WO2014162632A1 - 抽気蒸気タービン発電設備の保安運転方法および装置 - Google Patents

抽気蒸気タービン発電設備の保安運転方法および装置 Download PDF

Info

Publication number
WO2014162632A1
WO2014162632A1 PCT/JP2013/081425 JP2013081425W WO2014162632A1 WO 2014162632 A1 WO2014162632 A1 WO 2014162632A1 JP 2013081425 W JP2013081425 W JP 2013081425W WO 2014162632 A1 WO2014162632 A1 WO 2014162632A1
Authority
WO
WIPO (PCT)
Prior art keywords
pressure
low
steam
extraction
casing
Prior art date
Application number
PCT/JP2013/081425
Other languages
English (en)
French (fr)
Inventor
佳史 加藤
Original Assignee
富士電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 富士電機株式会社 filed Critical 富士電機株式会社
Priority to DE112013001671.0T priority Critical patent/DE112013001671B4/de
Priority to US14/478,648 priority patent/US9404382B2/en
Publication of WO2014162632A1 publication Critical patent/WO2014162632A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/02Arrangement of sensing elements
    • F01D17/08Arrangement of sensing elements responsive to condition of working-fluid, e.g. pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/10Final actuators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/10Final actuators
    • F01D17/12Final actuators arranged in stator parts
    • F01D17/14Final actuators arranged in stator parts varying effective cross-sectional area of nozzles or guide conduits
    • F01D17/141Final actuators arranged in stator parts varying effective cross-sectional area of nozzles or guide conduits by means of shiftable members or valves obturating part of the flow path
    • F01D17/145Final actuators arranged in stator parts varying effective cross-sectional area of nozzles or guide conduits by means of shiftable members or valves obturating part of the flow path by means of valves, e.g. for steam turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • F01D21/14Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for responsive to other specific conditions
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/02Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being of multiple-expansion type
    • F01K7/04Control means specially adapted therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/16Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
    • F01K7/18Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type the turbine being of multiple-inlet-pressure type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2220/00Application
    • F05D2220/30Application in turbines
    • F05D2220/31Application in turbines in steam turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2270/00Control
    • F05D2270/30Control parameters, e.g. input parameters
    • F05D2270/301Pressure

Definitions

  • This invention relates to a safe operation method and apparatus for preventing damage to a thrust bearing due to an excessive thrust force of an extraction steam turbine power generation facility for supplying steam to a production process.
  • an extraction steam turbine power generation facility including an extraction pipe that extracts a part of steam from a steam turbine that drives a generator and supplies the extracted steam to a production process that uses the steam has been generally used as disclosed in, for example, Patent Document 1 below.
  • Patent Document 1 The configuration of the steam turbine power generation facility disclosed in Patent Document 1 is shown in FIG. In FIG. 12, 1 is a boiler, 2 is an extraction steam turbine having a high pressure section 3 and a low pressure section 4 each having a blade stage, 5 is a condenser for condensing exhaust steam from the extraction steam turbine 2, and 6 is a turbine.
  • a generator 7 that is directly connected to 2 and 7 is a deaerator that heats and degass the condensate from the condenser 5.
  • the extraction steam turbine 2 controls the main steam control valve 8 for controlling the flow rate of the main steam flowing into the high pressure section 3 and the flow rate of the steam flowing from the high pressure section 3 into the low pressure section 4 to control the pressure of the extraction steam.
  • a bleeder adjusting valve 9 is provided.
  • a feed water supply system 10 connected to the condenser 5 and the boiler 1 includes a condensate pump 11, a first low pressure feed water heater 12, a second low pressure feed water heater 13, a deaerator 7, a feed water pump 14, and a high pressure feed water.
  • a heater 15 is provided.
  • An extraction pipe 19 for supplying the extraction steam controlled to a predetermined pressure by the extraction control valve 9 to the process 16 is connected to the outlet of the high pressure section 3 of the extraction steam turbine 2.
  • Reference numeral 20 denotes a main steam pipe connected to the boiler 1 and the main steam control valve 8.
  • the extraction pipe 21 for the high-pressure feed water heater is branched from the extraction pipe 19 and connected to the high-pressure feed water heater 15 and includes a check valve 22 and a stop valve 23.
  • Reference numeral 24 denotes a drain pipe that guides the drain of the high-pressure feed water heater 15 to the deaerator 7.
  • the deaerator bleed piping 25 is connected to the low pressure portion 4 of the bleed steam turbine 2 and the deaerator 7, and includes a check valve 26 and a stop valve 27.
  • the extraction pipe 29 for the second low-pressure feed water heater is connected to the low-pressure section 4 of the extraction steam turbine 2 and the second low-pressure feed water heater 13 and includes a check valve 30 and a stop valve 31.
  • the extraction pipe 33 for the first low-pressure feed water heater is connected to the low-pressure portion 4 of the extraction steam turbine 2 and the first feed water heater 12 and includes a check valve 34 and a stop valve 35.
  • Reference numeral 36 denotes a drain pipe that guides the drain of the second low-pressure feed water heater 13 to the first low-pressure feed water heater 12.
  • the main steam supplied from the boiler 1 has its steam flow controlled by the main steam control valve 8 and flows into the extraction steam turbine 2, and the high-pressure compartment of the high-pressure unit 3 and the low-pressure vehicle of the low-pressure unit 4.
  • the exhaust steam that flows through the chamber and rotates the turbine rotor to work and is exhausted from the low-pressure part 4 flows into the condenser 5 held at a pressure equal to or lower than the atmospheric pressure to be condensed.
  • the thrust force applied to the turbine rotor by the steam flowing in the vehicle interiors of the high pressure part 3 and the low pressure part 4 is supported by a thrust bearing.
  • the extracted steam extracted from the exhaust steam at the outlet of the high-pressure unit 3 is controlled to a predetermined pressure by the extraction control valve 9 and supplied to the process 16 through the extraction pipe 19.
  • a part of the extraction steam is supplied to the high-pressure feed water heater 15 through the extraction pipe 21 for the high-pressure feed water heater branched from the extraction pipe 19.
  • the remaining exhaust steam extracted by the extraction pipe 19 of the high pressure section 3 is supplied to the low pressure section 4 through the extraction control valve 9.
  • the generator 6 generates electric power corresponding to the amount of work in which steam flows through the high-pressure part 3 and the low-pressure part 4 of the extraction steam turbine 2 and rotates the turbine rotor.
  • the condensate in the condenser 5 is boosted by the condensate pump 11 of the condensate pipe 10 and supplied to the first and second low-pressure feed water heaters 12 and 13, and the condensate water is supplied from these feed water heaters 12 and 13. Are heated by uncontrolled extraction steam from the low pressure section 4 flowing through the first and second low pressure feed water heater extraction pipes 33 and 29, respectively.
  • the heated condensate flows into the deaerator 7 and is heated and degassed by uncontrolled bleed steam from the low pressure part 4 supplied through the bleeder extraction pipe 25.
  • the condensate degassed by the deaerator 7, that is, the feed water, is boosted by the feed water pump 14 and flows into the high pressure feed water heater 15, and the high pressure feed water heater 15 passes through the extraction pipe 21 for the high pressure feed water heater. Heated by uncontrolled extraction steam from the section 4 and supplied to the boiler 1.
  • the feed water supplied to the boiler 1 is heated by the boiler 1 to become steam, and is supplied to the extraction steam turbine 2 as main steam.
  • the steam from the boiler flows through the extraction steam turbine 2 and rotates the turbine rotor to work, and then condensates in the condenser, and this condensate is supplied to the water supply.
  • the extracted steam extracted from the extracted steam turbine 2 during this circulation is supplied to the process 16 by controlling the pressure to a predetermined pressure by the extraction control valve 9, and only the check valve, stop valve or stop valve is controlled without control.
  • the feed water is heated by supplying the feed water heaters 12, 13, 15 and the deaerator 7 through the extraction pipes 33, 29, 21, 25 provided.
  • the extraction steam turbine 2 that supplies the extraction steam to the process 16 in this way, when the ratio of the extraction flow rate of the process 16 to the main steam flow rate is large at the rated operating point, that is, the operating condition that is operated most frequently, Since the extraction steam turbine is designed to meet this requirement, when the amount of extraction required by the process 16 in actual operation is greatly deviated from the rated operating point and the ratio of the extraction flow to the main steam is reduced, the extraction control valve 9 Advances in the opening direction, and the flow rate of the steam flowing through the blade stage in the low-pressure part 4 of the extraction steam turbine is greatly increased from the rated operation point downstream of the extraction control valve 9.
  • the force received by the blades of the blade stage in the low-pressure part 4 is increased, the stress applied to the blade is increased, and the thrust force applied to the turbine rotor is also increased. Thereby, even if the stress applied to the blade stage is less than the allowable value, there is a risk that the thrust force applied to the turbine rotor becomes excessive and the thrust bearing is damaged.
  • the steam flow rate flowing through the blade stage of the low-pressure part 4 downstream from the extraction adjustment valve 9 is a steam flow rate that is greater than or equal to the fully open opening of the extraction adjustment valve 9. Absent. However, at this time, in the system for supplying uncontrolled extraction steam from the low pressure section 4 to a plurality of feed water heaters or the like, for example, check of the deaerator extraction pipe 25 and the second low pressure feed water heater extraction pipe 29 in FIG.
  • Patent Document 1 a part of the exhaust steam of the high-pressure section 3 having the blade stage is extracted and supplied to the process or the like, and the steam flow rate of the low-pressure section 4 having the blade stage through which the remaining steam flows is increased.
  • a safe operation device is shown for preventing the thrust bearing from being damaged by the excessive thrust force generated as a result.
  • FIG. 13 shows the safe driving apparatus disclosed in Patent Document 1.
  • the flow rate of the steam flowing into the high-pressure part 3 is controlled by the main steam control valve 8, and from the high-pressure part 3 by the extraction control valve 9.
  • the pressure of the extracted steam extracted from the exhaust steam of the high pressure section 3 and supplied to the process 16 is controlled.
  • it receives detection signals from a high pressure casing pressure detector 40 for detecting the steam pressure in the high pressure casing of the high pressure section 3 and a low pressure casing pressure detector 41 for detecting the steam pressure in the low pressure casing of the low pressure section 4.
  • the main steam control valve controller 44 that controls the main steam control valve 8 and the arithmetic control device 42 that provides the opening commands OP8 and OP9 to the extraction steam controller 46 that controls the extraction steam control valve 9 are provided.
  • the arithmetic and control unit 42 has a calculation function for adjusting the extraction steam pressure, and the steam pressure of the extraction pipe 19 detected by the steam pressure detector 48 installed in the extraction pipe 19 connected to the process 16 (hereinafter referred to as extraction pressure). ) Pp is compared with the set pressure Pps set by the extraction pressure setter 49, and the valve opening signal OP9 is formed so that the extraction pressure Pp becomes equal to the set pressure Pps. A valve operation signal based on the valve opening signal OP9 is output from the bleeder control valve controller 46, converted into a hydraulic signal through the electro-oil converter 47, and applied to the bleeder control valve 9.
  • the pressure of the bleed pipe 19 that connects the bleed steam turbine 2 and the process 16 is constantly controlled to the set pressure by the arithmetic and control unit 42 and the bleed control valve controller 46. As a result, the pressure of the process 16 is kept constant.
  • the arithmetic and control unit 42 determines that the low-pressure casing detection pressure Lp, the high-pressure casing pressure Hp and the low-pressure casing pressure Lp in the extraction steam turbine 2 shown in FIG.
  • a value on the correlation line P expressed by a linear expression in the relationship a comparison is made with a low-pressure casing reference pressure Lpp that is uniquely determined by the high-pressure casing pressure.
  • This specific relationship is a relationship between Hp and Lp in which the thrust force generated in the extraction steam turbine 2 by a combination of the steam flow rate passing through the high pressure part 3 and the steam flow rate passing through the low pressure part 4 becomes a certain value. . That is, the correlation line P shown in FIG.
  • the valve opening command OP8 for reducing the valve opening is output to the main steam control valve 8 so that the load of the extraction steam turbine 2 becomes smaller than the current load.
  • the correlation line P can represent the relationship between the low-pressure casing pressure and the high-pressure casing pressure when the thrust force is equal to the value corresponding to the allowable surface pressure of the thrust bearing.
  • the low-pressure casing pressure Lp of the extraction steam turbine 2 is a pressure that represents a specific relationship between the high-pressure casing pressure and the low-pressure casing pressure in FIG. Based on the correlation line P, when the pressure becomes lower than the low-pressure casing pressure that is uniquely determined as the low-pressure casing pressure on the P-line corresponding to the high-pressure casing pressure, the extraction pressure control by the extraction control valve is released. It is configured.
  • the load is reduced to a load smaller than the current load.
  • the conventional security device shown in Patent Document 1 does not show the limit of load change.
  • the load drop is too great, if the surplus power deducted from the factories used in the extraction steam turbine power generation facility is transmitted to the local power system, the production process that uses the power Not only will the impact on the power generation increase, but the amount of transmission will change suddenly and may have a significant impact on the local power system. Therefore, in the technique according to Patent Document 1, when the load is greatly reduced, the operation of the power generation facility may be hindered.
  • the safe operation method of the present invention includes an extraction steam turbine composed of a high-pressure part and a low-pressure part each having a blade stage, and the generator is driven by the extraction steam turbine.
  • the flow rate of steam flowing into the high-pressure part of the extraction steam turbine is controlled by a main steam control valve, and the flow rate of steam supplied from the exhaust steam of the high-pressure part to the low-pressure part is adjusted by the extraction control valve.
  • the steam pressure in the high-pressure compartment of the high-pressure part and the steam pressure in the low-pressure compartment of the low-pressure part are detected, Based on a preset pressure correlation line representing a specific relationship between the high-pressure casing pressure and the low-pressure casing pressure of the extraction steam turbine, it corresponds to the detected pressure of the high-pressure casing each time.
  • the low-pressure casing limit pressure that is a quasi-standard is obtained, the low-pressure casing limit pressure is compared with the detected pressure of the low-pressure casing, and the detected pressure of the low-pressure casing is greater than the low-pressure casing limit pressure.
  • the extraction steam pressure control by the extraction control valve is continuously operated, and the main steam control valve is forcibly throttled to reduce the flow rate of the main steam flowing into the high pressure section. It is characterized by that.
  • the operation of reducing the opening of the main steam control valve is performed so that the flow rate of the steam flowing into the high-pressure section is reduced by the operation.
  • the valve opening of the main steam control valve that is stopped and throttled when the detected pressure of the low-pressure compartment decreases and falls below the low-pressure compartment evacuation pressure, which is a reference pressure set lower than the low-pressure compartment limit pressure
  • the load operation by the main steam control valve can be resumed at a load corresponding to.
  • the low-pressure casing limit is maintained until the main steam flow rate supplied to the steam turbine reaches a flow rate at which a preset steady extraction operation can be performed.
  • the pressure correlation line is different from the pressure correlation line for obtaining the low-pressure casing limit pressure, and is a reference pressure obtained based on the initial pressure correlation line set for switching the extraction pressure control operation. It is better to set to the low pressure casing initial limit pressure.
  • the safety operation device of the present invention includes an extraction steam turbine composed of a high-pressure part and a low-pressure part each having a blade stage, and a generator is driven by the extraction steam turbine, and the high-pressure part of the extraction steam turbine is connected to the extraction steam turbine.
  • the main steam flow rate that flows in is controlled by the main steam control valve, and the steam flow rate that is supplied from the exhaust steam of the high pressure part to the low pressure part is adjusted by the extraction control valve to extract a part from the exhaust steam of the high pressure part.
  • Pressure detection for detecting the steam pressure in the high-pressure compartment of the high-pressure part and the steam pressure in the low-pressure compartment of the low-pressure part in the extraction steam turbine power generation equipment in which the pressure of the extraction steam supplied to the process is controlled to a constant value Based on a pressure correlation line representing a specific relationship between the high pressure casing pressure and the low pressure casing pressure of the extraction steam turbine set in advance, and the detected pressure of the high pressure casing each time
  • the pressure control function of the bleeder control valve is provided with a control means for reducing the flow rate of the steam flowing into the high pressure section by reducing the opening of the main steam control valve while the operation is continued as it is. To do.
  • the valve control command for narrowing the opening of the main steam control valve is the pressure of the low-pressure casing.
  • Load operation by the main steam control valve at a load corresponding to the valve opening degree of the main steam control valve stopped and throttled when the pressure becomes lower than the low-pressure casing retraction pressure set by a predetermined value smaller than the low-pressure casing limit pressure Can be resumed.
  • the main steam flow supplied to the extraction steam turbine becomes a steam flow set in advance as a main steam flow capable of continuing the steady extraction pressure control operation.
  • a pressure correlation line different from the pressure correlation line for obtaining the low-pressure casing limit pressure is based on the initial pressure correlation line set for switching the extraction pressure control operation
  • the low-pressure casing limit pressure corresponding to the detected pressure of the respective high-pressure casing is obtained, If for some reason the low-pressure casing pressure in the low-pressure section of the extraction steam turbine exceeds this low-pressure casing limit pressure and the thrust force of the turbine rotor becomes excessive, the extraction steam pressure control remains unchanged and By reducing the opening of the main steam control valve and reducing the flow rate of the steam flowing into the high-pressure part, the pressure of the low-pressure casing can be lowered while maintaining the supply of extracted steam to the process. Therefore, the thrust force acting on the turbine rotor can be reduced.
  • the throttle valve for the throttled main steam Since the load operation by the main steam control valve is resumed at the load corresponding to the opening, the change in the load is small.
  • the extraction control valve is automatically controlled so as to keep the pressure of the extraction steam constant, so that the influence on the process is small.
  • the system diagram of the extraction steam turbine equipment provided with the safe operation apparatus by the Example of this invention The figure which shows the correlation with the pressure of the high pressure housing
  • the schematic diagram which shows the cross section of the blade stage of an extraction steam turbine.
  • FIG. 2 is a flow chart of a security operation showing a security driving method according to Embodiment 1 of the present invention.
  • FIG. 4 is a diagram obtained by adding an initial pressure correlation line representing a specific relationship between a high-pressure casing pressure and a low-pressure casing limit pressure used for an initial safety operation when switching the extraction control of the extraction steam turbine to the pressure correlation line of FIG. 3. The figure explaining the driving
  • FIG. 11 is a partial security operation flowchart subsequent to FIG. 10 according to the second embodiment of the present invention.
  • the system diagram which shows general extraction steam turbine equipment.
  • FIG. 1 shows the configuration of a safety operation device according to a first embodiment of the present invention.
  • reference numeral 2 denotes an extraction steam turbine (hereinafter abbreviated as “extraction turbine”) composed of a high pressure section 3 and a low pressure section 4.
  • extraction turbine an extraction steam turbine
  • the flow rate of main steam supplied from a boiler (not shown) to the high pressure unit 3 is controlled by the main steam control valve 8.
  • a part of the exhaust steam discharged from the high pressure section 3 is supplied to the process 16 through the extraction pipe 19 and the remaining exhaust steam is supplied to the low pressure section 4 through the extraction control valve 9.
  • the exhaust steam discharged from the low-pressure part 4 is condensed by the condenser 5 and returned to the boiler.
  • the extraction turbine 2 supplies extracted steam from the extraction pipe 19 to the process 16 and generates power by driving a generator (not shown) coupled thereto.
  • a high-pressure casing pressure detector 40 and a low-pressure casing pressure detector 41 for detecting the steam pressure in each of the high-pressure section 3 and the low-pressure section 4 of the extraction turbine 2 are provided.
  • the pressure of the extraction steam supplied to the process 16 is also detected by the extraction pressure detector 48 installed in the extraction pipe 19.
  • the pressure detection signals from these pressure detectors 40, 41, and 48 are input to an arithmetic control device 42 configured by, for example, a programmable logic controller (hereinafter referred to as PLC).
  • PLC programmable logic controller
  • the PLC 42 compares the set pressure Pps of the extraction steam supplied to the process 16 that is input and set in advance to the extraction pressure setting device 49 with the detection pressure Pp of the extraction steam detected by the detector 48, and the detected pressure Pp is obtained.
  • An opening signal OP9 for changing the opening of the bleeder adjusting valve 9 so as to be equal to the set pressure Pps is formed and given to the bleeder adjusting valve controller 46.
  • the bleeder control valve controller 46 converts the valve opening signal OP9 into a valve operation signal Ve9 and applies it to the electro-oil converter 47, where it is converted into a hydraulic operation signal Vh9 and applied to the bleeder control valve 9. As a result, the extraction vapor pressure is kept constant at the set pressure.
  • the PLC 42 forms an opening signal OP8 for instructing the main steam control valve 8 to open the valve based on the load command, and supplies the main steam control valve controller 44 with the opening signal OP8.
  • the main steam control valve controller 44 converts this into a valve operation signal Ve8, which is converted into a hydraulic operation signal Vh8 by the electro-oil converter 45 and applied to the main steam control valve 8.
  • the opening degree of the main steam control valve 8 is controlled to the opening degree commanded from the PLC 42, and the main steam flow rate supplied to the high pressure unit 3 is adjusted.
  • the opening signal OP8 of the main steam control valve 8 and the opening signal OP9 to the extraction control valve 9 have a certain relationship so that the amount of extraction steam is maintained at a preset steam flow even when the main steam flow changes. Are controlled at the same time.
  • the relationship between the opening signal OP8 of the main steam control valve and the opening signal OP9 of the extraction control valve 9 will be described later.
  • FIG. 4 schematically shows a section of a blade stage of the extraction turbine 2.
  • the pressure of the steam (high pressure casing pressure Hp) flowing into the high pressure casing 3a from the inlet of the high pressure section 3 through the main steam control valve 8 is determined by the steam flow rate passing through the high pressure blade stage 3b and the pressure of the high pressure exhaust steam. The higher the steam flow rate through the paragraph, the higher the pressure.
  • a thrust force + F2 (+ indicates the right direction) is generated in the right direction in the figure by the steam passing through the high pressure blade stage 3b.
  • the high-pressure casing pressure Hp generates a thrust force ⁇ F1 ( ⁇ indicates the left direction) in the left direction on the axial end surface of the rotor boss 21a constituting the labyrinth packing.
  • a part of the high-pressure exhaust steam discharged from the outlet 3c of the high-pressure part 3 is extracted for supply to the process 16, and the remaining steam flows into the low-pressure casing 4a of the low-pressure part 4 through the extraction control valve 9.
  • the pressure Lp in the low-pressure casing 4a increases as the flow rate of steam passing through the low-pressure blade stage 4b increases.
  • the thrust force + F4 is applied to the low pressure blade stage 4b by the steam passing through the stage.
  • a thrust force + F3 acts on the axial end surface of the rotor boss 21b constituting the intermediate labyrinth packing due to the differential pressure between the low-pressure casing pressure Lp and the high-pressure exhaust steam pressure.
  • the thrust force F acting on the entire turbine rotor is expressed by the following equation (1).
  • F F2 + F3 + F4-F1 (1)
  • FIG. 5 shows the relationship between the main steam flow rate Q and the thrust force F acting on the turbine rotor, with the main steam flow rate Q on the horizontal axis and the thrust force F on the vertical axis.
  • the opening / closing valve 9 is operated in the manual mode (manual operation by the operator) and is fully opened, and the entire amount of high-pressure exhaust steam discharged from the high-pressure portion 3 of the extraction turbine 2 is extracted. 9, the extraction flow rate is zero.
  • extraction start steam flow rate a main steam flow rate (hereinafter referred to as “extraction start steam flow rate”) Q1 set as a main steam flow rate for starting extraction to the process 16
  • the extraction control valve 9 Is switched from the manual mode to the automatic control mode by the PLC 42 to automatically control the pressure of the extracted steam.
  • the opening degree of the bleeder adjusting valve 9 is lowered and the pressure of the high-pressure exhaust steam 3c is increased to the pressure Pp of the process 16.
  • the pressure of the high-pressure exhaust steam 3c reaches the pressure Pp of the process 16
  • the entire amount of the high-pressure exhaust steam 3c is still supplied to the low-pressure blade stage 4b through the extraction control valve 9.
  • the pressure Pp of the process 16 is higher than the pressure Hp of the high-pressure exhaust steam 3c, but the extraction check valve 17 provided in the extraction pipe 19 prevents the backflow of steam from the process 16 to the extraction turbine 2.
  • the thrust force F is increased by the thrust force F3 applied to the intermediate labyrinth boss 21b due to the pressure increase of the high-pressure exhaust steam 3c.
  • the increase in the thrust force F4 applied to the low-pressure blade stage 4b due to the increase in the flow rate of steam passing through the low-pressure part 4 are superimposed, and rapidly increase along the line 1-2 in FIG.
  • the opening degree of the extraction control valve 9 decreases, the pressure Hp of the high-pressure exhaust steam 3c increases to reach the pressure Pp of the process 16, and when the supply of extraction to the process 16 is started, the extraction control valve 9 is turned on. Since the flow rate of the steam passing therethrough is reduced and the steam flow rate of the low-pressure blade stage 4b is reduced, the thrust force + F4 acting on the turbine rotor is reduced. Therefore, the thrust force F of the entire turbine rotor decreases, for example, following the line 2-3 in FIG. When the load (power generation output) of the extraction turbine 2 is increased while the extraction steam flow rate to the process 16 is kept constant, the steam flow rate of the high pressure stage 3b and the steam flow rate of the low pressure blade stage 4b increase.
  • the thrust force + F2 applied to the high-pressure stage 3b and the thrust force + F4 applied to the low-pressure blade stage 4b rapidly increase, and at the same time, the thrust force ⁇ F1 applied to the labyrinth boss 21a also increases rapidly due to the increase of the high-pressure casing pressure Hp.
  • the thrust force F gradually increases along the 3-4 line.
  • the thrust force F of the extraction turbine 2 changes in the plus (right) direction and the minus (left) direction as the extraction flow rate increases or decreases.
  • the axial movement of the rotor due to the thrust force F is limited by the thrust bearing, but if the thrust force F received by the thrust bearing is excessive and exceeds the allowable value, the thrust bearing may be damaged.
  • the safety device is activated and the bleed turbine is brought to an emergency stop, resulting in a large loss in the operation of the power generation facility.
  • a necessary steam flow rate corresponding to the process demand is extracted and supplied to the process 16 from the extraction turbine, and the change in the thrust force as described above in the extraction turbine is an event inside the extraction turbine. This is not considered in the operation of the power generation equipment without knowing to the operator of the process, even the operator of the process using the extracted steam.
  • the thrust force F when the process extraction steam flow rate is minimum and when the process extraction steam flow rate is maximum changes in both negative and positive directions.
  • a bleed turbine is designed with full use of the thrust bearing. In this case, in the operation between the process extraction steam flow rate zero and the minimum (hereinafter referred to as “minimum extraction flow rate”), the thrust force F exceeds the use limit.
  • FIG. 7 shows a safety operation flow of the safety operation in the extraction turbine of the first embodiment of the present invention.
  • Step S1 in FIG. 7 is a load increasing operation process in a manual operation in which the main steam flow rate Q is increased from the start of the extraction turbine until reaching the extraction start steam flow rate Q1 for performing the extraction pressure control automatically.
  • the main steam flow rate Q is monitored by a manual, that is, by an operator (step S2).
  • the load increasing operation in step S1 is performed until the main steam flow rate Q reaches the preset extraction start steam flow rate Q1 (N branch).
  • the process proceeds from the Y branch to step S3 to switch to the extraction pressure control operation. This is usually done by pushing a push button on the operation panel. From here, the safety operation by the PLC 42 in FIG. 1 is started, and the extraction pressure control operation is performed to control the extraction steam pressure to coincide with a preset pressure.
  • Processing to obtain the low-pressure casing limit pressure Lpp by reading the pressure Hp, the low-pressure casing (steam) pressure Lp, and the extraction (steam) pressure Pp, and the extraction pressure control are executed, and the extraction steam having a constant pressure is supplied to the process. Is done.
  • the low-pressure compartment limit pressure Lpp is read from the pressure correlation line P that determines the limit pressure Lpp of the low-pressure compartment corresponding to the high-pressure compartment pressure Hp shown in FIG. It is obtained by calculation as the limit pressure Lpp of the low-pressure casing corresponding to the detected pressure Hp.
  • the next step S4 is a process of monitoring the low-pressure casing pressure Lp.
  • the monitoring of the low-pressure casing pressure Lp is nothing but monitoring the thrust force F applied to the thrust bearing of the extraction turbine.
  • the magnitude relation is determined by comparing the low-pressure casing limit pressure Lpp obtained corresponding to the high-pressure casing pressure Hp with the low-pressure casing pressure Lp detected each time. The That is, when the low-pressure casing pressure Lp is low and Lp ⁇ Lpp, the low-pressure casing pressure Lp corresponds to the pressure correlation line P shown in FIG. 3 (correlation line P indicating the reference pressure of the low-pressure casing shown in FIG. 2).
  • the thrust force F applied to the thrust bearing of the bleed turbine is in a range that does not hinder the operation. Further, when the low-pressure casing pressure Lp increases and Lp ⁇ Lpp, the low-pressure casing pressure Lp is above the correlation line P in FIG. 3, and the thrust force F applied to the thrust bearing of the extraction turbine is in operation. It will be in the range that hinders. In this way, by monitoring the low-pressure casing pressure Lp, it is possible to monitor whether or not the thrust force F generated in the thrust bearing of the extraction turbine is within a range that hinders operation.
  • step S4 When it is determined in step S4 that the low-pressure casing pressure Lp is lower than the low-pressure casing limit pressure Lpp (Lp ⁇ Lpp), the low-pressure casing pressure Lp is below the pressure correlation line P shown in FIG. Yes, the thrust force F applied to the thrust bearing of the bleed turbine is in a range that does not hinder the operation, so that the normal load operation is continued in the loop that monitors the normal load operation at the Y branch.
  • the low-pressure casing pressure Lp is equal to or higher than the low-pressure casing limit pressure Lpp (Lp ⁇ Lpp)
  • the low-pressure casing pressure Lp is on the line of the correlation line P in FIG. Point)) or higher than this, and the thrust force F applied to the thrust bearing of the bleed turbine is increased to the extent that the operation is hindered. Therefore, in this case, in order to immediately interlock (stop) the normal load operation (load control operation by the main steam control valve) of the extraction turbine, the process proceeds from the N branch of step S4 to step S6 of the interlock operation loop.
  • step S6 since the process bleed steam flow rate has decreased to the minimum bleed flow rate or less, a bleed abnormality alarm is generated indicating that the thrust force F of the thrust bearing of the bleed turbine is excessive.
  • point A in FIG. 3 corresponds to the thrust force at point a on the interlock operation line (line indicating the limit of thrust force) L1 in FIG.
  • Step S7 the forced extraction operation is performed in which the opening of the main steam control valve 8 is forcibly narrowed while the extraction pressure control continues to operate. This is performed in order to prevent the thrust bearing from being damaged by the excessive thrust force of the extraction turbine, and the thrust generated in the extraction turbine 2 by abruptly reducing the opening of the main steam control valve 8. The force F is reduced.
  • step S8 it is determined in step S8 whether or not the thrust force in the bleed turbine has decreased to a safe range that does not hinder the operation. That is, in step S8, the low-pressure casing pressure Lp detected by the low-pressure casing pressure detector 41 is slightly lower than the correlation line P in FIG.
  • a determination process is performed to determine whether Lp ⁇ Lpq.
  • the process proceeds from step Y to step S9. Then, the forcible throttle operation of the main steam control valve 8 is stopped, the extraction abnormality alarm is canceled, and the normal load operation monitoring loop is entered.
  • step S10 it is determined whether the main steam flow rate Q is equal to or higher than the extraction start steam flow rate Q1 by comparing the main steam flow rate Q reduced by the forced narrowing of the main steam control valve 8 with the extraction start steam flow rate Q1. I do.
  • Q ⁇ Q1 and it is determined that the main steam flow rate Q has not decreased below the bleed start steam flow rate Q1, the flow returns to step S7 from the Y branch, and the low pressure casing pressure Lp ⁇ low pressure casing evacuation.
  • the forced narrowing operation of the main steam control valve 8 is repeated until the pressure becomes Lpq.
  • step S8 when it is determined that the low-pressure casing pressure Lp is on the correlation line Q in FIG. 3 or below the Q-line, the forcible throttle operation of the main steam control valve 8 is performed from the Y branch. , S8 and S10 are exited, and the process proceeds to step S9.
  • the load operation by the main steam control valve is performed in the load in which the main steam control valve 8 is forcibly narrowed in step 7. Is done.
  • the operator confirms that the process extraction steam flow rate is equal to or higher than the minimum extraction flow rate, and performs a load increase operation.
  • step S7, S8, and S10 when the main steam flow rate Q is greatly reduced in the process of narrowing the main steam control valve 8, the main steam flow rate Q ⁇ the extraction start steam flow rate Q1. Since the extraction pressure control operation cannot be continued, the process proceeds from step N to steps S11 and S12 in step S10, and after the extraction abnormality alarm is canceled, the extraction pressure control operation is canceled. Thereafter, the process returns to step S1 (load increase operation by the operator), and switching to the extraction pressure control operation is executed again.
  • the reason why the low pressure casing pressure Lp> the low pressure casing limit pressure Lpp is that the extraction flow rate at the load at that time is not sufficient, that is, the steam exceeding the extraction flow rate corresponding to the minimum extraction flow rate. This is because the high pressure exhaust 3c (FIG. 4) is not supplied to the process 16.
  • step S8 when a bleed air abnormality alarm is issued, the operator performs an operation to increase the bleed air flow supplied from the high pressure exhaust 3c to the process 16 by increasing the process demand (steam flow rate), etc. If the pressure Lp is decreased so that the low-pressure casing pressure Lp ⁇ the low-pressure casing retracting pressure Lpq in step S8, the process can proceed to step S9.
  • the operation is stopped and the operation is returned to the normal load operation by performing an operation to increase the extraction flow rate. Can do. This is one of the points that did not exist in the prior art.
  • the steam control valve 8 and the extraction control valve are also controlled while the valve opening command from the PLC 42 to the main steam control valve 8 is fluctuating in the process of forcibly narrowing the valve opening of the main steam control valve 8.
  • 9 is configured to change the passage flow rate of the main steam control valve 8 and the extraction control valve 9 while maintaining a constant relationship.
  • FIG. 6 shows the relationship between the valve opening command OP and the steam passage flow rate Q of the main steam control valve 8 and the bleed air control valve 9, and the characteristic line V8 is the valve opening command of the main steam control valve 8-valve passage.
  • a flow rate characteristic and a characteristic line V9 indicate a valve opening degree command-valve passage flow rate characteristic of the extraction control valve 9.
  • the valve openings of the main steam control valve 8 and the bleed air control valve 9 are on the characteristic lines V8 and V9 parallel to each other in FIG. Will not change unless the steam demand of the process changes.
  • the common valve opening command OP is also issued to the extraction control valve 9.
  • the difference between the steam flow rate passing through the main steam control valve 8 and the steam flow rate passing through the extraction control valve 9, that is, the extraction flow rate is kept constant.
  • the main steam control valve 9 is in the forced throttling loop in step S7 of FIG. 7 and the valve opening command OP changes, the extraction flow rate does not change and is kept constant.
  • the bleeding abnormality alarm processing is canceled.
  • the valve opening command to the main steam control valve 8 is changed from OP2 to OP1 in FIG. 6, but the valve opening command to the extraction control valve 9 is also changed from OP2 to OP1 at the same time. That is, the relationship between the valve opening command-valve passage flow characteristic line V8 of the main steam control valve 8 and the valve opening command-valve passage flow characteristic line V9 of the extraction valve 9 is that the valve opening command is changed from OP2 to OP1. Even during the change, the relationship in which the difference between the flow rates of the two valves is constant is maintained. This keeps the bleed steam flow to process 16 during this time constant, as will be explained next.
  • the passing steam flow rate of the main steam control valve 8 is Q4, and the passing steam flow rate of the extraction control valve 9 is Q2.
  • the valve opening command OP is reduced from OP2 to OP1 by the above-described low-pressure casing pressure Lp determination, the passing steam flow rate of the main steam control valve 8 decreases to Q3, but the valve opening to the extraction control valve 8 is opened.
  • the low-pressure casing pressure in the low-pressure portion of the extraction turbine is detected, and this low-pressure casing pressure is
  • the opening of the main steam control valve is forced while maintaining the extraction pressure control. Therefore, the thrust flow acting on the turbine rotor can be suppressed while the supply of the extracted steam is maintained while the flow rate of the steam flowing into the high pressure portion of the extracted turbine is reduced.
  • the pressure of the high-pressure exhaust steam exhausted from the high-pressure exhaust part 3c is lower than the process steam pressure Pp.
  • the extraction control valve 9 is throttled so When the pressure of the steam increases and the pressure of the high pressure exhaust steam rises above the steam pressure of the process, extraction is performed.
  • all or most of the high-pressure exhaust steam exhausted from the high-pressure exhaust part 3c flows to the low-pressure blade part 4b, so the low-pressure casing pressure Lp increases. ing.
  • the forced narrowing operation of the main steam control valve 8 can be executed. There is sex.
  • the thrust force at this time is the magnitude of point 2 in FIG. Since this is temporary, it can be tolerated.
  • an operation for canceling this must be performed. This makes it difficult to operate.
  • the second embodiment is improved so as to eliminate such annoyance. Since the second embodiment only needs to change part of the security operation flow shown in FIG. 7 in the first embodiment, the security operation flow changed according to the second embodiment is shown in FIGS. 10 and 11.
  • steps indicated by the same symbols as the step symbols in the security operation flow of the first embodiment indicate the same processes or operations.
  • the starting operation from the load increasing operation in step S1 to the extraction pressure control operation switching in step S3 by the manual operation in FIG. 10 is the same as that in the first embodiment (FIG. 7).
  • Example 2 in addition to Lpp and Lpq, which are values on the pressure correlation lines P and Q shown in FIG. 3, instead of these, a correlation line P used for the extraction pressure control operation immediately after switching is used.
  • Q are used as initial pressure correlation lines (shown in circles in FIG. 8) Pi, Qi having different gradients, which are values on the initial low-pressure casing limit pressure Lpi and the initial low-pressure casing retracting pressure Lqi.
  • the initial pressure correlation lines Pi and Qi are determined as follows.
  • a low-pressure casing pressure Lp that generates a protruding thrust force (hereinafter referred to as “protruding thrust”) immediately after switching of the extraction pressure control operation indicated by a point 2 in FIG. 9 is obtained by calculation.
  • the Qi line is a straight line corresponding to a line obtained by translating the Pi line slightly downward.
  • the high-pressure casing pressure that is the coordinate of the intersection of the P line and the Pi line is referred to as “normal operation set pressure” Hpo. Hpo is determined in consideration of the size of the protruding thrust.
  • step S21 immediately after switching of the extraction pressure control operation in step S3, it is determined whether or not the high-pressure casing pressure Hp has reached the normal operation set pressure Hpo. If Hp ⁇ Hpo, the high-pressure casing pressure Hp is normal. Since the operation set pressure Hpo has not been reached, the process proceeds from step N to step S22. In step S22, it is determined whether or not the low-pressure casing pressure Lp is equal to or higher than the low-pressure casing initial limit pressure Lpi. If Lp ⁇ Lpi, a load increasing operation (main steam flow rate increasing operation) is performed from the N branch. Is executed and the process returns to step S21, and this operation is repeated until the high-pressure casing pressure Hp reaches the normal operation set pressure Hpo.
  • a load increasing operation main steam flow rate increasing operation
  • step S22 If it is determined in step S22 that Lp ⁇ Lpi, the thrust force generated in the bleed turbine is excessive due to the increase in the low-pressure casing pressure Lp, and the operation is disturbed. Therefore, after proceeding to step S25 from the Y branch and issuing a bleed out abnormality alarm, the forced narrowing operation of the main steam control valve in step S26 is executed immediately, and the main steam flow rate Q supplied to the bleed turbine 2 is executed. Reduce. As a result, the low-pressure casing pressure Lp decreases corresponding to the decrease in the main steam flow rate Q.
  • step S27 When the low-pressure casing pressure Lp is lowered below the low-pressure casing initial evacuation pressure Lqi by this operation, it is determined that Lp ⁇ Lqi in step S27 for determining the low-pressure casing pressure Lp. Then, after stopping the forced narrowing operation of the main steam control valve and canceling the bleeding abnormality alarm, the process returns to step S21 to determine the high-pressure casing pressure Hp again.
  • step 27 determines whether the decrease in the low-pressure casing pressure Lp is not yet sufficient and it is determined in step 27 that Lp> Lqi.
  • the process proceeds from step N of step 27 to step 28, and the high-pressure casing pressure Hp is set to the preset extraction. It is determined whether or not the pressure has not dropped below the starting set pressure Hps. If it is determined in step 28 that Hp ⁇ Hps, the process returns from step Y to step S26, and the main steam control valve forced narrowing operation is repeated until it is determined in step S27 that Lp ⁇ Lqi.
  • step S28 If it is determined in step S28 that Hp ⁇ Hps, the process proceeds from step N to step S29 to perform an operation for canceling the bleed air abnormality alarm, and then canceling the bleed pressure control operation in step 30, that is, switching to manual operation. Operate and return to step S1. When returning to the original load, the operator confirms that the steam demand for the process exceeds the minimum bleed amount, and restarts the bleed pressure control operation switching operation from the beginning.
  • step S21 when it is determined that Hp reaches the normal operation set pressure Hpo and Hp ⁇ Hpo, normal operation is possible, so in step S21 From the Y branch, the process proceeds to point A in the control flow showing the normal operation control loop of FIG. 11 and enters the normal operation control loop.
  • the safety operation flow for monitoring the normal load operation of FIG. 11 is substantially the same as the safety operation flow of the first embodiment shown in FIG. 7, but the low pressure casing pressure Lp and the low pressure casing retraction pressure Lpq are compared and determined. The difference is that step 32 is added after step S8 for processing. In step 32, the same determination process as in step 21 (FIG. 10) is performed, and the N branch is connected to point B in the security operation flow in FIG.
  • step S32 when it is determined in step S32 that the high-pressure casing pressure Hp is Hp ⁇ Hpo, the process returns to step S7 and a loop for forcibly narrowing down the main steam control valve. Configure. This is the same as the security operation shown in FIG.
  • the high-pressure cabin pressure Hp decreases due to the forced narrowing of the main steam control valve, and Hp ⁇ Hpo, the operation returns from the N branch of step S32 to the point B in FIG. 10 to increase the load.
  • step S11 the process returns to the point A of the safety operation flow to become a normal load operation monitoring loop.
  • the low-pressure casing pressure exceeds the low-pressure casing limit pressure until a certain amount of extraction is performed at the time of switching the extraction pressure control operation immediately after the start of the operation of the extraction steam turbine power generation facility.
  • the low pressure casing initial limit pressure used in the initial operation is set separately from the low pressure casing limit pressure used in the normal load operation. It has a feature in that one set value is used properly.
  • the second embodiment even if the low-pressure casing pressure after switching the extraction pressure control operation immediately after the start of the operation of the extraction steam turbine power generation facility exceeds the low-pressure casing limit pressure, Since the set value of the low-pressure casing limit pressure that shifts to the compulsory throttle operation (safety operation) is set to the low-pressure casing initial limit pressure that is higher than usual, the transition to the main steam control valve forced throttling operation is suppressed. In addition, even if the operation is switched to the forced narrowing operation, it is possible to automatically return to the normal operation.Therefore, it is not necessary to perform the troublesome operation of canceling the forced narrowing operation of the main steam control valve. It can be significantly reduced.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Control Of Turbines (AREA)

Abstract

【課題】抽気蒸気タービンにより蒸気および電力を供給するようにした抽気蒸気タービン発電設備において、蒸気および電力を使用する生産プロセスの運転にほとんど影響を与えることなく、抽気蒸気タービンの過大なスラスト力によるスラスト軸受の損傷を防止することのできる保安運転装置を提供する。【解決手段】抽気蒸気タービンの低圧部の低圧車室の圧力を監視し、この圧力が予め定められたその都度の高圧部の高圧車室の検出圧力に対応する低圧車室の基準圧力より大きくなったとき、抽気蒸気圧力制御は維持したままの状態で、一時的に、主蒸気加減弁の開度を一定量絞って前記高圧部に流入する蒸気流量を、低圧車室の圧力が前記基準圧力以下に低下するまで減らすようにする。

Description

抽気蒸気タービン発電設備の保安運転方法および装置
 この発明は、生産プロセスに蒸気を供給する抽気蒸気タービン発電設備の過大なスラスト力によるスラスト軸受の損傷を防止するための保安運転方法および装置に関する。
 発電機を駆動する蒸気タービンから蒸気の一部を抽気して、蒸気を使用する生産プロセスへ供給する抽気配管を備えた抽気蒸気タービン発電設備は、従来から例えば特許文献1に示されるように一般に知られている。この特許文献1に示された蒸気タービン発電設備の構成を図12に示す。
 図12において、1はボイラ、2はそれぞれ翼段落を有する高圧部3と低圧部4とを備える抽気蒸気タービン、5は抽気蒸気タービン2からの排気蒸気を復水する復水器、6はタービン2に直結して駆動される発電機、7は復水器5からの復水を加熱して脱気する脱気器である。なお、抽気蒸気タービン2には高圧部3に流入する主蒸気の流量を制御する主蒸気加減弁8と、高圧部3から低圧部4に流入する蒸気流量を制御して抽気蒸気の圧力を制御する抽気加減弁9とが設けられている。
 復水器5とボイラ1とに接続する給水供給系10には、復水ポンプ11、第1低圧給水加熱器12、第2低圧給水加熱器13、脱気器7、給水ポンプ14および高圧給水加熱器15を備えている。そして抽気蒸気タービン2の高圧部3の出口には、抽気加減弁9により所定の圧力に制御された抽気蒸気をプロセス16に供給する抽気配管19が接続されている。なお、20はボイラ1と主蒸気加減弁8とに接続する主蒸気配管である。
 高圧給水加熱器用抽気配管21は抽気配管19から分岐して高圧給水加熱器15に接続され、逆止弁22と止め弁23とを備えている。なお、24は高圧給水加熱器15のドレンを脱気器7に導くドレン配管である。脱気器用抽気配管25は抽気蒸気タービン2の低圧部4と脱気器7とに接続され、逆止弁26と止め弁27とを備えている。
 第2低圧給水加熱器用抽気配管29は抽気蒸気タービン2の低圧部4と第2低圧給水加熱器13とに接続され、逆止弁30と止め弁31とを備えている。第1低圧給水加熱器用抽気配管33は抽気蒸気タービン2の低圧部4と第1給水加熱器12とに接続され、逆止弁34と止め弁35を備えている。なお、36は第2低圧給水加熱器13のドレンを第1低圧給水加熱器12に導くドレン配管である。
 このような構成により、ボイラ1から供給される主蒸気は、主蒸気加減弁8により蒸気流量が制御されて抽気蒸気タービン2に流入し、高圧部3の高圧車室、低圧部4の低圧車室を流れてタービンロータを回転させて仕事をし、低圧部4から排気される排気蒸気は、大気圧以下の圧力に保持された復水器5に流入して復水にされる。なお、高圧部3および低圧部4の車室内を流れる蒸気によりタービンロータにかかるスラスト力はスラスト軸受で支持される。ここで、高圧部3の出口の排気蒸気から抽気された抽気蒸気は抽気加減弁9により所定の圧力に制御されて抽気配管19を経てプロセス16に供給される。
 図12に示す構成では、抽気蒸気の一部は抽気管19から分岐した高圧給水加熱器用抽気配管21を経て高圧給水加熱器15に供給される。
 高圧部3の抽気配管19により抽気された残りの排気蒸気は抽気加減弁9を通して低圧部4に供給される。
 発電機6は、蒸気が抽気蒸気タービン2の高圧部3、低圧部4を流れてタービンロータを回転させて仕事をする仕事量に対応する電力を発生する。
 復水器5内の復水は復水配管10の復水ポンプ11により昇圧されて第1、第2低圧給水加熱器12、13に給水され、これらの給水加熱器12、13にて復水はそれぞれ第1、第2低圧給水加熱器用抽気配管33、29を経て流入する低圧部4からの無制御の抽気蒸気により加熱される。加熱された復水は脱気器7に流入し、脱気器用抽気配管25を経て供給される低圧部4からの無制御の抽気蒸気により加熱脱気される。
 脱気器7にて脱気された復水、すなわち給水は給水ポンプ14により昇圧されて高圧給水加熱器15に流入し、この高圧給水加熱器15にて高圧給水加熱器用抽気配管21を経る低圧部4からの無制御の抽気蒸気により加熱されてボイラ1に供給される。ボイラ1に供給された給水はボイラ1にて加熱されて蒸気となり、主蒸気として抽気蒸気タービン2に供給される。
 このように一般の抽気蒸気タービン発電設備においては、ボイラからの蒸気は抽気蒸気タービン2を流れてタービンロータを回転させて仕事をした後、復水器にて復水となり、この復水が給水としてボイラ1に供給され、ボイラ1と抽気蒸気タービン2と復水器5との間を循環する。そしてこの循環中に抽気蒸気タービン2から抽気した抽気蒸気を、抽気加減弁9により圧力を所定圧力に制御してプロセス16に供給するとともに、無制御で逆止弁、止め弁又は止め弁のみを備えた抽気配管33、29、21、25を経て給水加熱器12、13、15と脱気器7とに供給して給水を加熱する。
 このようにプロセス16に抽気蒸気を供給するようにした抽気蒸気タービン2においては、定格運転点、すなわち最も頻繁に運転される運転条件で主蒸気流量に対するプロセス16の抽気流量の比率が大きい場合、抽気蒸気タービンはこれに適合するよう設計されるので、実運転でプロセス16が要求する抽気量が定格運転点から大きく外れて減少し主蒸気流量に対する抽気流量の比率が小さくなると、抽気加減弁9は開方向に進み、抽気加減弁9より下流、すなわち抽気蒸気タービンの低圧部4内の翼段落を流れる蒸気流量が定格運転点に対し大幅に増加する。この蒸気流量の増加により、低圧部4内の翼段落の翼の受ける力が大きくなってこれに加わる応力が高くなるとともにタービンロータにかかるスラスト力も増大する。これにより、翼段落に加わる応力が許容値以下であっても、タービンロータにかかるスラスト力が過大となってスラスト軸受が損傷する危険がある。
 また、抽気加減弁9により抽気蒸気流量を制御する抽気蒸気タービン2では、抽気加減弁9より下流の低圧部4の翼段落に流れる蒸気流量は、抽気加減弁9の全開以上の蒸気流量は流れない。しかしこのとき、低圧部4から無制御の抽気蒸気を複数の給水加熱器等に供給する系統において、例えば図12における脱気器用抽気配管25、および第2低圧給水加熱器用抽気配管29の逆止弁26および30が、蒸気流量の低下により発生するチャタリングや過大な蒸気流速により発生する振動により損傷して前記給水加熱器等への抽気蒸気の供給が停止された場合、低圧部4に流れる蒸気流量が規定の量より増加する。これによって、前述のように低圧部の4の翼段落に作用するスラスト力が過大となってスラスト軸受に損傷が生じる危険がある。
 特許文献1には、このように翼段落を有する高圧部3の排気蒸気の一部を抽気してプロセス等に供給し、その残りの蒸気が流れる翼段落を有する低圧部4の蒸気流量が増大することに伴って生じる過大なスラスト力によりスラスト軸受が損傷するのを防ぐための保安運転装置が示されている。
 この特許文献1に示された保安運転装置を、図13に示す。
 それぞれ翼段落を有する高圧部3と低圧部4とを備えた抽気蒸気タービン2においては、主蒸気加減弁8により高圧部3に流入する蒸気流量を制御し、抽気加減弁9により高圧部3から低圧部4に流入する蒸気流量を制御することにより、高圧部3の排気蒸気から抽気してプロセス16へ供給する抽気蒸気の圧力を制御するように構成されている。そして、高圧部3の高圧車室の蒸気圧力を検出する高圧車室圧力検出器40と、低圧部4の低圧車室の蒸気圧力を検出する低圧車室圧力検出器41からの検出信号を受けて、主蒸気加減弁8を制御する主蒸気加減弁制御器44および抽気蒸気加減弁9を制御する抽気蒸気制御器46に開度指令OP8およびOP9を与える演算制御装置42を備える。
 演算制御装置42は、抽気蒸気圧力の調節演算機能があり、プロセス16に連結する抽気配管19に設置された蒸気圧力検出器48で検出された抽気配管19の蒸気圧力(以下、抽気圧力と記す)Ppと抽気圧力設定器49で設定された設定圧力Ppsとを比較して、抽気圧力Ppが設定圧力Ppsと等しくなるような弁開度信号OP9を形成する。この弁開度信号OP9に基づく弁操作信号が抽気加減弁制御器46から出力され、電油変換器47を通して油圧信号に変換して抽気加減弁9に与えられる。これにより、抽気蒸気タービン2とプロセス16を連結する抽気配管19の圧力は、この演算制御装置42および抽気加減弁制御器46により、設定された圧力に一定に制御される。この結果プロセス16の圧力が一定に保たれる。
 演算制御装置42は、抽気蒸気タービン2の負荷(発電)運転時に、低圧車室検出圧力Lpと、図2に示す抽気蒸気タービン2における高圧車室圧力Hpと低圧車室圧力Lpとが特定の関係で一次式によって表される相関線P上の値として、高圧車室圧力により一義的に求められる低圧車室基準圧力Lppとの比較を行う。この特定の関係とは、高圧部3を通過する蒸気流量と低圧部4を通過する蒸気流量の組み合わせによって抽気蒸気タービン2に生ずるスラスト力が或る一定の値となるHpとLpの関係である。
 すなわち、図2に示す相関線Pは、抽気蒸気タービン2が抽気圧力制御運転をしているときに、スラスト力が或る一定値となる場合の高圧部3と低圧部4のそれぞれの通過蒸気流量の関係を表している。そして、低圧車室圧力Lpが、この高圧車室圧力に対応する低圧車室基準圧力Lppより高くなって図2の相関線Pより上の斜線の範囲になったとき、演算制御装置42は、抽気蒸気制御器46に自動制御解除指令CSを送って、抽気圧力制御を解除させ、低圧車室検出圧力Lpが前記相関圧力関係による高圧車室圧力に対応する低圧車室基準圧力Lppより小さくなり、抽気蒸気タービン2の負荷が現在の負荷より小さい負荷になるように主蒸気加減弁8に弁開度を減じる弁開度指令OP8を出力する。
 なお、この場合には相関線Pを、スラスト力がスラスト軸受の許容面圧に相当する値に等しいときの低圧車室圧力と高圧車室圧力との関係を表すものとすることができる。
 このような保安運転装置によれば、抽気蒸気タービン2の低圧部4の車室圧力Lpが、図2の相関線Pより上の斜線の範囲になったときは、演算制御装置42が主蒸気加減弁8および抽気蒸気加減弁9を制御して低圧部4の車室圧力Lpを図2の相関線Pより下方の圧力に低下させてタービンの運転を行うので、スラスト軸受に加わるスラスト力が過大となることがなく、抽気蒸気タービンのスラスト軸受の損傷を防止することができる。
特許第3186468号公報
 前記のように、従来の抽気蒸気タービン発電設備の保安運転装置は、抽気蒸気タービン2の低圧車室圧力Lpが、図2の高圧車室圧力と低圧車室圧力との特定の関係を表す圧力相関線Pに基づいて、高圧車室圧力に対応するP線上の低圧車室圧力として一義的に決まる基準となる低圧車室圧力より高くなったとき、抽気加減弁による抽気圧力制御を解除するように構成されている。
 しかしながら、抽気蒸気タービンの一部から抽気した蒸気をプロセスへ供給する抽気供給系を備える抽気蒸気タービン発電設備においては、抽気圧力制御を解除すると、抽気蒸気タービンからプロセスへ供給される抽気蒸気の圧力低下により、プロセスへの蒸気供給が停止される事態に至ることがある。このように抽気蒸気の供給が停止されると、蒸気を必要としている生産プロセスでは、製品の生産が停止されるので大きな操業損失が発生するという問題がある。
 また、負荷運転中、すなわち発電運転中に(以下、この発明においては「負荷」という用語は、特に説明がない限り「発電出力」の意味で使用する)、負荷を現在の負荷より小さい負荷に減じることも行われるが、特許文献1に示す従来の保安装置では負荷変化の限界が示されていない。
 一般的に負荷の低下があまりに大きくなると、抽気蒸気タービン発電設備で発電した電力のうち工場で使用する分を差し引いた余剰電力を地域の電力系統に送電している場合、電力を使用する生産プロセスへの影響が大きくなるばかりでなく、送電の供給量が急変して地域の電力系統に重大な影響が出ることがある。
 したがって、特許文献1による技術においては、負荷が大きく低下した場合には発電設備の運転に支障をきたすことがある。
 このように、電力および蒸気を生産プラントに供給するようにした抽気蒸気タービン発電設備において、生産プラント運用計画から外れて、突然、抽気圧力制御を停止したり、発電出力を際限なく低減したりするようにしたのでは、電力系統、及び、蒸気を使用する生産プロセスの運転に深刻な影響をもたらす可能性がある。
 この発明の課題は、このような問題を解決するため、電力系統、及び、蒸気を使用する生産プロセスの運転にほとんど影響を与えることなく、抽気蒸気タービンのスラスト軸受の損傷を防止することのできる抽気蒸気タービン発電設備の保安運転方法および保安運転装置を提供することである。
 このような課題を解決するために、この発明の保安運転方法は、それぞれ翼段落を有する高圧部と低圧部とで構成された抽気蒸気タービンを備え、この抽気蒸気タービンで発電機を駆動し、前記抽気蒸気タービンの高圧部に流入する蒸気流量を主蒸気加減弁により制御し、前記高圧部の排気蒸気から低圧部へ供給する蒸気流量を抽気加減弁で調整することにより前記高圧部の排気蒸気から一部を抽気してプロセスへ供給する抽気蒸気の圧力を制御する抽気蒸気タービン発電設備において、前記高圧部の高圧車室内の蒸気圧力および前記低圧部の低圧車室内の蒸気圧力を検出し、予め設定された前記抽気蒸気タービンの高圧車室圧力と低圧車室圧力との特定の関係を表す圧力相関線に基づいて、その都度の前記高圧車室の検出圧力に対応する基準となる低圧車室限界圧力を求め、この低圧車室限界圧力と前記低圧車室の検出圧力とを比較し、前記低圧車室の検出圧力が前記低圧車室限界圧力より大きくなったことが検知されたとき、前記抽気加減弁による抽気蒸気圧力制御はそのまま動作を継続した状態で、前記主蒸気加減弁の開度を強制的に絞って前記高圧部に流入する主蒸気流量を減らすようにしたことを特徴とするものである。
 さらに、前記の方法において、低圧車室圧力が前記低圧車室限界圧力より大きくなったときに、前記主蒸気加減弁の開度を絞る動作を、当該動作によって前記高圧部に流入する蒸気流量が減少して前記低圧車室の検出圧力が前記低圧車室限界圧力より低く設定された基準圧力である低圧車室退避圧力以下に低下したとき停止して絞り込まれた主蒸気加減弁の弁開度に相当する負荷において主蒸気加減弁による負荷運転を再開することができる。
 また、前記の方法において前記抽気蒸気タービン発電設備の起動時には、前記蒸気タービンへ供給される主蒸気流量が予め設定された定常的な抽気運転が可能な流量となるまでは、前記低圧車室限界圧力に代えて、当該低圧車室限界圧力を求める圧力相関線とは異なる圧力相関線であって、抽気圧力制御運転切換え用に設定された初期圧力相関線に基づいて求められた基準圧力である低圧車室初期限界圧力に設定するのがよい。
 また、この発明の保安運転装置は、それぞれ翼段落を有する高圧部と低圧部とで構成された抽気蒸気タービンを備え、この抽気蒸気タービンで発電機を駆動し、前記抽気蒸気タービンの高圧部に流入する主蒸気流量を主蒸気加減弁により制御し、前記高圧部の排気蒸気から低圧部へ供給する蒸気流量を抽気加減弁により調整することで前記高圧部の排気蒸気から一部を抽気してプロセスへ供給する抽気蒸気の圧力を一定値に制御するようにした抽気蒸気タービン発電設備において、前記高圧部の高圧車室内の蒸気圧力および前記低圧部の低圧車室内の蒸気圧力を検出する圧力検出手段と、予め設定された前記抽気蒸気タービンの高圧車室圧力と低圧車室圧力との特定の関係を表す圧力相関線に基づいて、その都度の前記高圧車室の検出圧力に対応する低圧車室限界圧力を求める手段と、前記低圧車室の検出圧力と前記低圧車室限界圧力とを比較する手段と、前記低圧車室の検出圧力が前記低圧車室限界圧力より大きくなったときに、前記抽気加減弁の圧力制御機能はそのまま動作を継続した状態で前記主蒸気加減弁の開度を絞って前記高圧部に流入する蒸気流量を減らす制御手段を備えたことを特徴とするものである。
 前記の保安運転装置においては、前記低圧車室の検出圧力が前記低圧車室限界圧力より大きくなったときに前記主蒸気加減弁の開度を絞る弁制御指令は、前記低圧車室の圧力が前記低圧車室限界圧力より所定値だけ小さく設定された低圧車室退避圧力以下になったとき停止して絞り込まれた主蒸気加減弁の弁開度に相当する負荷において主蒸気加減弁による負荷運転を再開することができる。
 また、前記抽気蒸気タービン発電設備の起動時に、前記抽気蒸気タービンへ供給される主蒸気流量が、定常的な抽気圧力制御運転を継続させることができる主蒸気流量として予め設定された蒸気流量となるまでは、前記低圧車室限界圧力に代えて、当該低圧車室限界圧力を求める圧力相関線とは異なる圧力相関線であって、抽気圧力制御運転切換え用に設定された初期圧力相関線に基づいて求められた基準圧力である低圧車室初期限界圧力に設定する手段を備えるようにしてもよい。
 この発明によれば、予め設定された高圧車室圧力と低圧車室圧力との相関を示す圧力相関線に基づいてその都度の高圧車室の検出圧力に対応した低圧車室限界圧力を求め、何らかの原因で、抽気蒸気タービンにおける低圧部の低圧車室圧力がこの低圧車室限界圧力を越えて、タービンロータのスラスト力が過大となったとき、抽出蒸気の圧力制御はそのままにして、強制的に主蒸気加減弁の開度を絞ってゆき、前記高圧部に流入する蒸気流量を減少させることにより、プロセスへの抽気蒸気の供給は維持したまま、低圧車室の圧力を低下させることができるので、タービンロータに作用するスラスト力を低減することができる。
 そして、前記高圧部に流入する蒸気流量が減少することにより、前記低圧部の低圧車室圧力が低下して低圧車室退避圧力以下の値になったときには、絞られた主蒸気加減弁の弁開度に相当する負荷において主蒸気加減弁による負荷運転を再開するので、負荷の変化は小さい。また、この間、抽気加減弁は抽気蒸気の圧力を一定に保つように自動制御されているのでプロセスへの影響も僅かである。
 これにより、抽気蒸気タービン発電設備が送電している電力系統、並びに、上記抽気蒸気タービン発電設備が蒸気を送気している生産プロセスの操業に与える影響を小さく抑えることができるので、抽気蒸気タービンを安全にかつ安定的に運転することができる。
この発明の実施例による保安運転装置を備えた抽気蒸気タービン設備の系統図。 抽気蒸気タービンの高圧部の高圧車室の圧力と、低圧部の低圧車室の圧力との相関関係を示す図。 抽気蒸気タービンの保安運転に使用する高圧車室の圧力と低圧車室の圧力との特定の関係を表す図。 抽気蒸気タービンの翼段落の断面を示す模式図。 抽気蒸気タービンの通常の運転状態を説明する図。 弁開度指令と主蒸気加減弁および抽気蒸気加減弁通過蒸気流量の関係を示す図。 この発明の実施例1の保安運転方法を示す保安動作フロー図。 図3の圧力相関線に抽気蒸気タービンの抽気制御切換え時の初期の保安運転に使用する高圧車室圧力と低圧車室限界圧力との特定の関係を表す初期圧力相関線を加えて示す図。 抽気蒸気タービンの起動状態を含めた運転状態を説明する図。 この発明の実施例2の保安運転方法を示す部分保安動作フロー図。 この発明の実施例2の図10に続く部分保安動作フロー図。 一般的な抽気蒸気タービン設備を示す系統図。 従来の保安運転装置を備えた抽気蒸気タービン設備の系統図。
 この発明の実施の形態を、図に示す実施例について説明する。
 図1にこの発明の第1の実施例の保安運転装置の構成を示す。
 図1において、2は、高圧部3と低圧部4で構成された抽気蒸気タービン(以下、「抽気タービン」と略す。)である。高圧部3に図示しないボイラから供給される主蒸気の流量は、主蒸気加減弁8によって制御される。高圧部3から排出された排気蒸気の一部は抽気配管19を介してプロセス16に供給されるとともに残りの排気蒸気が抽気加減弁9を介して低圧部4へ供給される。低圧部4から排出された排気蒸気は、復水器5で復水にしてボイラへ戻される。抽気タービン2は、抽気配管19からプロセス16へ抽気蒸気を供給するとともに、これに結合されたここには図示しない発電機を駆動して発電を行う。
 また、抽気タービン2の高圧部3および低圧部4のそれぞれの車室内の蒸気圧力を検出する高圧車室圧力検出器40および低圧車室圧力検出器41が設けられる。プロセス16に供給される抽気蒸気の圧力も抽気配管19に設置された抽気圧力検出器48により検出される。これらの圧力検出器40、41および48からの圧力検出信号は、例えば、プログラマブル・ロジック・コントローラー(以下PLCと呼ぶ。)で構成された演算制御装置42に入力される。PLCはその制御機能をハードの入れ替なしに、ソフトの入れ替え・修正のみにより構成又は変更することができる演算制御装置である。
 PLC42は、抽気圧力設定器49に予め入力設定された、プロセス16へ供給する抽気蒸気の設定圧力Ppsと検出器48で検出された抽気蒸気の検出圧力Ppとを比較して、検出圧力Ppが設定圧力Ppsに等しくなるように抽気加減弁9の開度を変化させる開度信号OP9を形成して、抽気加減弁制御器46に与える。抽気加減弁制御器46は、この弁開度信号OP9を弁操作信号Ve9に変換して電油変換器47に与え、ここで油圧の操作信号Vh9に変換され抽気加減弁9に与えられる。これによって、抽気蒸気圧が設定された圧力に一定に保たれる。
 さらに、PLC42は、負荷指令に基づいて、主蒸気加減弁8に弁開度を指令する開度信号OP8を形成して主蒸気加減弁制御器44に与える。主蒸気加減弁制御器44はこれを弁操作信号Ve8に変換し、これが電油変換器45で油圧の操作信号Vh8に変換されて主蒸気加減弁8に与えられる。これにより主蒸気加減弁8の開度がPLC42から指令された開度に制御され、高圧部3に供給される主蒸気流量が調節される。
 なお、主蒸気流量が変化しても抽気蒸気量が予め設定された蒸気流量を維持するよう、主蒸気加減弁8の開度信号OP8と抽気加減弁9への開度信号OP9は一定の関係を持って同時に制御される。主蒸気加減弁の開度信号OP8と抽気加減弁9の開度信号OP9との関係は、後で説明する。
 ここで、まず、抽気タービン2の各翼段落に発生するスラスト力について図4に基づいて説明する。
 図4は、抽気タービン2の翼段落部断面を模式化して示すものである。
 主蒸気加減弁8を通って高圧部3の入口から高圧車室3aへ流入した蒸気の圧力(高圧車室圧力Hp)は、高圧翼段落3bを通過する蒸気流量と高圧排出蒸気の圧力によって定まり、段落を通過する蒸気流量が多い程圧力が高くなる。
 タービンロータ21には高圧翼段落3bを通過する蒸気によって図上右方向にスラスト力+F2(+は右方向を示す)が発生する。一方、高圧車室圧力Hpはラビリンスパッキンを構成するロータボス21aの軸方向端面に左方向にスラスト力-F1(-は、左方向を示す)を発生させる。
 高圧部3の出口3cから排出される高圧排出蒸気の一部の蒸気がプロセス16へ供給するために抽気され、残りの蒸気が抽気加減弁9を通して低圧部4の低圧車室4aに流入する。低圧車室4aの圧力Lpも上記と同様に、低圧翼段落4bを通過する蒸気流量が多い程高くなる。そして、低圧翼段落4bには段落を通過する蒸気によってスラスト力+F4が働く。また、中間ラビリンスパッキンを構成するロータボス21bの軸方向端面には、低圧車室圧力Lpと高圧排出蒸気の圧力との差圧によりスラスト力+F3が働く。結局、タービンロータ全体に働くスラスト力Fは、次の(1)式で表される。
    F = F2 + F3 + F4 - F1                   (1)
 次に、図4および図5を参照してスラスト力が運転状態によってどのように変化するかについて説明する。
 図5は、横軸に主蒸気流量Qをとり、縦軸にスラスト力Fをとって、主蒸気流量Qとタービンロータに作用するスラスト力Fの関係を示すものである。
 タービンの起動時、負荷の増加、すなわち、主蒸気流量Qの増加に伴いF2及びF4がQに比例して増加するのでタービンロータ全体に働くスラスト力Fは図5の0‐1線を辿って上昇する。この間、抽気加減弁9はマニュアル(運転員による手動)モードでその弁開度が操作され、全開状態となっており抽気タービン2の高圧部3から排出される高圧排出蒸気の全量が抽気加減弁9を通して低圧部4へ供給されるため、抽気流量はゼロである。
 主蒸気流量Qが増加して、プロセス16への抽気を開始する主蒸気流量として設定された主蒸気流量(以下、これを「抽気開始蒸気流量」と呼ぶ)Q1に到達すると、抽気加減弁9の制御をマニュアルモードからPLC42による自動制御モードに切換えて、自動で抽気蒸気の圧力制御を行う。これにより抽気加減弁9の開度が低下して高圧排出蒸気3cの圧力がプロセス16の圧力Ppまで上昇される。
 なお、高圧排出蒸気3cの圧力がプロセス16の圧力Ppに到達するまでの間は、高圧排出蒸気3cは依然として全量が抽気加減弁9を通して低圧翼段落4bに供給される。
 この間、プロセス16の圧力Ppは高圧排出蒸気3cの圧力Hpより高いが抽気配管19に設けられた抽気逆止弁17がプロセス16から抽気タービン2への蒸気の逆流を防止する。
 抽気加減弁9の制御が自動制御モードになって一定量の抽気が行われるまでの間は、スラスト力Fは、高圧排出蒸気3cの圧力上昇による中間のラビリンスボス21bに加わるスラスト力F3の増加と低圧部4の通過蒸気流量の増大による低圧翼段落4bに加わるスラスト力F4の増加が重畳して、図5の1-2の線を辿って急上昇する。
 抽気加減弁9の開度が低下することにより、高圧排出蒸気3cの圧力Hpが上昇してプロセス16の圧力Ppに達し、プロセス16への抽気の供給が開始されると、抽気加減弁9を通過する蒸気流量が減少し低圧翼段落4bの蒸気流量が減少するのでタービンロータに作用するスラスト力+F4が減少する。このため、タービンロータ全体のスラスト力Fは図5上では、例えば、2-3の線を辿って減少する。そして、プロセス16への抽気蒸気流量を一定の状態に保った状態で、抽気タービン2の負荷(発電出力)を増加すると、高圧段落3bの蒸気流量、および、低圧翼段落4bの蒸気流量が増大することにより高圧段落3bに加わるスラスト力+F2、および低圧翼段落4bに加わるスラスト力+F4が急上昇する一方、同時に、高圧車室圧力Hpの上昇によりラビリンスボス21aに加わるスラスト力-F1も急上昇するため、スラスト力Fは3-4線を辿って緩やかに増加する。
 抽気流量が増えれば増える程、低圧翼段落4bに加わるスラスト力+F4は小さくなるので、タービンロータ21全体のスラスト力Fはマイナス(図5の下向き)方向に移動する。そして、抽気流量を一定に維持した状態で、負荷が増加すると、高圧翼段落3b、低圧翼段落4bともに蒸気流量が増加するためスラスト力+F2と+F4が増加するので、負荷の増加に伴い、例えば、5-6線、7-8線のようにプラス(図5の上向き)方向に変化する。
 しかし、抽気流量が多くなると低圧翼段落4bの蒸気流量が減少するため+F4が小さくなり高圧車室圧力Hpの増加によるラビリンスボス21aのスラスト力-F1の増大が支配的となる。そして、抽気流量が最大になると、タービンロータ全体のスラスト力Fは、主蒸気流量の増加に伴い、図5の10-11線を辿ってマイナス方向に大きく変化する。
 このように抽気タービン2のスラスト力Fは抽気流量の増減によって、プラス(右)方向とマイナス(左)方向に変化するのである。
 スラスト力Fによるロータの軸方向の移動はスラスト軸受が制限しているが、スラスト軸受が受けるスラスト力Fが過大となり許容値を超えるとスラスト軸受が損傷する危険がある。そして、スラスト軸受が損傷した場合には、保安装置が作動して抽気タービンが非常停止されるので、発電設備の運用に大きな損失を与える。
 プロセス16へは、プロセスの需要に応じた必要な蒸気流量が抽気タービンから抽気して供給されるが、抽気タービンにおける上記のようなスラスト力の変化は抽気タービン内部の事象であるので、発電設備の運転員、ましてや、抽気した蒸気を使用するプロセスの運転員には知る由もなく、発電設備の運転では考慮されない。しかし、プロセスの蒸気需要の変化幅が大きい場合には、プロセス抽気蒸気流量が最小の場合とプロセス抽気蒸気流量が最大の場合におけるスラスト力Fが、マイナスとプラスの両方向へ変化し、それぞれいずれもスラスト軸受の使用限度一杯で抽気タービンが設計される場合がある。
 この場合にはプロセス抽気蒸気流量ゼロから最小(以下、これを「最小抽気流量」と呼ぶ)の間での運転では、スラスト力Fが使用限度を超えてしまうので、抽気圧力制御運転をする場合にはプロセス16への抽気蒸気流量が最小抽気流量以下とならないよう、抽気タービン発電設備の運転員は運転状態を常時監視することが必要となる。
 しかし、抽気タービンが抽気圧力制御運転をしている場合、何らかの原因、例えば、プロセスの蒸気需要が急に低下することによって、プロセス抽気蒸気流量が減少して最小抽気流量以下となったとき、運転員が常に適切な措置をとるとは限らないので、スラスト軸受の損傷を完全に防止することはできない。
 この発明は、このような異常事態が発生した場合に、運転員の注意力に頼ることなく、かつ、抽気蒸気を使用するプロセスの運転への影響を最小限としつつ抽気タービンのスラスト軸受の損傷を防止するようにするものである。
 次に、このようなスラスト軸受の損傷を防止するための保安運転におけるPLC42による保安動作を説明する。
 図7は、この発明の実施例1の抽気タービンにおける保安運転の保安動作フローを示すものである。
 図7のステップS1は、抽気タービンを起動してから自動で抽気圧力制御を行うための抽気開始蒸気流量Q1に達するまで主蒸気流量Qを上昇させるマニュアル操作での負荷上昇運転工程である。
 この工程中に、マニュアル、すなわち運転員により主蒸気流量Qの監視が実行される(ステップS2)。この主蒸気流量監視工程においては主蒸気流量Qが予め設定された抽気開始蒸気流量Q1に到達するまで、ステップS1の負荷上昇操作を行う(N分岐)。
 主蒸気流量QがQ1に到達したと運転員が判断したところで、Y分岐からステップS3へ進んで抽気圧力制御運転への切換えが行われる。これは、通常、操作盤上の押しボタンの指押しで行われる。ここから図1におけるPLC42による保安運転が開始され、抽気蒸気圧力を予め設定した圧力に一致するよう制御する、抽気圧力制御運転が実行される。
 このステップS3での抽気圧力制御運転に切換え後は、PLC42で、常時、高圧車室圧力検出器40、低圧車室圧力検出器41および抽気蒸気圧力検出器48により検出された高圧車室(蒸気)圧力Hp、低圧車室(蒸気)圧力Lpおよび抽気(蒸気)圧力Ppを読み取って、低圧車室限界圧力Lppを求める処理や、抽気圧力制御が実行され、プロセスに一定圧力の抽気蒸気が供給される。
 低圧車室限界圧力Lppは、予めPLC42に記憶させた、図3に示す高圧車室圧力Hpに対応する低圧車室の限界圧力Lppを決める圧力相関線Pから、読み取ったその都度の高圧車室検出圧力Hpに対応する低圧車室の限界圧力Lppとして演算により求められるものである。
 次のステップS4は、低圧車室圧力Lpを監視する工程である。この低圧車室圧力Lpの監視は、抽気タービンのスラスト軸受に加わるスラスト力Fを監視することにほかならない。この工程においては、その都度、高圧車室圧力Hpに対応して求められた低圧車室限界圧力Lppと、その都度検出された低圧車室圧力Lpとを比較して、その大小関係が判定される。
 すなわち、低圧車室圧力Lpが低く、Lp<Lppである場合は、低圧車室圧力Lpが、図3に示す圧力相関線P(図2に示した低圧車室の基準圧力を示す相関線Pと同じ)より下方にあり、抽気タービンのスラスト軸受に加わるスラスト力Fが運転の支障にならない範囲にあることになる。また、低圧車室圧力Lpが高くなり、Lp≧Lppとなった場合は、低圧車室圧力Lpが図3の相関線Pより上方にあり、抽気タービンのスラスト軸受に加わるスラスト力Fが運転に支障となる範囲にあることになる。
 このように、低圧車室圧力Lpを監視することにより、抽気タービンのスラスト軸受に発生したスラスト力Fが運転の支障となる範囲にあるか否かを監視することができる。
 ステップS4において低圧車室圧力Lpが低圧車室限界圧力Lppより低い状態(Lp<Lpp)にあると判定された場合は、低圧車室圧力Lpが、図3に示す圧力相関線Pより下方にあり、抽気タービンのスラスト軸受に加わるスラスト力Fが運転の支障にならない範囲にあることになるので、Y分岐で通常負荷運転を監視するループに留まり、通常負荷運転を継続する。
 また、低圧車室圧力Lpが低圧車室限界圧力Lpp以上(Lp≧Lpp)となったと判定された場合は、低圧車室圧力Lpが、図3の相関線Pの線上(例えば同図のA点、)またはこれより上方まで上昇し、抽気タービンのスラスト軸受に加わるスラスト力Fが運転に支障を生じる範囲まで大きくなっていることになる。したがって、この場合は、直ちに、抽気タービンの通常負荷運転(主蒸気加減弁による負荷制御運転)をインターロック(中止)するため、ステップS4のN分岐からインターロック動作ループのステップS6へ移る。このステップS6では、プロセス抽気蒸気流量が最小抽気流量以下にまで減少したため抽気タービンのスラスト軸受のスラスト力Fが過大となったことを示す抽気異常警報が発せられる。
 なお、図3のA点は図5のインターロック作動線(スラスト力の限界を示す線)L1線上のa点のスラスト力に相当する。
 ステップ6で警報の発信後、直ちにステップS7に進み、抽気圧力制御はそのまま動作を継続させた状態で、主蒸気加減弁8の開度を強制的に絞り込む、強制絞込み動作が行われる。これは、抽気タービンの過大なスラスト力でスラスト軸受が破損されるのを防止するために行うもので、主蒸気加減弁8の開度を急激に絞り込むことにより、抽気タービン2内に生じたスラスト力Fを低減するものである。
 主蒸気加減弁8の開度が絞り込まれると、抽気タービン2に供給される主蒸気流量が減少し、高圧翼段落3b、低圧翼段落4bを通過する蒸気流量が減少するため、これに伴って高圧車室の圧力Hpおよび低圧車室の圧力Lpが低下するので、抽気タービン2内に生じたスラスト力Fが小さくなる。
 この動作によって、抽気タービン内のスラスト力が運転に支障を生じない安全な範囲まで低下したどうかをステップS8で判定する。すなわち、ステップS8では、低圧車室圧力検出器41で検出された低圧車室圧力Lpを、図3における相関線Pより僅かに低い圧力、例えば0.025MPaだけ低くした高圧車室圧力Hpと低圧車室退避圧力Lpqとの特定の関係を表す第2の圧力相関線Qに基づいて求められた低圧車室退避圧力Lpqと比較して、Lp≦Lpqになったかどうかの判定処理が行われる。この判定処理で、低圧車室圧力Lpが、低圧車室退避圧力Lpq以下(Lp≦Lpq)に低下し、相関線Qより下方の値となったと判定されたときは、Y分岐からスッテプS9に進んで主蒸気加減弁8の強制絞込み動作を停止し、抽気異常警報の解除処理を行って通常負荷運転の監視ループに入る。
 図3の例ではB点に到達したときに主蒸気加減弁の強制絞込みを停止することになる。
これは、図5におけるL2線上のb点のスラスト力に相当する。
 ステップS8で、低圧車室圧力Lp>低圧車室退避圧力Lpqであると判定された場合は、低圧車室圧力Lpが図3のQ線より上方にあることになるので、N分岐からステップS10へ進む。
 このステップS10では、主蒸気加減弁8の強制絞込みによって減少した主蒸気流量Qと抽気開始蒸気流量Q1とを比較して主蒸気流量Qが抽気開始蒸気流量Q1以上の流量あるか否かの判定を行う。ここで、Q≧Q1となり、主蒸気流量Qが抽気開始蒸気流量Q1以下に減少していないと判定された場合は、Y分岐から、ステップS7へ戻り、低圧車室圧力Lp≦低圧車室退避圧力Lpqとなるまで、主蒸気加減弁8の強制絞込み動作を繰り返す。
 このような主蒸気加減弁8の強制絞込み操作により、低圧車室の圧力Lp≦低圧車室退避圧力Lpqとなり、低圧車室圧力Lpが図3の圧力相関線Q線上、または、Q線より下方へ移動すると、抽気タービンのスラスト力Fが運転に支障を生じない範囲に減少したことになる。このため、ステップS8では、低圧車室圧力Lpが図3の相関線Q上またはQ線より下方にあると判定されたところで、Y分岐から、主蒸気加減弁8の強制絞込み操作を行う、S7、S8、S10で構成されるループを離脱してステップS9へ進む。そして、ステップ9の警報解除処理を経て通常負荷運転を継続する通常負荷運転監視ループへ復帰し、ステップ7で主蒸気加減弁8が強制絞込みされた状態の負荷において、主蒸気加減弁による負荷運転が行われる。
 なお、元の負荷に復帰させたい場合は、通常負荷運転に移行後に、運転員が、プロセス抽気蒸気流量が最小抽気流量以上となることを確認の上負荷上昇操作を行う。
 一方、ステップS7、S8、S10で構成されるループにおいて、主蒸気加減弁8を絞り込んでいる過程で主蒸気流量Qが大きく減少し、主蒸気流量Q≦抽気開始蒸気流量Q1となった場合は、抽気圧力制御運転が継続できないので、ステップS10でN分岐からスッテプS11、S12へ進んで、抽気異常警報の解除処理後、抽気圧力制御運転の解除処理が行われる。この後、ステップS1(運転員による負荷上昇操作)へ戻って、抽気圧力制御運転への切換えを再度実行することになる。
 なお、ステップS4の判定で、低圧車室圧力Lp>低圧車室限界圧力Lppとなるのは、その時の負荷における抽気流量が十分でないこと、すなわち、最小抽気流量に相当する抽気流量以上の蒸気が高圧部排気3c(図4)からプロセス16に供給されていないことが原因である。
 このため、抽気異常警報が発せられたときには、運転員がプロセス需要(蒸気流量)を増やすなどして高圧部排気3cからプロセス16への供給する抽気流量を増やす操作を実行ことにより、低圧車室圧力Lpを低下させて、ステップS8で、低圧車室圧力Lp≦低圧車室退避圧力Lpqとなるようにすれば、ステップS9に進めることができる。
 このように、この発明では、主蒸気加減弁の強制絞り動作が行われている最中でも、運転員が抽気流量を増やす操作を行うことにより、当該動作を停止させて通常負荷運転に復帰させることができる。これは従来技術にはなかった点のひとつである。
 さらに、この発明においては、主蒸気加減弁8の弁開度の強制絞込み過程でPLC42から主蒸気加減弁8への弁開度指令が変動している間も、蒸気加減弁8と抽気加減弁9の弁開度は一定の関係を維持しながら主蒸気加減弁8、抽気加減弁9の通過流量を変化させるように構成している。これにより、主蒸気加減弁8の弁開度の強制絞込みにより主蒸気流量が変化しても、プロセスへの抽気蒸気流量は、これに影響されることなく一定に維持されるようになる。
 図6は、弁開度指令OPと主蒸気加減弁8および抽気加減弁9の蒸気通過流量Qとの関係を示すもので、特性線V8が主蒸気加減弁8の弁開度指令―弁通過流量特性を、そして特性線V9は抽気加減弁9の弁開度指令―弁通過流量特性を示す。
 或るプロセスの蒸気需要に対して、主蒸気加減弁8と抽気加減弁9の弁開度は、図6の互いに並行な特性線V8とV9の線上にあり、負荷が変化してもこの関係はプロセスの蒸気需要が変化しない限り変わらない。そして、負荷が変動して主蒸気加減弁8に対する弁開度指令OPが変化するとき、抽気加減弁9に対しても共通の弁開度指令OPが発せられる。したがって、主蒸気加減弁8を通過する蒸気流量と抽気加減弁9を通過する蒸気流量との差、すなわち抽気流量は一定に保たれる。
 同様に、主蒸気加減弁9が図7のステップS7における強制絞込みのループにあって弁開度指令OPが変化しても、抽気流量は変化せずに一定に保たれる。
 例えば、主蒸気開閉弁8および抽気蒸気開閉弁9が弁開度指令OP2で運転中に、何らかの原因でプロセス16への抽気蒸気流量が減少すると、低圧翼段落4bへの流量が増えるので低圧車室圧力Lpが上昇する。そして、Lpが図3の圧力相関線P上のA点に到達すると、図7のステップS4で、Lp≧Lppと判定され、主蒸気加減弁8の弁開度の強制絞込みが行われる。これにより主蒸気流量が減少し、低圧車室圧Lpが低下して図3の圧力相関線Q上の点Bに達すると、図7のステップS8でLp≦Lpqと判定され、Y分岐からステップS9へ進み、抽気異常警報処理が解除される。このとき主蒸気加減弁8への弁開度指令は図6のOP2からOP1となっているが、抽気加減弁9への弁開度指令も、同時にOP2からOP1になる。すなわち、主蒸気加減弁8の弁開度指令―弁通過流量特性線V8と抽気加減弁9の弁開度指令―弁通過流量特性線V9との関係は、弁開度指令がOP2からOP1に変化する間も両弁の通過流量の差は一定となる関係が維持される。
 これによりこの間のプロセス16への抽気蒸気流量は、次に説明するように一定に保たれる。
 図6に示すように、弁開度指令がOP2のとき主蒸気加減弁8の通過蒸気流量はQ4、抽気加減弁9の通過蒸気流量はQ2となる。プロセス16への抽気蒸気流量は、主蒸気加減弁8の通過蒸気流量Q4と抽気加減弁9の通過蒸気流量Q2との差のQe2(Qe2=Q4-Q2)となる。
 一方、上述の低圧車室圧力Lp判定により弁開度指令OPがOP2からOP1に減じられることにより、主蒸気加減弁8の通過蒸気流量がQ3に減少するが、抽気加減弁8への弁開度指令も同時に同じ割合で減じられてOP1となり、抽気加減弁8の通過蒸気流量もQ1に減少する。したがって、プロセスへの抽気蒸気流量Qe1は、主蒸気加減弁8の通過蒸気流量Q3と抽気加減弁8の通過蒸気流量Q1との差(Qe1=Q3-Q1)となるが、これは、弁開度指令OP2のときのプロセスへの抽気蒸気流量Qe2と等しい。
 このようにこの発明の実施例1においては、抽気タービンが所定の負荷をとっている抽気圧力制御自動運転状態において、抽気タービンの低圧部の低圧車室圧力を検出し、この低圧車室圧力が、予め定められたその都度の高圧車室圧力に対応して決められた低圧車室限界圧力より大きくなったとき、抽気圧力制御は維持したままの状態で、主蒸気加減弁の開度を強制的に絞って抽気タービンの高圧部に流入する蒸気流量を減らすようにしているので、抽気蒸気の供給は維持したまま、タービンロータに作用するスラスト力を抑制することができる。
 そして、上記動作によってスラスト力が運転に支障を生じない安全な範囲まで低下したかどうかを自動で判断し、安全な範囲である場合には主蒸気加減弁の強制絞込みを中止し、その負荷において、主蒸気加減弁8により主蒸気流量を制御する通常の負荷運転を再開することができる。
 これにより、プラントへの抽気蒸気の供給および系統への電力の供給への影響を少なくすることができるとともに、抽気タービンのスラスト軸受が過大なスラスト力によって損傷されるのを未然に防止することができるので、抽気タービンを安全に運転することができる。
 次にこの発明の実施例2について説明する。
 抽気圧力制御運転への切換え直前は、高圧排気部3cから排気される高圧排気蒸気の圧力はプロセスの蒸気圧力Ppより低いが、抽気圧力制御運転に切換えると抽気加減弁9が絞られるので高圧排気蒸気の圧力が高くなってゆき、高圧排気蒸気の圧力がプロセスの蒸気圧力以上に上昇すると抽気が行われる。しかし、切換え直後、一定量の抽気が行われるまでの間は、高圧排気部3cから排気される高圧排気蒸気の全量又はそのほとんどが低圧翼部4bに流れるため、低圧車室圧力Lpが高くなっている。そして、低圧車室圧力Lpが図3の圧力相関線Pに基づいて決められた低圧車室限界圧力Lpp以上の値になっていると、主蒸気加減弁8の強制絞込み操作が実行される可能性がある。このときのスラスト力は図5の点2の大きさになる。これは一時的なものであるため、許容できるのであるが、運転モードを抽気圧力制御運転に切換える度に主蒸気加減弁8の強制絞込み動作が実行されると、これを解除する操作を行わなければならないので運転操作が煩わしくなる。
 このような煩わしさを解消するように改善したものがこの実施例2である。
 この実施例2は、実施例1における図7に示す保安動作フローの一部を変更するだけでよいので、実施例2により変更した保安動作フローを図10および図11に示す。
 この実施例2の保安動作フローにおいて、実施例1の保安動作フローにおけるステップ記号と同じ記号で示すステップはこれと同じ処理または操作を示す。
 図10におけるマニュアル操作によりステップS1の負荷上昇操作からステップS3の抽気圧力制御運転切換えまでの起動操作は、実施例1(図7)と同じである。
 実施例2においては、図3に示した圧力相関線P線及びQ線上の値である、Lpp及びLpqの外に、これらに代えて、切換え直後の抽気圧力制御運転に使用する、相関線P、Qとは勾配が異なる初期圧力相関線(図8の円内に示す。)Pi、Qi上の値である、初期低圧車室限界圧力Lpi及び初期低圧車室退避圧力Lqiが用いられる。
 そして、初期圧力相関線Pi、Qiは次のようにして定める。
 図9の点2で示される、抽気圧力制御運転切換え直後の突出したスラスト力(以下、これを「突出スラスト」と呼ぶ)を生じさせる低圧車室圧力Lpを計算によって求める。突出スラストは主蒸気流量が抽気開始蒸気流量Q1のときに主蒸気流量の全量が低圧翼段落4bに流入することにより生じる(段落0042参照)ので、Q1からLpが計算される(この値をLptとする)。
 そして、Q1と抽気圧力との関係から高圧車室圧力Hpも計算で求めることができるので(この値をHptとする)、図8上に抽気圧力制御運転開始直後の高圧車室圧力に対する低圧車室圧力の座標点が決まる。そこで、図8上でこの座標点(Hpt,Lpt)からP線上に適当に線分を延ばしたものがPi線となる。Qi線はPi線を僅か下方に並行移動した線に相当する直線である。
 P線とPi線との交点座標である高圧車室圧力を「通常運転設定圧力」Hpoと呼ぶ。
Hpoは、突出スラストの大きさを考慮して決められる。
 ステップS3の抽気圧力制御運転切換え直後のステップS21では、高圧車室圧力Hpが、通常運転設定圧力Hpoに達しているか否かを判定し、Hp<Hpoであれば、高圧車室圧力Hpが通常運転設定圧力Hpoに達していないので、N分岐からステップS22へ進む。
 ステップS22では、低圧車室圧力Lpが低圧車室初期限界圧力Lpi以上か否かの判定を行い、Lp<Lpiであれば、N分岐から負荷増加操作(主蒸気流量増加操作)を行うステップS24を実行してステップS21に戻り、高圧車室圧力Hpが通常運転設定圧力Hpoに達するまでこの操作を繰り返す。
 ステップS22で、Lp≧Lpiであると判定された場合には、低圧車室圧力Lpの上昇により、抽気タービンに発生するスラスト力が、過大となって運転に支障を生じる範囲となっていることを示しているので、Y分岐からステップS25へ進んで、抽気異常警報を発した後、直ちにステップS26の主蒸気加減弁の強制絞込み操作を実行し、抽気タービン2に供給される主蒸気流量Qを低減する。これにより、低圧車室圧力Lpは、主蒸気流量Qの減少に対応して低下する。
 この操作によって、低圧車室圧力Lpが低圧車室初期退避圧力Lqi以下に低下した場合は、低圧車室圧力Lpの判定を行うステップS27でLp≦Lqiと判定されるので、Y分岐からステップ31に進んで主蒸気加減弁の強制絞り込み動作を停止して、抽気異常警報を解除する操作をした後、スッテプS21へ戻って、再び高圧車室圧力Hpの判定を行う。
 また、低圧車室圧力Lpの低下が未だ十分でなく、ステップ27においてLp>Lqiと判定された場合は、ステップ27のN分岐からステップ28へ進み高圧車室圧力Hpが、予め設定された抽気開始設定圧力Hps以下に低下していないか否かの判定を行う。
 このステップ28において、Hp≧Hpsと判定された場合は、Y分岐からステップS26へ戻り主蒸気加減弁強制絞込み操作を、ステップS27でLp≦Lqiと判定されるまで繰り返し行う。
 また、ステップS28においてHp<Hpsと判定された場合は、N分岐からステップS29へ進んで、抽気異常警報解除の操作を行った後、ステップ30の抽気圧力制御運転解除、すなわちマニュアル運転への切り替え操作をして、ステップS1に戻る。
 元の負荷に戻す場合、運転員は最小抽気量以上のプロセスの蒸気需要があることを確認して、抽気圧力制御運転切り替え操作を最初からやり直すことになる。
 一方、ステップS21の高圧車室圧力Hpの判定処理において、Hpが通常運転設定圧力Hpoに達し、Hp≧Hpoであると判定された場合は、通常運転が可能な状態にあるので、ステップS21のY分岐から、図11の通常運転制御ループを示す制御フローのA点へ進んで、通常運転制御ループへ入る。
 この図11の通常負荷運転を監視する保安動作フローは、ほぼ図7に示す実施例1の保安動作フローと同じであるが、低圧車室圧力Lpと低圧車室退避圧力Lpqとを比較判定する処理を行うステップS8の後に、ステップ32を加えた点が異なる。
 ステップ32は、スッテプ21(図10)と同じ判定処理を行い、N分岐は図10の保安動作フローのB点とつながる。
 したがって、図11の通常運転での保安動作を示すフローにおいては、ステップS32で高圧車室圧力HpがHp≧Hpoと判定された場合、ステップS7へ戻って主蒸気加減弁の強制絞込み動作のループを構成する。これは図7に示す保安動作と同じである。
 主蒸気加減弁の強制絞込みによって高圧車室圧Hpが低下し、Hp<Hpoになった場合はステップS32のN分岐から図10のB点に戻って、負荷を増加させる操作を行う。
 ステップS11の後は保安動作フローのA点に戻って通常負荷運転の監視ループとなるが、負荷は、S7,S8,S32のループで低下した状態であるので、負荷を元に戻す場合には、運転員はプロセス抽気蒸気流量が最小抽気流量以上となったことを確認して、主蒸気加減弁の開度を大きくする操作をする。
 図11の保安動作フローのその外の動作は、図7の実施例1の保安動作フローの動作と同じであるので、詳細な動作の説明は省略する。
 このように、この発明の実施例2は抽気蒸気タービン発電設備の運転開始時直後の抽気圧力制御運転切換え時に、一定量の抽気が行われるまで、低圧車室圧力が低圧車室限界圧力を超えて上昇した場合に対処できるように、通常負荷運転で使用する低圧車室限界圧力とは別に、運転初期に使用する低圧車室初期限界圧力を設定し、抽気タービンの運転状態に応じてこの2つの設定値を使い分けるようにしたところに特徴を有する。このため、実施例2によれば、抽気蒸気タービン発電設備の運転開始時直後の抽気圧力制御運転切換え後の低圧車室圧力が低圧車室限界圧力を超えていても、この時は、主蒸気加減弁強制絞込み動作(保安動作)に移行する低圧車室限界圧力の設定値が通常より高い低圧車室初期限界圧力に設定されているので、主蒸気加減弁強制絞込み動作への移行が抑制されるとともに、仮に強制絞込み動作に移行した場合も自動で通常運転に戻すことができるため、煩わしい、主蒸気加減弁強制絞込み動作を解除する操作を行わなくて済むようになり運転員の操作負担を著しく軽減できる。
2:抽気蒸気タービン、3:高圧部、4:低圧部、8:主蒸気加減弁、9:抽気加減弁、16:生産プロセス、19:抽気供給系、40:高圧車室圧力検出器、41:低圧車室圧力検出器、42:演算制御装置、44:主蒸気加減弁制御器、46:抽気加減弁制御器、48:プロセス圧力検出器

Claims (6)

  1.  それぞれ翼段落を有する高圧部と低圧部とで構成された抽気蒸気タービンを備え、この抽気蒸気タービンで発電機を駆動し、前記抽気蒸気タービンの高圧部に流入する蒸気流量を主蒸気加減弁により制御し、前記高圧部の排気蒸気から低圧部へ供給する蒸気流量を抽気加減弁で調整することにより前記高圧部の排気蒸気から一部を抽気してプロセスへ供給する抽気蒸気の圧力を制御する抽気蒸気タービン発電設備において、
     前記高圧部の高圧車室内の蒸気圧力および前記低圧部の低圧車室内の蒸気圧力を検出し、予め設定された前記抽気蒸気タービンの高圧車室圧力と低圧車室圧力との特定の関係を表す圧力相関線に基づいて、その都度の前記高圧車室の検出圧力に対応する基準となる低圧車室限界圧力を求め、この低圧車室限界圧力と前記低圧車室の検出圧力とを比較し、前記低圧車室の検出圧力が前記低圧車室限界圧力より大きくなったことが検知されたとき、前記抽気加減弁による抽気蒸気圧力制御はそのまま動作を継続した状態で、前記主蒸気加減弁の開度を強制的に絞って前記高圧部に流入する主蒸気流量を減らすようにしたことを特徴とする抽気蒸気タービン発電設備の保安運転方法。
  2.  低圧車室圧力が前記低圧車室限界圧力より大きくなったときに、前記主蒸気加減弁の開度を絞る動作を、当該動作によって前記高圧部に流入する蒸気流量が減少して前記低圧車室の検出圧力が前記低圧車室限界圧力より低く設定された基準圧力である低圧車室退避圧力以下に低下したときに停止して絞り込まれた主蒸気加減弁の弁開度に相当する負荷において主蒸気加減弁による負荷運転を再開することを特徴とする請求項1に記載の抽気蒸気タービン発電設備の保安運転方法。
  3.  前記抽気蒸気タービン発電設備の起動時には、前記蒸気タービンへ供給される主蒸気流量が予め設定された定常的な抽気運転が可能な流量となるまでは、前記低圧車室限界圧力に代えて、当該低圧車室限界圧力を求める圧力相関線とは異なる圧力相関線であって、抽気圧力制御運転切換え用に設定された初期圧力相関線に基づいて求められた基準圧力である低圧車室初期限界圧力に設定することを特徴とする請求項1または2に記載の抽気蒸気タービン発電設備の保安運転方法。
  4.  それぞれ翼段落を有する高圧部と低圧部とで構成された抽気蒸気タービンを備え、この抽気蒸気タービンで発電機を駆動し、前記抽気蒸気タービンの高圧部に流入する蒸気流量を主蒸気加減弁により制御し、前記高圧部の排気蒸気から低圧部へ供給する蒸気流量を抽気加減弁により調整することで前記高圧部の排気蒸気から一部を抽気してプロセスへ供給する抽気蒸気の圧力を一定値に制御するようにした抽気蒸気タービン発電設備において、前記高圧部の高圧車室内の蒸気圧力および前記低圧部の低圧車室内の蒸気圧力を検出する圧力検出手段と、予め設定された前記抽気蒸気タービンの高圧車室圧力と低圧車室圧力との特定の関係を表す圧力相関線に基づいて、その都度の前記高圧車室の検出圧力に対応する基準となる低圧車室圧力である低圧車室限界圧力を求める手段と、前記低圧車室の検出圧力と前記低圧車室限界圧力とを比較する手段と、前記低圧車室の検出圧力が前記低圧車室限界圧力より大きくなったときに、前記抽気加減弁の圧力制御機能はそのまま動作を継続した状態で前記主蒸気加減弁の開度を絞って前記高圧部に流入する蒸気流量を減らす制御手段とを備えたことを特徴とする抽気蒸気タービン発電設備の保安運転装置。
  5.  前記低圧車室の検出圧力が前記低圧車室限界圧力より大きくなったときに、前記主蒸気加減弁の開度を絞る弁制御指令は、前記低圧車室の圧力が前記低圧車室限界圧力より所定値だけ小さく設定された基準圧力である低圧車室退避圧力以下になったとき停止して絞り込まれた主蒸気加減弁の弁開度に相当する負荷において主蒸気加減弁による負荷運転を再開することを特徴とする請求項4に記載の抽気蒸気タービン発電設備の保安運転装置。
  6.  前記抽気蒸気タービン発電設備の起動時に、前記抽気蒸気タービンへ供給される主蒸気流量が、定常的な抽気圧力制御運転を継続させることができる主蒸気流量として予め設定された蒸気流量となるまでは、前記低圧車室限界圧力に代えて、当該低圧車室限界圧力を求める圧力相関線とは異なる圧力相関線であって、抽気圧力制御運転切換え用に設定された初期圧力相関線に基づいて求められた基準圧力である低圧車室初期限界圧力に設定する手段を備えることを特徴とする請求項4または5に記載の抽気蒸気タービン発電設備の保安運転装置。
PCT/JP2013/081425 2013-04-05 2013-11-21 抽気蒸気タービン発電設備の保安運転方法および装置 WO2014162632A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE112013001671.0T DE112013001671B4 (de) 2013-04-05 2013-11-21 Verfahren und Vorrichtung zum Sicherheitsbetrieb einer Entnahmedampfturbine, die für eine Stromerzeugungsanlage genutzt ist
US14/478,648 US9404382B2 (en) 2013-04-05 2014-09-05 Method and apparatus for safety operation of extraction steam turbine utilized for power generation plant

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-079430 2013-04-05
JP2013079430A JP5397560B1 (ja) 2013-04-05 2013-04-05 抽気蒸気タービン発電設備の保安運転方法および装置

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/478,648 Continuation US9404382B2 (en) 2013-04-05 2014-09-05 Method and apparatus for safety operation of extraction steam turbine utilized for power generation plant

Publications (1)

Publication Number Publication Date
WO2014162632A1 true WO2014162632A1 (ja) 2014-10-09

Family

ID=50112349

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/081425 WO2014162632A1 (ja) 2013-04-05 2013-11-21 抽気蒸気タービン発電設備の保安運転方法および装置

Country Status (4)

Country Link
US (1) US9404382B2 (ja)
JP (1) JP5397560B1 (ja)
DE (1) DE112013001671B4 (ja)
WO (1) WO2014162632A1 (ja)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074561B (zh) * 2014-06-03 2015-07-15 国家电网公司 一种热电联产汽轮机组节流调整系统及其以热定电的方法
CN106246245A (zh) * 2016-08-29 2016-12-21 华能国际电力开发公司铜川照金电厂 一种缩短机组启动时间及节能启动的方法
US10871072B2 (en) 2017-05-01 2020-12-22 General Electric Company Systems and methods for dynamic balancing of steam turbine rotor thrust
JP7026520B2 (ja) * 2018-01-30 2022-02-28 三菱重工コンプレッサ株式会社 タービン用の弁装置、タービン、およびそれらの製造方法
CN109488394A (zh) * 2018-10-19 2019-03-19 哈尔滨汽轮机厂有限责任公司 百万核电汽轮机控制系统机堆协调的控制方法
CN109404075A (zh) * 2018-11-30 2019-03-01 上海电气电站设备有限公司 小汽轮机背压控制热力系统及其控制方法
CN110083938B (zh) * 2019-04-27 2022-09-30 吉林省电力科学研究院有限公司 一种确定汽轮机低压缸最小安全流量的方法
CN110374694B (zh) * 2019-06-05 2022-06-14 陕西渭河发电有限公司 一种高背压供热机组安全控制方法
CN111441831A (zh) * 2020-03-03 2020-07-24 大唐东北电力试验研究院有限公司 汽轮机最小安全流量试验方法
CN112377275B (zh) * 2020-11-18 2023-03-24 润电能源科学技术有限公司 一种节流配汽汽轮机运行控制方法、装置及设备
CN112412548B (zh) * 2020-11-23 2021-12-31 东方电气集团东方汽轮机有限公司 一种汽轮机变工况下轴向推力的调整系统及其使用方法
CN112922682B (zh) * 2021-02-26 2022-07-19 暨南大学 一种汽轮发电机组全负荷主汽压力及配汽优化方法
WO2023100457A1 (ja) * 2021-11-30 2023-06-08 三菱重工業株式会社 制御装置、制御方法およびシステム
CN114934828B (zh) * 2022-05-13 2023-08-22 华电电力科学研究院有限公司 基于超临界再热型双抽供热背压机组系统的投入运行方法
CN114961890B (zh) * 2022-06-02 2024-02-13 国网河北能源技术服务有限公司 一种供热期汽轮机组滑压运行优化方法
CN115749985A (zh) * 2022-11-11 2023-03-07 东方电气集团东方汽轮机有限公司 一种抽背式汽轮机季节性变参数运行方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07119408A (ja) * 1993-10-25 1995-05-09 Mitsubishi Heavy Ind Ltd 蒸気タービンの緊急用制御装置
JPH08105303A (ja) * 1994-10-06 1996-04-23 Fuji Electric Co Ltd 抽気蒸気タービンの保安装置
JPH10141013A (ja) * 1996-11-14 1998-05-26 Mitsubishi Heavy Ind Ltd 余剰蒸気の回収装置

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2540691A (en) * 1948-08-19 1951-02-06 Westinghouse Electric Corp Valve control of reheat turbine installation
US3242678A (en) * 1963-09-20 1966-03-29 Combustion Eng Apparatus and method for obtaining high temperature low pressure vapor from a high temperature high pressure vapor source
US3322153A (en) * 1964-06-09 1967-05-30 Gen Electric Multiple pressure control valve
US4320625A (en) * 1980-04-30 1982-03-23 General Electric Company Method and apparatus for thermal stress controlled loading of steam turbines
JPH0678724B2 (ja) * 1986-04-25 1994-10-05 株式会社日立製作所 1軸コンバインドプラントにおける蒸気タービンのクーリング方法及びクーリング装置
JPS63100203A (ja) * 1986-10-17 1988-05-02 Hitachi Ltd 蒸気タ−ビンの蒸気流量制御方法
US5042246A (en) * 1989-11-06 1991-08-27 General Electric Company Control system for single shaft combined cycle gas and steam turbine unit
EP0509347B1 (de) * 1991-04-16 1995-01-18 Siemens Aktiengesellschaft Verfahren und Vorrichtung zur Überwachung des Betriebszustandes einer Dampfturbine
DE4129518A1 (de) * 1991-09-06 1993-03-11 Siemens Ag Kuehlung einer niederbruck-dampfturbine im ventilationsbetrieb
US5361585A (en) * 1993-06-25 1994-11-08 General Electric Company Steam turbine split forward flow
JP3279740B2 (ja) * 1993-07-23 2002-04-30 株式会社日立製作所 発電プラントの給水装置
JPH07243304A (ja) * 1994-03-01 1995-09-19 Fuji Electric Co Ltd 抽気タービンの抽気圧力制御方法
JP2001317305A (ja) * 2000-05-12 2001-11-16 Babcock Hitachi Kk タービン・発電機の制御方法と装置
DE50110456D1 (de) * 2000-05-31 2006-08-24 Siemens Ag Verfahren und vorrichtung zum betrieb einer dampfturbine mit mehreren stufen im leerlauf oder schwachlastbetrieb
DE10042317A1 (de) * 2000-08-29 2002-03-14 Alstom Power Nv Dampfturbine und Verfahren zur Einleitung von Beipassdampf
ATE420274T1 (de) * 2002-05-22 2009-01-15 Siemens Ag Verfahren und vorrichtung zum betrieb einer dampfkraftanlage, insbesondere im teillastbereich
US8448437B2 (en) * 2003-07-25 2013-05-28 Baker Hughes Incorporated System and method of cooling turbines
US7614233B2 (en) * 2005-01-28 2009-11-10 Hitachi-Ge Nuclear Energy, Ltd. Operation method of nuclear power plant
JP4158120B2 (ja) * 2006-05-18 2008-10-01 株式会社日立製作所 蒸気タービンプラント
JP4616847B2 (ja) * 2007-02-16 2011-01-19 三菱重工業株式会社 蒸気システムとその制御システム及び制御方法
JP4901782B2 (ja) * 2008-02-19 2012-03-21 株式会社東芝 発電複合プラント及びプラント制御方法
DE102008033402A1 (de) * 2008-07-16 2010-01-21 Siemens Aktiengesellschaft Dampfturbinenanlage sowie Verfahren zum Betreiben einer Dampfturbine
US8499561B2 (en) * 2009-09-08 2013-08-06 General Electric Company Method and apparatus for controlling moisture separator reheaters
US8528314B2 (en) * 2010-02-02 2013-09-10 General Electric Company Method and apparatus for combined cycle power plant startup
US8568084B2 (en) * 2010-06-23 2013-10-29 General Electric Company System for controlling thrust in steam turbine
US8505299B2 (en) * 2010-07-14 2013-08-13 General Electric Company Steam turbine flow adjustment system
JP5637808B2 (ja) * 2010-10-21 2014-12-10 株式会社東芝 二酸化炭素回収方法及び二酸化炭素回収型汽力発電システム
JP5643691B2 (ja) * 2011-03-23 2014-12-17 株式会社東芝 二酸化炭素回収型汽力発電システム及びその運転方法
EP2666978B1 (en) * 2012-05-25 2016-08-24 General Electric Technology GmbH Steam Rankine plant

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07119408A (ja) * 1993-10-25 1995-05-09 Mitsubishi Heavy Ind Ltd 蒸気タービンの緊急用制御装置
JPH08105303A (ja) * 1994-10-06 1996-04-23 Fuji Electric Co Ltd 抽気蒸気タービンの保安装置
JPH10141013A (ja) * 1996-11-14 1998-05-26 Mitsubishi Heavy Ind Ltd 余剰蒸気の回収装置

Also Published As

Publication number Publication date
US20140373541A1 (en) 2014-12-25
US9404382B2 (en) 2016-08-02
DE112013001671B4 (de) 2016-09-29
JP5397560B1 (ja) 2014-01-22
JP2014202136A (ja) 2014-10-27
DE112013001671T5 (de) 2015-02-19

Similar Documents

Publication Publication Date Title
JP5397560B1 (ja) 抽気蒸気タービン発電設備の保安運転方法および装置
RU2562340C2 (ru) Система регулирования паровой турбины и способ эксплуатации паровой турбины при повышенном неустановившемся давлении на выхлопе
EP2390565B1 (en) Heat Recovery Steam Generation System and Method for Controlling a Water Level of a Drum in a Heat Recovery Steam Generation System for a Combined Cycle Power Plant
JP6396599B2 (ja) 主制御装置として熱応力制御装置を備えるタービン制御ユニット
JP2012167571A (ja) 一軸型複合サイクル発電プラントおよびその運転方法
JP4158120B2 (ja) 蒸気タービンプラント
JP4982507B2 (ja) タービングランドシール蒸気減温制御装置および蒸気タービン発電設備におけるプラント制御方法
JP2015124710A (ja) 制御装置、及び起動方法
JP2007046577A (ja) 再熱型蒸気タービンプラント
JP4734184B2 (ja) 蒸気タービン制御装置および蒸気タービン制御方法
JP4528693B2 (ja) 蒸気タービン発電プラントとその制御方法
JP4937822B2 (ja) 復水器真空度制御システム及び該システムを備えた発電プラント
JP5524923B2 (ja) 低圧タービンバイパス制御装置及び発電プラント
JP2008101494A (ja) 低圧蒸気タービンシステム及び制御方法
CN109923285B (zh) 用于运行联合循环电厂的方法
US10450900B2 (en) Plant control apparatus, plant control method and power generating plant
JP4905941B2 (ja) 排熱回収ボイラとその蒸気圧力制御方法
JP4901335B2 (ja) ボイラユニット起動中における補助ボイラトリップ時の対応方法
JP2000257405A (ja) 蒸気タービンプラントの運転方法
EP3146163B1 (en) Device for expanding steam and method to control such a device
EP3348902B1 (en) System and method for controlling drum levels using flow
JP2000297608A (ja) 発電所の給水ポンプ制御装置
JP3186468B2 (ja) 抽気蒸気タービンの保安装置
JP2004169621A (ja) 抽気復水タービンの制御装置
KR102624688B1 (ko) 복수기의 진공도 유지를 위한 냉각수 우회 장치 및 그 제어방법

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 1120130016710

Country of ref document: DE

Ref document number: 112013001671

Country of ref document: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13881049

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 13881049

Country of ref document: EP

Kind code of ref document: A1