WO2016137189A1 - 단위체 콘크리트 구조물 주택 시공방법 - Google Patents

단위체 콘크리트 구조물 주택 시공방법 Download PDF

Info

Publication number
WO2016137189A1
WO2016137189A1 PCT/KR2016/001732 KR2016001732W WO2016137189A1 WO 2016137189 A1 WO2016137189 A1 WO 2016137189A1 KR 2016001732 W KR2016001732 W KR 2016001732W WO 2016137189 A1 WO2016137189 A1 WO 2016137189A1
Authority
WO
WIPO (PCT)
Prior art keywords
concrete structure
iron plate
ceiling
protrusion
house
Prior art date
Application number
PCT/KR2016/001732
Other languages
English (en)
French (fr)
Inventor
박준신
Original Assignee
오동협
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 오동협 filed Critical 오동협
Publication of WO2016137189A1 publication Critical patent/WO2016137189A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34331Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by three-dimensional elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34384Assembling details for foldable, separable, collapsible or retractable structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses

Definitions

  • the present invention relates to a unit concrete structure housing construction method, and more specifically, to construct a culvert housing using a PC (Precast Concrete) structure consisting of each unit, each of which has a unit concrete structure having a bottom and ceiling of the house
  • PC Precast Concrete
  • the ease of construction and shortening of the housing construction period as well as the work efficiency are improved, and the support for the unit concrete structure of the floor and the ceiling that is stacked
  • it relates to a unit concrete structure housing construction method to greatly improve the durability.
  • construction of a house or a building is carried out by first digging out the ground to be built, and then constructing the ground using concrete in the space where the construction is made, and then building the ground to be built.
  • internal and external formwork with reinforced bars will be installed.
  • interior and exterior walls of the building are finished using interior and exterior materials such as bricks, and other electrical wiring or water pipes are constructed to complete the house.
  • a house or a building is prefabricated using a concrete structure in which a wall and a ceiling slab, which form the basis of the house, are formed into a single structure.
  • Each unit is mass-produced at the factory first, and then the assembled unit is transferred to the site and assembled to build a prefabricated house.
  • the construction period of the concrete house or building is omitted due to the elimination of formwork at work, reinforcement of reinforcing bars, concrete pouring work, and curing work of poured concrete. While there is an advantage that can be greatly shortened, there is a problem that does not significantly shorten the construction period by the time delay for assembling the concrete structures consisting of each unit connected to each other.
  • the head portion consisting of the cross-section of the c-shape instead of the c-shape with one side open;
  • the pair of members coupled to the body portion orthogonally extending from the end of the head portion is configured to face each other to be symmetrically spaced apart from each other, the head portion is formed in the vertical portion from the top in the sequential hole and a plurality of first bolt grooves
  • the second bolt groove is configured in the upper portion, and a plurality of hook-type hooks are formed at predetermined heights on the inner side in the downward direction of the second bolt groove.
  • This prior art is to reinforce the inner / outer formwork with a reinforcement and reinforcement plate, and to make a solid configuration and to use the connecting steel combined in the form of wrapping the inner / outer formwork, easily lifted by a crane and moved to the planned position after reinforcement and concrete The house is to be built by pouring.
  • the housing is constructed.
  • the process of having to re-install the inner and outer formwork on the top of the cured concrete structure and recast the concrete There is a problem that the construction period of the house will be long.
  • the present invention can not only significantly shorten the construction period of the house or building by stacking the unit concrete structure when building the house, but also when installing the concrete house in a multi-layered floor and ceiling of the unit structure It is simple to combine, but firmly combined, so that the construction period can be greatly reduced by constructing culvert houses by directly assembling concrete structures composed of units without installing concrete on the site and installing the formwork on site.
  • the purpose of the present invention is to provide a method for constructing a unit concrete structure house that is greatly improved.
  • the unit concrete structure housing construction method of the present invention vertically extending in the upper left direction of the bottom portion and the bottom portion and vertically extending in the upper right direction of the first left portion having a first projection and the bottom portion;
  • a bottom concrete structure having a first right side having a second protrusion and having a first reinforcing bar;
  • a second left portion having a first recess portion extending vertically in a lower left direction of the ceiling portion and corresponding to the first protrusion, and a second groove portion extending vertically in a lower right direction of the ceiling portion and corresponding to the second protrusion portion.
  • a first step comprising a ceiling concrete structure having a second right side and a second reinforcing bar disposed therein, wherein the first iron plate is bent and seated on the first protrusion and the second protrusion of the bottom concrete structure;
  • the iron plate and the first iron plate provided on the first protrusion and the second protrusion of the bottom concrete structure are positioned to correspond to each other so that the first groove and the second groove are fitted to the first protrusion and the second protrusion, respectively. It consists of the 8th process of seating.
  • first fixing pieces are further bent on both sides of the first iron plate of the bottom concrete structure, and second fixing pieces are further provided on both sides of the second iron plate of the ceiling concrete structure, respectively, and the eighth process Afterwards, the first fixing piece and the first groove part and the second groove part of the ceiling concrete structure respectively extending from both sides of the first iron plate provided in the first and second protrusions of the bottom concrete structure meshing with each other, respectively.
  • a ninth step of welding and fixing the second fixing piece extending from both sides of the second iron plate to be welded is further provided.
  • a concrete structure composed of units is assembled by directly assembling the concrete structure without installing concrete in the formwork and the installed formwork at the site.
  • the construction period be greatly shortened, but also the housing construction can be simplified and the construction period can be shortened, as well as the connection work by stacking concrete structures made of units can be made simple, thereby greatly improving the work efficiency. have.
  • Figure 1 is a process chart showing the process of the present inventors concrete unit housing construction method.
  • Figure 2 is a block diagram showing a state in which the concrete structures are stacked by the process of the present inventors unit concrete structure housing construction method.
  • Figure 3 is an exploded view showing a state in which the concrete structures are stacked by the process of the present inventors unit concrete structure housing construction method.
  • Figure 4 is an enlarged configuration diagram of the main components of the inventors concrete unit housing construction method.
  • Figure 5 is an enlarged configuration diagram showing another embodiment of the present inventors concrete unit housing construction method.
  • Figure 6 is a block diagram showing another embodiment of the present inventors concrete unit housing construction method.
  • the unit concrete structure house construction method of the present invention consists of six steps (S6), seventh process (S7), and eighth process (S8).
  • the house is constructed by a concrete structure consisting of a unit of the bottom concrete structure 10 and the ceiling concrete structure 20.
  • the present invention extends vertically in the upper left direction of the bottom portion 11 and the bottom portion 11 and has a first left portion 13 having a first protrusion 12 and an upper right side of the bottom portion 11.
  • a bottom concrete structure 10 having a first right portion 15 extending vertically in a direction and having a second protrusion 14 and having a first reinforcing bar 16 disposed thereon, a ceiling 21 and the ceiling 21
  • the second left portion 23 having a first groove portion 22 corresponding to the first protrusion 12 and extending vertically in the lower left direction of the lower portion and vertically extending in the lower right direction of the ceiling portion 21;
  • the second right portion 25 having a second groove portion 24 corresponding to the protrusion 14 includes a ceiling concrete structure 20 in which the second rebar 26 is disposed.
  • the bottom concrete structure 10 and the ceiling concrete structure 20, each consisting of a unit, the floor concrete structure 10 and the ceiling concrete structure 20, which is a unit concrete structure in a factory, not a house construction site
  • the concrete concrete structure is constructed by transporting the floor concrete structure 10 and the ceiling concrete structure 20, which are manufactured and manufactured unit concrete structures, to the house construction site and stacking them by the unit concrete structure house construction method of the present inventors.
  • the 1st process S1 of this invention is a process of bending and mounting the 1st iron plate 30 in the 1st protrusion part 12 and the 2nd protrusion part 14 of the floor concrete structure 10, respectively.
  • the first protrusion 12 and the second protrusion 14 of the bottom concrete structure 10 Since they protrude from the center of the upper surface, the first iron plate 30 is bent and seated to fit the shapes of the first protrusions 12 and the second protrusions 14.
  • the second step (S2), the first iron plate 30 and the bottom concrete structure 10 of each of the first protrusion 12 and the second protrusion 14 seated by the first step (S1), respectively This is a process of welding the first reinforcing bar 16 arranged in the first left part 13 and the first right part 15.
  • the first reinforcing bar 16 is to reinforce the interior of the bottom concrete structure 10 for the firmness and support of the bottom concrete structure 10, the first left portion of the bottom concrete structure 10 at this time
  • the first reinforcing bar 16 disposed in the 13 and the first right part 15 is also located.
  • the first reinforcing bar 16 located in the first left part 13 and the first right part 15 is thus located.
  • the third step S3 is a step of bending the second iron plate 40 into close contact with the first groove 22 and the second groove 24 of the ceiling concrete structure 10, respectively.
  • the first groove part 22 and the second groove part 24 of the ceiling concrete structure 20 correspond to the first protrusion 12 and the second protrusion 14 of the bottom concrete structure 10, respectively. Accordingly, the second iron plate 40, which is in close contact with the first groove part 22 and the second groove part 24, is also bent in accordance with the shape of the first groove part 22 and the second groove part 24.
  • the bent shape of the second iron plate 40 corresponds to the bent shape of the first iron plate 30.
  • the fourth step (S4), the second iron plate 40 and the ceiling concrete structure 20 of each of the seated in the first groove portion 22 and the second groove portion 24 by the third step (S3) It is a process of welding the 2nd rebar 26 arrange
  • the second reinforcing bar 26 is to reinforce the interior of the ceiling concrete structure 20 for the firmness and support of the ceiling concrete structure 20, the second left portion of the ceiling concrete structure 20
  • the second reinforcing bar 26 disposed in the 23 and the second right part 25 is also located, and thus the second rebar 26 located in the second left part 23 and the second right part 25 is thus provided.
  • the fifth step (S5) is a step of placing the foundation floor 50 on the ground to install a house or building, and after the smoothing operation on the ground to build a house, the foundation floor 50 to the ground What is to be put up, the base bottom 50 may also be made of a concrete material.
  • the first iron plate 30 is provided on the first protrusions 12 and the second protrusions 14 on the upper surface of the base bottom 50 mounted on the ground by the fifth step S5. It is a process of seating the bottom concrete structure 10 is fixed to each of the first reinforcement 16 and the welding operation is seated.
  • the upper surface of the base bottom 50 may be further provided with a display unit for indicating the position where the bottom concrete structure 10 is seated, the bottom concrete structure 10 is lifted using a device such as a crane After raising, it may be placed on the display unit displayed on the upper surface of the base bottom 50 and seated thereon.
  • the water repellent material 60 is applied to the upper surface of the first iron plate 30 of the bottom concrete structure 10 seated on the upper surface of the foundation floor 50 by the sixth step S6. It is a process to do it.
  • the index member 60 is a contact portion between the bottom concrete structure 10 and the ceiling concrete structure 20 that is mass produced in a production plant, that is, the first iron plate 30 of the bottom concrete structure 10. ) And the earthquake-resistant performance of the part to be joined between the second iron plate 40 of the ceiling concrete structure 20, as well as to improve the adhesion and waterproof made of a rubber material using butyl rubber.
  • the ceiling concrete structure 20 was placed on the top of the bottom concrete structure 10 in a subsequent process.
  • seismic resistance, durability, bonding and waterproofing are greatly improved.
  • the ceiling concrete structure 20 is disposed on the top of the bottom concrete structure 10 on which the water repellent material 60 is applied to the upper surface of the first iron plate 30 by the seventh step S7.
  • the second steel plate 40 and the first of the bottom concrete structure 10 are respectively provided in the first groove portion 22 and the second groove portion 24 of the ceiling concrete structure 20 to be seated and stacked.
  • the first iron plate 30 provided in each of the protrusions 12 and the second protrusions 14 correspond to each other so that the first grooves 22 and the second grooves 24 are positioned with the first protrusions 12. It is a process of seating so that each may be fitted to the 2nd protrusion 14.
  • the second iron plate 40 of the ceiling concrete structure 20 corresponds to the first iron plate 30 of the bottom concrete structure 10. After positioning, the ceiling concrete structure 20 is placed on the top of the bottom concrete structure 10 to be seated.
  • the ceiling concrete structure 20 seated on the top of the bottom concrete structure 10 is the bottom concrete structure (
  • the bottom body is formed by the water receptacle 60 which is fitted to the first protrusions 12 and the second protrusions 14 of 10), respectively, stacked and seated, and is provided between the first iron plate 30 and the second iron plate 40.
  • the concrete structure 10 is firmly fixed and supported.
  • the first fixing piece 31 is further provided on both sides of the first iron plate 30 of the bottom concrete structure 10, respectively, the second iron plate 40 of the ceiling concrete structure 20
  • Each of the second fixing piece 41 may be further bent and provided at both sides.
  • a ninth process (S9) for welding and fixing the second fixing piece 41 extending from both sides of the second iron plate 40 respectively provided by the welding operation may be further provided.
  • the first fixing piece 31 of the first iron plate 30 and the second fixing piece 41 of the second iron plate 40 are welded and fixed to each other by the ninth step S9.
  • the bottom concrete structure 10 and the ceiling concrete structure 20 may be firmly supported and fixed to each other.
  • the present invention is a laminated portion of the laminated bottom concrete structure 10 and the ceiling concrete structure 20, that is, the first iron plate 30 and the second iron plate 40 as well as these first iron plate 30 and the first
  • the bottom concrete structure by finishing the outside of the first groove portion 22 and the first protrusion portion 12 and the second groove portion 24 and the second protrusion portion 14, each of which is provided with the iron plate 40 by a plastering process. 10 and the laminated portion of the ceiling concrete structure 20 can be prevented from being exposed to the outside.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

본 발명은 단위체 콘크리트 구조물 주택 시공방법에 관한 것으로, 단위체로 이루어지는 바닥체 콘크리트구조물과 천정체 콘크리트구조물을 서로 적층하여 콘크리트 주택을 시공함에 따라 현장에서의 거푸집 설치와 설치된 거푸집에 콘크리트를 타설하지 않고 단위체로 이루어진 콘크리트 구조물을 직접 조립하여 암거주택을 시공함으로써 공사기간을 크게 단축시킬 수 있을 뿐만 아니라, 주택시공의 단순화와 함께 공사기간의 단축은 물론 단위체로 이루어진 콘크리트 구조물의 적층에 의한 연결작업이 간단하게 이루어지도록 하여 작업효율성을 크게 향상시킬 수 있다.

Description

단위체 콘크리트 구조물 주택 시공방법
본 발명은 단위체 콘크리트 구조물 주택 시공방법에 관한 것으로, 더욱 상세하게는 각각 단위체로 이루어진 PC(Precast Concrete) 구조체를 이용하여 암거주택을 시공하되, 주택의 바닥부와 천정부를 각각 단위체 콘크리트 구조물로 구비하고 구비된 바닥부와 천정부의 단위체 콘크리트 구조물을 서로 적층하여 주택을 시공하도록 하여 주택 시공의 용이성과 주택시공기간의 단축은 물론 작업효율성을 향상시키며 적층되는 바닥부와 천정부의 단위체 콘크리트 구조물에 대한 지지성 및 내구성을 크게 향상시킨 수 있도록 한 단위체 콘크리트 구조물 주택 시공방법에 관한 것이다.
일반적으로 주택이나 건물 등의 시공은, 먼저 건축하고자 하는 지면을 파내어 터잡기 공사를 진행한 다음, 터잡기 공사가 이루어진 공간에 콘크리트를 이용하여 지반을 구축한 후, 구축된 지반에 건축하고자 하는 주택이나 건물의 구조에 따라 내부에 철근이 배근된 내외측 거푸집을 설치한다.
이와 같이 내외측 거푸집이 설치되면, 설치된 내외측 거푸집의 내측에 콘크리트를 타설하여 기본적인 벽체를 시공하며, 벽체시공이 이루어진 후에는 타설된 콘크리트의 충분한 양생시간을 거치게 되고 콘크리트의 양생이 이루어지고 나면, 다시 시공된 벽체의 천정슬라브를 시공하기 위한 거푸집설치 공사를 진행하며 천정슬라브 거푸집에 콘크리트를 타설하고 양생하는 과정을 거쳐 기본적인 주택이나 건물의 구조를 완성한다.
또한, 기본적인 건물의 구조가 완성되면 벽돌 등과 같은 내외장재를 이용하여 건물의 내벽면과 외벽면을 마감하고, 기타 전기배선이나 수도배관 등을 시공한 다음 주택을 완성하게 된다.
이와 같은 시공방법에 의해 이루어지는 주택 또는 건물의 시공은, 예를 들어 내외측 거푸집을 설치하거나 또는 내외측 거푸집의 내부에 철근을 배근하거나 또는 콘크리트를 타설하거나 또는 타설된 콘크리트를 양생하는 과정을 반드시 거쳐야 하기 때문에 주택시공기간이 오래 걸리게 되는 문제점이 있다.
근자들어서는, 이러한 종래 주택 시공에 따른 문제점을 해결하기 위해 주택의 기본을 구축하는 벽체와 천정슬라브가 하나의 구조체로 성형된 콘크리트 구조체를 이용하여 조립식으로 주택이나 건물을 시공하고 있으며, 통상 콘크리트 구조체는 각각의 단위체로 공장에서 먼저 양산한 후 양상된 각각의 단위체를 현장으로 이송하여 조립함으로써 조립식 주택을 시공하고 있다.
이와 같이 공장에서 양산된 콘크리트 구조체를 이용하여 주택을 시공할 경우 현장에서의 거푸집 설치작업이나 철근의 배근작업 또는 콘크리트 타설작업이나 타설된 콘크리트의 양생작업이 생략됨에 따라 콘크리트 주택이나 건물의 공사기간을 크게 단축할 수 있다는 장점이 있는 반면에, 각각의 단위체로 이루어진 콘크리트 구조체들을 서로 연결하여 조립하는데 따른 시간이 지연됨으로써 공사기간을 크게 단축시키지 못하는 문제점이 있다.
종래 기술로서, 등록특허 10-1356781호인 공기단축을 위한 주택의 벽체틀 제작방법 및 이를 이용한 시공방법이 안출된 바 있으며, 이는 하부층과 상부층으로 나누어지는 다층으로 구성된 주택의 벽체틀 제작방법에서, 내측거푸집과 외측거푸집을 조립하고 내/외측거푸집 외면에 일정간격마다 가로/세로방향으로 보강재를 설치하는 제1단계, 내측거푸집과 외측거푸집에 개구부를 형성하는 제2단계, 내측거푸집과 외측거푸집 사이에 간격재를 설치하는 제3단계, 및 전체적으로 일측이 개방된 ㄷ자형의 형태를 가지면서 이 개방된 부위가 내/외측거푸집 상단에 씌워져 내/외측거푸집을 감싸는 형태로 결합되는 연결강을 설치하는 제4단계를 포함하여 구성되되, 제4단계의 연결강은, 일측이 개방된 ㄷ자형의 형태 대신에 ㄴ자 형태의 단면으로 구성된 머리부와 머리부의 단부에서 직교 연장되는 몸체부가 결합된 부재 한 쌍이 소정 이격되어 서로 대칭되게 마주보는 형태로 구성되되, 머리부는 수직부분에 위에서부터 순차적으로 양중구멍과 다수 개의 제1볼트홈이 형성되며 몸체부는 상부에 제2볼트홈이 구성되고 제2볼트홈 아래방향으로 내측에 일정높이마다 갈고리 형태의 걸림고리가 다수 개 형성되어 이루어져 있다.
이러한 종래 기술은 내/외측거푸집을 보강재 및 보강판으로 보강하여 견고하게 구성하고 내/외측거푸집을 감싸는 형태로 결합된 연결강을 이용함으로써 크레인으로 쉽게 들어올려 계획된 위치에 이동시킨 후 철근 배근 및 콘크리트 타설에 의해 주택이 시공되도록 하고 있다.
그러나, 종래 기술의 경우 내/외측 거푸집을 먼저 설치한 다음 내/외측 거푸집 사이에 콘크리트를 타설하여 주택을 시공하기 때문에, 거푸집 설치작업에 따른 인건비용의 부담과 함께 작업시간이 추가되고 또한 타설된 콘크리트의 양생시간에 따른 공사기간의 지연은 물론 주택을 다층으로 시공하기 위해서는 양생된 콘크리트 구조물의 상부에 내/외측 거푸집을 재 설치하고 다시 콘크리트를 타설하여야 하는 과정을 반복적으로 진행해야 하는 공정에 의해 주택시공기간이 길어질 수 밖에 없는 문제점이 있다.
본 발명은 주택을 시공할 때 단위체 콘크리트 구조물을 적층하여 주택을 시공함에 따라 주택이나 건물의 시공기간이 크게 단축될 수 있을 뿐만 아니라, 다층으로 콘크리트 주택을 시공할 때 단위체 구조물의 바닥부와 천정부를 간단하게 결합하되 견고하게 결합하여 현장에서의 거푸집 설치와 설치된 거푸집에 콘크리트를 타설하지 않고 단위체로 이루어진 콘크리트 구조물을 직접 조립하여 암거주택을 시공함으로써 공사기간을 크게 단축시킬 수 있을 뿐만 아니라, 작업효율성이 크게 향상되도록 한 단위체 콘크리트 구조물 주택 시공방법을 제공함에 그 목적이 있다.
상기 목적을 달성하기 위한 수단으로 본 발명인 단위체 콘크리트 구조물 주택 시공방법은, 바닥부와 상기 바닥부의 좌측상방향으로 수직 연장되고 제1돌부를 갖는 제1좌측부와 상기 바닥부의 우측상방향으로 수직 연장되고 제2돌부를 갖는 제1우측부로 이루어지며 제1철근이 배근된 바닥체 콘크리트구조물과; 천정부와 상기 천정부의 좌측 하방향으로 수직 연장되고 상기 제1돌부에 대응되는 제1홈부를 갖는 제2좌측부와 상기 천정부의 우측 하방향으로 수직 연장되고 상기 제2돌부에 대응되는 제2홈부를 갖는 제2우측부로 이루어지며 제2철근이 배근된 천정체 콘크리트구조물을 포함하고, 바닥체 콘크리트구조물의 제1돌부와 제2돌부에 각각 제1철판을 절곡하여 안착하는 제1공정과; 제1공정에 의해 제1돌부와 제2돌부에 각각 안착된 제1철판과 상기 바닥체 콘크리트구조물의 제1좌측부와 제1우측부에 배근된 철근을 용접하는 제2공정; 천정체 콘크리트구조물의 제1홈부와 제2홈부에 각각 제2철판을 절곡하여 밀착시키는 제3공정과; 제3공정에 의해 제1홈부와 제2홈부에 각각 안착된 제2철판과 상기 천정체 콘크리트구조물의 제2좌측부와 제2우측부에 배근된 철근을 용접하는 제4공정; 주택이나 건물을 설치하고자 하는 지면에 기초바닥을 올려놓는 제5공정; 제5공정에 의해 지면에 올려진 기초바닥 상면에 상기 제1철판이 제1돌부와 제2돌부에 각각 안착되어 철근과 용접작업에 의해 고정된 바닥체 콘크리트구조물을 안착하는 제6공정; 제6공정에 의해 기초바닥 상면에 안착된 바닥체 콘크리트구조물의 제1철판과 제2철판 상면에 각각 지수재를 도포하는 제7공정; 제7공정에 의해 지수재가 제1철판 상면에 각각 도포된 바닥체 콘크리트구조물 상단에 천정체 콘크리트구조물을 안착하여 적층하되, 상기 천정체 콘크리트구조물의 제1홈부와 제2홈부에 각각 구비되는 제2철판과 상기 바닥체 콘크리트구조물의 제1돌부와 제2돌부에 각각 구비되는 제1철판이 서로 대응되도록 위치하여 상기 제1홈부와 제2홈부를 상기 제1돌부와 제2돌부에 각각 끼움결합되도록 안착하는 제8공정으로 이루어진다.
나아가, 상기 바닥체 콘크리트구조물의 제1철판 양측에는 각각 제1고정편이 더 절곡되어 구비되고, 상기 천정체 콘크리트구조물의 제2철판 양측에는 각각 제2고정편이 더 절곡되어 구비되며, 상기 제8공정 후, 서로 대응되게 맞물리는 바닥체 콘크리트구조물의 제1돌부와 제2돌부에 각각 구비되는 제1철판 양측으로부터 연장되는 제1고정편과 천정체 콘크리트구조물의 제1홈부와 제2홈부에 각각 구비되는 제2철판 양측으로부터 연장되는 제2고정편을 용접작업에 의해 용접하여 고정하는 제9공정이 더 구비되어 이루어진다.
본 발명은 단위체로 이루어지는 바닥체 콘크리트구조물과 천정체 콘크리트구조물을 서로 적층하여 콘크리트 주택을 시공함에 따라 현장에서의 거푸집 설치와 설치된 거푸집에 콘크리트를 타설하지 않고 단위체로 이루어진 콘크리트 구조물을 직접 조립하여 암거주택을 시공함으로써 공사기간을 크게 단축시킬 수 있을 뿐만 아니라, 주택시공의 단순화와 함께 공사기간의 단축은 물론 단위체로 이루어진 콘크리트 구조물의 적층에 의한 연결작업이 간단하게 이루어지도록 하여 작업효율성을 크게 향상시킬 수 있다.
도 1은 본 발명인 단위체 콘크리트 구조물 주택 시공방법의 공정을 나타낸 공정도이다.
도 2는 본 발명인 단위체 콘크리트 구조물 주택 시공방법의 공정에 의해 콘크리트구조물이 적층된 상태를 나타낸 구성도이다.
도 3은 본 발명인 단위체 콘크리트 구조물 주택 시공방법의 공정에 의해 콘크리트구조물이 적층되는 상태를 나타낸 분해도이다.
도 4는 본 발명인 단위체 콘크리트 구조물 주택 시공방법의 구성요부를 확대한 구성도이다.
도 5는 본 발명인 단위체 콘크리트 구조물 주택 시공방법의 다른 실시예를 나타낸 확대 구성도이다.
도 6은 본 발명인 단위체 콘크리트 구조물 주택 시공방법의 또 다른 실시예를 나타낸 구성도이다.
이하, 본 발명을 첨부된 도면을 참조하여 더욱 상세하게 설명하면 다음과 같다.
이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.
따라서, 본 명세서에 기재된 실시 예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시 예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들은 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.
도시된 바와 같이 본 발명인 단위체 콘크리트 구조물 주택 시공방법은, 제1공정(S1)과 제2공정(S2), 제3공정(S3), 제4공정(S4), 제5공정(S5), 제6공정(S6), 제7공정(S7), 제8공정(S8)으로 이루어진다.
또한, 본 발명은 바닥체 콘크리트구조물(10)과 천정체 콘크리트구조물(20)의 단위체로 이루어지는 콘크리트구조물에 의해 주택이 시공된다.
이에 따라 본 발명은, 바닥부(11)와 상기 바닥부(11)의 좌측상방향으로 수직 연장되고 제1돌부(12)를 갖는 제1좌측부(13)와 상기 바닥부(11)의 우측상방향으로 수직 연장되고 제2돌부(14)를 갖는 제1우측부(15)로 이루어지며 제1철근(16)이 배근된 바닥체 콘크리트구조물(10)과, 천정부(21)와 상기 천정부(21)의 좌측 하방향으로 수직 연장되고 상기 제1돌부(12)에 대응되는 제1홈부(22)를 갖는 제2좌측부(23)와 상기 천정부(21)의 우측 하방향으로 수직 연장되고 상기 제2돌부(14)에 대응되는 제2홈부(24)를 갖는 제2우측부(25)로 이루어지며 제2철근(26)이 배근된 천정체 콘크리트구조물(20)을 포함한다.
상기 바닥체 콘크리트구조물(10)과 천정체 콘크리트구조물(20)은, 각각 단위체로 이루어지는 것으로 주택건설 현장이 아닌 공장에서 단위체 콘크리트 구조물인 바닥체 콘크리트구조물(10)과 천정체 콘크리트구조물(20)을 제작하고 제작된 단위체 콘크리트 구조물인 바닥체 콘크리트구조물(10)과 천정체 콘크리트구조물(20)을 주택건설 현장으로 운반하여 본 발명인 단위체 콘크리트 구조물 주택 시공방법에 의해 이들을 적층함으로써 콘크리트 주택을 시공하는 것이다.
본 발명의 제1공정(S1)은, 바닥체 콘크리트구조물(10)의 제1돌부(12)와 제2돌부(14)에 각각 제1철판(30)을 절곡하여 안착하는 공정이다.
이 때, 상기 바닥체 콘크리트구조물(10)의 제1돌부(12)와 제2돌부(14)는, 상기 바닥체 콘크리트구조물(10)의 제1좌측부(13)와 제1우측부(15) 상면 중앙으로부터 각각 돌출되어 있기 때문에 제1돌부(12)와 제2돌부(14)의 형상에 맞도록 상기 제1철판(30)을 절곡하여 안착한다.
상기 제2공정(S2)은, 제1공정(S1)에 의해 제1돌부(12)와 제2돌부(14)에 각각 안착된 제1철판(30)과 상기 바닥체 콘크리트구조물(10)의 제1좌측부(13)와 제1우측부(15)에 배근된 제1철근(16)을 용접하는 공정이다.
상기 제1철근(16)은, 상기 바닥체 콘크리트구조물(10)의 견고성과 지지성을 위해 바닥체 콘크리트구조물(10)의 내부에 배근하는 것으로 이 때 바닥체 콘크리트구조물(10)의 제1좌측부(13)와 제1우측부(15)에도 배근된 제1철근(16)이 위치되는 바, 이와 같이 제1좌측부(13)와 제1우측부(15)에 위치되는 제1철근(16)과 상기 제1돌부(12)와 제2돌부(14)에 각각 안착된 제1철판(30)을 용접하여 제1철판(30)이 제1돌부(12)와 제2돌부(14)에 각각 견고하게 고정되도록 한다.
상기 제3공정(S3)은, 천정체 콘크리트구조물(10)의 제1홈부(22)와 제2홈부(24)에 각각 제2철판(40)을 절곡하여 밀착시키는 공정이다.
상기 천정체 콘크리트구조물(20)의 제1홈부(22)와 제2홈부(24)는, 상기 바닥체 콘크리트구조물(10)의 제1돌부(12)와 제2돌부(14)에 각각 대응되게 구비되는 것으로 이에 따라 상기 제1홈부(22)와 제2홈부(24)에 밀착되는 상기 제2철판(40) 역시 제1홈부(22)와 제2홈부(24)이 형상에 따라 절곡된다.
이 때, 상기 제2철판(40)의 절곡된 형상은 상기 제1철판(30)의 절곡된 형상에 대응된다.
상기 제4공정(S4)은, 제3공정(S3)에 의해 제1홈부(22)와 제2홈부(24)에 각각 안착된 제2철판(40)과 상기 천정체 콘크리트구조물(20)의 제2좌측부(23)와 제2우측부(25)에 배근된 제2철근(26)을 용접하는 공정이다.
상기 제2철근(26)은, 상기 천정체 콘크리트구조물(20)의 견고성과 지지성을 위해 천정체 콘크리트구조물(20)의 내부에 배근하는 것으로 이 때 천정체 콘크리트구조물(20)의 제2좌측부(23)와 제2우측부(25)에도 배근된 제2철근(26)이 위치되는 바, 이와 같이 제2좌측부(23)와 제2우측부(25)에 위치되는 제2철근(26)과 상기 제1홈부(22)와 제2홈부(24)에 각각 안착된 제2철판(40)을 용접하여 제2철판(40)이 제1홈부(22)와 제2홈부(24)에 각각 견고하게 고정되도록 한다.
상기 제5공정(S5)은, 주택이나 건물을 설치하고자 하는 지면에 기초바닥(50)을 올려놓는 공정으로, 주택을 시공하고자 하는 지면에 평활작업을 진행한 다음 기초바닥(50)을 지면에 올려놓으면 되는 것으로, 이 때 기초바닥(50) 역시 콘크리트 재질로 이루어질 수 있다.
상기 제6공정(S6)은, 제5공정(S5)에 의해 지면에 올려진 기초바닥(50) 상면에 상기 제1철판(30)이 제1돌부(12)와 제2돌부(14)에 각각 안착되어 제1철근(16)과 용접작업에 의해 고정된 상기 바닥체 콘크리트구조물(10)을 안착하는 공정이다.
이 때, 상기 기초바닥(50)의 상면에는 상기 바닥체 콘크리트구조물(10)이 안착되는 위치를 표시하는 표시부가 더 구비될 수 있으며 바닥체 콘크리트구조물(10)은 크레인과 같은 장치를 이용하여 들어올린 후 기초바닥(50)의 상면에 표시된 표시부에 위치하여 올려 안착하면 된다.
상기 제7공정(S7)은, 제6공정(S6)에 의해 기초바닥(50) 상면에 안착된 바닥체 콘크리트구조물(10)의 제1철판(30) 상면에 각각 지수재(60)를 도포하는 공정이다.
상기 지수재(60)는, 생산공장에서 양산되는 상기 바닥체 콘크리트구조물(10)과 천정체 콘크리트구조물(20) 사이의 접해지는 부분 즉, 상기 바닥체 콘크리트구조물(10)의 제1철판(30)과 상기 천정체 콘크리트구조물(20)의 제2철판(40) 사이의 접합되는 부분에 대한 내진성능은 물론 접합성 향상과 방수성을 위해 도포하는 것으로 부틸고무를 이용한 고무재질로 이루어진다.
이와 같이 바닥체 콘크리트구조물(10)의 제1철판(30) 상면에 지수재(60)를 도포함에 따라 이후 공정에서 바닥체 콘크리트구조물(10)의 상단에 천정체 콘크리트구조물(20)을 올려 놓았을 때 내진성, 내구성, 접합성 및 방수성이 크게 향상된다.
상기 제8공정(S8)은, 제7공정(S7)에 의해 지수재(60)가 제1철판(30) 상면에 각각 도포된 바닥체 콘크리트구조물(10) 상단에 천정체 콘크리트구조물(20)을 안착하여 적층하되, 상기 천정체 콘크리트구조물(20)의 제1홈부(22)와 제2홈부(24)에 각각 구비되는 제2철판(40)과 상기 바닥체 콘크리트구조물(10)의 제1돌부(12)와 제2돌부(14)에 각각 구비되는 제1철판(30)이 서로 대응되도록 위치하여 상기 제1홈부(22)와 제2홈부(24)를 상기 제1돌부(12)와 제2돌부(14)에 각각 끼움결합되도록 안착하는 공정이다.
상기 천정체 콘크리트구조물(20) 역시 크레인과 같은 장치를 이용하여 들어올린 후 바닥체 콘크리트구조물(10)의 제1철판(30)에 천정체 콘크리트구조물(20)의 제2철판(40)이 대응되게 위치되도록 한 다음, 천정체 콘크리트구조물(20)을 바닥체 콘크리트구조물(10)의 상단에 올려 안착한다.
이와 같이 바닥체 콘크리트구조물(10)의 상단에 안착되는 천정체 콘크리트구조물(20)은, 천정체 콘크리트구조물(20)의 제1홈부(22)와 제2홈부(24)가 바닥체 콘크리트구조물(10)의 제1돌부(12)와 제2돌부(14)에 각각 끼워져 적층되어 안착되고 또한 제1철판(30)과 제2철판(40) 사이에 구비되는 지수재(60)에 의해 바닥체 콘크리트구조물(10)과 견고하게 고정 지지된다.
본 발명은, 상기 바닥체 콘크리트구조물(10)의 제1철판(30) 양측에는 각각 제1고정편(31)이 더 절곡되어 구비되고, 상기 천정체 콘크리트구조물(20)의 제2철판(40) 양측에는 각각 제2고정편(41)이 더 절곡되어 구비되어 이루어질 수 있다.
이와 같이 제1고정편(31)과 제2고정편(41)이 더 구비됨에 따라, 상기 제8공정(S8) 후, 서로 대응되게 맞물리는 바닥체 콘크리트구조물(10)의 제1돌부(12)와 제2돌부(14)에 각각 구비되는 제1철판(30) 양측으로부터 연장되는 제1고정편(31)과 천정체 콘크리트구조물(20)의 제1홈부(22)와 제2홈부(24)에 각각 구비되는 제2철판(40) 양측으로부터 연장되는 제2고정편(41)을 용접작업에 의해 용접하여 고정하는 제9공정(S9)이 더 구비되어 이루어질 수 있다.
이와 같이 제9공정(S9)에 의해 제1철판(30)의 제1고정편(31)과 제2철판(40)의 제2고정편(41)을 용접작업에 의해 서로 용착하여 고정함에 따라 바닥체 콘크리트구조물(10)과 천정체 콘크리트구조물(20)을 서로에 대해 견고하게지지 고정할 수 있다.
이외에도 본 발명은 적층된 바닥체 콘크리트구조물(10)과 천정체 콘크리트구조물(20)의 적층부 즉, 제1철판(30)과 제2철판(40)은 물론 이들 제1철판(30)과 제2철판(40)이 각각 구비되는 제1홈부(22)와 제1돌부(12) 및 제2홈부(24)와 제2돌부(14)의 외측을 미장공정에 의해 마감처리하여 바닥체 콘크리트구조물(10)과 천정체 콘크리트구조물(20)의 적층부가 외부로 노출되는 것을 방지할 수 있다.
이상과 같이 본 발명에서는 구체적인 구성 요소 등과 같은 특정 사항들과 한정된 실시예 및 도면에 의해 설명되었으나 이는 본 발명의 보다 전반적인 이해를 돕기 위해서 제공된 것일 뿐, 본 발명은 상기의 실시예에 한정되는 것은 아니며, 본 발명이 속하는 분야에서 통상적인 지식을 가진 자라면 이러한 기재로부터 다양한 수정 및 변형이 가능하다.
따라서, 본 발명의 사상은 설명된 실시예에 국한되어 정해져서는 아니 되며, 후술하는 특허청구범위뿐 아니라 이 특허청구범위와 균등하거나 등가적 변형이 있는 모든 것들은 본 발명 사상의 범주에 속한다고 할 것이다.

Claims (2)

  1. 바닥부(11)와 상기 바닥부(11)의 좌측상방향으로 수직 연장되고 제1돌부(12)를 갖는 제1좌측부(13)와 상기 바닥부(11)의 우측상방향으로 수직 연장되고 제2돌부(14)를 갖는 제1우측부(15)로 이루어지며 제1철근(16)이 배근된 바닥체 콘크리트구조물(10)과;
    천정부(21)와 상기 천정부(21)의 좌측 하방향으로 수직 연장되고 상기 제1돌부(12)에 대응되는 제1홈부(22)를 갖는 제2좌측부(23)와 상기 천정부(21)의 우측 하방향으로 수직 연장되고 상기 제2돌부(14)에 대응되는 제2홈부(24)를 갖는 제2우측부(25)로 이루어지며 제2철근(26)이 배근된 천정체 콘크리트구조물(20)을 포함하고,
    바닥체 콘크리트구조물(10)의 제1돌부(12)와 제2돌부(14)에 각각 제1철판(30)을 절곡하여 안착하는 제1공정(S1)과;
    제1공정(S1)에 의해 제1돌부(12)와 제2돌부(14)에 각각 안착된 제1철판(30)과 상기 바닥체 콘크리트구조물(10)의 제1좌측부(13)와 제1우측부(15)에 배근된 제1철근(16)을 용접하는 제2공정(S2);
    천정체 콘크리트구조물(10)의 제1홈부(22)와 제2홈부(24)에 각각 제2철판(40)을 절곡하여 밀착시키는 제3공정(S3)과;
    제3공정(S3)에 의해 제1홈부(22)와 제2홈부(24)에 각각 안착된 제2철판(40)과 상기 천정체 콘크리트구조물(20)의 제2좌측부(23)와 제2우측부(25)에 배근된 제2철근(26)을 용접하는 제4공정(S4);
    주택이나 건물을 설치하고자 하는 지면에 기초바닥(50)을 올려놓는 제5공정(S5);
    제5공정(S5)에 의해 지면에 올려진 기초바닥(50) 상면에 상기 제1철판(30)이 제1돌부(12)와 제2돌부(14)에 각각 안착되어 제1철근(16)과 용접작업에 의해 고정된 바닥체 콘크리트구조물(10)을 안착하는 제6공정(S6);
    제6공정(S6)에 의해 기초바닥(50) 상면에 안착된 바닥체 콘크리트구조물(10)의 제1철판(30) 상면에 각각 지수재(60)를 도포하는 제7공정(S7);
    제7공정(S7)에 의해 지수재(60)가 제1철판(30) 상면에 각각 도포된 바닥체 콘크리트구조물(10) 상단에 천정체 콘크리트구조물(20)을 안착하여 적층하되, 상기 천정체 콘크리트구조물(20)의 제1홈부(22)와 제2홈부(24)에 각각 구비되는 제2철판(40)과 상기 바닥체 콘크리트구조물(10)의 제1돌부(12)와 제2돌부(14)에 각각 구비되는 제1철판(30)이 서로 대응되도록 위치하여 상기 제1홈부(22)와 제2홈부(24)를 상기 제1돌부(12)와 제2돌부(14)에 각각 끼움결합되도록 안착하는 제8공정(S8)으로 이루어지는 것을 특징으로 하는 단위체 콘크리트 구조물 주택 시공방법.
  2. 제1항에 있어서,
    상기 바닥체 콘크리트구조물(10)의 제1철판(30) 양측에는 각각 제1고정편(31)이 더 절곡되어 구비되고,
    상기 천정체 콘크리트구조물(20)의 제2철판(40) 양측에는 각각 제2고정편(41)이 더 절곡되어 구비되며,
    상기 제8공정(S8) 후, 서로 대응되게 맞물리는 바닥체 콘크리트구조물(10)의 제1돌부(12)와 제2돌부(14)에 각각 구비되는 제1철판(30) 양측으로부터 연장되는 제1고정편(31)과 천정체 콘크리트구조물(20)의 제1홈부(22)와 제2홈부(24)에 각각 구비되는 제2철판(40) 양측으로부터 연장되는 제2고정편(41)을 용접작업에 의해 용접하여 고정하는 제9공정(S9)이 더 구비되어 이루어지는 것을 특징으로 하는 단위체 콘크리트 구조물 주택 시공방법.
PCT/KR2016/001732 2015-02-23 2016-02-23 단위체 콘크리트 구조물 주택 시공방법 WO2016137189A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2015-0024999 2015-02-23
KR1020150024999A KR101542717B1 (ko) 2015-02-23 2015-02-23 단위체 콘크리트 구조물 주택 시공방법

Publications (1)

Publication Number Publication Date
WO2016137189A1 true WO2016137189A1 (ko) 2016-09-01

Family

ID=53885603

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2016/001732 WO2016137189A1 (ko) 2015-02-23 2016-02-23 단위체 콘크리트 구조물 주택 시공방법

Country Status (2)

Country Link
KR (1) KR101542717B1 (ko)
WO (1) WO2016137189A1 (ko)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113632B (zh) * 2015-09-11 2017-09-12 安徽鸿路钢结构(集团)股份有限公司 一种新型易拆装活动板房
KR200489291Y1 (ko) * 2017-03-17 2019-06-13 주식회사 비파종합건설 친환경형 조립식 주택
CN114809488A (zh) * 2022-06-28 2022-07-29 南通科达建材科技股份有限公司 装配式建筑防水加强型带肋混凝土预制构件

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07102642A (ja) * 1993-10-08 1995-04-18 Misawa Homes Co Ltd ユニット式建物の建築方法
KR20030048837A (ko) * 2001-12-13 2003-06-25 삼연 피씨이 주식회사 프리캐스트 콘크리트로 제작된 전력맨홀의 체결 구조
KR20130036486A (ko) * 2011-10-04 2013-04-12 (주)유창플러스 모듈러 건축물의 모듈간 접합 구조
KR101370163B1 (ko) * 2013-08-23 2014-03-04 박준신 콘크리트주택 시공방법
KR101410602B1 (ko) * 2014-03-12 2014-06-20 박준신 콘크리트 주택의 단위체 구조물 적층 시공방법

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07102642A (ja) * 1993-10-08 1995-04-18 Misawa Homes Co Ltd ユニット式建物の建築方法
KR20030048837A (ko) * 2001-12-13 2003-06-25 삼연 피씨이 주식회사 프리캐스트 콘크리트로 제작된 전력맨홀의 체결 구조
KR20130036486A (ko) * 2011-10-04 2013-04-12 (주)유창플러스 모듈러 건축물의 모듈간 접합 구조
KR101370163B1 (ko) * 2013-08-23 2014-03-04 박준신 콘크리트주택 시공방법
KR101410602B1 (ko) * 2014-03-12 2014-06-20 박준신 콘크리트 주택의 단위체 구조물 적층 시공방법

Also Published As

Publication number Publication date
KR101542717B1 (ko) 2015-08-06

Similar Documents

Publication Publication Date Title
WO2015137577A1 (ko) 콘크리트 주택의 단위체 구조물 적층 시공방법
KR101182536B1 (ko) 용도와 기능에 맞는 표면재와 구조용 철근을 적용하고 조립식 구조를 갖는 더블월 피씨패널
KR101184277B1 (ko) 비정형 콘크리트 구조물 시공을 위한 철골구조체 및 이를 이용한 비정형 콘크리트 구조물 시공방법
CN103410317A (zh) 采用墙体预制构件现场拼装并浇筑的整体墙体施工方法
WO2016137189A1 (ko) 단위체 콘크리트 구조물 주택 시공방법
KR20070097891A (ko) 현장콘크리트 충진식 프리캐스트 콘크리트 패널 및 그시공방법
CN113529956A (zh) 一种剪力墙盒式装配式建筑结构及其施工方法
CN102660995A (zh) 预制复合板模墙体后浇混凝土框剪结构房屋及施工方法
CN213233888U (zh) 装配式部分空腔剪力墙及连接节点
WO2020214086A1 (en) Precast building
WO2015026027A1 (ko) 콘크리트주택 시공방법
US4408434A (en) Multi-storey building and a prefabricated panel for such a building
CN106760139A (zh) 一种外贴式模块化建筑结构及其施工方法
KR20140008905A (ko) 내/외장재 일체형 모듈러 셀블록 및 이를 이용한 건축물 시공방법
WO2015141907A1 (ko) 개구부가 구비된 조립식 콘크리트 주택의 콘크리트 구조물 제조방법
CN211341416U (zh) 模块装配式构件梁
WO2015026028A1 (ko) 주택시공용 콘크리트 구조체
CN110863586A (zh) 一种装配式建筑中的t字型水平连接节点
WO2018212391A1 (ko) 에어 단열 건축자재 및 이를 이용한 건축물 시공방법
WO2013125778A1 (ko) 강연선 위치 고정수단을 가진 pc슬래브 및 이를 이용한 1방향 장선 슬래브의 연속화 시공방법
WO2016153227A1 (ko) 콘크리트 암거주택
KR20170000255A (ko) 복합공법을 이용한 욕실의 시공방법 및 이를 이용하여 형성된 욕실
CN206308883U (zh) 一种外贴式模块化建筑结构
RU84033U1 (ru) Стена
KR20140046322A (ko) 모듈주택을 이용한 조립식 건축물과 이의 시공방법.

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16755839

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16755839

Country of ref document: EP

Kind code of ref document: A1