WO2014076976A1 - ボイラシステム - Google Patents

ボイラシステム Download PDF

Info

Publication number
WO2014076976A1
WO2014076976A1 PCT/JP2013/055185 JP2013055185W WO2014076976A1 WO 2014076976 A1 WO2014076976 A1 WO 2014076976A1 JP 2013055185 W JP2013055185 W JP 2013055185W WO 2014076976 A1 WO2014076976 A1 WO 2014076976A1
Authority
WO
WIPO (PCT)
Prior art keywords
boiler
load factor
selection unit
eco
amount
Prior art date
Application number
PCT/JP2013/055185
Other languages
English (en)
French (fr)
Inventor
山田 和也
嘉秀 久保
浩二 三浦
康弘 兵頭
Original Assignee
三浦工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三浦工業株式会社 filed Critical 三浦工業株式会社
Publication of WO2014076976A1 publication Critical patent/WO2014076976A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B35/00Control systems for steam boilers

Definitions

  • the present invention relates to a boiler system including a boiler group having a plurality of boilers capable of burning by continuously changing a load factor.
  • a boiler system has been proposed that includes a boiler group having a plurality of boilers that can be combusted at a plurality of staged combustion positions, and a control unit that controls the combustion state of the boiler group according to a required load.
  • a so-called proportional control type boiler system has been proposed in which the amount of steam generated is controlled by continuously increasing or decreasing the combustion amount of the boiler.
  • a boiler is divided into three load zones, a load increase zone, an optimum operation load zone, and a load decrease load zone, and the boiler is burned when burning in the load increase load zone.
  • a control method of a proportional control boiler has been proposed in which the number of boilers is increased and the number of boilers to be burned is reduced when the boiler is burning in a load reduction zone. And in the control method of the proportional control boiler proposed by this patent document 1, after performing increase / decrease in the number of the boilers to burn, all the boilers which are burned are operated by the equal load factor.
  • Patent Document 1 since the method proposed in Patent Document 1 is designed to control boilers by paying attention to the number of boilers to be burned and the combustion load factor, it is appropriate when the capacity and efficiency characteristics of all the boilers are the same. However, when applied to a boiler group in which boilers having different capacities and boilers having different efficiency characteristics are mixed, the control is not appropriate.
  • the output steam amount corresponding to 160% varies.
  • the present invention has been made in view of such problems, and an object of the present invention is to provide a boiler system that can be operated in an efficient state even in a boiler group in which boilers having different capacities and efficiency characteristics are mixed.
  • the present invention is a boiler system including a boiler group including a plurality of boilers capable of burning by continuously changing a load factor, and a control unit that controls a combustion state of the boiler group according to a required load.
  • the plurality of boilers are set with a unit steam amount, which is a unit of variable steam amount, and each of the plurality of boilers has a plurality of operation zones corresponding to a predetermined load factor range.
  • the control unit is a required steam amount calculation unit that calculates a required steam amount that is a steam amount required according to the required load, and a steam amount that is output by the boiler group
  • An output steam amount calculation unit that calculates an output steam amount
  • a deviation calculation unit that calculates a deviation amount between the required steam amount and the output steam amount
  • a magnitude that determines the size of the required steam amount and the output steam amount Judgment unit and the size judgment unit
  • a combustion increase boiler selection unit that selects a boiler that increases the steam amount, and the required steam amount is converted into the output steam amount by the magnitude determination unit.
  • a combustion reduction boiler selection unit that selects a boiler that reduces the amount of steam when it is determined that the deviation amount calculated by the deviation calculation unit is the combustion increase boiler selection unit or the combustion reduction boiler selection.
  • a deviation amount determination unit for determining whether the amount of steam is equal to or greater than the unit steam amount of the boiler selected by the unit, and the combustion increase when the deviation amount determination unit determines that the deviation amount is equal to or greater than the unit steam amount Increase the steam amount of the boiler selected by the boiler selection unit by the unit steam amount, or change the steam amount of the boiler selected by the combustion reduction boiler selection unit to the unit steam amount.
  • the combustion increase boiler selection unit selects a boiler located in the operation zone corresponding to the range of the lowest load factor among the plurality of operation zones from the plurality of boilers.
  • a combustion increase boiler selection unit that selects, from the plurality of boilers, a boiler located in an operation zone corresponding to a range of the highest load factor among the plurality of operation zones. And a reduction selection unit.
  • combustion increase boiler selection unit when a plurality of boilers are selected by the first increase selection unit, the load factor in the operation zone from the plurality of boilers selected by the first increase selection unit.
  • the combustion reduction boiler selection unit is further selected by the first reduction selection unit when a plurality of boilers are selected by the first reduction selection unit. It is preferable to further include a second reduction selection unit that selects a boiler having the highest load factor in the operation zone from the plurality of boilers.
  • the combustion increase boiler selection unit selects the boiler having the highest priority from the plurality of boilers selected by the second increase selection unit when a plurality of boilers are selected by the second increase selection unit.
  • the combustion reduction boiler selection unit further includes a plurality of boilers selected by the second reduction selection unit when the plurality of boilers are selected by the second reduction selection unit. It is preferable to further include a reduction priority selection unit that selects the boiler with the lowest priority.
  • the combustion increase boiler selection unit selects the boiler having the highest priority from the plurality of boilers selected by the first increase selection unit when the plurality of boilers are selected by the first increase selection unit.
  • the combustion reduction boiler selection unit further includes a plurality of boilers selected by the first reduction selection unit when the plurality of boilers are selected by the first reduction selection unit. It is preferable to further include a reduction priority selection unit that selects the boiler with the lowest priority.
  • the combustion increase boiler selection unit is configured to increase a steam amount from the plurality of boilers when the magnitude determination unit determines that the required steam amount is larger than the output steam amount after the increase in the steam amount. And an unselected increase boiler selection unit that selects a boiler that has not been selected, wherein the first increase selection unit corresponds to the range of the lowest load factor among the boilers selected by the unselected increase boiler selection unit.
  • the combustion reduction boiler selection unit selects the boiler when the required steam amount is determined to be smaller than the output steam amount after the steam amount is reduced by the size determination unit.
  • An unselected reduction boiler selection unit that selects a boiler that has not been selected as a boiler that reduces the amount of steam from the boilers of the boiler, and the first reduction selection unit includes the unselected reduction boiler Of the boiler selected by selecting section, it is preferable to select a boiler located on the operating zone corresponding to a range of the highest load factor.
  • it further comprises an order storage unit for storing the order of the boilers selected for the boiler for increasing the steam amount and the order of the boilers selected for the boiler for decreasing the steam amount, and selected by the unselected increase boiler selecting unit.
  • the combustion increase boiler selection unit selects the boiler that increases the steam amount in the order stored in the sequence storage unit, and the boiler selected by the unselected decrease boiler selection unit disappears.
  • the combustion reduction boiler selection unit selects a boiler that reduces the steam amount in the order stored in the order storage unit.
  • the plurality of operation zones are set corresponding to a range of a load factor when combustion is performed with a boiler efficiency within a predetermined range.
  • the plurality of operation zones include a first eco operation zone in which the boiler efficiency is higher than the first threshold value and a second threshold value in which the boiler efficiency is lower than the first threshold value and the first threshold value.
  • a second eco-operation zone that is a load factor range between and a normal operation zone that is a load factor range in which the boiler efficiency is lower than the second threshold, and the second eco-operation zone is An upper second eco-driving zone located in a range with a higher load factor than the first eco-driving zone; and a lower second eco-driving zone located in a range with a lower load factor than the first eco-driving zone;
  • the normal operation zone is located in a range where the load factor is higher than the upper second eco-operation zone and in a range where the load factor is lower than the lower second eco-operation zone.
  • Lower normal operation zone It may be provided with a.
  • the plurality of operation zones include a first eco operation zone in which the boiler efficiency is higher than the first threshold value and a second threshold value in which the boiler efficiency is lower than the first threshold value and the first threshold value.
  • a second eco-operation zone that is a load factor range between and a normal operation zone that is a load factor range in which the boiler efficiency is lower than the second threshold, and the second eco-operation zone is An upper second eco-driving zone located in a range with a higher load factor than the first eco-driving zone; and a lower second eco-driving zone located in a range with a lower load factor than the first eco-driving zone;
  • the normal operation zone may be located in a range with a higher load factor than the upper second eco-operation zone.
  • the plurality of operation zones include a first eco operation zone in which the boiler efficiency is higher than the first threshold value and a second threshold value in which the boiler efficiency is lower than the first threshold value and the first threshold value.
  • a second eco-operation zone that is a load factor range between and a normal operation zone that is a load factor range in which the boiler efficiency is lower than the second threshold, and the second eco-operation zone is An upper second eco-driving zone located in a range with a higher load factor than the first eco-driving zone; and a lower second eco-driving zone located in a range with a lower load factor than the first eco-driving zone;
  • the normal operation zone may be located in a range where the load factor is lower than that of the lower second eco-operation zone.
  • the plurality of operation zones include a first eco operation zone in which the boiler efficiency is higher than the first threshold value and a second threshold value in which the boiler efficiency is lower than the first threshold value and the first threshold value.
  • a second eco-operation zone that is a load factor range between and a normal operation zone that is a load factor range in which the boiler efficiency is lower than the second threshold, and the second eco-operation zone is The normal operation zone may be located in a range where the load factor is lower than that of the second eco-operation zone while being located in a range where the load factor is lower than that of the first eco-operation zone.
  • the plurality of operation zones include a first eco operation zone in which the boiler efficiency is higher than the first threshold value and a second threshold value in which the boiler efficiency is lower than the first threshold value and the first threshold value.
  • a second eco-operation zone that is a load factor range between and a normal operation zone that is a load factor range in which the boiler efficiency is lower than the second threshold, and the second eco-operation zone is The normal operation zone may be located in a range where the load factor is higher than that of the second eco-operation zone while being located in a range where the load factor is higher than that of the first eco-operation zone.
  • the unit steam amount is preferably set individually for each of the plurality of boilers.
  • a boiler system in which boilers having different capacities and efficiency characteristics are mixed can be operated in an efficient state.
  • the boiler system 1 includes a boiler group 2 including a plurality of (five) boilers 20, a steam header 6 that collects steam generated in the plurality of boilers 20, and steam that measures the pressure inside the steam header 6.
  • a pressure sensor 7 and a number control device 3 having a controller 4 that controls the combustion state of the boiler group 2 are provided.
  • the boiler group 2 produces
  • the steam header 6 is connected to a plurality of boilers 20 constituting the boiler group 2 via a steam pipe 11. A downstream side of the steam header 6 is connected to a steam use facility 18 via a steam pipe 12.
  • the steam header 6 collects and stores the steam generated in the boiler group 2, thereby adjusting the pressure difference and pressure fluctuation of the plurality of boilers 20, and supplying the steam whose pressure is adjusted to the steam using facility 18. Supply.
  • the vapor pressure sensor 7 is electrically connected to the number control device 3 through the signal line 13.
  • the steam pressure sensor 7 measures the steam pressure inside the steam header 6 (steam pressure generated in the boiler group 2), and sends a signal (steam pressure signal) related to the measured steam pressure via the signal line 13. It transmits to the control apparatus 3.
  • the number control device 3 is electrically connected to a plurality of boilers 20 through a signal line 16.
  • the number control device 3 controls the combustion state of each boiler 20 based on the steam pressure inside the steam header 6 measured by the steam pressure sensor 7. Details of the number control device 3 will be described later.
  • the above boiler system 1 can supply the steam generated in the boiler group 2 to the steam using equipment 18 via the steam header 6.
  • the load required in the boiler system 1 (required load) is the amount of steam consumed in the steam using facility 18.
  • the number control device 3 determines the fluctuation of the steam pressure inside the steam header 6 corresponding to the fluctuation of the steam consumption based on the steam pressure (physical quantity) inside the steam header 6 measured by the steam pressure sensor 7.
  • the amount of combustion of each boiler 20 which comprises the boiler group 2 is calculated and controlled.
  • the boiler system 1 can monitor the fluctuation of the required load based on the fluctuation of the vapor pressure measured by the vapor pressure sensor 7. Then, the boiler system 1 calculates a necessary steam amount that is a steam amount required according to the consumed steam amount (required load) of the steam using facility 18 based on the steam pressure of the steam header 6.
  • FIG.2 and FIG.3 is a figure which shows the outline of the boiler group 2 which concerns on this embodiment.
  • the boiler group 2 of the present embodiment is configured by mixing boilers 20 having different capacities (maximum steam amounts).
  • the No. 1 boiler is a 2t boiler
  • the No. 2 boiler is a 2.5t boiler
  • the No. 3 boiler is a 3t boiler
  • the No. 4 boiler is a 4t boiler
  • the No. 5 boiler is a 6t boiler.
  • the capacities of all of the No. 1 boilers to the No. 5 boilers are different.
  • the present invention is not limited to this, and one or a plurality of boilers 20 having different capacities may be mixed.
  • the boiler control method described in detail below is suitable not only when the boilers 20 having different capacities are mixed, but also when the capacities of the plurality of boilers 20 are all the same. Applicable.
  • the boiler 20 is composed of a proportional control boiler capable of burning by changing the load factor continuously.
  • the proportional control boiler is a boiler in which the combustion amount can be continuously controlled at least in the range from the minimum combustion state S1 in which boiler combustion can be maintained to the maximum combustion state S2 in which the boiler can be safely combusted.
  • the proportional control boiler adjusts the amount of combustion by, for example, controlling the opening degree (combustion ratio) of a valve that supplies fuel to the burner and a valve that supplies combustion air.
  • the continuous control of the combustion amount means that the calculation or signal in the local control unit 22 described later is a digital method and is handled in stages (for example, the output (combustion amount) of the boiler 20 is in increments of a predetermined unit). Even when the output is controlled).
  • the change of the combustion state between the combustion stop state S0 and the minimum combustion state S1 of the boiler 20 is controlled by turning on / off the combustion of the boiler 20 (burner).
  • the combustion amount can be controlled continuously.
  • a unit steam amount U which is a unit of variable steam amount, is set in each of the plurality of boilers 20.
  • the boiler 20 can change the amount of steam in units of the unit steam amount U in the range from the minimum combustion state S1 to the maximum combustion state S2.
  • the unit steam amount U can be appropriately set according to the steam amount (maximum steam amount) in the maximum combustion state S2 of the boiler 20, but from the viewpoint of improving the followability of the output steam amount to the necessary steam amount in the boiler system 1. It is preferably set to 0.1% to 20% of the maximum amount of steam of 20, and more preferably set to 1% to 10%.
  • the unit steam volume of the No. 1 boiler is 100 kg / h (5% of the maximum steam volume), the unit steam volume of the No.
  • 2 boiler is 250 kg / h (10% of the maximum steam volume), Unit 3 boiler unit steam volume 150kg / h (5% of maximum steam volume), Unit 4 boiler unit steam volume 200kg / h (5% of maximum steam volume), Unit 5 boiler unit steam volume 120 kg / h (2% of maximum steam).
  • the output steam amount indicates the steam amount output by the boiler group 2, and this output steam amount is represented by the total value of the steam amounts output from each of the plurality of boilers 20.
  • the plurality of boilers 20 are provided with a plurality of operation zones that are set corresponding to the range of the load factor in the case of combustion at a predetermined range of boiler efficiency, that is, the first eco-operation zone Z1, A second eco operation zone Z2 and a normal operation zone Z3 are set.
  • the first eco-operation zone Z1 is a load factor range in which the boiler efficiency (the thermal efficiency of the boiler 20) is higher than the first threshold value (for example, 98%), and the most preferable load factor for burning the boiler 20 It is a range.
  • the second eco-operation zone Z2 is a load factor range in which the boiler efficiency is between a first threshold value and a second threshold value (for example, 97%) lower than the first threshold value.
  • the second eco-driving zone Z2 includes an upper second eco-driving zone Z21 located in a range where the load factor is higher than that of the first eco-driving zone Z1, and a load that is greater than the first eco-driving zone Z1.
  • a lower second eco-operation zone Z22 located in a low rate range.
  • the normal operation zone Z3 is a load factor range in which the boiler efficiency is lower than the second threshold value. As shown in FIG. 3, the normal operation zone Z3 includes an upper normal operation zone Z31 located in a range where the load factor is higher than that of the upper second eco-operation zone Z21 and a load factor higher than that of the lower second eco-operation zone Z22. And a lower normal operation zone Z32 located in a lower range.
  • the boiler group 2 of the present embodiment is configured by mixing boilers 20 having different efficiency characteristics.
  • the first eco-operation zone Z1 of the No. 1 boiler is set to a load factor range of 40 to 70%
  • the first eco-operation zone Z1 of the No. 2 boiler is a range of 50 to 80% load factor.
  • the first eco-operating zone Z1 of the No. 3 boiler is set in the range of 30 to 50% load factor
  • the first eco-operating zone Z1 of the No. 4 boiler is set in the range of 40 to 60% load factor
  • the first eco-operating zone Z1 of the No. 5 boiler is set in the range of 70 to 80% load factor.
  • the second eco-operating zone Z2 and the normal operating zone Z3 are set in different load factor ranges in the first to fifth boilers.
  • the efficiency characteristics of all of the No. 1 boiler to the No. 5 boiler are made different.
  • the present invention is not limited to this, and one or a plurality of boilers 20 having different efficiency characteristics may be mixed.
  • the boiler control method described in detail below is suitable not only when the boilers 20 having different efficiency characteristics are mixed, but also when the efficiency characteristics of the plurality of boilers 20 are all the same. It can be suitably applied.
  • the priority order is set to each of the plurality of boilers 20.
  • the priority order is used to select the boiler 20 that performs a combustion instruction or a combustion stop instruction.
  • the priority order can be set, for example, using an integer value so that the lower the numerical value, the higher the priority order.
  • FIG. 3 when the priority order of “1” to “5” is assigned to each of the No. 1 boiler to the No. 5 boiler, the No. 1 boiler has the highest priority, and the No. 5 boiler priority Is the lowest. In the normal case, this priority order is changed at predetermined time intervals (for example, 24 hour intervals) under the control of the control unit 4 described later.
  • the boilers 20 are selected in descending order of priority
  • the boilers 20 are selected in ascending order of priority. Yes.
  • the boiler 20 demonstrated above is provided with the boiler main body 21 in which combustion is performed, and the local control part 22 which controls the combustion state of the boiler 20, as shown in FIG.
  • the local control unit 22 changes the combustion state of the boiler 20 according to the required load. Specifically, the local control unit 22 controls the combustion state of the boiler 20 based on the number control signal transmitted from the number control device 3 via the signal line 16. Further, the local control unit 22 transmits a signal used in the number control device 3 to the number control device 3 via the signal line 16. Examples of the signal used in the number control device 3 include an actual combustion state of the boiler 20 and other data.
  • the number control device 3 Based on the vapor pressure signal from the vapor pressure sensor 7, the number control device 3 calculates the required combustion amount of the boiler group 2 according to the required load and the combustion state of each boiler 20 corresponding to the required combustion amount, The number control signal is transmitted to the boiler 20 (local control unit 22). As shown in FIG. 1, the number control device 3 includes a storage unit 5 and a control unit 4.
  • the storage unit 5 includes information on instructions given to each boiler 20 under the control of the number control device 3 (control unit 4), information such as the combustion state received from each boiler 20, and operation zones of the plurality of boilers 20.
  • the information regarding the setting, the information regarding the setting of the unit steam amount U of the plurality of boilers 20, the information regarding the setting of the priority order of the plurality of boilers 20, the setting information regarding the change (rotation) of the priority order, and the like are stored.
  • the control unit 4 gives various instructions to each boiler 20 via the signal line 16 and receives various data from each boiler 20 to control the combustion state and priority order of the five boilers 20. .
  • each boiler 20 receives a signal for changing the combustion state from the number control device 3, it controls the boiler 20 according to the instruction.
  • FIG. 4 is a functional block diagram showing the configuration of the control unit 4.
  • the control unit 4 includes a necessary steam amount calculation unit 41, an output steam amount calculation unit 42, a deviation calculation unit 43, a magnitude determination unit 44, a combustion increase boiler selection unit 45, a combustion decrease boiler selection unit 46, a deviation An amount determination unit 47 and an output control unit 48 are provided.
  • the required steam amount calculation unit 41 calculates the required steam amount according to the required load based on the steam pressure of the steam header 6.
  • the output steam amount calculation unit 42 calculates an output steam amount that is a steam amount output by the boiler group 2 based on the combustion state of each boiler 20 transmitted from the local control unit 22.
  • the deviation calculation unit 43 calculates a deviation amount between the required steam amount and the output steam amount. Moreover, the deviation calculation part 43, when the vapor
  • the size determination unit 44 determines the size of the required steam amount and the output steam amount.
  • the combustion increase boiler selection unit 45 includes a first increase selection unit 451, a second increase selection unit 452, and an increase priority selection unit 453, and the required steam amount is output by the magnitude determination unit 44. If it is determined that it is larger than the boiler, the boiler that increases the steam amount (increases the load factor) is selected.
  • the first increase selection unit 451 corresponds to the range of the lowest load factor among the plurality of operation zones from the plurality of boilers 20 when it is determined that the required steam amount is larger than the output steam amount.
  • the boiler 20 located in the operation zone is selected as a boiler that increases the amount of steam. That is, the 1st increase selection part 451 selects the boiler 20 located in the operation zone in the lower side as a boiler which increases an amount of steam.
  • the operation zones are, in order from the lower side, the lower normal operation zone Z32, the lower second eco operation zone Z22, the first eco operation zone Z1, the upper second eco operation zone Z21, and the upper normal operation zone Z31. Is set.
  • the 2nd increase selection part 452 is when the several boiler 20 is selected by the 1st increase selection part 451 (when the boilers 20 located in the operation zone corresponding to the range of the lowest load factor exist).
  • the boiler 20 having the lowest load factor in the operation zone is selected as a boiler that increases the amount of steam.
  • the increase priority selection unit 453 is located in the operation zone corresponding to the range of the lowest load factor when the plurality of boilers 20 are selected by the second increase selection unit 452 and in the operation zone When there are a plurality of boilers 20 having the lowest load factor), the boiler 20 having the highest priority is selected from the plurality of boilers 20 as a boiler for increasing the steam amount.
  • the increase priority selection unit 453 increases the steam amount of the boiler 20 having the highest priority among the plurality of boilers 20 when the plurality of boilers 20 are selected by the first increase selection unit 451. It is good also as selecting as a boiler. That is, when a plurality of boilers 20 are selected by the first increase selection unit 451, the boiler in which the increase priority selection unit 453 increases the amount of steam based on the priority without using the second increase selection unit 452. It is good also as selecting.
  • the load factor in the same operation zone is used instead of the load factor of the boiler 20 so as to be suitably applicable to the boiler group 2 in which boilers 20 having different efficiency characteristics are mixed.
  • No. 1 boiler in which the first eco-operation zone Z1 is set to a load factor range of 40 to 70% and No. 2 boiler in which the first eco-operation zone Z1 is set to a range of load factor 50 to 80% Consider a case in which the No. 1 boiler is operating at a load factor of 55% and the No.
  • the No. 1 boiler with a low load factor has only a 55% margin to maintain the combustion state in the first eco-operation zone Z1 with respect to the increase in the amount of steam, while the No. 2 boiler with a high load factor has 66%. %
  • the efficiency of the boiler system 1 as a whole can be increased by increasing the steam volume of the No. 2 boiler having a high load factor. Therefore, each boiler 20 can be efficiently operated not by simply looking at the load factor but by looking at the load factor in the operation zone.
  • the combustion reduction boiler selection unit 46 includes a first reduction selection unit 461, a second reduction selection unit 462, and a reduction priority order selection unit 463.
  • a boiler that reduces the steam amount is selected.
  • the first reduction selection unit 461 corresponds to the range of the highest load factor from the plurality of boilers 20 among the plurality of operation zones.
  • the boiler 20 located in the operation zone is selected as a boiler that reduces the amount of steam. That is, the 1st reduction selection part 461 selects the boiler 20 located in the driving
  • decrease selection part 462 is when the several boiler 20 is selected by the 1st reduction
  • the boiler 20 having the highest load factor in the operation zone is selected as a boiler that reduces the amount of steam.
  • the reduction priority selection unit 463 is located in the operation zone corresponding to the range of the highest load factor when the plurality of boilers 20 are selected by the second reduction selection unit 462, and in the operation zone In the case where there are a plurality of boilers 20 having the highest load factor), the boiler 20 having the lowest priority is selected from the plurality of boilers 20 as a boiler for reducing the steam amount.
  • the reduction priority selection unit 463 reduces the steam amount of the boiler 20 having the lowest priority among the plurality of boilers 20 when the first reduction selection unit 461 selects the plurality of boilers 20. It is good also as selecting as a boiler. That is, when a plurality of boilers 20 are selected by the first reduction selection unit 461, the reduction priority selection unit 463 reduces the amount of steam based on the priority without using the second reduction selection unit 462. It is good also as selecting.
  • the deviation amount determination unit 47 determines whether the deviation amount calculated by the deviation calculation unit 43 is equal to or greater than the unit steam amount U of the boiler 20 selected by the combustion increase boiler selection unit 45 or the combustion decrease boiler selection unit 46.
  • the output control unit 48 determines the steam of the boiler 20 selected by the combustion increase boiler selection unit 45 or the combustion decrease boiler selection unit 46 when the deviation amount determination unit 47 determines that the deviation amount is equal to or greater than the unit steam amount U. Vary the amount. Specifically, when the required steam amount is larger than the output steam amount, the output control unit 48 increases the steam amount of the boiler 20 selected by the combustion increase boiler selecting unit 45 by the unit steam amount U, and is necessary. When the steam amount is smaller than the output steam amount, the steam amount of the boiler 20 selected by the combustion reduction boiler selecting unit 46 is decreased by the unit steam amount U.
  • 5 to 15 are diagrams each schematically showing an operation according to the first embodiment of the boiler system 1.
  • the No. 1 boiler, No. 2 boiler, and No. 3 boiler are operating at a load factor corresponding to the first eco-operation zone Z1, and the No. 4 boiler is on the upper side.
  • the vehicle is operating at a load factor in a range corresponding to the second eco-operation zone Z21
  • the No. 5 boiler is operating at a load factor in a range corresponding to the lower second eco-operation zone Z22.
  • the deviation calculating unit 43 calculates a deviation amount (200 kg / h) between the output steam amount and the required steam amount, and the magnitude determining unit 44 determines whether the output steam amount and the required steam amount are large or small. It is determined that the amount of steam needs to be increased. Then, the 1st increase selection part 451 of the combustion increase boiler selection part 45 is the boiler 20 located in the operation zone (lowermost operation zone) corresponding to the range of the lowest load factor among No. 1 boilers to No. 5 boilers. Is selected as a boiler that increases the amount of steam. In FIG. 5, since the lower second eco-operation zone Z22 of the No. 5 boiler is the lowermost operation zone, the first increase selection unit 451 selects the No. 5 boiler as a boiler that increases the amount of steam.
  • the deviation amount determination unit 47 determines whether the deviation amount is equal to or greater than the unit steam amount U of the No. 5 boiler, referring to FIG. 2, the unit steam amount U of the No. 5 boiler is 120 kg / h.
  • the deviation amount determination unit 47 determines that the deviation amount (200 kg / h) is equal to or greater than the unit steam amount U of the No. 5 boiler.
  • the output control unit 48 increases the steam amount of the No. 5 boiler by the unit steam amount U (increase from 3600 kg / h to 3720 kg / h), and thereby the output steam amount is also 10100 kg. / H to 10220 kg / h.
  • the deviation calculation unit 43 calculates the deviation amount (80 kg / h) based on the output steam amount (10220 kg / h) of the boiler group 2 after the increase in the steam amount, and the magnitude determination unit 44 Determines that it is necessary to increase the amount of steam from the size. Thereafter, the first increase selection unit 451 selects the No. 5 boiler located in the lower second eco-operation zone Z22 as the boiler for increasing the steam amount, but the unit steam amount U (120 kg / h) of the No. 5 boiler is a deviation. Since it is larger than the amount (80 kg / h), the operation when the required steam amount is increased is completed.
  • the output control unit 48 determines that the deviation amount determination unit 47 determines that the deviation amount is not equal to or greater than the unit steam amount U of the No. 5 boiler.
  • the steam amount of each boiler is increased by the amount of steam counted based on the unit steam amount U (see step ST6 in FIG. 16).
  • the deviation calculating unit 43 calculates a deviation amount (400 kg / h) between the output steam amount and the required steam amount, and the magnitude determining unit 44 calculates the difference between the output steam amount and the required steam amount. It is determined that the amount of steam needs to be reduced depending on the size. Then, the 1st reduction selection part 461 of the combustion reduction boiler selection part 46 makes the boiler 20 located in the operation zone (uppermost operation zone) corresponding to the range of the highest load factor among No. 1 boilers to No. 5 boilers. Select a boiler that reduces the amount of steam. In FIG. 5, since the upper second eco-operation zone Z21 of the No. 4 boiler is the uppermost operation zone, the first reduction selection unit 461 selects the No. 4 boiler as the boiler that reduces the steam amount.
  • the deviation amount determination unit 47 determines whether the deviation amount is equal to or greater than the unit steam amount U of the No. 4 boiler, referring to FIG. 2, the unit steam amount U of the No. 4 boiler is 200 kg / h.
  • the deviation amount determination unit 47 determines that the deviation amount (400 kg / h) is equal to or greater than the unit steam amount U of the No. 4 boiler.
  • the output control unit 48 reduces the steam amount of the No. 4 boiler by the unit steam amount U (reduced from 2800 kg / h to 2600 kg / h), whereby the output steam amount is also 10100 kg. / H to 9900 kg / h.
  • the deviation calculation unit 43 calculates the deviation amount (200 kg / h) based on the output steam amount (9900 kg / h) of the boiler group 2 after the reduction of the steam amount, and the magnitude determination unit 44 Determines that it is necessary to reduce the amount of steam from the size. Thereafter, when the first reduction selection unit 461 selects the No. 4 boiler located in the upper second eco-operation zone Z21 as the boiler for reducing the steam amount, the deviation amount determination unit 47 sets the deviation amount (200 kg / h) to No. 4 machine. It is determined that the unit steam amount U (200 kg / h) or more of the boiler. As a result, as shown in FIG. 8, the output control unit 48 decreases the steam amount of the No.
  • the boiler 20 that changes the amount of steam is selected based on the operation zone. Since the operation zone can be appropriately set according to the boiler 20, the boiler system 1 allows each boiler 20 to be operated efficiently even in the boiler group 2 in which boilers 20 having different capacities and efficiency characteristics are mixed. Can do.
  • the No. 1 boiler is currently operating at a load factor in the range corresponding to the first eco-operation zone Z1 (the reference time), and the No. 2 and No. 5 boilers are in the lower second ecology.
  • Driving is performed at a load factor in a range corresponding to the operation zone Z22, and the No. 3 boiler and the No. 4 boiler are operating at a load factor in a range corresponding to the upper second eco-operation zone Z21.
  • the necessary steam amount decreases to 9800 kg / h (FIG. 12, Consider (see FIG. 13).
  • the first increase selection unit 451 of the combustion increase boiler selection unit 45 operates in the operating zone corresponding to the lowest load factor range among the No. 1 to No. 5 boilers (the lowest operating zone). Is selected as a boiler that increases the amount of steam.
  • the first increase selection unit 451 selects two of the No. 2 boiler and the No. 5 boiler. select.
  • the second increase selection unit 452 of the combustion increase boiler selection unit 45 includes the No. 2 boiler and the No. 5 boiler.
  • the boiler 20 with the lowest load factor in the lower second eco-operation zone Z22 is selected as a boiler that increases the amount of steam.
  • the No. 5 boiler is operating in a state where the load factor in the lower second eco-operation zone Z22 is 75%, whereas the No. 2 boiler is in the lower second eco-operation zone Z22. Since the load factor is 50%, the second increase selection unit 452 selects the No. 2 boiler among the No. 2 boiler and the No. 5 boiler as a boiler that increases the amount of steam.
  • the unit steam amount U of the No. 2 boiler is 250 kg / h, which is smaller than the deviation amount (400 kg / h). Therefore, as shown in FIG. 10, the output control unit 48 increases the steam amount of the No. 2 boiler by the unit steam amount U, and increases the output steam amount from 10200 kg / h to 10450 kg / h. At this time, since the steam amount of the No. 2 boiler has increased from 1000 kg / h to 1250 kg / h, the load factor in the lower second eco-operation zone Z22 of the No. 2 boiler has also increased from 50% to 100%.
  • a load factor of 100% in the lower second eco-operation zone Z22 is synonymous with a load factor of 0% in the first eco-operation zone Z1, but the second boiler is It is assumed that the vehicle is located in the side second eco-operation zone Z22 (hereinafter, similarly, an operation zone that facilitates explanation of the boundary of the operation zone is assumed).
  • the deviation calculating unit 43 calculates the deviation amount (150 kg / h) based on the output steam amount (10450 kg / h) of the boiler group 2 after the increase in the steam amount, and the magnitude determining unit 44 Determines that it is necessary to increase the amount of steam from the magnitude of the required steam amount and the output steam amount.
  • the first increase selection unit 451 selects the No. 2 boiler and the No. 5 boiler located in the lower second eco-operation zone Z22. Since the plurality of boilers 20 are selected by the first increase selection unit 451, the second increase selection unit 452 has the lowest load factor in the lower second eco-operation zone Z22 among the No. 2 boiler and the No. 5 boiler.
  • the boiler 20 is selected as a boiler that increases the amount of steam.
  • the No. 5 boiler has a lower load factor in the lower second eco-operation zone Z22. Selects the No. 5 boiler as a boiler that increases the amount of steam.
  • the deviation amount (150 kg / h) is equal to or greater than the unit steam amount U (120 kg / h) of the No. 5 boiler, as shown in FIG.
  • the steam amount is increased by U, and the output steam amount is increased from 10450 kg / h to 10570 kg / h.
  • the No. 5 boiler is again selected as the boiler for increasing the steam amount from the deviation amount (30 kg / h) of the required steam amount and the output steam amount of the boiler group 2 after the increase in the steam amount. Since U is larger than the deviation amount, it is determined that the steam should not be increased, and the operation when the required steam amount is increased is terminated.
  • the first reduction selection unit 461 of the combustion reduction boiler selection unit 46 operates in the operation zone corresponding to the highest load factor range among the No. 1 boiler to the No. 5 boiler (the uppermost operation zone). ) Is selected as a boiler that reduces the amount of steam.
  • the first reduction selection unit 461 selects two of the No. 3 boiler and the No. 4 boiler. .
  • the second reduction selection unit 462 of the combustion reduction boiler selection unit 46 is the No. 3 boiler and the No. 4 boiler.
  • the boiler 20 with the highest load factor in the upper second eco-operation zone Z21 is selected as the boiler that reduces the steam amount.
  • the No. 4 boiler is operating with the load factor in the upper second eco-operation zone Z21 being 50%, whereas the No. 3 boiler is in the upper second eco-operation zone Z21. Since the operation is performed in a state where the load factor is 100%, the second reduction selection unit 462 selects the No. 3 boiler among the No. 3 boiler and the No. 4 boiler as a boiler for reducing the steam amount.
  • the output control unit 48 determines the steam amount of the No. 3 boiler as a unit.
  • the steam amount is decreased by U, and the output steam amount is decreased from 10200 kg / h to 10050 kg / h.
  • the load factor in the upper second eco-operation zone Z21 of the No. 3 boiler has also decreased from 100% to 50%.
  • the deviation calculation unit 43 calculates the deviation amount (250 kg / h) based on the output steam amount (10050 kg / h) of the boiler group 2 after the reduction of the steam amount, and the magnitude determination unit 44 Determines that it is necessary to reduce the amount of steam based on the required amount of steam and the amount of output steam.
  • decrease selection part 461 selects the No. 3 boiler and No. 4 boiler located in the upper side 2nd eco-operation zone Z21. Since the plurality of boilers 20 has been selected by the first reduction selection unit 461, the second reduction selection unit 462 has the highest load factor in the upper second eco-operation zone Z21 among the No. 3 boiler and the No. 4 boiler.
  • the second reduction selection unit 462 selects the No. 3 boiler and the No. 4 boiler.
  • the reduction priority selection unit 463 of the combustion reduction boiler selection unit 46 is the No. 3 boiler and the No. 4 boiler.
  • the boiler 20 with the lowest priority is selected.
  • the priority order of the No. 3 boiler is No. 3
  • the priority order of the No. 4 boiler is No. 4. Therefore, the reduction priority selection unit 463 selects the No. 4 boiler as the boiler for reducing the steam amount. To do.
  • the output control unit 48 determines the steam amount of the No. 4 boiler.
  • the unit steam amount is decreased by U, and the output steam amount is decreased from 10050 kg / h to 9850 kg / h.
  • the No. 3 boiler is selected again as the boiler for reducing the steam amount from the deviation amount (50 kg / h) between the required steam amount and the output steam amount of the boiler group 2 after the steam amount is reduced. Since U is larger than the deviation amount, it is determined that the steam should not be reduced, and the operation when the required steam amount is reduced ends.
  • the boiler 20 which changes the amount of steam based on the load factor in an operation zone is provided. You are going to choose.
  • boilers 20 having different efficiency characteristics coexist, simply selecting the boiler 20 having a high load factor among the plurality of boilers 20 as the boiler 20 that changes the amount of steam cannot efficiently operate each boiler. .
  • each boiler 20 can be operated efficiently by looking at the load factor in the operation zone instead of simply looking at the load factor.
  • the operation using the priority order is illustrated when the steam amount is decreased, but the boiler 20 can be selected using the priority order even when the steam amount is increased.
  • the lower second eco-operation zone Z22 of the No. 2 boiler and the No. 5 boiler is the lowermost operation zone.
  • the output control unit 48 sets the steam amount of the No. 5 boiler as the unit steam as shown in FIG. The amount is increased by the amount U, and the output steam amount is increased from 10200 kg / h to 10320 kg / h.
  • the boiler that increases the steam amount is selected again according to the deviation amount calculated based on the output steam amount of the boiler group 2 after the increase in the steam amount. The description is omitted because it is repeated.
  • the upper second eco-operation zone Z21 of the No. 3 boiler and the No. 4 boiler is the uppermost operation zone.
  • the priority order of the No. 3 boiler is No. 3, and the priority order of the No. 4 boiler is No. 4. Therefore, the reduction priority selection unit 463 selects the No. 4 boiler as the boiler that reduces the steam amount. .
  • the output control unit 48 sets the steam amount of the No. 4 boiler as the unit steam as shown in FIG. The amount is reduced by the amount U, and the output steam amount is reduced from 10200 kg / h to 10000 kg / h.
  • the boiler that reduces the steam amount is selected again according to the deviation amount calculated based on the output steam amount of the boiler group 2 after the steam amount decrease. The description is omitted because it is repeated.
  • the boiler 20 that changes the steam amount may be selected based on the priority order. Even in such a selection, since the operation zone is appropriately set according to the boiler 20, even in the boiler group 2 in which boilers 20 having different capacities and efficiency characteristics are mixed, each boiler 20 is operated efficiently. Can be made.
  • FIGS. 16 and 17 are flowcharts showing the flow of processing of the boiler system 1.
  • the unit steam amount U is set for each boiler 20 (step ST1) and the operation zone is set (step ST2), and stored in a predetermined area of the storage unit 5.
  • step ST3 the control unit 4 calculates a necessary steam amount and a deviation amount. That is, the required steam amount calculation unit 41 calculates the required steam amount according to the required load based on the steam pressure of the steam header 6, and the output steam amount calculation unit 42 calculates the output steam amount based on the combustion state of each boiler 20. Once calculated, the deviation calculating unit 43 calculates the deviation amount between the required steam amount and the output steam amount.
  • step ST4 the control unit 4 determines whether or not a change in the amount of steam is necessary.
  • the control unit 4 determines that the variation of the steam amount is not necessary when the deviation amount is zero, and determines that the variation of the steam amount is necessary when the deviation amount is not zero. If the change in the amount of steam is not necessary, the process returns to step ST3. If the change in the amount of steam is required, the process proceeds to step ST5.
  • step ST5 the control part 4 performs the fluctuation boiler selection process which selects the boiler 20 which fluctuates the amount of steam.
  • the control unit 4 outputs a combustion instruction to each boiler 20 and controls the amount of steam output from each boiler 20. That is, the output control unit 48 varies the steam amount of the boiler 20 selected in step ST5 based on the unit steam amount U.
  • step ST6 ends, the control unit 4 returns to the process of step ST3 and repeats the processes of step ST3 to step ST6.
  • step ST51 the control unit 4 determines whether it is necessary to increase the steam amount or decrease the steam amount. This determination is made based on the magnitude of the required steam amount and the output steam amount determined by the size determination unit 44. That is, when the required steam amount is larger, it is determined that the steam amount needs to be increased, and when the output steam amount is larger, it is determined that the steam amount needs to be decreased.
  • step ST52 the control unit 4 selects a steam amount increase candidate boiler.
  • the selection of the steam increase candidate boiler is as described above, and the combustion increase boiler selection unit 45 is a boiler that is a candidate for increasing the steam amount based on the operation zone, the load factor in the operation zone, and the priority order. 20 is selected.
  • step ST53 the control unit 4 (deviation amount determination unit 47) determines whether the deviation amount is equal to or greater than the unit steam amount U of the boiler 20 selected as the steam amount increase candidate boiler. At this time, if the deviation amount is greater than or equal to the unit steam amount U, the control unit 4 then proceeds to the process of step ST54.
  • step ST54 the control unit 4 increases the output steam amount and subtracts the deviation amount. That is, based on the unit steam amount U set in the boiler 20 selected in step ST52, the output steam amount calculating unit 42 and the deviation calculating unit 43 increase the output steam amount and subtract the deviation amount.
  • the control unit 4 returns to the process of step ST52, and repeats the processes of step ST52 to step ST54 until it is determined in step ST53 that the deviation amount is not equal to or greater than the unit steam amount U. If it is determined in step ST53 that the deviation amount is not equal to or greater than the unit steam amount U, the control unit 4 ends the variable boiler selection process, and proceeds to the process in step ST6 in FIG.
  • step ST6 the steam amount is changed based on the unit steam amount U by the number of times selected in association with the repeated steps ST52 to ST54 (the same applies to steps ST55 to ST57 described later).
  • the boiler 20 since there is a time lag between the time when the steam instruction output from the boiler 20 changes after receiving a combustion instruction, the boiler 20 changes the steam amount without considering this time lag due to the flow of such processing. Can be selected.
  • the control unit 4 selects a steam amount reduction candidate boiler.
  • the selection of the steam reduction candidate boiler is as described above, and the combustion reduction boiler selection unit 46 is a boiler that is a candidate for reducing the steam quantity based on the operation zone, the load factor in the operation zone, and the priority order. 20 is selected.
  • step ST56 the control unit 4 (deviation amount determination unit 47) determines whether the deviation amount is equal to or greater than the unit steam amount U of the boiler 20 selected as the steam amount increase candidate boiler. At this time, if the deviation amount is greater than or equal to the unit steam amount U, the control unit 4 subsequently proceeds to the process of step ST57. On the other hand, when it is determined that the deviation amount is not equal to or greater than the unit steam amount U, the control unit 4 ends the variation boiler selection process, and proceeds to the process of step ST6 in FIG.
  • step ST57 the control unit 4 decreases the output steam amount and subtracts the deviation amount. That is, based on the unit steam amount U set in the boiler 20 selected in step ST52, the output steam amount calculating unit 42 and the deviation calculating unit 43 perform a decrease in the output steam amount and a subtraction of the deviation amount.
  • the control unit 4 returns to the process of step ST55, and repeats the processes of step ST55 to step ST57 until it is determined in step ST56 that the deviation amount is not equal to or greater than the unit steam amount U.
  • the boiler system 1 according to the first embodiment described above has the following effects.
  • An operation zone is set for each of the plurality of boilers 20, and the control unit 4 increases the steam amount of the boiler 20 located in the lower operation zone when the required steam amount is larger than the output steam amount.
  • the boiler 20 located in the upper operation zone is selected as the boiler that reduces the steam amount.
  • the unit steam amount U is set for each of the plurality of boilers 20, and the control unit 4 changes the steam amount of the selected boiler 20 by the unit steam amount U.
  • the control unit 4 determines the steam amount of the boiler 20 having the lowest load factor in the operation zone among the plurality of selected boilers 20.
  • the boiler 20 having the highest load factor in the operation zone is selected as the boiler for reducing the steam amount.
  • the control unit 4 varies the amount of steam based on the priority order among the plurality of selected boilers 20. It was decided to select a boiler. Thereby, even if it is a case where the several boiler 20 is burning in the same state, since the steam quantity of any boiler 20 is fluctuate
  • control part 4 selects the boiler which fluctuates a steam quantity based on a priority among the selected several boilers 20 when the several boilers 20 are selected by selection based on an operation zone. It is good to do.
  • a boiler system 1 according to a second embodiment of the present invention will be described with reference to FIGS.
  • the boiler system 1 which concerns on 2nd Embodiment is the same as that of 1st Embodiment by the point which selects the boiler 20 which fluctuates the amount of steam based on the operation zone and the load factor and priority in an operation zone, these are the same. It differs from the boiler system 1 which concerns on 1st Embodiment by the point provided with the mechanism which reduces the possibility that the same boiler 20 will be selected continuously by selection based on.
  • the control unit 4 of the number control device 3 further includes an unselected increase boiler selection unit 454 and an unselected decrease boiler selection unit 464 in addition to the configuration of the first embodiment.
  • the storage unit 5 of the number control device 3 includes an order storage unit 51.
  • the unselected increase boiler selection unit 454 determines whether the required steam amount is greater than the output steam amount after the increase in the steam amount by the combustion determination boiler selection unit 45 among the plurality of boilers 20 when the magnitude determination unit 44 determines that the required steam amount is larger than the output steam amount.
  • a boiler other than the boiler that is selected and whose deviation amount is determined to be greater than or equal to the unit steam amount U by the deviation amount determination unit 47 (hereinafter referred to as “selective increase boiler”) is selected. In the following, boilers other than the selective increase boiler are referred to as “unselected increase boilers”.
  • the unselected reduction boiler selection unit 464 determines whether the required steam amount is smaller than the output steam amount after the reduction in the steam amount by the combustion determination boiler selection unit 46 among the plurality of boilers 20 when the magnitude determination unit 44 determines that the required steam amount is smaller than the output steam amount.
  • a boiler other than the boiler that has been selected and whose deviation amount is determined to be greater than or equal to the unit steam amount U by the deviation amount determination unit 47 (hereinafter referred to as “selective reduction boiler”) is selected. In the following, boilers other than the selective reduction boiler are referred to as “unselected reduction boilers”.
  • the order storage unit 51 stores the order of the plurality of boilers 20 selected as the selective increase boiler and the order of the plurality of boilers 20 selected as the selective decrease boiler.
  • the combustion increase boiler selection part 45 is the order memory
  • the combustion reduction boiler selection unit 46 determines that the necessary steam amount is smaller than the output steam amount after the reduction of the steam amount after the magnitude determination unit 44 after the unselected reduction boiler disappears, the order storage unit 51. Select the boiler that reduces the steam volume in the order stored in
  • the order of processing of the first increase selection unit 451 and the unselected increase boiler selection unit 454 constituting the combustion increase boiler selection unit 45 can be arbitrarily set. That is, after the unselected increase boiler selection unit 454 selects an unselected increase boiler, the first increase selection unit 451 may select the boiler 20 based on the operation zone from these unselected increase boilers. After the first increase selection unit 451 selects the boiler 20 based on the operation zone, the unselected increase boiler selection unit 454 selects the unselected increase boiler from the boilers 20 selected by the first increase selection unit 451. Also good.
  • the No. 1 boiler to the No. 3 boiler operate at a load factor in a range corresponding to the first eco-operation zone Z1, and the No. 4 boiler and the No. 5 boiler in a range corresponding to the lower second eco-operation zone Z22.
  • the No. 4 and No. 5 boilers operating at a load factor in the range corresponding to the lower second eco-operation zone Z22 are already selective increase boilers.
  • the unselected increase boiler selection unit 454 selects the unselected increase boiler from the No. 1 boiler to the No. 5 boiler. Therefore, the No. 1 boiler is selected as the unselected increase boiler from the No.
  • the first increase selection unit 451 selects the No. 4 boiler and the No. 5 boiler according to the selection of the boiler 20 based on the operation zone. select.
  • the combustion increase boiler selection unit 45 increases the amount of steam in the order stored in the sequence storage unit 51. You will choose a boiler. As a result, either the No. 4 boiler or the No. 5 boiler is selected as the boiler that increases the amount of steam.
  • FIGS. 19 to 25 are diagrams each schematically showing an operation according to the second embodiment of the boiler system 1.
  • 19 to 25 only the operation for increasing the amount of steam has been described, but the operation for decreasing the amount of steam is basically the same, so the description thereof is omitted.
  • the combustion increase boiler selection unit 45 determines whether the No. 1 boilers to No. 5 boilers are based on the operation zone, the load factor and priority in the operation zones.
  • the boiler 20 that increases the amount of steam is selected from the inside.
  • the No. 4 boiler and the No. 5 boiler are operated at a load factor in a range corresponding to the lower second eco-operation zone Z22, and the No. 5 boiler is in the operation zone than the No. 4 boiler. Since the load factor is low, the combustion increase boiler selection unit 45 selects the No. 5 boiler as a boiler that increases the amount of steam.
  • the output control unit 48 increases the steam amount of the No. 5 boiler by the unit steam amount U (from 2400 kg / h to 2520 kg / h).
  • the No. 5 boiler is a selective increase boiler. Further, the control unit 4 stores an order indicating that the No. 5 boiler is first selected in the order storage unit 51 of the storage unit 5.
  • the No. 5 boiler is a selective increase boiler, and the No. 1 to No. 4 boilers are non-selected increase boilers. Therefore, the combustion increase boiler selection unit 45 has the load ratio and priority in the operation zone, the operation zone. Based on the above, the boiler 20 that increases the amount of steam is selected from the No. 1 boiler to the No. 4 boiler. In FIG. 20, since the No. 4 boiler is operating at a load factor in a range corresponding to the lower second eco-operation zone Z22, the No. 4 boiler is selected as a boiler that increases the amount of steam.
  • the output control unit 48 increases the steam amount of the No. 4 boiler by the unit steam amount U (from 1200 kg / h to 1400 kg). / H) to make the No. 4 boiler a selective increase boiler.
  • the control unit 4 stores an order indicating that the No. 4 boiler has been selected secondly in the order storage unit 51 of the storage unit 5.
  • the combustion increase boiler selection unit 45 has a load in the operation zone and the operation zone. Based on the rate and the priority, the boiler 20 that increases the steam amount is selected from the No. 1 boiler to the No. 3 boiler. In FIG. 21, both the No. 1 boiler, No. 2 boiler and No. 3 boiler are operating in the first eco-operation zone Z1, and the load factor in the operation zone is the lowest in the No. 1 boiler and No. 2 boiler, The combustion increase boiler selection unit 45 selects the No. 1 boiler having the highest priority as the boiler that increases the amount of steam.
  • the output control unit 48 increases the steam amount of the No. 1 boiler by the unit steam amount U (from 1000 kg / h to 1100 kg). / H) to make the Unit 1 boiler a selective increase boiler. Further, the control unit 4 stores an order indicating that the No. 1 boiler is selected third in the order storage unit 51 of the storage unit 5.
  • the combustion increase boiler selection unit 45 increases the steam amount based on the operation zone, the load factor in the operation zone, and the priority order from the unselected increase boilers. Will be selected. As shown in FIG. 23, in this operation example, the second machine boiler is selected next, and finally the third machine boiler is selected. As a result, when all of the No. 1 boilers to No. 5 boilers become selective increase boilers, the presence or absence of selection is cleared, and all of No. 1 boilers to No. 5 boilers are reset to unselected increase boilers. When the required steam amount further increases and it is necessary to select a boiler that increases the steam amount, the combustion increase boiler selection unit 45 increases the steam amount in accordance with the order stored in the order storage unit 51. Select a boiler. In this operation example, the No. 5 boiler, the No. 4 boiler, the No. 1 boiler, the No. 2 boiler, and the No. 3 boiler are selected in this order.
  • the steam amount of the same boiler can be prevented from increasing continuously, so that the load factor fluctuation of each boiler 20 can be suppressed and the stability can be improved.
  • the flow from FIG. 19 to FIG. 21 is the same as that of pattern 3 and is selected as a boiler that increases the steam amount in the order of No. 5 boiler and No. 4 boiler as the required steam amount increases. Thereafter, as shown in FIG. 21, it is assumed that the required steam amount has increased from 7700 kg / h to 7800 kg / h. In this case, since the required steam amount has increased, the first increase selection unit 451 determines the steam amount from the No. 1 boiler to the No. 5 boiler based on the operation zone, the load factor and priority in the operation zone. The boiler 20 to be increased is selected.
  • the first increase selection unit 451 is the No. 4 boiler and the No. 5 boiler. Select.
  • the No. 4 boiler and the No. 5 boiler are selective increase boilers
  • the boiler 20 operating at a load factor in the range corresponding to the lower second eco-operation zone Z22 is not limited to the No. 4 boiler and the No. 5 boiler.
  • the control part 4 clears the presence or absence of selection, and resets a No. 4 boiler and a No. 5 boiler to an unselected increase boiler.
  • the combustion increase boiler selection unit 45 selects the No. 5 boiler as the boiler that increases the steam amount in accordance with the order stored in the order storage unit 51. Since the unit steam amount U of the No. 5 boiler is smaller than the deviation amount, as shown in FIG. 24, the output control unit 48 increases the steam amount of the No. 5 boiler by the unit steam amount U (from 2520 kg / h to 2620 kg). / H) to make the No. 5 boiler a selective increase boiler.
  • the combustion increase boiler selection unit 45 selects a boiler that increases the steam amount from the unselected increase boilers according to the order stored in the order storage unit 51. .
  • the No. 4 boiler is next selected.
  • an operation zone will switch from the lower 2nd eco-operation zone Z22 to the 1st eco-operation zone Z1.
  • the operation zone of the No. 4 boiler is switched from the lower second eco-operation zone Z22 to the first eco-operation zone Z1.
  • the boiler 20 that operates at the load factor in the range corresponding to the lower second eco-operation zone Z22 becomes only the No. 5 boiler. Will be selected as a boiler to increase the amount of steam.
  • the steam amount can be changed in order from the boiler 20 having the lower boiler efficiency, and the efficiency of the boiler system 1 as a whole can be improved.
  • the boiler system 1 of the second embodiment is the same as the boiler system 1 of the first embodiment except for the variable boiler selection process (step ST5 in FIG. 16), and thus the description thereof is omitted.
  • step ST501 the control unit 4 determines whether it is necessary to increase the steam amount or decrease the steam amount.
  • step ST502 the control unit 4 selects a steam amount increase candidate boiler from among the unselected increase boilers.
  • the selection of the steam increase candidate boiler is as described above, and the combustion increase boiler selection unit 45 determines the steam amount based on the operation zone, the load factor in the operation zone, the priority order, and the order of selection increase boilers. Is selected as a candidate for increasing the number of boilers.
  • step ST503 the control unit 4 (deviation amount determination unit 47) determines whether the deviation amount is equal to or greater than the unit steam amount U of the boiler 20 selected as the steam amount increase candidate boiler. At this time, when the deviation amount is greater than or equal to the unit steam amount U, the control unit 4 proceeds to the process of step ST504, and when the deviation amount is not greater than or equal to the unit steam amount U, the control unit 4 changes.
  • the boiler selection process ends, and the process proceeds to step ST6 in FIG.
  • step ST504 the control unit 4 increases the output steam amount and subtracts the deviation amount.
  • step ST505 the control unit 4 sets the boiler 20 selected in step ST502 as a selective increase boiler, and stores the order of the selective increase boiler in the order storage unit 51.
  • step ST506 the control unit 4 determines whether or not an unselected increase boiler exists. At this time, when an unselected increase boiler exists, the control part 4 returns to the process of step ST502. On the other hand, when there is no unselected increase boiler, the control unit 4 resets the selected increase boiler to the unselected increase boiler, and returns to the process of step ST502.
  • step ST508 the control unit 4 selects a steam amount reduction candidate boiler from among the unselected reduction boilers. Specifically, the combustion reduction boiler selection unit 46 selects the boiler 20 that is a candidate for reducing the amount of steam based on the operation zone, the load factor in the operation zone, the priority order, and the order of selection reduction boilers. .
  • step ST509 the control unit 4 (deviation amount determination unit 47) determines whether the deviation amount is equal to or greater than the unit steam amount U of the boiler 20 selected as the steam amount increase candidate boiler. At this time, if the deviation amount is greater than or equal to the unit steam amount U, the control unit 4 proceeds to the process of step ST510. If the deviation amount is not greater than or equal to the unit steam amount U, the control unit 4 varies. The boiler selection process ends, and the process proceeds to step ST6 in FIG. In step ST510, the control unit 4 decreases the output steam amount and subtracts the deviation amount.
  • step ST511 the control unit 4 sets the boiler 20 selected in step ST508 as a selective reduction boiler, and stores the order of the selective reduction boiler in the order storage unit 51.
  • step ST512 the control unit 4 determines whether or not an unselected reduction boiler exists. At this time, when an unselected decreasing boiler exists, the control part 4 returns to the process of step ST508. On the other hand, when there is no unselected decrease boiler, the control part 4 resets a selection decrease boiler to an unselected decrease boiler, and returns to the process of step ST508.
  • the boiler system 1 according to the second embodiment described above has the following effects.
  • the control unit 4 preferentially changes the steam amount from the boiler 20 that is not the selective increase boiler or the selective decrease boiler. Thereby, since it can prevent that the vapor
  • the control unit 4 varies the amount of steam based on the order of the boilers 20 that have become selective increase boilers or selective decrease boilers.
  • the boiler to be selected was selected. Thereby, the processing burden of the control part 4 can be reduced.
  • the first eco-operation zone Z1 and the upper second eco-operation zone Z21 are set as a plurality of operation zones set corresponding to the range of the load factor when burning with a boiler efficiency in a predetermined range.
  • the lower second eco-operation zone Z22, the upper normal operation zone Z31, and the lower normal operation zone Z32 are set, but the setting of the operation zone is not limited to this.
  • a lower second eco-operating zone Z22 located in a low load factor range and a normal operating zone Z3 located in a higher load factor range than the upper second eco-operating zone Z21 are set, and the lower second eco-friendly zone Z22 is set.
  • the lower normal operation zone Z32 located in a range where the load factor is lower than that of the operation zone Z22 may not be set.
  • the upper normal operation zone Z31 located in the higher range may not be set.
  • the normal operation zone Z3 may be set, and the upper second eco-operation zone Z21 and the upper normal operation zone Z31 located in a range where the load factor is higher than that of the first eco-operation zone Z1 may not be set.
  • the normal operation zone Z3 may be set, and the lower second eco operation zone Z22 and the lower normal operation zone Z32 located in a range where the load factor is lower than that of the first eco operation zone Z1 may not be set.
  • the types of operation zones set for the plurality of boilers 20 may be common to the plurality of boilers 20, or may be different for each boiler 20.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

 容量や効率特性の異なるボイラが混在するボイラシステムを効率の良い状態で運転すること。複数のボイラ(20)を備えるボイラ群(2)と、ボイラ群(2)の燃焼状態を制御する制御部(4)と、を備えるボイラシステム(1)であって、複数のボイラ(20)には、それぞれ、所定の負荷率の範囲に対応して複数の運転ゾーンが個別に設定されており、制御部(4)は、必要蒸発量が出力蒸発量よりも大きい場合に複数の運転ゾーンのうち最も低い負荷率の範囲に対応する運転ゾーンに位置するボイラを選択する第1増加選択部(451)と、必要蒸発量が出力蒸発量よりも小さい場合に複数の運転ゾーンのうち最も高い負荷率の範囲に対応する運転ゾーンに位置するボイラを選択する第1減少選択部(461)と、選択されたボイラの蒸気量を単位蒸気量分増加又は減少させる出力制御部(48)と、を備える。

Description

ボイラシステム
 本発明は、負荷率を連続的に変更して燃焼可能なボイラを複数有するボイラ群を備えるボイラシステムに関する。本願は、2012年11月13日に日本に出願された特願2012-249487号に基づき優先権を主張し、その内容をここに援用する。
 従来、複数の段階的な燃焼位置で燃焼可能なボイラを複数有するボイラ群と、要求される負荷に応じてボイラ群の燃焼状態を制御する制御部と、を備えるボイラシステムが提案されている。また、ボイラの燃焼量を連続的に増減させて蒸気の発生量を制御する、いわゆる比例制御方式のボイラシステムも提案されている。
 例えば、特許文献1には、ボイラを、台数増加負荷ゾーン、最適運転負荷ゾーン及び台数減少負荷ゾーンの3つの負荷ゾーンに区分し、ボイラが台数増加負荷ゾーンで燃焼している場合に燃焼させるボイラの台数を増加させ、ボイラが台数減少負荷ゾーンで燃焼している場合に燃焼させるボイラの台数を減少させる比例制御ボイラの制御方法が提案されている。そして、この特許文献1で提案された比例制御ボイラの制御方法では、燃焼させるボイラの台数の増減を行った後には、燃焼している全てのボイラを均等な負荷率で運転させている。
特開平11-132405号公報
 ここで、特許文献1で提案されている手法は、燃焼させるボイラの台数や燃焼負荷率に着目してボイラを制御することとしているため、全てのボイラの容量及び効率特性が同じ場合には適切な制御が可能になるものの、容量の異なるボイラや効率特性の異なるボイラが混在するボイラ群に適用した場合には適切な制御とはならない。
 具体的には、容量(最大蒸気量)の異なる複数のボイラによりボイラ群を構成した場合、以下のような問題が生じる。一例として、2tボイラを3台と5tボイラを2台とで構成されるボイラ群において、燃焼台数4台、必要量160%で運転する場合を考える。
 特許文献1で提案されている手法により燃焼しているボイラを均等な負荷率で運転させると、各ボイラへの燃焼指示は40%となる。このとき、燃焼させる4台のボイラを、2tボイラ3台と5tボイラ1台とした場合の出力蒸気量は4.4t(=2t×0.4×3台+5t×0.4×1台)となる一方で、2tボイラ2台と5tボイラ2台とした場合の出力蒸気量は5.6t(=2t×0.4×2台+5t×0.4×2台)となり、4台のボイラの選択パターンによって、160%に相当する出力蒸気量が異なることになる。
 また、各ボイラに対する同じ1%の燃焼指示も、2tボイラだと20kg/h、5tボイラだと50kg/hのように容量に応じて異なるため、燃焼指示を増減させるボイラによって実際の出力蒸気量の変化量が異なることになる。
 そのため、特許文献1で提案されている手法を容量の異なるボイラが混在するボイラ群に適用した場合には、制御が安定しない可能性がある。
 また、効率特性の異なる複数のボイラによりボイラ群を構成した場合、以下のような問題が生じる。一例として、最適運転(高効率)ゾーンが、50~70%のボイラと20~40%のボイラと80~100%のボイラとで構成されるボイラ群について考える。
 特許文献1で提案されている手法では燃焼しているボイラを均等な負荷率で運転させるため、このようなボイラ群について適用した場合、1台のボイラは高効率で運転することができるものの、他のボイラは高効率で運転することができない。
 そのため、特許文献1で提案されている手法を効率特性の異なるボイラが混在するボイラ群に適用した場合には、全てのボイラを高効率で運転することが困難になり、システム効率向上を期待することができない。
 本発明は、このような問題に鑑みてなされたものであり、容量や効率特性の異なるボイラが混在するボイラ群であっても、効率の良い状態で運転させられるボイラシステムを提供することを目的とする。
 本発明は、負荷率を連続的に変更して燃焼可能な複数のボイラを備えるボイラ群と、要求負荷に応じて前記ボイラ群の燃焼状態を制御する制御部と、を備えるボイラシステムであって、複数の前記ボイラには、変動可能な蒸気量の単位である単位蒸気量が設定されると共に、前記複数のボイラには、それぞれ、所定の負荷率の範囲に対応して複数の運転ゾーンが個別に設定されており、前記制御部は、前記要求負荷に応じて必要とされる蒸気量である必要蒸気量を算出する必要蒸気量算出部と、前記ボイラ群により出力される蒸気量である出力蒸気量を算出する出力蒸気量算出部と、前記必要蒸気量と前記出力蒸気量との偏差量を算出する偏差算出部と、前記必要蒸気量と前記出力蒸気量との大小を判定する大小判定部と、前記大小判定部により前記必要蒸気量が前記出力蒸気量よりも大きいと判定された場合に、蒸気量を増加させるボイラを選択する燃焼増加ボイラ選択部と、前記大小判定部により前記必要蒸気量が前記出力蒸気量よりも小さいと判定された場合に、蒸気量を減少させるボイラを選択する燃焼減少ボイラ選択部と、前記偏差算出部により算出された前記偏差量が前記燃焼増加ボイラ選択部又は前記燃焼減少ボイラ選択部により選択されたボイラの単位蒸気量以上であるかを判定する偏差量判定部と、前記偏差量判定部により前記偏差量が前記単位蒸気量以上であると判定された場合に、前記燃焼増加ボイラ選択部により選択されたボイラの蒸気量を前記単位蒸気量分増加させ、又は前記燃焼減少ボイラ選択部により選択されたボイラの蒸気量を前記単位蒸気量分減少させる出力制御部と、を備え、前記燃焼増加ボイラ選択部は、前記複数のボイラから、前記複数の運転ゾーンのうち最も低い負荷率の範囲に対応する運転ゾーンに位置するボイラを選択する第1増加選択部と、を備え、前記燃焼減少ボイラ選択部は、前記複数のボイラから、前記複数の運転ゾーンのうち最も高い負荷率の範囲に対応する運転ゾーンに位置するボイラを選択する第1減少選択部と、を備えるボイラシステムに関する。
 また、前記燃焼増加ボイラ選択部は、前記第1増加選択部により複数のボイラが選択された場合に、該第1増加選択部により選択された複数のボイラから、前記運転ゾーンの中における負荷率が最も低いボイラを選択する第2増加選択部を更に備え、前記燃焼減少ボイラ選択部は、前記第1減少選択部により複数のボイラが選択された場合に、該第1減少選択部により選択された複数のボイラから、前記運転ゾーンの中における負荷率が最も高いボイラを選択する第2減少選択部を更に備えることが好ましい。
 また、前記燃焼増加ボイラ選択部は、前記第2増加選択部により複数のボイラが選択された場合に、該第2増加選択部により選択された複数のボイラから、最も優先順位の高いボイラを選択する増加優先順位選択部を更に備え、前記燃焼減少ボイラ選択部は、前記第2減少選択部により複数のボイラが選択された場合に、該第2減少選択部により選択された複数のボイラから、最も優先順位の低いボイラを選択する減少優先順位選択部を更に備えることが好ましい。
 また、前記燃焼増加ボイラ選択部は、前記第1増加選択部により複数のボイラが選択された場合に、該第1増加選択部により選択された複数のボイラから、最も優先順位の高いボイラを選択する増加優先順位選択部を更に備え、前記燃焼減少ボイラ選択部は、前記第1減少選択部により複数のボイラが選択された場合に、該第1減少選択部により選択された複数のボイラから、最も優先順位の低いボイラを選択する減少優先順位選択部を更に備えることが好ましい。
 また、前記燃焼増加ボイラ選択部は、前記大小判定部により前記必要蒸気量が蒸気量増加後の前記出力蒸気量よりも大きいと判定された場合に、前記複数のボイラから蒸気量を増加させるボイラに選択されていないボイラを選択する未選択増加ボイラ選択部を更に備え、前記第1増加選択部は、前記未選択増加ボイラ選択部により選択されたボイラのうち、最も低い負荷率の範囲に対応する運転ゾーンに位置するボイラを選択し、前記燃焼減少ボイラ選択部は、前記大小判定部により前記必要蒸気量が蒸気量減少後の前記出力蒸気量よりも小さいと判定された場合に、前記複数のボイラから蒸気量を減少させるボイラに選択されていないボイラを選択する未選択減少ボイラ選択部を更に備え、前記第1減少選択部は、前記未選択減少ボイラ選択部により選択されたボイラのうち、最も高い負荷率の範囲に対応する運転ゾーンに位置するボイラを選択することが好ましい。
 また、蒸気量を増加させるボイラに選択されたボイラの順序、及び蒸気量を減少させるボイラに選択されたボイラの順序を記憶する順序記憶部を更に備え、前記未選択増加ボイラ選択部により選択されるボイラがなくなった場合、前記燃焼増加ボイラ選択部は、前記順序記憶部に記憶された順序で蒸気量を増加させるボイラを選択し、前記未選択減少ボイラ選択部により選択されるボイラがなくなった場合、前記燃焼減少ボイラ選択部は、前記順序記憶部に記憶された順序で蒸気量を減少させるボイラを選択することが好ましい。
 また、前記複数の運転ゾーンは、所定の範囲のボイラ効率で燃焼する場合における負荷率の範囲に対応して設定されることが好ましい。
 また、前記複数の運転ゾーンは、ボイラ効率が第1閾値よりも高くなる負荷率の範囲である第1エコ運転ゾーンと、ボイラ効率が前記第1閾値と該第1閾値よりも低い第2閾値との間となる負荷率の範囲である第2エコ運転ゾーンと、ボイラ効率が前記第2閾値よりも低くなる負荷率の範囲である通常運転ゾーンと、を備え、前記第2エコ運転ゾーンは、前記第1エコ運転ゾーンよりも負荷率の高い範囲に位置する上側第2エコ運転ゾーンと、前記第1エコ運転ゾーンよりも負荷率の低い範囲に位置する下側第2エコ運転ゾーンと、を備え、前記通常運転ゾーンは、前記上側第2エコ運転ゾーンよりも負荷率の高い範囲に位置する上側通常運転ゾーンと、前記下側第2エコ運転ゾーンよりも負荷率の低い範囲に位置する下側通常運転ゾーンと、を備えることとしてもよい。
 また、前記複数の運転ゾーンは、ボイラ効率が第1閾値よりも高くなる負荷率の範囲である第1エコ運転ゾーンと、ボイラ効率が前記第1閾値と該第1閾値よりも低い第2閾値との間となる負荷率の範囲である第2エコ運転ゾーンと、ボイラ効率が前記第2閾値よりも低くなる負荷率の範囲である通常運転ゾーンと、を備え、前記第2エコ運転ゾーンは、前記第1エコ運転ゾーンよりも負荷率の高い範囲に位置する上側第2エコ運転ゾーンと、前記第1エコ運転ゾーンよりも負荷率の低い範囲に位置する下側第2エコ運転ゾーンと、を備え、前記通常運転ゾーンは、前記上側第2エコ運転ゾーンよりも負荷率の高い範囲に位置することとしてもよい。
 また、前記複数の運転ゾーンは、ボイラ効率が第1閾値よりも高くなる負荷率の範囲である第1エコ運転ゾーンと、ボイラ効率が前記第1閾値と該第1閾値よりも低い第2閾値との間となる負荷率の範囲である第2エコ運転ゾーンと、ボイラ効率が前記第2閾値よりも低くなる負荷率の範囲である通常運転ゾーンと、を備え、前記第2エコ運転ゾーンは、前記第1エコ運転ゾーンよりも負荷率の高い範囲に位置する上側第2エコ運転ゾーンと、前記第1エコ運転ゾーンよりも負荷率の低い範囲に位置する下側第2エコ運転ゾーンと、を備え、前記通常運転ゾーンは、前記下側第2エコ運転ゾーンよりも負荷率の低い範囲に位置することとしてもよい。
 また、前記複数の運転ゾーンは、ボイラ効率が第1閾値よりも高くなる負荷率の範囲である第1エコ運転ゾーンと、ボイラ効率が前記第1閾値と該第1閾値よりも低い第2閾値との間となる負荷率の範囲である第2エコ運転ゾーンと、ボイラ効率が前記第2閾値よりも低くなる負荷率の範囲である通常運転ゾーンと、を備え、前記第2エコ運転ゾーンは、前記第1エコ運転ゾーンよりも負荷率の低い範囲に位置すると共に、前記通常運転ゾーンは、前記第2エコ運転ゾーンよりも負荷率の低い範囲に位置することとしてもよい。
 また、前記複数の運転ゾーンは、ボイラ効率が第1閾値よりも高くなる負荷率の範囲である第1エコ運転ゾーンと、ボイラ効率が前記第1閾値と該第1閾値よりも低い第2閾値との間となる負荷率の範囲である第2エコ運転ゾーンと、ボイラ効率が前記第2閾値よりも低くなる負荷率の範囲である通常運転ゾーンと、を備え、前記第2エコ運転ゾーンは、前記第1エコ運転ゾーンよりも負荷率の高い範囲に位置すると共に、前記通常運転ゾーンは、前記第2エコ運転ゾーンよりも負荷率の高い範囲に位置することとしてもよい。
 また、前記単位蒸気量は、前記複数のボイラそれぞれに対して個別に設定されることが好ましい。
 本発明によれば、容量や効率特性の異なるボイラが混在するボイラシステムを効率の良い状態で運転することができる。
本発明の一実施形態に係るボイラシステムの全体構成を示す図である。 本発明の第1実施形態に係るボイラ群の概略を示す図である。 本発明の第1実施形態に係るボイラ群の概略を示す図である。 本発明の第1実施形態に係る台数制御装置の機能構成を示すブロック図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの動作の概略を示す図である。 第1実施形態のボイラシステムの処理の流れを示すフローチャートである。 第1実施形態のボイラシステムの処理の流れを示すフローチャートである。 第2実施形態に係る台数制御装置の機能構成を示すブロック図である。 第2実施形態のボイラシステムの動作の概略を示す図である。 第2実施形態のボイラシステムの動作の概略を示す図である。 第2実施形態のボイラシステムの動作の概略を示す図である。 第2実施形態のボイラシステムの動作の概略を示す図である。 第2実施形態のボイラシステムの動作の概略を示す図である。 第2実施形態のボイラシステムの動作の概略を示す図である。 第2実施形態のボイラシステムの動作の概略を示す図である。 第2実施形態のボイラシステムの処理の流れを示すフローチャートである。 ボイラに設定する運転ゾーンの一例を示す図である。
 以下、本発明のボイラシステムの好ましい実施形態について、図面を参照しながら説明する。
 まず、本発明のボイラシステム1の全体構成につき、図1を参照しながら説明する。
 ボイラシステム1は、複数(5台)のボイラ20を含むボイラ群2と、これら複数のボイラ20において生成された蒸気を集合させる蒸気ヘッダ6と、この蒸気ヘッダ6の内部の圧力を測定する蒸気圧センサ7と、ボイラ群2の燃焼状態を制御する制御部4を有する台数制御装置3と、を備える。
 ボイラ群2は、負荷機器としての蒸気使用設備18に供給する蒸気を生成する。
 蒸気ヘッダ6は、蒸気管11を介してボイラ群2を構成する複数のボイラ20に接続されている。この蒸気ヘッダ6の下流側は、蒸気管12を介して蒸気使用設備18に接続されている。
 蒸気ヘッダ6は、ボイラ群2で生成された蒸気を集合させて貯留することにより、複数のボイラ20の相互の圧力差及び圧力変動を調整し、圧力が調整された蒸気を蒸気使用設備18に供給する。
 蒸気圧センサ7は、信号線13を介して、台数制御装置3に電気的に接続されている。蒸気圧センサ7は、蒸気ヘッダ6の内部の蒸気圧(ボイラ群2で発生した蒸気の圧力)を測定し、測定した蒸気圧に係る信号(蒸気圧信号)を、信号線13を介して台数制御装置3に送信する。
 台数制御装置3は、信号線16を介して、複数のボイラ20と電気的に接続されている。この台数制御装置3は、蒸気圧センサ7により測定される蒸気ヘッダ6の内部の蒸気圧に基づいて、各ボイラ20の燃焼状態を制御する。台数制御装置3の詳細については、後述する。
 以上のボイラシステム1は、ボイラ群2で発生させた蒸気を、蒸気ヘッダ6を介して、蒸気使用設備18に供給可能とされている。
 ボイラシステム1において要求される負荷(要求負荷)は、蒸気使用設備18における蒸気消費量である。台数制御装置3は、この蒸気消費量の変動に対応して生じる蒸気ヘッダ6の内部の蒸気圧の変動を、蒸気圧センサ7が測定する蒸気ヘッダ6の内部の蒸気圧(物理量)に基づいて算出し、ボイラ群2を構成する各ボイラ20の燃焼量を制御する。
 具体的には、蒸気使用設備18の需要の増大により要求負荷(蒸気消費量)が増加し、蒸気ヘッダ6に供給される蒸気量(後述の出力蒸気量)が不足すれば、蒸気ヘッダ6の内部の蒸気圧が減少することになる。一方、蒸気使用設備18の需要の低下により要求負荷(蒸気消費量)が減少し、蒸気ヘッダ6に供給される蒸気量が過剰になれば、蒸気ヘッダ6の内部の蒸気圧が増加することになる。従って、ボイラシステム1は、蒸気圧センサ7により測定された蒸気圧の変動に基づいて、要求負荷の変動をモニターすることができる。そして、ボイラシステム1は、蒸気ヘッダ6の蒸気圧に基づいて、蒸気使用設備18の消費蒸気量(要求負荷)に応じて必要とされる蒸気量である必要蒸気量を算出する。
 ここで、本実施形態のボイラシステム1を構成する複数のボイラ20について説明する。図2及び図3は、本実施形態に係るボイラ群2の概略を示す図である。
 図2に示すように本実施形態のボイラ群2は、容量(最大蒸気量)の異なるボイラ20が混在して構成される。一例として、本実施形態では、1号機ボイラを2tボイラ、2号機ボイラを2.5tボイラ、3号機ボイラを3tボイラ、4号機ボイラを4tボイラ、5号機ボイラを6tボイラで構成することとしている。なお、本実施形態では、1号機ボイラから5号機ボイラの全てについて容量を異ならせているが、これに限られず、容量の異なるボイラ20が1又は複数混在することとしてもよい。また、以下において詳細に説明するボイラ制御方法は、容量の異なるボイラ20が混在する場合に好適であることはもちろんのこと、複数のボイラ20の容量が全て同じである場合であっても好適に適用可能である。
 ボイラ20は、負荷率を連続的に変更して燃焼可能な比例制御ボイラからなる。
 比例制御ボイラとは、少なくとも、ボイラの燃焼を維持可能な最小燃焼状態S1からボイラを安全に燃焼可能な最大燃焼状態S2の範囲で、燃焼量が連続的に制御可能とされているボイラである。比例制御ボイラは、例えば、燃料をバーナに供給するバルブや、燃焼用空気を供給するバルブの開度(燃焼比)を制御することにより、燃焼量を調整するようになっている。
 また、燃焼量を連続的に制御するとは、後述のローカル制御部22における演算や信号がデジタル方式とされて段階的に取り扱われる場合(例えば、ボイラ20の出力(燃焼量)が所定単位刻みで制御される場合)であっても、事実上連続的に出力を制御可能な場合を含む。
 本実施形態では、ボイラ20の燃焼停止状態S0と最小燃焼状態S1との間の燃焼状態の変更は、ボイラ20(バーナ)の燃焼をオン/オフすることで制御される。そして、最小燃焼状態S1から最大燃焼状態S2の範囲においては、燃焼量が連続的に制御可能となっている。
 より具体的には、図2に示すように、複数のボイラ20それぞれには、変動可能な蒸気量の単位である単位蒸気量Uが設定されている。これにより、ボイラ20は、最小燃焼状態S1から最大燃焼状態S2の範囲においては、単位蒸気量U単位で、蒸気量を変動可能となっている。
 単位蒸気量Uは、ボイラ20の最大燃焼状態S2における蒸気量(最大蒸気量)に応じて適宜設定できるが、ボイラシステム1における出力蒸気量の必要蒸気量に対する追従性を向上させる観点から、ボイラ20の最大蒸気量の0.1%~20%に設定されることが好ましく、1%~10%に設定されることがより好ましい。
 一例として、本実施形態では、1号機ボイラの単位蒸気量を100kg/h(最大蒸気量の5%)とし、2号機ボイラの単位蒸気量を250kg/h(最大蒸気量の10%)とし、3号機ボイラの単位蒸気量を150kg/h(最大蒸気量の5%)とし、4号機ボイラの単位蒸気量を200kg/h(最大蒸気量の5%)とし、5号機ボイラの単位蒸気量を120kg/h(最大蒸気量の2%)としている。
 なお、出力蒸気量とは、ボイラ群2により出力される蒸気量を示し、この出力蒸気量は、複数のボイラ20それぞれから出力される蒸気量の合計値により表される。
 また、本実施形態では、複数のボイラ20には、所定の範囲のボイラ効率で燃焼する場合における負荷率の範囲に対応して設定される複数の運転ゾーン、すなわち第1エコ運転ゾーンZ1と、第2エコ運転ゾーンZ2と、通常運転ゾーンZ3と、が設定されている。
 第1エコ運転ゾーンZ1は、ボイラ効率(ボイラ20の熱効率)が第1閾値(例えば、98%)よりも高くなる負荷率の範囲であり、ボイラ20を燃焼させる上で、最も好ましい負荷率の範囲である。
 第2エコ運転ゾーンZ2は、ボイラ効率が第1閾値と、この第1閾値よりも低い第2閾値(例えば、97%)との間となる負荷率の範囲である。この第2エコ運転ゾーンZ2は、図3に示すように、第1エコ運転ゾーンZ1よりも負荷率の高い範囲に位置する上側第2エコ運転ゾーンZ21と、第1エコ運転ゾーンZ1よりも負荷率の低い範囲に位置する下側第2エコ運転ゾーンZ22と、を備える。
 通常運転ゾーンZ3は、ボイラ効率が第2閾値よりも低くなる負荷率の範囲である。この通常運転ゾーンZ3は、図3に示すように、上側第2エコ運転ゾーンZ21よりも負荷率の高い範囲に位置する上側通常運転ゾーンZ31と、下側第2エコ運転ゾーンZ22よりも負荷率の低い範囲に位置する下側通常運転ゾーンZ32と、を備える。
 ここで、本実施形態のボイラ群2は、効率特性の異なるボイラ20が混在して構成される。一例として、本実施形態では、1号機ボイラの第1エコ運転ゾーンZ1は負荷率40~70%の範囲に設定され、2号機ボイラの第1エコ運転ゾーンZ1は負荷率50~80%の範囲に設定され、3号機ボイラの第1エコ運転ゾーンZ1は負荷率30~50%の範囲に設定され、4号機ボイラの第1エコ運転ゾーンZ1は負荷率40~60%の範囲に設定され、5号機ボイラの第1エコ運転ゾーンZ1は負荷率70~80%の範囲に設定されている。第2エコ運転ゾーンZ2及び通常運転ゾーンZ3についても同様に、1号機ボイラから5号機ボイラでは、それぞれ異なる負荷率の範囲に第2エコ運転ゾーンZ2及び通常運転ゾーンZ3が設定されている。
 なお、本実施形態では、1号機ボイラから5号機ボイラの全てについて効率特性を異ならせているが、これに限られず、効率特性の異なるボイラ20が1又は複数混在することとしてもよい。また、以下において詳細に説明するボイラ制御方法は、効率特性の異なるボイラ20が混在する場合に好適であることはもちろんのこと、複数のボイラ20の効率特性が全て同じである場合であっても好適に適用可能である。
 また、複数のボイラ20には、それぞれ優先順位が設定されている。優先順位は、燃焼指示や燃焼停止指示を行うボイラ20を選択するために用いられる。優先順位は、例えば整数値を用いて、数値が小さいほど優先順位が高くなるよう設定することができる。図3に示すように、1号機ボイラから5号機ボイラのそれぞれに「1」~「5」の優先順位が割り当てられている場合、1号機ボイラの優先順位が最も高く、5号機ボイラの優先順位が最も低い。この優先順位は、通常の場合、後述の制御部4の制御により、所定の時間間隔(例えば、24時間間隔)で変更される。
 なお、本実施形態では、負荷率を増加させる場合には、優先順位の高い順にボイラ20を選択することとし、負荷率を減少させる場合には、優先順位の低い順にボイラ20を選択することとしている。
 以上説明したボイラ20は、図1に示すように、燃焼が行われるボイラ本体21と、ボイラ20の燃焼状態を制御するローカル制御部22と、を備える。
 ローカル制御部22は、要求負荷に応じてボイラ20の燃焼状態を変更させる。具体的には、ローカル制御部22は、信号線16を介して台数制御装置3から送信される台数制御信号に基づいて、ボイラ20の燃焼状態を制御する。
 また、ローカル制御部22は、台数制御装置3で用いられる信号を、信号線16を介して台数制御装置3に送信する。台数制御装置3で用いられる信号としては、ボイラ20の実際の燃焼状態、及びその他のデータが挙げられる。
 次に、台数制御装置3の詳細について説明する。
 台数制御装置3は、蒸気圧センサ7からの蒸気圧信号に基づいて、要求負荷に応じたボイラ群2の必要燃焼量、及び必要燃焼量に対応する各ボイラ20の燃焼状態を算出し、各ボイラ20(ローカル制御部22)に台数制御信号を送信する。この台数制御装置3は、図1に示すように、記憶部5と、制御部4と、を備える。
 記憶部5は、台数制御装置3(制御部4)の制御により各ボイラ20に対して行われた指示の内容や、各ボイラ20から受信した燃焼状態等の情報、複数のボイラ20の運転ゾーンの設定に関する情報、複数のボイラ20の単位蒸気量Uの設定に関する情報、複数のボイラ20の優先順位の設定に関する情報、優先順位の変更(ローテーション)に関する設定の情報等を記憶する。
 制御部4は、信号線16を介して各ボイラ20に各種の指示を行ったり、各ボイラ20から各種のデータを受信したりして、5台のボイラ20の燃焼状態や優先順位を制御する。各ボイラ20は、台数制御装置3から燃焼状態の変更指示の信号を受けると、その指示に従って当該ボイラ20を制御する。
 ここで、図4を参照して制御部4の詳細について説明する。図4は、制御部4の構成を示す機能ブロック図である。制御部4は、必要蒸気量算出部41と、出力蒸気量算出部42と、偏差算出部43と、大小判定部44と、燃焼増加ボイラ選択部45と、燃焼減少ボイラ選択部46と、偏差量判定部47と、出力制御部48と、を備える。
 必要蒸気量算出部41は、蒸気ヘッダ6の蒸気圧に基づいて、要求負荷に応じた必要蒸気量を算出する。
 出力蒸気量算出部42は、ローカル制御部22から送信される各ボイラ20の燃焼状態に基いて、ボイラ群2により出力される蒸気量である出力蒸気量を算出する。
 偏差算出部43は、必要蒸気量と出力蒸気量との偏差量を算出する。また、偏差算出部43は、後述の出力制御部48により、選択されたボイラ20の蒸気量が変更された場合には、必要蒸気量と、蒸気量変更後のボイラ群2の出力蒸気量と、の偏差量を算出する。
 大小判定部44は、必要蒸気量と出力蒸気量との大小を判定する。
 燃焼増加ボイラ選択部45は、第1増加選択部451と、第2増加選択部452と、増加優先順位選択部453と、を含んで構成され、大小判定部44により必要蒸気量が出力蒸気量よりも大きいと判定された場合に、蒸気量を増加(負荷率を増加)させるボイラを選択する。
 具体的には、第1増加選択部451は、必要蒸気量が出力蒸気量よりも大きいと判定された場合に、複数のボイラ20から複数の運転ゾーンのうち最も低い負荷率の範囲に対応する運転ゾーンに位置するボイラ20を、蒸気量を増加させるボイラとして選択する。すなわち、第1増加選択部451は、より下側にある運転ゾーンに位置するボイラ20を、蒸気量を増加させるボイラとして選択する。本実施形態では、運転ゾーンは下側から順に、下側通常運転ゾーンZ32、下側第2エコ運転ゾーンZ22、第1エコ運転ゾーンZ1、上側第2エコ運転ゾーンZ21、上側通常運転ゾーンZ31と設定されている。
 また、第2増加選択部452は、第1増加選択部451により複数のボイラ20が選択された場合(最も低い負荷率の範囲に対応する運転ゾーンに位置するボイラ20が複数存在する場合)に、運転ゾーンの中における負荷率が最も低いボイラ20を、蒸気量を増加させるボイラとして選択する。
 また、増加優先順位選択部453は、第2増加選択部452により複数のボイラ20が選択された場合(最も低い負荷率の範囲に対応する運転ゾーンに位置し、かつ、当該運転ゾーンの中における負荷率が最も低いボイラ20が複数存在する場合)に、これら複数のボイラ20の中から最も優先順位の高いボイラ20を、蒸気量を増加させるボイラとして選択する。なお、増加優先順位選択部453は、第1増加選択部451により複数のボイラ20が選択された場合に、これら複数のボイラ20の中から最も優先順位の高いボイラ20を、蒸気量を増加させるボイラとして選択することとしてもよい。すなわち、第1増加選択部451により複数のボイラ20が選択された場合に、第2増加選択部452を介することなく、増加優先順位選択部453が優先順位に基づいて蒸気量を増加させるボイラを選択することとしてもよい。
 なお、「運転ゾーンの中における負荷率」とは、(現在の負荷率-運転ゾーンの下限負荷率)/{運転ゾーンの負荷率の範囲(=上限負荷率-下限負荷率)}により算出される値である。本発明は、効率特性の異なるボイラ20が混在するボイラ群2に対して好適に適応可能にするため、ボイラ20の負荷率ではなく、同一の運転ゾーンの中における負荷率を用いることとしている。例えば、第1エコ運転ゾーンZ1が負荷率40~70%の範囲に設定された1号機ボイラと、第1エコ運転ゾーンZ1が負荷率50~80%の範囲に設定された2号機ボイラとにおいて、1号機ボイラが55%、2号機ボイラが60%の負荷率で運転している場合を考える。この場合、蒸気量の増加に対して、負荷率が低い1号機ボイラは第1エコ運転ゾーンZ1内での燃焼状態を維持する余裕が55%しかない一方、負荷率が高い2号機ボイラは66%の余裕があることになり、負荷率が高い2号機ボイラの蒸気量を増加させたほうが、ボイラシステム1全体としての効率を高めることができる。そのため、単に負荷率を見るのではなく、運転ゾーンの中における負荷率を見ることで、各ボイラ20を効率的に運転することができる。
 図4に戻り、燃焼減少ボイラ選択部46は、第1減少選択部461と、第2減少選択部462と、減少優先順位選択部463と、を含んで構成され、大小判定部44により必要蒸気量が出力蒸気量よりも小さいと判定された場合に、蒸気量を減少(負荷率を減少)させるボイラを選択する。
 具体的には、第1減少選択部461は、必要蒸気量が出力蒸気量よりも小さいと判定された場合に、複数のボイラ20から複数の運転ゾーンのうち最も高い負荷率の範囲に対応する運転ゾーンに位置するボイラ20を、蒸気量を減少させるボイラとして選択する。すなわち、第1減少選択部461は、より上側にある運転ゾーンに位置するボイラ20を、蒸気量を減少させるボイラとして選択する。
 また、第2減少選択部462は、第1減少選択部461により複数のボイラ20が選択された場合(最も高い負荷率の範囲に対応する運転ゾーンに位置するボイラ20が複数存在する場合)に、運転ゾーンの中における負荷率が最も高いボイラ20を、蒸気量を減少させるボイラとして選択する。
 また、減少優先順位選択部463は、第2減少選択部462により複数のボイラ20が選択された場合(最も高い負荷率の範囲に対応する運転ゾーンに位置し、かつ、当該運転ゾーンの中における負荷率が最も高いボイラ20が複数存在する場合)に、これら複数のボイラ20の中から最も優先順位の低いボイラ20を、蒸気量を減少させるボイラとして選択する。なお、減少優先順位選択部463は、第1減少選択部461により複数のボイラ20が選択された場合に、これら複数のボイラ20の中から最も優先順位の低いボイラ20を、蒸気量を減少させるボイラとして選択することとしてもよい。すなわち、第1減少選択部461により複数のボイラ20が選択された場合に、第2減少選択部462を介することなく、減少優先順位選択部463が優先順位に基づいて蒸気量を減少させるボイラを選択することとしてもよい。
 偏差量判定部47は、偏差算出部43により算出された偏差量が燃焼増加ボイラ選択部45又は燃焼減少ボイラ選択部46により選択されたボイラ20の単位蒸気量U以上であるかを判定する。
 出力制御部48は、偏差量判定部47により偏差量が単位蒸気量U以上であると判定された場合に、燃焼増加ボイラ選択部45又は燃焼減少ボイラ選択部46により選択されたボイラ20の蒸気量を変動させる。具体的には、出力制御部48は、必要蒸気量が出力蒸気量よりも大きい場合、燃焼増加ボイラ選択部45により選択されたボイラ20の蒸気量を単位蒸気量U分増加させ、また、必要蒸気量が出力蒸気量よりも小さい場合、燃焼減少ボイラ選択部46により選択されたボイラ20の蒸気量を単位蒸気量U分減少させる。
 ここで、ボイラシステム1による複数のボイラ20の燃焼状態の制御の詳細について説明する。図5~図15は、それぞれ、ボイラシステム1の第1実施形態に係る動作の概略を示す図である。
<パターン1>
 まず、運転ゾーンに基づきボイラ20の蒸気量を変更させる動作、すなわち第1増加選択部451又は第1減少選択部461により蒸気量を増加又は減少させるボイラ20を選択する動作を、図5~図8を参照して説明する。
 図5に示すように、現在(基準時)において、1号機ボイラ、2号機ボイラ及び3号機ボイラが第1エコ運転ゾーンZ1に対応する範囲の負荷率で運転しており、4号機ボイラが上側第2エコ運転ゾーンZ21に対応する範囲の負荷率で運転しており、5号機ボイラが下側第2エコ運転ゾーンZ22に対応する範囲の負荷率で運転している。このとき、出力蒸気量が10100kg/hである状態において、必要蒸気量が10300kg/hに増加した場合(図6参照)、必要蒸気量が9700kg/hに減少した場合(図7,図8参照)について考える。
 必要蒸気量の増加時には、偏差算出部43は、出力蒸気量と必要蒸気量との偏差量(200kg/h)を算出し、大小判定部44は、出力蒸気量と必要蒸気量との大小から蒸気量を増加する必要があると判定する。
 すると、燃焼増加ボイラ選択部45の第1増加選択部451は、1号機ボイラから5号機ボイラのうち最も低い負荷率の範囲に対応する運転ゾーン(最も下側の運転ゾーン)に位置するボイラ20を、蒸気量を増加させるボイラとして選択する。図5では、5号機ボイラの下側第2エコ運転ゾーンZ22が最も下側の運転ゾーンであるため、第1増加選択部451は、5号機ボイラを蒸気量を増加させるボイラとして選択する。
 続いて、偏差量判定部47は、偏差量が5号機ボイラの単位蒸気量U以上であるか判定するところ、図2を参照すると5号機ボイラの単位蒸気量Uは120kg/hであるため、偏差量判定部47は、偏差量(200kg/h)が5号機ボイラの単位蒸気量U以上であると判定する。その結果、図6に示すように、出力制御部48は、5号機ボイラの蒸気量を単位蒸気量U分増加(3600kg/hから3720kg/hに増加)させ、これにより、出力蒸気量も10100kg/hから10220kg/hに増加することになる。
 5号機ボイラの蒸気量が増加すると、偏差算出部43は、蒸気量増加後のボイラ群2の出力蒸気量(10220kg/h)に基づき偏差量(80kg/h)を算出し、大小判定部44は、その大小から蒸気量を増加する必要があると判定する。その後、第1増加選択部451が下側第2エコ運転ゾーンZ22に位置する5号機ボイラを蒸気量を増加させるボイラとして選択するが、5号機ボイラの単位蒸気量U(120kg/h)が偏差量(80kg/h)よりも大きいため、必要蒸気量増加時の動作が終了する。
 なお、図5及び図6では、出力制御部48が5号機ボイラの蒸気量を増加するタイミングを、偏差量判定部47が偏差量が5号機ボイラの単位蒸気量U以上であると判定したタイミングとしているが、これは理解を容易にするためであり、実際には、出力制御部48は、偏差量判定部47が偏差量が5号機ボイラの単位蒸気量U以上でないと判定されたタイミングで、ボイラ20毎に単位蒸気量Uに基づいて計数しておいた蒸気量分だけ各ボイラの蒸気量を増加させることとしている(図16のステップST6参照)。以下、その他の動作例についても同様である。
 また、必要蒸気量の減少時には、偏差算出部43は、出力蒸気量と必要蒸気量との偏差量(400kg/h)を算出し、大小判定部44は、出力蒸気量と必要蒸気量との大小から蒸気量を減少する必要があると判定する。
 すると、燃焼減少ボイラ選択部46の第1減少選択部461は、1号機ボイラから5号機ボイラのうち最も高い負荷率の範囲に対応する運転ゾーン(最も上側の運転ゾーン)に位置するボイラ20を、蒸気量を減少させるボイラとして選択する。図5では、4号機ボイラの上側第2エコ運転ゾーンZ21が最も上側の運転ゾーンであるため、第1減少選択部461は、4号機ボイラを蒸気量を減少させるボイラとして選択する。
 続いて、偏差量判定部47は、偏差量が4号機ボイラの単位蒸気量U以上であるか判定するところ、図2を参照すると4号機ボイラの単位蒸気量Uは200kg/hであるため、偏差量判定部47は、偏差量(400kg/h)が4号機ボイラの単位蒸気量U以上であると判定する。その結果、図7に示すように、出力制御部48は、4号機ボイラの蒸気量を単位蒸気量U分減少(2800kg/hから2600kg/hに減少)させ、これにより、出力蒸気量も10100kg/hから9900kg/hに減少することになる。
 4号機ボイラの蒸気量が減少すると、偏差算出部43は、蒸気量減少後のボイラ群2の出力蒸気量(9900kg/h)に基づき偏差量(200kg/h)を算出し、大小判定部44は、その大小から蒸気量を減少する必要があると判定する。その後、第1減少選択部461が上側第2エコ運転ゾーンZ21に位置する4号機ボイラを蒸気量を減少させるボイラとして選択すると、偏差量判定部47は、偏差量(200kg/h)が4号機ボイラの単位蒸気量U(200kg/h)以上であると判定する。その結果、図8に示すように、出力制御部48は、4号機ボイラの蒸気量を単位蒸気量U分減少(2600kg/hから2400kg/hに減少)させ、出力蒸気量も9900kg/hから9700kg/hに減少することになる。
 これにより、蒸気量減少後のボイラ群2の出力蒸気量(9900kg/h)が必要蒸気量(9900kg/h)と一致することになるため(偏差量=0)、必要蒸気量の減少時の動作が終了する。
 このように、本実施形態のボイラシステム1では、運転ゾーンに基づいて蒸気量を変更するボイラ20を選択することとしている。運転ゾーンは、ボイラ20に応じて適宜設定することができるため、ボイラシステム1では、容量や効率特性の異なるボイラ20が混在するボイラ群2であっても、各ボイラ20を効率良く運転させることができる。
<パターン2>
 続いて、運転ゾーンに基づき蒸気量を変更させるボイラ20が複数存在する場合の動作、すなわち第2増加選択部452又は第2減少選択部462により蒸気量を増加又は減少させるボイラ20を選択する動作を、図9~図13を参照して説明する。なお、以下では、パターン1と同様の動作については、説明を簡略化又は省略する。
 図9に示すように、現在(基準時)において、1号機ボイラが第1エコ運転ゾーンZ1に対応する範囲の負荷率で運転しており、2号機ボイラ及び5号機ボイラが下側第2エコ運転ゾーンZ22に対応する範囲の負荷率で運転しており、3号機ボイラ及び4号機ボイラが上側第2エコ運転ゾーンZ21に対応する範囲の負荷率で運転している。このとき、出力蒸気量が10200kg/hである状態において、必要蒸気量が10600kg/hに増加した場合(図10、図11参照)、必要蒸気量が9800kg/hに減少した場合(図12,図13参照)について考える。
 必要蒸気量の増加時には、燃焼増加ボイラ選択部45の第1増加選択部451は、1号機ボイラから5号機ボイラのうち最も低い負荷率の範囲に対応する運転ゾーン(最も下側の運転ゾーン)に位置するボイラ20を、蒸気量を増加させるボイラとして選択する。図9では、2号機ボイラ及び5号機ボイラの下側第2エコ運転ゾーンZ22が最も下側の運転ゾーンであるため、第1増加選択部451は、2号機ボイラ及び5号機ボイラの2つを選択する。
 第1増加選択部451により複数のボイラ20(2号機ボイラ及び5号機ボイラ)が選択されたため、燃焼増加ボイラ選択部45の第2増加選択部452は、2号機ボイラ及び5号機ボイラのうち、下側第2エコ運転ゾーンZ22の中における負荷率が最も低いボイラ20を、蒸気量を増加させるボイラとして選択する。図9では、5号機ボイラが下側第2エコ運転ゾーンZ22の中における負荷率が75%の状態で運転しているのに対して、2号機ボイラは、下側第2エコ運転ゾーンZ22の中における負荷率が50%の状態で運転しているため、第2増加選択部452は、2号機ボイラ及び5号機ボイラのうち2号機ボイラを、蒸気量を増加させるボイラとして選択する。
 ここで、図2に示すように、2号機ボイラの単位蒸気量Uは250kg/hであり、偏差量(400kg/h)よりも小さい。そのため、図10に示すように、出力制御部48は、2号機ボイラの蒸気量を単位蒸気量U分増加させ、出力蒸気量を10200kg/hから10450kg/hに増加させる。
 このとき、2号機ボイラの蒸気量が1000kg/hから1250kg/hに増加したため、2号機ボイラの下側第2エコ運転ゾーンZ22の中における負荷率も50%から100%に増加している。なお、下側第2エコ運転ゾーンZ22の中における負荷率100%は、第1エコ運転ゾーンZ1の中における負荷率0%と同義であるが、説明を容易にするため、2号機ボイラは下側第2エコ運転ゾーンZ22に位置しているものとする(以下同様に、運転ゾーンの境界については説明が容易となる運転ゾーンを採用するものとする)。
 2号機ボイラの蒸気量が増加すると、偏差算出部43は、蒸気量増加後のボイラ群2の出力蒸気量(10450kg/h)に基づき偏差量(150kg/h)を算出し、大小判定部44は、必要蒸気量と出力蒸気量との大小から蒸気量を増加する必要があると判定する。その後、第1増加選択部451は、下側第2エコ運転ゾーンZ22に位置する2号機ボイラ及び5号機ボイラを選択する。
 第1増加選択部451により複数のボイラ20が選択されたため、第2増加選択部452は、2号機ボイラ及び5号機ボイラのうち、下側第2エコ運転ゾーンZ22の中における負荷率が最も低いボイラ20を、蒸気量を増加させるボイラとして選択する。ここで、図10では、2号機ボイラの蒸気量が増加された結果、5号機ボイラのほうが下側第2エコ運転ゾーンZ22の中における負荷率が低くなっているため、第2増加選択部452は、5号機ボイラを蒸気量を増加させるボイラとして選択する。
 続いて、偏差量(150kg/h)が5号機ボイラの単位蒸気量U(120kg/h)以上であるため、図11に示すように、出力制御部48は、5号機ボイラの蒸気量を単位蒸気量U分増加させ、出力蒸気量を10450kg/hから10570kg/hに増加させる。
 その後、必要蒸気量と蒸気量増加後のボイラ群2の出力蒸気量の偏差量(30kg/h)から蒸気量を増加させるボイラとして再度5号機ボイラが選択されることになるが、単位蒸気量Uが偏差量よりも大きいため、蒸気を増加すべきでないと判定され、必要蒸気量増加時の動作が終了する。
 また、必要蒸気量の減少時には、燃焼減少ボイラ選択部46の第1減少選択部461は、1号機ボイラから5号機ボイラのうち最も高い負荷率の範囲に対応する運転ゾーン(最も上側の運転ゾーン)に位置するボイラ20を、蒸気量を減少させるボイラとして選択する。図9では、3号機ボイラ及び4号機ボイラの上側第2エコ運転ゾーンZ21が最も上側の運転ゾーンであるため、第1減少選択部461は、3号機ボイラ及び4号機ボイラの2つを選択する。
 第1減少選択部461により複数のボイラ20(3号機ボイラ及び4号機ボイラ)が選択されたため、燃焼減少ボイラ選択部46の第2減少選択部462は、3号機ボイラ及び4号機ボイラのうち、上側第2エコ運転ゾーンZ21の中における負荷率が最も高いボイラ20を、蒸気量を減少させるボイラとして選択する。図9では、4号機ボイラが上側第2エコ運転ゾーンZ21の中における負荷率が50%の状態で運転しているのに対して、3号機ボイラは、上側第2エコ運転ゾーンZ21の中における負荷率が100%の状態で運転しているため、第2減少選択部462は、3号機ボイラ及び4号機ボイラのうち3号機ボイラを、蒸気量を減少させるボイラとして選択する。
 その後、3号機ボイラの単位蒸気量U(150kg/h)が偏差量(400kg/h)よりも小さいことから、図12に示すように、出力制御部48は、3号機ボイラの蒸気量を単位蒸気量U分減少させ、出力蒸気量を10200kg/hから10050kg/hに減少させる。
 このとき、3号機ボイラの蒸気量が1800kg/hから1650kg/hに減少したため、3号機ボイラの上側第2エコ運転ゾーンZ21における負荷率も100%から50%に減少している。
 3号機ボイラの蒸気量が減少すると、偏差算出部43は、蒸気量減少後のボイラ群2の出力蒸気量(10050kg/h)に基づき偏差量(250kg/h)を算出し、大小判定部44は、必要蒸気量と出力蒸気量との大小から蒸気量を減少する必要があると判定する。その後、第1減少選択部461は、上側第2エコ運転ゾーンZ21に位置する3号機ボイラ及び4号機ボイラを選択する。
 第1減少選択部461により複数のボイラ20が選択されたため、第2減少選択部462は、3号機ボイラ及び4号機ボイラのうち、上側第2エコ運転ゾーンZ21の中における負荷率が最も高いボイラ20を、蒸気量を減少させるボイラとして選択する。ここで、図12では、3号機ボイラの蒸気量が減少された結果、上側第2エコ運転ゾーンZ21の中における負荷率が、3号機ボイラ及び4号機ボイラで同一(50%)となっている。その結果、第2減少選択部462は、3号機ボイラ及び4号機ボイラを選択することになる。
 第2減少選択部462により複数のボイラ20(3号機ボイラ及び4号機ボイラ)が選択されたため、燃焼減少ボイラ選択部46の減少優先順位選択部463は、3号機ボイラ及び4号機ボイラのうち、最も優先順位の低いボイラ20を選択する。図12では、3号機ボイラの優先順位は3位であり、4号機ボイラの優先順位は4位であるため、減少優先順位選択部463は、4号機ボイラを、蒸気量を減少させるボイラとして選択する。
 続いて、4号機ボイラの単位蒸気量U(200kg/h)と偏差量(250kg/h)との比較の結果、図13に示すように、出力制御部48は、4号機ボイラの蒸気量を単位蒸気量U分減少させ、出力蒸気量を10050kg/hから9850kg/hに減少させる。
 その後、必要蒸気量と蒸気量減少後のボイラ群2の出力蒸気量の偏差量(50kg/h)から蒸気量を減少させるボイラとして再度3号機ボイラが選択されることになるが、単位蒸気量Uが偏差量よりも大きいため、蒸気を減少すべきでないと判定され、必要蒸気量減少時の動作が終了する。
 このように、本実施形態のボイラシステム1では、運転ゾーンに基づく選択で複数のボイラ20が選択された場合には、運転ゾーンの中における負荷率に基づいて、蒸気量を変更するボイラ20を選択することとしている。効率特性の異なるボイラ20が混在する場合、複数のボイラ20のうち単に負荷率が高いボイラ20を、蒸気量を変更するボイラ20として選択しただけでは、各ボイラを効率的に運転することはできない。この点、本実施形態のボイラシステム1では、単に負荷率を見るのではなく、運転ゾーンの中における負荷率を見ることで、各ボイラ20を効率的に運転することができる。
 なお、パターン2では、蒸気量を減少する場合に優先順位を用いる動作を例示したが、蒸気量を増加する場合であっても優先順位を用いてボイラ20を選択することが可能である。
<パターン2a>
 続いて、運転ゾーンに基づき蒸気量を変更させるボイラ20が複数存在する場合の動作の別パターン、すなわち増加優先順位選択部453又は減少優先順位選択部463により蒸気量を増加又は減少させるボイラ20を選択する動作を、図9、図14、図15を参照して説明する。なお、以下では、パターン1,2と同様の動作については、説明を簡略化又は省略する。
 図9に示すように、必要蒸気量の増加時には、2号機ボイラ及び5号機ボイラの下側第2エコ運転ゾーンZ22が最も下側の運転ゾーンであるため、第1増加選択部451は、2号機ボイラ及び5号機ボイラの2つを選択する。
 第1増加選択部451により複数のボイラ20(2号機ボイラ及び5号機ボイラ)が選択されたため、燃焼増加ボイラ選択部45の増加優先順位選択部453は、2号機ボイラ及び5号機ボイラのうち、最も優先順位の高いボイラ20を選択する。図9では、2号機ボイラの優先順位は5位であり、5号機ボイラの優先順位は2位であるため、増加優先順位選択部453は、5号機ボイラを蒸気量を増加させるボイラとして選択する。
 その後、偏差量(400kg/h)が5号機ボイラの単位蒸気量U(120kg/h)以上であるため、図14に示すように、出力制御部48は、5号機ボイラの蒸気量を単位蒸気量U分増加させ、出力蒸気量を10200kg/hから10320kg/hに増加させる。
 なお、5号機ボイラの蒸気量が増加すると、蒸気量増加後のボイラ群2の出力蒸気量に基づき算出された偏差量に応じて、蒸気量を増加するボイラを再び選択することになるが、繰り返しになるため説明は省略する。
 また、図9に示すように、必要蒸気量の減少時には、3号機ボイラ及び4号機ボイラの上側第2エコ運転ゾーンZ21が最も上側の運転ゾーンであるため、第1減少選択部461は、3号機ボイラ及び4号機ボイラの2つを選択する。
 第1減少選択部461により複数のボイラ20(3号機ボイラ及び4号機ボイラ)が選択されたため、燃焼減少ボイラ選択部46の減少優先順位選択部463は、3号機ボイラ及び4号機ボイラのうち、最も優先順位の低いボイラ20を選択する。図9では、3号機ボイラの優先順位は3位であり、4号機ボイラの優先順位は4位であるため、減少優先順位選択部463は、4号機ボイラを蒸気量を減少させるボイラとして選択する。
 その後、偏差量(400kg/h)が4号機ボイラの単位蒸気量U(200kg/h)以上であるため、図15に示すように、出力制御部48は、4号機ボイラの蒸気量を単位蒸気量U分減少させ、出力蒸気量を10200kg/hから10000kg/hに減少させる。
 なお、4号機ボイラの蒸気量が減少すると、蒸気量減少後のボイラ群2の出力蒸気量に基づき算出された偏差量に応じて、蒸気量を減少するボイラを再び選択することになるが、繰り返しになるため説明は省略する。
 このように、運転ゾーンに基づく選択で複数のボイラ20が選択された場合には、優先順位に基づいて蒸気量を変更するボイラ20を選択することとしてもよい。このような選択であっても、運転ゾーンがボイラ20に応じて適宜設定されているため、容量や効率特性の異なるボイラ20が混在するボイラ群2であっても、各ボイラ20を効率良く運転させることができる。
 続いて、本実施形態のボイラシステム1の動作を実現するための処理の流れについて、図16、図17を参照して説明する。図16、図17は、ボイラシステム1の処理の流れを示すフローチャートである。
 初めに、処理の前準備として各ボイラ20に対して単位蒸気量Uの設定(ステップST1)及び運転ゾーンの設定(ステップST2)を行い、記憶部5の所定の領域に記憶する。
 続いて、ステップST3において、制御部4は、必要蒸気量及び偏差量を算出する。すなわち、必要蒸気量算出部41が蒸気ヘッダ6の蒸気圧に基づいて要求負荷に応じた必要蒸気量を算出し、出力蒸気量算出部42が各ボイラ20の燃焼状態に基いて出力蒸気量を算出すると、偏差算出部43は、必要蒸気量と出力蒸気量との偏差量を算出する。
 続いて、ステップST4において、制御部4は、蒸気量の変動が必要であるか否かを判定する。本実施形態では、制御部4は、偏差量が0である場合に蒸気量の変動が必要でないと判定し、偏差量が0でない場合に蒸気量の変動が必要であると判定する。蒸気量の変動が必要でない場合には、ステップST3の処理に戻り、蒸気量の変動が必要な場合には、続いてステップST5の処理に移る。
 ステップST5において、制御部4は、蒸気量を変動するボイラ20を選択する変動ボイラ選択処理を行う。なお、変動ボイラ選択処理の詳細については、図17で後述する。
 続いて、ステップST6において、制御部4は、各ボイラ20へ燃焼指示を出力し、各ボイラ20から出力される蒸気量を制御する。すなわち、出力制御部48は、ステップST5において選択されたボイラ20の蒸気量を単位蒸気量Uに基づき変動させる。
 ステップST6の処理が終わると、制御部4は、ステップST3の処理に戻り、ステップST3~ステップST6の処理を繰り返す。
 次に、ステップST5における変動ボイラ選択処理の詳細について、図17を参照して説明する。
 初めに、ステップST51において、制御部4は、蒸気量を増加する必要があるか、蒸気量を減少する必要があるかを判定する。この判定は、大小判定部44が判定した必要蒸気量と出力蒸気量との大小に基づいて行われる。すなわち、必要蒸気量の方が大きい場合には、蒸気量を増加する必要があると判定され、出力蒸気量の方が大きい場合には、蒸気量を減少する必要があると判定される。
 蒸気量を増加する必要がある場合、ステップST52において、制御部4は、蒸気量増加候補ボイラを選択する。蒸気量増加候補ボイラの選択については、上述した通りであり、燃焼増加ボイラ選択部45は、運転ゾーン、運転ゾーンの中における負荷率、及び優先順位に基づいて蒸気量を増加する候補となるボイラ20を選択する。
 続いて、ステップST53において、制御部4(偏差量判定部47)は、偏差量が蒸気量増加候補ボイラとして選択されたボイラ20の単位蒸気量U以上であるか判定する。このとき、偏差量が単位蒸気量U以上である場合には、制御部4は、続いてステップST54の処理に移る。
 ステップST54では、制御部4は、出力蒸気量を増加し、偏差量を減算する。すなわち、ステップST52で選択されたボイラ20に設定された単位蒸気量Uに基づき、出力蒸気量算出部42及び偏差算出部43は、出力蒸気量の増加及び偏差量の減算を行う。
 ステップST54の処理が終わると、制御部4は、ステップST52の処理に戻り、ステップST53において偏差量が単位蒸気量U以上でないと判定されるまで、ステップST52~ステップST54の処理を繰り返す。なお、ステップST53において偏差量が単位蒸気量U以上でないと判定されると、制御部4は、変動ボイラ選択処理を終了し、図16のステップST6の処理に移る。すなわち、ステップST6では、繰り返し行われたステップST52~ステップST54(後述のステップST55~ステップST57も同様)の処理に伴い選択された回数分だけ単位蒸気量Uに基づく蒸気量の変動が行われる。一般に、燃焼指示を受けてから実際にボイラ20から出力される蒸気量が変化するまでにはタイムラグがあるため、このような処理の流れによりこのタイムラグを考慮することなく蒸気量を変動するボイラ20を選択することができる。
 続いて、蒸気量を減少する必要がある場合、すなわちステップST51においてNOと判定された場合、ステップST55において、制御部4は、蒸気量減少候補ボイラを選択する。蒸気量減少候補ボイラの選択については、上述した通りであり、燃焼減少ボイラ選択部46は、運転ゾーン、運転ゾーンの中における負荷率、及び優先順位に基づいて蒸気量を減少する候補となるボイラ20を選択する。
 続いて、ステップST56において、制御部4(偏差量判定部47)は、偏差量が蒸気量増加候補ボイラとして選択されたボイラ20の単位蒸気量U以上であるか判定する。このとき、偏差量が単位蒸気量U以上である場合には、制御部4は、続いてステップST57の処理に移る。他方、偏差量が単位蒸気量U以上でないと判定されると、制御部4は、変動ボイラ選択処理を終了し、図16のステップST6の処理に移る。
 ステップST57では、制御部4は、出力蒸気量を減少し、偏差量を減算する。すなわち、ステップST52で選択されたボイラ20に設定された単位蒸気量Uに基づき、出力蒸気量算出部42及び偏差算出部43は、出力蒸気量の減少及び偏差量の減算を行う。
 ステップST57の処理が終わると、制御部4は、ステップST55の処理に戻り、ステップST56において偏差量が単位蒸気量U以上でないと判定されるまで、ステップST55~ステップST57の処理を繰り返す。
 以上説明した第1実施形態のボイラシステム1によれば、以下のような効果を奏する。
 (1)複数のボイラ20のそれぞれに運転ゾーンを設定し、制御部4は、必要蒸気量が出力蒸気量よりも大きい場合により下側にある運転ゾーンに位置するボイラ20を蒸気量を増加させるボイラとして選択し、必要蒸気量が出力蒸気量よりも小さい場合により上側にある運転ゾーンに位置するボイラ20を蒸気量を減少させるボイラとして選択することとした。これにより、効率特性の異なるボイラ20が混在していたとしても、ボイラ効率の悪いボイラ20から順に蒸気量を変動させることができ、ボイラシステム1全体としての効率を向上させることができる。
 また、ボイラシステム1では、複数のボイラ20のそれぞれに単位蒸気量Uを設定し、制御部4は、選択したボイラ20の蒸気量を単位蒸気量U分変動させることとした。これにより、必要蒸気量が変動した場合のボイラ20の蒸気量の変動を単位蒸気量U毎に行うことができるため、複数のボイラ20の負荷率を平準化でき、ボイラシステム1の圧力安定性を向上させることができる。
 (2)運転ゾーンに基づく選択で複数のボイラ20が選択された場合に、制御部4は、選択された複数のボイラ20のうち、運転ゾーンの中における負荷率が最も低いボイラ20を蒸気量を増加させるボイラとして選択し、運転ゾーンの中における負荷率が最も高いボイラ20を蒸気量を減少させるボイラとして選択することとした。これにより、効率特性の異なるボイラ20が混在していたとしても、より好適なボイラ20を蒸気量を変動するボイラとして選択するため、各ボイラ20を効率的に運転することができ、ボイラシステム1全体としての効率を向上させることができる。
 (3)運転ゾーンの中における負荷率に基づく選択で複数のボイラ20が選択された場合に、制御部4は、選択された複数のボイラ20のうち、優先順位に基づいて蒸気量を変動させるボイラを選択することとした。これにより、複数のボイラ20が等しい状態で燃焼している場合であっても、いずれかのボイラ20の蒸気量を変動させられるので、必要蒸気量の変動に応じて、適切に出力蒸気量を変動させられる。
 (4)なお、制御部4は、運転ゾーンに基づく選択で複数のボイラ20が選択された場合に、選択された複数のボイラ20のうち、優先順位に基づいて蒸気量を変動させるボイラを選択することとしてもよい。
 次に、本発明の第2実施形態に係るボイラシステム1について、図18~図27を参照して説明する。第2実施形態に係るボイラシステム1は、運転ゾーン、運転ゾーンの中における負荷率及び優先順位に基づいて蒸気量を変動させるボイラ20を選択する点で第1実施形態と同様であるが、これらに基づく選択で同じボイラ20が連続して選択される可能性を低減させる仕組みを備える点で第1実施形態に係るボイラシステム1と異なる。
 第2実施形態に係るボイラシステム1の全体構成、及びボイラ群2の概略は、第1実施形態と同様であるため、説明を省略する。一方、第2実施形態に係るボイラシステム1の台数制御装置3の構成は、第1実施形態と異なるため、図18を参照して、第2実施形態の台数制御装置3について説明する。なお、第1実施形態と同様の構成については、符号を同一にし、説明を省略する。
 台数制御装置3の制御部4は、第1実施形態の構成に加え、未選択増加ボイラ選択部454と、未選択減少ボイラ選択部464とを更に備える。また、台数制御装置3の記憶部5は、順序記憶部51を備える。
 未選択増加ボイラ選択部454は、大小判定部44により必要蒸気量が蒸気量増加後の出力蒸気量よりも大きいと判定された場合に、複数のボイラ20のうち、燃焼増加ボイラ選択部45により選択され、かつ、偏差量判定部47により偏差量が単位蒸気量U以上であると判定されたボイラ(以下、「選択増加ボイラ」と呼ぶ)以外のボイラを選択する。なお、選択増加ボイラ以外のボイラを、以下では「未選択増加ボイラ」と呼ぶ。
 未選択減少ボイラ選択部464は、大小判定部44により必要蒸気量が蒸気量減少後の出力蒸気量よりも小さいと判定された場合に、複数のボイラ20のうち、燃焼減少ボイラ選択部46により選択され、かつ、偏差量判定部47により偏差量が単位蒸気量U以上であると判定されたボイラ(以下、「選択減少ボイラ」と呼ぶ)以外のボイラを選択する。なお、選択減少ボイラ以外のボイラを、以下では「未選択減少ボイラ」と呼ぶ。
 順序記憶部51は、選択増加ボイラとして選択された複数のボイラ20の順序、及び選択減少ボイラとして選択された複数のボイラ20の順序を記憶する。
 そして、燃焼増加ボイラ選択部45は、未選択増加ボイラがなくなった後に、大小判定部44により必要蒸気量が蒸気量増加後の出力蒸気量よりも大きいと判定された場合に、順序記憶部51に記憶された順序で蒸気量を増加させるボイラを選択する。
 また、燃焼減少ボイラ選択部46は、未選択減少ボイラがなくなった後に、大小判定部44により必要蒸気量が蒸気量減少後の出力蒸気量よりも小さいと判定された場合に、順序記憶部51に記憶された順序で蒸気量を減少させるボイラを選択する。
 ここで、燃焼増加ボイラ選択部45を構成する第1増加選択部451及び未選択増加ボイラ選択部454の処理の順序は、任意に設定することができる。すなわち、未選択増加ボイラ選択部454が未選択増加ボイラを選択した後に、第1増加選択部451がこれら未選択増加ボイラの中から運転ゾーンに基づきボイラ20を選択することとしてもよく、また、第1増加選択部451が運転ゾーンに基づくボイラ20を選択した後に、未選択増加ボイラ選択部454が第1増加選択部451により選択されたボイラ20の中から未選択増加ボイラを選択することとしてもよい。
 未選択増加ボイラ選択部454の処理を第1増加選択部451の処理の前に行う構成によれば、最も下側にある運転ゾーンに対応する範囲で運転するボイラ20のみが順次蒸気量を増加させるボイラとして選択されることになり、第1増加選択部451の処理を未選択増加ボイラ選択部454の処理の前に行う構成によれば、運転ゾーンに関わらず全て(5台)のボイラ20が順次蒸気量を増加させるボイラとして選択されることになる。
 例えば、1号機ボイラから3号機ボイラが第1エコ運転ゾーンZ1に対応する範囲の負荷率で運転し、4号機ボイラ及び5号機ボイラが下側第2エコ運転ゾーンZ22に対応する範囲の負荷率で運転している状況において、下側第2エコ運転ゾーンZ22に対応する範囲の負荷率で運転している4号機ボイラ及び5号機ボイラが既に選択増加ボイラである場合について考える。
 未選択増加ボイラ選択部454、第1増加選択部451の順に処理を行った場合、未選択増加ボイラ選択部454は、1号機ボイラから5号機ボイラの中から未選択増加ボイラを選択することになり、1号機ボイラから3号機ボイラが未選択増加ボイラとして選択され、結果として、1号機ボイラから3号機ボイラのいずれかが蒸気量を増加させるボイラとして選択されることになる。
 他方、第1増加選択部451、未選択増加ボイラ選択部454の順に処理を行った場合、第1増加選択部451は、運転ゾーンに基づくボイラ20の選択により、4号機ボイラ及び5号機ボイラを選択する。このとき、4号機ボイラ及び5号機ボイラは、選択増加ボイラであるため、未選択増加ボイラが既になく、燃焼増加ボイラ選択部45は、順序記憶部51に記憶された順序で蒸気量を増加させるボイラを選択することになる。その結果、4号機ボイラ及び5号機ボイラのいずれかが蒸気量を増加させるボイラとして選択されることになる。
 なお、燃焼減少ボイラ選択部46についても同様に、第1減少選択部461及び未選択減少ボイラ選択部464の処理の順序は、任意に設定することができる。
 続いて、第2実施形態に係るボイラシステム1による複数のボイラ20の燃焼状態の制御の詳細について説明する。図19~図25は、それぞれ、ボイラシステム1の第2実施形態に係る動作の概略を示す図である。なお、図19~図25では、蒸気量を増加させる動作についてのみ説明しているが、蒸気量を減少させる動作も基本的に同じであるため、その説明を省略する。
<パターン3>
 まず、未選択増加ボイラ選択部454、第1増加選択部451の順に処理を行う場合の動作を、図19~図23を参照して説明する。
 図19に示すように、現在(基準時)において、1号機ボイラから5号機ボイラの全てが未選択増加ボイラであり、1号機ボイラ、2号機ボイラ及び3号機ボイラが第1エコ運転ゾーンZ1に対応する範囲の負荷率で運転しており、4号機ボイラ及び5号機ボイラが下側第2エコ運転ゾーンZ22に対応する範囲の負荷率で運転している。このとき、出力蒸気量が7300kg/hである状態において、必要蒸気量が7500kg/hに増加した場合について考える。
 1号機ボイラから5号機ボイラの全てが未選択増加ボイラであるため、燃焼増加ボイラ選択部45は、運転ゾーン、運転ゾーンの中における負荷率及び優先順位に基づいて1号機ボイラから5号機ボイラの中から蒸気量を増加させるボイラ20を選択する。図19では、4号機ボイラ及び5号機ボイラが、下側第2エコ運転ゾーンZ22に対応する範囲の負荷率で運転し、かつ、5号機ボイラの方が4号機ボイラよりも運転ゾーンの中における負荷率が低いため、燃焼増加ボイラ選択部45は、5号機ボイラを蒸気量を増加させるボイラとして選択する。
 5号機ボイラの単位蒸気量Uは偏差量よりも小さいため、図20に示すように、出力制御部48は、5号機ボイラの蒸気量を単位蒸気量U分増加(2400kg/hから2520kg/hに増加)させ、5号機ボイラを選択増加ボイラとする。
 また、制御部4は、記憶部5の順序記憶部51に5号機ボイラが最初に選択されたことを示す順序を記憶する。
 続いて、5号機ボイラの蒸気量を増加した後に、必要蒸気量が7500kg/hから7700kg/hに増加したとする。この場合、5号機ボイラが選択増加ボイラであり、1号機ボイラから4号機ボイラが未選択増加ボイラであるため、燃焼増加ボイラ選択部45は、運転ゾーン、運転ゾーンの中における負荷率及び優先順位に基づいて1号機ボイラから4号機ボイラの中から蒸気量を増加させるボイラ20を選択する。
 図20では、4号機ボイラが、下側第2エコ運転ゾーンZ22に対応する範囲の負荷率で運転しているため、4号機ボイラが蒸気量を増加させるボイラとして選択されることになる。
 そして、4号機ボイラの単位蒸気量Uは偏差量よりも小さいため、図21に示すように、出力制御部48は、4号機ボイラの蒸気量を単位蒸気量U分増加(1200kg/hから1400kg/hに増加)させ、4号機ボイラを選択増加ボイラとする。
 また、制御部4は、記憶部5の順序記憶部51に4号機ボイラが2番目に選択されたことを示す順序を記憶する。
 続いて、4号機ボイラの蒸気量を増加した後に、必要蒸気量が7700kg/hから7800kg/hに増加したとする。この場合、4号機ボイラ及び5号機ボイラが選択増加ボイラであり、1号機ボイラから3号機ボイラが未選択増加ボイラであるため、燃焼増加ボイラ選択部45は、運転ゾーン、運転ゾーンの中における負荷率及び優先順位に基づいて1号機ボイラから3号機ボイラの中から蒸気量を増加させるボイラ20を選択する。
 図21では、1号機ボイラ、2号機ボイラ、3号機ボイラの何れも第1エコ運転ゾーンZ1で運転しており、運転ゾーンの中における負荷率も1号機ボイラ及び2号機ボイラが最も低いため、燃焼増加ボイラ選択部45は、最も優先順位の高い1号機ボイラを蒸気量を増加させるボイラとして選択する。
 そして、1号機ボイラの単位蒸気量Uは偏差量よりも小さいため、図22に示すように、出力制御部48は、1号機ボイラの蒸気量を単位蒸気量U分増加(1000kg/hから1100kg/hに増加)させ、1号機ボイラを選択増加ボイラとする。
 また、制御部4は、記憶部5の順序記憶部51に1号機ボイラが3番目に選択されたことを示す順序を記憶する。
 その後、更に必要蒸気量が増加した場合には、燃焼増加ボイラ選択部45は、未選択増加ボイラの中から運転ゾーン、運転ゾーンの中における負荷率及び優先順位に基づいて蒸気量を増加させるボイラを選択することになる。図23に示すように、本動作例では、次に2号機ボイラが選択され、最後に3号機ボイラが選択されることになる。これにより、1号機ボイラから5号機ボイラの全てが選択増加ボイラとなると、選択の有無がクリアされ、1号機ボイラから5号機ボイラの全てが未選択増加ボイラにリセットされる。
 そして、更に必要蒸気量が増加し、蒸気量を増加するボイラを選択する必要がある場合には、燃焼増加ボイラ選択部45は、順序記憶部51に記憶された順序に従い、蒸気量を増加させるボイラを選択する。本動作例では、5号機ボイラ、4号機ボイラ、1号機ボイラ、2号機ボイラ、3号機ボイラの順に選択されることになる。
 このようなパターン3の動作によれば、同じボイラの蒸気量が連続して増加することを防止できるため、各ボイラ20の負荷率変動を抑制することができ、安定性を高めることができる。
<パターン3a>
 続いて、第1増加選択部451、未選択増加ボイラ選択部454の順に処理を行う場合の動作を、図19~図21、図24、図25を参照して説明する。
 図19~図21までの流れは、パターン3と同一であり、必要蒸気量の増加に伴い5号機ボイラ、4号機ボイラの順に蒸気量を増加させるボイラとして選択されている。その後、図21に示すように、必要蒸気量が7700kg/hから7800kg/hに増加したとする。この場合、必要蒸気量が増加しているため、第1増加選択部451は、運転ゾーン、運転ゾーンの中における負荷率及び優先順位に基づいて1号機ボイラから5号機ボイラの中から蒸気量を増加させるボイラ20を選択する。
 図21では、4号機ボイラ及び5号機ボイラが、下側第2エコ運転ゾーンZ22に対応する範囲の負荷率で運転しているため、第1増加選択部451は、4号機ボイラ及び5号機ボイラを選択する。ここで、4号機ボイラ及び5号機ボイラは選択増加ボイラであるものの、下側第2エコ運転ゾーンZ22に対応する範囲の負荷率で運転しているボイラ20は4号機ボイラ及び5号機ボイラ以外になく、また、下側第2エコ運転ゾーンZ22よりも下側の運転ゾーンに対応する範囲の負荷率で運転しているボイラ20も存在しない。そこで、制御部4は、選択の有無をクリアし、4号機ボイラ及び5号機ボイラを未選択増加ボイラにリセットする。
 その後、燃焼増加ボイラ選択部45は、順序記憶部51に記憶された順序に従い5号機ボイラを、蒸気量を増加させるボイラとして選択する。そして、5号機ボイラの単位蒸気量Uは偏差量よりも小さいため、図24に示すように、出力制御部48は、5号機ボイラの蒸気量を単位蒸気量U分増加(2520kg/hから2620kg/hに増加)させ、5号機ボイラを選択増加ボイラとする。
 その後、更に必要蒸気量が増加した場合には、燃焼増加ボイラ選択部45は、未選択増加ボイラの中から順序記憶部51に記憶された順序に従い蒸気量を増加させるボイラを選択することになる。図25に示すように、本動作例では、次に4号機ボイラが選択される。なお、4号機ボイラ及び5号機ボイラの蒸気量を増加させることを繰り返すと、いずれ運転ゾーンが下側第2エコ運転ゾーンZ22から第1エコ運転ゾーンZ1に切り替わることになる。図25では、タイミング100の時点で4号機ボイラの運転ゾーンが下側第2エコ運転ゾーンZ22から第1エコ運転ゾーンZ1に切り替わる。そして、4号機ボイラの運転ゾーンが切り替わると、下側第2エコ運転ゾーンZ22に対応する範囲の負荷率で運転するボイラ20が5号機ボイラのみとなるため、タイミング100以降は、5号機ボイラのみが蒸気量を増加させるボイラとして選択されることになる。
 このようなパターン3aの動作によれば、ボイラ効率の悪いボイラ20から順に蒸気量を変動させることができ、ボイラシステム1全体としての効率を向上させることができる。
 続いて、第2実施形態のボイラシステム1の動作を実現するための処理の流れについて説明する。なお、第2実施形態のボイラシステム1は、変動ボイラ選択処理(図16のステップST5)以外の処理は第1実施形態のボイラシステム1と同様であるため、説明を省略する。
 初めに、ステップST501において、制御部4は、蒸気量を増加する必要があるか、蒸気量を減少する必要があるかを判定する。
 蒸気量を増加する必要がある場合、ステップST502において、制御部4は、未選択増加ボイラの中から蒸気量増加候補ボイラを選択する。蒸気量増加候補ボイラの選択については、上述した通りであり、燃焼増加ボイラ選択部45は、運転ゾーン、運転ゾーンの中における負荷率、優先順位、選択増加ボイラとなった順序に基づいて蒸気量を増加する候補となるボイラ20を選択する。
 続いて、ステップST503において、制御部4(偏差量判定部47)は、偏差量が蒸気量増加候補ボイラとして選択されたボイラ20の単位蒸気量U以上であるか判定する。このとき、偏差量が単位蒸気量U以上である場合には、制御部4は、続いてステップST504の処理に移り、偏差量が単位蒸気量U以上でない場合には、制御部4は、変動ボイラ選択処理を終了し、図16のステップST6の処理に移る。ステップST504では、制御部4は、出力蒸気量を増加し、偏差量を減算する。
 続いて、ステップST505において、制御部4は、ステップST502で選択されたボイラ20を選択増加ボイラとし、選択増加ボイラとなった順序を順序記憶部51に記憶する。続いて、ステップST506において、制御部4は、未選択増加ボイラが存在するか否かを判定する。このとき、未選択増加ボイラが存在する場合には、制御部4は、ステップST502の処理に戻る。他方、未選択増加ボイラが存在しない場合には、制御部4は、選択増加ボイラを未選択増加ボイラにリセットし、ステップST502の処理に戻る。
 続いて、蒸気量を減少する必要がある場合、すなわちステップST501においてNOと判定された場合、ステップST508において、制御部4は、未選択減少ボイラの中から蒸気量減少候補ボイラを選択する。具体的には、燃焼減少ボイラ選択部46は、運転ゾーン、運転ゾーンの中における負荷率、優先順位、選択減少ボイラとなった順序に基づいて蒸気量を減少する候補となるボイラ20を選択する。
 続いて、ステップST509において、制御部4(偏差量判定部47)は、偏差量が蒸気量増加候補ボイラとして選択されたボイラ20の単位蒸気量U以上であるか判定する。このとき、偏差量が単位蒸気量U以上である場合には、制御部4は、続いてステップST510の処理に移り、偏差量が単位蒸気量U以上でない場合には、制御部4は、変動ボイラ選択処理を終了し、図16のステップST6の処理に移る。ステップST510では、制御部4は、出力蒸気量を減少し、偏差量を減算する。
 続いて、ステップST511において、制御部4は、ステップST508で選択されたボイラ20を選択減少ボイラとし、選択減少ボイラとなった順序を順序記憶部51に記憶する。続いて、ステップST512において、制御部4は、未選択減少ボイラが存在するか否かを判定する。このとき、未選択減少ボイラが存在する場合には、制御部4は、ステップST508の処理に戻る。他方、未選択減少ボイラが存在しない場合には、制御部4は、選択減少ボイラを未選択減少ボイラにリセットし、ステップST508の処理に戻る。
 以上説明した第2実施形態のボイラシステム1によれば、以下のような効果を奏する。
 (5)制御部4は、出力蒸気量の変動が必要な場合に、未だ選択増加ボイラ又は選択減少ボイラではないボイラ20から優先して蒸気量を変動させることとした。これにより、同じボイラの蒸気量が連続して変動することを防止できるため、各ボイラ20の負荷率変動を抑制することができ、安定性を高めることができる。
 (6)制御部4は、複数のボイラ20の全てが選択増加ボイラ又は選択減少ボイラとなった場合には、選択増加ボイラ又は選択減少ボイラとなったボイラ20の順序に基づき、蒸気量を変動させるボイラを選択することとした。これにより、制御部4の処理負担を軽減させることができる。
 以上、本発明のボイラシステム1の好ましい実施形態について説明したが、本発明は、上述した実施形態に制限されるものではなく、適宜変更が可能である。
 例えば、上記実施形態では、所定の範囲のボイラ効率で燃焼する場合における負荷率の範囲に対応して設定される複数の運転ゾーンとして、第1エコ運転ゾーンZ1と、上側第2エコ運転ゾーンZ21と、下側第2エコ運転ゾーンZ22と、上側通常運転ゾーンZ31と、下側通常運転ゾーンZ32と、を設定することとしているが、運転ゾーンの設定はこれに限るものではない。
 すなわち、図27に示すように、第1エコ運転ゾーンZ1と、第1エコ運転ゾーンZ1よりも負荷率の高い範囲に位置する上側第2エコ運転ゾーンZ21と、第1エコ運転ゾーンZ1よりも負荷率の低い範囲に位置する下側第2エコ運転ゾーンZ22と、上側第2エコ運転ゾーンZ21よりも負荷率の高い範囲に位置する通常運転ゾーンZ3と、を設定し、下側第2エコ運転ゾーンZ22よりも負荷率の低い範囲に位置する下側通常運転ゾーンZ32を設定しないこととしてもよい。
 また、第1エコ運転ゾーンZ1と、第1エコ運転ゾーンZ1よりも負荷率の高い範囲に位置する上側第2エコ運転ゾーンZ21と、第1エコ運転ゾーンZ1よりも負荷率の低い範囲に位置する下側第2エコ運転ゾーンZ22と、下側第2エコ運転ゾーンZ22よりも負荷率の低い範囲に位置する通常運転ゾーンZ3と、を設定し、上側第2エコ運転ゾーンZ21よりも負荷率の高い範囲に位置する上側通常運転ゾーンZ31を設定しないこととしてもよい。
 また、第1エコ運転ゾーンZ1と、第1エコ運転ゾーンZ1よりも負荷率の低い範囲に位置する第2エコ運転ゾーンZ2と、第2エコ運転ゾーンZ2よりも負荷率の低い範囲に位置する通常運転ゾーンZ3と、を設定し、第1エコ運転ゾーンZ1よりも負荷率の高い範囲に位置する上側第2エコ運転ゾーンZ21及び上側通常運転ゾーンZ31を設定しないこととしてもよい。
 また、第1エコ運転ゾーンZ1と、第1エコ運転ゾーンZ1よりも負荷率の高い範囲に位置する第2エコ運転ゾーンZ2と、第2エコ運転ゾーンZ2よりも負荷率の高い範囲に位置する通常運転ゾーンZ3と、を設定し、第1エコ運転ゾーンZ1よりも負荷率の低い範囲に位置する下側第2エコ運転ゾーンZ22及び下側通常運転ゾーンZ32を設定しないこととしてもよい。
 また、複数のボイラ20に対して設定する運転ゾーンの種類は、複数のボイラ20で共通としてもよく、ボイラ20毎に異ならせることとしてもよい。
 1…ボイラシステム、2…ボイラ群、20…ボイラ、3…台数制御装置、4…制御部、41…必要蒸気量算出部、42…出力蒸気量算出部、43…偏差算出部、44…大小判定部、45…燃焼増加ボイラ選択部、451…第1増加選択部、452…第2増加選択部、453…増加優先順位選択部、46…燃焼減少ボイラ選択部、461…第1減少選択部、462…第2減少選択部、463…減少優先順位選択部、47…偏差量判定部、48…出力制御部

Claims (13)

  1.  負荷率を連続的に変更して燃焼可能な複数のボイラを備えるボイラ群と、要求負荷に応じて前記ボイラ群の燃焼状態を制御する制御部と、を備えるボイラシステムであって、
     複数の前記ボイラには、変動可能な蒸気量の単位である単位蒸気量が設定されると共に、
     前記複数のボイラには、それぞれ、所定の負荷率の範囲に対応して複数の運転ゾーンが個別に設定されており、
     前記制御部は、
      前記要求負荷に応じて必要とされる蒸気量である必要蒸気量を算出する必要蒸気量算出部と、
      前記ボイラ群により出力される蒸気量である出力蒸気量を算出する出力蒸気量算出部と、
      前記必要蒸気量と前記出力蒸気量との偏差量を算出する偏差算出部と、
      前記必要蒸気量と前記出力蒸気量との大小を判定する大小判定部と、
     前記大小判定部により前記必要蒸気量が前記出力蒸気量よりも大きいと判定された場合に、蒸気量を増加させるボイラを選択する燃焼増加ボイラ選択部と、
     前記大小判定部により前記必要蒸気量が前記出力蒸気量よりも小さいと判定された場合に、蒸気量を減少させるボイラを選択する燃焼減少ボイラ選択部と、
      前記偏差算出部により算出された前記偏差量が前記燃焼増加ボイラ選択部又は前記燃焼減少ボイラ選択部により選択されたボイラの単位蒸気量以上であるかを判定する偏差量判定部と、
     前記偏差量判定部により前記偏差量が前記単位蒸気量以上であると判定された場合に、前記燃焼増加ボイラ選択部により選択されたボイラの蒸気量を前記単位蒸気量分増加させ、又は前記燃焼減少ボイラ選択部により選択されたボイラの蒸気量を前記単位蒸気量分減少させる出力制御部と、を備え、
     前記燃焼増加ボイラ選択部は、
      前記複数のボイラから、前記複数の運転ゾーンのうち最も低い負荷率の範囲に対応する運転ゾーンに位置するボイラを選択する第1増加選択部と、を備え、
     前記燃焼減少ボイラ選択部は、
      前記複数のボイラから、前記複数の運転ゾーンのうち最も高い負荷率の範囲に対応する運転ゾーンに位置するボイラを選択する第1減少選択部と、を備えるボイラシステム。
  2.  前記燃焼増加ボイラ選択部は、
      前記第1増加選択部により複数のボイラが選択された場合に、該第1増加選択部により選択された複数のボイラから、前記運転ゾーンの中における負荷率が最も低いボイラを選択する第2増加選択部を更に備え、
     前記燃焼減少ボイラ選択部は、
      前記第1減少選択部により複数のボイラが選択された場合に、該第1減少選択部により選択された複数のボイラから、前記運転ゾーンの中における負荷率が最も高いボイラを選択する第2減少選択部を更に備える請求項1に記載のボイラシステム。
  3.  前記燃焼増加ボイラ選択部は、
      前記第2増加選択部により複数のボイラが選択された場合に、該第2増加選択部により選択された複数のボイラから、最も優先順位の高いボイラを選択する増加優先順位選択部を更に備え、
     前記燃焼減少ボイラ選択部は、
      前記第2減少選択部により複数のボイラが選択された場合に、該第2減少選択部により選択された複数のボイラから、最も優先順位の低いボイラを選択する減少優先順位選択部を更に備える請求項2に記載のボイラシステム。
  4.  前記燃焼増加ボイラ選択部は、
      前記第1増加選択部により複数のボイラが選択された場合に、該第1増加選択部により選択された複数のボイラから、最も優先順位の高いボイラを選択する増加優先順位選択部を更に備え、
     前記燃焼減少ボイラ選択部は、
      前記第1減少選択部により複数のボイラが選択された場合に、該第1減少選択部により選択された複数のボイラから、最も優先順位の低いボイラを選択する減少優先順位選択部を更に備える請求項1に記載のボイラシステム。
  5.  前記燃焼増加ボイラ選択部は、
      前記大小判定部により前記必要蒸気量が蒸気量増加後の前記出力蒸気量よりも大きいと判定された場合に、前記複数のボイラから蒸気量を増加させるボイラに選択されていないボイラを選択する未選択増加ボイラ選択部を更に備え、
     前記第1増加選択部は、前記未選択増加ボイラ選択部により選択されたボイラのうち、最も低い負荷率の範囲に対応する運転ゾーンに位置するボイラを選択し、
     前記燃焼減少ボイラ選択部は、
      前記大小判定部により前記必要蒸気量が蒸気量減少後の前記出力蒸気量よりも小さいと判定された場合に、前記複数のボイラから蒸気量を減少させるボイラに選択されていないボイラを選択する未選択減少ボイラ選択部を更に備え、
     前記第1減少選択部は、前記未選択減少ボイラ選択部により選択されたボイラのうち、最も高い負荷率の範囲に対応する運転ゾーンに位置するボイラを選択する請求項1~4のいずれかに記載のボイラシステム。
  6.  蒸気量を増加させるボイラに選択されたボイラの順序、及び蒸気量を減少させるボイラに選択されたボイラの順序を記憶する順序記憶部を更に備え、
     前記未選択増加ボイラ選択部により選択されるボイラがなくなった場合、前記燃焼増加ボイラ選択部は、前記順序記憶部に記憶された順序で蒸気量を増加させるボイラを選択し、
     前記未選択減少ボイラ選択部により選択されるボイラがなくなった場合、前記燃焼減少ボイラ選択部は、前記順序記憶部に記憶された順序で蒸気量を減少させるボイラを選択する請求項5に記載のボイラシステム。
  7.  前記複数の運転ゾーンは、所定の範囲のボイラ効率で燃焼する場合における負荷率の範囲に対応して設定される請求項1~6のいずれかに記載のボイラシステム。
  8.  前記複数の運転ゾーンは、
      ボイラ効率が第1閾値よりも高くなる負荷率の範囲である第1エコ運転ゾーンと、
      ボイラ効率が前記第1閾値と該第1閾値よりも低い第2閾値との間となる負荷率の範囲である第2エコ運転ゾーンと、
      ボイラ効率が前記第2閾値よりも低くなる負荷率の範囲である通常運転ゾーンと、を備え、
     前記第2エコ運転ゾーンは、前記第1エコ運転ゾーンよりも負荷率の高い範囲に位置する上側第2エコ運転ゾーンと、前記第1エコ運転ゾーンよりも負荷率の低い範囲に位置する下側第2エコ運転ゾーンと、を備え、
     前記通常運転ゾーンは、前記上側第2エコ運転ゾーンよりも負荷率の高い範囲に位置する上側通常運転ゾーンと、前記下側第2エコ運転ゾーンよりも負荷率の低い範囲に位置する下側通常運転ゾーンと、を備える請求項7に記載のボイラシステム。
  9.  前記複数の運転ゾーンは、
      ボイラ効率が第1閾値よりも高くなる負荷率の範囲である第1エコ運転ゾーンと、
      ボイラ効率が前記第1閾値と該第1閾値よりも低い第2閾値との間となる負荷率の範囲である第2エコ運転ゾーンと、
      ボイラ効率が前記第2閾値よりも低くなる負荷率の範囲である通常運転ゾーンと、を備え、
     前記第2エコ運転ゾーンは、前記第1エコ運転ゾーンよりも負荷率の高い範囲に位置する上側第2エコ運転ゾーンと、前記第1エコ運転ゾーンよりも負荷率の低い範囲に位置する下側第2エコ運転ゾーンと、を備え、
     前記通常運転ゾーンは、前記上側第2エコ運転ゾーンよりも負荷率の高い範囲に位置する請求項7に記載のボイラシステム。
  10.  前記複数の運転ゾーンは、
      ボイラ効率が第1閾値よりも高くなる負荷率の範囲である第1エコ運転ゾーンと、
      ボイラ効率が前記第1閾値と該第1閾値よりも低い第2閾値との間となる負荷率の範囲である第2エコ運転ゾーンと、
      ボイラ効率が前記第2閾値よりも低くなる負荷率の範囲である通常運転ゾーンと、を備え、
     前記第2エコ運転ゾーンは、前記第1エコ運転ゾーンよりも負荷率の高い範囲に位置する上側第2エコ運転ゾーンと、前記第1エコ運転ゾーンよりも負荷率の低い範囲に位置する下側第2エコ運転ゾーンと、を備え、
     前記通常運転ゾーンは、前記下側第2エコ運転ゾーンよりも負荷率の低い範囲に位置する請求項7に記載のボイラシステム。
  11.  前記複数の運転ゾーンは、
      ボイラ効率が第1閾値よりも高くなる負荷率の範囲である第1エコ運転ゾーンと、
      ボイラ効率が前記第1閾値と該第1閾値よりも低い第2閾値との間となる負荷率の範囲である第2エコ運転ゾーンと、
      ボイラ効率が前記第2閾値よりも低くなる負荷率の範囲である通常運転ゾーンと、を備え、
     前記第2エコ運転ゾーンは、前記第1エコ運転ゾーンよりも負荷率の低い範囲に位置すると共に、前記通常運転ゾーンは、前記第2エコ運転ゾーンよりも負荷率の低い範囲に位置する請求項7に記載のボイラシステム。
  12.  前記複数の運転ゾーンは、
      ボイラ効率が第1閾値よりも高くなる負荷率の範囲である第1エコ運転ゾーンと、
      ボイラ効率が前記第1閾値と該第1閾値よりも低い第2閾値との間となる負荷率の範囲である第2エコ運転ゾーンと、
      ボイラ効率が前記第2閾値よりも低くなる負荷率の範囲である通常運転ゾーンと、を備え、
     前記第2エコ運転ゾーンは、前記第1エコ運転ゾーンよりも負荷率の高い範囲に位置すると共に、前記通常運転ゾーンは、前記第2エコ運転ゾーンよりも負荷率の高い範囲に位置する請求項7に記載のボイラシステム。
  13.  前記単位蒸気量は、前記複数のボイラそれぞれに対して個別に設定される請求項1~12のいずれかに記載のボイラシステム。
PCT/JP2013/055185 2012-11-13 2013-02-27 ボイラシステム WO2014076976A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-249487 2012-11-13
JP2012249487 2012-11-13

Publications (1)

Publication Number Publication Date
WO2014076976A1 true WO2014076976A1 (ja) 2014-05-22

Family

ID=50730906

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/055185 WO2014076976A1 (ja) 2012-11-13 2013-02-27 ボイラシステム

Country Status (2)

Country Link
JP (1) JP5534089B1 (ja)
WO (1) WO2014076976A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6926469B2 (ja) * 2016-12-22 2021-08-25 三浦工業株式会社 ボイラシステム

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03158601A (ja) * 1989-11-17 1991-07-08 Hirakawa Tekkosho:Kk ボイラ負荷制御方法及びその装置
JP2002130602A (ja) * 2000-10-19 2002-05-09 Kawasaki Thermal Engineering Co Ltd ボイラの台数制御方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03158601A (ja) * 1989-11-17 1991-07-08 Hirakawa Tekkosho:Kk ボイラ負荷制御方法及びその装置
JP2002130602A (ja) * 2000-10-19 2002-05-09 Kawasaki Thermal Engineering Co Ltd ボイラの台数制御方法

Also Published As

Publication number Publication date
JP5534089B1 (ja) 2014-06-25
JP2014115070A (ja) 2014-06-26

Similar Documents

Publication Publication Date Title
JP5534065B1 (ja) ボイラシステム
JP2010043768A (ja) ボイラの制御方法及びこの制御方法を用いたボイラシステム
JP6119505B2 (ja) ボイラシステム
JP2010048462A (ja) 制御システム、制御システム用プログラム、燃焼制御方法及びボイラシステム
JP6070414B2 (ja) ボイラシステム
JP5343935B2 (ja) ボイラシステム
JP5534055B1 (ja) ボイラシステム
JP5534089B1 (ja) ボイラシステム
JP5672276B2 (ja) ボイラシステム
JP5598139B2 (ja) プログラム、制御器及びボイラシステム
JP5668807B2 (ja) ボイラシステム
JP2017032223A (ja) ボイラシステム
WO2014109070A1 (ja) ボイラシステム
JP2014228180A (ja) ボイラシステム
JP5440069B2 (ja) ボイラ群の制御方法、プログラム、制御器及びボイラシステム
JP6044314B2 (ja) ボイラシステム
JP2016061498A (ja) ボイラシステム
JP6142667B2 (ja) ボイラシステム
JP5672314B2 (ja) ボイラシステム
JP5593895B2 (ja) プログラム、制御器及びボイラシステム
JP2014098503A (ja) ボイラシステム
JP6551005B2 (ja) ボイラシステム
JP6303543B2 (ja) ボイラシステム
JP6028608B2 (ja) ボイラシステム
JP6115093B2 (ja) ボイラシステム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13855968

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13855968

Country of ref document: EP

Kind code of ref document: A1