WO2014103417A1 - 廃棄物溶融炉 - Google Patents

廃棄物溶融炉 Download PDF

Info

Publication number
WO2014103417A1
WO2014103417A1 PCT/JP2013/070334 JP2013070334W WO2014103417A1 WO 2014103417 A1 WO2014103417 A1 WO 2014103417A1 JP 2013070334 W JP2013070334 W JP 2013070334W WO 2014103417 A1 WO2014103417 A1 WO 2014103417A1
Authority
WO
WIPO (PCT)
Prior art keywords
waste
furnace
main body
drying
gas
Prior art date
Application number
PCT/JP2013/070334
Other languages
English (en)
French (fr)
Inventor
博久 梶山
戸高 光正
一隆 真名子
康一 野田
将治 平倉
Original Assignee
新日鉄住金エンジニアリング株式会社
日鉄住金環境プラントソリューションズ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 新日鉄住金エンジニアリング株式会社, 日鉄住金環境プラントソリューションズ株式会社 filed Critical 新日鉄住金エンジニアリング株式会社
Priority to CN201380003838.XA priority Critical patent/CN104053949B/zh
Priority to KR1020147028431A priority patent/KR101921225B1/ko
Priority to PL13830075T priority patent/PL2940386T3/pl
Priority to ES13830075T priority patent/ES2748138T3/es
Priority to EP13830075.1A priority patent/EP2940386B1/en
Priority to BR112014006698A priority patent/BR112014006698B8/pt
Publication of WO2014103417A1 publication Critical patent/WO2014103417A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/24Incineration of waste; Incinerator constructions; Details, accessories or control therefor having a vertical, substantially cylindrical, combustion chamber
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/02Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment
    • F23G5/027Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment pyrolising or gasifying stage
    • F23G5/0276Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment pyrolising or gasifying stage using direct heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B1/00Shaft or like vertical or substantially vertical furnaces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B1/00Shaft or like vertical or substantially vertical furnaces
    • F27B1/10Details, accessories, or equipment peculiar to furnaces of these types
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B1/00Shaft or like vertical or substantially vertical furnaces
    • F27B1/10Details, accessories, or equipment peculiar to furnaces of these types
    • F27B1/16Arrangements of tuyeres
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2201/00Pretreatment
    • F23G2201/10Drying by heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2201/00Pretreatment
    • F23G2201/30Pyrolysing
    • F23G2201/303Burning pyrogases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2202/00Combustion
    • F23G2202/20Combustion to temperatures melting waste

Definitions

  • the present invention relates to a waste melting furnace for drying, pyrolyzing and melting waste.
  • waste such as general waste and industrial waste
  • a method of melting waste in an industrial furnace using a carbon-based combustible material such as coke as a melting heat source Disposal of waste by melting makes it possible to reduce the volume of waste, and it is also possible to recycle incinerated ash and incombustible waste that have been finally disposed of by landfill into slag and metal. It becomes.
  • a method for melting the waste there is a method in which the waste is incinerated in an incinerator and the incinerated ash and incombustible components are heated and melted.
  • a gasification melting furnace capable of burning and gasifying combustible components in waste and heating and melting ash in waste in one furnace has attracted attention.
  • the gasification and melting furnace burns and gasifies combustibles in waste with the heat of combustion of carbon-based combustible materials, discharges them outside the furnace, and heats and melts the ash and incombustibles remaining in the furnace. That is, the gasification melting furnace thermally decomposes waste to heat and melt ash and incombustibles.
  • a shaft-type melting furnace As a gasification melting furnace, a shaft-type melting furnace is known (for example, see Patent Documents 1 to 3).
  • the melting furnaces disclosed in Patent Documents 1 to 3 include a cylindrical shaft portion (straight barrel portion), an inverted truncated cone portion (taper portion), and a furnace bottom portion.
  • a lower tuyere is provided at the bottom of the furnace.
  • a gas (combustion support gas) for burning the carbon-based combustible material is blown into the furnace from the lower tuyere.
  • high-temperature furnace gas is generated and raised. Heat exchange is performed between the in-furnace gas and the waste, thereby promoting the drying and thermal decomposition of the waste.
  • Ashes and incombustibles gather on the furnace bottom side along the inner surface of the tapered portion, and are melted by the combustion heat of the carbon-based combustible material.
  • the melt is stored at the bottom of the furnace and taken out.
  • an upper tuyere is further provided in the inverted truncated cone part. Air is blown into the furnace from the upper tuyere. This promotes the drying and pyrolysis of the waste.
  • the unloading speed of the waste in the furnace is not uniform, and the unloading speed in the vicinity of the furnace wall tends to be lower than the unloading speed in the center of the furnace.
  • the unloading speed is particularly low in the vicinity of the inner surface of the inverted truncated cone part, and waste tends to stagnate.
  • waste is caught on the boundary between the inner surface of the shaft portion and the inner surface of the inverted truncated cone portion, and is likely to stagnate. When such a stagnation occurs, a portion in which the furnace gas does not spread sufficiently occurs, and the efficiency of heat exchange between the waste and the furnace gas may be reduced.
  • thermal decomposition residue generated when the cavity is generated may melt and adhere to the inner surface of the furnace.
  • adhesion occurs, waste becomes more likely to stagnate. For this reason, there exists a possibility that the efficiency of heat exchange with a waste material and furnace gas may fall further.
  • an object of this invention is to provide the waste melting furnace which can reduce the consumption of a carbon-type combustible substance.
  • a waste melting furnace is a waste melting furnace for drying, pyrolyzing and melting waste, and extends vertically to form a space for accommodating waste,
  • a cylindrical main body that is guided downward from the main body, a melt reservoir that is connected to the lower side of the main body along the central axis of the main body, and stores a melt generated from waste, and a central axis of the main body
  • a gas guiding part that collects the gas generated from the waste and guides it to the exhaust port, and the main body part has a taper in which the inner cross-sectional area gradually decreases as it goes downward.
  • the tapered portion occupies the entire height of the main body portion, or occupies the maximum height among all the portions constituting the main body portion, and the inclination angle of the inner surface of the tapered portion with respect to the horizontal plane is 75 Greater than and less than 90 °.
  • the taper part occupies the maximum height among all the parts constituting the main body part. For this reason, the inclination
  • the upper end portion of the taper portion is located on the upper side of the main body portion.
  • the waste is reduced in volume as it descends in the main body by drying and thermal decomposition. This volume reduction also proceeds on the upper side of the main body.
  • the cross-sectional area of the main body portion becomes smaller from the upper side toward the lower side in accordance with the volume reduction that proceeds on the upper side of the main body portion. For this reason, generation
  • the internal volume of the main body is smaller than when the straight body occupies the maximum height, there is no adverse effect on the waste processing efficiency. This is because, as described above, the efficiency of heat exchange between the waste and the gas in the furnace is improved, and the volume of the waste is efficiently reduced.
  • the inclination angle of the inner surface of the tapered portion with respect to the horizontal plane is more than 75 ° and less than 90 °.
  • the main body has a drying region for drying the waste and a thermal decomposition region for thermally decomposing the waste below the drying region, and a boundary between the drying region and the thermal decomposition region is located in the tapered portion. May be.
  • the upper end portion of the tapered portion is located in the drying region.
  • the volume reduction of the waste described above proceeds even in the dry region.
  • the cross-sectional area of the main body portion becomes smaller from the inside of the drying region toward the lower side in accordance with the volume reduction that proceeds in the drying region. For this reason, generation
  • the melt storage part is provided with a lower tuyere for supplying oxygen-enriched air into the furnace
  • the taper part is provided with an upper tuyere for supplying air into the furnace
  • at least One upper tuyere may be located in the drying area.
  • the combustion of the carbon-based combustible material can be continued by supplying oxygen-enriched air from the lower tuyere into the furnace.
  • By supplying air also into the furnace from the upper tuyere drying and thermal decomposition of waste can be promoted.
  • at least one upper tuyere is located in the drying region. For this reason, drying of the waste in the drying region is further promoted.
  • the waste in the drying region descends along the tapered portion.
  • the volume of the waste is further reduced, and the unloading along the tapered portion is further facilitated.
  • the waste reduced in volume by acceleration of drying is collected in the center by the taper part, formation of a cavity is suppressed.
  • the fact that the upper end portion of the tapered portion is located in the drying region and the upper tuyere is provided in the drying region allows the waste to be dried while suppressing the formation of cavities. It is possible to promote.
  • the upper tuyere located in the drying region may be located near the lower end of the drying region between the lower end of the drying region and the upper end of the tapered portion. In this case, generation
  • the waste melting furnace according to the present invention can reduce the consumption of carbon-based combustible materials.
  • the waste treatment apparatus 1 is an apparatus for treating general waste and industrial waste, and includes a waste melting furnace 2, a granulated pit 5, a combustion chamber 6, a boiler 61, The temperature reducing tower 62, the dust collector 63, the catalytic reaction tower 64, and the chimney 65 are provided.
  • the waste melting furnace 2 thermally decomposes and gasifies the combustible material in the waste under a reducing atmosphere to melt ash and incombustible materials. As will be described later, the gas generated from the waste is discharged from the upper part of the waste melting furnace 2, and the melt generated from the waste is discharged from the lower part of the waste melting furnace 2.
  • the water granulation pit 5 performs water granulation cooling of the melt discharged from the lower part of the waste melting furnace 2 and collects it.
  • the granulated pit 5 includes a casing for storing cooling water, and a scraper conveyor (not shown) for taking out a coolant that has been granulated and cooled in the casing.
  • the combustion chamber 6 and the boiler 61 are connected to the upper part of the waste melting furnace 2 through an exhaust duct, and recover thermal energy from the exhaust gas of the waste melting furnace 2.
  • the temperature reducing tower 62, the dust collector 63, and the catalytic reaction tower 64 are connected to the downstream side of the boiler 61 and render the exhaust gas harmless.
  • the chimney 65 emits detoxified exhaust gas.
  • the waste melting furnace 2 is formed of a refractory material including brick, SiC, alumina and the like.
  • the waste melting furnace 2 includes a cylindrical main body portion 20 extending in the vertical direction around an axis line CL ⁇ b> 1 extending in the vertical direction, a gas guiding portion 21 connected to the upper side of the main body portion 20, and a lower side of the main body portion 20. And a continuous melt storage unit 22.
  • the main body 20 forms a space for accommodating waste, and guides the waste from above to below.
  • the gas guiding part 21 collects the gas generated from the waste in the main body part 20 and guides it to the exhaust duct.
  • the melt storage unit 22 stores the melt generated from the waste in the main body unit 20.
  • the main body portion 20 includes a straight body portion 23 having a constant inner cross-sectional area and a tapered portion 24 that continues to the lower side of the straight body portion 23 and decreases in the inner cross-sectional area as it goes downward.
  • the inner surface 23a of the straight body portion 23 has a cylindrical shape, and the inner surface 24a of the tapered portion 24 has an inverted truncated cone shape.
  • the inner diameter of the upper end portion of the tapered portion 24 is equal to the inner diameter of the straight body portion 23.
  • the height H2 of the tapered portion 24 is larger than the height H3 of the straight body portion 23 (see FIG. 3). That is, the taper part 24 occupies the maximum height in all the parts constituting the main body part 20. For this reason, the inclination
  • the inclination angle ⁇ is greater than 75 ° and less than 90 °. More preferably, it is 80 ° or more and less than 90 °.
  • the inner diameter and height of the main body 20 are determined according to, for example, the volume required for the drying area 70 and the volume required for the pyrolysis area 71 described later.
  • the volume required for the drying region 70 is, for example, the amount of moisture contained in the waste that is charged into the waste melting furnace 2 per hour (50 to 150 kg / m 3 ⁇ h per hour). That is, it is a volume that can dry the entire amount of water input).
  • the volume required for the pyrolysis region 71 is, for example, included in the waste and coke that are charged into the waste melting furnace 2 per hour with an amount of carbon gasification per hour of 50 to 150 kg / m 3 ⁇ h. It is the volume which can gasify carbon to be gasified.
  • the melt storage part 22 has a cylindrical side wall part 22a centering on the axis line CL1 and a bottom part 22b closing the lower end part of the side wall part 22a.
  • the upper end portion of the side wall portion 22 a is connected to the lower end portion of the tapered portion 24.
  • the inner diameter of the side wall portion 22 a is equal to the inner diameter of the lower end portion of the tapered portion 24.
  • a hot water outlet 27 for discharging the melt stored in the melt storage portion 22 is provided at the lower end portion of the side wall portion 22a.
  • the hot water outlet 27 is provided with an open / close mechanism (not shown), and discharges the melt intermittently.
  • a molten metal bowl 28 extending obliquely downward from the side wall portion 22a is provided.
  • the melt slag 28 sends the melt to the granulated pit 5.
  • the gas guiding portion 21 has a cylindrical shape centered on the axis CL1.
  • a lower end portion of the gas guiding portion 21 is connected to an upper end portion of the straight body portion 23 of the main body portion 20.
  • the inner diameter of the lower end part of the gas guiding part 21 is equal to the inner diameter of the straight body part 23.
  • the middle part of the gas guiding part 21 in the vertical direction bulges in the radial direction. For this reason, the inner surface 21 a of the gas guiding portion 21 swells in the radial direction compared to the inner surface 23 a of the straight body portion 23.
  • the upper end portion of the gas guiding portion 21 is reduced in diameter as compared with the lower end portion, and constitutes an opening 2 a of the waste melting furnace 2.
  • the inner cylinder 25 is inserted into the opening 2a.
  • the inner cylinder 25 has a cylindrical shape centered on the axis CL ⁇ b> 1 and introduces waste and carbon-based combustible material into the waste melting furnace 2.
  • the lower end portion of the inner cylinder 25 is located above the lower end portion of the gas guiding portion 21.
  • An exhaust port 26 is provided in the upper part of the gas guiding part 21. The exhaust port 26 discharges gas generated from the waste in the main body 20.
  • the exhaust port 26 is connected to the combustion chamber 6 through an exhaust duct.
  • the melt reservoir 22 is provided with a lower tuyere 40 for supplying oxygen-enriched air (hereinafter referred to as “oxygen-enriched air”) into the furnace.
  • oxygen-enriched air oxygen-enriched air
  • the lower tuyere 40 is arranged at a plurality of locations arranged in the circumferential direction of the side wall portion 22a.
  • the lower tuyere 40 may be arranged at eight places arranged at 45 ° intervals in the circumferential direction.
  • the tip of the lower tuyere 40 may protrude into the melt storage part 22 or may not protrude.
  • the taper portion 24 is provided with upper tuyere 30, 31, 32, 33 for supplying air into the furnace.
  • the upper tuyere 30, 31, 32, 33 are lined up from below.
  • the number of upper tuyere arranged in the vertical direction is not limited to four, and may be less than four or five or more.
  • Each of the upper tuyere 30, 31, 32, 33 is disposed at a plurality of locations arranged in the circumferential direction of the tapered portion 24.
  • the upper tuyere 30, 31, 32, 33 may be arranged at four positions arranged at intervals of 90 ° in the circumferential direction.
  • the tips of the upper tuyere 30, 31, 32, 33 may or may not protrude into the tapered portion 24.
  • a blower 42 is connected to the upper tuyere 30, 31, 32, 33 and the lower tuyere 40.
  • Flow rate control valves 30 a, 31 a, 32 a, 33 a, and 40 a are respectively provided in the flow paths from the blower 42 toward the upper tuyere 30, 31, 32, 33 and the lower tuyere 40.
  • an oxygen generator 41 for enriching air with oxygen is connected to the flow path from the flow control valve 40a toward the lower tuyere 40.
  • the waste melting furnace 2 is provided with thermometers T1 to T5 for measuring the furnace temperature.
  • the thermometer T ⁇ b> 1 is arranged on the upper part of the gas guiding part 21.
  • the thermometer T ⁇ b> 5 is embedded in the refractory that forms the bottom 22 b of the melt storage unit 22.
  • the thermometers T2, T3, and T4 are arranged from the upper side to the lower side between the thermometers T1 and T5.
  • the waste melting furnace 2 is provided with a plurality of pressure gauges for measuring the pressure in the furnace.
  • the pressure gauge P ⁇ b> 1 is disposed on the upper part of the gas guiding part 21.
  • the pressure gauges P2, P3, and P4 are disposed at the upper part, the middle part, and the lower part of the taper part 24, respectively.
  • the carbon-based combustible material is introduced into the waste melting furnace 2 through the inner cylinder 25 before starting the introduction of the waste.
  • An example of the carbon-based combustible material is coke.
  • all or part of the coke may be replaced with a carbide of biomass such as wood.
  • the coke accumulated on the bottom 22b in the waste melting furnace 2 is ignited using a burner (not shown) or the like. As a result, a so-called coke bed 81 is formed at the bottom of the furnace.
  • the kind of waste is not particularly limited, and may be either general waste or industrial waste. Shredding dust (ASR), excavated waste, incinerated ash, or the like, or a mixture of these and combustible waste can be treated. Further, carbonized waste may be input. In addition to coke, limestone or the like as a basicity adjusting agent may be added to the waste.
  • ASR Shredding dust
  • excavated waste excavated waste
  • incinerated ash, or the like or a mixture of these and combustible waste can be treated.
  • carbonized waste may be input.
  • limestone or the like as a basicity adjusting agent may be added to the waste.
  • oxygen-enriched air is supplied from the lower tuyere 40 into the furnace.
  • a preferable setting example of the blowing pressure of oxygen-enriched air is to set it within a range of 5 to 25 kPa.
  • a fuel gas such as LNG may be mixed with the oxygen-enriched air supplied from the lower tuyere 40 into the furnace.
  • air is supplied into the furnace from the upper tuyere 30, 31, 32, 33.
  • setting to 5 to 25 kPa can be mentioned.
  • the pyrolysis residue (carbide) together with ash and incombustible material gathers along the inner surface 24a of the tapered portion 24 on the bottom 22b side of the waste melting furnace 2, and is formed on the coke bed 81 with a carbide particle layer (so-called char layer) 82.
  • the char layer 82 functions as a ventilation resistance layer and regulates the flow of oxygen-enriched air supplied from the lower tuyere 40. Thereby, local blow-by of the oxygen-enriched air supplied from the lower tuyere 40 is prevented.
  • the combustible dry residue (fixed carbon) of the pyrolysis residue is burned with coke.
  • the combustion gas of the coke and combustible dry distillate has the highest temperature in the region near the upper end of the coke bed 81. In this region, ash and incombustibles melt.
  • the melt enters the melt storage section 22 through the gap between the coke beds and is stored.
  • the stored melt is intermittently taken out from the hot water outlet 27.
  • the molten material taken out from the hot water outlet 27 is granulated and cooled in the granulating pit 5 and recovered as slag and metal. Thereafter, the mixture of coke and waste is replenished into the furnace, and the waste melting process is continued.
  • a dry region 70 is formed in the upper part of the waste melting furnace 2.
  • waste is mainly dried and preheated.
  • a pyrolysis region 71 is formed below the drying region 70. In the pyrolysis region 71, pyrolysis and gasification of combustible components in the dried waste are mainly performed.
  • a melting region 72 is formed below the pyrolysis region 71. In the melting region 72, ash and incombustible materials are mainly melted (see FIG. 3).
  • the upper end portion of the taper portion 24 since the position of the upper end portion of the taper portion 24 is higher than that of the straight body portion 23 occupying the maximum height, the upper end portion of the taper portion 24 reaches the drying region 70, and the drying region The boundary between 70 and the pyrolysis region 71 is located in the tapered portion 24.
  • the upper tuyere 30 arranged at the uppermost stage is located in the drying region 70.
  • the upper tuyere 30 is located near the lower end of the drying region 70 between the lower end of the drying region 70 and the upper end of the tapered portion 24.
  • the drying region 70 compared to the pyrolysis region 71, a larger gap is formed between the wastes. Therefore, the waste in the drying region 70 moves compared to the waste in the pyrolysis region 71. Cheap. For this reason, if the amount of air blown by the upper tuyere 30 of the drying area 70 is excessive, there is a risk of promoting the formation of a blow-through path for the in-furnace gas. Therefore, it is preferable that the amount of air blown from the upper tuyere 30 is 50 Nm 3 / h or less per location. It is not always necessary to provide the upper tuyere 30 in the drying region 70. In addition, two or more of the four upper tuyere 30, 31, 32, 33 may be arranged in the drying region 70.
  • thermometers T1 to T5 are arranged from the upper part to the lower part in the waste melting furnace 2. The ranges of the drying region 70, the pyrolysis region 71, and the melting region 72 can be roughly grasped by the temperature measured by each thermometer.
  • the position of the boundary between the drying region 70 and the pyrolysis region 71 can be grasped by, for example, the pressure difference in the furnace.
  • the waste In the drying area 70, the waste is reduced in volume by removing moisture by drying.
  • the waste In the pyrolysis region, the waste forms carbide particles by pyrolysis, and is further reduced in volume and concentrated. For this reason, there is, for example, a difference of about 0.5 kPa / m between the differential pressure in the drying region and the differential pressure in the pyrolysis region.
  • the differential pressure here is the amount of increase in pressure that accompanies a drop of 1 m.
  • the boundary between the dry region 70 and the pyrolysis region 71 can be roughly grasped.
  • the differential pressure in each part in the furnace can be roughly grasped by pressure gauges P1 to P4 arranged in the furnace. For example, if the differential pressure in the vicinity of the middle pressure gauge P3 is increased by about 0.5 kPa / m compared to the upper area, it is understood that the vicinity of the middle pressure gauge P3 is the boundary between the drying area 70 and the pyrolysis area 71. Is done.
  • the waste pyrolysis region 71 is a region below the portion that has been lowered in the drying region 70 until the differential pressure increase of 0.5 kPa / m or more is completed.
  • the differential pressure means a differential pressure when the operation of the furnace is relatively stable, and excludes a differential pressure when a gas blow-out or the like occurs.
  • the taper portion 24 occupies the maximum height among all the portions constituting the main body portion 20. For this reason, the inclination angle of the inner surface 24a of the taper part 24 with respect to the horizontal plane is larger than when the straight body part 23 that is not tapered occupies the maximum height. Thereby, the waste in the vicinity of the inner surface 24a of the tapered portion 24 is smoothly guided downward. Furthermore, since the inclination of the inner surface 24a of the taper portion 24 with respect to the inner surface 23a of the straight body portion 23 is gentle, waste is unlikely to stagnate at the upper end portion of the taper portion 24.
  • the upper end portion of the tapered portion 24 is located on the upper side of the main body portion 20.
  • the waste is reduced in volume as it descends in the main body 20 by drying and thermal decomposition. This volume reduction also proceeds on the upper side of the main body 20.
  • the upper end portion of the taper portion 24 is located on the upper side of the main body portion 20, as the cross-sectional area of the main body portion 20 moves downward from the upper side in accordance with the volume reduction that also proceeds on the upper side of the main body portion 20. Get smaller. For this reason, generation
  • the internal volume of the main-body part 20 is small compared with the case where the straight body part 23 occupies the maximum height, there is no bad influence on the waste processing efficiency. This is because, as described above, the efficiency of heat exchange between the waste and the gas in the furnace is improved, and the volume of the waste is efficiently reduced.
  • the inclination angle of the inner surface 24a of the tapered portion 24 with respect to the horizontal plane is more than 75 ° and less than 90 °. For this reason, the stagnation of waste is more reliably prevented. Therefore, the efficiency of heat exchange between the waste and the furnace gas can be further improved.
  • the boundary between the drying region 70 and the pyrolysis region 71 is located in the tapered portion 24. Thereby, the upper end part of the taper part 24 is located in the drying area
  • the volume reduction of the waste described above also proceeds in the drying area 70.
  • the cross-sectional area of the main body portion 20 becomes smaller from the inside of the drying region 70 toward the lower side in accordance with the volume reduction that proceeds in the drying region 70. . For this reason, generation
  • the upper tuyere 30 is located in the drying area 70. For this reason, the drying of the waste in the drying area 70 is further promoted. As described above, since the upper end portion of the tapered portion 24 is located in the drying region 70, the waste in the drying region 70 descends along the tapered portion 24. When the drying of the waste is promoted, the volume of the waste is further reduced, and the unloading along the tapered portion 24 is further facilitated. Moreover, since the waste reduced in volume by the promotion of drying is collected in the center by the taper part 24, formation of a cavity is suppressed. As described above, the fact that the upper end portion of the tapered portion 24 is located in the drying region 70 and the upper tuyere 30 is provided in the drying region 70, discarding while suppressing the formation of the cavity. It is possible to promote the drying of things.
  • the upper tuyere 30 is located near the lower end of the drying region 70 between the lower end of the drying region 70 and the upper end of the tapered portion 24. Thereby, the upper tuyere 30 located in the drying region 70 is separated from the boundary portion between the straight body portion 23 and the taper portion 24, and the generation of a cavity can be more reliably suppressed.
  • the waste melting furnace 2 since the occurrence of the pyrolysis residue is suppressed, the work load during the maintenance of the waste melting furnace 2 can be remarkably reduced. Moreover, since generation
  • the inner diameter of the pyrolysis region 71 is smaller than that in the conventional furnace as compared with the case where the straight body portion 23 occupies the maximum height. Accordingly, the thickness of the char layer can be increased, and a sufficient in-furnace differential pressure can be secured. This also contributes to stabilization of the operation of the waste melting furnace 2.
  • the main body portion 20 may not include the straight body portion 23 but may be configured only by the tapered portion 24. That is, the taper portion 24 may occupy the entire height H1 of the main body portion 20.
  • Example 1 As Example 1, a waste melting furnace 2A schematically shown in FIG.
  • the waste melting furnace 2A corresponds to the waste melting furnace 2 of the above-described embodiment.
  • the ratio of the height H2 of the tapered portion 24 to the total height H1 of the main body portion 20 is 95%.
  • the inclination angle ⁇ of the inner surface 24a of the tapered portion 24 with respect to the horizontal plane is 80 °.
  • the above-described thermometers T2 were provided at four locations arranged in the circumferential direction at 90 ° intervals.
  • Example 2 As Example 2, a waste melting furnace 2B schematically shown in FIG.
  • the waste melting furnace 2B corresponds to the waste melting furnace 2 of the above-described embodiment.
  • the ratio of the height H2 of the tapered portion 24 to the total height H1 of the main body portion 20 is 50%.
  • the inclination angle ⁇ of the inner surface 24a of the tapered portion 24 with respect to the horizontal plane is 75 °.
  • the inner diameter of the straight barrel portion 23 of the waste melting furnace 2B, the inner diameter of the lower end portion of the taper portion 24, and the overall height H1 of the main body portion 20 are the inner diameter of the straight barrel portion 23 of the waste melting furnace 2A, The inner diameter is equivalent to the total height H1 of the main body 20.
  • Comparative Example 1 As Comparative Example 1, a waste melting furnace 2C schematically shown in FIG.
  • the waste melting furnace 2C is different from the waste melting furnace 2 of the above-described embodiment in the following points.
  • the straight body part 23 occupies the maximum height among all the parts constituting the main body part 20.
  • the ratio of the height H2 of the tapered portion 24 to the total height H1 of the main body portion 20 is 35%.
  • the upper tuyere 30, 31, 32, 33 the upper upper tuyere 30 is not provided. All the upper tuyere 31, 32, 33 are located in the thermal decomposition region 71.
  • the inclination angle ⁇ of the inner surface 24a of the tapered portion 24 with respect to the horizontal plane is 70 °.
  • the inner diameter of the straight barrel portion 23 of the waste melting furnace 2C, the inner diameter of the lower end portion of the taper portion 24, and the overall height H1 of the main body portion 20 are the inner diameter of the straight barrel portion 23 of the waste melting furnace 2A, and the lower end portion of the taper portion 24.
  • the inner diameter is equivalent to the total height H1 of the main body 20.
  • the above-described thermometers T2 were provided at four locations arranged in the circumferential direction at intervals of 90 °.
  • the in-furnace differential pressure in this test example is the difference between the detected value of the pressure gauge P4 provided at the lower part of the taper part 24 and the detected value of the pressure gauge P1 provided at the upper part of the gas guiding part 21.
  • the furnace top gas temperature is a detection value of a thermometer T ⁇ b> 1 provided at the upper part of the gas induction unit 21.
  • the furnace middle gas temperature is a value measured by a thermometer T2.
  • FIG. 5 is a diagram showing the daily transition of the pressure difference in the furnace.
  • the pressure difference in the furnace is low from the first day to the third day, and may fall below the lower limit value LL in a range suitable for the operation of the furnace. It was. From this result, it is estimated that in the waste melting furnace 2C, gas blow-out occurred from the first day to the third day, and the pressure difference in the furnace decreased due to this.
  • the in-furnace differential pressure of Example 1 exceeds the lower limit value LL of the range desirable for the operation of the furnace, as indicated by the broken line L2 in FIG.
  • the width was small.
  • the in-furnace differential pressure of Example 2 is lower than the in-furnace differential pressure of Example 1 as indicated by the broken line L3 in FIG. 5, but exceeds the lower limit value LL.
  • the fluctuation range of was small. From this result, in Examples 1 and 2, it is estimated that the occurrence of gas blow-through is suppressed.
  • FIG. 6 is a diagram showing the daily transition of the furnace top gas temperature.
  • the furnace top gas temperature of Comparative Example 1 is higher from the first day to the third day, and the difference from the temperature after the fourth day is large.
  • the temperature from the first day to the third day is higher than the upper limit value ML in a desirable range for the operation of the furnace. From this result, it is estimated that in Comparative Example 1, gas blow-out occurred from the first day to the third day, and the furnace top temperature increased due to this.
  • Example 1 the furnace top gas temperature of Example 1 is lower than the upper limit value ML in a desirable range for the operation of the furnace, as indicated by the broken line L5 in FIG. The width was small. From this result, in Example 1, it is estimated that generation
  • FIG. 7 shows the measurement results of the furnace middle gas temperature.
  • FIG. 7 is a diagram showing the change over time of the furnace central gas temperature.
  • FIG. 7 (a) in Comparative Example 1, significant temperature fluctuations were exhibited over time in any of the four thermometers T2. The time zone in which the temperature variation occurs is different for each thermometer. From this result, in Comparative Example 1, it is estimated that gas blow-outs occurred one after another at different locations in the furnace and at different time zones.
  • Example 1 As shown in FIG. 7B, no significant temperature fluctuation was shown over time in any of the four thermometers T2. From this result, it is presumed that the occurrence of gas blow-through is significantly suppressed as compared with the waste melting furnace 2C of Comparative Example 1.
  • Example 2 since the ratio of the height H2 of the taper portion 24 to the total height H1 of the main body portion 20 is 50% or more, the taper portion has the maximum height among all the portions constituting the main body portion 20. It was almost confirmed that the occurrence of gas blow-through can be suppressed if the condition of occupying the thickness is satisfied.
  • FIG. 8 is a diagram showing the measurement results of waste treatment amount, coke ratio, furnace differential pressure, and furnace top gas temperature.
  • the coke ratio, the in-furnace differential pressure, and the furnace top gas temperature are shown as differences based on the measurement result of Comparative Example 1.
  • the coke ratio (kg / TR) is a value obtained by dividing the amount of coke (kg) charged into the melting furnace by the total amount of waste (t) processed in the melting furnace.
  • the coke ratio was reduced by about 12.7 kg / TR in a short-term test of about one week. From this result, according to this invention, it was confirmed that the consumption of a carbon-type combustible substance can be reduced.
  • the furnace top gas temperature of Example 1 is about 100 degreeC lower. Furthermore, the in-furnace differential pressure of Example 1 is about 1.5 kPa higher than the in-furnace differential pressure of Comparative Example 1. From these results, it is estimated that the stagnation of the waste and the occurrence of gas blow-through are suppressed in the waste melting furnace 2A. This is considered to have contributed greatly to the reduction of consumption of carbon-based combustible materials.
  • FIG. 9A is a diagram showing the distribution of the flow velocity (superficial velocity) of the gas in the furnace in the height direction of the furnace.
  • a curve L6 shows the flow rate of the in-furnace gas in Example 1
  • a curve L7 shows the flow rate of the in-furnace gas in Comparative Example 1.
  • Reference lines b1, b2, b3, and b4 indicate the positions of the upper tuyere 30, 31, 32, and 33, respectively.
  • FIG. 9B is a diagram in which the distribution of the pressure difference in the furnace in the height direction of the furnace is plotted.
  • Reference lines a1, a2, a3, a4, and a5 indicate the positions of the pressure gauges used for measuring the pressure difference in the furnace.
  • the pressure gauge used here is different from the above-described pressure gauges P1, P2, P3, and P4.
  • Plots F1, F2, F3, and F4 are respectively the differential pressure between the reference lines a2 and a1, the differential pressure between the reference lines a3 and a2, the differential pressure between the reference lines a4 and a3, and the differential pressure between the reference lines a5 and a4.
  • the vertical axis is drawn as the height of the furnace, and the scale of each vertical axis matches the height of the sectional view of the furnace shown in FIG. 9 (c). It has been.
  • Example 1 As shown by curves L6 and L7 in FIG. 9A, the flow rate of the in-furnace gas is higher in Example 1 than in Comparative Example 1. Thereby, according to Example 1, it is estimated that the heat exchange efficiency between the gas in the furnace and the waste is improved, and the drying capacity is improved. Further, as described above, in Example 1, the occurrence of gas blow-through is suppressed, and the flow of the in-furnace gas is stabilized. For this reason, it is estimated that the heat exchange efficiency between the in-furnace gas and the waste is further improved in combination with the increase in the flow rate of the in-furnace gas and the stabilization of the flow of the in-furnace gas. .
  • Example 1 gas blow-out frequently occurred during operation, the furnace top gas temperature increased, and it was forced to stop blowing from the upper tuyere 31. The result is also shown in the flow velocity data of FIG. On the other hand, in Example 1, since generation
  • FIG. 10 is a graph plotting the measurement results of the in-furnace heat exchange temperature (° C.) and the coke ratio (kg / TR).
  • the black circle plots show the measurement results of Example 1
  • the white triangle plots show the measurement results of Comparative Example 1.
  • the in-furnace heat exchange temperature is calculated by the following equation.
  • Furnace heat exchange temperature Furnace combustion temperature in the pyrolysis region 1000 ° C (assumed)-Furnace top gas temperature (actual value)
  • the heat exchange temperature was higher and the coke ratio was lower than in Comparative Example 1. That is, in Example 1, it was confirmed that the drying of waste was promoted as compared with Comparative Example 1.
  • FIG. 11 is a graph plotting measurement results of moisture drying capacity per volume (Mcal / (m 3 ⁇ h)) and coke ratio (kg / TR).
  • the black circle plots show the measurement results of Example 1
  • the white triangle plots show the measurement results of Comparative Example 1.
  • FIG. 12 is a graph plotting the measurement results of the heat transfer efficiency (Mcal / (m 3 ⁇ h ⁇ ° C.)) and the flow velocity (superficial velocity) (Bm / s) of the gas in the furnace.
  • the heat transfer efficiency is calculated by the following equation.
  • Heat transfer efficiency heat transfer area ⁇ heat transfer rate
  • the flow rate of the gas in the furnace indicates the flow rate at the height of the upper tuyere 30.
  • FIGS. 11 and 12 it was confirmed that the drying capacity in Example 1 was about 2.5 times that in Comparative Example 1. Based on the heat transfer area and heat transfer rate, this improvement of about 2.5 times the drying capacity is about 1.7 times due to the stabilization of the flow of the furnace gas, and the flow rate of the furnace gas is This was due to an improvement of about 1.5 times due to the increase.
  • FIG. 13 is a graph plotting the measurement results of the gas blow-out occurrence time and the coke ratio.
  • the black circle plot shows the measurement result when air is supplied from the upper tuyere 30
  • the white triangle plot shows the measurement result when air is not supplied from the upper tuyere 30. Yes.
  • the present invention can be used for the treatment of general waste and industrial waste.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Gasification And Melting Of Waste (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

 廃棄物の乾燥、熱分解及び溶融を行う廃棄物溶融炉(2)は、上下方向に延在して廃棄物を収容する空間を形成し、廃棄物を上方から下方に案内する筒状の本体部(20)と、本体部(20)の中心軸線に沿って本体部(20)の下側に連なり、廃棄物から生成された溶融物を貯留する溶融物貯留部(22)と、本体部(20)の中心軸線に沿って本体部(20)の上側に連なり、廃棄物から生成されたガスを集めて排気口(26)へ導くガス誘導部(21)と、を備える。本体部(20)は、下方へ向かうに従い内側の断面積が徐々に小さくなるテーパ部(24)を有する。テーパ部(24)は、上下方向において、本体部(20)を構成する全部分の中で最大の高さを占める。

Description

廃棄物溶融炉
 本発明は、廃棄物の乾燥、熱分解及び溶融を行う廃棄物溶融炉に関する。
 一般廃棄物や産業廃棄物などの廃棄物を処理する方法としては、例えばコークスなどの炭素系可燃物質を溶融熱源に用い、工業炉で廃棄物を溶融する方法がある。溶融による廃棄物の処理により、廃棄物の減容化が可能となるのに加え、これまで埋め立てによって最終処分されていた焼却灰や不燃性ごみをスラグやメタルにして再資源化することが可能となる。
 廃棄物を溶融する方法としては、廃棄物を焼却炉で焼却し、その焼却灰や不燃分を加熱溶融する方法がある。近年においては、廃棄物中の可燃分の燃焼及びガス化と、廃棄物中の灰分の加熱溶融とを一つの炉内で行えるガス化溶融炉が注目されている。ガス化溶融炉は、炭素系可燃物質の燃焼熱により、廃棄物中の可燃物を燃焼及びガス化させて炉外に排出し、炉内に残った灰分や不燃物を加熱溶融する。すなわち、ガス化溶融炉は、廃棄物を熱分解し、灰分や不燃物を加熱溶融する。
 ガス化溶融炉としては、シャフト式の溶融炉が知られている(例えば、特許文献1~3参照)。特許文献1~3に開示されている溶融炉は、円筒状のシャフト部(直胴部)と、逆円錐台部(テーパ部)と、炉底部とを備える。炉底部には、下段羽口が設けられている。下段羽口から炉内には、炭素系可燃物質を燃焼させるためのガス(燃焼支持ガス)が吹き込まれる。これにより炭素系可燃物質が燃焼すると、高温の炉内ガスが発生し、上昇する。この炉内ガスと廃棄物との間で熱交換が行われ、廃棄物の乾燥及び熱分解が促進される。灰分や不燃物は、テーパ部の内面に沿って炉底部側に集まり、炭素系可燃物質の燃焼熱により溶融する。溶融物は炉底部に貯留され、取り出される。
 また、特許文献1,2に開示されている溶融炉では、更に、逆円錐台部に上段羽口が設けられている。上段羽口から炉内には、空気が吹き込まれる。これにより、廃棄物の乾燥及び熱分解が促進される。
特開平8-94036号公報 特開2011-89672号公報 特開2002-130632号公報
 しかしながら、上述したガス化溶融炉では、炉内における廃棄物の荷下がり速度は均一ではなく、炉内中央部での荷下がり速度に比べ炉壁近傍での荷下がり速度が低い傾向がある。特許文献1~3に記載された溶融炉では、特に逆円錐台部の内面近傍での荷下がり速度が低く、廃棄物が停滞し易い。とりわけ、シャフト部の内面と逆円錐台部の内面との境界部に廃棄物が引っ掛かり、停滞し易い。このような停滞が生じると、炉内ガスが十分に行き渡らない部分が生じ、廃棄物と炉内ガスとの熱交換の効率が低下する場合がある。
 また、廃棄物の停滞部分で局所的に熱分解が生じ、空洞が発生する場合もある。特に、特許文献1,2に開示されている溶融炉では、上段羽口により逆円錐台部に空気が吹き込まれるため、上段羽口の近傍で局所的な熱分解が生じ易い。局所的な熱分解で生じた空洞が炉内ガスの流路を形成してしまうと、その流路を通って炉内ガスが吹き抜けてしまい、空洞以外の部分に炉内ガスが行き渡り難くなる(以下、この現象を「ガスの吹き抜け」という。)。このため、廃棄物と炉内ガスとの熱交換の効率が更に低下するおそれがある。
 更に、空洞が発生する際に生じた熱分解残渣が溶融し、炉の内面に付着してしまう場合もある。このような付着が生じると、廃棄物が更に停滞し易くなる。このため、廃棄物と炉内ガスとの熱交換の効率が更に低下するおそれがある。
 このように、廃棄物と炉内ガスとの熱交換の効率が低下すると、それを補うために炭素系可燃物質の消費量が増加する。一般に、炭素系可燃物質は化石燃料に由来するので、炭素系可燃物質の消費量の増加は環境保護の観点で望ましくない。そこで、本発明は、炭素系可燃物質の消費量を低減できる廃棄物溶融炉を提供することを目的とする。
 本発明に係る廃棄物溶融炉は、廃棄物の乾燥、熱分解及び溶融を行う廃棄物溶融炉であって、上下方向に延在して廃棄物を収容する空間を形成し、廃棄物を上方から下方に案内する筒状の本体部と、本体部の中心軸線に沿って本体部の下側に連なり、廃棄物から生成された溶融物を貯留する溶融物貯留部と、本体部の中心軸線に沿って本体部の上側に連なり、廃棄物から生成されたガスを集めて排気口へ導くガス誘導部と、を備え、本体部は、下方へ向かうに従い内側の断面積が徐々に小さくなるテーパ部を有し、上下方向において、テーパ部は本体部の全高を占めるか、又は本体部を構成する全部分の中で最大の高さを占め、水平面に対するテーパ部の内面の傾斜角は、75°を超え且つ90°未満である。
 この廃棄物溶融炉内の下部で炭素系可燃物を燃焼させると、高温の炉内ガスが発生し、上昇する。廃棄物は、炉内ガスの上昇流に対向しながら下降する。この過程で、炉内ガスと廃棄物との間で熱交換が行われ、廃棄物の乾燥及び廃棄物の熱分解が促進される。廃棄物の熱分解により発生したガスは、ガス誘導部に集まって排出される。炉内に残った灰分及び不燃物は、テーパ部の内面に沿って炉の底部側に集まり、炭素系可燃物質の燃焼熱により溶融する。溶融物は溶融物貯留部に貯留され、取り出される。
 ここで、本体部を構成する全部分の中でテーパ部が最大の高さを占めている。このため、テーパ状でない直胴部が最大の高さを占めている場合に比べ、水平面に対するテーパ部の内面の傾斜角が大きい。これにより、テーパ部の内面近傍の廃棄物が円滑に下方に導かれる。更に、テーパ部が直胴部の下側に連なっている場合であっても、直胴部の内面に対するテーパ部の内面の傾斜が緩やかであるため、テーパ部の上端部に廃棄物が停滞し難い。また、テーパ部が最大の高さを占めていると、テーパ部の上端部は本体部の上部側に位置する。廃棄物は、乾燥及び熱分解により、本体部内を下降するに従って減容化される。この減容化は、本体部の上部側でも進行する。テーパ部の上端部が本体部の上部側に位置していると、本体部の上部側でも進行する減容化に合わせて、本体部の断面積が上部側から下方へ向かうに従い小さくなる。このため、空洞の発生が抑制され、ガスの吹き抜けが防止される。これらのことから、直胴部が最大の高さを占めている場合に比べ、廃棄物と炉内ガスとの熱交換の効率が向上する。従って、炭素系可燃物質の消費量を低減できる。
 なお、直胴部が最大の高さを占めている場合に比べ、本体部の内容積は小さいが、廃棄物の処理効率への悪影響はない。これは、上述したように廃棄物と炉内ガスとの熱交換の効率が向上し、廃棄物が効率よく減容化されるためである。
 水平面に対するテーパ部の内面の傾斜角は、75°を超え且つ90°未満である。これにより、廃棄物の停滞がより確実に防止される。従って、廃棄物と炉内ガスとの熱交換の効率を更に向上させることができる。
 本体部は、廃棄物を乾燥させる乾燥領域と、乾燥領域の下方で廃棄物を熱分解させる熱分解領域と、を有し、乾燥領域と熱分解領域との境界部がテーパ部内に位置していてもよい。この場合、テーパ部の上端部が乾燥領域内に位置する。上述した廃棄物の減容化は乾燥領域内でも進行する。テーパ部の上端部が乾燥領域内に位置していると、乾燥領域内でも進行する減容化に合わせて、本体部の断面積が乾燥領域内から下方へ向かうに従い小さくなる。このため、空洞の発生をより確実に抑制できる。
 溶融物貯留部には、酸素富化された空気を炉内に供給するための下段羽口が設けられ、テーパ部には、空気を炉内に供給するための上段羽口が設けられ、少なくとも一つの上段羽口は、乾燥領域に位置してもよい。この場合、下段羽口から炉内に酸素富化された空気を供給することで、炭素系可燃物質の燃焼を継続させることができる。上段羽口からも炉内に空気を供給することで、廃棄物の乾燥及び熱分解を促進できる。ここで、少なくとも一つの上段羽口は、乾燥領域に位置している。このため、乾燥領域における廃棄物の乾燥が更に促進される。上述したように、テーパ部の上端部が乾燥領域内に位置していることから、乾燥領域内の廃棄物はテーパ部に沿って下降する。廃棄物の乾燥が促進されると、廃棄物が更に減容化され、テーパ部に沿った荷下がりが更に円滑化される。また、乾燥の促進により減容化された廃棄物がテーパ部によって中央に集められるため、空洞の形成は抑制される。このように、テーパ部の上端部が乾燥領域内に位置することと、上段羽口が乾燥領域に設けられていることとが相俟って、空洞の形成を抑制しつつ廃棄物の乾燥を促進することが可能となっている。
 乾燥領域に位置する上段羽口は、乾燥領域の下端部とテーパ部の上端部との間において、乾燥領域の下端部寄りに位置してもよい。この場合、空洞の発生をより確実に抑制できる。
 本発明に係る廃棄物溶融炉によれば、炭素系可燃物質の消費量を低減できる。
本発明に係る廃棄物溶融炉を用いた廃棄物処理装置の概略図である。 図1中の廃棄物溶融炉を示す縦断面図である。 廃棄物溶融炉内の乾燥領域、熱分解領域、溶融領域を模式的に示した図である。 実施例及び比較例を示す模式図である。 炉内差圧の経日的な推移を示す線図である。 炉頂ガス温度の経日的な推移を示す線図である。 炉中部ガス温度の経時的な推移を示す線図である。 廃棄物処理量、コークス比、炉内差圧、炉頂ガス温度の測定結果を示す図である。 炉の高さ方向における炉内ガスの流速の分布及び炉内差圧の分布を示す図である。 炉内熱交換温度とコークス比の測定結果をプロットした図である。 容積あたりの水分乾燥能力とコークス比の測定結果をプロットした図である。 熱伝達効率と炉内ガスの流速の測定結果をプロットした図である。 ガスの吹き抜け発生時間とコークス比の測定結果をプロットした図である。
 以下、本発明の好適な実施形態について、図面を参照しつつ詳細に説明する。説明において、同一要素又は同一機能を有する要素には同一の符号を付し、重複する説明を省略する。
 図1に示されるように、廃棄物処理装置1は、一般廃棄物や産業廃棄物を処理する装置であり、廃棄物溶融炉2と、水砕ピット5と、燃焼室6と、ボイラー61と、減温塔62と、集塵器63と、触媒反応塔64と、煙突65とを備えている。廃棄物溶融炉2は、還元雰囲気下で廃棄物中の可燃物を熱分解してガス化し、灰分や不燃物を溶融する。後述するように、廃棄物から生成されたガスは、廃棄物溶融炉2の上部から排出され、廃棄物から生成された溶融物は、廃棄物溶融炉2の下部から排出される。
 水砕ピット5は、廃棄物溶融炉2の下部から排出された溶融物を水砕冷却させ、回収する。水砕ピット5は、冷却水を貯留するケーシングと、ケーシング内で水砕冷却された冷却物を取り出すためのスクレーパコンベア(不図示)を備えている。燃焼室6及びボイラー61は、排気ダクトを介して廃棄物溶融炉2の上部に接続され、廃棄物溶融炉2の排ガスから熱エネルギーを回収する。減温塔62、集塵器63、触媒反応塔64は、ボイラー61の下流側に接続され、排ガスを無害化する。煙突65は、無害化された排ガスを放出する。
 廃棄物溶融炉2は、レンガ、SiCやアルミナ等を含む耐火性物質等によって形成されている。廃棄物溶融炉2は、上下方向に沿う軸線CL1を中心として上下方向に延在する筒状の本体部20と、本体部20の上側に連なるガス誘導部21と、本体部20の下側に連なる溶融物貯留部22とを備えている。本体部20は、廃棄物を収容する空間を形成し、廃棄物を上方から下方へ案内する。ガス誘導部21は、本体部20内の廃棄物から生成されたガスを集め、排気ダクトに導く。溶融物貯留部22は、本体部20内の廃棄物から生成された溶融物を貯留する。
 本体部20は、内側の断面積が一定の直胴部23と、直胴部23の下側に連なり、下方に向かうに従い内側の断面積が小さくなるテーパ部24とで構成されている。直胴部23の内面23aは円柱状を呈し、テーパ部24の内面24aは逆円錐台形状を呈している。テーパ部24の上端部の内径は、直胴部23の内径と同等である。
 テーパ部24の高さH2は、直胴部23の高さH3に比べ大きい(図3参照)。すなわち、本体部20を構成する全部分の中で、テーパ部24は最大の高さを占める。このため、直胴部23が最大の高さを占める場合に比べ、水平面に対するテーパ部24の内面24aの傾斜角θが大きい。傾斜角θは、75°を超え且つ90°未満である。80°以上且つ90°未満であることがより好ましい。
 本体部20の内径及び高さは、例えば、後述する乾燥領域70に必要な容積及び熱分解領域71に必要な容積に応じて定められる。乾燥領域70に必要な容積は、例えば、1時間当りの水分乾燥量を50~150kg/m・hとして、1時間当たりに廃棄物溶融炉2に投入される廃棄物に含まれる水分量(すなわち、投入水分量)の全量を乾燥し得る容積である。熱分解領域71に必要な容積は、例えば、1時間当たりの炭素ガス化量を50~150kg/m・hとして、1時間当たりに廃棄物溶融炉2内に投入する廃棄物及びコークスに含まれる炭素をガス化し得る容積である。
 溶融物貯留部22は、軸線CL1を中心とする円筒状の側壁部22aと、側壁部22aの下端部を塞ぐ底部22bとを有している。側壁部22aの上端部は、テーパ部24の下端部に接続されている。側壁部22aの内径は、テーパ部24の下端部の内径と同等である。側壁部22aの下端部には、溶融物貯留部22に貯留された溶融物を排出する出湯口27が設けられている。出湯口27には開閉機構(不図示)が設けられており、間欠的に溶融物を排出する。出湯口27の外側には、側壁部22aから斜め下方に延出する溶融物樋28が設けられている。溶融物樋28は、溶融物を水砕ピット5に送る。
 ガス誘導部21は、軸線CL1を中心とする円筒形状を呈している。ガス誘導部21の下端部は、本体部20の直胴部23の上端部に接続されている。ガス誘導部21の下端部の内径は、直胴部23の内径と同等である。上下方向でのガス誘導部21の中間部は径方向に膨出している。このため、ガス誘導部21の内面21aは、直胴部23の内面23aに比べ径方向に膨らんでいる。ガス誘導部21の上端部は、下端部に比べ縮径され、廃棄物溶融炉2の開口部2aを構成している。
 開口部2aには、内筒25が挿入される。内筒25は、軸線CL1を中心とする円筒形状を呈し、廃棄物溶融炉2内に廃棄物及び炭素系可燃物質を導入する。内筒25の下端部はガス誘導部21の下端部に比べ上方に位置する。ガス誘導部21の上部には、排気口26が設けられている。排気口26は、本体部20内の廃棄物から生成されたガスを排出する。排気口26は、排気ダクトを介して燃焼室6に接続される。
 溶融物貯留部22には、酸素富化された空気(以下、「酸素富化空気」という。)を炉内に供給するための下段羽口40が設けられている。酸素富化とは、酸素濃度を高めることである。下段羽口40は、側壁部22aの周方向に並ぶ複数の箇所に配置されている。下段羽口40の好ましい配置例として、周方向に45°間隔で並ぶ8カ所に下段羽口40を配置することが挙げられる。下段羽口40の先端部は、溶融物貯留部22内に突出していてもよいし、突出していなくてもよい。
 テーパ部24には、空気を炉内に供給するための上段羽口30,31,32,33が設けられている。上段羽口30,31,32,33は、上方から下方に並んでいる。上下方向に並ぶ上段羽口の数は4段に限られず、4段未満であってもよいし、5段以上であってもよい。上段羽口30,31,32,33のそれぞれは、テーパ部24の周方向に並ぶ複数の箇所に配置されている。好ましい配置例として、上段羽口30,31,32,33のそれぞれを、周方向に90°間隔で並ぶ4箇所に配置することが挙げられる。上段羽口30,31,32,33の先端部は、テーパ部24内に突出していてもよいし、突出していなくてもよい。
 上段羽口30,31,32,33及び下段羽口40には、送風機42が接続されている。送風機42から上段羽口30,31,32,33及び下段羽口40に向かう流路には、流量調節バルブ30a,31a,32a,33a,40aがそれぞれ設けられている。また、流量調節バルブ40aから下段羽口40に向かう流路には、空気を酸素富化するための酸素発生器41が接続されている。
 図2に示されるように、廃棄物溶融炉2には、炉内温度を測定するための温度計T1~T5が配置されている。温度計T1は、ガス誘導部21の上部に配置されている。温度計T5は、溶融物貯留部22の底部22bを構成する耐火物内に埋設されている。温度計T2,T3,T4は、温度計T1,T5の間で上方から下方に並んでいる。また、廃棄物溶融炉2には、炉内圧力を測定するための複数の圧力計が配置されている。圧力計P1は、ガス誘導部21の上部に配置されている。圧力計P2,P3,P4は、テーパ部24の上部、中部、下部にそれぞれ配置されている。
 続いて、廃棄物溶融炉2の動作について詳細に説明する。まず、廃棄物投入開始前に、内筒25を通し、炭素系可燃物質が廃棄物溶融炉2内に導入される。炭素系可燃物質は、例えばコークスである。化石燃料に由来するコークスの消費量を削減するために、コークスの全部又は一部を、木材等のバイオマスの炭化物で代替してもよい。廃棄物溶融炉2内の底部22b上に蓄積されたコークスは、バーナー(不図示)等を用いて着火される。これにより、炉内の底部に所謂コークスベッド81が形成される。
 次に、内筒25を通し、コークス及び廃棄物の混合物が廃棄物溶融炉2内に導入され、この混合物で本体部20内が満たされる。廃棄物の種類は特に限定されることはなく、一般廃棄物、産業廃棄物のいずれであってもよい。シュレッダーダスト(ASR)、掘り起こしごみ、焼却灰などの単体又は混合物、或いはこれらと可燃性ごみの混合物なども処理することが可能である。また、乾留された廃棄物を投入してもよい。コークスの他に、塩基度調整剤としての石灰石等を廃棄物に添加してもよい。
 この状態で、下段羽口40からは、酸素富化空気が炉内に供給される。酸素富化空気の送風圧力の好ましい設定例として、5~25kPaの範囲内に設定することが挙げられる。なお、下段羽口40から炉内に供給される酸素富化空気に、LNGなどの燃料ガスを混合してもよい。更に、上段羽口30,31,32,33からは、空気が炉内に供給される。空気の送風圧力の好ましい設定例として、5~25kPaに設定することが挙げられる。
 廃棄物溶融炉2の底部22b側では、下段羽口40から供給される酸素富化空気により、コークスの燃焼が継続し、燃焼で発生した高温の炉内ガスが上昇する。また、上段羽口30,31,32,33から供給される空気により、テーパ部24において廃棄物が部分燃焼し、部分燃焼で発生した高温の炉内ガスが上昇する。廃棄物は、本体部20に案内され、炉内ガスの上昇流に対向しながら下降する。この過程で、炉内ガスと廃棄物との間で熱交換が行われ、廃棄物の乾燥及び廃棄物の熱分解が促進される。廃棄物の熱分解により発生したガスは、ガス誘導部21内に集まって上方に導かれ、排気口26を通って排出される。排出されたガスは排気ダクトを通って燃焼室6に送られる。
 熱分解残渣(炭化物)は、灰分、不燃物と共に、テーパ部24の内面24aに沿って廃棄物溶融炉2の底部22b側に集まり、コークスベッド81の上に炭化物粒子層(所謂チャー層)82を形成する。チャー層82は、通気抵抗層として機能し、下段羽口40から供給される酸素富化空気の流れを整える。これにより、下段羽口40から供給される酸素富化空気の局所的な吹き抜けが防止される。
 熱分解残渣の可燃性乾留物(固定炭素)は、コークスと共に燃焼される。コークス及び可燃性乾留物の燃焼ガスは、コークスベッド81の上端近傍の領域で最高温度となる。この領域で、灰分、不燃物が溶融する。溶融物はコークスベッドの隙間を通って溶融物貯留部22に進入し、貯留される。貯留された溶融物は、出湯口27から間欠的に取り出される。出湯口27から取り出された溶融物は、水砕ピット5で水砕冷却され、スラグ及びメタルとして回収される。以後、コークス及び廃棄物の混合物が炉内に補充され、廃棄物溶融処理が継続される。
 ここで、廃棄物溶融処理を継続している間、廃棄物溶融炉2内の上部には、乾燥領域70が形成される。乾燥領域70では、主として廃棄物の乾燥及び予熱が行われる。乾燥領域70の下側には、熱分解領域71が形成される。熱分解領域71では、主として乾燥した廃棄物中の可燃成分の熱分解及びガス化が行われる。熱分解領域71の下側には、溶融領域72が形成される。溶融領域72では、主として灰分、不燃物の溶融が行われる(図3参照)。上述したように、直胴部23が最大の高さを占めるのに比べ、テーパ部24の上端部の位置が高いことから、テーパ部24の上端部は乾燥領域70に達しており、乾燥領域70と熱分解領域71との境界部はテーパ部24内に位置している。
 上段羽口30,31,32,33の中で、最上段に配置された上段羽口30は乾燥領域70に位置している。上段羽口30は、乾燥領域70の下端部とテーパ部24の上端部との間において、乾燥領域70の下端部寄りに位置している。
 乾燥領域70内では、熱分解領域71内に比べ、廃棄物同士の間に大きな空隙が形成されていることから、乾燥領域70内の廃棄物は、熱分解領域71内の廃棄物に比べ動きやすい。このため、乾燥領域70の上段羽口30による送風量が過大であると、炉内ガスの吹き抜け経路の形成を助長してしまうおそれがある。そこで、上段羽口30からの送風量を、一箇所当たり50Nm/h以下とすることが好ましい。なお、必ずしも乾燥領域70に上段羽口30を設けなくてもよい。また、4段の上段羽口30,31,32,33のうち2段以上を乾燥領域70内に配置してもよい。
 なお、炉内のいずれの部分が乾燥領域70、熱分解領域71、溶融領域72であるかは、例えば炉内温度によって把握可能である。例えば、炉内温度が350~600℃である部分は乾燥領域であり、炉内温度が600~1200℃である部分は熱分解領域であり、炉内温度が1200~1800℃である部分は溶融領域である。本実施形態では、廃棄物溶融炉2内の上部から下部にかけて、温度計T1~T5が配置されている。各温度計で測定される温度により、乾燥領域70、熱分解領域71、溶融領域72の範囲を大まかに把握できる。
 また、乾燥領域70と熱分解領域71の境界部の位置は、例えば炉内差圧によっても把握可能である。乾燥領域70において、廃棄物は、乾燥により水分が除去されることによって減容化される。熱分解領域において、廃棄物は、熱分解により炭化物粒子を形成し、更に減容化されて密集する。このため、乾燥領域における差圧と熱分解領域における差圧とには例えば0.5kPa/m程度の差がある。ここでの差圧とは、1mの下降に伴う圧力の上昇量である。そこで、上方の領域の差圧に比べて例えば0.5kPa/m程度差圧が上昇する部位を把握することで、乾燥領域70と熱分解領域71の境界部をおおまかに把握できる。炉内各部の差圧は、炉内に配置された圧力計P1~P4により大まかに把握できる。例えば、中部圧力計P3付近における差圧が上方の領域に比べ0.5kPa/m程度上昇していれば、中部圧力計P3付近が乾燥領域70と熱分解領域71の境界部であることが把握される。
 すなわち、廃棄物の熱分解領域71は、乾燥領域70内において0.5kPa/m以上の差圧上昇が完了するまで下降した部位より下の領域である。なお、ここでの差圧は、炉の操業が比較的安定しているときの差圧を意味し、ガスの吹き抜け等が発生しているときの差圧を除く。
 以上に説明した廃棄物溶融炉2では、本体部20を構成する全部分の中でテーパ部24が最大の高さを占めている。このため、テーパ状でない直胴部23が最大の高さを占めている場合に比べ、水平面に対するテーパ部24の内面24aの傾斜角が大きい。これにより、テーパ部24の内面24a近傍の廃棄物が円滑に下方に導かれる。更に、直胴部23の内面23aに対するテーパ部24の内面24aの傾斜が緩やかであるため、テーパ部24の上端部に廃棄物が停滞し難い。また、テーパ部24が最大の高さを占めていると、テーパ部24の上端部は本体部20の上部側に位置する。廃棄物は、乾燥及び熱分解により、本体部20内を下降するに従って減容化される。この減容化は、本体部20の上部側でも進行する。テーパ部24の上端部が本体部20の上部側に位置していると、本体部20の上部側でも進行する減容化に合わせて、本体部20の断面積が上部側から下方へ向かうに従い小さくなる。このため、空洞の発生が抑制され、ガスの吹き抜けが防止される。これらのことから、直胴部23が最大の高さを占めている場合に比べ、廃棄物と炉内ガスとの熱交換の効率が向上する。従って、コークスの消費量を低減できる。
 なお、直胴部23が最大の高さを占めている場合に比べ、本体部20の内容積は小さいが、廃棄物の処理効率への悪影響はない。これは、上述したように廃棄物と炉内ガスとの熱交換の効率が向上し、廃棄物が効率よく減容化されるためである。
 水平面に対するテーパ部24の内面24aの傾斜角は、75°を超え且つ90°未満である。このため、廃棄物の停滞がより確実に防止される。従って、廃棄物と炉内ガスとの熱交換の効率を更に向上させることができる。
 乾燥領域70と熱分解領域71との境界部はテーパ部24内に位置している。これにより、テーパ部24の上端部が乾燥領域70内に位置する。上述した廃棄物の減容化は乾燥領域70内でも進行する。テーパ部24の上端部が乾燥領域70内に位置していると、乾燥領域70内でも進行する減容化に合わせて、本体部20の断面積が乾燥領域70内から下方へ向かうに従い小さくなる。このため、空洞の発生をより確実に抑制できる。
 また、上段羽口30は乾燥領域70に位置している。このため、乾燥領域70における廃棄物の乾燥が更に促進される。上述したように、テーパ部24の上端部が乾燥領域70内に位置していることから、乾燥領域70内の廃棄物はテーパ部24に沿って下降する。廃棄物の乾燥が促進されると、廃棄物が更に減容化され、テーパ部24に沿った荷下がりが更に円滑化される。また、乾燥の促進により減容化された廃棄物がテーパ部24によって中央に集められるため、空洞の形成は抑制される。このように、テーパ部24の上端部が乾燥領域70内に位置することと、上段羽口30が乾燥領域70に設けられていることとが相俟って、空洞の形成を抑制しつつ廃棄物の乾燥を促進することが可能となっている。
 上段羽口30は、乾燥領域70の下端部とテーパ部24の上端部との間において、乾燥領域70の下端部寄りに位置している。これにより、乾燥領域70に位置する上段羽口30を直胴部23とテーパ部24の境界部から離間させ、空洞の発生をより確実に抑制できる。
 更に、廃棄物溶融炉2によれば、熱分解残渣の付着の発生が抑制されることから、廃棄物溶融炉2のメンテナンス時の作業負担を格段に軽減できる。また、空洞の発生が抑制されることから、廃棄物溶融炉2の安定した操業が可能となる。仮に空洞が発生し、その空洞が成長すると、炉内差圧は低下する。そして、成長していた空洞が荷崩れに伴って埋まると、炉内差圧は急激に上昇する。空洞の発生が抑制されると、このような炉内差圧の変動も抑制されるため、廃棄物溶融炉の安定した操業が可能となる。
 廃棄物溶融炉2では、直胴部23が最大の高さを占めている場合に比べ、従来の炉に比べて熱分解領域71の内径が小さくなる。その分、チャー層の層厚を大きくすることができ、充分な炉内差圧を確保することが可能となる。このことも、廃棄物溶融炉2の操業の安定化に寄与する。
 以上、本発明の好適な実施形態について説明してきたが、本発明は必ずしも上述した実施形態に限定されるものではなく、その要旨を逸脱しない範囲で様々な変更が可能である。例えば、本体部20が直胴部23を有さず、テーパ部24のみで構成されていてもよい。すなわち、テーパ部24は、本体部20の全高H1を占めていてもよい。
 以下に、本発明の実施例及び比較例を示すが、本発明は、ここで示す実施例に限定されるものではない。
(1)実施例1
 実施例1として、図4(a)に模式的に示される廃棄物溶融炉2Aを用意した。廃棄物溶融炉2Aは、上述した実施形態の廃棄物溶融炉2に相当する。本体部20の全高H1に対するテーパ部24の高さH2の比率は95%である。水平面に対するテーパ部24の内面24aの傾斜角θは、80°である。廃棄物溶融炉2Aでは、90°間隔で周方向に並ぶ4箇所に上述した温度計T2を設けた。
(2)実施例2
 実施例2として、図4(b)に模式的に示される廃棄物溶融炉2Bを用意した。廃棄物溶融炉2Bは、上述した実施形態の廃棄物溶融炉2に相当する。本体部20の全高H1に対するテーパ部24の高さH2の比率は50%である。水平面に対するテーパ部24の内面24aの傾斜角θは75°である。廃棄物溶融炉2Bの直胴部23の内径、テーパ部24の下端部の内径、本体部20の全高H1は、廃棄物溶融炉2Aの直胴部23の内径、テーパ部24の下端部の内径、本体部20の全高H1と同等である。
(3)比較例1
 比較例1として、図4(c)に模式的に示される廃棄物溶融炉2Cを用意した。次の点で、廃棄物溶融炉2Cは上述した実施形態の廃棄物溶融炉2と異なっている。本体部20を構成する全部分の中で直胴部23が最大の高さを占めている。本体部20の全高H1に対するテーパ部24の高さH2の比率は35%である。上段羽口30,31,32,33のうち、最上部の上段羽口30を有していない。全ての上段羽口31,32,33は、熱分解領域71に位置している。水平面に対するテーパ部24の内面24aの傾斜角θは70°である。
 廃棄物溶融炉2Cの直胴部23の内径、テーパ部24の下端部の内径、本体部20の全高H1は、廃棄物溶融炉2Aの直胴部23の内径、テーパ部24の下端部の内径、本体部20の全高H1と同等である。廃棄物溶融炉2Cにも、90°間隔で周方向に並ぶ4箇所に上述した温度計T2を設けた。
(4)炉内差圧、炉頂ガス温度及び炉中部ガス温度の比較評価
 実施例1,2及び比較例1の廃棄物溶融炉2A,2B,2Cを同時期に操業し、炉内差圧を測定した。また、実施例1及び比較例1の廃棄物溶融炉2A,2Cについては、炉頂ガス温度及び炉中部ガス温度も測定した。なお、上段羽口30を有しない比較例1を比較対象として、本体部20の形状の効果のみを評価するために、実施例1及び2において上段羽口30からの空気の供給を行わなかった。
 本試験例における炉内差圧は、テーパ部24の下部に設けた圧力計P4の検出値と、ガス誘導部21の上部に設けられた圧力計P1の検出値の差である。炉頂ガス温度は、ガス誘導部21の上部に設けられた温度計T1の検出値である。炉中部ガス温度は、温度計T2による測定値である。
 図5は、炉内差圧の経日的な推移を示す線図である。図5の折れ線L1に示されるように、比較例1では、1日目から3日目にかけて炉内差圧が低くなっており、炉の操業に好適な範囲の下限値LLを下回ることがあった。この結果から廃棄物溶融炉2Cでは、1日目から3日目にかけてガスの吹き抜けが発生し、これに起因して炉内差圧が低下したことが推定される。
 ガスの吹き抜けが発生した要因として、廃棄物溶融炉2Cでは、テーパ部24の内面24a近傍に廃棄物の停滞が生じたことが考えられる(図4(c)中の斜線部参照)。廃棄物の停滞が生じると、例えば、停滞した廃棄物が上段羽口31,32,33からの空気によって局所的に熱分解され、空洞が発生し、空洞が成長して炉内ガスの流路が形成されることが考えられる(このような現象は、直胴部23の内面23aとテーパ部24の内面24aの境界部の近傍で特に発生し易い。)。
 これに対し、実施例1の炉内差圧は、図5の折れ線L2に示されるように、炉の操業に望ましい範囲の下限値LLを上回っており、経日的な炉内差圧の変動幅が小さかった。実施例2の炉内差圧も、図5の折れ線L3に示されるように、実施例1の炉内差圧よりは低いものの、下限値LLを上回っており、経日的な炉内差圧の変動幅が小さかった。この結果から、実施例1及び2では、ガスの吹き抜けの発生が抑制されていることが推定される。
 図6は、炉頂ガス温度の経日的な推移を示す線図である。図6の折れ線L4に示されるように、比較例1の炉頂ガス温度は、1日目から3日目にかけて高くなっており、4日目以降の温度との差が大きい。1日目から3日目の温度は、炉の操業に望ましい範囲の上限値MLを上回っている。この結果から、比較例1では、1日目から3日目にかけてガスの吹き抜けが発生し、これに起因して炉頂温度が上昇したことが推定される。
 これに対し、実施例1の炉頂ガス温度は、図6の折れ線L5に示されるように、炉の操業に望ましい範囲の上限値MLを下回っており、経日的な炉頂ガス温度の変動幅が小さかった。この結果から、実施例1では、ガスの吹き抜けの発生が抑制されていることが推定される。
 炉中部ガス温度の測定結果を図7に示す。図7は、炉中部ガス温度の経時的な推移を示す線図である。図7(a)に示されるように、比較例1では、4つの温度計T2のいずれにおいても、経時的に大幅な温度変動が示された。温度の変動が起きた時間帯は、各温度計において異なっている。この結果から、比較例1では、炉内の異なる場所、異なる時間帯で次々にガスの吹き抜けが発生したことが推定される。
 これに対し、実施例1では、図7(b)に示されるように、4つの温度計T2のいずれにおいても、経時的に大幅な温度変動は示されなかった。この結果から、比較例1の廃棄物溶融炉2Cに比べてガスの吹き抜けの発生が格段に抑制されていることが推定される。
 以上の結果から、本発明によれば、ガスの吹き抜けの発生を抑制できることが確認された。特に、実施例2では、本体部20の全高H1に対するテーパ部24の高さH2の比率が50%以上であることから、本体部20を構成する全部分の中で、テーパ部が最大の高さを占めるという条件を満足していれば、ガスの吹き抜けの発生を抑制できることがほぼ確認された。
 なお、1ケ月が経過した後に操業を停止し、各炉の内部検査を実施した。その結果、比較例1の廃棄物溶融炉2Cの内面には、熱分解残渣が溶融した付着物が形成されていた。これに対し、実施例1の廃棄物溶融炉2Aの内面には、熱分解残渣が溶融した付着物は全くなかった。
(5)コークス比の比較評価
 実施例1及び比較例1の廃棄物溶融炉2A,2Cを同時期に約1週間操業し、コークス比を比較した。なお、上段羽口30を有しない比較例1を比較対象として、本体部20の形状の効果のみを評価するために、実施例1及び2において上段羽口30からの空気の供給を行わなかった。
 図8は、廃棄物処理量、コークス比、炉内差圧、炉頂ガス温度の測定結果を示す図である。コークス比、炉内差圧及び炉頂ガス温度は、比較例1の測定結果を基準とした差分で示されている。コークス比(kg/TR)は、溶融炉に装入したコークスの量(kg)を、溶融炉で処理した廃棄物総量(t)で除した値である。図8に示されるように、実施例1では、比較例1に比べ、約1週間程度の短期試験において、コークス比が約12.7kg/TR低減されていた。この結果から、本発明によれば、炭素系可燃物質の消費量を低減できることが確認された。
 なお、図8の結果によれば、比較例1の炉頂ガス温度に比べ、実施例1の炉頂ガス温度は約100℃低い。更に比較例1の炉内差圧に比べ、実施例1の炉内差圧は約1.5kPa高い。これらの結果から、廃棄物溶融炉2A内では、廃棄物の停滞、ガスの吹き抜けの発生が抑制されていることが推定される。このことが、炭素系可燃物質の消費量の削減に大きく寄与しているものと考えられる。
(6)乾燥能力の比較評価
 実施例1及び比較例1の廃棄物溶融炉2A,2Cを同時期に操業し、乾燥能力を比較した。乾燥能力に関連するパラメータとして、炉内ガスの流速(空塔速度)、炉内差圧、コークス比、炉内熱交換温度、容積当り水分乾燥能力及び熱伝達効率を操業中に測定し、比較した。なお、本評価は、乾燥領域70の下端部がテーパ部24内に位置することと、上段羽口30が乾燥領域70に設けられることとが相俟って得られる効果を確認することを目的としている。このため、実施例1において上段羽口30からの空気の供給を行った。
 図9(a)は、炉の高さ方向における炉内ガスの流速(空塔速度)の分布を示す線図である。曲線L6は、実施例1における炉内ガスの流速を示し、曲線L7は、比較例1における炉内ガスの流速を示している。基準線b1,b2,b3,b4は、それぞれ上段羽口30,31,32,33の位置を示している。図9(b)は、炉の高さ方向における炉内差圧の分布をプロットした図である。基準線a1,a2,a3,a4,a5は、炉内差圧の測定に用いた圧力計の位置を示している。ここで用いた圧力計は、上述した圧力計P1,P2,P3,P4とは異なる。プロットF1,F2,F3,F4は、それぞれ基準線a2,a1間の差圧、基準線a3,a2間の差圧、基準線a4,a3間の差圧、基準線a5,a4間の差圧を示している。図9(a)及び図9(b)は、縦軸を炉の高さとして描かれており、各縦軸のスケールは、図9(c)に示される炉の断面図の高さに合わせられている。
 図9(a)の曲線L6,L7に示されるように、実施例1では比較例1に比べて炉内ガスの流速が高い。これにより実施例1によれば、炉内ガスと廃棄物との熱交換効率が向上し、乾燥能力が向上することが推定される。また、上述したように、実施例1ではガスの吹き抜けの発生が抑制され、炉内ガスの流れが安定化する。このため、炉内ガスの流速が高くなることと、炉内ガスの流れが安定化することが相俟って、炉内ガスと廃棄物との熱交換効率が一層向上することが推定される。
 なお、比較例1では、操業中に度々ガスの吹き抜けが発生し、炉頂ガス温度が上昇してしまい、上段羽口31からの送風を停止することを余儀なくされた。その結果が図9の流速のデータにも表れている。一方、実施例1では、ガスの吹き抜けの発生が抑制されるので、上段羽口31からの安定的且つ定常的な送風を行うことができた。
 図10は、炉内熱交換温度(℃)とコークス比(kg/TR)の測定結果をプロットした図である。図中黒丸のプロットは実施例1の測定結果を示し、白三角のプロットは比較例1の測定結果を示している。炉内熱交換温度は、次式により算出される。
炉内熱交換温度=熱分解領域での炉内燃焼温度1000℃(仮定)-炉頂ガス温度(実績値)
図10に示されるように、実施例1では、比較例1に比べて熱交換温度が高く且つコークス比が低かった。すなわち、実施例1では、比較例1に比べて廃棄物の乾燥が促進されていることが確認された。
 図11は、容積あたりの水分乾燥能力(Mcal/(m・h))とコークス比(kg/TR)の測定結果をプロットした図である。図中黒丸のプロットは実施例1の測定結果を示し、白三角のプロットは比較例1の測定結果を示している。容積当り水分乾燥能力は、次式により算出される。
容積当りの水分乾燥能力={廃棄物投入量(t/h)×廃棄物中の水分(%)×水分蒸発潜熱(Mcal/t)}÷乾燥領域容積(m
 図12は、熱伝達効率(Mcal/(m・h・℃))と炉内ガスの流速(空塔速度)(Bm/s)の測定結果をプロットした図である。図中黒丸のプロットは実施例1の測定結果を示し、白三角のプロットは比較例1の測定結果を示している。熱伝達効率は、次式により算出される。
熱伝達効率=伝熱面積×熱伝達率
炉内ガスの流速は、上段羽口30の高さにおける流速を示している。
図11及び図12に示されるように、実施例1では、比較例1に比べ、乾燥能力が約2.5倍となっていることが確認された。伝熱面積及び熱伝達率に基づくと、この約2.5倍の乾燥能力の向上は、炉内ガスの流れの安定化に起因する約1.7倍の向上と、炉内ガスの流速が高くなったことに起因する約1.5倍の向上とによるものであった。
(7)上段羽口30の有無の比較評価
 実施例1の廃棄物溶融炉2Aの操業において、上段羽口30から空気の供給を行った場合と、行わなかった場合とで、ガスの吹き抜けが発生した時間を比較した。図13は、ガスの吹き抜け発生時間とコークス比の測定結果をプロットした図である。図中黒丸のプロットは、上段羽口30から空気の供給を行った場合の測定結果を示し、白三角のプロットは、上段羽口30から空気の供給を行わなかった場合の測定結果を示している。
 図13に示されるように、上段羽口30から空気の吹き込みを行わなかった場合には、ガスの吹き抜け時間のばらつきが大きく、長時間の吹き抜けが発生するときがあった。なお、白三角のプロットには、長時間の吹き抜けが発生するとその影響でコークス比が上昇する傾向も示されている。
 これに対し、上段羽口30から空気の吹き込みを行った場合には、ガスの吹き抜け時間のばらつきが小さく、全体的にガスの吹き抜け時間が短かった。この結果から、上段羽口30から空気を吹き込むことによって、ガスの吹き抜けの発生が更に抑制されることが確認されると共に、炭素系可燃物質の消費量を低減できることが確認された。
 本発明は、一般廃棄物や産業廃棄物の処理に利用できる。
 2…廃棄物溶融炉、20…本体部、21…ガス誘導部、22…溶融物貯留部、24…テーパ部、24a…内面、26…排気口、30,31,32,33…上段羽口、40…下段羽口、70…乾燥領域、71…熱分解領域、72…溶融領域、CL1…軸線。

Claims (4)

  1.  廃棄物の乾燥、熱分解及び溶融を行う廃棄物溶融炉であって、
     上下方向に延在して前記廃棄物を収容する空間を形成し、前記廃棄物を上方から下方に案内する筒状の本体部と、
     前記本体部の中心軸線に沿って前記本体部の下側に連なり、前記廃棄物から生成された溶融物を貯留する溶融物貯留部と、
     前記本体部の中心軸線に沿って前記本体部の上側に連なり、前記廃棄物から生成されたガスを集めて排気口へ導くガス誘導部と、を備え、
     前記本体部は、下方へ向かうに従い内側の断面積が徐々に小さくなるテーパ部を有し、
     上下方向において、前記テーパ部は前記本体部の全高を占めるか、又は前記本体部を構成する全部分の中で最大の高さを占め、
     水平面に対する前記テーパ部の内面の傾斜角は、75°を超え且つ90°未満である廃棄物溶融炉。
  2.  前記本体部は、廃棄物を乾燥させる乾燥領域と、前記乾燥領域の下方で廃棄物を熱分解させる熱分解領域と、を有し、前記乾燥領域と前記熱分解領域との境界部が前記テーパ部内に位置している請求項1記載の廃棄物溶融炉。
  3.  前記溶融物貯留部には、酸素富化された空気を炉内に供給するための下段羽口が設けられ、前記テーパ部には、空気を炉内に供給するための上段羽口が設けられ、少なくとも一つの前記上段羽口は、前記乾燥領域に位置する請求項2記載の廃棄物溶融炉。
  4.  前記乾燥領域に位置する前記上段羽口は、前記乾燥領域の下端部と前記テーパ部の上端部との間において、前記乾燥領域の下端部寄りに位置する請求項3記載の廃棄物溶融炉。
PCT/JP2013/070334 2012-12-25 2013-07-26 廃棄物溶融炉 WO2014103417A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
CN201380003838.XA CN104053949B (zh) 2012-12-25 2013-07-26 废弃物熔融炉
KR1020147028431A KR101921225B1 (ko) 2012-12-25 2013-07-26 폐기물 용융로
PL13830075T PL2940386T3 (pl) 2012-12-25 2013-07-26 Piec do topienia odpadów
ES13830075T ES2748138T3 (es) 2012-12-25 2013-07-26 Horno de fusión para material de desecho
EP13830075.1A EP2940386B1 (en) 2012-12-25 2013-07-26 Waste melting furnace
BR112014006698A BR112014006698B8 (pt) 2012-12-25 2013-07-26 Forno de fundição de resíduos para secar, decompor termicamente e fundir resíduos

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-281343 2012-12-25
JP2012281343A JP5283780B1 (ja) 2012-12-25 2012-12-25 廃棄物溶融炉

Publications (1)

Publication Number Publication Date
WO2014103417A1 true WO2014103417A1 (ja) 2014-07-03

Family

ID=49274015

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/070334 WO2014103417A1 (ja) 2012-12-25 2013-07-26 廃棄物溶融炉

Country Status (8)

Country Link
EP (1) EP2940386B1 (ja)
JP (1) JP5283780B1 (ja)
KR (1) KR101921225B1 (ja)
CN (1) CN104053949B (ja)
BR (1) BR112014006698B8 (ja)
ES (1) ES2748138T3 (ja)
PL (1) PL2940386T3 (ja)
WO (1) WO2014103417A1 (ja)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6299466B2 (ja) * 2014-06-17 2018-03-28 Jfeエンジニアリング株式会社 廃棄物ガス化溶融装置及び廃棄物ガス化溶融方法
CN105605581B (zh) * 2016-03-09 2017-11-28 中冶华天工程技术有限公司 竖式垃圾气化熔融炉
CN106642139A (zh) * 2017-02-20 2017-05-10 长沙超梵环境科技有限公司 生活垃圾热解气化飞灰直接熔融装置及其使用方法
CN108330282A (zh) * 2018-03-08 2018-07-27 扬州晨光特种设备有限公司 危险废弃物熔融-冶金一体化的处理方法
CN108775585B (zh) * 2018-07-04 2020-05-12 加拿大艾浦莱斯有限公司 一种废弃物高温空气/水蒸气气化燃烧熔融系统
CN112197588B (zh) * 2020-10-30 2023-04-07 唐海燕 一种带碾压净化处理机构的环保型垃圾回收装置

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0484012A (ja) * 1990-07-25 1992-03-17 Yoshimoto Ukita ゴミ焼却炉
JPH0894036A (ja) 1994-09-27 1996-04-12 Nippon Steel Corp 廃棄物の溶融炉
JPH09329313A (ja) * 1996-06-07 1997-12-22 Kubota Corp 廃棄物ガス化溶融炉の操炉方法
JP2000291919A (ja) * 1999-04-07 2000-10-20 Nippon Steel Corp シャフト炉式熱分解溶融炉及び熱分解溶融方法
JP2001304760A (ja) * 2000-04-26 2001-10-31 Kawasaki Giken Co Ltd シャフト型熱分解溶融炉
JP2002130632A (ja) 2000-10-27 2002-05-09 Kawasaki Heavy Ind Ltd 廃棄物ガス化溶融炉とその操業方法
JP2002357309A (ja) * 2001-05-31 2002-12-13 Nkk Corp 廃棄物溶融炉及びその操業方法
JP2011012901A (ja) * 2009-07-02 2011-01-20 Nippon Steel Engineering Co Ltd 廃棄物溶融炉
JP2011089672A (ja) 2009-10-21 2011-05-06 Nippon Steel Engineering Co Ltd 廃棄物溶融処理方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5316633B2 (ja) * 1974-01-23 1978-06-02
JPS6011766B2 (ja) * 1978-12-25 1985-03-28 新日本製鐵株式会社 廃棄物の溶融式熱分解炉における燃焼支持ガス吹込方法
US4346661A (en) * 1980-03-20 1982-08-31 Osaka Gas Kabushiki Kaisha Furnace for treating industrial wastes
JPS5838694B2 (ja) * 1980-04-28 1983-08-24 大阪瓦斯株式会社 産業廃棄物処理炉
JP2723010B2 (ja) * 1993-10-29 1998-03-09 日本鋼管株式会社 収束衝撃波による廃棄物処理装置
JP3742441B2 (ja) * 1994-09-27 2006-02-01 新日本製鐵株式会社 シャフト炉方式の廃棄物の溶融炉における燃焼温度調整方法
JPH09112852A (ja) * 1995-10-17 1997-05-02 Nippon Steel Corp 廃棄物の処理装置および処理方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0484012A (ja) * 1990-07-25 1992-03-17 Yoshimoto Ukita ゴミ焼却炉
JPH0894036A (ja) 1994-09-27 1996-04-12 Nippon Steel Corp 廃棄物の溶融炉
JPH09329313A (ja) * 1996-06-07 1997-12-22 Kubota Corp 廃棄物ガス化溶融炉の操炉方法
JP2000291919A (ja) * 1999-04-07 2000-10-20 Nippon Steel Corp シャフト炉式熱分解溶融炉及び熱分解溶融方法
JP2001304760A (ja) * 2000-04-26 2001-10-31 Kawasaki Giken Co Ltd シャフト型熱分解溶融炉
JP2002130632A (ja) 2000-10-27 2002-05-09 Kawasaki Heavy Ind Ltd 廃棄物ガス化溶融炉とその操業方法
JP2002357309A (ja) * 2001-05-31 2002-12-13 Nkk Corp 廃棄物溶融炉及びその操業方法
JP2011012901A (ja) * 2009-07-02 2011-01-20 Nippon Steel Engineering Co Ltd 廃棄物溶融炉
JP2011089672A (ja) 2009-10-21 2011-05-06 Nippon Steel Engineering Co Ltd 廃棄物溶融処理方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2940386A4

Also Published As

Publication number Publication date
BR112014006698B8 (pt) 2022-11-08
EP2940386A1 (en) 2015-11-04
BR112014006698A2 (pt) 2017-04-11
JP5283780B1 (ja) 2013-09-04
EP2940386A4 (en) 2016-08-24
BR112014006698B1 (pt) 2021-12-07
EP2940386B1 (en) 2019-09-04
ES2748138T3 (es) 2020-03-13
KR101921225B1 (ko) 2018-11-22
CN104053949B (zh) 2017-05-24
JP2014126227A (ja) 2014-07-07
KR20150099684A (ko) 2015-09-01
CN104053949A (zh) 2014-09-17
PL2940386T3 (pl) 2020-02-28

Similar Documents

Publication Publication Date Title
CN104094059B (zh) 废弃物气化熔融炉
JP5283780B1 (ja) 廃棄物溶融炉
JP2002081624A (ja) 廃棄物ガス化溶融炉と同溶融炉の操業方法
JP5180917B2 (ja) 廃棄物溶融処理方法および廃棄物溶融処理装置
JP2008209041A (ja) ガス化溶融システムの燃焼制御方法及び該システム
JP5510782B2 (ja) 廃棄物溶融処理方法および廃棄物溶融処理装置
WO2010123444A1 (en) Method and plant for burning solid fuel
JP2017180922A (ja) 廃タイヤガス化溶融装置及び廃タイヤガス化溶融方法
JP5490488B2 (ja) 廃棄物溶融処理方法
JP2010255888A (ja) 廃棄物溶融処理方法および廃棄物溶融処理装置
JP2010065932A (ja) 熱分解ガスの二次燃焼炉の燃焼制御装置及び燃焼制御方法
JP2009058216A (ja) ガス化溶融システムの燃焼制御方法及び該システム
JP5574475B2 (ja) 廃棄物溶融処理方法および廃棄物溶融処理装置
JP6016196B2 (ja) 廃棄物ガス化溶融装置及び廃棄物ガス化溶融方法
JP5605576B2 (ja) 廃棄物ガス化溶融装置
JP6643088B2 (ja) 廃棄物処理方法及び廃棄物処理装置
JP6066454B2 (ja) 混合気体吹込装置及びこれを有する廃棄物ガス化溶融炉、混合気体吹込方法及びこれを用いた廃棄物ガス化溶融方法
JP6098804B2 (ja) 混合気体吹込装置及びこれを有する廃棄物ガス化溶融炉、混合気体吹込方法及びこれを用いた廃棄物ガス化溶融方法
JP6331149B2 (ja) 廃棄物ガス化溶融装置及び廃棄物ガス化溶融方法
JP2019190730A (ja) 廃棄物ガス化溶融装置及び廃棄物ガス化溶融方法
JP5974950B2 (ja) 混合気体吹込装置及びこれを有する廃棄物ガス化溶融炉、混合気体吹込方法及びこれを用いた廃棄物ガス化溶融方法
JP5783078B2 (ja) 廃棄物ガス化溶融炉のクリンカの破壊・発生抑制装置
JP6018860B2 (ja) 廃棄物ガス化溶融炉の立ち上げ方法
JP2014190598A (ja) 混合気体吹込装置及びこれを有する廃棄物ガス化溶融炉、混合気体吹込方法及びこれを用いた廃棄物ガス化溶融方法
JP6493744B2 (ja) 廃棄物ガス化溶融装置及び廃棄物ガス化溶融方法

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 2013830075

Country of ref document: EP

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13830075

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20147028431

Country of ref document: KR

Kind code of ref document: A

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112014006698

Country of ref document: BR

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 112014006698

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20140318