WO2013046546A1 - 制御装置、集積回路、制御方法、プログラム - Google Patents

制御装置、集積回路、制御方法、プログラム Download PDF

Info

Publication number
WO2013046546A1
WO2013046546A1 PCT/JP2012/005616 JP2012005616W WO2013046546A1 WO 2013046546 A1 WO2013046546 A1 WO 2013046546A1 JP 2012005616 W JP2012005616 W JP 2012005616W WO 2013046546 A1 WO2013046546 A1 WO 2013046546A1
Authority
WO
WIPO (PCT)
Prior art keywords
cost
period
power
time
price
Prior art date
Application number
PCT/JP2012/005616
Other languages
English (en)
French (fr)
Inventor
有紀 脇
高山 久
俊久 池田
吉村 康男
甲田 哲也
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Priority to US14/237,666 priority Critical patent/US9488966B2/en
Priority to JP2013535847A priority patent/JP5654690B2/ja
Priority to EP12836930.3A priority patent/EP2763081A4/en
Publication of WO2013046546A1 publication Critical patent/WO2013046546A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/04Billing or invoicing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • H02J2310/14The load or loads being home appliances
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/12Billing, invoicing, buying or selling transactions or other related activities, e.g. cost or usage evaluation

Definitions

  • the present invention acquires information indicating the unit price of electric power, calculates a cost that is generated when the electric device is operated, and based on the calculated cost, makes the operation instruction the electric device. About.
  • a control device that holds information indicating the time when the unit price of electricity is low according to the late-night electricity rate system or hourly electricity rate system, and instructs an electric device to be operated in a time zone where the unit price of electricity is low (See Patent Documents 1 and 2, etc.).
  • the electrical equipment is, for example, home appliances such as a washing dryer and a dishwasher, a heat pump water heater, and the like, which are provided in a home of a general household.
  • Control devices may be provided as part of such electrical equipment.
  • control device may be provided outside such an electrical device.
  • such an external control device communicates with each of two or more electric devices provided in a house, and instructs the electric device based on the cost of each electric device. There are things to do.
  • the present invention provides a control device that can prevent an inappropriate instruction to cause an electric device to operate at a high cost, and more reliably provide an appropriate instruction to cause an electric device to operate at a low cost. To do.
  • the control device performs the operation of the electric device that performs any one of the first operation performed over the first period and the second operation performed over the second period.
  • the control device for controlling, the price acquisition unit for acquiring information indicating the price of power, and the acquired period between the first period and the second period that is not shorter
  • a detection unit that detects a change in price indicated by the information; a first calculation unit that calculates a first cost for the electric device to perform the first operation when the change is detected; and the change. Is detected, the second calculation unit that calculates the second cost for the electric device to perform the second operation is compared with the first cost and the second cost.
  • a comparison unit that identifies driving at the cost of the lesser and performing the identified driving
  • a control apparatus comprising an instruction unit for instructing to the electrical device.
  • the control device avoids giving an instruction to operate an electric device at a high cost, and more reliably gives an appropriate instruction to the electric device and can be operated at a low cost.
  • FIG. 1 is a diagram illustrating an operation period and power consumption of an electric device in the (A) column, and a power price in each of the (B) column and the (C) column.
  • FIG. 2 is a diagram showing the present system.
  • FIG. 3 is a diagram illustrating a configuration of the device control apparatus.
  • FIG. 4 is a flowchart of the operation of the device control apparatus.
  • FIG. 5 is a diagram showing the power price in the (A) column and the operation of the present system in each of the (B) and (C) columns.
  • FIG. 6A is a diagram illustrating a mathematical expression of a specific example of the first cost.
  • FIG. 6B is a diagram illustrating a mathematical expression of a specific example of the second cost.
  • FIG. 7A is a diagram illustrating a mathematical expression of a specific example of the first cost.
  • FIG. 7B is a diagram illustrating a mathematical expression of a specific example of the second cost.
  • FIG. 7C is a diagram illustrating a description of time.
  • FIG. 7D is a diagram illustrating determination conditions.
  • FIG. 8 is a diagram showing a configuration in the first modification.
  • FIG. 9A is a diagram illustrating an operation in the first modified example.
  • FIG. 9B is a diagram illustrating mathematical expressions in the first modification.
  • FIG. 9C is a diagram illustrating mathematical expressions in the first modification.
  • FIG. 10A is a diagram illustrating a change in quality of an electric device.
  • FIG. 10B is a diagram illustrating mathematical expressions in the second modification.
  • FIG. 10C is a diagram illustrating mathematical expressions in the second modification.
  • FIG. 11 is a diagram illustrating a configuration in the third modification.
  • FIG. 12 is a diagram showing a configuration in the fourth modification.
  • FIG. 13 is a diagram illustrating an operation in the fifth modification.
  • FIG. 1 schematically shows the relationship between the operation period of the electrical equipment and the power consumption in the (A) column.
  • the power price unit price
  • the upper row 5a shows the operation period La from the start of operation at time t to the end of operation at time t M1 when the first operation is performed, and the power consumption in the operation period La Represents. That is, the length in the horizontal axis direction of 5a represents the length of the operation period La, and the width in the vertical axis direction of 5a represents the power consumption at each time. Therefore, the area 5a represents the total power consumption (power consumption 5aA) from the start of operation to the end of operation.
  • the time taken from the start to the end of the operation is long, but the power consumption is low.
  • the total power consumption from the operation start to the operation end is relatively small.
  • (A) column lower 5b is definitive when the second operation is, to start the operation at time t, and operating period Lb until the end of the operation at time t M2, the power consumption in the operating period Lb Represents.
  • the time taken from the start to the end of the operation is short, but the power consumption is high.
  • the total power consumption (power consumption 5bA) from the start of operation to the end of operation is relatively large. That is, it is larger than the total power consumption (power amount 5aA) in the upper stage as described above.
  • 4p represents a power price (unit price of power) per unit power amount.
  • the unit price of electric power during the operation period of the electric equipment includes a case shown in the (B) column of FIG. 1 and a case shown in the (C) column.
  • the total power consumption (power amount 5aA) in the case of performing the first operation is the case of the second operation (lower portion of (A) column). It is smaller than the total power consumption (power consumption 5 bA).
  • the cost that occurs when the operation in the upper row of the (A) column is lower than the cost that occurs in the operation in the lower row of the (A) column, In this case, it is possible to drive at a lower cost.
  • the unit price of power 4p increases at time t x earlier than time t M1 .
  • the total power consumption at the lower stage (power amount 5bA), which is the larger one, is subtracted from the total power consumption (power amount 5aA) at the upper stage, which is the smaller one, between these two power quantities.
  • the second product is the product of the previous power unit price (unit price 4P1) for the rise.
  • the cost in the operation of the lower column of the (A) column does not include the first product described above regarding the amount of increase 4 px, while the above-described difference between the two electric energy amounts. Contains the second product.
  • the first product that is not included in the above cost in the lower part of the column (A) may be larger than the second product that is included.
  • the second operation is performed (cost in the lower row of (A)) is the first operation.
  • the cost is lower than the cost in ((A) column upper row), and in the case of the lower row, the operation can be performed at a lower cost.
  • the power of the unit price 4p is, the time which can be seen to increase at time t x, the operation start rather than time t, there may be a later than the time t of the start of operation. Even in that case, the above-described problem may occur.
  • the time t in the description of FIG. 1 described above is not the time at which the operation is started, but the time at which a change in the unit price of power 4p is detected after that time.
  • the time t M1 is read as the operation end time when the operation is continued with the first operation after the time t (time t x ) (upper column of the (A) column).
  • the time t M2 is read as the operation end time when the operation is switched to the second operation (at time t x ).
  • the device control apparatus 2 performs a first operation performed over a first period (for example, a period from time t 2 to t M1 in FIG. 7C). (If the operation is performed, the operation in which the necessary period is the first period) and the second operation (the period in the time t 2 to t M2 ) (the time in the column z3) Information) indicating the price (p e (t)) of the electric power 1eP (FIG. 3), which is the device control device 2 that controls the operation of the electric device 1e (for example, the electric device 1e1).
  • a first period for example, a period from time t 2 to t M1 in FIG. 7C.
  • a detection unit 22 for detecting a change in the price (such as a change at time t x in FIG. 5) indicated by the change is examined
  • the first cost calculation unit 23 that calculates the first cost (information) 23c generated when the electric device 1e performs the first operation is detected.
  • the second cost calculation unit 24 that calculates the second cost 24c that occurs when the electric device 1e performs the second operation is compared with the first cost 23c and the second cost 24c, and is not high. It is a control apparatus provided with the comparison part 26 which specifies the driving
  • the first operation or the second operation is performed by the electric device 1e even if the above-described process for instructing the operation specified from the two calculated costs is not performed. It is conceivable that an appropriate instruction is given to perform an appropriate operation in which a relatively small appropriate cost is generated only from the power consumption amount of the case.
  • an appropriate instruction is given in the second case, and an appropriate instruction is given in any case, so that an appropriate instruction can be made more reliably. it can.
  • a state acquisition unit 27 that acquires information 27Ia indicating the operation state of the electrical device 1e (for example, the length of time t 1 to t 2 in the example of FIG. 7C) from the electrical device 1e described above is further provided. You may prepare.
  • the first operation is an operation in which power consumption consumed by the above-described electric device 1e in the first period is the first power W M1 (FIG. 5), and the second operation is performed in the second period.
  • the operation in which the second power W M2 is different from the first power W M1 may be used.
  • the surplus power amount w g ( t) is further provided, and the calculation unit (for example, the first cost calculation unit 23) of the first cost calculation unit 23 and the second cost calculation unit 24 is controlled by the price acquisition unit 21.
  • the calculation unit for example, the first cost calculation unit 23 of the first cost calculation unit 23 and the second cost calculation unit 24 is controlled by the price acquisition unit 21.
  • the cost may be calculated in this manner based on the power consumption of the electrical device 1e (electrical device 1e1) to which the instruction is issued.
  • Each of the first cost calculation unit 23 and the second cost calculation unit 24 calculates the price indicated by the information 4 acquired by the power price acquisition unit 21 and the specified operation.
  • Each cost (first cost 23c) may be calculated in this manner based on the depreciation (value 1er) obtained by converting the deterioration of the quality of the device 1e (electric device 1e1) into a cost.
  • the detection unit 22 Based on the acquired information (information 27Ib) indicating the above-described operation state of the electric device 1e (electric device 1e1), the detection unit 22 changes the scheduled operation end time of the electric device 1e indicating the operation state ( For example, a change from t E1 to t E3 in FIG. 13 may be detected.
  • a recording medium recording medium such as a system, method, integrated circuit, computer program, or computer-readable CD-ROM, and the system, method, integrated circuit, You may implement
  • FIG. 2 is a diagram showing the present system 1.
  • the system 1 includes a photovoltaic power generation system 1g, one or more electric devices 1e, a device control device 2, and the like.
  • the electrical equipment 1e can perform a plurality of operations with different power consumption (power consumption).
  • power consumption power consumption
  • the first operation although it takes a long time from the start of operation to the end of operation, the power consumption is low and the total power consumption from the start of operation to the end of operation is small.
  • the second operation the time taken from the start to the end of the operation is short, but the power consumption is high, and the total power consumption from the start to the end of the operation is large (see FIG. 1 described above).
  • the electrical equipment 1e is, for example, a washing / drying machine that performs washing and drying.
  • the first operation is a washing and drying operation of the laundry
  • the second operation is a second power consumption that is different from the power consumption when the first operation is performed. This is a washing and drying operation performed over a second operation time different from the operation time in the operation.
  • the system 1 is provided, for example, in a house 1h that is a house of a general household.
  • FIG. 3 is a diagram showing the configuration of the device control apparatus 2.
  • the device control apparatus 2 includes a power price acquisition unit 21, a detection unit 22, a first cost calculation unit 23, a second cost calculation unit 24, a comparison unit 26, and an instruction unit 25.
  • the device control device 2 may be a computer including a CPU, a ROM, a RAM, and the like. And the function of these electric power price acquisition parts 21 etc. may be realized in this equipment control device 2 when this computer runs a program memorized by ROM. Further, at least a part of the device control device 2 may be realized by an integrated circuit.
  • FIG. 4 shows a processing flow of the device control apparatus 2.
  • the power price acquisition unit 21 acquires information 4 from a device 1m (FIG. 3 or the like) outside the device control device 2 (Sa1 in FIG. 4).
  • the device 1m may be, for example, a smart meter provided in the house 1h or a server provided outside the house 1h.
  • the information 4 described above may be transmitted from the device 1m, which is an external server, to a smart meter provided in the house 1h. Accordingly, the transmitted information 4 may be acquired by the power price acquisition unit 21 via this smart meter.
  • FIG. 5 is an explanatory diagram for explaining processing in the detection unit 22, the first cost calculation unit 23, the second cost calculation unit 24, the comparison unit 26, and the instruction unit 25.
  • the column (A) in FIG. 5 shows the relationship between the time (horizontal axis) and the unit price of power (vertical axis).
  • p e (t) is a price (unit price) per unit electric energy at time t.
  • p e (t) is a price paid by a user of the electric device 1e to an electric power company or the like when using commercial power with a predetermined unit power amount (for example, 1 kWh).
  • the unit price of power is set based on supply and demand, and may vary depending on the time zone.
  • the power company sets the power unit price high during a time period when the power demand is high, and sets the power unit price low during a time period when the power demand is low.
  • prior to time t x is the unit price of the power p 1
  • unit price after time t x power indicates the case where p 2.
  • the power consumption in the first operation and the second operation is constant at W M1 and W M2 for the sake of simplicity of explanation. Although described as a power value, it may vary.
  • the detection unit 22 determines whether or not the unit price of power changes during the period in which the electric device 1e is operated using the information (described above) indicating the unit price of power acquired by the power price acquisition unit 21 ( Sa2 in FIG.
  • the detection unit 22 has the unit price p e (t) of power changed from p 1 to p 2 at time t x , and the electric device 1 e is also in the first state after time t 2 . Since this time t x is ahead of the scheduled operation end time t M1 in the case of continuing the operation in this operation, it is determined that the unit price of the electric power changes during the period in which the electric device 1 e is operated.
  • First cost calculation unit 23 when the detection unit 22 determines that the power unit price changes during the period for operating the electric device 1e, be continued time t 2 after the first operation to the electric device 1e
  • the first cost C M1 that occurs in the process (column (B) in FIG. 5) is calculated (Sa3 in FIG. 4).
  • FIG. 6A is a diagram illustrating a mathematical expression of the first cost C M1 .
  • the first cost C M1 is the power usage when the electric device 1 e operates with the power consumption W M1 from the operation start time t 1 to the operation end scheduled time t M1.
  • unit price of power from time t 1 to time t x is p 1
  • from time t x and the time t M1 is p 2. Therefore, the first cost C M1 is a price obtained by adding the following two products (the first and second terms on the right side of the expression in FIG. 6A).
  • one product is the unit price p 1 of power before the time t x when the unit price of power changes, and the amount of power consumption (W M1 ⁇ (t x ⁇ ) before the time tx. t 1 )).
  • the other product is the unit price of power (p 2 ) after time t x when the unit price of power changes, and the amount of power consumed after time tx (W M1 ⁇ (t M1 ⁇ t x )).
  • the amount of power consumption is obtained by the product of the power consumption (W M1 in the above example) and the operation period (t x -t 1 , t M1 -t x ).
  • the first cost C M1 can be specifically calculated by the equation of FIG. 6A or the like.
  • FIG. 6B is a diagram illustrating a mathematical expression of the second cost C M2 .
  • the second cost calculation unit 24 when the detection unit 22 determines that the power unit price changes during the period for operating the electrical device 1e, the time t 2 after the predetermined time (shown in FIG. 5 (C) of the column
  • the second cost C M2 generated when the electric device 1e performs the second operation from time t 2 is calculated (Sa4 in FIG. 4).
  • the electrical equipment 1e at time t 2, the operation to be performed, from the first operating switch to the second operation is operated. Therefore, the second cost C M2 is operated with the power consumption W M1 from the operation start time t 1 to the time t 2 , and is operated with the power consumption W M2 from the time t 2 to the scheduled operation end time t M2.
  • This is the price for the amount of electricity used.
  • the time t x at which the unit price of power changes from p 1 to p 2 is later than the scheduled operation end time t M2 .
  • Bid power is between p 1 period of operation of the electrical device 1e (period until time t M2).
  • the second cost C M2 is a price obtained by adding the following two products (first and second terms on the right side of FIG. 6B). That is, the product of one is the amount of power consumption (W M1 ⁇ (t 2 ⁇ t 1 )) during the period (time t 1 to t 2 ) in which the electric device 1e is in the first operation, and the unit price p of power. Is the product of 1 . The other product is the product of the power consumption (W M2 ⁇ (t M2 ⁇ t 2 )) during the second operation (time t 2 to t M2 ) and the unit price p 1 of power. .
  • the amount of power consumption is also the power consumption (W M1 , W M2 ) in the case of the column (C). And the operation period (t 2 -t 1 , t M2 -t 2 ).
  • the second cost C M2 can be specifically calculated by the equation of FIG. 6B or the like.
  • 7A and 7B are diagrams showing modified examples of the calculation formulas for the first cost C M1 and the second cost C M2 , respectively.
  • the time t x at which the unit price p e (t) of the electric power changes may be an earlier time than the time t M2 or a later time.
  • the elapsed time from the operation start time t 1 (FIG. 5) at the time t can be expressed by t ⁇ t 1 .
  • the second cost C M2 can be expressed by the sum of the following two values.
  • One value indicates that the cost (p e (t) ⁇ W M1 (t ⁇ t 1 )) generated at the time t is the first operation from the operation start time t 1 that causes the electric device 1e to perform the first operation.
  • the other value is (p e (t) ⁇ W M2 (t ⁇ t 1 ′)) from the time t 2 when the first operation is finished and the second operation is started. a second integrated value in the interval between the operation end scheduled time t M2 (second paragraph).
  • FIG. 7C is an explanatory diagram illustrating time t 1 ′.
  • the electrical device 1e From time t 1 until time t 2, the at the time t 2 when obtained by the first operation (column z1, Time in column z3 t2), There is a progress state S1 of the operation of the electric device 1e. Further, the electrical device 1e, (time t 1 in column z2, time t 1 'in column z3) at the start of operation when is operated in the second operation, it has elapsed elapsed time T 1 from the start of operation There is a progress state S2 at time (t s1 , t 2 ) (see the column “second operation”). Here, it is assumed that the above-described progress state S1 matches the progress state S2.
  • time t 2 the when the progress state S1, operation of the electrical device 1e is, the first operation is when switched to the second operation (column z3), after which this switch is an electrical device 1e performs the following operation (operation from time t 2 to t M2 in column z3).
  • this switch is an electrical device 1e performs the following operation (operation from time t 2 to t M2 in column z3).
  • a second operation in the progress state S2 of the elapsed time T 1 of the start of the operation (time t 1 '), the time t 2 is an operation in which an operation equivalent to the operation performed from the operation to the operation end (time t M2 ) of the operation (operation in the column z4) is performed.
  • the electrical device 1e at time t 1, a first operation, to start the operation, the time t 2, the switch, the operation end scheduled time when allowed to operate at the second operation (when the column z3) t M2 is the time t 2 + T 2 after such a time T 2 has elapsed from the time t2 when the switching is performed.
  • the comparison unit 26 compares the calculated first cost C M1 with the second cost C M2 and identifies the smaller one of the two costs (Sa5 in FIG. 4).
  • FIG. 7D is a diagram showing a conditional expression for specifying a smaller cost.
  • the instruction unit 25 instructs the electric device 1e to perform the operation specified by the comparison unit 26 at a lower cost (Sa6 in FIG. 4). That is, rather than continuing the first operation after time t 2 (see FIG. 7C) (see column z1 in FIG. 7C), the operation is switched to the second operation (see column z3). In some cases, lower cost operation is possible. That is, such a case is a case where the second cost C M2 is smaller than the first cost C M1 as in the case where the conditional expression shown in FIG. 7D is satisfied.
  • the instructing unit 25 instructs the electric device 1e to switch to the second operation (see the column z3).
  • the second operation of this case when starting the operation in the second operation (for column z4), is operated from the operation state of the elapsed time T 1 (operating state S2).
  • first cost C M1 and the second cost C M2 described above may be costs generated when an operation after time t 2 is performed. That is already period operation is made, the cost or the like may be free of cost in the period from time t 1 to time t 2.
  • FIG. 8 is a diagram illustrating a configuration of the device control apparatus 2 in the first modification.
  • the device control apparatus 2 further includes a prediction unit 28 in addition to the components shown in FIG.
  • the prediction unit 28 predicts the generated power of solar power generation (power generation prediction) and other electrical devices (for example, the electrical device 1e2) other than the controlled electrical device 1e (for example, the electrical device 1e1 in FIG. 2) in the house 1h.
  • the predicted surplus power W g (t) is calculated based on the power consumption prediction (power demand prediction).
  • the detection unit 22 Make a decision. That is, in that case, it is determined whether or not the unit price of power and the surplus power change during the period in which the electric device 1e is operated.
  • the first power cost calculation unit 23 and the second power cost calculation unit 24 respectively calculate the first cost and the second cost using the calculation formulas of FIGS. 9B and 9C described below. .
  • FIG. 9A is a diagram showing an operation in the first modified example.
  • the surplus power is the electric power (electric equipment) other than the electric equipment 1e (electric equipment 1e1) to be controlled by the equipment control device 2 among the electric power generated by the solar power generation system 1g and the like.
  • the remaining power obtained by subtracting the power used in 1e2).
  • the purchased power unit price p e (t) shown in the upper part of the upper, middle and lower parts of FIG. 9A is supplied from commercial power at time t and purchased by a user who is a resident of the house 1h from the electric power company. It is the unit price of electricity to be used.
  • the purchased power unit price p e (t) increases from p 1 to p 2 at time t x .
  • the generated power unit price p g (t) shown in the upper stage is a unit price of power generated by the solar power generation system 1g.
  • the generated power unit price p g (t) may be set to 0 yen assuming that the running cost of the photovoltaic power generation system is 0 yen, for example.
  • the generated power unit price p g (t) is calculated based on the initial investment amount of the photovoltaic power generation system, the useful life, the expected generated power amount during the period, and the like per unit generated power amount with respect to the unit generated power amount. Expenses such as expenses may be set.
  • W g (t) shown in the middle is predicted surplus power of solar power generation (predicted surplus power).
  • time t 1 is the operation start time.
  • time t 1 a first operation, and starts the operation of the electrical device 1e.
  • Time t 2 is the acquisition time of the electricity price, is the time it is detected that the plan of the future electricity price changes.
  • Time t M1 is an operation end time when the operation in the first operation is continued after time t 2 .
  • Time t M2 is the operation end time when the operation is performed in the second operation after switching the type of operation to be performed after time t 2 .
  • FIG. 9B shows mathematical formulas for calculating the first cost C M1 in the first modification.
  • the electric device 1e to be controlled uses surplus power of solar power generation for operation.
  • the surplus power is not enough for the power consumption of the electrical device 1e, commercial power is used for the shortage of power.
  • the electrical device 1e when the power consumption W M1 and W M2 of the electrical device 1e and the surplus power W g (t) are in a relationship as shown in FIG. 9A, at the operation start time t 1 , the electrical device 1e. Of the power consumption W M1 , W g (t 1 ) uses surplus power of solar power generation, and the remaining W M1 ⁇ W g (t 1 ) uses commercial power.
  • the first cost C M1 at time t in the first modified example is a mathematical expression enclosed in braces ⁇ shown on the right side of the mathematical expression in FIG. 9B.
  • the first term of the mathematical expression in the curly braces is a cost generated by using surplus power of solar power generation, and surplus power W g (t) of solar power generation and time t 1 at the electric equipment 1e. Is the product of the smaller one of the power consumption W M1 (t ⁇ t 1 ) at time t when the first operation is performed and the generated power unit price p g (t).
  • the second term is the cost generated by using commercial power.
  • the first cost C M1 is the integral of the sum of the product of the first term and the product of the second term in the interval from time t 1 to time t M1 .
  • FIG. 9C shows mathematical formulas for calculating the second cost C M2 in the first modification.
  • Second cost C M2 is from time t 1 to time t 2, the cost of the period to the first operating the electrical device 1e (first term on the right side), from time t 2 to t M2, electrical equipment It can be calculated by adding together the cost (second term) of the period during which the second operation is performed on 1e.
  • the cost (first term) of the period for which the first operation is performed is an integral of the sum of the following first product and second product.
  • the first product is a solar power surplus power W g (t), the power consumption W M1 at time t in the case where the time t 1 is the first operating the electrical device 1e and (t-t 1) Is the product of the smaller one of these and the generated power unit price p g (t).
  • the second product is the surplus power shortage W M1 (t ⁇ t 1 ) ⁇ W g (t) at time t, the larger of 0, and the unit price p e (t) of purchased power.
  • Is the product of The cost of the first term is the integral from time t 1 to time t 2 of the sum of these first and second products.
  • the cost (second term) of the period for which the second operation is performed is the integral of the sum of the first product and the second product as follows.
  • the first product is a solar power surplus power W g (t), the time t 1 to the electrical device 1e 'power W at time t when the was the second operating M2 (t-t 1' ) And the generated power unit price p g (t).
  • the second product is the surplus power shortage W M2 (t ⁇ t 1 ′) ⁇ W g (t) at time t, the larger of 0, and the unit price p e (t) of purchased power. Is the product of Cost of the second term, the first of these, the sum obtained by adding the second product, the integral over the interval from time t 2 to time t M2.
  • FIG. 10A is a diagram showing the relationship between the number of times the electrical device 1e is used and the quality in the second modification.
  • the quality exceeds the service quality (see the broken horizontal line).
  • the deterioration of quality increases linearly with respect to the number of uses (horizontal axis).
  • N M1 indicates the maximum number of times that the quality of the electrical device 1e is equal to or higher than the service quality when the electrical device 1e repeats the operation in the first operation from the start to the end of the operation.
  • N M2 is the electrical device 1e, the operation in the second operation to end the operation start, the case of repetition, the quality of the electrical device 1e is useful quality or more, indicates the maximum number of uses.
  • FIG. 10B is a diagram illustrating mathematical formulas for calculating the first cost C M1 in the second modified example.
  • FIG. 10B shows the cost of one operation of the electric device 1e when the electric device 1e deteriorates according to the number of uses as shown in FIG. 10A.
  • the first cost C M1 is the cost for the total amount of electric power used by the electric device 1e from the start to the end of the operation, and the cost due to deterioration of the quality of the electric device 1e per operation (in FIG. 10B It is calculated by adding the value 1er) on the right side.
  • the cost due to the deterioration of quality per operation a value obtained by dividing the initial investment cost P initial which is the price of the electric device 1e by the maximum number of times N M1 of the electric device 1e when the first operation is repeated is used. .
  • FIG. 10C is a diagram illustrating mathematical formulas for calculating the second cost C M2 in the second modification.
  • the second cost C M2 calculated by this mathematical formula is the cost of one operation of the electric device 1e when the electric device 1e deteriorates according to the number of uses as shown in FIG. 10A.
  • the second cost C M2 is the cost (the first and second terms on the right side) of the total amount of power used by the electrical device 1e from the start to the end of operation and the electrical device 1e per operation. This is the sum of the cost (third and fourth terms) due to the deterioration of quality. Costs once degradation of the quality of the electrical device 1e per operation (third, fourth paragraph), the first cost of the quality degradation due to operation from time t 1 to time t 2 (paragraph 3 ) and is the sum of the cost (paragraph 4) by quality deterioration due to the second operation during the period from time t 2 to time t M2.
  • the cost of quality degradation due to the first operation (third term) is calculated by dividing the price P initial of the electric device 1e by the maximum number of times of use N M1 when the operation is repeated in the first operation. It is calculated by multiplying the ratio ((t 2 -t 1 ) / (t M1 -t 1 )) of the period for actually performing the first operation to the operation period when the first operation is performed until the end.
  • the cost of quality degradation due to the second operation is calculated by dividing the price P initial of the electric device 1e by the maximum number of times of use N M2 when the electric device 1e is repeatedly operated in the second operation. It is calculated by multiplying the ratio ((t M2 -t 2 ) / (t M2 -t 1 )) of the period during which the second operation is actually performed to the operation period when the second operation is performed until the end.
  • FIG. 11 is a diagram showing a configuration of the device control apparatus 2 in the third modification.
  • the device control apparatus 2 further includes an electric device state acquisition unit 27 in addition to the configuration of FIG.
  • the electrical device state acquisition unit 27 acquires information (information 27Ia) indicating the operation state from the electrical device 1e.
  • the electric equipment state acquisition unit 27 can specify the progress indicating which process has been progressed in all processes from the start of operation to the end of operation based on the acquired information.
  • the progress may be specified as a ratio of driving time to the entire period from the start of driving to the end of driving.
  • the progress may be specified as a ratio of the remaining operation time with respect to the entire period from the start of operation to the end of operation.
  • the progress may be specified as a progress in which each specified process is a remaining process by specifying each remaining process.
  • FIG. 12 is a diagram showing a configuration of the device control apparatus 2 in the fourth modification.
  • the device control device 2 further includes a prediction unit 28 (see FIG. 8) in addition to the components shown in FIG.
  • FIG. 13 is a diagram showing an operation in the fifth modification.
  • time t q1 user operation instructs the operation to complete before the time t x.
  • the electric device 1e predicts the first time tE1 as the time when the operation when the first operation is performed is based on the amount of laundry. However, when the end time in the case of performing the first operation is predicted again at time t 2 after time t q1 , the operation is performed at a second time t E3 that is different from the first time t E1. It may be predicted as the end time. Before starting the operation, the end time is predicted with relatively low accuracy. However, after the operation is started, the end time can be predicted with higher accuracy based on the actual operation state. .
  • time t E1 is a time with relatively low accuracy predicted before the blanket contains moisture.
  • the time t E3 is a time with a relatively high accuracy that is predicted after taking into account much water actually absorbed by the blanket after the blanket contains water.
  • the second time t E3 predicted by the second prediction is, for example, a time predicted by such a high-precision prediction, so that the first time t E1 in the previous prediction is obtained. May be different.
  • the acquired first information indicates that the operation end time is predicted to be the first time tE1 .
  • the acquired second information indicates that the operation end time is predicted to be the second time tE3 .
  • the end times t E1 and t E3 may be predicted by the electric device information acquisition unit 27 instead of being predicted by the electric device 1e.
  • the first information and the second information are obtained from, for example, the above-described first time t E1 and second time t E3 as the predicted operation end time. Information specified by the unit 27 or the like may be used.
  • the electrical equipment information acquisition unit 27 determines whether or not the second time t E3 is later than the first time t E1 .
  • the detection unit 22 may determine whether the second time tE3 is later than the first time tE1 .
  • the instruction unit 25 instructs the electric device 1e to continue the first operation after the time t 2 .
  • First power cost calculation unit 23 calculates the cost occurring when performing the time t 2 after the remaining operations in the first operation (operation in the field J2).
  • Second power cost calculation unit 24 calculates the cost occurring when performing the time t 2 after the remaining operations in the second operation (operation in the field J3).
  • the comparison unit 26 compares the two calculated costs to identify the operation with the lower cost.
  • the calculated cost that occurs when the remaining operation is performed in the first operation may be a cost that occurs between times t 2 and t E3 , or a time t 1 to t that includes the cost.
  • the total cost of E3 may be used.
  • the calculated cost generated when the remaining operation is performed in the second operation may be a cost between the times t 2 and t M2 , and includes the costs at times t 1 to t 2 .
  • the total cost of t M2 may be used.
  • instructing unit 25 instructs electric device 1e to perform the operation specified by comparing unit 26. . That is, if the cost of performing the remaining operation in the first operation is smaller, the electric device 1e is instructed to continue the first operation (column J2). If the cost of switching to the second operation and performing the remaining operation is smaller, the electric device 1e is instructed to switch to the second operation and operate (column J3).
  • the device control apparatus 2 controls the operation of the electric device 1e that performs any of the operations (column J3).
  • the power price acquisition unit 21 acquires information 4 indicating the price of the power 1 eP (P e (t) described above).
  • Price change (time t x) indicated by the acquired information 4 between the first period and the shorter period of the second period (the first period from time t 2 to t E3 ) The change in the) is detected by the detection unit 22.
  • the first cost 23c generated when the electric device 1e performs the first operation during the first period is the first The cost calculation unit 23 calculates.
  • the second cost calculation unit 24 calculates the second cost 24c that occurs when the electric device 1e performs the second operation in the second period (in the case of the column J3).
  • the first cost 23c and the second cost 24c are compared, and the comparison unit 26 identifies an operation at a lower cost.
  • the instruction unit 25 instructs the electric device 1e to perform the specified operation.
  • This technology has a configuration that realizes the above-described principle, and the above-described effects are produced by the action of the configuration.
  • the present technology is different from the conventional example in the configuration, operation, and effect.
  • each component may be configured by dedicated hardware or may be realized by executing a software program suitable for each component.
  • Each component may be realized by a program execution unit such as a CPU or a processor reading and executing a software program recorded on a recording medium such as a hard disk or a semiconductor memory.
  • the software that realizes the control device of each of the above embodiments is a program as follows.
  • the program causes the computer to operate the electric device that performs either the first operation performed over the first period or the second operation performed over the second period.
  • the acquired information during the price acquisition step of acquiring information indicating the price of power for control, and the shorter period of the first period and the second period A detecting step for detecting a change in price, a first calculating step for calculating a first cost for the electric device to perform the first operation when the change is detected, and the change is detected.
  • the second calculation step for calculating the second cost for the electric device to perform the second operation is compared with the first cost and the second cost. Identify driving at cost A comparing step to execute the instruction step of instructing to the electric device to perform the identified operation.
  • control device As described above, the control device according to one or more aspects has been described based on the embodiment, but the present invention is not limited to this embodiment. Unless it deviates from the gist of the present invention, various modifications conceived by those skilled in the art have been made in this embodiment, and forms constructed by combining components in different embodiments are also within the scope of one or more aspects. May be included.
  • the present invention avoids instructing an electric device to perform an operation that causes a high cost, can provide a more appropriate instruction more reliably, and can be applied to a control device that instructs the electric device to operate. Is available.

Abstract

 十分確実に、行われる指示が、適切な指示にできる制御装置を提供する。第1の運転と、第2の運転とのいずれかを行う電気機器の制御をする機器制御装置(2)が、電力の価格を示す情報を取得する電力価格取得部(21)と、第1の期間と、第2の期間のうち短くない方の期間の間における、価格の変化を検出する検出部(22)と、検出された場合に、第1の運転を行う第1のコストを算出する第1のコスト算出部(23)と、検出された場合に、第2の運転を行う第2のコストを算出する第2のコスト算出部(24)と、比較部(26)と、特定された運転を指示する指示部(25)とを備える。

Description

制御装置、集積回路、制御方法、プログラム
 本発明は、電力の単価を示す情報を取得して、電気機器の運転がされる際に生じるコストを算出し、算出されたコストに基づいて、運転の指示を、その電気機器にする制御装置に関する。
 従来より、深夜電力料金制度や時間帯別の電力料金制度による電力の単価が安い時間を示す情報を保有して、電気機器を電力の単価が安い時間帯に運転されるように指示する制御装置がある(特許文献1、2などを参照)。
 なお、電気機器は、例えば、一般家庭の住宅に設けられる、洗濯乾燥機、食器洗い乾燥機などの家電機器や、ヒートポンプ給湯器等である。
 制御装置は、そのような電気機器の一部として設けられることがある。
 また、制御装置は、そのような電気機器の外部に設けられることもある。例えば、このような、外部にある制御装置としては、住宅に設けられた2つ以上の電気機器のそれぞれと通信して、それぞれの電気機器でのコストに基づいて、その電気機器への指示をするものなどがある。
特開平06-165374号公報 特開2009-047334号公報
 しかしながら、従来の制御装置では、電気機器を比較的低いコストで運転させる適切な指示がなされず、比較的高いコストで運転させる不適切な指示がなされてしまうことがある。
 そこで、本発明は、電気機器へ高いコストの運転をさせる不適切な指示をすることを防ぎ、より確実に、電気機器へ低いコストの運転をさせる適切な指示をすることができる制御装置を提供する。
 本発明の一態様に係る制御装置は、第1の期間をかけて行う第1の運転と、第2の期間をかけて行う第2の運転とのいずれかの運転を行う電気機器の運転を制御する制御装置であって、電力の価格を示す情報を取得する価格取得部と、前記第1の期間と、前記第2の期間とのうち短くない方の期間の間における、取得された前記情報により示される価格の変化を検出する検出部と、前記変化が検出された場合に、前記電気機器が前記第1の運転を行う第1のコストを算出する第1の算出部と、前記変化が検出された場合に、前記電気機器が前記第2の運転を行う第2のコストを算出する第2の算出部と、前記第1のコストと前記第2のコストとを比較して、高くない方のコストでの運転を特定する比較部と、前記特定された運転を行うことを前記電気機器へ指示する指示部とを備える制御装置である。
 なお、これらの包括的または具体的な態様は、システム、方法、集積回路、コンピュータプログラムまたはコンピュータ読み取り可能なCD-ROMなどの記録媒体で実現されてもよく、システム、方法、集積回路、コンピュータプログラムおよび記録媒体の任意な組み合わせで実現されてもよい。
 本発明の制御装置は、電気機器へ、高いコストで運転させる指示をすることを回避して、より確実に、電気機器へ適切な指示をして、低いコストで運転させることができる。
 また、電気機器が動作する期間において、電力の単価の変化があっても、不適切な指示をせずに、適切な指示を行うことができる。
図1は、(A)欄で、電気機器の運転期間と消費電力を示し、(B)欄および(C)欄のそれぞれで、電力価格を示す図である。 図2は、本システムを示す図である。 図3は、機器制御装置の構成を示す図である。 図4は、機器制御装置の動作のフローチャートである。 図5は、(A)欄で、電力価格を示し、(B)欄および(C)欄のそれぞれで、本システムの動作を示す図である。 図6Aは、第1のコストの具体例の数式を示す図である。 図6Bは、第2のコストの具体例の数式を示す図である。 図7Aは、第1のコストの具体例の数式を示す図である。 図7Bは、第2のコストの具体例の数式を示す図である。 図7Cは、時刻についての説明を示す図である。 図7Dは、判定の条件を示す図である。 図8は、第1の変形例での構成を示す図である。 図9Aは、第1の変形例での動作を示す図である。 図9Bは、第1の変形例での数式を示す図である。 図9Cは、第1の変形例での数式を示す図である。 図10Aは、電気機器の品質の変化を示す図である。 図10Bは、第2の変形例での数式を示す図である。 図10Cは、第2の変形例での数式を示す図である。 図11は、第3の変形例での構成を示す図である。 図12は、第4の変形例での構成を示す図である。 図13は、第5の変形例での動作を示す図である。
 (本発明の基礎となった知見)
 本発明者は、「背景技術」の欄において記載した制御装置に関し、以下の問題が生じることを見出した。
 図1を用いて詳しく説明する。
 図1は、(A)欄で、電気機器の運転期間と、消費電力との関係を模式的に表し、(B)欄、(C)欄のそれぞれで、単位電力量当たりの電力価格(単価4p)の変化を表す図である。
 (A)欄上段の5aは、第1の運転がされる際における、時刻tに運転を開始して、時刻tM1に運転を終了するまでの運転期間Laと、その運転期間Laにおける消費電力とを表している。すなわち、5aの、横軸方向の長さは、運転期間Laの長さを表し、5aの、縦軸方向の幅は、各時刻での消費電力を表す。従って、5aの面積は、運転開始から運転終了までの総消費電力量(電力量5aA)を表す。第1の運転では、運転開始から運転終了までにかかる時間は長いが、消費電力が低い。また、第1の運転では、運転開始から運転終了までの総消費電力量が、比較的小さい。
 (A)欄下段の5bは、第2の運転がされる際における、時刻tに運転を開始して、時刻tM2に運転を終了するまでの運転期間Lbと、その運転期間Lbにおける消費電力とを表している。第2の運転では、運転開始から運転終了までにかかる時間は短いが、消費電力が高い。第2の運転では、運転開始から運転終了までの総消費電力量(電力量5bA)が、比較的大きい。つまり、先述の、上段での総消費電力量(電力量5aA)よりも大きい。
 (B)欄および(C)欄のそれぞれで、4pは、単位電力量当たりの電力価格(電力の単価)を表す。
 そして、電気機器の運転期間における電力の単価の変化には、図1の(B)欄に示す場合と、(C)欄に示す場合とがあることが想定される。
 まず、(B)欄の例では、運転終了までにかかる時間が長い第1の運転((A)欄上段)をさせた場合の運転終了時刻tM1までの、電力の単価4pが、一定である。
 ここで、先述の通り、第1の運転をさせる場合((A)欄上段)の総消費電力量(電力量5aA)の方が、第2の運転をさせる場合((A)欄下段)の総消費電力量(電力量5bA)よりも小さい。
 このため、(B)欄の例では、(A)欄上段での動作がされる場合に生じるコストの方が、(A)欄下段での動作がされる場合に生じるコストよりも低く、上段の場合の方で、より低いコストでの運転をさせることが可能である。
 一方で、図1の(C)欄の例では、時刻tM1よりも早い時刻tに、電力の単価4pが上昇する。
 このため、上昇をした後の単価4p2から、上昇をする前の単価4p1が減算された、電力の単価4pの上昇分(額4px)がある。
 そして、この額4pxと、第1の運転で運転させる場合((A)欄上段)の、時刻tからtM1の期間に消費される電力量5aJとの積である第1の積がある。
 一方で、第1の運転をさせた場合((A)欄上段)の総消費電力量(電力量5aA)と、先述のように、その総消費電力量5aAよりも大きい、第2の運転をさせた場合(下段)の総消費電力量(電力量5bA)とがある。
 つまり、大きい方である下段での総消費電力量(電力量5bA)から、小さい方である上段での総消費電力量(電力量5aA)が減算された、これらの2つの電力量の間の差分と、時刻tよりも前の、上昇をする前の電力単価(単価4p1)との積である第2の積もある。
 すなわち、(C)欄の例での、(A)欄下段の動作におけるコストは、上昇分の額4pxに関する上述の第1の積を含まない一方で、2つの電力量の差分に関する、上述の第2の積を含む。
 そして、(A)欄下段での上述のコストには含まれない第1の積の方が、含まれる第2の積よりも大きい場合があることが想定される。
 この場合には、電力の単価が上昇する前の時刻tM2に運転が終了する、第2の運転をさせる場合((A)欄下段)でのコストの方が、第1の運転をさせる場合((A)欄上段)でのコストよりも低いコストであり、下段の場合において、より低いコストでの運転ができる。
 このため、(B)欄の例では、(A)欄上段でのコストの方が、より低いコストである一方で、(C)欄の例では、(A)欄下段でのコストの方が、より低いコストである。
 このため、(B)欄の例の場合に、(A)欄上段の動作をさせる指示がされるのに加えて、更に、(C)欄の例の場合においてまでも、(A)欄上段のより高いコストが生じる不適切な指示がされてしまい、適切な指示ができない問題が生じることが想定される。
 なお、電力の単価4pが、時刻tで上昇することが分かる時刻は、運転開始の時刻tではなく、運転開始の時刻tよりも後である場合もある。その場合にも、上記で説明された問題が生じてしまう恐れがある。
 つまり、上記の、図1の説明における時刻tを、運転開始の時刻ではなくて、その時刻よりも後での、電力の単価4pの変化を検出した時刻とする。一方で、時刻tM1を、時刻t(時刻t)以降も、第1の運転のまま運転を継続させる場合((A)欄上段)の運転終了時刻と読み替える。また、時刻tM2を、(時刻tに)第2の運転に切り替えて運転させる場合の運転終了時刻と読み替える。
 すると、この場合において、先述の説明と同じように説明ができて、この場合にも先述の問題が生じる恐れがあるのがわかる。
 以下、本発明の一態様について、図面を参照して説明する。
 このような問題を解決するために、本発明の一態様に係る機器制御装置2は、第1の期間(例えば、図7Cの時刻t~tM1の期間)をかけて行う第1の運転(その運転がされれば、必要な期間が、第1の期間である運転)と、第2の期間(時刻t~tM2の期間)をかけて行う第2の運転(欄z3での運転)とのいずれかの運転を行う電気機器1e(例えば電気機器1e1)の運転を制御する機器制御装置2であって、電力1eP(図3)の価格(p(t))を示す情報4を取得する電力価格取得部21と、第1の期間と、第2の期間のうち短くない方の期間(時刻t~tM1の第1の期間)の間における、取得された情報4により示される価格の変化(図5の時刻tでの変化など)を検出する検出部22と、変化が検出された場合に、上述の電気機器1eが第1の運転を行うときに生じる第1のコスト(情報)23cを算出する第1のコスト算出部23と、変化が検出された場合に、上述の電気機器1eが第2の運転を行うときに生じる第2のコスト24cを算出する第2のコスト算出部24と、第1のコスト23cと第2のコスト24cとを比較して、高くない方のコストでの運転を特定する比較部26と、特定された運転を行うことを、上述の電気機器1eへと指示する指示部25(指示25sを参照)とを備える制御装置である。
 上記の電力1ePの価格(p(t))については、上述された、短くない方の期間(図7Cの時刻t~tM1の期間)のうちに、その価格の変化がない第1の場合(図1の(B)欄を参照)だけでなくて、変化がある第2の場合((C)欄を参照)もあることが想定される。
 そして、第1の場合には、上述された、算出された2つのコストから特定される運転を指示する処理がされなくても、電気機器1eで第1の運転または第2の運転がされた場合の消費電力量のみから比較的小さい適切なコストが生じる適切な運転がされる適切な指示がされることが考えられる。
 つまり、第2の場合には、上述の処理がされないときには、適切な指示がされず、上述の処理がされるときにのみ、適切な指示がされることが想定される。
 そこで、上述の期間における変化(図1の(C)欄を参照)が検出されて、第1の場合ではなく、第2の場合であると判断されるときには、上述の処理がされる。
 これにより、上述の処理がされずに、適切な指示がされず、先述された「高いコストの運転をさせる不適切な指示」がされてしまうことが防がれ、「低いコストの運転をさせる」適切な指示ができる。
 ひいては、第1の場合に適切な指示がされるのに加えて、第2の場合にも適切な指示がされ、何れの場合にも適切な指示がされて、より確実に、適切な指示ができる。
 つまり、上述の期間(先述の「電気機器が動作する期間」)において、電力の単価が変化して、そのような変化が存在する上述の第2の場合(図1の(C)欄)が発生しても、適切な指示ができる。
 なお、上述の電気機器1eから、その電気機器1eの運転状態(例えば、図7Cの例での、時刻t~tの長さなど)を示す情報27Iaを取得する状態取得部27を更に備えてもよい。
 第1の運転は、第1の期間において、上述の電気機器1eにより消費される消費電力が第1の電力WM1(図5)である運転であり、第2の運転は、第2の期間においての消費電力が第1の電力WM1とは異なる第2の電力WM2である運転でもよい。
 電気機器1e(例えば電気機器1e1)以外の他の電気機器(電気機器1e2)での消費電力量と、太陽光発電システム1gで発電される発電電力量とに基づいて、余剰電力量w(t)を予測する予測部28を更に備え、第1のコスト算出部23と第2のコスト算出部24とのそれぞれの算出部(例えば第1のコスト算出部23)は、価格取得部21により取得された情報4により示される価格と、予測した余剰電力量w(t)と、上述の他の電気機器(電気機器1e2など)ではない、指示部25により、特定された運転をすることが指示される電気機器1e(電気機器1e1)の消費電力とに基づいて、この態様で、それぞれのコスト(第1のコスト23)を算出してもよい。
 第1のコスト算出部23と、第2のコスト算出部24とのそれぞれの算出部は、電力価格取得部21により取得された情報4により示される価格と、特定された運転が指示される電気機器1e(電気機器1e1)の品質の劣化をコストに換算した減価(値1er)とに基づいて、この態様で、それぞれのコスト(第1のコスト23c)を算出してもよい。
 検出部22は、取得された、電気機器1e(電気機器1e1)の先述の運転状態を示す先述の情報(情報27Ib)に基づき、運転状態が示される電気機器1eの運転終了予定時刻の変化(例えば、図13での、tE1からtE3への変化など)を検出してもよい。
 なお、これらの包括的または具体的な態様は、システム、方法、集積回路、コンピュータプログラムまたはコンピュータ読み取り可能なCD-ROMなどの記録媒体記録媒体で実現されてもよく、システム、方法、集積回路、コンピュータプログラムまたは記録媒体の任意な組み合わせで実現されてもよい。
 以下、実施の形態について、図面を参照しながら具体的に説明する。
 なお、以下で説明する実施の形態は、いずれも包括的または具体的な例を示すものである。以下の実施の形態で示される数値、形状、材料、構成要素、構成要素の配置位置及び接続形態、ステップ、ステップの順序などは、一例であり、本発明を限定する主旨ではない。また、以下の実施の形態における構成要素のうち、最上位概念を示す独立請求項に記載されていない構成要素については、任意の構成要素として説明される。
 (実施形態)
 図2は、本システム1を示す図である。
 システム1は、太陽光発電システム1g、1つ以上の電気機器1e、機器制御装置2などを含む。
 電気機器1eは、使用する電力(消費電力)が異なる複数の運転ができるものである。ここでは、第1の運転と第2の運転とを行うことができるものとする。第1の運転では、運転開始から運転終了までにかかる時間は長いが、消費電力が低く、運転開始から運転終了までの総消費電力量が小さい。第2の運転では、運転開始から運転終了までにかかる時間は短いが、消費電力が高く、運転開始から運転終了までの総消費電力量が大きい(先述の図1参照)。
 電気機器1eは、例えば、洗濯および乾燥を行う洗濯乾燥機である。そして、例えば、第1の運転は、洗濯物の洗濯および乾燥の動作であり、第2の運転は、第1の運転をさせた場合の消費電力とは異なる第2の消費電力で、第1の運転での運転時間とは異なる第2の運転時間をかけて行われる、洗濯および乾燥の動作である。
 システム1は、例えば、一般家庭の住宅などである住宅1hに設けられる。
 図3は、機器制御装置2の構成を示す図である。
 機器制御装置2は、電力価格取得部21と、検出部22と、第1のコスト算出部23と、第2のコスト算出部24と、比較部26と、指示部25とを備える。
 なお、例えば、機器制御装置2の少なくとも一部は、CPU、ROM、RAMなどを含んでなるコンピュータでもよい。そして、このコンピュータが、ROMに記憶されたプログラムなどを実行することにより、これら電力価格取得部21などの機能が、この機器制御装置2に実現されてもよい。また、機器制御装置2の少なくとも一部は、集積回路で実現されてもよい。
 図4は、機器制御装置2の処理フローを示している。
 電力価格取得部21(図3)は、機器制御装置2の外部にある装置1m(図3など)から、情報4を取得する(図4のSa1)。
 なお、装置1mは、例えば、住宅1hに設けられたスマートメータでもよいし、住宅1hの外部に設けられたサーバなどでもよい。例えば、外部のサーバである装置1mから、住宅1hに設けられたスマートメータへと、上述の情報4が送信されてもよい。このことにより、送信された情報4が、このスマートメータを経由して、電力価格取得部21により取得されてもよい。
 図5は、検出部22、第1のコスト算出部23、第2のコスト算出部24、比較部26、指示部25での処理を説明する説明図である。
 図5は、時刻tに、電気機器1eが第1の運転で運転を開始しており、時刻tに、電力価格取得部21が電力の単価を示す情報(上述)を取得した場合を表している。
 図5の(A)欄は、時刻(横軸)と、電力の単価(縦軸)との関係を示すものである。p(t)は、時刻tにおける、単位電力量当たりの価格(単価)である。p(t)は、所定の単位電力量(例えば1kWh)の商用電力を使用する際に、その電力の使用に対して、電力会社などに、電気機器1eのユーザなどが支払う価格である。電力の単価は、需給に基づいて設定され、時間帯によって変化することがある。電力会社は、電力需要が多い時間帯には電力単価を高く設定し、電力需要が少ない時間帯には電力単価を低く設定する。図5では、時刻tより前には電力の単価がpであり、時刻t以降の電力の単価がpである場合を示している。
 図5の(B)欄は、時刻t以降も継続して電気機器1eを第1の運転で運転させる場合の、運転開始から運転終了までの時間経過(横軸)と、電気機器1eの消費電力(縦軸)との関係を表す。
 図5の(C)欄は、時刻t以降には、行われる運転を、第2の運転に切り替えて、電気機器1eを運転させる場合の、運転開始から運転終了までの時間経過と、電気機器1eの消費電力との関係を表す。
 なお、図5の(B)欄、図5の(C)欄においては、説明の簡略化のため、第1の運転、第2の運転での消費電力はそれぞれWM1、WM2で、一定電力値として記載しているが、変動しても構わない。
 検出部22は、電力価格取得部21で取得された、電力の単価を示す情報(上述)を用いて、電気機器1eを運転させる期間中に、電力の単価が変化するかどうかを判断する(図4のSa2)。
 図5の例では、検出部22は、電力の単価p(t)が時刻tにおいてpからpに変化しており、且つ、電気機器1eを、時刻t以降も、第1の運転で継続して運転させる場合においての運転終了予定時間tM1よりも、この時刻tが先であるので、電気機器1eを運転させる期間中に、電力の単価が変化すると判断する。
 第1のコスト算出部23は、検出部22が電気機器1eを運転させる期間中に電力の単価が変化すると判断した場合に、時刻t以降も継続して電気機器1eに第1の運転をさせる際(図5の(B)欄)に生じる第1のコストCM1を算出する(図4のSa3)。
 図6Aは、第1のコストCM1の数式を示す図である。
 なお、図6Aの数式は、単なる一例である。なお、以下では、このような、単なる一例であることを明記する説明が、適宜省略される。
 図5の(B)欄の例の場合、第1のコストCM1は、電気機器1eが、消費電力WM1で、運転開始時刻tから運転終了予定時刻tM1まで運転する場合の電力使用量に対する価格である。また、電力の単価は、時刻tから時刻tまではpであり、時刻tから時刻tM1まではpである。このため、第1のコストCM1は、次の2つの積(図6Aの式の右辺の第1、第2項)を足し合わせた価格となる。つまり、一方の積(第1項)は、電力の単価が変化する時刻tより前での電力の単価pと、その時刻txより前での消費電力量(WM1×(t-t))との積である。他方の積(第2項)は、電力の単価が変化する時刻tより後での電力の単価(p)と、その時刻txより後での消費電力量(WM1×(tM1-t))との積である。
 なお、図5の場合、消費電力量は、消費電力(上述の例ではWM1)と、運転期間(t-t、tM1-t)との積で求められる。
 このように、第1のコストCM1については、具体的には、図6Aの式などで算出できる。
 図6Bは、第2のコストCM2の数式を示す図である。
 第2のコスト算出部24は、検出部22が電気機器1eを運転させる期間中に電力の単価が変化すると判断した場合に、時刻t以降の所定の時刻(図5の(C)欄の例では時刻t)から電気機器1eに第2の運転をさせる際に生じる第2のコストCM2を算出する(図4のSa4)。
 図5の場合、電気機器1eを、時刻tで、行われる運転を、第1の運転から第2の運転に切り替えて、運転させる。このため、第2のコストCM2は、運転開始時刻tから時刻tまで、消費電力WM1で運転し、時刻tから運転終了予定時刻tM2まで、消費電力WM2で運転する場合の電力使用量に対する価格である。ここで、電力の単価がpからpに変化する時刻tが、運転終了予定時刻tM2よりも後の時刻であるとする。電力の単価は電気機器1eの運転期間(時刻tM2までの期間)の間pである。このため、第2のコストCM2は、次の2つの積(図6Bの右辺の第1、第2項)を足し合わせた価格となる。つまり、一方の積は、電気機器1eが第1の運転をしている期間(時刻t~t)の消費電力量(WM1×(t-t))と、電力の単価pとの積である。他方の積は、第2の運転をしている期間(時刻t~tM2)の消費電力量(WM2×(tM2-t))と、電力の単価pとの積である。
 なお、図5の場合、先述された、図5の(B)欄での場合と同様に、この(C)欄での場合にも、消費電力量は、消費電力(WM1、WM2)と、運転期間(t-t、tM2-t)との積で求められる。
 このように、第2のコストCM2については、具体的には、図6Bの式などで算出できる。
 図7A、図7Bは、それぞれ、第1のコストCM1および第2のコストCM2の算出式の変形例を示す図である。
 図7A、図7Bでは、電気機器1eの消費電力が変動する場合を考慮している。また、電力の単価p(t)が変化する時刻tが、時刻tM2よりも早い時刻である場合と、遅い時刻である場合とがあることも考慮している。
 時刻tにおける、運転開始の時刻t(図5)からの経過時間は、t-tで表すことができる。このため、時刻tにおけるコストは、時刻tにおける電力の単価p(t)と、運転開始から時間(t-t)経過後の電気機器1eの消費電力WM1(t-t)との積で表すことができる。つまり、このような、時刻tでのコストの、時刻t=t~tM1の区間での積分(図7Aの右辺)で、第1のコストCM1(図7Aの左辺)を表すことができる。
 同様に、第2のコストCM2は、次の2つの値の和で表せる。一方の値は、時刻tに発生するコスト(p(t)×WM1(t-t))が、電気機器1eに第1の運転をさせる運転開始時刻tから、第1の運転が終了する時刻tまでの第1の区間で積分された値(図7Bの右辺の第1項)である。他方の値は、(p(t)×WM2(t-t’))が、第1の運転が終了して、第2の運転が開始する時刻tから、第2の運転での運転終了予定時刻tM2の間の第2の区間で積分された値(第2項)である。
 ここで、上述の時刻t’について説明する。
 図7Cは、時刻t’を説明する説明図である。
 図7Cに示すように、電気機器1eに、時刻tから時刻tまでの間に、第1の運転をさせた際の時刻t(欄z1、欄z3での時刻t2)での、電気機器1eの運転の進捗状態S1がある。また、電気機器1eを、運転開始時(欄z2での時刻t、欄z3での時刻t’)から第2の運転で運転させたときの、運転開始から経過時間Tが経過した時刻(ts1、t)での進捗状態S2がある(「第2の運転」の欄を参照)。ここで、先述の進捗状態S1が、この進捗状態S2と一致すると仮定する。時刻tで、進捗状態S1のときに、電気機器1eの運転が、第1の運転から、第2の運転に切り替えられる際には(欄z3)、この切り替えがされた後には、電気機器1eは、次のような運転(欄z3での、時刻t~tM2の運転)を行う。その運転とは、第2の運転(欄z4での、時刻t~tM2の運転)での、運転開始(時刻t’)からの経過時間Tでの進捗状態S2で、時刻tから、その運転(欄z4での運転)の運転終了(時刻tM2)までの運転で行われる動作と同等の動作が行われる運転である。従って、時刻tで、第1の運転から第2の運転に切り替えた際(欄z3)の、電気機器1eの運転状態は、切り替えがされる時刻tよりも、上述の経過時間Tだけ前における時刻t’=t-Tに、第2の運転(欄z4の運転)で運転を開始させた場合での、時刻t2における運転状態(運転状態S2)と同じ運転状態(運転状態S1)である。また、第2の運転(欄z4での運転)で、運転開始(時刻t1’)から経過時間Tが経過した時刻tまで、電気機器1eを運転させた場合の、運転終了の時刻tM2までの残りの時間がTであると仮定する。電気機器1eに、時刻tに、第1の運転で、運転を開始させ、時刻tに、切り替えて、第2の運転で運転をさせた場合(欄z3の場合)の運転終了予定時刻tM2は、切り替えがされる時刻t2から、このような時間Tが経過した後の時刻t+Tとなる。
 比較部26は、算出された第1のコストCM1と第2のコストCM2とを比較し、それら2つのコストのうちから、より小さい方のコストを特定する(図4のSa5)。
 図7Dは、より小さい方のコストを特定する条件式を示す図である。
 指示部25は、比較部26により特定された、より小さいコストとなる運転をするように、電気機器1eに対して指示する(図4のSa6)。すなわち、時刻t(図7C)以降にも第1の運転を継続させる(図7Cの欄z1を参照)よりも、第2の運転に切り替えて運転させた方が(欄z3を参照)、より低いコスト運転できる場合がある。つまり、このような場合とは、図7Dに示す条件式が満たされる場合のような、第2のコストCM2が、第1のコストCM1より小さい場合である。指示部25は、この場合であると比較部26により判断されるときに、電気機器1eに対して、第2の運転に切り替えて運転する(欄z3を参照)ように指示する。なお、このときの第2の運転は、第2の運転で運転を開始した場合(欄z4の場合)の、経過時間Tでの運転状態(運転状態S2)から運転される。
 なお、上述した第1のコストCM1および第2のコストCM2は、時刻t以降の運転がされた際に生じるコストでもよい。すなわち、既に運転がなされた期間である、時刻tから時刻tまでの期間のコストを含まないコストなどでもよい。
 (変形例)
 図8は、第1の変形例における機器制御装置2の構成を示す図である。
 機器制御装置2は、図3の構成要素に加え、更に、予測部28を備える。
 予測部28は、太陽光発電の発電電力の予測(発電予測)と、住宅1hにおける、制御対象の電気機器1e(例えば、図2における電気機器1e1)以外の他の電気機器(例えば電気機器1e2)による消費電力の予測(電力需要予測)とに基づき、予測余剰電力W(t)を算出する。
 検出部22は、電力価格取得部21で、電力の単価を示す情報(先述)が取得された場合や、予測部28で、予測余剰電力W(t)が算出された場合に、次の判断を行う。つまり、その場合に、電気機器1eを運転させる期間中に、電力の単価や余剰電力が変化するかどうかが判断される。
 第1の電力コスト算出部23および第2の電力コスト算出部24は、それぞれ、以下で説明される図9B、図9Cの算出式を用いて、第1のコストおよび第2のコストを算出する。
 図9Aは、第1の変形例での動作を示す図である。
 第1の変形例では、電気機器1eで、太陽光発電(図2の太陽光発電システム1gを参照)により生成される電力(発電電力)も使用される場合における、コストの計算方法が示される。
 なお、余剰電力とは、太陽光発電システム1gなどでの発電された電力のうちで、機器制御装置2が制御する対象である電気機器1e(電気機器1e1)以外の他の電気機器(電気機器1e2)で使用される電力を差し引いた残りの電力をいう。
 図9Aの上段、中段、下段のうちの上段で示される買電電力単価p(t)は、時刻tにおける、商用電力から供給されて、電力会社から、住宅1hの住人であるユーザが購入する電力の単価である。ここでは、買電電力単価p(t)は、時刻tに、pからpへと上昇している。
 この上段に示される発電電力単価p(t)は、太陽光発電システム1gで発電する電力の単価である。発電電力単価p(t)は、例えば太陽光発電システムのランニングコストが0円であるとみなして、0円と設定してもよい。発電電力単価p(t)としては、太陽光発電システムの初期投資額と、耐用年数と、その期間の期待発電電力量となどから算出した、単位発電電力量に対する、単位発電電力量当りの費用などの費用を設定してもよい。
 中段に示されるW(t)は、予測される、太陽光発電の余剰電力(予測余剰電力)である。
 図9Aにおいて、時刻tは、運転開始時刻である。ここでは、図9Aの中段および下段でそれぞれ示されるように、この時刻tに、第1の運転で、電気機器1eの運転を開始している。時刻tは、電力価格の取得時刻であり、将来の電力価格の予定が変化したことを検出した時刻である。時刻tM1は、時刻t以後にも、第1の運転での運転を継続する場合の運転終了時刻である。時刻tM2は、時刻t以後には、行われる運転の種類を切り替えて、第2の運転で運転する場合の運転終了時刻である。
 図9Bは、第1の変形例における、第1のコストCM1を算出する数式を示している。
 第1の変形例においては、制御対象の電気機器1eは、太陽光発電の余剰電力を運転に使用する。ただし、余剰電力が、その電気機器1eの消費電力にまで足りない場合には、電力の不足分だけ、商用電力を使用する。
 例えば、電気機器1eの消費電力WM1、WM2と、余剰電力W(t)との大きさが、図9Aに示すような関係にあるとき、運転開始時刻tにおいては、電気機器1eの消費電力WM1のうち、W(t)は、太陽光発電の余剰電力を使用し、残りのWM1-W(t)は、商用電力を使用する。
 また、時刻t以降にも第1の運転を継続させた場合(中段の場合)での時刻tにおいては、電気機器1eの消費電力WM1よりも余剰電力W(t)の方が大きいため、電気機器1eは、太陽光発電の余剰電力のみを使用する。
 これにより、第1の変形例における時刻tの第1のコストCM1は、図9Bの数式の右辺に示される中括弧{}で括られた数式となる。その中括弧の中の数式の第1項は、太陽光発電の余剰電力を使用することによって発生するコストであり、太陽光発電の余剰電力W(t)と、電気機器1eに時刻tから第1の運転をさせた場合の時刻tにおける消費電力WM1(t-t)とのうちの小さい方と、発電電力単価p(t)との積である。第2項は、商用電力を使用することによって発生するコストであり、余剰電力の不足分WM1(t-t)-W(t)と、0とのうちの大きい方と、買電電力の単価p(t)との積である。第1のコストCM1は、これらの、第1項の積と、第2項の積とを足し合わせた和の、時刻tから時刻tM1までの区間での積分となる。
 図9Cは、第1の変形例における、第2のコストCM2を算出する数式を示している。
 第2のコストCM2は、時刻tから時刻tまでの、電気機器1eに第1の運転させる期間のコスト(右辺の第1項)と、時刻tからtM2までの、電気機器1eに第2の運転をさせる期間のコスト(第2項)とを足し合わせることで算出できる。
 第1の運転をさせる期間のコスト(第1項)は、次の第1の積と、第2の積とを足し合わせた和の積分となる。第1の積は、太陽光発電の余剰電力W(t)と、電気機器1eに時刻tから第1の運転をさせた場合の時刻tにおける消費電力WM1(t-t)とのうちの小さい方と、発電電力単価p(t)との積である。第2の積は、時刻tにおける余剰電力の不足分WM1(t-t)-W(t)と、0とのうちの大きい方と、買電電力の単価p(t)との積である。第1項のコストは、これらの第1、第2の積を足し合わせた和の、時刻tから時刻tまでの積分となる。
 第2の運転をさせる期間のコスト(第2項)は、次のような、第1の積と、第2の積とを足し合わせた和の積分となる。第1の積は、太陽光発電の余剰電力W(t)と、電気機器1eに時刻t’から第2の運転をさせた場合の時刻tにおける消費電力WM2(t-t’)とのうちの小さい方と、発電電力単価p(t)との積である。第2の積は、時刻tにおける余剰電力の不足分WM2(t-t’)-W(t)と、0とのうちの大きい方と、買電電力の単価p(t)との積である。第2項のコストは、これらの第1、第2の積を足し合わせた和の、時刻tから時刻tM2までの区間での積分となる。
 第2の変形例では、電気機器1eの品質の劣化を考慮したコストの計算方法を示す。
 図10Aは、第2の変形例における、電気機器1eの使用回数と品質との関係を示す図である。
 使用開始時には、品質は、耐用品質(破線の水平線を参照)を上回っている。図10Aの例では、使用回数(横軸)に対して、品質の劣化が線形に大きくなる。
 図10Aにおいて、NM1は、電気機器1eに、運転開始から終了まで第1の運転での運転を、繰り返しさせる場合に、電気機器1eの品質が耐用品質以上である、最大の使用回数を示す。NM2は、電気機器1eに、運転開始から終了まで第2の運転での運転を、繰り返しさせる場合に、電気機器1eの品質が耐用品質以上である、最大の使用回数を示す。
 図10Bは、第2の変形例における、第1のコストCM1を算出する数式を示す図である。
 図10Bは、電気機器1eが、図10Aに示すように使用回数に応じて劣化する場合の、電気機器1eの1回の運転のコストを示す。
 図10Bでは、第1のコストCM1は、電気機器1eが運転開始から終了までに使用する総電力量に対するコストに、1回の運転当りの電気機器1eの品質の劣化によるコスト(図10Bの右辺での値1er)を加えて算出される。1回の運転当りの品質の劣化によるコストは、電気機器1eの価格である初期投資費用Pinitialを、第1の運転を繰り返す場合の電気機器1eの最大使用回数NM1で割った値を用いる。
 なお、図10Bの右辺の第1項については、先述の図7Aの数式などを参照されたい。
 図10Cは、第2の変形例における、第2のコストCM2を算出する数式を示す図である。
 この数式で算出される第2のコストCM2は、電気機器1eが、図10Aに示すように使用回数に応じて劣化する場合の、電気機器1eの1回の運転のコストである。
 図10Cでは、第2のコストCM2は、電気機器1eが運転開始から終了までに使用する総電力量に対するコスト(右辺の第1、第2項)と、1回の運転当りの電気機器1eの品質の劣化によるコスト(第3、第4項)との和である。1回の運転当りの電気機器1eの品質の劣化によるコスト(第3、第4項)は、時刻tから時刻tまでの間の第1の運転による品質の劣化のコスト(第3項)と、時刻tから時刻tM2までの間の第2の運転による品質の劣化によるコスト(第4項)との合計である。
 第1の運転による品質の劣化のコスト(第3項)は、電気機器1eの価格Pinitialを、第1の運転で繰り返し運転させる場合の最大使用回数NM1で割った値に、運転開始から終了まで第1の運転をさせる場合の運転期間に対する実際に第1の運転をさせる期間の比率((t-t)/(tM1-t))を乗じて算出される。
 第2の運転による品質の劣化のコスト(第4項)は、電気機器1eの価格Pinitialを、第2の運転で繰り返し運転させる場合の最大使用回数NM2で割った値に、運転開始から終了まで第2の運転をさせる場合の運転期間に対する実際に第2の運転をさせる期間の比率((tM2-t)/(tM2-t))を乗じて算出される。
 図11は、第3の変形例における、機器制御装置2の構成を示す図である。
 機器制御装置2は、図3の構成に加えて、更に、電気機器状態取得部27を備える。
 電気機器状態取得部27は、電気機器1eから運転状態を示す情報(情報27Ia)を取得する。電気機器状態取得部27は、取得された情報により、運転開始から運転終了までの全工程において、いずれの工程まで進んでいるのかを示す進捗を特定することができる。なお、進捗は、運転開始から運転終了までの期間全体に対する、運転した時間の割合として特定されてもよい。また、進捗は、運転開始から運転終了までの期間全体に対する、残りの運転時間の割合として特定されてもよい。また、進捗は、残りの各工程が特定されることにより、特定される各工程が、残りの各工程である進捗として特定されてもよい。
 図12は、第4の変形例における機器制御装置2の構成を示す図である。機器制御装置2は、図11の構成要素に加え、更に、予測部28(図8参照)を備える。
 図13は、第5の変形例における動作を示す図である。
 時刻tから時刻tまでの期間には、電力価格は比較的低い。それ以外の期間には、電力価格が高い。
 洗濯乾燥機である電気機器1eにより行われる、毛布である洗濯物の洗濯および乾燥をする動作を例に説明する。
 時刻tq1において、ユーザは、その動作が、時刻tよりも前に完了するように運転を指示する。
 電気機器1eは、洗濯物の量などに基づいて、第1の運転を行った場合の動作が終了する時刻として、第1の時刻tE1を予測する。しかし、時刻tq1よりも後の時刻tにおいて、第1の運転を行った場合の終了の時刻を再度予測すると、第1の時刻tE1とは異なる第2の時刻tE3を、動作が終了する時刻として予測することがある。動作を開始する前には、比較的低い精度で終了時刻を予測するが、動作を開始した後、実際の動作状況に基づいて、より高い精度で終了時刻を予測することができる場合などである。
 例えば、時刻tE1は、毛布が水分を含む前において予測された、比較的精度が低い時刻である。
 時刻tE3は、毛布が水分を含んだ後において、実際に毛布が吸収した多くの水分を考慮して予測された、比較的精度が高い時刻である。
 後から、再度の予測で予測された第2の時刻tE3は、例えば、このような高い精度の予測で予測された時刻であることにより、先にされた予測での第1の時刻tE1とは異なってもよい。
 電気機器情報取得部27は、時刻tq1において、第1の情報(情報27Ib)を、電気機器1e等から取得する。取得された第1の情報は、動作終了時刻が、第1の時刻tE1と予測されていることを示している。また、電気機器情報取得部27は、時刻tにおいて、第2の情報(情報27Ib)を、電気機器1eから取得する。取得された第2の情報は、動作終了時刻が第2の時刻tE3と予測されていることを示している。終了時刻tE1、tE3は、電気機器1eにより予測されるのではなく、電気機器情報取得部27によって予測されてもよい。なお、これらの第1、第2の情報は、例えば、その情報から、予測される動作終了時刻として、上述の第1の時刻tE1、第2の時刻tE3が各々、この電気機器情報取得部27等により特定される情報などでもよい。
 電気機器情報取得部27は、第2の時刻tE3が第1の時刻tE1よりも遅いか否かを判定する。
 なお、電気機器情報取得部27ではなく、検出部22が、第2の時刻tE3が、第1の時刻tE1よりも遅いか否かを判定してもよい。
 指示部25は、時刻tE3が時刻tE1よりも遅くないと判定された場合には、時刻tよりも後にも、第1の運転を継続するように、電気機器1eへ指示する。
 図13に示されるように、第1の時刻tE1よりも第2の時刻tE3が後の時刻であり、時刻tE1と時刻tE3との間の時刻tに、電力の単価が変化して、高くなることがある。この場合には、短時間で運転が終了する第2の運転に切り替えて運転する方が(図13の欄J3を参照)、第1の運転を継続する(図13の欄J2を参照)よりも、運転終了までにかかるコストが低く抑えられることがある。
 第1の電力コスト算出部23は、第1の運転(欄J2での運転)で時刻t以降の残りの動作を行う際に生じるコストを算出する。第2の電力コスト算出部24は、第2の運転(欄J3での運転)で時刻t以降の残りの動作を行う際に生じるコストを算出する。比較部26は、算出された2つのコストを比較してよりコストの低い方の運転を特定する。
 なお、算出される、残りの動作が第1の運転でされる際に生じるコストは、時刻t~tE3の間に生じるコストでもよいし、そのコストを含んでなる、時刻t~tE3の全体でのコストなどでもよい。
 同様に、算出される、残りの動作が第2の運転でされる際に生じるコストも、時刻t~tM2の間でのコストでもよいし、そのコストを含んでなる、時刻t~tM2の全体でのコストなどでもよい。
 指示部25は、時刻tE3が時刻tE1よりも遅いと判定された場合(図13で示される場合)には、比較部26で特定された運転を行うように、電気機器1eへ指示する。すなわち、第1の運転で残りの動作を行うコストの方が小さければ、第1の運転を継続するように、電気機器1eへ指示する(欄J2)。第2の運転に切り替えて残りの動作を行うコストの方が小さければ、第2の運転に切り替えて運転するように、電気機器1eへ指示する(欄J3)。
 このように、この図13の処理は、先述の処理と同様の処理である。
 つまり、第1の期間(例えば、図13のt~tE3)をかけて行う第1の運転(欄J2)と、第2の期間(t~tM2)をかけて行う第2の運転(欄J3)とのいずれかの運転を行う電気機器1eの運転を機器制御装置2が制御する。
 電力1ePの価格(先述のP(t)など)を示す情報4を電力価格取得部21が取得する。
 第1の期間と、第2の期間のうち短くない方の期間(時刻t~tE3での第1の期間)の間における、取得された情報4により示される価格の変化(時刻tでの変化)を検出部22が検出する。
 変化が検出された場合(図13の場合)に、電気機器1eが、第1の期間の間に第1の運転を行う場合(欄J2の場合)に生じる第1のコスト23cを第1のコスト算出部23が算出する。
 変化が検出された場合に、電気機器1eが、第2の期間において第2の運転を行う場合(欄J3の場合)に生じる第2のコスト24cを第2のコスト算出部24が算出する。
 第1のコスト23cと第2のコスト24cとを比較して、高くない方のコストでの運転を比較部26が特定する。
 特定された運転を行うことを上述の電気機器1eへ指示部25が指示する。
 これにより、この図13の例でも、先述の処理での原理と同様の原理により、先述の処理での効果と同様の効果が得られる。
 本技術では、上記の原理を実現する構成を備え、その構成による作用によって、上述の効果が生じる。本技術は、これらの構成、作用、効果の点で、従来例とは相違する。
 なお、上記各実施の形態において、各構成要素は、専用のハードウェアで構成されるか、各構成要素に適したソフトウェアプログラムを実行することによって実現されてもよい。各構成要素は、CPUまたはプロセッサなどのプログラム実行部が、ハードディスクまたは半導体メモリなどの記録媒体に記録されたソフトウェアプログラムを読み出して実行することによって実現されてもよい。ここで、上記各実施の形態の制御装置などを実現するソフトウェアは、次のようなプログラムである。
 すなわち、このプログラムは、コンピュータに、第1の期間をかけて行う第1の運転と、第2の期間をかけて行う第2の運転とのいずれかの運転を行う電気機器の運転をコンピュータが制御するための、電力の価格を示す情報を取得する価格取得ステップと、前記第1の期間と、前記第2の期間とのうち短くない方の期間の間における、取得された前記情報により示される価格の変化を検出する検出ステップと、前記変化が検出された場合に、前記電気機器が前記第1の運転を行う第1のコストを算出する第1の算出ステップと、前記変化が検出された場合に、前記電気機器が前記第2の運転を行う第2のコストを算出する第2の算出ステップと、前記第1のコストと前記第2のコストとを比較して、高くない方のコストでの運転を特定する比較ステップと、前記特定された運転を行うことを前記電気機器へ指示する指示ステップとを実行させる。
 以上、一つまたは複数の態様に係る制御装置について、実施の形態に基づいて説明したが、本発明は、この実施の形態に限定されるものではない。本発明の趣旨を逸脱しない限り、当業者が思いつく各種変形を本実施の形態に施したものや、異なる実施の形態における構成要素を組み合わせて構築される形態も、一つまたは複数の態様の範囲内に含まれてもよい。
 本発明は、電気機器に対して、高いコストを生じる運転を指示することが回避されて、より確実に、適切な指示を行うことができ、その電気機器に運転の指示を行う制御装置等に利用可能である。
 1h 住宅
 1e 電気機器
 1er 値
 1eP 電力
 1g 太陽光発電システム
 1GI 情報
 2 機器制御装置
 4 情報
 4p、4p1、4p2 単価
 4px 額
 5aA、5bA、5aJ 電力量
 21 電力価格取得部
 22 検出部 
 23 第1のコスト算出部
 24 第2のコスト算出部
 25 指示部
 25s 指示
 26 比較部
 27 状態取得部
 27Ia、27Ib 情報
 28 予測部

Claims (9)

  1.  第1の期間をかけて行う第1の運転と、第2の期間をかけて行う第2の運転とのいずれかの運転を行う電気機器の運転を制御する制御装置であって、
     電力の価格を示す情報を取得する価格取得部と、
     前記第1の期間と、前記第2の期間とのうち短くない方の期間の間における、取得された前記情報により示される価格の変化を検出する検出部と、
     前記変化が検出された場合に、前記電気機器が前記第1の運転を行う第1のコストを算出する第1の算出部と、
     前記変化が検出された場合に、前記電気機器が前記第2の運転を行う第2のコストを算出する第2の算出部と、
     前記第1のコストと前記第2のコストとを比較して、高くない方のコストでの運転を特定する比較部と、
     前記特定された運転を行うことを前記電気機器へ指示する指示部と
     を備える制御装置。
  2.  前記電気機器から、前記電気機器の運転状態を示す情報を取得する状態取得部を更に備える
     請求項1記載の制御装置。
  3.  前記第1の運転は、前記第1の期間の消費電力が第1の電力である運転であり、
     前記第2の運転は、前記第2の期間の消費電力が前記第1の電力とは異なる第2の電力である運転である
     請求項1記載の制御装置。
  4.  前記電気機器以外の他の電気機器での消費電力量と、太陽光発電システムで発電される発電電力量とに基づいて、余剰電力量を予測する予測部を更に備え、
     前記第1の算出部と前記第2の算出部とのそれぞれの算出部は、前記価格取得部により取得された前記情報により示される前記価格と、予測した前記余剰電力量と、前記他の電気機器ではない、前記指示部により、前記特定された運転をすることが指示される前記電気機器の消費電力とに基づいて、前記コストをそれぞれ算出する
     請求項1記載の制御装置。
  5.  前記第1の算出部と、前記第2の算出部とのそれぞれの算出部は、前記価格取得部により取得された前記情報により示される前記価格と、前記特定された運転が指示される前記電気機器の品質の劣化をコストに換算した減価とに基づいて、前記コストをそれぞれ算出する
     請求項1記載の制御装置。
  6.  前記検出部は、取得された、前記電気機器の前記運転状態を示す前記情報に基づき、前記運転状態が示される前記電気機器の運転終了予定時刻の変化を検出する
     請求項2記載の制御装置。
  7.  第1の期間をかけて行う第1の運転と、第2の期間をかけて行う第2の運転とのいずれかの運転を行う電気機器の運転を制御する集積回路であって、
     電力の価格を示す情報を取得する価格取得部と、
     前記第1の期間と、前記第2の期間とのうち短くない方の期間の間における、取得された前記情報により示される価格の変化を検出する検出部と、
     前記変化が検出された場合に、前記電気機器が前記第1の運転を行う第1のコストを算出する第1の算出部と、
     前記変化が検出された場合に、前記電気機器が前記第2の運転を行う第2のコストを算出する第2の算出部と、
     前記第1のコストと前記第2のコストとを比較して、高くない方のコストでの運転を特定する比較部と、
     前記特定された運転を行うことを前記電気機器へ指示する指示部と
     を備える集積回路。
  8.  第1の期間をかけて行う第1の運転と、第2の期間をかけて行う第2の運転とのいずれかの運転を行う電気機器の運転を制御する制御方法であって、
     電力の価格を示す情報を取得する価格取得ステップと、
     前記第1の期間と、前記第2の期間とのうち短くない方の期間の間における、取得された前記情報により示される価格の変化を検出する検出ステップと、
     前記変化が検出された場合に、前記電気機器が前記第1の運転を行う第1のコストを算出する第1の算出ステップと、
     前記変化が検出された場合に、前記電気機器が前記第2の運転を行う第2のコストを算出する第2の算出ステップと、
     前記第1のコストと前記第2のコストとを比較して、高くない方のコストでの運転を特定する比較ステップと、
     前記特定された運転を行うことを前記電気機器へ指示する指示ステップと
     を含む制御方法。
  9.  第1の期間をかけて行う第1の運転と、第2の期間をかけて行う第2の運転とのいずれかの運転を行う電気機器の運転をコンピュータが制御するための、
     電力の価格を示す情報を取得する価格取得ステップと、
     前記第1の期間と、前記第2の期間とのうち短くない方の期間の間における、取得された前記情報により示される価格の変化を検出する検出ステップと、
     前記変化が検出された場合に、前記電気機器が前記第1の運転を行う第1のコストを算出する第1の算出ステップと、
     前記変化が検出された場合に、前記電気機器が前記第2の運転を行う第2のコストを算出する第2の算出ステップと、
     前記第1のコストと前記第2のコストとを比較して、高くない方のコストでの運転を特定する比較ステップと、
     前記特定された運転を行うことを前記電気機器へ指示する指示ステップと
     を前記コンピュータに実行させるためのプログラム。
PCT/JP2012/005616 2011-09-30 2012-09-05 制御装置、集積回路、制御方法、プログラム WO2013046546A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US14/237,666 US9488966B2 (en) 2011-09-30 2012-09-05 Control device, integrated circuit, control method, and program for controlling an appliance performing different operations
JP2013535847A JP5654690B2 (ja) 2011-09-30 2012-09-05 制御装置、集積回路、制御方法、プログラム
EP12836930.3A EP2763081A4 (en) 2011-09-30 2012-09-05 CONTROL DEVICE, INTEGRATED CIRCUIT, CONTROL METHOD, AND PROGRAM

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-217227 2011-09-30
JP2011217227 2011-09-30

Publications (1)

Publication Number Publication Date
WO2013046546A1 true WO2013046546A1 (ja) 2013-04-04

Family

ID=47994637

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/005616 WO2013046546A1 (ja) 2011-09-30 2012-09-05 制御装置、集積回路、制御方法、プログラム

Country Status (4)

Country Link
US (1) US9488966B2 (ja)
EP (1) EP2763081A4 (ja)
JP (1) JP5654690B2 (ja)
WO (1) WO2013046546A1 (ja)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9359712B2 (en) 2012-04-04 2016-06-07 Whirlpool Corporation Apparatus and method for controlling the energy usage of an appliance
CN104898593B (zh) * 2015-04-01 2018-01-05 珠海格力电器股份有限公司 一种用于判断操控端与电器是否匹配的方法
WO2019132052A1 (ko) * 2017-12-26 2019-07-04 엘지전자 주식회사 동작 상황에 기반하여 유관 장치를 제어하는 장치, 이를 제어하는 스케줄 봇 및 서버

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10510138A (ja) * 1995-01-05 1998-09-29 テコム・インコーポレーテッド エネルギ管理及びビルディング自動化システム
JP2006149788A (ja) * 2004-11-30 2006-06-15 Sharp Corp 洗濯機
JP2007236538A (ja) * 2006-03-07 2007-09-20 Toshiba Corp 全自動洗濯乾燥機
JP2010259186A (ja) * 2009-04-23 2010-11-11 Panasonic Corp 制御システムおよびその制御方法、プログラム
JP2011166884A (ja) * 2010-02-05 2011-08-25 Panasonic Electric Works Co Ltd エネルギー需給制御システム

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2797640B2 (ja) 1990-04-27 1998-09-17 凸版印刷株式会社 キャリッジ移動装置並びに自動処理装置
JP2845697B2 (ja) 1992-11-18 1999-01-13 シャープ株式会社 電気機器
US7274975B2 (en) * 2005-06-06 2007-09-25 Gridpoint, Inc. Optimized energy management system
JP5026191B2 (ja) 2007-08-17 2012-09-12 株式会社コロナ ヒートポンプ式給湯機
KR101595391B1 (ko) * 2009-10-26 2016-02-18 엘지전자 주식회사 세탁기 제어 장치 및 제어 방법
CN102598583B (zh) 2009-10-26 2016-08-31 Lg电子株式会社 控制网络系统的方法
KR101611296B1 (ko) 2010-02-09 2016-04-12 엘지전자 주식회사 스마트 디바이스를 이용한 전력 제어 방법 및 장치
US20110125337A1 (en) * 2010-08-30 2011-05-26 Vyacheslav Zavadsky Household appliance adapted to work with time of use electricity rates

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10510138A (ja) * 1995-01-05 1998-09-29 テコム・インコーポレーテッド エネルギ管理及びビルディング自動化システム
JP2006149788A (ja) * 2004-11-30 2006-06-15 Sharp Corp 洗濯機
JP2007236538A (ja) * 2006-03-07 2007-09-20 Toshiba Corp 全自動洗濯乾燥機
JP2010259186A (ja) * 2009-04-23 2010-11-11 Panasonic Corp 制御システムおよびその制御方法、プログラム
JP2011166884A (ja) * 2010-02-05 2011-08-25 Panasonic Electric Works Co Ltd エネルギー需給制御システム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2763081A4 *

Also Published As

Publication number Publication date
EP2763081A1 (en) 2014-08-06
JP5654690B2 (ja) 2015-01-14
US20140180443A1 (en) 2014-06-26
JPWO2013046546A1 (ja) 2015-03-26
EP2763081A4 (en) 2015-03-25
US9488966B2 (en) 2016-11-08

Similar Documents

Publication Publication Date Title
JP5877346B2 (ja) 負荷制御装置、プログラム、負荷制御システム
EP2902539B1 (en) A method of controlling a washing machine and corresponding washing machine
US10447035B2 (en) Electric power creation control system and method
JP5654690B2 (ja) 制御装置、集積回路、制御方法、プログラム
JP2017099148A (ja) 電力管理システムおよび電力管理方法
JP6264695B2 (ja) 電力管理装置、及び情報提示方法
CN106120241A (zh) 洗衣机的用电量和用水量的计算方法、装置及洗衣机
JP5995653B2 (ja) 充放電制御装置、充放電制御方法、プログラム及び充放電制御システム
WO2017033282A1 (ja) 制御装置、イベント情報表示方法及びプログラム
Halimi et al. Reactive dvfs control for multicore processors
JP2015233413A (ja) 負荷制御システム、負荷制御装置、負荷制御方法
CN106068590A (zh) 设备运转设定装置以及设备运转设定值决定程序
JP2017163630A (ja) 制御装置、発電装置、制御方法およびプログラム
EP3168951B1 (en) Power generation device, power generation system and power generation method
WO2014091725A1 (ja) コントローラ
JP6839820B2 (ja) 発電制御システム、プログラム、及び制御方法
JP2012080680A (ja) 電源出力制御装置、需要電力制御システム、電源出力制御方法、および電源出力制御プログラム
CN108150352B (zh) 控制风力发电机组运行的方法和设备
JP6452071B2 (ja) 電力制御装置、電力制御システムおよび電力制御方法
US20200252013A1 (en) Power generation facility evaluating device, power generation facility evaluating system, power generation facility evaluating method, and computer program product
JP6343228B2 (ja) デマンドレスポンスリスク評価装置
JP7348031B2 (ja) 燃料電池システム
EP2717072B1 (en) Electrical power forecasting system monitoring weather information and state of use of electrical equipement
Chen et al. Energy-aware application performance management in virtualized data centers
JP6210864B2 (ja) 充放電制御装置、充放電制御方法及びプログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12836930

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2013535847

Country of ref document: JP

Kind code of ref document: A

REEP Request for entry into the european phase

Ref document number: 2012836930

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2012836930

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 14237666

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE