WO2014050195A1 - 制御装置 - Google Patents

制御装置 Download PDF

Info

Publication number
WO2014050195A1
WO2014050195A1 PCT/JP2013/062622 JP2013062622W WO2014050195A1 WO 2014050195 A1 WO2014050195 A1 WO 2014050195A1 JP 2013062622 W JP2013062622 W JP 2013062622W WO 2014050195 A1 WO2014050195 A1 WO 2014050195A1
Authority
WO
WIPO (PCT)
Prior art keywords
pump
inverter
pumps
operation time
deterioration degree
Prior art date
Application number
PCT/JP2013/062622
Other languages
English (en)
French (fr)
Inventor
隆之 中原
瑞樹 田中
Original Assignee
ダイキン工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ダイキン工業株式会社 filed Critical ダイキン工業株式会社
Priority to US14/430,524 priority Critical patent/US9695830B2/en
Priority to EP13842421.3A priority patent/EP2918934A4/en
Priority to CN201380049591.5A priority patent/CN104662377B/zh
Publication of WO2014050195A1 publication Critical patent/WO2014050195A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D27/00Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B41/00Pumping installations or systems specially adapted for elastic fluids
    • F04B41/06Combinations of two or more pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/02Stopping, starting, unloading or idling control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/06Control using electricity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D15/00Control, e.g. regulation, of pumps, pumping installations or systems
    • F04D15/0066Control, e.g. regulation, of pumps, pumping installations or systems by changing the speed, e.g. of the driving engine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D15/00Control, e.g. regulation, of pumps, pumping installations or systems
    • F04D15/0088Testing machines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/84Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/85Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using variable-flow pumps
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B2203/00Motor parameters
    • F04B2203/02Motor parameters of rotating electric motors
    • F04B2203/0214Number of working motor-pump units

Definitions

  • the present invention relates to a control device.
  • Patent Document 1 Japanese Patent Laid-Open No. 2009-133253
  • the operation time of each pump is set in advance, and a plurality of pumps are determined depending on whether the accumulated operation time of the pump reaches the set operation time. Has been determined to be activated / deactivated. As a result, the accumulated operation time of each pump is made uniform.
  • an object of the present invention is to provide a control device that can level the deterioration degree of the pump.
  • a control device is a control device that controls a plurality of inverter-driven pumps arranged between a heat source device and an air conditioner, and includes a grasping unit, a deterioration degree deriving unit, A determination unit.
  • the grasping unit grasps the accumulated operation time of the pump and the rotational speed distribution during the operation of the pump.
  • the deterioration degree deriving unit derives the deterioration degree of the pump based on the accumulated operation time of the pump and the rotation speed distribution during operation of the pump.
  • the determination unit determines a pump to be operated / stopped next time based on the deterioration degree of the pump.
  • the accumulated operation time is used as a parameter to calculate the deterioration degree of the pump, but the influence on the deterioration degree of the pump is not limited to the accumulated operation time. Moreover, it is thought that the influence which it has on a pump is large depending on the driving
  • the control apparatus which concerns on the 2nd viewpoint of this invention is a control apparatus which concerns on the 1st viewpoint of this invention, Comprising: A calculation part is further provided.
  • the calculation unit calculates an operation time in the low-speed rotation range of the pump and an operation time in the high-speed rotation range of the pump based on the rotation speed distribution during operation of the pump.
  • the deterioration degree deriving unit derives the deterioration degree of the pump based on the accumulated operation time of the pump, the operation time in the low speed rotation region of the pump, and the operation time in the high speed rotation region.
  • the operation in the high-speed rotation region has a great influence on the grease life due to heat generation, and in the low-speed rotation region, the vibration is likely to increase, so that the failure is likely to occur. That is, the operation of the pump in the low speed and high speed rotation regions is considered to have a great influence on the degree of deterioration. Therefore, in the present invention, by using the operation time of the pump in the high speed rotation region and the low speed rotation region as a parameter for deriving the deterioration degree of the pump, the deterioration degree of the pump can be derived more in line with the actual operation. .
  • the pump operation time in the high-speed rotation region and the low-speed rotation region includes the total operation time of the operation time in the high-speed rotation region and the operation time in the low-speed rotation region.
  • a control device is the control device according to the second aspect of the present invention, wherein the grasping unit further grasps the number of times of starting and stopping the pump, and the deterioration degree deriving unit is configured to start and stop the pump.
  • the deterioration degree of the pump is derived by further considering the number of times.
  • the deterioration degree of the pump can be derived more in line with actual operation.
  • the control apparatus which concerns on the 4th viewpoint of this invention is a control apparatus which concerns on the 3rd viewpoint of this invention, Comprising: A memory
  • the storage unit stores the accumulated operation time of the pump, the operation time in the low speed rotation region of the pump, the operation time in the high speed rotation region of the pump, and the weighting values corresponding to the number of start / stop times of the pump.
  • the deterioration degree deriving unit further considers weighting values corresponding to the accumulated operation time of the pump, the operation time in the low speed rotation region of the pump, the operation time in the high speed rotation region of the pump, and the number of start / stop times of the pump.
  • the deterioration degree of the pump is derived.
  • the weight values of each of these parameters are stored in the storage unit in advance. Therefore, it is possible to determine the degree of deterioration more in line with actual driving.
  • a control device is the control device according to the fourth aspect of the present invention, wherein the deterioration degree deriving unit further derives an increase in the deterioration degree of the pump in a predetermined period, and the determining unit includes The pump to be operated / stopped next time is determined based on the increase in the degree of deterioration of the pump during the predetermined period.
  • the predetermined period is a period from when the pump is installed (at the time of replacement) to when the pump is scheduled to be replaced.
  • the pump to be operated / stopped next time is determined based on the increase in the deterioration degree of the pump in a predetermined period. It is possible to avoid a situation where only the pump is operated.
  • the level of deterioration of the pump can be further leveled.
  • the degree of deterioration of the pump can be derived more in line with actual operation.
  • the degree of deterioration of the pump can be derived more in line with actual operation.
  • the control device according to the fifth aspect of the present invention for example, when half of a plurality of pumps are replaced every several years, a situation where only the replaced pumps are operated can be avoided.
  • the schematic block diagram of an air-conditioning system provided with the control apparatus which concerns on one Embodiment of this invention.
  • the graph which shows an example of rotation speed distribution of an inverter pump.
  • surface which shows the driving
  • surface which shows the frequency
  • the flowchart which shows the flow of control processing of the inverter pump in an air conditioning system controller.
  • the flowchart which shows the flow of the control process of the inverter pump in an air conditioning system controller (process after step S111).
  • FIG. 1 is a schematic configuration diagram of an air conditioning system 100 including a control device 110 according to an embodiment of the present invention.
  • the air conditioning system 100 is mainly installed in a relatively large building such as a building, factory, hospital, or hotel.
  • the air conditioning system 100 mainly includes a plurality (eight in this embodiment) of first to eighth refrigerators 51 to 58 as heat source devices, and air conditioning target spaces (for example, Between the first to ninth air conditioners 21 to 29, the first to eighth refrigerators 51 to 58, and the first to ninth air conditioners 21 to 29 as heat utilization devices installed in the indoor space).
  • a plurality of (in the present embodiment, five) first to fifth inverter pumps 61 to 65 arranged, and an air conditioning system controller 110 as a control device for controlling these devices are configured.
  • this air conditioning system 100 water as a heat medium circulates between these devices via a water pipe 30.
  • water pipe 30 cold water flows during cooling, and warm water flows during heating from the first to eighth refrigerators 51 to 58 to the first to ninth air conditioners 21 to 29.
  • the first to ninth air conditioners 21 to 29 in operation are used for air conditioning.
  • each apparatus which mainly comprises the air conditioning system 100 is demonstrated, and the structure of the air conditioning system controller 110 and the flow of a process are demonstrated after that.
  • (2) Equipment constituting the air conditioning system (2-1) First to eighth refrigerators First to eighth refrigerators 51 to 58 are connected in parallel to each other as shown in FIG. Water is drawn from 12 and water is sent to the feed header 11. The return header 12 and the feed header 11 are connected by a pipe 71.
  • the pipe 71 includes a return header connection pipe 72 connected to the return header 12 and first to fifth inverter pumps 61 to 65 which are branched into a plurality from the return header connection pipe 72 and are arranged with first to fifth inverter pumps 61 to 65, respectively.
  • Pipes 73a to 73e, first to eighth refrigerator pipes 74a to 74h in which first to eighth refrigerators 51 to 58 are disposed, first to fifth pump pipes 73a to 73e, and first to It is composed of an intermediate pipe 75 that connects the eight refrigerator pipes 74a to 74h, and a feed header connection pipe 76 that connects the first to eighth refrigerator pipes 74a to 74h and the feed header 11.
  • Each of the first to eighth refrigerators 51 to 58 is an air-cooled heat pump chiller, and a compressor, an air side heat exchanger, an expansion valve, and a water side heat exchanger are sequentially connected to constitute a refrigerant circuit. Yes.
  • the refrigerant circuit is filled with a refrigerant.
  • (2-2) First to Fifth Inverter Pumps The first to fifth inverter pumps 61 to 65 are inverter-driven pumps that are inverter-driven by the air conditioning system controller 110.
  • the first to fifth inverter pumps 61 to 65 pass water as a heat medium flowing out from the first to ninth air conditioners 21 to 29 through the water pipe 30 and the return header 12 to the first to eighth refrigerators 51. Send water to ⁇ 58 to circulate water.
  • the water (cold water or hot water) sent out from the first to eighth refrigerators 51 to 58 flows to the water pipe 30 via the feed header 11, and the first to ninth air conditioners 21 to 29 are supplied.
  • the water returned from the water via the water pipe 30 once flows into the return header 12 and is sucked into the first to eighth refrigerators 51 to 58, respectively.
  • the 1st to 9th air conditioners 21 to 29 are the cold heat or hot water heat generated by the first to eighth refrigerators 51 to 58 as heat source devices, respectively. Is used to process the heat load in the air-conditioned space. That is, the first to ninth air conditioners 21 to 29 perform air conditioning (cooling or heating) of the air-conditioning target space using the cold water or the hot water flowing from the first to eighth refrigerators 51 to 58.
  • the first to ninth air conditioners 21 to 29 are installed in the same or different air conditioning target spaces. Therefore, each of the first to ninth air conditioners 21 to 29 is arranged in parallel between the water pipe 30 extending from the feed header 11 and the water pipe 30 connected to the return header 12.
  • the first to ninth air conditioners 21 to 29 take in water from the water pipe 30 on the feed header 11 side via the lead-in pipes 21d to 29d, and return to the water pipe 30 on the return header 12 side by the return pipes 21e to 29e. Return the water.
  • Air passages through which air flows are formed inside the casings of the first to ninth air conditioners 21 to 29.
  • One end of a suction duct (not shown) is connected to the inflow end of the air passage, and one end of an air supply duct (not shown) is connected to the outflow end of the air passage.
  • the other ends of the suction duct and the air supply duct are each connected to the air-conditioning target space.
  • a blower fan 21a, a heat exchanger 21b, a flow rate adjusting valve 21c, and the like are arranged inside each casing of the first to ninth air conditioners 21 to 29, a blower fan 21a, a heat exchanger 21b, a flow rate adjusting valve 21c, and the like are arranged inside each casing of the first to ninth air conditioners 21 to 29, a blower fan 21a, a heat exchanger 21b, a flow rate adjusting valve 21c, and the like are arranged inside each casing of the first to ninth air conditioners 21 to 29, a blower
  • the heat exchanger 21b is a fin-and-tube heat exchanger having a plurality of heat transfer fins and a heat transfer tube penetrating the heat transfer fins.
  • Water circulating between the first to eighth refrigerators 51 to 58 and the first to ninth air conditioners 21 to 29 flows through the heat transfer tubes of the heat exchanger 21b, and passes through the heat transfer tubes and the heat transfer fins.
  • the blower fan 21a can change the rotation speed stepwise by inverter control, and can adjust the blown amount of heated or cooled air.
  • the flow rate adjusting valve 21c plays a role of adjusting the amount of water flowing to the air conditioner. That is, the flow rate of water flowing through each of the first to ninth air conditioners 21 to 29 is determined by the opening degree of each flow rate adjusting valve 21c.
  • the feed header 11 and the return header 12 are connected by a bypass pipe 13.
  • the bypass pipe 13 is provided with a bypass flow rate adjustment valve 13a.
  • the bypass flow rate adjustment valve 13a adjusts the flow rate of water flowing through the first to ninth air conditioners 21 to 29. Even if the required amount of water is reduced on the first to ninth air conditioners 21 to 29 side and the inverter frequency of the first to fifth inverter pumps 61 to 65 in operation is the lower limit value, the first to eighth refrigerators When the amount of water required on the first to ninth air conditioners 21 to 29 side is larger than the flow rate of the water flowing through 51 to 58, the water supply pressure of the feed header 11 increases.
  • the first to ninth air conditioners are adjusted by varying the opening of the bypass flow rate adjustment valve 13a and adjusting the flow rate of water that returns directly from the feed header 11 to the return header 12 through the bypass pipe 13.
  • the flow rate of water flowing through 21 to 29 can be suppressed.
  • the water temperature sensor 11a that measures the water temperature is measured downstream of the feed header 11 of the water pipe 30, and the water temperature sensor 12a that measures the water temperature and the water volume are measured upstream of the return header 12 of the water pipe 30.
  • a water amount sensor 15 is provided.
  • the air conditioning system controller 110 should handle the heat load of the first to ninth air conditioners 21 to 29 (specifically, the first to ninth air conditioners 21 to 29 should handle)
  • the number of pumps controlled to vary the number of operating first to fifth inverter pumps 61 to 65 according to the heat load of the air-conditioning target space is performed. Specifically, for example, when the heat load of the first to ninth air conditioners 21 to 29 is small, one inverter pump is operated and the heat load of the first to ninth air conditioners 21 to 29 is large. In some cases, a plurality of inverter pumps are operated.
  • the air conditioning system controller 110 controls the number of inverter pumps 61 to 65 when controlling the number of pumps in order to suppress the occurrence of variation in the degree of deterioration of the pumps by operating only the same pump among the plurality of inverter pumps. Based on the degree of deterioration, the pump to be operated / stopped next time is determined. This will be described below in the configuration and processing flow of the air conditioning system controller 110.
  • FIG. 2 is a schematic configuration diagram of the air conditioning system controller 110.
  • the air-conditioning system controller 110 includes a water temperature sensor 11a, a ring water temperature sensor 12a, a water amount sensor 15, first to ninth air conditioners 21 to 29, and first to eighth refrigerators 51 to 58.
  • the first to fifth inverter pumps 61 to 65, the bypass flow rate adjusting valve 13a and the like are connected.
  • the air conditioning system controller 110 mainly includes a communication unit 111, a display unit 112, an input unit 113, a timer unit 114, a storage unit 115, and a control unit 116.
  • the communication unit 111 is a network interface that enables the air conditioning system controller 110 to communicate with each device, sensor, and the like.
  • the display unit 112 mainly includes a display.
  • the display unit 112 displays a screen showing the operating status of the first to ninth air conditioners 21 to 29. Examples of the operation status of the first to ninth air conditioners 21 to 29 include an operation / stop state, an operation mode (cooling mode / heating mode, etc.), and the like.
  • the display unit 112 displays the average value of the water temperature measured by the going water temperature sensor 11a and the circulating water temperature sensor 12a, the set temperature of the water, the amount of water measured by the water amount sensor 15, and the like.
  • the input unit 113 mainly includes operation buttons and a touch panel that covers the display. When an administrator or the like touches an operation button or a button on the touch panel, control processing corresponding to the button is executed by the control unit 116.
  • the timer unit 114 measures time elements such as time, date, month, year, day of the week, and elapsed time based on a predetermined time.
  • the storage unit 115 includes a hard disk or the like, and includes an operation information storage area 115a, a rotation speed distribution rule storage area 115b, a reference value storage area 115c, and a weight value storage area 115d. And a pump information storage area 115e.
  • the operation status of the first to ninth air conditioners 21 to 29 includes the operation / stop state, the operation mode (cooling mode / heating mode, etc.), the air volume of the blower fan 21a, the temperature and pressure of the water flowing through the heat exchanger 21b, Examples include the opening degree of the flow rate adjusting valve 21c, the operation integration time, the number of start / stop times.
  • the air temperature system controller 110 specifically, a grasping unit 116a to be described later
  • the operating conditions of the first to eighth refrigerators 51 to 58 include the rotation speed of the compressor, the opening of the expansion valve, the refrigerant temperature and refrigerant pressure at a predetermined location of the refrigerant circuit, the accumulated operation time, the number of start / stop operations, Examples include a stopped state. Further, examples of the operation status of the first to fifth inverter pumps 61 to 65 include a rotational speed distribution, an operation integration time, the number of start / stop times, and an operation / stop state.
  • the grasping part 116a also grasps the water temperature measured by the going water temperature sensor 11a and the circulating water temperature sensor 12a, the set temperature of water, the amount of water measured by the water amount sensor 15, the opening degree of the bypass flow rate control valve 13a, and the like. It is stored in this driving information storage area 115a.
  • the rotational speed distribution of the first to fifth inverter pumps 61 to 65 is, as shown in FIG. 3, a predetermined rotational speed and an operation time at the predetermined rotational speed (specifically, an integrated operation time). ).
  • FIG. 3 shows an example of the rotational speed distribution of the inverter pumps 61-65.
  • the low-speed rotation range, medium-speed rotation range, and high-speed rotation range in FIG. 3 will be described later in the location of the rotation speed distribution rule storage area.
  • (3-3-3-5-2) Rotation Number Distribution Rule Storage Area A rotation number distribution rule storage area 115b stores a rotation number distribution rule table.
  • the rotation speed distribution rule is, for example, a rule for distributing the rotation speed into three stages of rotation ranges as shown in FIG.
  • a rotation speed distribution rule as shown in FIG. 4 is stored in the rotation speed distribution rule storage area 115b, if the rotation speed A of the inverter pump is not less than ⁇ and less than ⁇ , it is distributed to the low speed rotation region, If it is ⁇ or more and less than ⁇ , it is assigned to the medium speed rotation region, and if it is ⁇ or more and less than ⁇ , it is assigned to the high speed rotation region.
  • Reference value storage area 115c In the reference value storage area 115c, the accumulated operation time, the number of start / stop times and the rotation speed distribution of the first to fifth inverter pumps 61 to 65 (specifically, described later) Reference values for generalizing the total accumulated operation time (described later) in the low-speed and high-speed rotation regions are stored.
  • Each reference value is a value obtained by simulation, desktop calculation, or the like, and is input in advance by a service person or the like via the input unit 113.
  • an allowable allowable operation integration time is input as a reference value for the operation integration time.
  • the allowable operation integration time is, for example, 1500 hours.
  • An allowable allowable number of starts / stops is input as the reference value for the number of starts / stops.
  • the allowable number of starts / stops is, for example, 1000 times.
  • an allowable allowable operation integration time (specifically, the allowable total operation integration time in the low speed and high speed rotation range). Is entered.
  • the allowable total operation integration time is, for example, 1000 hours.
  • Weighted value storage area 115d includes the accumulated operation time, the number of start / stop times, and the rotation speed distribution (specifically, the low speed) of the first to fifth inverter pumps 61 to 65. And a total weighted accumulated operation time in the high-speed rotation range) are stored.
  • Each weight value is a value obtained by simulation, desktop calculation, or the like, and is input in advance by a service person or the like via the input unit 113.
  • the weighting value is obtained by the following method.
  • the grabbing unit 116a includes the various devices described above (first to ninth air conditioners 21 to 29, first to eighth refrigerators 51 to 58, first to fifth inverter pumps). 61-65 etc.) and the measured values of various sensors.
  • the grasping unit 116a not only simply grasps the operation status of each device and the measurement values of various sensors (for example, simply grasps the state value measured by the sensor), but based on the operation status of each device, It is grasped by calculating the number of starts and stops and the accumulated operation time.
  • the grasping unit 116a determines the rotation speed distribution during operation of the first to fifth inverter pumps 61 to 65 from the rotation speed during operation of the first to fifth inverter pumps 61 to 65, that is, at a predetermined rotation speed. Knowing the accumulated operation time. And the grasping
  • the operation time in the low speed rotation region of the inverter pumps 61 to 65 and the operation time in the high speed rotation region of the first to fifth inverter pumps 61 to 65 are calculated.
  • the calculation unit 116b refers to the rotation speed distribution rule stored in the rotation speed distribution rule storage area 115b from the rotation speed distribution during operation of the first to fifth inverter pumps 61 to 65, and The operation integration time in the low speed rotation region and the operation integration time in the high speed rotation region are calculated.
  • the total operation integrated time obtained by summing the operation integrated time in the low speed rotation region and the operation integration time in the high speed rotation region is the rotation speed that is a parameter for deriving the degree of deterioration of each inverter pump 61-65. Since it is used as the distribution, the calculation unit 116b calculates the total operation integration time by adding the operation integration time in the low-speed rotation region and the operation integration time in the high-speed rotation region. Although not described above, the operation integration time in the low-speed rotation region, the operation integration time in the high-speed rotation region, and the total operation integration time calculated by the calculation unit 116b are also stored in the operation information storage region 115a. .
  • the degradation degree deriving unit 116c is a first to second unit that is grasped by the grasping unit 116a and calculated by the calculating unit 116b every predetermined time (for example, one hour). 5. Deterioration degree of first to fifth inverter pumps 61 to 65 based on the accumulated operation time of 5 inverter pumps 61 to 65, the number of start / stop times, and the rotation speed distribution (total accumulated operation time in the low speed and high speed rotation regions). Is derived.
  • the deterioration degree deriving unit 116c first determines the accumulated operation time, the number of start / stop times of the first to fifth inverter pumps 61 to 65 based on the reference value stored in the reference value storage area 115c. Generalize the total accumulated operation time in the low-speed rotation range and the high-speed rotation range. Specifically, the deterioration degree deriving unit 116c divides the accumulated operation time of the inverter pump, the number of start / stop times, and the total accumulated operation time by the respective reference values based on the rules stored in a predetermined storage area. By doing so, it is generalized.
  • FIG. 5 is a table showing an example of the accumulated operation time and generalized values of the first to fifth inverter pumps 61 to 65.
  • FIG. 6 is a table showing an example of the number of start / stop times of the first to fifth inverter pumps 61 to 65 and generalized values.
  • FIG. 7 is a table showing an example of the total accumulated operation time and generalized values in the low speed and high speed rotation regions of the first to fifth inverter pumps 61 to 65.
  • the accumulated operation time of the first inverter pump 61 grasped by the grasping unit 116a is 400 hours and the reference value for the accumulated operation time is 1500 hours
  • 400 hours is 1500 hours.
  • the generalization regarding the operation integration time of the 1st inverter pump 61 is performed by dividing by. As a result, a generalized value of 0.26 is derived.
  • the second to fifth inverter pumps 62 to 65 are generalized to derive generalized values of 0.40, 0.66, 0.80, and 0.86 (here, These are designated as parameter I).
  • the 100 hours is 1000 hours.
  • the generalization of the total operation integration time in the low speed and high speed rotation regions of the first inverter pump 61 is performed. As a result, a generalized value of 0.10 is derived.
  • the second to fifth inverter pumps 62 to 65 are generalized to derive generalized values 0.05, 0.05, 0.20, and 0.30 (here, These are designated as parameter III).
  • the deterioration degree deriving unit 116c generalizes the operation integration time, the number of start / stop operations, and the total operation integration time of the inverter pumps 61 to 65, and then generalizes each inverter pump 61 to 65.
  • Degree of deterioration of each of the inverter pumps 61 to 65 is derived on the basis of the measured value and the weighted values corresponding to the accumulated operation time, the number of start / stop times and the total accumulated operation time stored in the weighted value storage area 115d. To do.
  • the weighting value corresponding to the driving cumulative time is 3.0
  • the weighting value corresponding to the number of start / stops is 2.0
  • the weighting value corresponding to the total driving cumulative time is 1.0
  • the degree of deterioration of the inverter pump is derived from parameter I ⁇ 3.0 + parameter II ⁇ 2.0 + parameter III ⁇ 1.0. It should be noted that the equation for deriving the deterioration degree is stored in a predetermined storage area.
  • the deterioration degrees are 2.65, 3.03, 4.2, and 3.28 in order.
  • the deterioration degree deriving unit 116c stores the derived deterioration degrees of the inverter pumps 61 to 65 in the above-described pump information storage area 115e.
  • the determination unit 116d determines the inverter pump to be operated / stopped next time based on the latest deterioration levels of the inverter pumps 61 to 65 stored in the pump information storage area 115e. decide. Specifically, the inverter pump with the smallest deterioration degree stored in the pump information storage area 115e is determined as the inverter pump to be operated next time. Also, the inverter pump 61 to 65 stored in the pump information storage area 115e having the highest degree of deterioration is determined as the inverter pump to be stopped next time.
  • the determination unit 116d determines not only the inverter pump to be operated / stopped next time, but also the priority order of the inverter pump to be operated / stopped next time based on the deterioration degree of each of the inverter pumps 61 to 65. Specifically, the priority order is determined as the inverter pump to be operated next time in order from the smallest deterioration degree of each of the inverter pumps 61 to 65 stored in the pump information storage area 115e. Further, the priority order is determined as the inverter pump to be stopped next time, in descending order of the deterioration degree of each of the inverter pumps 61 to 65 stored in the pump information storage area 115e.
  • the deterioration levels of the first to fifth inverter pumps 61 to 65 are 2.68, 2.65, 3.03, 4.2, and 3.28, respectively.
  • the priority order of the inverter pumps to be operated next time is the second, first, third, fifth, and fourth inverter pumps in order.
  • the priority order of the inverter pump to be stopped next time is the fourth, fifth, third, first, and second inverter pumps.
  • FIGS. 8 and 9 are flowcharts showing the flow of control processing of the inverter pumps 61 to 65 in the air conditioning system controller 110.
  • FIG. 8 in step S ⁇ b> 101, a service person or the like inputs the above-described reference value and weighting value via the input unit 113 in advance. Accordingly, the reference value and the weight value are stored in the reference value storage area 115c and the weight value storage area 115d, respectively.
  • step S102 the inverter pump number N is set to an initial value of zero.
  • the number 1 inverter pump is the first inverter pump 61
  • number 2 is the second inverter pump 62
  • number 3 is the third inverter pump 63
  • number 4 is the fourth inverter pump 64
  • Reference numeral 5 denotes a fifth inverter pump 65.
  • the deterioration degree deriving unit 116c derives the deterioration degrees of the first to fifth inverter pumps 61 to 65 as described above.
  • step S104 the determination unit 116d determines the degree of deterioration of the inverter pumps 61 to 65 derived by the deterioration degree deriving unit 116c (the degree of deterioration of the inverter pumps 61 to 65 stored in the pump information storage area 115e most recently). ) To determine the inverter pump to be operated / stopped next time.
  • step S105 the pump control unit 116e determines whether or not the inverter pumps 61 to 65 need to be increased. Specifically, the pump control unit 116e determines whether or not the inverter pumps 61 to 65 need to be increased based on the heat load of the air conditioning target space to be processed by the first to ninth air conditioners 21 to 29. Is judged. If it is determined that the number of steps needs to be increased, the process proceeds to step S106.
  • step S106 the pump control unit 116e determines whether or not the number N inverter pump is stopped.
  • step S107 the pump control part 116e determines whether the inverter pump of the number of N is determined as the inverter pump to operate next time. More specifically, the pump control unit 116e determines the priority order of the inverter pumps to be operated / stopped next time determined by the determination unit 116d (for each of the inverter pumps 61 to 65 most recently stored in the pump information storage region 115e). Based on the priority of operation / stop), it is determined whether or not the N-number inverter pump is determined as the inverter pump to be operated next time.
  • step S106 when it is determined in step S106 that the inverter pump of number N is not stopped, the pump control unit 116e substitutes N + 1 for N in step S109.
  • step S110 the pump control unit 116e determines whether N is 5 or less.
  • the number 5 is appropriately changed according to the number of inverter pumps. May be. If it is determined in step S110 that N ⁇ 5, the process returns to step S106.
  • the pump control unit 116e determines whether or not the inverter pumps 61 to 65 need to be stepped down based on the heat load of the air-conditioning target space to be processed by the first to ninth air conditioners 21 to 29. Is judged. If it is determined that step reduction is necessary, the process proceeds to step S112. On the other hand, if it is determined that there is no need for step reduction, the process returns to step S102 in FIG.
  • step S112 the pump control unit 116e determines whether or not the number N inverter pump is operating.
  • the pump control part 116e determines whether the inverter pump of the number of N is determined as the inverter pump which stops next time. More specifically, the pump control unit 116e determines the priority order of the inverter pumps to be operated / stopped next time determined by the determination unit 116d (for each of the inverter pumps 61 to 65 most recently stored in the pump information storage region 115e). Based on (priority of operation / stop), it is determined whether the inverter pump with the number N is determined as the inverter pump to be stopped next time.
  • step S112 if it is determined in step S112 that the inverter pump of number N is not operating, the pump control unit 116e substitutes N + 1 for N in step S115. In step S116, the pump control unit 116e determines whether N is 5 or less. If it is determined in step S116 that N ⁇ 5, the process returns to step S112.
  • the grasping unit 116a of the air conditioning system controller 110 grasps not only the accumulated operation time of each of the inverter pumps 61 to 65 but also the number of start / stop times and the rotation speed distribution during operation. Based on these, the deterioration degree deriving unit 116c derives the deterioration degree of each of the inverter pumps 61 to 65, and based on the deterioration degree, the determining unit 116d determines the inverter pump to be operated / stopped next time. ing.
  • the number of start / stop times and the parameter of the rotational speed distribution during operation are grasped, thereby making the actual inverter pump 61 more actual.
  • the number of inverter pumps can be controlled according to the operating conditions of ⁇ 65. Therefore, in the present embodiment, the deterioration levels of the plurality of inverter pumps 61 to 65 can be leveled.
  • the calculation unit 116b of the air conditioning system controller 110 calculates the accumulated operation time in the low-speed rotation region of each inverter pump 61-65 and the high-speed rotation from the rotation speed distribution during operation of each inverter pump 61-65.
  • the operation integration time in the area is calculated.
  • the total operation integration time of these totals is also calculated.
  • the deterioration degree deriving unit 116c determines the deterioration of each inverter pump 61 to 65 based on the accumulated operation time of each inverter pump 61 to 65, the number of start / stop times, and the total operation accumulated time in the low speed and high speed rotation regions. Derived degrees.
  • the operation in the high-speed rotation region is likely to increase the influence of the heat generation on the grease, and in the low-speed rotation region, the vibration is likely to increase, which is likely to lead to the failure of the device. That is, when the inverter pump is operated in the low speed and high speed rotation regions, the influence on the degree of deterioration is large. Therefore, as in this embodiment, the operation integrated time and the total operation integrated time in the low speed and high speed rotation regions are calculated, and this is used as a parameter for deriving the degree of deterioration of the inverter pumps 61 to 65. The degree of deterioration of each of the inverter pumps 61 to 65 can be derived in accordance with actual operation.
  • the storage unit 115 stores the accumulated operation time of the inverter pumps 61 to 65, the number of start / stop times, and the weighted values corresponding to the accumulated operation time and the total accumulated operation time in the low speed and high speed rotation regions. Are stored in the weight value storage area 115d.
  • the above weight values are derived in advance by simulation or the like, and the derived weight values are input to the air conditioning system controller 110 via the input unit 113.
  • the control unit 116 of the air conditioning system controller 110 further functions as an updating unit that updates the weighting value by learning.
  • the distribution of the rotational speed that easily affects the inverter pump is referred to as a parameter. It is possible to derive the degree of deterioration of each inverter pump 61 to 65 in accordance with the actual operation state of the inverter pumps 61 to 65, compared to the conventional case. In particular, referring to the operation integration time and the total operation integration time in the low and high speed rotation regions obtained from the rotation speed distribution during operation, as described above, the actual operation of each inverter pump 61 to 65 can be further improved. The degree of deterioration of each inverter pump 61 to 65 can be derived in accordance with the situation. (5-2) Modification B
  • the structure of the air-conditioning system controller 110 can be considered besides the said embodiment.
  • the deterioration degree deriving unit of the air conditioning system controller (basic operation is the same as the deterioration degree deriving unit 116c of the above embodiment), when deriving the deterioration degree of each inverter pump, An increase in the degree of deterioration may be derived.
  • the predetermined period is a period from the time of installation of the inverter pump (at the time of replacement) to the time of replacement, for example, 2 years.
  • the determination unit of the air conditioning system controller (basic operation is the same as that of the determination unit 116d of the above embodiment) is operated / stopped next time based on the increase in the degree of deterioration of each inverter pump in a predetermined period.
  • An inverter pump may be determined.
  • this specific example will be described with reference to FIG. In this modification, the number of inverter pumps is six for convenience of explanation.
  • FIG. 10 is a table showing the degree of deterioration of each inverter pump immediately after replacement with new inverter pumps (fourth to sixth inverter pumps) in the building. That is, the fourth to sixth inverter pumps are inverter pumps scheduled to be replaced in two years, and the first to third inverter pumps are scheduled to be replaced one year after being replaced one year ago. It will be an inverter pump.
  • the deterioration degree deriving unit derives an increase in the deterioration degree of each inverter pump during a predetermined period. Specifically, the deterioration degree deriving unit derives the increment from that time point based on the deterioration degree of each inverter pump when the fourth to sixth inverter pumps are replaced.
  • the increase is derived based on the degree of deterioration of each inverter pump at the time of replacement of the fourth to sixth inverter pumps until the replacement of the first to third inverter pumps. Therefore, when it is time to replace the first to third inverter pumps, the deterioration degree deriving unit derives the increment from that time point based on the deterioration degree of each inverter pump at the time of replacement of the first to third inverter pumps. Will do.
  • the determining unit determines the inverter pump to be operated / stopped next time based on the increase.
  • the air conditioning system controller 110 controls the first to eighth refrigerators 51 to 58 and the first to ninth air conditioners 21 to 29. However, these are controlled by another control device. Also good. For example, the first to eighth refrigerators 51 to 58 and the first to fifth inverter pumps 61 to 65 are controlled by the air conditioning system controller 110, and the first to ninth air conditioners 21 to 29 are separately air-conditioned. A machine controller (not shown) may be controlled.
  • the present invention can be applied in various ways to a control device that controls an inverter-driven inverter pump disposed between a refrigerator as a heat source device and an air conditioner.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

よりポンプの劣化度の平準化を行うことができる制御装置を提供する。冷凍機と空調機との間に配置される複数のインバータ駆動式のインバータポンプを制御する空調システムコントローラ(110)であって、インバータポンプの運転積算時間と、インバータポンプの運転中の回転数分布とを把握する把握部(116a)と、インバータポンプの運転積算時間とインバータポンプの運転中の回転数分布とに基づいて、インバータポンプの劣化度を導出する劣化度導出部(116c)と、インバータポンプの劣化度に基づいて、次回に運転/停止するインバータポンプを決定する決定部(116d)とを備える。

Description

制御装置
 本発明は、制御装置に関する。
 従来、所定のパラメータをポンプの劣化因子として参照することによって、複数のポンプの台数制御を行う制御装置が存在する。例えば、特許文献1(特開2009-133253号公報)では、予め各ポンプの運転時間を設定しておき、ポンプの累積運転時間が、設定された運転時間に達するか否かによって、複数のポンプの稼動/停止が決定されている。そして、これにより、各ポンプの累積運転時間が均一化されている。
 特許文献1に開示の制御では、ポンプの累積運転時間をポンプの劣化因子として参照しているが、ポンプの劣化度は、ポンプの累積運転時間に限られないため、より実際の運転状況に即して把握する必要があると考えられる。
 そこで、本発明の課題は、よりポンプの劣化度の平準化を行うことができる制御装置を提供することにある。
 本発明の第1観点に係る制御装置は、熱源機器と空調機との間に配置される複数のインバータ駆動式のポンプを制御する制御装置であって、把握部と、劣化度導出部と、決定部とを備える。把握部は、ポンプの運転積算時間と、ポンプの運転中の回転数分布と、を把握する。劣化度導出部は、ポンプの運転積算時間とポンプの運転中の回転数分布とに基づいて、ポンプの劣化度を導出する。決定部は、ポンプの劣化度に基づいて、次回に運転/停止するポンプを決定する。
 従来、ポンプの劣化度を算出するのに、運転積算時間がパラメータとして用いられているが、ポンプの劣化度への影響は運転積算時間のみに限られない。また、ポンプの運転回転数によってはポンプに与える影響が大きいと考えられる。
 そこで、本発明では、運転積算時間だけでなくポンプの運転中の回転数分布も含めて、複数のポンプの劣化度を導出し、導出したポンプの劣化度に基づいて、複数のポンプのうち次回に運転/停止するポンプを決定している。よって、よりポンプの実際の運転状況に即して、複数のポンプの運転制御を行うことができる。従って、より複数のポンプの劣化度の平準化を行うことができる。
 本発明の第2観点に係る制御装置は、本発明の第1観点に係る制御装置であって、算出部をさらに備える。算出部は、ポンプの運転中の回転数分布に基づいて、ポンプの低速回転域における運転時間と、ポンプの高速回転域における運転時間とを算出する。そして、劣化度導出部は、ポンプの運転積算時間と、ポンプの低速回転域における運転時間及び高速回転域における運転時間とに基づいて、ポンプの劣化度を導出する。
 ここで、高速回転域での運転は、発熱によるグリース寿命への影響が大きくなると考えられ、低速回転域では、振動が多くなりやすいので故障につながり易いと考えられる。すなわち、低速及び高速回転域でのポンプの運転は、劣化度への影響が大きいと考えられる。
 そこで、本発明では、高速回転域及び低速回転域におけるポンプの運転時間をポンプの劣化度を導出するパラメータとして用いることで、より実際の運転に即して、ポンプの劣化度を導出できている。尚、ここでの高速回転域及び低速回転域におけるポンプの運転時間には、高速回転域における運転時間と低速回転域における運転時間との合計の運転時間も含まれるものとする。
 本発明の第3観点に係る制御装置は、本発明の第2観点に係る制御装置であって、把握部は、ポンプの発停回数をさらに把握し、劣化度導出部は、ポンプの発停回数をさらに加味して、ポンプの劣化度を導出する。
 本発明では、ポンプの劣化度を導出するパラメータとしてさらにポンプの発停回数も参照することで、より実際の運転に即してポンプの劣化度を導出できる。
 本発明の第4観点に係る制御装置は、本発明の第3観点に係る制御装置であって、記憶部をさらに備える。記憶部は、ポンプの運転積算時間と、ポンプの低速回転域における運転時間及びポンプの高速回転域における運転時間と、ポンプの発停回数と、のそれぞれに対応する重み付け値、を記憶する。そして、劣化度導出部は、ポンプの運転積算時間と、ポンプの低速回転域における運転時間及びポンプの高速回転域における運転時間と、ポンプの発停回数とのそれぞれに対応する重み付け値をさらに加味して、ポンプの劣化度を導出する。
 ここで、運転積算時間、運転回転数の分布(低速回転域での運転及び高速回転域での運転)及び発停回数のそれぞれがポンプに与える影響は一律ではないと考えられる。
 そこで、本発明では、これらの各々のパラメータの重み付け値を、予め記憶部に記憶している。よって、より実際の運転に即した劣化度を決定できる。
 本発明の第5観点に係る制御装置は、本発明の第4観点に係る制御装置であって、劣化度導出部は、所定期間におけるポンプの劣化度の増加分をさらに導出し、決定部は、所定期間におけるポンプの劣化度の増加分に基づいて、次回に運転/停止するポンプを決定する。
 ここで、例えば、所定期間とは、ポンプの設置時(入れ替え時)からポンプの交換を予定しているまでの期間である。
 例えば、複数のポンプのうち半数を数年毎で交換するような場合、本発明では、所定期間におけるポンプの劣化度の増加分に基づいて次回に運転/停止するポンプを決定するので、入れ替えされたポンプばかり稼動されるといった状況を回避できる。
 本発明の第1観点に係る制御装置では、よりポンプの劣化度の平準化を行うことができる。
 本発明の第2観点に係る制御装置では、より実際の運転に即してポンプの劣化度を導出できる。
 本発明の第3観点に係る制御装置では、より実際の運転に即してポンプの劣化度を導出できる。
 本発明の第4観点に係る制御装置では、より実際の運転に即した劣化度を決定できる。
 本発明の第5観点に係る制御装置では、例えば、複数のポンプのうち半数を数年毎で交換するような場合に、入れ替えされたポンプばかり稼動される状況を回避できる。
本発明の一実施形態に係る制御装置を備える空調システムの概略構成図。 空調システムコントローラの概略構成図。 インバータポンプの回転数分布の一例を示すグラフ。 回転数振り分けルールの一例のテーブル。 第1~第5インバータポンプの運転積算時間と一般化した値とを示す表。 第1~第5インバータポンプの発停回数と一般化した値とを示す表。 第1~第5インバータポンプの低速及び高速回転域における合計運転積算時間と一般化した値とを示す表。 空調システムコントローラにおけるインバータポンプの制御処理の流れを示すフローチャート。 空調システムコントローラにおけるインバータポンプの制御処理の流れを示すフローチャート(ステップS111以降の処理)。 変形例Bに係る、所定のインバータポンプの入れ替え時点での各インバータポンプの劣化度を示す表。
 以下、本発明に係る制御装置110を備える空調システム100について、図面を参照しながら説明する。
 (1)空調システムの全体構成
 図1は、本発明の一実施形態に係る制御装置110を備える空調システム100の概略構成図である。空調システム100は、主として、ビル、工場、病院、ホテル等の比較的大きい建物内に設置されている。
 空調システム100は、図1に示すように、主として、熱源機器としての複数(本実施形態では、8台)の第1~第8冷凍機51~58と、建物内の各空調対象空間(例えば、室内空間)に設置される熱利用機器としての第1~第9空調機21~29と、第1~第8冷凍機51~58と第1~第9空調機21~29との間に配置される複数(本実施形態では、5台)の第1~第5インバータポンプ61~65と、これらの機器を制御する制御装置としての空調システムコントローラ110と、から構成されている。
 この空調システム100では、これらの機器の間を、水配管30を介して熱媒体である水が循環している。尚、水配管30においては、冷房時には冷水、暖房時には温水が、第1~第8冷凍機51~58から第1~第9空調機21~29へと流れており、水の冷熱又は温熱が運転中の第1~第9空調機21~29において空調に利用されるようになっている。
 以下、空調システム100を主に構成する各機器について説明し、その後に、空調システムコントローラ110の構成及び処理の流れについて説明する。
 (2)空調システムを構成する機器
  (2-1)第1~第8冷凍機
 第1~第8冷凍機51~58は、図1に示すように、互いに並列に接続されており、戻りヘッダー12から水を引き込み、送りヘッダー11へと水を送り出す。尚、戻りヘッダー12と送りヘッダー11とは、配管71によって接続されている。配管71は、戻りヘッダー12に接続される戻りヘッダー接続配管72と、戻りヘッダー接続配管72から複数に分岐され各々に第1~第5インバータポンプ61~65が配置される第1~第5ポンプ配管73a~73eと、各々に第1~第8冷凍機51~58が配置される第1~第8冷凍機配管74a~74hと、第1~第5ポンプ配管73a~73eと第1~第8冷凍機配管74a~74hとを接続する中間配管75と、第1~第8冷凍機配管74a~74hと送りヘッダー11とを接続する送りヘッダー接続配管76とから構成されている。
 第1~第8冷凍機51~58は、それぞれ、空冷式のヒートポンプチラーであり、圧縮機、空気側熱交換器、膨張弁、水側熱交換器が順次接続されて冷媒回路を構成している。冷媒回路の内部には、冷媒が充填されている。
  (2-2)第1~第5インバータポンプ
 第1~第5インバータポンプ61~65は、空調システムコントローラ110によってインバータ駆動されるインバータ駆動式のポンプである。第1~第5インバータポンプ61~65は、第1~第9空調機21~29から流出した熱媒体としての水を、水配管30及び戻りヘッダー12を介して第1~第8冷凍機51~58へと送ることで、水を循環させる。そして、これにより、第1~第8冷凍機51~58から送り出された水(冷水あるいは温水)は、送りヘッダー11を介して水配管30へと流れ、第1~第9空調機21~29から水配管30を介して戻ってきた水は、戻りヘッダー12に一旦流入し、第1~第8冷凍機51~58のそれぞれに吸い込まれるようになっている。
  (2-3)第1~第9空調機
 第1~第9空調機21~29は、それぞれ、熱源機器としての第1~第8冷凍機51~58が生成する冷水の冷熱あるいは温水の温熱を使って、空調対象空間の熱負荷を処理する。すなわち、第1~第9空調機21~29は、第1~第8冷凍機51~58から流れてくる冷水あるいは温水を用いて、空調対象空間の空調(冷房や暖房)を行う。
 第1~第9空調機21~29は、それぞれ同一或いは異なる空調対象空間に設置されている。従って、第1~第9空調機21~29のそれぞれは、送りヘッダー11から延びる水配管30と、戻りヘッダー12につながる水配管30との間に、並列に配置されている。第1~第9空調機21~29は、送りヘッダー11側の水配管30から、引き込み配管21d~29dを介して水を取り入れ、戻し配管21e~29eによって戻りヘッダー12側の水配管30へと水を戻す。
 第1~第9空調機21~29の各ケーシングの内部には、空気が流通する空気通路が形成されている。空気通路の流入端には、吸い込みダクト(図示せず)の一端が接続され、空気通路の流出端には、給気ダクト(図示せず)の一端が接続されている。吸い込みダクト及び給気ダクトの他端は、それぞれ空調対象空間に接続されている。
 第1~第9空調機21~29の各ケーシングの内部には、送風ファン21a、熱交換器21b、流量調整弁21c等が配備されている。熱交換器21bは、水と空気との間で熱交換を行わせて、空気を冷却または加熱させる。具体的には、熱交換器21bは、複数の伝熱フィンと、それらの伝熱フィンを貫通する伝熱管とを有する、フィンアンドチューブ式の熱交換器である。熱交換器21bの伝熱管には、第1~第8冷凍機51~58と第1~第9空調機21~29との間を循環する水が流れ、伝熱管及び伝熱フィンを介して水の熱が空気に供給されることで、空気が冷却または加熱されるようになっている。送風ファン21aは、インバータ制御によって回転数を段階的に変化させることが可能であって、加熱又は冷却された空気の送風量を調節できる。流量調整弁21cは、その空調機に流れる水の量を調節する役割を果たす。つまり、第1~第9空調機21~29それぞれに流れる水の流量は、各流量調整弁21cの開度によって決まる。
  (2-4)その他の構成
 送りヘッダー11と戻りヘッダー12とは、バイパス配管13によって結ばれている。このバイパス配管13には、バイパス流量調節弁13aが配置されている。バイパス流量調節弁13aは、第1~第9空調機21~29に流れる水の流量を調節する。第1~第9空調機21~29側で必要な水量が少なくなり、稼働中の第1~第5インバータポンプ61~65のインバータ周波数が下限値であっても、第1~第8冷凍機51~58を流れる水の流量に対し第1~第9空調機21~29側で必要な水量が多い場合には、送りヘッダー11の送水圧力が上昇してしまう。このようなときに、バイパス流量調節弁13aの開度を可変させ、バイパス配管13を通って送りヘッダー11から戻りヘッダー12に直接戻る水の流量を調節することで、第1~第9空調機21~29に流れる水の流量を抑制することができる。
 また、水配管30の送りヘッダー11の下流側には、水温を測る往水温度センサ11aが、水配管30の戻りヘッダー12の上流側には、水温を測る環水温度センサ12a及び水量を測る水量センサ15が、それぞれ設けられている。
 (3)空調システムの動作
  (3-1)全体概略動作
 第1~第9空調機21~29のそれぞれでは、吸込ダクト(図示せず)によって空調対象空間から取り込まれた空気が、ケーシング内の空気通路を流れる。この空気は、各熱交換器21b等において第1~第8冷凍機51~58から流れてきた冷水/温水によって冷却/加熱される。その冷却/加熱された空気が給気ダクト(図示せず)を介して空調対象空間へ供給されることで、空調対象空間の冷房/暖房が行われる。
  (3-2)空調システムコントローラによるポンプ制御
 空調システムコントローラ110は、第1~第9空調機21~29の熱負荷(具体的には、第1~第9空調機21~29が処理すべき空調対象空間の熱負荷)に応じて、第1~第5インバータポンプ61~65の運転台数を可変させるポンプ台数制御を行う。具体的には、例えば、第1~第9空調機21~29の熱負荷が小さい場合には、1台のインバータポンプを運転し、第1~第9空調機21~29の熱負荷が大きい場合には、複数のインバータポンプを運転させる。
 ここで、複数のインバータポンプのうち同じポンプのみが稼動されてポンプの劣化度にばらつきが生じることを抑制するため、空調システムコントローラ110は、ポンプ台数制御を行う際、複数のインバータポンプ61~65の劣化度に基づいて、次回に運転/停止するポンプを決定している。これについては、以下で、空調システムコントローラ110の構成及び処理の流れの中で説明していく。
  (3-3)空調システムコントローラの構成
 図2は、空調システムコントローラ110の概略構成図である。空調システムコントローラ110は、図1に示すように、往水温度センサ11a、環水温度センサ12a、水量センサ15、第1~第9空調機21~29、第1~第8冷凍機51~58、第1~第5インバータポンプ61~65、バイバス流量調整弁13a等と接続されている。また、空調システムコントローラ110は、図2に示すように、主として、通信部111と、表示部112と、入力部113と、タイマー部114と、記憶部115と、制御部116とを有している。
   (3-3-1)通信部
 通信部111は、空調システムコントローラ110を各機器やセンサ等と通信可能にするためのネットワークインターフェースである。
   (3-3-2)表示部
 表示部112は、主として、ディスプレイから構成されている。表示部112には、第1~第9空調機21~29の運転状況等を示す画面が表示される。第1~第9空調機21~29の運転状況としては、運転/停止状態、運転モード(冷房モード/暖房モード等)等が挙げられる。その他、表示部112には、往水温度センサ11a及び環水温度センサ12aによって計測される水温の平均値や水の設定温度、さらには、水量センサ15によって計測される水量等が表示される。
   (3-3-3)入力部
 入力部113は、主として、操作ボタン及び上記ディスプレイを覆うタッチパネルから構成されている。管理者等が操作ボタンやタッチパネル上のボタンに触れることによって、当該ボタンに対応する制御処理が制御部116によって実行される。
   (3-3-4)タイマー部
 タイマー部114は、時刻、日、月、年、曜日、所定時刻を基準とした経過時間等の時間的要素を計測する。
   (3-3-5)記憶部
 記憶部115は、ハードディスク等から構成されており、運転情報記憶領域115aと、回転数振り分けルール記憶領域115bと、基準値記憶領域115cと、重み付け値記憶領域115dと、ポンプ情報記憶領域115eと、を有している。
    (3-3-5-1)運転情報記憶領域
 運転情報記憶領域115aには、後述する把握部116aによって把握された、第1~第9空調機21~29、第1~第8冷凍機51~58、第1~第5インバータポンプ61~65等の運転状況が記憶されている。第1~第9空調機21~29の運転状況としては、運転/停止状態、運転モード(冷房モード/暖房モード等)、送風ファン21aの風量、熱交換器21bを流れる水の温度や圧力、流量調整弁21cの開度、運転積算時間、発停回数等が挙げられる。尚、水の温度や圧力及び冷媒温度や冷媒圧力等は、これらを計測するセンサからの情報を、空調システムコントローラ110(具体的には、後述する把握部116a)が直接又は第1~第9空調機21~29の制御部(図示せず)を介して受け取っている。第1~第8冷凍機51~58の運転状況としては、圧縮機の回転数、膨張弁の開度、冷媒回路の所定箇所における冷媒温度や冷媒圧力、運転積算時間、発停回数、運転/停止状態等が挙げられる。また、第1~第5インバータポンプ61~65の運転状況としては、回転数分布、運転積算時間、発停回数、運転/停止状態等が挙げられる。その他、往水温度センサ11a及び環水温度センサ12aによって計測される水温や水の設定温度、水量センサ15によって計測される水量、バイパス流量調節弁13aの開度等も把握部116aによって把握されてこの運転情報記憶領域115aに格納されている。
 ここで、第1~第5インバータポンプ61~65の回転数分布とは、図3に示すように、所定の回転数と、その所定の回転数における運転時間(具体的には、運転積算時間)との関係を示すものである。尚、図3は、インバータポンプ61~65の回転数分布の一例を示すものである。図3における、低速回転域、中速回転域及び高速回転域については、この後の回転数振り分けルール記憶領域の箇所で説明する。
    (3-3-5-2)回転数振り分けルール記憶領域
 回転数振り分けルール記憶領域115bには、回転数振り分けルールのテーブルが記憶されている。回転数振り分けルールとは、例えば、図4に示すような、回転数を3段階の回転域に振り分けるためのルールである。仮に、回転数振り分けルール記憶領域115bに図4に示すような回転数振り分けルールが記憶されているとすると、インバータポンプの回転数Aがα以上β未満であれば、低速回転域に振り分けられ、β以上γ未満であれば、中速回転域に振り分けられ、γ以上Δ未満であれば、高速回転域に振り分けられる。
    (3-3-5-3)基準値記憶領域
 基準値記憶領域115cには、第1~第5インバータポンプ61~65の運転積算時間、発停回数及び回転数分布(具体的には、後述する低速及び高速回転域における合計運転積算時間(後述する))をそれぞれ一般化するための基準値が記憶されている。各基準値は、シミュレーション、机上計算等によって得られる値であり、予め、入力部113を介してサービスパーソン等によって入力される。具体的には、運転積算時間に関する基準値としては、許容できる許容運転積算時間が入力される。許容運転積算時間は、例えば、1500時間である。発停回数に関する基準値としては、許容できる許容発停回数が入力される。許容発停回数は、例えば、1000回である。回転数分布(具体的には、低速及び高速回転域における合計運転積算時間)に関する基準値としては、許容できる許容運転積算時間(具体的には、低速及び高速回転域における許容合計運転積算時間)が入力される。許容合計運転積算時間は、例えば、1000時間である。
    (3-3-5-4)重み付け値記憶領域
 重み付け値記憶領域115dには、第1~第5インバータポンプ61~65の運転積算時間、発停回数及び回転数分布(具体的には、低速及び高速回転域における合計運転積算時間)のそれぞれに対応する重み付け値を記憶している。各重み付け値は、シミュレーション、机上計算等によって得られる値であり、予め、入力部113を介してサービスパーソン等によって入力される。尚、重み付け値は、以下の方法によって得られる。まず、発停なしで運転を継続した場合の故障までの時間と、発停を伴いながら運転を継続した場合の故障までの時間とをシミュレーションすることによって、運転積算時間の重み付け値と発停回数の重み付け値との比率を導出する。次に、高速回転域又は低速回転域で運転を継続した場合の故障までの時間と、通常回転域(中速回転域)で運転を継続した場合の故障までの時間とをシミュレーションすることによって、運転積算時間の重み付け値と回転数分布(低速及び高速回転域における合計運転積算時間)の重み付け値との比率を導出する。そして、運転積算時間の重み付け値と発停回数の重み付け値との比率及び運転積算時間の重み付け値と回転数分布(低速及び高速回転域における合計運転積算時間)の重み付け値との比率から、3者の重み付け値を決定している。
    (3-3-5-5)ポンプ情報記憶領域
 ポンプ情報記憶領域115eには、後述する劣化度導出部116cによって導出された各インバータポンプ61~65の劣化度や、決定部116dによって決定された、次回に運転/停止するインバータポンプの優先順位が記憶されている。
   (3-3-6)制御部
 制御部116は、記憶部115に記憶されているプログラムを読み込むことにより、把握部116a、算出部116b、劣化度導出部116c、決定部116d、ポンプ制御部116e等として機能する。
    (3-3-6-1)把握部
 把握部116aは、上述した各種機器(第1~第9空調機21~29、第1~第8冷凍機51~58、第1~第5インバータポンプ61~65等)の運転状況や、各種のセンサの計測値等を把握する。把握部116aは、各機器の運転状況や各種のセンサの計測値を単に把握する(例えば、センサによって計測される状態値等を単に把握する)だけでなく、各機器の運転状況に基づいて、発停回数や運転積算時間も算出することによって把握している。
 また、把握部116aは、第1~第5インバータポンプ61~65の運転中の回転数から、第1~第5インバータポンプ61~65の運転中の回転数分布、すなわち、所定の回転数における運転積算時間を把握している。そして、把握部116aは、把握した各機器の運転状況等を、上述の運転情報記憶領域115aに格納する。
    (3-3-6-2)算出部
 算出部116bは、把握部116aによって把握された、第1~第5インバータポンプ61~65の運転中の回転数分布に基づいて、第1~第5インバータポンプ61~65の低速回転域における運転時間及び第1~第5インバータポンプ61~65の高速回転域における運転時間を算出する。具体的には、算出部116bは、第1~第5インバータポンプ61~65の運転中の回転数分布から、回転数振り分けルール記憶領域115bに記憶されている回転数振り分けルールを参照して、低速回転域における運転積算時間及び高速回転域における運転積算時間を算出する。
 ここで、本実施形態では、低速回転域における運転積算時間と高速回転域における運転積算時間とを合計した合計運転積算時間を、各インバータポンプ61~65の劣化度を導出するパラメータである回転数分布として用いることから、算出部116bは、低速回転域における運転積算時間と、高速回転域における運転積算時間とを合計して、さらに、合計運転積算時間を算出している。尚、上記では述べていないが、算出部116bによって算出された、低速回転域における運転積算時間及び高速回転域における運転積算時間や合計運転積算時間も、上述の運転情報記憶領域115aに格納される。
    (3-3-6-3)劣化度導出部
 劣化度導出部116cは、所定時間(例えば、1時間)毎に、把握部116aによって把握され且つ算出部116bによって算出された、第1~第5インバータポンプ61~65の運転積算時間と、発停回数と、回転数分布(低速及び高速回転域における合計運転積算時間)とに基づいて、第1~第5インバータポンプ61~65の劣化度を導出する。
 より具体的には、劣化度導出部116cは、まず、基準値記憶領域115cに記憶されている基準値に基づいて、第1~第5インバータポンプ61~65の運転積算時間、発停回数及び低速回転域と高速回転域とにおける合計運転積算時間、の一般化を行う。具体的には、劣化度導出部116cは、所定の記憶領域に記憶されているルールに基づいて、インバータポンプの運転積算時間、発停回数及び合計運転積算時間を、それぞれに関する基準値で除することによって、一般化を行っている。そして、一般化した値と、上述の重み付け値と、に基づいて、最終的に、各インバータポンプ61~65の劣化度を導出している。以下、一般化の処理と、最終的な劣化度の導出処理とについて説明する。
 <一般化の処理>
 以下、一般化に関して図5~図7を用いて具体例を説明する。尚、図5は、第1~第5インバータポンプ61~65の運転積算時間と一般化した値とを示す一例の表である。図6は、第1~第5インバータポンプ61~65の発停回数と一般化した値とを示す一例の表である。図7は、第1~第5インバータポンプ61~65の低速及び高速回転域における合計運転積算時間と一般化した値とを示す一例の表である。
 仮に、図5に示すように、把握部116aによって把握された第1インバータポンプ61の運転積算時間が400時間であって、運転積算時間に関する基準値が1500時間である場合、400時間を1500時間で除することによって、第1インバータポンプ61の運転積算時間に関する一般化を行う。この結果、一般化された値である0.26が導出されることになる。第2~第5インバータポンプ62~65も同様に、一般化を行うことによって、一般化された値である0.40、0.66、0.80、0.86が導出される(ここでは、これらをパラメータIとする)。次に、図6に示すように、把握部116aによって把握された第1インバータポンプ61の発停回数が900回であって、発停回数に関する基準値が1000回である場合、900回を1000回で除することによって、第1インバータポンプ61の発停回数に関する一般化を行う。この結果、一般化された値である0.90が導出される。そして、第2~第5インバータポンプ62~65も同様に、一般化を行うことによって、一般化された値である0.70、0.50、0.80、0.20が導出される(ここでは、これらをパラメータIIとする)。最後に、算出部116bによって算出された第1インバータポンプ61の低速及び高速回転域における合計運転積算時間が100時間であって、これに関する基準値が1000時間である場合、100時間を1000時間で除することによって、第1インバータポンプ61の低速及び高速回転域における合計運転積算時間に関する一般化を行う。この結果、一般化された値である0.10が導出される。第2~第5インバータポンプ62~65も同様に、一般化を行うことによって、一般化された値である0.05、0.05、0.20、0.30が導出される(ここでは、これらをパラメータIIIとする)。
 <劣化度の導出>
 劣化度導出部116cは、上述のように、インバータポンプ61~65の、運転積算時間、発停回数及び合計運転積算時間の一般化を行った後に、それぞれのインバータポンプ61~65の一般化された値と、重み付け値記憶領域115dに記憶されている、運転積算時間、発停回数及び合計運転積算時間にそれぞれ対応する重み付け値とに基づいて、それぞれのインバータポンプ61~65の劣化度を導出する。具体的には、例えば、運転積算時間に対応する重み付け値が3.0、発停回数に対応する重み付け値が2.0、合計運転積算時間に対応する重み付け値が1.0である場合、インバータポンプの劣化度は、パラメータI×3.0+パラメータII×2.0+パラメータIII×1.0によって導出される。尚、この劣化度の導出のための式は、所定の記憶領域に記憶されているものとする。
 よって、図5~図7の例では、第1インバータポンプ61の劣化度は、0.26×3.0+0.90×2.0+0.10×1.0=2.68となる。同様に、第2~第5インバータポンプ62~65についても計算すると、劣化度は、順に、2.65、3.03、4.2、3.28となる。
 そして、劣化度導出部116cは、導出した各インバータポンプ61~65の劣化度を、上述のポンプ情報記憶領域115eに格納する。
    (3-3-6-4)決定部
 決定部116dは、ポンプ情報記憶領域115eに記憶されている最新の各インバータポンプ61~65の劣化度に基づいて、次回に運転/停止するインバータポンプを決定する。具体的には、ポンプ情報記憶領域115eに記憶されている各インバータポンプ61~65の劣化度の最も小さいものを、次回に運転するインバータポンプとして決定している。また、ポンプ情報記憶領域115eに記憶されている各インバータポンプ61~65の劣化度の最も大きいものを、次回に停止するインバータポンプとして決定している。
 尚、決定部116dは、次回に運転/停止するインバータポンプだけではなく、各インバータポンプ61~65の劣化度に基づいて、次回に運転/停止するインバータポンプの優先順位も決定している。具体的には、ポンプ情報記憶領域115eに記憶されている各インバータポンプ61~65の劣化度の小さいものから順に、次回に運転するインバータポンプとして優先順位を決定している。また、ポンプ情報記憶領域115eに記憶されている各インバータポンプ61~65の劣化度の大きいものから順に、次回に停止するインバータポンプとして優先順位を決定している。
 尚、上述の例でいうと、第1~第5インバータポンプ61~65の劣化度は、それぞれ順に、2.68、2.65、3.03、4.2、3.28であるので、次回に運転するインバータポンプの優先順位は、順に、第2、第1、第3、第5、第4のインバータポンプとなる。また、次回に停止するインバータポンプの優先順位は、第4、第5、第3、第1、第2のインバータポンプとなる。
 そして、決定部116dは、決定した、各インバータポンプの運転/停止の優先順位を、上述のポンプ情報記憶領域115eに格納する。
    (3-3-6-5)ポンプ制御部
 ポンプ制御部116eは、各インバータポンプ61~65に対して運転/停止指令を送信したり、下記の制御処理の流れで説明する各種の判定等を行ったりする。
  (3-4)空調システムコントローラにおける制御処理の流れ
 図8及び図9は、空調システムコントローラ110におけるインバータポンプ61~65の制御処理の流れを示すフローチャートである。
 まず、図8に示すように、ステップS101では、サービスパーソン等が、予め、入力部113を介して、上述の基準値及び重み付け値を入力する。これにより、基準値及び重み付け値が、それぞれ、基準値記憶領域115c及び重み付け値記憶領域115dに記憶される。
 ステップS102では、インバータポンプの番号Nを初期値0に設定する。尚、番号が1のインバータポンプは、上述の第1インバータポンプ61であり、番号2は、第2インバータポンプ62、番号3は、第3インバータポンプ63、番号4は、第4インバータポンプ64、番号5は、第5インバータポンプ65である。
 ステップS103では、劣化度導出部116cが、上述のように、第1~第5インバータポンプ61~65の劣化度を導出する。そして、ステップS104で、決定部116dが、劣化度導出部116cが導出した各インバータポンプ61~65の劣化度(ポンプ情報記憶領域115eに最新に記憶されている各インバータポンプ61~65の劣化度)に基づいて、次回に運転/停止するインバータポンプを決定する。
 ステップS105では、ポンプ制御部116eが、インバータポンプ61~65の増段の必要があるか否かを判定する。具体的には、ポンプ制御部116eは、第1~第9空調機21~29が処理すべき空調対象空間の熱負荷に基づいて、インバータポンプ61~65の増段が必要であるか否かを判定している。増段の必要があると判定する場合は、ステップS106へ移行する。
 ステップS106では、ポンプ制御部116eが、番号Nのインバータポンプが停止しているか否かを判定する。停止していると判定する場合は、ステップS107において、ポンプ制御部116eは、そのNの番号のインバータポンプが、次回運転するインバータポンプとして決定されているか否かを判定する。より具体的には、ポンプ制御部116eは、決定部116dによって決定された次回に運転/停止するインバータポンプの優先順位(ポンプ情報記憶領域115eに最新に記憶されている各インバータポンプ61~65の運転/停止の優先順位)に基づいて、そのNの番号のインバータポンプが、次回運転するインバータポンプとして決定されているか否かを判定する。他方、ステップS106において、番号Nのインバータポンプが停止していないと判定する場合は、ステップS109において、ポンプ制御部116eは、NにN+1を代入する。そして、ステップS110において、ポンプ制御部116eは、Nが5以下であるか否かを判定する。ここで、本実施形態では、インバータポンプ61~65が5台であるためNが5以下であるか否かを判定しているが、この5という数字は、インバータポンプの台数に合わせて適宜変更されてもよい。そして、ステップS110において、N≦5であると判定する場合は、ステップS106に戻る。
 ステップS107において、ポンプ制御部116eが、Nの番号のインバータポンプが、次回運転するインバータポンプとして決定されていると判定する場合は、ステップS108に進んで、そのNの番号のインバータポンプを運転する。すなわち、そのNの番号のポンプに対して運転指令を送信する。そして、ステップS102に戻って、それ以降の処理を繰り返す。また、ステップS110において、N≦5以下でないと判定する場合も、ステップS102に戻る。
 ステップS106において、増段の必要がないと判定する場合は、図9のステップS111へ移行する。ステップS111では、ポンプ制御部116eが、減段の必要があるか否かを判定する。具体的には、ポンプ制御部116eは、第1~第9空調機21~29が処理すべき空調対象空間の熱負荷に基づいて、インバータポンプ61~65の減段が必要であるか否かを判定している。減段の必要があると判定する場合は、ステップS112へ移行する。他方、減段の必要がないと判定する場合は、図8のステップS102に戻る。
 ステップS112では、ポンプ制御部116eが、番号Nのインバータポンプが運転している否かを判定する。運転していると判定する場合は、ステップS113において、ポンプ制御部116eが、そのNの番号のインバータポンプが、次回停止するインバータポンプとして決定されているか否かを判定する。より具体的には、ポンプ制御部116eは、決定部116dによって決定された次回に運転/停止するインバータポンプの優先順位(ポンプ情報記憶領域115eに最新に記憶されている各インバータポンプ61~65の運転/停止の優先順位)に基づいて、そのNの番号のインバータポンプが、次回停止するインバータポンプとして決定されているか否かを判定する。他方、ステップS112において、番号Nのインバータポンプが運転していないと判定する場合は、ステップS115において、ポンプ制御部116eが、NにN+1を代入する。そして、ステップS116において、ポンプ制御部116eが、Nが5以下であるか否かを判定する。そして、ステップS116において、N≦5であると判定する場合は、ステップS112に戻る。
 (4)特徴
  (4-1)
 従来、所定のパラメータをポンプの劣化因子として参照することによって、複数のポンプの台数制御を行う制御装置が存在する。例えば、特許文献1(特開2009-133253号公報)では、予め各ポンプの運転時間を設定しておき、ポンプの累積運転時間が、設定された運転時間に達するか否かによって、複数のポンプの稼動/停止が決定されている。そして、これにより、各ポンプの累積運転時間が均一化されている。
 しかし、特許文献1に開示の制御では、ポンプの累積運転時間をポンプの劣化因子として参照しているが、ポンプの劣化度は、ポンプの累積運転時間に限られないため、より実際の運転状況に即して把握する必要があると考えられる。
 そこで、本実施形態では、空調システムコントローラ110の把握部116aは、各インバータポンプ61~65の運転積算時間だけでなく、発停回数や、運転中の回転数分布を把握している。そして、これらに基づいて、劣化度導出部116cが、各インバータポンプ61~65の劣化度を導出し、この劣化度に基づいて、決定部116dが、次回に運転/停止するインバータポンプを決定している。
 このように、本実施形態では、インバータポンプ61~65の劣化因子として、運転積算時間以外にも、発停回数や運転中の回転数分布のパラメータを把握することによって、より実際のインバータポンプ61~65の運転状況に即して各インバータポンプの台数制御を行うことができている。よって、本実施形態では、より複数のインバータポンプ61~65の劣化度の平準化を行うことができる。
  (4-2)
 さらに、本実施形態では、空調システムコントローラ110の算出部116bが、各インバータポンプ61~65の運転中の回転数分布から、各インバータポンプ61~65の低速回転域における運転積算時間と、高速回転域における運転積算時間とを算出している。また、これらの合計の合計運転積算時間も算出している。
 そして、劣化度導出部116cは、各インバータポンプ61~65の運転積算時間と、発停回数と、低速及び高速回転域における合計運転積算時間と、に基づいて、各インバータポンプ61~65の劣化度を導出している。
 ここで、高速回転域での運転は、発熱によるグリースへの影響が大きくなると考えられ、低速回転域では、振動が大きくなりやすいので機器の故障に繋がりやすいと考えられる。すなわち、インバータポンプは、低速及び高速回転域で運転すると、劣化度への影響が大きい。よって、本実施形態のように、低速及び高速回転域における運転積算時間や合計運転積算時間を算出し、これを、インバータポンプ61~65の劣化度を導出するためのパラメータとして用いることによって、より実際の運転に即して各インバータポンプ61~65の劣化度を導出できていることになる。
  (4-3)
 インバータポンプの運転積算時間、発停回数及び回転数分布(低速及び高速回転域における運転積算時間や合計運転積算時間)のそれぞれが、インバータポンプに与える影響は一律でないことを発明者は認識している。
 そこで、本実施形態では、インバータポンプ61~65の運転積算時間と、発停回数と、低速及び高速回転域における運転積算時間や合計運転積算時間とのそれぞれに対応する重み付け値、を記憶部115の重み付け値記憶領域115dに記憶している。具体的には、予め、シミュレーション等により上記の重み付け値を導出しておき、導出した重み付け値を、入力部113を介して空調システムコントローラ110に入力している。
 このように、本実施形態では、各パラメータ(運転積算時間と、発停回数と、低速及び高速回転域における運転積算時間や合計運転積算時間と)に対応する重み付け値を設定することで、より実際の運転に即して、各インバータポンプ61~65の劣化度を導出できる。尚、重み付け値は、インバータポンプ61~65の運転状況に鑑みて、適宜、適当な値へと変更されてもよい。この場合、空調システムコントローラ110の制御部116は、さらに、重み付け値を学習によって更新する更新部、として機能することになる。
 (5)変形例
 以上、本発明の実施形態について図面に基づいて説明したが、具体的な構成は、上記の実施形態に限られるものではなく、発明の要旨を逸脱しない範囲で変更可能である。
  (5-1)変形例A
 上記実施形態では、各インバータポンプ61~65の劣化度を導出するためのパラメータとして、各インバータポンプ61~65の運転積算時間と、発停回数と、運転中の回転数分布(これから得られる、低速及び高速回転域における運転積算時間や合計運転積算時間も含む)と、を参照しているが、これに限られるものではなく、各インバータポンプ61~65の運転積算時間と、運転中の回転数分布(これから得られる、低速及び高速回転域における運転積算時間や合計運転積算時間も含む)とを参照してもよい。
 この場合、上記実施形態よりは、実際の運転に即したインバータポンプの劣化度の導出、といった点では多少劣るが、インバータポンプに影響を与えやすい回転数の分布をパラメータとして参照しているので、従来よりも、実際のインバータポンプ61~65の運転状況に即した各インバータポンプ61~65の劣化度を導出できる。
 また、特に、運転中の回転数分布から得られる、低速及び高速回転域における運転積算時間や合計運転積算時間を参照すれば、上述したように、より、各インバータポンプ61~65の実際の運転状況に即して、各インバータポンプ61~65の劣化度を導出できる。
  (5-2)変形例B
 上記実施形態以外にも空調システムコントローラ110の構成は考えられる。
 例えば、空調システムコントローラの劣化度導出部(上記実施形態の劣化度導出部116cと基本的な動作は同じである)は、各インバータポンプの劣化度を導出する際、所定期間における各インバータポンプの劣化度の増加分を導出してもよい。ここで、所定期間とは、インバータポンプの設置時(入れ替え時)から交換時点までの期間であり、例えば、2年である。
 そして、空調システムコントローラの決定部(上記実施形態の決定部116dと基本的な動作は同じである)は、所定期間における各インバータポンプの劣化度の増加分に基づいて、次回に運転/停止するインバータポンプを決定してもよい。
 以下、この具体例について図10を用いて説明する。尚、本変形例では、説明の便宜のために、インバータポンプの台数を6台とする。
 例えば、ある建物では、耐用年数が2年である第1~第6インバータポンプを、1年周期で、半数(すなわち、3台)ずつ交換すると仮定する。図10は、その建物において新たなインバータポンプ(第4~第6インバータポンプ)に入れ替えた直後の各インバータポンプの劣化度を示す表である。すなわち、第4~第6インバータポンプは、2年後に交換が予定されているインバータポンプであり、第1~第3インバータポンプは、1年前に入れ替えられてから1年後に交換を予定されているインバータポンプということになる。
 そして、このような例の建物では、上記実施形態と同様に制御すると、劣化度の小さい新たに入れ替えられた第4~第6インバータポンプばかりが稼動されるといった状況が生じると考えられる。
 そこで、本変形例に係る空調システムコントローラでは、劣化度導出部が、所定期間における各インバータポンプの劣化度の増加分を導出している。具体的には、劣化度導出部は、第4~第6インバータポンプの入れ替え時点における各インバータポンプの劣化度を基準として、その時点からの増加分を導出している。尚、第4~第6インバータポンプの入れ替え時点での各インバータポンプの劣化度を基準として増加分が導出されるのは、第1~第3インバータポンプの交換時点まで続けられる。よって、第1~第3インバータポンプの交換時点になると、劣化度導出部は、第1~第3インバータポンプの入れ替え時点における各インバータポンプの劣化度を基準として、その時点からの増加分を導出することになる。そして、本変形例に係る空調システムコントローラでは、決定部は、上記増加分に基づいて、次回に運転/停止するインバータポンプを決定する。
 このように、本変形例では、入れ替えられたインバータポンプばかりが稼動されるといった状況を回避できる。よって、複数のインバータポンプの劣化度の平準化を保つことができる。
  (5-3)変形例C
 上記実施形態では、空調システムコントローラ110が、第1~第8冷凍機51~58及び第1~第9空調機21~29の制御行うと説明したが、これらは別の制御装置によって制御されてもよい。例えば、第1~第8冷凍機51~58や第1~第5インバータポンプ61~65は、上記の空調システムコントローラ110が制御し、第1~第9空調機21~29は、別途の空調機コントローラ(図示せず)が制御してもよい。
  (5-4)変形例D
 例えば、低速回転域における運転のほうが、高速回転域における運転よりもインバータポンプの劣化度への影響が大きいと考えられる場合、予め、低速回転域における運転積算時間と、高速回転域における運転積算時間と、に各々基準値や重み付け値を設定しておいてもよい。
 本発明は、熱源機器としての冷凍機と空調機との間に配置されるインバータ駆動式のインバータポンプを制御する制御装置に、種々適用できる。
 21~29 第1~第9空調機
 51~58 第1~第8冷凍機(熱源機器)
 61~65 第1~第5インバータポンプ(ポンプ)
 110   空調システムコントローラ(制御装置)
 115   記憶部
 116a  把握部
 116b  算出部
 116c  劣化度導出部
 116d  決定部
特開2009-133253号公報

Claims (5)

  1.  熱源機器(51~58)と空調機(21~29)との間に配置される複数のインバータ駆動式のポンプ(61~65)を制御する制御装置(110)であって、
     前記ポンプの運転積算時間と、前記ポンプの運転中の回転数分布と、を把握する把握部(116a)と、
     前記ポンプの運転積算時間と前記ポンプの運転中の回転数分布とに基づいて、前記ポンプの劣化度を導出する劣化度導出部(116c)と、
     前記ポンプの劣化度に基づいて、次回に運転/停止するポンプを決定する決定部(116d)と、
    を備える、制御装置(110)。
  2.  前記ポンプの運転中の回転数分布に基づいて、前記ポンプの低速回転域における運転時間と、前記ポンプの高速回転域における運転時間とを算出する算出部(116b)、をさらに備え、
     前記劣化度導出部は、前記ポンプの運転積算時間と、前記ポンプの低速回転域における運転時間及び高速回転域における運転時間とに基づいて、前記ポンプの劣化度を導出する、
    請求項1に記載の制御装置。
  3.  前記把握部は、前記ポンプの発停回数をさらに把握し、
     前記劣化度導出部は、前記ポンプの発停回数をさらに加味して、前記ポンプの劣化度を導出する、
    請求項2に記載の制御装置。
  4.  前記ポンプの運転積算時間と、前記ポンプの低速回転域における運転時間及び前記ポンプの高速回転域における運転時間と、前記ポンプの発停回数と、のそれぞれに対応する重み付け値、を記憶する記憶部(115)、をさらに備え、
     前記劣化度導出部は、前記ポンプの運転積算時間と、前記ポンプの低速回転域における運転時間及び前記ポンプの高速回転域における運転時間と、前記ポンプの発停回数とのそれぞれに対応する重み付け値をさらに加味して、前記ポンプの劣化度を導出する、
    請求項3に記載の制御装置。
  5.  前記劣化度導出部は、所定期間における前記ポンプの劣化度の増加分をさらに導出し、
     前記決定部は、所定期間における前記ポンプの劣化度の増加分に基づいて、次回に運転/停止するポンプを決定する、
    請求項4に記載の制御装置。
PCT/JP2013/062622 2012-09-26 2013-04-30 制御装置 WO2014050195A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US14/430,524 US9695830B2 (en) 2012-09-26 2013-04-30 Control device
EP13842421.3A EP2918934A4 (en) 2012-09-26 2013-04-30 CONTROL DEVICE
CN201380049591.5A CN104662377B (zh) 2012-09-26 2013-04-30 控制装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012212568A JP5464247B1 (ja) 2012-09-26 2012-09-26 制御装置
JP2012-212568 2012-09-26

Publications (1)

Publication Number Publication Date
WO2014050195A1 true WO2014050195A1 (ja) 2014-04-03

Family

ID=50387615

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/062622 WO2014050195A1 (ja) 2012-09-26 2013-04-30 制御装置

Country Status (5)

Country Link
US (1) US9695830B2 (ja)
EP (1) EP2918934A4 (ja)
JP (1) JP5464247B1 (ja)
CN (1) CN104662377B (ja)
WO (1) WO2014050195A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016076068A1 (ja) * 2014-11-12 2016-05-19 三菱重工業株式会社 熱源システム及びその制御装置並びに制御方法
WO2018163882A1 (ja) * 2017-03-06 2018-09-13 ダイキン工業株式会社 空調システム
WO2020039467A1 (ja) * 2018-08-20 2020-02-27 東芝三菱電機産業システム株式会社 デスケーリング装置用ポンプシステムの制御装置
US11933289B2 (en) 2018-12-28 2024-03-19 Kabushiki Kaisha Yaskawa Denki Selective fluid pumping system

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101816226B1 (ko) * 2016-04-29 2018-01-08 엘에스산전 주식회사 복수 인버터 제어장치 및 이를 적용한 인버터 시스템
US10533562B2 (en) * 2017-04-03 2020-01-14 Honeywell International Inc. Pump selection using dynamic priority numbers
WO2020054480A1 (ja) * 2018-09-12 2020-03-19 住友精密工業株式会社 定圧液供給装置
JP7197601B2 (ja) * 2018-09-26 2022-12-27 東芝キヤリア株式会社 熱源システムの管理装置、管理システム、および熱源システムの管理情報の表示方法
JP7261579B2 (ja) * 2018-12-20 2023-04-20 株式会社日立産機システム 流体機械システム、及びその制御方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000045982A (ja) * 1998-07-29 2000-02-15 Teral Kyokuto Inc 可変速給水装置のポンプ運転時間均一化制御方法及び装置
JP2001263255A (ja) * 2000-03-15 2001-09-26 Sayama Seisakusho:Kk ポンプのローテーション運転制御方法および装置
JP2004116328A (ja) * 2002-09-25 2004-04-15 Boc Edwards Technologies Ltd 真空ポンプ
JP2006002594A (ja) * 2004-06-15 2006-01-05 Toyota Motor Corp 電動ポンプ制御装置
JP2009133253A (ja) 2007-11-30 2009-06-18 Mitsubishi Electric Corp ポンプ運転制御システム
JP2012154544A (ja) * 2011-01-25 2012-08-16 Yokogawa Electric Corp ポンプ運転台数制御装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6178393B1 (en) * 1995-08-23 2001-01-23 William A. Irvin Pump station control system and method
US5742500A (en) * 1995-08-23 1998-04-21 Irvin; William A. Pump station control system and method
JP3867521B2 (ja) * 2000-09-05 2007-01-10 トヨタ自動車株式会社 電動オイルポンプ制御装置
US6648606B2 (en) * 2002-01-17 2003-11-18 Itt Manufacturing Enterprises, Inc. Centrifugal pump performance degradation detection
KR101254367B1 (ko) * 2008-08-26 2013-04-12 엘지전자 주식회사 히트펌프 연동 온수 순환 시스템 및 제어 방법
JP5178841B2 (ja) * 2008-10-29 2013-04-10 三菱電機株式会社 空気調和装置
JP5460701B2 (ja) * 2009-05-08 2014-04-02 三菱電機株式会社 空気調和装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000045982A (ja) * 1998-07-29 2000-02-15 Teral Kyokuto Inc 可変速給水装置のポンプ運転時間均一化制御方法及び装置
JP2001263255A (ja) * 2000-03-15 2001-09-26 Sayama Seisakusho:Kk ポンプのローテーション運転制御方法および装置
JP2004116328A (ja) * 2002-09-25 2004-04-15 Boc Edwards Technologies Ltd 真空ポンプ
JP2006002594A (ja) * 2004-06-15 2006-01-05 Toyota Motor Corp 電動ポンプ制御装置
JP2009133253A (ja) 2007-11-30 2009-06-18 Mitsubishi Electric Corp ポンプ運転制御システム
JP2012154544A (ja) * 2011-01-25 2012-08-16 Yokogawa Electric Corp ポンプ運転台数制御装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2918934A4

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016076068A1 (ja) * 2014-11-12 2016-05-19 三菱重工業株式会社 熱源システム及びその制御装置並びに制御方法
JP2016095053A (ja) * 2014-11-12 2016-05-26 三菱重工業株式会社 熱源システム及びその制御装置並びに制御方法
CN107148541A (zh) * 2014-11-12 2017-09-08 三菱重工业株式会社 热源系统及其控制装置以及控制方法
US10197301B2 (en) 2014-11-12 2019-02-05 Mitsubishi Heavy Industries Thermal Systems, Ltd. Heat source system, and control device and control method therefor
CN107148541B (zh) * 2014-11-12 2019-12-17 三菱重工制冷空调系统株式会社 热源系统及其控制装置以及控制方法
WO2018163882A1 (ja) * 2017-03-06 2018-09-13 ダイキン工業株式会社 空調システム
JP2018146171A (ja) * 2017-03-06 2018-09-20 ダイキン工業株式会社 空調システム
WO2020039467A1 (ja) * 2018-08-20 2020-02-27 東芝三菱電機産業システム株式会社 デスケーリング装置用ポンプシステムの制御装置
JP6733827B1 (ja) * 2018-08-20 2020-08-05 東芝三菱電機産業システム株式会社 デスケーリング装置用ポンプシステムの制御装置
US11933289B2 (en) 2018-12-28 2024-03-19 Kabushiki Kaisha Yaskawa Denki Selective fluid pumping system

Also Published As

Publication number Publication date
CN104662377B (zh) 2016-05-18
US9695830B2 (en) 2017-07-04
US20150252814A1 (en) 2015-09-10
JP2014066454A (ja) 2014-04-17
CN104662377A (zh) 2015-05-27
EP2918934A1 (en) 2015-09-16
EP2918934A4 (en) 2016-07-13
JP5464247B1 (ja) 2014-04-09

Similar Documents

Publication Publication Date Title
JP5464247B1 (ja) 制御装置
US10295214B2 (en) Environmental setpoint for HVAC system control
CN107525217B (zh) 一种空调器控制方法、控制装置及空调器
JP5954538B2 (ja) 空気調和機のデマンド制御装置
CN107917510A (zh) 一种空调室外风机转速的控制方法及装置
CN106642521A (zh) 多联机空调系统的控制方法
JP5972018B2 (ja) 空気調和装置
JP7490831B2 (ja) 空調システムの制御装置、制御方法、制御プログラムおよび空調システム
JP6239424B2 (ja) Vav空調システムの制御方法
JP2018031537A (ja) 空調システムの制御装置、制御方法および制御プログラム
US20220228766A1 (en) Device management apparatus, heat source system, management apparatus, and device management system
JP6365649B2 (ja) 空気調和システム
CN110762784B (zh) 一种空调风机的控制方法、装置及计算机可读存储介质
JP2014126234A (ja) 熱負荷処理システム
CN111397144A (zh) 空调器的静音运行控制方法
JP6787726B2 (ja) 空調システムの制御装置、制御方法、制御プログラムおよび空調システム
CN113108445B (zh) 多联机空调系统的回油控制方法及装置
WO2021205983A1 (ja) 機器メンテナンス支援システム
JP7043573B2 (ja) 空調システムの制御装置、制御方法、制御プログラム、および空調システム
CN115325684B (zh) 一种多联机制冷控制方法、装置、多联机及可读存储介质
CN106594997A (zh) 供回水温差控制系统
WO2016024504A1 (ja) 負荷分配システム
JP4657654B2 (ja) スポット空調装置
JP7015105B2 (ja) 空調システムの制御装置、制御方法、制御プログラム及び空調システム
JP2006275398A (ja) 空調システムの変風量最適制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13842421

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14430524

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2013842421

Country of ref document: EP