WO2015141907A1 - 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법 - Google Patents

개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법 Download PDF

Info

Publication number
WO2015141907A1
WO2015141907A1 PCT/KR2014/007762 KR2014007762W WO2015141907A1 WO 2015141907 A1 WO2015141907 A1 WO 2015141907A1 KR 2014007762 W KR2014007762 W KR 2014007762W WO 2015141907 A1 WO2015141907 A1 WO 2015141907A1
Authority
WO
WIPO (PCT)
Prior art keywords
door
concrete
window
concrete structure
manufacturing
Prior art date
Application number
PCT/KR2014/007762
Other languages
English (en)
French (fr)
Inventor
박준신
Original Assignee
박준신
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박준신 filed Critical 박준신
Publication of WO2015141907A1 publication Critical patent/WO2015141907A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/02Forms or shutterings for making openings, cavities, slits, or channels for windows, doors, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34815Elements not integrated in a skeleton
    • E04B1/34823Elements not integrated in a skeleton the supporting structure consisting of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0604Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods
    • E04C5/0622Open cages, e.g. connecting stirrup baskets

Definitions

  • the present invention relates to a method for manufacturing a concrete structure of a prefabricated concrete house having an opening, and more particularly, to constitute a door opening part and a window opening part on both sides of the structure in the process of manufacturing a PC (precast concrete) structure consisting of units.
  • a prefabricated concrete house using unit concrete structure it is possible to omit the drilling work by drilling the unit concrete structure for the installation of doors and windows.
  • the present invention relates to a method for manufacturing a concrete structure of a prefabricated concrete house having an opening so as to obtain work efficiency as well as simplifying the construction of a house.
  • construction of a house or a building is carried out by first digging out the ground to be built, and then constructing the ground using concrete in the space where the construction is made, and then building the ground to be built.
  • internal and external formwork with reinforced bars will be installed.
  • interior and exterior walls of the building are finished using interior and exterior materials such as bricks, and other electrical wiring or water pipes are constructed to complete the house.
  • a house or a building is prefabricated using a concrete structure in which a wall and a ceiling slab, which form the basis of the house, are molded into a single structure.
  • Each unit is mass-produced at the factory first, and then the assembled unit is transferred to the site and assembled to build a prefabricated house.
  • the head portion consisting of the cross-section of the c-shape instead of the c-shape with one side open;
  • the pair of members coupled to the body portion orthogonally extending from the end of the head portion is configured to face each other to be symmetrically spaced apart from each other, the head portion is formed in the vertical portion from the top in the sequential hole and a plurality of first bolt grooves
  • the second bolt groove is configured in the upper portion, and a plurality of hook-type hooks are formed at predetermined heights on the inner side in the downward direction of the second bolt groove.
  • This prior art is to reinforce the inner / outer formwork with a reinforcement and reinforcement plate, and to make a solid configuration and to use the connecting steel combined in the form of wrapping the inner / outer formwork, easily lifted by a crane and moved to the planned position after reinforcement and concrete The house is to be built by pouring.
  • the housing is constructed.
  • the process of having to re-install the inner and outer formwork on the top of the cured concrete structure and recast the concrete There is a problem that the construction period of the house will be long.
  • the present invention is to install the door and the window when constructing the prefabricated concrete house using the unit concrete structure by constructing the door opening and the window opening in each side of the structure in the process of manufacturing a PC (Precast Concrete) structure consisting of units
  • a PC Precast Concrete
  • the purpose is to provide a method for manufacturing a concrete structure of a prefabricated concrete house.
  • Concrete structure manufacturing method of a prefabricated concrete house having an opening as a means for achieving the above object after reinforcing the reinforcing bar inside the concrete structure forming frame, the concrete is poured into the forming frame and the curing through the curing of the cast concrete
  • a concrete structure manufacturing method for manufacturing a unitary concrete structure by removing the first step, the first step of setting the position of the door and the window to the reinforcement before placing the concrete in the mold;
  • the fifth step is further provided with a window installation space by removing the window molding frame fixed in the window position by the second step.
  • the door molding frame the top penetrates the inside and in close contact with the inner upper portion of the set door position; A lower surface in close contact with an inner lower portion of the set door position; A left side in close contact with an inner left side of the set door position; It is made of a door frame type having a right side in close contact with the inner right side of the set door position.
  • the window forming frame the upper surface penetrates inside and in close contact with the inner upper portion of the set window position; A lower surface in close contact with an inner lower portion of the set window position; A left side in close contact with an inner left side of the set window position; It is made of a window frame type having a right side in close contact with the inner right side of the set window position.
  • the present invention is produced by placing the concrete in the mold after installing the door molding frame and window molding frame in each of the installation position of the door and window after reinforcing the reinforcing bars in the molding frame is installed when manufacturing the unit concrete structure
  • Door installation space and window installation space can be provided in the unit concrete structure, so that the operator does not need to additionally install the door installation space or window installation space, which not only shortens the work construction period but also simplifies the housing construction.
  • the construction period can be shortened and work efficiency can be greatly improved.
  • 1 is a process chart showing a method for manufacturing a concrete structure of a prefabricated concrete house having an opening of the present invention.
  • Figure 2 is an exploded perspective view showing a state in which the molding die of the method of manufacturing a concrete structure of a prefabricated concrete house provided with an opening.
  • FIG 3 is an exploded perspective view showing the first step to the third step of the method for manufacturing a concrete structure of a prefabricated concrete house provided with an opening.
  • FIG. 4 is a perspective view showing a second step and a third step of the method for manufacturing a concrete structure of a prefabricated concrete house provided with an opening.
  • Figure 5 is a block diagram showing the inside of the molding frame of the method of manufacturing a concrete structure of a prefabricated concrete house having an opening.
  • FIG. 6 is an exploded perspective view showing a fourth process of the method for manufacturing a concrete structure of a prefabricated concrete house provided with an opening.
  • FIG. 7 is a perspective view showing a unit concrete structure manufactured by a method for manufacturing a concrete structure of a prefabricated concrete house having an opening.
  • the method of manufacturing a concrete structure of a prefabricated concrete house having an opening includes reinforcing steel bars in a concrete mold, and then placing concrete in the mold and removing the mold through curing of the poured concrete.
  • the concrete structure manufacturing method for manufacturing a unit concrete structure by, the first step (S1) of setting the position of the door and the window to the reinforcing reinforcing bar 10, before placing concrete in the forming mold 100, The second step S2 of positioning and fixing the door molding frame 30 at the door position 20 set by the first step S1, and the window position 40 at the window position 40 set by the first step S1. It is further provided with a third step (S3) for positioning and fixing the molding die (50).
  • the first step (S1) in the process of reinforcing the reinforcing bar 10 in the mold 100, the space to be installed in advance and the space in which the window is to be installed after the reinforcing bars 10 by reinforcing the door and Form the location of each window.
  • the door molding frame 30 is positioned and fixed at the door position 20 set by the first step S1. At this time, the door molding frame 30 is fixed. It is possible to fix using an iron string called 'half life' or to have the door molding frame 30 made of a weldable metal material and to fix the reinforcing bar 10 by welding.
  • the welding of the door molding frame 30 and the reinforcing bar 10 is preferably welded so that the door molding frame 30 can be easily removed in a later work process.
  • the third step (S3) is to fix the window molding frame 50 to the window position 40 set by the first step (S1), in which the fixing of the window molding frame 50 to the iron strap It can be fixed by using or the window molding frame 50 is provided with a weldable metal material and the reinforcing reinforcing bar 10 is welded and fixed.
  • the welding of the window mold 50 and the reinforcing bar 10 is preferably welded so that the window mold 50 can be easily removed in a later work process.
  • the fourth step of providing a door installation space 60 by removing the door molding frame 30 fixed at the door position 20 by the second step (S2). (S4) and the fifth step (S5) having a window installation space 70 by removing the window molding frame 50 fixed in the window position 40 by the second step (S2) is further provided. It is done.
  • the fourth step (S4) is to remove the door molding frame 30 remaining in the unit concrete structure 200 is formed by the molding die 100 is removed and the poured concrete is cured, at this time door molding frame
  • the removal of (30) may be performed by cutting off the bundled iron string or by removing the welded portion.
  • a door installation space 60 which is a space for installing a door in the unit concrete structure 200, is formed.
  • the fifth step (S5) is to remove the window mold 50 remaining in the unit concrete structure 200 is formed by the molding die 100 is removed and the poured concrete is cured, the window at this time Removal of the mold 50 may be removed by cutting the bundled iron string or by removing the welded portion.
  • the window installation space 70 which is a space for installing a door in the unit concrete structure 200, is formed.
  • the door installation space 60 for installing the door and the window installation space 70 for installing the window may already be secured, thereby additionally in the workplace. Since the work for installing the door or window is omitted, the work time can be shortened and the work efficiency can be obtained along with the economic effect according to the cost reduction.
  • the door molding frame 30 has an upper surface 31 penetrating the inside and being in close contact with the inner upper portion of the set door position 20, and a lower surface 32 being in close contact with the inner lower portion of the set door position 20.
  • the door frame has a left side surface 33 in close contact with an inner left side of the set door position 20 and a right side surface 34 in close contact with an inner right side of the set door position 20.
  • the window molding frame 50 has an upper surface 51 penetrating the inside and in close contact with the inner upper portion of the set window position 40, and a lower surface 52 in close contact with the inner lower portion of the set window position 40. ) And a left side surface 53 in close contact with the inner left side of the set window position 40 and a right side surface 54 in close contact with the inner right side of the set window position 40.
  • the material of the door molding frame 30 and the window molding frame 50 is not limited, but can withstand the load of the concrete to be poured and can be fixed by tying with reinforcing steel bars and steel strings or by welding. Any material can be used as long as it can be fixed to the rebar.
  • the door molding frame 30 and the window molding frame 50 of the present invention is penetrated into the interior and made of a door frame type and a window frame type, respectively, the production of the door molding frame 30 and the window molding frame 50 The cost can be reduced, and the weight can be minimized so that it can be easily placed in the door position 20 or the window position 40 of the reinforcement 100.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Panels For Use In Building Construction (AREA)
  • Door And Window Frames Mounted To Openings (AREA)

Abstract

본 발명은 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법이 개시되는 것으로, 콘크리트 구조물 성형틀 내부에 철근을 배근한 후 성형틀 내부에 콘크리트를 타설하고 타설된 콘크리트의 양생을 거쳐 성형틀을 제거하여 단위체 콘크리트 구조물을 제조하는 콘크리트 구조물 제조방법에 있어서, 성형틀(100) 내부에 콘크리트를 타설하기 전, 배근된 철근(10)에 도어와 창문의 위치를 설정하는 제1공정(S1); 제1공정(S1)에 의해 설정된 도어 위치(20)에 도어성형틀(30)을 위치하여 고정하는 제2공정(S2); 제1공정(S1)에 의해 설정된 창문 위치(40)에 창문성형틀(50)을 위치하여 고정하는 제3공정(S3)을 더 구비하고, 성형틀(100) 내부에 타설된 콘크리트가 양생된 다음 성형틀(100)을 제거한 후, 상기 제2공정(S2)에 의해 도어 위치(20)에 위치 고정된 도어성형틀(30)을 제거하여 도어설치공간(60)을 구비하는 제4공정(S4); 상기 제2공정(S2)에 의해 창문 위치(40)에 위치 고정된 창문성형틀(50)을 제거하여 창문설치공간(70)을 구비하는 제5공정(S5)이 더 구비되어 이루어진다.

Description

개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법
본 발명은 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제작방법에 관한 것으로, 더욱 상세하게는 단위체로 이루어진 PC(Precast Concrete) 구조물을 제조하는 과정에서 구조물의 양측부에 각각 도어개구부와 창문개구부를 구성하여 줌으로써 단위체 콘크리트 구조물을 이용하여 조립식 콘크리트 주택을 시공할 때 도어와 창문의 설치를 위해 단위체 콘크리트 구조물을 천공하여 구멍을 뚫는 작업을 생략할 수 있도록 하고 구성된 도어개구부와 창문개구부에 바로 도어와 창문을 설치하도록 하여 작업효율성은 물론 주택시공의 단순화를 얻을 수 있도록 한 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법에 관한 것이다.
일반적으로 주택이나 건물 등의 시공은, 먼저 건축하고자 하는 지면을 파내어 터잡기 공사를 진행한 다음, 터잡기 공사가 이루어진 공간에 콘크리트를 이용하여 지반을 구축한 후, 구축된 지반에 건축하고자 하는 주택이나 건물의 구조에 따라 내부에 철근이 배근된 내외측 거푸집을 설치한다.
이와 같이 내외측 거푸집이 설치되면, 설치된 내외측 거푸집의 내측에 콘크리트를 타설하여 기본적인 벽체를 시공하며, 벽체시공이 이루어진 후에는 타설된 콘크리트의 충분한 양생시간을 거치게 되고 콘크리트의 양생이 이루어지고 나면, 다시 시공된 벽체의 천정슬라브를 시공하기 위한 거푸집설치 공사를 진행하며 천정슬라브 거푸집에 콘크리트를 타설하고 양생하는 과정을 거쳐 기본적인 주택이나 건물의 구조를 완성한다.
또한, 기본적인 건물의 구조가 완성되면 벽돌 등과 같은 내외장재를 이용하여 건물의 내벽면과 외벽면을 마감하고, 기타 전기배선이나 수도배관 등을 시공한 다음 주택을 완성하게 된다.
이와 같은 시공방법에 의해 이루어지는 주택 또는 건물의 시공은, 예를 들어 내외측 거푸집을 설치하거나 또는 내외측 거푸집의 내부에 철근을 배근하거나 또는 콘크리트를 타설하거나 또는 타설된 콘크리트를 양생하는 과정을 반드시 거쳐야 하기 때문에 주택시공기간이 오래 걸리게 되는 문제점이 있다.
근자들어서는, 이러한 종래 주택 시공에 따른 문제점을 해결하기 위해 주택의 기본을 구축하는 벽체와 천정슬라브가 하나의 구조물로 성형된 콘크리트 구조물을 이용하여 조립식으로 주택이나 건물을 시공하고 있으며, 통상 콘크리트 구조물은 각각의 단위체로 공장에서 먼저 양산한 후 양상된 각각의 단위체를 현장으로 이송하여 조립함으로써 조립식 주택을 시공하고 있다.
이와 같이 공장에서 양산된 콘크리트 구조물을 이용하여 주택을 시공할 경우 현장에서의 거푸집 설치작업이나 철근의 배근작업 또는 콘크리트 타설작업이나 타설된 콘크리트의 양생작업이 생략됨에 따라 콘크리트 주택이나 건물의 공사기간을 크게 단축할 수 있다는 장점이 있는 반면에, 각각의 단위체로 이루어진 콘크리트 구조물들을 서로 연결한 상태에서 주택에 필요한 도어나 창문을 설치하기 위해 다시 콘크리트 구조물들에 도어나 창문이 설치될 공간을 확보하는 구멍 천공작업이 진행됨으로써 작업시간의 지연은 물론 현장에서 구멍 천공작업에 따른 대형 천공기가 구비되어 있어야 함으로서 장비에 대한 비용추가 및 천공작업자의 인건비에 따른 비용추가가 부득이하게 발생되고 또한, 공사기간을 크게 단축시키지 못하는 문제점이 있다.
종래 기술로서, 등록특허 10-1356781호인 공기단축을 위한 주택의 벽체틀 제작방법 및 이를 이용한 시공방법이 안출된 바 있으며, 이는 하부층과 상부층으로 나누어지는 다층으로 구성된 주택의 벽체틀 제작방법에서, 내측거푸집과 외측거푸집을 조립하고 내/외측거푸집 외면에 일정간격마다 가로/세로방향으로 보강재를 설치하는 제1단계, 내측거푸집과 외측거푸집에 개구부를 형성하는 제2단계, 내측거푸집과 외측거푸집 사이에 간격재를 설치하는 제3단계, 및 전체적으로 일측이 개방된 ㄷ자형의 형태를 가지면서 이 개방된 부위가 내/외측거푸집 상단에 씌워져 내/외측거푸집을 감싸는 형태로 결합되는 연결강을 설치하는 제4단계를 포함하여 구성되되, 제4단계의 연결강은, 일측이 개방된 ㄷ자형의 형태 대신에 ㄴ자 형태의 단면으로 구성된 머리부와 머리부의 단부에서 직교 연장되는 몸체부가 결합된 부재 한 쌍이 소정 이격되어 서로 대칭되게 마주보는 형태로 구성되되, 머리부는 수직부분에 위에서부터 순차적으로 양중구멍과 다수 개의 제1볼트홈이 형성되며 몸체부는 상부에 제2볼트홈이 구성되고 제2볼트홈 아래방향으로 내측에 일정높이마다 갈고리 형태의 걸림고리가 다수 개 형성되어 이루어져 있다.
이러한 종래 기술은 내/외측거푸집을 보강재 및 보강판으로 보강하여 견고하게 구성하고 내/외측거푸집을 감싸는 형태로 결합된 연결강을 이용함으로써 크레인으로 쉽게 들어올려 계획된 위치에 이동시킨 후 철근 배근 및 콘크리트 타설에 의해 주택이 시공되도록 하고 있다.
그러나, 종래 기술의 경우 내/외측 거푸집을 먼저 설치한 다음 내/외측 거푸집 사이에 콘크리트를 타설하여 주택을 시공하기 때문에, 거푸집 설치작업에 따른 인건비용의 부담과 함께 작업시간이 추가되고 또한 타설된 콘크리트의 양생시간에 따른 공사기간의 지연은 물론 주택을 다층으로 시공하기 위해서는 양생된 콘크리트 구조물의 상부에 내/외측 거푸집을 재 설치하고 다시 콘크리트를 타설하여야 하는 과정을 반복적으로 진행해야 하는 공정에 의해 주택시공기간이 길어질 수 밖에 없는 문제점이 있다.
이에 따라, 단위체 콘크리트 구조물을 이용하여 쉽고 간단하게 조립식 콘크리트 주택을 시공하되, 도어와 창문을 설치할 수 있는 공간을 확보하기 위한 기술이 절실하게 요구되고 있는 실정이다.
본 발명은 단위체로 이루어진 PC(Precast Concrete) 구조물을 제조하는 과정에서 구조물의 양측부에 각각 도어개구부와 창문개구부를 구성하여 줌으로써 단위체 콘크리트 구조물을 이용하여 조립식 콘크리트 주택을 시공할 때 도어와 창문의 설치를 위해 단위체 콘크리트 구조물을 천공하여 구멍을 뚫는 작업을 생략할 수 있도록 하고 구성된 도어개구부와 창문개구부에 바로 도어와 창문을 설치하도록 하여 작업효율성은 물론 주택시공의 단순화를 얻을 수 있도록 한 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법을 제공함에 그 목적이 있다.
상기 목적을 달성하기 위한 수단으로 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법은, 콘크리트 구조물 성형틀 내부에 철근을 배근한 후 성형틀 내부에 콘크리트를 타설하고 타설된 콘크리트의 양생을 거쳐 성형틀을 제거하여 단위체 콘크리트 구조물을 제조하는 콘크리트 구조물 제조방법에 있어서, 성형틀 내부에 콘크리트를 타설하기 전, 배근된 철근에 도어와 창문의 위치를 설정하는 제1공정; 제1공정에 의해 설정된 도어 위치에 도어성형틀을 위치하여 고정하는 제2공정; 제1공정에 의해 설정된 창문 위치에 창문성형틀을 위치하여 고정하는 제3공정을 더 구비하고, 성형틀 내부에 타설된 콘크리트가 양생된 다음 성형틀을 제거한 후, 상기 제2공정에 의해 도어 위치에 위치 고정된 도어성형틀을 제거하여 도어설치공간을 구비하는 제4공정; 상기 제2공정에 의해 창문 위치에 위치 고정된 창문성형틀을 제거하여 창문 설치공간을 구비하는 제5공정이 더 구비되어 이루어진다.
나아가, 상기 도어성형틀은, 내부가 관통되고 상기 설정된 도어위치의 내측 상부에 밀착되는 상면과; 상기 설정된 도어위치의 내측 하부에 밀착되는 하면과; 상기 설정된 도어위치의 내측 좌측부에 밀착되는 좌측면과; 상기 설정된 도어위치의 내측 우측부에 밀착되는 우측면을 갖는 도어프레임형으로 이루어진다.
나아가, 상기 창문성형틀은, 내부가 관통되고 상기 설정된 창문위치의 내측 상부에 밀착되는 상면과; 상기 설정된 창문위치의 내측 하부에 밀착되는 하면과; 상기 설정된 창문위치의 내측 좌측부에 밀착되는 좌측면과; 상기 설정된 창문위치의 내측 우측부에 밀착되는 우측면을 갖는 창문프레임형으로 이루어진다.
본 발명은 단위체 콘크리트 구조물을 제작할 때 설치되는 성형틀 내부에 철근을 배근한 후 도어와 창문의 설치 위치에 각각 도어성형틀과 창문성형틀을 더 설치한 후 성형틀 내부에 콘크리트를 타설함으로써 제작된 단위체 콘크리트 구조물에 도어설치공간과 창문설치공간이 더 구비될 수 있어 현장에서 작업자가 추가적으로 도어설치공간 또는 창문설치공간을 시공하지 않아도 됨으로써 작업공사기간을 크게 단축시킬 수 있을 뿐만 아니라, 주택시공의 단순화와 함께 공사기간의 단축은 물론 작업효율성을 크게 향상시킬 수 있다.
도 1은 본 발명인 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법을 나타낸 공정도이다.
도 2는 발명인 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법의 성형틀을 분리한 상태를 나타낸 분해사시도이다.
도 3은 발명인 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법의 제1공정 내지 제3공정을 나타낸 분해사시도이다.
도 4는 발명인 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법의 제2공정 및 제3공정을 나타낸 사시도이다.
도 5는 발명인 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법의 성형틀 내부를 점선으로 도시한 구성도이다.
도 6은 발명인 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법의 제4공정을 나타낸 분해사시도이다.
도 7은 발명인 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법에 의해 제조된 단위체 콘크리트 구조물을 나타낸 사시도이다.
이하, 본 발명을 첨부된 도면을 참조하여 더욱 상세하게 설명하면 다음과 같다.
이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.
따라서, 본 명세서에 기재된 실시 예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시 예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들은 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.
도시된 바와 같이 본 발명인 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법은, 콘크리트 구조물 성형틀 내부에 철근을 배근한 후 성형틀 내부에 콘크리트를 타설하고 타설된 콘크리트의 양생을 거쳐 성형틀을 제거하여 단위체 콘크리트 구조물을 제조하는 콘크리트 구조물 제조방법에 있어서, 성형틀(100) 내부에 콘크리트를 타설하기 전, 배근된 철근(10)에 도어와 창문의 위치를 설정하는 제1공정(S1)과, 제1공정(S1)에 의해 설정된 도어 위치(20)에 도어성형틀(30)을 위치하여 고정하는 제2공정(S2)과, 제1공정(S1)에 의해 설정된 창문 위치(40)에 창문성형틀(50)을 위치하여 고정하는 제3공정(S3)을 더 구비되어 이루어진다.
상기 제1공정(S1)은, 성형틀(100) 내부에 철근(10)을 배근하는 과정에서 미리 도어가 설치될 공간과 창문이 설치될 공간을 설정한 후 철근(10)을 배근함으로써 도어와 창문의 위치를 각각 형성한다.
또한, 성형틀(100) 내부에 전체적으로 철근(10)을 배근한 다음, 도어가 설치될 공간과 창문의 설치될 공간을 설정한 후 배근된 철근(10)을 절단하여 도어와 창문의 위치를 각각 형성할 수 있다.
상기 제2공정(S2)은, 제1공정(S1)에 의해 설정된 도어위치(20)에 도어성형틀(30)을 위치하여 고정하는 것으로, 이 때 도어성형틀(30)의 고정은 일명 '반생이'라 불리우는 철끈을 이용하여 고정하거나 또는 도어성형틀(30)을 용접이 가능한 금속재질로 구비하고 배근된 철근(10)을 용접작업에 의해 용접하여 고정할 수 있다.
이 때, 도어성형틀(30)과 철근(10)의 용접은 이후 작업공정에서 도어성형틀(30)을 쉽게 제거할 수 있도록 용접작업하는 것이 바람직하다.
상기 제3공정(S3)은, 제1공정(S1)에 의해 설정된 창문위치(40)에 창문성형틀(50)을 위치하여 고정하는 것으로, 이 때 창문성형틀(50)의 고정은 철끈을 이용하여 고정하거나 또는 창문성형틀(50)을 용접이 가능한 금속재질로 구비하고 배근된 철근(10)을 용접작업에 의해 용접하여 고정할 수 있다.
이 때, 창문성형틀(50)과 철근(10)의 용접은 이후 작업공정에서 창문성형틀(50)을 쉽게 제거할 수 있도록 용접작업하는 것이 바람직하다.
본 발명은 상기 제3공정(S3)을 마친 다음, 성형틀(100) 내부에 콘크리트를 타설하고 타설된 콘크리트가 양생되면 성형틀(100)을 제거한다.
이와 같이 성형틀(100)을 제거한 다음, 상기 제2공정(S2)에 의해 도어 위치(20)에 위치 고정된 도어성형틀(30)을 제거하여 도어설치공간(60)을 구비하는 제4공정(S4)과, 상기 제2공정(S2)에 의해 창문 위치(40)에 위치 고정된 창문성형틀(50)을 제거하여 창문설치공간(70)을 구비하는 제5공정(S5)이 더 구비되어 이루어진다.
상기 제4공정(S4)은, 성형틀(100)이 제거되고 타설된 콘크리트가 양생되어 이루어진 단위체 콘크리트 구조물(200)에 남아있는 상기 도어성형틀(30)을 제거하는 것으로, 이 때 도어성형틀(30)의 제거는 묶여진 철끈을 절단하여 제거하거나 또는 용접부분을 때어내어 제거하면 된다.
이와 같이 도어성형틀(30)을 단위체 콘크리트 구조물(200)로부터 제거하면 단위체 콘크리트 구조물(200)에 도어를 설치할 수 있는 공간인 도어설치공간(60)이 형성된다.
또한, 상기 제5공정(S5)은, 성형틀(100)이 제거되고 타설된 콘크리트가 양생되어 이루어진 단위체 콘크리트 구조물(200)에 남아있는 상기 창문성형틀(50)을 제거하는 것으로, 이 때 창문성형틀(50)의 제거는 묶여진 철끈을 절단하여 제거하거나 또는 용접부분을 때어내어 제거하면 된다.
이와 같이 창문성형틀(50)을 단위체 콘크리트 구조물(200)로부터 제거하면 단위체 콘크리트 구조물(200)에 도어를 설치할 수 있는 공간인 창문설치공간(70)이 형성된다.
이에 따라, 본 발명에 의해 제작된 단위체 콘크리트 구조물(200)에는 도어를 설치할 수 있는 도어설치공간(60)과 창문을 설치할 수 있는 창문설치공간(70)이 이미 확보될 수 있어 작업현장에서 추가로 도어나 창문을 설치하기 위한 작업이 생략되어 작업시간의 단축은 물론 비용절감에 따른 경제적인 효과와 함께 작업효율성을 얻을 수 있다.
상기 도어성형틀(30)은, 내부가 관통되고 상기 설정된 도어위치(20)의 내측 상부에 밀착되는 상면(31)과, 상기 설정된 도어위치(20)의 내측 하부에 밀착되는 하면(32)과, 상기 설정된 도어위치(20)의 내측 좌측부에 밀착되는 좌측면(33)과, 상기 설정된 도어위치(20)의 내측 우측부에 밀착되는 우측면(34)을 갖는 도어프레임형으로 이루어진다.
또한, 상기 창문성형틀(50)은, 내부가 관통되고 상기 설정된 창문위치(40)의 내측 상부에 밀착되는 상면(51)과, 상기 설정된 창문위치(40)의 내측 하부에 밀착되는 하면(52)과, 상기 설정된 창문위치(40)의 내측 좌측부에 밀착되는 좌측면(53)과, 상기 설정된 창문위치(40)의 내측 우측부에 밀착되는 우측면(54)을 갖는 창문프레임형으로 이루어진다.
상기 도어성형틀(30)과 창문성형틀(50)의 재질을 한정하는 것은 물론 아니나, 타설되는 콘크리트의 하중을 견뎌낼 수 있고 배근된 철근과 철끈으로 묶어 고정할 수 있거나 또는 용접작업에 의해 배근된 철근과 고정할 수 있는 재질이면 어느 재질이든 관계치 않는다.
또한, 본 발명의 도어성형틀(30)과 창문성형틀(50)은 내부가 관통되어 각각 도어프레임형과 창문프레임형으로 이루어짐에 따라 도어성형틀(30)과 창문성형틀(50)의 제작비용을 절감할 수 있으며, 중량이 최소화되어 배근된 철근(100)의 도어위치(20) 또는 창문위치(40)에 쉽게 들어 위치할 수 있다.
이상과 같이 본 발명에서는 구체적인 구성 요소 등과 같은 특정 사항들과 한정된 실시예 및 도면에 의해 설명되었으나 이는 본 발명의 보다 전반적인 이해를 돕기 위해서 제공된 것일 뿐, 본 발명은 상기의 실시예에 한정되는 것은 아니며, 본 발명이 속하는 분야에서 통상적인 지식을 가진 자라면 이러한 기재로부터 다양한 수정 및 변형이 가능하다.
따라서, 본 발명의 사상은 설명된 실시예에 국한되어 정해져서는 아니 되며, 후술하는 특허청구범위뿐 아니라 이 특허청구범위와 균등하거나 등가적 변형이 있는 모든 것들은 본 발명 사상의 범주에 속한다고 할 것이다.

Claims (3)

  1. 콘크리트 구조물 성형틀 내부에 철근을 배근한 후 성형틀 내부에 콘크리트를 타설하고 타설된 콘크리트의 양생을 거쳐 성형틀을 제거하여 단위체 콘크리트 구조물을 제조하는 콘크리트 구조물 제조방법에 있어서,
    성형틀(100) 내부에 콘크리트를 타설하기 전,
    배근된 철근(10)에 도어와 창문의 위치를 각각 설정하는 제1공정(S1);
    제1공정(S1)에 의해 설정된 도어 위치(20)에 도어성형틀(30)을 위치하여 고정하는 제2공정(S2);
    제1공정(S1)에 의해 설정된 창문 위치(40)에 창문성형틀(50)을 위치하여 고정하는 제3공정(S3)을 더 구비하고,
    성형틀(100) 내부에 타설된 콘크리트가 양생된 다음 성형틀(100)을 제거한 후,
    상기 제2공정(S2)에 의해 도어 위치(20)에 위치 고정된 도어성형틀(30)을 제거하여 도어설치공간(60)을 구비하는 제4공정(S4);
    상기 제2공정(S2)에 의해 창문 위치(40)에 위치 고정된 창문성형틀(50)을 제거하여 창문설치공간(70)을 구비하는 제5공정(S5)이 더 구비되어 이루어지는 것을 특징으로 하는 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법.
  2. 제1항에 있어서,
    상기 도어성형틀(30)은,
    내부가 관통되고
    상기 설정된 도어위치(20)의 내측 상부에 밀착되는 상면(31)과;
    상기 설정된 도어위치(20)의 내측 하부에 밀착되는 하면(32)과;
    상기 설정된 도어위치(20)의 내측 좌측부에 밀착되는 좌측면(33)과;
    상기 설정된 도어위치(20)의 내측 우측부에 밀착되는 우측면(34)을 갖는 도어프레임형으로 이루어지는 것을 특징으로 하는 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법.
  3. 제1항에 있어서,
    상기 창문성형틀(50)은,
    내부가 관통되고
    상기 설정된 창문위치(40)의 내측 상부에 밀착되는 상면(51)과;
    상기 설정된 창문위치(40)의 내측 하부에 밀착되는 하면(52)과;
    상기 설정된 창문위치(40)의 내측 좌측부에 밀착되는 좌측면(53)과;
    상기 설정된 창문위치(40)의 내측 우측부에 밀착되는 우측면(54)을 갖는 창문프레임형으로 이루어지는 것을 특징으로 하는 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법.
PCT/KR2014/007762 2014-03-18 2014-08-21 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법 WO2015141907A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020140031389A KR101399778B1 (ko) 2014-03-18 2014-03-18 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법
KR10-2014-0031389 2014-03-18

Publications (1)

Publication Number Publication Date
WO2015141907A1 true WO2015141907A1 (ko) 2015-09-24

Family

ID=50895359

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2014/007762 WO2015141907A1 (ko) 2014-03-18 2014-08-21 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법

Country Status (2)

Country Link
KR (1) KR101399778B1 (ko)
WO (1) WO2015141907A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109333799A (zh) * 2018-11-09 2019-02-15 如皋汉府建筑科技有限公司 一种非金属矿物制品的生产工艺

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016153227A1 (ko) * 2015-03-20 2016-09-29 박준신 콘크리트 암거주택
KR102620982B1 (ko) * 2022-12-07 2024-01-04 서금석 Pc 모듈러 조립 주택 및 pc 모듈의 제조방법

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR980002605A (ko) * 1996-06-26 1998-03-30 김영남 도어 또는 창문설치용 콘크리트패널 및 그 제조방법
JP2003328487A (ja) * 2002-05-09 2003-11-19 Yoshida Komuten:Kk ボイドスラブの構築方法
JP2006124927A (ja) * 2004-10-26 2006-05-18 Kumagai Gumi Co Ltd コンクリート建物の構築方法
KR20110029489A (ko) * 2009-09-15 2011-03-23 동국대학교 산학협력단 건축 리모델링을 위한 프리케스트 콘크리트 패널과 패널의 이음부 접합 시공방법 및 구조

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR980002605A (ko) * 1996-06-26 1998-03-30 김영남 도어 또는 창문설치용 콘크리트패널 및 그 제조방법
JP2003328487A (ja) * 2002-05-09 2003-11-19 Yoshida Komuten:Kk ボイドスラブの構築方法
JP2006124927A (ja) * 2004-10-26 2006-05-18 Kumagai Gumi Co Ltd コンクリート建物の構築方法
KR20110029489A (ko) * 2009-09-15 2011-03-23 동국대학교 산학협력단 건축 리모델링을 위한 프리케스트 콘크리트 패널과 패널의 이음부 접합 시공방법 및 구조

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109333799A (zh) * 2018-11-09 2019-02-15 如皋汉府建筑科技有限公司 一种非金属矿物制品的生产工艺

Also Published As

Publication number Publication date
KR101399778B1 (ko) 2014-05-27

Similar Documents

Publication Publication Date Title
WO2015137577A1 (ko) 콘크리트 주택의 단위체 구조물 적층 시공방법
CN103410317A (zh) 采用墙体预制构件现场拼装并浇筑的整体墙体施工方法
KR101903628B1 (ko) 내진 성능이 강화된 더블 pc벽체 및 이를 이용한 pc벽체 구조물의 시공방법
WO2015141907A1 (ko) 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법
CN104120883A (zh) 免拆防火保温建筑构件模板的施工方法
CN213233888U (zh) 装配式部分空腔剪力墙及连接节点
WO2016137189A1 (ko) 단위체 콘크리트 구조물 주택 시공방법
WO2015026027A1 (ko) 콘크리트주택 시공방법
US4408434A (en) Multi-storey building and a prefabricated panel for such a building
CN110805061B (zh) 一种管廊墙体单元、管廊墙体及其施工方法
CN106760139A (zh) 一种外贴式模块化建筑结构及其施工方法
WO2016153227A1 (ko) 콘크리트 암거주택
CN210597742U (zh) 一种剪力墙
CN209669686U (zh) 一种箱梁头部装配式封堵结构
CN211948837U (zh) 一种装配式预制阳台以及阳台隔板
KR100612662B1 (ko) 철근콘크리트구조물의 철근망 조립시공법
CN210316183U (zh) 一种预制混凝土砌块
CN214497993U (zh) 一种拼装式模壳墙板
CN220014443U (zh) 一种二次构造柱浇筑施工结构
CN217000135U (zh) 钢管混凝土柱与现浇梁组合结构体系
CN211007179U (zh) 一种钢骨-纤维混凝土墙体结构
TWI803435B (zh) 格子板,用於建造格子板的結構,及於間隔設置的複數個柱體上方建造格子板的方法
WO2019093772A1 (ko) 빔 보강 데크플레이트 및 이를 이용한 시공방법
JP2016217052A (ja) コンクリート構造物の分割施工方法およびコンクリート構造物
CN112780013A (zh) 一种拼装式模壳墙板

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14886139

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14886139

Country of ref document: EP

Kind code of ref document: A1