WO2012014467A1 - 部品実装装置および部品実装方法 - Google Patents

部品実装装置および部品実装方法 Download PDF

Info

Publication number
WO2012014467A1
WO2012014467A1 PCT/JP2011/004248 JP2011004248W WO2012014467A1 WO 2012014467 A1 WO2012014467 A1 WO 2012014467A1 JP 2011004248 W JP2011004248 W JP 2011004248W WO 2012014467 A1 WO2012014467 A1 WO 2012014467A1
Authority
WO
WIPO (PCT)
Prior art keywords
nozzle
switching valve
component
mounting apparatus
component mounting
Prior art date
Application number
PCT/JP2011/004248
Other languages
English (en)
French (fr)
Inventor
実 木谷
慧 常政
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Publication of WO2012014467A1 publication Critical patent/WO2012014467A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/04Mounting of components, e.g. of leadless components
    • H05K13/0404Pick-and-place heads or apparatus, e.g. with jaws
    • H05K13/0408Incorporating a pick-up tool
    • H05K13/0409Sucking devices
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/04Mounting of components, e.g. of leadless components
    • H05K13/0404Pick-and-place heads or apparatus, e.g. with jaws
    • H05K13/0408Incorporating a pick-up tool
    • H05K13/041Incorporating a pick-up tool having multiple pick-up tools
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/04Mounting of components, e.g. of leadless components
    • H05K13/0404Pick-and-place heads or apparatus, e.g. with jaws
    • H05K13/0413Pick-and-place heads or apparatus, e.g. with jaws with orientation of the component while holding it; Drive mechanisms for gripping tools, e.g. lifting, lowering or turning of gripping tools

Definitions

  • the present invention relates to a component mounting apparatus and a component mounting method for sucking a component supplied from a component supply unit with a nozzle and mounting the component on a substrate.
  • a component mounting apparatus that sucks a component supplied from a component supply unit with a nozzle, transports the sucked component to a substrate, and mounts the transported component on the substrate.
  • Such a component mounting apparatus sucks the air in the ventilation path formed in the nozzle and communicating with the suction hole for sucking the components with a vacuum pump or the like, and reduces the pressure in the ventilation path to the vacuum pressure (hereinafter referred to as the vacuum pressure).
  • the vacuum pressure hereinafter referred to as the vacuum pressure.
  • “Vacuum startup”) the component is sucked from the component supply unit.
  • a blower or the like supplies air into the air passage to increase the pressure in the air passage to atmospheric pressure or higher (
  • the component is mounted on the substrate by “vacuum break”.
  • vacuum startup time the time required for such a vacuum startup
  • vacuum breakdown time the time required for vacuum breakdown
  • the present invention has been made to solve the above-described problems, and is a component mounting apparatus capable of shortening the vacuum start-up time and the vacuum break time and improving the stability of component suction and mounting, and An object is to provide a component mounting method.
  • a component mounting apparatus sucks a component supplied from a component supply unit with a nozzle and mounts the sucked component on a substrate by moving the nozzle up and down.
  • a component mounting apparatus wherein the nozzle block is detachably held and can move up and down, a first switching valve attached to the nozzle block, and a positive pressure source for supplying compressed air to the nozzle
  • a second switching valve that switches whether or not to communicate with the first switching valve, and the first switching valve is one of a vacuum source for sucking air from the nozzle and the second switching valve. Is communicated with the nozzle.
  • the first switching valve that allows the nozzle to communicate with either the second switching valve or the vacuum source connected to the positive pressure source is a nozzle block that can move up and down while holding the nozzle detachably. It is attached. Therefore, since the length of the ventilation path from the first switching valve to the nozzle can be shortened, the volume in the ventilation path from the first switching valve to the nozzle can be reduced. In other words, the amount of air that must be sucked or supplied to reduce or increase the pressure in the air passage is reduced, so that the vacuum start-up time and the vacuum break time can be shortened, and the suction and mounting of parts can be reduced. Stability can be improved.
  • the first switching valve is preferably attached to the outer surface of the nozzle block.
  • the first switching valve can be easily attached to the nozzle block.
  • the first switching valve is installed so that the longitudinal direction thereof coincides with the vertical direction.
  • a plurality of the nozzle blocks are arranged in at least one arrangement direction on the mounting head, and the first switching valve is installed in a direction in which the longitudinal direction is orthogonal to the vertical direction and is arranged next to each other. It is preferable to be installed on the outer surface on a side different from the nozzle block side.
  • the plurality of nozzle blocks can be installed close to each other, and the mounting head can be reduced in size. It becomes possible.
  • the nozzle block includes a rotating unit that rotates the nozzle in the ⁇ -axis direction with respect to the mounting head, and a fixing unit that does not rotate the nozzle in the ⁇ -axis direction with respect to the mounting head, and the first switching It is preferable that a valve is installed in the outer surface of the said fixing
  • the first switching valve is installed in the fixed portion that does not rotate the nozzle in the ⁇ -axis direction with respect to the mounting head, in order to secure wiring and a ventilation path for supplying power to the first switching valve. It is possible to prevent the piping and the like from becoming complicated.
  • the first switching valve is built in the nozzle block.
  • the length of the air passage from the first switching valve to the nozzle can be further shortened. Therefore, it is possible to further shorten the vacuum start-up time and the vacuum break time, and it is possible to improve the stability of component adsorption and mounting.
  • the first switching valve is an electromagnetic valve including a plunger, and is provided so that the longitudinal direction of the plunger coincides with the vertical direction.
  • a first filter that is provided in a first ventilation path that connects the nozzle and the first switching valve, and that captures solid matter flowing in the first ventilation path, and the first switching valve; It is preferable to include a second filter that is provided in a second ventilation path that connects to the vacuum source and that captures solid matter that has passed through the first filter and flows in the second ventilation path.
  • the first switching valve is installed at a position where the length of the ventilation path from the suction hole for sucking the component provided at the tip of the nozzle is 80 mm or less.
  • the component mounting method is a component mounting method for sucking a component supplied from a component supply unit with a nozzle and mounting the sucked component on a substrate, the nozzle supplying the component with the component
  • the nozzle can be lowered to the height of a component supplied from the section, and either a vacuum source for sucking air from the nozzle or a second switching valve can be communicated with the nozzle.
  • a vacuum source for sucking air from the nozzle or a second switching valve can be communicated with the nozzle.
  • a suction holding step for communicating the positive pressure source with the first switching valve, a nozzle for sucking and holding the component is lowered to the position of the substrate, and via the first switching valve.
  • the first switching valve that allows the nozzle to communicate with either the second switching valve or the vacuum source connected to the positive pressure source is attached to the nozzle block. Therefore, since the length of the air passage from the first switching valve to the nozzle can be shortened, the vacuum start-up time and the vacuum break time can be shortened, and the stability of component adsorption and mounting can be improved. Is possible.
  • FIG. 1 is a perspective view showing a main configuration of a component mounting apparatus according to an embodiment of the present invention.
  • FIG. 2 is an enlarged perspective view of the head portion of the component mounting apparatus according to the embodiment of the present invention.
  • FIG. 3 is a cross-sectional view around the nozzle block of the component mounting apparatus according to the embodiment of the present invention.
  • FIG. 4 is a diagram (pneumatic circuit diagram) showing a main configuration of the component mounting apparatus according to the embodiment of the present invention.
  • FIG. 5 is a flowchart showing the operation of the component mounting apparatus according to the embodiment of the present invention.
  • FIG. 6 is a cross-sectional view around the nozzle block of the component mounting apparatus according to the comparative example of the embodiment of the present invention.
  • FIG. 1 is a perspective view showing a main configuration of a component mounting apparatus according to an embodiment of the present invention.
  • FIG. 2 is an enlarged perspective view of the head portion of the component mounting apparatus according to the embodiment of the present invention.
  • FIG. 3 is
  • FIG. 7 is a diagram (pneumatic circuit diagram) showing a main configuration of a component mounting apparatus according to a comparative example of the embodiment of the present invention.
  • FIG. 8 is a diagram for explaining the details of the operation in the component mounting apparatus according to the comparative example of the embodiment of the present invention.
  • FIG. 9 is a diagram for explaining the details of the operation in the component mounting apparatus according to the embodiment of the present invention.
  • FIG. 10 is a diagram (pneumatic circuit diagram) showing a main configuration of a component mounting apparatus according to a modification of the embodiment of the present invention.
  • FIG. 11 is a cross-sectional view around a nozzle block of a component mounting apparatus according to a modification of the embodiment of the present invention.
  • FIG. 12 is an enlarged perspective view of a head portion of a component mounting apparatus according to a modification of the embodiment of the present invention.
  • FIG. 1 is a perspective view showing a main configuration of a component mounting apparatus according to an embodiment of the present invention.
  • a component mounting apparatus 10 includes an X beam 11 that guides a head 13 in the X axis direction, a Y beam 12 that guides the X beam 11 in the Y axis direction, and a base that forms the basis of the apparatus. 14.
  • the component mounting apparatus 10 includes a head 13, a transport rail 17, and a component supply unit 18.
  • the head 13 is, for example, a mounting head called a multi mounting head having a plurality of nozzles that suck and hold a plurality of components.
  • the head 13 is slidably attached to the X beam 11. Therefore, the head 13 is moved along the X beam 11 by driving means such as a motor.
  • the component mounting apparatus 10 includes only one head 13, but may include a plurality of heads 13.
  • the plurality of heads 13 may be arranged at positions facing each other with the substrate 15 sandwiched in the Y-axis direction, and components may be mounted on the substrate 15 in cooperation with each other.
  • each of the plurality of heads 13 may mount components on different substrates 15.
  • the transport rails 17 are a pair of rails arranged in parallel with the X-axis direction to transport the substrate 15.
  • One of the pair of rails is movable in the Y-axis direction according to the length of the substrate 15 to be transported in the Y-axis direction.
  • substrate 15 carried in from the carrying-in port of the component mounting apparatus 10 is conveyed along this conveyance rail 17, and is stopped in the position for mounting components.
  • the conveyance rail 17 is a pair, two or more pairs may be sufficient. That is, the component mounting apparatus 10 may transport two or more boards in the X-axis direction in parallel.
  • a plurality of tape feeders for storing carrier tapes are arranged side by side in the X-axis direction.
  • the carrier tape is, for example, a tape that stores a plurality of components of the same component type, and is wound around a reel or the like.
  • the parts stored in the carrier tape are, for example, chip parts, specifically, 0402 chip parts, 1005 chip parts, or 1608 chip parts.
  • FIG. 2 is an enlarged perspective view of the head portion of the component mounting apparatus according to the embodiment of the present invention.
  • FIG. 3 is a cross-sectional view around the nozzle block of the component mounting apparatus according to the embodiment of the present invention.
  • the head 13 is provided with a plurality of nozzle blocks 100 each detachably holding suction nozzles (hereinafter simply referred to as “nozzles”) for sucking and holding components.
  • the nozzle block 100 holds the head 13 so as to rotate the nozzle in the ⁇ axis direction around the Z axis, and rotates in the ⁇ axis direction around the Z axis with respect to the rotating unit 101 that rotates together with the nozzle.
  • a fixed portion (non-rotating portion) 102 that holds the portion 101 so as to rotate (rotate in the ⁇ -axis direction).
  • the nozzle may be referred to as a tool
  • the nozzle block may be referred to as a nozzle holder, a nozzle portion, a tool holder, a tool portion, or a tool block.
  • the rotating unit 101 is provided so as to rotate in the ⁇ -axis direction together with the shaft 103 provided in the nozzle block 100. Further, the fixed portion 102 is provided so as not to rotate in the ⁇ -axis direction (non-rotation) even when the shaft 103 provided therein rotates.
  • the shaft 103 is moved up and down in the Z-axis direction and rotated around the Z-axis by driving means such as a motor (not shown).
  • the rotating unit 101 and the fixed unit 102 move up and down in the Z-axis direction together with the shaft 103.
  • a first air passage 131 that communicates the suction hole 106 of the nozzle 105 for sucking and holding components and the first switching valve 110 is formed.
  • a primary filter 141 is installed at a connection portion between the first air passage 131 formed in the shaft 103 and the air passage 105 a formed in the nozzle 105.
  • the plurality of nozzles 105 are detachably held on the rotating unit 101 of the nozzle block 100. Accordingly, the nozzle 105 rotates in the ⁇ -axis direction around the Z axis together with the shaft 103 and moves in the Z-axis direction together with the shaft 103. That is, the nozzle 105 moves up and down together with the nozzle block 100.
  • a ventilation path 105a is formed inside the nozzle 105, and an adsorption hole 106 is formed at one end of the ventilation path 105a.
  • the nozzle 105 sucks and holds the component through the suction hole 106.
  • the first switching valve 110 is attached to each nozzle block 100 that can move up and down together with the nozzle 105. That is, the first switching valve 110 is installed outside or inside the nozzle block 100 located in the vicinity of the nozzle 105.
  • the first switching valve 110 allows one of the vacuum source 191 and the second switching valve 120 including a vacuum pump, a vacuum ejector, or a factory vacuum to communicate with the nozzle 105 in the vicinity of each nozzle 105. That is, the first switching valve 110 switches between a state in which the nozzle 105 and the vacuum source 191 are connected and a state in which the nozzle 105 and the second switching valve 120 are connected.
  • the first switching valve 110 is an electromagnetic valve that switches between opening and closing of the valve by moving the plunger 111 using the magnetic force generated by the electromagnetic coil 112.
  • the first switching valve 110 is not necessarily an electromagnetic valve, and may be any valve that can automatically switch the opening / closing of the valve in accordance with an electric signal or the like.
  • the first switching valve 110 is attached to the outer surface of the nozzle block 100 and installed such that its longitudinal direction coincides with the vertical direction (Z-axis direction).
  • the 1st switching valve 110 can be attached to the nozzle block 100 easily.
  • the component mounting apparatus 10 can install a plurality of nozzle blocks 100 close to each other, and can reduce the size of the mounting head.
  • the 1st switching valve 110 is installed in the outer surface of the fixing
  • the component mounting apparatus 10 can suppress that the wiring for supplying electric power to the first switching valve, the piping for securing the ventilation path, and the like are complicated.
  • the 2nd switching valve 120 switches whether the 1st switching valve 110 and the positive pressure source 192 which supplies compressed air are connected. Specifically, in the present embodiment, the second switching valve 120 can move either the positive pressure source 192 or the atmosphere in the vicinity of the nozzle 105 and can move up and down together with the nozzle 105 that detachably sucks and holds the components. It communicates with the first switching valve 110 provided in the nozzle block 100 located. That is, the second switching valve 120 switches between a state where the first switching valve 110 and the positive pressure source 192 are connected and a state where the first switching valve 110 and the atmosphere are connected.
  • FIG. 4 is a diagram (pneumatic circuit diagram) showing a main configuration of the component mounting apparatus according to the embodiment of the present invention.
  • the first air passage 131 is an air passage connecting the nozzle 105 and the first switching valve 110.
  • a pressure sensor 151 for measuring the pressure of the nozzle 105 in the first air passage 131 is installed in the first air passage 131 in order from the nozzle 105 side, and then a primary filter 141 is installed.
  • the primary filter 141 corresponds to a first filter, and is installed to capture a solid material such as solder powder that flows from the suction hole 106 of the nozzle 105 and flows in the first air passage 131 when the component is sucked. .
  • the primary filter 141 is installed to prevent a relatively large solid material from entering the first switching valve 110.
  • the second air passage 132 is an air passage connecting the first switching valve 110 and the vacuum source 191.
  • the secondary filter 142 corresponds to the second filter, and is installed to capture the solid material that has passed through the primary filter 141 and flows in the second air passage 132. That is, the secondary filter 142 is installed to prevent a relatively small solid material that has passed through the primary filter 141 from entering the vacuum source 191 such as the flow sensor 152 and the vacuum pump. Therefore, the secondary filter 142 has a larger air resistance than the primary filter 141.
  • the third ventilation path 133 is a ventilation path that allows the first switching valve 110 and the second switching valve 120 to communicate with each other.
  • the flow rate of the air (compressed air) flowing through the third air passage 133 toward the air first switching valve 110 side supplied from the positive pressure source 192 side that supplies the compressed air to the nozzle 105 is set.
  • a flow sensor 153 to be measured is installed. From the flow rate measured by the flow rate sensor 153 and the flow rate measured by the flow rate sensor 152 installed in the second air passage 132, from the nozzle 105 side to the first switching valve 110 side or from the first switching valve 110 side. A flow rate of air flowing through the first air passage 131 toward the nozzle 105 is obtained.
  • a secondary filter is connected to the third ventilation path 133 in order to prevent solid matter from entering the flow rate sensor 153. It is not necessary to install in. Therefore, compared with the case where a secondary filter is installed in the third air passage 133, air can be supplied to the first air passage 131 in a state where the air resistance is low, so that the vacuum breaking time can be shortened. It becomes.
  • the control unit 160 includes a processor and a memory, and controls the operation of the component mounting apparatus 10. Specifically, the control unit 160 is detachably held by the first switching valve 110, the second switching valve 120, the head 13 including the nozzle 105, and the nozzle block 100, and in the ⁇ -axis direction with respect to the nozzle 105. A driving means for driving the shaft 103 for transmitting the rotational force is controlled.
  • the vacuum source 191 corresponds to a vacuum source, and sucks air in the first air passage 131 connected to the nozzle 105 through the second air passage 132 and the first switching valve 110. Note that the vacuum source 191 does not necessarily need to be able to suck air to a complete vacuum state, and it is sufficient if the inside of the first air passage 131 can be depressurized to about ⁇ 70 kPa, for example.
  • the positive pressure source 192 supplies compressed air to the first ventilation path 131 via the third ventilation path 133 and the first switching valve 110. Specifically, it is preferable that the positive pressure source 192 can pressurize, for example, the inside of the first air passage 131 to about 10 kPa by supplying compressed air.
  • FIG. 5 is a flowchart showing the operation of the component mounting apparatus according to the embodiment of the present invention.
  • control unit 160 lowers the nozzle 105 to the height of the component supplied from the component supply unit 18 and makes the nozzle 105 communicate with the nozzle 105 by communicating the vacuum source 191 with the nozzle 105 via the first switching valve 110.
  • the component is vacuum-sucked (S101).
  • control unit 160 reduces the pressure in the first air passage 131 when the tip of the nozzle 105 is lowered to a position higher by 0.05 mm than the Z axis lowering completion position for component suction holding (
  • the control signal for the first switching valve 110 is changed from the ON state to the OFF state so that the pressure in the air passage 105a in the nozzle 105 shifts to a vacuum state in which the pressure is negative.
  • the first switching valve 110 causes the vacuum source 191 to communicate with the nozzle 105 when the control signal is OFF, and the second switching valve 120 is connected to the nozzle when the control signal is ON. 105 is communicated.
  • control unit 160 raises the nozzle 105 that holds the component by suction and moves it above the substrate 15, and also, via the second switching valve 120, the first switching valve 110 and the positive pressure source 192. Are communicated (S102).
  • the control unit 160 raises the nozzle 105 that holds the component by suction and moves it above the substrate 15, and also, via the second switching valve 120, the first switching valve 110 and the positive pressure source 192. Are communicated (S102).
  • the control unit 160 raises the nozzle 105 that holds the component by suction and moves it above the substrate 15, and also, via the second switching valve 120, the first switching valve 110 and the positive pressure source 192. Are communicated (S102).
  • the control unit 160 determines that the pressure in the first air passage 131 is a negative pressure that is equal to or lower than the pressure P1 (see FIG. 9) when the tip of the nozzle 105 rises to a position higher by, for example, 0.05 mm than the Z axis lowering completion position.
  • the movement of the nozzle is controlled so that
  • the value of the pressure P1 varies depending on the part, but for example, it is preferably ⁇ 40 to ⁇ 70 kPa for a general chip part, and ⁇ 30 kPa for a small part such as a 1608 chip part.
  • control unit 160 lowers the nozzle 105 that holds and holds the component, and causes the second switching valve 120 to communicate with the nozzle 105 via the first switching valve 110, so that the component is placed on the substrate 15. Wear (S103).
  • the control unit 160 performs the first ventilation corresponding to the internal pressure of the nozzle 105 when the tip of the nozzle 105 in a state where the component is sucked and held is lowered to a position higher by 0.3 mm than the Z axis lowering completion position.
  • the control signal for the first switching valve 110 is changed from the OFF state to the ON state so that the pressure in the passage 131 becomes a negative pressure or a positive pressure equal to or higher than the pressure P2 (see FIG. 9), and the positive pressure source 192 compresses the compressed air.
  • the third air passage 133 filled with is communicated with the nozzle 105.
  • the value of the pressure P2 varies depending on the part, but for example, it is preferably ⁇ 40 to ⁇ 70 kPa for a general chip part, and ⁇ 20 kPa for a small part such as a 1608 chip part.
  • control unit 160 causes the pressure in the first air passage 131 to be equal to or higher than atmospheric pressure (see FIG. 9) when the tip of the nozzle 105 rises to a position higher by, for example, 0.1 mm than the Z-axis descent completion position. Control the movement of the nozzle.
  • control unit 160 raises the nozzle 105 to move it above the component supply unit 18 and causes the first switching valve 110 and the atmosphere to communicate with each other via the second switching valve 120 (S104).
  • the pressure in the first ventilation path 131 and the third ventilation path 133 is reduced from the blow pressure by the compressed air from the positive pressure source 192 to the atmospheric pressure.
  • the component mounting apparatus 10 can mount a plurality of components on the board 15.
  • step S104 is not necessarily executed. That is, the second switching valve 120 may keep the first switching valve 110 and the positive pressure source 192 in communication when starting up the vacuum.
  • the pressure of the first air passage 131 when starting up the vacuum of the nozzle 105 becomes a pressure (blow pressure) higher than the atmospheric pressure, the vacuum startup time slightly increases. Therefore, in order to further shorten the vacuum rise time, it is preferable that the process of step S104 is executed as shown in FIG.
  • FIG. 6 is a cross-sectional view around the nozzle block of the component mounting apparatus according to the comparative example of the embodiment of the present invention.
  • the component mounting apparatus 20 according to the comparative example is different from the component mounting apparatus 10 according to the present embodiment in the mounting position of the first switching valve 210.
  • the same components as those in FIG. 3 are denoted by the same reference numerals, and description thereof will be omitted as appropriate.
  • the first switching valve 210 is installed in the head 13.
  • the first switching valve 210 is communicated with the nozzle 105 through a ventilation path 231 formed in the nozzle block 100, a tube 234, a secondary filter 142, a flow sensor 152, and the like.
  • the tube 234 is a flexible tube that connects between the first switching valve 210 and the nozzle block 100. Even when the nozzle block 100 is moved in the Z-axis direction by the tube 234, the first switching valve 210 installed in the nozzle block 100 and the head 13 that does not move in the Z-axis direction with respect to the nozzle block 100. Can be maintained in communication with each other.
  • FIG. 7 is a diagram (pneumatic circuit diagram) showing a main configuration of a component mounting apparatus according to a comparative example of the embodiment of the present invention.
  • the same components as those in FIG. 4 are denoted by the same reference numerals, and description thereof will be omitted as appropriate.
  • the component mounting apparatus 20 according to this comparative example is different from the component mounting apparatus 10 according to the present embodiment mainly in the connection form of the first switching valve and the second switching valve.
  • the first switching valve 210 switches the vacuum source 191 to or from the nozzle 105.
  • the second switching valve 220 causes either the positive pressure source 192 or the atmosphere to communicate with the nozzle 105.
  • the first air passage 231 connected to the nozzle 105 branches into a second air passage 232 and a third air passage 233.
  • the second ventilation path 232 and the third ventilation path 233 are connected to the first switching valve 210 and the second switching valve 220, respectively.
  • a secondary filter 142 and a flow sensor 152 are installed in the first air passage 231. That is, the secondary filter 142 is installed between the nozzle 105 and the positive pressure source 192.
  • FIG. 8 is a diagram for explaining the details of the operation in the component mounting apparatus according to the comparative example of the embodiment of the present invention.
  • FIG. 9 is a figure for demonstrating the detail of operation
  • FIG. 9 show the change over time of the switching signal for the first switching valve 110 or 210.
  • 8 and 9 show the pressure in the first air passage 131 or 231 measured by the pressure sensor 151 that measures the pressure of the nozzle 105 in the first air passage 131 for the evaluation of the present invention. Changes are shown. 8 and 9 show the movement trajectory of the nozzle 105 in the Z-axis direction.
  • the pressure in the first air passage 131 or 231 starts to decrease when the tip of the nozzle 105 is lowered to a position higher by 0.05 mm than the Z-axis lowering completion position for component suction holding.
  • the control unit 160 controls the first switching valve 110 or 210.
  • the time from the time t0 at which the pressure in the first air passage 131 or 231 starts to decrease to the time t1 at which the pressure decreases to the pressure P1 is defined as a vacuum rising time.
  • the vacuum rise time in the comparative example was 4 milliseconds (see FIG. 8), whereas in this embodiment, the vacuum rise time was 2 milliseconds (see FIG. 9). That is, the component mounting apparatus 10 according to the present embodiment can shorten the vacuum rise time by 2 milliseconds as compared with the component mounting apparatus 20 according to the comparative example.
  • the path length between the first switching valve 110 and the suction hole 106 is 90 mm shorter than that of the component mounting apparatus 20 (see FIGS. 6 and 7). It is conceivable that. That is, since the volume in the first air passage is reduced and the amount of air that must be sucked in order to reduce the pressure in the first air passage is reduced, the component mounting apparatus 10 shortens the vacuum startup time. can do.
  • the apparatus 10 can prevent the component from being sucked from the component supply unit 18 due to the influence of the variation in the vacuum rising time or the change in the stroke of the nozzle. That is, the component mounting apparatus 10 can improve the stability of component adsorption. In other words, the component mounting apparatus 10 can ensure the same stability as the comparative example even if the time for stopping at the Z-axis lowering completion position is shortened. It is also possible to plan.
  • the control unit 160 controls the first switching valve 110 or 210 so that the pressure becomes equal to or higher than the atmospheric pressure.
  • the time from the time t2 when the pressure in the first air passage 131 or 231 becomes the pressure P2 when mounting the component to the substrate 15 to the time t3 when the pressure is increased to the atmospheric pressure is defined as a vacuum breaking time.
  • the vacuum break time in the comparative example was 5 milliseconds, whereas in this embodiment, the vacuum break time was 2 milliseconds. That is, the component mounting apparatus 10 according to the present embodiment can shorten the vacuum breaking time by 3 milliseconds as compared with the component mounting apparatus 20 according to the comparative example.
  • the component mounting apparatus 10 supplies air into the first air passage with a lower air resistance than the component mounting apparatus 20 in which the secondary filter is installed between the nozzle 105 and the positive pressure source 192. Therefore, the pressure in the first air passage can be increased quickly, and the vacuum breaking time can be shortened.
  • the component mounting apparatus 10 can suppress the component from dropping before the nozzle reaches the Z-axis lowering completion position due to the influence of the variation in the vacuum break time or the change in the stroke of the nozzle. . That is, the component mounting apparatus 10 can improve the stability of component mounting. In other words, the component mounting apparatus 10 can ensure the same stability as the comparative example even if the time for stopping at the Z-axis lowering completion position is shortened. It is also possible to plan.
  • the first switching valve 110 is arranged in the vicinity of the nozzle 105 by, for example, being provided in the nozzle block 100 that detachably holds the nozzle 105 so as to move up and down together with the nozzle 105. It is preferable that the ventilation path from the suction hole 106 of 105 is installed at a position where the length is 80 mm or less. In this case, it is possible to shorten the vacuum rise time and the vacuum break time as compared with the comparative example. More preferably, as in the present embodiment, the first switching valve 110 may be installed at a position where the length of the ventilation path from the suction hole 106 of the nozzle 105 is 60 mm or less. In this case, as described above, it is possible to halve the vacuum rise time and the vacuum break time as compared with the comparative example.
  • the ventilation path from the suction hole 106 of the nozzle 105 to the first switching valve 110 is considered. Is generally 30 mm or longer.
  • the component mounting apparatus 10 changes the switching signal of the first switching valve 110 from the ON state to the OFF state so that the nozzle 105 communicates with the vacuum source 191. Thereafter, the response time for starting up the vacuum until the pressure in the first air passage 131 for generating a vacuum state for adsorbing the components to the nozzle 105 is reduced to -70 kPa can be shortened. Similarly, the component mounting apparatus 10 switches the switching signal of the first switching valve 110 from the OFF state so that the first switching valve 110 communicates with the third ventilation path 133 filled with the compressed air of the positive pressure source 192.
  • the pressure in the first air passage in which the component is held by vacuum suction on the nozzle 105 is increased to the atmospheric pressure.
  • the vacuum break response time can also be shortened.
  • the component mounting apparatus 10 since the time from the change of the switching signal to the change of the pressure in the first air passage to the target pressure is also shortened, the component mounting apparatus 10 according to the present embodiment The stability of adsorption and mounting can be improved.
  • the secondary filter 142 and the flow sensor 152 are installed in the second air passage 132, but it is not always necessary to install in this manner.
  • the secondary filter 142 and the flow sensor 152 may be installed in the first air passage 131.
  • the path length from the suction hole 106 of the nozzle 105 to the first switching valve 110 is, for example, about 20 mm longer than that of the embodiment, and becomes 80 mm.
  • the number of flow sensors can be reduced as compared with the above embodiment, and the configuration of the component mounting apparatus 10 can be simplified.
  • the first switching valve 110 is installed on the outer surface of the nozzle block 100, but it is not always necessary to install it in this way.
  • the first switching valve 110 may be installed inside the nozzle block 100.
  • FIG. 11 is a cross-sectional view around the nozzle block of a component mounting apparatus according to a modification of the embodiment of the present invention.
  • the first switching valve 110 is built in the nozzle block 100.
  • the 1st switching valve 110 is an electromagnetic valve provided with the plunger 111 and the electromagnetic coil 112, and is provided so that the longitudinal direction of the plunger 111 may correspond with an up-down direction.
  • the component mounting apparatus 10 can further shorten the path length from the first switching valve 110 to the nozzle 105 as compared with the above embodiment.
  • the path length from the first switching valve 110 to the tip (suction hole 106) of the nozzle 105 can be shortened from 60 mm to 30 mm. Therefore, the component mounting apparatus 10 can shorten the vacuum startup time and the vacuum break time as compared with the above embodiment, and can further improve the stability of component adsorption and mounting.
  • the nozzle block 100 in which the 1st switching valve 110 was incorporated is provided in the size.
  • the first switching valve 110 is installed on the outer surface of the nozzle block 100 so that the longitudinal direction of the first switching valve 110 coincides with the vertical direction.
  • the first switching valve 110 may be installed in a direction in which the longitudinal direction is orthogonal to the vertical direction.
  • the 1st switching valve 110 should just be installed in the outer surface of the nozzle block 100 of the side different from the side of the nozzle block 100 arranged adjacently.
  • the component mounting apparatus 10 can install the plurality of nozzle blocks 100 close to each other even when the plurality of nozzle blocks 100 are provided in the head 13. Can be achieved.
  • the head 13 is provided with a plurality of nozzle blocks 100, and each nozzle block holds one nozzle.
  • the component mounting apparatus 10 does not necessarily have such a configuration. There is no need to be configured.
  • a single nozzle block 100 may hold a plurality of nozzles.
  • a component mounting apparatus and a component mounting method according to an aspect of the present invention are capable of shortening a vacuum rising time and a vacuum break time, and improving component adsorption and mounting stability. Useful as.

Abstract

 真空立上時間および真空破壊時間の短縮を図り、部品の吸着および装着の安定性を向上させる。部品供給部(18)から供給される部品をノズル(105)で吸着し、ノズル(105)を上下移動させて吸着した部品を基板(15)に装着する部品実装装置(10)であって、ノズル(105)を着脱可能に保持して上下動作可能なノズルブロック(100)と、ノズルブロック(100)に取り付けられる第1切替弁(110)と、ノズル(105)に圧縮空気を供給するための正圧源(192)と第1切替弁(110)とを連通させるか否かを切り替える第2切替弁(120)とを備え、第1切替弁(110)は、ノズル(105)から空気を吸引するための真空源(191)および第2切替弁(120)のいずれか一方をノズル(105)に連通させる。

Description

部品実装装置および部品実装方法
 本発明は、部品供給部から供給される部品をノズルで吸着して基板に装着する部品実装装置および部品実装方法に関する。
 従来、部品供給部から供給される部品をノズルにより吸着し、吸着した部品を基板まで搬送し、搬送した部品を基板に装着する部品実装装置が存在する。
 このような部品実装装置は、ノズルに形成された、部品を吸着する吸着孔に連通する通気路内の空気を真空ポンプなどで吸引し、通気路内の圧力を真空圧まで低下させること(以下、「真空立上げ」という)により、部品供給部から部品を吸着する。また、部品が吸着保持された状態(通気路内が減圧された状態)のときに、ブロー装置などが通気路内に空気を供給し、通気路内の圧力を大気圧以上まで上昇させること(以下、「真空破壊」という)により、部品を基板へ装着する。
 そこで、このような真空立上げに要する時間(以下、「真空立上時間」という)、および真空破壊に要する時間(以下、「真空破壊時間」という)が、部品実装時間に与える影響を抑制するための各種方法が提案されている(例えば、特許文献1を参照)。
 特許文献1に記載の方法によれば、部品供給部から部品を吸着する際には、ノズルが下死点に到達する前から真空立上げを開始するので、ノズルが下死点に到達してから部品を吸着するまでの時間が短縮される。また、部品を基板に装着する際には、ノズルが下死点に到達する前から真空破壊を開始するので、ノズルが下死点に到達してから部品を基板に装着するまでの時間が短縮される。
特開平8-298395号公報
 しかしながら、特許文献1に記載の方法では、ノズルが下死点に到達する前から真空立上げを開始するため、真空立上時間のばらつき、あるいはノズルのストロークの変化などの影響により、真空立上げが完了するタイミングとノズルが下死点に到達するタイミングとにずれが発生する場合がある。このような場合、部品供給部から部品を吸着できないなどの問題が発生していた。
 また、特許文献1に記載の方法では、ノズルが下死点に到達する前から真空破壊を開始するため、真空破壊時間のばらつき、あるいはノズルのストロークの変化などの影響により、真空破壊が完了するタイミングとノズルが下死点に到達するタイミングとにずれが発生する場合がある。このような場合、ノズルが下死点に到達する前に部品を落下させる、あるいはノズルが部品を保持したまま上昇するなどの問題が発生していた。
 そこで、本発明は、上記課題を解決するためになされたものであり、真空立上時間および真空破壊時間の短縮を図り、部品の吸着および装着の安定性を向上させることができる部品実装装置および部品実装方法を提供することを目的とする。
 上記目的を達成するために、本発明の一態様に係る部品実装装置は、部品供給部から供給される部品をノズルで吸着し、前記ノズルを上下移動させて吸着した前記部品を基板に装着する部品実装装置であって、前記ノズルを着脱可能に保持して上下動作可能なノズルブロックと、前記ノズルブロックに取り付けられる第1切替弁と、前記ノズルに圧縮空気を供給するための正圧源と前記第1切替弁とを連通させるか否かを切り替える第2切替弁とを備え、前記第1切替弁は、前記ノズルから空気を吸引するための真空源および前記第2切替弁のいずれか一方を前記ノズルに連通させる。
 この構成によれば、正圧源と接続された第2切替弁および真空源のいずれか一方にノズルを連通させる第1切替弁が、ノズルを着脱可能に保持して上下動作可能なノズルブロックに取り付けられる。したがって、第1切替弁からノズルまでの通気路の長さを短縮することができるので、第1切替弁からノズルまでの通気路内の体積を減少させることができる。つまり、通気路内の圧力を低下または上昇させるために吸引または供給しなければならない空気の量が減少するので、真空立上時間および真空破壊時間を短縮することができ、部品の吸着および装着の安定性を向上させることが可能となる。
 また、前記第1切替弁は、前記ノズルブロックの外側面に取り付けられることが好ましい。
 この構成によれば、第1切替弁を容易にノズルブロックに取り付けることができる。
 また、前記第1切替弁は、長手方向が上下方向と一致するように設置されることが好ましい。
 また、前記ノズルブロックは、装着ヘッドに少なくとも1つの配列方向に複数配列されており、前記第1切替弁は、長手方向が、上下方向と直交する方向に設置され、かつ、隣りに配列される前記ノズルブロックの側と異なる側の前記外側面に設置されることが好ましい。
 これらの構成によれば、複数のノズルブロックが装着ヘッドに備えられている場合であっても、当該複数のノズルブロックを互いに近接して設置することができ、装着ヘッドの小型化を図ることが可能となる。
 また、前記ノズルブロックは、装着ヘッドに対して前記ノズルをθ軸方向に回転させる回転部と、前記装着ヘッドに対して前記ノズルをθ軸方向に回転させない固定部とを備え、前記第1切替弁は、前記固定部の外側面に設置されることが好ましい。
 この構成によれば、装着ヘッドに対してノズルをθ軸方向に回転しない固定部に第1切替弁が設置されるので、第1切替弁に対する電力供給のための配線および通気路を確保するための配管などが煩雑となることを抑制することができる。
 また、前記第1切替弁は、前記ノズルブロックに内蔵されることが好ましい。
 この構成によれば、第1切替弁がノズルブロックに内蔵されるので、さらに、第1切替弁からノズルまでの通気路の長さを短縮することができる。したがって、真空立上時間および真空破壊時間をさらに短縮することができ、部品の吸着および装着の安定性を向上させることが可能となる。
 また、前記第1切替弁は、プランジャを備える電磁弁であり、前記プランジャの長手方向が上下方向と一致するように設けられることが好ましい。
 この構成によれば、第1切替弁が内蔵されたノズルブロックを小型化することが可能となる。
 また、さらに、前記ノズルと前記第1切替弁とを接続する第1通気路に設けられ、前記第1通気路内を流れる固体物を捕捉するための第1フィルタと、前記第1切替弁と前記真空源とを接続する第2通気路に設けられ、前記第2通気路内を流れる、前記第1フィルタを通過した固体物を捕捉するための第2フィルタとを備えることが好ましい。
 この構成によれば、正圧源とノズルとの間には、第1フィルタを通過した固体物を捕捉するための第2フィルタを設置する必要がない。したがって、正圧源とノズルとの間に第2フィルタが設置される場合よりも、空気抵抗が低い状態でノズルに空気を供給することができるので、真空破壊時間を短縮することが可能となる。
 また、前記第1切替弁は、前記ノズルの先端に設けられる、前記部品を吸着する吸着孔からの通気経路の長さが80mm以下となる位置に設置されることが好ましい。
 この構成によれば、真空立上時間および真空破壊時間を効果的に短縮することができる。
 また、本発明の一態様に係る部品実装方法は、部品供給部から供給される部品をノズルで吸着し、吸着した前記部品を基板に装着する部品実装方法であって、前記ノズルを前記部品供給部から供給される部品の高さまで下降させるとともに、前記ノズルから空気を吸引するための真空源および第2切替弁のいずれか一方を前記ノズルに連通させることができる、前記ノズルと一体的に上下動作する第1切替弁を介して、前記ノズルを前記真空源に連通させることにより、前記ノズルに前記部品を吸着させる吸着ステップと、前記部品を吸着保持している前記ノズルを上昇させて前記基板の上方へ移動させるとともに、前記ノズルに圧縮空気を供給するための正圧源と前記第1切替弁とを連通させるか否かを切り替えることができる第2切替弁を介して、前記正圧源と前記第1切替弁とを連通させる吸着保持ステップと、前記部品を吸着保持しているノズルを前記基板の位置まで下降させるとともに、前記第1切替弁を介して前記第2切替弁を前記ノズルに連通させることにより、前記部品を前記基板に装着する装着ステップとを含む。
 これによれば、上記部品実装装置と同様の効果を奏することができる。
 以上の説明から明らかなように、本発明によれば、正圧源と接続された第2切替弁および真空源のいずれか一方にノズルを連通させる第1切替弁がノズルブロックに取り付けられる。したがって、第1切替弁からノズルまでの通気路の長さを短縮することができるので、真空立上時間および真空破壊時間を短縮することができ、部品の吸着および装着の安定性を向上させることが可能となる。
図1は、本発明の実施の形態に係る部品実装装置の主要な構成を示す斜視図である。 図2は、本発明の実施の形態に係る部品実装装置のヘッド部分を拡大した斜視図である。 図3は、本発明の実施の形態に係る部品実装装置のノズルブロック周辺の断面図である。 図4は、本発明の実施の形態に係る部品実装装置の主要な構成を示す図(空圧回路図)である。 図5は、本発明の実施の形態に係る部品実装装置の動作を示すフローチャートである。 図6は、本発明の実施の形態の比較例に係る部品実装装置のノズルブロック周辺の断面図である。 図7は、本発明の実施の形態の比較例に係る部品実装装置の主要な構成を示す図(空圧回路図)である。 図8は、本発明の実施の形態の比較例に係る部品実装装置における動作の詳細を説明するための図である。 図9は、本発明の実施の形態に係る部品実装装置における動作の詳細を説明するための図である。 図10は、本発明の実施の形態の一変形例に係る部品実装装置の主要な構成を示す図(空圧回路図)である。 図11は、本発明の実施の形態の一変形例に係る部品実装装置のノズルブロック周辺の断面図である。 図12は、本発明の実施の形態の一変形例に係る部品実装装置のヘッド部分を拡大した斜視図である。
 以下に、本発明の実施の形態について、図面を参照しながら説明する。なお、以下で説明する実施の形態は、いずれも本発明の好ましい一具体例を示す。つまり、以下の実施の形態で示される数値、形状、材料、構成要素、構成要素の配置及び接続形態、ステップ、ステップの順序などは、本発明の一例であり、本発明を限定する主旨ではない。本発明は、請求の範囲の記載によって限定される。したがって、以下の実施の形態における構成要素のうち、本発明の最上位概念を示す独立請求項に記載されていない構成要素は、本発明の課題を達成するために必ずしも必要ではないが、より好ましい形態を構成する構成要素として説明される。
 (実施の形態)
 まず、部品実装装置10の全体概要について説明する。
 図1は、本発明の実施の形態に係る部品実装装置の主要な構成を示す斜視図である。図1に示すように、部品実装装置10は、ヘッド13をX軸方向に案内するXビーム11と、Xビーム11をY軸方向に案内するYビーム12と、当該装置の基礎となる基台14とを備える。さらに、部品実装装置10は、ヘッド13と、搬送レール17と、部品供給部18とを備える。
 ヘッド13は、例えば複数の部品をそれぞれ吸着保持する複数のノズルを有するマルチ装着ヘッドと呼ばれる装着ヘッドである。ヘッド13は、Xビーム11に対してスライド自在に取り付けられている。したがって、ヘッド13は、例えばモータなどの駆動手段により、Xビーム11に沿って移動させられる。
 なお、本実施の形態では、部品実装装置10は、ヘッド13を1つしか備えていないが、複数のヘッド13を備えてもよい。この場合、複数のヘッド13は、基板15をY軸方向に挟んで対向する位置に配置され、互いに協調して基板15に部品を実装すればよい。または、複数のヘッド13のそれぞれは、互いに異なる基板15に部品を実装してもよい。
 搬送レール17は、基板15を搬送するためにX軸方向に平行に配置された一対のレールである。一対のレールの一方は、搬送される基板15のY軸方向の長さに応じてY軸方向に移動可能である。部品実装装置10の搬入口から搬入された基板15は、この搬送レール17に沿って搬送され、部品を実装するための位置に停止される。
 なお、本実施の形態では、搬送レール17は一対であるが、二対以上であってもよい。つまり、部品実装装置10は、2枚以上の基板を並行してX軸方向に搬送してもよい。
 部品供給部18には、キャリアテープを収納する複数のテープフィーダがX軸方向に多数並んで配置されている。なお、キャリアテープとは、例えば、同一部品種の複数の部品が収納されるテープであり、リール等に巻かれている。また、キャリアテープに収納される部品は、例えばチップ部品であって、具体的には0402チップ部品、1005チップ部品、あるいは1608チップ部品などである。
 次に、ヘッド13の詳細について図2および図3を用いて説明する。
 図2は、本発明の実施の形態に係る部品実装装置のヘッド部分を拡大した斜視図である。また、図3は、本発明の実施の形態に係る部品実装装置のノズルブロック周辺の断面図である。
 図2に示すように、ヘッド13には、各々が、部品を吸着保持する吸着ノズル(以下、単に「ノズル」という)を着脱可能に保持する複数のノズルブロック100が取り付けられている。ノズルブロック100は、ヘッド13に対してZ軸回りのθ軸方向にノズルを自転させるように保持し、ノズルとともに回転する回転部101と、ヘッド13に対してZ軸回りのθ軸方向に回転部101を回転(θ軸方向に自転)するように保持する固定部(非自転部)102とを備える。
 なお、ノズルは、ツールと呼ばれる場合もあり、ノズルブロックは、ノズルホルダ、ノズル部、ツールホルダ、ツール部、またはツールブロックと呼ばれる場合もある。
 回転部101は、ノズルブロック100の内部に設けられたシャフト103とともにθ軸方向に回転するように設けられている。また、固定部102は、内部に設けられたシャフト103が回転しても、θ軸方向に回転しない(非自転)ように設けられている。
 シャフト103は、図示しないモータなどの駆動手段によって、Z軸方向に上下移動され、かつ、Z軸回りに回転される。なお、回転部101および固定部102は、シャフト103とともにZ軸方向に上下移動する。
 シャフト103の内部には、ノズル105の、部品を吸着保持する吸着孔106と、第1切替弁110とを連通する第1通気路131が形成されている。シャフト103に形成された第1通気路131とノズル105に形成された通気路105aとの接続部分には一次フィルタ141が設置されている。
 複数のノズル105は、ノズルブロック100の回転部101に着脱可能に保持されている。したがって、ノズル105は、シャフト103とともにZ軸回りのθ軸方向に回転し、シャフト103とともにZ軸方向に移動する。つまり、ノズル105は、ノズルブロック100とともに上下方向に移動する。
 また、ノズル105の内部には、通気路105aが形成されており、当該通気路105aの一端に吸着孔106が形成されている。ノズル105は、この吸着孔106を介して部品を吸着し保持する。
 第1切替弁110は、ノズル105とともに上下動作可能なそれぞれのノズルブロック100に取り付けられる。つまり、第1切替弁110は、ノズル105の近傍に位置するノズルブロック100の外側または内側に設置される。また、第1切替弁110は、真空ポンプ、真空エジェクタあるいは工場真空等からなる真空源191および第2切替弁120のいずれか一方をそれぞれのノズル105の近傍にてノズル105に連通させる。つまり、第1切替弁110は、ノズル105と真空源191とが接続される状態と、ノズル105と第2切替弁120とが接続される状態とを切り替える。
 具体的には、第1切替弁110は、電磁コイル112によって生じる磁力を用いてプランジャ111を動かすことにより弁の開閉を切り替える電磁バルブである。なお、第1切替弁110は、必ずしも電磁バルブである必要はなく、電気信号などに応じて自動で弁の開閉を切り替えることができるバルブであればよい。
 本実施の形態では、第1切替弁110は、ノズルブロック100の外側面に取り付けられ、その長手方向が上下方向(Z軸方向)と一致するように設置される。これにより、部品実装装置10では、第1切替弁110を容易にノズルブロック100に取り付けることができる。また、部品実装装置10は、複数のノズルブロック100を互いに近接して設置することができ、装着ヘッドの小型化を図ることができる。
 なお、第1切替弁110は、図2および図3に示すように、ノズルブロック100の固定部102の外側面に設置されることが好ましい。これにより、部品実装装置10は、第1切替弁に対する電力供給のための配線および通気路を確保するための配管などが煩雑となることを抑制することができる。
 第2切替弁120は、第1切替弁110と圧縮空気を供給する正圧源192とを連通させるか否かを切り替える。具体的には、本実施の形態では、第2切替弁120は、正圧源192および大気のいずれか一方を、部品を着脱可能に吸着保持するノズル105とともに上下動作可能でノズル105の近傍に位置するノズルブロック100に備えられる第1切替弁110に連通させる。つまり、第2切替弁120は、第1切替弁110と正圧源192とが接続される状態と、第1切替弁110と大気とが接続される状態とを切り替える。
 なお、第2切替弁120の内部構造は、第1切替弁110と同様であるので、図3において図示を簡略化している。
 次に、ノズル105と、真空源191あるいは正圧源192とをつなぐ通気路の詳細について、図4を用いて説明する。
 図4は、本発明の実施の形態に係る部品実装装置の主要な構成を示す図(空圧回路図)である。
 第1通気路131は、ノズル105と第1切替弁110とを接続する通気路である。第1通気路131には、ノズル105側から順に、本発明の評価のために第1通気路131内のノズル105の圧力を測定する圧力センサ151が設置され、次に一次フィルタ141が設置される。
 一次フィルタ141は、第1フィルタに相当し、部品を吸着する際にノズル105の吸着孔106から流入して第1通気路131内を流れるはんだ粉などの固体物を捕捉するために設置される。つまり、一次フィルタ141は、第1切替弁110の内部に比較的大きな固体物が侵入することを防ぐために設置される。
 第2通気路132は、第1切替弁110と真空源191とを接続する通気路である。第2通気路132には、第1切替弁110側から順に、二次フィルタ142と、第1切替弁110側から真空源191側へ向かって第2通気路132を流れる空気(真空)の流量を測定する流量センサ152とが設置される。
 二次フィルタ142は、第2フィルタに相当し、第2通気路132内を流れる、一次フィルタ141を通過した固体物を捕捉するために設置される。つまり、二次フィルタ142は、一次フィルタ141を通過した比較的小さな固体物が、流量センサ152および真空ポンプ等の真空源191に侵入することを防ぐために設置される。したがって、二次フィルタ142は、一次フィルタ141よりも空気抵抗が大きい。
 第3通気路133は、第1切替弁110と第2切替弁120とを連通する通気路である。第3通気路133には、ノズル105に圧縮空気を供給する正圧源192側から供給された空気第1切替弁110側に向かって第3通気路133を流れる空気(圧縮空気)の流量を測定する流量センサ153が設置される。この流量センサ153によって測定された流量と、第2通気路132に設置された流量センサ152によって測定された流量とから、ノズル105側から第1切替弁110側、あるいは第1切替弁110側からノズル105側に向かって第1通気路131を流れる空気の流量が得られる。
 なお、この第3通気路133内では、流量センサ153側からノズル105側に向かう方向に空気が流れるので、流量センサ153に固体物が侵入することを防ぐために二次フィルタを第3通気路133に設置しなくてもよい。したがって、第3通気路133に二次フィルタが設置される場合と比べて、空気抵抗が低い状態で第1通気路131に空気を供給することができるので、真空破壊時間を短縮することが可能となる。
 制御部160は、プロセッサおよびメモリなどによって構成され、部品実装装置10の動作を制御する。具体的には、制御部160は、第1切替弁110、第2切替弁120、、ノズル105を備えるヘッド13、およびノズルブロック100に着脱可能に保持され、ノズル105に対してθ軸方向に回転力を伝達するシャフト103を駆動する駆動手段などを制御する。
 真空源191は、真空源に相当し、第2通気路132および第1切替弁110を介して、ノズル105に接続された第1通気路131内の空気を吸引する。なお、真空源191は、必ずしも完全な真空状態まで空気を吸引できる必要はなく、例えば、-70kPa程度まで第1通気路131内を減圧できればよい。
 正圧源192は、第3通気路133および第1切替弁110を介して、第1通気路131に圧縮空気を供給する。具体的には、正圧源192は、圧縮空気を供給することにより、例えば、第1通気路131内を10kPa程度まで加圧できることが好ましい。
 次に、以上のように構成された部品実装装置10の各種動作について、図5を用いて説明する。つまり、本実施の形態に係る部品実装方法について説明する。
 図5は、本発明の実施の形態に係る部品実装装置の動作を示すフローチャートである。
 なお、図5の初期状態として、ノズル105に部品が吸着されていない状態であり、かつ第1通気路131内および第3通気路133内が大気圧状態であると仮定する。
 まず、制御部160は、ノズル105を部品供給部18から供給される部品の高さまで下降させるとともに、第1切替弁110を介して、真空源191をノズル105に連通させることにより、ノズル105に部品を真空吸着させる(S101)。
 具体的には、制御部160は、例えば、ノズル105の先端が部品吸着保持のためのZ軸下降完了位置より0.05mmだけ高い位置まで下降した時に第1通気路131内の圧力が低下(ノズル105内の通気路105a内の圧力が負圧である真空状態に移行)し始めるように、第1切替弁110に対する制御信号をON状態からOFF状態に変化させる。
 なお、本実施の形態では、第1切替弁110は、制御信号がOFF状態のときに、真空源191をノズル105に連通させ、制御信号がON状態のときに、第2切替弁120をノズル105に連通させる。
 続いて、制御部160は、部品を吸着保持しているノズル105を上昇させて基板15の上方へ移動させるとともに、第2切替弁120を介して、第1切替弁110と正圧源192とを連通させる(S102)。その結果、第1通気路131内の圧力が真空状態に維持されたまま、第3通気路133内に正圧源192からの圧縮空気が充填されたその内部の圧力がブロー圧まで上昇する。
 なお、制御部160は、ノズル105の先端がZ軸下降完了位置より例えば0.05mmだけ高い位置まで上昇した時に第1通気路131内の圧力が圧力P1以下(図9参照)の負圧となるように、ノズルの動きを制御する。圧力P1の値は、部品によって異なるが、例えば、一般的なチップ部品の場合は-40~-70kPaであることが好ましく、1608チップ部品などの小さな部品の場合は-30kPaであることが好ましい。
 次に、制御部160は、部品を吸着保持しているノズル105を下降させるとともに、第1切替弁110を介して、第2切替弁120をノズル105に連通させることにより、部品を基板15に装着する(S103)。
 具体的には、制御部160は、部品を吸着保持した状態でのノズル105の先端がZ軸下降完了位置より0.3mmだけ高い位置まで下降した時に、ノズル105の内圧に相当する第1通気路131内の圧力が圧力P2以上(図9参照)の負圧もしくは正圧になるように、第1切替弁110に対する制御信号をOFF状態からON状態に変化させて正圧源192により圧縮空気が充填されている第三通気路133とノズル105とを連通させる。圧力P2の値は、部品によって異なるが、例えば、一般的なチップ部品の場合は-40~-70kPaであることが好ましく、1608チップ部品などの小さな部品の場合は-20kPaであることが好ましい。
 なお、制御部160は、ノズル105の先端がZ軸下降完了位置より例えば0.1mmだけ高い位置まで上昇した時に第1通気路131内の圧力が大気圧以上(図9参照)となるように、ノズルの動きを制御する。
 最後に、制御部160は、ノズル105を上昇させて部品供給部18の上方へ移動させるとともに、第2切替弁120を介して、第1切替弁110と大気とを連通させる(S104)。その結果、第1通気路131内および第3通気路133内の圧力は、正圧源192からの圧縮空気によるブロー圧から大気圧まで低下する。
 このように、ステップS101~S104の処理を繰り返すことにより、部品実装装置10は、複数の部品を基板15に実装することができる。
 なお、ステップS104の処理は、必ずしも実行される必要はない。つまり、第2切替弁120は、真空立上げを開始するときに第1切替弁110と正圧源192とを連通させたままでもよい。ただし、この場合、ノズル105の真空立上げを開始するときの第1通気路131の圧力が大気圧よりも高い圧力(ブロー圧)となるので、真空立上時間が少し増加する。したがって、より真空立上時間を短縮するためには、図5に示すように、ステップS104の処理は実行されることが好ましい。
 次に、本実施の形態に係る部品実装装置10における動作について、比較例に係る部品実装装置20と比較しながら、さらに詳細に説明する。そこで、まず比較例に係る部品実装装置20について、図6および図7を用いて説明する。
 図6は、本発明の実施の形態の比較例に係る部品実装装置のノズルブロック周辺の断面図である。図6に示すように、比較例に係る部品実装装置20は、本実施の形態に係る部品実装装置10と、第1切替弁210の取り付け位置が異なる。なお、図6において、図3と同様の構成要素については、同一の符号を付し、適宜説明を省略する。
 第1切替弁210は、ヘッド13に設置されている。第1切替弁210は、ノズルブロック100に形成された通気路231、チューブ234、二次フィルタ142、および流量センサ152などを介してノズル105と連通される。
 チューブ234は、第1切替弁210とノズルブロック100との間をつなぐ、柔軟性を有する管体である。このチューブ234により、ノズルブロック100がZ軸方向に移動した場合であっても、当該ノズルブロック100と、ノズルブロック100に対してZ軸方向に移動しないヘッド13に設置された第1切替弁210とが連通した状態を維持することができる。
 このように、本比較例に係る第1切替弁210は、ノズルブロック100よりもノズル105から遠い位置にあるヘッド13に設置されており、チューブ234を介してノズルブロック100と接続されている。したがって、ノズル105の吸着孔106から第1切替弁210までの経路長は、例えば150mm(=40+60+50)となり、図3に示す吸着孔106から第1切替弁110までの経路長60mm(=40+20)よりも長くなる。
 図7は、本発明の実施の形態の比較例に係る部品実装装置の主要な構成を示す図(空圧回路図)である。なお、図7において、図4と同様の構成要素については、同一の符号を付し、適宜説明を省略する。
 図7に示すように、本比較例に係る部品実装装置20は、本実施の形態に係る部品実装装置10と、主として第1切替弁および第2切替弁の接続形態が異なる。
 第1切替弁210は、真空源191をノズル105に連通あるいは非連通の切り替えを行なう。また、第2切替弁220は、正圧源192および大気のいずれか一方をノズル105に連通させる。また、ノズル105と接続された第1通気路231は、第2通気路232および第3通気路233に分岐する。第2通気路232および第3通気路233は、第1切替弁210および第2切替弁220とそれぞれ接続される。
 第1通気路231には、圧力センサ151および一次フィルタ141に加えて、二次フィルタ142および流量センサ152が設置される。つまり、ノズル105と正圧源192との間に、二次フィルタ142が設置される。
 次に、このような比較例に係る部品実装装置20と本実施の形態に係る部品実装装置10との動作の詳細を説明する。
 図8は、本発明の実施の形態の比較例に係る部品実装装置における動作の詳細を説明するための図である。また、図9は、本発明の実施の形態に係る部品実装装置における動作の詳細を説明するための図である。
 図8および図9の上段には、第1切替弁110または210に対する切替信号の時間変化が示されている。また、図8および図9の中段には、本発明の評価のために第1通気路131内のノズル105の圧力を測定する圧力センサ151によって測定される第1通気路131または231内の圧力変化が示されている。また、図8および図9の下段には、ノズル105のZ軸方向の移動軌跡が示されている。
 図8および図9では、ノズル105の先端が部品吸着保持のためのZ軸下降完了位置より0.05mmだけ高い位置まで下降した時に第1通気路131または231内の圧力が低下し始めるように、制御部160は、第1切替弁110または210を制御している。
 ここで、第1通気路131または231内の圧力が低下し始める時刻t0から圧力P1まで低下する時刻t1までの時間を真空立上時間とする。このとき、比較例における真空立上時間は4ミリ秒(図8参照)であったのに対し、本実施の形態では、真空立上時間は2ミリ秒(図9参照)であった。つまり、本実施の形態に係る部品実装装置10は、比較例に係る部品実装装置20よりも、真空立上時間を2ミリ秒だけ短縮することができた。
 これは、部品実装装置10(図3、4参照)において、第1切替弁110と吸着孔106との経路長が、部品実装装置20(図6、7参照)よりも90mm短くなったためであると考えられる。つまり、第1通気路内の体積が減少し、第1通気路内の圧力を低下させるために吸引しなければならない空気の量が減少したので、部品実装装置10は、真空立上時間を短縮することができる。
 このように真空立上時間が短縮された結果、第1通気路内の圧力が圧力P1まで低下してからノズル105がZ軸下降完了位置から上昇するまでの時間に余裕ができるので、部品実装装置10は、真空立上時間のばらつき、あるいはノズルのストロークの変化などの影響により、部品供給部18から部品を吸着できないことを抑制することができる。つまり、部品実装装置10は、部品の吸着の安定性を向上させることができる。逆に言えば、部品実装装置10は、Z軸下降完了位置に停止している時間を短縮しても、比較例と同様の安定性を確保することができるので、部品の実装時間の短縮を図ることも可能となる。
 また、図8および図9では、基板15に部品を装着(実装)した後にノズル105の先端がZ軸下降完了位置より0.1mmだけ高い位置まで上昇した時に第1通気路131または231内の圧力が大気圧以上となるように、制御部160は、第1切替弁110または210を制御している。
 ここで、第1通気路131または231内の圧力が基板15に部品を装着する際に圧力P2になった時刻t2から大気圧まで上昇した時刻t3までの時間を真空破壊時間とする。このとき、比較例における真空破壊時間は5ミリ秒であったのに対し、本実施の形態では、真空破壊時間は2ミリ秒であった。つまり、本実施の形態に係る部品実装装置10は、比較例に係る部品実装装置20よりも、真空破壊時間を3ミリ秒だけ短縮することができた。
 これは、真空立上時間が短縮されたのと同様に、ノズル105と一体的に上下動作しノズル近傍に配置される第1切替弁とノズル105の吸着孔との経路長が短縮されたためであると考えられる。さらに、ノズル105が吸い込む固体物を一次フィルタの後に捕捉する二次フィルタがノズル105と圧縮空気を供給する正圧源192との間に設置されていないためでもあると考えられる。
 つまり、部品実装装置10は、ノズル105と正圧源192との間に二次フィルタが設置される部品実装装置20よりも、空気抵抗が低い状態で第1通気路内に空気を供給することができるので、第1通気路内の圧力を速く上昇させることができ、真空破壊時間を短縮することが可能となる。
 このように真空破壊時間が短縮された結果、第1通気路内の圧力が圧力P2まで上昇してからノズル105が基板15に部品を装着するZ軸下降完了位置に到達するまでの時間に余裕ができるので、部品実装装置10は、真空破壊時間のばらつき、あるいはノズルのストロークの変化などの影響により、ノズルがZ軸下降完了位置に到達する前に部品を落下させることを抑制することができる。つまり、部品実装装置10は、部品の装着の安定性を向上させることができる。逆に言えば、部品実装装置10は、Z軸下降完了位置に停止している時間を短縮しても、比較例と同様の安定性を確保することができるので、部品の実装時間の短縮を図ることも可能となる。
 なお、第1切替弁110は、それぞれのノズル105とともにそれぞれ上下動作するように、例えばノズル105をそれぞれ着脱可能に保持するノズルブロック100に設けられてノズル105の近傍に配置されることにより、ノズル105の吸着孔106からの通気経路の長さが80mm以下となる位置に設置されることが好ましい。この場合に、比較例よりも真空立上時間および真空破壊時間を短縮することが可能となる。さらに好ましくは、本実施の形態のように、第1切替弁110は、ノズル105の吸着孔106からの通気経路の長さが60mm以下となる位置に設置されればよい。この場合、上記に示したように、比較例よりも真空立上時間および真空破壊時間を半減することが可能となる。
 なお、ノズル105の吸着孔106からの通気経路の長さは、短ければ短いほどよい。しかし、部品装着時に搬送レール17などと干渉しない程度のノズル高さが必要であることなどの物理的な制約条件を考慮すれば、ノズル105の吸着孔106から第1切替弁110までの通気経路の長さは、30mm以上となることが一般的である。
 また、図9に示すように、本実施の形態に係る部品実装装置10は、ノズル105が真空源191に連通されるように第1切替弁110の切替信号をON状態からOFF状態に変化させてから、ノズル105に部品を吸着する真空状態を発生させる第1通気路131内の圧力が-70kPaまで低下するまでの真空立上応答時間も短くすることができる。同様に、部品実装装置10は、第1切替弁110が正圧源192の圧縮空気が充填されている第3通気路133に連通されるように第1切替弁110の切替信号をOFF状態からON状態に変化させてから、基板15にノズル105に保持された部品を装着する際に、ノズル105に部品を真空吸着保持させている第1通気路内の圧力が大気圧まで上昇するまでの真空破壊応答時間も短くすることができる。
 このように、切替信号が変化してから、第1通気路内の圧力を目的となる圧力まで変化させるまでの時間も短縮されるので、本実施の形態に係る部品実装装置10は、部品の吸着および装着の安定性を向上させることができる。
 以上、本発明に係る部品実装装置について、実施の形態に基づいて説明したが、本発明は、これらの実施の形態に限定されるものではない。本発明の趣旨を逸脱しない限り、当業者が思いつく各種変形を本実施の形態に施した形態も、本発明の範囲内に含まれる。
 例えば、上記実施の形態において、図4に示すように、二次フィルタ142と流量センサ152とが第2通気路132に設置されていたが、必ずしもこのように設置される必要はない。例えば、図10に示すように、二次フィルタ142と流量センサ152とが第1通気路131に設置されてもよい。この場合、ノズル105の吸着孔106から第1切替弁110までの経路長が実施の形態よりも例えば20mm程長くなり80mmとなる。しかし、この場合であっても、上記比較例に対して真空立上時間および真空破壊時間を短縮することが可能となる。また、上記実施の形態よりも流量センサの数を減らすことが可能となり、部品実装装置10の構成を簡略化できる。
 また、上記実施の形態において、第1切替弁110は、ノズルブロック100の外側面に設置されていたが、必ずしもこのように設置される必要はない。例えば、図11に示すように、第1切替弁110はノズルブロック100に内部に設置されてもよい。
 図11は、本発明の実施の形態の一変形例に係る部品実装装置のノズルブロック周辺の断面図である。
 図11では、第1切替弁110は、ノズルブロック100に内蔵されている。第1切替弁110は、プランジャ111と電磁コイル112とを備える電磁弁であり、プランジャ111の長手方向が上下方向と一致するように設けられている。
 これにより、部品実装装置10は、第1切替弁110からノズル105までの経路長を上記実施の形態よりもさらに短縮することができる。具体的には例えば、第1切替弁110からノズル105の先端(吸着孔106)までの経路長を60mmから30mmに短縮することができる。したがって、部品実装装置10は、真空立上時間および真空破壊時間を上記実施の形態よりも短縮することができ、部品の吸着および装着の安定性をさらに向上させることが可能となる。また、図11に示す部品実装装置10では、プランジャ111の長手方向が上下方向と一致するように第1切替弁110が設けられているので、第1切替弁110が内蔵されたノズルブロック100を小型化することが可能となる。
 また、上記実施の形態において、図2などに示すように、第1切替弁110の長手方向が上下方向と一致するように、第1切替弁110はノズルブロック100の外側面に設置されていたが、必ずしもこのように設置される必要はない。例えば、図12に示すように、第1切替弁110は、長手方向が、上下方向と直交する方向に設置されてもよい。そのとき、第1切替弁110は、隣りに配列されるノズルブロック100の側と異なる側のノズルブロック100の外側面に設置されればよい。これにより、部品実装装置10は、複数のノズルブロック100がヘッド13に備えられている場合であっても、当該複数のノズルブロック100を互いに近接して設置することができ、ヘッド13の小型化を図ることが可能となる。
 また、上記実施の形態では、ヘッド13に複数のノズルブロック100が備えられており、かつ、各ノズルブロックには1つのノズルがそれぞれ保持されていたが、部品実装装置10は、必ずしもこのように構成される必要はない。例えば、1つのノズルブロック100に複数のノズルが保持されてもよい。
 なお、今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は上記した説明ではなくて請求の範囲によって示され、請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。
 本発明の一態様に係る部品実装装置および部品実装方法は、真空立上時間および真空破壊時間の短縮を図り、部品の吸着および装着の安定性を向上させることができる部品実装装置および部品実装方法として有用である。
  10、20  部品実装装置
  11  Xビーム
  12  Yビーム
  13  ヘッド
  14  基台
  15  基板
  17  搬送レール
  18  部品供給部
 100  ノズルブロック
 101  回転部
 102  固定部(非自転部)
 103  シャフト
 105  ノズル
 106  吸着孔
 110、210  第1切替弁
 111  プランジャ
 112  電磁コイル
 120、220  第2切替弁
 131、231  第1通気路
 132、232  第2通気路
 133、233  第3通気路
 141  一次フィルタ
 142  二次フィルタ
 151  圧力センサ
 152、153  流量センサ
 160  制御部
 191  真空源
 192  正圧源
 234  チューブ

Claims (10)

  1.  部品供給部から供給される部品をノズルで吸着し、前記ノズルを上下移動させて吸着した前記部品を基板に装着する部品実装装置であって、
     前記ノズルを着脱可能に保持して上下動作可能なノズルブロックと、
     前記ノズルブロックに取り付けられる第1切替弁と、
     前記ノズルに圧縮空気を供給するための正圧源と前記第1切替弁とを連通させるか否かを切り替える第2切替弁とを備え、
     前記第1切替弁は、前記ノズルから空気を吸引するための真空源および前記第2切替弁のいずれか一方を前記ノズルに連通させる
     部品実装装置。
  2.  前記第1切替弁は、前記ノズルブロックの外側面に取り付けられる
     請求項1に記載の部品実装装置。
  3.  前記第1切替弁は、長手方向が上下方向と一致するように設置される
     請求項2に記載の部品実装装置。
  4.  前記ノズルブロックは、装着ヘッドに少なくとも1つの配列方向に複数配列されており、
     前記第1切替弁は、長手方向が、上下方向と直交する方向に設置され、かつ、隣りに配列される前記ノズルブロックの側と異なる側の前記外側面に設置される
     請求項2に記載の部品実装装置。
  5.  前記ノズルブロックは、装着ヘッドに対して前記ノズルをθ軸方向に回転させる回転部と、前記装着ヘッドに対して前記ノズルをθ軸方向に回転させない固定部とを備え、
     前記第1切替弁は、前記固定部の外側面に設置される
     請求項2に記載の部品実装装置。
  6.  前記第1切替弁は、前記ノズルブロックに内蔵される
     請求項1に記載の部品実装装置。
  7.  前記第1切替弁は、プランジャを備える電磁弁であり、前記プランジャの長手方向が上下方向と一致するように設けられる
     請求項6に記載の部品実装装置。
  8.  さらに、
     前記ノズルと前記第1切替弁とを接続する第1通気路に設けられ、前記第1通気路内を流れる固体物を捕捉するための第1フィルタと、
     前記第1切替弁と前記真空源とを接続する第2通気路に設けられ、前記第2通気路内を流れる、前記第1フィルタを通過した固体物を捕捉するための第2フィルタとを備える
     請求項1に記載の部品実装装置。
  9.  前記第1切替弁は、前記ノズルの先端に設けられる、前記部品を吸着する吸着孔からの通気経路の長さが80mm以下となる位置に設置される
     請求項1に記載の部品実装装置。
  10.  部品供給部から供給される部品をノズルで吸着し、吸着した前記部品を基板に装着する部品実装方法であって、
     前記ノズルを前記部品供給部から供給される部品の高さまで下降させるとともに、前記ノズルから空気を吸引するための真空源および第2切替弁のいずれか一方を前記ノズルに連通させることができる、前記ノズルと一体的に上下動作する第1切替弁を介して、前記ノズルを前記真空源に連通させることにより、前記ノズルに前記部品を吸着させる吸着ステップと、
     前記部品を吸着保持している前記ノズルを上昇させて前記基板の上方へ移動させるとともに、前記ノズルに圧縮空気を供給するための正圧源と前記第1切替弁とを連通させるか否かを切り替えることができる第2切替弁を介して、前記正圧源と前記第1切替弁とを連通させる吸着保持ステップと、
     前記部品を吸着保持しているノズルを前記基板の位置まで下降させるとともに、前記第1切替弁を介して前記第2切替弁を前記ノズルに連通させることにより、前記部品を前記基板に装着する装着ステップとを含む
     部品実装方法。
PCT/JP2011/004248 2010-07-30 2011-07-27 部品実装装置および部品実装方法 WO2012014467A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2010173042 2010-07-30
JP2010-173042 2010-07-30

Publications (1)

Publication Number Publication Date
WO2012014467A1 true WO2012014467A1 (ja) 2012-02-02

Family

ID=45529698

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2011/004248 WO2012014467A1 (ja) 2010-07-30 2011-07-27 部品実装装置および部品実装方法

Country Status (1)

Country Link
WO (1) WO2012014467A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013007068A1 (de) 2013-04-23 2014-10-23 Mimot Gmbh Bestückkopf zum Bestücken von Substraten mit elektrischen Bauelementen mittels einer pneumatischen Einrichtung
CN107497153A (zh) * 2017-09-25 2017-12-22 信义节能玻璃(四川)有限公司 自洁式水滤装置
US10259123B2 (en) 2017-03-10 2019-04-16 Hsin-Po Huang Vacuum suction device
EP3071006B1 (en) * 2013-11-11 2019-12-25 FUJI Corporation Substrate processing device and dispensing head
WO2020110319A1 (ja) * 2018-11-30 2020-06-04 株式会社Fuji 対基板作業機

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04274400A (ja) * 1991-03-01 1992-09-30 Matsushita Electric Ind Co Ltd 電子部品装着装置
JPH11330788A (ja) * 1998-05-08 1999-11-30 Matsushita Electric Ind Co Ltd 電子部品実装装置および電子部品実装方法
JP2004023027A (ja) * 2002-06-20 2004-01-22 Matsushita Electric Ind Co Ltd 電子部品実装装置および電子部品実装方法
JP2004103922A (ja) * 2002-09-11 2004-04-02 Ckd Corp ノズル異常検出システム
JP2006351815A (ja) * 2005-06-16 2006-12-28 Calsonic Kansei Corp 部品実装方法および装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04274400A (ja) * 1991-03-01 1992-09-30 Matsushita Electric Ind Co Ltd 電子部品装着装置
JPH11330788A (ja) * 1998-05-08 1999-11-30 Matsushita Electric Ind Co Ltd 電子部品実装装置および電子部品実装方法
JP2004023027A (ja) * 2002-06-20 2004-01-22 Matsushita Electric Ind Co Ltd 電子部品実装装置および電子部品実装方法
JP2004103922A (ja) * 2002-09-11 2004-04-02 Ckd Corp ノズル異常検出システム
JP2006351815A (ja) * 2005-06-16 2006-12-28 Calsonic Kansei Corp 部品実装方法および装置

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013007068A1 (de) 2013-04-23 2014-10-23 Mimot Gmbh Bestückkopf zum Bestücken von Substraten mit elektrischen Bauelementen mittels einer pneumatischen Einrichtung
EP2797398A2 (de) 2013-04-23 2014-10-29 Mimot GmbH Bestückkopf zum Bestücken von Substraten mit elektrischen Bauelementen mittels einer pneumatischen Einrichtung
EP3071006B1 (en) * 2013-11-11 2019-12-25 FUJI Corporation Substrate processing device and dispensing head
US10259123B2 (en) 2017-03-10 2019-04-16 Hsin-Po Huang Vacuum suction device
CN107497153A (zh) * 2017-09-25 2017-12-22 信义节能玻璃(四川)有限公司 自洁式水滤装置
WO2020110319A1 (ja) * 2018-11-30 2020-06-04 株式会社Fuji 対基板作業機
JPWO2020110319A1 (ja) * 2018-11-30 2021-09-27 株式会社Fuji 対基板作業機
JP7097988B2 (ja) 2018-11-30 2022-07-08 株式会社Fuji 対基板作業機

Similar Documents

Publication Publication Date Title
WO2012014467A1 (ja) 部品実装装置および部品実装方法
JP5294204B2 (ja) ワーク挿入機構及びワーク挿入方法
CN101938894B (zh) 电子元件用搬送装置
CN110431935B (zh) 元件安装机及安装头
JP2014130960A (ja) 電子部品実装装置及び電子部品実装方法
JPWO2015011805A1 (ja) 部品実装機の部品移載装置
JP2009231303A (ja) ヘッド駆動制御方法および表面実装装置
JP2007158102A (ja) ボンディング装置
JP2006286781A (ja) 電子部品の搭載ヘッド、部品実装装置及びその制御方法
JP5925524B2 (ja) 電子部品供給装置及び電子部品実装装置
JP5410864B2 (ja) 電子部品実装装置
JP2009016498A (ja) 部品吸着方法および表面実装機
JP2007043089A (ja) 実装条件決定方法
JP2006298578A (ja) パ−ツフィ−ダ
JP2016063162A (ja) 電子部品実装装置
JP4667091B2 (ja) 電子部品装着装置
JP6574953B2 (ja) 部品吸着ヘッド
US9354628B2 (en) Component mounting device and component mounting method
JP2006279076A (ja) 電子部品実装方法
JP7308628B2 (ja) 部品実装装置
JP2011049504A (ja) 電子部品装着装置
KR20120043803A (ko) 표면실장기용 스틱 공급장치
JP5457081B2 (ja) 電子部品実装装置
JP2005050858A (ja) 電子部品吸着装置
WO2024018626A1 (ja) 部品装着機および装着方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11812069

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11812069

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP