WO2011042980A1 - 対面通行トンネルのジェットファンによるトンネル換気制御システム - Google Patents

対面通行トンネルのジェットファンによるトンネル換気制御システム Download PDF

Info

Publication number
WO2011042980A1
WO2011042980A1 PCT/JP2009/067592 JP2009067592W WO2011042980A1 WO 2011042980 A1 WO2011042980 A1 WO 2011042980A1 JP 2009067592 W JP2009067592 W JP 2009067592W WO 2011042980 A1 WO2011042980 A1 WO 2011042980A1
Authority
WO
WIPO (PCT)
Prior art keywords
tunnel
ventilation
traffic
wind
wind speed
Prior art date
Application number
PCT/JP2009/067592
Other languages
English (en)
French (fr)
Inventor
一郎 中堀
和男 前田
敦史 三谷
Original Assignee
株式会社創発システム研究所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社創発システム研究所 filed Critical 株式会社創発システム研究所
Priority to PCT/JP2009/067592 priority Critical patent/WO2011042980A1/ja
Priority to CN200980160267.4A priority patent/CN102472105B/zh
Publication of WO2011042980A1 publication Critical patent/WO2011042980A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/003Ventilation of traffic tunnels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/0001Control or safety arrangements for ventilation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/50Air quality properties
    • F24F2110/65Concentration of specific substances or contaminants
    • F24F2110/72Carbon monoxide
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Definitions

  • the present invention relates to a ventilation equipment for a road tunnel with two-way traffic, and more particularly to a ventilation technique for a road tunnel in which ventilation is performed by a longitudinal flow ventilation control system using an inverter-driven jet fan.
  • Ventilation by natural ventilation or traffic ventilation is insufficient to exhaust the pollutants in the tunnel, and forced ventilation is performed using a ventilator installed in the tunnel.
  • a ventilation system called “vertical flow ventilation system” is standardly adopted as a ventilation system for small and medium-sized road tunnels with a size of 3000 m or less, which is very common in Japan.
  • the "vertical flow ventilation system” is a ventilation system that uses the entire tunnel cross section as a ventilation duct.
  • the ventilation system used is a jet fan that pushes the air inside the road tunnel out of the tunnel, and the air inside the road tunnel.
  • the jet fan drive motor in the conventional “longitudinal ventilation system” is driven by an induction motor whose starting current is several times the rated current.
  • FIG. 10 shows a two-way road tunnel of a longitudinal ventilation system using a conventional general jet fan.
  • This tunnel 1 is of a type called a face-to-face tunnel with traffic directions in both directions.
  • a plurality of jet fans that perform ventilation in the longitudinal direction are disposed inside.
  • four jet fans 10 a, 10 b, 10 c, and 10 d are depicted.
  • a longitudinal airflow A is generated from the left to the right in the figure in the two-way tunnel 1 and contaminated air in the tunnel is exhausted from the left to the right.
  • the operation of the jet fan 10 is controlled by the ventilation control device.
  • FIG. 10 In the example of FIG.
  • an anemometer (AV meter) is installed near the entrance, near the center, and near the exit in the tunnel 1, and near the entrance of the exhaust vent, a fume that is a pollution concentration meter.
  • a transmittance meter (VI meter) and a carbon monoxide concentration meter (CO meter) are installed (not shown).
  • the fume transmittance meter (VI meter) is a device that measures the contamination concentration from the ratio of light transmitted through the substance
  • the carbon monoxide concentration meter (CO meter) measures the concentration of carbon monoxide.
  • the traffic measuring device is a device that measures the traffic of a vehicle passing through the face-to-face traffic tunnel 1.
  • a conventional longitudinal ventilation system using a jet fan based on various environmental component values obtained from an anemometer, a fume permeability meter, a carbon monoxide concentration meter, and a traffic volume measuring device inside the face-to-face tunnel 1
  • the operation number of the jet fans 10a to 10d installed inside the face-to-face road tunnel 1 is adjusted by a ventilation control device (not shown). That is, an environmental component measuring instrument that measures environmental component values such as smoke, carbon monoxide, traffic volume, or wind direction and wind speed, for example, is installed in the face-to-face traffic tunnel 1, and the measured values of these environmental component measuring instruments are measured.
  • the number of jet fans 10a to 10d that are necessary to ensure the necessary ventilation volume are operated, thereby reducing the pollutant concentration below a preset allowable value, Ensures comfort.
  • unit operation by feedback of contamination concentration VI, CO
  • the ventilation control device reads the current traffic volume from the traffic volume measuring device, then calculates the amount of smoke generated by multiplying this traffic volume by the exhaust gas coefficient of the automobile and the structure coefficient of the road tunnel, The necessary ventilation amount Q is calculated from the soot generation amount and the control target value of the soot concentration.
  • the ventilation control device reads the air pollution concentration in the current road tunnel as a feedback value from the smoke transmission meter, obtains the deviation value between the necessary ventilation amount Q calculated as described above and the feedback value, PID control (proportional / integral / derivative control) is calculated from the deviation value, and the jet fan 10 is controlled and operated from the calculation result of the PID control.
  • PID control proportional / integral / derivative control
  • the conventional longitudinal ventilation system has the following problems.
  • the first conventional problem is that the amount of electric power becomes large in the longitudinal ventilation method using the feedback control technique focusing on the contamination concentration (VI, CO).
  • VI, CO contamination concentration
  • unit operation with feedback focusing on the contamination concentration (VI, CO) has been adopted, but jet fans directly generate wind speed due to forced ventilation in the tunnel,
  • feedback control focusing on the concentration of contamination is performed, the actual situation is that there are many cases of excessive ventilation and insufficient ventilation because of follow-up control.
  • Conventionally, only mechanical ventilation by a jet fan is considered as ventilation power.
  • traffic ventilation power conventionally, in the case of a two-way tunnel, the ventilation power by a traveling vehicle is not expected, but conversely, it is often considered as resistance to ventilation.
  • an object of the present invention is to provide a longitudinal ventilation system capable of saving power by devising feedback control and feedforward control.
  • a tunnel ventilation control system includes a plurality of ventilation devices arranged in a tunnel, haze transmittance data in the tunnel, polluted gas concentration data, cross-sectional wind speed data, and the like.
  • a sensor unit that measures and collects data in the tunnel including vehicle traffic data in the tunnel, a wind speed model that models the wind flowing in the tunnel, and a traffic model that models vehicle traffic in the tunnel;
  • a model storage unit that stores and stores a contamination concentration model that models the concentration of a contaminant generated by a vehicle passing through the tunnel, and the tunnel data acquired from the sensor unit is input, and the tunnel data Estimate and update parameters of the wind speed model, the traffic model, and the pollution concentration model in the model storage unit according to changes Model parameter estimation unit, fume transmittance target value and pollutant gas concentration target value, data in the tunnel measured by the sensor unit, natural wind prediction using the wind speed model, the traffic model, and the pollutant concentration model And a prediction unit that performs traffic wind prediction and pollution generation amount prediction, a feedforward control unit that determines a cross-sectional wind speed target value and a ventilation device control target value based on each prediction of the prediction unit, and the number of parallel operation units of the ventilation device And an optimal selection plan determination unit that determines an energy
  • Each configuration is preferably as follows. First, it is preferable that the operation of the ventilator is an inverter drive operation, and the ventilator is capable of continuous operation with an optimum control amount determined by the hybrid adaptive control unit at a rated power or less. Next, the feedback correction of the hybrid adaptive control unit controls the number of parallel operation units, the forward / reverse direction, and the number of rotations of the ventilation devices from the cross-sectional wind speed target value and the cross-sectional wind speed data actually measured by the sensor unit.
  • the second feedback control for controlling the number of revolutions is provided and the second feedback loop is formed so as to include the first feedback loop.
  • the equation of [Equation 1] as the wind speed model is regarded as a quadratic polynomial for the wind direction wind speed Ur in the tunnel, and the two steady solutions are Ur1 * and Ur2 *, and the analytical solution according to [Equation 2] is solved for Ur. It is preferable that the speed is increased as a discrete time wind speed model based thereon.
  • the wind direction wind speed Ur in the tunnel, the tunnel cross-sectional area Ar, the tunnel length L, the air density ⁇ , the tunnel inner wall friction force Pr, the traffic ventilation force Pt, the natural ventilation force Pn, and the mechanical ventilation force Pj, , B, c, ⁇ , ⁇ are coefficients.
  • the speed-up is achieved as a discrete-time contamination concentration model based on an analytical solution according to [Equation 4] obtained by solving the advection diffusion equation of [Equation 3] with respect to C (t, x). It is preferable.
  • D is the diffusion coefficient
  • Mi is the amount of contamination generated by the i-th vehicle
  • ti is the time of contamination generation by the i-th vehicle
  • xi is the distance from the tunnel entrance of the i-th vehicle.
  • the parameter estimation unit is [ [Equation 7] obtained from [Equation 5] and [Equation 6] is arranged with respect to P1, P2, and P3 in [Equation 8] in which [Equation 7] is arranged using the large vehicle equivalent resistance area P1, the small vehicle equivalent resistance area P2, and the natural wind speed P3 as parameters. It is preferable to estimate the parameters P1, P2, and P3 as a Kalman filter problem of the discrete-time stochastic system by treating that the linearity of [Equation 9] is established.
  • ⁇ e is the inlet loss coefficient
  • is the wall friction coefficient
  • Am is the vehicle equivalent resistance area
  • Vt is the average vehicle speed.
  • the suffix (H) is a large vehicle
  • (L) is a small vehicle.
  • is the cross-sectional area ratio (Aj / Ar) between the jet fan blowing area Aj and the tunnel cross-sectional area Ar
  • is the wind speed ratio (Ur / Uj) between the tunnel wind speed Ur and the jet fan blowing wind speed Uj.
  • P 1 (t) corresponds to Am (H)
  • P 2 (t) corresponds to Am (L)
  • P 3 (t) corresponds to
  • the parameter estimation unit By focusing on the fact that linearity is established with respect to P4 and P5 in [Equation 10] in which [Equation 3] is arranged using the large vehicle smoke generation amount P4 and the small vehicle smoke generation amount P5 as parameters, [Equation 11] and It is preferable to estimate the parameters P4 and P5 as a Kalman filter problem of the discrete-time stochastic system.
  • P 4 (t) corresponds to Co (H)
  • P 5 (t) corresponds to Co (L).
  • Feedback control can be performed finely, and the operation of the jet fan can be feedback controlled by cascade control even for pollution concentrations that change slowly compared to the wind direction and wind speed, so there are fewer cases of excessive ventilation and insufficient ventilation as a whole. It can be reduced and energy-saving operation can be realized.
  • feed-forward control a discrete-time wind speed model and a pollution concentration model based on the analytical solution are applied to calculate the optimal control amount for the parallel operation number, forward / reverse direction, and rotation speed of the ventilator. The accuracy can be increased.
  • the parameter estimation is reduced to the Kalman filter problem using linearity, and the unknown natural ventilation force (Ur), the large vehicle traffic ventilation parameter (AmHeavy), the small vehicle traffic ventilation parameter (AMIGHT), It can be obtained at high speed only by substituting the actual measurement values obtained by the sensor unit as the large vehicle pollution occurrence parameter (CoHeavy) and the small vehicle pollution occurrence parameter (CoLight).
  • feedforward control based on at least three predictions of natural wind prediction, traffic wind prediction, and pollution generation amount prediction
  • cascade control that combines two feedback corrections of wind direction wind speed and pollution concentration
  • Energy-saving operation that appropriately incorporates traffic ventilation and natural wind ventilation by hybrid type adaptive control that combines optimal control of the number of jet fans in parallel and forward / reverse direction and rotation speed based on the energy-saving optimal selection plan It can be carried out.
  • FIG. 1 is a control block diagram focusing on the functional aspects of the tunnel ventilation control system 100 of the present invention.
  • FIG. 2 is a diagram schematically showing the inside of the tunnel.
  • FIG. 3 is a block diagram showing components of the tunnel ventilation control system 100 of the present invention.
  • FIG. 4 is a diagram showing a state of control by the inverter operation of the jet fan of the present invention and a state of control by the conventional on / off type induction motor operation.
  • FIG. 5 is a diagram showing an example of an optimal selection plan for the tunnel ventilation control system 100 of the present invention.
  • FIG. 6 is a diagram showing an operation pattern table including forward / reverse switching of the operation direction of the jet fan according to the optimum selection plan of the tunnel ventilation control system 100 of the present invention.
  • FIG. 1 is a control block diagram focusing on the functional aspects of the tunnel ventilation control system 100 of the present invention.
  • FIG. 2 is a diagram schematically showing the inside of the tunnel.
  • FIG. 3 is a block diagram showing components of the
  • FIG. 7 is a diagram for explaining the relationship of accumulation of contaminated smoke during the switching period based on the operation pattern table.
  • FIG. 8 is a flowchart showing the processing of the tunnel ventilation control system 100 of the present invention.
  • FIG. 9 is a diagram showing experimental results.
  • FIG. 10 is a view showing a two-way road tunnel of a longitudinal ventilation system using a conventional general jet fan.
  • FIG. 1 is a control block diagram focusing on the functional aspects of the tunnel ventilation control system 100 of the present invention.
  • FIG. 2 is a diagram schematically showing the inside of the tunnel.
  • FIG. 3 is a block diagram showing components of the tunnel ventilation control system 100 of the present invention.
  • the tunnel ventilation control system 100 of the present invention includes not only a mechanical ventilation force using only a jet fan, but also a natural ventilation force caused by natural wind, a traffic ventilation force caused by traffic wind caused by resistance of a passing vehicle, etc.
  • feedback control incorporating control, model parameter estimation processing, and the like, the wind speed Ur and the contamination concentration in the tunnel are appropriately controlled, and energy saving operation is realized by inverter operation of the jet fan. As shown in FIG.
  • the tunnel to which the tunnel ventilation control system 100 of the present invention is applied is face-to-face traffic in the tunnel 1.
  • the tunnel 1 has a natural ventilation force due to natural wind Un blown from the outside, a traffic ventilation force caused by the traffic wind Ut generated by combining the wind pressure generated in the direction of travel of each vehicle caused by the resistance of the passing vehicle, a machine by the jet fan 10 Mechanical ventilation by wind Uj is added.
  • a wind speed Ur in the tunnel is generated in the tunnel 1.
  • the ventilation device 10 is a device that ventilates the air in the tunnel 1.
  • the ventilation device 10 is a jet fan that is driven by an inverter, and there are a plurality of units that can be operated in parallel.
  • the ventilation apparatus 10 can operate continuously with an optimum control amount below the rated power as will be described later. This will be described in detail with reference to the control block diagram of FIG.
  • the tunnel ventilation control system 100 of the present invention includes a tunnel wind speed prediction block S1 and a pollution generation amount prediction block S2.
  • the tunnel wind speed prediction block S1 employs the following high-speed prediction processing method for tunnel wind speed Ur prediction.
  • [Expression 12] is established from Newton's law.
  • Ar is the tunnel cross-sectional area
  • L is the tunnel length
  • is the air density
  • Pr is the wall friction force
  • Pt is the traffic ventilation force
  • Pn is the natural ventilation force
  • Pj is the jet fan ventilation force.
  • the advection diffusion equation can be written as [Equation 14].
  • Ur is the wind speed in the tunnel
  • C is the contamination concentration
  • D is the diffusion coefficient
  • t is the time
  • x is the distance in the downstream direction.
  • Solving the advection diffusion equation [Expression 14] with respect to the contamination concentration C (t, x) yields [Expression 15].
  • x is the distance from the tunnel entrance
  • Ar is the cross-sectional area of the tunnel
  • D is the diffusion coefficient
  • Ur is the wind speed in the tunnel
  • Mi is the amount of pollution generated by the i-th vehicle
  • ti is the time of pollution occurrence by the i-th vehicle.
  • Xi is the distance from the tunnel entrance of the i-th vehicle.
  • the contamination generation amount prediction block S2 can quickly determine the contamination generation amount C (t, x) generated at a distance x from the tunnel entrance after an arbitrary t seconds.
  • the above is the high-speed prediction processing method of the pollution generation amount C (t, x) generated at a distance x from the tunnel entrance after an arbitrary t seconds of the tunnel ventilation control system 100 of the present invention.
  • model parameters are estimated and updated in order to improve the prediction accuracy in the tunnel wind speed prediction block S1 and the pollution generation amount prediction block S2.
  • the tunnel data acquired from various sensors are used as input, and the parameters of the wind speed model, traffic model, and pollution concentration model in the model storage unit 120 are estimated and updated in accordance with changes in the tunnel 1 data.
  • the wind speed model in the tunnel is converted into the large vehicle equivalent resistance in correcting the deviation between the actual measurement data obtained by the sensor and the predicted data predicted in the tunnel wind speed prediction block S1, as will be described later.
  • the area P1 the small vehicle equivalent resistance area P2, and the natural wind speed P3 as parameters
  • parameter estimation can be performed using the linearity of each parameter. If the linearity is used, the parameter can be updated at high speed, and the calculation cost can be reduced. This high-speed parameter estimation process will be described in detail.
  • [Formula 18] is the parameter P 1 , P 2 , P 3 Can be expressed as in [Equation 19].
  • ⁇ d is observation noise.
  • parameter P 1 , P 2 , P 3 Is considered not to change significantly in a short period of time, so it can be treated that the linearity of [Equation 20] is established.
  • ⁇ 1, ⁇ 2, and ⁇ 3 are state noises.
  • [Equation 19] is an observation equation
  • [Equation 20] as an equation of state, it can be reduced to the Kalman filter problem of a discrete-time stochastic system. 1 , P 2 , P 3 It can be seen that the estimation of can be performed at high speed.
  • 1 , P 2 , P 3 Parameter estimation can be performed at high speed.
  • the correction of the deviation between the actual measurement data collected by the sensor and the prediction data predicted by the pollution generation amount prediction block S2 is performed.
  • Small vehicle smoke generation P 5 In [Equation 21], the linearity of [Equation 22] is established with respect to P4 and P5 in [Equation 21], so that the parameter P as a Kalman filter problem of the discrete-time stochastic system is obtained.
  • the feedforward calculation block C0 calculates the forced ventilation volume by the ventilation device 10 and the traffic ventilation volume by the vehicle traffic volume with respect to the reference value of the smoke transmission rate target value (VI *) and the pollutant gas concentration target value (CO *). This is a part for determining the cross-sectional wind speed target value (Ur *) and the ventilation equipment control target value (JF *) in the tunnel in consideration of the natural wind ventilation amount due to the natural wind flowing into the tunnel.
  • feedforward calculation is performed on the target value Ur * of the wind direction and the target value JF * of the jet fan 10 for realizing the VI target value and the CO target value based on the change in traffic volume from the traffic counter.
  • the amount of pollutant expected to be generated in the tunnel from the traffic volume by vehicle type and the pollutant generated by the vehicle type, and the haze transmittance expected from the data such as the length and cross-sectional area of the tunnel (VI) and carbon monoxide concentration (CO) are calculated, and the wind direction and the amount of wind required to keep those values within the target value VI target value (VI *) and CO target value (CO *) are calculated.
  • the wind speed control calculator C1 receives the difference between the VI target value (VI *) and the CO target value (CO *) that are target values, and the measured value VI and the measured value CO that are actually measured in the tunnel.
  • a first feedback loop regarding the amount of contamination in the tunnel 1 is formed.
  • the ventilation volume control computing unit C2 receives the difference between the UR target value (Ur *) given from the wind speed control computing unit C1 and the measured value Ur actually measured in the tunnel 1 by the AV meter 114, and the ventilation device Are the parts that control the number of parallel operation, the forward / reverse direction, and the rotational speed, and calculate the adjustment value ( ⁇ JF) of the jet fan operation.
  • Ur * the UR target value
  • the ventilation device operation amount control block A receives the ventilation device control target value (JF *) determined by the feedforward calculator C0 and the adjustment value ( ⁇ JF) of the jet fan operation determined by the ventilation amount control calculator C2.
  • the air volume process 201 in the tunnel represents a system related to the tunnel wind of the actual tunnel 1 as a block, and is summarized as mechanical wind and disturbance generated by forced ventilation force driven by a jet fan as a ventilation device as input.
  • the disturbance includes natural wind blown into the tunnel 1 and traffic wind generated by a vehicle passing through the tunnel.
  • the output is the wind direction wind speed Ur actually generated in the tunnel.
  • the tunnel contamination process 202 represents the system related to the tunnel contamination of the actual tunnel 1 as a block, and is summarized as a disturbance exhaust and disturbance caused by the wind direction wind speed UR as an input.
  • the output is the haze transmission rate (VI) and the carbon monoxide concentration (CO), which indicate the generation of pollutants that actually occur in the tunnel.
  • the jet fan 10 in the tunnel is a device that ventilates the air in the tunnel 1.
  • the jet fan 10 is a jet fan that is driven by an inverter, and there are a plurality of jet fans that can be operated in parallel. . As shown in FIG.
  • the tunnel ventilation control system 100 of the present invention is a cascade control in which a first feedback loop is formed so as to include a second feedback loop.
  • the change in the air volume changes quickly and finely.
  • the amount of pollution is due to insufficient ventilation or increased ventilation with the change in air volume.
  • the tunnel as a whole fluctuates slowly and greatly, and the amount of pollution in the tunnel is a physical quantity with a large time constant compared to the air volume.
  • the air volume is easy to operate directly and finely by the operation control of the jet fan, but the contamination amount is operated not indirectly but directly by the operation control of the jet fan.
  • the tunnel ventilation control system 100 of the present invention the feedback control of the wind direction and wind speed in the tunnel and the feedback control of the pollution amount in the tunnel are cascade-controlled, so that the jet fan can be controlled against the wind direction and wind speed that are easily changed.
  • the operation can be finely feedback-controlled, and the feedback control can be performed by using the cascade control for the amount of contamination that changes with the change of wind direction and wind speed. As a whole, it can reduce the number of cases of excessive ventilation and insufficient ventilation, and energy saving operation can be realized.
  • energy saving operation is realized by reducing the cases of excessive ventilation and insufficient ventilation as a whole by finely adjusting the wind direction and air flow.
  • High synergistic effect can be obtained by driving operation.
  • the inverter driving operation it is possible to quickly control by the rated current such as forward / reverse / reverse driving of the jet fan drive or change of the rotational speed, and an effect of power saving can be obtained.
  • the tunnel ventilation control system 100 includes a sensor unit 110, a model storage unit 120, a prediction unit 130, a feedforward control unit 140, a model parameter estimation unit 150, and an optimum selection plan determination unit 160.
  • the feedback correction unit 170 and the hybrid adaptive control unit 180 are provided.
  • the sensor unit 110 includes various sensors and measuring instruments that collect actual measurement data.
  • the sensor unit 110 includes the fume transmittance data in the tunnel 1, the pollutant gas concentration data, the cross-section wind speed data, and the vehicle traffic data in the tunnel. This is the part that measures and collects data in the tunnel.
  • a traffic counter (TC) 111 a traffic counter (TC) 111, a fume transmittance data measuring device (VI measuring device) 112, a carbon monoxide concentration data measuring device (CO measuring device 113), a wind direction anemometer (AV meter) 114 in the tunnel are provided.
  • TC traffic counter
  • VI measuring device fume transmittance data measuring device
  • CO measuring device carbon monoxide concentration data measuring device
  • AV meter wind direction anemometer
  • Smoke transmittance data measuring instrument (VI measuring instrument) 112 is equipped with a laser irradiation part and a laser light receiving part, and measures the contamination concentration due to dust etc. from the ratio of the laser light transmitted through the air between the laser irradiation part and the laser light receiving part. It is a device to do.
  • the carbon monoxide concentration data measuring device (CO measuring device 113) 113 is a device that measures the concentration of carbon monoxide in the tunnel 1.
  • the tunnel anemometer (AV meter) 114 is installed at a position suitable for measuring the flow of longitudinal ventilation, for example, near the center of the tunnel 1 and near the exit.
  • the model storage unit 120 includes a “wind speed model” that models the wind flowing in the tunnel 1 based on the data of the tunnel 1, a “traffic model” that models vehicle traffic in the tunnel 1, Are stored in a “contamination concentration model” in which the concentration of the pollutant generated by the vehicle passing through the vehicle is modeled, and each model is used for the prediction process by the prediction unit 130. If these various models are suitable, various prediction accuracy described later will be high.
  • the prediction unit 130 uses the wind speed model, the traffic model, and the pollution concentration model based on the data in the tunnel acquired from the sensor unit 110 to predict natural wind Un prediction, traffic wind Ut prediction, tunnel wind speed Ur prediction, and pollution generation amount prediction.
  • the natural wind predicting means 131 has a function of predicting natural wind based on various data such as daily amount change, weekly change, monthly change, and yearly change of natural wind outside the tunnel, and a function for predicting wind direction wind speed generated in the tunnel by the natural wind.
  • the traffic wind predicting means 132 is used in the tunnel 1 based on the traffic volume prediction function based on various data such as daily change, weekly change, monthly change, and annual change of the traffic volume, and the equivalent volume area of the traffic volume and the vehicle type.
  • the wind speed prediction means 133 in the tunnel predicts the wind speed Ur generated in the tunnel 1 based on the prediction of the natural wind Un in the tunnel, the prediction of the traffic wind Ut, the mechanical ventilation force Pj due to the operation of the jet fan 10 and the tunnel specifications. Part.
  • the high-speed prediction processing algorithm has already been shown.
  • the pollution generation amount predicting means 134 is a pollution generation amount after a predetermined time has elapsed from the actual traffic volume data measured by the traffic counter 111 and the traffic volume prediction data obtained from the traffic volume prediction function and the vehicle type pollution generation amount prediction data. This is a part for predicting C (t, x). Since the amount of contamination depends on the elapsed time t in the tunnel and the distance x from the entrance in the tunnel, it is predicted as a function thereof. The high-speed prediction processing algorithm has already been shown.
  • the feedforward control unit 140 determines the cross-sectional wind speed target value and the ventilation equipment control target value based on various predictions of the prediction unit 130.
  • the model parameter estimation unit 150 receives the in-tunnel data acquired from the sensor unit 110 as an input, and estimates and updates the parameters of the wind speed model, the traffic model, and the pollution concentration model in the model storage unit 120 in accordance with changes in the data in the tunnel 1. It is a part to do.
  • the wind speed model in the tunnel can be estimated using the large vehicle equivalent resistance area P1, the small vehicle equivalent resistance area P2, and the natural wind speed P3 as parameters, and using linearity for each parameter.
  • the optimum selection plan determination unit 160 uses the prediction of the wind speed Ur in the tunnel and the prediction of the pollution generation amount C (t, x) by the prediction unit 130, and corrects the number of jet fans 10 in parallel operation to comply with the contamination concentration standard. It is the part that decides the energy saving optimum selection plan including the reverse direction and its rotation speed.
  • the feedback correction unit 170 performs feedback control of the parallel operation number, forward / reverse direction, and rotation speed of the jet fans 10 to comply with the contamination concentration standard based on various detection data obtained from the tunnel 1 by the sensor unit 110. Part.
  • the feedback correction of the feedback correction unit 170 is the first feedback control for controlling the parallel operation number, the forward / reverse direction, and the rotation speed of the ventilation equipment 10 from the cross-sectional wind speed target value and the cross-section wind speed data actually measured by the sensor unit 110.
  • the number of parallel operation units, the forward / reverse direction, and the number of rotations of the ventilation device 10 are controlled from the pollutant gas concentration data and the pollutant gas concentration target value, and the smoke transmittance data and the smoke transmittance target value actually measured by the sensor unit 110.
  • This is a cascade control in which the first feedback loop is formed so as to include the second feedback loop.
  • the hybrid adaptive control unit 180 is a part that performs hybrid type adaptive control in which the feedback correction by the feedback correction unit 170 and the energy saving optimal selection plan determined by the optimal selection plan determination unit 160 are combined. Determine the control amount.
  • the number of jet fans 10 in parallel operation, the forward / reverse direction, and the rotational speed thereof may be calculated by calculating using an appropriate algorithm.
  • the tunnel ventilation control system 100 of the present invention controls the operation of the jet fan 1 with a hybrid optimal control amount that combines feedback correction based on various predictions and an energy saving optimal selection plan. The above is the operation of each component in the configuration example of the tunnel ventilation control system 100 of the present invention.
  • FIG. 4 illustrates the state of control by the inverter operation of the jet fan of the present invention and the state of control by the conventional on / off type induction motor operation in an easy-to-understand manner.
  • FIG. 4B when the control is performed on and off toward the target value, the fluctuation of the VI value change by the control becomes large and the amount of overhead is large, so that it is difficult to control the target value accurately and accurately. I understand.
  • the jet fan 10 performs inverter operation control, and the jet fan 10 can be operated at a low speed rotation C (Low) advantageous for energy saving operation. Therefore, all 10 jet fans 10 are selected to operate at low speed C (Low) to obtain Uj. In this way, the optimum selection plan determination unit 160 can make an optimum selection plan for forward and reverse jet fans that realizes energy saving.
  • FIG. 4 (a) illustrates the state of control by the inverter control operation of the present invention in an easy-to-understand manner. As shown in FIG.
  • FIG. 5 is a diagram showing an example of the optimum selection plan of the tunnel ventilation control system 100 of the present invention.
  • FIG. 6 is a diagram showing an operation pattern table including switching between normal rotation and reverse rotation of the operation direction of the jet fan according to the optimum selection plan of the tunnel ventilation control system 100 of the present invention.
  • FIG. 7 is a diagram for explaining the relationship of accumulation of contaminated smoke during the switching period based on the operation pattern table of FIG.
  • the tunnel has a tunnel cross-sectional area of 63.5 square meters, and in the forward direction, a tunnel with two sections of slope section 1 (distance 1500 m, slope 2%) and slope section 2 (distance 500 m, slope -1%).
  • the traffic volume is 1550 vehicles / h
  • the large vehicle mixing rate is 20%
  • the vehicle speed is 63 km / h.
  • the vertical axis of FIG. 5 represents the scale of the number of jet fans operated (units) and the wind speed (m / S), and the horizontal axis represents the scale of the heavy traffic ratio (%).
  • the “heavy direction” is the traveling direction of the vehicle that is the most severe condition when determining the ventilation amount.
  • the forward direction of gradient section 1 ⁇ gradient section 2 is the heavy direction.
  • three curves (1), (2), and (3) are drawn.
  • the curve (1) is an operation plan curve when the tunnel wind speed Ur is 0, and the curve of (2)
  • the curve is the operation plan curve when the tunnel wind speed Ur is 2.5 m / S in the forward direction
  • the curve (3) is the operation when the tunnel wind speed Ur is -2.5 m / S in the forward direction. It is a planned curve.
  • wind speed lines generated in the tunnel due to traffic wind are drawn.
  • the heavy traffic ratio (heavy traffic / total traffic) is 0%, that is, when all the vehicles are traveling in the opposite direction to the heavy traffic, a wind speed of ⁇ 6 m / S occurs in the tunnel, If the heavy traffic ratio is 50%, they are just offset and 0. However, if the heavy traffic ratio is 100%, that is, if all the vehicles are traveling in the heavy direction, 6m / S is placed in the tunnel. It can be seen that the wind speed of. Also, in the figure, the wind speed line required for extruding soot generated by vehicles in the tunnel in the forward direction and the wind speed line required for extruding in the reverse direction Is drawn.
  • an operation plan of a jet fan will be described by taking an operation plan curve when the tunnel wind speed Ur of (1) is 0 as an example.
  • the heavy traffic ratio is 30% or less or 80% or more
  • the line of wind speed required for pushing in the opposite direction intersects with the wind speed generated in the tunnel due to traffic wind.
  • traffic ratio is 30% or less
  • traffic It can be seen that the wind is over -2 m / S, and that there is sufficient ventilation capacity with only traffic wind. In this case, it can be seen that the necessary ventilation can be performed without operating the jet fan.
  • the heavy traffic ratio is 80% or more.
  • the traffic wind is over 2 m / S, and it can be seen that there is sufficient ventilation capacity only with the traffic wind.
  • the jet fan is reversely rotated to switch to the forward rotation operation.
  • the heavy traffic ratio is less than 80%, the necessary wind speed cannot be obtained with the traffic wind alone, so the jet fan must be operated. If the heavy traffic ratio is close to 50%, about 6.5 jet fans are required for forward rotation. However, as the heavy traffic ratio increases from 50%, the traffic wind increases, reducing the number of jet fans. If it reaches 80%, the wind speed necessary for ventilation can be obtained only by traffic wind even if the jet fan is not operated.
  • the above is the jet fan operation plan based on the operation plan curve when the tunnel wind speed Ur of (1) is 0. However, when the natural wind is blowing, the wind speed in the tunnel is affected.
  • the operation plan curve becomes the operation plan curve (2).
  • the operation plan curve becomes the operation plan curve of (3).
  • the operation plan curve can be read in the same manner as in the case of the operation plan curve (1).
  • the forward and reverse rotation of the jet fan operation direction is performed for the purpose of energy saving during the period when the change in the heavy traffic ratio in the tunnel traffic and the change in natural wind occur. Switching operation can occur.
  • FIG. 6 is a diagram showing an example of an operation pattern table including switching of the operation direction of the jet fan according to the optimum selection plan of the tunnel ventilation control system 100 of the present invention.
  • the operation direction of the jet fan is simply arranged in three periods (first period, second period, and third period) every 10 minutes.
  • FIG. 6 is a diagram for explaining the relationship of the accumulation of contaminated smoke during the switching period.
  • the left side schematically shows the interior of the tunnel
  • the right side schematically shows the accumulation of soot generated from the vehicles encountered as the air mass moves.
  • a plate-like air mass that moves on the air flow in the tunnel.
  • the left side of FIG. 7 shows the middle, and it is assumed that air in the tunnel flows from south (bottom) to north (top) in the first period.
  • the air mass moves over time as shown in the right side of FIG.
  • the air mass and the vehicle cross each other by passing or overtaking the vehicle passing through the tunnel.
  • the smoke generated from the vehicle accumulates in the air mass.
  • the air contamination concentration increases.
  • the wind speed in the tunnel is controlled so that even the most dirty contamination concentration immediately before the air mass exits the tunnel is below the target contamination concentration standard.
  • the jet fan operation direction is reversed with an emphasis on energy saving, the flow direction of the air mass before it exits the tunnel reverses and returns to the tunnel again.
  • the operation direction of the jet fan is reversed in the second period, the movement direction of the air mass is reversed. In this way, when the vehicle crosses while the air mass moves from north (upper) to south (lower) in the second period, the smoke generated from the vehicle accumulates in the air mass. As shown in FIG.
  • the plan deciding unit 160 reflects it in the operation plan so that the concentration is less than the contamination concentration to be observed even in the case of the third pattern and the sixth pattern.
  • the optimum selection plan determination unit 160 makes an optimum selection plan in consideration of an operation pattern including switching of the operation direction of the jet fan in accordance with the optimum selection plan. The above is an example of the process in the optimum selection plan determination unit 160. Next, the operation and characteristics of the tunnel ventilation control system 100 of the present invention will be described in comparison with a conventional tunnel ventilation control system 1 driven by an on / off control induction motor.
  • FIG. 8 is a flowchart showing a processing flow of the tunnel ventilation control system 100 of the present invention.
  • data is acquired from the tunnel 1 by the traffic counter 111, the VI measuring instrument 112, the CO measuring instrument 113, and the AV measuring instrument 114, which are sensors of the sensor unit 110 (step 1 in FIG. 8).
  • the traffic counter 111 acquires traffic data relating to various vehicle traffic such as the number of vehicles passing through the tunnel, the difference between the large and small vehicles, and the speed.
  • Fume transmittance data in the tunnel is obtained by the VI measuring instrument 112
  • the carbon monoxide concentration data in the tunnel 300 is obtained by the CO measuring instrument 113
  • the wind direction and wind speed data are obtained by the AV meter to obtain various data of the pollution level in the tunnel 300.
  • Traffic data, haze transmittance data, and carbon monoxide concentration data obtained by the sensor unit 110 are input to the model parameter estimation unit 150, the prediction unit 130, and the feedback correction unit 170, respectively.
  • the prediction unit 130 uses at least the model of the model storage unit 120 based on the traffic data, smoke transmission data, and carbon monoxide concentration data obtained by the sensor unit 110, and at least natural wind Un prediction, traffic wind Ut prediction, pollution
  • Each prediction data of the generation amount C (t, x) prediction is calculated (step 2 in FIG. 8). For example, prediction data after 10 minutes each is calculated.
  • Natural wind prediction is performed by the natural wind prediction means 131.
  • the natural wind predicting means 131 predicts the natural wind blowing from the outside of the tunnel 10 minutes after the current time, and the current measured data of the wind direction wind speed in the tunnel 1 obtained from the AV meter 114 and the natural wind 10 minutes after.
  • the natural wind Un after 10 minutes is predicted from the prediction data.
  • the traffic wind prediction is performed by the traffic wind prediction means 132.
  • the traffic wind predicting means 132 predicts the traffic volume 10 minutes after the current time based on the past traffic volume data, and the traffic wind generated in the tunnel 1 using the traffic model in the model storage unit 120.
  • Ut is predicted, and traffic wind Ut after 10 minutes is predicted from actual traffic volume data and traffic volume prediction data by the traffic counter 111.
  • the tunnel wind speed Ur prediction is performed by the tunnel wind speed prediction means 133.
  • the above-described high speed wind speed prediction method is used.
  • the contamination generation amount prediction is performed by the contamination generation amount prediction means 134.
  • the traffic volume prediction data obtained by traffic wind prediction and the pollution concentration model are used to predict the pollution generation amount prediction data, and the pollution generation amount after 10 minutes is calculated from the traffic volume actual measurement data and the pollution generation amount prediction data by the traffic counter 111. Predict.
  • the high-speed prediction method for the amount of contamination described above is used.
  • the optimum selection plan determination unit 160 uses the tunnel wind speed Ur prediction and the pollution generation amount C (t, x) prediction by the prediction unit 130, and the number of jet fans 10 in parallel operation to comply with the contamination concentration standard.
  • An energy saving optimum selection plan including N, forward / reverse direction D, and its rotation speed C is determined (step 3 in FIG. 8). For example, the necessary wind direction and wind speed Ura in the tunnel is determined by the pollution generation amount prediction.
  • the wind direction wind speed Uj to be supplied by the jet fan 10 is obtained by subtracting the natural wind prediction Un and the traffic wind prediction Ut expected for the wind direction wind speed.
  • the optimum selection plan determination unit 160 determines the operation plan for the parallel operation number N, the forward / reverse direction D, and the respective rotation speeds C of the jet fans 10 that cause Uj.
  • various combinations are possible for the parallel operation number N, the forward / reverse direction D, and the respective rotation speeds C of the jet fans 10 that cause Uj.
  • the optimal selection plan determination unit 160 selects the parallel operation number N, the forward / reverse direction D, and the respective rotation speeds C of the jet fans 10 so as to achieve the most energy-saving operation.
  • the operating jet fan 10 is assumed to be used at full power rotation C (Top). Determine if it will be Uj. For example, if five jet fans 10 are operated at full power rotation C (Top), Uj is satisfied.
  • the feedback correction unit 170 performs the parallel operation number N, forward / reverse direction D, and the number of rotations of the jet fans 10 for complying with the contamination concentration standard based on various detection data obtained from the tunnel 1 by the sensor unit 110.
  • the feedback control amount for C is calculated (step 4 in FIG. 8).
  • the hybrid adaptive control unit 180 combines the feedback correction by the feedback correction unit 170 and the energy saving optimal selection plan determined by the optimal selection plan determination unit 160 in the forward and reverse directions for the required number N of jet fans 10.
  • An operation control signal of an optimal control amount is given so as to be in the direction D and the rotation speed C, and the energy saving operation of the jet fan 10 is performed (step 5 in FIG. 8).
  • the model parameter estimation unit 150 estimates parameters so that the parameters of the wind speed model, traffic model, and pollution concentration model stored in the model storage unit 120 are optimal, and updates the parameters of each model to the estimated values. (Step 6 in FIG. 8).
  • Parameter estimation uses only the above-described high-speed parameter estimation process, and only substitutes actual measured values obtained by the sensor units of natural ventilation power (Ur), large vehicle traffic ventilation power (AmHeavy), and small vehicle traffic ventilation power (AMight). Seek fast.
  • the tunnel ventilation control system 100 of the present invention can control the operation of the jet fan 1 with a hybrid type optimal control amount that combines feedback correction based on various predictions and an energy saving optimal selection plan.
  • an experimental example applied in an actual tunnel using the tunnel ventilation control system 100 of the present invention will be described. As shown in FIG.
  • FIG. 9A is a diagram showing a result of driving a jet fan by inverter driving using the tunnel ventilation control system 100 of the present invention in order to obtain the wind speed in the tunnel shown in FIG. 9B.
  • the jet fan is finely controlled by inverter control. In general, it operates in the range of two units in the forward direction to two units in the reverse direction.
  • FIG. 9B is a diagram showing a result of driving a jet fan by inverter driving using the tunnel ventilation control system 100 of the present invention in order to obtain the wind speed in the tunnel shown in FIG. 9B.
  • the jet fan is finely controlled by inverter control. In general, it operates in the range of two units in the forward direction to two units in the reverse direction.
  • FIG. 9C is a diagram showing a result of driving a jet fan by inverter driving using the tunnel ventilation control system 100 of the present invention in order to obtain the wind speed in the tunnel shown in FIG. 9B.
  • the jet fan is finely controlled by inverter control. In general, it operates in
  • FIG. 9D shows an example in which the number of jet fans is controlled not by inverter operation but by conventional on / off control as a comparison.
  • the jet fan performs unit control only in the forward direction. Many units are in operation, from 2 to 8 units.
  • the operation of the inverter control of the present invention of FIG. 9C can save energy.

Abstract

 フィードバック制御、フィードフォワード制御を工夫して省電力化を可能としたトンネル換気制御システムを提供する。 フィードフォワード制御部140は煙霧透過率目標値とCO濃度目標値とセンサ部110で実測したトンネル内の各種データとモデル記憶部120内の風速モデルと交通モデルと汚染濃度モデルを用いた自然風予測と交通風予測と汚染発生量予測を行い、断面風速目標値と換気機器制御目標値を決定する。最適選定計画決定部160により換気機器10の並列運転台数と回転数との関係、正逆逆転時における自然風の自然換気方向と対面交通による交通換気方向との関係とを考慮した省エネ最適選定計画を決める。断面風速目標値に関する第1のフィードバック補正と換気機器制御目標値に対する第2のフィード バック補正をカスケード制御で行い、ハイブリッド適応制御部180はフィードバック補正と省エネ最適選定計画とを組み合わせた適応制御を行う。

Description

対面通行トンネルのジェットファンによるトンネル換気制御システム
 本発明は、対面通行の道路トンネルの換気設備装置、特にインバータ駆動ジェットファンを用いた縦流式の換気制御方式により換気をする道路トンネルの換気技術に関する。
 道路トンネルにおいては、人体に対して有害な自動車のエンジンからの排出物質や塵埃などが浮遊しており、そのままではトンネル内の汚染物質濃度が高まってゆく。そこで、トンネル内の良好な環境を確保するためトンネル内の汚染物質を排気する必要がある。トンネル内の汚染物質を排気するには自然換気力や交通換気力による換気では不十分であり、トンネル内に設置された換気機を用いた強制換気が行われている。
 トンネルの換気にはさまざまな方式がある。わが国に非常に多い3000m以下の中小の対面通行の道路トンネルの換気方式として「縦流換気方式」と呼ばれる換気方式が標準採用される場合が多い。
 「縦流換気方式」とは、トンネル断面全体を換気ダクトとして利用する方式の換気方式であり、用いる換気装置としては、道路トンネル内の空気をトンネル外に押し出すジェットファン、道路トンネル内の空気を浄化する電気集塵機などがあり、適宜これらを組み合わせてトンネルの入口から出口に向かう空気流を形成して排気する。道路トンネルの中央付近に立抗を設けて道路トンネル内の空気を道路トンネル外の空気と交換する集中排気方式を組み合わせることもある。
 従来の「縦流換気方式」でのジェットファン駆動モータは起動電流が定格電流の数倍となる誘導モータで駆動されている。
 従来の一般的なジェットファンを用いた縦流換気方式の対面通行道路トンネルを図10に示す。このトンネル1は、交通方向が両方向の対面通行トンネルと呼ばれるタイプである。このような対面通行道路トンネル1では、内部に縦流方向の換気を行なうジェットファンが複数台配設されている。図10の例ではジェットファン10a、10b、10c、10dの4台が描かれている。対面通行道路トンネル内1には図左から図右にかけて縦流の空気流Aが発生し、左から右にかけてトンネル内の汚染空気が排気される。換気制御装置によりジェットファン10の運転を制御する。
 図10の例ではトンネル1内の入口近く、中央部近く、出口近くの各場所に風向風速計(AV計)がそれぞれ設置されており、排気抗の入口近くには、汚染濃度計である煙霧透過率計(VI計)、一酸化炭素濃度計(CO計)が設置されている(図示せず)。ここで、煙霧透過率計(VI計)は物質中を透過する光の割合から汚染濃度を計測する装置であり、また、一酸化炭素濃度計(CO計)は一酸化炭素の濃度を測定する装置である。交通量計測装置は対面通行道路トンネル1内を通過する車の交通量を計測する装置である。
 従来のジェットファンを用いた縦流換気方式では、対面通行道路トンネル1内部の風向風速計、煙霧透過率計、一酸化炭素濃度計、交通量計測装置から得られた各種環境成分値に基づいて、換気制御装置(図示せず)により対面通行道路トンネル1内部に設置されたジェットファン10a~10dの運転台数を調整することが行われている。すなわち、対面通行道路トンネル1内部には、例えば、煤煙、一酸化炭素、交通量、または風向風速等の環境成分値を測定する環境成分測定器が設置され、これらの環境成分測定器の計測値に基づいて、必要な換気量を確保するのに必要な台数だけジェットファン10a~10dを運転し、これによって汚染物質濃度を予め設定されている許容値以下にして、トンネル利用者の安全性、快適性を確保している。従来の対面通行トンネルでは費用対効果から汚染濃度(VI、CO)のフィードバックによる台数運転が採用されてきたが、運転速度の制御を行うものも知られている。
 例えば、換気制御装置は、交通量計測装置から現在の交通量を読み込み、次に、この交通量に、自動車の排ガス量係数と道路トンネルの構造係数とを乗算して煤煙発生量を算出し、この煤煙発生量と煤煙濃度の制御目標値とから必要換気量Qを算出する。並行して、換気制御装置は煤煙透過率計から現在の道路トンネル内の空気の汚染濃度をフィードバック値として読み込み、上記のようにして算出した必要換気量Qとフィードバック値との偏差値を求め、この偏差値からPID制御(比例・積分・微分制御)を演算し、このPID制御の演算結果よりジェットファン10を制御、操作している。
 従来の縦流換気方式には以下の問題があった。
 従来の第1の問題は、汚染濃度(VI、CO)に注目したフィードバック制御技術を用いた縦流換気方式では電力量が大きくなってしまうという問題である。従来の対面通行トンネルでは汚染濃度(VI、CO)に注目したフィードバックによる台数運転が採用されてきたが、ジェットファンは直接的にはトンネル内に強制換気力による風速を生じさせるものであるため、汚染濃度に注目したフィードバック制御を行うと、後追い制御となるために過剰換気、換気不足となるケースが多いのが実情である。従来では換気力としてジェットファンによる機械換気力しか考えないことが通例であった。交通換気力については、従来は、対面通行トンネルの場合は走行車両による換気力を期待せず、逆に換気上の抵抗として考える場合が多かった。また、VI、COのフィードバックが主流ということで交通量計なども設置されず交通換気力を把握できない場合が多かった。自然風は換気機器の換気方向に対して順風であったり、逆風であったりするため、換気動力費に大きな影響を与えることは知られていたが、トンネル周辺の気象状況によって風向や風速が常に変化しているため、自然換気力の積極的な利用は困難であり、あくまで機械換気が主で自然風は従と考えられてきた。こうして補助的に利用する場合も、自然風の把握には、トンネル両坑口に微気圧計を設置する必要があり、初期費用ならびに保守費用が増大するという問題があった。
 従来の第2の問題は、的確な予測を用いたフィードフォワード制御が難しいという問題があった。自然換気力の大きさや交通換気力の大きさの変動に応じて刻々と変化するが、それら変化を的確に織り込んだジェットファン制御を行うことができなかった。自然換気力や交通換気力の大きさや方向の変化を的確に織り込んだフィードフォワード制御を行うことができれば消費電力量を低減することが可能となる。
 従来の第3の問題は、オンオフ切り替えのジェットファンの運転切り替えには大きなスパンが必要とされ、即応性に問題があり細かく運転制御できないという問題があった。対面通行トンネルは一方通行のトンネルに比べ交通換気力が互いに反対方向に働くため、車道内風速が不安定な運転になりやすいといわれている。一般的には平常時及び非常時(火災時)とも、ジェットファンの運転台数を切り換える事で実現されてきたため精度の高い制御は困難であった。しかるにジェットファン駆動モータは起動電流が定格電流の数倍となる誘導モータであるため、停止後30分程度は起動できない問題があった。また、その回転数は電源周波数により定まる固定回転数となるため、縦流換気力も固定値(最大値)しかとれない。そのために従来のジェットファン運転では即応性に問題があり細かく運転制御できないという問題があった。
 上記問題点に鑑み、本発明は、フィードバック制御、フィードフォワード制御を工夫して省電力化を可能とした縦流換気システムを提供することを目的とする。
 上記目的を達成するため、本発明にかかるトンネル換気制御システムは、トンネル内に配設された複数の換気機器と、前記トンネル内の煙霧透過率データと、汚染ガス濃度データと、断面風速データと、トンネル内の車両交通量データとを含むトンネル内データを計測・収集するセンサ部と、前記トンネル内を流れる風をモデル化した風速モデルと、前記トンネル内の車両交通をモデル化した交通モデルと、前記トンネル内を通過する車両により発生する汚染物質の濃度をモデル化した汚染濃度モデルを保持記憶するモデル記憶部と、前記センサ部から取得した前記トンネル内データを入力とし、前記トンネル内データの変化に合わせ、前記モデル記憶部の前記風速モデルと前記交通モデルと前記汚染濃度モデルのパラメータを推定して更新するモデルパラメータ推定部と、煙霧透過率目標値と汚染ガス濃度目標値と、前記センサ部により実測した前記トンネル内データと、前記風速モデルと前記交通モデルと前記汚染濃度モデルを用いた自然風予測と交通風予測と汚染発生量予測を行う予測部と、前記予測部の各予測に基づき、断面風速目標値と換気機器制御目標値を決定するフィードフォワード制御部と、前記換気機器の並列運転台数と回転数との関係と、前記換気機器の正逆逆転時における自然風の自然換気方向と対面交通による交通換気方向との関係とを考慮した省エネ最適選定計画を決める最適選定計画決定部と、前記断面風速目標値と前記換気機器制御目標値に対するフィードバック補正と、前記省エネ最適選定計画とを組み合わせた適応制御を行うハイブリッド適応制御部とを備えたことを特徴とする。
 なお、各々の構成は下記のものとすることが好ましい。
 まず、前記換気機器の運転がインバータ駆動運転であり、前記換気機器を定格電力以下で前記ハイブリッド適応制御部が決定した最適制御量による連続運転を可能とすることが好ましい。
 次に、前記ハイブリッド適応制御部のフィードバック補正が、前記断面風速目標値と前記センサ部が実測した前記断面風速データから前記換気機器の並列運転台数と正逆方向とその回転数を制御する第1のフィードバック制御と、前記汚染ガス濃度データおよび前記汚染ガス濃度目標値と、前記センサ部が実測した前記煙霧透過率データおよび前記煙霧透過率目標値から前記換気機器の並列運転台数と正逆方向とその回転数を制御する第2のフィードバック制御を備え、前記第1のフィードバックループを包含するように前記第2のフィードバックループを形成せしめたカスケード制御とすることが好ましい。
 次に、前記風速モデルとして[数1]の方程式を前記トンネル内風向風速Urに関する2次多項式とみて2つの定常解をUr1*、Ur2*とし、Urについて解いた[数2]による解析解に基づく離散時間風速モデルとして高速化を図ったものであることが好ましい。
Figure JPOXMLDOC01-appb-M000012
Figure JPOXMLDOC01-appb-M000013
 ここで、前記トンネル内風向風速Ur、前記トンネル断面積Ar、前記トンネル長L、空気密度ρ、前記トンネル内壁面摩擦力Pr、交通換気力Pt、自然換気力Pn、機械換気力Pjとし、a、b、c、α、βは係数とする。
 次に、前記汚染濃度モデルとして、[数3]の移流拡散方程式をC(t,x)について解いた[数4]による解析解に基づく離散時間汚染濃度モデルとして高速化を図ったものであることが好ましい。
Figure JPOXMLDOC01-appb-M000014
Figure JPOXMLDOC01-appb-M000015
 ここで、汚染濃度C、前記トンネル内風向風速Ur、時間t、前記トンネル入口から流下方向への距離x、汚染発生量Mとする。Dは拡散係数、Miはi番目の車両による汚染発生量、tiはi番目の車両による汚染発生時刻、xiはi番目の車両のトンネル入口からの距離である。
 次に、ハイブリッド適応制御部による前記換気機器運転の結果として、前記センサ部が収集した前記実測データと、前記予測部が予測した前記予測データとのずれの修正において、前記パラメータ推定部が、[数5]と[数6]から得た[数7]を大型車両等価抵抗面積P1、小型車両等価抵抗面積P2、自然風風速P3をパラメータとして整理した[数8]においてP1,P2,P3に関して[数9]の線形性が成立していると扱うことにより離散時間確率システムのカルマンフィルタ問題としてパラメータP1,P2,P3の推定を行うことが好ましい。
Figure JPOXMLDOC01-appb-M000016
Figure JPOXMLDOC01-appb-M000017
 ζeは入口損失係数、λは壁面摩擦抵抗係数、Amは車両等価抵抗面積、Vtは平均車両速度である。添字の(H)は大型車、(L)は小型車である。φはジェットファンの吹き出し面積Ajとトンネル断面積Arの断面積比(Aj/Ar)、Ψはトンネル内風速Urとジェットファンの吹き出し風速Ujとの風速比(Ur/Uj)
Figure JPOXMLDOC01-appb-M000018
Figure JPOXMLDOC01-appb-M000019
 ここでP(t)はAm(H)、P(t)はAm(L)、P(t)は|Ur|Urに相当する。
Figure JPOXMLDOC01-appb-M000020
 次に、前記ハイブリッド適応制御部による前記換気機器運転の結果として、前記センサ部が収集した前記実測データと、前記予測部が予測した前記予測データとのずれの修正において、前記パラメータ推定部が、大型車両煤煙発生量P4、小型車両煤煙発生量P5をパラメータとして[数3]を整理した[数10]においてP4,P5に関して線形性が成立していることに着目することにより[数11]および離散時間確率システムのカルマンフィルタ問題としてパラメータP4,P5の推定を行うことが好ましい。
Figure JPOXMLDOC01-appb-M000021
 ここでP(t)はCo(H)、P(t)はCo(L)に相当する。
Figure JPOXMLDOC01-appb-M000022
 上記構成により、ジェットファンをインバータ運転することにより、ジェットファン駆動の正逆逆転運転や回転数の変更など定格電流により速やかに制御を行うことができ、省電力化の効果が得られる。従来の誘導モータによるジェットファン運転では、運転保護インターバル時間があり、一旦停止したジェットファンは10分間運転不可であったが、上記のようにインバータ制御運転を前提とすれば、即応性を得ることができ、細かい運転制御が可能となる。
 また、上記構成により、フィードバック制御に関しては、トンネル内の風向風速のフィードバック制御と、トンネル内の汚染濃度のフィードバック制御をカスケード制御することにより、細かく変化しやすい風向風速に対してジェットファンの運転を細かくフィードバック制御することができ、また、風向風速に比べて変化が遅くあらわれる汚染濃度に対してもカスケード制御によりジェットファンの運転をフィードバック制御できるので、全体として過剰換気、換気不足となるケースを少なく低減でき、省エネ運転を実現できる。
 また、フィードフォワード制御に関しては、解析解に基づく離散時間の風速モデルと汚染濃度モデルとを適用し、前記換気機器の並列運転台数と正逆方向とその回転数の最適制御量を算出し、解析精度を高めることが可能となる。また、上記のようにパラメータ推定が線形性を利用してカルマンフィルタの問題に帰着し、未知数である自然換気力(Ur)、大型車両交通換気パラメータ(AmHeavy)、小型車両交通換気パラメータ(AmLight)、大型車両汚染発生パラメータ(CoHeavy)、小型車両汚染発生パラメータ(CoLight)としてセンサ部で得た実測値を代入するのみで高速に求めることができる。
 本発明のトンネル換気制御システムによれば、自然風予測と交通風予測と汚染発生量予測の少なくとも3つの予測に基づくフィードフォワード制御、風向風速と汚染濃度の2つのフィードバック補正を組み合わせたカスケード制御、省エネ最適選定計画に基づくジェットファンの並列運転台数と正逆方向とその回転数の最適に制御などを組み合わせたハイブリッド型の適応制御により交通換気力、自然風換気力を適切に織り込んだ省エネルギー運転を行うことができる。
 第1図は本発明のトンネル換気制御システム100の機能面に注目した制御ブロック図である。
 第2図はトンネル内の様子を模式的に示した図である。
 第3図は本発明のトンネル換気制御システム100の構成要素を示した構成図である。
 第4図は本発明のジェットファンのインバータ運転による制御の様子と従来のオンオフ型の誘導モータ運転による制御の様子を示す図である。
 第5図は本発明のトンネル換気制御システム100の最適選定計画の例を示した図である。
 第6図は本発明のトンネル換気制御システム100の最適選定計画に従ったジェットファンの運転方向の正転・逆転の切り替えを含む運転パターン表を示した図である。
 第7図は運転パターン表に基づく切り替え期間中における汚染煤煙蓄積の関係について説明する図である。
 第8図は本発明のトンネル換気制御システム100の処理を示すフローチャートである。
 第9図は実験結果を示す図である。
 第10図は従来の一般的なジェットファンを用いた縦流換気方式の対面通行道路トンネルを示す図である。
 以下、図面を参照しつつ、本発明のインバータ駆動ジェットファンによるトンネル換気制御システムの実施例を説明する。ただし、本発明の範囲は以下の実施例に示した具体的な用途、形状、個数などには限定されないことは言うまでもない。
 実施例1にかかる本発明のトンネル換気制御システムの例を示す。
 図1は本発明のトンネル換気制御システム100の機能面に注目した制御ブロック図である。
 図2はトンネル内の様子を模式的に示した図である。
 図3は本発明のトンネル換気制御システム100の構成要素を示した構成図である。
 本発明のトンネル換気制御システム100は、ジェットファンのみによる機械換気力のみならず、自然風による自然換気力、通行車両が持つ抵抗により生じる交通風による交通換気力などを組み合わせたフィードフォワード制御、カスケード制御を組み込んだフィードバック制御、モデルのパラメータ推定処理などにより、適切にトンネル内風向風速Ur、汚染濃度をコントロールし、ジェットファンのインバータ運転による省エネルギー運転を実現するものである。
 本発明のトンネル換気制御システム100を適用するトンネルは、図2に示すように、トンネル1内は対面交通となっている。トンネル1内には外界から吹き込む自然風Unによる自然換気力と、通行車両が持つ抵抗により生じる各車両の通行方向に生じる風圧が合成されて生じる交通風Utによる交通換気力、ジェットファン10による機械風Ujによる機械換気力が加わる。これら3つの換気力とトンネル1を流れる空気の壁面摩擦力の合成の結果、トンネル1内にトンネル内風向風速Urが生じる。
 なお、換気機器10は、トンネル1内の空気を換気する機器であり、ここでは、インバータ駆動により運転されるジェットファンであり、複数台あり、それらの並列運転が可能なものとなっている。換気機器10は定格電力以下で後述するように最適制御量による連続運転が可能となっている。
 図1の制御ブロック図を参照しつつ詳しく説明する。
 まず、本発明のトンネル換気制御システム100は、トンネル内風速予測ブロックS1と汚染発生量予測ブロックS2とを備えている。
 トンネル内風速予測ブロックS1は、トンネル内風速Ur予測について、以下の高速予測処理方法を採用する。
 まず、ニュートンの法則から次の[数12]式が成立する。
Figure JPOXMLDOC01-appb-M000023
 ここで、Arはトンネル断面積、Lはトンネル長、ρは空気密度、Prは壁面摩擦力、Ptは交通換気力、Pnは自然換気力、Pjはジェットファン換気力である。
 この[数12]式をトンネル内風速Urに関して解くと[数13]式のようになる。
Figure JPOXMLDOC01-appb-M000024
 ここで、Ur1*、Ur2*は、[数12]の右辺を0とする2つの定常解である。
 この[数13]を用いれば、トンネル内風速予測演算ブロックS1は、任意のt秒後のトンネル内風速Ur(t)を高速に求めることができる。
 次に、汚染発生量予測ブロックS2は、汚染発生量C(t,x)予測について、以下の高速予測処理方法を採用する。まず、移流拡散方程式は[数14]式のように書ける。
Figure JPOXMLDOC01-appb-M000025
 ここで、Urはトンネル内風速、Cは汚染濃度、Dは拡散係数、tは時間、xは流下方向への距離である。
 移流拡散方程式[数14]式を汚染濃度C(t,x)について解けば[数15]式となる。
Figure JPOXMLDOC01-appb-M000026
 ここで、xはトンネル入口からの距離、Arはトンネルの断面積、Dは拡散係数、Urはトンネル内風速、Miはi番目の車両による汚染発生量、tiはi番目の車両による汚染発生時刻、xiはi番目の車両のトンネル入口からの距離である。
 この[数15]を用いれば、汚染発生量予測ブロックS2は、任意のt秒後、トンネルの入口からの距離xで発生する汚染発生量C(t,x)を高速に求めることができる。
 以上が本発明のトンネル換気制御システム100の任意のt秒後、トンネルの入口からの距離xで発生する汚染発生量C(t,x)の高速の予測処理方法である。
 本発明のトンネル換気制御システム100では、トンネル内風速予測ブロックS1、汚染発生量予測ブロックS2での予測精度を上げるため、モデルのパラメータを推定して更新してゆく。各種センサから取得したトンネル内データを入力とし、トンネル1内データの変化に合わせ、モデル記憶部120の風速モデルと交通モデルと汚染濃度モデルのパラメータを推定して更新する。
 パラメータ推定では、後述するように換気機器運転の結果、センサにて得た実測データと、トンネル内風速予測ブロックS1で予測した予測データとのずれの修正において、トンネル内風速モデルを大型車両等価抵抗面積P1、小型車両等価抵抗面積P2、自然風風速P3をパラメータとし、各パラメータに関する線形性を利用してパラメータ推定を行うことができる。線形性を利用すればパラメータの更新を高速に行うことができ、計算コストを低減させることができる。
 この高速のパラメータ推定処理について詳しく説明する。
 上記した[数12]式の右辺の各項は[数16]式に示すように書ける。
Figure JPOXMLDOC01-appb-M000027
 ζeは入口損失係数、λは壁面摩擦抵抗係数、Amは車両等価抵抗面積、Vtは平均車両速度である。添字の(H)は大型車、(L)は小型車である。
 この[数16]式を用いて[数12]式をAm(H)、Am(L)、自然風Unに関してまとめると[数17]のようになる。
Figure JPOXMLDOC01-appb-M000028
 大型車両等価抵抗面積Am(H)をP、小型車両等価抵抗面積Am(L)をP、自然風風速|Ur|UrをPとすると、[数17]式はパラメータP、P、Pによって[数18]式のようになる。
Figure JPOXMLDOC01-appb-M000029
 [数18]式はパラメータP、P、Pに関して[数19]式のように表わすことができる。
Figure JPOXMLDOC01-appb-M000030
 なお、εdは観測雑音である。
 ここで、パラメータP、P、Pは短時間では大きく変化しないと考えられるので、[数20]の線形性が成立していると扱うことができる。
Figure JPOXMLDOC01-appb-M000031
 なお、ε1、ε2、ε3は状態雑音である。
 ここで、[数19]式を観測方程式、[数20]を状態方程式と見ることにより、離散時間確率システムのカルマンフィルタ問題に帰着することができるので、パラメータP,P,Pの推定を高速に行うことができることが分かる。[数19]式、[数20]式をもとに離散時間確率システムのカルマンフィルタとしてパラメータP,P,Pの推定を行うことにより高速にパラメータ推定を実行することができる。
 次に、汚染発生量予測ブロックS2での予測精度を上げるため、センサが収集した実測データと、汚染発生量予測ブロックS2が予測した予測データとのずれの修正において、大型車両煤煙発生量P、小型車両煤煙発生量Pをパラメータとして整理した[数21]においてP4,P5に関して[数22]の線形性が成立していることに着目することにより離散時間確率システムのカルマンフィルタ問題としてパラメータP,Pの推定を行うことができる。線形性を利用すればパラメータの更新を高速に行うことができ、計算コストを低減させることができる。
 この高速のパラメータ推定処理について詳しく説明する。
 上記した[数14]を大型車両煤煙発生量P、小型車両煤煙発生量Pについて整理すると[数21]が得られる。
Figure JPOXMLDOC01-appb-M000032
 なお、εeは観測雑音である。
 ここで、パラメータP、Pは短時間では大きく変化しないと考えられるので[数22]が成立していると扱うことができる。
Figure JPOXMLDOC01-appb-M000033
 なお、ε4,ε5は状態雑音である。
 ここで、[数21]式を観測方程式、[数22]を状態方程式と見ることにより、線形の離散時間確率システムのカルマンフィルタ問題に帰着することができるので、パラメータP4,P5の推定を高速に行うことができることが分かる。[数21]式、[数22]式をもとに離散時間確率システムのカルマンフィルタとしてパラメータP4,P5の推定を行うことにより高速にパラメータ推定を実行することができる。
 次に、図1に戻り、他のブロックの説明を続ける。
 フィードフォワード演算ブロックC0は、基準値である煙霧透過率目標値(VI*)と汚染ガス濃度目標値(CO*)に対して、換気機器10による強制換気量と車両交通量による交通換気量とトンネル内に流れ込む自然風による自然風換気量を勘案し、トンネル内の断面風速目標値(Ur*)および換気機器制御目標値(JF*)とを決定する部分である。つまり、トラフィックカウンタからの交通量の変化をもとにVI目標値およびCO目標値を実現するための風向風量の目標値Ur*と、ジェットファン10の制御量目標値JF*をフィードフォワード演算する部分である。つまり、トラフィックカウンタから得られる車種別の交通量と車種別の発生汚染物質からトンネル内に発生が予想される汚染物質量とトンネルの長さや断面積などの諸元データから予想される煙霧透過率(VI)と一酸化炭素濃度(CO)を計算し、それらの値を目標値であるVI目標値(VI*)およびCO目標値(CO*)内に収めるために必要とされる風向風量を計算し、その値をUr目標値(Ur*)として得る。さらにそのUr目標値(Ur*)を発生させるために必要とされるジェットファン10による機械換気風Ujを計算し、その機械換気風Ujを発生させるためのジェットファン10の制御量を計算し、その値をJF目標値(JF*)として得る。
 次に、本発明のトンネル換気制御システム100における2つのフィードバック制御に関するカスケード制御について説明する。
 風速制御演算器C1は、目標値となるVI目標値(VI*)およびCO目標値(CO*)と、実際にトンネル内で計測される計測値VIおよび計測値COとの差分を受けて、換気機器の並列運転台数と正逆方向とその回転数を制御する部分であり、風向風量の調整値(ΔUr)を演算する。図1の点線で示すように、トンネル1内の汚染量に関する第1のフィードバックループを形成している。
 換気量制御演算器C2は、風速制御演算器C1から与えられるUR目標値(Ur*)と、実際にトンネル1内においてAV計114により計測される計測値Urとの差分を受けて、換気機器の並列運転台数と正逆方向とその回転数を制御する部分であり、ジェットファン運転の調整値(ΔJF)を演算する。図1の点線で示すように、トンネル1内の風量に関する第2のフィードバックループを形成している。
 なお、換気機器操作量制御ブロックAは、フィードフォワード演算器C0が決定した換気機器制御目標値(JF*)と、換気量制御演算器C2が決定したジェットファン運転の調整値(ΔJF)を受けて、実際にジェットファン10の運転制御を行う。
 トンネル内の風量プロセス201は、実際のトンネル1が持つトンネル風に関する系をブロックとして表したものであり、入力として換気機器であるジェットファンの駆動の強制換気力により発生する機械風と外乱にまとめられており、外乱には、トンネル1に対して吹き込む自然風とトンネル内を通行する車両により発生する交通風等がある。出力はトンネル内に実際に発生する風の風向風速Urである。
 トンネル内の汚染プロセス202は、実際のトンネル1が持つトンネル内汚染に関する系をブロックとして表したものであり、入力として風向風速URにより排気される汚染排気と外乱にまとめられており、外乱にはトンネル1に対して吹き込む自然風による排気とトンネル内を通行する車両により発生する交通風による排気等がある。出力はトンネル内に実際に発生する汚染物質の発生を示す煙霧透過率(VI)と一酸化炭素濃度(CO)である。
 トンネル内のジェットファン10は、トンネル1内の空気を換気する機器であり、ここでは、インバータ駆動により運転されるジェットファンであり、複数台あり、それらの並列運転が可能なものとなっている。
 本発明のトンネル換気制御システム100は、図1に見るように、第2のフィードバックループを包含するように第1のフィードバックループを形成せしめたカスケード制御となっている。
 トンネル内の物理現象として風量と汚染量を考えてみると、風量の変化は速くかつ細かく変動するが、一方、汚染量は風量の変化に伴って換気が不足したり換気が進んだりすることによりトンネル全体としてゆっくりと大きく変動するものであり、風量に比べてトンネル内汚染量は時間定数が大きな物理量となっている。つまり、風量はジェットファンの運転制御により直接的に細かく操作しやすいが、汚染量はジェットファンの運転制御では直接的ではなく間接的に操作することとなる。ただし、真に守るべき基準は煙霧透過率目標値(VI*)と一酸化炭素濃度目標値(CO*)として与えられるので、汚染量に注目して制御する必要がある。
 そこで、本発明のトンネル換気制御システム100では、トンネル内の風向風速のフィードバック制御と、トンネル内の汚染量のフィードバック制御とをカスケード制御することにより、細かく変化しやすい風向風速に対してジェットファンの運転を細かくフィードバック制御することができ、また、風向風速の変化に伴って変化があらわれる汚染量に関してカスケード制御とすることによりフィードバック制御できるので、ジェットファンの運転制御を通じて、トンネル内の汚染量を正しく制御することができ、全体として過剰換気、換気不足となるケースを少なく低減でき、省エネ運転を実現できる。
 本発明のトンネル換気制御システム100では、細かく風向風量を調節することで全体として過剰換気、換気不足となるケースを少なく低減できることを通じて省エネ運転を実現するが、その際、ジェットファン10の運転をインバータ駆動運転とすることにより高い相乗効果が得られる。つまり、インバータ駆動運転とすれば、ジェットファン駆動の正逆逆転運転や回転数の変更など定格電流により速やかに制御を行うことができ、省電力化の効果が得られる。一方、従来の誘導モータによるジェットファン運転では、運転保護インターバル時間があり、一旦停止したジェットファンは10分間運転不可であったが、上記のようにインバータ制御運転を前提とすれば、回転数は0から最大周波数まで自由にとれるため、換気力も0から最大値まで任意に設定でき、理想的な風向風量制御をきめ細かい精度で制御できるというメリットが得られる。
 以上が、本発明のトンネル換気制御システム100の制御ブロックの構成である。
 次に、本発明のトンネル換気制御システム100の構成例を示す。
 図3の構成例では、トンネル換気制御システム100は、センサ部110と、モデル記憶部120と、予測部130と、フィードフォワード制御部140と、モデルパラメータ推定部150と、最適選定計画決定部160と、フィードバック補正部170と、ハイブリッド適応制御部180とを備えた構成となっている。
 まず、トンネル換気制御システム100の各構成要素を説明する。
 センサ部110は、実測データを収集する各種センサや計測器を備えており、トンネル1内の煙霧透過率データと、汚染ガス濃度データと、断面風速データと、トンネル内の車両交通量データとを含むトンネル内データを計測・収集する部分である。この構成例では、トラフィックカウンタ(TC)111、煙霧透過率データ計測器(VI計測器)112、一酸化炭素濃度データ計測器(CO計測器113)、トンネル内風向風速計(AV計)114を備えている。各センサはトンネル1内に適宜配置されているものとする。
 トラフィックカウンタ(TC)111は、トンネル1を通過する車両の台数や速度を計測するセンサであり、トンネル1の入口近くまたは出口近くに設置される。トラフィックカウンタ111によりトンネル1を通過する車両に関して必要なデータを得ることができる。本発明では交通車両の大型車/小型車の車種別の数を検知することができるものとする。
 煙霧透過率データ計測器(VI計測器)112は、レーザー照射部とレーザー受光部を備え、レーザー照射部とレーザー受光部間の空気中を透過するレーザー光の割合から塵などによる汚染濃度を計測する装置である。
 一酸化炭素濃度データ計測器(CO計測器113)113は、トンネル1内の一酸化炭素の濃度を測定する装置である。
 トンネル内風向風速計(AV計)114は、縦流換気の流れを計測するために適した位置、例えば、トンネル1の中央部近く及び出口近くに設置されている。
 モデル記憶部120は、トンネル1の諸元データに基づいたトンネル1内を流れる風をモデル化した「風速モデル」と、トンネル1内の車両交通をモデル化した「交通モデル」と、トンネル1内を通過する車両により発生する汚染物質の濃度をモデル化した「汚染濃度モデル」を保持記憶している部分であり、各モデルは予測部130による予測処理に用いられる。これら各種モデルが適したものであれば、後述する各種の予測精度が高くなる。
 予測部130は、センサ部110から取得したトンネル内データより、風速モデルと交通モデルと汚染濃度モデルを用いて、自然風Un予測、交通風Ut予測、トンネル内風速Ur予測、汚染発生量予測とを行う予測機能を備えた部分であり、自然風予測手段131と交通風予測手段132とトンネル内風速予測手段133と汚染発生量予測手段134とを備えている。
 自然風予測手段131は、トンネル外界の自然風の日量変化、週変化、月変化、年変化などの諸データに基づく自然風の予測と当該自然風によりトンネル内に生じる風向風速の予測機能と、トンネル内に吹く風の風向風速からトンネル1内における自然換気力を予測する機能を備えており、トンネル1内の風向風速の実測データと自然風により生じる風向風速の予測データとから所定時間経過後のトンネル内の自然風Unを予測する部分である。
 交通風予測手段132は、交通量の日量変化、週変化、月変化、年変化などの諸データに基づく交通量の予測機能と、交通量と車種別等価抵抗面積に基づいてトンネル1内で発生する交通風を予測する機能を備え、トラフィックカウンタ111による交通量の実測データと交通量の予測機能から得られた交通量予測データから、所定時間経過後の交通風Utを予測する部分である。
 トンネル内風速予測手段133は、トンネル内の自然風Un予測、の交通風Ut予測、ジェットファン10の運転による機械換気力Pjやトンネル諸元にもとづいて、トンネル1内に生じる風速Urを予測する部分である。高速の予測処理アルゴリズムに関しては既に示したとおりである。
 汚染発生量予測手段134は、トラフィックカウンタ111による交通量の実測データと交通量の予測機能から得られた交通量予測データと、車種別の汚染発生量予測データから所定時間経過後の汚染発生量C(t,x)を予測する部分である。なお汚染発生量についてはトンネル内での経過時間t、トンネル内での入口からの距離xに依存するので、それらの関数として予測される。高速の予測処理アルゴリズムに関しては既に示したとおりである。
 フィードフォワード制御部140は、予測部130の各種予測に基づき、断面風速目標値と換気機器制御目標値を決定する。
 モデルパラメータ推定部150は、センサ部110から取得したトンネル内データを入力とし、トンネル1内データの変化に合わせ、モデル記憶部120の風速モデルと交通モデルと汚染濃度モデルのパラメータを推定して更新する部分である。
 モデルパラメータ推定部150におけるパラメータ推定では、後述するように換気機器運転の結果、センサ部110にて得た実測データと、予測部130が予測した予測データとのずれの修正において、トンネル内風速モデルとトンネル内汚染濃度モデルを大型車両等価抵抗面積P1、小型車両等価抵抗面積P2、自然風風速P3をパラメータとし、各パラメータに関する線形性を利用してパラメータ推定を行うことができる。線形性を利用すればパラメータの更新を高速に行うことができ、計算コストを低減させることができる。
 この高速のパラメータ推定処理アルゴリズムについては上記したとおりであるのでここでは省略する。
 最適選定計画決定部160は、予測部130によるトンネル内風速Ur予測と汚染発生量C(t,x)の予測を利用し、汚染濃度基準を遵守するためのジェットファン10の並列運転台数と正逆方向とその回転数を含む省エネ最適選定計画を決める部分である。
 フィードバック補正部170は、センサ部110でトンネル1内から得た各種検出データに基づいて汚染濃度基準を遵守するためのジェットファン10の並列運転台数と正逆方向とその回転数のフィードバック制御を行う部分である。
 ここでは、フィードバック補正部170のフィードバック補正が、断面風速目標値とセンサ部110が実測した断面風速データから換気機器10の並列運転台数と正逆方向とその回転数を制御する第1のフィードバック制御と、汚染ガス濃度データおよび汚染ガス濃度目標値と、センサ部110が実測した煙霧透過率データおよび煙霧透過率目標値から換気機器10の並列運転台数と正逆方向とその回転数を制御する第2のフィードバック制御を備え、第2のフィードバックループを包含するように第1のフィードバックループを形成せしめたカスケード制御となっている。
 ハイブリッド適応制御部180は、フィードバック補正部170によるフィードバック補正と、最適選定計画決定部160により決定された省エネ最適選定計画とを組み合わせたハイブリッド型の適応制御を行う部分であり、ジェットファン10の最適制御量を決定する。ジェットファン10の並列運転台数と正逆方向とその回転数の算出は、適切なアルゴリズムを用いて計算することにより算出すれば良い。
 このように、本発明のトンネル換気制御システム100は、各種予測に基づくフィードバック補正と省エネ最適選定計画とを組み合わせたハイブリッド型の最適制御量にてジェットファン1を運転制御する。
 以上が、本発明のトンネル換気制御システム100の構成例における各構成要素の動作である。
 以上の構成において、ジェットファンのインバータ運転制御および最適選定計画決定部160における省エネ最適選定計画について説明を補足しておく。
 まず、ジェットファンのインバータ運転制御による省エネルギー化のメリットについて説明しておく。
 図4は、本発明のジェットファンのインバータ運転による制御の様子と、従来のオンオフ型の誘導モータ運転による制御の様子を分かりやすく図示したものである。
 図4(b)に示すように、目標値に向けてオンオフ型で制御すると制御によるVI値変化の振れ幅が大きくなりオーバーヘッド量が大きいため、精度良く目標値に安定させた制御が難しいことが分かる。
 しかし、本実施例1のトンネル換気制御システム100では、ジェットファン10はインバータ運転制御を行うものであり、ジェットファン10を省エネルギー運転で有利な低速回転C(Low)にて運転することも可能であるため、10台すべてのジェットファン10を低速回転C(Low)で運転してUjを得るように選定する。このように最適選定計画決定部160は省エネルギーを実現するジェットファンの正逆台数最適選定計画を立てることができる。
 図4(a)は本発明のインバータ制御運転による制御の様子を分かりやすく図示したものである。図4(a)に示すように、目標値に向けてインバータ制御運転すると制御によるVI値変化の振れ幅が小さくて済み、オーバーヘッドが少なく、精度良く目標値に安定させた制御が可能となることが分かる。
 次に、最適選定計画決定部160における省エネ最適選定計画の例について説明する。
 図5は本発明のトンネル換気制御システム100の最適選定計画の例を示した図である。
 図6は本発明のトンネル換気制御システム100の最適選定計画に従ったジェットファンの運転方向の正転・逆転の切り替えを含む運転パターン表を示した図である。
 図7は図6の運転パターン表に基づく切り替え期間中における汚染煤煙蓄積の関係について説明する図である。
 まず、図5の本発明のトンネル換気制御システム100の最適選定計画の例を説明する。
 今、トンネルは、トンネル断面積63.5平方メートルで、順方向において、勾配区間1(距離1500m、勾配2%)、勾配区間2(距離500m、勾配−1%)の2区間が連なったトンネルとする。交通量は1550台/h、大型車両混入率20%、車速63km/hとする。
 図5の縦軸はジェットファンの運転台数(台)と風速(m/S)の目盛を兼ねたもの、横軸は重方向交通比(%)の目盛をあらわしている。ここで、「重方向」とは、換気量を決める際に最も厳しい条件となる車両の走行方向である。この例では勾配区間1→勾配区間2の順方向が重方向であるものとする。
 図5には▲1▼▲2▼▲3▼の3つの曲線が描かれているが、▲1▼の曲線はトンネル内風速Urが0である場合の運転計画曲線であり、▲2▼の曲線はトンネル内風速Urが順方向に2.5m/Sである場合の運転計画曲線であり、▲3▼の曲線はトンネル内風速Urが順方向に−2.5m/Sである場合の運転計画曲線である。また、図中には交通風によりトンネル内に発生する風速線が描かれている。重方向交通比(重方向交通量/総交通量)0%の場合、つまり、車両がすべて重方向とは逆方向に向かう車両である場合、トンネル内には−6m/Sの風速が生じ、重方向交通比が50%であればちょうど相殺し合って0であるが、重方向交通比100%の場合、つまり、車両がすべて重方向に向かう車両である場合、トンネル内には6m/Sの風速が生じることが分かる。また、図中にはトンネル内の車両により発生した煤煙をトンネル内から排気するために順方向に押し出す場合に必要とされる風速の線と、逆方向に押し出す場合に必要とされる風速の線が描かれている。
 まず、▲1▼のトンネル内風速Urが0である場合の運転計画曲線を例にジェットファンの運転計画を説明する。
 (1)重方向交通比が30%以下または80%以上の場合
 重方向交通比30%あたりにおいて、逆方向に押し出す場合に必要とされる風速の線と交通風によりトンネル内に発生する風速線が交わっており、重方向交通比が30%以下であれば交通風が−2m/S超であり、交通風のみで充分な換気能力があることが分かる。この場合、ジェットファンを稼動させることなく必要な換気が行えることが分かる。重方向交通比が80%以上の場合も同様であり、交通風が2m/S超であり、交通風のみで充分な換気能力があることが分かる。この場合、ジェットファンを稼動させることなく必要な換気が行えることが分かる。
 (2)重方向交通比が30%から50%までの場合
 重方向交通比が30%を超えると交通風のみでは必要な風速は得られないので逆方向に運転するジェットファン稼動が必要となる。50%に近づくにつれ交通風はゼロに近くなるので逆方向運転するジェットファン台数を増やす必要がある。
 (3)重方向交通比が50%から80%までの場合
 重方向交通比が50%より大きくなると、交通風の流れる方向は50%以下の場合とは逆転し、交通風は順方向に吹き始める。ジェットファンの運転を逆方向運転のまま必要な風速を得ようとすると交通風に逆らう方向にジェットファンを稼動することとなり非効率である。そこで、50%を超える範囲ではジェットファンを逆転させて正転運転に切り替えて運転する。重方向交通比が80%に満たない場合はまだ交通風のみでは必要な風速は得られないのでジェットファン稼動が必要となる。重方向交通比が50%近くであれば、正転運転するジェットファンが6.5台程度必要であるが、重方向交通比が50%から増えるにつれ交通風は大きくなるのでジェットファン台数を減らすことが可能となり、80%に達すればジェットファンの稼動がなくても交通風のみで換気に必要な風速を得ることができる。
 上記が、▲1▼のトンネル内風速Urが0である場合の運転計画曲線によるジェットファンの運転計画であるが、自然風が吹いている場合、トンネル内風速に影響を与える。順方向に2.5m/Sの自然風がトンネル内に生じている場合、運転計画曲線が▲2▼の運転計画曲線となる。順方向に−2.5m/Sの自然風がトンネル内に生じている場合、運転計画曲線が▲3▼の運転計画曲線となる。運転計画曲線の読み方は上記の▲1▼の運転計画曲線の場合と同様で良い。
 上記のように本発明のトンネル換気制御システム100では、トンネル内交通における重方向交通比の変化や自然風の変化が生じた期間において、省エネルギー化を目的としてジェットファンの運転方向の正転逆転という運転の切り替えが発生しうる。つまり、省エネルギー化の観点から運転方向を切り替える訳であるが、切り替え期間中においては、本来はそのまま排気されるトンネル内空気の流れが逆転して戻ってくるのでトンネル内空気に汚染煤煙がさらに蓄積することとなる。ここで、切り替え期間中における汚染煤煙蓄積について考察しておく。
 図6は本発明のトンネル換気制御システム100の最適選定計画に従ったジェットファンの運転方向の切り替えを含む運転パターン表の一例を示した図である。図6の例では簡単に10分ごとの3つの期間(第1期間、第2期間、第3期間)において、ジェットファンの運転方向を整理したものである。隣接する期間において、正転と逆転、逆転と正転というように運転方向が変わっている箇所ではジェットファンの運転方向が切り替わることを示している。図6に見るように、3つの期間の運転パターンとしては8パターン存在する。ここで、図6に示した第3のパターンと第6のパターンは、3つの期間のすべてにおいて運転方向が前の期間とは異なり運転切り替えが2回発生するパターンであることが分かる。
 上記のように、ジェットファンの運転方向が切り替わるとトンネル端から排気されるはずの空気の流れが排気される前に流れる方向が逆転し、トンネル内を戻って行き、さらに、通行車両から発生する汚染煤煙が蓄積されてゆくこととなる。
 図7は、切り替え期間中における汚染煤煙蓄積の関係について説明する図である。左側はトンネルの内部を模式的に示しており、右側は空気塊の移動に伴って出会う車両から発生する煤煙が蓄積されてゆくことを模式的に示している。
 今、トンネル内の空気の流れに乗って移動する板状の空気塊を想定する。図7左側では中ほどに示されており、第1期間では南(下)から北(上)へトンネル内の空気が流れているものとする。空気塊が流れて行くにつれ、図7右側に示すように時間の経過とともに空気塊が移動して行く。
 空気塊が移動してゆくにつれ、トンネル内を通行する車両とすれ違ったり追い抜かれたりして空気塊と車両が交わってゆく。空気塊と車両が交わると車両から発生する煤煙が空気塊に蓄積してゆくこととなる。このように空気塊と車両が交わる回数が増えるにつれ、空気の汚染濃度が高くなってゆく。本発明のトンネル換気制御システム100の運転において、空気塊がトンネルを抜け出る直前のもっとも汚い汚染濃度であっても目標とする汚染濃度基準以下となるようにトンネル内風速が制御されている。
 今、省エネルギーの観点を重視してジェットファン運転方向を逆転させた場合、空気塊がトンネルを抜け出る前に流れる方向が逆転し、再度トンネルの中に戻ってゆく。図7右側において第2期間ではジェットファンの運転方向を逆転させたために、空気塊の移動方位が反転する様子が示されている。このように空気塊は第2期間において北(上)から南(下)へ移動しながら車両が交わると車両から発生する煤煙が空気塊に蓄積してゆくこととなる。
 図6に示すように、3つの期間におけるジェットファンの運転方向の切り替えを考慮すると第3パターンと第6パターンの2つの場合は、3つの期間にわたり汚染が蓄積する可能性があるため、最適選定計画決定部160は、この第3パターンと第6パターンの場合であっても遵守すべき汚染濃度以下となるように運転計画に反映させる。
 最適選定計画決定部160は上記の最適選定計画に従ったジェットファンの運転方向の切り替えを含む運転パターンを考慮して最適選定計画を立てる。
 以上が最適選定計画決定部160における処理の一例である。
 次に、本発明のトンネル換気制御システム100の動作や特徴を、従来型のオンオフ制御の誘導モータ駆動によるトンネル換気制御システム1と比較しつつ説明する。
 ここでは、トンネル1内にはジェットファンが10台備えられた例とする。
 図8は本発明のトンネル換気制御システム100の処理の流れを示すフローチャートである。
 まず、ある時刻T1において、センサ部110の各センサであるトラフィックカウンタ111、VI計測器112、CO計測器113、AV計114により、トンネル1内からデータを取得する(図8ステップ1)。トラフィックカウンタ111によりトンネル内を通行中の車両の数、大型車か小型車かという車種の違い、スピード等の種々の車両交通に関するトラフィックデータを取得する。VI計測器112によりトンネル内の煙霧透過率データ、CO計測器113によりトンネル300内の一酸化炭素濃度データ、AV計により風向風速データを得てトンネル300内の汚染レベルの諸データを取得する。
 センサ部110で得られたトラフィックデータ、煙霧透過率データ、一酸化炭素濃度データは、モデルパラメータ推定部150、予測部130、フィードバック補正部170にそれぞれ入力される。
 予測部130は、センサ部110で得たトラフィックデータ、煙霧透過率データ、一酸化炭素濃度データを基にモデル記憶部120のモデルを用いて、少なくとも、自然風Un予測、交通風Ut予測、汚染発生量C(t,x)予測の各々の予測データを計算する(図8ステップ2)。例えば、各々10分後の予測データを計算する。
 自然風予測は自然風予測手段131により行う。例えば、自然風予測手段131は現在の時刻より10分後のトンネル外界から吹く自然風を予測し、AV計114より得たトンネル1内の風向風速の現在の実測データと10分後の自然風予測データとから10分後の自然風Unを予測する。
 交通風予測は交通風予測手段132により行う。例えば、交通風予測手段132は過去の交通量の諸データに基づいて現在の時刻より10分後の交通量を予測し、モデル記憶部120の交通モデルを用いてトンネル1内で発生する交通風Utを予測し、トラフィックカウンタ111による交通量の実測データと交通量予測データから10分後の交通風Utを予測する。
 トンネル内風速Ur予測は、トンネル内風速予測手段133により行う。上記したトンネル内風速の高速予測手法を用いる。
 汚染発生量予測は汚染発生量予測手段134により行う。交通風予測で得た交通量予測データと汚染濃度モデルを用いて汚染発生量予測データを予測し、トラフィックカウンタ111による交通量の実測データと汚染発生量予測データから10分後の汚染発生量を予測する。上記した汚染発生量の高速予測手法を用いる。
 次に、最適選定計画決定部160は、予測部130によるトンネル内風速Ur予測と汚染発生量C(t,x)予測を利用し、汚染濃度基準を遵守するためのジェットファン10の並列運転台数Nと正逆方向Dとその回転数Cを含む省エネ最適選定計画を決める(図8ステップ3)。
 例えば、汚染発生量予測により必要なトンネル内の風向風速Uraが決まる。その風向風速に対して予想される自然風予測Unと交通風予測Utの差し引きにより、ジェットファン10により供給しなければならない風向風速Ujが求まる。最適選定計画決定部160はUjをもたらすジェットファン10の並列運転台数Nと正逆方向Dとそれぞれの回転数Cの運転計画を決定する。ここで、Ujをもたらすジェットファン10の並列運転台数Nと正逆方向Dとそれぞれの回転数Cにはいろいろな組み合わせが可能である。ここで、最適選定計画決定部160はもっとも省エネルギー運転となるようにジェットファン10の並列運転台数Nと正逆方向Dとそれぞれの回転数Cを選定する。
 例えば、従来のオンオフ型の誘導モータ運転を前提とすれば、稼動するジェットファン10は全力回転C(Top)にて使用することが前提となるため、全力回転するジェットファン10が何台あればUjとなるかを割り出す。例えば5台のジェットファン10を全力回転C(Top)にて運転すればUjを満たしたとする。
 次に、フィードバック補正部170は、センサ部110でトンネル1内から得た各種検出データに基づいて汚染濃度基準を遵守するためのジェットファン10の並列運転台数Nと正逆方向Dとその回転数Cのフィードバック制御量の計算を行う(図8ステップ4)。
 次に、ハイブリッド適応制御部180は、フィードバック補正部170によるフィードバック補正と、最適選定計画決定部160により決定された省エネ最適選定計画とを組み合わせて必要な台数Nのジェットファン10に対して正逆方向Dと回転数Cとなるよう最適制御量の運転制御信号を与え、ジェットファン10の省エネルギー運転を行う(図8ステップ5)。
 なお、モデルパラメータ推定部150は、モデル記憶部120に記憶されている風速モデル、交通モデル、汚染濃度モデルのパラメータが最適となるようにパラメータを推定し、各モデルのパラメータを当該推定値に更新しておく(図8ステップ6)。パラメータ推定は上記した高速パラメータ推定処理を用いて、自然換気力(Ur)、大型車両交通換気力(AmHeavy)、小型車両交通換気力(AmLight)のセンサ部で得た実測値を代入するのみで高速に求める。
 以上、本発明のトンネル換気制御システム100は、各種予測に基づくフィードバック補正と省エネ最適選定計画とを組み合わせたハイブリッド型の最適制御量にてジェットファン1を運転制御することができる。
[実験例]
 次に、本発明のトンネル換気制御システム100を用いて、実際のトンネルにおいて適用した実験例を示しておく。
 今、実験したトンネルの実験日において、図9(a)に示すように、上り方向(順方向)の大型車種の交通量▲1▼、上り方向(順方向)の小型車種の交通量▲2▼、下り方向(逆方向)の大型車種の交通量▲3▼、下り方向(逆方向)の小型車種▲4▼の交通量があった。
 トンネル内の風速は図9(b)に示すように制御された。なお、自然風は0であった。
 図9(c)は、図9(b)に示すトンネル内風速を得るために、本発明のトンネル換気制御システム100を用いてジェットファンをインバータ駆動により運転した結果を示す図である。インバータ制御によりジェットファンが細かく制御されている。概ね、順方向に2台から逆方向に2台の範囲で作動している。
 一方、図9(d)は、比較として、インバータ運転ではなく、従来型のオンオフ制御によりジェットファンを台数制御した場合の例を示している。図9(c)に示すように細かく制御されていないが、ジェットファンは順方向のみの台数制御を行っている。台数は2台から8台までと多くの台数が運転されている。
 このように、図9(d)の従来型のオンオフ制御による運転に比べ、図9(c)の本発明のインバータ制御の運転の方が省エネルギー化を図ることができる。
 以上、本発明の好ましい実施形態を図示して説明してきたが、トンネル換気制御システムに向けて広く適用することができる。
 本発明の技術的範囲を逸脱することなく種々の変更が可能であることは理解されるであろう。従って本発明の技術的範囲は添付された特許請求の範囲の記載によってのみ限定されるものである。

Claims (7)

  1.  トンネル内に配設された複数の換気機器と、
     前記トンネル内の煙霧透過率データと汚染ガス濃度データと断面風速データとトンネル内の車両交通量データとを含むトンネル内データを計測・収集するセンサ部と、
     前記トンネル内を流れる風をモデル化した風速モデルと、前記トンネル内の車両交通をモデル化した交通モデルと、前記トンネル内を通過する車両により発生する汚染物質の濃度をモデル化した汚染濃度モデルを保持記憶するモデル記憶部と、
     前記センサ部から取得した前記トンネル内データを入力とし、前記トンネル内データの変化に合わせ、前記モデル記憶部の前記風速モデルと前記交通モデルと前記汚染濃度モデルのパラメータを推定して更新するモデルパラメータ推定部と、
     煙霧透過率目標値と汚染ガス濃度目標値と、前記センサ部により実測した前記トンネル内データと、前記風速モデルと前記交通モデルと前記汚染濃度モデルを用いた自然風予測と交通風予測と汚染発生量予測を行う予測部と、
     前記予測部の各予測に基づき、断面風速目標値と換気機器制御目標値を決定するフィードフォワード制御部と、
     前記換気機器の並列運転台数と回転数との関係と前記換気機器の正逆逆転時における自然風の自然換気方向と対面交通による交通換気方向との関係とを考慮した省エネ最適選定計画を決める最適選定計画決定部と、
     前記断面風速目標値と前記換気機器制御目標値に対するフィードバック補正と前記省エネ最適選定計画とを組み合わせた適応制御を行うハイブリッド適応制御部を備えたトンネル換気制御システム。
  2.  前記換気機器の運転がインバータ駆動運転であり、前記換気機器を定格電力以下で前記ハイブリッド適応制御部が決定した最適制御量による連続運転を可能とした請求項1に記載のトンネル換気制御システム。
  3.  前記ハイブリッド適応制御部のフィードバック補正が、前記断面風速目標値と前記センサ部が実測した前記断面風速データから前記換気機器の並列運転台数と正逆方向とその回転数を制御する第1のフィードバック制御と、前記汚染ガス濃度データおよび前記汚染ガス濃度目標値と、前記センサ部が実測した前記煙霧透過率データおよび前記煙霧透過率目標値から前記換気機器の並列運転台数と正逆方向とその回転数を制御する第2のフィードバック制御を備え、
     前記第1のフィードバックループを包含するように前記第2のフィードバックループを形成せしめたカスケード制御としたことを特徴とするトンネル換気制御システム。
  4.  前記風速モデルとして、[数23]の方程式を前記トンネル内風向風速Urに関する2次多項式とみて2つの定常解をUr1*、Ur2*とし、Urについて解いた[数24]による解析解に基づく離散時間風速モデルを用いて、前記予測部における予測処理の高速化を図ることを特徴とする請求項1から3のいずれか1項に記載のトンネル換気制御システム。
    Figure JPOXMLDOC01-appb-M000001
    Figure JPOXMLDOC01-appb-M000002
     ここで、前記トンネル内風向風速Ur、前記トンネル断面積Ar、前記トンネル長L、空気密度ρ、前記トンネル内壁面摩擦力Pr、交通換気力Pt、自然換気力Pn、機械換気力Pjとし、α、βは係数とする。
  5.  前記汚染濃度モデルとして[数25]の移流拡散方程式をC(t,x)について解いた[数26]による解析解に基づく離散時間汚染濃度モデルを用いて前記予測部における予測処理の高速化を図ることを特徴とする請求項1から4のいずれか1項に記載のトンネル換気制御システム。
    Figure JPOXMLDOC01-appb-M000003
    Figure JPOXMLDOC01-appb-M000004
     ここで、汚染濃度C、前記トンネル内風向風速Ur、時間t、前記トンネル入口から流下方向への距離x、汚染発生量Mとする。Dは拡散係数、Miはi番目の車両による汚染発生量、tiはi番目の車両による汚染発生時刻、xiはi番目の車両のトンネル入口からの距離である。
  6.  前記ハイブリッド適応制御部による前記換気機器運転の結果として前記センサ部が収集した前記実測データと、前記予測部が予測した前記予測データとのずれの修正において、前記パラメータ推定部が、[数27]と[数28]から得た[数29]を、大型車両等価抵抗面積P1、小型車両等価抵抗面積P2、自然風風速P3をパラメータとして整理した[数30]においてP1,P2,P3に関して[数31]の線形性が成立していると扱うことにより離散時間確率システムのカルマンフィルタ問題としてパラメータP1,P2,P3の推定を行うことを特徴とする請求項1から4のいずれか1項に記載のトンネル換気制御システム。
    Figure JPOXMLDOC01-appb-M000005
    Figure JPOXMLDOC01-appb-M000006
     ζeは入口損失係数、λは壁面摩擦抵抗係数、Amは車両等価抵抗面積、Vtは平均車両速度である。添字の(H)は大型車、(L)は小型車である。φはジェットファンの吹き出し面積Ajとトンネル断面積Arの断面積比(Aj/Ar)、Ψはトンネル内風速Urとジェットファンの吹き出し風速Ujとの風速比(Ur/Uj)
    Figure JPOXMLDOC01-appb-M000007
    Figure JPOXMLDOC01-appb-M000008
    Figure JPOXMLDOC01-appb-M000009
  7.  前記ハイブリッド適応制御部による前記換気機器運転の結果として前記センサ部が収集した前記実測データと、前記予測部が予測した前記予測データとのずれの修正において、前記パラメータ推定部が、大型車両煤煙発生量P4、小型車両煤煙発生量P5をパラメータとして[数25]を整理した[数32]においてP4,P5に関して線形性が成立していることに着目することにより[数33]および離散時間確率システムのカルマンフィルタ問題としてパラメータP4,P5の推定を行うことを特徴とする請求項1から4のいずれか1項に記載のトンネル換気制御システム。
    Figure JPOXMLDOC01-appb-M000010
     ここでP(t)はCo(H)、P(t)はCo(L)に相当する。
    Figure JPOXMLDOC01-appb-M000011
PCT/JP2009/067592 2009-10-05 2009-10-05 対面通行トンネルのジェットファンによるトンネル換気制御システム WO2011042980A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2009/067592 WO2011042980A1 (ja) 2009-10-05 2009-10-05 対面通行トンネルのジェットファンによるトンネル換気制御システム
CN200980160267.4A CN102472105B (zh) 2009-10-05 2009-10-05 双向隧道用射流风机的隧道通风控制系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2009/067592 WO2011042980A1 (ja) 2009-10-05 2009-10-05 対面通行トンネルのジェットファンによるトンネル換気制御システム

Publications (1)

Publication Number Publication Date
WO2011042980A1 true WO2011042980A1 (ja) 2011-04-14

Family

ID=43856474

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/067592 WO2011042980A1 (ja) 2009-10-05 2009-10-05 対面通行トンネルのジェットファンによるトンネル換気制御システム

Country Status (2)

Country Link
CN (1) CN102472105B (ja)
WO (1) WO2011042980A1 (ja)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102200022A (zh) * 2011-04-20 2011-09-28 杭州行者工业产品设计事务所 隧道通风系统
CN105370609A (zh) * 2015-12-01 2016-03-02 中铁第一勘察设计院集团有限公司 高海拔集群通风智能控制系统及其方法
EP3339569A1 (de) * 2016-12-22 2018-06-27 Korfmann Lufttechnik GmbH Verfahren und vorrichtung zur belüftung eines tunnelbauwerks
FR3094076A1 (fr) * 2019-03-19 2020-09-25 Magma Conseil Et Equipement Procédé et dispositif d’aérage en galerie et tunnel
CN111752199A (zh) * 2020-07-06 2020-10-09 大连理工大学 一种基于实时监测和大数据学习技术的自动化智能风机管理系统及方法
CN113323907A (zh) * 2021-07-20 2021-08-31 河北省高速公路延崇管理中心 一种隧道内射流风机反转的确定方法及系统
CN113685221A (zh) * 2021-09-09 2021-11-23 西安重装韩城煤矿机械有限公司 一种局部通风机不停风切换的控制方法及装置

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060863B (zh) * 2017-01-05 2018-05-22 深圳市市政设计研究院有限公司 一种地铁隧道泄压孔风压控制方法及系统
CN108223009A (zh) * 2017-11-27 2018-06-29 广东工业大学 一种基于污染物浓度的隧道通风控制方法
CN108553786A (zh) * 2018-06-29 2018-09-21 清华大学 地铁互通式隧道火灾试验系统及方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09125897A (ja) * 1995-11-06 1997-05-13 Nissin Electric Co Ltd トンネル換気制御方法
JPH10292800A (ja) * 1997-04-16 1998-11-04 Toshiba Corp 道路トンネル換気制御装置
JPH1181900A (ja) * 1997-09-11 1999-03-26 Toshiba Corp トンネル換気制御装置
JPH11210399A (ja) * 1998-01-20 1999-08-03 Nissin Electric Co Ltd トンネル換気制御方法
JP2004156258A (ja) * 2002-11-05 2004-06-03 Hitachi Ltd トンネル換気制御方法および装置
JP2004169341A (ja) * 2002-11-19 2004-06-17 Hitachi Ltd トンネル換気制御方法および装置
JP2009243244A (ja) * 2008-03-31 2009-10-22 Sohatsu System Kenkyusho:Kk 対面通行トンネルのジェットファンによるトンネル換気制御システム
JP2009243241A (ja) * 2008-03-31 2009-10-22 Sohatsu System Kenkyusho:Kk 対面通行トンネルのジェットファンによるトンネル換気制御システム

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0240713B1 (en) * 1986-04-07 1992-01-08 Mitsubishi Denki Kabushiki Kaisha Controller for tunnel ventilating system
JPH11229798A (ja) * 1998-02-13 1999-08-24 Meidensha Corp 道路トンネルの換気制御システム
CN1580493B (zh) * 2004-05-20 2010-06-09 陆懋成 双孔单向行车公路隧道侧压通风排烟方法
CN101235724B (zh) * 2008-02-02 2010-12-08 西南交通大学 高速公路毗邻隧道联动通风控制方法
CN101235723B (zh) * 2008-02-02 2010-08-18 西南交通大学 高速公路路段多隧道集合式智能通风控制方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09125897A (ja) * 1995-11-06 1997-05-13 Nissin Electric Co Ltd トンネル換気制御方法
JPH10292800A (ja) * 1997-04-16 1998-11-04 Toshiba Corp 道路トンネル換気制御装置
JPH1181900A (ja) * 1997-09-11 1999-03-26 Toshiba Corp トンネル換気制御装置
JPH11210399A (ja) * 1998-01-20 1999-08-03 Nissin Electric Co Ltd トンネル換気制御方法
JP2004156258A (ja) * 2002-11-05 2004-06-03 Hitachi Ltd トンネル換気制御方法および装置
JP2004169341A (ja) * 2002-11-19 2004-06-17 Hitachi Ltd トンネル換気制御方法および装置
JP2009243244A (ja) * 2008-03-31 2009-10-22 Sohatsu System Kenkyusho:Kk 対面通行トンネルのジェットファンによるトンネル換気制御システム
JP2009243241A (ja) * 2008-03-31 2009-10-22 Sohatsu System Kenkyusho:Kk 対面通行トンネルのジェットファンによるトンネル換気制御システム

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102200022A (zh) * 2011-04-20 2011-09-28 杭州行者工业产品设计事务所 隧道通风系统
CN105370609A (zh) * 2015-12-01 2016-03-02 中铁第一勘察设计院集团有限公司 高海拔集群通风智能控制系统及其方法
EP3339569A1 (de) * 2016-12-22 2018-06-27 Korfmann Lufttechnik GmbH Verfahren und vorrichtung zur belüftung eines tunnelbauwerks
FR3094076A1 (fr) * 2019-03-19 2020-09-25 Magma Conseil Et Equipement Procédé et dispositif d’aérage en galerie et tunnel
CN111752199A (zh) * 2020-07-06 2020-10-09 大连理工大学 一种基于实时监测和大数据学习技术的自动化智能风机管理系统及方法
CN113323907A (zh) * 2021-07-20 2021-08-31 河北省高速公路延崇管理中心 一种隧道内射流风机反转的确定方法及系统
CN113685221A (zh) * 2021-09-09 2021-11-23 西安重装韩城煤矿机械有限公司 一种局部通风机不停风切换的控制方法及装置

Also Published As

Publication number Publication date
CN102472105B (zh) 2014-05-07
CN102472105A (zh) 2012-05-23

Similar Documents

Publication Publication Date Title
WO2011042980A1 (ja) 対面通行トンネルのジェットファンによるトンネル換気制御システム
JP4898732B2 (ja) 対面通行トンネルのジェットファンによるトンネル換気制御システム
Kim et al. Indoor air quality control for improving passenger health in subway platforms using an outdoor air quality dependent ventilation system
JP2009243241A (ja) 対面通行トンネルのジェットファンによるトンネル換気制御システム
JP5784530B2 (ja) トンネル換気制御装置及びその方法
JP6089329B2 (ja) 対面通行トンネルのジェットファンによるトンネル換気制御システム
JP3778539B2 (ja) トンネル内車両走行制御方法及びその装置
JP4729079B2 (ja) トンネル換気制御装置
JP4762086B2 (ja) トンネル換気制御装置
JP2019044507A (ja) 道路トンネル換気制御装置
JP3789076B2 (ja) 道路トンネル換気制御装置
KR100377503B1 (ko) 도로터널의 종류식 환기시설 운전 방법
JPH01235799A (ja) 道路トンネルの換気制御装置
JP4199138B2 (ja) トンネル換気制御装置
JPH07324598A (ja) トンネル換気制御装置
JP2550178B2 (ja) トンネルの換気制御装置
JPH0613840B2 (ja) 集中排気式自動車トンネルの換気制御方法
JP2004275834A (ja) 電気集塵装置の制御方法および装置
JPH08165900A (ja) 道路トンネル換気制御装置
JP2003185356A (ja) 集塵風量の制御方法
JP3425317B2 (ja) 道路トンネル換気制御装置
JPH11210399A (ja) トンネル換気制御方法
KR100403866B1 (ko) 종류식 도로터널의 오염도 및 가시도 예측방법, 및 이를 이용한 허용오염도 및 허용가시도 유지방법
JPH04309700A (ja) トンネルの換気制御装置
JP3254801B2 (ja) 換気自動制御装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980160267.4

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09850251

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 16/07/2012)

NENP Non-entry into the national phase

Ref country code: JP

122 Ep: pct application non-entry in european phase

Ref document number: 09850251

Country of ref document: EP

Kind code of ref document: A1