WO2011093362A1 - 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム - Google Patents

電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム Download PDF

Info

Publication number
WO2011093362A1
WO2011093362A1 PCT/JP2011/051563 JP2011051563W WO2011093362A1 WO 2011093362 A1 WO2011093362 A1 WO 2011093362A1 JP 2011051563 W JP2011051563 W JP 2011051563W WO 2011093362 A1 WO2011093362 A1 WO 2011093362A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
time point
period
target output
generated
Prior art date
Application number
PCT/JP2011/051563
Other languages
English (en)
French (fr)
Inventor
山田 洋平
池部 早人
総一 酒井
Original Assignee
三洋電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三洋電機株式会社 filed Critical 三洋電機株式会社
Priority to JP2011551891A priority Critical patent/JP5507582B2/ja
Publication of WO2011093362A1 publication Critical patent/WO2011093362A1/ja
Priority to US13/425,096 priority patent/US9148020B2/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/50Energy storage in industry with an added climate change mitigation effect

Definitions

  • the present invention relates to a power supply method, a computer-readable recording medium, and a power generation system.
  • EDC economic load distribution control
  • the power company adjusts the amount of power supplied to the power system according to the load that changes from moment to moment, and performs a plurality of controls to stabilize the frequency.
  • These controls excluding EDC are particularly called frequency control, and by this frequency control, adjustment of the load fluctuation that cannot be adjusted by EDC is performed.
  • LFC Load Frequency Control
  • the LFC power plant adjusts the power generation output by a control signal from the central power supply command station of the power supplier, thereby performing frequency control.
  • the output of the power generation device using natural energy may change rapidly depending on the weather.
  • Such an abrupt change in the output of the power generation apparatus has a significant adverse effect on the frequency stability of the interconnected power system.
  • This adverse effect becomes more prominent as more consumers have power generation devices that use natural energy. For this reason, when the number of customers who have power generation devices that use natural energy increases further in the future, it will be necessary to maintain the stability of the power system by suppressing sudden changes in the output of the power generation devices. Come.
  • a power generation system including a power generation device using natural energy and a power storage device capable of storing the electric power generated by the power generation device is provided. Proposed.
  • Such a power generation system is disclosed in, for example, Japanese Patent Application Laid-Open No. 2001-5543.
  • JP-A-2001-5543 includes a solar cell, an inverter connected to the solar cell and connected to the power system, and a power storage device connected to a bus connecting the inverter and the solar cell.
  • a power generation system is disclosed.
  • a moving average value (target output power) of past generated power is calculated, and the moving average value and the solar power are output so that the power of the moving average value is output from the inverter to the power system.
  • smoothing control is performed to suppress fluctuations in the power that flows backward to the power system. Thereby, it is possible to suppress an adverse effect on the frequency of the power system.
  • the moving average value target output power
  • the moving average value is close to the past generated power value reflecting the past generated power value.
  • the transition of the moving average value is shifted (delayed) as a whole from the transition of the actual generated power to the past generated power value side.
  • an overall shift occurs between the moving average value and the actual generated power by the amount of the delay.
  • the charge / discharge amount and charge / discharge depth of the power storage device which is the difference between the actual generated power and the moving average value, is also calculated. As a result, there is a problem that the life of a power storage device including a secondary battery is shortened.
  • the present invention has been made in order to solve the above-described problems, and one object of the present invention is to reduce the influence on the power system caused by fluctuations in the generated power by the power generation device, while suppressing the power storage device. It is an object to provide a power supply method, a computer-readable recording medium, and a power generation system capable of extending the service life of the computer.
  • the power supply method of the present invention includes a step of generating power by a power generation device using renewable energy, a step of storing power generated by the power generation device in a power storage device, Based on the generated power of the power generation device at the time point and the second time point before the first time point, the rate of increase or decrease in the generated power between the first time point and the second time point is calculated, A step of determining the target output power from the ratio, and a step of outputting the target output power from at least one of the power generation device and the power storage device.
  • the computer-readable recording medium of the present invention stores a power generation device that generates power using renewable energy and a control program for controlling a power storage device that stores electric power generated by the power generation device.
  • a power generation system of the present invention includes a power storage device that stores power generated by a power generation device that generates power using renewable energy, and a charge / discharge control unit that controls power supplied to the power system from the power generation device or the power storage device.
  • the charging / discharging control unit includes a first time point and a second time point based on the generated power of the power generation device at the first time point and the second time point before the first time point. An increase or decrease rate of the generated power is calculated, a target output power to be output to the power system is determined from the rate, and the target output power is output from at least one of the power generation device and the power storage device.
  • the target output power can be set so that the transition of the target output power is close to the transition of the actual generated power based on not only the generated power of the power generator but also the increasing / decreasing tendency of the generated power. .
  • the difference between the target output power for smoothing the change in the generated power and the actual generated power is reduced as a whole, so that the power storage device is charged by the difference between the target output power and the actual generated power.
  • the charge / discharge amount and the charge / discharge depth of the power storage device can be reduced. As a result, it is possible to extend the life of the power storage device while suppressing the influence on the power system caused by fluctuations in power generated by the power generation device.
  • FIG. 1 It is a block diagram which shows the structure of the electric power generation system by 3rd Embodiment of this invention. It is a flowchart for demonstrating the control flow of charging / discharging control of the electric power generation system by 3rd Embodiment shown in FIG. It is a graph which shows the output power (Example 1) after an example of transition of the generated electric power of a power generator, and the smoothing by Example 1.
  • FIG. 1 shows the output electric power (example 1) after an example of the transition of the generated electric power of a power generator, and the smoothing by Example 2.
  • Example 1 It is a graph which shows transition (Example 1) of the electrical storage amount of the storage battery of Example 1, Example 2, and a comparative example. It is a graph which shows the FFT analysis result (Example 1) of Example 1 and a comparative example. It is a graph which shows the output power (Example 2) after an example of the transition of the generated electric power of a generator, and the smoothing by Example 1.
  • FIG. It is a graph which shows the output electric power (example 2) after the example of 1 day transition of the generated electric power of a power generator, and the smoothing by Example 2.
  • FIG. It is a graph which shows the output electric power (example 2) after the smoothing by an example of the transition of the generated electric power of the electric power generating apparatus for one day and a comparative example. It is a graph which shows transition (Example 2) of the electrical storage amount of the storage battery of Example 1, Example 2, and a comparative example. It is a graph which shows the FFT analysis result (Example 2) of Example 1, Example 2,
  • the power generation system 1 is connected to a power generation device 2 and a power system 50 including solar cells that generate power using sunlight.
  • the power generation system 1 includes a power storage device 3 that can store the power generated by the power generation device 2, and an inverter that outputs the power generated by the power generation device 2 and the power stored by the power storage device 3 to the power system 50.
  • An output unit 4 and a charge / discharge control unit 5 that controls charging / discharging of the power storage device 3 are provided.
  • the power generation device 2 may be a power generation device that uses renewable energy, and for example, a wind power generation device or the like may be used.
  • a DC-DC converter 7 is connected in series to the bus 6 connecting the power generation device 2 and the power output unit 4.
  • the DC-DC converter 7 converts the direct current voltage of the power generated by the power generation device 2 into a constant direct current voltage (about 260 V in the first embodiment) and outputs it to the power output unit 4 side.
  • the DC-DC converter 7 has a so-called MPPT (Maximum Power Point Tracking) control function.
  • the MPPT function is a function that automatically adjusts the operating voltage of the power generation device 2 so that the power generated by the power generation device 2 is maximized.
  • a diode (not shown) for preventing a current from flowing backward toward the power generation device 2 is provided.
  • the power storage device 3 includes a storage battery 31 connected in parallel to the bus 6 and a charging / discharging unit 32 that charges and discharges the storage battery 31.
  • a secondary battery for example, a Li-ion storage battery, a Ni-MH storage battery, etc.
  • the voltage of the storage battery 31 is about 48V.
  • the charging / discharging unit 32 has a DC-DC converter 33, and the bus 6 and the storage battery 31 are connected via the DC-DC converter 33.
  • the DC-DC converter 33 reduces the voltage of the power supplied to the storage battery 31 from the voltage of the bus 6 to a voltage suitable for charging the storage battery 31, thereby supplying power from the bus 6 to the storage battery 31. Supply.
  • the DC-DC converter 33 discharges power from the storage battery 31 side to the bus 6 side by boosting the voltage of the power discharged to the bus 6 side from the voltage of the storage battery 31 to the vicinity of the bus 6 voltage at the time of discharging.
  • the charge / discharge control unit 5 performs charge / discharge control of the storage battery 31 by controlling the DC-DC converter 33.
  • the charge / discharge control unit 5 sets a target output power to be output to the power system 50 in order to smooth the power value output to the power system 50 regardless of the generated power of the power generation device 2.
  • the charge / discharge control unit 5 controls the charge / discharge amount of the storage battery 31 so that the amount of power output to the power system 50 becomes the target output power according to the generated power of the power generation device 2.
  • the charging / discharging control unit 5 controls the DC-DC converter 33 so as to charge the storage battery 31 with excess power when the generated power of the power generation device 2 is larger than the target output power, and the power generation device When the generated power of 2 is smaller than the target output power, the DC-DC converter 33 is controlled so that the insufficient power is discharged from the storage battery 31.
  • the charge / discharge control unit 5 acquires the generated power data of the power generation device 2 from the generated power detection unit 8 provided on the output side of the DC-DC converter 7.
  • the generated power detection unit 8 detects the generated power of the power generation device 2 and transmits the generated power data to the charge / discharge control unit 5.
  • the charge / discharge control unit 5 acquires the generated power data from the generated power detection unit 8 at predetermined detection time intervals.
  • the charge / discharge control unit 5 acquires the generated power data of the power generator 2 every 60 seconds.
  • an appropriate value is taken into consideration, for example, the fluctuation cycle of the generated power of the power generator 2. Determined.
  • the charge / discharge control unit 5 acquires the output power of the power output unit 4, thereby recognizing the difference between the power actually output from the power output unit 4 to the power system 50 and the target output power,
  • the charging / discharging of the charging / discharging unit 32 is feedback-controlled so that the output power from the power output unit 4 becomes the target output power.
  • the charge / discharge control unit 5 controls the charge / discharge of the storage battery 31 so that the sum of the generated power of the power generation device 2 and the charge / discharge amount of the storage battery 31 becomes the target output power.
  • the target output power is calculated using the moving average method. However, if the moving average value using the moving average method is used as it is, a deviation from the actual generated power of the power generator 2 occurs. Therefore, in this embodiment, the charge / discharge control unit 5 calculates the target output power based on the moving average value and the increasing / decreasing tendency of the generated power, not the moving average value calculated using the moving average method.
  • the moving average method is a calculation method in which a moving average value at a certain point in time is an average value of the generated power of the power generation device 2 in a past period from that point.
  • a period for acquiring the generated power data used for calculating the moving average value is referred to as a sampling period.
  • the specific value of the sampling period is about 20 minutes in this embodiment.
  • the charge / discharge control unit 5 acquires the generated power data of the power generation device 2 about every 60 seconds, the average value of the 20 generated power data included in the period of the past 20 minutes is calculated as the target output power. is doing.
  • the load fluctuation period that can be handled by the load frequency control (LFC) is shown in a region D (region indicated by hatching).
  • the load fluctuation period that can be handled by EDC is shown in region A.
  • Region B is a region that naturally absorbs the influence of load fluctuations due to the self-controllability of power system 50 itself.
  • Region C is a region that can be handled by governor-free operation of the generators at each power plant.
  • the boundary line between the region D and the region A becomes the upper limit cycle T1 of the load fluctuation period that can be handled by the load frequency control (LFC), and the boundary line between the region C and the region D can be handled by the load frequency control. It becomes the lower limit cycle T2 of the load fluctuation cycle.
  • the upper limit cycle T1 and the lower limit cycle T2 are numerical values that change depending on the magnitude of the load fluctuation, not the inherent cycles.
  • the time of the fluctuation period illustrated by the constructed power network also changes.
  • load fluctuation having a fluctuation period (fluctuation frequency) included in the range of region D (region that can be handled by LFC) that cannot be handled by EDC, self-controllability of power system 50 itself and governor-free operation, etc. It aims at suppressing it.
  • the charge / discharge control unit 5 detects the generated power every detection time interval (i seconds), acquires the generated power data, and sequentially stores it in the memory 5a. Further, the charge / discharge control unit 5 obtains new generated power data (every detection time interval) from the current time (time t) to the past sampling period T3 (from time t-T3 to time t). A moving average value is calculated based on the generated power data. This moving average value is also sequentially stored in the memory 5a. That is, the moving average value is a value calculated based on past generated power. Therefore, the moving average value is shifted (delayed) as a whole from the actual generated power transition to the past generated power value side. In FIG. 3, the moving average value is shown only at two points in time for simplicity.
  • the charge / discharge control unit 5 predicts the transition of the generated power based on the increasing / decreasing tendency of the moving average value, and sets the target output power. .
  • the charge / discharge control unit 5 first calculates the latest moving average value A1 (time t, power value Y1 at the current time (time t)). ) And the moving average value A2 (time t-T4, power value Y2) at a time (t-T4) before the current time by a predetermined time interval T4.
  • the charge / discharge control unit 5 moves the moving average value A1 in the midpoint (time t-T3 / 2) of the moving average interval (time t-T3 to time t) for calculating the moving average value A1 at time t.
  • the power value at time t + i when the generated power has changed at the rate of increase / decrease in the slope S from the point C (time t ⁇ T3 / 2, power value Y1) that has the power value Y1 of Let it be power G.
  • the target output power G changes on the side closer to the center of the actual transition of the generated power that fluctuates by repeatedly increasing and decreasing from moment to moment. The transition of the target output power G will be described later by showing simulation results.
  • the time interval T4 between the moving average values (moving average values A1 and A2) at two time points for calculating the slope S is a period equal to or longer than the upper limit cycle T1 of the fluctuation cycle that can be handled by the load frequency control. .
  • the time interval T4 is 20 minutes.
  • the charge / discharge control unit 5 calculates the target output power G for each detection time interval based on the slope S between the moving average value A1 and the moving average value A2, and the actual power generator 2
  • the charge / discharge control of the storage battery 31 is performed so that the sum of the generated power and the charge / discharge amount of the storage battery 31 becomes the target output power G.
  • the power generation system 1 of this embodiment can obtain the following effects by the above configuration.
  • the charge / discharge control unit 5 calculates a target output power for smoothing a change in the generated power based on not only the generated power of the power generator 2 but also the increasing / decreasing tendency of the generated power.
  • the target output power can be set so that the transition of the target output power is close to the actual transition of the generated power based on the increasing / decreasing tendency of the generated power.
  • the difference between the target output power for smoothing the change in the generated power and the actual generated power is reduced as a whole, so that the storage battery 31 is charged by the difference between the target output power and the actual generated power.
  • the charge / discharge amount and the charge / discharge depth of the storage battery 31 can be reduced.
  • the lifetime of the storage battery 31 can be extended while suppressing the influence on the electric power system 50 resulting from the fluctuation
  • the charge / discharge control unit 5 sets the power calculated based on the increasing / decreasing tendency of the moving average value as the target output power. Therefore, unlike the conventional case where the smoothed power is calculated based on only the generated power to obtain the target output power, the target output power based on the increase / decrease tendency of the generated power can be easily calculated.
  • the charge / discharge control unit 5 uses the moving average value A1 and the moving average value A2 as the increasing / decreasing tendency of the generated power of the power generation device 2 as the slope S between the moving average value A2 and the moving average value A2 before the moving average value A1.
  • a target output power G is calculated based on A1 and the slope S.
  • the charge / discharge control unit 5 calculates the moving average value A1 and the moving average value A2 at a time point that is earlier than the time point when the moving average value A1 is acquired by a period equal to or longer than the upper limit cycle of the fluctuation cycle that can be handled by the load frequency control.
  • a target output power G is calculated based on the slope S between the two.
  • the charge / discharge control unit 5 generates power at an increase / decrease rate of the slope S from the point C that has the power value Y1 of the moving average value A1 at an intermediate time point in the moving average section for calculating the moving average value A1.
  • the target output power G can be set so as to be closer to the actual transition of the generated power.
  • the charge / discharge control unit 5 sets the sampling period to a target output power calculated based on the moving average value A1 and the moving average value A2 by setting the sampling period to a period equal to or longer than the upper limit cycle of the fluctuation cycle that can be handled by the load frequency control. It is possible to reduce the fluctuation of the fluctuation cycle that can cope with the fluctuation of G by the load frequency control.
  • FIG. 4 shows the FFT analysis result when the sampling period, which is the generation period of the generated power data, is 10 minutes, and the FFT analysis result when the sampling period is 20 minutes.
  • the sampling period when the sampling period is 10 minutes, the fluctuation in the range where the fluctuation period is less than 10 minutes is suppressed, while the fluctuation in the range where the fluctuation period is 10 minutes or more is not much suppressed. . Further, when the sampling period is 20 minutes, the fluctuation in the range where the fluctuation period is less than 20 minutes is suppressed, while the fluctuation in the range where the fluctuation period is 20 minutes or more is not much suppressed.
  • the sampling period is longer than the fluctuation cycle corresponding to the load frequency control, particularly in the vicinity of the second half of T1 to T2 ( It is preferable that the period is in the range from the vicinity of the long period) to T1 or more. For example, in the example of FIG. 2, most of the fluctuation period corresponding to the load frequency control can be suppressed by setting the sampling period to 20 minutes or more.
  • the power generation system 100 includes a charge / discharge control unit 101 instead of the charge / discharge control unit 5 of the first embodiment.
  • the configuration other than the charge / discharge control unit 101 is the same as that of the power generation system 1 according to the first embodiment.
  • the charge / discharge control unit 101 sets the sampling period as 20 minutes and the time interval between the moving average values for calculating the gradient of the moving average value as 20 minutes. Calculate the output power.
  • the charging / discharging control unit 101 extends the sampling period to 40 minutes and sets the target output power to a time interval between moving average values of 20 minutes when the fluctuation of the generated power is outside the predetermined range. calculate. Whether or not the fluctuation of the generated power is within a predetermined range is determined based on whether or not the actual amount of change in the generated power for 10 minutes is between ⁇ 0.7 kW and 0.7 kW. That is, the difference between the latest generated power and the generated power 10 minutes ago is sequentially calculated, and it is determined whether or not the difference value is between ⁇ 70 W and 70 W.
  • the sampling interval is set to 20 minutes. return. Controls other than the sampling period switching control in this charge / discharge control (such as a target output power calculation method) are the same as in the first embodiment.
  • step S1 the charge / discharge control unit 101 calculates a target output power with a sampling interval of 20 minutes and a time interval between moving average values of 20 minutes.
  • step S2 the charge / discharge control unit 101 determines whether or not the fluctuation of the generated power is within a predetermined range. If the fluctuation of the generated power is within the predetermined range, the process returns to step S1, and the charge / discharge control unit 101 performs charge / discharge control with a sampling period of 20 minutes.
  • step S3 the charge / discharge control unit 101 calculates the target output power with a sampling period of 40 minutes and a time interval between moving average values of 20 minutes. To do.
  • step S4 the charge / discharge control unit 101 determines whether or not the fluctuation of the generated power has returned to a predetermined range. When the fluctuation
  • step S5 the charge / discharge control unit 101 determines whether or not the state where the fluctuation of the generated power is within the predetermined range has continued for 30 minutes. To do. If it does not continue for 30 minutes (if the fluctuation of the generated power falls outside the predetermined range within 30 minutes), the process returns to step S3, and the charge / discharge control unit 101 performs charge / discharge control with a sampling period of 40 minutes. Do. In addition, when it continues for 30 minutes, the process returns to step S1, and the charge / discharge control unit 101 performs charge / discharge control by returning the sampling period to 20 minutes.
  • the power generation system 100 of this embodiment can obtain the following effects by the above configuration.
  • the charging / discharging control unit 101 calculates the moving average value A1 and the moving average value A2 with a sampling period of 20 minutes when the change in generated power is small, and sets the sampling period when the change in generated power is large.
  • the moving average value A1 and the moving average value A2 are calculated for 40 minutes.
  • the calculation period of the moving average values becomes long when the change in generated power is large. Can be small.
  • the target output power based on the moving average value A1 and the moving average value A2 with such a long period length, even when the change in the generated power is large, the change in the generated power is greatly increased.
  • the target output power can be calculated by calculating the slope between the moving average value A1 and the moving average value A2 without being influenced, it is possible to calculate the target output power that is not greatly influenced by changes in the generated power. Thereby, even when the change in the generated power is large, smoothing can be sufficiently performed, and the charge / discharge amount and the charge / discharge depth of the power storage device 3 can be reduced to extend the life of the power storage device 3.
  • the power generation system 200 includes a charge / discharge control unit 201 instead of the charge / discharge control unit 5 of the first embodiment.
  • the configuration other than the charge / discharge control unit 201 is the same as that of the power generation system 1 according to the first embodiment.
  • the charge / discharge control unit 201 sets the sampling period as 20 minutes and the time interval between the moving average values for calculating the gradient of the moving average value as 20 minutes. Calculate the output power.
  • the charge / discharge control unit 201 calculates the target output power by setting the sampling period to 20 minutes and extending the time interval between the moving average values to 40 minutes when the fluctuation of the generated power is outside the predetermined range. To do.
  • the determination as to whether or not the fluctuation of the generated power is within a predetermined range is the same as in the second embodiment.
  • the charge / discharge control unit 201 continues the state in which the fluctuation of the generated power is within the predetermined range for a predetermined time (here, 30 minutes).
  • the time interval between the moving average values is returned to 20 minutes. Controls other than the switching control of the time interval between the moving average values in this charge / discharge control (such as a target output power calculation method) are the same as in the first embodiment.
  • step S11 the charge / discharge control unit 201 calculates a target output power with a sampling interval of 20 minutes and a time interval between moving average values of 20 minutes.
  • step S12 the charge / discharge control unit 201 determines whether or not the fluctuation of the generated power is within a predetermined range. When the fluctuation of the generated power is within the predetermined range, the process returns to step S11, and the charge / discharge control unit 201 performs charge / discharge control with the time interval between the moving average values being 20 minutes.
  • step S13 the charge / discharge control unit 201 calculates the target output power with a sampling period of 20 minutes and a time interval between moving average values of 40 minutes. To do.
  • step S14 the charge / discharge control unit 201 determines whether or not the fluctuation of the generated power has returned within a predetermined range. When the fluctuation
  • step S15 the charge / discharge control unit 201 determines whether or not the fluctuation of the generated power has continued within the predetermined range for 30 minutes. To do. When it does not continue for 30 minutes (when the fluctuation of the generated power is outside the predetermined range within 30 minutes), the process returns to step S13, and the charge / discharge control unit 201 sets the time interval between the moving average values to 40 minutes. Charge / discharge control as follows. Moreover, when it continues for 30 minutes, it returns to step S11, and the charging / discharging control part 201 returns the time interval between moving average values to 20 minutes, and performs charging / discharging control.
  • the power generation system 200 of the present embodiment can obtain the following effects by the above configuration.
  • the charge / discharge control unit 201 sets the time interval between the acquisition point of the moving average value A1 and the acquisition point of the moving average value A2 to 20 minutes and the change in the generated power is large.
  • the time interval between the acquisition time point of the moving average value A1 and the acquisition time point of the moving average value A2 is 40 minutes.
  • the target output power can be calculated without being greatly influenced by the change in the generated power. Thereby, even when the change in the generated power is large, smoothing can be sufficiently performed, and the charge / discharge amount and the charge / discharge depth of the power storage device 3 can be reduced to extend the life of the power storage device 3.
  • Example 1 the output power transition after smoothing when the charge / discharge control according to Example 1, Example 2 and the comparative example is performed on the daily power generation transition of the power generator on a clear day without clouds is shown. Verified.
  • Example 1 is an example in which charge / discharge control is performed by the control method of the first embodiment (sampling interval 20 minutes, time interval between moving average values 20 minutes).
  • Example 2 is an example in which charge / discharge control is performed by the control method of the second embodiment (switching of sampling interval 20 minutes / 40 minutes, time interval 20 minutes between moving average values).
  • the comparative example is an example in which charge / discharge control is performed using the moving average value itself as the target output power.
  • 9, 10, and 11 respectively show the generated power transition and the output power transition of the first embodiment, the generated power transition and the output power transition of the second embodiment, and the generated power transition and the output power transition of the comparative example.
  • FIG. 12 has shown transition of the electrical storage amount of the storage battery of Example 1, Example 2, and a comparative example in Example 1.
  • FIG. In FIG. 12, the initial value of the charged amount is set to 0 in order to explain the fluctuation of the charged amount with respect to the initial value, but this does not indicate that the initial value of the charged amount is 0 Wh.
  • FIG. 12 has shown transition of the electrical storage amount of the storage battery of Example 1, Example 2, and a comparative example in Example 1.
  • the initial value of the charged amount is set to 0 in order to explain the fluctuation of the charged amount with respect to the initial value, but this does not indicate that the initial value of the charged amount is 0 Wh.
  • Example 13 shows the FFT (Fast Fourier Transform) results of the output power fluctuations of Example 1 and Comparative Example in Example 1.
  • Example 2 is not shown in FIG. 13, since the fluctuation
  • the fluctuation of the actual generated power can be smoothed in any of Example 1, Example 2 and Comparative Example.
  • the charge / discharge control according to the comparative example in the morning when the generated power rises, it changes at a value smaller than the actual generated power transition, and in the afternoon when the generated power falls. It can be seen that the value is larger than the actual generated power. That is, in the comparative example in which the moving average value itself is the target output power, the target output power shifts to the value side of the past generated power, so that the transition of the target output power is generally delayed from the transition of the actual generated power. It has transitioned to.
  • the target output power of Example 1 changes at a value closer to the actual generated power transition than the comparative example.
  • the target output power of the second embodiment is shifted to a value closer to the actual generated power transition as compared with the comparative example and the first embodiment.
  • the amount of power storage monotonously increases from the initial value in the morning, and the amount of power storage monotonously decreases in the afternoon.
  • the target output power changes overall behind the actual generated power, so that the target output power changes at a value smaller than the actual generated power in the morning. In the afternoon, the value is larger than the actual generated power.
  • Example 1 and Example 2 regardless of whether it is morning or afternoon, the rising and lowering are repeated centering on the initial value. In Example 1 and Example 2, since the deviation between the target output power and the actual generated power caused by the delay in the target output power as in the comparative example is suppressed, charging and discharging are alternately repeated.
  • Example 1 and Example 2 While being able to perform charging / discharging control with the capacity
  • Example 1 and Example 2 since the peak value (maximum value) of charging is significantly smaller than that of the comparative example, charging / discharging control is being performed even when the initial state of charge (SOC) is increased. Can be prevented from being fully charged. As a result, the initial state of charge (the state of charge at night) can be increased, so that when a power outage or disaster occurs at night, more power can be supplied from the storage battery and used. Also in Example 1, as in the comparative example, the first charged state and the last charged state of the day can be made substantially the same.
  • Example 1 and Example 2 the actual fluctuation cycle of the generated power is suppressed as a whole.
  • the components of the fluctuation period about 2 minutes (about 120 seconds) to about 20 minutes (about 1200 seconds) that can be handled by the load frequency control are sufficiently suppressed.
  • Example 2 simulation results (example 2) for verifying the effect of performing the charge / discharge control of the present invention will be described with reference to FIGS.
  • Example 2 the output power transition after smoothing when the charge / discharge control according to Example 1, Example 2 and the comparative example is performed on the power generation power transition of the power generator on a sunny day with clouds is shown. Verified.
  • FIGS. 14 to 18 show simulation results similar to those in FIGS. 9 to 13, respectively.
  • Example 1 and Example 2 are significantly smaller than the charge / discharge depth H5 of the comparative example. That is, it can be seen that the control of the present invention is effective even on days when the generated power changes greatly. Moreover, it turns out that the charge / discharge amount of Example 1 and Example 2 is also significantly small compared with a comparative example.
  • Example 2 the actual fluctuation cycle of the generated power is suppressed as a whole.
  • Example 2 it turns out that smoothing is performed on the substantially same level as a comparative example. That is, in Example 2, the charge / discharge depth is smaller than that of the comparative example while performing smoothing at substantially the same level as that of the comparative example.
  • the present invention is not limited to this, and is used in the consumer in calculating the target output power.
  • the amount of power consumed by at least a part of the load may be detected, and the target output may be calculated in consideration of the amount of load power consumption or the amount of load power fluctuation.
  • the present invention is not limited to the specific numerical values such as the sampling period and the bus voltage described in the first to third embodiments, and can be appropriately changed.
  • the example in which the increasing / decreasing tendency of the moving average value (the increasing / decreasing tendency of the generated power) is determined based on the slope between the moving average values at two time points has been described.
  • the present invention is not limited to this, and the moving average value increasing / decreasing tendency (the generated power increasing / decreasing tendency) may be determined based on the moving average values at three or more time points.
  • the present invention is not limited to this and may be in the vicinity of the midpoint of the moving average section. Even if it is not near the midpoint of the moving average section, if the target output power is set before the target output power setting point and the starting point is within the moving average section, the target output power can be calculated only by the normal moving average method. The difference between the target output power and the actual generated power can be made smaller as a whole than in the case of setting.
  • the time interval between the moving average values for calculating the sampling period or the slope is increased when the amount of change in the generated power for 10 minutes is outside the predetermined range.
  • the present invention is not limited to this, and any index may be used as long as it can be determined that the variation in generated power is large. For example, you may make it judge that the fluctuation
  • the moving average value is calculated as an example of the “average power” of the present invention.
  • the present invention is not limited to this, and the first-order lag method (first-order phase method)
  • the calculated value by the delay method may be calculated as “average power”.
  • a value obtained by dividing a predetermined time constant T by a detection time interval ⁇ t (the number of data of generated power data W included in time T) is N, and a calculated value Qt at time t
  • This is a method of calculating a value obtained by adding a value obtained by dividing the difference between the calculated value Q (t ⁇ t) and the generated power Wt at time t by N to the calculated value Q (t ⁇ t).
  • the calculated value Qt by the first-order lag method is also calculated using a value obtained by dividing the difference between the calculated value Q (t ⁇ t) and the generated power Wt at time t by N, Qt is the fluctuation of the generated power. Becomes a smoothed value. Similarly to the moving average value, the calculated value Qt is also a value that changes with a delay from the actual change of the generated power data. Even in the case of performing smoothing by such a first-order lag method, by setting the target output power by applying the present invention, it is possible to suppress the influence on the power system caused by the fluctuation of the generated power by the power generator. Thus, the effect of the present invention of extending the life of the power storage device can be obtained.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Control Of Electrical Variables (AREA)

Abstract

 この電力供給方法は、再生可能エネルギーを利用して発電装置により発電する工程と、蓄電装置に発電装置により発電された電力を蓄電する工程と、第1の時点と、第1の時点より前の第2の時点とにおける発電装置の発電電力に基づいて、第1の時点と第2の時点との間の発電電力の増加または減少の割合を算出し、割合から目標出力電力を決定する工程と、発電装置および蓄電装置の少なくとも一方から目標出力電力を出力する工程と、を含む。

Description

電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム
 本発明は、電力供給方法、コンピュータ読み取り可能な記録媒体および発電システムに関する。
 近年、変電所からの交流電力の供給を受ける各需要家(たとえば、住宅や工場など)に、風力や太陽光などの自然エネルギーを利用した発電装置(太陽電池など)が設けられるケースが増加している。このような発電装置は、変電所の配下に設けられる電力系統に接続され、発電装置により発電された電力は、需要家内の電力消費装置側に出力される。また、需要家内の電力消費装置により消費されずに余った電力は、電力系統に出力される。この需要家から電力系統に向かう電力の流れは、「逆潮流」と呼ばれ、需要家から電力系統に出力される電力は「逆潮流電力」と呼ばれる。
 ここで、電力会社等の電力供給者には、電力の安定供給の義務が課されており、逆潮流電力分も含めた電力系統全体における周波数や電圧を一定に保つ必要がある。たとえば、電力供給者は、変動周期の大きさに応じた複数の制御手法によって、電力系統全体の周波数を一定に保っている。具体的には、一般に十数分以上の変動周期をもつような負荷成分については、最も経済的な発電電力の出力分担が可能なように経済負荷配分制御(EDC:Economic Dispatching Control)が行われている。このEDCは、1日の負荷変動予想に基づいた制御であり、時々刻々と変動する負荷の増減(十数分より小さい変動周期の成分)に対する対応は困難である。そこで、電力会社は、時々刻々と変動する負荷に応じて電力系統への電力の供給量を調整し、周波数の安定化を行うための複数の制御を行っている。EDCを除いたこれらの制御は特に周波数制御と呼ばれており、この周波数制御によって、EDCで調整できない負荷変動分の調整を行っている。
 より詳細には、約10秒以下の変動周期の成分については、電力系統自体の自己制御性により自然に吸収することができる。また、約10秒~数分程度の変動周期の成分に対しては、各発電所の発電機のガバナフリー運転により対応が可能である。また、数分から十数分までの変動周期の成分については、負荷周波数制御(LFC:Load Frequency Control)により対応している。この負荷周波数制御では、電力供給者の中央給電指令所からの制御信号によってLFC用発電所が発電出力を調整することにより、周波数制御を行っている。
 しかし、自然エネルギーを利用した発電装置の出力は、天候などに応じて急激に変化することがある。このような発電装置の出力の急激な変化は、連系している電力系統の周波数の安定度に大きな悪影響を与えてしまう。この悪影響は、自然エネルギーを利用した発電装置を有する需要家が増えるほど顕著になってくる。このため、今後、自然エネルギーを利用した発電装置を有する需要家がさらに増えてきた場合には、発電装置の出力の急激な変化を抑制することにより、電力系統の安定度を維持する必要が生じてくる。
 そこで、従来、このような発電装置の出力の急激な変化を抑制するために、自然エネルギーを利用した発電装置と、発電装置により発電された電力を蓄電可能な蓄電装置とを備えた発電システムが提案されている。このような発電システムは、たとえば、特開2001-5543号公報に開示されている。
 上記特開2001-5543号公報には、太陽電池と、太陽電池に接続されるとともに電力系統に接続されるインバータと、インバータと太陽電池とを接続する母線に接続された蓄電装置とを備えた発電システムが開示されている。上記特開2001-5543号公報では、過去の発電電力の移動平均値(目標出力電力)を算出し、その移動平均値の電力がインバータから電力系統に出力されるように、移動平均値と太陽電池の発電電力との差分だけ蓄電装置の充放電を行うことにより、電力系統に逆潮流される電力の変動を抑制する平滑化制御を行っている。これにより、電力系統の周波数などへの悪影響を抑制することが可能である。
特開2001-5543号公報
 しかしながら、移動平均値(目標出力電力)は過去の発電電力データから算出されるので、移動平均値の値は過去の発電電力の値を反映して過去の発電電力の値に近くなる。このため、移動平均値の推移は、実際の発電電力の推移から全体的に過去の発電電力の値側にずれて(遅れて)推移することになる。この場合、その遅れの分だけ移動平均値と実際の発電電力との間に全体的なずれが生じる。上記の実際の発電電力の推移と移動平均値の推移との全体的なずれが大きい場合には、実際の発電電力と移動平均値との差分である蓄電装置の充放電量および充放電深度も全体的に大きくなってしまい、その結果、2次電池などからなる蓄電装置の寿命が短くなるという問題点がある。
 この発明は、上記のような課題を解決するためになされたものであり、この発明の1つの目的は、発電装置による発電電力の変動に起因する電力系統への影響を抑制しながら、蓄電装置の長寿命化を図ることが可能な電力供給方法、コンピュータ読み取り可能な記録媒体および発電システムを提供することである。
 上記目的を達成するために、本発明の電力供給方法は、再生可能エネルギーを利用して発電装置により発電する工程と、蓄電装置に発電装置により発電された電力を蓄電する工程と、第1の時点と、第1の時点より前の第2の時点とにおける発電装置の発電電力に基づいて、第1の時点と第2の時点との間の発電電力の増加または減少の割合を算出し、割合から目標出力電力を決定する工程と、発電装置および蓄電装置の少なくとも一方から目標出力電力を出力する工程とを含む。
 本発明のコンピュータ読み取り可能な記録媒体は、再生可能エネルギーを利用して発電する発電装置および発電装置により発電された電力を蓄電する蓄電装置を制御するための制御プログラムを記憶する、コンピュータ読み取り可能な記録媒体であって、プログラムはコンピュータシステムに以下の動作を実行させる、第1の時点と、第1の時点より前の第2の時点とにおける発電装置の発電電力に基づいて、第1の時点と第2の時点との間の発電電力の増加または減少の割合を算出し、割合から電力系統に出力する目標出力電力を決定し、発電装置および蓄電装置の少なくとも一方から目標出力電力を出力する。
 本発明の発電システムは、再生可能エネルギーを利用して発電する発電装置により発電された電力を蓄電する蓄電装置と、発電装置または蓄電装置から電力系統に供給する電力を制御する充放電制御部とを備え、充放電制御部は、第1の時点と、第1の時点より前の第2の時点とにおける発電装置の発電電力に基づいて、第1の時点と第2の時点との間の発電電力の増加または減少の割合を算出し、割合から電力系統に出力する目標出力電力を決定し、発電装置および蓄電装置の少なくとも一方から目標出力電力を出力させるように構成されている。
 本発明によれば、発電装置の発電電力のみならず、発電電力の増減傾向に基づいて、目標出力電力の推移が実際の発電電力の推移に近くなるように目標出力電力を設定することができる。これにより、発電電力の変化を平滑化するための目標出力電力と実際の発電電力とのずれが全体的に小さくなるので、目標出力電力と実際の発電電力との差分の電力だけ蓄電装置の充放電を行う場合に、蓄電装置の充放電量および充放電深度を小さくすることができる。この結果、発電装置による発電電力の変動に起因する電力系統への影響を抑制しながら、蓄電装置の長寿命化を図ることができる。
本発明の第1実施形態による発電システムの構成を示すブロック図である。 電力系統に出力される負荷変動の大きさと変動周期との関係を説明するための図である。 図1に示した第1実施形態による発電システムによる目標出力電力の算出方法を説明するための図である。 充放電制御におけるサンプリング期間について説明するための図である。 本発明の第2実施形態による発電システムの構成を示すブロック図である。 図5に示した第2実施形態による発電システムの充放電制御の制御フローを説明するためのフローチャートである。 本発明の第3実施形態による発電システムの構成を示すブロック図である。 図7に示した第3実施形態による発電システムの充放電制御の制御フローを説明するためのフローチャートである。 発電装置の発電電力の1日の推移の一例および実施例1による平滑化後の出力電力(例1)を示すグラフである。 発電装置の発電電力の1日の推移の一例および実施例2による平滑化後の出力電力(例1)を示すグラフである。 発電装置の発電電力の1日の推移の一例および比較例による平滑化後の出力電力(例1)を示すグラフである。 実施例1、実施例2および比較例の蓄電池の蓄電量の推移(例1)を示すグラフである。 実施例1および比較例のFFT解析結果(例1)を示すグラフである。 発電装置の発電電力の1日の推移の一例および実施例1による平滑化後の出力電力(例2)を示すグラフである。 発電装置の発電電力の1日の推移の一例および実施例2による平滑化後の出力電力(例2)を示すグラフである。 発電装置の発電電力の1日の推移の一例および比較例による平滑化後の出力電力(例2)を示すグラフである。 実施例1、実施例2および比較例の蓄電池の蓄電量の推移(例2)を示すグラフである。 実施例1、実施例2および比較例のFFT解析結果(例2)を示すグラフである。
 以下、本発明の実施形態を図面に基づいて説明する。
 (第1実施形態)
 まず、図1~図3を参照して、本発明の第1実施形態による発電システム1の構造を説明する。
 図1に示すように、発電システム1は、太陽光を用いて発電する太陽電池からなる発電装置2および電力系統50に接続されている。発電システム1は、発電装置2により発電された電力を蓄電可能な蓄電装置3と、発電装置2により発電された電力および蓄電装置3により蓄電された電力を電力系統50に出力するインバータを含む電力出力部4と、蓄電装置3の充放電を制御する充放電制御部5とを備えている。なお、発電装置2は、再生可能エネルギーを利用した発電装置であればよく、例えば風力発電装置等を用いてもよい。
 発電装置2と電力出力部4とを接続する母線6には、DC-DCコンバータ7が直列的に接続されている。DC-DCコンバータ7は、発電装置2により発電された電力の直流電圧を一定の直流電圧(第1実施形態では、約260V)に変換して電力出力部4側に出力する。また、DC-DCコンバータ7は、いわゆるMPPT(Maximum Power Point Tracking)制御機能を有している。MPPT機能とは、発電装置2により発電された電力が最大となるように発電装置2の動作電圧を自動的に調整する機能である。発電装置2とDC-DCコンバータ7との間には、発電装置2に向かって電流が逆流するのを防止するためのダイオード(図示せず)が設けられている。
 蓄電装置3は、母線6に並列的に接続された蓄電池31と、蓄電池31の充放電を行う充放電部32とを含んでいる。蓄電池31としては、自然放電が少なく、充放電効率の高い2次電池(たとえば、Li-ion蓄電池、Ni-MH蓄電池など)が用いられている。また、蓄電池31の電圧は約48Vである。
 充放電部32は、DC-DCコンバータ33を有しており、母線6と蓄電池31とはDC-DCコンバータ33を介して接続されている。DC-DCコンバータ33は、充電時には、蓄電池31に供給する電力の電圧を、母線6の電圧から蓄電池31を充電するのに適した電圧まで降圧させることにより、母線6側から蓄電池31側に電力を供給する。また、DC-DCコンバータ33は、放電時には、母線6側に放電させる電力の電圧を、蓄電池31の電圧から母線6の電圧付近まで昇圧させることにより、蓄電池31側から母線6側に電力を放電させる。
 充放電制御部5は、DC-DCコンバータ33を制御することにより、蓄電池31の充放電制御を行う。充放電制御部5は、発電装置2の発電電力に関わらず電力系統50へ出力する電力値を平滑化するために、電力系統50へ出力する目標出力電力を設定する。充放電制御部5は、発電装置2の発電電力に応じて、電力系統50へ出力する電力量が目標出力電力となるように、蓄電池31の充放電量を制御する。すなわち、充放電制御部5は、発電装置2の発電電力が目標出力電力よりも大きい場合には、過剰分の電力を蓄電池31に充電するようにDC-DCコンバータ33を制御するとともに、発電装置2の発電電力が目標出力電力よりも小さい場合には、不足分の電力を蓄電池31から放電するようにDC-DCコンバータ33を制御する。
 また、充放電制御部5は、DC-DCコンバータ7の出力側に設けられた発電電力検出部8から発電装置2の発電電力データを取得する。発電電力検出部8は、発電装置2の発電電力を検出して、発電電力データを充放電制御部5に送信する。充放電制御部5は、発電電力データを発電電力検出部8から所定の検出時間間隔毎に取得する。ここでは、充放電制御部5は、60秒毎に発電装置2の発電電力データを取得している。なお、発電電力データの検出時間間隔は、長すぎても短すぎても発電電力の変化を正確に検出することができないので、発電装置2の発電電力の変動周期などを勘案して適正な値に定められる。
 また、充放電制御部5は、電力出力部4の出力電力を取得することにより、実際に電力出力部4から電力系統50に出力された電力と目標出力電力との差を認識することにより、電力出力部4からの出力電力が目標出力電力となるように充放電部32の充放電をフィードバック制御する。
 次に、充放電制御部5による蓄電池3の充放電制御方法について説明する。
 上述したように、充放電制御部5は、発電装置2の発電電力と蓄電池31の充放電量との合計が目標出力電力となるように蓄電池31の充放電を制御する。この目標出力電力は移動平均法を用いて算出されるが、移動平均法を用いた移動平均値をそのまま用いれば、実際の発電装置2の発電電力とずれが生じてしまう。そのため、本実施形態では、充放電制御部5は、目標出力電力を、移動平均法を用いて算出した移動平均値そのものではなく、移動平均値と発電電力の増減傾向とに基づいて算出する。
 なお、移動平均法とは、ある時点の移動平均値を、その時点より過去の期間の発電装置2の発電電力の平均値とする算出方法である。以下、移動平均値の算出に用いる発電電力データを取得するための期間をサンプリング期間と呼ぶ。
 サンプリング期間の具体的な値としては、本実施形態では、約20分としている。この場合、充放電制御部5は、約60秒置きに発電装置2の発電電力データを取得するので、過去20分の期間に含まれる20個の発電電力データの平均値を目標出力電力として算出している。
 次に、図2を参照して、充放電制御部5による充放電制御により、変動抑制を主に行う変動周期範囲について説明する。図2に示すように、変動周期によって対応可能な制御方法は異なっている。負荷周波数制御(LFC)により対応可能な負荷の変動周期は、領域D(ハッチングで示す領域)に示されている。また、EDCにより対応可能な負荷の変動周期は、領域Aに示されている。なお、領域Bは、負荷変動による影響を電力系統50自体の自己制御性により自然に吸収する領域である。また、領域Cは、各発電所の発電機のガバナフリー運転により対応が可能な領域である。ここで、領域Dと領域Aとの境界線が負荷周波数制御(LFC)により対応可能な負荷の変動周期の上限周期T1となり、領域Cと領域Dとの境界線が負荷周波数制御により対応可能な負荷の変動周期の下限周期T2となる。この上限周期T1および下限周期T2は、図2より固有の周期ではなく、負荷変動の大きさによって変化する数値であることが分かる。さらに、構築された電力網によって図示されている変動周期の時間も変化する。第1実施形態では、EDC、電力系統50自体の自己制御性およびガバナフリー運転などによって対応できない領域D(LFCにより対応可能な領域)の範囲内に含まれる変動周期(変動周波数)を有する負荷変動に着目し、抑制することを目的としている。
 次に、図3を参照して、充放電制御部5による目標出力電力の算出方法について説明する。
 充放電制御部5は、検出時間間隔(i秒)毎に発電電力を検出して発電電力データを取得し、メモリ5aに逐次記憶している。また、充放電制御部5は、新たな発電電力データを取得する毎(検出時間間隔毎)に、現時点(時刻t)から過去のサンプリング期間T3内(時刻t-T3~時刻tまで)に取得した発電電力データに基づいて移動平均値を算出する。この移動平均値もメモリ5aに逐次記憶される。すなわち、移動平均値は過去の発電電力に基づいて算出される値である。そのため、移動平均値は実際の発電電力の推移から全体的に過去の発電電力の値側にずれて(遅れて)推移することになる。なお、図3では、簡略のため移動平均値を2つの時点のみ示している。
 ここで、充放電制御部5は、移動平均値と実際の発電電力とのずれを補正するために、移動平均値の増減傾向に基づいて発電電力の推移を予測し、目標出力電力を設定する。
 具体的には、充放電制御部5は、現在の時刻tにおいて時刻t+iの目標出力電力Gを算出するために、まず現時点(時刻t)で最新の移動平均値A1(時刻t、電力値Y1)と、現時点よりも所定の時間間隔T4だけ前の時刻(t-T4)における移動平均値A2(時刻t-T4、電力値Y2)との間の傾きSを算出する。
 そして、充放電制御部5は、時刻tにおける移動平均値A1を算出するための移動平均区間(時刻t-T3~時刻t)の中点(時刻t-T3/2)において、移動平均値A1の電力値Y1を有するとした点C(時刻t-T3/2、電力値Y1)から発電電力が傾きSの増減率で推移したとした場合の時刻t+iにおける電力値を、時刻t+iにおける目標出力電力Gとする。時刻t+iの直前に算出された移動平均値A1を算出するための移動平均区間(サンプリング期間(20分))の中点を目標出力電力Gを算出する際の増減の起点とすることにより、目標出力電力Gの推移が実際の発電電力の推移から遅れなくなるように補正することができる。そのため、目標出力電力Gは、時々刻々と増減を繰り返して変動しながら推移する実際の発電電力の推移の中心に近い側を推移することになる。この目標出力電力Gの推移については、後にシミュレーション結果を示して説明する。また、傾きSを算出するための2つの時点の移動平均値(移動平均値A1およびA2)の間の時間間隔T4は、負荷周波数制御により対応可能な変動周期の上限周期T1以上の期間である。ここでは、時間間隔T4を20分としている。
 上記のように、充放電制御部5は、移動平均値A1と移動平均値A2との間の傾きSとに基づいて目標出力電力Gを検出時間間隔毎に算出し、発電装置2の実際の発電電力と蓄電池31の充放電量との合計が目標出力電力Gとなるように蓄電池31の充放電制御を行う。
 本実施形態の発電システム1は、上記構成により以下の効果を得ることができる。
 充放電制御部5は、発電装置2の発電電力のみならず、発電電力の増減傾向に基づいて、発電電力の変化を平滑化するための目標出力電力を算出する。上記構成により、発電電力の増減傾向に基づいて、目標出力電力の推移が実際の発電電力の推移に近くなるように目標出力電力を設定することができる。これにより、発電電力の変化を平滑化するための目標出力電力と実際の発電電力とのずれが全体的に小さくなるので、目標出力電力と実際の発電電力との差分の電力だけ蓄電池31の充放電を行う場合に、蓄電池31の充放電量および充放電深度を小さくすることができる。これにより、発電装置2による発電電力の変動に起因する電力系統50への影響を抑制しながら、蓄電池31の長寿命化を図ることができる。また、従来(移動平均値を目標出力電力とする場合)と比べて充放電深度が小さくなるので、従来と比べて小さい容量の蓄電池を用いて充放電制御を行うことができる。
 また、充放電制御部5は、移動平均値の増減傾向に基づいて算出した電力を目標出力電力とする。これにより、発電電力のみに基づいて平滑化電力を算出して目標出力電力とする従来の場合と異なり、容易に発電電力の増減傾向にも基づいた目標出力電力を算出することができる。
 また、充放電制御部5は、移動平均値A1と、移動平均値A1よりも前の時点における移動平均値A2との間の傾きSを発電装置2の発電電力の増減傾向として、移動平均値A1と傾きSとに基づいて目標出力電力Gを算出する。このように構成することによって、2つの時点の移動平均値間(移動平均値A1と移動平均値A2との間)の傾きSに基づいて、容易に発電電力の推移(増減傾向)を予測して目標出力電力Gを設定することができる。
 また、充放電制御部5は、移動平均値A1と、移動平均値A1の取得時点よりも負荷周波数制御により対応可能な変動周期の上限周期以上の期間だけ前の時点における移動平均値A2との間の傾きSに基づいて目標出力電力Gを算出する。このような時間間隔を隔てた移動平均値A1と移動平均値A2との間の傾きSに基づいて目標出力電力Gを算出することにより、負荷周波数制御により対応可能な変動周期の成分を抑制するような目標出力電力Gを設定することができる。
 また、充放電制御部5は、移動平均値A1を算出するための移動平均区間内の中間時点において移動平均値A1の電力値Y1を有するとした点Cから傾きSの増減率で発電電力が推移した場合の発電電力を目標出力電力Gとすることにより、実際の発電電力の推移により近づくように目標出力電力Gを設定することができる。
 また、充放電制御部5は、サンプリング期間を負荷周波数制御により対応可能な変動周期の上限周期以上の期間とすることによって、移動平均値A1および移動平均値A2に基づいて算出される目標出力電力Gの変動に負荷周波数制御により対応可能な変動周期の変動を低減することができる。
 次に、図4を参照して、移動平均法のサンプリング期間の検討結果について説明する。図4は、発電電力データの取得期間であるサンプリング期間を10分とした場合のFFT解析結果と、サンプリング期間を20分とした場合のFFT解析結果を示す。
 図4に示すように、サンプリング期間が10分の場合には、変動周期が10分未満の範囲における変動が抑制されている一方、変動周期が10分以上の範囲における変動があまり抑制されていない。また、サンプリング期間が20分の場合には、変動周期が20分未満の範囲における変動が抑制されている一方、変動周期が20分以上の範囲における変動はあまり抑制されていない。
 したがって、サンプリング期間の大きさと、充放電制御により抑制できる変動周期との間には良好な相関関係があることがわかる。このため、サンプリング期間の設定により効果的に変動周期を抑制できる範囲が変化するといえる。そこで、本システムで主に注目している負荷周波数制御により対応可能な変動周期の部分を抑制するためには、サンプリング期間を負荷周波数制御で対応する変動周期以上、特にT1~T2の後半付近(長周期付近)からT1以上の範囲の期間とすることが好ましい。たとえば、図2の例では20分以上のサンプリング期間とすることにより、負荷周波数制御で対応する変動周期の殆どを抑制することができる。
 (第2実施形態)
 次に、本発明の第2実施形態による発電システム100について説明する。本実施形態では、第1実施形態と異なり、発電電力の変動が大きい場合に、サンプリング期間を長くする例について説明する。
 発電システム100は、第1実施形態の充放電制御部5に替えて充放電制御部101を備えている。充放電制御部101以外の構成は、第1実施形態による発電システム1と同様である。
 充放電制御部101は、発電電力の変動が所定の範囲内の場合には、サンプリング期間を20分、移動平均値の傾きを算出するための移動平均値間の時間間隔を20分として、目標出力電力を算出する。また、充放電制御部101は、発電電力の変動が所定の範囲外になった場合には、サンプリング期間を40分に延ばすとともに、移動平均値間の時間間隔を20分として、目標出力電力を算出する。発電電力の変動が所定の範囲内にあるか否かの判断は、10分間の実際の発電電力の変化量が-0.7kW以上0.7kW以下にあるか否かにより行う。すなわち、最新の発電電力と、10分前の発電電力との差分を逐次算出し、その差分の値が-70W以上70W以下にあるか否かを判断する。
 また、サンプリング間隔を40分に延ばした状態で、発電電力の変動が所定の範囲内にある状態が所定時間(第2実施形態では、30分)継続した場合には、サンプリング間隔を20分に戻す。この充放電制御におけるサンプリング期間の切替制御以外の制御(目標出力電力の算出方法など)については、第1実施形態と同様である。
 次に、図6を参照して、発電システム100のサンプリング期間の切替制御の制御フローについて説明する。
 まず、ステップS1において、充放電制御部101は、サンプリング間隔を20分、移動平均値間の時間間隔を20分として、目標出力電力を算出する。また、ステップS2において、充放電制御部101は、発電電力の変動が所定の範囲内にあるか否かを判断する。発電電力の変動が所定の範囲内にある場合には、ステップS1に戻り、充放電制御部101はサンプリング期間を20分として充放電制御を行う。
 発電電力の変動が所定の範囲外になった場合には、ステップS3において、充放電制御部101は、サンプリング期間を40分、移動平均値間の時間間隔を20分として、目標出力電力を算出する。サンプリング期間を40分として充放電制御を行っている際に、ステップS4において、充放電制御部101は発電電力の変動が所定の範囲内に戻ったか否かを判断する。発電電力の変動が所定の範囲内に戻らない場合には、ステップS3に戻り、充放電制御部101はサンプリング期間を40分として充放電制御を行う。
 また、発電電力の変動が所定の範囲内に戻った場合には、ステップS5において、充放電制御部101は、発電電力の変動が所定の範囲内の状態が30分継続したか否かを判断する。30分継続しなかった場合(30分以内に発電電力の変動が所定の範囲外になった場合)には、ステップS3に戻り、充放電制御部101はサンプリング期間を40分として充放電制御を行う。また、30分継続した場合には、ステップS1に戻り、充放電制御部101はサンプリング期間を20分に戻して充放電制御を行う。
 本実施形態の発電システム100は、上記構成により以下の効果を得ることができる。
 充放電制御部101は、発電電力の変化が小さい場合には、サンプリング期間を20分として移動平均値A1および移動平均値A2を算出するとともに、発電電力の変化が大きい場合には、サンプリング期間を40分として移動平均値A1および移動平均値A2を算出する。このように構成することによって、発電電力の変化が大きい場合に移動平均値(移動平均値A1および移動平均値A2)の算出期間が長くなるので、発電電力の変化が移動平均値に与える影響を小さくすることができる。これにより、このような期間長さを長くした移動平均値A1および移動平均値A2に基づいて目標出力電力を算出することによって、発電電力の変化が大きい場合にも、その発電電力の変化に大きく左右されずに移動平均値A1および移動平均値A2間の傾きを算出して目標出力電力を算出することができるので、発電電力の変化に大きく左右されない目標出力電力を算出することができる。これにより、発電電力の変化が大きい場合にも、平滑化を十分に行い、かつ、蓄電装置3の充放電量および充放電深度を小さくして蓄電装置3の長寿命化を図ることができる。
 (第3実施形態)
 次に、図7および図8を参照して、本発明の第3実施形態による発電システム200について説明する。本実施形態では、第1実施形態と異なり、発電電力の変動が大きい場合に、傾きを算出するための移動平均値間の時間間隔を長くする例について説明する。
 図7に示すように、発電システム200は、第1実施形態の充放電制御部5に替えて充放電制御部201を備えている。充放電制御部201以外の構成は、第1実施形態による発電システム1と同様である。
 充放電制御部201は、発電電力の変動が所定の範囲内の場合には、サンプリング期間を20分、移動平均値の傾きを算出するための移動平均値間の時間間隔を20分として、目標出力電力を算出する。また、充放電制御部201は、発電電力の変動が所定の範囲外になった場合には、サンプリング期間を20分とし、移動平均値間の時間間隔を40分に延ばして目標出力電力を算出する。発電電力の変動が所定の範囲内にあるか否かの判断は、第2実施形態と同様である。
 また、充放電制御部201は、移動平均値間の時間間隔を40分に延ばした状態で、発電電力の変動が所定の範囲内にある状態が所定時間(ここでは、30分)継続した場合には、移動平均値間の時間間隔を20分に戻す。この充放電制御における移動平均値間の時間間隔の切替制御以外の制御(目標出力電力の算出方法など)については、第1実施形態と同様である。
 次に、図8を参照して、発電システム200の移動平均値間の時間間隔の切替制御の制御フローについて説明する。
 まず、ステップS11において、充放電制御部201は、サンプリング間隔を20分、移動平均値間の時間間隔を20分として、目標出力電力を算出する。また、ステップS12において、充放電制御部201は、発電電力の変動が所定の範囲内にあるか否かを判断する。発電電力の変動が所定の範囲内にある場合には、ステップS11に戻り、充放電制御部201は移動平均値間の時間間隔を20分として充放電制御を行う。
 発電電力の変動が所定の範囲外になった場合には、ステップS13において、充放電制御部201は、サンプリング期間を20分、移動平均値間の時間間隔を40分として、目標出力電力を算出する。移動平均値間の時間間隔を40分として充放電制御を行っている際に、ステップS14において、充放電制御部201は、発電電力の変動が所定の範囲内に戻ったか否かを判断する。発電電力の変動が所定の範囲内に戻らない場合には、ステップS13に戻り、充放電制御部201は、移動平均値間の時間間隔を40分として充放電制御を行う。
 また、発電電力の変動が所定の範囲内に戻った場合には、ステップS15において、充放電制御部201は、発電電力の変動が所定の範囲内の状態が30分継続したか否かを判断する。30分継続しなかった場合(30分以内に発電電力の変動が所定の範囲外になった場合)には、ステップS13に戻り、充放電制御部201は移動平均値間の時間間隔を40分として充放電制御を行う。また、30分継続した場合には、ステップS11に戻り、充放電制御部201は移動平均値間の時間間隔を20分に戻して充放電制御を行う。
 本実施形態の発電システム200は、上記構成により以下の効果を得ることができる。
 充放電制御部201は、発電電力の変化が小さい場合には、移動平均値A1の取得時点と移動平均値A2の取得時点との時間間隔を20分とするとともに、発電電力の変化が大きい場合には、移動平均値A1の取得時点と移動平均値A2の取得時点との時間間隔を40分とする。このように構成することによって、発電電力の変化が大きい場合に移動平均値A1と移動平均値A2との間の時間間隔が大きくなるので、移動平均値A1および移動平均値A2間の傾きを緩やかにすることができる。これにより、このように移動平均値A1と移動平均値A2との間の時間間隔を長くして算出した傾きに基づいて目標出力電力を算出することによって、発電電力の変化が大きい場合にも、その発電電力の変化に大きく左右されずに目標出力電力を算出することができる。これにより、発電電力の変化が大きい場合にも、平滑化を十分に行い、かつ、蓄電装置3の充放電量および充放電深度を小さくして蓄電装置3の長寿命化を図ることができる。
 第3実施形態のその他の効果は、第1実施形態と同様である。
 次に、図9~図13を参照して、本発明の充放電制御を行うことによる効果を検証したシミュレーション結果(例1)について説明する。例1では、雲のない快晴の日における発電装置の1日の発電電力推移に対して実施例1、実施例2および比較例による充放電制御を行った場合の平滑化後の出力電力推移を検証した。なお、実施例1は、第1実施形態の制御方法(サンプリング間隔20分、移動平均値間の時間間隔20分)で充放電制御を行った例である。実施例2は、第2実施形態の制御方法(サンプリング間隔20分/40分の切替、移動平均値間の時間間隔20分)で充放電制御を行った例である。比較例は、移動平均値そのものを目標出力電力として充放電制御を行った例である。図9、図10および図11には、それぞれ、発電電力推移と実施例1の出力電力推移、発電電力推移と実施例2の出力電力推移、および、発電電力推移と比較例の出力電力推移を示している。また、図12は、例1における実施例1、実施例2および比較例の蓄電池の蓄電量の推移を示している。なお、図12においては初期値に対する蓄電量の変動を説明するために蓄電量の初期値を0としているが、これは蓄電量の初期値が0Whであることを示すものではない。図13は、例1における実施例1および比較例の出力電力変動のFFT(高速フーリエ変換)結果を示している。なお、図13において実施例2を示していないが、例1のような快晴の日には発電電力の変動が1日を通して小さいため、発電電力の変動が大きい場合にサンプリング間隔を延ばす実施例2の制御を行っても実施例1と略同じ結果となる。
 図9~図11に示すように、実施例1、実施例2および比較例のいずれにおいても、実際の発電電力の変動を平滑化できていることがわかる。また、図11に示すように、比較例による充放電制御では、発電電力が上昇していく午前中においては実際の発電電力推移よりも小さい値で推移し、発電電力が下降していく午後においては実際の発電電力推移よりも大きい値で推移していることがわかる。すなわち、移動平均値そのものを目標出力電力とする比較例では、目標出力電力が過去の発電電力の値側にずれるため、目標出力電力の推移は実際の発電電力の推移よりも全体的に遅れるように推移している。
 ここで、図9に示すように、実施例1の目標出力電力は、比較例に比べて実際の発電電力推移に近い値で推移している。また、図10に示すように、実施例2の目標出力電力は、比較例および実施例1に比べてさらに実際の発電電力推移に近い値で推移している。
 また、図12に示すように、比較例では、午前中は蓄電量が初期値から単調に増加していき、午後には蓄電量が単調に減少している。これは、図11に示したように、比較例では目標出力電力が実際の発電電力よりも全体的に遅れて推移するため、午前中において目標出力電力は実際の発電電力よりも小さい値で推移し、午後においては実際の発電電力よりも大きい値で推移するためである。その一方、実施例1および実施例2では、午前、午後に拘わらず、初期値を中心として上昇と下降とを繰り返している。これは、実施例1および実施例2では、比較例のような目標出力電力の遅れに起因する目標出力電力と実際の発電電力とのずれが抑制されるため、充電と放電とが交互に繰り返されるようになっているためである。ここで、実施例1および実施例2の蓄電池の容量変化は、比較例に比べて大幅に小さいことがわかる。具体的には、実施例1および実施例2の充放電深度H1は、比較例の充放電深度H2に比べて大幅に小さくなっている。また、実施例1および実施例2の充放電量も比較例に比べて大幅に小さいことがわかる。これにより、実施例1および実施例2では、比較例に比べて少ない蓄電池の容量で充放電制御を行うことができるとともに、蓄電池の長寿命化を図ることができる。
 また、実施例1および実施例2では、比較例に比べて充電のピーク値(最大値)が大幅に小さくなるので、初期状態の充電状態(SOC)を高くした場合にも、充放電制御中に満充電となってしまうことを抑制することができる。これにより、初期状態の充電状態(夜間の充電状態)を高くすることができるので、夜間に停電や災害などが生じた場合に、より多くの電力を蓄電池から供給して使用することができる。また、実施例1においても、比較例と同様に、1日の初めの充電状態と終わりの充電状態とを略同じにすることができる。
 また、図13に示すように、実施例1および実施例2では、実際の発電電力の変動周期が全体的に抑制されている。特に、負荷周波数制御により対応可能な変動周期(約2分(約120秒)~約20分(約1200秒))の成分が十分に抑制されていることがわかる。
 次に、図14~図18を参照して、本発明の充放電制御を行うことによる効果を検証したシミュレーション結果(例2)について説明する。例2では、雲のある晴れの日における発電装置の1日の発電電力推移に対して実施例1、実施例2および比較例による充放電制御を行った場合の平滑化後の出力電力推移を検証した。図14~図18には、それぞれ、図9~図13と同様のシミュレーション結果を示している。
 図14~図16に示すように、雲のある晴れの日では発電電力の変動が大きいことがわかるが、雲のある晴れの日においても、実施例1、実施例2および比較例のいずれにおいても、実際の発電電力の変動を平滑化できていることがわかる。また、図17に示すように、実施例1および実施例2の蓄電池の容量変化は、比較例に比べて大幅に小さいことがわかる。具体的には、実施例1の充放電深度H3および実施例2の充放電深度H4は、比較例の充放電深度H5に比べて大幅に小さくなっている。すなわち、発電電力の変化の大きい日においても、本発明の制御が有効であることがわかる。また、実施例1および実施例2の充放電量も比較例に比べて大幅に小さいことがわかる。
 また、図18に示すように、実施例1、実施例2および比較例では、実際の発電電力の変動周期が全体的に抑制されている。ここで、実施例2では、比較例と略同じレベルで平滑化を行っていることがわかる。すなわち、実施例2では、比較例と略同じレベルで平滑化を行いながら、比較例よりも充放電深度が小さくなっている。
 なお、今回開示された実施形態および実施例は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記した実施形態の説明ではなく特許請求の範囲によって示され、さらに特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれる。
 また、上記第1~第3実施形態では、需要家内で用いる負荷における消費電力量を想定しない場合について説明したが、本発明はこれに限らず、目標出力電力の算出において、需要家内で用いられる少なくとも一部の負荷で消費する電力量を検出し、その負荷消費電力量あるいは負荷消費電力変動量を加味して目標出力の算出を行ってもよい。
 また、上記第1~第3実施形態に記載されたサンプリング期間、母線電圧などの具体的な数値についても、本発明はこれに限られず、適宜変更が可能である。
 また、上記第1~第3実施形態では、2つの時点の移動平均値間の傾きに基づいて移動平均値の増減傾向(発電電力の増減傾向)を判断した例について説明したが、本発明はこれに限らず、3時点以上の移動平均値に基づいて移動平均値の増減傾向(発電電力の増減傾向)を判断してもよい。
 また、上記第1~第3実施形態では、現在(時刻t)の移動平均値A1を算出するための移動平均区間(時刻t-T3~時刻t)の中点(時刻t-T3/2)を起点として、傾きSで推移した場合の電力値を目標出力電力Gとする例について説明したが、本発明はこれに限らず、移動平均区間の中点近傍であればよい。また、移動平均区間の中点近傍でなくても、目標出力電力の設定時点よりも前で、かつ、移動平均区間内の点を起点とすれば、通常の移動平均法のみにより目標出力電力を設定する場合より目標出力電力と実際の発電電力との差を全体的に小さくすることができる。
 また、上記第2および第3実施形態では、10分間の発電電力の変化量が所定の範囲外になったときに、サンプリング期間または傾きを算出するための移動平均値間の時間間隔を大きくした例について説明したが、本発明はこれに限らず、発電電力の変動が大きいと判断することができれば、どのような指標を用いて判断してもよい。たとえば、所定の閾値以上の変化を複数回検知した場合に発電電力の変動が大きいと判断するようにしてもよい。また、設置場所の気候や天気予報などに基づいて、発電電力の変動が大きいと予想される日などには、最初からサンプリング期間または傾きを算出するための移動平均値間の時間間隔を大きくして充放電制御を行ってもよい。
 また、上記第1~第3実施形態では、本発明の「平均電力」の一例として移動平均値を算出した例を示したが、本発明はこれに限らず、1次遅れ法(1次位相遅れ法)による算出値を「平均電力」として算出してもよい。1次遅れ法とは、所定の時定数Tを検出時間間隔Δtで除した値(時間Tに含まれる発電電力データWのデータ数)をNとし、時刻tにおける算出値Qtを、その前の算出値Q(t-Δt)に、算出値Q(t-Δt)と時刻tにおける発電電力Wtとの差分をNで除した値を加えた値として計算する方法である。この1次遅れ法による算出値Qtも、算出値Q(t-Δt)と時刻tにおける発電電力Wtとの差分をNで除した値を用いてQtを算出するので、Qtは発電電力の変動が平滑化された値となる。また、算出値Qtも移動平均値と同様に、実際の発電電力データの推移から遅れて推移する値となる。このような1次遅れ法により平滑化を行う場合においても、本発明を適用して目標出力電力を設定することにより、発電装置による発電電力の変動に起因する電力系統への影響を抑制しながら、蓄電装置の長寿命化を図るという本発明の効果を得ることができる。

Claims (14)

  1.  再生可能エネルギーを利用して発電装置により発電する工程と、
     蓄電装置に前記発電装置により発電された電力を蓄電する工程と、
     第1の時点と、前記第1の時点より前の第2の時点とにおける前記発電装置の発電電力に基づいて、前記第1の時点と前記第2の時点との間の発電電力の増加または減少の割合を算出し、前記割合から目標出力電力を決定する工程と、
     前記発電装置および前記蓄電装置の少なくとも一方から前記目標出力電力を出力する工程と、を含む電力供給方法。
  2.  請求項1に従属する電力供給方法であって、
     前記目標出力電力決定工程は、
     前記第1の時点から第1の所定時間前までの期間における前記発電装置の発電電力の第1平均電力を算出する工程と、
     前記第2の時点から第2の所定時間前までの期間における前記発電装置の発電電力の第2平均電力を算出する工程と、
     前記第2の時点から前記第1の時点までの期間と、前記第2平均電力と前記第1平均電力との電力変化量とから前記割合を算出し、前記割合から前記目標出力電力を決定する工程とを含む。
  3.  請求項2に従属する電力供給方法であって、
     前記目標出力電力決定工程において、前記第1平均電力は、前記第1の時点から前記第1の所定時間前までの期間の複数の時点における前記発電装置の発電電力データに基づいて算出され、前記第2平均電力は、前記第2の時点から前記第2の所定時間前までの期間の複数の時点における前記発電装置の発電電力データに基づいて算出される。
  4.  請求項3に従属する電力供給方法であって、
     前記目標出力電力決定工程において、前記発電電力データを取得した時点から所定時間前までの期間における前記発電電力の平均電力が、前記複数の時点のそれぞれにおいて算出される。
  5.  請求項1~4のいずれか1項に記載の電力供給方法であって、
     前記目標出力電力決定工程において、
     前記第2の時点は、前記第1の時点よりも、負荷周波数制御により対応可能な変動周期の上限周期以上の期間だけ前の時点である。
  6.  請求項2~4のいずれかに従属する電力供給方法であって、
     前記目標出力電力決定工程において、前記第1平均電力を算出するための期間内の所定の時点を基準時とし、前記基準時から前記目標出力電力を設定する目標出力電力設定時点までに、前記第1平均電力から前記割合で推移した電力値を目標出力電力として設定する。
  7.  請求項6に従属する電力供給方法であって、
     前記基準時は、前記第1平均電力を算出するための期間内の中間近傍の時点である。
  8.  請求項2に従属する電力供給方法であって、
     前記第1の時点から前記第1の所定時間前までの期間および前記第2の時点から前記第2の所定時間前までの期間は、負荷周波数制御により対応可能な変動周期の上限周期以上の期間長さである。
  9.  請求項6または7に従属する電力供給方法であって、
     前記第1平均電力は、前記目標出力電力設定時点の直前に算出された電力平均値である。
  10.  請求項2に従属する電力供給方法であって、
     前記目標出力電力決定工程において、前記発電装置の発電電力の変化に応じて、前記第1の時点から前記第1の所定時間前までの期間および前記第2の時点から前記第2の所定時間前までの期間と、前記第1の時点から前記第2の時点までの期間との少なくともいずれか一方を変更する。
  11.  請求項10に従属する電力供給方法であって、
     前記目標出力電力決定工程は、
     所定期間内における前記発電装置の発電電力の変化量を算出する工程と、
     前記変化量が所定の範囲内にあるかどうかを判断する工程と、
     前記変化量が前記範囲内にある場合は、前記範囲内にない場合よりも、前記第1の時点から前記第1の所定時間前までの期間および前記第2の時点から前記第2の所定時間前までの期間を短くして前記目標出力電力を決定する工程とを含む。
  12.  請求項10に従属する電力供給方法であって、
     前記目標出力電力決定工程は、
     所定期間内における前記発電装置の発電電力の変化量を算出する工程と、
     前記変化量が所定の範囲内にあるかどうかを判断する工程と、
     前記変化量が前記範囲内にある場合は、前記範囲内にない場合よりも、前記第1の時点から前記第2の時点までの期間を短くして前記目標出力電力を決定する工程とを含む。
  13.  再生可能エネルギーを利用して発電する発電装置および前記発電装置により発電された電力を蓄電する蓄電装置を制御するための制御プログラムを記憶する、コンピュータ読み取り可能な記録媒体であって、前記プログラムはコンピュータシステムに以下の動作を実行させる、
     第1の時点と、前記第1の時点より前の第2の時点とにおける前記発電装置の発電電力に基づいて、前記第1の時点と前記第2の時点との間の発電電力の増加または減少の割合を算出し、
     前記割合から電力系統に出力する目標出力電力を決定し、
     前記発電装置および前記蓄電装置の少なくとも一方から前記目標出力電力を出力する。
  14.  再生可能エネルギーを利用して発電する発電装置により発電された電力を蓄電する蓄電装置と、
     前記発電装置または前記蓄電装置から電力系統に供給する電力を制御する充放電制御部とを備え、
     前記充放電制御部は、第1の時点と、前記第1の時点より前の第2の時点とにおける前記発電装置の発電電力に基づいて、前記第1の時点と前記第2の時点との間の発電電力の増加または減少の割合を算出し、前記割合から電力系統に出力する目標出力電力を決定し、前記発電装置および前記蓄電装置の少なくとも一方から前記目標出力電力を出力させるように構成されている、発電システム。
PCT/JP2011/051563 2010-01-27 2011-01-27 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム WO2011093362A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2011551891A JP5507582B2 (ja) 2010-01-27 2011-01-27 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム
US13/425,096 US9148020B2 (en) 2010-01-27 2012-03-20 Method of controlling a battery, computer readable recording medium, electric power generation system and device controlling a battery

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2010015236 2010-01-27
JP2010-015236 2010-06-22

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US13/425,096 Continuation US9148020B2 (en) 2010-01-27 2012-03-20 Method of controlling a battery, computer readable recording medium, electric power generation system and device controlling a battery

Publications (1)

Publication Number Publication Date
WO2011093362A1 true WO2011093362A1 (ja) 2011-08-04

Family

ID=44319345

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2011/051563 WO2011093362A1 (ja) 2010-01-27 2011-01-27 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム

Country Status (3)

Country Link
US (1) US9148020B2 (ja)
JP (1) JP5507582B2 (ja)
WO (1) WO2011093362A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013242805A (ja) * 2012-05-22 2013-12-05 Sony Corp 制御システム、制御装置および制御方法
WO2015097842A1 (ja) * 2013-12-27 2015-07-02 株式会社日立製作所 回転電機システム
JP2016103900A (ja) * 2014-11-28 2016-06-02 株式会社日立製作所 蓄電池システム
JP2018112899A (ja) * 2017-01-11 2018-07-19 横河電機株式会社 データ処理装置、データ処理方法及びプログラム
WO2022259778A1 (ja) * 2021-06-08 2022-12-15 三菱重工業株式会社 平滑化目標値算出装置、電力供給システム、平滑化目標値算出方法及びプログラム

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6091817B2 (ja) * 2012-09-11 2017-03-08 株式会社東芝 自然エネルギー発電装置の出力変動抑制装置
US10291031B2 (en) 2013-09-30 2019-05-14 Acciona Energia, S.A. Method for controlling power fluctuation ramps having energy storage systems in plants for intermittent energy generation
CN104102270A (zh) * 2014-06-20 2014-10-15 北京京东方能源科技有限公司 最大功率点跟踪方法及装置、光伏发电系统
CN104201982B (zh) 2014-09-28 2017-06-13 阳光电源股份有限公司 光伏系统及其控制方法
JP6566355B2 (ja) * 2015-09-11 2019-08-28 パナソニックIpマネジメント株式会社 電力変換装置
CN106058942B (zh) * 2016-08-03 2020-01-10 长沙理工大学 考虑风电不确定性的含电转气和cchp的能量枢纽优化模型
JP7073865B2 (ja) * 2018-04-09 2022-05-24 トヨタ自動車株式会社 冗長電源システム
CN108521236A (zh) * 2018-04-19 2018-09-11 佛山市小沙江科技有限公司 一种新能源自供电系统
US11894682B2 (en) 2020-05-15 2024-02-06 Caterpillar Inc. Methods and systems for off-grid load stabilization of energy distribution systems

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001005543A (ja) * 1999-06-17 2001-01-12 Kansai Electric Power Co Inc:The 直流電力出力装置および太陽光発電システム
JP2002017044A (ja) * 2000-06-30 2002-01-18 Kansai Electric Power Co Inc:The 電力変動平滑化装置及びそれを備えた分散電源システムの制御方法
JP2005318705A (ja) * 2004-04-28 2005-11-10 Daihen Corp インバータ装置の制御方法
JP2007330017A (ja) * 2006-06-07 2007-12-20 Fuji Electric Systems Co Ltd 電力貯蔵装置を用いた電力安定化システム、その制御装置

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3758359B2 (ja) * 1998-04-14 2006-03-22 石川島播磨重工業株式会社 風力発電出力安定化方法及び装置
JP2001339995A (ja) * 2000-05-25 2001-12-07 Ishikawajima Harima Heavy Ind Co Ltd 風力発電出力安定化装置及び方法
JP3905692B2 (ja) * 2000-07-10 2007-04-18 三菱重工業株式会社 風力発電制御方法
JP5006104B2 (ja) * 2007-05-24 2012-08-22 川崎重工業株式会社 電力平滑化方法、電力平滑化装置および同装置の設計方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001005543A (ja) * 1999-06-17 2001-01-12 Kansai Electric Power Co Inc:The 直流電力出力装置および太陽光発電システム
JP2002017044A (ja) * 2000-06-30 2002-01-18 Kansai Electric Power Co Inc:The 電力変動平滑化装置及びそれを備えた分散電源システムの制御方法
JP2005318705A (ja) * 2004-04-28 2005-11-10 Daihen Corp インバータ装置の制御方法
JP2007330017A (ja) * 2006-06-07 2007-12-20 Fuji Electric Systems Co Ltd 電力貯蔵装置を用いた電力安定化システム、その制御装置

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013242805A (ja) * 2012-05-22 2013-12-05 Sony Corp 制御システム、制御装置および制御方法
WO2015097842A1 (ja) * 2013-12-27 2015-07-02 株式会社日立製作所 回転電機システム
JPWO2015097842A1 (ja) * 2013-12-27 2017-03-23 株式会社日立製作所 回転電機システム
JP2016103900A (ja) * 2014-11-28 2016-06-02 株式会社日立製作所 蓄電池システム
JP2018112899A (ja) * 2017-01-11 2018-07-19 横河電機株式会社 データ処理装置、データ処理方法及びプログラム
US10613830B2 (en) 2017-01-11 2020-04-07 Yokogawa Electric Corporation Data processing device, data processing method, and storage medium
WO2022259778A1 (ja) * 2021-06-08 2022-12-15 三菱重工業株式会社 平滑化目標値算出装置、電力供給システム、平滑化目標値算出方法及びプログラム

Also Published As

Publication number Publication date
US20120235484A1 (en) 2012-09-20
JP5507582B2 (ja) 2014-05-28
JPWO2011093362A1 (ja) 2013-06-06
US9148020B2 (en) 2015-09-29

Similar Documents

Publication Publication Date Title
JP5507582B2 (ja) 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム
Sathishkumar et al. Dynamic energy management of micro grids using battery super capacitor combined storage
JP5479182B2 (ja) 発電システムおよび充放電制御装置
CN100380774C (zh) 功率控制装置、发电系统以及电力网系统
JP5520365B2 (ja) 系統安定化システム、電力供給システム、集中管理装置の制御方法および集中管理装置のプログラム
WO2011078151A1 (ja) 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム
US20140210275A1 (en) Photovoltaic power generation system including apparatus and method to buffer power fluctuations
JP5383902B2 (ja) 電力供給システム、電力供給方法および電力供給システムの制御プログラム
WO2011118766A1 (ja) 電力供給システム、集中管理装置、系統安定化システム、集中管理装置の制御方法および集中管理装置の制御プログラム
JPWO2011074661A1 (ja) 充放電システム
WO2011122669A1 (ja) 電力供給システム、電力供給方法および電力供給システムの制御プログラム
Xiao et al. Flat tie-line power scheduling control of grid-connected hybrid microgrids
JP2011097816A (ja) 発電システムおよび充放電制御装置
Ju et al. Energy management system for microgrids including batteries with degradation costs
WO2011078215A1 (ja) 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム
JP5475019B2 (ja) 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム
JP5479499B2 (ja) 充放電システムおよび充放電制御装置
JP2021083301A (ja) 計算装置、計算方法
WO2019193837A1 (ja) 発電システムおよびその制御方法
KR102285030B1 (ko) 듀얼 SoC 구간을 이용한 DC 기반 산업단지 마이크로그리드 운영 방법 및 그 프로그램
JP5355721B2 (ja) 充放電システムおよび充放電制御装置
WO2011118771A1 (ja) 充放電システム
Torchyan Enhancing Photovoltaic Hosting Capacity in Distribution Grid via Grid Reconfigurations, PV Droops and Battery Inverter Control

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11737074

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011551891

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11737074

Country of ref document: EP

Kind code of ref document: A1