WO2014083873A1 - クレーンの制振制御システム及びクレーンの制振制御方法 - Google Patents

クレーンの制振制御システム及びクレーンの制振制御方法 Download PDF

Info

Publication number
WO2014083873A1
WO2014083873A1 PCT/JP2013/066750 JP2013066750W WO2014083873A1 WO 2014083873 A1 WO2014083873 A1 WO 2014083873A1 JP 2013066750 W JP2013066750 W JP 2013066750W WO 2014083873 A1 WO2014083873 A1 WO 2014083873A1
Authority
WO
WIPO (PCT)
Prior art keywords
vibration
support structure
crane
trolley
suppression control
Prior art date
Application number
PCT/JP2013/066750
Other languages
English (en)
French (fr)
Inventor
内田 浩二
草野 利之
Original Assignee
三菱重工マシナリーテクノロジー株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工マシナリーテクノロジー株式会社 filed Critical 三菱重工マシナリーテクノロジー株式会社
Priority to IN6846DEN2014 priority Critical patent/IN2014DN06846A/en
Priority to CN201380009611.6A priority patent/CN104136359B/zh
Publication of WO2014083873A1 publication Critical patent/WO2014083873A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/002Container cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00Safety gear

Definitions

  • the present invention relates to a vibration damping control system for a crane such as a container crane and a vibration damping control method for a crane during vibration caused by an earthquake or strong wind.
  • Seismic isolation technology is a technology that attaches a seismic isolation device such as a damper to the traveling part of a container crane so that the container crane does not follow the shaking of the ground.
  • the vibration control technology is a technology that suppresses the shaking of the container crane by providing a vibration control device on the support structure or the like of the container crane.
  • seismic isolation devices cannot be made very large, so they are not adequate for large earthquakes, and vibration control devices are often effective only for specific frequency components. There was a problem that the initial response was difficult.
  • Patent Document 1 provides a horizontal displacement absorbing device for seismic isolation on a support leg of a container crane, and a vibration damping on an upper portion of the container crane. What provided the mass damper apparatus for operation is disclosed.
  • the crane's seismic isolation / damping combined device using this technology is controlled to cancel the seismic force using mass, and it is excellent in handling early earthquakes and long-period earthquakes. The large external force acting on the crane when an earthquake occurs can be reduced efficiently.
  • Patent Document 1 since a machine room that does not move is used as a mass, a separate device for driving the machine room is required, which increases costs. Also, in a machine room, it is quite difficult to handle a wire rope used for main winding, undulation, and traversing of a container crane and to drive a machine room that does not move as a mass. In order to improve the earthquake resistance of the container crane, it is preferable that it is possible to deal with earthquakes of a wide range of frequencies and sizes, and in particular, it is possible to easily perform vibration damping retrofit.
  • the present invention has been made in view of the above-mentioned problems of conventional crane vibration suppression control systems, can easily perform vibration retrofitting, and can respond to vibrations caused by earthquakes and strong winds of a wide range of frequencies and sizes. It is an object of the present invention to provide a new and improved crane damping control system and crane damping control method.
  • One aspect of the present invention is a crane vibration suppression control system that reduces vibration of the support structure when the crane includes a girder provided on the top side of the support structure and a trolley that moves on the boom.
  • a vibration detection sensor for detecting the vibration, a trolley drive unit that is driven when the trolley moves on the girder and the boom, and a vibration speed of the support structure is calculated from a detection signal of the vibration detection sensor.
  • a determination unit that determines whether the damping control of the support structure is necessary from a calculation signal of the calculation unit, and when the determination unit determines that the damping control is necessary, the movement of the trolley
  • a command signal transmission unit that transmits a command signal for adjusting a speed to the trolley drive unit.
  • the vibration damping control of the support structure is enabled using the trolley provided in the crane, the vibration damping retrofit can be easily performed, and earthquakes with a wide range of frequencies and sizes can be obtained. Can handle vibrations caused by strong winds.
  • the determination unit may determine that the vibration suppression control is necessary when the vibration speed of the support structure is equal to or higher than a set value.
  • a seismic isolation device is further provided on the bottom side of the support structure, and the determination unit determines that the vibration suppression control is necessary when the seismic isolation device starts operating. It is good as well.
  • a normal power source that supplies power to the power receiving unit of the crane, and an emergency power source that supplies power to the power receiving unit when the normal power source fails during a vibration
  • Power supply switching means for switching the power supply source to the power receiving unit from the normal power supply to the emergency power supply when the power failure occurs may be provided.
  • a vibration damping control method for a crane that reduces vibration of the support structure when the crane includes a girder provided on the top side of the support structure and a trolley that moves on the boom.
  • the vibration detection step for detecting the vibration the vibration speed calculation step for calculating the vibration speed of the support structure from the detection result of the vibration detection step, and the support structure from the calculation result of the vibration speed calculation step.
  • the present invention relates to a crane vibration damping control method including a command signal transmission step of transmitting to a section.
  • active vibration suppression control can be performed by controlling the drive of an existing trolley in a crane when the crane support structure is vibrated due to an earthquake or the like due to an earthquake or the like. Easy retrofitting of vibration.
  • FIG. 1 is a front view showing a schematic configuration of a crane to which a first embodiment of a crane vibration damping control system of the present invention is applied. It is a block diagram which shows schematic structure of the vibration suppression control system of the crane of the embodiment. It is a flowchart which shows the outline of the vibration suppression control method of the crane of the embodiment. It is a front view which shows schematic structure of the crane with which 2nd Embodiment of the damping control system of the crane of this invention is applied. It is a block diagram which shows schematic structure of the vibration suppression control system of the crane of the embodiment. It is a flowchart which shows the outline of the vibration suppression control method of the crane of the embodiment.
  • FIG. 1 is a front view showing a schematic configuration of a crane to which a first embodiment of a vibration damping control system for a crane of the present invention is applied.
  • the container crane 10 unloads the container 16 mounted on the container ship 14 berthed on the quay 12 to the land and loads the land container 16 on the container ship 14.
  • a crane that reciprocates between the mouths of the container ship 14.
  • the container crane 10 includes a support structure 20 provided to be movable on a traveling rail 18 laid along the quay 12, a girder 22 provided on the top side of the support structure 20, and the top side of the support structure 20.
  • a boom 23 that extends in a substantially horizontal direction so as to project from the sea side to the sea side, and a trolley 24 that moves on the girder 22 and the boom 23.
  • a traveling device 26 that rolls on the traveling rail 18 is provided on the bottom side of the supporting structure 20, and the supporting structure 20 can move along the traveling rail 18.
  • the girder 22 and the boom 23 provided on the top side of the support structure 20 are provided with a traverse rail 27 for the trolley 24 to move along the girder 22 and the boom 23, and the trolley 24 moves on the traverse rail 27. It is movable.
  • the trolley 24 is driven to rotate in a direction in which the traverse drum is rotated forward or reverse by a rope pulling system using a traverse drum (not shown) provided in a machine chamber 28 disposed on the top side of the support structure 20. , And traverse along the girder 22.
  • a vibration detection sensor 30 for detecting the vibration of the support structure 20 is provided in the machine room 28, and the vibration of the support structure 20 at the time of vibration is generated based on the detection signal of the vibration detection sensor 30. Vibration suppression control is performed to reduce the noise.
  • FIG. 2 is a block diagram showing a schematic configuration of the crane vibration suppression control system of the present embodiment.
  • the crane vibration suppression control system 100 of the present embodiment is a so-called computer system, and is a crane vibration suppression control system that reduces the vibration of the support structure 20 when the crane is vibrated due to the occurrence of an earthquake or the like.
  • the vibration damping control system 100 of the crane according to the present embodiment detects shaking such as an earthquake, feeds back the shaking speed of the crane support structure 20, and controls the drive of the trolley 24. Suppression of the crane support structure 20 due to an earthquake is suppressed.
  • the vibration suppression control system 100 includes a vibration detection sensor 30, a trolley drive unit 40, a CPU 110, a storage unit 120, a power reception unit 130, a normal power supply 140, an emergency power supply 142, And a power switch 150.
  • the crane vibration suppression control system at the time of vibration due to the occurrence of an earthquake will be described.
  • the crane vibration suppression control system according to the present embodiment can cope with vibrations caused by other factors such as strong winds. And
  • the vibration detection sensor 30 is a sensor that detects the vibration of the support structure 20.
  • the vibration detection sensor 30 is an accelerometer that detects acceleration of vibration and shaking of the support structure 20.
  • the vibration detection sensor 30 is an accelerometer that detects acceleration of vibration and shaking of the support structure 20, but may be a displacement meter that detects displacement of vibration and shaking of the support structure 20. .
  • the trolley driving unit 40 is a driving unit that drives the trolley 24 when it is moved on the girder 22 and the boom 23.
  • the trolley driving unit 40 is provided in the machine room 28 and is driven in a traverse drum that is driven to rotate by a rope pulling system.
  • Various drive motors that drive the drive 24 are applicable.
  • the CPU110 performs operation control of each component including the trolley 24 with which the container crane 10 is equipped by executing the various programs memorize
  • the CPU 110 includes at least a calculation unit 112, a determination unit 114, and a command signal transmission unit 116.
  • the calculation unit 112 calculates the vibration speed of the support structure 20 from the detection signal of the vibration detection sensor 30.
  • the vibration speed of the support structure 20 is calculated by integrating the detection signal.
  • the detection signal of the vibration detection sensor 30 is the vibration displacement of the support structure 20, so that the vibration speed of the support structure 20 is calculated by differentiating the detection signal. To do.
  • the determination unit 114 determines whether vibration control of the support structure 20 is necessary from the calculation signal of the calculation unit 112. In the present embodiment, the determination unit 114 determines that the vibration control of the support structure 20 is necessary when the vibration speed of the support structure 20 is equal to or higher than a set value. As described above, the determination unit 114 determines whether or not the vibration suppression control of the support structure 20 is necessary, so that the active vibration suppression control of the support structure 20 is performed until the vibration speed of the support structure 20 becomes a set value or less. It can be carried out.
  • the vibration suppression control start of the driver in the machine room 28 or a driver's cab (not shown) is started. It may be triggered by the switch input or the reception of earthquake early warning.
  • the command signal transmission unit 116 transmits a command signal for adjusting the moving speed of the trolley 24 to the trolley driving unit 40. Specifically, when the command signal transmission unit 116 receives from the determination unit 114 a necessity determination signal determined to require active vibration suppression control of the support structure, the vibration of the support structure 20 calculated by the calculation unit 112 A signal obtained by multiplying the speed by the control constant is transmitted to the trolley driving unit 40 as a trolley speed command signal.
  • the command signal transmission unit 116 when the command signal transmission unit 116 receives the necessity determination signal that requires damping control from the determination unit 114, the command signal transmission unit 116 multiplies the vibration speed of the support structure 20 calculated by the calculation unit 112 by a control constant, and A signal obtained by reversing the vibration speed and the sign is transmitted to the trolley driving unit 40 as a trolley speed command signal.
  • the trolley driving unit 40 adjusts the speed of the trolley 24 according to the trolley speed command signal.
  • the crane vibration suppression control system 100 cancels the vibration and vibration of the support structure 20 with the driving of the trolley 24 when the vibration and vibration of the support structure 20 are detected due to the occurrence of an earthquake or the like.
  • the trolley 24 is actively operated so as to be attenuated.
  • the command signal transmission unit 116 moves the trolley 24 until the vibration speed of the support structure 20 becomes equal to or less than the set value. Is adjusted, a trolley speed command signal is transmitted to the trolley drive unit 40.
  • the trolley 24 is set to a predetermined value so that the trolley 24 vibrates on the girder 22 with a certain amplitude, and the vibration and vibration of the support structure 20 are attenuated. The method of moving at a speed is mentioned.
  • the storage unit 120 stores various programs used for processing by the CPU 110.
  • operation control of the trolley driving unit 40 that adjusts the moving speed of the trolley 24 when the support structure 20 is vibrated due to an earthquake or the like, and power supply switching control when a power failure occurs. Programs and so on are stored.
  • the power receiving unit 130 receives power necessary for controlling the operation of the container crane 10 from a power source.
  • the normal power source 140 that is a power supply source from the outside, and when the normal power source fails during a vibration due to an earthquake or the like, power is supplied to the power receiving unit.
  • An emergency power supply 142 is provided.
  • a battery such as a storage battery, a large-capacity capacitor, a diesel engine generator, a micro gas turbine, or the like is applicable. Note that the emergency power supply 142 only needs to be usable for a short time of about several minutes at the time of the earthquake, so long as it has a capacity capable of supplying the minimum necessary power in an emergency.
  • a power supply switch 150 is provided as a power supply switching means for switching the power supply source to the power receiving unit from the normal power supply to the emergency power supply when a power failure occurs.
  • the power switch 150 automatically switches the power supply source from the normal power supply 140 to the emergency power supply 142 when a power failure occurs due to an earthquake or the like. That is, when the CPU 110 determines that the power supply from the normal power supply 140 is lost when a power failure occurs, the power supply switch 150 is automatically operated to switch the power supply to the emergency power supply 142. For this reason, even when a power failure occurs at the time of vibration generation due to an earthquake or the like, active vibration suppression control of the support structure 20 of the container crane 10 can be performed.
  • the crane vibration suppression control system 100 performs vibration suppression control of the support structure 20 when the vibration speed of the support structure 20 is determined to be equal to or higher than a set value.
  • Various constraints may be provided in order to perform vibration control safely. That is, when there is a load on the trolley 24, when the hanging rope of the trolley 24 is longer than a predetermined length, or when the trolley 24 goes to the stroke end of the boom 23, in order to avoid danger, The vibration control of the support structure 20 by driving may not be performed. In addition, when an earthquake occurs when the main trunk is falling, the main trunk may automatically enter and vibration control may be automatically performed.
  • FIG. 3 is a flowchart showing an outline of the crane vibration suppression control method of the present embodiment.
  • an earthquake occurs (step S110), and the vibration detection sensor 30 detects the vibration of the support structure 20 (vibration detection step S120).
  • the vibration detection sensor 30 detects vibration and vibration acceleration of the support structure 20, but may detect vibration and vibration displacement of the support structure 20.
  • the vibration speed of the support structure 20 is calculated from the detection result of the vibration detection step S120 (vibration speed calculation step S130). Specifically, when the detection signal of the vibration detection sensor 30 is the vibration acceleration of the support structure 20, the vibration speed of the support structure 20 is calculated by integrating the detection signal. When the detection signal of the vibration detection sensor 30 is the vibration displacement of the support structure 20, the vibration speed of the support structure 20 is calculated by differentiating the detection signal. In this way, the calculation unit 112 calculates the vibration speed of the support structure 20 from the detection signal of the vibration detection sensor 30.
  • the vibration speed calculation step S130 it is next determined whether or not the vibration suppression control of the support structure 20 is necessary from the calculation result of the vibration speed calculation step S130 (necessity determination step S140). Specifically, when the vibration speed of the support structure 20 is equal to or higher than a set value, the determination unit 114 determines that the vibration control of the support structure 20 is necessary. In this embodiment, the set value of the vibration speed of the support structure 20 is used as a trigger for determining the necessity of active vibration suppression control of the support structure 20 of the crane 10 in the necessity determination step S140.
  • a trigger for determining whether or not the active vibration suppression control is necessary for example, a switch input for starting vibration suppression control of the driver in the machine room 28 or the driver's cab, an emergency earthquake warning Reception or the like may be used as a trigger.
  • a command signal for adjusting the moving speed of the trolley 24 is transmitted to the trolley drive unit 40 (command signal transmission step S150).
  • the command signal transmission unit 116 drives the command signal for adjusting the moving speed of the trolley 24 by the trolley. To the unit 40.
  • the trolley driving unit 40 adjusts the moving speed of the trolley 24 (step S160). Specifically, when the trolley speed command signal is transmitted to the trolley drive unit 40, the trolley drive unit 40 adjusts the speed of the trolley 24 according to the trolley speed command signal.
  • the determination unit 114 determines whether or not the vibration suppression control of the support structure 20 is to be continued, and if the vibration speed of the support structure 20 is determined to be equal to or less than a set value, the vibration suppression of the support structure 20 is performed. Control ends. On the other hand, when it is determined that the vibration speed of the support structure 20 is larger than the set value, the speed of the trolley 24 is adjusted again, and the support structure 20 is rotated until the vibration speed of the support structure 20 becomes the set value or less. Perform active vibration suppression control.
  • the vibration suppression control system 100 of the present embodiment when the support structure 20 of the container crane 10 is vibrated due to an earthquake or the like, the container crane 10 is controlled to drive the trolley 24.
  • active vibration suppression control can be performed. That is, since the active trolley 24 of the container crane 10 is used to control the drive of the container crane 10 and the active vibration suppression control of the support structure 20 of the container crane 10 is performed, the vibration suppression retrofit becomes easy.
  • the active vibration suppression control can be performed only by changing the logic of the sensor 30 that detects the swing of the crane support structure 20 and the CPU 110, so that the remodeling work can be performed easily and at low cost.
  • the trolley 24 since active control is performed with respect to the swing of the crane support structure 20 caused by an earthquake, vibration control can be performed not only for specific frequencies but also for vibrations caused by earthquakes and strong winds in a wide range of frequencies. .
  • the trolley 24 usually has a large weight of about 30 to 40 t, and has a wide movable range so as to move about 100 meters on the girder 22 and the boom 23. Therefore, active vibration suppression control using the trolley 24 is performed. As a result, it will be possible to cope with larger earthquakes.
  • FIG. 4 is a front view showing a schematic configuration of a crane to which the second embodiment of the crane damping control system of the present invention is applied.
  • the container crane 50 in the present embodiment is a crane in which a seismic isolation device 70 such as a damper is attached to a traveling part or the like that is provided on the bottom side of the support structure 60 of the container crane 50 as shown in FIG. That is, the crane vibration suppression control system of the present embodiment is applied to a container crane including a seismic isolation device. Based on the operation start signal of the seismic isolation device 70, the control of the support structure 60 at the time of vibration generation is applied. Vibration control is performed. Similarly to the first embodiment, a vibration detection sensor 80 that detects vibration of the support structure 60 is provided in the machine room 28. In addition, about the other component of the container crane 50 applied to this embodiment, since it is substantially the same as the container crane 10 applied in 1st Embodiment, the detailed description is abbreviate
  • omitted is abbreviate
  • FIG. 5 is a block diagram showing a schematic configuration of the crane vibration suppression control system of the present embodiment.
  • the crane vibration suppression control system 200 of the present embodiment is a so-called computer system, and is a crane vibration suppression control system that reduces the vibration of the support structure 60 when the crane is vibrated due to an earthquake or the like.
  • the vibration suppression control system 200 includes a vibration detection sensor 80, a seismic isolation device 70, a trolley drive unit 240, a CPU 210, a storage unit 220, a power reception unit 230, a normal power supply 240, An emergency power supply 242 and a power supply switch 250 are provided.
  • the vibration detection sensor 80 is a sensor that detects the vibration of the support structure 60 as in the first embodiment.
  • the vibration detection sensor 80 is an accelerometer that detects acceleration of vibration and shaking of the support structure 60, but may be a displacement meter that detects displacement of vibration and shaking of the support structure 60.
  • the seismic isolation device 70 is a device such as a damper attached to a traveling portion of the support structure 60 of the container crane 50 so that the container crane 50 does not follow the shaking of the ground.
  • the trolley driving unit 240 is a driving unit that drives the trolley 24 when it is moved on the girder 22 and the boom 23.
  • the trolley driving unit 240 is provided in the machine room 28 and is driven by a rope pulling system to rotate or other trolleys.
  • Various drive motors that drive the drive 24 are applicable.
  • the CPU 210 executes various programs stored in the storage unit 220, thereby performing operation control of each component including the trolley 24 provided in the container crane 50.
  • the CPU 210 includes at least a calculation unit 212, a determination unit 214, and a command signal transmission unit 216, as shown in FIG.
  • the calculation unit 212 calculates the vibration speed of the support structure 60 from the detection signal of the vibration detection sensor 80.
  • the vibration speed of the support structure 60 is calculated by integrating the detection signal.
  • the vibration detection sensor 80 is a displacement meter
  • the detection signal of the vibration detection sensor 80 is the vibration displacement of the support structure 60. Therefore, the vibration speed of the support structure 60 is calculated by differentiating the detection signal. To do.
  • the determination unit 214 determines whether or not the vibration suppression control of the support structure 60 is necessary from the operation start signal of the seismic isolation device 70. That is, in the present embodiment, the determination unit 214 determines that the vibration suppression control of the support structure 60 is necessary when an earthquake occurs and the seismic isolation device 70 starts operating. As described above, when the operation of the seismic isolation device 70 is confirmed by the determination unit 214, it is determined that the vibration suppression control is necessary, so that the active vibration suppression of the support structure 60 including the initial stage of the occurrence of the large earthquake is performed. Control can be performed.
  • the start of vibration suppression control of the driver in the machine room or cab It may be triggered by switch input or the reception of earthquake early warning.
  • the command signal transmission unit 216 transmits a command signal for adjusting the moving speed of the trolley 24 to the trolley driving unit 240 when the determination unit 214 determines that the vibration suppression control is necessary. Specifically, when the command signal transmission unit 216 receives a necessity determination signal that determines that active vibration suppression control of the support structure is necessary from the determination unit 214, the command signal transmission unit 216 sets a control constant to the vibration speed calculated by the calculation unit 112. The multiplied signal is transmitted to the trolley drive unit 240 as a trolley speed command signal.
  • the command signal transmission unit 216 when the command signal transmission unit 216 receives a necessity determination signal that requires vibration suppression control from the determination unit 214, the command signal transmission unit 216 multiplies the vibration speed of the support structure 60 calculated by the calculation unit 212 by a control constant, and A signal obtained by reversing the sign of speed and sign is transmitted to the trolley drive unit 240 as a trolley speed command signal.
  • the trolley driving unit 240 adjusts the speed of the trolley 24 according to the trolley speed command signal.
  • the crane vibration suppression control system 200 detects the vibration and the vibration of the support structure 60 as the driving of the trolley 24 when the seismic isolation device 70 starts operating at the time of vibration such as the occurrence of an earthquake.
  • the trolley 24 is actively driven to cancel and attenuate.
  • the trolley 24 is adjusted so that the trolley 24 vibrates on the girder 22 and the boom 23 with a certain amplitude, or the trolley 24 is moved at a predetermined speed. Adjust the speed.
  • the storage unit 220 stores various programs used for processing by the CPU 210.
  • the storage unit 220 includes operation control of the trolley driving unit 240 that adjusts the moving speed of the trolley 24 when the support structure 60 is vibrated due to an earthquake or the like, and power supply switching control when a power failure occurs. Programs and so on are stored.
  • the power receiving unit 230 receives power necessary for controlling the operation of the container crane 50 from the power source.
  • the normal power source 240 that is an external power supply source and the normal power source when power is interrupted due to an earthquake or the like cause power to the power receiving unit.
  • An emergency power supply 242 is provided.
  • a battery such as a storage battery, a large-capacity capacitor, a diesel engine generator, a micro gas turbine, or the like is applicable. Note that the emergency power source 242 only needs to be usable for only a short time of about several minutes at the time of the earthquake, so long as it has a capacity capable of supplying the minimum necessary power in an emergency.
  • a power switch 250 is provided as a power switching means for switching the power supply source to the power receiving unit from the normal power source to the emergency power source when a power failure occurs.
  • the power supply switch 250 automatically switches the power supply source from the normal power supply 240 to the emergency power supply 242 when a power failure occurs due to an earthquake or the like. That is, when the CPU 210 determines that the power supply from the normal power supply 240 is lost when a power failure occurs, the power supply switch 250 is automatically operated to switch the power supply to the emergency power supply 242. For this reason, even when a power failure occurs at the time of vibration generation due to an earthquake or the like, the active vibration suppression control of the support structure 60 of the container crane 50 can be performed.
  • the crane vibration suppression control system 200 performs vibration suppression control of the support structure 60 when the seismic isolation device 70 starts to operate, but performs crane vibration suppression control safely. Therefore, various restrictions may be provided. That is, when there is a load on the trolley 24, when the hanging rope of the trolley 24 is longer than a predetermined length, or when the trolley 24 goes to the stroke end of the boom 23, in order to avoid danger, The vibration control of the support structure 60 by driving may not be performed. In addition, when an earthquake occurs when the main trunk is falling, the main trunk may automatically enter and vibration control may be automatically performed.
  • FIG. 6 is a flowchart showing an outline of the crane vibration suppression control method of the present embodiment.
  • an earthquake occurs (step S210), and the vibration detection sensor 80 detects the vibration of the support structure 60 (vibration detection step S220).
  • the vibration detection sensor 80 detects acceleration of vibration and shaking of the support structure 60, but may detect displacement of vibration and shaking of the support structure 60.
  • vibration suppression control of the support structure 60 is necessary (necessity determination step S230). In the present embodiment, it is determined that the vibration control of the support structure 60 is necessary when the seismic isolation device 70 starts operation.
  • a command signal for adjusting the moving speed of the trolley 24 is transmitted to the trolley drive unit 240 (command signal transmission step S240).
  • the command signal transmission unit 216 drives the command signal for adjusting the moving speed of the trolley 24 by trolley driving. It transmits to the part 240.
  • the trolley driving unit 240 adjusts the moving speed of the trolley 24 (step S250). Specifically, when a trolley speed command signal is transmitted to trolley drive unit 240, trolley drive unit 240 adjusts the speed of trolley 24 in accordance with the trolley speed command signal.
  • the determination unit 214 determines whether or not the vibration suppression control of the support structure 60 is to be continued, and if it is determined that the operation of the seismic isolation device 70 has stopped, the vibration suppression control of the support structure 60 is performed. Terminate. On the other hand, when it is determined that the operation of the seismic isolation device 70 is continuing, the speed of the trolley 24 is adjusted again, and the active damping control of the support structure 60 is performed until the operation of the seismic isolation device 70 stops.
  • the trolley 24 Active vibration suppression control can be performed by controlling the drive of. That is, since the active trolley 24 of the container crane 50 is used to control the drive and the active vibration suppression control of the support structure 60 of the container crane 50 is performed, the vibration suppression retrofit becomes easy.
  • the active vibration damping control can be performed only by changing the logic in the sensor 80 for detecting the swing of the crane support structure 60, the seismic isolation device 70, and the CPU 110, so that the remodeling work is easy and low cost. Can be done.
  • the seismic isolation device 70 it is possible to deal with a larger earthquake including the initial stage of the occurrence of a large earthquake, and the amount of movement of the trolley 24 can be reduced.
  • the vibration suppression control corresponding to the earthquake of not only a specific frequency but also a wide frequency becomes possible.
  • the trolley 24 usually has a large weight of about 30 to 40 t, and has a wide movable range so as to move about 100 meters on the girder 22 and the boom 23. Therefore, active vibration suppression control using the trolley 24 is performed. As a result, it will be possible to cope with larger earthquakes.
  • the configuration and operation of the crane vibration suppression control system are not limited to those described in the first and second embodiments, and various modifications can be made.
  • the controller (program) for vibration suppression control in the first and second embodiments may be a controller that moves the crane, or may be provided separately and independently.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control And Safety Of Cranes (AREA)

Abstract

 本発明は、支持構造体(20)の頂部側に設けられるガーダ(22)及びブーム(23)上を移動するトロリ(24)を備えるクレーン(10)の起振時における支持構造体の振動を低減させるクレーンの制振制御システムであって、振動を検出する振動検出センサ(30)と、ガーダ(22)及びブーム(23)上への移動の際に駆動するトロリ駆動部と、振動検出センサ(30)の検出信号から支持構造体の振動速度を算出する算出部と、算出部の算出信号から支持構造体(20)の制振制御の要否を判定する判定部と、判定部で制振制御を必要と判定した際に、トロリ(24)の移動速度を調整する指令信号をトロリ駆動部に送信する指令信号送信部とを備えるものである。本発明は、これにより、制振レトロフィットが容易に行なえ、かつ幅広い周波数や大きさの地震や強風等による起振に対応可能とすることが可能となる。

Description

クレーンの制振制御システム及びクレーンの制振制御方法
 本発明は、地震や強風等による起振時におけるコンテナクレーン等のクレーンの制振制御システム及びクレーンの制振制御方法に関する。
 近年、日本各地において大きな地震が発生しており、工場や港湾施設においては、コンテナクレーンにも大きな被害が発生している。また、今後に発生する可能性のある大地震に備えて、大地震発生時の地震力によるコンテナクレーンの損傷、ダメージを回避又は低減するために、コンテナクレーンの耐震性を向上することが研究され、様々な免震技術や制振技術が開発されている。
 免震技術は、コンテナクレーンの走行部等にダンパー等の免震装置を取り付けて、地盤の揺れにコンテナクレーンが追随しないようにする技術である。制振技術は、コンテナクレーンの支持構造体等に制振装置を設けて、コンテナクレーンの揺れを抑える技術である。しかしながら、免震装置は、あまり大型化できないので、大地震への対応が不十分であり、制振装置は、特定の周波数成分にしか効果が得られない場合が多いので、特に、大地震発生初期の対応が難しいという課題があった。
 上記免震装置及び制振装置の課題を解決する従来技術として、特許文献1には、コンテナクレーンの支持脚部に免震用水平方向変位吸収装置を設けると共に、コンテナクレーンの上部に、制振用マスダンパー装置を設けたものが開示されている。本技術によるクレーンの免震・制振複合装置は、マスを利用して地震力を打ち消すように制御するものであり、大地震発生初期の対応、及び長周期の地震の対応にも優れ、大地震発生時にクレーンに作用する大きな外力を効率良く低減できる。
特開2009-242062号公報
 しかしながら、特許文献1に開示された従来技術では、本来動かない機械室をマスとして利用するため、この機械室を駆動するための装置が別途必要となり、コスト高となる。また、機械室中では、コンテナクレーンの主巻や起伏、横行のために使用されるワイヤロープを取り扱い、本来動かない機械室をマスとして駆動することは、かなり困難である。コンテナクレーンの耐震性を向上させるためには、幅広い周波数や大きさの地震に対応可能とし、特に、制振レトロフィットを容易に行えることが好ましい。
 本発明は、従来のクレーンの制振制御システムが有する上記課題に鑑みてなされたものであり、制振レトロフィットが容易に行なえ、かつ幅広い周波数や大きさの地震や強風等による起振時に対応可能な、新規かつ改良されたクレーンの制振制御システム及びクレーンの制振制御方法を提供することを目的とする。
 本発明の一態様は、支持構造体の頂部側に設けられるガーダ及びブーム上を移動するトロリを備えるクレーンの起振時における前記支持構造体の振動を低減させるクレーンの制振制御システムであって、前記振動を検出する振動検出センサと、前記トロリの前記ガーダ及び前記ブーム上への移動の際に駆動するトロリ駆動部と、前記振動検出センサの検出信号から前記支持構造体の振動速度を算出する算出部と、前記算出部の算出信号から前記支持構造体の制振制御の要否を判定する判定部と、前記判定部で前記制振制御を必要と判定した際に、前記トロリの移動速度を調整する指令信号を前記トロリ駆動部に送信する指令信号送信部と、を備えることを特徴とするクレーンの制振制御システムに関係する。
 本発明の一態様によれば、クレーンに備わるトロリを利用して、支持構造体のアクティブ制振制御を可能としているので、制振レトロフィットが容易に行なえ、かつ幅広い周波数や大きさの地震や強風等による起振に対応できる。
 このとき、本発明の一態様では、前記判定部は、前記支持構造体の前記振動速度が設定値以上の場合に、前記制振制御を必要と判定することとしてもよい。
 このようにすれば、支持構造体の振動速度が設定値以下になるまで、クレーンの支持構造体のアクティブ制振制御を行うことができる。
 また、本発明の一態様では、前記支持構造体の底部側に免震装置を更に備え、前記判定部は、前記免震装置が作動を開始した場合に、前記制振制御を必要と判定することとしてもよい。
 このようにすれば、大地震発生初期も含めて、クレーンの支持構造体のアクティブ制振制御を行うことができる。
 また、本発明の一態様では、前記クレーンの受電部に電力を供給する通常電源と、前記起振時に前記通常電源が停電になった場合に前記受電部に電力を供給する非常用電源と、前記停電の発生時に前記受電部への電力供給源を前記通常電源から前記非常用電源に切り替える電源切替手段と、を備えることとしてもよい。
 このようにすれば、起振時に停電が発生した場合でも、クレーンの支持構造体のアクティブ制振制御を行うことができる。
 また、本発明の他の態様は、支持構造体の頂部側に設けられるガーダ及びブーム上を移動するトロリを備えるクレーンの起振時における前記支持構造体の振動を低減させるクレーンの制振制御方法であって、前記振動を検出する振動検出工程と、前記振動検出工程の検出結果から前記支持構造体の振動速度を算出する振動速度算出工程と、前記振動速度算出工程の算出結果から前記支持構造体の制振制御の要否を判定する要否判定工程と、前記要否判定工程で前記制振制御が必要と判定された際に前記トロリの移動速度を調整する指令信号を前記トロリの駆動部に送信する指令信号送信工程と、を含むことを特徴とするクレーンの制振制御方法に関係する。
 以上説明したように本発明によれば、地震等によりクレーンの支持構造体に地震発生等による起振時に、クレーンに既設のトロリの駆動を制御することで、アクティブ制振制御を行えるので、制振レトロフィットが容易にできる。
本発明のクレーンの制振制御システムの第1の実施形態が適用されるクレーンの概略構成を示す正面図である。 同実施形態のクレーンの制振制御システムの概略構成を示すブロック図である。 同実施形態のクレーンの制振制御方法の概略を示すフローチャートである。 本発明のクレーンの制振制御システムの第2の実施形態が適用されるクレーンの概略構成を示す正面図である。 同実施形態のクレーンの制振制御システムの概略構成を示すブロック図である。 同実施形態のクレーンの制振制御方法の概略を示すフローチャートである。
 以下、本発明の好適な実施の形態について詳細に説明する。なお、以下に説明する本実施形態は、特許請求の範囲に記載された本発明の内容を不当に限定するものではなく、本実施形態で説明される構成の全てが本発明の解決手段として必須であるとは限らない。
(第1の実施形態)
 まず、本発明のクレーンの制振制御システムの第1の実施形態に適用されるクレーンの構成について、図面を使用しながら説明する。図1は、本発明のクレーンの制振制御システムの第1の実施形態が適用されるクレーンの概略構成を示す正面図である。
 コンテナクレーン10は、岸壁12に接岸したコンテナ船14に搭載されたコンテナ16を陸上へ荷降し、陸上のコンテナ16をコンテナ船14に積載するため、岸壁12に沿って走行すると共に、陸上とコンテナ船14の艙口上の間を往復動するクレーンである。コンテナクレーン10は、岸壁12に沿って敷設された走行レール18上を移動可能に設けられる支持構造体20と、支持構造体20の頂部側に設けられるガーダ22と、支持構造体20の頂部側から海側へ張出すように略水平方向に延出して設けられるブーム23と、ガーダ22及びブーム23上を移動するトロリ24と、を備える。
 支持構造体20の底部側には、図1に示すように、走行レール18上を転動する走行装置26が設けれ、走行レール18に沿って支持構造体20が移動可能となっている。一方、支持構造体20の頂部側に設けられるガーダ22及びブーム23には、トロリ24がガーダ22及びブーム23に沿って移動するための横行レール27が設けられ、トロリ24が横行レール27上を移動可能となっている。トロリ24は、支持構造体20の頂部側に配置される機械室28内に設けられている不図示の横行ドラムによるロープ牽引方式により、横行ドラムを正転又は反転させる方向へ回転駆動することにより、ガーダ22に沿って横行するようになっている。また、本実施形態では、機械室28に支持構造体20の振動を検出する振動検出センサ30が設けられ、この振動検出センサ30の検出信号に基づいて、起振時における支持構造体20の振動を低減させる制振制御が行われる。
 次に、本実施形態のクレーンの制振制御システムの構成について、図面を使用しながら説明する。図2は、本実施形態のクレーンの制振制御システムの概略構成を示すブロック図である。
 本実施形態のクレーンの制振制御システム100は、いわゆるコンピュータシステムであり、地震発生等によるクレーンの起振時における支持構造体20の振動を低減させるクレーンの制振制御システムである。具体的には、本実施形態のクレーンの制振制御システム100は、地震等の揺れを検出して、クレーン支持構造体20の揺れ速度をフィードバックして、トロリ24の駆動を制御することで、地震によるクレーン支持構造体20の揺れを抑制する。制振制御システム100は、図2に示すように、振動検出センサ30と、トロリ駆動部40と、CPU110と、記憶部120と、受電部130と、通常電源140と、非常用電源142と、電源切替スイッチ150とを備える。なお、以下の説明では、地震発生による起振時におけるクレーンの制振制御システムについて説明するが、本実施形態のクレーンの制振制御システムは、強風等の他の要因による起振時にも対応可能とする。
 振動検出センサ30は、支持構造体20の振動を検出するセンサである。本実施形態では、振動検出センサ30は、支持構造体20の振動、揺れの加速度を検出する加速度計である。なお、本実施形態では、振動検出センサ30は、支持構造体20の振動、揺れの加速度を検出する加速度計としているが、支持構造体20の振動、揺れの変位を検出する変位計としてもよい。
 トロリ駆動部40は、トロリ24をガーダ22及びブーム23上で移動させる際に駆動する駆動手段であり、例えば、機械室28内に設けられ、ロープ牽引方式により回転駆動する横行ドラムや、その他トロリ24を駆動させる各種駆動モーター等が該当する。
 CPU110は、記憶部120に記憶された各種プログラムを実行することにより、コンテナクレーン10に備わるトロリ24を始めとする各構成要素の動作制御等を行う。本実施形態では、CPU110は、図2に示すように、少なくとも算出部112と、判定部114と、指令信号送信部116とを備える。
 算出部112は、振動検出センサ30の検出信号から支持構造体20の振動速度を算出する。本実施形態では、振動検出センサ30の検出信号が支持構造体20の振動加速度となるので、その検出信号を積分することにより、支持構造体20の振動速度を算出する。なお、振動検出センサ30が変位計の場合では、振動検出センサ30の検出信号が支持構造体20の振動変位となるので、その検出信号を微分することにより、支持構造体20の振動速度を算出する。
 判定部114は、算出部112の算出信号から支持構造体20の制振制御の要否を判定する。本実施形態では、判定部114は、支持構造体20の振動速度が設定値以上の場合に、支持構造体20の制振制御を必要と判定する。このように、判定部114で支持構造体20の制振制御の要否判定を行うことにより、支持構造体20の振動速度が設定値以下になるまで、支持構造体20のアクティブ制振制御を行うことができる。なお、クレーンの支持構造体のアクティブ制振制御の要否を判定するトリガとして、振動速度の設定値以外にも、例えば、機械室28或いは不図示の運転室での運転手の制振制御開始のスイッチ入力や、緊急地震速報の受信等をトリガとしてもよい。
 指令信号送信部116は、判定部114で制振制御を必要と判定した際に、トロリ24の移動速度を調整する指令信号をトロリ駆動部40に送信する。具体的には、指令信号送信部116は、判定部114から支持構造体のアクティブ制振制御を必要と判定した要否判定信号を受信すると、算出部112で算出された支持構造体20の振動速度に制御定数を掛けて求めた信号をトロリ速度指令信号として、トロリ駆動部40に送信する。すなわち、指令信号送信部116は、判定部114から制振制御を必要とする要否判定信号を受信すると、算出部112で算出された支持構造体20の振動速度に制御定数を掛けて、当該振動速度と符号の正負を反対にして求めた信号をトロリ速度指令信号として、トロリ駆動部40に送信する。そして、トロリ駆動部40は、指令信号送信部116からトロリ速度指令信号を受信すると、当該トロリ速度指令信号に従って、トロリ24の速度調整を行う。このように、本実施形態のクレーンの制振制御システム100は、地震発生等により支持構造体20の振動、揺れを検出した場合に、支持構造体20の振動、揺れをトロリ24の駆動と相殺させて減衰するように、トロリ24をアクティブに動作させる。
 すなわち、指令信号送信部116は、判定部114で支持構造体20の制振制御を必要と判定された場合に、支持構造体20の振動速度が設定値以下となるまで、トロリ24の移動速度を調整するために、トロリ速度指令信号をトロリ駆動部40に送信する。トロリ24の移動速度の調整方法としては、例えば、トロリ24が一定の大きさの振幅でガーダ22上を振動させる方法や、支持構造体20の振動、揺れを減衰させるように、トロリ24を所定速度で移動させる方法等が挙げられる。
 記憶部120には、CPU110での処理に利用される各種プログラムが記憶されている。本実施形態では、記憶部120には、地震等による支持構造体20の起振の際に、トロリ24の移動速度を調整するトロリ駆動部40の動作制御や、停電発生時における電源切替制御のプログラム等が記憶されている。
 受電部130は、コンテナクレーン10を動作制御するのに必要な電力を電源から受電する。本実施形態では、受電部130に電力を供給する電源として、外部からの電力供給源である通常電源140と、地震等による起振時に通常電源が停電になった場合に、受電部に電力を供給する非常用電源142が設けられている。
 コンテナクレーン10の非常用電源142として、蓄電池等のバッテリ、大容量キャパシタ、ディーゼルエンジン発電機、マイクロガスタービン等が適用可能である。なお、非常用電源142は、地震発生時の数分程度の短時間のみ使用可能となっていればよいので、非常時における必要最小限の電力を供給できる容量があればよい。
 また、停電の発生時に受電部への電力供給源を通常電源から非常用電源に切り替える電源切替手段として、電源切替スイッチ150が設けられている。本実施形態では、電源切替スイッチ150は、地震等により停電が発生した場合に、電力供給源を自動的に通常電源140から非常用電源142に切り替える。すなわち、停電発生時に通常電源140からの電力供給が無くなったとCPU110で判定された場合に、自動的に電源切替スイッチ150を作動させて、電源を非常用電源142に切り替える。このため、地震等による起振時に停電が発生した場合でも、コンテナクレーン10の支持構造体20のアクティブ制振制御を行うことができる。
 なお、本実施形態のクレーンの制振制御システム100は、支持構造体20の振動速度が設定値以上と判定された場合に、支持構造体20の制振制御を行っているが、クレーンの制振制御を安全に行うために、各種制約を設けてもよい。すなわち、トロリ24に吊り荷がある場合や、トロリ24の吊りロープが所定の長さ以上の場合や、トロリ24がブーム23のストロークエンドまで行った場合には、危険回避のため、トロリ24の駆動による支持構造体20の制振制御を行わないようにしてもよい。また、主幹が落ちているときに地震が発生した場合には、自動的に主幹が入って、制振制御を自動的に行うようにしてもよい。
 次に、本実施形態のクレーンの制振制御方法について、図面を使用しながら説明する。図3は、本実施形態のクレーンの制振制御方法の概略を示すフローチャートである。
 まず、地震が発生して(工程S110)、振動検出センサ30が支持構造体20の振動を検出する(振動検出工程S120)。本実施形態では、振動検出センサ30は、支持構造体20の振動、揺れの加速度を検出するが、支持構造体20の振動、揺れの変位を検出してもよい。
 振動検出工程S120が終わると、次に、振動検出工程S120の検出結果から支持構造体20の振動速度を算出する(振動速度算出工程S130)。具体的には、振動検出センサ30の検出信号が支持構造体20の振動加速度の場合は、その検出信号を積分することにより、支持構造体20の振動速度を算出する。また、振動検出センサ30の検出信号が支持構造体20の振動変位の場合は、その検出信号を微分することにより、支持構造体20の振動速度を算出する。このようにして、算出部112が振動検出センサ30の検出信号から支持構造体20の振動速度を算出する。
 振動速度算出工程S130が終わると、次に、振動速度算出工程S130の算出結果から支持構造体20の制振制御の要否を判定する(要否判定工程S140)。具体的には、支持構造体20の振動速度が設定値以上の場合に、判定部114が支持構造体20の制振制御を必要と判定する。本実施形態では、要否判定工程S140におけるクレーン10の支持構造体20のアクティブ制振制御の要否を判定するトリガとして、支持構造体20の振動速度の設定値としている。アクティブ制振制御の要否を判定するトリガとして、支持構造体20の振動速度以外にも、例えば、機械室28或いは運転室での運転手の制振制御開始のスイッチ入力や、緊急地震速報の受信等をトリガとしてもよい。
 要否判定工程S140で制振制御が必要と判定されると、次にトロリ24の移動速度を調整する指令信号をトロリ駆動部40に送信する(指令信号送信工程S150)。具体的には、要否判定工程S140で判定部114が支持構造体20の制振制御を必要と判定した際に、指令信号送信部116がトロリ24の移動速度を調整する指令信号をトロリ駆動部40に送信する。
 指令信号送信工程S150でトロリ駆動部40にトロリ速度を調整する指令信号が送信されると、トロリ駆動部40は、トロリ24の移動速度の調整を行う(工程S160)。具体的には、トロリ駆動部40にトロリ速度指令信号を送信すると、トロリ駆動部40は、トロリ速度指令信号に従って、トロリ24の速度調整を行う。
 トロリ24の速度調整を行った後に、支持構造体20の制振制御の継続の要否判定が行われる(継続要否判定工程S170)。具体的には、判定部114が支持構造体20の制振制御の継続要否判定を行い、支持構造体20の振動速度が設定値以下と判定された場合は、支持構造体20の制振制御が終了する。一方、支持構造体20の振動速度が設定値より大きいと判定された場合は、再びトロリ24の速度調整を行い、支持構造体20の振動速度が設定値以下になるまで、支持構造体20のアクティブ制振制御を行う。
 以上説明したように、本実施形態の制振制御システム100によれば、地震発生等によりコンテナクレーン10の支持構造体20が起振した場合に、コンテナクレーン10にトロリ24の駆動を制御することで、アクティブ制振制御を行えるようになる。すなわち、コンテナクレーン10に既設のトロリ24を利用して、その駆動を制御してコンテナクレーン10の支持構造体20のアクティブ制振制御を行うので、制振レトロフィットが容易なものとなる。換言すると、クレーンの支持構造体20の揺れを検出するセンサ30とCPU110でのロジックの変更だけでアクティブ制振制御の対応が可能なので、改造工事を容易にかつ低コストで行うことができる。
 また、地震により発生するクレーンの支持構造体20の揺れに対してアクティブに制御するため、特定の周波数だけでなく、幅広い周波数の地震や強風等による起振に対応する制振制御が可能となる。さらに、トロリ24は、通常30~40t程度と大きな重量を有し、かつガーダ22及びブーム23上を100メートル程度移動するように可動範囲が広いので、トロリ24を利用したアクティブ制振制御を行うことにより、より大きな地震にも対応できるようになる。
(第2の実施形態)
 次に、本発明のクレーンの制振制御システムの第2の実施形態に適用されるクレーンの構成について、図面を使用しながら説明する。図4は、本発明のクレーンの制振制御システムの第2の実施形態が適用されるクレーンの概略構成を示す正面図である。
 本実施形態におけるコンテナクレーン50は、図4に示すように、コンテナクレーン50の支持構造体60の底部側に有する走行部等にダンパー等の免震装置70を取り付けたクレーンである。すなわち、本実施形態のクレーンの制振制御システムでは、免震装置を備えるコンテナクレーンに適用するものであり、免震装置70の作動開始信号に基づいて、起振時における支持構造体60の制振制御が行われる。また、第1の実施形態と同様に、機械室28に支持構造体60の振動を検出する振動検出センサ80が設けられている。なお、本実施形態に適用されるコンテナクレーン50の他の構成要素については、第1の実施形態で適用されるコンテナクレーン10と略同一なので、その詳細な説明は省略する。
 次に、本実施形態のクレーンの制振制御システムの構成について、図面を使用しながら説明する。図5は、本実施形態のクレーンの制振制御システムの概略構成を示すブロック図である。
 本実施形態のクレーンの制振制御システム200は、いわゆるコンピュータシステムであり、地震等によるクレーンの起振時における支持構造体60の振動を低減させるクレーンの制振制御システムである。制振制御システム200は、図5に示すように、振動検出センサ80と、免震装置70と、トロリ駆動部240と、CPU210と、記憶部220と、受電部230と、通常電源240と、非常用電源242と、電源切替スイッチ250とを備える。
 振動検出センサ80は、第1の実施形態と同様に、支持構造体60の振動を検出するセンサである。本実施形態では、振動検出センサ80は、支持構造体60の振動、揺れの加速度を検出する加速度計としているが、支持構造体60の振動、揺れの変位を検出する変位計としてもよい。免震装置70は、地盤の揺れにコンテナクレーン50が追随しないようにするために、コンテナクレーン50の支持構造体60の走行部等に取り付けたダンパー等の装置である。
 トロリ駆動部240は、トロリ24をガーダ22及びブーム23上で移動させる際に駆動する駆動手段であり、例えば、機械室28内に設けられ、ロープ牽引方式により回転駆動する横行ドラムや、その他トロリ24を駆動させる各種駆動モーター等が該当する。
 CPU210は、記憶部220に記憶された各種プログラムを実行することにより、コンテナクレーン50に備わるトロリ24を始めとする各構成要素の動作制御等を行う。本実施形態では、CPU210は、図5に示すように、少なくとも算出部212と、判定部214と、指令信号送信部216とを備える。
 算出部212は、振動検出センサ80の検出信号から支持構造体60の振動速度を算出する。本実施形態では、振動検出センサ80の検出信号が支持構造体60の振動加速度となるので、その検出信号を積分することにより、支持構造体60の振動速度を算出する。なお、振動検出センサ80が変位計の場合では、振動検出センサ80の検出信号が支持構造体60の振動変位となるので、その検出信号を微分することにより、支持構造体60の振動速度を算出する。
 判定部214は、免震装置70の作動開始信号から支持構造体60の制振制御の要否を判定する。すなわち、本実施形態では、判定部214は、地震が発生して、免震装置70が作動を開始した場合に、支持構造体60の制振制御を必要と判定する。このように、判定部214によって、免震装置70の作動開始が確認された場合に、制振制御を必要と判定することにより、大地震発生初期も含めて、支持構造体60のアクティブ制振制御を行うことができるようになる。なお、クレーンの支持構造体のアクティブ制振制御の要否を判定するトリガとして、免震装置の作動開始の確認以外にも、例えば、機械室或いは運転室での運転手の制振制御開始のスイッチ入力や、緊急地震速報の受信等をトリガとしてもよい。
 指令信号送信部216は、判定部214で制振制御を必要と判定した際に、トロリ24の移動速度を調整する指令信号をトロリ駆動部240に送信する。具体的には、指令信号送信部216は、判定部214から支持構造体のアクティブ制振制御を必要と判定した要否判定信号を受信すると、算出部112で算出された振動速度に制御定数を掛けて求めた信号をトロリ速度指令信号としてトロリ駆動部240に送信する。すなわち、指令信号送信部216は、判定部214から制振制御を必要とする要否判定信号を受信すると、算出部212で算出した支持構造体60の振動速度に制御定数を掛けて、当該振動速度と符号の正負を反対にして求めた信号をトロリ速度指令信号として、トロリ駆動部240に送信する。そして、トロリ駆動部240は、指令信号送信部216からトロリ速度指令信号を受信すると、当該トロリ速度指令信号に従って、トロリ24の速度調整を行う。
 このように、本実施形態のクレーンの制振制御システム200は、地震発生等の起振時に免震装置70の作動が開始した場合に、支持構造体60の振動、揺れをトロリ24の駆動と相殺させて減衰するように、トロリ24をアクティブに駆動させる。トロリ24の移動速度の調整方法として、例えば、トロリ24が一定の大きさの振幅でガーダ22及びブーム23上を振動するように速度調整をすることや、トロリ24を所定の速度で移動させる等の速度調整を行う。
 記憶部220には、CPU210での処理に利用される各種プログラムが記憶されている。本実施形態では、記憶部220には、地震等による支持構造体60の起振の際に、トロリ24の移動速度を調整するトロリ駆動部240の動作制御や、停電発生時における電源切替制御のプログラム等が記憶されている。
 受電部230は、コンテナクレーン50を動作制御するのに必要な電力を電源から受電する。本実施形態では、受電部230に電力を供給する電源として、外部からの電力供給源である通常電源240と、地震等による起振時に通常電源が停電になった場合に、受電部に電力を供給する非常用電源242が設けられている。
 コンテナクレーン50の非常用電源242として、蓄電池等のバッテリ、大容量キャパシタ、ディーゼルエンジン発電機、マイクロガスタービン等が適用可能である。なお、非常用電源242は、地震発生時の数分程度の短時間のみ使用可能となっていればよいので、非常時における必要最小限の電力を供給できる容量があればよい。
 また、停電の発生時に受電部への電力供給源を通常電源から非常用電源に切り替える電源切替手段として、電源切替スイッチ250が設けられている。本実施形態では、電源切替スイッチ250は、地震等により停電が発生した場合に、電力供給源を自動的に通常電源240から非常用電源242に切り替える。すなわち、停電発生時に通常電源240からの電力供給が無くなったとCPU210で判定された場合に、自動的に電源切替スイッチ250を作動させて、電源を非常用電源242に切り替える。このため、地震等による起振時に停電が発生した場合でも、コンテナクレーン50の支持構造体60のアクティブ制振制御を行うことができる。
 なお、本実施形態のクレーンの制振制御システム200は、免震装置70が作動を開始した場合に、支持構造体60の制振制御を行っているが、クレーンの制振制御を安全に行うために、各種制約を設けてもよい。すなわち、トロリ24に吊り荷がある場合や、トロリ24の吊りロープが所定の長さ以上の場合や、トロリ24がブーム23のストロークエンドまで行った場合には、危険回避のため、トロリ24の駆動による支持構造体60の制振制御を行わないようにしてもよい。また、主幹が落ちているときに地震が発生した場合には、自動的に主幹が入って、制振制御を自動的に行うようにしてもよい。
 次に、本実施形態のクレーンの制振制御方法について、図面を使用しながら説明する。図6は、本実施形態のクレーンの制振制御方法の概略を示すフローチャートである。
 まず、地震が発生して(工程S210)、振動検出センサ80が支持構造体60の振動を検出する(振動検出工程S220)。本実施形態では、振動検出センサ80は、支持構造体60の振動、揺れの加速度を検出するが、支持構造体60の振動、揺れの変位を検出してもよい。
 振動検出工程S220が終わると、次に、支持構造体60の制振制御の要否を判定する(要否判定工程S230)。本実施形態では、免震装置70が作動を開始した場合に支持構造体60の制振制御が必要と判定される。
 要否判定工程S230で制振制御が必要と判定されると、次にトロリ24の移動速度を調整する指令信号をトロリ駆動部240に送信する(指令信号送信工程S240)。具体的には、要否判定工程S230で判定部214が支持構造体60の制振制御を必要と判定した際に、指令信号送信部216がトロリ24の移動速度を調整する指令信号をトロリ駆動部240に送信する。
 指令信号送信工程S240でトロリ駆動部240にトロリ速度を調整する指令信号が送信されると、トロリ駆動部240は、トロリ24の移動速度の調整を行う(工程S250)。具体的には、トロリ駆動部240にトロリ速度指令信号を送信すると、トロリ駆動部240は、トロリ速度指令信号に従って、トロリ24の速度調整を行う。
 トロリ24の速度調整を行った後に、支持構造体60の制振制御の継続の要否判定が行われる(継続要否判定工程S260)。具体的には、判定部214が支持構造体60の制振制御の継続要否判定を行い、免震装置70の作動が停止したと判定された場合は、支持構造体60の制振制御を終了させる。一方、免震装置70の作動が継続中と判定された場合は、再びトロリ24の速度調整を行い、免震装置70の作動が停止するまで、支持構造体60のアクティブ制振制御を行う。
 以上説明したように、本実施形態の制振制御システム200によれば、地震等によりコンテナクレーン50の支持構造体60が起振して、免震装置70が作動を開始した場合に、トロリ24の駆動を制御することで、アクティブ制振制御を行えるようになる。すなわち、コンテナクレーン50に既設のトロリ24を利用して、その駆動を制御してコンテナクレーン50の支持構造体60のアクティブ制振制御を行うので、制振レトロフィットが容易なものとなる。換言すると、クレーンの支持構造体60の揺れを検出するセンサ80と、免震装置70と、CPU110でのロジックの変更だけでアクティブ制振制御の対応が可能なので、改造工事を容易にかつ低コストで行うことができる。また、免震装置70も併用することで、大地震発生初期も含めて、より大きな地震に対応可能とし、また、トロリ24の動き量を小さくすることもできる。
 また、地震により発生するクレーンの支持構造体20の揺れに対してアクティブに制御するため、特定の周波数だけでなく、幅広い周波数の地震に対応する制振制御が可能となる。さらに、トロリ24は、通常30~40t程度と大きな重量を有し、かつガーダ22及びブーム23上を100メートル程度移動するように可動範囲が広いので、トロリ24を利用したアクティブ制振制御を行うことにより、より大きな地震にも対応できるようになる。
 なお、上記のように、本発明の第1及び第2の実施形態について詳細に説明したが、本発明の新規事項および効果から実体的に逸脱しない多くの変形が可能であることは、当業者には、容易に理解できるであろう。従って、このような変形例は、全て本発明の範囲に含まれるものとする。
 例えば、明細書または図面において、少なくとも一度、より広義または同義な異なる用語と共に記載された用語は、明細書または図面のいかなる箇所においても、その異なる用語に置き換えることができる。また、クレーンの制振制御システムの構成、動作も第1及び第2の実施形態で説明したものに限定されず、種々の変形実施が可能である。さらに、第1及び第2の実施形態における制振制御のコントローラ(プログラム)は、クレーンを動かすコントローラであっても良く、また、独立して別途設けたものであっても良い。

Claims (5)

  1.  支持構造体の頂部側に設けられるガーダ及びブーム上を移動するトロリを備えるクレーンの起振時における前記支持構造体の振動を低減させるクレーンの制振制御システムであって、
     前記振動を検出する振動検出センサと、
     前記トロリの前記ガーダ及び前記ブーム上への移動の際に駆動するトロリ駆動部と、
     前記振動検出センサの検出信号から前記支持構造体の振動速度を算出する算出部と、
     前記算出部の算出信号から前記支持構造体の制振制御の要否を判定する判定部と、
     前記判定部で前記制振制御を必要と判定した際に、前記トロリの移動速度を調整する指令信号を前記トロリ駆動部に送信する指令信号送信部と、を備えることを特徴とするクレーンの制振制御システム。
  2.  前記判定部は、前記支持構造体の前記振動速度が設定値以上の場合に、前記制振制御を必要と判定することを特徴とする請求項1に記載のクレーンの制振制御システム。
  3.  前記支持構造体の底部側に免震装置を更に備え、前記判定部は、前記免震装置が作動を開始した場合に、前記制振制御を必要と判定することを特徴とする請求項1に記載のクレーンの制振制御システム。
  4.  前記クレーンの受電部に電力を供給する通常電源と、前記起振時に前記通常電源が停電になった場合に前記受電部に電力を供給する非常用電源と、前記停電の発生時に前記受電部への電力供給源を前記通常電源から前記非常用電源に切り替える電源切替手段と、を備えることを特徴とする請求項1~3の何れかに記載のクレーンの制振制御システム。
  5.  支持構造体の頂部側に設けられるガーダ及びブーム上を移動するトロリを備えるクレーンの起振時における前記支持構造体の振動を低減させるクレーンの制振制御方法であって、
     前記振動を検出する振動検出工程と、
     前記振動検出工程の検出結果から前記支持構造体の振動速度を算出する振動速度算出工程と、
     前記振動速度算出工程の算出結果から前記支持構造体の制振制御の要否を判定する要否判定工程と、
     前記要否判定工程で前記制振制御が必要と判定された際に前記トロリの移動速度を調整する指令信号を前記トロリの駆動部に送信する指令信号送信工程と、を含むことを特徴とするクレーンの制振制御方法。
PCT/JP2013/066750 2012-11-28 2013-06-18 クレーンの制振制御システム及びクレーンの制振制御方法 WO2014083873A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
IN6846DEN2014 IN2014DN06846A (ja) 2012-11-28 2013-06-18
CN201380009611.6A CN104136359B (zh) 2012-11-28 2013-06-18 起重机的抑制振动控制系统及起重机的抑制振动控制方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012260252A JP5984642B2 (ja) 2012-11-28 2012-11-28 クレーンの制振制御システム及びクレーンの制振制御方法
JP2012-260252 2012-11-28

Publications (1)

Publication Number Publication Date
WO2014083873A1 true WO2014083873A1 (ja) 2014-06-05

Family

ID=50827530

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/066750 WO2014083873A1 (ja) 2012-11-28 2013-06-18 クレーンの制振制御システム及びクレーンの制振制御方法

Country Status (4)

Country Link
JP (1) JP5984642B2 (ja)
CN (1) CN104136359B (ja)
IN (1) IN2014DN06846A (ja)
WO (1) WO2014083873A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3653484A1 (en) * 2018-11-19 2020-05-20 Ørsted Wind Power A/S A system for transferring an object from a ship to an offshore structure

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9522810B2 (en) * 2014-01-17 2016-12-20 Taiwan Semiconductor Manufacturing Company Limited Overhead crane
CN104261256B (zh) * 2014-09-12 2017-08-25 三峡大学 一种塔机顶升状态在线监控系统及监控方法
DE102017114789A1 (de) * 2017-07-03 2019-01-03 Liebherr-Components Biberach Gmbh Kran und Verfahren zum Steuern eines solchen Krans
JP7005374B2 (ja) * 2018-02-13 2022-01-21 住友重機械搬送システム株式会社 クレーンシステム及び非常時電力供給方法
JP7183072B2 (ja) * 2019-02-20 2022-12-05 住友重機械搬送システム株式会社 クレーン、及びクレーンの吊具の振れ検出方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6123098A (ja) * 1984-07-12 1986-01-31 三菱電機株式会社 荷役機械の非常運転装置
JPS63183187U (ja) * 1987-05-15 1988-11-25
GB2300177A (en) * 1995-04-24 1996-10-30 Mitsubishi Heavy Ind Ltd Preventing Load Vibration
JP3565294B2 (ja) * 1995-06-07 2004-09-15 石川島播磨重工業株式会社 クレーンの制振構造
JP2009242062A (ja) * 2008-03-31 2009-10-22 Ishikawajima Transport Machinery Co Ltd クレーンの免震・制振複合装置
JP2010228871A (ja) * 2009-03-27 2010-10-14 Mitsui Eng & Shipbuild Co Ltd 岸壁クレーン

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2327651B1 (de) * 2009-11-30 2012-08-01 Siemens Aktiengesellschaft System zur Dämpfung einer Schwingung an einem Containerkran
CN202272650U (zh) * 2011-08-20 2012-06-13 鞍钢股份有限公司 吊车故障在线监控装置

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6123098A (ja) * 1984-07-12 1986-01-31 三菱電機株式会社 荷役機械の非常運転装置
JPS63183187U (ja) * 1987-05-15 1988-11-25
GB2300177A (en) * 1995-04-24 1996-10-30 Mitsubishi Heavy Ind Ltd Preventing Load Vibration
JPH08290892A (ja) * 1995-04-24 1996-11-05 Mitsubishi Heavy Ind Ltd 吊荷の振れ止め装置
CN1139646A (zh) * 1995-04-24 1997-01-08 三菱重工业株式会社 起吊物的止摆装置
US5642822A (en) * 1995-04-24 1997-07-01 Mitsubishi Jukogyo Kabushiki Kaisha Suspended load vibration preventing apparatus
HK1010361A1 (en) * 1995-04-24 1999-06-17 Mitsubishi Heavy Ind Ltd Suspended load vibration preventing apparatus
JP3565294B2 (ja) * 1995-06-07 2004-09-15 石川島播磨重工業株式会社 クレーンの制振構造
JP2009242062A (ja) * 2008-03-31 2009-10-22 Ishikawajima Transport Machinery Co Ltd クレーンの免震・制振複合装置
JP2010228871A (ja) * 2009-03-27 2010-10-14 Mitsui Eng & Shipbuild Co Ltd 岸壁クレーン

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3653484A1 (en) * 2018-11-19 2020-05-20 Ørsted Wind Power A/S A system for transferring an object from a ship to an offshore structure
WO2020104137A1 (en) * 2018-11-19 2020-05-28 Ørsted Wind Power A/S A system for transferring an object from a ship to an offshore structure

Also Published As

Publication number Publication date
JP5984642B2 (ja) 2016-09-06
IN2014DN06846A (ja) 2015-05-22
CN104136359A (zh) 2014-11-05
CN104136359B (zh) 2016-04-06
JP2014105082A (ja) 2014-06-09

Similar Documents

Publication Publication Date Title
JP5984642B2 (ja) クレーンの制振制御システム及びクレーンの制振制御方法
TWI704094B (zh) 物品搬送裝置
RU2534694C2 (ru) Устройство управления краном для управления подъемным механизмом крана
JP4840442B2 (ja) 吊荷振れ止め装置
US9434581B2 (en) Slow stopping apparatus for working machine
SG181233A1 (en) Elevator apparatus
JPWO2010013597A1 (ja) エレベータ装置
JP4800793B2 (ja) エレベータの制御装置
JP7038862B2 (ja) エレベータ装置
JP5844377B2 (ja) 建設機械及び旋回用電動機の制御方法
JP5039365B2 (ja) クレーンのスキュー振れ止め装置およびクレーン
JP5327836B2 (ja) エレベータの制御装置
JPWO2007029331A1 (ja) エレベータの振動低減装置
JP5973929B2 (ja) エレベータの管制運転装置およびその方法
JP2010228871A (ja) 岸壁クレーン
JP6407903B2 (ja) クレーンおよびクレーンの制御方法
JPH09110341A (ja) エレベータかご室の制振装置
JP2009029578A (ja) タワークレーンの地震応答制御方法及び装置
JP5890556B1 (ja) クレーンおよびクレーンの制御方法
JP7384025B2 (ja) 懸架式クレーンの制御装置及びインバータ装置
KR101821028B1 (ko) 크레인의 제어장치
JP2012188212A (ja) 洋上荷役システム及びこれを備えた洋上浮遊体
JPH06336394A (ja) 天井クレーンの振動抑制方法
JP2011131976A (ja) 搬送装置および搬送装置の制御システム
JP3621954B2 (ja) クレーン船の吊枠揺れ止め装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201380009611.6

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13858897

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13858897

Country of ref document: EP

Kind code of ref document: A1