WO2014162863A1 - パレット搬送装置及びパレット搬送方法 - Google Patents

パレット搬送装置及びパレット搬送方法 Download PDF

Info

Publication number
WO2014162863A1
WO2014162863A1 PCT/JP2014/057240 JP2014057240W WO2014162863A1 WO 2014162863 A1 WO2014162863 A1 WO 2014162863A1 JP 2014057240 W JP2014057240 W JP 2014057240W WO 2014162863 A1 WO2014162863 A1 WO 2014162863A1
Authority
WO
WIPO (PCT)
Prior art keywords
pallet
rail
endless belt
concavo
moving mechanism
Prior art date
Application number
PCT/JP2014/057240
Other languages
English (en)
French (fr)
Inventor
博文 齋藤
Original Assignee
日特エンジニアリング株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日特エンジニアリング株式会社 filed Critical 日特エンジニアリング株式会社
Priority to US14/414,465 priority Critical patent/US10071864B2/en
Priority to EP14779158.6A priority patent/EP2982619B1/en
Priority to KR1020157000784A priority patent/KR101670190B1/ko
Priority to CN201480001996.6A priority patent/CN104507834B/zh
Publication of WO2014162863A1 publication Critical patent/WO2014162863A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G37/00Combinations of mechanical conveyors of the same kind, or of different kinds, of interest apart from their application in particular machines or use in particular manufacturing processes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/14Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting co-ordinated in production lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q16/00Equipment for precise positioning of tool or work into particular locations not otherwise provided for
    • B23Q16/02Indexing equipment
    • B23Q16/08Indexing equipment having means for clamping the relatively movable parts together in the indexed position
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/005Lifting devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/14Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting co-ordinated in production lines
    • B23Q7/1421Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting co-ordinated in production lines with a parallel disposition of working devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/14Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting co-ordinated in production lines
    • B23Q7/1426Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting co-ordinated in production lines with work holders not rigidly fixed to the transport devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/14Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting co-ordinated in production lines
    • B23Q7/1426Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting co-ordinated in production lines with work holders not rigidly fixed to the transport devices
    • B23Q7/1447Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting co-ordinated in production lines with work holders not rigidly fixed to the transport devices using endless conveyors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G49/00Conveying systems characterised by their application for specified purposes not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/02Articles
    • B65G2201/0267Pallets

Definitions

  • the present invention relates to a pallet conveying apparatus and a pallet conveying method for conveying one or more pallets on which a workpiece can be placed along a predetermined trajectory.
  • the pallet transport device provided in the conventional production line transports the pallet in a state in which a work requiring processing is placed on the pallet.
  • the pallet conveying device is provided with a machine tool, and the machine tool performs a predetermined process on the conveyed workpiece.
  • Japanese Patent Application Laid-Open No. 2011-93032 discloses a pallet transport device that transports a plurality of pallets on which workpieces can be placed on a square track in a horizontal plane with respect to the machine tool.
  • This pallet transport device includes a rear side and a front side pallet rail extending in parallel to each other, and a pallet moving mechanism for moving a pallet mounted on one of the back side and the front side pallet rail to the other side.
  • Each pallet is engaged with an endless belt that circulates in the pallet conveying device.
  • the pallet conveying device conveys each pallet along the back side and the near side pallet rail.
  • An object of the present invention is to provide a pallet transport apparatus and a pallet transport method that enable quick transport of pallets without increasing the exclusive area.
  • a pallet transport device configured to transport one or more pallets on which a workpiece can be placed, the first pallet rail on which the pallet is movably mounted;
  • the pallet is movably mounted, and is configured to circulate along the first pallet rail, a second pallet rail provided parallel to the first pallet rail at a predetermined interval in the vertical direction.
  • a first pallet feeding mechanism including a first endless belt in which irregularities extending in the belt width direction are continuously formed in the belt longitudinal direction, and configured to circulate along the second pallet rail.
  • a second pallet feeding mechanism comprising a second endless belt in which irregularities extending in the belt width direction are continuously formed in the belt longitudinal direction, and the pallet
  • a pallet moving mechanism that moves from one of the first pallet rail and the second pallet rail to the other of the first pallet rail and the second pallet rail, and the first endless belt and the second endless belt are And provided with a predetermined interval in the vertical direction, and arranged so that the belt width direction coincides with the vertical direction, and the pallet is moved to the first pallet rail by the pallet moving mechanism.
  • An uneven portion configured to engage with the unevenness of the first endless belt and configured to engage with the unevenness of the second endless belt when the pallet is raised to the second pallet rail by the pallet moving mechanism;
  • a pallet transport apparatus is provided.
  • a pallet transport method using the pallet transport device wherein the pallet engaged with the first endless belt is moved to the first pallet by the first pallet feed mechanism.
  • the pallet is moved from the second pallet rail to the first pallet rail by the pallet moving mechanism so that the concavo-convex part of the pallet and the concavo-convex part of the first endless belt are engaged with each other.
  • a second pallet moving step for lowering the pallet for lowering the pallet.
  • FIG. 1 is a front view of a pallet carrying device according to an embodiment of the present invention.
  • FIG. 2 is a front view of the pallet transport device showing a state after the pallet is transported along the first pallet rail and before the pallet is moved to the second pallet rail.
  • FIG. 3 is a front view of the pallet conveying apparatus showing a state after the pallet is moved to the second pallet rail and before the pallet is conveyed along the second pallet rail.
  • FIG. 4 is a front view of the pallet transport device showing a state after the pallet is transported along the second pallet rail and before the pallet is moved to the first pallet rail.
  • FIG. 5 is a longitudinal sectional view of the pallet carrying device taken along line AA in FIG.
  • FIG. 6 is a plan view of the pallet carrying device.
  • a pallet transport apparatus 10 will be described with reference to FIGS.
  • three axes that is, an X axis, a Y axis, and a Z axis, which are orthogonal to each other, are set.
  • the X axis indicates the horizontal horizontal direction
  • the Y axis indicates the horizontal front-rear direction.
  • the Z axis indicates the vertical direction (up and down direction).
  • the pallet conveyance device 10 is a conveyance device provided in a line for manufacturing a stator such as a motor, for example. As shown in FIG. 6, the pallet transport device 10 includes five machine tools 1 to 5. These machine tools 1 to 5 are provided in a line at a predetermined pitch P in the X-axis direction.
  • Each of the machine tools 1 to 5 sequentially performs various processes such as insertion of an insulating member, caulking of lead wires of each phase coil, welding and the like on the workpiece conveyed by the pallet conveying device 10. By these machine tools 1 to 5, the stator is automatically manufactured.
  • the pallet transport device 10 transports a plurality of pallets 11 and transports the workpieces placed on the pallets 11 to the machine tools 1 to 5.
  • the pallet carrying device 10 holds the workpiece at a predetermined position using the pallet 11 during machining by the machine tools 1 to 5.
  • the number of pallets 11 is set to 1 or 2 or more according to the number of machine tools 1 to 5.
  • the pallet carrying device 10 includes first and second pallet rails 12 and 13 extending in the X-axis direction.
  • the first pallet rail 12 and the second pallet rail 13 are arranged in parallel to each other with a predetermined interval in the vertical direction (up and down direction). Further, the first pallet rail 12 and the second pallet rail 13 are arranged substantially parallel to the machine tools 1 to 5 (see FIG. 6) arranged straight in the X-axis direction.
  • the machine tools 1 to 5 are installed on the front side or the back side of the first pallet rail 12 and the second pallet rail 13.
  • the pallet transport device 10 includes a mounting plate 14 that is horizontally fixed to the upper surface of the gantry 9, and a first horizontal plate 17 that is horizontally mounted to the mounting plate 14 via a column 16. And a second horizontal plate 18 disposed horizontally above the first horizontal plate 17 at a predetermined interval.
  • a side wall plate 8 is attached to one side of the first horizontal plate 17 and the second horizontal plate 18 in the Y-axis direction so as to connect both.
  • the first horizontal plate 17 and the second horizontal plate 18 are arranged in parallel to each other with a predetermined interval in the vertical direction.
  • 1st and 2nd support plates 17a and 18a are being fixed to the other side part in the Y-axis direction of the 1st and 2nd horizontal plates 17 and 18 along the longitudinal direction.
  • the first pallet rail 12 is fixed to the upper surface of the first support plate 17a by screwing
  • the second pallet rail 13 is fixed to the upper surface of the second support plate 18a by screwing.
  • the first and second pallet rails 12 and 13 are commercially available linear motion guide rails.
  • the pallet 11 is formed so as to straddle the first and second pallet rails 12 and 13, and the linear motion block 11 a that can move on the rails 12 and 13, and a screw on the block 11 a And a fixed base 11b.
  • a locking member 19 is provided on the side surface of the pedestal 11b on the side wall plate 8 side.
  • the linear motion block 11a of the pallet 11 is a part corresponding to the linear motion guide rail and includes a roller retainer.
  • the pallet 11 is mounted so as to be movable with respect to the first and second pallet rails 12 and 13.
  • the linear motion block 11 a prohibits movement of the pallet 11 in the width direction (Y-axis direction) and reduces resistance when the pallet 11 moves along the first and second pallet rails 12 and 13.
  • the length of the pallet 11 in the X-axis direction (the length of the base 11b) L is set equal to or shorter than the pitch P, which is the installation interval of the machine tools 1-5.
  • the In the pallet transport device 10, the plurality of pallets 11 are moved along the second pallet rail 13 corresponding to the pitch P, so that the workpieces placed on the pallets 11 face each of the machine tools 1 to 5. It becomes.
  • the pallet carrying device 10 moves the pallet 11 mounted on one of the first pallet rail 12 and the second pallet rail 13 to the other of the first pallet rail 12 and the second pallet rail 13. Further, pallet moving mechanisms 20 and 25 are provided.
  • the pallet moving mechanism includes a first pallet moving mechanism 20 that moves the pallet 11 from the second pallet rail 13 to the first pallet rail 12, and a second pallet that moves the pallet 11 from the first pallet rail 12 to the second pallet rail 13. And a moving mechanism 25.
  • the first and second pallet moving mechanisms 20 and 25 are provided so as to sandwich the first and second pallet rails 12 and 13 from both sides in the longitudinal direction (X-axis direction). That is, the first pallet moving mechanism 20 is disposed on one side of the first and second pallet rails 12 and 13, and the second pallet moving mechanism 25 is on the other end side of the first and second pallet rails 12 and 13. Placed in the direction.
  • the first and second pallet moving mechanisms 20 and 25 are symmetrical to each other. As shown in FIG. 1, the first and second pallet moving mechanisms 20 and 25 include lift actuators 21 and 26 that are attached to stand vertically with respect to the attachment plate 14. Each has.
  • the elevating actuator 21 (first elevating actuator) includes an elongated box-shaped housing 21a erected in the vertical direction (Z-axis direction) from the mounting plate 14, and a ball screw 21b provided so as to extend in the vertical direction in the housing 21a. And a servo motor 21c that rotationally drives the ball screw 21b, and a follower 21d that engages with the ball screw 21b and moves up and down in the vertical direction by the rotation of the ball screw 21b.
  • the lifting / lowering actuator 26 (second lifting / lowering actuator) is provided so as to extend in the vertical direction in the housing 26a and an elongated box-shaped housing 26a erected vertically from the mounting plate 14 (Z-axis direction).
  • the first pallet moving mechanism 20 further includes a first movable rail 22 on which the pallet 11 can be mounted
  • the second pallet moving mechanism 25 further includes a second movable rail 27 on which the pallet 11 can be mounted.
  • the first movable rail 22 is attached horizontally to the follower 21d of the elevating actuator 21 via an L-shaped attachment member 21e, and extends in the Y-axis direction.
  • the second movable rail 27 is attached horizontally to the follower 26d of the elevating actuator 26 via an L-shaped attachment member 26e, and extends in the Y-axis direction.
  • the servomotors 21c and 26c are driven to rotate the ball screws 21b and 26b and the followers 21d and 26d screwed to the ball screws 21b and 26c are moved up and down, the solid line arrows in FIGS. As shown, the first and second movable rails 22 and 27 move up and down together with the followers 21d and 26d.
  • the first and second movable rails 22 and 27 are linearly connected to the first pallet rail 12 as shown in FIGS. 1 and 2 at the most lowered position (down position), and are at the most elevated position (up position). 3 and 4, the second pallet rail 13 is connected linearly.
  • the length W (see FIG. 4) of the first and second movable rails 22 and 27 in the X-axis direction is the same as or longer than the length L (see FIG. 6) of the pallet 11 in the X-axis direction. Is set. That is, the first and second movable rails 22 and 27 are configured to be movable in the vertical direction while the pallet 11 is mounted.
  • each of the first and second movable rails 22 and 27 is mounted with one of the pallets 11 arranged at the same pitch as the pitch P that is the installation interval of the machine tools 1 to 5. . That is, the distance between the first movable rail 22 and the second movable rail 27 in the X-axis direction is set to be an integral multiple of the pitch P of the pallet 11, and the lift actuators 21 and 26 satisfy the setting. Installed on the mounting plate 14.
  • the pallet conveying device 10 further includes a first pallet feeding mechanism 30 that conveys the pallet 11 along the first pallet rail 12 and a second pallet feeding mechanism 40 that conveys the pallet 11 along the second pallet rail 13. I have.
  • the first pallet feed mechanism 30 and the second pallet feed mechanism 40 have the same structure.
  • the first pallet feed mechanism 30 is provided on the first horizontal plate 17, and the second pallet feed mechanism 40 is provided on the second horizontal plate 18 positioned above the first horizontal plate 17.
  • the first pallet feed mechanism 30 is configured to be engageable with the pallet 11 and circulates along the first pallet rail 12, and a first circulator mechanism that circulates the first endless belt 31. And a servo motor 32.
  • the second pallet feed mechanism 40 is configured to be able to engage with the pallet 11 and circulates along the second pallet rail 13 as a circulation mechanism that circulates the second endless belt 41.
  • the second servo motor 42 is provided.
  • the pallet feeding mechanism will be described on behalf of the second pallet feeding mechanism 40 provided on the second horizontal plate 18.
  • idle pulleys 43 to 46 are rotatably provided at substantially four corners of the second horizontal plate 18, respectively.
  • a second endless belt 41 is wound around the four idle pulleys 43 to 46 so as to surround the pulleys.
  • the tension of the second endless belt 41 is set so that the belt positioned between the idle pulleys 44 and 45 on the second pallet rail 13 side is substantially parallel to the second pallet rail 13.
  • the second endless belt 41 is configured such that a belt parallel to the second pallet rail 13 reaches the first movable rail 22 and the second movable rail 27 that are continuous with the second pallet rail 13.
  • Notches 18c and 18d for preventing interference with the two horizontal plates 18 are formed.
  • a second drive pulley 47 and a second driven pulley 48 are provided so as to push the second endless belt 41 inward from both sides in the longitudinal direction (X-axis direction). It is done.
  • the second drive pulley 47 is driven by a second servo motor 42 as a circulation mechanism.
  • the second servo motor 42 is fixed to the second horizontal plate 18, and the second drive pulley 47 is attached to the rotation shaft 42 a of the second servo motor 42.
  • the rotation shaft 42a of the second servo motor 42 rotates together with the second drive pulley 47, and the second endlessly wound around the second drive pulley 47.
  • the belt 41 circulates while being wound around the four idle pulleys 43 to 46.
  • the second driven pulley 48 is rotatably attached to the second horizontal plate 18 via the position adjusting mechanism 49.
  • the position adjusting mechanism 49 is provided on the second horizontal plate 18 so as to extend in parallel with the second pallet rail 13, and is movably provided on the rail 49a.
  • the second driven pulley 48 is rotatably arranged on the base portion 49b of the position adjusting mechanism 49, and the X-axis direction position of the second driven pulley 48 is adjusted by moving the base portion 49b with the screw member 49d.
  • the position of the second driven pulley 48 in the X-axis direction it is possible to adjust the tension of the second endless belt 41 wound around the pulleys 43, 44, 45, 46, 47, 48. Become.
  • the first pallet feed mechanism 30 is configured in the same manner as the second pallet feed mechanism 40. As shown in FIG. 4, the first pallet feed mechanism 30 includes idle pulleys 33 to 36, a first drive pulley 37, a first driven pulley 38 provided on the first horizontal plate 17, and these pulleys 33 to 36, And a first endless belt 31 wound around 37,38.
  • the first drive pulley 37 is driven by a first servo motor 32 as a circulation mechanism.
  • the first servo motor 32 is fixed to the first horizontal plate 17, and the first drive pulley 37 is attached to the rotation shaft 32 a of the first servo motor 32.
  • the first pallet feed mechanism 30 includes a position adjustment mechanism that can adjust the position of the first driven pulley 38 in the X-axis direction in order to adjust the tension of the first endless belt 31.
  • the first and second endless belts 31 and 41 are so-called toothed belts. Since the first and second endless belts 31 and 41 have the same structure, the second endless belt 41 will be described as a representative. As shown in the enlarged view of FIG. 6, the second endless belt 41 is configured such that concave portions 41a and convex portions 41b extending in the belt width direction are alternately continued in the belt longitudinal direction. Below, the recessed part 41a and the convex part 41b are collectively called the unevenness
  • the second endless belt 41 is wound around idle pulleys 43 to 46 provided on the second horizontal plate 18, and is arranged so that the belt width direction coincides with the vertical direction (Z-axis direction).
  • the first horizontal plate 17 provided with the first endless belt 31 and the second horizontal plate 18 provided with the second endless belt 41 are provided in parallel to each other with a predetermined interval in the vertical direction. Therefore, the first endless belt 31 and the second endless belt 41 are arranged at a predetermined interval in the vertical direction with the belt width direction coinciding with the vertical direction.
  • the locking member 19 of the pallet 11 has convex portions that can be engaged with the concave and convex portions 31 a and 31 b of the first endless belt 31 and the concave and convex portions 41 a and 41 b of the second endless belt 41. 19a and a recess 19b are formed.
  • the locking member 19 is a member attached to the side surface of the base 11b of the pallet 11 on the belt side, and the protrusions 19a and the recesses 19b of the locking member 19 extend in the vertical direction and alternately continue in the longitudinal direction. Is formed.
  • the convex portion 19a and the concave portion 19b of the locking member 19 are collectively referred to as the concave and convex portions 19a and 19b of the pallet 11.
  • the first horizontal plate 17 is provided with a support member 17 b that holds the first endless belt 31 from the back side along the longitudinal direction
  • the second horizontal plate 18 is provided with a second endless belt 41.
  • a support member 18b that is pressed from the back side along the longitudinal direction is provided.
  • the support member 18b Since the support member 17b and the support member 18b have the same structure, the support member 18b provided on the second horizontal plate 18 will be described as a representative. As shown in the enlarged view of FIG. 6, the support member 18 b has the second endless belt 41 on the back side when the concave and convex portions 19 a and 19 b of the pallet 11 are engaged with the concave and convex portions 41 a and 41 b of the second endless belt 41. The second endless belt 41 is prevented from being bent by being pressed from above.
  • the support member 18b causes the bent second endless belt 41 to rise from the locking member 19 of the pallet 11, and the engagement between the concave and convex portions 19a and 19b of the pallet 11 and the concave and convex portions 41a and 41b of the second endless belt 41. Prevents the combination from being released.
  • the pallet 11 has the first And it is prohibited to move in the X-axis direction independently of the second endless belts 31 and 41.
  • the pallet 11 moves together with the first and second endless belts 31 and 41 and is conveyed along the first and second pallet rails 12 and 13.
  • the unevenness 31a, 31b of the first endless belt 31, the unevenness 41a, 41b of the second endless belt 41, and the unevenness portions 19a, 19b of the pallet 11 are formed so as to extend in the vertical direction (Z-axis direction). Therefore, when the pallet 11 moves up and down in the vertical direction, the unevenness 31a and 31b of the first endless belt 31 and the unevenness 41a and 41b of the second endless belt 41 and the unevenness portions 19a and 19b of the pallet 11 shift in the vertical direction. It will be. Thereby, the locking member 19 of the pallet 11 is disengaged from the first and second endless belts 31 and 41, and the engagement state between the pallet 11 and the first and second endless belts 31 and 41 is released. Then, when the pallet 11 is moved up and down again to the positions of the first and second endless belts 31 and 41, the uneven portions 19a and 19b of the pallet 11 are engaged with the belts 31 and 41.
  • the first and second movable rails 22 and 27 on which the pallet 11 is mounted are moved up and down and separated from the first and second pallet rails 12 and 13, so And the engagement state with the 2nd endless belts 31 and 41 is cancelled
  • the first and second movable rails 22 and 27 are moved up and down and linearly connected to the first and second pallet rails 12 and 13, so that the pallet 11 and the first and second endless belts 31 are connected. , 41 are engaged.
  • the pallet transporting method by the pallet transporting device 10 includes a first pallet transporting process for transporting the pallet 11 along the first pallet rail 12 and a first pallet transporting the pallet 11 from the first pallet rail 12 to the second pallet rail 13.
  • the pallet 11 is transported using the pallet transport device 10.
  • the first pallet rail 12 and the second pallet rail 13 are provided in parallel to each other with a predetermined interval in the vertical direction.
  • the first endless belt 31 that conveys the pallet 11 is formed with irregularities 31a and 31b extending in the belt width direction, and the first endless belt 31 is disposed so that the width direction thereof coincides with the vertical direction.
  • the second endless belt 41 that conveys the pallet 11 is formed with irregularities 41a and 41b extending in the belt width direction, and the second endless belt 41 is disposed so that the width direction thereof coincides with the vertical direction. Is done.
  • the pallet 11 is formed with uneven portions 19 a and 19 b that can be engaged with the uneven portions 31 a and 31 b of the first endless belt 31 and the uneven portions 41 a and 41 b of the second endless belt 41.
  • each of the machine tools 1 to 5 performs predetermined processing on the workpiece placed on the pallet 11 located on the second pallet rail 13. Below, each process of a pallet conveyance method is demonstrated.
  • First pallet transport process In the first pallet transporting process, the pallet 11 mounted on the first pallet rail 12 positioned below the second pallet rail 13 is transported.
  • the first movable rail 22 on which the pallet 11 is mounted is lowered to connect the first movable rail 22 and the first pallet rail 12 linearly.
  • the first movable rail 22 and the pallet 11 descend through the notch 17 d of the first horizontal plate 17 and the first movable rail 22 is connected to the first pallet rail 12, the first movable rail 22 and the pallet 11 are mounted on the first movable rail 22.
  • the concave and convex portions 19 a and 19 b of the pallet 11 engage with the concave and convex portions 31 a and 31 b of the first endless belt 31 that are parallel to the first pallet rail 12.
  • the pallet 11 may be arranged on the first pallet rail 12 from the end of the first pallet rail 12 with the first and second movable rails 22 and 27 raised. Even in this way, the uneven portions 19 a and 19 b of the pallet 11 and the uneven portions 31 a and 31 b of the first endless belt 31 can be engaged.
  • the first endless belt 31 After engaging the concavo-convex portions 19a and 19b of the pallet 11 with the concavo-convex portions 31a and 31b of the first endless belt 31, the first endless belt 31 is circulated by driving the servo motor 32 of the first pallet feeding mechanism 30. . As a result, the pallet 11 engaged with the first endless belt 31 is conveyed from the left side to the right side in the drawing along the first pallet rail 12 as shown in FIGS.
  • the pallet conveying apparatus 10 is configured such that each machine tool 1 to 5 (see FIG. 6) performs a predetermined process on the workpiece of the pallet 11 on the second pallet rail 13. Therefore, the pallet 11 on the first pallet rail 12 is only transported from the first movable rail 22 toward the right end of the first pallet rail 12.
  • First pallet moving process In the first pallet moving step, the pallet 11 is raised from the first pallet rail 12 to the second pallet rail 13.
  • the second movable rail 27 is lowered to the lowered position by the second pallet moving mechanism 25, and the second movable rail 27 and the first pallet rail 12 are continuously connected. Thereafter, the pallet 11 is moved from the end of the first pallet rail 12 to the second movable rail 27 by the first pallet feed mechanism 30.
  • the second movable rail 27 After moving to the second movable rail 27, as shown in FIG. 3, the second movable rail 27 is raised to the raised position, and the second movable rail 27 and the second pallet rail 13 are continuously connected. That is, the second movable rail 27 on which the pallet 11 is mounted rises to a predetermined ascending position and then stops in a state where it is connected to the second pallet rail 13.
  • the second movable rail 27 rises and separates from the first pallet rail 12, the engagement between the pallet 11 and the first endless belt 31 is released, and thus the upward movement of the second movable rail 27 is hindered. There is no.
  • first movable rail 22 and the second pallet rail 13 are continuously connected by raising the first movable rail 22 by the lift actuator 21 of the first pallet moving mechanism 20.
  • the pallet 11 on the second movable rail 27 follows the second pallet rail 13 as shown in FIG. Engaged with the second endless belt 41 provided. Thereafter, when the servo motor 42 of the second pallet feed mechanism 40 is driven to circulate the second endless belt 41, the pallet 11 moves from the second movable rail 27 to the second pallet rail 13 as shown in FIG. And conveyed along the second pallet rail 13.
  • Servo motor 42 is controlled so that each pallet 11 is temporarily stopped while facing each machine tool 1-5. In this way, the pallet 11 on the second pallet rail 13 moves from the right end to the left end of the second pallet rail 13 while repeatedly carrying and stopping.
  • the pallet 11 on which the work that has been processed by the machine tools 1 to 5 is placed is the second pallet. It is conveyed from the left end of the rail 13 onto the first movable rail 22.
  • the first pallet moving mechanism 20 lowers the first movable rail 22 in the raised position shown in FIG. 4 to the lowered position shown in FIG. That is, the first movable rail 22 on which the pallet 11 is mounted descends to a predetermined lowered position and then stops in a state where it is connected to the first pallet rail 12.
  • the engagement between the pallet 11 and the second endless belt 41 is released, so that the downward movement of the first movable rail 22 is inhibited. There is no.
  • the pallet 11 on the first movable rail 22 is a first endless provided along the first pallet rail 12. Engage with the belt 31.
  • the second movable rail 27 and the first pallet rail 12 are connected by lowering the second movable rail 27 by the lifting actuator 26 of the second pallet moving mechanism 25.
  • the pallet 11 can be conveyed counterclockwise by one by performing the conveying cycle shown in FIGS. 1 to 4 once.
  • the machine tools 1 to 5 are operated in a state where the transport of the pallet 11 is stopped.
  • various processes such as insertion of the insulating member, caulking of the lead wires of the respective phase coils, and welding are performed on the workpieces of the respective pallets 11 arranged on the second pallet rail 13.
  • the work is carried into and out of any pallet 11 on the second pallet rail 13.
  • each pallet 11 moves along the first pallet rail 12 while being engaged with the first endless belt 31 and is engaged with the second endless belt 41. It moves along the second pallet rail 13 in a state.
  • the pallet 11 can be transported at a high speed, and the pallet 11 can be reliably stopped at a predetermined position. As a result, productivity can be improved.
  • the pallet 11 is configured to be engageable with the first and second endless belts 31 and 41, and the first and second endless belts 31 and 41 are connected to each other.
  • the engaged pallet 11 is conveyed along the first and second pallet rails 12 and 13.
  • the first pallet rail 12 and the second pallet rail 13 are provided in parallel in the vertical direction with a predetermined interval therebetween, and the machine tools 1 to 5 are the first and second machines. It is arranged on the near side or the far side of the pallet rails 12 and 13.
  • the machine tools 1 to 5 are not arranged between the first and second pallet rails 12 and 13, even if the machine tools 1 to 5 are relatively large devices, The distance between the second pallet rails 12 and 13 does not increase. Therefore, even when the machine tools 1 to 5 are arranged, it is possible to suppress an increase in the occupied area occupied by the pallet transport device 10.
  • the first and second pallet moving mechanisms 20 and 25 are configured to move the pallet 11 to the first pallet rail 12 or the second pallet rail 13 by moving the pallet 11 up and down in the vertical direction.
  • the vertical movement distance of the pallet 11 is a predetermined distance in the vertical direction of the first and second pallet rails 12 and 13.
  • the predetermined distance is set to the vertical thickness of the pallet 11 or the vertical thickness of the pallet 11 including the work when the work is placed on the pallet 11. Therefore, the distance by which the pallet moving mechanisms 20 and 25 move (lift) the pallet 11 can be remarkably shortened as compared with a conventional pallet transport device that moves across the machine tool in the horizontal direction. As a result, the moving time of the pallet 11 by the pallet moving mechanisms 20 and 25 can be shortened, and the pallet 11 can be transported quickly.
  • the first endless belt 31 is arranged so that the extending direction of the irregularities 31a, 31b matches the vertical direction
  • the second endless belt 41 is arranged so that the extending direction of the irregularities 41a, 41b matches the vertical direction.
  • the pallet 11 is provided with uneven portions 19 a and 19 b that can be engaged with the uneven portions 31 a and 31 b of the first endless belt 31 and the uneven portions 41 a and 41 b of the second endless belt 41.
  • the concave and convex portions 19 a and 19 b engage with the concave and convex portions 31 a and 31 b of the first endless belt 31, and when the pallet 11 is raised to the second pallet rail 13, the concave and convex portions 19 a and 19 b Is configured to engage with the irregularities 41 a and 41 b of the second endless belt 41. For this reason, the pallet 11 and the 1st and 2nd endless belts 31 and 41 can be easily engaged only by raising / lowering the pallet 11, and a complicated engagement means becomes unnecessary. As a result, the pallet 11 can be quickly conveyed.
  • the belt width direction of the first and second endless belts 31 and 41 coincides with the vertical direction, the first and second endless belts 31 and 41 are not easily bent due to their own weights and are further placed on the pallet 11. Less affected by the weight of the workpiece. As a result, it is possible to prevent the pallet 11 from being detached from the first and second endless belts 31 and 41 due to a shift in the conveyance position called “step jump” and belt bending, and it is faster and more stable than the prior art. Thus, the pallet 11 can be transported. If the first and second endless belts 31 and 41 are bent in the width direction, it is possible to avoid the problem by providing a predetermined number of outer ring U-groove bearings or the like directly under the belt. it can.
  • the pallet conveyance device 10 may be configured to convey the pallet 11 not in the counterclockwise direction but in the clockwise direction.

Abstract

パレット搬送装置(10)は、第1パレットレール(12)と、第1パレットレール(12)に対して鉛直方向に所定間隔を開けて平行に設けられる第2パレットレール(13)と、ベルト幅方向に延在する凹凸(31a,31b)が形成された第1無端ベルト(31)を備える第1パレット送り機構(30)と、ベルト幅方向に延在する凹凸(41a,41b)が形成された第2無端ベルト(41)を備える第2パレット送り機構(40)と、パレット(11)を第1パレットレール(31)及び第2パレットレール(41)の一方から他方に移動させるパレット移動機構(20,25)と、を備える。 第1・第2無端ベルト(31,41)は、鉛直方向に所定間隔を開けて設けられるとともに、ベルト幅方向が鉛直方向と一致するように配置される。パレット(11)が備える凹凸部(19a,19b)は、第1・第2無端ベルト(31,41)の凹凸(31a,31b、41a,41b)と係合し移動する。

Description

パレット搬送装置及びパレット搬送方法
 本発明は、ワークを載置可能な1又は2以上のパレットを所定の軌道に沿って搬送するパレット搬送装置及びパレット搬送方法に関する。
 従来の製造ラインに設けられたパレット搬送装置は、加工が必要なワークをパレットに載せた状態で当該パレットを搬送する。パレット搬送装置には工作機が設けられており、搬送されたワークに対して工作機が所定の加工を行う。特開2011-93032号公報には、ワークを載置可能な複数のパレットを、工作機に対する水平面内において四角形の軌道で搬送するパレット搬送装置が開示されている。
 このパレット搬送装置は、互いに平行に延びる奥側及び手前側パレットレールと、奥側及び手前側パレットレールの一方に搭載されたパレットを他方に移動するパレット移動機構と、を備える。各パレットは、パレット搬送装置内を循環する無端ベルトに係合されている。パレット搬送装置は、奥側及び手前側パレットレールに沿って各パレットを搬送する。
 しかしながら、上記したパレット搬送装置では、奥側パレットレールと手前側パレットレールの間に複数の工作機が設置されているため、これら工作機が比較的大型な装置になると、奥側パレットレールと手前側パレットレールとの間の水平方向の距離が拡大してしまう。このように奥側パレットレールと手前側パレットレールとの間の距離が拡大すると、奥側及び手前側パレットレールを含むパレット搬送装置が占める専有面積が拡大するという問題がある。
 また、奥側パレットレールと手前側パレットレールとの間の距離が拡大すると、パレット移動機構により一方のパレットレールに搭載されたパレットを他方のパレットレールに移動する際のパレット移動時間が長くなるという問題もある。
 本発明の目的は、専有面積を拡大することなく、パレットの迅速な搬送を可能にするパレット搬送装置及びパレット搬送方法を提供することである。
 本発明のある態様によれば、ワークを載置可能な1又は2以上のパレットを搬送するように構成されたパレット搬送装置であって、前記パレットを移動可能に搭載する第1パレットレールと、前記パレットを移動可能に搭載するとともに、前記第1パレットレールに対して鉛直方向に所定間隔を開けて平行に設けられる第2パレットレールと、前記第1パレットレールに沿って循環するように構成されるとともに、ベルト幅方向に延在する凹凸がベルト長手方向に連続的に形成された第1無端ベルトを備える第1パレット送り機構と、前記第2パレットレールに沿って循環するように構成されるとともに、ベルト幅方向に延在する凹凸がベルト長手方向に連続的に形成された第2無端ベルトを備える第2パレット送り機構と、前記パレットを前記第1パレットレール及び前記第2パレットレールの一方から前記第1パレットレール及び前記第2パレットレールの他方に移動させるパレット移動機構と、を備え、前記第1無端ベルト及び前記第2無端ベルトは、鉛直方向に所定間隔を開けて設けられるとともに、ベルト幅方向が鉛直方向と一致するように配置され、前記パレットは、当該パレットが前記パレット移動機構により前記第1パレットレールまで下降した場合に前記第1無端ベルトの凹凸に係合し、当該パレットが前記パレット移動機構により前記第2パレットレールまで上昇した場合に前記第2無端ベルトの凹凸に係合するように構成された凹凸部を備える、パレット搬送装置が提供される。
 さらに、本発明のある態様によれば、前記パレット搬送装置を用いたパレット搬送方法であって、前記第1パレット送り機構により、前記第1無端ベルトに係合している前記パレットを前記第1パレットレールに沿って搬送する第1パレット搬送工程と、前記第2パレット送り機構により、前記第2無端ベルトに係合している前記パレットを前記第2パレットレールに沿って搬送する第2パレット搬送工程と、前記パレットの凹凸部と前記第1無端ベルトの凹凸との係合が解除され、前記パレットの凹凸部と前記第2無端ベルトの凹凸とが係合するように、前記パレットを前記パレット移動機構により前記第1パレットレールから前記第2パレットレールまで上昇させる第1パレット移動工程と、前記パレットの凹凸部と前記第2無端ベルトの凹凸との係合が解除され、前記パレットの凹凸部と前記第1無端ベルトの凹凸とが係合するように、前記パレットを前記パレット移動機構により前記第2パレットレールから前記第1パレットレールまで下降させる第2パレット移動工程と、を備えるパレット搬送方法が提供される。
図1は、本発明の実施形態によるパレット搬送装置の正面図である。 図2は、パレットを第1パレットレールに沿って搬送した後であってパレットを第2パレットレールに移動する前の状態を示すパレット搬送装置の正面図である。 図3は、パレットを第2パレットレールに移動した後であってパレットを第2パレットレールに沿って搬送する前の状態を示すパレット搬送装置の正面図である。 図4は、パレットを第2パレットレールに沿って搬送した後であってパレットを第1パレットレールに移動する前の状態を示すパレット搬送装置の正面図である。 図5は、図1のA-A線に沿うパレット搬送装置の縦断面図である。 図6は、パレット搬送装置の平面図である。
 以下、図面を参照しながら、本発明の実施形態について説明する。
 図1~図6を参照して、本発明の実施形態によるパレット搬送装置10について説明する。各図では、互いに直交するX軸、Y軸、及びZ軸の3軸が設定されている。X軸は水平横方向を示し、Y軸は水平前後方向を示す。また、Z軸は鉛直方向(上下方向)を示す。
 パレット搬送装置10は、例えばモータ等のステータを製造するラインに設けられる搬送装置である。図6に示すように、パレット搬送装置10は5台の工作機1~5を備えている。これら工作機1~5は、X軸方向に所定ピッチPで一列に並んで設けられている。
 各工作機1~5は、パレット搬送装置10によって搬送されるワークに対して、絶縁部材の挿入や各相コイルのリード線のカシメ、溶接等の各種加工を順番に行う。これら工作機1~5により、ステータが自動的に製造される。
 パレット搬送装置10は、複数のパレット11を搬送し、これらパレット11に載置されたワークを各工作機1~5まで運ぶ。パレット搬送装置10は、各工作機1~5による加工時に、パレット11を用いてワークを所定位置に保持する。なお、パレット11の数は、工作機1~5の台数に応じて1又は2以上に設定される。
 図1に示すように、パレット搬送装置10は、X軸方向に延在する第1及び第2パレットレール12,13を備える。第1パレットレール12及び第2パレットレール13は、鉛直方向(上下方向)に所定間隔を開けて、互いに平行に配置される。また、第1パレットレール12及び第2パレットレール13は、X軸方向に真っ直ぐに並べられた各工作機1~5(図6参照)に対して、略平行に配置される。工作機1~5は、第1パレットレール12及び第2パレットレール13の手前側又は奥側に設置されている。
 図1及び図5に示すように、パレット搬送装置10は、架台9の上面に水平に固定される取付板14と、取付板14に支柱16を介して水平に取付けられる第1水平板17と、第1水平板17の上方に所定間隔を開けて水平に配置される第2水平板18と、を備える。
 第1水平板17と第2水平板18のY軸方向における一方の側部には、側壁板8が双方を連結するように取付けられている。この側壁板8により、第1水平板17と第2水平板18は鉛直方向に所定間隔を開けて互いに平行に配置される。
 第1及び第2水平板17,18のY軸方向における他方の側部には、第1及び第2支持板17a,18aが長手方向に沿って固定されている。第1支持板17aの上面には第1パレットレール12がねじ止めにより固定されており、第2支持板18aの上面には第2パレットレール13がねじ止めにより固定されている。第1及び第2パレットレール12,13は、市販されている直線運動ガイドレールである。
 図5に示すように、パレット11は、第1及び第2パレットレール12,13を跨ぐように形成されるとともに、それらレール12,13上を移動可能な直線運動ブロック11aと、ブロック11aにねじ止めされた台座11bと、を備えている。なお、台座11bの側壁板8側の側面には、係止部材19が設けられている。
 パレット11の直線運動ブロック11aは、直線運動ガイドレールに対応する部品であって、ローラリテーナを備えている。ローラリテーナを備える直線運動ブロック11aを用いることにより、パレット11は、第1及び第2パレットレール12,13に対して移動可能に搭載される。直線運動ブロック11aは、パレット11の幅方向(Y軸方向)への移動を禁止するとともに、パレット11が第1及び第2パレットレール12,13に沿って移動する際の抵抗を低減する。
 図6に示すように、パレット11のX軸方向の長さ(台座11bの長さ)Lは、各工作機1~5の設置間隔であるピッチPと同一、又はピッチPよりも短く設定される。パレット搬送装置10では、複数のパレット11を第2パレットレール13に沿ってピッチPに対応して移動させることで、各パレット11に載置されたワークが各工作機1~5に対峙することとなる。
 図1~図4に示すように、パレット搬送装置10は、第1パレットレール12及び第2パレットレール13の一方に搭載されたパレット11を、第1パレットレール12及び第2パレットレール13の他方に移動するパレット移動機構20,25をさらに備えている。
 パレット移動機構は、パレット11を第2パレットレール13から第1パレットレール12に移動する第1パレット移動機構20と、パレット11を第1パレットレール12から第2パレットレール13に移動する第2パレット移動機構25と、から構成されている。第1及び第2パレット移動機構20,25は第1及び第2パレットレール12,13を長手方向(X軸方向)の両側から挟むように設けられている。つまり、第1パレット移動機構20は第1及び第2パレットレール12,13の一端の側方に配置され、第2パレット移動機構25は第1及び第2パレットレール12,13の他端の側方に配置される。
 第1及び第2パレット移動機構20,25は、互いに対称な構造となっており、図1に示すように取付板14に対して鉛直方向に起立するように取付けられた昇降アクチュエータ21,26をそれぞれ備えている。
 昇降アクチュエータ21(第1昇降アクチュエータ)は、取付板14から鉛直方向(Z軸方向)に立設する細長い箱形のハウジング21aと、ハウジング21a内に鉛直方向に延在するように設けられるボールネジ21bと、ボールネジ21bを回動駆動させるサーボモータ21cと、ボールネジ21bに螺合してボールネジ21bの回転により鉛直方向に昇降する従動子21dと、を備えている。同様に、昇降アクチュエータ26(第2昇降アクチュエータ)は、取付板14から鉛直方向(Z軸方向)に立設する細長い箱形のハウジング26aと、ハウジング26a内に鉛直方向に延在するように設けられるボールネジ26bと、ボールネジ26bを回動駆動させるサーボモータ26cと、ボールネジ26bに螺合してボールネジ26bの回転により鉛直方向に昇降する従動子26dと、を備えている。
 また、第1パレット移動機構20はパレット11を搭載可能な第1可動レール22をさらに備えており、第2パレット移動機構25はパレット11を搭載可能な第2可動レール27をさらに備えている。
 第1可動レール22は、L型の取付部材21eを介して昇降アクチュエータ21の従動子21dに対して水平に取付けられ、Y軸方向に延在する。第2可動レール27は、L型の取付部材26eを介して昇降アクチュエータ26の従動子26dに対して水平に取付けられ、Y軸方向に延在する。パレット搬送装置10では、サーボモータ21c,26cが駆動してボールネジ21b,26bが回動し、ボールネジ21b,26cに螺合する従動子21d,26dが昇降すると、図1及び図3の実線矢印で示すように従動子21d,26dとともに第1及び第2可動レール22,27も昇降する。
 第1及び第2可動レール22,27は、最も下降した位置(下降位置)において図1及び図2に示すように第1パレットレール12と直線的に接続し、最も上昇した位置(上昇位置)において図3及び図4に示すように第2パレットレール13と直線的に接続するように構成されている。
 ここで、第1及び第2可動レール22,27のX軸方向の長さW(図4参照)は、パレット11のX軸方向の長L(図6参照)と同一、又はそれよりも長く設定されている。つまり、第1及び第2可動レール22,27は、パレット11を搭載した状態のまま、鉛直方向に移動できるように構成されている。
 なお、図6に示すように、第1及び第2可動レール22,27には、各工作機1~5の設置間隔であるピッチPと同一ピッチで配置されたパレット11の一つが搭載される。つまり、第1可動レール22と第2可動レール27とのX軸方向の間隔はパレット11のピッチPの整数倍となるように設定されており、この設定を満たすように昇降アクチュエータ21,26は取付板14に設置される。
 再び図1に戻り、パレット搬送装置10の構成についてさらに説明する。パレット搬送装置10は、パレット11を第1パレットレール12に沿って搬送させる第1パレット送り機構30と、パレット11を第2パレットレール13に沿って搬送させる第2パレット送り機構40と、をさらに備えている。
 第1パレット送り機構30及び第2パレット送り機構40は、同一構造である。第1パレット送り機構30は第1水平板17に設けられ、第2パレット送り機構40は第1水平板17の上方に位置する第2水平板18に設けられる。
 第1パレット送り機構30は、パレット11と係合可能に構成されるとともに第1パレットレール12に沿って循環する第1無端ベルト31と、第1無端ベルト31を循環させる循環機構としての第1サーボモータ32と、を備える。同様に、第2パレット送り機構40は、パレット11と係合可能に構成されるとともに第2パレットレール13に沿って循環する第2無端ベルト41と、第2無端ベルト41を循環させる循環機構としての第2サーボモータ42と、を備える。
 パレット送り機構については、第2水平板18に設けられた第2パレット送り機構40を代表して説明する。図6に示すように、第2水平板18の略四隅には、アイドルプーリ43~46がそれぞれ回転可能に設けられている。4つのアイドルプーリ43~46には、これらプーリを包囲するように第2無端ベルト41が掛け回されている。なお、第2無端ベルト41の張力は、第2パレットレール13側のアイドルプーリ44,45の間に位置するベルトが第2パレットレール13と略平行となるように設定されている。
 第2無端ベルト41は、第2パレットレール13と平行になるベルトが第2パレットレール13に連続する第1可動レール22及び第2可動レール27まで達するように構成されている。なお、第2パレットレール13の両端に位置する第2水平板18の隅部には、第1可動レール22及び第2可動レール27に搭載されたパレット11が昇降する際に、パレット11と第2水平板18との干渉を防止するための切り欠き18c,18dが形成されている。
 また、第2水平板18の長手方向の両側には、長手方向(X軸方向)の両側から第2無端ベルト41を内側に押し込むように、第2駆動プーリ47及び第2従動プーリ48が設けられる。第2駆動プーリ47は、循環機構としての第2サーボモータ42によって駆動される。第2サーボモータ42は第2水平板18に固定され、第2駆動プーリ47は第2サーボモータ42の回転軸42aに取り付けられている。
 図示しないコントローラからの指令に基づいて第2サーボモータ42が駆動すると、第2サーボモータ42の回転軸42aが第2駆動プーリ47とともに回転し、第2駆動プーリ47に掛け回された第2無端ベルト41が4つのアイドルプーリ43~46に掛け回された状態で循環する。
 一方、第2従動プーリ48は、位置調整機構49を介して、第2水平板18に回転可能に取り付けられる。図6に示すように、位置調整機構49は、第2パレットレール13に対して平行に延在するように第2水平板18上に設置されたレール49aと、レール49aに移動可能に設けられた台部49bと、第2水平板18に取付けられた支持台49cと、支持台49cに設けられ台部49bをレール49aに沿って移動させるネジ部材49dと、を備える。
 第2従動プーリ48は位置調整機構49の台部49b上に回転可能に配置されており、台部49bをネジ部材49dにより移動させることで、第2従動プーリ48のX軸方向位置が調整される。このように第2従動プーリ48のX軸方向位置を調整することで、プーリ43,44,45,46,47,48に掛け回された第2無端ベルト41の張力を調整することが可能となる。
 なお、第1パレット送り機構30も、第2パレット送り機構40と同様に構成されている。図4に示すように、第1パレット送り機構30は、第1水平板17上に設けられるアイドルプーリ33~36、第1駆動プーリ37、及び第1従動プーリ38と、これらプーリ33~36,37,38に掛け回される第1無端ベルト31と、から構成されている。第1駆動プーリ37は、循環機構としての第1サーボモータ32によって駆動される。第1サーボモータ32は第1水平板17に固定され、第1駆動プーリ37は第1サーボモータ32の回転軸32aに取り付けられている。また、第1パレット送り機構30は、第1無端ベルト31の張力を調整するために、第1従動プーリ38のX軸方向位置を調整可能な位置調整機構を備えている。
 第1及び第2無端ベルト31,41はいわゆる歯付きベルトである。第1及び第2無端ベルト31,41は同一構造であるので、第2無端ベルト41を代表して説明する。図6の拡大図に示すように、第2無端ベルト41は、ベルト幅方向に延在する凹部41a及び凸部41bがベルト長手方向に交互に連続するように構成されている。以下では、凹部41a及び凸部41bをまとめて凹凸41a,41bと称する。このように、第2無端ベルト41の外側面は波状に形成されている。
 第2無端ベルト41は、第2水平板18に設けられたアイドルプーリ43~46に掛け回されており、ベルト幅方向が鉛直方向(Z軸方向)に一致するように配置されている。
 図1~図4に示すように、第1無端ベルト31が設けられる第1水平板17と第2無端ベルト41が設けられる第2水平板18は鉛直方向に所定間隔を開けて互いに平行に設けられるので、第1無端ベルト31及び第2無端ベルト41はベルト幅方向が鉛直方向に一致した状態で鉛直方向に所定間隔を開けて配置されることとなる。
 一方、図6の拡大図に示すように、パレット11の係止部材19には、第1無端ベルト31の凹凸31a,31b及び第2無端ベルト41の凹凸41a,41bに係合可能な凸部19a及び凹部19bが形成されている。係止部材19はパレット11の台座11bのベルト側の側面に取付けられた部材であり、係止部材19の凸部19a及び凹部19bは鉛直方向に延在するとともに長手方向に交互に連続するように形成されている。以下では、係止部材19の凸部19a及び凹部19bをまとめてパレット11の凹凸部19a,19bと称する。
 図5に示すように、第1水平板17には第1無端ベルト31を長手方向に沿って裏側から押さえる支持部材17bが設けられており、第2水平板18には第2無端ベルト41を長手方向に沿って裏側から押さえる支持部材18bが設けられている。
 支持部材17b及び支持部材18bは同じ構造であるので、第2水平板18に設けられた支持部材18bを代表して説明する。図6の拡大図に示すように、支持部材18bは、パレット11の凹凸部19a,19bが第2無端ベルト41の凹凸41a,41bに係合している場合に、第2無端ベルト41を裏側から押さえることで、第2無端ベルト41の撓みを防止する。これにより、支持部材18bは、撓んだ第2無端ベルト41がパレット11の係止部材19から浮き上がって、パレット11の凹凸部19a,19bと第2無端ベルト41の凹凸41a,41bとの係合が解除されることを防止する。
 図6に示すように、パレット11の凹凸部19a,19bが第1無端ベルト31の凹凸31a,31bや第2無端ベルト41の凹凸41a,41bに係合している場合、パレット11は第1及び第2無端ベルト31,41とは独立してX軸方向に移動することが禁止される。このように係合した状態では、パレット11は第1及び第2無端ベルト31,41とともに移動し、第1及び第2パレットレール12,13に沿って搬送されることとなる。
 また、第1無端ベルト31の凹凸31a,31b、第2無端ベルト41の凹凸41a,41b、及びパレット11の凹凸部19a,19bは、鉛直方向(Z軸方向)に延在するように形成されているので、パレット11が鉛直方向に昇降すると、第1無端ベルト31の凹凸31a,31b及び第2無端ベルト41の凹凸41a,41bと、パレット11の凹凸部19a,19bとは鉛直方向へずれることになる。これにより、パレット11の係止部材19が第1及び第2無端ベルト31,41からはずれ、パレット11と第1及び第2無端ベルト31,41との係合状態が解除される。そして、パレット11が再び第1及び第2無端ベルト31,41の位置まで昇降すると、パレット11の凹凸部19a,19bがこれらベルト31,41と係合する。
 上記の通り、パレット搬送装置10では、パレット11を搭載する第1及び第2可動レール22,27が昇降して第1及び第2パレットレール12,13から分離することで、パレット11と第1及び第2無端ベルト31,41との係合状態が解除される。これに対して、第1及び第2可動レール22,27が昇降して第1及び第2パレットレール12,13と直線的に接続されることで、パレット11と第1及び第2無端ベルト31,41とが係合する。
 次に、上述したパレット搬送装置10を用いたパレット11の搬送方法について説明する。
 パレット搬送装置10によるパレット11の搬送方法は、第1パレットレール12に沿ってパレット11を搬送する第1パレット搬送工程と、パレット11を第1パレットレール12から第2パレットレール13に移動する第1パレット移動工程と、第2パレットレール13に沿ってパレット11を搬送する第2パレット搬送工程と、パレット11を第2パレットレール13から第1パレットレール12に移動する第2パレット移動工程と、を備えている。
 本実施形態によるパレット搬送方法では、パレット搬送装置10を用いてパレット11の搬送を行う。パレット搬送装置10では、第1パレットレール12及び第2パレットレール13は鉛直方向に所定の間隔を開けて互いに平行に設けられる。パレット11を搬送する第1無端ベルト31にはベルト幅方向に延在する凹凸31a,31bが形成されており、第1無端ベルト31は、その幅方向が鉛直方向に一致するように配置される。また、パレット11を搬送する第2無端ベルト41にはベルト幅方向に延在する凹凸41a,41bが形成されており、第2無端ベルト41は、その幅方向が鉛直方向に一致するように配置される。パレット11には、第1無端ベルト31の凹凸31a,31b及び第2無端ベルト41の凹凸41a,41bに係合可能な凹凸部19a,19bが形成されている。
 パレット搬送装置10では、パレット11は図1において反時計回りに搬送される。パレット搬送装置10では、各工作機1~5(図6参照)は、第2パレットレール13に位置するパレット11に載置されたワークに対して所定の加工を行う。以下では、パレット搬送方法の各工程について説明する。
 <第1パレット搬送工程>
 第1パレット搬送工程では、第2パレットレール13の下方に位置する第1パレットレール12に搭載されたパレット11を搬送する。
 この工程では、パレット11を第1パレットレール12に沿って移動させるため、パレット11が第1パレットレール12に搭載されている必要がある。
 例えば、図1に示すようにパレット11が搭載された第1可動レール22を下降させ、第1可動レール22と第1パレットレール12とを直線的に接続する。第1可動レール22及びパレット11が第1水平板17の切り欠き17dを通過して下降し、第1可動レール22が第1パレットレール12に接続されると、第1可動レール22に搭載されたパレット11の凹凸部19a,19bと、第1パレットレール12に対して平行に沿う第1無端ベルト31の凹凸31a,31bとが係合する。
 なお、図3に示すように、第1及び第2可動レール22,27を上昇させた状態で、第1パレットレール12の端部からパレット11を第1パレットレール12に配置させてもよい。このようにしても、パレット11の凹凸部19a,19bと、第1無端ベルト31の凹凸31a,31bを係合させることができる。
 パレット11の凹凸部19a,19bを第1無端ベルト31の凹凸31a,31bに係合させた後、第1パレット送り機構30のサーボモータ32を駆動することにより、第1無端ベルト31を循環させる。これにより、第1無端ベルト31に係合したパレット11は、図1及び図2に示すように、第1パレットレール12に沿って図中左側から右側に搬送される。
 なお、パレット搬送装置10は、各工作機1~5(図6参照)が第2パレットレール13上にあるパレット11のワークに対して所定の加工を行うように構成されている。そのため、第1パレットレール12上にあるパレット11は、第1可動レール22から、第1パレットレール12の右端に向かって搬送されるだけである。
 <第1パレット移動工程>
 第1パレット移動工程では、パレット11を第1パレットレール12から第2パレットレール13まで上昇させる。
 まず、図2に示すように、第2パレット移動機構25により第2可動レール27を下降位置まで下降させ、第2可動レール27と第1パレットレール12とを連続的に接続する。その後、第1パレット送り機構30により、パレット11を第1パレットレール12の端部から第2可動レール27に移動させる。
 第2可動レール27への移動後、図3に示すように第2可動レール27を上昇位置まで上昇させ、第2可動レール27と第2パレットレール13とを連続的に接続する。つまり、パレット11が搭載された第2可動レール27は、所定の上昇位置まで上昇した後、第2パレットレール13に接続した状態で停止する。第2可動レール27が上昇して第1パレットレール12から分離する際に、パレット11と第1無端ベルト31の係合が解除されるため、第2可動レール27の上昇移動が阻害されることがない。
 このとき、第1パレット移動機構20の昇降アクチュエータ21により第1可動レール22を上昇させることで、第1可動レール22と第2パレットレール13とを連続的に接続させておくことが好ましい。
 <第2パレット搬送工程>
 第2パレット搬送工程では、第2パレットレール13に搭載されたパレット11を搬送する。
 第1パレット移動工程により第2可動レール27が第2パレットレール13に直線的に接続されると、第2可動レール27上のパレット11は、図5に示すように第2パレットレール13に沿って設けられた第2無端ベルト41に係合する。その後、第2パレット送り機構40のサーボモータ42を駆動して第2無端ベルト41を循環させると、図4に示すように、パレット11は第2可動レール27から第2パレットレール13に移動し、第2パレットレール13に沿って搬送される。
 サーボモータ42は、各パレット11が各工作機1~5に対峙した状態で一旦停止するように制御される。このように、第2パレットレール13上のパレット11は、搬送及び停止を繰り返しながら、第2パレットレール13の右端から左端に向かって移動する。
 なお、図4に示すように第1可動レール22が第2パレットレール13に接続されている場合には、工作機1~5による加工が終了したワークを載置するパレット11が、第2パレットレール13の左端から第1可動レール22上に搬送される。
 <第2パレット移動工程>
 第2パレット移動工程では、第1パレット移動機構20を用いて、パレット11を第2パレットレール13から第1パレットレール12に下降させる。
 第2パレット移動工程では、第1パレット移動機構20によって、図4に示す上昇位置にある第1可動レール22を、図1に示す下降位置まで下降させる。つまり、パレット11が搭載された第1可動レール22は、所定の下降位置まで下降した後、第1パレットレール12に接続した状態で停止する。第1可動レール22が下降して第2パレットレール13から分離する際に、パレット11と第2無端ベルト41の係合が解除されるため、第1可動レール22の下降移動が阻害されることがない。
 第2パレット移動工程により第1可動レール22が第1パレットレール12に直線的に接続されると、第1可動レール22上のパレット11は第1パレットレール12に沿って設けられた第1無端ベルト31に係合する。
 このとき、第2パレット移動機構25の昇降アクチュエータ26により第2可動レール27を下降させることで、第2可動レール27と第1パレットレール12とを接続させておくことが好ましい。
 パレット搬送装置10では、図1~図4に示した搬送サイクルが1回行われることにより、各パレット11を1個分ずつ反時計回りに搬送することができる。そして、図1~図4に示した搬送サイクルが1回行われるたびに、パレット11の搬送を停止した状態で、各工作機1~5(図6参照)を作動させる。これにより、第2パレットレール13上に並ぶ各パレット11のワークに対して、絶縁部材の挿入、各相コイルのリード線のカシメ、溶接等の各種加工が実行される。各工作機1~5の作動時には、第2パレットレール13上のいずれかのパレット11に対して、ワークの搬入及び搬出が行われる。
 本実施形態によるパレット搬送装置10及びパレット搬送方法では、各パレット11は、第1無端ベルト31に係合した状態で第1パレットレール12に沿って移動し、第2無端ベルト41に係合した状態で第2パレットレール13に沿って移動する。このように構成することで、パレット11に搭載されるワークの重量が比較的大きい場合であっても、パレット11を高速で搬送でき、さらにパレット11を確実に所定位置に停止させることができる。その結果、生産性を高めることが可能となる。
 本実施形態によるパレット搬送装置10及びパレット搬送方法では、パレット11は第1及び第2無端ベルト31,41に対して係合可能に構成されており、第1及び第2無端ベルト31,41に係合したパレット11を第1及び第2パレットレール12,13に沿って搬送する。パレット11と第1及び第2無端ベルト31,41との係合位置を変えることで、第1及び第2パレットレール12上において隣り合うパレット11の間隔、つまりパレット11の搬送ピッチ、を容易に変更することが可能となる。
 本実施形態によるパレット搬送装置10及びパレット搬送方法では、第1パレットレール12及び第2パレットレール13は鉛直方向に所定間隔を開けて平行に設けられ、工作機1~5は第1及び第2パレットレール12,13の手前側又は奥側に配置される。このように、第1及び第2パレットレール12,13の間に工作機1~5が配置されることがないので、工作機1~5が比較的大型な装置であっても、第1及び第2パレットレール12,13の間の距離が拡大することはない。したがって、工作機1~5を配置した場合であっても、パレット搬送装置10が占める専有面積が拡大することを抑制することができる。
 また、第1及び第2パレット移動機構20,25は、パレット11を鉛直方向に昇降させることで、パレット11を第1パレットレール12又は第2パレットレール13に移動させるように構成されている。パレット11の昇降移動距離は、第1及び第2パレットレール12,13の鉛直方向における所定の距離となる。所定の距離は、パレット11の鉛直方向の厚さ、又はパレット11にワークが載せられた場合のワークを含むパレット11の鉛直方向の厚さに設定される。したがって、工作機を水平方向に横切るよう移動する従来のパレット搬送装置と比較して、パレット移動機構20,25がパレット11を移動(昇降)させる距離を著しく短くすることができる。その結果、パレット移動機構20,25によるパレット11の移動時間を短縮することができ、パレット11の迅速な搬送が可能になる。
 第1無端ベルト31は凹凸31a,31bの延在方向が鉛直方向と一致するように配置され、第2無端ベルト41は凹凸41a,41bの延在方向が鉛直方向と一致するように配置される。そして、パレット11には、第1無端ベルト31の凹凸31a,31b及び第2無端ベルト41の凹凸41a,41bに係合可能な凹凸部19a,19bが形成される。パレット11は、第1パレットレール12まで下降した場合に凹凸部19a,19bが第1無端ベルト31の凹凸31a,31bに係合し、第2パレットレール13まで上昇した場合に凹凸部19a,19bが第2無端ベルト41の凹凸41a,41bに係合するように構成されている。このため、パレット11を昇降させるだけで、パレット11と第1及び第2無端ベルト31,41とを容易に係合させることができ、複雑な係合手段が不要となる。その結果、パレット11の迅速な搬送が可能になる。
 また、第1及び第2無端ベルト31,41のベルト幅方向は鉛直方向に一致しているので、第1及び第2無端ベルト31,41は、自重によって撓みにくく、さらにパレット11に載置されるワークの重量の影響を受けにくい。これにより、「段飛び」と呼ばれる搬送位置のずれや、ベルト撓みに起因してパレット11が第1及び第2無端ベルト31,41からはずれてしまうことを防止でき、従来よりも高速でかつ安定的にパレット11を搬送することが可能となる。なお、第1及び第2無端ベルト31,41の幅方向の撓みが問題となる場合には、所定数の外輪U溝型のベアリング等をベルト直下に設けることで、その問題を回避することができる。
 本実施形態によるパレット搬送装置10では、パレット11の一方の側面にのみ、第1無端ベルト31の凹凸31a,31a及び第2無端ベルト41の凹凸41a,41aに係合可能な凹凸部19a,19bが形成されている。したがって、本実施形態によるパレット搬送装置10では、パレットの両側にベルトとの係合部を形成する必要のある従来のパレット搬送装置と比較して、パレット11の部品点数を減少させることができ、製造コストを削減することが可能となる。
 以上、本発明の実施形態について説明したが、上記実施形態は本発明の適用例の一つを示したに過ぎず、本発明の技術的範囲を上記実施形態の具体的構成に限定する趣旨ではない。
 上記した実施形態では、パレット11が図1において反時計回り方向に搬送される場合を説明した。しかしながら、パレット搬送装置10は、パレット11を反時計回り方向ではなく、時計回り方向に搬送するように構成されてもよい。
 本願は2013年4月5日に日本国特許庁に出願された特願2013-79268号に基づく優先権を主張し、この出願の全ての内容は参照により本明細書に組み込まれる。

Claims (4)

  1.  ワークを載置可能な1又は2以上のパレットを搬送するように構成されたパレット搬送装置であって、
     前記パレットを移動可能に搭載する第1パレットレールと、
     前記パレットを移動可能に搭載するとともに、前記第1パレットレールに対して鉛直方向に所定間隔を開けて平行に設けられる第2パレットレールと、
     前記第1パレットレールに沿って循環するように構成されるとともに、ベルト幅方向に延在する凹凸がベルト長手方向に連続的に形成された第1無端ベルトを備える第1パレット送り機構と、
     前記第2パレットレールに沿って循環するように構成されるとともに、ベルト幅方向に延在する凹凸がベルト長手方向に連続的に形成された第2無端ベルトを備える第2パレット送り機構と、
     前記パレットを前記第1パレットレール及び前記第2パレットレールの一方から前記第1パレットレール及び前記第2パレットレールの他方に移動させるパレット移動機構と、を備え、
     前記第1無端ベルト及び前記第2無端ベルトは、鉛直方向に所定間隔を開けて設けられるとともに、ベルト幅方向が鉛直方向と一致するように配置され、
     前記パレットは、当該パレットが前記パレット移動機構により前記第1パレットレールまで下降した場合に前記第1無端ベルトの凹凸に係合し、当該パレットが前記パレット移動機構により前記第2パレットレールまで上昇した場合に前記第2無端ベルトの凹凸に係合するように構成された凹凸部を備える、
     パレット搬送装置。
  2.  請求項1に記載のパレット搬送装置であって、
     前記パレット移動機構は、
     前記第1パレットレール及び前記第2パレットレールの一端の側方に配置される第1パレット移動機構と、
     前記第1パレットレール及び前記第2パレットレールの他端の側方に配置される第2パレット移動機構と、を備え、
     前記第1パレット移動機構は、
     前記パレットを移動可能に搭載する第1可動レールと、
     前記第1可動レールが前記第1パレットレールと直線的に接続する下降位置と、前記第1可動レールが前記第2パレットレールと直線的に接続する上昇位置との間で、前記第1可動レールを昇降させる第1昇降アクチュエータと、を備え、
     前記第2パレット移動機構は、
     前記パレットを移動可能に搭載する第2可動レールと、
     前記第2可動レールが前記第1パレットレールと直線的に接続する下降位置と、前記第2可動レールが前記第2パレットレールと直線的に接続する上昇位置との間で、前記第2可動レールを昇降させる第2昇降アクチュエータと、を備える、
     パレット搬送装置。
  3.  請求項1に記載のパレット搬送装置であって、
     前記第1パレットレール及び前記第2パレットレールの手前側又は奥側にこれらレールに沿って並んで設けられ、前記第2パレットレール上にある前記パレットに載置されたワークに対して所定の加工を行う複数の工作機をさらに備える、
     パレット搬送装置。
  4.  請求項1に記載のパレット搬送装置を用いたパレット搬送方法であって、
     前記第1パレット送り機構により、前記第1無端ベルトに係合している前記パレットを前記第1パレットレールに沿って搬送する第1パレット搬送工程と、
     前記第2パレット送り機構により、前記第2無端ベルトに係合している前記パレットを前記第2パレットレールに沿って搬送する第2パレット搬送工程と、
     前記パレットの凹凸部と前記第1無端ベルトの凹凸との係合が解除され、前記パレットの凹凸部と前記第2無端ベルトの凹凸とが係合するように、前記パレットを前記パレット移動機構により前記第1パレットレールから前記第2パレットレールまで上昇させる第1パレット移動工程と、
     前記パレットの凹凸部と前記第2無端ベルトの凹凸との係合が解除され、前記パレットの凹凸部と前記第1無端ベルトの凹凸とが係合するように、前記パレットを前記パレット移動機構により前記第2パレットレールから前記第1パレットレールまで下降させる第2パレット移動工程と、
     を備えるパレット搬送方法。
PCT/JP2014/057240 2013-04-05 2014-03-18 パレット搬送装置及びパレット搬送方法 WO2014162863A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US14/414,465 US10071864B2 (en) 2013-04-05 2014-03-18 Pallet carrying apparatus and pallet carrying method
EP14779158.6A EP2982619B1 (en) 2013-04-05 2014-03-18 Pallet carrying apparatus and pallet carrying method
KR1020157000784A KR101670190B1 (ko) 2013-04-05 2014-03-18 팔레트 반송 장치 및 팔레트 반송 방법
CN201480001996.6A CN104507834B (zh) 2013-04-05 2014-03-18 托板输送装置以及托板输送方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013079268A JP6112713B2 (ja) 2013-04-05 2013-04-05 パレット搬送装置及びパレット搬送方法
JP2013-079268 2013-04-05

Publications (1)

Publication Number Publication Date
WO2014162863A1 true WO2014162863A1 (ja) 2014-10-09

Family

ID=51658163

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/057240 WO2014162863A1 (ja) 2013-04-05 2014-03-18 パレット搬送装置及びパレット搬送方法

Country Status (7)

Country Link
US (1) US10071864B2 (ja)
EP (1) EP2982619B1 (ja)
JP (1) JP6112713B2 (ja)
KR (1) KR101670190B1 (ja)
CN (1) CN104507834B (ja)
TW (1) TWI523729B (ja)
WO (1) WO2014162863A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107428477A (zh) * 2015-02-16 2017-12-01 日特机械工程株式会社 工件输送用托盘

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6460826B2 (ja) * 2015-02-16 2019-01-30 日特エンジニアリング株式会社 パレット搬送装置
JP6439564B2 (ja) * 2015-04-17 2018-12-19 株式会社豊田自動織機 搬送装置
JP6447340B2 (ja) * 2015-04-17 2019-01-09 株式会社豊田自動織機 搬送装置
JP6650651B2 (ja) * 2015-08-25 2020-02-19 Nittoku株式会社 パレット搬送装置及びそれを用いたパレット搬送方法
JP6536298B2 (ja) * 2015-09-02 2019-07-03 株式会社豊田自動織機 搬送装置
JP6621205B2 (ja) * 2015-10-30 2019-12-18 Nittoku株式会社 パレット搬送装置
WO2017073305A1 (ja) * 2015-10-30 2017-05-04 日特エンジニアリング株式会社 パレット搬送装置
JP6681182B2 (ja) * 2015-12-04 2020-04-15 株式会社Screenホールディングス 搬送装置、処理装置、および搬送方法
US10494188B2 (en) * 2016-06-08 2019-12-03 Nittoku Engineering Co., Ltd. Pallet transport device
CN106217150A (zh) * 2016-07-27 2016-12-14 耐世特凌云驱动系统(芜湖)有限公司 外环复合磨床上下料温度检测装置
CN106141777A (zh) * 2016-07-27 2016-11-23 耐世特凌云驱动系统(芜湖)有限公司 汽车轴承cv环加工上料装置
US10556312B2 (en) * 2016-09-01 2020-02-11 Midaco Corporation Indexer for operating workpieces
CN107161663A (zh) * 2017-05-17 2017-09-15 苏州电瓷厂股份有限公司 一种上料装置
JP7028691B2 (ja) * 2018-03-29 2022-03-02 Nittoku株式会社 パレット搬送装置
CN110271829B (zh) * 2019-05-15 2020-04-17 中联重科股份有限公司 粘稠物质输送设备
EP3772477A1 (en) * 2019-08-08 2021-02-10 Renishaw PLC Pallet loader for a positioning apparatus
CN111408851B (zh) * 2020-04-02 2021-11-30 上海精测半导体技术有限公司 一种多工位轮转设备
KR102459334B1 (ko) * 2021-04-01 2022-10-28 주식회사 뉴코애드윈드 화물자동차의 적재함용 파렛트 이송장치

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0218210A (ja) * 1988-07-01 1990-01-22 Miyano Seisakusho:Kk 物品格納棚
JP2011093032A (ja) 2009-10-29 2011-05-12 Nittoku Eng Co Ltd パレット搬送装置及びパレット搬送方法
JP2011189999A (ja) * 2010-03-12 2011-09-29 Nittoku Eng Co Ltd パレット搬送装置及びパレット搬送方法

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT202929B (de) * 1957-10-31 1959-04-10 Voest Ag Fördervorrichtung für Gießhallen u. dgl.
JPS60188217A (ja) * 1984-03-07 1985-09-25 Nissan Motor Co Ltd パレツト搬送用コンベア装置
JPS60213458A (ja) * 1984-04-02 1985-10-25 Miyano Tekkosho:Kk パレットステーション
JPH0712326Y2 (ja) * 1992-06-18 1995-03-22 茂之 篠原 パレットの直進間欠移送装置
JP3394847B2 (ja) * 1995-05-10 2003-04-07 株式会社カイジョー 部品搬送装置
US6202824B1 (en) * 1999-06-15 2001-03-20 International Business Machines Corporation Vehicle for facilitating assembly verification test
JP2007216291A (ja) * 2006-02-20 2007-08-30 Nippon Mektron Ltd プレス打ち抜き装置
JP4883399B2 (ja) * 2006-09-22 2012-02-22 株式会社ダイフク 被搬送物積み下ろし搬送方法
CN101801596B (zh) * 2007-09-14 2012-05-09 柔性连接部件股份公司 输送器系统用的提升装置、输送器系统和方法
CA3030712C (en) * 2009-03-03 2023-02-14 Albert Kleinikkink Multi-mode and multi-pitch conveyor system
JP2011189998A (ja) * 2010-03-12 2011-09-29 Nittoku Eng Co Ltd パレット搬送方法及びパレット搬送装置
CN101850884B (zh) * 2010-05-27 2012-03-07 南京音飞储存设备工程有限公司 一种垂直升降货柜
CN102991982A (zh) 2011-09-09 2013-03-27 鸿富锦精密工业(深圳)有限公司 流动板循环机构
CN102774627A (zh) 2012-07-11 2012-11-14 肇庆理士电源技术有限公司 一种循环使用电池托盘的系统

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0218210A (ja) * 1988-07-01 1990-01-22 Miyano Seisakusho:Kk 物品格納棚
JP2011093032A (ja) 2009-10-29 2011-05-12 Nittoku Eng Co Ltd パレット搬送装置及びパレット搬送方法
JP2011189999A (ja) * 2010-03-12 2011-09-29 Nittoku Eng Co Ltd パレット搬送装置及びパレット搬送方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2982619A4

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107428477A (zh) * 2015-02-16 2017-12-01 日特机械工程株式会社 工件输送用托盘
CN107428477B (zh) * 2015-02-16 2020-05-05 日特有限公司 工件输送用托盘

Also Published As

Publication number Publication date
KR101670190B1 (ko) 2016-10-27
JP2014200887A (ja) 2014-10-27
TWI523729B (zh) 2016-03-01
TW201502046A (zh) 2015-01-16
US20150175362A1 (en) 2015-06-25
EP2982619A1 (en) 2016-02-10
JP6112713B2 (ja) 2017-04-12
US10071864B2 (en) 2018-09-11
CN104507834B (zh) 2016-11-30
CN104507834A (zh) 2015-04-08
EP2982619B1 (en) 2018-03-14
KR20150023725A (ko) 2015-03-05
EP2982619A4 (en) 2016-11-30

Similar Documents

Publication Publication Date Title
WO2014162863A1 (ja) パレット搬送装置及びパレット搬送方法
JP6452433B2 (ja) 循環式パレット搬送装置
WO2016132972A1 (ja) パレット搬送装置
CN108367867B (zh) 托盘输送装置
JP6615067B2 (ja) パレット搬送装置
US20180043489A1 (en) Work conveying pallet
CN108698181B (zh) 托盘输送装置和托盘输送方法
WO2017033739A1 (ja) パレット搬送装置及びそれを用いたパレット搬送方法
JP2011189999A (ja) パレット搬送装置及びパレット搬送方法
JP6655854B2 (ja) パレット搬送装置
JP5769331B2 (ja) パレット搬送装置及びパレット搬送方法
JP5651667B2 (ja) 基板搬送装置、基板作業装置および搬送ベルト
CN113993798B (zh) 托盘输送装置以及托盘输送静止方法
WO2017043397A1 (ja) パレット搬送装置
JP6452431B2 (ja) パレット搬送装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14779158

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20157000784

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14414465

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2014779158

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE