との合計>
PV買取価格が充電累積単価Xと所定単価との合計よりも高いと経済性判定部38が判定した場合(ステップS34:YES)、蓄電池12の充放電が停止されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、蓄電池12の充放電が停止されるように制御する(ステップS27)。この場合、蓄電池12に対してPV余剰電力が供給されないため、需要家10から電気事業者に対して売却されるPV余剰電力の電力量を増大させることができる。従って、電気事業者から需要家10に支払われる対価の額が増大し、需要家10の経済的メリットが発生する。
一方、PV買取価格が充電累積単価Xと所定単価との合計よりも低いと経済性判定部38が判定した場合(ステップS34:NO)、蓄電池12が充電されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、ステップS35の動作を行う。
ステップS35の動作が行われると、充放電制御装置3は、充電電力量Wtを積算し(ステップS36)、放電可能電力量Sを計算し(ステップS37)、充電累積単価Xを計算する(ステップS38)。尚、ステップS37において、充放電制御装置3は、ステップS36で積算された充電電力量Wtと充電効率pと放電効率qとの積と、ステップS35において充電される前の放電可能電力量Sとの合計を放電可能電力量Sとして計算する。
充放電制御装置3は、制御計画T3の全ての時間帯において制御が行われたか否かを判断する(ステップS58)。つまり、充放電制御装置3は、1日における蓄電池12の制御が全て行われたか否かを判断する。1日における蓄電池12の制御が全て行われたと判断した場合(ステップS58:YES)、充放電制御装置3は、動作を終了する。一方、1日における蓄電池12の制御が全て行われたと判断しない場合(ステップS58:NO)、充放電制御装置3は、ステップS22の判断を再度実行する。
=放電予定時間帯の制御=
現在の時間帯が放電予定時間帯であると判断された場合(ステップS22:放電)、余剰判定部37は、ステップS41の判定を行う。尚、ステップS41の判定は、ステップS31の判定と同様である。発電量が電力消費量よりも少ないと余剰判定部37が判定した場合(ステップS41:NO)、制御部40は、逆潮しない範囲で蓄電池12が放電されるように制御する(ステップS55)。尚、逆潮しない範囲とは、例えば、需要家10において予め設定されている電力量の範囲内であることを示していることとしてもよい。ステップS55の動作が行われると、充放電制御装置3は、放電電力量Ptを積算し(ステップS56)、放電可能電力量Sを計算(ステップS57)した後、ステップS58の判断を行う。尚、ステップS57において、充放電制御装置3は、ステップS55で放電される前の放電可能電力量Sに対するステップS56で積算された放電電力量Ptの差分を放電可能電力量Sとして計算する。
=放電予定時間帯の制御=
現在の時間帯が放電予定時間帯であると判断された場合(ステップS22:放電)、余剰判定部37は、ステップS41の判定を行う。尚、ステップS41の判定は、ステップS31の判定と同様である。発電量が電力消費量よりも少ないと余剰判定部37が判定した場合(ステップS41:NO)、制御部40は、逆潮しない範囲で蓄電池12が放電されるように制御する(ステップS55)。尚、逆潮しない範囲とは、例えば、需要家10において予め設定されている電力量の範囲内であることを示していることとしてもよい。ステップS55の動作が行われると、充放電制御装置3は、放電電力量Ptを積算し(ステップS56)、放電可能電力量Sを計算(ステップS57)した後、ステップS58の判断を行う。尚、ステップS57において、充放電制御装置3は、ステップS55で放電される前の放電可能電力量Sに対するステップS56で積算された放電電力量Ptの差分を放電可能電力量Sとして計算する。
ステップS41において、発電量が電力消費量よりも多いと余剰判定部37が判定した場合(ステップS41:YES)、PV余剰電力が発生しているものとして、以下の判定及び制御が行われる。
<PV買取価格、電力価格>
経済性判定部38は、PV買取価格が電力価格よりも高いか否かを判定する(ステップS42)。PV買取価格が電力価格よりも高いと経済性判定部38が判定した場合(ステップS42:NO)、蓄電池12の充放電が停止されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、ステップS26の動作を行う。従って、需要家10がダブル発電状態となるのを防止しつつ、PV余剰電力を需要家10が電気事業者に売却することができる。よって、電気事業者から需要家10に対して対価が支払われることになり、需要家10の経済的メリットが発生する。
<PV買取価格、電力価格>
経済性判定部38は、PV買取価格が電力価格よりも高いか否かを判定する(ステップS42)。PV買取価格が電力価格よりも高いと経済性判定部38が判定した場合(ステップS42:NO)、蓄電池12の充放電が停止されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、ステップS26の動作を行う。従って、需要家10がダブル発電状態となるのを防止しつつ、PV余剰電力を需要家10が電気事業者に売却することができる。よって、電気事業者から需要家10に対して対価が支払われることになり、需要家10の経済的メリットが発生する。
尚、ダブル発電状態とは、PV余剰電力と蓄電池12の放電により出力される電力との双方が配電線L1に対して供給される状態である。ダブル発電状態となった場合は、PV買取価格の額が低下するように、需要家10と電気事業者との間の電気契約により定められているため、需要家10の経済的メリットを発生させて増大させるために、ダブル発電状態となるのを防止する必要がある。
一方、PV買取価格が電力価格よりも低いと経済性判定部38が判定した場合(ステップS42:YES)、経済性判定部38は、PV買取価格が充電累積単価Xよりも高いか否かを判定する(ステップS43)。
<PV買取価格、充電累積単価X>
PV買取価格が充電累積単価Xよりも高いと判定した場合(ステップS43:NO)、蓄電池12の充放電が停止されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、ステップS26の動作を行う。従って、ステップS42:NOの場合と同様に経済的メリットが発生する。
<PV買取価格、充電累積単価X>
PV買取価格が充電累積単価Xよりも高いと判定した場合(ステップS43:NO)、蓄電池12の充放電が停止されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、ステップS26の動作を行う。従って、ステップS42:NOの場合と同様に経済的メリットが発生する。
一方、PV買取価格が充電累積単価Xよりも低いと経済性判定部38が判定した場合(ステップS43:YES)、PV買取価格に応じた価格が充電累積単価Xよりも高いか否かを判定する(ステップS44)。
<PV買取価格に応じた価格、充電累積単価X>
PV買取価格に応じた価格が充電累積単価Xよりも低いと経済性判定部38が判定した場合(ステップS44:YES)、蓄電池12が充電されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、PV余剰電力が蓄電池12に充電されるように制御する(ステップS45)。この場合、ステップS33:YESの場合と同様に経済的メリットが発生することになる。更に、需要家10がダブル発電状態となるのが防止される。ステップ45の動作が行われると、充放電制御装置3は、ステップS46~S48の動作を行った後、ステップS58の判断を行う。尚、ステップS46~S48の夫々の動作は、ステップS36~S38の動作と同様である。
<PV買取価格に応じた価格、充電累積単価X>
PV買取価格に応じた価格が充電累積単価Xよりも低いと経済性判定部38が判定した場合(ステップS44:YES)、蓄電池12が充電されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、PV余剰電力が蓄電池12に充電されるように制御する(ステップS45)。この場合、ステップS33:YESの場合と同様に経済的メリットが発生することになる。更に、需要家10がダブル発電状態となるのが防止される。ステップ45の動作が行われると、充放電制御装置3は、ステップS46~S48の動作を行った後、ステップS58の判断を行う。尚、ステップS46~S48の夫々の動作は、ステップS36~S38の動作と同様である。
一方、PV買取価格に応じた価格が充電累積単価Xよりも高いと経済性判定部38が判定した場合(ステップS44:NO)、蓄電池12の充放電が停止されることに基づく需要家10の経済的メリットが発生すると経済性判定部38が判定したことになる。この場合、制御部40は、ステップS26の動作を行う。
=停止予定時間帯の制御=
<電力価格、充電累積単価>
現在の時間帯が停止予定時間帯であると判断された場合(ステップS22:停止)、経済性判定部38は、電力価格が充電累積単価Xよりも高いか否かを判定する(ステップS23)。
<第1価格差、第2価格差>
電力価格が充電累積単価Xよりも低いと経済性判定部38が判定した場合(ステップS23:YES)、経済性判定部38は、充電累積単価Xと現在の電力価格Ctとの第1価格差(X-Ct)が現在の電力価格Ctと将来の電力価格A1との第2価格差(Ct-A1)より小さいか否かを判定する。即ち、経済性判定部38は、蓄電池12が放電することに基づく損失よりも充電することに基づく利益の方が大きいか否かを判定する(ステップS24)。尚、将来の電力価格A1とは、将来の時間帯に設定される予め分かっている電力価格である。
<電力価格、充電累積単価に応じた価格>
電力価格が充電累積単価Xよりも大きいと経済性判定部38が判定した場合(ステップS23:NO)、又は、第1価格差が第2価格差よりも小さいと経済性判定部38が判定した場合(ステップS24:YES)、経済性判定部38は、現在の電力価格Ctが充電累積単価Xと所定単価との合計よりも高いか否かを判定する。即ち、経済性判定部38は、蓄電池12が放電されることに基づく経済的メリットが発生するか否かを判定する(ステップS25)。そして、現在の電力価格Ctが充電累積単価Xと所定単価との合計よりも高いと経済性判定部38が判定した場合(ステップS25:YES)、ステップS41の動作を行う。一方、現在の電力価格Ctが充電累積単価Xと所定単価との合計よりも低いと経済性判定部38が判定した場合(ステップS25:NO)、ステップS27の動作を行う。
<電力価格に応じた価格、充電累積単価X>
第1価格差が第2価格差よりも大きいと経済性判定部38が判定した場合(ステップS24:NO)、経済性判定部38は、電力価格に応じた価格が充電累積単価Xよりも低いか否かを判定する。即ち、経済性判定部38は、蓄電池12が充電されることに基づく経済的メリットが発生するか否かを判定する(ステップS26)。尚、電力価格に応じた値は、Ct/(p*q)+βで表される。βは所定価格である。そして、電力価格に応じた価格が充電累積単価Xよりも低いと経済性判定部38が判定した場合(ステップS26:YES)、ステップS31の動作を行う。一方、電力価格に応じた価格が充電累積単価Xよりも高いと経済性判定部38が判定した場合(ステップS26:NO)、ステップS27の動作を行う。
=停止予定時間帯の制御=
<電力価格、充電累積単価>
現在の時間帯が停止予定時間帯であると判断された場合(ステップS22:停止)、経済性判定部38は、電力価格が充電累積単価Xよりも高いか否かを判定する(ステップS23)。
<第1価格差、第2価格差>
電力価格が充電累積単価Xよりも低いと経済性判定部38が判定した場合(ステップS23:YES)、経済性判定部38は、充電累積単価Xと現在の電力価格Ctとの第1価格差(X-Ct)が現在の電力価格Ctと将来の電力価格A1との第2価格差(Ct-A1)より小さいか否かを判定する。即ち、経済性判定部38は、蓄電池12が放電することに基づく損失よりも充電することに基づく利益の方が大きいか否かを判定する(ステップS24)。尚、将来の電力価格A1とは、将来の時間帯に設定される予め分かっている電力価格である。
<電力価格、充電累積単価に応じた価格>
電力価格が充電累積単価Xよりも大きいと経済性判定部38が判定した場合(ステップS23:NO)、又は、第1価格差が第2価格差よりも小さいと経済性判定部38が判定した場合(ステップS24:YES)、経済性判定部38は、現在の電力価格Ctが充電累積単価Xと所定単価との合計よりも高いか否かを判定する。即ち、経済性判定部38は、蓄電池12が放電されることに基づく経済的メリットが発生するか否かを判定する(ステップS25)。そして、現在の電力価格Ctが充電累積単価Xと所定単価との合計よりも高いと経済性判定部38が判定した場合(ステップS25:YES)、ステップS41の動作を行う。一方、現在の電力価格Ctが充電累積単価Xと所定単価との合計よりも低いと経済性判定部38が判定した場合(ステップS25:NO)、ステップS27の動作を行う。
<電力価格に応じた価格、充電累積単価X>
第1価格差が第2価格差よりも大きいと経済性判定部38が判定した場合(ステップS24:NO)、経済性判定部38は、電力価格に応じた価格が充電累積単価Xよりも低いか否かを判定する。即ち、経済性判定部38は、蓄電池12が充電されることに基づく経済的メリットが発生するか否かを判定する(ステップS26)。尚、電力価格に応じた値は、Ct/(p*q)+βで表される。βは所定価格である。そして、電力価格に応じた価格が充電累積単価Xよりも低いと経済性判定部38が判定した場合(ステップS26:YES)、ステップS31の動作を行う。一方、電力価格に応じた価格が充電累積単価Xよりも高いと経済性判定部38が判定した場合(ステップS26:NO)、ステップS27の動作を行う。
[第2実施形態]
第2実施形態における充放電制御装置3B(図3)は、第1実施形態の充放電制御装置3における経済性判定部38以外の構成を有し、計画部36、制御部40を夫々、計画部36B、制御部40Bに変更したものである。充放電制御装置3Bのこれらの構成以外は充放電制御装置3の構成と同様である。
===充放電制御装置===
図12は、本実施形態に係る充放電制御装置で用いられる第4価格情報を示すグラフであり、図13は、本実施形態に係る充放電制御装置の動作を示すフローチャートである。尚、図11と同様な動作には、同様な符号を付しその説明については省略する。以下、図3、図12及び図13を参照しながら充放電制御装置3Bについて説明する。
第2実施形態における充放電制御装置3B(図3)は、第1実施形態の充放電制御装置3における経済性判定部38以外の構成を有し、計画部36、制御部40を夫々、計画部36B、制御部40Bに変更したものである。充放電制御装置3Bのこれらの構成以外は充放電制御装置3の構成と同様である。
===充放電制御装置===
図12は、本実施形態に係る充放電制御装置で用いられる第4価格情報を示すグラフであり、図13は、本実施形態に係る充放電制御装置の動作を示すフローチャートである。尚、図11と同様な動作には、同様な符号を付しその説明については省略する。以下、図3、図12及び図13を参照しながら充放電制御装置3Bについて説明する。
第4価格情報T4は、第1価格情報T1(図4)と同様な情報である。尚、第4価格情報T4のPV買取価格は、固定単価に基づいて定められている。固定単価とは、各時間帯において変動しない単価を言う。又、第4価格情報T4のPV買取価格は、電力価格よりも高く設定されている。
充放電制御装置3Bは、計画部36B、余剰判定部37、累積単価演算部39、制御部40Bを含んで構成される。
計画部36Bは、第4価格情報T4に基づいて所定の制御計画を作成する。尚、計画部36Bが所定の制御計画を作成する構成は、計画部36が制御計画T3を作成する構成と同様である。
制御部40Bは、余剰判定部37の判定結果に基づいて蓄電池12の充放電を制御する。
具体的には、余剰判定部37は、ステップS61、S62(図13)において、ステップS31、S41(図11)と同様な判定を行う。分散型電源G1の発電量が負荷R1の電力消費量よりも少ないと余剰判定部37が判定した場合(ステップS61:NO、ステップS62:NO)、制御部40Bは、ステップS35、S55の動作を行う。一方、分散型電源G1の発電量が負荷R1の電力消費量よりも多いと余剰判定部37が判定した場合(ステップS61:YES、ステップS62:YES)、制御部40Bは、PV余剰電力が発生しているものとして、蓄電池12が充放電されないように制御する(ステップS27)。尚、ステップS61:YESの場合、ステップS34:YESの場合と同様な経済的メリットが発生する。又、ステップS62:YESの場合、ステップS42:NOの場合と同様な経済的メリットが発生する。
以上説明したように、充放電制御装置3は、負荷R1と、負荷R1に電力を供給する分散型電源G1と、負荷R1及び分散型電源G1に接続される蓄電池12と、を有する需要家10において、蓄電池12の充電、放電、充電及び放電の停止が各時間帯に対して予め計画される制御計画T3に従って、蓄電池12の充放電を制御する。充放電制御装置3は、蓄電池12の充電及び放電の停止が予め計画されている時間帯において、需要家10に供給される電力の現在の電力価格Ctが蓄電池12に充電された容量に対応する充電累積単価Xより低い場合、充電累積単価X及び電力価格Ctの第1価格差(X-Ct)と現在の電力価格Ct及び将来の電力価格A1の第2価格差(Ct-A1)とを比較する。又、充放電制御装置3は、第1価格差が第2価格差より小さい場合、現在の電力価格Ctと充電累積単価Xと所定単価との合計とを比較する。又、充放電制御装置3は、現在の電力価格Ctが充電累積単価Xと所定単価との合計よりも高い場合、分散型電源G1の発電量と負荷R1の電力消費量との差に応じて、需要家10の経済的利益が発生するものとして、蓄電池12を放電するように制御する。従って、現在の時間帯が停止予定時間帯に設定されている場合であっても、蓄電池12の充放電に基づく経済的メリットが発生するように、蓄電池12の充放電を制御することが可能になる。
又、充放電制御装置3は、分散型電源G1の発電量と負荷R1の電力消費量とを比較し、分散型電源G1の発電量が負荷R1の電力消費量より少ない場合、分散型電源G1による余剰電力はないものとして、蓄電池12を放電するように制御する。
又、充放電制御装置3は、現在の電力価格Ctが充電累積単価Xと所定単価との合計より低い場合、蓄電池12を充放電しないように制御する。
又、充放電制御装置3は、第1価格差が第2価格差より大きい場合、現在の電力価格Ctに応じた価格と充電累積単価Xとを比較し、現在の電力価格Ctに応じた価格が充電累積単価Xより低い場合、需要家10の経済的メリットが発生するものとして、蓄電池12を充電するように制御する。
又、充放電制御装置3は、分散型電源G1の発電量が負荷R1の電力消費量より少ない場合、分散型電源G1による余剰電力はないものとして、蓄電池12を充電するように制御する。
又、充放電制御装置3は、現在の電力価格Ctに応じた価格が充電累積単価Xより高い場合、蓄電池12を充放電しないように制御する。
又、制御計画T3は、1日の中で1時間を単位とする24の時間帯に対して予め計画される。
又、充放電制御装置3は、24の各時間帯に対して蓄電池12の充放電を制御する。
尚、第1及び第2実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得るとともに、本発明にはその等価物も含まれる。
第1実施形態においては、ステップS31:YESの場合、ステップS32~S34の判断及びこれらの判断結果に基づく制御が行われることについて説明したが、これに限定されるものではない。例えば、ステップS31:YESの後の判断として、ステップS32~S34のうちの少なくとも1つの判断及び制御がされることしてもよい。つまり、ステップS32~S34のうちの何れか1つのみが設けられていることとしてもよいし、ステップS32、S33のみ、又は、ステップS33、S34のみ、又は、ステップS32、S34のみが設けられていることとしてもよい。又、例えば、ステップS41:YESの場合も、同様にして、テップS42~S44のうちの少なくとも1つの判断及び制御がされることしてもよい。
又、第1実施形態においては、分散型電源G1が太陽光発電装置であることについて説明したが、これに限定されるものではない。例えば、分散型電源G1が風力発電装置であることとしてもよい。
又、第1実施形態においては、制御計画T3が計画部36によって作成されることについて説明したが、これに限定されるものではない。例えば、制御計画T3は予め定められていることとしてもよいし、制御計画T3を示す情報が入力装置35を介して入力されることとしてもよい。
又、第1実施形態においては、第1価格情報T1が1時間毎の電力価格等を示していることについて説明したが、これに限定されるものではない。例えば、第1価格情報T1が30分等毎の電力価格等を示していることとしてもよい。
又、第1実施形態においては、第1価格情報T1において、売電電力の価格と買電電力の価格とが同価格であることについて説明したが、これに限定されるものではない。例えば、同じ時間帯における売電電力の価格と買電電力の価格とが相互に異なることとしてもよい。
又、充放電制御装置3の構成と同様な構成を有する他の充放電制御装置を用いて、例えば、配電線L1に接続されているフライホイール等の電力貯蔵装置と配電線L1との間の電力の授受を制御することとしてもよい
又、例えば、充放電装置11が充放電制御装置3の機能を発揮することとしてもよいし、計測装置M1が充放電制御装置3の機能を発揮することとしてもよい。
又、例えば、充放電装置11が充放電制御装置3の機能を発揮することとしてもよいし、計測装置M1が充放電制御装置3の機能を発揮することとしてもよい。
尚、本実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得るとともに、本発明にはその等価物も含まれる。
G1 分散型電源
R1 負荷
L1 配電線
3,3B 充放電制御装置
10 需要家
11 充放電装置
12 蓄電池
31 CPU
32 通信装置
33 記憶装置
34 表示装置
35 入力装置
36,36B 計画部
37 余剰判定部
38 経済性判定部
39 累積単価演算部
40,40B 制御部
100 配電系統
101 配電用変圧器
R1 負荷
L1 配電線
3,3B 充放電制御装置
10 需要家
11 充放電装置
12 蓄電池
31 CPU
32 通信装置
33 記憶装置
34 表示装置
35 入力装置
36,36B 計画部
37 余剰判定部
38 経済性判定部
39 累積単価演算部
40,40B 制御部
100 配電系統
101 配電用変圧器
Claims (10)
- 電力負荷と、前記電力負荷に電力を供給する分散型電源と、前記電力負荷及び前記分散型電源に接続される蓄電池と、を有する需要家において、前記蓄電池の充電、放電、充電及び放電の停止が各時間帯に対して予め計画される制御計画に従って、前記蓄電池の充放電を制御する充放電制御装置であって、
前記蓄電池の充電及び放電の停止が予め計画されている時間帯において、前記需要家に供給される電力の買電価格が前記蓄電池に充電された容量に対応する充電累積単価より低い場合、前記充電累積単価及び前記買電価格の第1価格差と前記買電価格及び将来の買電価格の第2価格差とを比較する第1比較装置と、
前記第1価格差が前記第2価格差より小さい場合、前記買電価格と前記充電累積単価に応じた価格とを比較する第2比較装置と、
前記買電価格が前記充電累積単価に応じた価格より高い場合、前記分散型電源の発電量と前記電力負荷の電力消費量との差に応じて、前記需要家の経済的利益が発生するものとして、前記蓄電池を放電するように制御する制御装置と、
を備えたことを特徴とする充放電制御装置。 - 前記分散型電源の発電量と前記電力負荷の電力消費量とを比較する第3比較装置を更に備え、
前記制御装置は、前記分散型電源の発電量が前記電力負荷の電力消費量より少ない場合、前記分散型電源による余剰電力はないものとして、前記蓄電池を放電するように制御する
ことを特徴とする請求項1に記載の充放電制御装置。 - 前記制御装置は、前記買電価格が前記充電累積単価に応じた価格より低い場合、前記蓄電池を充放電しないように制御する
ことを特徴とする請求項1又は2に記載の充放電制御装置。 - 前記第1価格差が前記第2価格差より大きい場合、前記買電価格に応じた価格と前記充電累積単価とを比較する第4比較装置を更に備え、
前記制御装置は、前記買電価格に応じた価格が前記充電累積単価より低い場合、前記需要家の経済的利益が発生するものとして、前記蓄電池を充電するように制御する
ことを特徴とする請求項2又は3に記載の充放電制御装置。 - 前記制御装置は、前記分散型電源の発電量が前記電力負荷の電力消費量より少ない場合、前記分散型電源による余剰電力はないものとして、前記蓄電池を充電するように制御する
ことを特徴とする請求項4に記載の充放電制御装置。 - 前記制御装置は、前記買電価格に応じた価格が前記充電累積単価より高い場合、前記蓄電池を充放電しないように制御する
ことを特徴とする請求項4又は5に記載の充放電制御装置。 - 前記制御計画は、1日の中で1時間を単位とする24の時間帯に対して予め計画される
ことを特徴とする請求項1乃至6の何れかに記載の充放電制御装置。 - 前記制御装置は、前記24の各時間帯に対して前記蓄電池の充放電を制御する
ことを特徴とする請求項7に記載の充放電制御装置。 - 電力負荷と、前記電力負荷に電力を供給する分散型電源と、前記電力負荷及び前記分散型電源に接続される蓄電池と、を有する需要家において、前記蓄電池の充電、放電、充電及び放電の停止が各時間帯に対して予め計画される制御計画に従って、前記蓄電池の充放電を制御する充放電制御装置に、
前記蓄電池の充電及び放電の停止が予め計画されている時間帯において、前記需要家に供給される電力の買電価格が前記蓄電池に充電された容量に対応する充電累積単価より低い場合、前記充電累積単価及び前記買電価格の第1価格差と前記買電価格及び将来の買電価格の第2価格差とを比較する機能と、
前記第1価格差が前記第2価格差より小さい場合、前記買電価格と前記充電累積単価に応じた価格とを比較する機能と、
前記買電価格が前記充電累積単価に応じた価格より高い場合、前記分散型電源の発電量と前記電力負荷の電力消費量との差に応じて、前記需要家の経済的利益が発生するものとして、前記蓄電池を放電するように制御する機能と、
を実現させるプログラム。 - 電力負荷と、前記電力負荷に電力を供給する分散型電源と、前記電力負荷及び前記分散型電源に接続される蓄電池と、を有する需要家において、前記蓄電池の充電、放電、充電及び放電の停止が各時間帯に対して予め計画される制御計画に従って、前記蓄電池の充放電を制御する充放電制御方法であって、
前記蓄電池の充電及び放電の停止が予め計画されている時間帯において、前記需要家に供給される電力の買電価格が前記蓄電池に充電された容量に対応する充電累積単価より低い場合、前記充電累積単価及び前記買電価格の第1価格差と前記買電価格及び将来の買電価格の第2価格差とを比較し、
前記第1価格差が前記第2価格差より小さい場合、前記買電価格と前記充電累積単価に応じた価格とを比較し、
前記買電価格が前記充電累積単価に応じた価格より高い場合、前記分散型電源の発電量と前記電力負荷の電力消費量との差に応じて、前記需要家の経済的利益が発生するものとして、前記蓄電池を放電するように制御する
ことを特徴とする充放電制御方法。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015530193A JP5833283B1 (ja) | 2014-11-21 | 2014-11-21 | 充放電制御装置、プログラム、充放電制御方法 |
PCT/JP2014/080885 WO2016079863A1 (ja) | 2014-11-21 | 2014-11-21 | 充放電制御装置、プログラム、充放電制御方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2014/080885 WO2016079863A1 (ja) | 2014-11-21 | 2014-11-21 | 充放電制御装置、プログラム、充放電制御方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2016079863A1 true WO2016079863A1 (ja) | 2016-05-26 |
Family
ID=54874346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2014/080885 WO2016079863A1 (ja) | 2014-11-21 | 2014-11-21 | 充放電制御装置、プログラム、充放電制御方法 |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP5833283B1 (ja) |
WO (1) | WO2016079863A1 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160241072A1 (en) * | 2013-12-10 | 2016-08-18 | The Chugoku Electric Power Co., Inc. | Charge/discharge control device and program |
JP2017224208A (ja) * | 2016-06-16 | 2017-12-21 | 株式会社東芝 | 蓄電池制御システム、方法及びプログラム |
CN118288838A (zh) * | 2024-04-26 | 2024-07-05 | 江阴复睿技术有限公司 | 一种新能源汽车的智能充电方法、电子设备和存储介质 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7299220B2 (ja) * | 2018-07-30 | 2023-06-27 | 出光興産株式会社 | プログラム、制御方法及び電力制御システム |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004048982A (ja) * | 2002-05-21 | 2004-02-12 | Sumitomo Electric Ind Ltd | 二次電池の使用方法及び受電システム |
WO2011142114A1 (ja) * | 2010-05-10 | 2011-11-17 | パナソニック株式会社 | 制御装置、蓄電システム、制御方法およびコンピュータプログラム |
JP5579954B1 (ja) * | 2013-10-31 | 2014-08-27 | 中国電力株式会社 | 蓄電池の充放電計画装置、蓄電池の充放電計画方法、プログラム、蓄電池の充放電装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160046895A (ko) * | 2013-12-10 | 2016-04-29 | 쥬코쿠 덴료쿠 가부시키 가이샤 | 충방전 제어 장치, 프로그램 |
-
2014
- 2014-11-21 JP JP2015530193A patent/JP5833283B1/ja active Active
- 2014-11-21 WO PCT/JP2014/080885 patent/WO2016079863A1/ja active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004048982A (ja) * | 2002-05-21 | 2004-02-12 | Sumitomo Electric Ind Ltd | 二次電池の使用方法及び受電システム |
WO2011142114A1 (ja) * | 2010-05-10 | 2011-11-17 | パナソニック株式会社 | 制御装置、蓄電システム、制御方法およびコンピュータプログラム |
JP5579954B1 (ja) * | 2013-10-31 | 2014-08-27 | 中国電力株式会社 | 蓄電池の充放電計画装置、蓄電池の充放電計画方法、プログラム、蓄電池の充放電装置 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160241072A1 (en) * | 2013-12-10 | 2016-08-18 | The Chugoku Electric Power Co., Inc. | Charge/discharge control device and program |
JP2017224208A (ja) * | 2016-06-16 | 2017-12-21 | 株式会社東芝 | 蓄電池制御システム、方法及びプログラム |
CN118288838A (zh) * | 2024-04-26 | 2024-07-05 | 江阴复睿技术有限公司 | 一种新能源汽车的智能充电方法、电子设备和存储介质 |
Also Published As
Publication number | Publication date |
---|---|
JPWO2016079863A1 (ja) | 2017-04-27 |
JP5833283B1 (ja) | 2015-12-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7179500B2 (ja) | 蓄電池管理装置、蓄電池管理方法および蓄電池管理プログラム | |
JP5807201B2 (ja) | 電力制御装置 | |
CN109937431B (zh) | 用于管理电力供应/需求的调度设备、方法及计算机可读存储介质 | |
Imani et al. | Implementing Time-of-Use Demand Response Program in microgrid considering energy storage unit participation and different capacities of installed wind power | |
WO2014208059A1 (ja) | 電力調整装置、電力調整方法、電力調整システム、蓄電装置、サーバ、プログラム | |
JP6838792B2 (ja) | 制御装置、制御システム、制御装置の動作方法及びプログラム | |
JP6732552B2 (ja) | 蓄電池制御システム、方法及びプログラム | |
JP6763193B2 (ja) | 需給計画装置、需給計画方法及びプログラム | |
JP5833283B1 (ja) | 充放電制御装置、プログラム、充放電制御方法 | |
JP5579954B1 (ja) | 蓄電池の充放電計画装置、蓄電池の充放電計画方法、プログラム、蓄電池の充放電装置 | |
Tsagkou et al. | Stacking grid services with energy storage techno-economic analysis | |
JP5654179B1 (ja) | 充放電制御装置、プログラム | |
JP2015087886A (ja) | 売電計画作成方法、売電計画作成装置、売電計画作成システム及び売電計画作成プログラム | |
JP7074724B2 (ja) | 情報処理装置、情報処理方法及びプログラム | |
US10742037B2 (en) | Managing consumer energy demand | |
JP2002064934A (ja) | 電力供給管理システムおよび方法 | |
Galiana et al. | Economics of electricity generation | |
KR102018875B1 (ko) | 에너지 저장장치의 전력관리장치 및 전력관리방법 | |
WO2017022000A1 (en) | Information processing apparatus, charge or discharge scheduling method, and program | |
JP6787706B2 (ja) | 蓄電制御装置、蓄電池システム及び蓄電制御プログラム | |
JP7092558B2 (ja) | 電力需要調整装置、電力需要調整システム、電力需要調整方法及び電力需要調整プログラム | |
JP6462284B2 (ja) | エネルギー管理システム及びエネルギー管理方法 | |
Belonogova et al. | Methodology to define a BESS operating strategy for the end-customer in the changing business environment | |
Chawda et al. | Dynamic Sale Price Setting for Load Serving Entity’s Profit Maximization | |
KR20230161022A (ko) | 불확실성 비용 및 에너지 비용 최소화를 위한 p2p 에너지 거래 시스템 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ENP | Entry into the national phase |
Ref document number: 2015530193 Country of ref document: JP Kind code of ref document: A |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14906420 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 14906420 Country of ref document: EP Kind code of ref document: A1 |