WO2013046685A1 PCT/JP2012/006179 JP2012006179W WO2013046685A1 WO 2013046685 A1 WO2013046685 A1 WO 2013046685A1 JP 2012006179 W JP2012006179 W JP 2012006179W WO 2013046685 A1 WO2013046685 A1 WO 2013046685A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
generation device
power supply
amount
power generation
Prior art date
Application number
PCT/JP2012/006179
Other languages
English (en)
French (fr)
Inventor
裕章 加来
加藤 玄道
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Publication of WO2013046685A1 publication Critical patent/WO2013046685A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/46Accumulators structurally combined with charging apparatus
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • H02J7/0024Parallel/serial switching of connection of batteries to charge or load circuit
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/062Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for AC powered loads
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present invention relates to a power supply system and a power control method, and more particularly, to a power supply system and a power control method including a power generation device that is activated by power supply from a power storage device.
  • FIG. 4 is a block diagram of a conventional power supply system.
  • the conventional power supply system includes a system power supply 11 (commercial power supply), a fuel cell system 12, a load 13, a distribution board 14, a disconnect switch 15, and a self-sustained operation support device 16.
  • the system power supply 11 supplies AC power in a single-phase three-wire system or a three-phase three-wire system.
  • the fuel cell system 12 includes a fuel cell stack 21 that generates (generates) DC power, and a power conditioner 22 that converts DC power from the fuel cell stack 21 into AC power connected to the system power supply 11. .
  • the power conditioner 22 supplies the generated power converted from direct current power to alternating current power superimposed on the alternating current power from the system power supply 11 to the load 13 and allows the fuel cell system 12 to operate autonomously when the system power supply 11 fails. Then, power is supplied to the load 13.
  • the distribution board 14 is connected to the system power supply 11 via the disconnect switch 15 and connects the fuel cell system 12 and the load 13.
  • a disconnect switch 17 for disconnecting the fuel cell system 12 in the event of a power failure of the system power supply 11 is provided in the distribution board 14.
  • the autonomous driving support device 16 includes a connection point 31 for a distribution line between the fuel cell system 12 and the distribution board 14, a voltage control type inverter 32 having an output connected to the connection point 31, and an inverter 32.
  • the power storage device 33 that stores the DC power supplied to the power source, the load regulator 34 that is connected to the connection point 31 and consumes excess power of the AC power generated by the fuel cell system 12, and the connection point 31
  • a charging converter 35 that is connected and converts AC power taken from the connection point 31 into DC power and supplies the DC power to the power storage device 33 for charging, and an auxiliary device such as a solar power generation device or an engine power generation device And a power supply device 37.
  • the autonomous driving support device 16 converts AC power taken from the connection point 31 into DC power by the charging converter 35 and stores the DC power in the power storage device 33.
  • the disconnection switch 15 and the disconnection switch 17 are temporarily cut off. After that, when the fuel cell system 12 is restarted in the self-sustaining operation mode, the disconnection switch 15 is turned off. In this state, the disconnect switch 17 is turned on so that only AC power from the fuel cell system 12 can be supplied to the load 13.
  • the autonomous driving support device 16 supplies the DC power stored in the power storage device 33 to the fuel cell system 12 in order to start the fuel cell system 12 in a state where the system power supply 11 has failed. Note that when the power supplied from the power storage device 33 is insufficient, power is supplied from the auxiliary power supply device 37.
  • the power storage device when the power generation device is activated only by power supply from the power storage device, the power storage device is activated from the power storage device to the power generation device depending on the remaining amount of power stored in the power storage device. There is a case where power necessary for processing cannot be supplied.
  • the present invention has been made to solve such a problem, and provides a power supply system and a power control method capable of preventing an unnecessary stop during start-up of a power generation device due to insufficient power supply from a power storage device.
  • the purpose is to do.
  • an aspect of a power supply system includes a power storage device that supplies stored power to a power load, a power supply that is activated by the power supplied from the power storage device, and generates the generated power A power generation device that supplies power to the power load; and a determination device that determines whether or not a remaining amount of power stored in the power storage device is smaller than a startup power amount required to start the power generation device. And when the said determination apparatus determines with the electrical storage residual amount of the said electrical storage apparatus being smaller than the starting electric energy required in order to start the said electric power generation apparatus, starting of the said electric power generation apparatus is prohibited.
  • the power generation device when the power generation device is activated only by power supply from the power storage device, the power generation device is activated when it is determined that the remaining power storage amount of the power storage device is smaller than the amount of power required for the power generation device activation process. Is prohibited. Thereby, it is possible to prevent the power generation device from stopping during startup due to insufficient power supply from the power storage device.
  • the power supply system of the present invention it is possible to prevent an unnecessary stop during the start-up of the power generation device due to insufficient power supply from the power storage device.
  • FIG. 1 is a block diagram showing the configuration of the power supply system according to Embodiment 1 of the present invention.
  • FIG. 2A is a diagram for explaining the normal operation of the power supply system according to Embodiment 1 of the present invention.
  • FIG. 2B is a diagram for explaining an operation at the time of a power failure (before the start of power generation) of the power supply system according to Embodiment 1 of the present invention.
  • FIG. 2C is a diagram for describing an operation at the time of a power failure (after the start of power generation) of the power supply system according to Embodiment 1 of the present invention.
  • FIG. 2D is a diagram for explaining an operation at the time of power recovery of the power supply system according to Embodiment 1 of the present invention.
  • FIG. 3 is a block diagram showing the configuration of the power supply system according to Embodiment 2 of the present invention.
  • FIG. 4 is a block diagram showing a configuration of a conventional power supply system.
  • a power storage device that supplies stored power to a power load, a power generation device that is activated by the power supplied from the power storage device and supplies the generated power to the power load, and a power storage of the power storage device
  • a determination device that determines whether or not a remaining amount is smaller than a startup power amount required to start the power generation device, wherein the determination device starts up the power generation device with a remaining power storage amount of the power storage device Therefore, the power supply system prohibits the start-up of the power generation device when it is determined that the amount of start-up power is smaller than that required.
  • the power generation device when the power generation device is activated only by power supply from the power storage device, the power generation device is determined when it is determined that the remaining amount of power stored in the power storage device is smaller than the amount of power required for the power generation device activation process. Prohibit activation of. Thereby, the unnecessary stop during starting of the electric power generating apparatus by the power supply shortage from an electrical storage apparatus can be prevented.
  • the second invention includes a switch for connecting or disconnecting power supply from the power storage device to the power load in the first invention, and when the switch starts the power generation device, the power storage device It is an electric power supply system which cuts off electric power supply from an apparatus to the electric power load. Accordingly, it is possible to reliably supply the power of the power storage device to the power generation device, and it is possible to prevent an unnecessary stop during startup of the power generation device due to insufficient power supply from the power storage device.
  • the power storage device further includes a remaining power storage detection unit that detects a remaining power storage amount, and the determination device is detected by the remaining power storage detection unit. It is an electric power supply system which performs the said determination based on the said electrical storage remaining amount.
  • the remaining amount of electricity stored in the electricity storage device can be detected by the remaining amount of electricity detection unit, and the remaining amount of electricity stored in order to activate the power generation device based on the remaining amount of electricity stored detected by the remaining amount of electricity storage detection unit. It can be determined whether or not it is smaller than the required starting power.
  • the power storage device includes a plurality of storage batteries, and the determination device stores power of the plurality of storage batteries.
  • the power generation device is prohibited from starting.
  • the power generation device is activated when it is determined that the total remaining power of the plurality of storage batteries is smaller than the amount of power required for the power generation device activation process. Ban.
  • the remaining amount of electricity stored is calculated by calculating an amount of electric power for preventing overdischarge from an amount of electric power charged in the electric storage device.
  • the amount of power deducted is calculated.
  • a sixth invention relates to a power supply system comprising: a power storage device that supplies stored power to a power load; and a power generation device that is activated by the power supplied from the power storage device and supplies the generated power to the power load.
  • the power control method is a power control method for prohibiting activation of the power generation device when it is determined that the remaining amount of power stored in the power storage device is smaller than the amount of activation power required to activate the power generation device.
  • the power generation device is determined when it is determined that the remaining amount of power stored in the power storage device is smaller than the amount of power required for the power generation device activation process. Prohibit activation of. Thereby, the unnecessary stop during starting of the electric power generating apparatus by the power supply shortage from an electrical storage apparatus can be prevented.
  • FIG. 1 is a block diagram showing the configuration of the power supply system according to Embodiment 1 of the present invention.
  • the power supply system in the present embodiment includes a system power supply 101, a general power load 102, a self-supporting power load 103, a power storage device 104, a power generation device 105, and a first switch 115. And a distribution board 106 having a second switch 116, a third switch 107, and a determination device 108.
  • the power supply system in this embodiment can perform a self-sustained operation using the power storage device 104 and the power generation device 105 when power supply from the system power supply 101 is stopped due to a power failure or the like.
  • the system power supply 101 is a commercial power system that supplies AC power having a predetermined voltage and a predetermined frequency from an electric power company to consumers.
  • the system power supply 101 in the present embodiment is a single-phase three-wire or three-phase three-wire AC power supply, and supplies power to the general power load 102 and the like.
  • the general power load 102 is one or a plurality of load devices that consume power in the consumer, and is, for example, a device such as a television, an air conditioner, and a refrigerator connected to a general outlet (not shown).
  • the general power load 102 consumes AC power supplied from the system power supply 101, the power storage device 104, or the power generation device 105 when the system power supply 101 is normal (normal time).
  • the self-supporting power load 103 is a device connected to a self-supporting outlet (not shown), and consumes AC power supplied from the power storage device 104 or the power generation device 105 when the system power supply 101 is powered off.
  • the power storage device 104 includes a storage battery 109, an inverter 110, a charging converter 111, and a remaining power storage detection unit 112.
  • the power storage device 104 stores power and also loads the stored power via a distribution board 106 (general load). The power is supplied to the power load 102 and the independent power load 103).
  • the storage battery 109 is a battery having a function of accumulating (charging) electric power supplied from the system power supply 101 or the power generation device 105 and a function of discharging (discharging) the accumulated electric power.
  • the storage battery 109 is a secondary battery that can be repeatedly charged and discharged, and is, for example, a lithium ion battery or a lead storage battery.
  • the storage battery 109 outputs direct-current power at the time of discharge.
  • the inverter 110 converts the DC power output from the storage battery 109 into AC power, and supplies the converted AC power to the general power load 102 or the independent power load 103. Further, the inverter 110 generates AC power that serves as a reference for the frequency and phase of the AC power generated by the power generation device 105 when the system power supply 101 is interrupted.
  • the charging converter 111 converts AC power supplied from the system power supply 101 or the power generation device 105 into DC power, and charges the storage battery 109.
  • the remaining power storage detection unit 112 detects the amount of power remaining in the storage battery 109 (remaining power storage). That is, the remaining power storage detection unit 112 detects the remaining amount of DC power that can be discharged from the storage battery 109. Information on the remaining amount of electricity stored in the storage battery 109 detected by the remaining electricity storage detection unit 112 is output to the determination device 108.
  • the power generation device 105 includes a generator 113 and a power conditioner 114, and generates power and supplies the generated power to a power load (the general power load 102 and the independent power load 103) via the distribution board 106.
  • a fuel cell power generation device fuel cell system
  • the generator 113 generates (generates) DC power and supplies the generated DC power to the power conditioner 114.
  • the generator 113 is, for example, a fuel cell stack that generates DC power from a fuel gas mainly composed of hydrogen and oxygen.
  • the power conditioner 114 converts the DC power from the generator 113 into AC power and outputs it, detects a power failure on the system power supply 101 side, and disconnects the power generator 105 from the system power supply 101.
  • the power generation apparatus 105 configured as described above requires a predetermined power consumption (startup power) for a certain period of time when the generator 113 is started. That is, at the time of starting the power generation apparatus 105, a predetermined amount of startup power necessary for starting the power generation apparatus 105 is required. At this time, it is preferable that the power conditioner 114 supplies power to the microcomputer in the power conditioner 114 so that the operation command can be received. Therefore, as the amount of electromotive force necessary for starting the power generation device 105, the amount of start power necessary for starting the power generation device 105 is the amount of power necessary for starting the generator 113 and the power condition. It is preferable to set the amount of power combined with the amount of power supplied to the power supply 114.
  • the power generation apparatus 105 when the system power supply 101 is normal, the power generation apparatus 105 generates power based on the AC power from the system power supply 101, and supplies the generated power to the general power load 102 in a manner superimposed on the power from the system power supply 101. In this case, the power generation apparatus 105 performs power generation by synchronizing the frequency (phase) of the power generated by itself with the frequency (phase) of the AC power of the system power supply 101.
  • the power generation device 105 is activated by the power supplied from the power storage device 104 at the time of a power failure of the system power supply 101, and supplies the power generated by the independent operation to the independent power load 103.
  • the power generation device 105 is activated based on the determination result from the determination device 108. Specifically, when the determination device 108 determines that the remaining amount of power stored in the power storage device 104 (storage battery 109) is smaller than the starting power amount required to start the power generation device 105, the power generation device 105 is started. It is forbidden. On the other hand, when the determination device 108 determines that the remaining amount of power stored in the power storage device 104 (storage battery 109) is greater than or equal to the amount of startup power of the power generation device 105, the power generation device 105 is permitted to start.
  • the distribution board 106 includes a first switch 115 and a second switch 116, and is connected to the system power supply 101 via the third switch 107. Further, the distribution board 106 switches the power supply destination of the power storage device 104 and the power generation device 105 to the general power load 102 or the independent power load 103 according to the state of the system power supply 101.
  • the third switch 107 may be included in the distribution board 106.
  • the determination device 108 acquires the remaining power storage amount of the storage battery 109 detected by the remaining power storage detection unit 112 of the power storage device 104 and also acquires the amount of power (starting power amount) necessary to start the power generation device 105. . Then, the determination device 108 determines whether or not the remaining amount of power stored in the storage battery 109 is smaller than the starting power amount of the power generation device 105, and outputs the determined result to the power generation device 105.
  • FIGS. 2A to 2D are diagrams for explaining the operation of the power supply system according to Embodiment 1 of the present invention.
  • FIG. 2A is a normal time
  • FIG. 2B is a power failure (before power generation is started)
  • FIG. FIG. 2D shows the state at the time of power recovery.
  • connection state power can be supplied from the system power supply 101, the power storage device 104, or the power generation device 105 to the general power load 102. That is, the general power load 102 can receive power supply using the system power supply 101, the power storage device 104, and the power generation device 105. Moreover, by setting it as the said connection state, while being in the state which can supply electric power to the power generation apparatus 105 from the system power supply 101 or the electrical storage apparatus 104, the state which can supply electric power from the system power supply 101 or the power generation apparatus 105 to the electrical storage apparatus 104; Become.
  • the power generation apparatus 105 is activated by power supply from the system power supply 101 and generates power. After the power generation is started, the generated power is superimposed on the power from the system power supply 101 and supplied to the general power load 102. .
  • the power storage device 104 acquires information about the generated power of the power generation device 105 and information about the power consumption of the general power load 102 from the power generation device 105 and a measuring instrument (not shown).
  • the power storage device 104 supplies the surplus power to the storage battery 109 via the charging converter 111 when the generated power of the power generation device 105 is larger than the power consumption of the general power load 102 and surplus power is generated. Then, the storage battery 109 is charged. Thereby, reverse power flow can be prevented.
  • the power storage device 104 supplies the power stored via the inverter 110 to the general power load 102.
  • surplus power generated due to the relationship between the power generated by the power generation apparatus 105 and the power consumed by the general power load 102 is effectively utilized.
  • the power supply from the system power supply 101 is stopped, and each device detects a power outage.
  • the first switch 115, the second switch 116, and the third switch 107 are all disconnected.
  • the power supply path from the system power supply 101, the power storage device 104, and the power generation device 105 to the general power load 102 is disconnected, and the power supply from the system power supply 101, the power storage device 104, and the power generation device 105 to the general power load 102 is performed.
  • the power supply from the system power supply 101 to the power storage device 104 and the power generation device 105 is cut off, and the power supply from the system power supply 101 to the power storage device 104 and the power generation device 105 is stopped.
  • the control method of inverter 110 is switched from voltage-type current control to current-type voltage control.
  • the power storage device 104 generates a voltage waveform that serves as a reference for the frequency and phase of the AC power of the power conditioner 114 of the power generation device 105.
  • the operation of the power generation device 105 is temporarily stopped, and the operation mode of the power generation device 105 is switched from the interconnection mode to the independent operation mode.
  • the determination device 108 determines whether or not the power generation device 105 is to be restarted. Specifically, when the determination device 108 determines that the remaining amount of power stored in the storage battery 109 detected by the remaining power amount detection unit 112 of the power storage device 104 is smaller than the startup power amount required for the startup process of the power generation device 105. Then, the activation of the power generation device 105 is prohibited, and the power generation device 105 is not activated and is set in a standby state. On the other hand, when the determination device 108 determines that the remaining amount of power stored in the storage battery 109 is greater than or equal to the activation power amount of the power generation device 105, the activation of the power generation device 105 is permitted. In this case, the power storage device 104 supplies power to the power generation device 105, and the power generation device 105 restarts based on the power supplied from the power storage device 104.
  • the power generation device 105 since the power generation device 105 is permitted to start when the remaining amount of power stored in the storage battery 109 is equal to or greater than the amount of activation power of the power generation device 105, the power generation device 105 is caused by insufficient power supply from the power storage device 104 during startup. It is possible to prevent the power from going down. That is, the power generation apparatus 105 can be started without causing an unnecessary stop due to power-down.
  • the 2nd switch 116 is made into a conduction
  • FIG. 1 when the power generated by the power generation device 105 is larger than the power consumed by the self-sustained power load 103 and surplus power is generated, the power storage device 104 transfers the surplus power to the storage battery 109 via the charging converter 111.
  • the power stored in the storage battery 109 is supplied to the independent power load 103 via the inverter 110. To do.
  • the power recovery is detected in each device.
  • the second switch 116 is disconnected as shown in FIG. 2D.
  • the power supply path from the power storage device 104 and the power generation device 105 to the self-supporting power load 103 is cut, and the power supply from the power storage device 104 and the power generation device 105 to the self-supporting power load 103 is stopped.
  • the control method of the inverter 110 is switched from the current type voltage control to the voltage type current control. Further, the operation of the power generation device 105 is temporarily stopped, and the operation mode of the power generation device 105 is switched from the self-sustained operation mode to the interconnection mode.
  • the first switch 115 and the third switch 107 are brought into a conductive state so that power can be supplied from the system power supply 101 to the general power load 102. Further, the power generation apparatus 105 is activated by power supply from the system power supply 101 and resumes power generation.
  • the power supply system in the present embodiment operates.
  • the second switch 116 is turned on after the power generation apparatus 105 starts power generation. If the overload state is determined based on the measurement result of the power consumption of the self-supporting power load 103 or the measurement result of the voltage (not shown), the disconnected state may be set. As a result, when power is supplied from the power storage device 104 to the independent power load 103 during the startup of the power generation device 105, an unnecessary stop of the power generation device 105 due to a voltage drop caused by an overload state can be prevented.
  • the second switch 116 is turned on after the power generation of the power generation apparatus 105 is started, but the system power supply in FIG. Immediately after the power failure of 101, the second switch 116 is turned on, and the remaining power necessary for the power generation device 105 to start power generation by the determination device 108 or the like while starting the power generation device 105 while maintaining the conduction state.
  • the amount of electric power is always compared with the remaining amount of power stored in the power storage device 104 (storage battery 109) obtained from the remaining power storage detection unit 112, and the remaining power stored in the power storage device 104 is required by the determination device 108 before the power generation device 105 starts generating power.
  • the second switch 116 may be in a disconnected state when it is determined that the amount of power is smaller than the remaining power amount. Accordingly, it is possible to prevent an unnecessary stop of the power generation apparatus 105 in which the power generation apparatus 105 is powered down due to insufficient power supply from the power storage apparatus 104 during the activation of the power generation apparatus 105.
  • the determination device 108 determines whether to prohibit the start of the power generation device 105, but a control unit (not shown) in the power generation device 105 has a function of the determination device, The control unit may perform the above determination as to whether or not to prohibit the start of the power generation apparatus 105.
  • the power load supplied by the power storage device 104 and the power generation device 105 when the system power supply 101 is normal and during a power failure is divided into the general power load 102 and the independent power load 103, but only one. It doesn't matter.
  • the power generation device 105 when power generation device 105 is activated only by power supply from power storage device 104, the remaining power storage capacity of power storage device 104 (storage battery 109) is equal to power generation device 105.
  • the startup of the power generation apparatus 105 is prohibited. Thereby, it is possible to prevent the power generation device 105 from being stopped during startup due to insufficient power supply from the power storage device 104.
  • the second switch 116 when the second switch 116 starts the power generation device 105, the second switch 116 cuts off the power supply path from the power storage device 104 to the self-sustained power load 103, and therefore outputs power from the power storage device 104. It is possible to reliably supply the power generation device 105. Thereby, it is possible to prevent the power generation device 105 from being stopped during startup due to insufficient power supply from the power storage device 104.
  • the remaining amount of electricity to be compared with the amount of starting power of the power generation device 105 is the remaining amount of electricity stored in the storage battery 109.
  • the storage battery 109 is charged.
  • the amount of electric power obtained by subtracting the amount of electric power for preventing overdischarge of the storage battery 109 from the amount of electric power may be used as the remaining amount of electricity stored in the storage battery 109 (power storage device 104).
  • FIG. 3 is a block diagram showing the configuration of the power supply system according to Embodiment 2 of the present invention.
  • the power supply system according to the present embodiment is different from the power supply system according to the first embodiment shown in FIG. It is provided one by one.
  • the power storage device 104A in the present embodiment includes a first storage battery 109a, a first inverter 110a, a first charging converter 111a, a first remaining power storage detection unit 112a, and a second storage battery. 109b, a second inverter 110b, a second charging converter 111b, and a second remaining charge detection unit 112b.
  • First storage battery 109a and second storage battery 109b, first inverter 110a and second inverter 110b, first charging converter 111a and second charging converter 111b, and first remaining charge detection Unit 112a and second remaining power detection unit 112b have the same functions as storage battery 109, inverter 110, charging converter 111, and remaining power detection unit 112 in the first embodiment, and are the same as those. Detailed description is omitted.
  • each device detects that there is a power failure by stopping the power supply from the system power supply 101.
  • the first switch 115 and the third switch 107 are disconnected.
  • the power supply path from the system power supply 101, the power storage device 104A and the power generation device 105 to the general power load 102 is disconnected, and the power supply from the system power supply 101, the power storage device 104A and the power generation device 105 to the general power load 102 is performed.
  • the power supply path from the system power supply 101 to the power storage device 104A and the power generation device 105 is disconnected, and the power supply from the system power supply 101 to the power storage device 104A and the power generation device 105 is stopped.
  • first inverter 110a and second inverter 110b are switched from voltage-type current control to current-type voltage control.
  • the power storage device 104A generates a voltage waveform that serves as a reference for the frequency and phase of the AC power of the power conditioner 114 of the power generation device 105.
  • the operation of the power generation device 105 is temporarily stopped, and the operation mode of the power generation device 105 is switched from the interconnection mode to the independent operation mode.
  • the determination device 108 uses the first storage battery 109a detected by the first remaining storage charge detection unit 112a and the second storage battery detected by the second storage remaining charge detection unit 112b.
  • the startup of the power generation device 105 is prohibited and the power generation device 105 is not started and is set in a standby state. .
  • the determination device 108 determines that the sum of the remaining power amount of the first storage battery 109a and the remaining power amount of the second storage battery 109b is equal to or greater than the starting power amount of the power generation device 105, Startup is allowed. In this case, the power storage device 104A supplies power to the power generation device 105, and the power generation device 105 restarts based on the power supplied from the power storage device 104A.
  • the power generation device 105 is permitted to start when the remaining amount of power stored in the storage battery 109 is equal to or greater than the amount of startup power of the power generation device 105. It is possible to prevent the power generation apparatus 105 from powering down. That is, the power generation device 105 can be started without powering down.
  • the second switch 116 is turned on and power is supplied from the power generation device 105 to the self-supporting power load 103.
  • the power storage device 104A uses the first charging converter 111a and the second charging power.
  • the first storage battery 109a and the second storage battery 109b are supplied via the charging converter 111b to charge the first storage battery 109a and the second storage battery 109b.
  • the power generated by the power generator 105 is smaller than the power consumed by the self-sustained power load 103, the power stored in the first storage battery 109a and the second storage battery 109b via the first inverter 110a and the second inverter 110b. Is supplied to the independent power load 103.
  • the power recovery is detected in each device.
  • the second switch 116 is disconnected.
  • the power supply path from the power storage device 104A and the power generation device 105 to the independent power load 103 is cut off, and the power supply from the power storage device 104A and the power generation device 105 to the independent power load 103 is stopped.
  • first inverter 110a and second inverter 110b are switched from current-type voltage control to voltage-type current control. Further, the operation of the power generation device 105 is temporarily stopped, and the operation mode of the power generation device 105 is switched from the self-sustained operation mode to the interconnection mode.
  • the first switch 115 and the third switch 107 are turned on so that power can be supplied from the system power supply 101 to the general power load 102. Further, the power generation apparatus 105 is activated by power supply from the system power supply 101, and power generation is resumed.
  • the power generation device 105 when power generation device 105 is activated by power supply from a plurality of storage batteries, the total remaining amount of electricity stored in the plurality of storage batteries is used for the activation process of power generation device 105.
  • the power generation apparatus 105 is prohibited from starting. Thereby, it is possible to prevent the power generation device 105 from being stopped during startup due to insufficient power supply from the power storage device 104A.
  • the determination device 108 makes the determination, the sum of the remaining amount of electricity stored in the first storage battery 109a and the remaining amount of electricity stored in the second storage battery 109b is the amount of power required for the startup process of the power generation device 105.
  • the power generation device 105 is prohibited from starting. In this case, for example, the amount of power for preventing overdischarge of the first storage battery 109a is calculated from the amount of power charged in the first storage battery 109a.
  • the first storage battery 109a and the second storage battery 109b can each retain an amount of power for preventing overdischarge. For this reason, when starting the electric power generating apparatus 105, it can suppress that the 1st storage battery 109a and the 2nd storage battery 109b deteriorate by overdischarge.
  • the power supply system according to the present invention has been described based on the embodiment, but the present invention is not limited to the above-described embodiment.
  • the fuel cell power generation device is exemplified as the power generation device, but another power generation device such as a gas engine power generation device or a solar power generation device may be used.
  • the present invention can be realized not only as a power supply system or a power control method, but also as a program for causing a computer to execute operations (steps) included in the power control method.
  • a program is stored in a computer-readable recording medium (for example, a memory card such as a flexible disk, hard disk, CD-ROM, MO, DVD, DVD-ROM, DVD-RAM, BD, USB memory, SD card).
  • a transmission medium such as the Internet.
  • LSI Large Scale Integration
  • these components may be individually made into one chip, or may be made into one chip so as to include a part or all of them.
  • an integrated circuit may be referred to as an IC (Integrated Circuit), a system LSI, a super LSI, or an ultra LSI depending on the degree of integration.
  • the embodiment can be realized by arbitrarily combining the components and functions in each embodiment without departing from the scope of the present invention, or a form obtained by subjecting each embodiment to various modifications conceived by those skilled in the art. Forms are also included in the present invention.
  • the present invention can be widely used in a power supply system using a power generation device such as a fuel cell power generation device or a gas engine power generation device and a power storage device.
  • a power generation device such as a fuel cell power generation device or a gas engine power generation device and a power storage device.

Abstract

 本発明に係る電力供給システムは、蓄電した電力を自立電力負荷(103)に供給する蓄電装置(104)と、蓄電装置(104)から供給される電力により起動し、発電した電力を自立電力負荷(103)に供給する発電装置(105)と、蓄電装置(104)の蓄電残量が、発電装置(105)を起動するために必要な起動電力量より小さいか否かを判定する判定装置(108)と、を備え、判定装置(108)が、蓄電装置(104)の蓄電残量が発電装置(105)を起動するために必要な起動電力量より小さいと判定した場合に、発電装置(105)の起動を禁止する。

Description

電力供給システム及び電力制御方法
 本発明は、電力供給システム及び電力制御方法に関し、特に、蓄電装置からの電力供給により起動が行われる発電装置を備える電力供給システム及び電力制御方法に関するものである。
 従来、この種の電力供給システムとして、例えば図4に示す構成のものが知られている(例えば、特許文献1参照)。図4は、従来の電力供給システムのブロック図である。図4に示すように、従来の電力供給システムは、系統電源11(商用電源)、燃料電池システム12、負荷13、分電盤14、切り離しスイッチ15、及び自立運転支援装置16を備えている。
 ここで、系統電源11は、単相三線式あるいは三相三線式で交流電力を供給する。
 燃料電池システム12は、直流電力を生成(発電)する燃料電池スタック21と、燃料電池スタック21からの直流電力を系統電源11に連系した交流電力に変換するパワーコンディショナ22とを備えている。パワーコンディショナ22は、直流電力から交流電力に変換した発電電力を系統電源11からの交流電力と重畳して負荷13へ供給するとともに、系統電源11の停電時には、燃料電池システム12を自立運転させて負荷13に電力を供給する。分電盤14は、切り離しスイッチ15を介して系統電源11に接続されるとともに、燃料電池システム12と負荷13とを接続する。分電盤14内には、系統電源11の停電時に燃料電池システム12を解列するための解列スイッチ17が設けられている。
 自立運転支援装置16は、燃料電池システム12と分電盤14との間の配電線に対する接続点31と、この接続点31に対して出力が接続された電圧制御型のインバータ32と、インバータ32に対して供給される直流電力を蓄える蓄電装置33と、接続点31に接続され、燃料電池システム12が発生する交流電力のうちの余った電力を消費する負荷調整器34と、接続点31に接続され、当該接続点31から取り込んだ交流電力を直流電力に変換して当該直流電力を充電のために蓄電装置33に供給する充電用コンバータ35と、太陽光発電装置やエンジン発電装置などの補助電源装置37とを備えている。
 以上のように構成された電力供給システムは、系統電源11が正常に動作している場合、系統電源11に連系された燃料電池システム12の出力電力が系統電源11の電力に重畳して負荷13に供給されると共に、自立運転支援装置16は、接続点31から取り込んだ交流電力を充電用コンバータ35によって直流電力に変換して当該直流電力を蓄電装置33に蓄える。
 一方、系統電源11が停電した場合、切り離しスイッチ15及び解列スイッチ17がいったん遮断状態となり、その後、燃料電池システム12を自立運転モードで再起動させた場合には、切り離しスイッチ15を遮断状態としたまま解列スイッチ17を導通状態とし、燃料電池システム12からの交流電力のみを負荷13に供給できるようにする。このとき、自立運転支援装置16は、系統電源11が停電となった状態で燃料電池システム12を始動させるために、蓄電装置33に蓄積されている直流電力を燃料電池システム12に供給する。なお、蓄電装置33から供給される電力が不足する場合には、補助電源装置37から電力を供給する。
特開2008―022650号公報
 しかしながら、図4に示すような従来の電力供給システムの構成では、蓄電装置からの電力供給のみで発電装置を起動させる場合、蓄電装置の蓄電残量によっては、蓄電装置から発電装置に対して起動処理に必要な電力を供給することができない場合がある。
 この場合、起動中に電力が途絶えることで発電装置が電源ダウンしてしまい、発電装置の起動処理に要した電力を無駄にするという問題がある。さらに、起動中の電源ダウンによる不要な停止によって発電装置が正常な停止処理を行うことができず、発電装置内の機器がストレスを受けて劣化し、寿命が短縮するという問題がある。
 本発明は、このような問題を解決するためになされたものであり、蓄電装置からの電力供給不足による発電装置の起動中の不要な停止を防ぐことができる電力供給システム及び電力制御方法を提供することを目的とする。
 前記課題を解決するために、本発明に係る電力供給システムの一態様は、蓄電した電力を電力負荷に供給する蓄電装置と、前記蓄電装置から供給される電力により起動し、発電した電力を前記電力負荷に供給する発電装置と、前記蓄電装置の蓄電残量が、前記発電装置を起動するために必要な起動電力量より小さいか否かを判定する判定装置とを備えている。そして、前記判定装置が、前記蓄電装置の蓄電残量が前記発電装置を起動するために必要な起動電力量より小さいと判定した場合に、前記発電装置の起動を禁止する。
 本態様によれば、蓄電装置からの電力供給のみで発電装置が起動する場合、蓄電装置の蓄電残量が発電装置の起動処理に必要な電力量より小さいと判定されたときは発電装置の起動を禁止する。これにより、蓄電装置からの電力供給不足によって発電装置が起動中に停止することを防ぐことができる。
 本発明に係る電力供給システムによれば、蓄電装置からの電力供給不足による発電装置の起動中の不要な停止を防ぐことができる。
図1は、本発明の実施の形態1における電力供給システムの構成を示すブロック図である。 図2Aは、本発明の実施の形態1における電力供給システムの通常時の動作を説明するための図である。 図2Bは、本発明の実施の形態1における電力供給システムの停電時(発電開始前)の動作を説明するための図である。 図2Cは、本発明の実施の形態1における電力供給システムの停電時(発電開始後)の動作を説明するための図である。 図2Dは、本発明の実施の形態1における電力供給システムの復電時の動作を説明するための図である。 図3は、本発明の実施の形態2における電力供給システムの構成を示すブロック図である。 図4は、従来の電力供給システムの構成を示すブロック図である。
 第1の発明は、蓄電した電力を電力負荷に供給する蓄電装置と、前記蓄電装置から供給される電力により起動し、発電した電力を前記電力負荷に供給する発電装置と、前記蓄電装置の蓄電残量が、前記発電装置を起動するために必要な起動電力量より小さいか否かを判定する判定装置とを備え、前記判定装置が、前記蓄電装置の蓄電残量が前記発電装置を起動するために必要な起動電力量より小さいと判定した場合に、前記発電装置の起動を禁止する電力供給システムである。第1の発明によれば、蓄電装置からの電力供給のみで発電装置が起動する場合、蓄電装置の蓄電残量が発電装置の起動処理に必要な電力量より小さいと判定されたときに発電装置の起動を禁止する。これにより、蓄電装置からの電力供給不足による発電装置の起動中の不要な停止を防ぐことができる。
 第2の発明は、特に、第1の発明において、前記蓄電装置から前記電力負荷への電力供給を接続又は切断する開閉器を備え、前記開閉器は、前記発電装置を起動させる場合、前記蓄電装置から前記電力負荷への電力供給を切断する電力供給システムである。これにより、蓄電装置の電力を発電装置に確実に供給することが可能となり、蓄電装置からの電力供給不足による発電装置の起動中の不要な停止を防ぐことができる。
 第3の発明は、特に、第1の発明又は第2の発明において、前記蓄電装置の蓄電残量を検出する蓄電残量検出部を備え、前記判定装置は、前記蓄電残量検出部によって検出された前記蓄電残量に基づいて前記判定を行う電力供給システムである。これにより、蓄電装置の蓄電残量を蓄電残量検出部によって検出することができ、蓄電残量検出部によって検出された蓄電残量に基づいて、当該蓄電残量が発電装置を起動するために必要な起動電力より小さいか否かを判定することができる。
 第4の発明は、特に、第1の発明から第3の発明のいずれか1つの発明において、前記蓄電装置は、複数の蓄電池で構成されており、前記判定装置は、前記複数の蓄電池の蓄電残量の合計が、前記発電装置を起動するために必要な起動電力量より小さいと判定した場合に、前記発電装置の起動を禁止する。これにより、発電装置が複数の蓄電池からの電力供給で起動する場合、複数の蓄電池の総蓄電残量が発電装置の起動処理に必要な電力量より小さいと判定されたときに発電装置の起動を禁止する。これにより、蓄電装置からの電力供給不足による発電装置の起動中の不要な停止を防ぐことができる。
 第5の発明は、特に、第1の発明から第4の発明のいずれか1つの発明において、前記蓄電残量は、前記蓄電装置に充電された電力量から過放電防止のための電力量を差し引いた電力量である。これにより、発電装置を起動する際に、過放電によって蓄電装置が劣化することを抑制することができる。
 第6の発明は、蓄電した電力を電力負荷に供給する蓄電装置と、前記蓄電装置から供給される電力により起動し、発電した電力を前記電力負荷に供給する発電装置とを備える電力供給システムにおける電力制御方法であって、前記蓄電装置の蓄電残量が前記発電装置を起動するために必要な起動電力量より小さいと判定された場合に、前記発電装置の起動を禁止する電力制御方法である。第5の発明によれば、蓄電装置からの電力供給のみで発電装置が起動する場合、蓄電装置の蓄電残量が発電装置の起動処理に必要な電力量より小さいと判定されたときに発電装置の起動を禁止する。これにより、蓄電装置からの電力供給不足による発電装置の起動中の不要な停止を防ぐことができる。
 以下、本発明の実施の形態に係る電力供給システム及び電力制御方法について、図面を参照しながら説明する。なお、以下に説明する実施の形態は、いずれも本発明の好ましい一具体例を示すものである。したがって、以下の実施の形態で示される構成要素、構成要素の配置位置及び接続形態、ステップ、ステップの順序などは、一例であって本発明を限定する主旨ではない。よって、以下の実施の形態における構成要素のうち、本発明の最上位概念を示す独立請求項に記載されていない構成要素については、任意の構成要素として説明される。なお、各図において、同じ構成部材については同じ符号を付している。
 (実施の形態1)
 まず、本発明の実施の形態1における電力供給システムの構成について、図1を用いて詳細に説明する。図1は、本発明の実施の形態1における電力供給システムの構成を示すブロック図である。
 図1に示すように、本実施の形態における電力供給システムは、系統電源101と、一般電力負荷102と、自立電力負荷103と、蓄電装置104と、発電装置105と、第1の開閉器115及び第2の開閉器116を有する分電盤106と、第3の開閉器107と、判定装置108とによって構成される。本実施の形態における電力供給システムは、停電などにより系統電源101からの電力供給が停止した場合に、蓄電装置104と発電装置105とを使用して自立運転を行うことができる。
 系統電源101は、電気事業者から需要家に所定の電圧及び所定の周波数の交流電力を供給する商用電力系統ある。本実施の形態における系統電源101は、単相三線式あるいは三相三線式の交流電源であり、一般電力負荷102などに電力を供給する。
 一般電力負荷102は、需要家において電力を消費する一つ又は複数の負荷機器であり、例えば、一般用コンセント(図示せず)に接続されたテレビ、エアコン、冷蔵庫などの機器である。一般電力負荷102は、系統電源101の正常時(通常時)には、系統電源101、蓄電装置104又は発電装置105から供給される交流電力を消費する。
 自立電力負荷103は、自立用コンセント(図示せず)に接続された機器であり、系統電源101の停電時に、蓄電装置104又は発電装置105から供給される交流電力を消費する。
 蓄電装置104は、蓄電池109と、インバータ110と、充電用コンバータ111と、蓄電残量検出部112とを備え、電力を蓄電するとともに、蓄電した電力を分電盤106を介して電力負荷(一般電力負荷102、自立電力負荷103)に供給する。
 蓄電池109は、系統電源101又は発電装置105から供給される電力を蓄積(充電)する機能を有すると共に、その蓄積した電力を放出(放電)する機能を有する電池である。このように、蓄電池109は、充電と放電とを繰り返して行うことができる二次電池であって、例えばリチウムイオン電池や鉛蓄電池などである。なお、蓄電池109は、放電時に直流電力を出力する。
 インバータ110は、蓄電池109が出力する直流電力を交流電力に変換し、変換した交流電力を、一般電力負荷102又は自立電力負荷103に供給する。また、インバータ110は、系統電源101の停電時には、発電装置105が生成する交流電力の周波数や位相の基準となる交流電力を生成する。
 充電用コンバータ111は、系統電源101又は発電装置105から供給される交流電力を直流電力に変換し、蓄電池109への充電を行う。
 蓄電残量検出部112は、蓄電池109に残っている電力量(蓄電残量)を検出する。すなわち、蓄電残量検出部112は、蓄電池109の放電可能な直流電力の残存量を検出する。蓄電残量検出部112によって検出された蓄電池109の蓄電残量の情報は、判定装置108に出力される。
 発電装置105は、発電機113とパワーコンディショナ114とを備え、発電を行うとともに、発電した電力を分電盤106を介して電力負荷(一般電力負荷102、自立電力負荷103)に供給する。例えば、発電装置105として燃料電池発電装置(燃料電池システム)を用いることができる。
 発電機113は、直流電力を生成(発電)して、発電した直流電力をパワーコンディショナ114に供給する。発電機113は、例えば、水素を主体とする燃料ガスと酸素とから直流電力を発電する燃料電池スタックなどである。
 パワーコンディショナ114は、発電機113からの直流電力を交流電力に変換して出力すると共に、系統電源101側の停電を検出して発電装置105を系統電源101から解列する。
 このように構成される発電装置105は、発電機113を起動する時に、一定時間、所定の消費電力(起動電力)を必要とする。すなわち、発電装置105の起動時には、発電装置105を起動するために必要な所定の起動電力量が必要となる。このとき、パワーコンディショナ114は、運転指令を受けられるように当該パワーコンディショナ114内のマイコンに電力を供給しておくことが好ましい。したがって、発電装置105を起動させるために必要な起電力量としては、発電装置105を起動するために必要な起動電力量とは、発電機113を起動するために必要な電力量と、パワーコンディショナ114に供給する電力量とを合わせた電力量とすることが好ましい。
 そして、発電装置105は、系統電源101の正常時には、系統電源101からの交流電力を基準にして発電し、発電した電力を系統電源101からの電力と重畳して一般電力負荷102に供給する。この場合、発電装置105は、自身が生成している電力の周波数(位相)を、系統電源101の交流電力の周波数(位相)に同期させることで発電を行っている。
 また、発電装置105は、系統電源101の停電時には、蓄電装置104から供給される電力によって起動し、自立運転を行って発電した電力を自立電力負荷103に供給する。この場合、発電装置105の起動は、判定装置108からの判定結果に基づいて行われる。具体的には、判定装置108が、蓄電装置104(蓄電池109)の蓄電残量が発電装置105を起動するために必要な起動電力量より小さいと判定した場合には、発電装置105の起動が禁止される。一方、判定装置108が、蓄電装置104(蓄電池109)の蓄電残量が発電装置105の起動電力量以上であると判定した場合には、発電装置105の起動が許可される。
 分電盤106は、第1の開閉器115と第2の開閉器116とを備え、第3の開閉器107を介して系統電源101に接続されている。また、分電盤106は、系統電源101の状態に応じて、蓄電装置104及び発電装置105の電力供給先を、一般電力負荷102又は自立電力負荷103に切り替える。なお、第3の開閉器107は、分電盤106が備えていてもよい。
 判定装置108は、蓄電装置104の蓄電残量検出部112によって検出された蓄電池109の蓄電残量を取得するとともに、発電装置105を起動するために必要な電力量(起動電力量)を取得する。そして、判定装置108は、蓄電池109の蓄電残量が発電装置105の起動電力量より小さいか否かを判定し、判定した結果を発電装置105に出力する。
 次に、以上のように構成された電力供給システムの動作(電力制御方法)及び作用について、図2A~図2Dを用いて説明する。図2A~図2Dは、本発明の実施の形態1における電力供給システムの動作を説明するための図であり、図2Aは通常時、図2Bは停電時(発電開始前)、図2Cは停電時(発電開始後)、図2Dは復電時の状態を示している。
 まず、図2Aを用いて、系統電源101が正常時(通常時)の動作について説明する。
 図2Aに示すように、系統電源101の正常時、すなわち系統電源101が停電していない場合には、第1の開閉器115を導通状態とし、第2の開閉器116を解列状態とし、第3の開閉器107を導通状態とするように、各開閉器の接続状態を制御する。
 このような接続状態とすることにより、系統電源101、蓄電装置104又は発電装置105から一般電力負荷102へ電力が供給可能な状態となる。つまり、一般電力負荷102は、系統電源101、蓄電装置104及び発電装置105を使用して電力の供給を受けることができる。また、上記接続状態とすることにより、系統電源101又は蓄電装置104から発電装置105に電力が供給できる状態になるとともに、系統電源101又は発電装置105から蓄電装置104へ電力が供給可能な状態となる。
 ここで、例えば、発電装置105は系統電源101からの電力供給により起動して発電を行い、発電開始後は、発電した電力を系統電源101からの電力と重畳して一般電力負荷102に供給する。
 この場合、発電装置105の発電電力より一般電力負荷102の消費電力が大きいときは、発電装置105の発電電力すべてが一般電力負荷102にて消費されるが、逆に、発電装置105の発電電力より一般電力負荷102の消費電力が小さいときは、余剰電力が発生し、その余剰電力が系統電源101へ流れ込もうとする(以下、これを「逆潮流」という)。
 燃料電池システム等の発電装置では、電力コストや系統電源101の安全面(例えば、逆潮流による交流電圧の上昇)などの理由により逆潮流を防止する必要がある。そこで、蓄電装置104は、発電装置105の発電電力の情報と一般電力負荷102の消費電力の情報とを発電装置105や計測器(図示せず)から取得する。そして、蓄電装置104は、発電装置105の発電電力が一般電力負荷102の消費電力より大きく、余剰電力が発生している場合には、その余剰電力を充電用コンバータ111を介して蓄電池109に供給して蓄電池109の充電を行う。これにより、逆潮流を防止することができる。一方、発電装置105の発電電力より一般電力負荷102の消費電力が大きいときは、蓄電装置104は、インバータ110を介して蓄積した電力を一般電力負荷102に供給する。これにより、発電装置105の発電電力と一般電力負荷102の消費電力との関係により発生する余剰電力を有効に活用している。
 次に、図2B及び図2Cを用いて、系統電源101が停電した時の動作について説明する。
 災害や計画停電などによって系統電源101の停電が発生した場合、系統電源101からの電力供給の停止により、各々の装置は停電であることを検出する。停電を検出すると、図2Bに示すように、第1の開閉器115、第2の開閉器116及び第3の開閉器107を全て解列状態とする。これにより、系統電源101、蓄電装置104及び発電装置105から一般電力負荷102への電力供給経路が切断されて、系統電源101、蓄電装置104及び発電装置105から一般電力負荷102への電力供給を停止すると共に、系統電源101から蓄電装置104及び発電装置105への電力供給が切断されて、系統電源101から蓄電装置104及び発電装置105への電力供給を停止する。
 その後、蓄電装置104では、インバータ110の制御方式が電圧型電流制御から電流型電圧制御へ切り替えられる。これにより、蓄電装置104は、発電装置105のパワーコンディショナ114の交流電力における周波数や位相の基準となる電圧波形を生成する。また、発電装置105の運転を一旦停止して、発電装置105の運転モードを連系モードから自立運転モードに切り替える。
 その後、判定装置108の判定結果に基づき、発電装置105を再起動するか否かを判定する。具体的には、判定装置108が、蓄電装置104の蓄電残量検出部112によって検出される蓄電池109の蓄電残量が発電装置105の起動処理に必要な起動電力量より小さいと判定した場合は、発電装置105の起動が禁止され、発電装置105を起動せずに待機状態とする。一方、判定装置108が、蓄電池109の蓄電残量が発電装置105の起動電力量以上であると判定した場合は、発電装置105の起動が許可される。この場合、蓄電装置104は発電装置105に電力を供給し、発電装置105は蓄電装置104から供給される電力をもとに再起動する。
 このように、発電装置105は、蓄電池109の蓄電残量が発電装置105の起動電力量以上の場合に起動が許可されるので、起動中に蓄電装置104からの電力供給不足によって発電装置105が電源ダウンすることを防止できる。すなわち、電源ダウンによる不要な停止を発生することなく発電装置105を起動させることができる。
 そして、発電装置105が発電を開始した後は、図2Cに示すように、第2の開閉器116を導通状態とし、発電装置105から自立電力負荷103に電力を供給する。このとき、蓄電装置104は、発電装置105の発電電力が自立電力負荷103の消費電力より大きく、余剰電力が発生している場合には、その余剰電力を充電用コンバータ111を介して蓄電池109に供給して蓄電池109の充電を行い、一方、発電装置105の発電電力が自立電力負荷103の消費電力より小さい場合には、インバータ110を介して蓄電池109に蓄電した電力を自立電力負荷103に供給する。
 次に、図2Dを用いて、系統電源101が復電した時の動作について説明する。
 停電後に系統電源101が復電した場合、各々の装置において復電を検出する。復電を検出すると、図2Dに示すように、第2の開閉器116を解列状態とする。これにより、蓄電装置104及び発電装置105から自立電力負荷103への電力供給経路を切断して、蓄電装置104及び発電装置105から自立電力負荷103への電力供給を停止する。
 その後、蓄電装置104では、インバータ110の制御方式が電流型電圧制御から電圧型電流制御に切り替えられる。また、発電装置105の運転を一旦停止して、発電装置105の運転モードを自立運転モードから連系モードに切り替える。
 そして、その後、同図に示すように、第1の開閉器115及び第3の開閉器107を導通状態とすることで、系統電源101から一般電力負荷102に電力を供給できる状態にする。また、発電装置105は、系統電源101からの電力供給により起動し、発電を再開する。
 以上のようにして、本実施の形態における電力供給システムが動作する。
 なお、本実施の形態では、系統電源101の停電時において、発電装置105が発電開始後に第2の開閉器116を導通状態としたが、系統電源101の停電直後に導通状態とし、計測器(図示せず)による自立電力負荷103の消費電力の計測結果や電圧の計測結果に基づき過負荷状態と判定したとき解列状態とするようにしてもかまわない。これにより、発電装置105の起動中に蓄電装置104から自立電力負荷103へ電力供給する場合、過負荷状態が原因で発生する電圧低下による発電装置105の不要な停止を防ぐことができる。
 また、本実施の形態では、系統電源101の停電時において、図2Cに示すように、発電装置105の発電開始後に第2の開閉器116を導通状態としたが、図2Bのときの系統電源101の停電直後に第2の開閉器116を導通状態とし、その導通状態を保ったまま、発電装置105の起動中において、判定装置108などによって発電装置105の発電開始までに必要とする残りの電力量と蓄電残量検出部112から取得する蓄電装置104(蓄電池109)の蓄電残量とを常時比較し、判定装置108によって蓄電装置104の蓄電残量が発電装置105の発電開始までに必要とする残りの電力量より小さいと判定されたときに第2の開閉器116を解列状態としてもかまわない。これにより、発電装置105の起動中に蓄電装置104からの電力供給不足によって発電装置105が電源ダウンするという発電装置105の不要な停止を防ぐことができる。
 また、本実施の形態では、判定装置108が発電装置105の起動を禁止するか否かの判定を行ったが、発電装置105内の制御部(図示せず)が判定装置の機能を備え、当該制御部によって発電装置105の起動を禁止するか否かの上記判定を行ってもかまわない。
 また、本実施の形態では、系統電源101が正常時と停電時において蓄電装置104及び発電装置105が供給する電力負荷を、一般電力負荷102と自立電力負荷103の別々としたが、1つにしてもかまわない。
 以上のように、本実施の形態に係る電力供給システムによれば、蓄電装置104からの電力供給のみで発電装置105が起動する場合、蓄電装置104(蓄電池109)の蓄電残量が発電装置105の起動処理に必要な電力量より小さいと判定されたときは発電装置105の起動を禁止する。これにより、蓄電装置104からの電力供給不足によって発電装置105が起動中に停止することを防ぐことができる。
 また、本実施の形態においては、第2の開閉器116は、発電装置105を起動させる場合、蓄電装置104から自立電力負荷103への電力供給経路を切断するため、蓄電装置104から出力電力を発電装置105に確実に供給することが可能となる。これにより、蓄電装置104からの電力供給不足によって発電装置105が起動中に停止することを防ぐことができる。
 また、本実施の形態では、判定装置108によって判定する際、発電装置105の起動電力量と比較する蓄電残量は蓄電池109の蓄電残量としたが、この場合、例えば、蓄電池109に充電された電力量から蓄電池109の過放電防止のための電力量を引いた電力量を蓄電池109(蓄電装置104)の蓄電残量としてもよい。これにより、蓄電装置104からの電力供給により発電装置105を起動しても(つまり、蓄電装置104の充電電力を発電装置105の起動のために消費されたとしても)、蓄電池109には過放電を防止するための電力量を残すことができる。このように、蓄電装置104の蓄電残量を蓄電池109に充電された電力量から過放電防止のための電力量を差し引いた電力量とすることで、発電装置105を起動する際に、過放電によって蓄電池109が劣化することを抑制することができる。
 (実施の形態2)
 次に、本発明の実施の形態2における電力供給システムの構成について、図3を用いて説明する。図3は、本発明の実施の形態2における電力供給システムの構成を示すブロック図である。
 図3に示すように、本実施の形態における電力供給システムは、図1に示す実施の形態1における電力供給システムに対して、蓄電池、インバータ、充電用コンバータ及び蓄電残量検出部の各々が2つずつ設けられている。
 具体的には、本実施の形態における蓄電装置104Aは、第1の蓄電池109a、第1のインバータ110a、第1の充電用コンバータ111a及び第1の蓄電残量検出部112aと、第2の蓄電池109b、第2のインバータ110b、第2の充電用コンバータ111b及び第2の蓄電残量検出部112bとを備える。
 第1の蓄電池109a及び第2の蓄電池109bと、第1のインバータ110a及び第2のインバータ110bと、第1の充電用コンバータ111a及び第2の充電用コンバータ111bと、第1の蓄電残量検出部112a及び第2の蓄電残量検出部112bとは、実施の形態1における、蓄電池109、インバータ110、充電用コンバータ111及び蓄電残量検出部112と同じ機能を有し、また、それらと同様に接続されているので、詳しい説明は省略する。
 以下に、本実施の形態における電力供給システムの動作(電力制御方法)及び作用について、図3を用いて説明する。
 系統電源101が正常時の動作については、実施の形態1と同様のため、説明を省略する。
 次に、系統電源101が停電した時の動作について説明する。
 系統電源101の停電が発生した場合、系統電源101からの電力供給の停止により、各々の装置は、停電であることを検出する。停電を検出すると、第1の開閉器115及び第3の開閉器107を解列状態とする。これにより、系統電源101、蓄電装置104A及び発電装置105から一般電力負荷102への電力供給経路が切断されて、系統電源101、蓄電装置104A及び発電装置105から一般電力負荷102への電力供給が停止すると共に、系統電源101から蓄電装置104A及び発電装置105への電力供給経路を切断して、系統電源101から蓄電装置104A及び発電装置105への電力供給を停止する。
 その後、蓄電装置104Aでは、第1のインバータ110a及び第2のインバータ110bの制御方式が電圧型電流制御から電流型電圧制御へ切り替えられる。これにより、蓄電装置104Aは、発電装置105のパワーコンディショナ114の交流電力における周波数や位相の基準となる電圧波形を生成する。また、発電装置105の運転を一旦停止して、発電装置105の運転モードを連系モードから自立運転モードに切り替える。
 その後、判定装置108の判定結果に基づき、発電装置105を再起動するか否かを判定する。具体的には、判定装置108が、第1の蓄電残量検出部112aによって検出される第1の蓄電池109aの蓄電残量と第2の蓄電残量検出部112bによって検出される第2の蓄電池109bの蓄電残量との合計が発電装置105の起動処理に必要な起動電力量より小さいと判定した場合は、発電装置105の起動が禁止され、発電装置105を起動せずに待機状態とする。一方、判定装置108が、第1の蓄電池109aの蓄電残量と第2の蓄電池109bの蓄電残量との合計が発電装置105の起動電力量以上であると判定した場合は、発電装置105の起動が許可される。この場合、蓄電装置104Aは発電装置105に電力を供給し、発電装置105は蓄電装置104Aから供給される電力をもとに再起動する。
 このように、発電装置105は、蓄電池109の蓄電残量が発電装置105の起動電力量以上の場合に起動が許可されるので、発電装置105の起動中に蓄電装置104Aからの電力供給不足によって発電装置105が電源ダウンすることを防止できる。すなわち、電源ダウンさせることなく発電装置105を起動させることができる。
 発電装置105が発電を開始した後は、第2の開閉器116を導通状態とし、発電装置105から自立電力負荷103に力を供給する。このとき、蓄電装置104Aは、発電装置105の発電電力が自立電力負荷103の消費電力より大きく、余剰電力が発生している場合には、その余剰電力を第1の充電用コンバータ111a及び第2の充電用コンバータ111bを介して第1の蓄電池109a及び第2の蓄電池109bに供給して第1の蓄電池109a及び第2の蓄電池109bの充電を行う。一方、発電装置105の発電電力が自立電力負荷103の消費電力より小さい場合は、第1のインバータ110a及び第2のインバータ110bを介して第1の蓄電池109a及び第2の蓄電池109bに蓄電した電力を自立電力負荷103に供給する。
 次に、系統電源101が復電した時の動作について説明する。
 系統電源101が復電した場合、各々の装置において復電を検出する。復電を検出すると、第2の開閉器116を解列状態とする。これにより、蓄電装置104A及び発電装置105から自立電力負荷103への電力供給経路を切断して、蓄電装置104A及び発電装置105から自立電力負荷103への電力供給を停止する。
 その後、蓄電装置104Aでは、第1のインバータ110a及び第2のインバータ110bの制御方式が電流型電圧制御から電圧型電流制御に切り替えられる。また、発電装置105の運転を一旦停止して、発電装置105の運転モードを自立運転モードから連系モードに切り替える。
 そして、その後、第1の開閉器115及び第3の開閉器107を導通状態とすることで、系統電源101から一般電力負荷102に電力を供給できる状態にする。また、発電装置105は、系統電源101からの電力供給により起動し、発電が再開される。
 以上のように、本実施の形態に係る電力供給システムによれば、発電装置105が複数の蓄電池からの電力供給で起動する場合、複数の蓄電池の総蓄電残量が発電装置105の起動処理に必要な電力量より小さいと判定されたときは発電装置105の起動を禁止する。これにより、蓄電装置104Aからの電力供給不足によって発電装置105が起動中に停止することを防ぐことができる。
 なお、本実施の形態では、判定装置108によって判定する際、第1の蓄電池109aの蓄電残量と第2の蓄電池109bの蓄電残量との合計が発電装置105の起動処理に必要な電力量より小さいと判定されたときに発電装置105の起動を禁止したが、この場合、例えば、第1の蓄電池109aに充電された電力量から第1の蓄電池109aの過放電防止のための電力量を引いた電力量を第1の蓄電池109aの蓄電残量とし、かつ、第2の蓄電池109bに充電された電力量から第2の蓄電池109bの過放電防止のための電力量を引いた電力量を第2の蓄電池109bの蓄電残量としてもよい。これにより、蓄電装置104Aからの電力供給により発電装置105を起動しても、第1の蓄電池109a及び第2の蓄電池109bには、それぞれ過放電を防止するための電力量を残すことができる。このため、発電装置105を起動する際に、過放電によって第1の蓄電池109a及び第2の蓄電池109bが劣化することを抑制することができる。
 以上、本発明に係る電力供給システムについて、実施の形態に基づいて説明したが、本発明は、上記の実施の形態に限定されるものではない。
 例えば、上記の実施の形態では、発電装置として、燃料電池発電装置を例示したが、ガスエンジン発電装置又は太陽光発電装置などの他の発電装置を用いることもできる。
 また、本発明は、電力供給システム又は電力制御方法として実現できるだけでなく、当該電力制御方法に含まれる動作(ステップ)をコンピュータに実行させるプログラムとして実現することもできる。さらに、そのようなプログラムは、コンピュータに読み取り可能な記録媒体(例えば、フレキシブルディスク、ハードディスク、CD-ROM、MO、DVD、DVD-ROM、DVD-RAM、BD、USBメモリ、SDカードなどのメモリカード、半導体メモリ等)に記録したり、インターネット等の伝送媒体を介して流通させたりすることができる。
 また、本発明に係る電力供給システムを構成する構成要素の一部又は全部は、集積回路(LSI:Large Scale Integration)として実現することもできる。これらの構成要素は、個別に1チップ化されてもよいし、一部又は全てを含むように1チップ化されてもよい。なお、集積回路は、集積度の違いにより、IC(Integrated Circuit)、システムLSI、スーパーLSI又はウルトラLSIと呼称されることもある。
 その他、各実施の形態に対して当業者が思いつく各種変形を施して得られる形態や、本発明の趣旨を逸脱しない範囲で各実施の形態における構成要素及び機能を任意に組み合わせることで実現される形態も本発明に含まれる。
 本発明は、燃料電池発電装置又はガスエンジン発電装置などの発電装置及び蓄電装置を用いた電力供給システムにおいて広く利用することができる。
 101 系統電源
 102 一般電力負荷
 103 自立電力負荷(電力負荷)
 104、104A 蓄電装置
 105 発電装置
 106 分電盤
 107 第3の開閉器
 108 判定装置
 109 蓄電池
 110 インバータ
 111 充電用コンバータ
 112 蓄電残量検出部
 113 発電機
 114 パワーコンディショナ
 115 第1の開閉器
 116 第2の開閉器(開閉器)
 109a 第1の蓄電池
 110a 第1のインバータ
 111a 第1の充電用コンバータ
 112a 第1の蓄電残量検出部
 109b 第2の蓄電池
 110b 第2のインバータ
 111b 第2の充電用コンバータ
 112b 第2の蓄電残量検出部

Claims (6)

  1.  蓄電した電力を電力負荷に供給する蓄電装置と、
     前記蓄電装置から供給される電力により起動し、発電した電力を前記電力負荷に供給する発電装置と、
     前記蓄電装置の蓄電残量が、前記発電装置を起動するために必要な起動電力量より小さいか否かを判定する判定装置と、を備え、
     前記判定装置が、前記蓄電装置の蓄電残量が前記発電装置を起動するために必要な起動電力量より小さいと判定した場合に、前記発電装置の起動を禁止する
     電力供給システム。
  2.  前記蓄電装置から前記電力負荷への電力供給を接続又は切断する開閉器を備え、
     前記開閉器は、前記発電装置を起動させる場合、前記蓄電装置から前記電力負荷への電力供給を切断する
     請求項1に記載の電力供給システム。
  3.  前記蓄電装置の蓄電残量を検出する蓄電残量検出部を備え、
     前記判定装置は、前記蓄電残量検出部によって検出された前記蓄電残量に基づいて前記判定を行う
     請求項1又は2記載の電力供給システム。
  4.  前記蓄電装置は、複数の蓄電池で構成されており、
     前記判定装置は、前記複数の蓄電池の蓄電残量の合計が、前記発電装置を起動するために必要な起動電力量より小さいと判定した場合に、前記発電装置の起動を禁止する
     請求項1~3のいずれか1項に記載の電力供給システム。
  5.  前記蓄電残量は、前記蓄電装置に蓄電された電力量から過放電防止のための電力量を差し引いた電力量である
     請求項1~4のいずれか1項に記載の電力供給システム。
  6.  蓄電した電力を電力負荷に供給する蓄電装置と、前記蓄電装置から供給される電力により起動し、発電した電力を前記電力負荷に供給する発電装置とを備える電力供給システムにおける電力制御方法であって、
     前記蓄電装置の蓄電残量が前記発電装置を起動するために必要な起動電力量より小さいと判定された場合に、前記発電装置の起動を禁止する
     電力制御方法。
PCT/JP2012/006179 2011-09-28 2012-09-27 電力供給システム及び電力制御方法 WO2013046685A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011212087A JP2014239558A (ja) 2011-09-28 2011-09-28 電力供給システム
JP2011-212087 2011-09-28

Publications (1)

Publication Number Publication Date
WO2013046685A1 true WO2013046685A1 (ja) 2013-04-04

Family

ID=47994761

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/006179 WO2013046685A1 (ja) 2011-09-28 2012-09-27 電力供給システム及び電力制御方法

Country Status (2)

Country Link
JP (1) JP2014239558A (ja)
WO (1) WO2013046685A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016067603A1 (ja) * 2014-10-27 2016-05-06 京セラ株式会社 電力供給機器、電力供給システム及び電力供給機器の制御方法
JP2016092849A (ja) * 2014-10-29 2016-05-23 京セラ株式会社 電力供給システム、起動制御装置及び電力供給システムの制御方法
JP2016127777A (ja) * 2015-01-08 2016-07-11 三菱電機株式会社 蓄電池システム
EP3226373A4 (en) * 2014-11-27 2018-07-25 Kyocera Corporation Power control device, power supply system, and method for controlling power supply system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6770581B2 (ja) * 2016-03-02 2020-10-14 フュエルセル エナジー, インコーポレイテッドFuelcell Energy, Inc. 直流(dc)負荷平準化器
JP6423497B1 (ja) * 2017-08-01 2018-11-14 株式会社興和電設 電力制御システムおよび電力制御方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007228728A (ja) * 2006-02-23 2007-09-06 Nippon Oil Corp 燃料電池を用いた非常電源システム
JP2008258072A (ja) * 2007-04-06 2008-10-23 Honda Motor Co Ltd 燃料電池システム

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007228728A (ja) * 2006-02-23 2007-09-06 Nippon Oil Corp 燃料電池を用いた非常電源システム
JP2008258072A (ja) * 2007-04-06 2008-10-23 Honda Motor Co Ltd 燃料電池システム

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016067603A1 (ja) * 2014-10-27 2016-05-06 京セラ株式会社 電力供給機器、電力供給システム及び電力供給機器の制御方法
JPWO2016067603A1 (ja) * 2014-10-27 2017-04-27 京セラ株式会社 電力供給機器、電力供給システム及び電力供給機器の制御方法
US10418820B2 (en) 2014-10-27 2019-09-17 Kyocera Corporation Power supply apparatus, power supply system, and control method of power supply apparatus
JP2016092849A (ja) * 2014-10-29 2016-05-23 京セラ株式会社 電力供給システム、起動制御装置及び電力供給システムの制御方法
EP3226373A4 (en) * 2014-11-27 2018-07-25 Kyocera Corporation Power control device, power supply system, and method for controlling power supply system
JP2016127777A (ja) * 2015-01-08 2016-07-11 三菱電機株式会社 蓄電池システム

Also Published As

Publication number Publication date
JP2014239558A (ja) 2014-12-18

Similar Documents

Publication Publication Date Title
JP5253690B1 (ja) 電力供給システムおよびその制御方法
WO2013046685A1 (ja) 電力供給システム及び電力制御方法
JP6019614B2 (ja) 蓄電制御装置、蓄電制御装置の制御方法、プログラム、および蓄電システム
JP5854242B2 (ja) 電動車両を用いた電力供給装置
JP5303577B2 (ja) バックアップ電源システム及び方法
JP2011151952A (ja) 電源装置
JP5657257B2 (ja) 充電システム
JP2004357377A (ja) 分散型発電システム
KR20160072975A (ko) 연료전지 자동차를 이용한 이동식 발전 시스템 및 그 제어 방법
JP2015033234A (ja) 電源システム
JPH11191424A (ja) 燃料電池発電装置の操作方法
JP2013046532A (ja) 電力平準化装置
JP6481938B2 (ja) 蓄電システム
US20210249896A1 (en) Power supply management system and method for use with one or multiple different utility proxies
JP5717173B2 (ja) 電源システム、電源制御方法、電源制御装置、及び、プログラム
EP3598600A1 (en) Device and method for preventing over-discharge of energy storage device and re-operating same
JP2014117083A (ja) 蓄電装置の入力電源切り替え方法
JP2003153448A (ja) 発電システム
KR101047022B1 (ko) 계통연계형 연료전지시스템의 전원제어방법 및 장치
JP2009219310A (ja) 電力供給装置
JP2009095107A (ja) 無瞬断バックアップ電源
JP2011176980A (ja) 電源装置
JP2003079070A (ja) 電力貯蔵システム
WO2019163008A1 (ja) 直流給電システム
KR101161111B1 (ko) 연료 전지 시스템 제어 장치 및 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12835202

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12835202

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP