WO2014142077A1 - 情報提供装置、施工業者管理装置、情報提示装置、プログラム、通信システム及び情報提供方法 - Google Patents

情報提供装置、施工業者管理装置、情報提示装置、プログラム、通信システム及び情報提供方法 Download PDF

Info

Publication number
WO2014142077A1
WO2014142077A1 PCT/JP2014/056187 JP2014056187W WO2014142077A1 WO 2014142077 A1 WO2014142077 A1 WO 2014142077A1 JP 2014056187 W JP2014056187 W JP 2014056187W WO 2014142077 A1 WO2014142077 A1 WO 2014142077A1
Authority
WO
WIPO (PCT)
Prior art keywords
contractor
information
construction
work
report
Prior art date
Application number
PCT/JP2014/056187
Other languages
English (en)
French (fr)
Inventor
健 永濱
亮平 花井
Original Assignee
アルシス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by アルシス株式会社 filed Critical アルシス株式会社
Priority to SG11201507392WA priority Critical patent/SG11201507392WA/en
Priority to KR1020157025237A priority patent/KR20150127103A/ko
Publication of WO2014142077A1 publication Critical patent/WO2014142077A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate
    • G06Q50/163Real estate management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis

Definitions

  • the present invention relates to an information providing apparatus, an information presenting apparatus, a program, an information providing system, an information providing method, and a contractor management apparatus that manages a contractor for recommending and providing appropriate information to applicants.
  • equipment including electrical equipment such as air conditioning and lighting equipment, piping equipment, the building itself, or general electrical appliances installed in buildings, etc.
  • construction work such as inspection and repair
  • user the user of the equipment
  • distributor of the equipment or the electrical appliances related to the equipment
  • a construction ordering agency service that accepts construction requests from manufacturers, general contractors, condominium developers, or house manufacturers at a facility such as a customer center, and the operator of the facility arranges a construction contractor suitable for the requested content. Is provided.
  • each contractor calculates the estimated time required for arrival, and one or more contractors are assigned. Select and recommend to operators.
  • Patent Document 1 has a predetermined skill (national qualification, industry recommended qualification, etc.) depending on the work contents, although it is possible to identify a contractor that can be quickly installed. However, because there are many things that are necessary conditions for construction, the selected contractor does not have the necessary skills to carry out the requested construction, and the recommendation and selection of appropriate contractors. May not be possible.
  • each contractor may have already received an order for another construction, so it takes time to adjust the schedule and execute the construction quickly. May not be possible.
  • the present invention has been made to solve the above-mentioned problems, and its purpose is information that can improve the work efficiency of a construction ordering agency service that receives and orders construction work in response to a request from a client. It is to provide a recommendation providing device and the like.
  • the information providing apparatus can construct the contractor attribute information including at least the location and name of the contractor for each of the plurality of contractors, and can be constructed by the contractor.
  • Record management means for managing a database in which skill information indicating a specific work type and qualification information including at least schedule information indicating a schedule in which the contractor can receive an order for a construction work are associated and recorded, and from the client
  • the construction request information acquisition means for obtaining the construction request information including the position of the construction site, the construction contents indicating the contents of the construction work and the schedule from the outside, and the obtained construction request information
  • the requested construction work can be accepted based on the construction details and schedule shown and the recorded qualification information.
  • the requested A calculation means for calculating priority information indicating the priority of each contractor that can receive an order for construction work, and the contractor that can receive an order for at least one construction work is selected based on the calculated priority.
  • a contractor management apparatus is the above-described information providing apparatus and one contractor selected based on the recommended information, and the construction work
  • An arrival report indicating that the contractor has arrived at the construction site and current position information indicating a position at the time of the arrival report are acquired in association with each other from the communication terminal device of the contracted contractor
  • On-site position information collating means for collating whether or not they match, and managing means for managing data on the status of construction work in the contracted contractor based on the acquired arrival date and time and the matching result of the current arrival position; Having a configuration comprising There.
  • the contractor management apparatus is an operation indicating that the construction work is completed from the information providing apparatus and the communication terminal device of the contracted contractor.
  • Work completion report acquisition means for acquiring a completion report
  • work completion date / time information acquisition means for acquiring information on work completion date / time indicating the acquisition date / time of the work completion report, and the order construction based on the acquired work completion date / time
  • a management means for managing data on the status of construction work at a contractor.
  • the information presenting apparatus inputs the construction request information indicating the position of the construction site, the contents of the construction work, and the construction period when the construction work is requested by the client. From the selected construction contractor based on the operation means and the construction content and construction period indicated by the acquired construction request information, the location of the construction site and the location of the construction contractor included in the contractor attribute information Based on a calculation element including at least the distance between two points, recommendation information acquisition means for acquiring information on at least one selected construction contractor selected as recommendation information, and the recommendation acquired by the recommendation information acquisition means And an information presenting means for displaying information related to the selected construction contractor so that the applicant can browse based on the information.
  • the information providing apparatus and the like according to the present invention can improve the work efficiency of the construction ordering agency service that receives and orders construction work in response to a request from the client, manages the position at the time of reporting, and Or, it is possible to appropriately manage the construction work, such as preventing unauthorized reporting by the worker.
  • FIG. 1 is a system configuration diagram showing a configuration of a communication system in an embodiment according to the present invention. It is a block diagram which shows the structure of the server apparatus of one Embodiment. It is a figure which shows an example of the data recorded on the requester management database provided in the server apparatus of one Embodiment. It is a figure which shows an example of the data recorded on the contractor management database provided in the server apparatus of one Embodiment. It is a figure which shows an example of the data recorded on the construction history management database provided in the server apparatus of one Embodiment. It is a figure which shows an example of the data recorded on the report database provided in the server apparatus of one Embodiment. It is a figure which shows an example of the report data recorded on the report database of one Embodiment.
  • terminal device for contractor a communication terminal device possessed by each contractor
  • server device that communicates with the contractor terminal device via a network
  • terminal device for operator a communication terminal device possessed by each contractor
  • server device that communicates with the contractor terminal device via a network
  • FIG. 1 is a system configuration diagram showing the configuration of the communication system 1 of the present embodiment. Further, in FIG. 1, only some contractors and operators are shown in order to prevent the figure from becoming complicated. That is, in the actual communication system 1, there are a larger number of contractors, operators and contractor terminal devices, and operator terminal devices than displayed.
  • the communication system 1 of the present embodiment receives a construction request from a client (not shown), the requested content (that is, the content or type of construction work, the site address, the desired construction period, etc.) is shown. Based on the information (hereinafter referred to as “construction request information”), one or more construction contractors appropriate for the construction are selected, and information on the selected construction contractors (contact phone number, contractor name, or location) Etc.) as recommendation information.
  • the communication system 1 of the present embodiment is a system for managing data on site work at one selected contractor who has received an order for a construction work (hereinafter referred to as “ordered contractor”).
  • the communication system 1 (1) From among multiple contractors, contractors who have the skills required for the requested construction work and who can start construction work on the schedule (that is, contractors with free schedules) And (2) Based on various information, the priority in each extracted contractor is calculated, (3) Select at least one contractor that satisfies the predetermined condition for the calculated priority, (4) Generate information about the selected contractor (for example, location, contact telephone number and e-mail address) as recommended information, (5) Provide the generated recommendation information so that it can be viewed by those who desire the recommendation information such as an operator. It has a configuration.
  • the communication system 1 performs a notification process to the contractor, a report on the current arrival (hereinafter referred to as “current arrival report”), and a construction work start.
  • Work report processing hereinafter referred to as “work start report”
  • construction completion report hereinafter referred to as “work completion report”
  • settlement processing related to settlement are executed, and the construction work And it has the structure which performs various data management regarding the construction contractor who performs the said construction work.
  • the communication system 1 includes a plurality of operator terminal devices 10 provided in the service center SC, a network 20, and an operator terminal using recommended construction companies that can perform construction work as recommendation information.
  • the server device 30 that directly provides to the device 10 or the communication terminal device (not shown) of the client and manages various data related to the construction work, and the terminal device 40 for the contractor owned by each contractor, Have.
  • the service center SC When the service center SC receives a construction request from the client by telephone or web service, the service center SC registers the construction request information based on the accepted construction request in the communication system, and the construction The server apparatus 30 that arranges (orders) and manages the requested construction based on the request, and the installed facility.
  • the method for accepting construction requests is arbitrary.
  • acceptance by e-mail or server The reception of the electronic construction request by the application page of the website for construction application in the web service of WWW (World Wide Web) formed in the apparatus 30 is included.
  • WWW World Wide Web
  • the server device 30 acquires the construction request information input by the operator via the operator terminal device 10, or for e-mail or construction application.
  • construction request information is directly acquired.
  • the operator terminal device 10 is a terminal device such as a PC (personal computer) installed in the service center SC, and communicates with the server device 30 directly or via an intranet (not shown) in the service center SC. It is connected.
  • the mutual communication function of the operator terminal device 10 is not always necessary.
  • the operator terminal device 10 is configured to display a screen for inputting construction request information in response to an operator's input operation when a construction request is manually made by a client such as a telephone or a facsimile.
  • the construction request information is generated according to the input from the operator and provided to the server device 30.
  • the operator terminal device 10 displays a message to that effect under the instruction of the server device 30 and the received client Request information is displayed on the screen.
  • the operator terminal device 10 is used when placing an order for a construction work performed by an operator according to the construction request information while displaying the generated construction request information or the acquired construction request information on a display. It has a possible configuration.
  • the operator terminal device 10 is configured to provide construction work information to the contractor in conjunction with the corresponding contractor terminal device 40 when one contractor is specified.
  • a providing method for providing construction work information to the terminal device 40 for the contractor (1) URL (Uniform Resource Locator) or bar code (QR code (registered trademark)) necessary for acquiring construction work information and surrounding maps is described in an e-mail from the operator terminal device 10 A method of transmitting to the terminal device 40 for the contractor, or (2) A method of starting a predetermined application by the terminal device 40 for a contractor and acquiring construction work information and a surrounding map according to the procedure of the application, To be run by either.
  • the providing method is arbitrary and is not limited to this.
  • the server device 30 includes a recording device 330 having various databases (hereinafter referred to as “DB”), and acquires construction request information from the operator terminal device 10 or the communication terminal device (not shown) of the client. Based on the data in the DB and the construction request information, recommendation information is generated and provided to the operator terminal device 10 or the communication terminal device of the client.
  • DB various databases
  • the server device 30 acquires the construction request information, the server device 30 assigns a construction ID for uniquely identifying the construction request and manages each construction based on the construction ID. While coordinating with the vendor terminal device 40, various types of data are registered and updated, and the entire construction ordering agency service is managed.
  • the contractor terminal device 40 is, for example, a communication terminal device that can be carried by a worker of a contractor such as a smartphone, a tablet information terminal device, or a mobile phone. It is used to acquire construction work information necessary for construction from the center SC and present it to the worker.
  • the contractor terminal device 40 is described based on a URL by a markup language such as construction work information, a voice call function, an e-mail transmission / reception function, and XML (extensible Markup Language). It has a configuration in which resource data is acquired and image display and data communication are performed by a browsing function based on the resource data.
  • a markup language such as construction work information, a voice call function, an e-mail transmission / reception function, and XML (extensible Markup Language). It has a configuration in which resource data is acquired and image display and data communication are performed by a browsing function based on the resource data.
  • the contractor terminal device 40 accesses a website established by the server device 30 and uses an application linked to the server device 30 by a browsing function or uses an e-mail having a predetermined format.
  • the present arrival report including the work start report and the report processing of the work completion report are executed.
  • the contractor terminal device 40 receives the GPS signal from the GPS (Global Positioning System) satellite 50, and based on the GPS signal, Detect position information indicating the current position (latitude / longitude) of the own device, and execute each report process of the arrival report and the work completion report to the server device 30 with the detected position information added. It has become.
  • GPS Global Positioning System
  • the contractor terminal device 40 has an interface such as Bluetooth (registered trademark), for example, constructs a PAN (personal area network) with a portable printer or an IC card reader, etc.
  • Corresponding work statement slips (hereinafter also referred to as “work instructions”), receipts, etc. can be printed, and payment procedures using credit cards can be performed for settlement of construction fees. It has a configuration.
  • the communication system 1 of the present embodiment excludes a contractor who does not have the skill to perform construction requested from the outside, and a contractor who cannot receive an order on a schedule, and the position of the site.
  • Information on a contractor that can quickly execute a construction work based on the distance from the contractor to the contractor can be accurately provided to the operator (that is, a person who wants to select the contractor) as recommended information. It is like that.
  • the communication system 1 allows a person who wishes to select a contractor to determine a contractor capable of performing the work easily, quickly, and accurately in response to a request from the client. Therefore, it is possible to improve the work efficiency of a construction ordering agency service that receives and orders construction work in response to a request from a client.
  • the communication system 1 of the present embodiment reliably grasps the date and time when the requested construction contractor arrived, can manage the time required from construction request to arrival, and manages the position at the time of reporting. In addition, it is possible to appropriately manage data of construction work such as preventing fraud reports by construction contractors or their workers.
  • FIG. 2 is a block diagram showing the configuration of the server device 30 of the present embodiment.
  • FIGS. 3, 4, 5, and 6 are the requester management DB 331 and the contractor management DB 332 of the present embodiment, respectively. It is a figure which shows an example of the data recorded on construction history DB333 and report DB334. 7 is a diagram showing an example of report data recorded in the report DB 334, and FIG. 8 is a diagram showing an example of data recorded in the qualification management DB 335 of the present embodiment.
  • FIG. 9 is a diagram showing an example of a report data creation image displayed on the contractor terminal device 40 of the present embodiment
  • FIG. 10 is a work completion report displayed on the operator terminal device 10. It is a figure which shows the example of an image.
  • the server device 30 of the present embodiment includes a communication control unit 310 that is communicatively connected to the network 20, a ROM / RAM 320 that functions as various memories, a recording device 330 that includes various DBs, Server management control unit 340 for controlling the entire apparatus, data processing unit 350 for selecting a contractor corresponding to the construction request information, executing a contractor recommendation process for generating recommendation information, and a timer for specifying the current date and time 360.
  • the above-described units are connected to each other by a bus B, and data transfer is performed between the components.
  • the communication control unit 310 is a predetermined network interface, establishes a communication channel with the contractor terminal device 40 and the communication terminal device of the client (not shown) via the network 20, and transmits and receives various data. Various data are exchanged with the terminal device 10.
  • the communication control unit 310 has a connection interface with the network 20 and an intranet interface separately, and performs communication by separating communication with the network 20 and communication within the intranet. May be.
  • the ROM / RAM 320 is used as a work area when various processes are executed.
  • the recording device 330 includes an HDD (Hard Disc Drive) or an SSD (Solid State Drive).
  • the recording device 330 has at least a client management DB 331, a contractor management DB 332, a construction history DB 333, a report DB 334, and a qualification management DB 335.
  • the recording device 330 of the present embodiment constitutes the database of the present invention.
  • the requester management DB 331 is a database in which various information for managing the requester (service user) of the construction ordering agency service is registered as data. For example, in the requester management DB 331, as shown in FIG. (1) The client ID assigned to each client, (2) Requester attribute information including at least the name or name, address or location, telephone number, e-mail address, and settlement information of the requester; (3) request history information indicating a past request history by the requester; Are registered in association with each other.
  • these pieces of information may be registered at the time of the first construction request. However, in this embodiment, in order to facilitate data management and registration, it is assumed that these pieces of information are registered by performing user registration in advance.
  • the construction prohibited contractor is information individually registered when the client prohibits the ordering of the construction because the satisfaction with the past construction request is low, for example, the name of the construction contractor and the service center SC. In, information that can identify the contractor is registered.
  • various information such as a site address, a contractor who has received an order for a construction work requested in the past, a construction fee at that time, a construction date and time, and details of the construction work may be recorded.
  • the contractor management DB 332 is a DB in which information for managing each contractor is registered as data. For example, in the contractor management DB 332, as shown in FIG. (1) A contractor ID for identifying each contractor; (2) Contractor attribute information including information such as the name, location, telephone number, and email address of the contractor; (3) Qualification information corresponding to the contractor, Are registered in association with each other.
  • Credentials include (A) Skill information indicating national qualifications (hereinafter referred to as "qualifications") possessed by the contractor; (B) Order rate information indicating the past order rate of the contractor; (C) Acceptable period indicating the schedule for which the contractor can accept the construction; (D) Evaluation information indicating the client's evaluation of the construction performed by the contractor in the past, Is included.
  • the qualification information does not necessarily include all the information (a) to (d), and it is sufficient that at least the information (a) and (c) is included.
  • the evaluation information may use an average value of evaluations for constructions performed within a predetermined period in the past, and may include all evaluations for constructions performed during a past predetermined period.
  • evaluation information is not included in evaluation information.
  • the contractor attribute information and skill information registered in the contractor management DB 332 are registered when the contractor is pre-registered.
  • the order rate for example, indicates the percentage of orders actually received by the selected contractor in the past construction based on the construction fee estimate before construction, etc., and is automatically calculated and registered. Alternatively, it may be registered based on the operation of the operator terminal device 10.
  • FIG. 4 illustrates information for managing each contractor recorded in the contractor management DB 332.
  • the contractor ID “C001” corresponds to the contractor “ABC Electric”, and as the qualification information, the skill information “Electric Contractor (2 types)” The rate “30%” and the evaluation information “ ⁇ ” are registered.
  • the evaluation information is expressed by the number of stars, but may be expressed by a number indicating the evaluation level of the client for the contractor, “good”, “normal”. Evaluation may be made in three stages, “bad”. This evaluation information is determined based on an ex-post evaluation performed by the client on the construction performed after the completion of construction, and is registered in the contractor management DB 332.
  • the contractor that the client wants to refuse to perform the construction work that is, the construction contractor that prohibits the construction work (hereinafter, “construction prohibited trader”) may be included in the evaluation information.
  • construction prohibited trader the construction prohibited trader
  • it is separately registered in the client management DB 331 as a construction prohibition contractor, and is configured to be associated with evaluation information by a contractor ID or a contractor name. It may be.
  • the construction history DB 333 is a DB for managing information related to the construction history of construction performed in the past as data. For example, in the construction history DB 333, as shown in FIG. 5, (1) the construction ID assigned to each construction work, (2) Construction request information (3) The construction request date and time of the construction, (4) work history information; Are registered in association with each other.
  • the construction request information includes the contact information of the person in charge of the client, the site address, the desired construction date and time, the construction work content, and the construction type.
  • the work history information is based on the current arrival report and work completion report performed by the worker using the contractor terminal device 40, (A) Date and time of arrival report, (B) Location information at arrival; (C) the matching result for the arrival report; (D) work completion report date and time; (E) location information upon completion; (F) Check result for work completion report; (G) status information indicating the status of the work; including.
  • the collation result indicates whether the location information added to the arrival report and the work completion report matches the location of the site, and the status information indicates that the construction is in progress. This is information indicating the status of whether or not it has been completed. In particular, the status of the status information is changed to “completed” when the completion report is received after the construction is ordered until the completion of construction is reported.
  • the worker makes an arrival report to “2013/02/01/12: 0”,
  • the position information at that time is “N: 36.626446, W: 138.772344”, which coincides with the location of the work site, and the work completion report is “2013/02/01/17: 00” with “N: 36.626446,
  • the data when it is performed at the place “W: 138.723444” is shown.
  • the report DB 334 is a DB for recording and managing data (hereinafter referred to as “report data”) constituting a report uploaded together with the work completion report from the terminal device 40 for the contractor. As shown in FIG. 6, report data is registered in association with each construction ID.
  • FIG. 6 shows an example in which information “Report 1” is registered as report data having a predetermined data format of the construction work indicated by the construction ID “W001”. Further, for example, as shown in FIG. 7, the data of each report includes information on the site name, site address, work content, work date, various photos, and comments on each photo.
  • FIG. 7 shows a site photograph P1 before the start of the work, photographs P2 and P3 of the faulty part and newly attached parts, and a field photograph P4 after the completion of the work in the construction work for performing “downlight inverter replacement”. Shows an example attached to the report, and an example of report data in which a text comment corresponding to each photograph is described.
  • report data is generated and uploaded in conjunction with the website or application in the terminal device 40 for the contractor.
  • the qualification management DB 335 is a DB for managing qualifications and the like necessary for performing the construction for each construction content.
  • the qualification name defined by the law or the like is recorded in association with the contents of each construction, in association with the execution of the construction.
  • an essential qualification name is registered for each construction content.
  • the construction content (work content) that can be implemented for each qualification name can be specified by a flag or the like. Also good.
  • the server management control unit 340 is mainly configured by a central processing unit (CPU), and integrally controls each unit of the server device 30 by executing a program.
  • CPU central processing unit
  • the data processing unit 350 executes an application under the control of the server management control unit 340, thereby interlocking with the communication control unit 310 and the recording device 330 to perform registration and update of data in each DB.
  • a unit 351, a contractor recommendation unit 352 that executes a contractor recommendation process, and a settlement processing unit 353 that performs settlement of the construction fee are realized.
  • the DB management control unit 351 of the present embodiment includes a record management unit, a construction request information capital unit, a request information acquisition unit, a current arrival report acquisition unit, a work completion report acquisition unit,
  • the contractor recommendation unit 352 constitutes an extraction means, a calculation means, a selection means, and an information provision means.
  • the DB management control unit 351 performs registration and management of construction request information acquired from the operator terminal device 10 or the terminal device (not shown) of the client, and reports the arrival from the contractor terminal device 40.
  • the registration and update of data for the client management DB 331, the contractor management DB 332, and the construction history DB 333 based on the work completion report are performed.
  • the DB management control unit 351 receives each report data of the current arrival report and the work completion report created by the worker using the contractor terminal device 40 via the website or by e-mail, While identifying the construction ID of the construction work included in the report data, the construction ID and the report data included in the report data are associated with each other and registered in the report DB 334 for the current arrival report and the work completion report. Execute report processing.
  • the DB management control unit 351 receives the various report data and receives the received report Based on the data, the construction history DB 333 and the management report DB 334 are updated.
  • the DB management control unit 351 when the client desires to browse the report data of the predetermined construction work via the operator terminal device 10 or a predetermined Web site, the construction history DB 333 and the management report DB 334. Image data in accordance with a predetermined display format is generated based on the various information recorded in the information, and the generated image data is provided to the operator terminal device 10 or the communication terminal device of the client (not shown).
  • the DB management control unit 351 displays various information on the corresponding construction work from the management report DB 334.
  • the read image data D as shown in FIG. 10 is generated, and the generated image data D is provided to the corresponding operator terminal device 10.
  • the DB management control unit 351 receives an evaluation for a contractor in charge of the construction work under the instruction of the communication terminal device (not shown) of the requester, and if the evaluation by the requester is made, Based on this, the evaluation information in the contractor management DB 332 is updated.
  • the contractor recommendation unit 352 generates recommendation information by executing a contractor recommendation process, and provides the recommendation information to the operator terminal device 10 or a communication terminal device of a contractor (not shown). Note that the contractor recommendation unit 352 and the contractor recommendation process of this embodiment will be described later.
  • the settlement processing unit 353 calculates a construction fee for the ordered construction and executes processing necessary for settlement.
  • the payment processing unit 353 may be provided with a server device (not shown) dedicated to payment in the network 20 and realized by the server device, or realizes payment processing in conjunction with the server device dedicated for payment. May be.
  • the contractor recommendation unit 352 has the skills necessary for the requested construction work in order to execute the contractor recommendation process under the instruction of the operator by the operator terminal device 10. Based on the calculated priority, a contractor extraction unit 352A that extracts a contractor that can start construction on a schedule, a priority calculation unit 352B that calculates a priority corresponding to each extracted contractor, and It has a contractor selection unit 352C that selects a contractor, and a recommendation information generation unit 352D that generates recommendation information and provides it to the operator terminal device 10.
  • the contractor extraction unit 352A obtains construction request information from the operator terminal device 10 or the client terminal device, and searches the qualification management DB 335 based on the construction content included in the obtained construction request information. Identify the qualifications required for the requested construction work. Then, the contractor extraction unit 352A searches the contractor management DB 332 using the qualification as a search key, reads out the contractor IDs of all contractors hit as a result of the search, and records them in the ROM / RAM 320. .
  • the contractor extraction unit 352A selects a contractor whose work period matches the order acceptance period from the read contractors, and updates the contractor ID recorded in the ROM / RAM 320.
  • the ROM / RAM 320 has the skill to execute the requested construction, and only the construction contractor ID of the construction contractor who can work on the construction work is recorded on the schedule.
  • the priority calculation unit 352B reads out the contractor attribute information from the contractor management DB 332 based on the contractor ID recorded in the ROM / RAM 320 (that is, the contractor capable of working on the requested construction work), and uses the contractor management information as the construction request information.
  • a distance between two points (hereinafter referred to as “distance between two points”) X between the site position included and the location of the contractor is calculated.
  • the priority P is calculated according to (Equation 1). To do.
  • the priority P of the construction contractor whose evaluation of the past client is high becomes high, or the distance, that is, the priority P of the construction contractor that can quickly arrive is set high.
  • “A”, “B”, and “C” can be arbitrarily set and changed in order to change the calculation standard of the priority P according to the times and requests of the client.
  • the contractor selection unit 352C selects a contractor having a predetermined condition recorded in the ROM / RAM 320 based on the priority calculated by the priority calculation unit 352B. Specifically, the contractor selection unit 352C is based on priority. A contractor ID having a predetermined condition is identified from the contractor IDs recorded in the ROM / RAM 320, and a contractor is selected.
  • the contractor selection unit 352C sets the contractor having the highest priority contractor ID as the contractor having the predetermined condition, and sets the contractor having the highest priority (for example, Top 5 contractors) or a contractor whose priority level exceeds a predetermined threshold is selected as a recommended contractor.
  • the recommendation information generation unit 352D reads the contractor attribute information registered in the contractor management DB 332 in association with the contractor ID of the selected contractor, and generates recommendation information based on the contractor attribute information. Then, the recommendation information generation unit 352D provides the generated recommendation information to the corresponding operator terminal device 10 (that is, the operator terminal device 10 that has instructed the contractor recommendation process).
  • the recommendation information generation unit 352D identifies the prohibited contractor based on the requester management DB 331 and excludes it from the recommendation information.
  • FIG. 11 is a flowchart showing recommendation information provision processing executed when a request for construction is made by the client in the server device 30 of the communication system 1 according to the present embodiment.
  • FIG. 12 is for a contractor. It is a figure which shows an example of the work instruction document printed at the time of construction work request in the terminal device.
  • each information of each client and orderable contractor is registered in advance, and necessary information is registered in advance in the client management DB 331 and the contractor DB 332.
  • the client requests the service center SC to perform the construction by telephone, facsimile, or e-mail, or executes the construction request on the construction application page of the site established by the service center SC.
  • the DB management control unit 351 acquires the construction request information requested by the requester in conjunction with the operator terminal device 10 or directly through the communication control unit 310 (step Sa200), the acquired construction is performed. It is determined whether the request information is a request acquired from the operator terminal device 10 or a request acquired directly from a communication terminal device (not shown) of the client (step Sa201).
  • step Sa202 the DB management control unit 351 determines that the construction request information is obtained directly from the communication terminal device (not shown) of the requester. Further, when the DB management control unit 351 determines that the construction request information is a request acquired from the operator terminal device 10, the DB management control unit 351 directly proceeds to the process of step Sa203.
  • step Sa202 when the DB management control unit 351 determines that the construction request information is obtained directly from a communication terminal device (not shown) of the requester, the construction request is sent to a predetermined operator terminal device 10.
  • the information is transmitted (step Sa202), and the process proceeds to step Sa203.
  • the data processing unit 350 transmits the construction request information to the operator terminal device 10 that is being activated and is on standby.
  • the DB management control unit 351 assigns a construction ID to the received construction request information and obtains a requester ID corresponding to the construction requester while acquiring the acquisition date and time of the construction request information from the timer 360. Specify (step Sa203).
  • requester ID it is arbitrary, For example, you may make it search the requester management DB331 based on the name etc. which are included in construction request information, or a contact address.
  • the DB management control unit 351 reads out and acquires requester attribute information and request history information of the requester from the requester management DB 331 based on the specified requester ID (step Sa204), and records it in the ROM / RAM 320.
  • the DB management control unit 351 updates the construction history DB 333 by causing the assigned construction ID and construction request information to be associated with each other and recorded in the construction history DB 333 (step Sa205).
  • the DB management control unit 351 acquires the current date and time from the timer 360 and records it in the construction history DB 333 as the request date and time. At this time, the DB management control unit 351 changes the status information status to “working”.
  • the contractor extraction unit 352A searches the contractor management DB 332 based on the construction request information, has the skill to perform the construction work, and has a schedule that is free at the client's desired date and time. Is extracted (step Sa206).
  • the contractor extraction unit 352A specifies the qualification that can be performed by the construction request information based on the qualification management DB, and the qualification information that has registered the contractor having the qualification in the contractor management DB 332. Extract based on
  • the contractor selection unit 352C excludes the contractor corresponding to the prohibition contractor from the extracted contractors while referring to the request history information registered in the requester management DB 331 (step Sa207).
  • the contractor selection unit 352C causes the contractor selection unit 352C to calculate the priority P for each of the contractors that have been extracted and from which the prohibition contractor has been excluded, and to set a predetermined condition for each priority P.
  • the construction contractor to be provided is specified (step Sa208).
  • the priority calculation unit 352B calculates the distance X between two points based on the site address included in the construction request information and the location of the contractor, and performs a predetermined calculation (for example, (Expression 1)). ) To calculate the priority P.
  • the contractor selection unit 352C identifies the highest-ranking contractor ID, a predetermined number of contractor IDs from the highest rank, or a contractor with a certain priority or higher as a contractor having predetermined conditions.
  • the recommendation information generation unit 352D reads out the contractor attribute information registered in the contractor management DB 331 in association with the identified contractor ID of the contractor, and recommends information based on the contractor attribute information. Generate (step Sa209).
  • the recommendation information generating unit 352D supplies the generated recommendation information to the corresponding operator terminal device 10 or the communication terminal device (not shown) of the client (step Sa210), and ends this operation.
  • the operator terminal device 10 When receiving the recommendation information, the operator terminal device 10 selects the recommended construction contractor based on the operation of the operator, or selects one construction contractor from a plurality of recommended construction contractors.
  • the URL corresponding to the request information and the surrounding map of the site, or a bar code having these contents is transmitted as construction work information to the terminal device 40 for the contractor, and the construction work is ordered after the request for issuance of the quotation and the approval of the quotation. I do.
  • the operator terminal device 10 is linked with the application of the corresponding contractor terminal device (that is, the contractor terminal device for the ordering party) 40 or the corresponding contractor terminal device.
  • the construction work information including a URL for displaying a map around the site including the site address can be received by the contractor terminal device 40 so as to be viewable by an e-mail so that the device 40 can receive it.
  • the contractor terminal device 40 notifies the worker of the construction work information received using a predetermined application, registers it in association with the application when executing the reporting process, and, for example, As a work instruction sheet as shown in FIG. 12, a portable printer can output the work instruction sheet.
  • the work instruction sheet output on the paper has a bar code for specifying the construction work, and can be used when performing the arrival report and the work completion report.
  • FIG. 13 is a flowchart which shows the report process containing the arrival report and work completion report which are performed in the terminal device 10 for contractors and the server apparatus 30 of this embodiment. Also, prior to this processing, a plurality of work requests are executed and predetermined information is registered in each database.
  • the contractor terminal device 40 acquires a construction ID for identifying the construction work while detecting the operation of the worker (step Sb100). Sb101).
  • the contractor terminal device 40 activates the camera function of the contractor terminal device 40, acquires the barcode of the work instruction sheet output on the paper as described above, analyzes the image, and sets the construction ID. Identify. Further, the contractor terminal device 40 activates a predetermined application and specifies a construction ID based on the construction work information transmitted from the operator terminal device 10 and registered therein.
  • the terminal device 40 for the contractor displays for executing the report of the construction work (that is, the arrival report and the work completion report) (that is, prompting the worker to input).
  • Resource data for transmitting report data to the server device 30 (hereinafter referred to as “report data transmission resource data”) is acquired (step Sb102).
  • the contractor terminal device 40 may generate report data transmission resource data based on the construction ID by a predetermined application, or in conjunction with the server device 30, based on the identified construction ID, the URL
  • the report data transmission resource data may be acquired by specifying a Web page for performing the arrival report and the work completion report.
  • the contractor terminal device 40 displays, for example, a predetermined image (hereinafter referred to as “report data creation image”) as shown in FIG.
  • the input operation is waited (step Sb103).
  • step S104 when the operator's operation input is detected (step S104), the contractor terminal device 40 receives the GPS signal to generate position information corresponding to the current location (step Sb105), and adds the position information. Report data indicating an arrival report or a work completion report is transmitted (step Sb106), and this operation is terminated.
  • the contractor terminal device 40 prompts the user to input a comment and capture an image of the site using the camera function when obtaining a work completion report, and acquires the comment and the image of the site. Then, the contractor terminal device 40 creates report data in a predetermined data format based on the acquired comments and images, and transmits the report data attached with the generated report data. However, comments and on-site images may be acquired and attached to the report data when reporting the arrival.
  • the contractor terminal device 40 may attach to the report data settlement information indicating whether settlement processing will be performed later or when the work is completed when the work completion report is made.
  • the contractor terminal device 40 causes the client or the person in charge to select a payment method, and attaches the payment method specified by the client as report information to the report data.
  • the terminal device 40 for the contractor includes data related to the additional cost in the report data based on the input of the worker. Attached.
  • step Sb 200 when the communication control unit 310 receives the report data transmitted by the contractor terminal device 40 (step Sb 200), the DB management control unit 351 acquires the reception date and time from the timer 360 ( In step Sb201), it is determined whether the report indicated by the received report data is an arrival report or a work completion report (step Sb202).
  • the DB management control unit 351 determines that the report indicated by the received report data is the current arrival report, the current arrival date and time information and position information (that is, current arrival position information) are stored in the construction history DB 333. Recording is performed (step Sb203), and this operation is terminated.
  • the DB management control unit 351 compares the position information added to the report with the site address, obtains a collation result, and registers the result in the construction history DB 333. Moreover, when a comment or an image is attached to the report data, the DB management control unit 351 may register various data in the construction history DB 333.
  • the DB management control unit 351 determines that the report indicated by the received report data is a work completion report, the DB management control unit 351 identifies a construction ID corresponding to the completion report and is included in the reception date and report data. While updating each piece of information in the construction history DB 333 based on the position information, the report data attached to the report data is recorded in the report DB 334 in association with the construction ID (step Sb204).
  • the DB management control unit 351 records the reception date and time in the construction history DB 333 as the work completion date and compares the location information added to the report data with the site address. A collation result is acquired and the result is recorded in construction history DB333. In addition, the DB management control unit 351 changes the status of the status information in the construction history DB 334 to “completed”.
  • the settlement processing unit 353 obtains estimate data from a database in which estimate data and construction ID (not shown) are associated with each other, or calculates the number of hours (man-hours) required to complete the work from the current arrival date and time. Then, a construction fee calculation process is executed (step Sb205). Note that the settlement processing unit 353 calculates a construction fee including the additional cost based on the information on the additional cost attached to the report data when an additional cost such as a part cost has occurred.
  • the additional fee may be determined manually by the operator based on the information described in the report data, or automatically based on the report data and additional fee data such as parts registered in advance. May be determined automatically.
  • the settlement processing unit 353 determines whether the settlement process is a later settlement process or the settlement process when the work is completed based on the construction ID or the settlement information attached to the report data (step S206). If it is determined that the settlement processing is to be completed, this operation is terminated as it is. However, when the settlement processing unit 353 determines that the settlement process is to be performed at a later date, the settlement processing unit 353 notifies the corresponding terminal device for operator 10 to that effect.
  • the settlement processing unit 353 determines that the settlement processing is performed when the work is completed, the settlement processing unit 353 performs predetermined settlement processing such as credit settlement in conjunction with the contractor terminal device 40 (step Sb207), and performs this operation. finish.
  • predetermined settlement processing such as credit settlement in conjunction with the contractor terminal device 40 (step Sb207)
  • the settlement processing in the present embodiment is the same as the conventional one, and thus the details thereof are omitted.
  • the communication system 1 of the present embodiment from the position of the site to the contractor while excluding the contractor without the skill to perform the requested construction work and the contractor that cannot be ordered on a schedule basis.
  • Information on a contractor capable of quickly executing a construction work based on the distance between at least two points can be accurately provided as a recommendation information to a person who wishes to select the contractor.
  • construction work can be performed quickly and accurately in response to a request from the client for those who wish to select a contractor such as an operator or a client (including a person in charge). Therefore, it is possible to improve the work efficiency of the construction ordering agency service that receives and orders construction work in response to a request from the client.
  • the client's evaluation for example, evaluation of the client's satisfaction score
  • the degree of satisfaction that is, the CS degree
  • the client individually designates a contractor who wants to refuse the request from the past request experience, there is a situation in which the contractor is ordered again for the work. Can be prevented.
  • each construction contractor becomes the one barometer which shows the trust relationship between a contractor and a client, for example, based on the order receipt status in the past. Therefore, it is possible to preferentially select a contractor with a high order rate, indicating that the efficiency of construction work can be improved and the CS degree of the client can be improved.
  • the priority of a contractor who can set the priority of a contractor whose evaluation of a past client is high is high or can be quickly installed based on the distance.
  • the priority calculation standard can be changed according to the type of construction or the request of the client.
  • the priority calculation standard can be changed according to the request of the client.
  • a candidate for a contractor who executes a construction work having a predetermined condition is selected. Since it can narrow down, compared with the case where the contractor requested from many contractors is determined, the said determination work can be performed easily.
  • the work efficiency of the construction ordering service can be improved.
  • the communication system 1 of this embodiment for example, it is possible to preferentially recommend a contractor who is good at the requested construction, and to be able to respond according to the situation of the construction request such as when there is urgency. Since a contractor can be preferentially recommended, a more appropriate construction contractor can be selected.
  • the CS degree of the client can be improved and can be applied to various constructions.
  • the server device 30 executes the payment process.
  • a server device dedicated to payment may be provided in the network 20, and the server may execute the payment process.
  • each computer system that manages and controls each database is operated by a separate computer system. May be. In this case, each computer system may be installed in a different country.
  • the priority calculation unit 352B may display “evaluation” on the operator terminal device 10 only as a reference value without using the calculation of the priority P.
  • the reference value includes information on the number of works performed in the past, and the priority calculation unit 352B may display the number of works on the operator terminal device 10 as a reference value. .
  • the service center SC may be provided overseas, and only the server device 30 may be operated in the country.
  • only the operator terminal device 10 may be provided in the overseas service center SC, and data communication with the domestic server device 30 may be performed via the network 20.
  • Modification 9 In the above embodiment, only information corresponding to qualifications essential for construction is recorded in the skill information. For example, as optional information, “LAN (Local Area Network) construction”, “distribution” The work information such as “breaker construction” and “interior construction” may be included in the skill information. Furthermore, information regarding a service system such as “24 hours available” may be included in the skill information. [4.9] Modification 9 By adopting this configuration, for example, preferentially recommend a contractor who is good at the requested construction, such as realizing a more flexible contractor recommendation and recommending a contractor considering the service system. Can be done.
  • LAN Local Area Network

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

【課題】依頼主からの依頼に応じて施工を受発注する、施工発注代行サービスの業務効率を向上させ、施工発注代行サービスに対する、CS度を向上させる情報提供装置等を提供すること。 【解決手段】通信システム1は、依頼主から施工の依頼を受けた場合に、サービスセンターSCのサーバ装置30により当該施工依頼情報に対応する施工に適切な技能を有する施工業者であって、現場までの2点間距離に基づいて、各施工業者に対応する優先度を算出し、優先度が高い施工業者に関する情報を推薦情報として、オペレータ用端末装置10のディスプレイに表示させる。

Description

情報提供装置、施工業者管理装置、情報提示装置、プログラム、通信システム及び情報提供方法
 本発明は、希望者に対して適切な情報を推薦及び提供する情報提供装置、情報提示装置、プログラム、情報提供システム及び情報提供方法及び施工業者を管理する施工業者管理装置に関する。
 従来、建築物等に設置された、空調、照明設備等の電気設備、配管設備、建築物自体、又は、一般電化製品、を含む各種設備(以下、「設備」という。)の設置、保守、点検、修理等の作業(以下、「施工」という。)を実施する場合に、当該設備のユーザ(以下、単に「ユーザ」という。)、設備の販売業者、又は、設備に関連する電化製品の製造業者、ゼネコン、マンションデベロッパー、若しくは、ハウスメーカー等による施工依頼をカスタマーセンター等の施設にて、一括して、受け付け、当該施設のオペレータが、依頼内容に適した施工業者を手配する施工発注代行サービスが提供されている。
 このような状況下において、最近では、現場からの距離等に基づいて、所定の時間内に現場に到着すること(以下、「現着」という。)が可能な一以上の施工業者を選定し、当該施工業者に関する情報(連絡先電話番号、携帯電話の電子メールアドレス、所在地、業者名等)を推薦情報として、オペレータ用の端末装置(以下、「オペレータ用端末装置」という。)に表示させることにより、オペレータによる施工の受発注業務を円滑化し、その作業効率を向上させたシステムが提案されている(例えば、特許文献1)。
 特に、このシステムにおいては、現場の住所と、施工業者の所在地から両者間の二点間距離等に基づき、各施工業者が現着に要する推定所要時間を算出して、一以上の施工業者を選定してオペレータに推薦するようになっている。
特開2008-204403号公報
 しかしながら、上記特許文献1に開示されたシステムにあっては、迅速に現着できる施工業者を特定することはできるものの、作業内容によって、所定の技能(国家資格や業界推奨資格等)を有することが、施工の必要条件となっているものが数多く存在するため、選定された施工業者が依頼された施工を実施するために必要な技能を有しておらず、適切な施工業者の推薦及び選定を行うことができない場合もある。
 また、上記特許文献1に開示されたシステムにあっては、各施工業者が既に他の施工を受注している場合もあるので、スケジュール調整等に時間を要し、迅速に施工を実行させることができない場合もある。
 本発明は、上記課題を解決するためになされたものであり、その目的は、依頼主からの依頼に応じて施工作業を受発注する施工発注代行サービスの業務効率を向上させることが可能な情報推薦提供装置等を提供することにある。
 (1)上述した課題を解決するため、本発明に係る情報提供装置等は、複数の施工業者の各々について当該施工業者の所在地及び名称を少なくとも含む施工業者属性情報と、当施工業者が施工可能な作業種別を示す技能情報及び当該施工業者が施工作業を受注可能なスケジュールを示すスケジュール情報を少なくとも含む資格情報と、が対応付けて記録されるデータベースを管理する記録管理手段と、依頼主から前記施工作業を依頼された場合に、施工現場の位置、施工する作業の内容を示す施工内容及びスケジュールを含む施工依頼情報を外部から取得する施工依頼情報取得手段と、前記取得された施工依頼情報により示される施工内容及びスケジュールと前記記録されている資格情報とに基づいて、当該依頼された施工作業を受注可能な前記施工業者を前記記録手段から抽出する抽出手段と、前記現場の位置と前記施工業者属性情報に含まれる施工業者の所在地との2点間距離を少なくとも含む算定要素に基づいて、前記依頼された施工作業を受注可能な各施工業者の優先度を示す優先度情報を算出する算出手段と、前記算出された優先度に基づいて、少なくとも一の施工作業を受注可能な前記施工業者を選定施工業者として、選定する選定手段と、前記選定した施工業者に関する情報を、推薦情報として、当該施工業者の選定を希望する希望者に閲覧可能に提供する情報提供手段と、を具備する構成を有している。
(2)また、上述した課題を解決するため、本発明に係る施工業者管理装置は、上記の情報提供装置と、前記推薦情報に基づいて選定された一の施工業者であって、前記施工作業を受注した受注施工業者の通信端末装置から当該施工業者が前記施工現場に到着したことを示す現着報告と、当該現着報告時の位置を示す現着位置情報と、を対応付けて取得する現着報告取得手段と、前記現着報告の取得日時を示す現着日時の情報を取得する現着日時情報取得手段と、前記現着得位置情報により示される現着位置と前記現場の所在地が一致するか否かを照合する現場位置情報照合手段と、前記取得された現着日時と前記現着位置の照合結果とに基づいて前記受注施工業者における施工作業の状況をデータ管理する管理手段と、を備える構成を有している。
(3)また、上述した課題を解決するため、本発明に係る施工業者管理装置は、上記の情報提供装置と、前記受注施工業者の通信端末装置から、当該施工作業が完了したことを示す作業完了報告を取得する作業完了報告取得手段と、前記作業完了報告の取得日時を示す作業完了日時の情報を取得する作業完了日時情報取得手段と、前記取得された作業完了日時に基づいて前記受注施工業者における施工作業の状況をデータ管理する管理手段と、を備える構成を有している。
(4)また、本発明にかかる情報提示装置は、依頼主から施工作業を依頼された場合に、当該施工現場の位置、施工する作業の内容を示す施工内容及び工期を示す施工依頼情報を入力するための操作手段と、前記取得された施工依頼情報により示される施工内容及び工期に基づいて、選出された前記施工業者から、前記現場の位置と前記施工業者属性情報に含まれる施工業者の所在地との2点間距離を少なくとも含む算定要素に基づいて、選出される少なくとも一の選定施工業者に関する情報を、推薦情報として取得する推薦情報取得手段と、前記推薦情報取得手段によって取得された前記推薦情報に基づいて、前記選定施工業者に関する情報を希望者が閲覧可能に表示する情報提示手段と、を有する構成を有している。
 本発明に係る情報提供装置等は、依頼主からの依頼に応じて施工作業の受発注を行う施工発注代行サービスの業務効率を向上させることができるとともに、報告時の位置を管理し、施工業者、又は、その作業員による不正報告を防止するなど適切に施工作業を管理することができる。
本発明に係る一実施形態における通信システムの構成を示すシステム構成図である。 一実施形態のサーバ装置の構成を示すブロック図である。 一実施形態のサーバ装置内に設けられた依頼主管理データベースに記録されるデータの一例を示す図である。 一実施形態のサーバ装置内に設けられた施工業者管理データベースに記録されるデータの一例を示す図である。 一実施形態のサーバ装置内に設けられた施工履歴管理データベースに記録されるデータの一例を示す図である。 一実施形態のサーバ装置内に設けられた報告書データベースに記録されるデータの一例を示す図である。 一実施形態の報告書データベースに記録される報告書データの一例を示す図である。 一実施形態の資格管理DBに記録されるデータの一例を示す図である。 一実施形態の報告データ作成用画像の一例を示す図である。 一実施形態のオペレータ用端末装置に表示される作業完了報告の画像例を示す図である。 一実施形態の通信システムのサーバ装置において、依頼主から施工の依頼がされた際に実行される推薦情報提供処理を示すフローチャートである。 一実施形態の通信システムの施工業者用端末装置40において施工作業依頼時に印刷される作業指示書の一例を示す図である。 一実施形態の通信システムの施工業者用端末装置及びサーバ装置において現着報告及び作業完了報告を行う報告処理を示すフローチャートである。
 以下、図面を参照しつつ、本発明の実施形態について説明する。なお、以下の実施形態は、各施工業者が所持する通信端末装置(以下、「施工業者用端末装置」という。)と、当該施工業者用端末装置とネットワークを介して通信接続するサーバ装置と、当該サーバ装置と連動してオペレータの操作に基づいて各種の処理を実行する端末装置(オペレータ用端末装置)と、を有する通信システムに対し、本発明に係る、情報提供装置、情報提示装置、施工業者管理装置、プログラム、通信システム及び情報提供方法を適用した場合の実施形態である。
[1]通信システム
 まず、図1を用いて本実施形態における通信システム1の構成及び概要について説明する。なお、図1は、本実施形態の通信システム1の構成を示すシステム構成図である。また、図1においては、図が煩雑になることを防止するため、一部の施工業者及びオペレータのみを示している。すなわち、実際の通信システム1においては、表示するよりも多数の施工業者、オペレータ及び施工業者用端末装置、オペレータ用端末装置が存在している。
 本実施形態の通信システム1は、図示せぬ依頼主からの施工依頼を受け付けた場合に、当該依頼された内容(すなわち、施工作業の内容、又は、種類、現場住所、希望工期等)を示す情報(以下、「施工依頼情報」という。)に基づいて、当該施工に適切な1又は複数の施工業者を選定し、当該選定した施工業者に関する情報(連絡先電話番号、業者名、又は、所在地等)を推薦情報として提供するシステムである。
 また、本実施形態の通信システム1は、選定した施工業者であって施工作業を受注した1の施工業者(以下、「受注施工業者」という。)における現場作業をデータ管理するシステムである。
 特に、通信システム1は、
(1)依頼された施工作業に必要となる技能を有し、かつ、スケジュール上、施工作業に着手可能な施工業者(すなわち、スケジュールの空いている施工業者)を複数の施工業者の中から抽出し、
(2)各種の情報に基づいて、抽出した各施工業者における優先度を算出し、
(3)算出した優先度について所定の条件を満たす少なくとも一以上の施工業者を選定し、
(4)当該選定した施工業者に関する情報(例えば、所在地、連絡先電話番号及び電子メールアドレスなど)を推薦情報として生成し、
(5)生成した推薦情報をオペレータなどの推薦情報を希望する希望者に閲覧可能に提供する、
構成を有している。
 そして、通信システム1は、推薦情報に基づいて希望者が1の施工業者を特定すると、当該施工業者への通知処理、現着の報告(以下、「現着報告」という。)、施工作業開始の報告(以下、「作業開始報告」という。)及び施工完了の報告(以下、「作業完了報告」という)などの作業報告処理、及び、決済に関する決済処理の各処理を実行し、当該施工作業及び当該施工作業を実行する施工業者に関する種々のデータ管理を行う構成を有している。
 具体的には、本実施形態の通信システム1は、サービスセンターSCに設けられた複数のオペレータ用端末装置10と、ネットワーク20と、施工作業可能な推薦すべき施工業者を推薦情報としてオペレータ用端末装置10又は依頼主の通信端末装置(図示しない)に直接的に提供するともに、施工作業に関する各種のデータ管理を行うサーバ装置30と、各施工業者が所有する施工業者用端末装置40と、を有している。
 なお、サービスセンターSCは、依頼主からの施工依頼を電話又はwebサービスによって受け付けた場合に、受け付けた施工依頼に基づく施工依頼情報を通信システムに登録するためのオペレータ用端末装置10と、当該施工依頼に基づいて当該依頼された施工を手配(発注)し、管理するサーバ装置30と、設置されている施設である。
 また、本実施形態においては、施工依頼の受付方法は任意であり、例えば、依頼主からの電話又はファクシミリなどのオペレータによる人的な施工依頼の受け付けの他に、電子メールによる受け付け、又は、サーバ装置30に形成されたWWW(World Wide Web)のwebサービスにおける施工申し込み用のWebサイトの申し込みページによる電子的な施工依頼の受け付けが含まれる。
 ただし、サーバ装置30は、電話にてオペレータが施工依頼を受け付けた場合には、オペレータによってオペレータ用端末装置10を介して入力された施工依頼情報を取得し、又は、電子メール又は施工申し込み用のWebサイトにおいて施工依頼を受け付けた場合には、直接的に施工依頼情報を取得するようになっている。
 オペレータ用端末装置10は、サービスセンターSC内に設置されたPC(パーソナルコンピュータ)等の端末装置であり、サーバ装置30と、直接、又は、サービスセンターSC内の図示せぬイントラネットを介して、通信接続されている。なお、オペレータ用端末装置10の相互通信機能に関しては、必ずしも必要とならない。
 また、オペレータ用端末装置10は、電話又はファクシミリなど人的に依頼主から施工の依頼がなされた場合には、オペレータの入力操作に応じて、施工依頼情報を入力させるための画面を表示する構成を有しており、オペレータの入力に従って、施工依頼情報を生成し、サーバ装置30に提供する構成を有している。
 その一方、オペレータ用端末装置10は、電子メールなど電子的に依頼主から施工の依頼がなされた場合には、サーバ装置30の指示の下、その旨を画面に表示するとともに、受信した依頼主から依頼情報を画面に表示するようになっている。
 特に、オペレータ用端末装置10は、生成した施工依頼情報又は取得した施工依頼情報をディスプレイに表示しつつ、当該施工依頼情報にしたがってオペレータによって行われる施工業者に対する施工作業の発注を実行する際に用いることが可能な構成を有している。
 他方、オペレータ用端末装置10は、1の施工業者が特定された場合に、該当する施工業者用端末装置40と連動して、当該施工業者に施工作業情報を提供する構成を有している。
 なお、本実施形態において、施工作業情報を施工業者用端末装置40に提供する提供手法としては、
(1)施工作業情報及び周辺地図を取得するために必要となるURL(Uniform Resource Locator)、又は、バーコード(QRコード(登録商標)等)を電子メールに記述してオペレータ用端末装置10から施工業者用端末装置40に送信する方法、又は、
(2)施工業者用端末装置40によって所定のアプリケーションを起動させ、当該アプリケーションの手順に従って施工作業情報及び周辺地図を取得する方法、
のいずれかによって実行するようになっている。ただし、当該提供手法は、任意であり、これに限定されるものではない。
 サーバ装置30は、各種のデータベース(以下、「DB」という。)を有する記録装置330を備え、オペレータ用端末装置10又は依頼主の通信端末装置(図示しない)から、施工依頼情報を取得しつつ、DB内のデータ及び施工依頼情報に基づいて、推薦情報を生成してオペレータ用端末装置10又は依頼主の通信端末装置に提供するようになっている。
 また、サーバ装置30は、施工依頼情報を取得した場合に、当該施工依頼を一意に識別するための施工IDを割り当てて各施工を施工IDに基づいて管理するとともに、オペレータ用端末装置10及び施工業者用端末装置40と連携しつつ、各種データの登録及び更新を行い、施工発注代行サービスの全体を管理する構成を有している。
 施工業者用端末装置40は、例えば、スマートフォン、タブレット型情報端末装置、又は、携帯用電話機等の施工業者の作業員が携帯可能な通信端末装置であり、オペレータが施工を発注する際に、サービスセンターSCから施工に必要な施工作業情報を取得して、作業員に提示するために用いられる。
 具体的には、この施工業者用端末装置40は、URLに基づいて、施工作業情報など、音声通話機能、電子メールの送受信機能及びXML(eXtensible Markup Language)等のマークアップ言語によって記述されているリソースデータを取得し、当該リソースデータに基づいて、ブラウジング機能によって画像の表示及びデータ通信を行う構成を有している。
 また、施工業者用端末装置40は、サーバ装置30の開設するWebサイトにアクセスし、ブラウジング機能によって、サーバ装置30と連動するアプリケーションを用いることによって、又は、所定の形式を有する電子メールを用いることによって、作業開始報告を含む現着報告及び作業完了報告の報告処理を実行する構成を有している。
 なお、施工業者用端末装置40は、現着報告及び作業完了報告の報告処理を実行する場合には、GPS(Global Positioning System)衛星50からGPS信号を受信しつつ、当該GPS信号に基づいて、自機の現在位置(緯度・経度)を示す位置情報を検出し、当該検出された位置情報を付加した状態にて、サーバ装置30に現着報告及び作業完了報告の各報告処理を実行するようになっている。
 さらに、施工業者用端末装置40は、bluetooth(登録商標)等のインターフェースを有し、例えば、携帯型のプリンタ又は、ICカードリーダ等とPAN(パーソナルエリアネットワーク)を構築して、施工作業情報に対応する作業明細伝票(以下、「作業指示書」ともいう。)、領収書等の印刷を行うことができるとともに、施工料金の決済においては、クレジットカードを用いた決済手続きを行うことが可能な構成を有している。
 このような構成を有することによって、本実施形態の通信システム1は、外部から依頼された施工を行う技能の無い施工業者、及び、スケジュール的に受注できない施工業者を除外しつつ、前記現場の位置から施工業者までの距離に基づいて迅速に施工作業を実行可能な施工業者の情報を、推薦情報として、オペレータ(すなわち、当該施工業者の選定を希望する希望者)に的確に提供することができるようになっている。
 したがって、本実施形態の通信システム1は、施工業者の選定を希望する希望者に対して、依頼主からの依頼に応じて簡易に、迅速にかつ的確に施工作業が可能な施工業者を決定させて施工作業を発注することができるので、依頼主からの依頼に応じて施工作業の受発注を行う施工発注代行サービスの業務効率を向上させることができるようになっている。
 また、本実施形態の通信システム1は、依頼した施工業者が現着した日時を確実に把握し、施工の依頼から現着までに要した時間の管理ができるとともに、報告時の位置を管理し、施工業者、又は、その作業員による不正報告を防止するなど適切に施工作業をデータ管理することができるようになっている。
 [2]サーバ装置
 次に、図2~図10を用いて本実施形態の各サーバ装置30の構成について説明する。なお、図2は、本実施形態のサーバ装置30の構成を示すブロック図であり、図3、図4、図5及び図6は、それぞれ、本実施形態の依頼主管理DB331、施工業者管理DB332、施工履歴DB333及び報告書DB334に記録されるデータの一例を示す図である。また、図7は、報告書DB334に記録される報告書データの一例を示す図であり、図8は、本実施形態の資格管理DB335に記録されるデータの一例を示す図である。さらに、図9は、本実施形態の施工業者用端末装置40に表示される報告データ作成用画像の一例を示す図であり、図10は、オペレータ用端末装置10に表示される作業完了報告の画像例を示す図である。
 本実施形態のサーバ装置30は、図2に示すように、ネットワーク20に通信接続される通信制御部310と、各種のメモリとして機能するROM/RAM320と、各種のDBを有する記録装置330と、装置全体を制御するサーバ管理制御部340と、施工依頼情報に対応する施工業者を選定し、推薦情報を生成する施工業者推薦処理を実行するデータ処理部350と、現在日時を特定するためのタイマー360と、を有する。なお、上記の各部は、バスBによって相互に接続され、各構成要素間におけるデータの転送が実行される。
 通信制御部310は、所定のネットワークインターフェースであり、ネットワーク20を介して施工業者用端末装置40及び図示せぬ依頼主の通信端末装置と通信チャネルを構築し、各種データの授受を行うとともに、オペレータ用端末装置10と各種データの授受を行う。
 なお、通信制御部310は、ネットワーク20との接続用インターフェースと、イントラネット用のインターフェースと、を別個に有し、ネットワーク20との通信と、イントラネット内の通信と、を切り分けて通信をするようにしてもよい。
 ROM/RAM320には、サーバ装置30の駆動に必要な各種のプログラムが記録されている。また、ROM/RAM320は、各種の処理が実行される際のワークエリアとして用いられる。
 記録装置330は、HDD(Hard Disc  Drive)、又は、SSD(Solid State Drive)により構成される。そして、記録装置330は、少なくとも、依頼主管理DB331と、施工業者管理DB332と、施工履歴DB333と、報告書DB334と、資格管理DB335と、を有している。なお、例えば、本実施形態の記録装置330は、本発明のデータベースを構成する。
 依頼主管理DB331は、施工発注代行サービスの依頼主(サービス利用ユーザ)を管理するための各種情報がデータとして登録されるデータベースである。例えば、依頼主管理DB331には、図3に示すように、
(1)各依頼主に割り当てられた依頼主IDと、
(2)当該依頼主の氏名又は名称、住所又は所在地、電話番号、電子メールアドレス及び決済情報を少なくとも含む依頼主属性情報と、
(3)当該依頼主による過去の依頼履歴を示す依頼履歴情報と、
が対応付けて登録される。
 例えば、図3に例示する場合には、依頼主ID「U001」と対応付けて、依頼者名「○○株式会社」、所在地「東京都・・・」、電話番号「03*****」、メールアドレス「**@○○.co.jp」、決済情報「○○銀行普通**」なる依頼主属性情報が登録されており、依頼履歴情報として、依頼回数「10回」、施工禁止業者「××電機」なる情報が登録されている。
 なお、この依頼主管理DB331には、初回の施工依頼時にこれらの情報が登録されるようにしてもよい。ただし、本実施形態においては、データの管理、登録を容易化するため、事前にユーザ登録を行うことによりこれらの情報が登録されるものとする。
 また、施工禁止業者は、過去の施工依頼における満足度が低いなど、依頼主が施工の発注を禁止した場合に個別に登録される情報であり、例えば、当該施工業者の名称等、サービスセンターSCにおいて、当該施工業者を特定可能な情報が登録される。
 さらに、依頼履歴情報には、現場住所、過去に依頼した施工作業を受注した施工業者、そのときの施工料金、施工日時、施工作業の内容など種々の情報が記録されていてもよい。
 施工業者管理DB332は、各施工業者を管理するための情報がデータとして登録されるDBである。例えば、施工業者管理DB332には、図4に示すように、
(1)各施工業者を識別するための施工業者IDと、
(2)当該施工業者の名称、所在地、電話番号、メールアドレス等の情報を含む施工業者属性情報と、
(3)当該施工業者に対応する資格情報と、
が対応付けて登録される。
 また、資格情報には、
(a)当該施工業者が保有している国家資格等(以下、「資格等」という。)を示す技能情報と、
(b)当該施工業者の過去の受注率を示す受注率情報と、
(c)当該施工業者が施工を受任可能な日程を示す受任可能期間と、
(d)当該施工業者が過去に行った施工に対する依頼主の評価を示す評価情報と、
が含まれる。
 特に、資格情報には、(a)~(d)の各情報の全てが必ず含まれる必要はなく、少なくとも(a)及び(c)の情報が含まれていればよい。
 また、評価情報は、過去の所定期間内に実施された施工に対する評価の平均値を用いてよく、過去所定期間中に行った施工に対する全ての評価を含むものであってもよい。ただし、本実施形態においては、施工業者の再教育等により、施工業者の能力が向上する可能性が高く、古い評価の有効性は低いものと見なせるため、一年以上前に実施された施工に対する評価情報は、原則として、評価情報には、含ませないようになっている。
 さらに、施工業者管理DB332に登録される施工業者属性情報及び技能情報は、施工業者を事前登録した際に、登録されるものである。
 一方、受注率とは、例えば、過去の施工において、選定された施工業者が、施工前の施工料金見積その他によって、実際に受注した割合を示すものであり、自動的に算出して登録されてもよいし、オペレータ用端末装置10の操作に基づいて登録されてもよい。
 なお、図4に、施工業者管理DB332に記録された各施工業者を管理するための情報を例示する。具体的には、図4は、施工業者ID「C001」が、「ABC電機」なる施工業者に対応したものとなっており、資格情報として、技能情報「電気施工士(二種)」、受注率「30%」、評価情報「☆☆☆」が登録された状態を示している。
 また、図4の例示においては、評価情報を、星の数で表現しているが、当該施工業者に対する依頼主の評価レベルを示す数字で表現してもよいし、「よい」、「普通」、「悪い」、の3段階にて評価するようにしてもよい。この評価情報は、依頼主が、施工完了後に当該実施された施工に対して事後的に行う評価に基づいて決定され、施工業者管理DB332に登録されている。
 さらに、依頼主が施工作業の実施を拒否したい施工業者、すなわち、施工作業を禁止する施工業者(以下、「施工禁止業者」)については、評価情報に含ませるようにしてもよい。ただし、本実施形態においては、データの管理を簡易化するため別途、施工禁止業者として依頼主管理DB331に登録し、施工業者ID、又は、施工業者名により評価情報と紐付けられるように構成されていてもよい。
 施工履歴DB333は、過去に実施された施工の施工履歴に関する情報をデータとして管理するためのDBである。例えば、施工履歴DB333には、図5に示すように、各施工作業に割り当てられた
(1)施工IDと、
(2)施工依頼情報と、
(3)当該施工の施工依頼日時と、
(4)作業履歴情報と、
が対応付けて登録される。
 特に、施工依頼情報には、依頼主の担当者の連絡先、現場住所、施工希望日時、施工作業内容及び施工種別などが含まれる。
 また、作業履歴情報は、施工業者用端末装置40を用いて作業員が行った現着報告及び作業完了報告に基づいて、
(a)現着報告日時と、
(b)現着時位置情報と、
(c)現着報告に対する照合結果と、
(d)作業完了報告日時と、
(e)完了時位置情報と、      
(f)作業完了報告に対する照合結果と、
(g)作業の状態を示す状態情報と、
 を含む。
 なお、照合結果とは、それぞれ、現着報告及び作業完了報告に付加された位置情報と、現場の所在地とが一致するか否かを示すものであり、状態情報は、当該施工が作業中であるか、完了済みであるかのステータスを示す情報である。特に、状態情報は、施工の発注後、施工完了報告がなされるまでの間「作業中」、完了報告を受けた時点で「完了」と、ステータスが変更される。
 例えば、図5には、施工ID「W001」、施工依頼情報「依頼1」により特定される施工について、作業員が「2013/02/01/12:00」に現着報告を行いつつ、その際の位置情報は、「N:36.626446、W:138.723444」で、現場所在地と一致し、作業完了報告が「2013/02/01/17:00」に「N:36.626446、W:138.723444」なる場所にて行われた場合のデータが示されている。
 報告書DB334は、施工業者用端末装置40から作業完了報告とともにアップロードされた報告書を構成するデータ(以下、「報告書データ」という。)を記録及びその管理を行うためのDBである。また、図6に示すように、各施工IDと対応付けて、報告書データが登録されている。
 例えば、図6には、施工ID「W001」により示される施工作業の所定のデータ形式を有する報告書データとして、「報告書1」なる情報が登録された例が示されている。また、例えば、各報告書のデータとしては、図7に示すように、現場名称、現場の住所、作業内容、作業日、各種の写真及び各写真に対するコメントの各情報が含まれるとともに、図7に示すような表示形式を規定するフォーマット情報も含む。
 なお、図7には、「ダウンライトのインバータ交換」を行う施工作業において、作業開始前の現場写真P1と、故障部品及び新規に取り付ける部品の写真P2及びP3と、作業完了後の現場写真P4と、が報告書に添付した例を示しており、各写真に対応するテキストコメントが記載された報告書データの例が示されている。
 また、報告書データは、施工業者用端末装置40において、Webサイト又はアプリケーションと連動して生成されアップロードされるようになっている。
 資格管理DB335は、施工の内容毎に、当該施工を実施するために必要な資格等を管理するためのDBである。例えば、資格管理DB335には、図8に示すように各施工内容と対応付けて、当該施工の実施に法律等が定めている資格名が対応付けて記録される。
 なお、図8に例示する場合には、施工内容毎に必須の資格名が登録されているが、例えば、資格名毎に実施可能な施工内容(作業内容)をフラグ等により特定できるようにしてもよい。
 サーバ管理制御部340は、主に中央演算処理装置(CPU)によって構成され、プログラムを実行することによって、サーバ装置30の各部を統合制御する。
 データ処理部350は、サーバ管理制御部340による制御の下、アプリケーションを実行することにより、通信制御部310及び記録装置330と連動し、各DBへのデータの登録及び更新を実行するDB管理制御部351と、施工業者推薦処理を実行する施工業者推薦部352と、施工料金の決済を行う決済処理部353を実現する。
 なお、例えば、本実施形態のDB管理制御部351は、本発明の記録管理手段と、施工依頼情報首都手段と、依頼情報取得手段と、現着報告取得手段と、作業完了報告取得手段と、報告書提供手段と、を構成し、施工業者推薦部352は、抽出手段、算出手段、選定手段及び情報提供手段を構成する。
 DB管理制御部351は、オペレータ用端末装置10、又は、依頼主の図示せぬ端末装置から取得された施工依頼情報の登録及び管理を実行するとともに、施工業者用端末装置40からの現着報告、作業完了報告に基づく依頼主管理DB331、施工業者管理DB332、施工履歴DB333に対するデータの登録及び更新を行う。
 また、DB管理制御部351は、施工業者用端末装置40を用いて作業員によって作成された現着報告及び作業完了報告の各報告データを、Webサイトを介して又は電子メールによって受信すると、当該報告データに含まれる施工作業の施工IDを特定しつつ、当該施工IDと、当該報告データに含まれる報告書データと、を対応付けて、報告書DB334に登録させる現着報告及び作業完了報告の報告処理を実行する。
 例えば、図9に示すように、施工業者用端末装置40によって、現着時には、「現着」ボタンを選択し、作業完了時には、作業報告を入力し、現場写真を撮影して、「作業完了」ボタンを選択することにより、現着報告及び報告書データを含む作業完了報告の各種の報告データが送信されると、DB管理制御部351は、当該各種の報告データを受信し、受信した報告データに基づいて、施工履歴DB333及び管理報告書DB334を更新する。
 一方、DB管理制御部351は、オペレータ用端末装置10又は所定のWebサイトを介して依頼主が所定の施工作業の報告書データの閲覧を希望した場合には、施工履歴DB333及び管理報告書DB334に記録された各種の情報に基づいて、所定の表示形式に従った画像データを生成し、オペレータ用端末装置10又は図示しない依頼主の通信端末装置に生成した画像データを提供する。
 例えば、オペレータ用端末装置10の指示の下に、該当する施工作業の作業完了報告の閲覧が指示されると、DB管理制御部351は、管理報告書DB334から該当する施工作業の各種の情報を読み出し、図10に示すような画像データDを生成し、該当するオペレータ用端末装置10に生成した画像データDを提供する。
 また、DB管理制御部351は、依頼主の図示しない通信端末装置の指示の下に、施工作業を担当した施工業者に対する評価を受け付け、依頼主による評価がなされた場合には、当該評価結果に基づいて、施工業者管理DB332の評価情報を更新する。
 施工業者推薦部352は、施工業者推薦処理を実行することによって、推薦情報を生成し、当該推薦情報をオペレータ用端末装置10又は図示しない施工主の通信端末装置に提供する。なお、本実施形態の施工業者推薦部352及び施工業者推薦処理については後述する。
 決済処理部353は、発注した施工の施工料金を算出して、決済に必要な処理を実行する。なお、決済処理部353は、ネットワーク20に決済専用のサーバ装置(図示しない)を設け、当該サーバ装置によって実現するようにしてもよし、当該決済専用のサーバ装置と連動して決済処理を実現してもよい。
 [2.2]施工業者推薦部
 施工業者推薦部352は、オペレータ用端末装置10によるオペレータの指示の下、施工業者推薦処理を実行するため、依頼された施工作業に必要となる技能を有し、スケジュール上、施工に着手可能な施工業者を抽出する施工業者抽出部352Aと、抽出された各施工業者に対応する優先度を算出する優先度算出部352Bと、算出された優先度に基づいて施工業者を選定する施工業者選定部352Cと、推薦情報を生成し、オペレータ用端末装置10に提供する推薦情報生成部352Dと、を有する。
 施工業者抽出部352Aは、オペレータ用端末装置10、又は、依頼主の端末装置から施工依頼情報を取得し、当該取得された施工依頼情報に含まれる施工内容に基づいて、資格管理DB335を検索し、依頼された施工作業に必要な資格を特定する。そして、施工業者抽出部352Aは、当該資格を検索キーとして、施工業者管理DB332を検索して、当該検索の結果、ヒットした全ての施工業者の施工業者IDを読み出して、ROM/RAM320に記録させる。
 また、施工業者抽出部352Aは、読み出した施工業者の中から工期が受注可能期間と合致する施工業者を選定し、ROM/RAM320に記録された施工業者IDを更新する。なお、このとき、ROM/RAM320には、依頼された施工を実施する技能を有し、スケジュール上、施工作業に作業可能な施工業者の施工業者IDのみが、記録された状態になる。
 優先度算出部352Bは、ROM/RAM320に記録された施工業者ID(すなわち、依頼された施工作業について作業可能な施工業者)に基づき施工業者属性情報を施工業者管理DB332から読み出し、施工依頼情報に含まれる現場位置と、施工業者の所在地と、の2点間の距離(以下、「2点間距離」という。)Xを算出して、例えば、(式1)にしたがって、優先度Pを算出する。
Figure JPOXMLDOC01-appb-M000001
 なお、(式1)において「A」、「B」及び「C」は、重み付けの係数を示し、「Y」は、評価情報を数値化した値を示す。また、「Z」は、受注率を示す。
 ただし、過去の依頼主の評価が高い施工業者の優先度Pが高くなるように設定すること、または、距離、すなわち、迅速に現着できる施工業者の優先度Pが高くなるように設定することなど、優先度Pの算出基準を時代や依頼主の要望に合わせて変更するため、「A」、「B」及び「C」は、任意に設定及び変更可能となっている。
 例えば、優先度算出部352Bは、
(1)現場からの距離が「20km」、評価が「☆☆☆」、受注率が「30%」の施工業者1と、
(2)距離が「5km」評価「☆☆」受注率「80%」の施工業者2と、
(3)現場からの距離が「30km」、評価が「☆☆☆☆」、受注率が「70%」の施工業者3と、
が存在する場合には、
(1)施工業者1の優先度:P1=A/20+3B+0.3C、
(2)施工業者2の優先度:P2=A/5+2B+0.8C、
(3)施工業者3の優先度:P3=A/30+4B+0.7C、
という演算式によって各優先度Pを算出する。
 なお、このとき、「A=80」、「B=10、「C=5」と設定するとP1=35.5、P2=40.0,P3=23.5、となり、施工業者2、施工業者1、施工業者3の順に優先度が高くなる。
 施工業者選定部352Cは、優先度算出部352Bによって算出され優先度に基づいて、ROM/RAM320に記録された所定の条件を具備する施工業者を選定する。具体的には、施工業者選定部352Cは、優先度に基づいて。所定の条件を具備する施工業者IDをROM/RAM320に記録された施工業者IDの中から特定して施工業者を選定する。
 例えば、施工業者選定部352Cは、所定の条件を具備する施工業者としては、最も優先度が最も高い施工業者IDを有する施工業者を設定し、所定の上位の優先度を有する施工業者(例えば、上位5業者)を選定し、又は、優先度が所定の閾値を超える施工業者を、推薦すべき施工業者として選定する。
 推薦情報生成部352Dは、選定された施工業者の施工業者IDと対応付けて施工業者管理DB332に登録された施工業者属性情報を読み出し、当該施工業者属性情報に基づいて、推薦情報を生成する。そして、推薦情報生成部352Dは、該当するオペレータ用端末装置10(すなわち、施工業者推薦処理を指示したオペレータ用端末装置10)に生成した推薦情報を提供する。
 なお、このとき、推薦情報生成部352Dは、施工禁止業者を依頼主管理DB331に基づいて特定し、推薦情報から除外するようになっている。
 [3]通信システムの動作
 次に、図11~図13を用いて本実施形態の通信システム1において実行される具体的な処理について説明する。
 [3.1]施工作業依頼時の動作
 まず、図11及び図12を用いて、本実施形態の通信システム1において実行される施工作業依頼時の処理について説明する。なお、図11は、本実施形態の通信システム1のサーバ装置30において、依頼主から施工の依頼がされた際に実行される推薦情報提供処理を示すフローチャートであり、図12は、施工業者用端末装置40において施工作業依頼時に印刷される作業指示書の一例を示す図である。
 本動作においては、各依頼主及び発注可能施工業者の各情報は、事前に登録されるとともに、依頼主管理DB331及び施工業者DB332に必要な情報が予め登録されているものとする。また、本動作においては、依頼主は、サービスセンターSCに電話、ファクシミリ、電子メールによって施工を依頼するか、又は、サービスセンターSCの開設するサイトの施工申し込みページにおいて、施工依頼を実行する。
 まず、DB管理制御部351は、オペレータ用端末装置10と連動し、又は、直接、通信制御部310を介して、依頼主から依頼された施工依頼情報を取得すると(ステップSa200)、取得した施工依頼情報がオペレータ用端末装置10から取得された依頼であるか、又は、依頼主の図示せぬ通信端末装置から直接取得した依頼であるかを判定する(ステップSa201)。
 このとき、DB管理制御部351は、施工依頼情報が依頼主の図示せぬ通信端末装置から直接取得されたものであると判定した場合には、ステップSa202の処理に移行する。また、DB管理制御部351は、施工依頼情報がオペレータ用端末装置10から取得された依頼であると判定した場合には、直接ステップSa203の処理に移行する。
 次いで、DB管理制御部351は、施工依頼情報が依頼主の図示せぬ通信端末装置から直接取得されたものであると判定した場合には、予め定められたオペレータ用端末装置10に当該施工依頼情報を、送信して(ステップSa202)、ステップSa203の処理に移行する。例えば、データ処理部350は、起動中であって待機中のオペレータ用端末装置10に施工依頼情報を送信する。
 次いで、DB管理制御部351は、受信した施工依頼情報に対して、施工IDを割り当てるとともに、タイマー360から施工依頼情報の取得日時を取得しつつ、当該施工の依頼主に対応する依頼主IDを特定する(ステップSa203)。
 なお、依頼主IDの特定方法については任意であり、例えば施工依頼情報に含まれる氏名等、又は、連絡先に基づいて依頼主管理DB331を検索するようにしてもよい。
 次いで、DB管理制御部351は、特定した依頼主IDに基づいて、依頼主管理DB331から当該依頼主の依頼主属性情報及び依頼履歴情報を読み出して取得し(ステップSa204)、ROM/RAM320に記録させる。
 次いで、DB管理制御部351は、割り当てた施工IDと、施工依頼情報とを対応付けて施工履歴DB333に記録させることにより、施工履歴DB333を更新する(ステップSa205)。
 このとき、DB管理制御部351は、タイマー360から現在日時を取得し、依頼日時として、施工履歴DB333に記録させる。また、このとき、DB管理制御部351は、状態情報のステータスを「作業中」に変更する。
 次いで、施工業者抽出部352Aは、施工依頼情報に基づいて、施工業者管理DB332を検索し、当該施工作業を実施する技能を有し、かつ、依頼主の希望日時にスケジュールの空いている施工業者を抽出する(ステップSa206)。
 特に、施工業者抽出部352Aは、施工依頼情報により示される施工を実施可能な資格を資格管理DBに基づいて特定しつつ、当該資格等を有する施工業者を施工業者管理DB332に登録済みの資格情報に基づいて、抽出する。
 次いで、施工業者選定部352Cは、依頼主管理DB331に登録された依頼履歴情報を参照しつつ、抽出した施工業者の中から施工禁止業者に対応する施工業者を除外する(ステップSa207)。
 次いで、施工業者選定部352Cは、施工業者選定部352Cに、抽出され、かつ、施工禁止業者が除外された施工業者の各々について優先度Pを算出させるとともに、各優先度Pについて所定の条件を具備する施工業者を特定する(ステップSa208)。具体的には、優先度算出部352Bは、施工依頼情報に含まれる現場住所と、施工業者の所在地に基づいて、二地点間の距離Xを算出し、所定の演算(例えば、(式1))に従って、優先度Pを算出する。また、例えば、施工業者選定部352Cは、所定の条件を具備する施工業者として、最上位の施工業者ID、最上位から所定数の施工業者ID又は一定の優先度以上の施工業者を特定する。
 次いで、推薦情報生成部352Dは、特定された施工業者の施工業者IDと対応付けて施工業者管理DB331に登録された施工業者属性情報を読み出して、当該施工業者属性情報に基づいて、推薦情報を生成する(ステップSa209)。
 最後に、推薦情報生成部352Dは、該当するオペレータ用端末装置10又は依頼主の図示しない通信端末装置に生成した推薦情報を供給して(ステップSa210)、本動作を終了する。
 なお、オペレータ用端末装置10は、推薦情報を受信すると、オペレータの操作に基づいて、推薦された施工業者を、また、複数の推薦された施工業者の中から一の施工業者を選択すると、施工依頼情報及び現場の周辺地図に対応するURL、又は、これらの内容を有するバーコードを施工作業情報として施工業者用端末装置40に送信し、見積の発行依頼及び見積の承認後の施工作業の発注を行う。
 また、施工作業の発注時には、オペレータ用端末装置10は、該当する施工業者用端末装置(すなわち、発注先の施工業者用端末装置)40のアプリケーションと連動して、又は、該当する施工業者用端末装置40が受信可能に電子メールによって、現場住所を含む現場周辺の地図を表示するためのURLを含む施工作業情報を、施工業者用端末装置40において施工業者の作業員に閲覧可能に配信する。
 さらに、施工業者用端末装置40は、所定のアプリケーションを用いて受信した施工作業情報を作業員に通知すること、報告処理を実行する際のアプリケーションに対応付けて内部に登録すること、及び、例えば、図12に示すような作業指示書として、携帯型のプリンタによって紙面に出力することができるようになっている。特に、紙面に出力された作業指示書は、当該施工作業を特定するためのバーコードを有し、現着報告及び作業完了報告を行う際に用いることができるようになっている。
 [3.2]現着及び作業完了報告時の動作
 次に、図13を用いて本実施形態の施工業者用端末装置10及びサーバ装置30において実行される現着報告及び作業完了報告を含む報告処理について説明する。なお、図13は、本実施形態の施工業者用端末装置10及びサーバ装置30において実行される現着報告及び作業完了報告を含む報告処理を示すフローチャートである。また、この処理に先立って、複数の作業依頼が実行されるとともに、所定の情報が各データベースに登録されているものとする。
 まず、施工業者用端末装置40は、施工業者の作業員の報告指示を検出すると(ステップSb100)、当該作業員の操作を検出しつつ、施工作業を特定するための施工IDを取得する(ステップSb101)。
 例えば、施工業者用端末装置40は、施工業者用端末装置40のカメラ機能を起動させるとともに、上述のように紙面に出力された作業指示書のバーコードを取得して画像解析し、施工IDを特定する。また、施工業者用端末装置40は、所定のアプリケーションを起動してオペレータ用端末装置10から送信されて内部に登録した施工作業情報に基づいて、施工IDを特定する。
 次いで、施工業者用端末装置40は、特定した施工IDに基づいて、当該施工作業の報告(すなわち、現着報告及び作業完了報告)を実行するための表示(すなわち、作業員の入力を促すための表示)をするためであって、かつ、サーバ装置30に報告データを送信するためのリソースデータ(以下、「報告データ送信用リソースデータ」という。)を取得する(ステップSb102)。
 なお、施工業者用端末装置40は、所定のアプリケーションによって施工IDに基づいて報告データ送信用リソースデータを生成してもよいし、サーバ装置30と連動しつつ、特定した施工IDに基づいて、URLなど現着報告及び作業完了報告を行うためのWebページを特定して当該報告データ送信用リソースデータを取得してもよい。
 次いで、施工業者用端末装置40は、取得したリソースデータに基づいて、例えば、図9に示すような所定の画像(以下、「報告データ作成用画像」という。)を表示して、作業員による入力操作を待機する(ステップSb103)。
 次いで、施工業者用端末装置40は、作業員の操作入力を検出すると(ステップS104)、GPS信号を受信して現在地に対応する位置情報を生成するとともに(ステップSb105)、当該位置情報を付加した現着報告、又は、作業完了報告を示す報告データを送信して(ステップSb106)、本動作を終了する。
 なお、施工業者用端末装置40は、作業完了報告時には、コメント入力、及び、カメラ機能による現場の撮像を促し、コメント及び現場の画像を取得する。そして、施工業者用端末装置40は、取得したコメント及び画像に基づいて、所定のデータフォーマットにおける報告書データを作成し、当該生成した報告書データを添付した報告データを送信する。ただし、現着報告時にコメント及び現場の画像を取得して報告データに添付してもよい。
 また、施工業者用端末装置40は、作業完了報告時に、後日に決算処理を行うか又は作業完了時に行うかを示す決算情報を報告データに添付してもよい。この場合には、施工業者用端末装置40は、依頼主又はその担当者に決済方法を選択させて、依頼主によって指示された支払い方法を決算情報として報告データに添付する。また、施工業者用端末装置40は、部品又は部材交換などの施工作業において新規の部品又は部材の費用が生じた場合には、作業員の入力に基づいて、当該追加費用に関するデータが報告データに添付される。
 一方、サーバ装置30においては、通信制御部310が、施工業者用端末装置40によって送信された報告データを受信すると(ステップSb200)、DB管理制御部351は、タイマー360から受信日時を取得し(ステップSb201)、当該受信した報告データによって示される報告が現着報告であるか作業完了報告であるかを判定する(ステップSb202)。
 次いで、DB管理制御部351は、受信した報告データによって示される報告が現着報告であると判定した場合には、施工履歴DB333に、現着日時及び位置情報(すなわち、現着位置情報)を記録させて(ステップSb203)、本動作を終了する。
 なお、このとき、DB管理制御部351は、報告に付加された位置情報と現場住所を比較して照合結果を取得し、その結果を施工履歴DB333に登録させる。また、DB管理制御部351は、報告データにコメント又は画像が添付されている場合には、各種のデータを施工履歴DB333に登録させてもよい。
 一方、DB管理制御部351は、受信した報告データによって示される報告が作業完了報告であると判定した場合には、当該完了報告に対応する施工IDを特定し、受信日時及び報告データに含まれる位置情報に基づいて、施工履歴DB333の各情報を更新しつつ、報告データに添付された報告書データを施工IDと対応付けて報告書DB334に記録させる(ステップSb204)。
 具体的には、施工履歴DB333の更新については、DB管理制御部351は、受信日時を作業完了日時として施工履歴DB333に記録するとともに、報告データに付加された位置情報と現場住所を比較して照合結果を取得し、その結果を施工履歴DB333に記録する。また、DB管理制御部351は、施工履歴DB334の状態情報のステータスを「完了」に変更する。
 次いで、決済処理部353は、図示しない見積データと施工IDとが対応付けられたデータベースから見積データを取得し、又は、現着日時から、作業完了までに要した時間数(工数)を算出し、施工料金の算出処理を実行する(ステップSb205)。なお、決済処理部353は、部品代などの追加費用が発生している場合には、報告データに添付された追加費用に関する情報に基づいて追加費用を含めた施工料金を算出する。
 なお、追加料金については、報告書データに記載された情報に基づいて、オペレータの手動によって決定されてもよいし、当該報告書データと予め登録された部品などの追加料金データとに基づいて自動的に決定されてもよい。
 次いで、決済処理部353は、施工IDに基づいて、又は、報告データに添付された決算情報に基づいて、後日の決算処理か作業完了時の決算処理かを判定し(ステップS206)、後日の決算処理と判定した場合には、そのまま本動作を終了させる。ただし、決済処理部353は、後日の決算処理と判定した場合には、その旨を該当するオペレータ用端末装置10に通知する。
 一方、決済処理部353は、作業完了時の決算処理と判定した場合には、施工業者用端末装置40と連動し、クレジット決済など所定の決済処理を実行して(ステップSb207)、本動作を終了する。なお、本実施形態における決済処理は、従来と同様であるため、その詳細は、省略する。
 このように、本実施形態の通信システム1においては、依頼された施工作業を行う技能の無い施工業者、及び、スケジュール的に受注できない施工業者を除外しつつ、前記現場の位置から施工業者までの少なくとも2点間距離に基づいて迅速に施工作業を実行可能な施工業者の情報を、推薦情報として、当該施工業者の選定を希望する希望者に的確に提供することができる。
 したがって、本実施形態の通信システム1においては、オペレータ又は依頼主(担当者含む)などの施工業者の選定を希望する希望者に対して、依頼主の依頼に応じて迅速にかつ的確に施工作業が可能な施工業者を選定させることができるので、依頼主からの依頼に応じて施工作業の受発注を行う施工発注代行サービスの業務効率を向上させることができる。
 また、本実施形態の通信システム1においては、各施工業者が過去に行った施工に対する依頼主の評価(例えば、依頼主の満足度を点数評価したものなど)を施工業者の施工履歴としてデータベースに蓄積し、評価の高い施工業者を優先的に選定することができるので、依頼主における施工作業の満足度(すなわち、CS度)を向上させることができる。
 また、本実施形態の通信システム1においては、依頼主が、過去の依頼経験から、依頼を拒否したい施工業者を個別に指定すれば、当該施工業者に再度施工が発注されるような事態を未然に防止することができる。
 また、本実施形態の通信システム1においては、各施工業者が過去に受注状況に基づいて、例えば、施工業者と依頼主との信頼関係示す一つのバロメータとなる、施工業者において施工依頼に対する施工実績を示す受注率の高い施工業者を優先的に選出にすることができるので、施工作業の効率化及び依頼主にけるCS度の向上を図ることができる。
 また、本実施形態の通信システム1においては、例えば、過去の依頼主の評価が高い施工業者の優先度が高くなるように設定し、又は、距離に基づき迅速に現着できる施工業者の優先度が高くなるように設定する等、優先度の算出基準を施工の種別又は依頼主の要望に合わせて変更することができる。
 また、本実施形態の通信システム1においては、優先度の算出基準を依頼主の要望に合わせて変更することができる。
 また、本実施形態の通信システム1においては、2点間距離などによって一律に施工業者を判断することが難しい場合であっても、所定の条件を具備する施工作業を実行する施工業者の候補を絞ることができるので、多くの施工業者の中から依頼する施工業者を決める場合には比べて当該決定作業を容易に実行させることができる。
 また、本実施形態の通信システム1においては、最も適した施工業者に対して施工作業を依頼することができるので、施工発注代行サービスの業務効率を向上させることができる。
 また、本実施形態の通信システム1においては、例えば、依頼された施工が得意な施工業者を優先的に推薦すること、及び、緊急性を有する場合など施工依頼の状況に応じて対応可能な施工業者を優先的に推薦することができるので、より適切な施工業者を選定することができる。
 したがって、本実施形態の通信システム1においては、依頼主のCS度を向上させることができるとともに、種々の施工に対しても適用させることができる。
 [4]変形例
 [4.1]変形例1
 上記実施形態においては、サーバ装置30にて決済処理を実行する構成としたが、ネットワーク20に決済専用のサーバ装置を設け、当該サーバにおいて、決済処理を実行するようにしてもよい。
 [4.2]変形例2
 また、上記実施形態においては、サーバ装置30内に各種のDBを設け一元管理するようにしたが、各データベースの管理、制御主体となるコンピュータシステムは、各々、別個なコンピュータシステムによって稼働するようにしてもよい。この場合、各コンピュータシステムは、各々、異なる国に設置するようにしてもよい。
 [4.3]変形例3
 また、上記実施形態においては、物品の設置又は保守等を含む施工作業について、説明したが、本発明に係る情報提供装置等は、施設の清掃等にも適用することができる。この場合であっても、上記実施形態の通信システム1と同様の構成により実現可能である。
 [4.4]変形例4
 また、上記実施形態においては、報告書に作業内容のテキストと、画像データのみを含む報告書データを登録する構成としたが、報告書データに、施工作業にて交換した部品に関する情報として、型番や交換理由を記述するようにしてもよい。そして、依頼された施工作業が、設備のユーザ側の責任と考えられる場合と、設備の製造者、又は、管理者側の責任と考えられる場合と、に分けて、自動的に請求先を変更する構成とすることも可能である。
 [4.5]変形例5
 また、上記実施形態においては、優先度Pの算出方法として、(式1)を用いる例を示したが、評価情報を過去所定期間分、全て、DBに残す構成を採用する場合には、新しい評価と、古い評価と、を分けて、新しい評価の重みを大きくするようにすることも可能である。特に、評価に関しては、古い評価よりも新しい評価の方が有用性が高くなるので、優先度算出の精度を向上させることが可能となる。
 [4.6]変形例6
 また、上記実施形態の優先度算出部352Bにおいては、例えば(式1)を用いて、優先度Pを算出する際に、「距離」、「評価」、「受注率」の各項、すなわち、「AX」、「BY」、「CZ」について、「AX」が「80点」、「BY」が「50点」、「CZ」が「30点」というように上限値を設けるようにしてもよい。また、優先度算出部352Bは、(式1)に代えて(式2)に基づいて優先度Pを算出するようにしてもよい。
Figure JPOXMLDOC01-appb-M000002
 なお、(式2)において、「A」、「B」、「C」、「X」、「Z」は、上記(式1)と同様であり、a、b及びcは、変更可能な重み付け係数を示すとともに、y1=工期的な満足度(10点評価等)、y2=価格的満足度、y3=品質的満足度を示す。また「A」、「B」、「C」、「a」、「b」、「c」の6つの係数を各々可変にすれば、例えば、工期を優先する依頼主、値段を優先する依頼主、品質を優先する依頼主など、依頼主の事情を反映させつつ施工業者を選定することが可能となる。
 さらに、優先度算出部352Bは、「評価」については優先度Pの算出に用いずに、参考値としてのみオペレータ用端末装置10に表示するようにしてもよい。なお、このような参考値としては、過去に施工作業した作業件数の情報も含まれ、優先度算出部352Bは、当該作業件数も参考値としてオペレータ用端末装置10に表示するようにしてもよい。
 [4.7]変形例7
 また、上記実施形態においては、オペレータ用端末装置10と、サーバ装置を別個のコンピュータシステムとする構成を採用したが
、サーバ装置30に入力用のユーザインターフェースと、ディスプレイを設け、サーバ装置30単独にて、サービスセンターSCを統括管理するようにしてもよい。
 また、サービスセンターSCを海外に設け、サーバ装置30のみ国内にて運用するようにしてもよい。この場合、海外のサービスセンターSCにオペレータ用端末装置10のみを設け、ネットワーク20を介して国内のサーバ装置30とデータ通信を行うようにすればよい。
 [4.8]変形例8
 また、上記実施形態においては、施工業者毎に、資格情報や施工履歴を管理する構成を採用したが、作業員毎に、資格情報及び工事履歴を管理するようにしてもよい。
 [4.9]変形例9
 また、上記実施形態においては、技能情報に施工に必須の資格等に対応する情報のみを記録させるようにしたが、例えば、オプションの情報として、「LAN(Local Area Network)工事」、「分電、ブレーカー工事」、「インテリア工事」等、施工業者が得意な作業種別、又は、過去に施工経験が多い作業種別を技能情報に含ませるようにしてもよい。さらに、「24時間対応可能」等のサービス体制に関する情報を技能情報に含ませるようにしてもよい。
 [4.9]変形例9
 この構成を採用することにより、例えば、依頼された施工が得意な施工業者を優先的に推薦する等、より自由度の高い施工業者推薦を実現すること及びサービス体制を加味した施工業者の推薦を行うことが可能となる。
1 … 通信システム
10 … オペレータ用端末装置
20 … ネットワーク
30 … サーバ装置
40 … 施工業者用端末装置
310 … 通信制御部
320 … ROM/RAM
330 … 記録装置
331 … 依頼主管理DB
332 … 施工業者管理DB
333 … 施工履歴DB
334 … 報告書DB
335 … 資格管理DB
340 … サーバ管理制御部
350 … データ処理部
351 … DB管理制御部
352 … 施工業者推薦部
352A … 施工業者抽出部
352B … 優先度算出部
352C … 施工業者選定部
352D … 推薦情報生成部
353 … 決算処理部
360 … タイマー

Claims (25)

  1.  複数の施工業者の各々について当該施工業者の所在地及び名称を少なくとも含む施工業者属性情報と、当該施工業者が施工可能な作業種別を示す技能情報及び当該施工業者が施工作業を受注可能なスケジュールを示すスケジュール情報を少なくとも含む資格情報と、が対応付けて記録されるデータベースを管理する記録管理手段と、
     依頼主から前記施工作業が依頼された場合に、施工現場の位置、施工作業の内容を示す施工内容及びスケジュールを含む施工依頼情報を外部から取得する施工依頼情報取得手段と、
     前記取得された施工依頼情報により示される施工内容及びスケジュールと前記記録されている資格情報とに基づいて、当該依頼された施工作業を受注可能な前記施工業者を前記データベースから抽出する抽出手段と、
     前記現場の位置と前記施工業者属性情報に含まれる施工業者の所在地との2点間距離を少なくとも含む算定要素に基づいて、前記依頼された施工作業を受注可能な各施工業者の優先度を示す優先度情報を算出する算出手段と、
     前記算出された優先度に基づいて、少なくとも一の施工作業を受注可能な選定施工業者として、選定する選定手段と、
     前記選定した施工業者に関する情報を、推薦情報として、当該施工業者の選定を希望する希望者に閲覧可能に提供する情報提供手段と、
     を具備することを特徴とする情報提供装置。
  2.  請求項1に記載の情報提供装置であって、
     前記データベースには、前記資格情報及び前記施工業者属性情報と対応付けて、当該施工業者が過去に実施した施工に対する、前記依頼主の評価を示す評価情報が更に記録されており、
     前記算出手段が、前記2点間距離とともに前記評価情報を含む算定要素に基づいて前記優先度情報を算出する、情報提供装置。
  3.  請求項2に記載の情報提供装置であって、
     前記評価情報には、前記依頼主が、施工の発注を拒否する当該施工業者を示す拒否情報が含まれる、情報提供装置。
  4.  請求項1~3のいずれか1項に記載の情報提供装置であって、
     前記記録管理には、前記資格情報、及び、前記施工業者属性情報に対応付けて、前記選定された施工業者であって過去に施工作業を受注したことを示す受注情報又は当該受注情報に関連する受注関連情報が更に記録されており、
     前記算出手段が、前記優先度情報を算出する際に、前記2点間距離とともに前記受注情報又は前記受注関連情報を含む算定要素を用いる、情報提供装置。
  5.  請求項4に記載の情報提供装置であって、
     前記算出手段が、異なる前記算定要素に対して、それぞれ、所定の重み付けを行いつつ、前記優先度情報を算出する、情報提供装置。
  6.  請求項5に記載の情報提供装置であって、
     前記算出手段が、前記依頼主毎に、前記異なる算定要素の各々に対する重み付けの係数を変更しつつ、前記優先度情報を算出する、情報提供装置。
  7.  請求項1~6のいずれか1項に記載の情報提供装置であって、
     前記選定手段が、前記優先度が予め定められた条件を具備する複数の施工業者を、前記選定施工業者として選定する、情報提供装置。
  8.  請求項1~7のいずれか1項に記載の情報提供装置であって、
     前記選定手段が、前記優先度の最も高い施工業者を前記選定施工業者として選定する、情報提供装置。
  9.  請求項1~8のいずれか1項に記載の情報提供装置であって、
     前記技能情報には、当該施工業者の得意な作業、施工経験のある作業、及び、当該施工業者のサービス対応体制を示す情報の少なくともいずれかが含まれる、情報提供装置。
  10.  請求項1~9のいずれか1項に記載の情報提供装置と、
     前記推薦情報に基づいて選定された一の施工業者であって、前記施工作業を受注した受注施工業者の通信端末装置から当該施工業者が前記施工現場に到着したことを示す現着報告と、当該現着報告時の位置を示す現着位置情報と、を対応付けて取得する現着報告取得手段と、
     前記現着報告の取得日時を示す現着日時の情報を取得する現着日時情報取得手段と、
     前記現着得位置情報により示される現着位置と前記現場の所在地が一致するか否かを照合する現場位置情報照合手段と、
     前記取得された現着日時と前記現着位置の照合結果とに基づいて前記受注施工業者における施工作業の状況をデータ管理する管理手段と、
     を備えることを特徴とする施工業者管理装置。
  11.  請求項1~9のいずれか1項に記載の情報提供装置と、
     前記受注施工業者の通信端末装置から、当該施工作業が完了したことを示す作業完了報告を取得する作業完了報告取得手段と、
     前記作業完了報告の取得日時を示す作業完了日時の情報を取得する作業完了日時情報取得手段と、
     前記取得された作業完了日時に基づいて前記受注施工業者における施工作業の状況をデータ管理する管理手段と、
     を備えることを特徴とする施工業者管理装置。
  12.  請求項11に記載の施工業者管理装置であって、
     前記作業完了報告取得手段が、前記作業完了報告とともに、当該施工作業を実行した前記施工業者、又は、当該施工業者の作業員によって作成された作業報告書のデータを報告書データとして取得する、施工業者管理装置。
  13.  請求項12に記載の施工業者管理装置であって、
     前記報告書データには、現場にて撮影された画像を構成する画像データが少なくとも、含まれる、施工業者管理装置。
  14.  請求項13に記載の施工業者管理装置であって、
     前記画像データには、施工作業前の現場画像及び、施工作業後の現場画像の画像データが少なくとも含まれる、施工業者管理装置。
  15.  請求項13又は14に記載の施工業者管理装置であって、
     前記報告書データには、前記画像に対するコメントのデータが含まれる、施工業者管理装置。
  16.  請求項11~15のいずれか1項に記載の施工業者管理装置であって、
     前記報告書データが取得された場合に、当該報告書データをデータベースに記録するとともに、所定の通信端末装置からの要求に基づき、記録された報告書データの中から該当する報告書データを閲覧可能に提供する報告書提供手段をさらに備える、施工業者管理装置。
  17.  コンピュータを、
     複数の施工業者の各々について当該施工業者の所在地及び名称を少なくとも含む施工業者属性情報と、当該施工業者が施工可能な作業種別を示す技能情報及び当該施工業者が施工作業を受注可能なスケジュールを示すスケジュール情報を少なくとも含む資格情報と、が対応付けて記録されるデータベースを管理する記録管理手段、
     依頼主から前記施工作業が依頼された場合に、施工現場の位置、施工作業の内容を示す施工内容及びスケジュールを含む施工依頼情報を外部から取得する施工依頼情報取得手段、
     前記取得された施工依頼情報により示される施工内容及びスケジュールと前記記録されている資格情報とに基づいて、当該依頼された施工作業を受注可能な前記施工業者を前記データベースから抽出する抽出手段、
     前記現場の位置と前記施工業者属性情報に含まれる施工業者の所在地との2点間距離を少なくとも含む算定要素に基づいて、前記依頼された施工作業を受注可能な各施工業者の優先度を示す優先度情報を算出する算出手段、
     前記算出された優先度に基づいて、少なくとも一の施工作業を受注可能な前記施工業者を選定施工業者として、選定する選定手段、及び、
     前記選定した施工業者に関する情報を、推薦情報として、当該施工業者の選定を希望する希望者に閲覧可能に提供する情報提供手段、
     として機能させることを特徴とするプログラム。
  18.  請求項17に記載のプログラムであって、
     前記コンピュータを、
     前記推薦情報に基づいて選定された一の施工業者であって、前記施工作業を受注した受注施工業者の通信端末装置から当該施工業者が前記施工現場に到着したことを示す現着報告と、当該現着報告時の位置を示す現着位置情報と、を対応付けて取得する現着報告取得手段、
     前記現着報告の取得日時を示す現着日時の情報を取得する現着日時情報取得手段と、
     前記現着得位置情報により示される現着位置と前記現場の所在地が一致するか否かを照合する現場位置情報照合手段、及び、
     前記取得された現着日時と前記現着位置の照合結果とに基づいて前記受注施工業者における施工作業の状況をデータ管理する管理手段、
     として更に機能させる、プログラム。
  19.  請求項17に記載のプログラムであって、
     前記コンピュータを、
     前記受注施工業者の通信端末装置から、当該施工作業が完了したことを示す作業完了報告を取得する作業完了報告取得手段、
     前記作業完了報告の取得日時を示す作業完了日時の情報を取得する作業完了日時情報取得手段、及び、
     前記取得された作業完了日時に基づいて前記受注施工業者における施工作業の状況をデータ管理する管理手段、
     として更に機能させる、プログラム。
  20.  依頼主から施工作業が依頼された場合に、施工現場の位置、施工作業の内容を示す施工内容及びスケジュールを含む施工依頼情報を外部から取得する施工依頼情報取得ステップと、
     データベースに施工業者の所在地及び名称を少なくとも含む施工業者属性情報に対応付けて記録され、施工業者が施工可能な作業種別を示す技能情報及び当該施工業者が施工作業を受注可能なスケジュールを示すスケジュール情報を少なくとも含む資格情報と、前記取得された施工依頼情報により示される施工内容及びスケジュールと、に基づいて、当該依頼された施工作業を受注可能な前記施工業者を当該データベースから抽出する抽出ステップと、
     前記現場の位置と前記施工業者属性情報に含まれる施工業者の所在地との2点間距離を少なくとも含む算定要素に基づいて、前記依頼された施工作業を受注可能な各施工業者の優先度を示す優先度情報を算出する算出ステップと、
     前記算出された優先度に基づいて、少なくとも一の施工作業を受注可能な前記施工業者を選定施工業者として、選定する選定ステップと、
     前記選定した施工業者に関する情報を、推薦情報として、当該施工業者の選定を希望する希望者に閲覧可能に提供する情報提供ステップと、
     を含むことを特徴とする情報提供方法。
  21.  複数の通信端末装置と、
     前記通信端末装置に通信接続され、各種の情報を前記通信端末装置に提供するサーバ装置と、
     を備え、
     前記サーバ装置が、
      複数の施工業者の各々について当該施工業者の所在地及び名称を少なくとも含む施工業者属性情報と、当該施工業者が施工可能な作業種別を示す技能情報及び当該施工業者が施工作業を受注可能なスケジュールを示すスケジュール情報を少なくとも含む資格情報と、が対応付けて記録されるデータベースを管理する記録管理手段と、
      依頼主から前記施工作業が依頼された場合に、施工現場の位置、施工作業の内容を示す施工内容及びスケジュールを含む施工依頼情報を外部から取得する施工依頼情報取得手段と、
      前記取得された施工依頼情報により示される施工内容及びスケジュールと前記記録されている資格情報とに基づいて、当該依頼された施工作業を受注可能な前記施工業者を前記データベースから抽出する抽出手段と、
      前記現場の位置と前記施工業者属性情報に含まれる施工業者の所在地との2点間距離を少なくとも含む算定要素に基づいて、前記依頼された施工作業を受注可能な各施工業者の優先度を示す優先度情報を算出する算出手段と、
      前記算出された優先度に基づいて、少なくとも一の施工作業を受注可能な前記施工業者を選定施工業者として、選定する選定手段と、
      前記選定した施工業者に関する情報を、推薦情報として、当該施工業者の選定を希望する希望者に閲覧可能に提供する情報提供手段と、
     を具備することを特徴とする通信システム。
  22.  依頼主から施工作業が依頼された場合に、当該施工現場の位置、施工する作業の内容を示す施工内容及び工期を示す施工依頼情報を入力するための操作手段と、
     前記取得された施工依頼情報により示される施工内容及び工期に基づいて抽出された前記施工業者の中から、前記現場の位置と前記施工業者属性情報に含まれる施工業者の所在地との2点間距離を少なくとも含む算定要素に基づいて選定された少なくとも一の選定施工業者に関する情報を、推薦情報として取得する推薦情報取得手段と、
     前記取得された前記推薦情報に基づいて前記選定施工業者に関する情報を希望者に閲覧可能に提示する提示手段と、
    を有することを特徴とする情報提示装置。
  23.  請求項22記載の情報提示装置であって、
     前記選定施工業者の通信端末装置から当該施工業者が前記施工現場に到着したことを示す現着報告と、当該現着報告時の位置を示す現着位置情報と、を対応付けて取得する現着報告取得手段と、
     前記現着報告の取得日時を示す現着日時の情報を取得する現着日時情報取得手段と、
     前記現着得位置情報により示される現着位置と前記現場の所在地が一致するか否かを照合する現場位置情報照合手段と、
     前記取得された現着日時と前記現着位置の照合結果とに基づいて前記受注施工業者における施工作業の状況を管理するデータ管理手段と、を更に有し、
    前記提示手段が、前記管理手段によって管理される前記作業の状況及び前記照合結果を希望者に閲覧可能に提示する、情報提示装置。
  24.  請求項22に記載の情報提示装置であって、
     前記受注施選定施工業者の通信端末装置から、当該施工作業が完了したことを示す作業完了報告を取得する作業完了報告取得手段と、
     前記作業完了報告の取得日時を示す作業完了日時の情報を取得する作業完了日時情報取得手段と、
     前記取得された作業完了日時に基づいて前記受注施工業者における施工作業の状況をデータ管理する管理手段と、
    を更に有する、情報提示装置。
  25.  コンピュータを
     依頼主から施工を依頼された場合に、当該施工現場の位置、施工する作業の内容を示す施工内容及び工期を示す施工依頼情報を入力するための操作手段、
     前記取得された施工依頼情報により示される施工内容及び工期に基づいて、選出された前記施工業者から、前記現場の位置と前記施工業者属性情報に含まれる施工業者の所在地との2点間距離を少なくとも含む算定要素に基づいて、選出される少なくとも一の選定施工業者に関する情報を、推薦情報として取得する推薦情報取得手段、及び
     前記推薦情報取得手段によって取得された前記推薦情報に基づいて、前記選定施工業者に関する情報を希望者が閲覧可能に表示する情報提示手段、
    として機能させることを特徴とするプログラム。
     
     
     
PCT/JP2014/056187 2013-03-11 2014-03-10 情報提供装置、施工業者管理装置、情報提示装置、プログラム、通信システム及び情報提供方法 WO2014142077A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
SG11201507392WA SG11201507392WA (en) 2013-03-11 2014-03-10 Information provision device, constructor management apparatus, information presentation device, program, communication system, and information provision method
KR1020157025237A KR20150127103A (ko) 2013-03-11 2014-03-10 정보 제공장치, 시공업자 관리장치, 정보 제시장치, 프로그램, 통신 시스템 및 정보 제공방법

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-048540 2013-03-11
JP2013048540A JP5848276B2 (ja) 2013-03-11 2013-03-11 情報推薦提供装置、プログラム及び通信システム

Publications (1)

Publication Number Publication Date
WO2014142077A1 true WO2014142077A1 (ja) 2014-09-18

Family

ID=51536733

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/056187 WO2014142077A1 (ja) 2013-03-11 2014-03-10 情報提供装置、施工業者管理装置、情報提示装置、プログラム、通信システム及び情報提供方法

Country Status (4)

Country Link
JP (1) JP5848276B2 (ja)
KR (1) KR20150127103A (ja)
SG (1) SG11201507392WA (ja)
WO (1) WO2014142077A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109450090A (zh) * 2018-11-14 2019-03-08 遵义华正电缆桥架有限公司 一种缺处作业安全保护系统
JP2020091685A (ja) * 2018-12-06 2020-06-11 ヤフー株式会社 情報処理装置、情報処理方法、及び情報処理プログラム
JP2020091684A (ja) * 2018-12-06 2020-06-11 ヤフー株式会社 情報処理装置、情報処理方法、及び情報処理プログラム
WO2024095345A1 (ja) * 2022-10-31 2024-05-10 株式会社Fuji マッチングシステムおよびマッチング方法

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11138542B2 (en) 2016-03-09 2021-10-05 Nec Corporation Confirming field technician work based on photographic time and location device
KR102294420B1 (ko) * 2016-04-08 2021-08-26 (주) 아키드로우 부동산 정보 처리 장치 및 방법
KR102294418B1 (ko) * 2016-04-08 2021-08-26 (주) 아키드로우 부동산 정보 처리 장치 및 방법
KR102294419B1 (ko) * 2016-04-08 2021-08-26 (주) 아키드로우 부동산 정보 처리 장치 및 방법
JP7381373B2 (ja) 2019-07-09 2023-11-15 株式会社竹中工務店 管理システム、及び管理プログラム
JP7376284B2 (ja) * 2019-08-29 2023-11-08 パナソニックホームズ株式会社 サービス提供システム、及び、サービス提供方法
KR102356330B1 (ko) * 2019-10-04 2022-01-27 주식회사 야크솔루션 Qr코드를 이용한 건설공정 자동관리 시스템
JP2021117576A (ja) * 2020-01-23 2021-08-10 ナインアンドパートナーズ株式会社 情報処理装置、紹介情報作成方法
JP7354935B2 (ja) * 2020-06-08 2023-10-03 トヨタ自動車株式会社 制御装置、システム、及び判定方法
JP2022081319A (ja) * 2020-11-19 2022-05-31 株式会社丸菱製作所 検索システム

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001209740A (ja) * 2000-01-24 2001-08-03 Kyokuto Sanki Co Ltd 内外装工事受注・施工システム
JP2001357239A (ja) * 2000-06-15 2001-12-26 Knowledge & Intelligence:Kk 就職斡旋サーバおよび就職斡旋方法
JP2002133003A (ja) * 2000-10-27 2002-05-10 Toto Ltd 業者紹介システム及び方法
JP2003281402A (ja) * 2002-03-22 2003-10-03 Osaka Gas Co Ltd 出力方法、受発注システム、仲介装置及びコンピュータプログラム
JP2005266960A (ja) * 2004-03-16 2005-09-29 Chugoku Electric Power Co Inc:The 工事請負会社選定システム
JP2006209509A (ja) * 2005-01-28 2006-08-10 Nippon Telegr & Teleph Corp <Ntt> サービス要素切り替え方法およびプログラム
JP2008176421A (ja) * 2007-01-16 2008-07-31 Neomars Corporation Inc 工事仲介システム、プログラム及び方法
JP2008204403A (ja) * 2007-02-22 2008-09-04 Lanabake Co Ltd 工事業者選定システム
JP2012059209A (ja) * 2010-09-13 2012-03-22 Gir Co Ltd 住宅完成バックアップ方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5637347B2 (ja) * 2009-05-29 2014-12-10 健 坪井 顧客紹介支援システム

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001209740A (ja) * 2000-01-24 2001-08-03 Kyokuto Sanki Co Ltd 内外装工事受注・施工システム
JP2001357239A (ja) * 2000-06-15 2001-12-26 Knowledge & Intelligence:Kk 就職斡旋サーバおよび就職斡旋方法
JP2002133003A (ja) * 2000-10-27 2002-05-10 Toto Ltd 業者紹介システム及び方法
JP2003281402A (ja) * 2002-03-22 2003-10-03 Osaka Gas Co Ltd 出力方法、受発注システム、仲介装置及びコンピュータプログラム
JP2005266960A (ja) * 2004-03-16 2005-09-29 Chugoku Electric Power Co Inc:The 工事請負会社選定システム
JP2006209509A (ja) * 2005-01-28 2006-08-10 Nippon Telegr & Teleph Corp <Ntt> サービス要素切り替え方法およびプログラム
JP2008176421A (ja) * 2007-01-16 2008-07-31 Neomars Corporation Inc 工事仲介システム、プログラム及び方法
JP2008204403A (ja) * 2007-02-22 2008-09-04 Lanabake Co Ltd 工事業者選定システム
JP2012059209A (ja) * 2010-09-13 2012-03-22 Gir Co Ltd 住宅完成バックアップ方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109450090A (zh) * 2018-11-14 2019-03-08 遵义华正电缆桥架有限公司 一种缺处作业安全保护系统
JP2020091685A (ja) * 2018-12-06 2020-06-11 ヤフー株式会社 情報処理装置、情報処理方法、及び情報処理プログラム
JP2020091684A (ja) * 2018-12-06 2020-06-11 ヤフー株式会社 情報処理装置、情報処理方法、及び情報処理プログラム
WO2024095345A1 (ja) * 2022-10-31 2024-05-10 株式会社Fuji マッチングシステムおよびマッチング方法

Also Published As

Publication number Publication date
KR20150127103A (ko) 2015-11-16
SG11201507392WA (en) 2015-10-29
JP5848276B2 (ja) 2016-01-27
JP2014174852A (ja) 2014-09-22

Similar Documents

Publication Publication Date Title
JP5848276B2 (ja) 情報推薦提供装置、プログラム及び通信システム
US20210272051A1 (en) Asset communication hub
US20100257012A1 (en) Lead management system
JP6839521B2 (ja) プロジェクト進捗状況管理システム
KR102153938B1 (ko) 기계 시스템의 통합 거래 서비스 제공 서버 및 방법
JP5571351B2 (ja) 生産管理システム、その制御方法及びそのプログラム
JP6062086B1 (ja) 業務支援システム
KR20200136808A (ko) 제품의 유지보수 관리 시스템 및 방법
JP2018106336A (ja) 配送サービスシステム、サーバ装置及びプログラム
US20180322598A1 (en) Property management systems and method thereof
JP7463637B2 (ja) 報告支援サーバ、報告支援システム、報告支援方法、及び報告支援プログラム
US20130268388A1 (en) At home service quotation platform and method
JP2021163280A (ja) チラシ受発注仲介サーバ、チラシ発注支援サーバ及びチラシ受発注方法
JP2009238148A (ja) 動線情報を利用した広告表示システム
KR20170115219A (ko) 집수리 서비스 제공 방법 및 시스템
US20150120335A1 (en) Method and system for generating a quote
JP2007249684A (ja) 設備管理支援システム、設備管理支援方法及びプログラム
JP5981607B1 (ja) ガス設備作業管理システム
US20180150925A1 (en) Computer-based control of timing with which property review orders are processed
JPWO2013038905A1 (ja) 情報管理装置、ネットワークシステム、情報管理プログラム、および情報管理方法
WO2015194519A1 (ja) 販売価格算出装置および販売価格算出システム
KR20120028112A (ko) 휴대폰을 이용한 매매정보 서비스 방법 및 그 시스템
JP2007249683A (ja) 設備管理支援システム、設備管理支援方法及びプログラム
JP5689203B1 (ja) 設備メンテナンス管理システム、設備担当者端末、メンテナンス業者端末、および管理装置
US20210390493A1 (en) Intelligent work performance transaction engine

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14762261

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20157025237

Country of ref document: KR

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 14762261

Country of ref document: EP

Kind code of ref document: A1