WO2014125666A1 - 電線スプライス部の止水方法及び電線群整列装置 - Google Patents

電線スプライス部の止水方法及び電線群整列装置 Download PDF

Info

Publication number
WO2014125666A1
WO2014125666A1 PCT/JP2013/071610 JP2013071610W WO2014125666A1 WO 2014125666 A1 WO2014125666 A1 WO 2014125666A1 JP 2013071610 W JP2013071610 W JP 2013071610W WO 2014125666 A1 WO2014125666 A1 WO 2014125666A1
Authority
WO
WIPO (PCT)
Prior art keywords
wire group
pair
water stop
electric wire
parallel
Prior art date
Application number
PCT/JP2013/071610
Other languages
English (en)
French (fr)
Inventor
友彦 浅見
加藤 卓
康弘 吉田
Original Assignee
住友電装株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 住友電装株式会社 filed Critical 住友電装株式会社
Priority to US14/764,361 priority Critical patent/US20150364233A1/en
Priority to CN201380073121.2A priority patent/CN104995804B/zh
Publication of WO2014125666A1 publication Critical patent/WO2014125666A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/70Insulation of connections
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B17/00Insulators or insulating bodies characterised by their form
    • H01B17/50Insulators or insulating bodies characterised by their form with surfaces specially treated for preserving insulating properties, e.g. for protection against moisture, dirt, or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60RVEHICLES, VEHICLE FITTINGS, OR VEHICLE PARTS, NOT OTHERWISE PROVIDED FOR
    • B60R16/00Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for
    • B60R16/02Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements
    • B60R16/0207Wire harnesses
    • B60R16/0215Protecting, fastening and routing means therefor
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • H01B13/008Apparatus or processes specially adapted for manufacturing conductors or cables for manufacturing extensible conductors or cables
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • H01B13/06Insulating conductors or cables
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B19/00Apparatus or processes specially adapted for manufacturing insulators or insulating bodies
    • H01B19/02Drying; Impregnating
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B7/00Insulated conductors or cables characterised by their form
    • H01B7/17Protection against damage caused by external factors, e.g. sheaths or armouring
    • H01B7/28Protection against damage caused by moisture, corrosion, chemical attack or weather
    • H01B7/282Preventing penetration of fluid, e.g. water or humidity, into conductor or cable
    • H01B7/2825Preventing penetration of fluid, e.g. water or humidity, into conductor or cable using a water impermeable sheath
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B7/00Insulated conductors or cables characterised by their form
    • H01B7/17Protection against damage caused by external factors, e.g. sheaths or armouring
    • H01B7/28Protection against damage caused by moisture, corrosion, chemical attack or weather
    • H01B7/282Preventing penetration of fluid, e.g. water or humidity, into conductor or cable
    • H01B7/285Preventing penetration of fluid, e.g. water or humidity, into conductor or cable by completely or partially filling interstices in the cable
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R43/00Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors
    • H01R43/005Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors for making dustproof, splashproof, drip-proof, waterproof, or flameproof connection, coupling, or casing
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G15/00Cable fittings
    • H02G15/08Cable junctions
    • H02G15/18Cable junctions protected by sleeves, e.g. for communication cable
    • H02G15/1806Heat shrinkable sleeves
    • H02G15/1813Wraparound or slotted sleeves
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R13/00Details of coupling devices of the kinds covered by groups H01R12/70 or H01R24/00 - H01R33/00
    • H01R13/46Bases; Cases
    • H01R13/52Dustproof, splashproof, drip-proof, waterproof, or flameproof cases
    • H01R13/5216Dustproof, splashproof, drip-proof, waterproof, or flameproof cases characterised by the sealing material, e.g. gels or resins
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49002Electrical device making
    • Y10T29/49117Conductor or circuit manufacturing
    • Y10T29/49194Assembling elongated conductors, e.g., splicing, etc.
    • Y10T29/49195Assembling elongated conductors, e.g., splicing, etc. with end-to-end orienting
    • Y10T29/49197Assembling elongated conductors, e.g., splicing, etc. with end-to-end orienting including fluid evacuating or pressurizing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/53Means to assemble or disassemble
    • Y10T29/5313Means to assemble electrical device
    • Y10T29/532Conductor
    • Y10T29/53243Multiple, independent conductors

Definitions

  • the present invention relates to a method for water-stopping a splice portion of a wire group and a wire group aligning device suitable for use in the method.
  • a wire harness mounted on a vehicle typified by an automobile may have a splice part.
  • the splice portion is a portion where a plurality of conductors exposed from the insulating coating are joined together.
  • a splice part is formed in the intermediate part or edge part of the electric wire group containing a some insulated wire.
  • an insulated wire is simply referred to as an electric wire.
  • the splice part is formed by welding a plurality of conductors.
  • a splice part may be formed by crimping a plurality of conductors with a crimping fitting.
  • Patent Documents 1 and 2 the splice portion of the electric wire group is stopped by being covered with a synthetic resin.
  • the water stop part shown by patent document 1, 2 is the part which the fluid ultraviolet curing resin hardened
  • the ultraviolet curable resin is an example of a photo curable resin.
  • the water stop portion made of synthetic resin covers a region including from the splice portion in the electric wire group to the end portion of the insulating coating facing the splice portion.
  • this area is referred to as a water stop area.
  • the water stop portion of the wire harness fills the gaps between the plurality of electric wires in the insulating coating portion in the water stop region. This prevents liquid from entering the splice portion from the gaps between the plurality of electric wires.
  • the material of the water stop portion includes a photo-curing resin
  • the irradiation light does not reach the photo-curing resin that fills the gaps inside the bundled electric wires. If it does so, since it will flow out before hardening of photocuring resin, sufficient water stop performance cannot be obtained.
  • the fluid synthetic resin when the water stop portion covering the splice portion of the electric wire group is obtained by curing the fluid synthetic resin, the fluid synthetic resin easily spreads to the gaps between the plurality of insulated wires.
  • the purpose is to ensure sufficient water stopping performance.
  • the water splice method for the electric wire splice part according to the first aspect of the present invention includes a first clamping process, a swing process, a parallel maintaining process, and a water stop part forming process shown below.
  • the first clamping step the first covering portion at a position spaced from the end portion of the insulating coating facing the splice portion in the electric wire group is converted into a parallel pair of the pair of first sandwiching portions facing each other. This is a step of sandwiching between the first supporting surfaces.
  • the electric wire group includes a plurality of insulated wires, and includes the splice portion that is a portion where conductors of the insulated wires are joined.
  • the swinging step is a step of reciprocally displacing one of the pair of first sandwiching portions sandwiching the first covering portion with respect to the other in parallel to the first supporting surface.
  • the parallel maintaining step is a step of maintaining at least an end portion of the insulating coating in the electric wire group in a parallel state at the end of the swinging step.
  • the water stop portion forming step is a step of covering the water stop region in the wire group whose state is maintained by the parallel maintaining step with a fluid water stop material and further curing the water stop material. .
  • the water stop region is a region including from the splice part to the end of the insulating coating in the electric wire group.
  • the water stop method for the electric wire splice part according to the second aspect of the present invention is an aspect of the water stop method for the electric wire splice part according to the first aspect.
  • the parallel maintaining step includes a second clamping step, a clamping release step, and a moving step described below. (3-1)
  • the second clamping step the second covering portion of the wire group that has been clamped by the pair of first clamping portions through the swinging step is changed to a pair of second clamping portions facing each other. It is a step of sandwiching between a pair of second support surfaces parallel to the first support surface.
  • the second covering portion is a portion between the first covering portion and the water stop region in the electric wire group.
  • the clamping release step is a step of releasing the clamping by the first clamping unit after the second clamping step.
  • the wire group is moved to the position of the water stop portion forming step by moving the pair of second holding portions that hold the wire group after the holding release step. It is a process.
  • the method for water stopping the electric wire splice part according to the third aspect of the present invention is an aspect of the water stopping method for the electric wire splice part according to the first aspect or the second aspect.
  • the water stopping portion forming step includes a sheet attaching step, a water stopping material supplying step, a sheet wrapping step, and an exposure step as described below.
  • the sheet attaching step is a step of maintaining the water stop region of the electric wire group whose state is maintained by the parallel maintaining step in a state along the transparent sheet material.
  • the water-stopping material supply step is a step of supplying the fluidized water-stopping material containing a photocurable resin on the sheet material.
  • the sheet wrapping step includes the step of wrapping the water stop region of the wire group with the sheet material to which the water stop material is supplied to thereby provide a gap between the water stop region of the wire group and the sheet material. Is filled with the above-mentioned water-stopping material.
  • the exposure step is a step of irradiating the water stop material covering the water stop region of the wire group from the outside of the sheet material.
  • the water splice portion water stopping method according to the fourth aspect of the present invention is an aspect of the electric wire splice portion water stopping method according to any one of the first aspect to the third aspect.
  • the first clamping step, the swinging step, and the parallel maintaining step are performed in parallel at positions on both sides of the splice portion formed in an intermediate portion of the electric wire group. Done.
  • the wire group aligning device is a device that aligns the portions of the insulation coating in the wire group in a state where a plurality of insulated wires are arranged in a line.
  • the said electric wire group alignment apparatus is provided with each component shown below.
  • a 1st component is a pair of 1st clamping part in which a pair of parallel 1st supporting surface was formed.
  • the pair of first sandwiching portions sandwich the first covering portion at a position spaced from the end portion of the insulating coating facing the splice portion in the wire group between the pair of first supporting surfaces.
  • the second component is a swing mechanism that reciprocally displaces one of the pair of first sandwiching portions sandwiching the first covering portion with respect to the other in parallel with the first supporting surface. .
  • the electric wire group alignment device is an aspect of the electric wire group alignment device according to the fifth aspect.
  • the electric wire group alignment device further includes each component shown below.
  • a 3rd component is a pair of 2nd clamping part in which a pair of 2nd support surface parallel to the said 1st support surface was formed.
  • the pair of second sandwiching portions sandwich the second covering portion in the wire group sandwiched between the pair of first sandwiching portions between the pair of second supporting surfaces.
  • the second covering portion is a portion between the first covering portion and the end portion of the insulating coating in the electric wire group.
  • the fourth component is a moving mechanism that moves the pair of second clamping parts that clamp the wire group after the clamping by the first clamping part is released.
  • the first covering portion (insulating covering portion) close to the water stop region in the electric wire group is sandwiched between the pair of first sandwiching portions. Further, the pair of first sandwiching portions are reciprocally displaced in parallel with the supporting surface while the first covering portion is sandwiched.
  • the first covering portion is in a state where a plurality of insulated wires are stacked in an initial stage of being sandwiched between the pair of first sandwiching portions.
  • the state in which the insulated wires are stacked collapses.
  • the first covering portion is in a state (parallel state) in which all the insulated wires are arranged in parallel along the first supporting surface.
  • an electric wire group clamps the 2nd coating
  • fluctuation process) of aligning another electric wire group in a parallel state are carried out in parallel. Can be done. As a result, it is possible to efficiently manufacture a wire harness having a water stop portion that covers the splice portion.
  • the water stop part which covers a splice part is a part hardened
  • the photo-curing resin is used as a water-stopping material, a dead zone where the irradiated light does not reach easily occurs in the portion where the insulated wires are stacked.
  • the present invention is particularly suitable for application to such objects.
  • the present invention can also be applied to a so-called intermediate splice water-stopping treatment as in the fourth aspect.
  • FIG. 1 is a schematic perspective view of an electric wire group alignment apparatus 10 according to an embodiment of the present invention. It is a top view of an electric wire group. It is a top view of the electric wire group in which the water stop part was formed. It is a figure showing the 1st clamping process in the water stop method which concerns on embodiment of this invention. It is a figure showing the rocking
  • the electric wire group 90 is a part of a wire harness mounted on a vehicle such as an automobile.
  • the electric wire group 90 includes a plurality of electric wires 9 and further includes a splice portion 93.
  • the electric wire 9 is an insulated wire having a linear conductor 91 and an insulating coating 92 covering the periphery of the conductor 91.
  • the splice portion 93 is a portion where the conductors 91 of the plurality of electric wires 9 are joined.
  • the splice portion 93 a plurality of conductors 91 exposed from the insulating coating 92 are joined together.
  • the splice part 93 is formed at an intermediate part or an end part of the electric wire group 90. In the present embodiment, the splice part 93 is formed in the middle part of the wire group 90.
  • the joining of the conductors 91 is performed by, for example, resistance welding, ultrasonic welding, laser welding, or the like. Alternatively, the conductors 91 may be joined by crimping a crimping fitting.
  • the water stop portion 8 is formed in a predetermined region including the splice portion 93 in the wire group 90.
  • a region where the water stop portion 8 in the electric wire group 90 is formed is referred to as a water stop region 900.
  • the water stop region 900 is a region including at least the splice portion 93 to the covering end portion 94 in the electric wire group 90.
  • the covering end portion 94 is an end portion facing the splice portion 93 in the insulating covering 92. Accordingly, the water stop region 900 includes the splice portion 93 and the conductor 91 exposed from the insulating coating 92 next to the splice portion 93.
  • the water stop portion 8 includes a water stop material 81 and a sheet material 82.
  • the water stop material 81 is a synthetic resin member that covers the water stop region 900 of the wire group 90.
  • the sheet material 82 wraps the water stop material 81 in a state of being wound around the water stop region 900 from the outside of the water stop material 81.
  • the sheet material 82 prevents the fluidized water stop material 81 from flowing out. Further, the water stop material 81 and the sheet material 82 each made of a non-conductive material are also insulating coatings for the splice portion 93.
  • the water stop material 81 is obtained by curing the fluid synthetic resin supplied to the water stop region 900.
  • the water stop region 900 to which the fluid water stop material 81 is supplied is wrapped with the sheet material 82 before the synthetic resin is cured.
  • the gap between the water stop area 900 and the sheet material 82 is filled with the fluid water stop material 81. Then, the water stop part 8 is formed when the water stop material 81 hardens
  • a photo-curing resin is used as the water blocking material 81.
  • the sheet material 82 is a transparent film.
  • transparent means that light in a band necessary for curing the water stop material 81 can be transmitted.
  • the transparency said here includes both total transparency and semi-transparency.
  • first covering portion 95 a predetermined portion spaced apart from the covering end portion 94 facing the splice portion 83 in the electric wire group 90 is referred to as a first covering portion 95.
  • the first covering portion 95 is a portion other than the water stop region 900.
  • a predetermined portion between the first covering portion 95 and the water stop region 900 in the electric wire group 90 is referred to as a second covering portion 96.
  • An example of the first covering portion 95 and the second covering portion 96 is shown in FIG.
  • the wire group aligning device 10 is used in a pre-process of a step in which the water stop portion 8 that covers the splice portion 93 of the wire group 90 is formed.
  • FIG. 4 is a side view of the wire group aligning device 10 although it is a diagram showing the first clamping step in the water stopping method according to the embodiment of the present invention.
  • the wire group aligning device 10 is a device that aligns the portions of the insulation coating 92 in the wire group 90 having the splice portion 93 so that the plurality of wires 9 are arranged in a line. More specifically, the wire group aligning device 10 aligns the portions of the wire group 90 from the first covering portion 95 to the covering end portion 94 so that the plurality of wires 9 are arranged in a line.
  • the electric wire group aligning device 10 includes two sets of alignment mechanisms 1 and two sets of parallel maintaining mechanisms 2.
  • the electric wire group 90 set in the electric wire group arranging device 10 is drawn with a virtual line (two-dot chain line).
  • the alignment mechanism 1 includes a pair of first clamping parts 11, a first clamping actuator 12, a swing mechanism 13, and an electric wire support part 14. Further, the pair of first clamping parts 11 includes a first pressing part 111 and a first receiving part 112 that face each other.
  • the pair of first clamping portions 11 are members in which a pair of parallel first support surfaces 113 and 114 are formed.
  • each of the pair of first support surfaces 113 and 114 that is, each of the first support surface 113 of the first pressing portion 111 and the first support surface 114 of the first receiving portion 112 is a flat surface.
  • the first clamping actuator 12 is a displacement mechanism that changes the distance between the pair of first clamping parts 11, that is, the distance between the pair of first supporting surfaces 113 and 114. In the present embodiment, the first clamping actuator 12 moves the first pressing portion 111 toward and away from the first receiving portion 112.
  • the pair of first sandwiching portions 11 sandwich the first covering portion 95 of the wire group 90 between the pair of first support surfaces 113 and 114 by the action of the first sandwiching actuator 12. Further, the pair of first clamping parts 11 releases the clamping of the first covering part 95 of the wire group 90 by the action of the first clamping actuator 12.
  • the first clamping actuator 12 brings the first pressing portion 111 closer to the first receiving portion 112, the pair of first clamping portions 11 sandwich the first covering portion 95 of the wire group 90.
  • the first holding actuator 12 separates the first pressing portion 111 from the first receiving portion 112, the electric wire group 90 is released from being held by the pair of first holding portions 11.
  • the first clamping actuator 12 presses the first pressing portion 111 against the first receiving portion 112 side by elastic force. That is, the pair of first sandwiching portions 11 sandwich the first covering portion 95 by elastic force. Therefore, in a state where the pair of first sandwiching portions 11 sandwiches the first covering portion 95, the distance between the pair of first sandwiching portions 11 changes following the change in the thickness of the first covering portion 95.
  • the first clamping actuator 12 is an air cylinder type actuator. It is also conceivable that a spring mechanism (not shown) is incorporated in the first clamping actuator 12.
  • the wire support portion 14 is a portion that supports the wire group 90 together with the first receiving portion 112.
  • the electric wire support portion 14 mainly plays a role of supporting the electric wire group 90 before the electric wire group 90 is clamped by the pair of first clamping portions 11.
  • the Y-axis direction is the extending direction (longitudinal direction) of the electric wire group 90 disposed between the pair of first sandwiching portions 11.
  • the Z-axis direction is a direction in which the pair of first sandwiching portions 11 are relatively displaced in order to sandwich the wire group 90.
  • the Z-axis direction is a direction in which the first pressing portion 111 is displaced.
  • the X-axis direction is a direction orthogonal to the Y-axis direction and the Z-axis direction.
  • the pair of parallel first support surfaces 113 and 114 are planes along the X-axis direction and the Y-axis direction. Furthermore, the X-axis direction and the Y-axis direction are horizontal directions, and the Z-axis direction is a vertical direction.
  • the swing mechanism 13 is a mechanism for reciprocally displacing one of the pair of first sandwiching portions 11 sandwiching the first covering portion 95 of the electric wire group 90 in parallel to the first support surfaces 113 and 114 with respect to the other. .
  • the swing mechanism 13 in the present embodiment reciprocally displaces the first receiving portion 112 in a direction (X-axis direction) orthogonal to the extending direction of the wire group 90.
  • the swing mechanism 13 is configured by an air cylinder type actuator or the like.
  • the rocking mechanism 13 is reciprocally displaced by a displacement amount of about several millimeters to tens of millimeters.
  • the number of reciprocations at that time may be, for example, about 2 to 4 times.
  • the electric wire group alignment apparatus 10 provided with two sets of the alignment mechanisms 1 is used for the alignment process of the electric wire group 90 in which the splice part 93 is formed in the intermediate part.
  • One alignment mechanism 1 is configured such that one of the first covering portions 95 on both sides of the splice portion 93 in the wire group 90 is clamped by the pair of first clamping portions 11 and reciprocated by the first receiving portion 112 by the swing mechanism 13. Perform the action.
  • the other alignment mechanism 1 includes a first receiving portion by the pair of first holding portions 11 and the swing mechanism 13 in the other of the first covering portions 95 on both sides of the splice portion 93 in the wire group 90. 112 reciprocating operations are executed.
  • the two sets of alignment mechanisms 1 are processed in parallel at the positions on both sides of the splice portion 93.
  • the parallel maintaining mechanism 2 is a mechanism that maintains the region closer to the end portion 94 than the first covering portion 95 in the portion of the insulating coating 92 of the electric wire group 90 in the state at the end of the processing by the alignment mechanism 1 (parallel state). is there. Furthermore, the parallel maintaining mechanism 2 moves the wire group 90 to the position of the next process while maintaining the region closer to the end portion 94 than the first covering portion 95 in the state at the end of the processing by the alignment mechanism 1.
  • the parallel maintaining mechanism 2 includes a pair of second clamping portions 21, a second clamping actuator 22, a traversing actuator 23, and a lifting actuator 24. Further, the pair of second clamping parts 21 includes a second pressing part 211 and a second receiving part 212 that face each other.
  • the pair of second clamping parts 21 is a member in which a pair of parallel second supporting surfaces 213 and 214 are formed, and the pair of second supporting surfaces 213 and 214 are parallel to the pair of first supporting surfaces 113 and 114. This is a serious aspect.
  • the pair of second clamping parts 21 transfers the wire group 90 from the pair of first clamping parts 11.
  • the pair of second support surfaces 213 and 214 only need to be parallel to the pair of first support surfaces 113 and 114 at the time of delivery.
  • the second clamping actuator 22 changes the distance between the pair of second clamping parts 21, that is, the distance between the pair of second supporting surfaces 213 and 214, similarly to the first clamping actuator 12.
  • the second clamping actuator 22 causes the second pressing portion 211 to approach and separate from the second receiving portion 212.
  • the pair of second sandwiching portions 21 sandwich the second covering portion 96 of the wire group 90 between the pair of second supporting surfaces 213 and 214 by the action of the second sandwiching actuator 22. Further, the pair of second clamping parts 21 releases the clamping of the second covering part 96 of the wire group 90 by the action of the second clamping actuator 22.
  • the second clamping actuator 22 presses the second pressing portion 211 against the second receiving portion 212 side by an elastic force.
  • the electric wire group 90 is damaged due to the clamping force of the pair of second clamping parts 21 being too strong, or the electric wire group 90 is dropped due to the clamping force of the pair of second clamping parts 21 being too weak. Is prevented.
  • the traversing actuator 23 and the lifting / lowering actuator 24 are an example of a moving mechanism that moves the pair of second clamping parts 21.
  • the traversing actuator 23 moves the pair of second clamping parts 21 in a direction (X-axis direction) parallel to the direction of reciprocal displacement by the swing mechanism 13.
  • the elevating actuator 24 moves the pair of second clamping parts 21 in a direction intersecting the reciprocating displacement direction by the swing mechanism 13.
  • the elevating actuator 24 moves the pair of second clamping parts 21 in a direction (Z-axis direction) orthogonal to the direction of reciprocal displacement by the swing mechanism 13.
  • the traversing actuator 23 and the lifting / lowering actuator 24 are located between the position of the second covering portion 96 in the electric wire group 90 held by the pair of second holding portions 21 and the position where the second covering portion 96 is to be disposed in the next step. Then, the pair of second clamping parts 21 is moved.
  • the next step is a step of forming the water stop portion 8 in the water stop region 900 of the wire group 90.
  • the traversing actuator 23 and the lifting actuator 24 are configured such that the pair of second clamping parts 21 is replaced with the second coating part 96 after the pair of first clamping parts 11 clamps the first coating part 95 of the wire group 90. Move to the position.
  • the transverse actuator 23 and the lift actuator 24 move the pair of second clamping parts 21 to the position of the second covering part 96 when the reciprocating displacement operation by the swing mechanism 13 is completed.
  • the traversing actuator 23 and the lifting actuator 24 move the pair of second clamping parts 21 after the wire group 90 is transferred from the pair of first clamping parts 11 to the pair of second clamping parts 21. At that time, the traversing actuator 23 and the lifting / lowering actuator 24 move the pair of second sandwiching portions 21 that sandwich the wire group 90 to move the wire group 90 to the position 7 in the water stop portion forming step.
  • the first clamping step is a step of clamping the first covering portion 95 of the wire group 90 between the pair of parallel first supporting surfaces 113 and 114 in the pair of first clamping portions 11. is there. This step is performed by the operation of the first clamping actuator 12. Further, this step is performed in a state where the wire group 90 is placed on the first receiving portion 112 and the wire support portion 14.
  • the first covering portion 95 may be in a state where a plurality of electric wires 9 are stacked in an initial stage of being sandwiched between the pair of first sandwiching portions 11.
  • the pair of first clamping portions 11 are reciprocally displaced in parallel with the first supporting surfaces 113 and 114 while the first covering portion 95 is sandwiched.
  • the state in which the electric wires 9 are stacked collapses.
  • the first covering portion 95 is in a state (parallel state) in which all the electric wires 9 are arranged in parallel along the first supporting surfaces 113 and 114.
  • one of the pair of first supporting surfaces 113 and 114 is made of a material having a larger coefficient of friction with respect to the electric wire 9 than the other in order for the swinging process to function effectively.
  • the first support surface 113 of the first pressing portion 111 is a smooth metal surface
  • the first support surface 114 of the first receiving portion 112 is a surface of a member made of a rubber material such as an elastomer.
  • the pair of first clamping portions 11 is connected to the wire group 90. What is necessary is just to continue clamping the 1st coating
  • the wire group 90 that has undergone the swing process is quickly moved to the next process location.
  • the wire group 90 that has undergone the swing process is quickly moved to the next process location.
  • the step of moving the pair of second clamping portions 21 to the position of the second covering portion 96 is performed by the operation of the traversing actuator 23 and the lifting actuator 24. Further, the step of sandwiching the second covering portion 96 by the pair of second sandwiching portions 21 is performed by the operation of the second sandwiching actuator 22.
  • the clamping release process is a process of releasing the clamping of the first covering part 95 by the first clamping part 11 after the second clamping process. This step is performed by the operation of the first clamping actuator 12.
  • a movement process is a process of moving the electric wire group 90 to the position 7 of a water stop part formation process by moving a pair of 2nd clamping part 21 which clamps the electric wire group 90 after a clamping cancellation
  • the water stop part forming step is a step of covering the water stop region 900 in the wire group 90 maintained in the parallel state by the parallel maintaining step with the fluid water stop material 81 and further curing the water stop material 81.
  • the water stop forming step includes a sheet attaching step, a water stop material supplying step, a sheet wrapping step, and an exposure step.
  • a case where the water stopping material supply process is performed before the sheet attaching process and a case where the water stopping material supply process is performed after the sheet attaching process are considered.
  • the former case is referred to as a first example, and the latter case is referred to as a second example.
  • a water-stopping material supply step is first performed.
  • the fluidized water-stopping material 81 containing the photo-curing resin is supplied to a position where the water-stopping region 900 is to be disposed on the transparent sheet material 82.
  • the sheet attaching step is a step of maintaining the water stop region 900 of the wire group 90 maintained in the parallel state by the parallel maintaining step in a state along the transparent sheet material 82.
  • the water stop region 900 is formed in the sheet material 82 such that a part of the splice portion 93 is immersed in the water stop material 81 on the sheet material 82 supplied in the water stop material supply process. Along the top.
  • the fluidized water-stopping material 81 containing the photo-curing resin is a portion where the water-stopping region 900 is disposed on the transparent sheet material 82. In particular, it is supplied to the part where the splice part 93 is arranged.
  • the water-stopping material 81 has a fluidity that can flow between the electric wires 9 in the water-stopping region 900 and a fluid state that has a viscosity that can maintain the supplied state to some extent. It is.
  • the water stop material 81 various curable resins that can be cured after being applied in a fluid state having fluidity and viscosity as described above are used.
  • a photo-curing resin is used as the curable resin for the water stop material 81.
  • a typical example of the photocurable resin is an ultraviolet curable resin.
  • the ultraviolet curable resin is, for example, a synthetic resin having a photoinitiator and having an acrylate oligomer such as urethane acrylate, silicone acrylate, and epoxy acrylate and an acrylate monomer as a main composition. From the viewpoint of forming the water stop portion 8 by curing the water stop material 81 in a short time, it is preferable to use a photocurable resin (usually an ultraviolet curable resin).
  • the present embodiment is an example in which an ultraviolet curable resin is used as the water stop material 81.
  • a sheet wrapping process is performed after the sheet attaching process and the water stop material supplying process.
  • the sheet wrapping step is a step of wrapping the water stop region 900 of the wire group 90 with the sheet material 82 supplied with the water stop material 81.
  • the gap between the water stop region 900 and the sheet material 82 is filled with the fluid water stop material 81.
  • the sheet material 82 is wound around the splice portion 93 and the water stop material 81 after being folded in half. Thereby, the splice part 93 and the fluidized water stop material 81 are wrapped by the sheet material 82.
  • the method of wrapping the splice 93 and the water stop material 81 with the sheet material 82 is not limited to this.
  • the specific example of the method and apparatus which wraps the splice part 93 and the water stop material 81 with the sheet material 82 is shown by patent document 2, etc., for example.
  • the fluidized water-stopping material 81 fills the gap between the water-stopping region 900 and the sheet material 82 and covers the periphery of the water-stopping region 900. Further, the water stop material 81 is easily spread between the plurality of electric wires 9 due to the pressure received from the sheet material 82.
  • the exposure process is performed after the sheet wrapping process.
  • the exposure step is a step of irradiating light from the outside of the sheet material 82 to the water stop material 81 that covers the water stop region of the wire group 90.
  • the water stop material 81 wound around the sheet material 82 is exposed to the output light of the exposure apparatus 6.
  • the water blocking material 81 includes an ultraviolet curable resin
  • ultraviolet light ultraviolet light (ultraviolet light) is irradiated in the exposure process.
  • the exposure process is an example of a process for curing the fluid water stop material 81.
  • the first covering portion 95 close to the water stop region 900 in the electric wire group 90 is sandwiched between the pair of first sandwiching portions 11. Further, the pair of first sandwiching portions 11 are relatively reciprocally displaced in parallel with the first support surfaces 113 and 114 while the first covering portion 95 is sandwiched.
  • the electric wire group 90 includes a pair of second sandwiching portions that sandwich the second covering portion 96 closer to the splice portion 93 than the first covering portion 95 from the pair of first sandwiching portions 11 that sandwich the first covering portion 95. Passed to 21. Furthermore, the electric wire group 90 is moved to the position 7 in the water stop portion forming step while being held between the pair of second holding portions 21.
  • the portion from the second covering portion 96 to the covering end portion 94 in the electric wire group 90 is the portion of the swinging step. The parallel state at the end is maintained.
  • the water stop forming step for a certain wire group 90 and the step of aligning the other wire group 90 in a parallel state can be performed in parallel.
  • the water blocking material 81 in this embodiment is a portion cured by receiving light from the outside of the transparent sheet material 82 that encloses the fluid synthetic resin containing the photocuring resin.
  • the photo-curing resin is used as the water stop material 81, a dead zone where the irradiated light does not reach easily occurs in the portion where the electric wires 9 are stacked. Therefore, it is particularly preferable that the present embodiment is applied to such a target.
  • each of the pair of first support surfaces 113 and 114 is a flat surface.
  • each of the pair of first supporting surfaces 113 and 114 is an arc surface having a relatively small curvature.
  • the swing mechanism 13 reciprocates the first receiving portion 112 along the arc surface.
  • the curable resin for the water stop material 81 for example, a thermosetting resin such as an epoxy resin or an acrylic resin may be employed.
  • a moisture curable resin typified by moisture curable silicone may be employed.
  • the processing target is an electric wire group in which a splice portion 93 is formed at the end
  • one set of alignment mechanisms among the two sets of alignment mechanisms 1 and the two sets of parallel maintaining mechanisms 2 in the electric wire group alignment apparatus 10 One and one set of the parallel maintaining mechanism 2 may be omitted.
  • the parallel maintaining mechanism 2 in the electric wire group aligning device 10 may be realized by other mechanisms such as an arm mechanism of an industrial robot other than the mechanism shown in FIG.
  • the water splicing method and the wire group arranging device according to the present invention can be freely combined or implemented within the scope of the invention described in each claim. It is also possible to configure by modifying the form and application examples as appropriate or omitting some of them.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Electric Cables (AREA)
  • Processing Of Terminals (AREA)
  • Manufacturing Of Electrical Connectors (AREA)
  • Insulated Conductors (AREA)

Abstract

 目的は、電線群のスプライス部を覆う止水部が、流動状の合成樹脂の硬化によって得られる場合に、流動状の合成樹脂が複数の絶縁電線の間の隙間へ行き渡りやすくし、これにより十分な止水性能を確保することである。一対の第一挟持部は、電線群におけるスプライス部の第一被覆部を平行な一対の第一支面の間に挟み込む。揺動機構は、第一被覆部を挟み込んだ一対の第一挟持部のうちの一方を他方に対して第一支面に平行に往復変位させる。

Description

電線スプライス部の止水方法及び電線群整列装置
 本発明は、電線群のスプライス部を止水する方法及びその方法において用いられるのに好適な電線群整列装置に関する。
 自動車に代表される車両に搭載されるワイヤハーネスは、スプライス部を有する場合がある。スプライス部は、絶縁被覆から露出した複数の導体どうしが接合された部分である。スプライス部は、複数の絶縁電線を含む電線群の中間部又は端部に形成される。以下の説明において、絶縁電線のことを単に電線と称する。
 例えば、スプライス部は、複数の導体が溶接されることによって形成される。或いは、複数の導体が圧着金具で圧着されることによってスプライス部が形成される場合もある。
 特許文献1,2の示されるように、電線群のスプライス部は、合成樹脂で覆われることによって止水される。特許文献1,2に示される止水部は、流動状の紫外線硬化樹脂が硬化した部分である。なお、紫外線硬化樹脂は、光硬化樹脂の一例である。
 合成樹脂からなる止水部は、電線群におけるスプライス部からそのスプライス部に面する絶縁被覆の端部までを含む領域を覆う。以下、その領域のことを止水領域と称する。
特開2009-136039号公報 特開2012-080633号公報
 ワイヤハーネスの止水部は、止水領域における絶縁被覆の部分において、複数の電線の間の隙間を埋めている。これにより、液体が複数の電線の間の隙間からスプライス部へ浸入することが防がれる。
 しかしながら、多数の電線が束ねられている場合、流動状の合成樹脂が複数の電線の間の隙間へ十分に行き渡りにくい。そうすると、十分な止水性能が得られない。
 さらに、止水部の材料が光硬化樹脂を含む場合、照射光が、束ねられた電線における内部の隙間を埋める光硬化樹脂に届かない。そうすると、光硬化樹脂が硬化する前に流出するため、十分な止水性能が得られない。
 本発明は、電線群のスプライス部を覆う止水部が、流動状の合成樹脂の硬化によって得られる場合に、流動状の合成樹脂が複数の絶縁電線の間の隙間へ行き渡りやすくし、これにより十分な止水性能を確保することを目的とする。
 本発明の第1態様に係る電線スプライス部の止水方法は、以下に示される第一挟持工程、揺動工程、並列維持工程及び止水部形成工程を含む。
(1)上記第一挟持工程は、電線群におけるスプライス部に面する絶縁被覆の端部から間隔を隔てた位置の第一被覆部を、相互に対向する一対の第一挟持部における平行な一対の第一支面の間に挟み込む工程である。上記電線群は、複数の絶縁電線を含み、それら絶縁電線各々の導体が接合された部分である上記スプライス部を有する。
(2)上記揺動工程は、上記第一被覆部を挟み込んだ上記一対の第一挟持部のうちの一方を他方に対して上記第一支面に平行に往復変位させる工程である。
(3)上記並列維持工程は、上記電線群における少なくとも上記絶縁被覆の端部を上記揺動工程の終了時の並列状態に維持する工程である。
(4)上記止水部形成工程は、上記並列維持工程によって状態が維持された上記電線群における止水領域を流動状の止水材で覆い、さらに、その止水材を硬化させる工程である。上記止水領域は、上記電線群における上記スプライス部から上記絶縁被覆の端部までを含む領域である。
 本発明の第2態様に係る電線スプライス部の止水方法は、第1態様に係る電線スプライス部の止水方法の一態様である。第2態様に係る電線スプライス部の止水方法において、上記並列維持工程は、以下に示される第二挟持工程と挟持解除工程と移動工程とを含む。
(3-1)上記第二挟持工程は、上記揺動工程を経て上記一対の第一挟持部で挟持された上記電線群の第二被覆部を、相互に対向する一対の第二挟持部における上記第一支持面に平行な一対の第二支面の間に挟み込む工程である。上記第二被覆部は、上記電線群における上記第一被覆部と上記止水領域との間の部分である。
(3-2)上記挟持解除工程は、上記第二挟持工程の後に上記第一挟持部による挟持を解除する工程である。
(3-3)上記移動工程は、上記挟持解除工程の後に上記電線群を挟持する上記一対の第二挟持部を移動させることにより、上記電線群を上記止水部形成工程の位置へ移動させる工程である。
 本発明の第3態様に係る電線スプライス部の止水方法は、第1態様又は第2態様に係る電線スプライス部の止水方法の一態様である。第3態様に係る電線スプライス部の止水方法において、上記止水部形成工程は、以下に示されるシート添え工程と止水材供給工程とシート包み工程と露光工程とを含む。
(4-1)上記シート添え工程は、上記並列維持工程によって状態が維持された上記電線群の上記止水領域を透明のシート材の上に沿う状態に維持する工程である。
(4-2)上記止水材供給工程は、上記シート材の上に光硬化樹脂を含む流動状の上記止水材を供給する工程である。
(4-3)上記シート包み工程は、上記電線群の上記止水領域を上記止水材が供給された上記シート材で包むことにより上記電線群の上記止水領域と上記シート材との隙間を流動状の上記止水材で埋める工程である。
(4-4)上記露光工程は、上記電線群の上記止水領域を覆う上記止水材に上記シート材の外側から光を照射する工程である。
 本発明の第4態様に係る電線スプライス部の止水方法は、第1態様から第3態様のいずれかに係る電線スプライス部の止水方法の一態様である。第4態様に係る電線スプライス部の止水方法において、上記第一挟持工程、上記揺動工程及び上記並列維持工程は、上記電線群における中間部分に形成された上記スプライス部の両側の位置において並行して行われる。
 また、本発明は、上記の各態様における一挟持工程、揺動工程及び並列維持工程での使用に適した電線群整列装置の発明として捉えられてもよい。本発明の第5態様に係る電線群整列装置は、上記電線群における絶縁被覆の部分を複数の絶縁電線が一列に並ぶ状態に整列させる装置である。そして、上記電線群整列装置は、以下に示される各構成要素を備えている。
(1)第1の構成要素は、平行な一対の第一支面が形成された一対の第一挟持部である。これら一対の第一挟持部は、上記電線群における上記スプライス部に面する上記絶縁被覆の端部から間隔を隔てた位置の第一被覆部を上記一対の第一支面の間に挟み込む。
(2)第2の構成要素は、上記第一被覆部を挟み込んだ上記一対の第一挟持部のうちの一方を他方に対して上記第一支面に平行に往復変位させる揺動機構である。
 本発明の第6態様に係る電線群整列装置は、第5態様に係る電線群整列装置の一態様である。第6態様に係る電線群整列装置は、以下に示される各構成要素をさらに備える。
(3)第3の構成要素は、上記第一支持面に平行な一対の第二支面が形成された一対の第二挟持部である。これら一対の第二挟持部は、上記一対の第一挟持部で挟持された上記電線群における第二被覆部を上記一対の第二支面の間に挟み込む。上記第二被覆部は、上記電線群における上記第一被覆部と上記絶縁被覆の端部との間の部分である。
(4)第4の構成要素は、上記第一挟持部による挟持が解除された後に、上記電線群を挟持する上記一対の第二挟持部を移動させる移動機構である。
 上記の各態様によれば、電線群における止水領域に近い第一被覆部(絶縁被覆の部分)は、一対の第一挟持部の間に挟み込まれる。さらに、一対の第一挟持部は、第一被覆部を挟み込んだ状態のまま、支面に平行に相対的に往復変位する。
 第一被覆部は、一対の第一挟持部の間に挟み込まれた初期の段階において、複数の絶縁電線が積み重なった状態となっていることが考えられる。しかしながら、一対の第一挟持部が相対的に往復変位すると、絶縁電線が積み重なった状態が崩れる。その結果、第一被覆部は、全ての絶縁電線が第一支面に沿って並列に並んだ状態(並列状態)となる。
 全ての絶縁電線が積み重ならずに並列に並んだ並列状態においては、流動状の合成樹脂が流入しにくいデッドゾーンが生じにくい。即ち、流動状の合成樹脂が全ての絶縁電線の間の隙間へ行き渡りやすい。その結果、電線群のスプライス部を覆う止水部が、流動状の合成樹脂の硬化によって得られる場合に、十分な止水性能が確保される。
 また、上記の第2態様及び第6態様においては、電線群は、第一被覆部を挟持する一対の第一挟持部から、第一被覆部よりもスプライス部寄りの第二被覆部を挟持する一対の第二挟持部へ、受け渡される。さらに、電線群は、一対の第二挟持部で挟持されたまま、止水部形成工程の位置へ移動される。
 上記の第2態様及び第6態様によれば、止水部形成工程が、第一挟持工程の位置と異なる位置で行われる場合であっても、電線群における第二被覆部から絶縁被覆の端部までの部分は、揺動工程の終了時の並列状態に維持される。
 従って、上記の第2態様及び第6態様によれば、ある電線群に対する止水部形成工程と、他の電線群を並列状態に整列させる工程(第一挟持工程及び揺動工程)とを並行して行うことができる。その結果、スプライス部を覆う止水部を有するワイヤハーネスを効率的に製造することが可能となる。
 また、上記の第3態様においては、スプライス部を覆う止水部は、光硬化樹脂を含む流動状の止水材がそれを包む透明のシート材の外側から受光することによって硬化した部分である。光硬化樹脂が止水材として用いられる場合、絶縁電線が積み重なった部分において、照射された光が届かないデッドゾーンが生じやすい。本発明は、そのような対象への適用に特に好適である。
 また、本発明は、上記の第4態様のように、いわゆる中間スプライスの止水処理に適用することも可能である。
本発明の実施形態に係る電線群整列装置10の概略斜視図である。 電線群の平面図である。 止水部が形成された電線群の平面図である。 本発明の実施形態に係る止水方法における第一挟持工程を表す図である。 本発明の実施形態に係る止水方法における揺動工程を表す図である。 揺動工程の終了時の様子を表す図である。 本発明の実施形態に係る止水方法における第二挟持工程の途中の様子を表す図である。 第二挟持工程の終了時の様子を表す図である。 第二挟持工程における挟持部の位置関係を表す平面図である。 本発明の実施形態に係る止水方法における挟持解除工程を表す図である。 本発明の実施形態に係る止水方法における移動工程を表す図である。 本発明の実施形態に係る止水方法における止水材供給工程の第一例を表す図である。 本発明の実施形態に係る止水方法におけるシート添え工程の第一例を表す図である。 本発明の実施形態に係る止水方法におけるシート添え工程及び止水材供給工程の第二例を表す図である。 本発明の実施形態に係る止水方法におけるシート包み工程を表す図である。 本発明の実施形態に係る止水方法におけるシート包み工程を表す図である。 本発明の実施形態に係る止水方法における露光工程を表す図である。
 以下、添付の図面を参照しながら、本発明の実施形態について説明する。以下の実施形態は、本発明を具体化した一例であり、本発明の技術的範囲を限定する事例ではない。
 <電線群>
 まず、図2,3を参照しつつ、本発明の実施形態に係る電線スプライス部の止水方法において止水処理の対象となる電線群90について説明する。電線群90は、自動車などの車両に搭載されるワイヤハーネスの一部である。
 電線群90は、複数の電線9を含み、さらに、スプライス部93を有する。電線9は、線状の導体91とその導体91の周囲を覆う絶縁被覆92とを有する絶縁電線である。スプライス部93は、複数の電線9各々の導体91が接合された部分である。
 スプライス部93において、絶縁被覆92から露出した複数の導体91どうしが接合されている。スプライス部93は、電線群90の中間部又は端部に形成される。本実施形態においては、スプライス部93は、電線群90の中間部に形成されている。
 導体91どうしの接合は、例えば、抵抗溶接、超音波溶接、レーザ溶接等により行われる。或いは、導体91どうしの接合が、圧着金具の圧着により行われる場合もある。
 図3に示されるように、電線群90におけるスプライス部93を含む所定の領域には、止水部8が形成される。以下、電線群90における止水部8が形成される領域のことを止水領域900と称する。
 止水領域900は、電線群90における少なくともスプライス部93から被覆端部94までを含む領域である。被覆端部94は、絶縁被覆92におけるスプライス部93に面する端部である。従って、止水領域900は、スプライス部93及びスプライス部93の隣において絶縁被覆92から露出した導体91の全てを含む。
 止水部8は、止水材81とシート材82とを含む。止水材81は、電線群90の止水領域900を覆う合成樹脂の部材である。シート材82は、止水材81の外側から止水領域900に巻かれた状態で止水材81を包んでいる。
 シート材82は、流動状の止水材81の流出を防ぐ。また、それぞれ非導電性材料からなる止水材81及びシート材82は、スプライス部93の絶縁被覆でもある。
 止水材81は、止水領域900に供給された流動状の合成樹脂が硬化することによって得られる。流動状の止水材81が供給された止水領域900は、合成樹脂が硬化する前にシート材82で包まれる。
 止水領域900がシート材82で包まれることにより、止水領域900とシート材82との隙間が流動状の止水材81で埋まる。その後、止水材81が硬化することにより、止水部8が形成される。
 本実施形態においては、光硬化樹脂が止水材81として用いられる。この場合、シート材82は、透明のフィルムである。なお、透明とは、止水材81を硬化させるために必要な帯域の光が透過可能であることを意味する。また、ここで言う透明は、全透明及び半透明のいずれも含む。
 以下の説明において、電線群90におけるスプライス部83に面する被覆端部94から間隔を隔てた予め定められた部位のことを第一被覆部95と称する。第一被覆部95は、止水領域900以外の部分である。さらに、電線群90における第一被覆部95と止水領域900との間の予め定められた部位のことを第二被覆部96と称する。なお、第一被覆部95及び第二被覆部96の一例が図2に示されている。
 <電線群整列装置>
 続いて、図1,4を参照しつつ、本発明の実施形態に係る電線群整列装置10の構成について説明する。電線群整列装置10は、電線群90のスプライス部93を覆う止水部8が形成される工程の前工程で用いられる。
 なお、図4は、本発明の実施形態に係る止水方法における第一挟持工程を表す図であるが、電線群整列装置10の側面図でもある。
 電線群整列装置10は、スプライス部93を有する電線群90における絶縁被覆92の部分を、複数の電線9が一列に並ぶ状態に整列させる装置である。より具体的には、電線群整列装置10は、電線群90における第一被覆部95から被覆端部94までの部分を、複数の電線9が一列に並ぶ状態に整列させる。
 図1に示されるように、電線群整列装置10は、2組の整列機構1と、2組の並列維持機構2とを備えている。なお、図1において、電線群整列装置10にセットされた電線群90が仮想線(二点鎖線)で描かれている。
 <整列機構>
 また、整列機構1は、一対の第一挟持部11、第一挟持アクチュエータ12、揺動機構13及び電線支持部14を備えている。さらに、一対の第一挟持部11は、相互に対向する第一押さえ部111及び第一受け部112を含む。
 一対の第一挟持部11は、それぞれ平行な一対の第一支面113,114が形成された部材である。本実施形態においては、一対の第一支面113,114の各々、即ち、第一押さえ部111の第一支面113及び第一受け部112の第一支面114の各々は平面である。
 第一挟持アクチュエータ12は、一対の第一挟持部11の間隔、即ち、一対の第一支面113,114の間隔を変化させる変位機構である。本実施形態では、第一挟持アクチュエータ12は、第一押さえ部111を第一受け部112に対して接近及び離隔させる。
 一対の第一挟持部11は、第一挟持アクチュエータ12の作用により、電線群90の第一被覆部95を一対の第一支面113,114の間に挟み込む。さらに、一対の第一挟持部11は、第一挟持アクチュエータ12の作用により、電線群90の第一被覆部95の挟持を解除する。
 即ち、第一挟持アクチュエータ12が第一押さえ部111を第一受け部112に接近させることにより、一対の第一挟持部11が電線群90の第一被覆部95を挟み込む。第一挟持アクチュエータ12が第一押さえ部111を第一受け部112から離隔させることにより、一対の第一挟持部11により電線群90の挟持が解除される。
 また、第一挟持アクチュエータ12は、弾性力によって第一押さえ部111を第一受け部112側へ押し付ける。即ち、一対の第一挟持部11は、弾性力によって第一被覆部95を挟み込む。そのため、一対の第一挟持部11が第一被覆部95を挟み込んでいる状態において、一対の第一挟持部11の間隔は、第一被覆部95の厚みの変化に追従して変化する。
 第一押さえ部111に弾性力を作用させるために、第一挟持アクチュエータ12がエアシリンダタイプのアクチュエータであることが考えられる。また、不図示のバネ機構が第一挟持アクチュエータ12に組み込まれていることも考えられる。
 電線支持部14は、第一受け部112とともに電線群90を支持する部分である。電線支持部14は、主に電線群90が一対の第一挟持部11によって挟持される前において、電線群90を支持する役割を果たす。
 ここで、各図に示される座標軸におけるX軸、Y軸及びZ軸の各々の方向について説明する。Y軸方向は、一対の第一挟持部11の間に配置される電線群90の延伸方向(長手方向)である。Z軸方向は、一対の第一挟持部11が電線群90を挟み込むために相対的に変位する方向である。本実施形態においては、Z軸方向は第一押さえ部111が変位する方向である。また、X軸方向は、Y軸方向及びZ軸方向に直交する方向である。
 本実施形態においては、平行な一対の第一支面113,114は、X軸方向及びY軸方向に沿う平面である。さらに、X軸方向及びY軸方向は水平方向であり、Z軸方向は鉛直方向である。
 揺動機構13は、電線群90の第一被覆部95を挟み込んだ一対の第一挟持部11のうちの一方を他方に対して第一支面113,114に平行に往復変位させる機構である。本実施形態における揺動機構13は、第一受け部112を電線群90の延伸方向に直交する方向(X軸方向)に往復変位させる。
 揺動機構13はエアシリンダ式のアクチュエータなどによって構成される。例えば、揺動機構13は、数ミリメートルから十数ミリメートル程度の変位量で往復変位させる。その際の往復回数は、例えば、2回から4回程度であることが考えられる。
 2組の整列機構1を備える電線群整列装置10は、中間部分にスプライス部93が形成された電線群90の整列処理に用いられる。一方の整列機構1は、電線群90におけるスプライス部93の両側の第一被覆部95のうちの一方において、一対の第一挟持部11による挟持及び揺動機構13による第一受け部112の往復動作を実行する。同様に、他方の整列機構1は、電線群90におけるスプライス部93の両側の第一被覆部95のうちの他方において、一対の第一挟持部11による挟持及び揺動機構13による第一受け部112の往復動作を実行する。2組の整列機構1の処理は、スプライス部93の両側の位置において並行して行われる。
 <並列維持機構>
 並列維持機構2は、電線群90の絶縁被覆92の部分における第一被覆部95よりも端部94側の領域を、整列機構1による処理の終了時の状態(並列状態)に維持する機構である。さらに、並列維持機構2は、第一被覆部95よりも端部94側の領域を、整列機構1による処理の終了時の状態に維持しつつ、電線群90を次工程の位置へ移動させる。
 図1,4に示されるように、並列維持機構2は、一対の第二挟持部21、第二挟持アクチュエータ22、横行アクチュエータ23及び昇降アクチュエータ24を備えている。さらに、一対の第二挟持部21は、相互に対向する第二押さえ部211及び第二受け部212を含む。
 一対の第二挟持部21は、それぞれ平行な一対の第二支面213,214が形成された部材である一対の第二支面213,214は、一対の第一支面113,114に平行な面である。
 後述するように、一対の第二挟持部21は、一対の第一挟持部11から電線群90の受け渡しを行う。一対の第二支面213,214は、その受け渡しが行われる時点において、一対の第一支面113,114と平行になっていればよい。
 第二挟持アクチュエータ22は、第一挟持アクチュエータ12と同様に、一対の第二挟持部21の間隔、即ち、一対の第二支面213,214の間隔を変化させる。本実施形態では、第二挟持アクチュエータ22は、第二押さえ部211を第二受け部212に対して接近及び離隔させる。
 一対の第二挟持部21は、第二挟持アクチュエータ22の作用により、電線群90の第二被覆部96を一対の第二支面213,214の間に挟み込む。さらに、一対の第二挟持部21は、第二挟持アクチュエータ22の作用により、電線群90の第二被覆部96の挟持を解除する。
 また、第一挟持アクチュエータ12と同様に、第二挟持アクチュエータ22が、弾性力によって第二押さえ部211を第二受け部212側へ押し付けることが望ましい。これにより、一対の第二挟持部21の挟持力が強すぎることによって電線群90が破損したり、一対の第二挟持部21の挟持力が弱すぎることによって電線群90が脱落したりすることが防止される。
 横行アクチュエータ23及び昇降アクチュエータ24は、一対の第二挟持部21を移動させる移動機構の一例である。横行アクチュエータ23は、揺動機構13による往復変位の方向に平行な方向(X軸方向)において、一対の第二挟持部21を移動させる。
 一方、昇降アクチュエータ24は、揺動機構13による往復変位の方向に交差する方向において、一対の第二挟持部21を移動させる。本実施形態においては、昇降アクチュエータ24は、揺動機構13による往復変位の方向に直交する方向(Z軸方向)において、一対の第二挟持部21を移動させる。
 横行アクチュエータ23及び昇降アクチュエータ24は、一対の第二挟持部21で挟持された電線群90における第二被覆部96の位置と、次工程において第二被覆部96が配置されるべき位置との間で、一対の第二挟持部21を移動させる。なお、次工程は、電線群90の止水領域900に止水部8を形成する工程である。
 より具体的には、横行アクチュエータ23及び昇降アクチュエータ24は、一対の第一挟持部11が電線群90の第一被覆部95を挟持した後に、一対の第二挟持部21を第二被覆部96の位置へ移動させる。例えば、横行アクチュエータ23及び昇降アクチュエータ24は、揺動機構13による往復変位動作が終了したときに、一対の第二挟持部21を第二被覆部96の位置へ移動させる。
 さらに、横行アクチュエータ23及び昇降アクチュエータ24は、一対の第一挟持部11から一対の第二挟持部21への電線群90の受け渡しが行われた後に、一対の第二挟持部21を移動させる。その際、横行アクチュエータ23及び昇降アクチュエータ24は、電線群90を挟持する一対の第二挟持部21を移動させることにより、電線群90を止水部形成工程の位置7へ移動させる。
 <電線スプライス部の止水方法>
 次に、図4~17を参照しつつ、本発明の実施形態に係る電線スプライス部の止水方法について説明する。同止水方法においては、以下に示される各工程が行われる。
 <第一挟持工程>
 図4に示されるように、第一挟持工程は、電線群90の第一被覆部95を、一対の第一挟持部11における平行な一対の第一支面113,114の間に挟み込む工程である。本工程は、第一挟持アクチュエータ12の作動によって行われる。また、本工程は、電線群90が第一受け部112及び電線支持部14に載置された状態において行われる。
 図4に示されるように、第一被覆部95は、一対の第一挟持部11の間に挟み込まれた初期の段階において、複数の電線9が積み重なった状態となっている場合がある。
 <揺動工程>
 図5に示されるように、揺動工程は、第一被覆部95を挟み込んだ一対の第一挟持部11のうちの一方を他方に対して第一支面113,114に平行に往復変位させる工程である。本工程は、揺動機構13の作動によって行われる。
 揺動工程において、一対の第一挟持部11は、第一被覆部95を挟み込んだ状態のまま、第一支面113,114に平行に相対的に往復変位する。一対の第一挟持部11が相対的に往復変位すると、電線9が積み重なった状態が崩れる。その結果、図6に示されるように、第一被覆部95は、全ての電線9が第一支面113,114に沿って並列に並んだ状態(並列状態)となる。
 揺動工程が有効に機能するために、一対の第一支面113,114のうちの一方が、他方よりも電線9に対する摩擦係数が大きな材料で構成されていることが望ましい。例えば、第一押さえ部111の第一支面113が滑らかな金属の表面であり、第一受け部112の第一支面114がエラストマーなどのゴム材料の部材の面であることが考えられる。
 <並列維持工程>
 次に、電線群90における少なくとも被覆端部94を揺動工程の終了時の並列状態に維持する工程(並列維持工程)が行われる。
 電線群90の止水領域900に止水部8を形成する工程(止水部形成工程)が、揺動工程と同じ位置で行われる場合は、一対の第一挟持部11が、電線群90の第一被覆部95を挟持し続けていればよい。この場合、一対の第一挟持部11が電線群90の第一被覆部95を挟持し続ける工程が、並列維持工程となる。
 一方、本実施形態においては、ワイヤハーネスの製造工程を流れ作業により効率化するために、揺動工程を経た電線群90が、速やかに次工程の場所へ移動される。そうすることにより、第一挟持工程及び揺動工程と、止水部形成工程とを並行して行うことが可能となる。そこで、本実施形態における並列維持工程においては、以下に示される第二挟持工程、挟持解除工程及び移動工程が行われる。
 <第二挟持工程(並列維持工程)>
 図7,8に示されるように、第二挟持工程は、揺動工程を経て一対の第一挟持部11で挟持された電線群90の第二被覆部96を、一対の第二挟持部21における一対の第二支面213,214の間に挟み込む工程である。
 本工程において、一対の第二挟持部21を第二被覆部96の位置へ移動させる工程は、横行アクチュエータ23及び昇降アクチュエータ24の作動によって行われる。また、一対の第二挟持部21が第二被覆部96を挟み込む工程は、第二挟持アクチュエータ22の作動によって行われる。
 <挟持解除工程(並列維持工程)>
 挟持解除工程は、第二挟持工程の後に第一挟持部11による第一被覆部95の挟持を解除する工程である。本工程は、第一挟持アクチュエータ12の作動によって行われる。
 <移動工程(並列維持工程)>
 移動工程は、挟持解除工程の後に、電線群90を挟持する一対の第二挟持部21を移動させることにより、電線群90を止水部形成工程の位置7へ移動させる工程である。本工程は、横行アクチュエータ23及び昇降アクチュエータ24の作動によって行われる。
 <止水部形成工程)>
 電線群90が止水部形成工程の位置7へ移動されると、止水部形成工程が行われる。止水部形成工程は、並列維持工程によって並列状態が維持された電線群90における止水領域900を流動状の止水材81で覆い、さらに、その止水材81を硬化させる工程である。
 本実施形態においては、止水部形成工程は、シート添え工程、止水材供給工程、シート包み工程及び露光工程を含む。ここで、止水材供給工程が、シート添え工程の前に行われる場合と、及び、シート添え工程の後に行われる場合とが考えられる。以下の説明において、前者の場合のことを第一例と称し、後者の場合のことを第二例と称する。
 <シート添え工程及び止水材供給工程の第一例(止水部形成工程)>
 図12に示されるように、第一例においては、まず、止水材供給工程が行われる。止水材供給工程の第一例では、光硬化樹脂を含む流動状の止水材81が、透明のシート材82上における止水領域900が配置される予定の位置に供給される。
 続いて、図13に示されるように、シート添え工程が行われる。シート添え工程は、並列維持工程によって並列状態が維持された電線群90の止水領域900を透明のシート材82の上に沿う状態に維持する工程である。
 シート添え工程の第一例においては、スプライス部93の一部が止水材供給工程で供給されたシート材82上の止水材81中に浸かるようにして、止水領域900がシート材82上に沿わされる。
 一方、第二例においては、まず、シート添え工程が行われ、続いて、止水材供給工程が行われる。図14に示されるように、止水材供給工程の第二例においては、光硬化樹脂を含む流動状の止水材81が、透明のシート材82上における止水領域900が配置された部分、特に、スプライス部93が配置された部分に供給される。
 止水材供給工程において、止水材81は、止水領域900における各電線9の間に行渡ることができる程度の流動性と、供給された状態をある程度維持できる粘性と、を有する流動状態である。
 止水材81としては、上記のような流動性及び粘性を有する流動状態で塗布された後に硬化可能な各種硬化型樹脂が用いられる。本実施形態においては、止水材81の硬化性樹脂として、光硬化樹脂が用いられる。光硬化樹脂の典型例は、紫外線硬化樹脂である。
 紫外線硬化樹脂は、例えば、光開始材を有するとともに、ウレタンアクリレート、シリコーンアクリレート及びエポキシアクリレートなどのアクリレートオリゴマーとアクリレートモノマーを主組成物とする合成樹脂である。短時間で止水材81を硬化させて止水部8を形成する形成する観点からは、光硬化樹脂(通常は、紫外線硬化樹脂)を用いることが好ましい。本実施形態は、止水材81として紫外線硬化樹脂が用いられる例である。
 <シート包み工程(止水部形成工程)>
 シート添え工程及び止水材供給工程の後、シート包み工程が行われる。図15,16に示されるように、シート包み工程は、電線群90の止水領域900を止水材81が供給されたシート材82で包む工程である。止水領域900がシート材82で包まれることにより、止水領域900とシート材82との隙間が流動状の止水材81で埋められる。
 図15,16に示される例では、シート材82は、二つ折りにされた後にスプライス部93及び止水材81に巻付けられている。これにより、スプライス部93及び流動状の止水材81は、シート材82によって包まれる。
 しかしながら、スプライス部93及び止水材81をシート材82で包む方法はこれに限られない。なお、スプライス部93及び止水材81をシート材82で包む方法及び装置の具体例は、例えば、特許文献2などに示されている。
 シート包み工程が行われることにより、流動状の止水材81は、止水領域900とシート材82との隙間を埋め、止水領域900の周囲を覆う。また、止水材81は、シート材82から受ける圧力により、複数の電線9の間に行き渡りやすい。
 <露光工程(止水部形成工程)>
 露光工程は、シート包み工程の後に行われる。図17に示されるように、露光工程は、電線群90の止水領域を覆う止水材81にシート材82の外側から光を照射する工程である。露光工程において、シート材82で巻かれた止水材81は、露光装置6の出力光にさらされる。
 止水材81が紫外線硬化樹脂を含む場合、露光工程において紫外線(紫外光)が照射される。なお、露光工程は、流動状の止水材81を硬化させる工程の一例である。
 <効果>
 以上に示された実施形態によれば、電線群90における止水領域900に近い第一被覆部95は、一対の第一挟持部11の間に挟み込まれる。さらに、一対の第一挟持部11は、第一被覆部95を挟み込んだ状態のまま、第一支面113,114に平行に相対的に往復変位する。
 図4~6に示されるように、一対の第一挟持部11が相対的に往復変位すると、電線9が積み重なった状態が崩れる。その結果、第一被覆部95は、全ての電線9が第一支面113,114に沿って並列に並んだ並列状態となる。
 全ての電線9が積み重ならずに並列に並んだ並列状態においては、流動状の止水材81が流入しにくいデッドゾーンが生じにくい。即ち、流動状の止水材81が全ての電線9の間の隙間へ行き渡りやすい。その結果、電線群90のスプライス部93を覆う止水部8が、流動状の合成樹脂の硬化によって得られる場合に、十分な止水性能が確保される。
 また、電線群90は、第一被覆部95を挟持する一対の第一挟持部11から、第一被覆部95よりもスプライス部93寄りの第二被覆部96を挟持する一対の第二挟持部21へ、受け渡される。さらに、電線群90は、一対の第二挟持部21で挟持されたまま、止水部形成工程の位置7へ移動される。
 従って、止水部形成工程が、第一挟持工程の位置と異なる位置で行われる場合であっても、電線群90における第二被覆部96から被覆端部94までの部分は、揺動工程の終了時の並列状態に維持される。
 従って、ある電線群90に対する止水部形成工程と、他の電線群90を並列状態に整列させる工程(第一挟持工程及び揺動工程)とを並行して行うことができる。その結果、スプライス部93を覆う止水部8を有するワイヤハーネスを効率的に製造することが可能となる。
 また、本実施形態における止水材81は、光硬化樹脂を含む流動状の合成樹脂がそれを包む透明のシート材82の外側から受光することによって硬化した部分である。光硬化樹脂が止水材81として用いられる場合、電線9が積み重なった部分において、照射された光が届かないデッドゾーンが生じやすい。従って、本実施形態がそのような対象へ適用されれば特に好適である。
 また、図1に示される電線群整列装置は、第一挟持工程、揺動工程及び並列維持工程を、電線群90における中間部分に形成されたスプライス部93の両側の位置で並行して行うことが可能である。
 <その他>
 以上に示された実施形態では、一対の第一支面113,114の各々は平面である。しかしながら、一対の第一支面113,114の各々が、比較的小さな曲率の円弧面であることも考えられる。この場合、揺動機構13は、第一受け部112を円弧面に沿って往復変位させる。
 また、止水材81用の硬化性樹脂として、例えば、エポキシ樹脂、アクリル樹脂などの熱硬化性樹脂が採用されることも考えられる。その他、硬化性樹脂として、湿気硬化性シリコーンに代表される湿気硬化樹脂が採用されることもできる。
 また、処理対象が、端部にスプライス部93が形成された電線群である場合、電線群整列装置10における2組の整列機構1及び2組の並列維持機構2のうち、1組の整列機構1及び1組の並列維持機構2が省略されてもよい。
 電線群整列装置10における並列維持機構2は、図1に示される機構の他、いわゆる産業用ロボットのアーム機構などの他の機構によって実現されてもよい。
 なお、本発明に係る電線スプライス部の止水方法及び電線群整列装置は、各請求項に記載された発明の範囲において、以上に示された実施形態及び応用例を自由に組み合わせること、或いは実施形態及び応用例を適宜、変形する又は一部を省略することによって構成されることも可能である。
 1 整列機構
 2 並列維持機構
 6 露光装置
 7 止水部形成工程の位置
 8 止水部
 9 電線(絶縁電線)
 10 電線群整列装置
 11 一対の第一挟持部
 12 第一挟持アクチュエータ
 13 揺動機構
 14 電線支持部
 21 第二挟持部
 22 第二挟持アクチュエータ(移動機構)
 23 横行アクチュエータ(移動機構)
 24 昇降アクチュエータ
 81 止水材
 82 シート材
 83 スプライス部
 90 電線群
 91 導体
 92 絶縁被覆
 93 スプライス部
 94 被覆端部
 95 第一被覆部
 96 第二被覆部
 111 第一押さえ部
 112 第一受け部
 113,114 第一支面
 211 第二押さえ部
 212 第二受け部
 213,214 第二支面
 900 止水領域

Claims (6)

  1.  複数の絶縁電線を含み該絶縁電線各々の導体が接合された部分であるスプライス部を有する電線群における前記スプライス部に面する絶縁被覆の端部から間隔を隔てた位置の第一被覆部を、相互に対向する一対の第一挟持部における平行な一対の第一支面の間に挟み込む第一挟持工程と、
     前記第一被覆部を挟み込んだ前記一対の第一挟持部のうちの一方を他方に対して前記第一支面に平行に往復変位させる揺動工程と、
     前記電線群における少なくとも前記絶縁被覆の端部を前記揺動工程の終了時の並列状態に維持する並列維持工程と、
     前記並列維持工程によって状態が維持された前記電線群における前記スプライス部から前記絶縁被覆の端部までを含む止水領域を流動状の止水材で覆い、さらに、前記止水材を硬化させる止水部形成工程と、を含む電線スプライス部の止水方法。
  2.  請求項1に記載の電線スプライス部の止水方法であって、
     前記並列維持工程は、
     前記揺動工程を経て前記一対の第一挟持部で挟持された前記電線群における前記第一被覆部と前記止水領域との間の第二被覆部を、相互に対向する一対の第二挟持部における前記第一支持面に平行な一対の第二支面の間に挟み込む第二挟持工程と、
     前記第二挟持工程の後に前記第一挟持部による挟持を解除する挟持解除工程と、
     前記挟持解除工程の後に前記電線群を挟持する前記一対の第二挟持部を移動させることにより、前記電線群を前記止水部形成工程の位置へ移動させる移動工程と、を含む、電線スプライス部の止水方法。
  3.  請求項1又は請求項2に記載の電線スプライス部の止水方法であって、
     前記止水部形成工程は、
     前記並列維持工程によって状態が維持された前記電線群の前記止水領域を透明のシート材の上に沿う状態に維持するシート添え工程と、
     前記シート材上に光硬化樹脂を含む流動状の前記止水材を供給する止水材供給工程と、
     前記電線群の前記止水領域を前記止水材が供給された前記シート材で包むことにより前記電線群の前記止水領域と前記シート材との隙間を流動状の前記止水材で埋めるシート包み工程と、
     前記電線群の前記止水領域を覆う前記止水材に前記シート材の外側から光を照射する露光工程と、を含む、電線スプライス部の止水方法。
  4.  請求項1から請求項3のいずれかに記載の電線スプライス部の止水方法であって、
     前記第一挟持工程、前記揺動工程及び前記並列維持工程は、前記電線群における中間部分に形成された前記スプライス部の両側の位置において並行して行われる、電線スプライス部の止水方法。
  5.  複数の絶縁電線を含み該絶縁電線各々の導体が接合された部分であるスプライス部を有する電線群における絶縁被覆の部分を複数の前記絶縁電線が一列に並ぶ状態に整列させる電線群整列装置であって、
     平行な一対の第一支面が形成され、前記電線群における前記スプライス部に面する前記絶縁被覆の端部から間隔を隔てた位置の第一被覆部を前記一対の第一支面の間に挟み込む一対の第一挟持部と、
     前記第一被覆部を挟み込んだ前記一対の第一挟持部のうちの一方を他方に対して前記第一支面に平行に往復変位させる揺動機構と、を備える電線群整列装置。
  6.  請求項5に記載の電線群整列装置であって、
     前記第一支持面に平行な一対の第二支面が形成され、前記一対の第一挟持部で挟持された前記電線群における前記第一被覆部と前記絶縁被覆の端部との間の第二被覆部を前記一対の第二支面の間に挟み込む一対の第二挟持部と、
     前記第一挟持部による挟持が解除された後に、前記電線群を挟持する前記一対の第二挟持部を移動させる移動機構と、をさらに備える電線群整列装置。
PCT/JP2013/071610 2013-02-15 2013-08-09 電線スプライス部の止水方法及び電線群整列装置 WO2014125666A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US14/764,361 US20150364233A1 (en) 2013-02-15 2013-08-09 Waterproofing method of wire spliced portion and wire group alignment apparatus
CN201380073121.2A CN104995804B (zh) 2013-02-15 2013-08-09 电线接合部的止水方法及电线组排列装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-027514 2013-02-15
JP2013027514A JP5924288B2 (ja) 2013-02-15 2013-02-15 電線スプライス部の止水方法及び電線群整列装置

Publications (1)

Publication Number Publication Date
WO2014125666A1 true WO2014125666A1 (ja) 2014-08-21

Family

ID=51353686

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/071610 WO2014125666A1 (ja) 2013-02-15 2013-08-09 電線スプライス部の止水方法及び電線群整列装置

Country Status (4)

Country Link
US (1) US20150364233A1 (ja)
JP (1) JP5924288B2 (ja)
CN (1) CN104995804B (ja)
WO (1) WO2014125666A1 (ja)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170110867A1 (en) * 2015-10-20 2017-04-20 Sumitomo Wiring Systems, Ltd. Intermediate spliced portion waterproofing structure of covered electrical wires
US11222736B2 (en) * 2017-07-19 2022-01-11 Sumitomo Wiring Systems, Ltd. Wiring harness with a reinforcing layer that includes polyurea resin
US20220028581A1 (en) * 2019-01-30 2022-01-27 Autonetworks Technologies, Ltd. Insulated electric wire, wire harness, and insulated electric wire production method
US20220157491A1 (en) * 2019-01-30 2022-05-19 Autonetworks Technologies, Ltd. Insulated electric wire and wire harness
US20220165453A1 (en) * 2019-01-30 2022-05-26 Autonetworks Technologies, Ltd. Insulated electric wire and wire harness
US11887757B2 (en) 2019-01-30 2024-01-30 Autonetworks Technologies, Ltd. Insulated electric wire and wire harness

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6172127B2 (ja) * 2014-11-28 2017-08-02 株式会社オートネットワーク技術研究所 ワイヤーハーネス
JP6950202B2 (ja) * 2016-04-18 2021-10-13 株式会社オートネットワーク技術研究所 外装部材付電線
JP6774627B2 (ja) * 2016-11-11 2020-10-28 住友電装株式会社 電線の接合構造及びワイヤハーネス
JP7153202B2 (ja) * 2019-09-24 2022-10-14 株式会社オートネットワーク技術研究所 分岐ワイヤーハーネスの製造方法
JP7234188B2 (ja) * 2020-07-22 2023-03-07 矢崎総業株式会社 電線の製造方法および電線製造装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003059359A (ja) * 2001-08-09 2003-02-28 Yazaki Corp ワイヤハーネスの防水処理方法及びワイヤハーネス
JP2003173720A (ja) * 2001-09-27 2003-06-20 Yazaki Corp ワイヤハーネスへの止水剤塗布方法および止水剤塗布具
JP2011113692A (ja) * 2009-11-25 2011-06-09 Autonetworks Technologies Ltd ワイヤーハーネスの製造方法、及びワイヤーハーネス

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1887670A4 (en) * 2005-06-02 2010-09-08 Sumitomo Wiring Systems METHOD FOR SEALING A SEALING PART IN AN ELECTRIC CABLE TERMINAL AND SEALED STRUCTURE
JP4950531B2 (ja) * 2006-03-17 2012-06-13 矢崎総業株式会社 シールド電線の止水構造および止水方法
JP5264081B2 (ja) * 2007-01-29 2013-08-14 矢崎総業株式会社 線間止水方法および線間止水装置
JP5176533B2 (ja) * 2007-12-19 2013-04-03 住友電装株式会社 電線の止水方法及び該止水方法で形成された止水部を有する電線
KR101729795B1 (ko) * 2009-05-13 2017-04-24 제이에스알 가부시끼가이샤 전선 지수재용 키트, 전선 지수재, 지수 부재, 지수 처리된 전선 및 지수 처리 방법
EP2506267A4 (en) * 2009-11-25 2014-12-31 Autonetworks Technologies Ltd METHOD FOR PRODUCING ELECTRICAL BEAM, AND ELECTRICAL BEAM
JP5418457B2 (ja) * 2010-09-30 2014-02-19 住友電装株式会社 電線の止水中間スプライス部の製造方法及び電線の止水中間スプライス部
JP2013030454A (ja) * 2011-06-22 2013-02-07 Hitachi Cable Ltd ワイヤハーネス及びその製造方法
JP6447450B2 (ja) * 2015-10-14 2019-01-09 住友電装株式会社 ワイヤハーネス

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003059359A (ja) * 2001-08-09 2003-02-28 Yazaki Corp ワイヤハーネスの防水処理方法及びワイヤハーネス
JP2003173720A (ja) * 2001-09-27 2003-06-20 Yazaki Corp ワイヤハーネスへの止水剤塗布方法および止水剤塗布具
JP2011113692A (ja) * 2009-11-25 2011-06-09 Autonetworks Technologies Ltd ワイヤーハーネスの製造方法、及びワイヤーハーネス

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170110867A1 (en) * 2015-10-20 2017-04-20 Sumitomo Wiring Systems, Ltd. Intermediate spliced portion waterproofing structure of covered electrical wires
US11222736B2 (en) * 2017-07-19 2022-01-11 Sumitomo Wiring Systems, Ltd. Wiring harness with a reinforcing layer that includes polyurea resin
US20220028581A1 (en) * 2019-01-30 2022-01-27 Autonetworks Technologies, Ltd. Insulated electric wire, wire harness, and insulated electric wire production method
US20220157491A1 (en) * 2019-01-30 2022-05-19 Autonetworks Technologies, Ltd. Insulated electric wire and wire harness
US20220165453A1 (en) * 2019-01-30 2022-05-26 Autonetworks Technologies, Ltd. Insulated electric wire and wire harness
US11887757B2 (en) 2019-01-30 2024-01-30 Autonetworks Technologies, Ltd. Insulated electric wire and wire harness
US11887759B2 (en) 2019-01-30 2024-01-30 Autonetworks Technologies, Ltd. Insulated electric wire with water-stopping agent, wire harness, and insulated electric wire production method
US11887758B2 (en) * 2019-01-30 2024-01-30 Autonetworks Technologies, Ltd. Wire harness and insulated electric wire thereof having water-stopping agent
US11908598B2 (en) * 2019-01-30 2024-02-20 Autonetworks Technologies, Ltd. Insulated electric wire and harness with water-stopping agent and wire harness

Also Published As

Publication number Publication date
JP2014157708A (ja) 2014-08-28
CN104995804A (zh) 2015-10-21
US20150364233A1 (en) 2015-12-17
JP5924288B2 (ja) 2016-05-25
CN104995804B (zh) 2017-03-22

Similar Documents

Publication Publication Date Title
JP5924288B2 (ja) 電線スプライス部の止水方法及び電線群整列装置
JP5418457B2 (ja) 電線の止水中間スプライス部の製造方法及び電線の止水中間スプライス部
JP2012086340A (ja) 把持装置
JP5846057B2 (ja) 把持装置による把持方法
KR20180051369A (ko) 복합 부품들을 적층 가공하기 위한 시스템들 및 방법들
JP7405289B2 (ja) 絶縁電線およびワイヤーハーネス
KR102306743B1 (ko) 레이저 솔더링 시스템
US11887758B2 (en) Wire harness and insulated electric wire thereof having water-stopping agent
CN106965501B (zh) 一种膜状结构、撕膜设备及撕膜方法
JP2015522181A5 (ja)
US20190160587A1 (en) Tool for ultrasonic bonding and apparatus for ultrasonic bonding
US20180272463A1 (en) Ultrasonic vibration bonding apparatus
JP2020005338A (ja) 電線束の製造方法、及び、電線束の製造装置
CN106457681A (zh) 用于制造构件连接系统的方法
JP2015050800A (ja) 止水構造付電線束の製造装置
KR101991190B1 (ko) 릴체, 필름 연결체, 필름 권취 장착체 및 필름 연결체의 제조 방법
KR101641733B1 (ko) 와이어의 코팅용 도포장치
JP6754267B2 (ja) 電磁シールド管、電磁シールド管付電線、及び電磁シールド管付電線の製造方法
JP2013187980A (ja) ワイヤハーネス及び配線具
EP2542929A1 (en) Optical fibre fixed on substrates
JP2013173229A (ja) 把持装置
JP7123487B2 (ja) 端子作業装置
KR101654292B1 (ko) 와이어의 도포장치 및 와이어 연결용 터미널
JP2008153092A (ja) 電線束の止水部形成装置及び止水部形成方法
WO2016117379A1 (ja) 噴流部、防食剤噴流装置及び端子付電線製造方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13875049

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14764361

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13875049

Country of ref document: EP

Kind code of ref document: A1