WO2012096050A1 - 電力供給予備力取引システムおよび電力供給予備力取引方法 - Google Patents

電力供給予備力取引システムおよび電力供給予備力取引方法 Download PDF

Info

Publication number
WO2012096050A1
WO2012096050A1 PCT/JP2011/075908 JP2011075908W WO2012096050A1 WO 2012096050 A1 WO2012096050 A1 WO 2012096050A1 JP 2011075908 W JP2011075908 W JP 2011075908W WO 2012096050 A1 WO2012096050 A1 WO 2012096050A1
Authority
WO
WIPO (PCT)
Prior art keywords
amount
power
reduction
consumer
unit
Prior art date
Application number
PCT/JP2011/075908
Other languages
English (en)
French (fr)
Inventor
憲史 三ッ本
高木 康夫
西村 信孝
村山 大
飯野 穣
大場 義和
正明 齋藤
Original Assignee
株式会社 東芝
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 東芝 filed Critical 株式会社 東芝
Priority to CN201180003655.9A priority Critical patent/CN102714410B/zh
Priority to SG2012015897A priority patent/SG182248A1/en
Priority to EP11820836.2A priority patent/EP2665149B1/en
Priority to US13/412,073 priority patent/US20120179596A1/en
Publication of WO2012096050A1 publication Critical patent/WO2012096050A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/008Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/84Greenhouse gas [GHG] management systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Definitions

  • Embodiments of the present invention relate to a power supply reserve capacity transaction system and a power supply reserve capacity transaction method.
  • the power system has the characteristic that stable operation is not possible unless the power consumption (demand) and the power generation (supply) always match. In other words, the balance between supply and demand needs to be maintained at all times.
  • Standby generators are generators that are not scheduled to start up in the generator operation plan that is planned from the predicted value of power demand. In other words, the standby generator does not generate power according to the plan, but starts generating power when the generator that generates power based on the plan fails or when the power demand increases beyond the forecast at the time of planning. It is a generator.
  • the supply reserve means power (capability) that compensates for the shortage when power supply shortage occurs.
  • the reserve capacity is necessary for stable operation of the power system.
  • supply amount 10% of the power demand
  • the proportion of power supplied by wind power generation, etc., whose power generation tends to fluctuate the proportion of reserve capacity required is expected to increase further.
  • the standby generator is an idle facility because it does not generate power when the supply and demand balance is in line with the generator operation plan. For this reason, incentives for generators with standby generators are difficult to work. This is especially true in developing countries where power consumption is increasing year by year and needs to be addressed preferentially to actual power demand.
  • Securing demand response capability is expected as another form for securing supply reserves that are the most economical and have the lowest environmental impact.
  • Demand response is a mechanism that reduces power demand instead of increasing power generation to balance supply and demand. By securing the ability to reduce power demand when necessary (demand response ability), it is possible to contribute to stable operation of the power system as a reserve power supply.
  • JP 2002-369380 A Japanese Patent No. 4131905 JP 2010-119269 A Japanese Patent No. 3564605
  • the supply reserve transaction broker predicts the demand amount when the power demand is not reduced, and calculates the demand amount when the reduction is made. Can do. However, it is difficult to increase the prediction accuracy because the reserve demand broker does not predict the power demand but the consumer himself.
  • the present invention has been made in view of the above circumstances, and provides a power supply reserve capacity trading system and a power supply reserve capacity transaction method capable of improving the accuracy of prediction of power demand and ensuring adequate supply reserve capacity.
  • the purpose is to provide.
  • a power supply reserve capacity trading system includes a reserve capacity trading section, a customer rank determination section (determination section), and a transaction consideration distribution section.
  • the reserve capacity trading unit obtains the amount of electricity that can be reduced by the customer, trades it as a demand adjustment reserve capacity, and acquires consideration.
  • the consumer rank determination unit determines the rank of each customer so that the consumer with a smaller difference between the predicted power demand and the consumed power amount becomes higher.
  • the transaction consideration distribution unit distributes the consideration so that the higher the rank of the consumers when the power reduction request is not transmitted, and the rank is high and the power is reduced when the power reduction request is transmitted. The distribution is made so that the customer having a larger estimated reduction amount after notifying the customer of the reduction request amount due to the transmission of the reduction request has a higher ratio.
  • FIG. 1 It is a block diagram which shows the structure of the electric power demand adjustment reserve power trading system (henceforth a trading system) by one Embodiment. It is a flowchart which shows operation
  • (A) is a graph which shows the case where adjustment of predicted power consumption in the transaction system according to one embodiment is performed in a biased manner, and (b) is the time when a request for reducing the predicted power consumption is generated in the transaction system according to one embodiment. It is a graph which shows the case where it adjusts so that power consumption may be maintained.
  • a system is built in advance to trade the future power reduction possible amount indicated by the consumer as a demand adjustment reserve relative to the power system operator or with the consideration in the power market. Shall be conducted by a reserve power broker.
  • the power supply reserve capacity trading system 1 includes a customer terminal 10 operated by each consumer who uses power, a power management device 20 corresponding to the customer terminal 10 and managing the power of each consumer.
  • the customer terminal 10 and the power management apparatus 20 are connected to the mediator terminal 30.
  • FIG. 1 shows a case where there is one customer terminal 10 and one power management device 20 for convenience of explanation, but in actuality, a large number of customer terminals 10 and power management devices 20 corresponding to them are reserved. It is connected to the power transaction broker terminal 30.
  • the customer terminal 10 includes an input unit 101 to which a predicted power demand amount and a power reduction possible amount for a predetermined period in the future are input by a user's operation, and a power demand prediction amount and a power reduction possible amount input from the input unit 101. Is transmitted to the mediator terminal 30, and a display unit 103 that displays the reduction request amount transmitted from the mediator terminal 30.
  • the power management apparatus 20 transmits to the intermediary terminal 30 the power consumption measuring unit 201 that measures the power consumption used by the consumer who operates the customer terminal 10 and the power consumption measured by the power consumption measuring unit 201.
  • Communication unit 202 The power management apparatus 20 transmits to the intermediary terminal 30 the power consumption measuring unit 201 that measures the power consumption used by the consumer who operates the customer terminal 10 and the power consumption measured by the power consumption measuring unit 201.
  • the broker terminal 30 includes a predicted amount / reducible amount acquisition unit (hereinafter referred to as a first acquisition unit) 301, a customer information storage unit 302, a reducible amount adjustment unit 303, and a total reducible amount calculation unit 304.
  • a reduction request notification unit (hereinafter referred to as a notification unit) 309 and an estimated reduction amount calculation unit 310 are included.
  • the first acquisition unit 301 acquires the power demand prediction amount and the power reduction possible amount of each customer transmitted from the customer terminal 10.
  • the customer information storage unit 302 stores the power demand prediction amount and the power reduction possible amount acquired by the first acquisition unit 301, and the power consumption amount acquired by the second acquisition unit 306 described later.
  • the reducible amount adjustment unit 303 evaluates, for each consumer, a risk that is predicted to be unreducible among the acquired power reducible amount, and can reduce the power acquired by the first acquisition unit 301 based on this evaluation. Adjust the amount.
  • the total reduction possible amount calculation unit 304 calculates the total value of the power reduction possible amount transmitted from each customer terminal 10.
  • the reserve capacity trading unit 305 obtains consideration by trading the total value of the possible power reduction amount calculated by the total reduction possible quantity calculation unit 304 as a demand adjustment reserve capacity relative to the power system operator or in the power market. To do.
  • the second acquisition unit 306 acquires the power consumption amount transmitted from the power management apparatus 20.
  • the determining unit 307 calculates, for each consumer, the difference between the predicted power demand accumulated in the consumer information accumulating unit 302 and the consumed power amount for the corresponding period acquired by the second acquiring unit 306.
  • the rank of each consumer is determined so as to increase the rank as a consumer having better differences.
  • the transaction consideration distribution unit 308 is configured such that, when a power reduction request is not transmitted from the electric power company, the consideration obtained by the transaction in the reserve capacity transaction unit 305 is higher for the consumers whose rank determined by the determination unit 307 is higher. Distribute to Further, when a power reduction request is transmitted from the power company, the consideration obtained by the transaction in the reserve capacity transaction unit 305 has a high rank determined by the determination unit 307, and an estimated reduction amount calculation unit 310 described later. Distribute so that consumers with a larger estimated reduction amount have a higher ratio.
  • the reduction request notifying unit 309 determines a reduction request amount for each consumer based on the power reduction possible amount stored in the customer information storage unit 302 when a power reduction request is transmitted from the power company. The information is transmitted to the customer terminal 10 of the customer and notified.
  • the estimated reduction amount calculation unit 310 is based on the predicted power demand stored in the consumer information storage unit 302 and the power consumption after the reduction request notification unit 309 notifies the customer terminal 10 of the reduction request amount. An estimated reduction amount that is an estimated value of the power consumption reduction amount of each consumer is calculated.
  • FIG. 2 is a flowchart showing processing executed by the mediator terminal 30 when the transaction system 1 is operating.
  • the power consumption of the equipment load used by the customer terminal 10 measured by the power consumption measuring unit 201 of the power management apparatus 20 at predetermined time intervals is obtained via the communication unit 202 as an intermediary terminal. 30. Then, the power consumption is acquired by the second acquisition unit 306 of the mediator terminal 30 and stored in the customer information storage unit 302 (step S1).
  • the period of the power demand forecast amount and the power reduction possible amount to be input is, for example, one day the next day, one week for the next week, or one month for the next month. Further, the predicted power demand amount and the power reduction possible amount are input by the customer using the past power consumption data stored in the consumer terminal 10 and the like.
  • This power demand prediction amount can be input using a certain period obtained by subdividing a set predetermined period, for example, an integrated amount of power demand prediction amount in units of one hour. As this unit period, different periods can be used depending on the consumers, whereby a wide range of customers having various prediction means can use the transaction system 1.
  • this power reduction possible amount designates a reduction level corresponding to a plurality of power reduction possible amounts set for each customer in advance, information on reduction possible time, or information on both of them. You may make it input. By specifying these pieces of information, it is possible to predict a reasonable power reduction possible amount corresponding to the power consumption pattern of the load used by the consumer.
  • the power demand prediction amount and the power reduction possible amount input from the input unit 101 are transmitted from the communication unit 102 to the mediator terminal 30.
  • the power demand prediction amount and the power reducible amount transmitted from the customer terminal 10 are acquired by the first acquisition unit 301 and stored in the customer information storage unit 302 (step S2).
  • the reducible amount adjusting unit 303 is predicted to be unable to reduce the acquired power reducible amount based on the past actual amount of reduction for each consumer accumulated in the consumer information accumulating unit 302.
  • the risk is evaluated and adjusted to a power reduction possible amount from which this risk has been removed (step S3).
  • the reducible amount adjusting unit 303 when the acquired power reducible amount is specified by the reduction level and the reducible time information, a process of making the power reducible amount in the time direction may be performed. .
  • the total reducible amount calculating unit 304 determines whether or not a predetermined transaction period, for example, a period of several months or one year, has passed in order to trade a preset power supply reserve capacity (Step S4) When it is determined that the transaction period has elapsed ("YES" in Step S4), the total value of the transaction period of the power reduction possible amount transmitted from each customer terminal 10 is calculated. (Step S5).
  • the power supply reserve capacity is biased as indicated by the dotted line with respect to the total power consumption when the power reduction request indicated by the solid line is not generated.
  • To adjust the predicted power consumption to reduce the predicted power consumption or to reduce the predicted power consumption so as to maintain the power consumption when the reduction request is generated as shown in FIG. can do.
  • By adjusting the predicted consumption in this way it is possible to obtain the same effect as starting the standby generator, or the effect of alleviating the increase in power load of the entire load system toward the time zone when the load peaks. You can do it.
  • the power supply reserve capacity in this way, it becomes possible to respond to a power reduction request that does not know when it will occur and when it will end.
  • the power consumption amount acquired by the second acquisition unit 306 and stored in the consumer information storage unit 302 should be the same as the power demand prediction amount acquired in advance. Actually, power is not consumed as expected, and a difference occurs.
  • the difference between the predicted power demand stored in the consumer information storage unit 302 and the actual power consumption for the corresponding period acquired by the second acquisition unit 306 is calculated.
  • the rank of each consumer is determined so as to increase the rank as a better consumer with a smaller consumer (step S7).
  • step S8 whether or not a power reduction request is received from the power company is determined by the mediator terminal 30 (step S8).
  • the transaction value distribution unit 308 determines the value acquired by the reserve transaction unit 305 by the determination unit 307. Distribution is performed such that the higher the rank of the ranked customers, the higher the ratio (step S9).
  • This consideration is distributed to the relevant customers, for example, by providing points for receiving a predetermined service or awarding in addition to the return based on electricity charges.
  • Information on the distributed consideration and the estimated reduction amount is transmitted to the customer terminal 10 and displayed on the display unit 103 to notify the customer.
  • step S8 If it is determined in step S8 that a power reduction request has been received from the power company (“YES” in step S8), the reduction request notification unit 309 sets the power reduction possible amount stored in the customer information storage unit 302. Based on this, the amount of reduction required for each customer is determined and transmitted to the customer terminal 10 of each customer for notification (step S10).
  • the reduction request amount transmitted from the mediator terminal 30 is received via the communication unit 102 and displayed on the display unit 103, and information is provided to the customer.
  • the consumer confirms the information on the displayed reduction request amount and attempts to reduce the power consumption.
  • the possible power reduction amount and the actual power consumption amount during the period during which the reduction is executed by the consumer are acquired from the consumer information storage unit 302 in the estimated reduction amount calculation unit 310, and the predicted power demand amount and consumption An estimated reduction amount that is an estimated value of the power consumption reduction amount of each consumer is calculated from the power amount (step S11).
  • an additional reduction request amount may be generated and transmitted to the customer terminal 10 of each customer.
  • this estimated reduction amount is significantly less than the pre-obtainable reduction amount, or when it differs by a predetermined value or more, processing is performed to impose a penalty such as lowering the rank of the customer or collecting an additional fee. You may do it. Thereby, a consumer can be induced so that the amount that can be reduced is reported honestly.
  • the transaction consideration distribution unit 308 the consideration acquired by the transaction in the reserve capacity transaction unit 305 has a high rank determined by the determination unit 307, and the estimated reduction amount calculated by the estimated reduction amount calculation unit 310 is The distribution is made so that the larger the number of consumers, the higher the ratio (step S9). Information on the distributed consideration and the estimated reduction amount is transmitted to the customer terminal 10 and displayed on the display unit 103 to notify the customer.
  • the power demand forecast amount is aggregated from a wide range of customers having various forecasting means, and the consideration traded in this power demand forecast amount is fairly distributed to the customers to ensure accuracy.
  • the customer acquired these in the mediator terminal 30 by inputting the power demand prediction amount and the power reduction possible amount using the customer terminal 10.
  • a fixed amount set according to the terms and conditions a fixed amount set by patterning by time, Or you may set so that the mediator terminal 30 may use the calculation amount by the preset formula as a power demand prediction amount or a power reduction possible amount.
  • the intermediary terminal 30 is equipped with a function for estimating the power demand forecast amount and the power reduction possible amount for each consumer by analyzing the accumulated power consumption amount.
  • the power demand forecast amount and the power reduction possible amount are installed. May be provided to provide the customer with the service. With this service, it is possible to support a customer who wants to obtain a high rank without taking time and a customer who lacks prediction skills.
  • the case where the consumer reduces the amount of power consumption in response to the reduction request notified from the reduction request notification unit 309 of the mediator terminal 30 has been described.
  • a function of directly controlling the power load facility may be installed, and the operation of the power load facility of the customer may be adjusted according to the reduction request by this function. Further, by holding the power generation facility, the power load facility, or the power storage facility held by the reserve power broker, and connecting these facilities to the broker terminal 30, it is possible to reduce the calculated reduction request amount. As such, these facilities may be controlled.
  • a greenhouse gas reduction amount such as a CO 2 reduction amount calculated based on the original unit price may be included as information on the environmental load reduction effect.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Power Engineering (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

 実施形態によれば、電力供給予備力取引システムは、予備力取引部と決定部と取引対価分配部とを有する。予備力取引部は、需要家の電力削減可能量を取得して需要調整予備力として取引して対価を取得する。決定部は、電力需要予測量と消費電力量との差が小さい需要家程高くなるように各需要家のランクを決定する。取引対価分配部は、電力の削減要求が送信されていないときにはランクが高い需要家程高い比率になるように対価を分配し、電力の削減要求が送信されたときには、ランクが高く、且つ電力の削減要求が送信されたことにより需要家に削減要求量を通知した後の推定削減量が多い需要家程高い比率になるように分配する。

Description

電力供給予備力取引システムおよび電力供給予備力取引方法
 本発明の実施形態は、電力供給予備力取引システムおよび電力供給予備力取引方法に関する。
 近年、温暖化ガス削減の動きは産業だけでなく民生部門でも加速しており、ビルや工場などのエネルギーを消費する建物における更なる省エネルギー化が求められている。
 しかしながら、発展途上国においては経済発展に伴う消費電力の増加は避けられず、また先進国においても電気自動車などの普及にともない消費電力が増加すると考えられる。
 さらに、発電時に温暖化ガスを排出しない風力発電などの再生可能エネルギー発電や発電時の温暖化ガスの発生量が少ない原子力発電の電力供給比率が高まるにしたがい、これらのクリーンなエネルギー源が増加することが予想される。
 電力供給側の視点に立つと、電力系統は、電力消費量(需要)と発電量(供給)とが常に一致していないと安定運用できないという特性を持っている。言い換えると、需給バランスが常に保たれている必要がある。
 このため、消費電力のピークに合わせた発電設備の増強と、より大きな供給予備力(需給調整予備力)の確保が必要となる。供給予備力の意味を、その一形態である待機発電機を用いて説明する。
 待機発電機とは、電力需要の予測値から立案される発電機の運転計画では当初起動予定のない発電機である。換言すると、待機発電機は、計画上は発電しないものの、計画に基づいて発電している発電機が故障した場合や、計画時の予測を上回って電力需要が増加した場合などに発電を開始する発電機である。つまり、供給予備力とは、電力供給不足が生じた際のその不足分を補う電力(能力)を意味する。
 待機発電機の役割から分かるように、供給予備力は電力系統の安定運用のために必要である。確保義務を負う主体が電力システムの形態に応じて異なるものの、供給予備力として通常、電力需要(=供給量)の約10%程度が確保されている。今後は発電量が変動しやすい風力発電などによる供給電力の割合が高まるにつれ、必要とされる予備力の割合は更に増加すると予想される。
 しかしながら待機発電機は、発電機の運転計画通りに需給バランスが取れている状況では発電しないため遊休設備となる。このため、発電事業者が待機発電機を持つインセンティブは働きにくい。電力消費量が年々増加し、実際の電力需要に対して優先的に対応する必要がある発展途上国においてはなおさらである。
 また発電計画においては、運転効率が高く発電コストが低い発電機から運転される。従って、待機発電機には効率も信頼性も低い老朽化した発電機が割り当てられる傾向にある。
 このような状況において、増加する供給予備力に対応可能な待機発電機を、量と質との両面を満たすように確保するのは先進国においても困難になると予想される。また、遊休設備を維持し、待機させるための環境負荷も社会的観点から無視できない。
 最も経済的かつ環境負荷の低い供給予備力を確保するためのもう一つの形態として期待されているのが、デマンドレスポンス能力の確保である。
 デマンドレスポンスとは、需給バランスをとるために発電量を増やす代わりに電力需要を削減する仕組みのことである。必要な時に電力需要を削減できる能力(デマンドレスポンス能力)を確保することにより供給予備力として電力系統の安定運用に寄与することができる。
 デマンドレスポンスの一手法として、(1)需給バランスに合わせて電力価格にプレミア料金を加算して電力需要を減らすように需要家を誘導する手法、(2)電力供給主体から需要家に電力需要の削減を依頼して需要家側が削減の可否を回答する方法、(3)電力需要削減のために供給側が電力消費機器を停止する権利を需要家側から入札してもらう方法、(4)需要家の消費電力予想量から一定比率の削減量を引いた目標電力を与える方法、などが提案されている。
特開2002-369380号公報 特許第4131905号公報 特開2010-119269号公報 特許第3564605号公報
 しかし、上述したようなデマンドレスポンス手法を用いても、(1)~(3)の手法では削減されなかったときの電力需要量が不明確であるため、削減量も不明確であり、供給予備力を適切に確保することができない場合がある。
 一方、(4)の手法では供給予備力取引仲介者が電力需要を削減しない場合の需要量を予測し、削減した場合の需要量を計算するので、ある程度確定的な供給予備力を確保することができる。しかしながら、電力需要量の予測を需要家自身ではなく予備力取引仲介者が行うため、予測精度を高めることが困難である。
 本発明は上記事情に鑑みてなされたものであり、電力需要量の予測精度を向上させ、供給予備力を適切に確保することが可能な電力供給予備力取引システムおよび電力供給予備力取引方法を提供することを目的とする。
 上記目的を達成するための一実施形態に係る電力供給予備力取引システムは、予備力取引部と需要家ランク決定部(決定部)と取引対価分配部とを有する。予備力取引部は、需要家の電力削減可能量を取得して需要調整予備力として取引して対価を取得する。需要家ランク決定部(決定部)は、電力需要予測量と消費電力量との差が小さい需要家程高くなるように各需要家のランクを決定する。取引対価分配部は、電力の削減要求が送信されていないときにはランクが高い需要家程高い比率になるように対価を分配し、電力の削減要求が送信されたときには、ランクが高く、且つ電力の削減要求が送信されたことにより需要家に削減要求量を通知した後の推定削減量が多い需要家程高い比率になるように分配する。
一実施形態による電力需要調整予備力取引システム(以下、取引システムと称する)の構成を示すブロック図である。 一実施形態による取引システムの予備力取引仲介者端末の動作を示すフローチャートである。 一実施形態による取引システムで電力削減可能量が入力される際に利用される削減レベルの説明図である。 (a)は、一実施形態による取引システムにおいて予測消費電力量をバイアス的に調整する場合を示すグラフであり、(b)は、一実施形態による取引システムにおいて予測消費電力量を削減要求発生時の消費電力量を維持するように調整する場合を示すグラフである。
 以下、本発明の電力需要調整予備力取引システムの一実施形態について説明する。以下の実施形態においては、需要家が示した将来の電力削減可能量を、需要調整予備力として電力系統運用者と相対であるいは電力市場で対価と取引するシステムが予め構築されており、この取引を予備力取引仲介者が行うものとする。
 〈一実施形態による電力供給予備力取引システムの構成〉
 本発明の一実施形態による電力供給予備力取引システムの構成について、図1を参照して説明する。
 本実施形態による電力供給予備力取引システム1は、電力を使用する各需要家によって操作される需要家端末10と、需要家端末10に対応し各需要家の電力を管理する電力管理装置20と、電力供給予備力を取引する仲介者によって操作される予備力取引仲介者端末(以下、仲介者端末と称する)30とを備える。需要家端末10及び電力管理装置20は、仲介者端末30に接続している。図1は、説明の便宜上、需要家端末10および電力管理装置20がそれぞれ1台の場合を示しているが、実際には多数の需要家端末10およびこれらにそれぞれ対応する電力管理装置20が予備力取引仲介者端末30に接続されている。
 需要家端末10は、需要家の操作によって将来の所定期間の電力需要予測量および電力削減可能量が入力される入力部101と、入力部101から入力された電力需要予測量および電力削減可能量を仲介者端末30に送信する通信部102と、仲介者端末30から送信された削減要求量を表示する表示部103とを有する。
 電力管理装置20は、需要家端末10を操作する需要家が使用した消費電力量を計測する消費電力計測部201と、消費電力計測部201で計測された消費電力量を仲介者端末30に送信する通信部202とを有する。
 仲介者端末30は、予測量・削減可能量取得部(以下、第1取得部と称する)301と、需要家情報蓄積部302と、削減可能量調整部303と、合計削減可能量算出部304と、予備力取引部305と、消費電力量取得部(以下、第2取得部と称する)306と、需要家ランク決定部(以下、決定部と称する)307と、取引対価分配部308と、削減要求通知部(以下、通知部と称する)309と、推定削減量算出部310とを有する。
 第1取得部301は、需要家端末10から送信された各需要家の電力需要予測量および電力削減可能量を取得する。
 需要家情報蓄積部302は、第1取得部301で取得された電力需要予測量および電力削減可能量、後述する第2取得部306で取得された消費電力量を蓄積する。
 削減可能量調整部303は、取得された電力削減可能量のうち削減不可能と予測されるリスクを需要家ごとに評価し、この評価に基づいて第1取得部301で取得された電力削減可能量を調整する。
 合計削減可能量算出部304は、各需要家端末10から送信された電力削減可能量の合計値を算出する。
 予備力取引部305は、合計削減可能量算出部304で算出された電力削減可能量の合計値を需要調整予備力として電力系統運用者と相対で、あるいは電力市場で取引することにより対価を取得する。
 第2取得部306は、電力管理装置20から送信された消費電力量を取得する。
 決定部307は、需要家ごとに、需要家情報蓄積部302に蓄積された電力需要予測量と、第2取得部306で取得された対応する期間の消費電力量との差を算出し、この差が小さい需要家程優良な需要家としてランクを高くするように、各需要家のランクを決定する。
 取引対価分配部308は、電力会社から電力の削減要求が送信されていないときには、予備力取引部305で取引により取得された対価を、決定部307で決定されたランクが高い需要家程高い比率になるように分配する。また、電力会社から電力の削減要求が送信されたときには、予備力取引部305で取引により取得された対価を、決定部307で決定されたランクが高く、且つ後述する推定削減量算出部310で算出される推定削減量が多い需要家程高い比率になるように分配する。
 削減要求通知部309は、電力会社から電力の削減要求が送信されたときに、需要家情報蓄積部302に蓄積された電力削減可能量に基づいて各需要家の削減要求量を決定して各需要家の需要家端末10に送信して通知する。
 推定削減量算出部310は、需要家情報蓄積部302に蓄積された電力需要予測量と、削減要求通知部309から各需要家端末10に削減要求量を通知した後の消費電力量とから、各需要家の電力消費削減量の推定値である推定削減量を算出する。
 〈一実施形態による電力供給予備力取引システムの動作〉
 本実施形態による電力供給予備力取引システム(以下、取引システムと称する)1の動作について説明する。図2は、取引システム1が稼動しているときに、仲介者端末30で実行される処理を示すフローチャートである。
 取引システム1が稼動すると、電力管理装置20の消費電力計測部201において所定時間間隔で計測された、需要家端末10が使用する設備負荷の消費電力量が、通信部202を介して仲介者端末30に送信される。そして、この消費電力量が仲介者端末30の第2取得部306で取得され、需要家情報蓄積部302に蓄積される(ステップS1)。
 また、当該取引システム1を利用する需要家の操作により、各需要家端末10の入力部101から、需要家端末10ごとに予め設定された将来の所定期間の電力需要予測量および電力削減可能量が入力される。
 入力する電力需要予測量および電力削減可能量の期間は、例えば翌日一日分、翌週一週間分、または翌月一月分等である。また電力需要予測量および電力削減可能量は、需要家がそれぞれ需要家端末10に蓄積している過去の消費電力量のデータ等を利用して見積もることにより入力される。
 この電力需要予測量は、設定された所定期間を細分化した一定の期間、例えば1時間単位の電力需要予測量の積算量を用いて入力することができる。この単位期間は需要家によって異なる期間を用いることができ、これにより様々な予測手段を持った幅広い需要家が当該取引システム1を利用することができる。
 また、この電力削減可能量は、図3に示すように、予め需要家ごとに設定された複数の電力削減可能量に対応した削減レベル、削減可能時間情報、またはこれら双方の情報を指定して入力するようにしてもよい。これらの情報を指定するようにすることで、需要家が使用する負荷の電力消費パターンに対応した無理のない電力削減可能量を予測することができる。
 入力部101から入力された電力需要予測量および電力削減可能量は、通信部102から仲介者端末30に送信される。
 仲介者端末30では、需要家端末10から送信された電力需要予測量および電力削減可能量が第1取得部301で取得され、需要家情報蓄積部302に蓄積される(ステップS2)。
 次に削減可能量調整部303において、需要家情報蓄積部302に蓄積された過去の需要家ごとの削減量の実績に基づいて、取得された電力削減可能量のうち削減不可能と予測されるリスクが評価され、このリスクが除かれた電力削減可能量に調整される(ステップS3)。
 また削減可能量調整部303において、取得された電力削減可能量が削減レベルと削減可能時間情報で指定されている場合に、電力削減可能量を時間方向にならす処理が行われるようにしてもよい。
 次に、合計削減可能量算出部304において、予め設定された電力供給予備力を取引するために予め設定された取引期間、例えば数ヶ月や1年の期間が経過したか否かが判定され(ステップS4)、この取引期間が経過したと判定されたとき(ステップS4の「YES」)には、各需要家端末10から送信された電力削減可能量の当該取引期間の合計値が算出される(ステップS5)。
 そして、予備力取引部305において、合計削減可能量算出部304で算出された電力削減可能量の合計値を需要調整予備力として電力系統運用者と相対で、あるいは電力市場で取引することにより、対価が取得される(ステップS6)。
 この取引が行われる際に、電力供給予備力を図4(a)に示すように、実線で示す電力削減要求が発生しなかった場合の合計消費電力量に対して、点線で示すようにバイアス的に予測消費電力量を削減するように調整したり、図4(b)に示すように、削減要求発生時の消費電力量を維持するように予測消費電力量を削減するように調整したりすることができる。このように予測消費量を調整することにより、待機発電機を起動するのと同等の効果や、負荷がピークとなる時間帯に向けて負荷系統全体の電力負荷増加を緩和させる効果を得ることがでできる。また、このように電力供給予備力を調整することにより、いつ発生し、いつ終了するかわからない電力削減要求にも対応することが可能になる。
 またここで、本来であれば、第2取得部306で取得され需要家情報蓄積部302に蓄積された消費電力量と、事前に取得された電量需要予測量とは一致するはずであるが、実際には予測どおりには電力が消費されず差が生じる。
 そこで、需要家ごとに、需要家情報蓄積部302に蓄積された電力需要予測量と、第2取得部306で取得された対応する期間の実際の消費電力量との差が算出され、この差が小さい需要家程優良な需要家としてランクを高くするように、各需要家のランクが決定される(ステップS7)。
 次にこの取引期間中に、電力会社から電力の削減要求が受信されたか否かが仲介者端末30で判定される(ステップS8)。
 判定の結果、電力の削減要求が受信されていないとき(ステップS8の「NO」)は、取引対価分配部308において、予備力取引部305で取引により取得された対価が、決定部307で決定されたランクが高い需要家程高い比率になるように分配される(ステップS9)。
 この対価は、例えば電力料金による還元の他、所定のサービスを受けることができるポイントや表彰の付与等により、該当する需要家に分配される。この分配された対価や推定削減量の情報は需要家端末10に送信され、表示部103に表示されることで需要家に通知される。
 またステップS8において、電力会社から電力の削減要求が受信されたと判定されたときには(ステップS8の「YES」)、削減要求通知部309において需要家情報蓄積部302に蓄積された電力削減可能量に基づいて各需要家の削減要求量が決定され、各需要家の需要家端末10に送信されて通知される(ステップS10)。
 各需要家の需要家端末10では、仲介者端末30から送信された削減要求量が通信部102を介して受信されて表示部103に表示され、需要家に情報が提供される。需要家は、表示された削減要求量の情報を確認し、消費電力量の削減を図る。
 次に、需要家により削減が実行されている期間の電力削減可能量と実際の消費電力量とが推定削減量算出部310において需要家情報蓄積部302から取得され、この電力需要予測量と消費電力量とから、各需要家の電力消費削減量の推定値である推定削減量が算出される(ステップS11)。
 ここで、推定削減量算出部310において算出された推定削減量では足りないと判断されたときには、追加の削減要求量を生成し、各需要家の需要家端末10に送信するようにしてもよい。
 また、この推定削減量が予め取得された削減可能量よりも著しく少ない等、所定値以上異なる場合に、需要家のランクを下げたり追加料金を徴収する等のペナルティを課すための処理を実行するようにしてもよい。これにより、削減可能量を正直に申告するように需要家を誘導することができる。
 次に、取引対価分配部308において、予備力取引部305で取引により取得された対価が、決定部307で決定されたランクが高く、且つ推定削減量算出部310で算出された推定削減量が多い需要家程高い比率になるように分配される(ステップS9)。この分配された対価や推定削減量の情報は需要家端末10に送信され、表示部103に表示されることで需要家に通知される。
 以上の本実施形態によれば、様々な予測手段を持った幅広い需要家から電力需要予測量を集約し、またこの電力需要予測量で取引された対価をフェアに需要家に配分して精度の高い電力需要予測量を需要家に提供させるためのインセンティブを与えることにより、供給予備力を適切に確保することが可能になる。
 上述した本実施形態においては、需要家が需要家端末10を用いて電力需要予測量および電力削減可能量を入力することで仲介者端末30においてこれらを取得する場合について説明したが、これには限定されず、電力需要予測量や電力削減可能量を見積もるためのデータを蓄積していない需要家については、約款などにより定めた一定の固定量、時間別にパターン化されて設定された固定量、または予め設定された計算式による算出量を電力需要予測量や電力削減可能量として仲介者端末30が利用するように設定してもよい。このように設定することにより、過去の電力消費量を管理していない中小ビルや一般家庭なども、需要家として本システムを利用することが可能になる。
 また、仲介者端末30に、蓄積した消費電力量を分析することにより需要家ごとの電力需要予測量や電力削減可能量を見積もる機能を搭載し、この機能により電力需要予測量や電力削減可能量を需要家に提供するサービスを行うようにしてもよい。このサービスにより、手間をかけずに高いランクを得たい需要家や、予測のスキルに乏しい需要家をサポートすることができる。
 また、本実施形態においては仲介者端末30の削減要求通知部309から通知された削減要求に対応して需要家が消費電力量の削減を行う場合について説明したが、仲介者端末30に需要家の電力負荷設備を直接制御する機能を搭載し、この機能により削減要求に応じて需要家の電力負荷設備の運転を調整するようにしてもよい。また、予備力取引仲介者が保持する発電設備、電力負荷設備、あるいは蓄電設備を保有して、仲介者端末30にこれらの設備を接続することにより、算出した削減要求量の削減が可能になるようにこれらの設備を制御するようにしてもよい。
 また、上述した電力需要予測量の取引および対価の配分が行われた後に需要家に通知される情報に、推定削減量算出部で算出された推定削減量と、この推定削減量から電力のCO2原単価に基づいて算出されるCO2削減量などの温室効果ガス削減量を、環境負荷低減効果に関する情報として含めるようにしてもよい。これにより需要家の環境志向を高めるとともに、将来予測されるCO2排出権の制限にも対応することができる。
 本発明の実施形態を説明したが、この実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。この新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。この実施形態やその変形は、発明の範囲や要旨に含まれるとともに、請求の範囲に記載された発明とその均等の範囲に含まれる。

Claims (9)

  1.  需要家ごとの、将来の所定期間の電力需要予測量および電力削減可能量を取得する第1取得部と、
     前記第1取得部で取得された需要家の電力削減可能量を需要調整予備力として取引することにより、対価を取得する予備力取引部と、
     需要家ごとの消費電力量を取得する第2取得部と、
     需要家ごとの、前記第1取得部で取得された電力需要予測量と、前記第2取得部で取得された前記所定期間の消費電力量との差を算出し、この差が小さい需要家程高くなるように各需要家のランクを決定する決定部と、
     電力の削減要求が送信されたときに、前記第1取得部で取得された電力削減可能量に基づいて各需要家の削減要求量を決定して需要家にその削減要求量を通知するために送信する通知部と、
     需要家ごとの、前記第1取得部で取得された電力需要予測量と、前記第2取得部で取得された消費電力量から算出した前記削減要求量の送信後の消費電力量とから、電力消費削減量の推定値である推定削減量を算出する推定削減量算出部と、
     前記予備力取引部で取得された対価を、
    電力の削減要求が送信されていないときには、前記決定部で決定されたランクが高い需要家程高い比率になるように分配し、
    電力の削減要求が送信されたときには、前記決定部で決定されたランクが高く、且つ前記推定削減量算出部で算出された推定削減量が多い需要家程高い比率になるように分配する取引対価分配部と、
    を備えることを特徴とする電力供給予備力取引システム。
  2.  前記第1取得部で取得される電力需要予測量は、前記設定された所定期間を細分化した一定の期間単位の電力需要予測量の積算量を用いて入力された情報である
    ことを特徴とする請求項1に記載の電力供給予備力取引システム。
  3.  前記第1取得部で取得される電力削減可能量は、予め需要家ごとに設定された複数の電力削減可能量に対応した削減レベル、削減可能時間情報、またはこれら双方の情報を指定して入力された情報である
    ことを特徴とする請求項1または2に記載の電力供給予備力取引システム。
  4.  前記第1取得部で取得される電力需要予測量および電力削減可能量は、需要家ごとに設定された一定の固定量、時間別にパターン化されて設定された固定量、または予め設定された計算式による算出量が用いられる
    ことを特徴とする請求項1~3いずれか1項に記載の電力供給予備力取引システム。
  5.  前記第2取得部で取得された消費電力量を蓄積する需要家情報蓄積部と、
     前記需要家情報蓄積部に蓄積された消費電力量を分析することにより、電力需要予測量または電力削減可能量を見積もる需要家情報見積部と、
    をさらに有することを特徴とする請求項1~4いずれか1項に記載の電力供給予備力取引システム。
  6.  前記推定削減量算出部は、算出した推定削減量が前記第1取得部で取得された削減可能量と所定値以上異なる場合に、前記需要家のランクを下げるかまたは、追加料金を徴収するための処理を実行する
    ことを特徴とする請求項1~5いずれか1項に記載の電力供給予備力取引システム。
  7.  前記通知部で決定された削減要求量に応じて需要家の電力負荷設備の運転を制御する需要家設備制御部
    をさらに有することを特徴とする請求項1~6いずれか1項に記載の電力供給予備力取引システム。
  8.  前記推定削減量算出部で算出された推定削減量と、この推定削減量から算出される温室効果ガス削減量とを、前記需要家に通知するために表示させる表示部
    をさらに有することを特徴とする請求項1~7いずれか1項に記載の電力供給予備力取引システム。
  9.  電力供給予備力取引システムが、
     需要家ごとの、将来の所定期間の電力需要予測量および電力削減可能量を取得する予測量・削減可能量取得ステップと、
     前記予測量・削減可能量取得ステップで取得された需要家の電力削減可能量を需要調整予備力として取引することにより、対価を取得する予備力取引ステップと、
     需要家ごとの消費電力量を取得する消費電力量取得ステップと、
     需要家ごとの、前記予測量・削減可能量取得ステップで取得された電力需要予測量と、前記消費電力量取得ステップで取得された消費電力量から算出した前記所定期間の消費電力量との差を算出し、この差が小さい需要家程高くなるように各需要家のランクを決定する需要家ランク決定ステップと、
     電力の削減要求が送信されたときに、予測量・削減可能量取得ステップで取得された電力削減可能量に基づいて各需要家の削減要求量を決定して需要家に通知するために送信する削減要求通知ステップと、
     需要家ごとの、前記予測量・削減可能量取得ステップで取得された電力需要予測量と、前記消費電力量取得ステップで取得された消費電力量から算出した前記削減要求量の送信後の消費電力量とから、電力消費削減量の推定値である推定削減量を算出する推定削減量算出ステップと、
     前記予備力取引ステップで取得された対価を、
    電力の削減要求が送信されていないときには、前記需要家ランク決定ステップで決定されたランクが高い需要家程高い比率になるように分配し、
    電力の削減要求が送信されたときには、前記需要家ランク決定ステップで決定されたランクが高く、且つ前記推定削減量算出ステップで算出された推定削減量が多い需要家程高い比率になるように分配する取引対価分配ステップと、
    を有することを特徴とする電力供給予備力取引方法。
PCT/JP2011/075908 2011-01-11 2011-11-10 電力供給予備力取引システムおよび電力供給予備力取引方法 WO2012096050A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201180003655.9A CN102714410B (zh) 2011-01-11 2011-11-10 电力供给预备力交易系统和电力供给预备力交易方法
SG2012015897A SG182248A1 (en) 2011-01-11 2011-11-10 Power reserve margin trading system and power reserve margin trading method
EP11820836.2A EP2665149B1 (en) 2011-01-11 2011-11-10 Reserve power-supplying capacity transaction system and reserve power-supplying capacity transaction method
US13/412,073 US20120179596A1 (en) 2011-01-11 2012-03-05 Power reserve margin trading system and power reserve margin trading method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-002955 2011-01-11
JP2011002955A JP5487125B2 (ja) 2011-01-11 2011-01-11 電力需給調整予備力取引システムおよび電力需給調整予備力取引方法

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US13/412,073 Continuation US20120179596A1 (en) 2011-01-11 2012-03-05 Power reserve margin trading system and power reserve margin trading method

Publications (1)

Publication Number Publication Date
WO2012096050A1 true WO2012096050A1 (ja) 2012-07-19

Family

ID=46506967

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2011/075908 WO2012096050A1 (ja) 2011-01-11 2011-11-10 電力供給予備力取引システムおよび電力供給予備力取引方法

Country Status (5)

Country Link
EP (1) EP2665149B1 (ja)
JP (1) JP5487125B2 (ja)
CN (1) CN102714410B (ja)
SG (1) SG182248A1 (ja)
WO (1) WO2012096050A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5496431B1 (ja) * 2013-06-26 2014-05-21 三菱電機株式会社 需給計画装置、需給計画方法、需給計画プログラムおよび記録媒体
JP2017135825A (ja) * 2016-01-27 2017-08-03 住友電気工業株式会社 電力消費管理装置および電力消費管理プログラム

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9136706B2 (en) 2011-12-28 2015-09-15 Kabushiki Kaisha Toshiba Power management system and power management method
JP5908302B2 (ja) 2012-02-27 2016-04-26 株式会社東芝 蓄電蓄熱最適化装置、最適化方法及び最適化プログラム
JP2014049464A (ja) * 2012-08-29 2014-03-17 Toshiba Corp 電力制御装置、電力制御システムおよび電力制御方法
WO2014132370A1 (ja) * 2013-02-27 2014-09-04 株式会社日立製作所 ネガワット売買支援システム
JP6118136B2 (ja) * 2013-02-27 2017-04-19 株式会社日立製作所 電力補給調整装置及び電力補給調整方法
JP2014180187A (ja) 2013-03-15 2014-09-25 Toshiba Corp 電力需要予測装置、方法及びプログラム並びに需要抑制計画策定装置
JP6116970B2 (ja) * 2013-03-29 2017-04-19 株式会社東芝 エネルギー管理システム、エネルギー管理装置及びエネルギー管理方法
JP6160957B2 (ja) 2013-09-30 2017-07-12 パナソニックIpマネジメント株式会社 電力管理装置、電力管理方法、プログラム
JP6221714B2 (ja) * 2013-12-11 2017-11-01 住友電気工業株式会社 電力消費管理装置、電力消費管理方法および電力消費管理プログラム
US20150213466A1 (en) * 2014-01-24 2015-07-30 Fujitsu Limited Demand response aggregation optimization
JP6134286B2 (ja) * 2014-03-28 2017-05-24 アズビル株式会社 需要家調整計画立案方法および需要家調整計画立案装置
JP6519990B2 (ja) * 2014-06-02 2019-05-29 住友電気工業株式会社 生産管理装置、電力消費管理装置、電力消費管理システム、生産管理方法、電力消費管理方法、生産管理プログラム、および電力消費管理プログラム
JP6343228B2 (ja) * 2014-11-13 2018-06-13 アズビル株式会社 デマンドレスポンスリスク評価装置
CN104659781B (zh) * 2015-03-13 2017-01-04 广西大学 一种以最小调节量应对风电功率随机变化的调度方法
CN106560823B (zh) * 2015-09-30 2019-04-05 中国电力科学研究院 一种电力系统ahp模型下的削减量分配方法
KR101724686B1 (ko) * 2015-11-27 2017-04-07 한전케이디엔주식회사 참여고객별로 수요반응 이벤트를 처리하는 수요반응자원 관리시스템 및 이를 이용한 참여고객별 수요반응 이벤트 처리방법
JP6605416B2 (ja) * 2016-08-26 2019-11-13 三菱電機ビルテクノサービス株式会社 電力管理システム、電力管理方法、アグリゲータシステム、需要家電力管理システム、及びプログラム
US10504195B2 (en) 2017-11-13 2019-12-10 Mitsubishi Electric Research Laboratories, Inc. System and method for decentralized energy production
WO2019182016A1 (ja) * 2018-03-20 2019-09-26 本田技研工業株式会社 電力情報管理システム、管理方法、プログラム、電力情報管理サーバ、通信端末、及び、電力システム
WO2020110297A1 (ja) * 2018-11-30 2020-06-04 三菱電機株式会社 取引価格予測装置および取引価格予測方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002176729A (ja) * 2000-12-08 2002-06-21 Hitachi Ltd インセンティブ電力負荷制御方法およびシステム
JP2002315191A (ja) * 2001-04-13 2002-10-25 Hitachi Ltd 電力需給制御方法および装置
JP2002369380A (ja) 2001-06-01 2002-12-20 Osaka Gas Co Ltd 電力供給システム及びその電力料金の課金方法
JP3564605B2 (ja) 2000-09-27 2004-09-15 ダイキン工業株式会社 デマンド制御運用支援方法およびその装置
JP4131905B2 (ja) 2001-02-26 2008-08-13 株式会社東芝 電力取引システム
JP2010119269A (ja) 2008-11-14 2010-05-27 Mitsubishi Electric Corp 電力予備力供給装置

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5481140A (en) * 1992-03-10 1996-01-02 Mitsubishi Denki Kabushiki Kaisha Demand control apparatus and power distribution control system
JPH05260658A (ja) * 1992-03-10 1993-10-08 Mitsubishi Electric Corp デマンド制御装置
US20030189420A1 (en) * 2001-09-28 2003-10-09 Hiroyuki Hashimoto Method for assisting in planning of power supply schedule
JP3994910B2 (ja) * 2003-05-08 2007-10-24 株式会社日立製作所 電力売買支援システム
US8165891B2 (en) * 2007-12-31 2012-04-24 Roberts Charles E S Green rating system and associated marketing methods
JP4703736B2 (ja) * 2009-03-02 2011-06-15 株式会社東芝 エネルギー管理システム及び方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3564605B2 (ja) 2000-09-27 2004-09-15 ダイキン工業株式会社 デマンド制御運用支援方法およびその装置
JP2002176729A (ja) * 2000-12-08 2002-06-21 Hitachi Ltd インセンティブ電力負荷制御方法およびシステム
JP4131905B2 (ja) 2001-02-26 2008-08-13 株式会社東芝 電力取引システム
JP2002315191A (ja) * 2001-04-13 2002-10-25 Hitachi Ltd 電力需給制御方法および装置
JP2002369380A (ja) 2001-06-01 2002-12-20 Osaka Gas Co Ltd 電力供給システム及びその電力料金の課金方法
JP2010119269A (ja) 2008-11-14 2010-05-27 Mitsubishi Electric Corp 電力予備力供給装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5496431B1 (ja) * 2013-06-26 2014-05-21 三菱電機株式会社 需給計画装置、需給計画方法、需給計画プログラムおよび記録媒体
WO2014207851A1 (ja) * 2013-06-26 2014-12-31 三菱電機株式会社 需給計画装置、需給計画方法、需給計画プログラムおよび記録媒体
JP2017135825A (ja) * 2016-01-27 2017-08-03 住友電気工業株式会社 電力消費管理装置および電力消費管理プログラム

Also Published As

Publication number Publication date
EP2665149A1 (en) 2013-11-20
JP2012147546A (ja) 2012-08-02
CN102714410B (zh) 2015-07-22
JP5487125B2 (ja) 2014-05-07
CN102714410A (zh) 2012-10-03
SG182248A1 (en) 2012-08-30
EP2665149B1 (en) 2018-03-21
EP2665149A4 (en) 2017-01-25

Similar Documents

Publication Publication Date Title
WO2012096050A1 (ja) 電力供給予備力取引システムおよび電力供給予備力取引方法
JP3631967B2 (ja) 余剰電力管理システムおよびその制御方法
JP6160957B2 (ja) 電力管理装置、電力管理方法、プログラム
US8521336B2 (en) Energy reduction
JP4584056B2 (ja) 電力需給予測・制御システム
US8706650B2 (en) Optimization of microgrid energy use and distribution
US8364609B2 (en) Optimization of microgrid energy use and distribution
Goebel On the business value of ICT-controlled plug-in electric vehicle charging in California
WO2013179876A1 (ja) 需給調整システム
US20120179596A1 (en) Power reserve margin trading system and power reserve margin trading method
WO2012114372A1 (ja) 電力需要管理システム及び電力需要管理方法
KR20120000116A (ko) 전기자동차를 이용한 전력수요감축시장의 입찰참여시스템 및 그 방법
EP3771060B1 (en) Power information management system, management method, program, power information management server, communication terminal, and power system
JP2015211516A (ja) 蓄電装置の充放電制御システム
JP6900563B1 (ja) 需要調整サーバ及び需要調整システム
WO2015064024A1 (ja) 特典情報決定装置および特典情報決定システム
KR20220080551A (ko) 수요 반응을 고려한 ess 운영 시스템 및 운영 방법
JP2009071973A (ja) 排出co2の監視システムおよび排出co2の監視方法
JP2016157438A (ja) 電気料金管理装置、電気料金管理方法及びプログラム
JP6626359B2 (ja) 電力関連情報提示装置、電気関連情報提示方法及びプログラム
JP2019159628A (ja) 制御装置、制御方法およびコンピュータプログラム
JP6472056B2 (ja) 特典情報決定装置および特典情報決定システム
JP2018068020A (ja) 電力需要抑制可能量計算装置および方法、電力需要抑制システム
JP7257107B2 (ja) 二次電池制御装置および二次電池制御方法
JP2021022288A (ja) 電力需要予測システムおよび電力需要予測プログラム

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201180003655.9

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2011820836

Country of ref document: EP

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11820836

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE