US20140180443A1 - Control device, integrated circuit, control method, and program - Google Patents
Control device, integrated circuit, control method, and program Download PDFInfo
- Publication number
- US20140180443A1 US20140180443A1 US14/237,666 US201214237666A US2014180443A1 US 20140180443 A1 US20140180443 A1 US 20140180443A1 US 201214237666 A US201214237666 A US 201214237666A US 2014180443 A1 US2014180443 A1 US 2014180443A1
- Authority
- US
- United States
- Prior art keywords
- cost
- electric appliance
- power
- price
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/04—Billing or invoicing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
- H02J2310/14—The load or loads being home appliances
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/62—The condition being non-electrical, e.g. temperature
- H02J2310/64—The condition being economic, e.g. tariff based load management
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/12—Billing, invoicing, buying or selling transactions or other related activities, e.g. cost or usage evaluation
Definitions
- the present invention relates to a control device that obtains information indicating a unit price of power, calculates a cost produced when an electric appliance operates, and gives the electric appliance an instruction to operate, based on the calculated cost.
- a control device has been so far available which holds information indicating a time period in which a unit price of power is less expensive according to a midnight power rate system or a time-of-day power rate system, and gives an electric appliance an instruction to operate in the time period in which the unit price of power is less expensive (see Patent Literatures (PTLs) 1 and 2, for instance).
- the electric appliance is, for example, a home appliance such as a washing and drying machine and a dish washing and drying machine, or a heat pump water heater, which are provided in an ordinary family house.
- control device is provided as part of such an electric appliance.
- control device is provided outside of the electric appliance.
- control device outside of the electric appliance include a control device that communicates with at least two electric appliances provided in a house and gives each of the at least two electric appliances an instruction based on a cost of the electric appliance.
- the existing control device fails to give an electric appliance an appropriate instruction to operate at a relatively low cost, and sometimes gives the electric appliance an inappropriate instruction to operate at a relatively high cost.
- the present invention provides a control device that makes it possible to avoid giving an electric appliance an inappropriate instruction to operate at a high cost, and to more surely give the electric appliance an appropriate instruction to operate at a low cost.
- a control device is a control device that controls an electric appliance that performs one of a first operation during a first period and a second operation during a second period, the control device including: a price obtaining unit configured to obtain information indicating a price of power; a detecting unit configured to detect a change in the price in a not shorter one of the first period and the second period, the price being indicated in the obtained information; a first calculating unit configured to calculate a first cost produced when the electric appliance performs the first operation, in the case where the change is detected; a second calculating unit configured to calculate a second cost produced when the electric appliance performs the second operation, in the case where the change is detected; a comparing unit configured to compare the first cost and the second cost to determine which one of the first operation and the second operation produces a not higher one of the first cost and the second cost; and an instructing unit configured to instruct the electric appliance to perform the determined one of the first operation and the second operation.
- This general and specific aspect may be implemented using a system, a method, an integrated circuit, a computer program, or a computer-readable recording medium such as a CD-ROM, or any combination of systems, methods, integrated circuits, computer programs, or computer-readable recording media,
- a control device makes it possible to avoid giving an electric appliance an instruction to operate at a high cost, and to more surely give the electric appliance an appropriate instruction to operate at a low cost.
- control device makes it possible to give the electric appliance not the inappropriate instruction but the appropriate instruction even when a unit price of power changes in a period during which the electric appliance operates.
- FIG. 1 is a diagram of which (A) shows an operation period and power consumption of an electric appliance, and (B) and (C) each show a power price.
- FIG. 2 is a diagram showing a system.
- FIG. 3 is a diagram showing a configuration of an appliance control device.
- FIG. 4 is a flow chart showing operations performed by the appliance control device.
- FIG. 5 is a diagram of which (A) shows a power price, and (B) and (C) each show an operation performed by the system.
- FIG. 6A shows an exemplary equation for a first cost.
- FIG. 6B shows an exemplary equation for a second cost.
- FIG. 7A shows an exemplary equation for a first cost.
- FIG. 7B shows an exemplary equation for a second cost.
- FIG. 7C is a diagram illustrating a time.
- FIG. 7D shows a determination condition
- FIG. 8 is a diagram showing a configuration according to Modification 1.
- FIG. 9A is a diagram showing operations according to Modification 1.
- FIG. 9B shows an equation according to Modification 1.
- FIG. 9C shows an equation according to Modification 1.
- FIG. 10A is a graph showing a change in quality of an electric appliance.
- FIG. 10B shows an equation according to Modification 2.
- FIG. 10C shows an equation according to Modification 2.
- FIG. 11 is a diagram showing a configuration according to Modification 3.
- FIG. 12 is a diagram showing a configuration according to Modification 4.
- FIG. 13 is a diagram showing operations according to Modification 5.
- FIG. 1 is a diagram of which (A) schematically shows a relationship between an operation period and power consumption of an electric appliance, and (B) and (C) each show a change in a price per unit amount of power (price 4 p ).
- 5 a in the upper half of (A) shows, at a time when a first operation is performed, an operation period La from when the operation starts at time t to when the operation ends at time t M1 , and power consumption in the operation period La.
- the length of 5 a in the horizontal axis direction represents a length of the operation period La
- the width of 5 a in the vertical axis direction represents power consumption at each time.
- the area of 5 a represents a total amount of consumed power from the start to end of the operation (amount of power 5 a A).
- the first operation needs a long time for completion, but consumes less power. Besides, the first operation has a relatively small total amount of consumed power from the start to end of the operation.
- 5 b in the lower half of (A) shows, at a time when a second operation is performed, an operation period Lb from when the operation starts at the time t to when the operation ends at time t M2 , and power consumption in the operation period Lb.
- the second operation needs a short time for completion, but consumes more power.
- the second operation has a relatively large total amount of consumed power (amount of power 5 b A) from the start to end of the operation. To put it another way, the second operation has the total amount of consumed power larger than the total amount of consumed power (amount of power 5 a A) shown in the upper half.
- a change in the unit price of power in an operation period of an electric appliance is assumed to include a case shown by (B) and a case shown by (C) of FIG. 1 .
- the unit price of power 4 p is fixed until the operation end time t M1 in the case where the first operation (the upper half of (A)) that needs a long time to end is performed.
- the total amount of consumed power (amount of power 5 a A) when the first operation is performed (the upper half of (A)) is smaller than the total amount of consumed power (amount of power 5 b A) when the second operation is performed (the lower half of (A)).
- a cost produced when an operation shown in the upper half of (A) (the first operation) is performed is lower than a cost produced when an operation shown in the lower half of (A) (the second operation) is performed, and the first operation can be performed at the lower cost.
- a first product is obtained by multiplying together the price 4 px and an amount of power 5 a J consumed during a period from the times t x to t M1 in the case where the first operation is performed (the upper half of (A)).
- a second product is also obtained by multiplying together a unit price of power before the time t x and the rise (price 4 p 1 ), and a difference between the larger total amount of consumed power (amount of power 5 b A) shown in the lower half and the smaller total amount of consumed power (amount of power 5 a A) shown in the upper half.
- the cost produced when the operation shown in the lower half of (A) is performed includes not the first product regarding the price 4 px resulting from the rise but the second product regarding the difference between the two amounts of power.
- the first product not included in the cost in the lower half of (A) is assumed to be sometimes larger than the second product included in the cost.
- the cost produced when the second operation that ends at the time t M2 which is before the unit price of power rises is performed (the lower half of (A)) is lower than the cost produced when the first operation is performed (the upper half of (A)), and the second operation can be performed at the lower cost.
- a time at which it is known that the unit price of power 4 p would rise at the time t x is sometimes not the time t of the start of the operation but a time later than the time t of the start of the operation. In this case also, the above problem may arise.
- the time t described with reference to FIG. 1 is not an operation start time but a time that is later than the operation start time and at which a change in the unit price of power 4 p is detected.
- the time t M1 is read as an operation end time in the case where the first operation is continuously performed (the upper half of (A)) after the time t (time t x ).
- the time t M2 is read as an operation end time in the case where the second operation is switched to and performed (at the time t x ).
- an appliance control device 2 is an appliance control device 2 that controls an electric appliance 1 e (e.g., an electric appliance 1 e 1 ) that performs one of a first operation (operation of which a necessary period is a first period (e.g., a period between times t 2 and t M1 in FIG. 7C ) when the first operation is performed) during the first period and a second operation (operation shown in z3) during a second period (a period between times t 2 and t M2 ), the appliance control device 2 including: a price obtaining unit 21 configured to obtain information 4 indicating a price (p e (t)) of power 1 e P ( FIG.
- a detecting unit 22 configured to detect a change in the price (e.g., a change at time t x in FIG. 5 ) in a not shorter one of the first period and the second period, the price being indicated in the obtained information; a first calculating unit 23 configured to calculate a first cost (information) 23 c produced when the electric appliance 1 e performs the first operation, in the case where the change is detected; a second calculating unit 24 configured to calculate a second cost 24 c produced when the electric appliance 1 e performs the second operation, in the case where the change is detected; a comparing unit 26 configured to compare the first cost 23 c and the second cost 24 c to determine which one of the first operation and the second operation produces a not higher one of the first cost and the second cost; and an instructing unit 25 (refer to an instruction 25 s ) configured to instruct the electric appliance 1 e to perform the determined one of the first operation and the second operation.
- a change in the price e.g., a change at time t
- the appropriate instruction is also given in the second case, and thus the appropriate instruction is more surely given in either case.
- the appliance control device 2 may further include a state obtaining unit configured to obtain, from the electric appliance 1 e , information 27 I a indicating an operation state (e.g., a length of a period between times t 1 and t 2 in an example shown in FIG. 7C ) of the electric appliance 1 e.
- a state obtaining unit configured to obtain, from the electric appliance 1 e , information 27 I a indicating an operation state (e.g., a length of a period between times t 1 and t 2 in an example shown in FIG. 7C ) of the electric appliance 1 e.
- the first operation may consume first power W M1 ( FIG. 5 ) that is power consumed by the electric appliance 1 e in the first period
- the second operation may consume second power W M2 that is power consumed in the second period, the second power W M2 being different from the first power W M1 .
- the appliance control device 2 may further include a predicting unit configured to predict an amount of surplus power w g (t) based on an amount of power consumed by a different electric appliance (electric appliance 1 e 2 ) from the electric appliance 1 e (e.g., the electric appliance 1 e 1 ), and an amount of power generated by a photovoltaic power generation system 1 g , wherein the first calculating unit 23 and the second calculating unit 24 may calculate the first cost and the second cost, respectively, based on the price indicated in the information 4 obtained by the price obtaining unit 21 , the predicted amount of surplus power w g (t), and power consumption of the electric appliance (e.g., the electric appliance 1 e 2 ) which the instructing unit 25 instructs to perform the determined one of the first operation and the second operation.
- a predicting unit configured to predict an amount of surplus power w g (t) based on an amount of power consumed by a different electric appliance (electric appliance 1 e 2 ) from the electric appliance 1 e (e.g
- the first calculating unit and the second calculating unit may calculate the first cost and the second cost, respectively, based on the price indicated in the information 4 obtained by the price obtaining unit 21 , and a depreciation converted from a cost of quality deterioration of the electric appliance 1 e (the electric appliance 1 e 1 ) that is instructed to perform the determined one of the first operation and the second operation.
- the detecting unit may detect a change of an estimated operation end time (e.g., change from t E1 to t E3 in FIG. 13 ) of the electric appliance 1 e (the electric appliance 1 e 1 ) of which the operation state is indicated, based on the obtained information (information 27 I b ) indicating the operation state of the electric appliance 1 e.
- an estimated operation end time e.g., change from t E1 to t E3 in FIG. 13
- This general and specific aspect may be implemented using a system, a method, an integrated circuit, a computer program, or a computer-readable recording medium such as a CD-ROM, or any combination of systems, methods, integrated circuits, computer programs, or computer-readable recording media.
- FIG. 2 is a diagram showing a system 1 .
- the system 1 includes a photovoltaic power generation system 1 g , at least one electric appliance 1 e , and an appliance control device 2 , for instance.
- the electric appliance 1 e is capable of performing operations that differ in power usage (power consumption).
- the electric appliance 1 e is assumed to be capable of performing a first operation and a second operation.
- the first operation needs a long time for completion, but consumes less power and has a small total amount of consumed power from the start to end of the operation.
- the second operation needs a short time for completion, but consumes more power and has a large total amount of consumed power from the start to end of the operation (see aforementioned FIG. 1 ).
- the electric appliance 1 e is, for example, a washing and drying machine that performs washing and drying.
- the first operation is an operation to wash and dry clothes
- the second operation is an operation to wash and dry clothes with second power consumption different from power consumption when the first operation is performed and a second operation time different from an operation time of the first operation.
- the system 1 is provided to, for example, a house 1 h such as an ordinary family house.
- FIG. 3 is a diagram showing a configuration of the appliance control device 2 .
- the appliance control device 2 includes a power price obtaining unit 21 , a detecting unit 22 , a first cost calculating unit 23 , a second cost calculating unit 24 , a comparing unit 26 , and an instructing unit 25 .
- the appliance control device 2 may be, for example, a computer including a CPU, a ROM, a RAM, and so on.
- the appliance control device 2 may achieve functions of the power price obtaining unit 21 and so on by the computer executing a program or the like stored in the ROM.
- at least part of the appliance control device 2 may be realized by an integrated circuit.
- FIG. 4 shows a flow chart for the appliance control device 2 .
- the power price obtaining unit 21 obtains information 4 from a device 1 m ( FIG. 3 or the like) outside of the appliance control device 2 (Sa1 in FIG. 4 ).
- the device 1 m may be, for instance, a smart meter provided to the house 1 h or a server provided outside of the house 1 h .
- the information 4 may be transmitted from the device 1 m , the outside server, to a smart meter provided to the house 1 h .
- the power price obtaining unit 21 may obtain the transmitted information 4 through the smart meter.
- FIG. 5 is a diagram illustrating processes performed by the detecting unit 22 , the first cost calculating unit 23 , the second cost calculating unit 24 , the comparing unit 26 , and the instructing unit 25 .
- FIG. 5 shows a case where the electric appliance 1 e starts the first operation at time t 1 , and the power price obtaining unit 21 obtains information (above-mentioned) indicating unit price of power at time t 2 .
- FIG. 5 shows a relationship between a time (horizontal axis) and a unit price of power (vertical axis).
- p e (t) is a price per unit amount of power (unit price) at time t.
- p e (t) is a price for using commercial power having a predetermined unit amount (e.g., 1 kWh) that a user or the like of the electric appliance 1 e pays to a power company or the like in the case where the commercial power is used.
- the unit price of power is set based on supply, and sometimes changes depending on a time period.
- the power company sets the unit price of power to be higher in a time period when power is in high demand, and the unit price of power to be lower in a time period when power is in low demand.
- FIG. 5 shows a case where a unit price of power before time t x is p 1 , and a unit price of power after the time t x is p 2 .
- FIG. 5 shows a relationship between passage of time from a start of operation to an end of operation (horizontal axis), and power consumption of the electric appliance 1 e (vertical axis) when the electric appliance le continuously performs the first operation after the time t 2 .
- (C) in FIG. 5 shows a relationship between passage of time from a start of operation to an end of operation, and power consumption of the electric appliance 1 e when the first operation being performed is switched to the second operation and the electric appliance 1 e performs the second operation after the time t 2 .
- the detecting unit 22 determines whether or not a unit price of power changes in a period during which the electric appliance 1 e operates, using information (above-mentioned) that indicates the unit price of power and is obtained by the power price obtaining unit 21 (Sa2 in FIG. 4 ).
- the detecting unit 22 determines that the unit price of power changes in the period during which the electric appliance 1 e operates.
- the first cost calculating unit 23 calculates a first cost C M1 produced when the electric appliance 1 e continuously performs the first operation after the time t z ((B) in FIG. 5 ) (Sa3 in FIG. 4 ).
- FIG. 6A shows an equation for the first cost C M1 .
- the first cost C M1 is a price for an amount of power used when the electric appliance 1 e operates with power consumption W M1 from operation start time t 1 to the estimated operation end time t M1 .
- the unit price of power is p 1 from the time t 1 to the time t x , and p 2 from the time t x to the time t M1 . Consequently, the first cost C M1 is a price obtained by adding the following two products (the first and second terms on the right side of the equation shown in FIG. 6A ).
- one of the products is between the unit price of power p 1 before the time t x when the unit price of power changes, and an amount of consumed power (W M1 ⁇ (t x ⁇ t 1 )) before the time t x .
- the other of the products (second term) is between the unit price of power (p 2 ) after the time t x when the unit price of power changes, and an mount of consumed power (W M2 ⁇ (t M1 ⁇ t x )) after the time t x .
- an amount of consumed power can be obtained by multiplying together power consumption (W M1 in the above example) and an operation period (t x ⁇ t 1 , t M1 ⁇ t x ).
- the first cost C M1 can be specifically calculated by the equation shown in FIG. 6A or the like.
- FIG. 6B shows an equation for a second cost C M2 .
- the second cost calculating unit 24 calculates the second cost C M2 produced when the electric appliance 1 e switches the first operation to the second operation and performs the second operation from a predetermined time later than the time t 2 (time t 2 in the example shown by (B) in FIG. 5 ) (Sa4 in FIG. 4 ).
- the electric appliance 1 e switches the first operation to the second operation and performs the second operation at the time t 2 .
- the second cost C M2 is a price for an amount of power used when the electric appliance 1 e operates with the power consumption W M1 from the operation start time t 1 to the time t 2 and operates with power consumption W M2 from the time t 2 to estimated operation end time t M2 .
- the time t o when the unit price of power changes from p 1 to p 2 is a time later than the estimated operation end time t M2 .
- the unit price of power in an operation period (a period until the time t M2 ) of the electric appliance is p 1 .
- the second cost C M2 is a price obtained by adding the following two products (the first and second terms on the right side of the equation shown in FIG. 6B ).
- one of the products is between the unit price of power p 1 and an amount of consumed power (W M1 ⁇ (t 2 ⁇ t 1 )) in the period (the times t 1 to t 2 ) during which the electric appliance 1 e performs the first operation.
- the other of the products is between the unit price of power p 1 and an amount of consumed power (W M2 ⁇ (t M2 ⁇ t 2 )) in the period (times t 2 to t M2 ) during which the electric appliance 1 e performs the second operation.
- the amount of consumed power is also obtained by multiplying together the power consumption (W M1 , W M2 ) and the operation period (t 2 ⁇ t 1 , t M2 ⁇ Wt 2 ) in the example shown by (C).
- the second cost C M2 can be specifically calculated by the equation shown in FIG. 6B or the like.
- FIG. 7A and FIG. 7B show modifications of the calculations for the first cost C M1 and the second cost C M2 , respectively.
- a case is considered where power consumption of the electric appliance 1 e varies.
- cases are considered where the time t x when the unit price of power p e (t) changes is earlier than the time t M2 and where the time t x when the unit price of power p e (t) changes is later than the time t M2 .
- An elapsed time from the operation start time t 1 ( FIG. 5 ) to the time t can be represented by t ⁇ t 1 . Consequently, a cost at the time t can be expressed in a product between the unit price of power p e (t) at the time t and power consumption W M1 (t ⁇ t 1 ) of the electric appliance 1 e after the time (t ⁇ t 1 ) elapses from the operation start time.
- the first cost C M1 (the left side in FIG. 7A ) can be represented by an integral of such a cost from the time t 1 to the time t M1 (the right side in FIG. 7A ).
- the second cost C M2 can be represented by a sum of the following two values.
- One of the values is obtained by integrating a cost produced at the time t(p e (t) ⁇ W M1 (t ⁇ t 1 )) in a first interval from the operation start time t 1 when the electric appliance 1 e starts to perform the first operation to the time t 2 when the electric appliance 1 e stops performing the first operation (the first term on the right side in FIG. 7B ).
- the other of the values is obtained by integrating (p e (t) ⁇ W M2 (t ⁇ t 1 1 )) in a second interval from the time t 2 when the electric appliance 1 e starts to perform the second operation to the estimated operation end time t M2 when the electric appliance 1 e stops performing the second operation (the second term).
- FIG. 7C is a diagram illustrating the time t 1 ′.
- the electric appliance 1 e in the progress state S1 at the time t 2 switches the first operation to the second operation (z3)
- the electric appliance 1 e performs the following operation (operation between times t 2 to t M2 in z3).
- the operation is the second operation (operation between the times t 2 and t M2 in z4) that is in the progress state S2 during the elapsed time T 1 from the operation start (time t 1 ′) and is performed from the time t 2 to the operation end (time t M2 ).
- a remaining time to the operation end time t M is T 2 in the case where the electric appliance le performs the second operation (operation in z4) until the time t 2 after the elapsed time T 1 passes from the operation start (time t 1 ′).
- the estimated operation end time t M2 in the case where the electric appliance 1 e starts to perform the first operation at the time t 1 , and switches the first operation to the second operation and performs the second operation at the time t 2 (case of z3) is time t 2 +T 2 after such time T 2 passes from the time t 2 when the switching is performed.
- the comparing unit 26 compares the calculated first cost C M1 and second cost C M2 , and determines a smaller one of the two costs (Sa5 in FIG. 4 ).
- FIG. 7D shows a conditional equation for determining the smaller one of the costs.
- the instructing unit 25 instructs the electric appliance 1 e to perform an operation at the smaller cost determined by the comparing unit 26 (Sa6 in FIG. 4 ). Stated differently, there is a case where switching to and performing the second operation can be lower in cost than continuously performing the first operation after the time t 2 ( FIG. 7C ) (refer to z1 in FIG. 7C ). In short, such a case is a case where the conditional equation shown in FIG. 7D is satisfied, that is, a case where the second cost C M2 is lower than the first cost C.
- the instructing unit 25 instructs the electric appliance 1 e to switch to and perform the second operation (refer to z3). It is to be noted that the second operation is performed in the operation state (operation state S2) during the elapsed time T 1 in the case where the second operation is started (case of z4).
- first cost C M1 and second cost C M2 each may be a cost produced when an operation is performed after the time t 2 .
- first cost C M1 and the second cost C M2 each may be a cost not including a cost in a period from the time t 1 to the time t 2 , that is, a period in which an operation is already performed.
- FIG. 8 is a diagram showing a configuration of an appliance control device 2 according to Modification 1
- the appliance control device 2 further includes a predicting unit 28 in addition to the structural elements shown in FIG. 3 .
- the predicting unit 28 calculates predicted surplus power W g (t) based on a prediction about generated power of photovoltaic power generation (power generation prediction) and a prediction about power consumption of an electric appliance (e.g., electric appliance 1 e 2 ) other than an electric appliance 1 e to be controlled (e.g., the electric appliance 1 e 1 shown in FIG. 2 ) in a house 1 h (power demand prediction).
- power generation prediction a prediction about generated power of photovoltaic power generation
- a prediction about power consumption of an electric appliance e.g., electric appliance 1 e 2
- an electric appliance e.g., electric appliance 1 e 2
- a house 1 h power demand prediction
- the detecting unit 22 performs the following determination when the power price obtaining unit 21 obtains information indicating a unit price of power (aforementioned) or the predicting unit 28 calculates the predicted surplus power W g (t). In other words, in that case, the predicting unit 22 determines whether or not the unit price of power or the surplus power changes in a period during which the electric appliance 1 e operates.
- the first cost calculating unit 23 and the second cost calculating unit 24 calculate a first cost and a second cost using equations described with reference to FIG. 93 and FIG. 9C , respectively.
- FIG. 9A is a diagram showing operations according to Modification 1.
- Modification 1 describes a cost calculation method when the electric appliance 1 e also uses power generated by photovoltaic power generation (generated power) (refer to the photovoltaic power generation system 1 g shown in FIG. 2 ).
- the surplus power refers to power remaining after power used by an electric appliance (electric appliance 1 e 2 ) other than the electric appliance 1 e (electric appliance 1 e 1 ) controlled by the appliance control device 2 is subtracted from the power generated by the photovoltaic power generation system 1 g.
- a unit price of purchased power p e (t) shown by the upper tier among the upper, middle, and lower tiers of FIG. 9A is a unit price of power supplied from commercial power and purchased by a user, a resident of the house 1 h , from a power company at time t.
- the unit price of purchased power p e (t) rises from p 1 to p 2 at time t r .
- a unit price of generated power p g (t) shown by the upper tier is a unit price of power generated by the photovoltaic power generation system 1 g .
- the unit price of generated power p g (t) may be set as 0 yen on the supposition that a running cost of the photovoltaic power generation system is 0 yen, for instance.
- a cost such as a cost per unit amount of generated power calculated from the initial investment, the service life, an expected amount of generated power during the service life, and so on of the photovoltaic power generation system may be set to the unit price of generated power p g (t).
- W g (t) shown by the middle tier is surplus power (predicted surplus power) of the photovoltaic power generation.
- time t 1 is an operation start time.
- the electric appliance 1 e starts to perform the first operation at the time t 1 .
- Time t 2 is a time when a power price is obtained and a time when it is detected that the power price would change in the future.
- Time t M1 is an operation end time in the case where the first operation is continuously performed after the time t 2 .
- Time t M2 is an operation end time in the case where a type of operation being performed is switched to another type, and the second operation is performed after the time t 2.
- FIG. 9B shows an equation for calculating a first cost C M1 according to Modification 1.
- the electric appliance 1 e to be controlled operates using the surplus power of the photovoltaic power generation.
- the surplus power is less than the power consumption of the electric appliance le, commercial power is used as much as the power shortage.
- the power consumption W M1 of the electric appliance 1 e at the operation start time t 1 is made up of surplus power W g (t 1 ) of the photovoltaic power generation and W M1 ⁇ W g (t 1 ) provided from commercial power.
- surplus power W g (t 2 ) is larger than the power consumption W M1 of the electric appliance 1 e at the time t 2 in the case where the first operation is continuously performed after the time t 2 (case of the middle tier), the electric appliance 1 e uses only the surplus power of the photovoltaic power generation.
- the first cost C M1 at the time t 1 according to Modification 1 is obtained by an equation enclosed in curly brackets ⁇ ⁇ shown in the right side of the equation shown in FIG. 9B .
- the first term in the equation enclosed in the curly brackets is a cost produced when the surplus power of the photovoltaic power generation is used, and a product between the unit price of generated power p g (t) and a smaller one of the surplus power W g (t) of the photovoltaic power generation and power consumption W M1 (t ⁇ t 1 ) at the time t in the case where the electric appliance 1 e performs the first operation from the time t 1 .
- the second term is a cost produced when the commercial power is used, and a product between the unit price of purchased power p e (t) and a larger one of W M1 (t ⁇ t 1 ) ⁇ W g (t), the shortage of the surplus power, and 0.
- the first cost C M1 is obtained by integrating a sum of the first term product and the second term product in intervals from the time t 1 to time t M1 .
- FIG. 9C shows an equation for calculating a second cost C M2 according to Modification 1.
- the second cost C M2 can be calculated by adding a cost (the first term on the right side) in a period, from the time t 1 to the time t 2 , during which the electric appliance 1 e performs the first operation, and a cost (the second term) in a period, from the time t 2 to the time t M2 , during which the electric appliance 1 e performs the second operation.
- the cost in the period during which the electric appliance 1 e performs the first operation is obtained by integrating a sum of the following first product and second products.
- the first product is between the unit price of generated power p g (t) and a smaller one of the surplus power W g (t) of the photovoltaic power generation and the power consumption W M1 (t ⁇ t 1 ) at the time t in the case where the electric appliance 1 e performs the first operation from the time t 1 .
- the second product is between the unit price of purchased power p e (t) and a larger one of W M1 (t ⁇ t 1 ) ⁇ W g (t), the shortage of the surplus power, at the time t, and 0.
- the cost of the first term is obtained by integrating the sum of the first and second products from the time t 1 to the time t 2 .
- the cost in the period during which the electric appliance 1 e performs the second operation is obtained by integrating a sum of the following first product and second products.
- the first product is between the unit price of generated power p g (t) and a smaller one of the surplus power W g (t) of the photovoltaic power generation and the power consumption W M2 (t ⁇ t 1 ′) at the time t in the case where the electric appliance 1 e performs the first operation from the time t 1 ′.
- the second product is between the unit price of purchased power p e (t) and a larger one of W M2 (t ⁇ t 1 ′) ⁇ W g (t), the shortage of the surplus power, at the time t, and 0.
- the cost of the second term is obtained by integrating the sum of the first and second products from the time t 2 to the time t M2 .
- Modification 2 describes a cost calculation method in consideration of quality deterioration of the electric appliance 1 e.
- FIG. 10A is a graph showing a relationship between the number of times the electric appliance 1 e is used and quality of the electric appliance 1 e according to Modification 2.
- the quality exceeds durable quality (see horizontal broken line) at the start of use.
- quality deterioration linearly increases with respect to the number of uses (horizontal axis).
- N M1 shows the maximum number of uses at which the quality of the electric appliance 1 e exceeds the durable quality when the electric appliance 1 e repeatedly completes the first operation.
- N M2 shows the maximum number of uses at which the quality of the electric appliance 1 e exceeds the durable quality when the electric appliance 1 e repeatedly completes the second operation.
- FIG. 10B shows an equation for calculating a first cost C M1 according to Modification 2.
- FIG. 10B shows a cost of a single operation of the electric appliance le when the electric appliance 1 e deteriorates according to the number of the uses as shown in FIG. 10A .
- the first cost C M1 is calculated by adding a cost for a total amount of power used from the start to end of operation by the electric appliance 1 e to a cost (value 1 e r in the right side shown in FIG. 10B ) produced by the quality deterioration of the electric appliance 1 e per single operation.
- a value obtained by dividing an initial investment cost P initial , the price of the electric appliance 1 e , by the maximum number of uses N M1 of the electric appliance 1 e when the first operation is repeated is used for the cost produced by the quality deterioration per single operation.
- FIG. 10C shows an equation for calculating a second cost C M2 according to Modification 2.
- the second cost CM2 calculated by this equation is a cost of a single operation by the electric appliance be when the electric appliance 1 e deteriorates according to the number of the uses as shown in FIG. 10A .
- the second cost C M2 is a sum of a cost (the first and second terms on the right side) for a total amount of power used from the start to end of operation by the electric appliance 1 e and a cost (the third and fourth terms) produced by the quality deterioration of the electric appliance 1 e per single operation.
- the cost (the third and fourth terms) produced by the quality deterioration of the electric appliance be per single operation is a sum of a cost (the third term) produced by the first operation from the time t 1 to the time t 2 and a cost (the fourth term) produced by the second operation from the time t 2 to the time t M2 .
- the cost (the third term) produced by the quality deterioration caused by the first operation is calculated by multiplying a value obtained by dividing the price P initial of the electric appliance be by the maximum number of the uses N M1 when the first operation is repeated, by a ratio ((t 2 ⁇ t 1 )/(t M1 ⁇ t 1 )) of a period during which the first operation is actually performed to an operation period in the case where the first operation is performed from its start to end.
- the cost (the fourth term) produced by the quality deterioration caused by the second operation is calculated by multiplying a value obtained by dividing the price P initial of the electric appliance 1 e by the maximum number of uses N M2 when the second operation is repeated, by a ratio ((t M2 ⁇ t 2 )/(t M2 ⁇ t 1 )) of a period during which the second operation is actually performed to an operation period in the case where the second operation is performed from its start to end.
- FIG. 11 shows a configuration of an appliance control device 2 according to Modification 3.
- the appliance control device 2 further includes a state obtaining unit 27 in addition to the structural elements shown in FIG. 3 .
- the state obtaining unit 27 obtains information indicating an operation state (information 27 I a ) from the electric appliance 1 e .
- the state obtaining unit 27 is capable of identifying a progress indicating which step is completed among all steps from the start to end of an operation, based on the obtained information. It is to be noted that the progress may be identified as a ratio of an operation time to an entire period from the start to end of the operation. Moreover, the progress may be identified as a ratio of a remaining operation time to the entire period from the start to end of the operation. Furthermore, the progress may be identified as remaining steps each of which is identified.
- FIG. 12 shows a configuration of an appliance control device 2 according to Modification 4.
- the appliance control device 2 further includes the predicting unit 28 (refer to FIG. 8 ) in addition to the structural elements shown in FIG. 11 .
- FIG. 13 is a diagram showing operations according to Modification 5.
- a unit price of power is relatively low in a period from time t 0 to time t x .
- the unit price of power is high in periods other than the period.
- the following describes, as an example, an operation to wash and dry laundry, a blanket, that is performed by the electric appliance 1 e , a washing and drying machine.
- a user instructs the electric appliance 1 e to complete the operation to wash and dry before the time t x .
- the electric appliance 1 e estimates first time t E1 as a time at which the operation to wash and dry ends when the electric appliance 1 e performs the first operation, based on an amount of laundry or the like. However, when estimating again the end time in the case of performing the first operation, at time t 2 later than the time t q1 , the electric appliance 1 e sometimes estimates, as the time at which the operation to wash and dry ends, second time t E3 different from the first time t E1 .
- the electric appliance 1 e estimates the end time with relatively low accuracy before the start of the operation to wash and dry
- the electric appliance 1 e is capable of estimating, based on an actual operation status, the end time with higher accuracy after the start of the operation to wash and dry.
- the time t E1 is a time that is estimated with relatively low accuracy before the blanket absorbs water.
- Time t E3 is a time that is estimated with relatively high accuracy after the blanket absorbs the water and in consideration of much water actually absorbed by the blanket.
- the time t E3 that is estimated again subsequently is, for instance, the time estimated with such high accuracy, and thus may be different from the first time t E1 estimated previously.
- the state obtaining unit 27 obtains first information (information 271 b ) from the electric appliance 1 e or the like at the time t q1 .
- the obtained first information indicates that an operation end time is estimated as the first time t E1 .
- the state obtaining unit 27 obtains second information (information 27 I b ) from the electric appliance 1 e or the like at the time t 2 .
- the obtained second information indicates that the operation end time is estimated as the second time t E3 .
- the end times t E1 and t E3 may be estimated not by the electric appliance 1 e but by the state obtaining unit 27 .
- each of the first information and the second information may be information or the like with which the state obtaining unit 27 or the like identifies each of the first time t E1 and the second time t E3 as an estimated operation end time.
- the state obtaining unit 27 determines whether or not the second time t E3 is later than the first time t E1 .
- the detecting unit 22 may determine whether or not the second time t E3 is later than the first time t E1 .
- the instructing unit 25 instructs the electric appliance 1 e to continuously perform the first operation after the time t 2 .
- the second time t E3 is later than the first time t E1 , and the unit price of power sometimes becomes higher at the time t x between the time t E1 and the time t E3 .
- the first cost calculating unit 23 calculates a cost produced when the first operation (operation in J2) is continuously performed after the time t 2 .
- the second cost calculating unit 24 calculates a cost produced when the second operation (operation in J3) is performed after the time t 2 .
- the comparing unit 26 compares the two calculated costs to determine which one of the operations produces a lower one of the costs.
- the cost that is calculated and produced when the first operation is continuously performed to the end may be a cost produced between the times t 2 and t E3 , or an entire cost between the times t 1 and t E3 that includes the cost between the times t 2 and t E3 .
- the cost that is calculated and produced when the second operation is switched to and performed to the end may also be a cost produced between the times t 2 and t M2 , or an entire cost between the times t 1 and t M2 that includes the cost between the times t 2 and t M2 .
- the instructing unit 25 instructs the electric appliance 1 e to perform the operation determined by the comparing unit 26 .
- the instructing unit 25 instructs the electric appliance 1 e to continuously perform the first operation (J2).
- the instructing unit 25 instructs the electric appliance 1 e to switch to and perform the second operation (J3).
- the processing shown in FIG. 13 is the same as the aforementioned processing.
- the appliance control device 2 controls the electric appliance 1 e that performs one of the first operation (J2) during a first period (e.g., from t 2 to t E3 in FIG. 13 ) and the second operation (J3) during a second period (e.g., from t 2 to t M2 ).
- the power price obtaining unit 21 obtains information 4 indicating a price of power 1 e P (e.g., aforementioned P e (t)).
- the detecting unit 22 detects a change in the price (change at the time t x ) which is in a not shorter (longer) one of the first period and the second period (first period from times t 2 to t E3 ) and indicated in the obtained information 4 .
- the first cost calculating unit 23 calculates a first cost 23 c produced when the electric appliance 1 e performs the first operation during the first period (case shown in J2).
- the second cost calculating unit 24 calculates a second cost 24 c produced when the electric appliance 1 e performs the second operation during the second period (case shown in J3).
- the comparing unit 26 compares the first cost 23 c and the second cost 24 c to determine which one of the operations produces a not higher (lower) one of the costs.
- the instructing unit 25 instructs the electric appliance 1 e to perform the determined operation.
- the present invention includes the structural elements that achieve the above principle, and produces the above advantageous effects due to the operations of the structural elements.
- the present invention differs from the conventional techniques in these structural elements, operations, and advantageous effects.
- Each of the structural elements in the above-described embodiment may be configured in the form of an exclusive hardware product, or may be realized by executing a software program suitable for the structural element.
- Each of the structural elements may be realized by means of a program executing unit, such as a CPU and a processor, reading and executing the software program recorded on a recording medium such as a hard disk or a semiconductor memory.
- the software program for realizing the control device according to the embodiment is a program described below.
- the program causes a computer to execute, for the computer to control an electric appliance that performs one of a first operation during a first period and a second operation during a second period: obtaining information indicating a price of power; detecting a change in the price in a not shorter one of the first period and the second period, the price being indicated in the obtained information; calculating a first cost produced when the electric appliance performs the first operation, in the case where the change is detected; calculating a second cost produced when the electric appliance performs the second operation, in the case where the change is detected; comparing the first cost and the second cost to determine which one of the first operation and the second operation produces a not higher one of the first cost and the second cost; and instructing the electric appliance to perform the determined one of the first operation and the second operation.
- control device according to one or more aspects is described above based on the embodiment, the present invention is not limited to the embodiment.
- Those skilled in the art will readily appreciate that various modifications may be made in the embodiment and that other embodiments may be obtained by combining structural elements in different embodiments, without departing from the spirit of the present invention. Accordingly, all such modifications and embodiments may be included in the scope of the one or more aspects.
- the present invention makes it possible to avoid instructing an electric appliance to perform an operation that produces a high cost, and to more surely give the electric appliance a more appropriate instruction.
- the present invention is applicable to a control device or the like that gives the electric appliance an instruction to perform an operation.
Abstract
Description
- The present invention relates to a control device that obtains information indicating a unit price of power, calculates a cost produced when an electric appliance operates, and gives the electric appliance an instruction to operate, based on the calculated cost.
- A control device has been so far available which holds information indicating a time period in which a unit price of power is less expensive according to a midnight power rate system or a time-of-day power rate system, and gives an electric appliance an instruction to operate in the time period in which the unit price of power is less expensive (see Patent Literatures (PTLs) 1 and 2, for instance).
- It is to be noted that the electric appliance is, for example, a home appliance such as a washing and drying machine and a dish washing and drying machine, or a heat pump water heater, which are provided in an ordinary family house.
- There is a case where the control device is provided as part of such an electric appliance.
- There is also a case where the control device is provided outside of the electric appliance. For instance, examples of the control device outside of the electric appliance include a control device that communicates with at least two electric appliances provided in a house and gives each of the at least two electric appliances an instruction based on a cost of the electric appliance.
-
- [PTL 1] Japanese Unexamined Patent Application Publication No. 06-165374
- [PTL 2] Japanese Unexamined Patent Application Publication No, 2009-047334
- However, the existing control device fails to give an electric appliance an appropriate instruction to operate at a relatively low cost, and sometimes gives the electric appliance an inappropriate instruction to operate at a relatively high cost.
- In view of this, the present invention provides a control device that makes it possible to avoid giving an electric appliance an inappropriate instruction to operate at a high cost, and to more surely give the electric appliance an appropriate instruction to operate at a low cost.
- A control device according to an aspect of the present invention is a control device that controls an electric appliance that performs one of a first operation during a first period and a second operation during a second period, the control device including: a price obtaining unit configured to obtain information indicating a price of power; a detecting unit configured to detect a change in the price in a not shorter one of the first period and the second period, the price being indicated in the obtained information; a first calculating unit configured to calculate a first cost produced when the electric appliance performs the first operation, in the case where the change is detected; a second calculating unit configured to calculate a second cost produced when the electric appliance performs the second operation, in the case where the change is detected; a comparing unit configured to compare the first cost and the second cost to determine which one of the first operation and the second operation produces a not higher one of the first cost and the second cost; and an instructing unit configured to instruct the electric appliance to perform the determined one of the first operation and the second operation.
- This general and specific aspect may be implemented using a system, a method, an integrated circuit, a computer program, or a computer-readable recording medium such as a CD-ROM, or any combination of systems, methods, integrated circuits, computer programs, or computer-readable recording media,
- A control device according to the present invention makes it possible to avoid giving an electric appliance an instruction to operate at a high cost, and to more surely give the electric appliance an appropriate instruction to operate at a low cost.
- In addition, the control device makes it possible to give the electric appliance not the inappropriate instruction but the appropriate instruction even when a unit price of power changes in a period during which the electric appliance operates.
-
FIG. 1 is a diagram of which (A) shows an operation period and power consumption of an electric appliance, and (B) and (C) each show a power price. -
FIG. 2 is a diagram showing a system. -
FIG. 3 is a diagram showing a configuration of an appliance control device. -
FIG. 4 is a flow chart showing operations performed by the appliance control device. -
FIG. 5 is a diagram of which (A) shows a power price, and (B) and (C) each show an operation performed by the system. -
FIG. 6A shows an exemplary equation for a first cost. -
FIG. 6B shows an exemplary equation for a second cost. -
FIG. 7A shows an exemplary equation for a first cost. -
FIG. 7B shows an exemplary equation for a second cost. -
FIG. 7C is a diagram illustrating a time. -
FIG. 7D shows a determination condition. -
FIG. 8 is a diagram showing a configuration according toModification 1. -
FIG. 9A is a diagram showing operations according toModification 1. -
FIG. 9B shows an equation according toModification 1. -
FIG. 9C shows an equation according toModification 1. -
FIG. 10A is a graph showing a change in quality of an electric appliance. -
FIG. 10B shows an equation according toModification 2. -
FIG. 10C shows an equation according toModification 2. -
FIG. 11 is a diagram showing a configuration according to Modification 3. -
FIG. 12 is a diagram showing a configuration according toModification 4. -
FIG. 13 is a diagram showing operations according to Modification 5. - In relation to the control device disclosed in the Background Art section, the inventors have found the following problem.
- The problem is described in detail with reference to
FIG. 1 . -
FIG. 1 is a diagram of which (A) schematically shows a relationship between an operation period and power consumption of an electric appliance, and (B) and (C) each show a change in a price per unit amount of power (price 4 p). - 5 a in the upper half of (A) shows, at a time when a first operation is performed, an operation period La from when the operation starts at time t to when the operation ends at time tM1, and power consumption in the operation period La. In other words, the length of 5 a in the horizontal axis direction represents a length of the operation period La, and the width of 5 a in the vertical axis direction represents power consumption at each time. Thus, the area of 5 a represents a total amount of consumed power from the start to end of the operation (amount of power 5 aA). The first operation needs a long time for completion, but consumes less power. Besides, the first operation has a relatively small total amount of consumed power from the start to end of the operation.
- 5 b in the lower half of (A) shows, at a time when a second operation is performed, an operation period Lb from when the operation starts at the time t to when the operation ends at time tM2, and power consumption in the operation period Lb. The second operation needs a short time for completion, but consumes more power. The second operation has a relatively large total amount of consumed power (amount of power 5 bA) from the start to end of the operation. To put it another way, the second operation has the total amount of consumed power larger than the total amount of consumed power (amount of power 5 aA) shown in the upper half.
- In each of (B) and (C), 4 p shows a price per unit amount of power (unit price of power).
- A change in the unit price of power in an operation period of an electric appliance is assumed to include a case shown by (B) and a case shown by (C) of
FIG. 1 . - First, in the case shown by (B), the unit price of
power 4 p is fixed until the operation end time tM1 in the case where the first operation (the upper half of (A)) that needs a long time to end is performed. - Here, as stated above, the total amount of consumed power (amount of power 5 aA) when the first operation is performed (the upper half of (A)) is smaller than the total amount of consumed power (amount of power 5 bA) when the second operation is performed (the lower half of (A)).
- For this reason, in the case shown by (B), a cost produced when an operation shown in the upper half of (A) (the first operation) is performed is lower than a cost produced when an operation shown in the lower half of (A) (the second operation) is performed, and the first operation can be performed at the lower cost.
- In contrast, in the case shown by (C) of
FIG. 1 , the unit price ofpower 4 p rises at time tx that is earlier than the time tM1. - For this reason, there is the rise in the unit price of
power 4 p (price 4 px) obtained by subtracting aunit price 4p 1 before the rise from aunit price 4p 2 after the rise. - A first product is obtained by multiplying together the
price 4 px and an amount of power 5 aJ consumed during a period from the times tx to tM1 in the case where the first operation is performed (the upper half of (A)). - On the other hand, there are the total amount of consumed power (amount of power 5 aA) when the first operation is performed (the upper half of (A)), and the total amount of consumed power (amount of power 5 bA) when the second operation is performed (the lower half) and which is larger than the total amount of consumed power 5 aA.
- Stated differently, a second product is also obtained by multiplying together a unit price of power before the time tx and the rise (
price 4 p 1), and a difference between the larger total amount of consumed power (amount of power 5 bA) shown in the lower half and the smaller total amount of consumed power (amount of power 5 aA) shown in the upper half. - In short, in the case shown by (C), the cost produced when the operation shown in the lower half of (A) is performed includes not the first product regarding the
price 4 px resulting from the rise but the second product regarding the difference between the two amounts of power. - The first product not included in the cost in the lower half of (A) is assumed to be sometimes larger than the second product included in the cost.
- In this case, the cost produced when the second operation that ends at the time tM2 which is before the unit price of power rises is performed (the lower half of (A)) is lower than the cost produced when the first operation is performed (the upper half of (A)), and the second operation can be performed at the lower cost.
- For this reason, while the cost in the upper half of (A) is lower in the case shown by (B), the cost in the lower half of (A) is lower in the case shown by (C).
- As a result, it is assumed that because an instruction to perform the operation in the upper half of (A) is given in the case shown by (B) and an inappropriate instruction that results in the higher cost than the upper half of (A) is further given also in the case shown by (C), it is impossible to give an appropriate instruction.
- It is to be noted that a time at which it is known that the unit price of
power 4 p would rise at the time tx is sometimes not the time t of the start of the operation but a time later than the time t of the start of the operation. In this case also, the above problem may arise. - To put it another way, the time t described with reference to
FIG. 1 is not an operation start time but a time that is later than the operation start time and at which a change in the unit price ofpower 4 p is detected. The time tM1 is read as an operation end time in the case where the first operation is continuously performed (the upper half of (A)) after the time t (time tx). In addition, the time tM2 is read as an operation end time in the case where the second operation is switched to and performed (at the time tx). - The aforementioned description can similarly apply to this case, and there is clearly a possibility that the aforementioned problem also arises in the case.
- The following describes an aspect of the present invention with reference to the drawings.
- In order to solve such a problem, an
appliance control device 2 according to the aspect of the present invention is anappliance control device 2 that controls anelectric appliance 1 e (e.g., anelectric appliance 1 e 1) that performs one of a first operation (operation of which a necessary period is a first period (e.g., a period between times t2 and tM1 inFIG. 7C ) when the first operation is performed) during the first period and a second operation (operation shown in z3) during a second period (a period between times t2 and tM2), the appliance control device 2 including: a price obtaining unit 21 configured to obtain information 4 indicating a price (pe(t)) of power 1 eP (FIG. 3 ); a detecting unit 22 configured to detect a change in the price (e.g., a change at time tx inFIG. 5 ) in a not shorter one of the first period and the second period, the price being indicated in the obtained information; a first calculating unit 23 configured to calculate a first cost (information) 23 c produced when the electric appliance 1 e performs the first operation, in the case where the change is detected; a second calculating unit 24 configured to calculate a second cost 24 c produced when the electric appliance 1 e performs the second operation, in the case where the change is detected; a comparing unit 26 configured to compare the first cost 23 c and the second cost 24 c to determine which one of the first operation and the second operation produces a not higher one of the first cost and the second cost; and an instructing unit 25 (refer to an instruction 25 s) configured to instruct the electric appliance 1 e to perform the determined one of the first operation and the second operation. - Regarding the price of
power 1 eP (pe(t)), not only a first case where the price of power does not change (refer to (B) inFIG. 1 ) but also a second case where the price of power changes (refer to (C)) are assumed in the not shorter one of the first period and the second period (the period between times t2 and tM1 inFIG. 7C ). - In the first case, even when a process for instructing an operation determined based on the calculated two costs is not performed, it appears that an appropriate instruction to perform a proper operation that produces a relatively small, reasonable cost is given based only on an amount of power consumption when the
electric appliance 1 e performs the first operation or the second operation. - In other words, in the second case, it is assumed that when the above process is not performed, the appropriate instruction is not given, and only when the process is performed, the appropriate instruction is given.
- In view of this, when not the first case but the second case is determined by detecting the change in the above period (refer to (C) in
FIG. 1 ), the process is performed. - With this, it is possible to avoid giving the aforementioned “inappropriate instruction to operate at a high cost” when the process is not performed to give the appropriate instruction, and to give the appropriate instruction “to operate at a low cost.”
- Eventually, in addition to giving the appropriate instruction in the first case, the appropriate instruction is also given in the second case, and thus the appropriate instruction is more surely given in either case.
- To put it another way, when the price of power changes in the above period (the period during which the electric appliance operates), and the second case ((C) in
FIG. 1 ) where such a change exists occurs, the appropriate instruction can be given. - It is to be noted that the
appliance control device 2 may further include a state obtaining unit configured to obtain, from theelectric appliance 1 e, information 27Ia indicating an operation state (e.g., a length of a period between times t1 and t2 in an example shown inFIG. 7C ) of theelectric appliance 1 e. - The first operation may consume first power WM1 (
FIG. 5 ) that is power consumed by theelectric appliance 1 e in the first period, and the second operation may consume second power WM2 that is power consumed in the second period, the second power WM2 being different from the first power WM1. - The
appliance control device 2 may further include a predicting unit configured to predict an amount of surplus power wg(t) based on an amount of power consumed by a different electric appliance (electric appliance 1 e 2) from theelectric appliance 1 e (e.g., theelectric appliance 1 e 1), and an amount of power generated by a photovoltaicpower generation system 1 g, wherein the first calculatingunit 23 and the second calculatingunit 24 may calculate the first cost and the second cost, respectively, based on the price indicated in theinformation 4 obtained by theprice obtaining unit 21, the predicted amount of surplus power wg(t), and power consumption of the electric appliance (e.g., theelectric appliance 1 e 2) which the instructingunit 25 instructs to perform the determined one of the first operation and the second operation. - The first calculating unit and the second calculating unit may calculate the first cost and the second cost, respectively, based on the price indicated in the
information 4 obtained by theprice obtaining unit 21, and a depreciation converted from a cost of quality deterioration of theelectric appliance 1 e (theelectric appliance 1 e 1) that is instructed to perform the determined one of the first operation and the second operation. - The detecting unit may detect a change of an estimated operation end time (e.g., change from tE1 to tE3 in
FIG. 13 ) of theelectric appliance 1 e (theelectric appliance 1 e 1) of which the operation state is indicated, based on the obtained information (information 27Ib) indicating the operation state of theelectric appliance 1 e. - This general and specific aspect may be implemented using a system, a method, an integrated circuit, a computer program, or a computer-readable recording medium such as a CD-ROM, or any combination of systems, methods, integrated circuits, computer programs, or computer-readable recording media.
- The following describes in detail an embodiment with reference to the drawings.
- The embodiment described below shows a general or specific example. The numerical values, shapes, materials, structural elements, the arrangement and connection of the structural elements, steps, the processing order of the steps etc. shown in the embodiment are mere examples, and therefore do not limit the scope of the appended Claims and their equivalents. Therefore, among the structural elements in the embodiment, structural elements not recited in any one of the independent claims are described as arbitrary structural elements.
-
FIG. 2 is a diagram showing asystem 1. - The
system 1 includes a photovoltaicpower generation system 1 g, at least oneelectric appliance 1 e, and anappliance control device 2, for instance. - The
electric appliance 1 e is capable of performing operations that differ in power usage (power consumption). Here, theelectric appliance 1 e is assumed to be capable of performing a first operation and a second operation. The first operation needs a long time for completion, but consumes less power and has a small total amount of consumed power from the start to end of the operation. The second operation needs a short time for completion, but consumes more power and has a large total amount of consumed power from the start to end of the operation (see aforementionedFIG. 1 ). - The
electric appliance 1 e is, for example, a washing and drying machine that performs washing and drying. Moreover, for instance, the first operation is an operation to wash and dry clothes, and the second operation is an operation to wash and dry clothes with second power consumption different from power consumption when the first operation is performed and a second operation time different from an operation time of the first operation. - The
system 1 is provided to, for example, ahouse 1 h such as an ordinary family house. -
FIG. 3 is a diagram showing a configuration of theappliance control device 2. - The
appliance control device 2 includes a powerprice obtaining unit 21, a detectingunit 22, a firstcost calculating unit 23, a secondcost calculating unit 24, a comparingunit 26, and an instructingunit 25. - It is to be noted that at least part of the
appliance control device 2 may be, for example, a computer including a CPU, a ROM, a RAM, and so on. Theappliance control device 2 may achieve functions of the powerprice obtaining unit 21 and so on by the computer executing a program or the like stored in the ROM. Moreover, at least part of theappliance control device 2 may be realized by an integrated circuit. -
FIG. 4 shows a flow chart for theappliance control device 2. - The power price obtaining unit 21 (
FIG. 3 ) obtainsinformation 4 from adevice 1 m (FIG. 3 or the like) outside of the appliance control device 2 (Sa1 inFIG. 4 ). - It is to be noted that the
device 1 m may be, for instance, a smart meter provided to thehouse 1 h or a server provided outside of thehouse 1 h. For example, theinformation 4 may be transmitted from thedevice 1 m, the outside server, to a smart meter provided to thehouse 1 h. With this, the powerprice obtaining unit 21 may obtain the transmittedinformation 4 through the smart meter. -
FIG. 5 is a diagram illustrating processes performed by the detectingunit 22, the firstcost calculating unit 23, the secondcost calculating unit 24, the comparingunit 26, and the instructingunit 25. -
FIG. 5 shows a case where theelectric appliance 1 e starts the first operation at time t1, and the powerprice obtaining unit 21 obtains information (above-mentioned) indicating unit price of power at time t2. - (A) in
FIG. 5 shows a relationship between a time (horizontal axis) and a unit price of power (vertical axis). pe(t) is a price per unit amount of power (unit price) at time t. pe(t) is a price for using commercial power having a predetermined unit amount (e.g., 1 kWh) that a user or the like of theelectric appliance 1 e pays to a power company or the like in the case where the commercial power is used. The unit price of power is set based on supply, and sometimes changes depending on a time period. The power company sets the unit price of power to be higher in a time period when power is in high demand, and the unit price of power to be lower in a time period when power is in low demand.FIG. 5 shows a case where a unit price of power before time tx is p1, and a unit price of power after the time tx is p2. - (B) in
FIG. 5 shows a relationship between passage of time from a start of operation to an end of operation (horizontal axis), and power consumption of theelectric appliance 1 e (vertical axis) when the electric appliance le continuously performs the first operation after the time t2. - (C) in
FIG. 5 shows a relationship between passage of time from a start of operation to an end of operation, and power consumption of theelectric appliance 1 e when the first operation being performed is switched to the second operation and theelectric appliance 1 e performs the second operation after the time t2. - It is to be noted that although, for the sake of brevity, power consumption in the first operation and power consumption in the second operation are respectively described as WM1 and WM2 that are fixed power values in (B) and (C) in
FIG. 5 , the power consumption may vary. - The detecting
unit 22 determines whether or not a unit price of power changes in a period during which theelectric appliance 1 e operates, using information (above-mentioned) that indicates the unit price of power and is obtained by the power price obtaining unit 21 (Sa2 inFIG. 4 ). - In an example shown in
FIG. 5 , because the unit price of power pe(t) changes from p1 to pz at the time tx, and the time tx is earlier than estimated operation end time tM1 in the case where theelectric appliance 1 e continuously performs the first operation after the time t2, the detectingunit 22 determines that the unit price of power changes in the period during which theelectric appliance 1 e operates. - When the detecting
unit 22 determines that the unit price of power changes in the period during which theelectric appliance 1 e operates, the firstcost calculating unit 23 calculates a first cost CM1 produced when theelectric appliance 1 e continuously performs the first operation after the time tz ((B) inFIG. 5 ) (Sa3 inFIG. 4 ). -
FIG. 6A shows an equation for the first cost CM1. - It is to be noted that the equation shown in
FIG. 6A is a mere example. Hereinafter, a description for specifying such a statement is omitted properly. - In an example shown by (B) in
FIG. 5 , the first cost CM1 is a price for an amount of power used when theelectric appliance 1 e operates with power consumption WM1 from operation start time t1 to the estimated operation end time tM1. Moreover, the unit price of power is p1 from the time t1 to the time tx, and p2 from the time tx to the time tM1. Consequently, the first cost CM1 is a price obtained by adding the following two products (the first and second terms on the right side of the equation shown inFIG. 6A ). In other words, one of the products (first term) is between the unit price of power p1 before the time tx when the unit price of power changes, and an amount of consumed power (WM1×(tx−t1)) before the time tx. The other of the products (second term) is between the unit price of power (p2) after the time tx when the unit price of power changes, and an mount of consumed power (WM2×(tM1−tx)) after the time tx. - It is to be noted that in the case of
FIG. 5 , an amount of consumed power can be obtained by multiplying together power consumption (WM1 in the above example) and an operation period (tx−t1, tM1−tx). - As stated above, the first cost CM1 can be specifically calculated by the equation shown in
FIG. 6A or the like. -
FIG. 6B shows an equation for a second cost CM2. - When the detecting
unit 22 determines that the unit price of power changes in the period during which theelectric appliance 1 e operates, the secondcost calculating unit 24 calculates the second cost CM2 produced when theelectric appliance 1 e switches the first operation to the second operation and performs the second operation from a predetermined time later than the time t2 (time t2 in the example shown by (B) inFIG. 5 ) (Sa4 inFIG. 4 ). - In the case of
FIG. 5 , theelectric appliance 1 e switches the first operation to the second operation and performs the second operation at the time t2. For this reason, the second cost CM2, is a price for an amount of power used when theelectric appliance 1 e operates with the power consumption WM1 from the operation start time t1 to the time t2 and operates with power consumption WM2 from the time t2 to estimated operation end time tM2. Here, the time to when the unit price of power changes from p1 to p2 is a time later than the estimated operation end time tM2. The unit price of power in an operation period (a period until the time tM2) of the electric appliance is p1. Consequently, the second cost CM2, is a price obtained by adding the following two products (the first and second terms on the right side of the equation shown inFIG. 6B ). In other words, one of the products is between the unit price of power p1 and an amount of consumed power (WM1×(t2−t1)) in the period (the times t1 to t2) during which theelectric appliance 1 e performs the first operation. The other of the products is between the unit price of power p1 and an amount of consumed power (WM2×(tM2−t2)) in the period (times t2 to tM2) during which theelectric appliance 1 e performs the second operation. - It is to be noted that in the case of
FIG. 5 , as with the above example shown by (B) inFIG. 5 , the amount of consumed power is also obtained by multiplying together the power consumption (WM1, WM2) and the operation period (t2−t1, tM2−Wt2) in the example shown by (C). - As stated above, the second cost CM2 can be specifically calculated by the equation shown in
FIG. 6B or the like. -
FIG. 7A andFIG. 7B show modifications of the calculations for the first cost CM1 and the second cost CM2, respectively. - In
FIG. 7A andFIG. 7B , a case is considered where power consumption of theelectric appliance 1 e varies. In addition, cases are considered where the time tx when the unit price of power pe(t) changes is earlier than the time tM2 and where the time tx when the unit price of power pe(t) changes is later than the time tM2. - An elapsed time from the operation start time t1 (
FIG. 5 ) to the time t can be represented by t−t1. Consequently, a cost at the time t can be expressed in a product between the unit price of power pe(t) at the time t and power consumption WM1(t−t1) of theelectric appliance 1 e after the time (t−t1) elapses from the operation start time. To put it another way, the first cost CM1 (the left side inFIG. 7A ) can be represented by an integral of such a cost from the time t1 to the time tM1 (the right side inFIG. 7A ). - Likewise, the second cost CM2 can be represented by a sum of the following two values. One of the values is obtained by integrating a cost produced at the time t(pe(t)×WM1(t−t1)) in a first interval from the operation start time t1 when the
electric appliance 1 e starts to perform the first operation to the time t2 when theelectric appliance 1 e stops performing the first operation (the first term on the right side inFIG. 7B ). The other of the values is obtained by integrating (pe(t)×WM2(t−t1 1)) in a second interval from the time t2 when theelectric appliance 1 e starts to perform the second operation to the estimated operation end time tM2 when theelectric appliance 1 e stops performing the second operation (the second term). - The following describes the above time t1′.
-
FIG. 7C is a diagram illustrating the time t1′. - As shown in
FIG. 7C , there is a progress state S1 of an operation of theelectric appliance 1 e at time t2 (time t2 in z1, z3) when theelectric appliance 1 e performs the first operation from time t1 to the time t2. Moreover, there is a progress state S2 at a time (ts1, t2) after elapsed time T1 passes from an operation start time (time t1 in z2, time t1′ in z3) and when theelectric appliance 1 e starts to perform the second operation (refer to “second operation” section). Here, it is assumed that the above progress state S1 matches the progress state S2. When theelectric appliance 1 e in the progress state S1 at the time t2 switches the first operation to the second operation (z3), theelectric appliance 1 e performs the following operation (operation between times t2 to tM2 in z3). The operation is the second operation (operation between the times t2 and tM2 in z4) that is in the progress state S2 during the elapsed time T1 from the operation start (time t1′) and is performed from the time t2 to the operation end (time tM2). Thus, an operation state of theelectric appliance 1 e when the first operation is switched to the second operation at the time t2 (z3) is an operation state (operation state S1) that is the same as an operation state (operation state S2) at the time t2 in the case where theelectric appliance 1 e starts to perform the second operation (operation in z4) at time t1′=t2−T1 that is a time earlier than the time t2 when the switching is performed by the above elapsed time T1. Furthermore, it is assumed that a remaining time to the operation end time tM, is T2 in the case where the electric appliance le performs the second operation (operation in z4) until the time t2 after the elapsed time T1 passes from the operation start (time t1′). The estimated operation end time tM2 in the case where theelectric appliance 1 e starts to perform the first operation at the time t1, and switches the first operation to the second operation and performs the second operation at the time t2 (case of z3) is time t2+T2 after such time T2 passes from the time t2 when the switching is performed. - The comparing
unit 26 compares the calculated first cost CM1 and second cost CM2, and determines a smaller one of the two costs (Sa5 inFIG. 4 ). -
FIG. 7D shows a conditional equation for determining the smaller one of the costs. - The instructing
unit 25 instructs theelectric appliance 1 e to perform an operation at the smaller cost determined by the comparing unit 26 (Sa6 inFIG. 4 ). Stated differently, there is a case where switching to and performing the second operation can be lower in cost than continuously performing the first operation after the time t2 (FIG. 7C ) (refer to z1 inFIG. 7C ). In short, such a case is a case where the conditional equation shown inFIG. 7D is satisfied, that is, a case where the second cost CM2 is lower than the first cost C. When the comparingunit 26 determines that the conditional equation shown inFIG. 7D is satisfied, the instructingunit 25 instructs theelectric appliance 1 e to switch to and perform the second operation (refer to z3). It is to be noted that the second operation is performed in the operation state (operation state S2) during the elapsed time T1 in the case where the second operation is started (case of z4). - It is to be noted that the above-described first cost CM1 and second cost CM2 each may be a cost produced when an operation is performed after the time t2. In other words, the first cost CM1 and the second cost CM2 each may be a cost not including a cost in a period from the time t1 to the time t2, that is, a period in which an operation is already performed.
-
FIG. 8 is a diagram showing a configuration of anappliance control device 2 according toModification 1 - The
appliance control device 2 further includes a predictingunit 28 in addition to the structural elements shown inFIG. 3 . - The predicting
unit 28 calculates predicted surplus power Wg(t) based on a prediction about generated power of photovoltaic power generation (power generation prediction) and a prediction about power consumption of an electric appliance (e.g.,electric appliance 1 e 2) other than anelectric appliance 1 e to be controlled (e.g., theelectric appliance 1e 1 shown inFIG. 2 ) in ahouse 1 h (power demand prediction). - The detecting
unit 22 performs the following determination when the powerprice obtaining unit 21 obtains information indicating a unit price of power (aforementioned) or the predictingunit 28 calculates the predicted surplus power Wg(t). In other words, in that case, the predictingunit 22 determines whether or not the unit price of power or the surplus power changes in a period during which theelectric appliance 1 e operates. - The first
cost calculating unit 23 and the secondcost calculating unit 24 calculate a first cost and a second cost using equations described with reference toFIG. 93 andFIG. 9C , respectively. -
FIG. 9A is a diagram showing operations according toModification 1. -
Modification 1 describes a cost calculation method when theelectric appliance 1 e also uses power generated by photovoltaic power generation (generated power) (refer to the photovoltaicpower generation system 1 g shown inFIG. 2 ). - It is to be noted that the surplus power refers to power remaining after power used by an electric appliance (
electric appliance 1 e 2) other than theelectric appliance 1 e (electric appliance 1 e 1) controlled by theappliance control device 2 is subtracted from the power generated by the photovoltaicpower generation system 1 g. - A unit price of purchased power pe(t) shown by the upper tier among the upper, middle, and lower tiers of
FIG. 9A is a unit price of power supplied from commercial power and purchased by a user, a resident of thehouse 1 h, from a power company at time t. Here, the unit price of purchased power pe(t) rises from p1 to p2 at time tr. - A unit price of generated power pg(t) shown by the upper tier is a unit price of power generated by the photovoltaic
power generation system 1 g. The unit price of generated power pg(t) may be set as 0 yen on the supposition that a running cost of the photovoltaic power generation system is 0 yen, for instance. A cost such as a cost per unit amount of generated power calculated from the initial investment, the service life, an expected amount of generated power during the service life, and so on of the photovoltaic power generation system may be set to the unit price of generated power pg(t). - Wg(t) shown by the middle tier is surplus power (predicted surplus power) of the photovoltaic power generation.
- In
FIG. 9A , time t1 is an operation start time. Here, as shown by each of the middle and lower tiers ofFIG. 9A , theelectric appliance 1 e starts to perform the first operation at the time t1. Time t2 is a time when a power price is obtained and a time when it is detected that the power price would change in the future. Time tM1 is an operation end time in the case where the first operation is continuously performed after the time t2. Time tM2 is an operation end time in the case where a type of operation being performed is switched to another type, and the second operation is performed after the time t2. -
FIG. 9B shows an equation for calculating a first cost CM1 according toModification 1. - In
Modification 1, theelectric appliance 1 e to be controlled operates using the surplus power of the photovoltaic power generation. However, when the surplus power is less than the power consumption of the electric appliance le, commercial power is used as much as the power shortage. - For instance, when magnitude of the power consumption WM1, WM2 and the surplus power Wg(t) of the
electric appliance 1 e is in a relationship as shown byFIG. 9A , the power consumption WM1 of theelectric appliance 1 e at the operation start time t1 is made up of surplus power Wg(t1) of the photovoltaic power generation and WM1−−Wg(t1) provided from commercial power. - Moreover, because surplus power Wg(t2) is larger than the power consumption WM1 of the
electric appliance 1 e at the time t2 in the case where the first operation is continuously performed after the time t2 (case of the middle tier), theelectric appliance 1 e uses only the surplus power of the photovoltaic power generation. - With this, the first cost CM1 at the time t1 according to
Modification 1 is obtained by an equation enclosed in curly brackets { } shown in the right side of the equation shown inFIG. 9B . The first term in the equation enclosed in the curly brackets is a cost produced when the surplus power of the photovoltaic power generation is used, and a product between the unit price of generated power pg(t) and a smaller one of the surplus power Wg(t) of the photovoltaic power generation and power consumption WM1(t−t1) at the time t in the case where theelectric appliance 1 e performs the first operation from the time t1. The second term is a cost produced when the commercial power is used, and a product between the unit price of purchased power pe(t) and a larger one of WM1(t−t1)−Wg(t), the shortage of the surplus power, and 0. The first cost CM1 is obtained by integrating a sum of the first term product and the second term product in intervals from the time t1 to time tM1. -
FIG. 9C shows an equation for calculating a second cost CM2 according toModification 1. - The second cost CM2 can be calculated by adding a cost (the first term on the right side) in a period, from the time t1 to the time t2, during which the
electric appliance 1 e performs the first operation, and a cost (the second term) in a period, from the time t2 to the time tM2, during which theelectric appliance 1 e performs the second operation. - The cost in the period during which the
electric appliance 1 e performs the first operation (first term) is obtained by integrating a sum of the following first product and second products. The first product is between the unit price of generated power pg(t) and a smaller one of the surplus power Wg(t) of the photovoltaic power generation and the power consumption WM1(t−t1) at the time t in the case where theelectric appliance 1 e performs the first operation from the time t1. The second product is between the unit price of purchased power pe(t) and a larger one of WM1(t−t1)−Wg(t), the shortage of the surplus power, at the time t, and 0. The cost of the first term is obtained by integrating the sum of the first and second products from the time t1 to the time t2. - The cost in the period during which the
electric appliance 1 e performs the second operation (second term) is obtained by integrating a sum of the following first product and second products. The first product is between the unit price of generated power pg(t) and a smaller one of the surplus power Wg(t) of the photovoltaic power generation and the power consumption WM2(t−t1′) at the time t in the case where theelectric appliance 1 e performs the first operation from the time t1′. The second product is between the unit price of purchased power pe(t) and a larger one of WM2(t−t1′)−Wg(t), the shortage of the surplus power, at the time t, and 0. The cost of the second term is obtained by integrating the sum of the first and second products from the time t2 to the time tM2. -
Modification 2 describes a cost calculation method in consideration of quality deterioration of theelectric appliance 1 e. -
FIG. 10A is a graph showing a relationship between the number of times theelectric appliance 1 e is used and quality of theelectric appliance 1 e according toModification 2. - The quality exceeds durable quality (see horizontal broken line) at the start of use. In an example shown in
FIG. 10A , quality deterioration linearly increases with respect to the number of uses (horizontal axis). - In
FIG. 10A , NM1 shows the maximum number of uses at which the quality of theelectric appliance 1 e exceeds the durable quality when theelectric appliance 1 e repeatedly completes the first operation. NM2 shows the maximum number of uses at which the quality of theelectric appliance 1 e exceeds the durable quality when theelectric appliance 1 e repeatedly completes the second operation. -
FIG. 10B shows an equation for calculating a first cost CM1 according toModification 2. -
FIG. 10B shows a cost of a single operation of the electric appliance le when theelectric appliance 1 e deteriorates according to the number of the uses as shown inFIG. 10A . - In
FIG. 10B , the first cost CM1 is calculated by adding a cost for a total amount of power used from the start to end of operation by theelectric appliance 1 e to a cost (value 1 er in the right side shown inFIG. 10B ) produced by the quality deterioration of theelectric appliance 1 e per single operation. A value obtained by dividing an initial investment cost Pinitial, the price of theelectric appliance 1 e, by the maximum number of uses NM1 of theelectric appliance 1 e when the first operation is repeated is used for the cost produced by the quality deterioration per single operation. - Regarding the first term on the right side shown in
FIG. 10B , please refer to the equation shown inFIG. 7A , for instance. -
FIG. 10C shows an equation for calculating a second cost CM2 according toModification 2. - The second cost CM2 calculated by this equation is a cost of a single operation by the electric appliance be when the
electric appliance 1 e deteriorates according to the number of the uses as shown inFIG. 10A . - In
FIG. 10C , the second cost CM2 is a sum of a cost (the first and second terms on the right side) for a total amount of power used from the start to end of operation by theelectric appliance 1 e and a cost (the third and fourth terms) produced by the quality deterioration of theelectric appliance 1 e per single operation. The cost (the third and fourth terms) produced by the quality deterioration of the electric appliance be per single operation is a sum of a cost (the third term) produced by the first operation from the time t1 to the time t2 and a cost (the fourth term) produced by the second operation from the time t2 to the time tM2. - The cost (the third term) produced by the quality deterioration caused by the first operation is calculated by multiplying a value obtained by dividing the price Pinitial of the electric appliance be by the maximum number of the uses NM1 when the first operation is repeated, by a ratio ((t2−t1)/(tM1−t1)) of a period during which the first operation is actually performed to an operation period in the case where the first operation is performed from its start to end.
- The cost (the fourth term) produced by the quality deterioration caused by the second operation is calculated by multiplying a value obtained by dividing the price Pinitial of the
electric appliance 1 e by the maximum number of uses NM2 when the second operation is repeated, by a ratio ((tM2−t2)/(tM2−t1)) of a period during which the second operation is actually performed to an operation period in the case where the second operation is performed from its start to end. -
FIG. 11 shows a configuration of anappliance control device 2 according to Modification 3. - The
appliance control device 2 further includes astate obtaining unit 27 in addition to the structural elements shown inFIG. 3 . - The
state obtaining unit 27 obtains information indicating an operation state (information 27Ia) from theelectric appliance 1 e. Thestate obtaining unit 27 is capable of identifying a progress indicating which step is completed among all steps from the start to end of an operation, based on the obtained information. It is to be noted that the progress may be identified as a ratio of an operation time to an entire period from the start to end of the operation. Moreover, the progress may be identified as a ratio of a remaining operation time to the entire period from the start to end of the operation. Furthermore, the progress may be identified as remaining steps each of which is identified. -
FIG. 12 shows a configuration of anappliance control device 2 according toModification 4. Theappliance control device 2 further includes the predicting unit 28 (refer toFIG. 8 ) in addition to the structural elements shown inFIG. 11 . -
FIG. 13 is a diagram showing operations according to Modification 5. - A unit price of power is relatively low in a period from time t0 to time tx. The unit price of power is high in periods other than the period.
- The following describes, as an example, an operation to wash and dry laundry, a blanket, that is performed by the
electric appliance 1 e, a washing and drying machine. - At time tq1 a user instructs the
electric appliance 1 e to complete the operation to wash and dry before the time tx. - The
electric appliance 1 e estimates first time tE1 as a time at which the operation to wash and dry ends when theelectric appliance 1 e performs the first operation, based on an amount of laundry or the like. However, when estimating again the end time in the case of performing the first operation, at time t2 later than the time tq1, theelectric appliance 1 e sometimes estimates, as the time at which the operation to wash and dry ends, second time tE3 different from the first time tE1. For instance, there is a case where although theelectric appliance 1 e estimates the end time with relatively low accuracy before the start of the operation to wash and dry, theelectric appliance 1 e is capable of estimating, based on an actual operation status, the end time with higher accuracy after the start of the operation to wash and dry. - For example, the time tE1 is a time that is estimated with relatively low accuracy before the blanket absorbs water.
- Time tE3 is a time that is estimated with relatively high accuracy after the blanket absorbs the water and in consideration of much water actually absorbed by the blanket.
- The time tE3 that is estimated again subsequently is, for instance, the time estimated with such high accuracy, and thus may be different from the first time tE1 estimated previously.
- The
state obtaining unit 27 obtains first information (information 271 b) from theelectric appliance 1 e or the like at the time tq1. The obtained first information indicates that an operation end time is estimated as the first time tE1. Moreover, thestate obtaining unit 27 obtains second information (information 27Ib) from theelectric appliance 1 e or the like at the time t2. The obtained second information indicates that the operation end time is estimated as the second time tE3. The end times tE1 and tE3 may be estimated not by theelectric appliance 1 e but by thestate obtaining unit 27. It is to be noted that each of the first information and the second information may be information or the like with which thestate obtaining unit 27 or the like identifies each of the first time tE1 and the second time tE3 as an estimated operation end time. - The
state obtaining unit 27 determines whether or not the second time tE3 is later than the first time tE1. - It is to be noted that instead of the
state obtaining unit 27, the detectingunit 22 may determine whether or not the second time tE3 is later than the first time tE1. - When it is determined that the time tE3 is not later than the time tE1, the instructing
unit 25 instructs theelectric appliance 1 e to continuously perform the first operation after the time t2. - As shown in
FIG. 13 , the second time tE3 is later than the first time tE1, and the unit price of power sometimes becomes higher at the time tx between the time tE1 and the time tE3. In this case, it may be possible to reduce a cost produced at the operation end more when the second operation that ends in a short time is switched to and performed (refer to J3 inFIG. 13 ) than when the first operation is continuously performed (refer to J2 inFIG. 13 ). - The first
cost calculating unit 23 calculates a cost produced when the first operation (operation in J2) is continuously performed after the time t2. The secondcost calculating unit 24 calculates a cost produced when the second operation (operation in J3) is performed after the time t2. The comparingunit 26 compares the two calculated costs to determine which one of the operations produces a lower one of the costs. - It is to be noted that the cost that is calculated and produced when the first operation is continuously performed to the end may be a cost produced between the times t2 and tE3, or an entire cost between the times t1 and tE3 that includes the cost between the times t2 and tE3.
- Likewise, the cost that is calculated and produced when the second operation is switched to and performed to the end may also be a cost produced between the times t2 and tM2, or an entire cost between the times t1 and tM2 that includes the cost between the times t2 and tM2.
- When it is determined that the time tE3 is later than the time tE1 (case shown in
FIG. 13 ), the instructingunit 25 instructs theelectric appliance 1 e to perform the operation determined by the comparingunit 26. In other words, when continuously performing the first operation produces a lower cost, the instructingunit 25 instructs theelectric appliance 1 e to continuously perform the first operation (J2). When switching to and performing the second operation produces a lower cost, the instructingunit 25 instructs theelectric appliance 1 e to switch to and perform the second operation (J3). - As stated above, the processing shown in
FIG. 13 is the same as the aforementioned processing. - To put it another way, the
appliance control device 2 controls theelectric appliance 1 e that performs one of the first operation (J2) during a first period (e.g., from t2 to tE3 inFIG. 13 ) and the second operation (J3) during a second period (e.g., from t2 to tM2). - The power
price obtaining unit 21 obtainsinformation 4 indicating a price ofpower 1 eP (e.g., aforementioned Pe(t)). - The detecting
unit 22 detects a change in the price (change at the time tx) which is in a not shorter (longer) one of the first period and the second period (first period from times t2 to tE3) and indicated in the obtainedinformation 4. - When the change is detected (case shown in
FIG. 13 ), the firstcost calculating unit 23 calculates afirst cost 23 c produced when theelectric appliance 1 e performs the first operation during the first period (case shown in J2). - When the change is detected, the second
cost calculating unit 24 calculates asecond cost 24 c produced when theelectric appliance 1 e performs the second operation during the second period (case shown in J3). - The comparing
unit 26 compares thefirst cost 23 c and thesecond cost 24 c to determine which one of the operations produces a not higher (lower) one of the costs. - The instructing
unit 25 instructs theelectric appliance 1 e to perform the determined operation. - With this, even in the example shown in
FIG. 13 , the same advantageous effects as those of the aforementioned processing can be gained according to the same principle as the aforementioned processing. - The present invention includes the structural elements that achieve the above principle, and produces the above advantageous effects due to the operations of the structural elements. The present invention differs from the conventional techniques in these structural elements, operations, and advantageous effects.
- Each of the structural elements in the above-described embodiment may be configured in the form of an exclusive hardware product, or may be realized by executing a software program suitable for the structural element. Each of the structural elements may be realized by means of a program executing unit, such as a CPU and a processor, reading and executing the software program recorded on a recording medium such as a hard disk or a semiconductor memory. Here, the software program for realizing the control device according to the embodiment is a program described below.
- The program causes a computer to execute, for the computer to control an electric appliance that performs one of a first operation during a first period and a second operation during a second period: obtaining information indicating a price of power; detecting a change in the price in a not shorter one of the first period and the second period, the price being indicated in the obtained information; calculating a first cost produced when the electric appliance performs the first operation, in the case where the change is detected; calculating a second cost produced when the electric appliance performs the second operation, in the case where the change is detected; comparing the first cost and the second cost to determine which one of the first operation and the second operation produces a not higher one of the first cost and the second cost; and instructing the electric appliance to perform the determined one of the first operation and the second operation.
- Although the control device according to one or more aspects is described above based on the embodiment, the present invention is not limited to the embodiment. Those skilled in the art will readily appreciate that various modifications may be made in the embodiment and that other embodiments may be obtained by combining structural elements in different embodiments, without departing from the spirit of the present invention. Accordingly, all such modifications and embodiments may be included in the scope of the one or more aspects.
- The present invention makes it possible to avoid instructing an electric appliance to perform an operation that produces a high cost, and to more surely give the electric appliance a more appropriate instruction. The present invention is applicable to a control device or the like that gives the electric appliance an instruction to perform an operation.
-
-
- 1 h House
- 1 e Electric appliance
- 1 er Value
- 1 eP Power
- 1 g Photovoltaic power generation system
- 1GI Information
- 2. Appliance control device
- 4. Information
- 4 p, 4
p p 2 Unit price - 4 px Cost
- 5 aA, 5 bA, 5 aJ Amount of power
- 21 Power price obtaining unit
- 22 Detecting unit
- 23 First cost calculating unit
- 24 Second cost calculating unit
- 25 Instructing unit
- 25 s Instruction
- 26 Comparing unit
- 27 State obtaining unit
- 27Ia, 27Ib Information
- 28 Predicting unit
Claims (9)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011217227 | 2011-09-30 | ||
JP2011-217227 | 2011-09-30 | ||
PCT/JP2012/005616 WO2013046546A1 (en) | 2011-09-30 | 2012-09-05 | Control device, integrated circuit, control method, and program |
Publications (2)
Publication Number | Publication Date |
---|---|
US20140180443A1 true US20140180443A1 (en) | 2014-06-26 |
US9488966B2 US9488966B2 (en) | 2016-11-08 |
Family
ID=47994637
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/237,666 Active 2033-09-28 US9488966B2 (en) | 2011-09-30 | 2012-09-05 | Control device, integrated circuit, control method, and program for controlling an appliance performing different operations |
Country Status (4)
Country | Link |
---|---|
US (1) | US9488966B2 (en) |
EP (1) | EP2763081A4 (en) |
JP (1) | JP5654690B2 (en) |
WO (1) | WO2013046546A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104898593A (en) * | 2015-04-01 | 2015-09-09 | 珠海格力电器股份有限公司 | Method of judging whether control end is matched with electric appliance |
EP2647756A3 (en) * | 2012-04-04 | 2016-11-02 | Whirlpool Corporation | Apparatus and method for controlling the energy usage of an appliance |
US11310068B2 (en) * | 2017-12-26 | 2022-04-19 | Lg Electronics Inc. | Device of controlling related device using artificial intelligence based on operation situation, schedule bot and server controlling thereof |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110098869A1 (en) * | 2009-10-26 | 2011-04-28 | Lg Electronics Inc. | Electric appliance and a control method thereof |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2797640B2 (en) | 1990-04-27 | 1998-09-17 | 凸版印刷株式会社 | Carriage moving device and automatic processing device |
JP2845697B2 (en) | 1992-11-18 | 1999-01-13 | シャープ株式会社 | Electrical equipment |
US5572438A (en) | 1995-01-05 | 1996-11-05 | Teco Energy Management Services | Engery management and building automation system |
JP4229901B2 (en) | 2004-11-30 | 2009-02-25 | シャープ株式会社 | Washing machine |
US7274975B2 (en) * | 2005-06-06 | 2007-09-25 | Gridpoint, Inc. | Optimized energy management system |
JP4679395B2 (en) * | 2006-03-07 | 2011-04-27 | 株式会社東芝 | Fully automatic washing dryer |
JP5026191B2 (en) | 2007-08-17 | 2012-09-12 | 株式会社コロナ | Heat pump water heater |
JP5484776B2 (en) * | 2009-04-23 | 2014-05-07 | パナソニック株式会社 | Control system, control method therefor, and program |
WO2011052957A2 (en) | 2009-10-26 | 2011-05-05 | Lg Electronics Inc. | Method of controlling network system |
JP5645244B2 (en) | 2010-02-05 | 2014-12-24 | パナソニックIpマネジメント株式会社 | Energy supply and demand control system |
KR101611296B1 (en) | 2010-02-09 | 2016-04-12 | 엘지전자 주식회사 | Method and apparatus for controlling power using a smart device |
US20110125337A1 (en) * | 2010-08-30 | 2011-05-26 | Vyacheslav Zavadsky | Household appliance adapted to work with time of use electricity rates |
-
2012
- 2012-09-05 WO PCT/JP2012/005616 patent/WO2013046546A1/en active Application Filing
- 2012-09-05 JP JP2013535847A patent/JP5654690B2/en not_active Expired - Fee Related
- 2012-09-05 US US14/237,666 patent/US9488966B2/en active Active
- 2012-09-05 EP EP12836930.3A patent/EP2763081A4/en not_active Ceased
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110098869A1 (en) * | 2009-10-26 | 2011-04-28 | Lg Electronics Inc. | Electric appliance and a control method thereof |
Non-Patent Citations (1)
Title |
---|
Structured Computer Organization, By: Andrew S. Tanenbaum (Second Edition, ISBN: 0-13-854489-1) * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2647756A3 (en) * | 2012-04-04 | 2016-11-02 | Whirlpool Corporation | Apparatus and method for controlling the energy usage of an appliance |
US10135245B2 (en) | 2012-04-04 | 2018-11-20 | Whirlpool Corporation | Apparatus and method for controlling the energy usage of an appliance |
CN104898593A (en) * | 2015-04-01 | 2015-09-09 | 珠海格力电器股份有限公司 | Method of judging whether control end is matched with electric appliance |
US11310068B2 (en) * | 2017-12-26 | 2022-04-19 | Lg Electronics Inc. | Device of controlling related device using artificial intelligence based on operation situation, schedule bot and server controlling thereof |
Also Published As
Publication number | Publication date |
---|---|
JP5654690B2 (en) | 2015-01-14 |
EP2763081A4 (en) | 2015-03-25 |
US9488966B2 (en) | 2016-11-08 |
EP2763081A1 (en) | 2014-08-06 |
WO2013046546A1 (en) | 2013-04-04 |
JPWO2013046546A1 (en) | 2015-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5877346B2 (en) | Load control device, program, load control system | |
JP2020505703A5 (en) | ||
US9649009B2 (en) | Method for controlling a domestic appliance, using smart metering | |
US9488966B2 (en) | Control device, integrated circuit, control method, and program for controlling an appliance performing different operations | |
US11596288B2 (en) | System for determining an operating state of a dishwasher and an according method | |
KR20150001102A (en) | Method and apparatus for server power prediction using virtual machine | |
JP2016123532A (en) | Clothes washing machine | |
JP6074868B2 (en) | Load control system, load control device, and load control method | |
JP6098840B2 (en) | Supply / demand control apparatus and supply / demand control method | |
JP5314813B1 (en) | Cogeneration system | |
US20140142875A1 (en) | Appliance operation state detection | |
EP2586353B1 (en) | Dishwasher | |
WO2018042521A1 (en) | Hot water supply control system, server, hot water supply control method and program | |
TW201243528A (en) | Control apparatus, control method, program, and recording medium | |
JP6163355B2 (en) | Power demand control apparatus and method | |
JP4914141B2 (en) | Cogeneration system operation control device | |
JP2008215782A (en) | Fuel cell cogeneration system, its control method and control program | |
CN113123070B (en) | Washing machine and fault reminding method thereof | |
WO2013145294A1 (en) | Information processing device, power supplying control method, and power supplying control program | |
CN109722844A (en) | A kind of method for heating and controlling and more washing facilitys of more washing facilitys | |
JP7348031B2 (en) | fuel cell system | |
JP5478580B2 (en) | Cogeneration system operation control device | |
JPWO2013145294A1 (en) | Information processing apparatus, power supply control method, and power supply control program | |
JP6917558B2 (en) | Gas appliance management device and its operation method | |
US9817044B2 (en) | Determination of a substitute value for the primary-side power consumption of a power supply unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: PANASONIC CORPORATION, JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WAKI, YUKI;TAKAYAMA, HISASHI;IKEDA, TOSIHISA;AND OTHERS;SIGNING DATES FROM 20131229 TO 20140114;REEL/FRAME:032919/0466 |
|
AS | Assignment |
Owner name: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD., JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:PANASONIC CORPORATION;REEL/FRAME:034194/0143 Effective date: 20141110 Owner name: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LT Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:PANASONIC CORPORATION;REEL/FRAME:034194/0143 Effective date: 20141110 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 4 |
|
AS | Assignment |
Owner name: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD., JAPAN Free format text: CORRECTIVE ASSIGNMENT TO CORRECT THE ERRONEOUSLY FILED APPLICATION NUMBERS 13/384239, 13/498734, 14/116681 AND 14/301144 PREVIOUSLY RECORDED ON REEL 034194 FRAME 0143. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT;ASSIGNOR:PANASONIC CORPORATION;REEL/FRAME:056788/0362 Effective date: 20141110 |