JP7074724B2 - 情報処理装置、情報処理方法及びプログラム - Google Patents
情報処理装置、情報処理方法及びプログラム Download PDFInfo
- Publication number
- JP7074724B2 JP7074724B2 JP2019125707A JP2019125707A JP7074724B2 JP 7074724 B2 JP7074724 B2 JP 7074724B2 JP 2019125707 A JP2019125707 A JP 2019125707A JP 2019125707 A JP2019125707 A JP 2019125707A JP 7074724 B2 JP7074724 B2 JP 7074724B2
- Authority
- JP
- Japan
- Prior art keywords
- resource
- power
- information
- adjustable
- power generation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000010365 information processing Effects 0.000 title claims description 41
- 238000003672 processing method Methods 0.000 title claims description 5
- 238000010248 power generation Methods 0.000 claims description 71
- 238000000034 method Methods 0.000 claims description 8
- 230000008569 process Effects 0.000 claims description 8
- 238000010586 diagram Methods 0.000 description 9
- 230000006870 function Effects 0.000 description 5
- 238000011156 evaluation Methods 0.000 description 4
- 230000002776 aggregation Effects 0.000 description 2
- 238000004220 aggregation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 206010063659 Aversion Diseases 0.000 description 1
- 238000013473 artificial intelligence Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000010801 machine learning Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
リソースにおける電力生成実績及び当該リソースに関連した電力消費に関する電力需要実績を用いて当該リソースに対する調整可能能力予測モデルを生成するモデル生成部と、
前記調整可能能力予測モデルに、予測変数情報を適用することで、前記リソースの個別調整可能能力を予測する個別情報生成部と、
前記個別調整可能能力を出力する出力部と、
を備え、
リソースの電力生成能力も用いて前記個別調整可能能力を予測してもよい。
複数の個別調整可能能力を用いて統合調整可能能力を予測する総合情報生成部をさらに備えてもよい。
前記総合情報生成部は統合調整可能能力を確率とともに生成し、
前記出力部は前記統合調整可能能力を確率とともに出力してもよい。
前記個別情報生成部は個別調整可能能力を確率とともに生成し、
前記出力部は前記個別調整可能能力を確率とともに出力してもよい。
前記予測変数情報は、気温、天候及びカレンダー情報のいずれか1つ以上を含んでもよい。
前記リソースは操業情報を有する操業施設の自家発電機を含み、
操業施設に設置された自家発電機からなるリソースに対する調整可能能力予測モデルは、適用される予測変数情報として操業施設における操業情報を含んでもよい。
電力の価格を予測する価格予測部を備えてもよい。
前記リソースを実際に稼働する際に、優先順位に基づいてリソースを稼働する稼働部を備えてもよい。
予め設定された条件にしたがって、所定の時間又は時間帯における入札に適したリソースの組み合わせを決定する決定部を備えてもよい。
前記出力部は余力電力の期待値を出力してもよい。
前記モデル生成部は、リソースの電力生成能力、リソースにおける電力生成実績及び当該リソースに関連した電力消費に関する電力需要実績を用いて当該リソースに対する調整可能能力予測モデルを生成してもよい。
前記調整可能能力予測モデルは、前記リソースにおける電力生成実績を用いて生成される電力生成モデルと、当該リソースに関連した電力消費に関する電力需要実績を用いて生成される電力需要モデルとを有し、
前記個別情報生成部は、前記電力生成モデルに予測変数情報を適用することで得られた電力生成予想情報及び前記電力需要モデルに予測変数情報を適用することで得られた電力需要予想情報と、前記リソースの電力生成能力とを用いて、前記リソースの個別調整可能能力を予測してもよい。
モデル生成部によって、リソースにおける電力生成実績及び当該リソースに関連した電力消費に関する電力需要実績を用いて当該リソースの調整可能能力予測モデルを生成する工程と、
個別情報生成部が、前記調整可能能力予測モデルに、予測変数情報を適用することで、前記リソースの個別調整可能能力を予測する工程と、
出力部によって、前記個別調整可能能力を出力する工程と、
を備え、
リソースの電力生成能力も用いて前記個別調整可能能力を予測してもよい。
情報処理装置にインストールされるプログラムであって、
前記プログラムがインストールされた情報処理装置は、
リソースにおける電力生成実績及び当該リソースに関連した電力消費に関する電力需要実績を用いて当該リソースに対する調整可能能力予測モデルを生成するモデル生成部と、
前記調整可能能力予測モデルに、予測変数情報を適用することで、前記リソースの個別調整可能能力を予測する個別情報生成部と、
前記個別調整可能能力を出力する出力部と、
を備え、
リソースの電力生成能力も用いて前記個別調整可能能力を予測してもよい。
《構成》
本実施の形態の情報処理装置は、一つの装置から構成されてもよいし複数の装置から構成されてもよい。本実施の形態では、本実施の形態の情報処理装置を用いた情報処理方法、情報処理装置を生成するためにインストールされるプログラムや、当該プログラムを記憶したUSB、DVD等からなる記憶媒体も提供される。
次に、上述した構成からなる本実施の形態による効果であって、未だ説明していないものを中心に説明する。
20 個別情報生成部
30 総合情報生成部
70 出力部
110 価格予測部
120 稼働部
Claims (10)
- リソースにおける電力生成実績及び当該リソースに関連した電力消費に関する電力需要実績を用いて当該リソースに対する調整可能能力予測モデルを生成するモデル生成部と、
前記調整可能能力予測モデルに、予測変数情報を適用することで、前記リソースの個別調整可能能力を予測する個別情報生成部と、
複数の個別調整可能能力を用いて、確率を用いた統合調整可能能力を予測する総合情報生成部と、
前記個別調整可能能力を出力し、また前記統合調整可能能力を確率とともに出力する出力部と、
を備え、
前記調整可能能力予測モデルは、前記リソースにおける電力生成実績を用いて生成される電力生成モデルと、当該リソースに関連した電力消費に関する電力需要実績を用いて生成される電力需要モデルとを有し、
前記個別情報生成部は、前記電力生成モデルに予測変数情報を適用することで得られた電力生成予想と前記リソースの電力生成能力との差分及び前記電力生成予想と前記電力需要モデルに予測変数情報を適用することで得られた電力需要予想との差分のうち小さい方を前記リソースの個別調整可能能力として予測する情報処理装置。 - 前記個別情報生成部は個別調整可能能力を確率とともに生成し、
前記出力部は前記個別調整可能能力を確率とともに出力する、請求項1に記載の情報処理装置。 - 前記予測変数情報は、気温、天候及びカレンダー情報のいずれか1つ以上を含む、請求項1又は2のいずれか1項に記載の情報処理装置。
- 前記リソースは操業情報を有する操業施設の自家発電機を含み、
操業施設に設置された自家発電機からなるリソースに対する調整可能能力予測モデルは、適用される予測変数情報として操業施設における操業情報を含む、請求項1乃至3のいずれか1項に記載の情報処理装置。 - 電力の価格を予測する価格予測部を備える、請求項1乃至4のいずれか1項に記載の情報処理装置。
- 前記リソースを実際に稼働する際に、優先順位に基づいてリソースを稼働する稼働部を備える、請求項1乃至5のいずれか1項に記載の情報処理装置。
- 予め設定された条件にしたがって、所定の時間又は時間帯における入札に適したリソースの組み合わせを決定する決定部を備える、請求項1乃至6のいずれか1項に記載の情報処理装置。
- 前記出力部は余力電力の期待値を出力する、請求項1乃至7のいずれか1項に記載の情報処理装置。
- モデル生成部によって、リソースにおける電力生成実績及び当該リソースに関連した電力消費に関する電力需要実績を用いて当該リソースの調整可能能力予測モデルを生成する工程と、
個別情報生成部が、前記調整可能能力予測モデルに、予測変数情報を適用することで、前記リソースの個別調整可能能力を予測する工程と、
総合情報生成部によって、複数の個別調整可能能力を用いて、確率を用いた統合調整可能能力を予測する工程と、
出力部によって、前記個別調整可能能力を出力する工程と、
出力部によって、前記統合調整可能能力を確率とともに出力する工程と、
を備え、
前記調整可能能力予測モデルは、前記リソースにおける電力生成実績を用いて生成される電力生成モデルと、当該リソースに関連した電力消費に関する電力需要実績を用いて生成される電力需要モデルとを有し、
前記個別情報生成部は、前記電力生成モデルに予測変数情報を適用することで得られた電力生成予想と前記リソースの電力生成能力との差分及び前記電力生成予想と前記電力需要モデルに予測変数情報を適用することで得られた電力需要予想との差分のうち小さい方を前記リソースの個別調整可能能力として予測する情報処理方法。 - 情報処理装置にインストールされるプログラムであって、
前記プログラムが情報処理装置を、
リソースにおける電力生成実績及び当該リソースに関連した電力消費に関する電力需要実績を用いて当該リソースに対する調整可能能力予測モデルを生成するモデル生成部と、
前記調整可能能力予測モデルに、予測変数情報を適用することで、前記リソースの個別調整可能能力を予測する個別情報生成部と、
複数の個別調整可能能力を用いて、確率を用いた統合調整可能能力を予測する総合情報生成部と、
前記個別調整可能能力を出力し、また前記統合調整可能能力を確率とともに出力する出力部
として機能させ、
前記調整可能能力予測モデルは、前記リソースにおける電力生成実績を用いて生成される電力生成モデルと、当該リソースに関連した電力消費に関する電力需要実績を用いて生成される電力需要モデルとを有し、
前記個別情報生成部は、前記電力生成モデルに予測変数情報を適用することで得られた電力生成予想と前記リソースの電力生成能力との差分及び前記電力生成予想と前記電力需要モデルに予測変数情報を適用することで得られた電力需要予想との差分のうち小さい方を前記リソースの個別調整可能能力として予測するプログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019125707A JP7074724B2 (ja) | 2019-07-05 | 2019-07-05 | 情報処理装置、情報処理方法及びプログラム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019125707A JP7074724B2 (ja) | 2019-07-05 | 2019-07-05 | 情報処理装置、情報処理方法及びプログラム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2021013231A JP2021013231A (ja) | 2021-02-04 |
JP7074724B2 true JP7074724B2 (ja) | 2022-05-24 |
Family
ID=74226405
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019125707A Active JP7074724B2 (ja) | 2019-07-05 | 2019-07-05 | 情報処理装置、情報処理方法及びプログラム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7074724B2 (ja) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023282738A1 (en) * | 2021-07-09 | 2023-01-12 | Universiti Tenaga Nasional | A computer-implemented method and system for modeling and predicting failure of a power grid configuration |
JP7461327B2 (ja) * | 2021-11-11 | 2024-04-03 | プライムプラネットエナジー&ソリューションズ株式会社 | 廃食用油を用いたエネルギー生成システムおよびエネルギー生成方法 |
EP4250508A1 (de) * | 2022-03-23 | 2023-09-27 | Siemens Aktiengesellschaft | Verfahren zur plausibilitätsprüfung einer prognose |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016076008A1 (ja) | 2014-11-10 | 2016-05-19 | 日本電気株式会社 | 電力需給制御装置、電力需給制御方法、及び、プログラム |
JP2016134939A (ja) | 2015-01-15 | 2016-07-25 | 株式会社日立製作所 | 電力取引管理システムおよび電力取引管理方法 |
JP2017022807A (ja) | 2015-07-07 | 2017-01-26 | パナソニックIpマネジメント株式会社 | 受電電力制御方法、受電電力制御装置および電気機器 |
-
2019
- 2019-07-05 JP JP2019125707A patent/JP7074724B2/ja active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016076008A1 (ja) | 2014-11-10 | 2016-05-19 | 日本電気株式会社 | 電力需給制御装置、電力需給制御方法、及び、プログラム |
JP2016134939A (ja) | 2015-01-15 | 2016-07-25 | 株式会社日立製作所 | 電力取引管理システムおよび電力取引管理方法 |
JP2017022807A (ja) | 2015-07-07 | 2017-01-26 | パナソニックIpマネジメント株式会社 | 受電電力制御方法、受電電力制御装置および電気機器 |
Also Published As
Publication number | Publication date |
---|---|
JP2021013231A (ja) | 2021-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7320503B2 (ja) | エネルギ貯蔵システムを最適に制御するためのシステム及び方法 | |
Schram et al. | On the trade-off between environmental and economic objectives in community energy storage operational optimization | |
Nojavan et al. | Application of fuel cell and electrolyzer as hydrogen energy storage system in energy management of electricity energy retailer in the presence of the renewable energy sources and plug-in electric vehicles | |
Nojavan et al. | Stochastic energy procurement of large electricity consumer considering photovoltaic, wind-turbine, micro-turbines, energy storage system in the presence of demand response program | |
Silvente et al. | A rolling horizon optimization framework for the simultaneous energy supply and demand planning in microgrids | |
JP3980541B2 (ja) | 分散型エネルギーコミュニティー制御システム、中央制御装置、分散制御装置と、それらの制御方法 | |
Choi et al. | A microgrid energy management system for inducing optimal demand response | |
Sheikhahmadi et al. | A risk-based approach for modeling the strategic behavior of a distribution company in wholesale energy market | |
JP7074724B2 (ja) | 情報処理装置、情報処理方法及びプログラム | |
Imani et al. | Implementing Time-of-Use Demand Response Program in microgrid considering energy storage unit participation and different capacities of installed wind power | |
US11789082B2 (en) | Systems and method for managing dispatch and lifecycle of energy storage systems on an electrical grid, including management of energy storage systems for provisioning of multiple services | |
KR20150053704A (ko) | 전력 관리 방법 및 시스템 | |
WO2020153443A1 (ja) | エネルギーマネジメントシステムおよびその制御方法 | |
JP6069738B2 (ja) | 充放電制御システム、充放電制御方法、および充放電制御プログラム | |
Xu et al. | Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation | |
KR101581685B1 (ko) | 에너지 저장장치의 충방전 스케줄링 장치 및 방법 | |
JP6903531B2 (ja) | 分散型電源制御装置、分散型電源制御システム及び分散型電源制御方法 | |
Yi et al. | Dispatch-aware planning of energy storage systems in active distribution network | |
JP2022050126A (ja) | 分散型エネルギーリソース管理装置、分散型エネルギーリソース管理方法、および、分散型エネルギーリソース管理プログラム | |
Mohamed et al. | Stacking battery energy storage revenues in future distribution networks | |
Belloni et al. | A stochastic optimal control solution to the energy management of a microgrid with storage and renewables | |
Levorato et al. | Robust microgrid energy trading and scheduling under budgeted uncertainty | |
US20200006943A1 (en) | Managing consumer energy demand | |
Ardeshiri et al. | Using improved time of use demand response in optimal operation of microgrid | |
JP2020039222A (ja) | 電力需給制御装置、電力需給制御システムおよび電力需給制御方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190705 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20200908 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20201106 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20210105 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210329 |
|
C60 | Trial request (containing other claim documents, opposition documents) |
Free format text: JAPANESE INTERMEDIATE CODE: C60 Effective date: 20210329 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20210405 |
|
C21 | Notice of transfer of a case for reconsideration by examiners before appeal proceedings |
Free format text: JAPANESE INTERMEDIATE CODE: C21 Effective date: 20210406 |
|
A912 | Re-examination (zenchi) completed and case transferred to appeal board |
Free format text: JAPANESE INTERMEDIATE CODE: A912 Effective date: 20210528 |
|
C211 | Notice of termination of reconsideration by examiners before appeal proceedings |
Free format text: JAPANESE INTERMEDIATE CODE: C211 Effective date: 20210601 |
|
C22 | Notice of designation (change) of administrative judge |
Free format text: JAPANESE INTERMEDIATE CODE: C22 Effective date: 20210907 |
|
C13 | Notice of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: C13 Effective date: 20220111 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20220224 |
|
C23 | Notice of termination of proceedings |
Free format text: JAPANESE INTERMEDIATE CODE: C23 Effective date: 20220322 |
|
C22 | Notice of designation (change) of administrative judge |
Free format text: JAPANESE INTERMEDIATE CODE: C22 Effective date: 20220412 |
|
C03 | Trial/appeal decision taken |
Free format text: JAPANESE INTERMEDIATE CODE: C03 Effective date: 20220426 |
|
C30A | Notification sent |
Free format text: JAPANESE INTERMEDIATE CODE: C3012 Effective date: 20220426 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20220512 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7074724 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |