WO2010145529A1 - 一种用于盾构机密闭始发及到达的装置 - Google Patents

一种用于盾构机密闭始发及到达的装置 Download PDF

Info

Publication number
WO2010145529A1
WO2010145529A1 PCT/CN2010/073916 CN2010073916W WO2010145529A1 WO 2010145529 A1 WO2010145529 A1 WO 2010145529A1 CN 2010073916 W CN2010073916 W CN 2010073916W WO 2010145529 A1 WO2010145529 A1 WO 2010145529A1
Authority
WO
WIPO (PCT)
Prior art keywords
steel sleeve
arrival
shield machine
rear end
shield
Prior art date
Application number
PCT/CN2010/073916
Other languages
English (en)
French (fr)
Inventor
易觉
赖伟文
方启超
赵晖
蔡国贤
凌波
吴启光
刘玮
李飞
王家星
Original Assignee
广东华隧建设股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 广东华隧建设股份有限公司 filed Critical 广东华隧建设股份有限公司
Priority to DE112010000017.4T priority Critical patent/DE112010000017B4/de
Priority to JP2011546582A priority patent/JP5529892B2/ja
Publication of WO2010145529A1 publication Critical patent/WO2010145529A1/zh

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Definitions

  • the invention relates to the field of building construction, in particular to a receiving device for sealing and starting and arriving of a shield machine in tunnel construction.
  • the shield construction method is a kind of tunneling in the underground using a shield machine. In the prevention of the collapse of the soft foundation excavation surface or maintaining the stability of the excavation surface, the tunnel is safely excavated and lining in the machine. Tunnel construction method.
  • Shield origination and arrival technology refers to the treatment of the end of the tunnel before the shield tunneling (reinforcing the soft stratum and high groundwater level geological conditions), the hole door chiseling, the shield origination and the receiving base design and processing, Positioning and installation; support system, installation of the door door ring, assembly and disassembly of the shield machine, so as to ensure that the shield construction can carry out the construction technology of tunneling and arrival according to the tunnel design axis.
  • the utility model relates to a device for sealing and starting and arriving of a shield machine, which comprises a steel sleeve assembled by a plurality of curved steel plates, a bottom of which is welded with a bracket and a slurry pipe, and the steel sleeve is The top is provided with a feeding port and a lifting lug, the rear end of the steel sleeve is connected with a rear end cover, and the rear end cover is mounted with a reaction force frame, and the inner bottom of the steel sleeve is provided with a pushing shield Pushing roller set for body use;
  • the joint surface of the steel plate is welded with a flange, and the flanges are connected by bolts;
  • the rear end cover is welded by an ellipsoidal cover and a plane ring plate; the reaction force frame is a "well" type structure.
  • the invention has the beneficial effects that the invention can effectively avoid the origin of the shield and the construction risk brought by the traditional end reinforcement.
  • the shield receiving device can be reused, and the loss of the device is small, the service life is long, and the end reinforcing cost required for each shield origination and arrival is reduced, which has good economic benefits.
  • it is not necessary to carry out end reinforcement no need to occupy the road and pipeline relocation, and the cost increase caused by the increase of the construction period due to the end treatment can be greatly reduced.
  • Figure 1 is a schematic view of the structure of the present invention
  • Figure 2 is a cross-sectional view of the steel sleeve of the present invention.
  • Figure 3 is a cross-sectional view of the reaction frame of the present invention.
  • Figure 4 is a schematic view showing the installation of the push-up roller set of the present invention.
  • a device for sealing and starting and reaching a shield machine comprises a steel sleeve 1 assembled from a plurality of curved steel plates 11 and a steel plate 11 adopting 16 mm.
  • a thick A3 steel plate is rolled, the flange of the steel plate 11 is welded with a flange, and the flange is finished by a 24 mm thick A3 plate.
  • the flanges are connected by bolts 6 and a rubber pad of 6 mm thick is added in the middle.
  • the bottom of the steel sleeve 1 is welded with a bracket 2 and a slurry pipe 3, and the top of the steel sleeve 1 is provided with a feed port 12 and a lifting lug 13 for lifting the rear end of the steel sleeve 1
  • a rear end cover 3 which is welded by an ellipsoidal cover and a flat ring plate.
  • the ellipsoidal cover and the flat ring plate material are processed by a 30 mm thick steel plate, and the reaction frame 4 is mounted on the rear end cover 3, and the reaction force frame 4 is a device for providing a reaction force to the steel sleeve 1, and the reaction force frame 4 is tight.
  • the back cover 3 is mounted on a flat plate, and the crown portion is not in contact with the reaction frame 4.
  • the reaction frame 4 is of a "well” type structure.
  • the "well” frame is welded with 500mm I-beams, and the 12mm thick steel plate is added at intervals of 500mm.
  • the inner bottom portion of the steel sleeve 1 is provided with a push-up roller set 5 for pushing the shield.
  • the invention can effectively avoid the origin of the shield and the construction risk brought by the traditional end reinforcement.
  • the shield receiving device can be reused, and the loss of the device is small, the service life is long, and the end reinforcing cost required for each shield origination and arrival is reduced, which has good economic benefits.
  • it is not necessary to carry out end reinforcement no need to occupy the road and pipeline relocation, and the cost increase caused by the increase of the construction period due to the end treatment can be greatly reduced.

Description

一种用于盾构机密闭始发及到达的装置
技术领域
本发明涉及建筑施工领域,特别是涉及一种隧道施工中的盾构机密闭始发及到达的接收装置。
背景技术
盾构施工法是一种使用盾构机在地下掘进,在防止软基开挖面崩塌或保持开挖面稳定的同时,在机内安全地进行隧道的开挖和衬砌作业的一种在暗挖隧道施工方法。
盾构始发及到达技术是指在盾构掘进前对洞门端头采取处理(加固软弱地层及高地下水位地质条件)、洞门凿除、盾构始发及接收基座的设计加工、定位安装;支撑系统、洞门环的安设、盾构机组装与拆卸措施,从而保证盾构施工能按照隧道设计轴线进行掘进及到达的施工技术。
国内目前使用的盾构机始发及到达施工方法比较多,主要有旋喷桩加固法、钢板桩置换法、化学注浆加固法、冻结法、挖填法等工法。采用这些传统盾构始发工法成功的例子很多,但是施工过程也有不少问题,甚至始发和到达失败的也不乏少数,不仅容易造成漏水、端头失稳等现象,更可能会对基坑的安全也存在一定的影响。始发与到达施工风险是整个盾构施工风险中的主要风险(占整个施工风险的65%~75%),所以开发一种可以大大降低盾构机始发及到达的风险,为较好地控制地面沉降的盾构机密闭始发及到达的接收装置已经提上了人们的研究日程。
发明内容
为了克服现有技术的不足,本发明的目的是提供一种大大降低了对洞门凿除所存在的风险性,为较好地控制地面沉降的盾构机密闭始发及到达的接收装置。
本发明解决其技术问题所采用的技术方案是:
一种用于盾构机密闭始发及到达的装置,其包括由多块弧形的钢板拼装而成钢套筒,钢套筒底部焊接有托架以及排浆管,所述钢套筒的顶部设置有进料口以及起吊用的吊耳,所述钢套筒的后端连接有后端盖,后端盖上安装有反力架,所述钢套筒的内侧底部设置有顶推盾体用的顶推托轮组;
作为上述技术方案的改进,所述钢板的接合面上焊接有法兰,法兰之间采用螺栓连接;
作为上述技术方案的改进,所述后端盖由椭球盖和平面环板焊接而成;所述的反力架为“井”字结构型式。
本发明的有益效果是:本发明可以有效规避传统端头加固带来的盾构始发及到达施工风险。另外,盾构接收装置可以重复使用,且设备的损耗小,使用寿命长,减少由于每次盾构始发及到达都要进行的端头加固费用,具有较好的经济效益。而且使用时,无须进行端头加固、无须占道及管线迁改,可以大大减少由于进行端头处理导致工期增加所带来的成本增加。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1为本发明的结构示意图;
图2为本发明的钢套筒截面图;
图3为本发明的反力架截面图;
图4为本发明的顶推托轮组安装示意图。
具体实施方式
参照图1、图2、图3、图4,一种用于盾构机密闭始发及到达的装置,其包括由多块弧形的钢板11拼装而成钢套筒1,钢板11采用16mm厚的A3钢板卷制而成,所述钢板11的接合面上焊接有法兰,法兰用24mm厚的A3板精加工而成,法兰之间采用螺栓6连接,中间加6mm厚橡胶垫密封,钢套筒1底部焊接有托架2以及排浆管3,所述钢套筒1的顶部设置有进料口12以及起吊用的吊耳13,所述钢套筒1的后端连接有后端盖3,所述后端盖3由椭球盖和平面环板焊接而成。椭球盖和平面环板材料用30mm厚钢板加工制作,后端盖3上安装有反力架4,反力架4是用于给钢套筒1提供反力的装置,反力架4紧贴后盖3平面板安装,冠球部分不与反力架4接触。所述的反力架4为“井”字结构型式。“井”字框架采用500mm的工字钢组焊而成,中间间隔500mm增加12mm厚钢板筋板。所述钢套筒1的内侧底部设置有顶推盾体用的顶推托轮组5。
本发明可以有效规避传统端头加固带来的盾构始发及到达施工风险。另外,盾构接收装置可以重复使用,且设备的损耗小,使用寿命长,减少由于每次盾构始发及到达都要进行的端头加固费用,具有较好的经济效益。而且使用时,无须进行端头加固、无须占道及管线迁改,可以大大减少由于进行端头处理导致工期增加所带来的成本增加。

Claims (4)

  1. 一种用于盾构机密闭始发及到达的装置,其特征在于:包括由多块弧形的钢板(11)拼装而成钢套筒(1),钢套筒(1)底部焊接有托架(2)以及排浆管(3),所述钢套筒(1)的顶部设置有进料口(12)以及起吊用的吊耳(13),所述钢套筒(1)的后端连接有后端盖(3),后端盖(3)上安装有反力架(4),所述钢套筒(1)的内侧底部设置有顶推盾体用的顶推托轮组(5)。
  2. 根据权利要求1所述的一种用于盾构机密闭始发及到达的装置,其特征在于:所述钢板(11)的接合面上焊接有法兰,法兰之间采用螺栓(6)连接。
  3. 根据权利要求1所述的一种用于盾构机密闭始发及到达的装置,其特征在于:所述后端盖(3)由椭球盖和平面环板焊接而成。
  4. 根据权利要求1所述的一种用于盾构机密闭始发及到达的装置,其特征在于:所述的反力架(4)为“井”字结构型式。
PCT/CN2010/073916 2009-06-15 2010-06-13 一种用于盾构机密闭始发及到达的装置 WO2010145529A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE112010000017.4T DE112010000017B4 (de) 2009-06-15 2010-06-13 Geschlossene Abfahrts- und Ankunftsvorrichtung für eine Schildvortriebsmaschine
JP2011546582A JP5529892B2 (ja) 2009-06-15 2010-06-13 シールド機械の密閉状態での発進及び到達のための装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200920058408.9 2009-06-15
CN2009200584089U CN201424941Y (zh) 2009-06-15 2009-06-15 一种用于盾构机密闭始发及到达的装置

Publications (1)

Publication Number Publication Date
WO2010145529A1 true WO2010145529A1 (zh) 2010-12-23

Family

ID=42024388

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2010/073916 WO2010145529A1 (zh) 2009-06-15 2010-06-13 一种用于盾构机密闭始发及到达的装置

Country Status (4)

Country Link
JP (1) JP5529892B2 (zh)
CN (1) CN201424941Y (zh)
DE (1) DE112010000017B4 (zh)
WO (1) WO2010145529A1 (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953353A (zh) * 2014-04-23 2014-07-30 中铁十五局集团有限公司 盾构始发反力架及其安装使用方法
CN106948829A (zh) * 2017-04-29 2017-07-14 中铁局集团有限公司 一种泥水盾构始发洞门密封结构及其施工方法
CN108086986A (zh) * 2018-01-24 2018-05-29 中铁工程装备集团机电工程有限公司 一种盾构接收用钢套筒
CN108755755A (zh) * 2018-06-19 2018-11-06 中交第二航务工程局有限公司 分片预制装配式管廊装备始发的反力装置
CN109372541A (zh) * 2018-11-27 2019-02-22 中铁第四勘察设计院集团有限公司 一种适用于盾构隧道的洞门临时封堵结构及其施工方法
CN109736832A (zh) * 2019-01-07 2019-05-10 中铁十一局集团城市轨道工程有限公司 盾构机始发即下穿既有盾构隧道时始发端洞门密封装置及方法
CN109915155A (zh) * 2019-04-28 2019-06-21 中铁隧道股份有限公司 盾构机主机过站装置及在不可吊移环境中的盾构机主机过站方法
CN110552709A (zh) * 2019-09-27 2019-12-10 中铁十一局集团城市轨道工程有限公司 适用于大直径盾构机的自进式整体过站方法及装置
CN112302669A (zh) * 2020-12-01 2021-02-02 长江勘测规划设计研究有限责任公司 一种复杂环境条件下地铁盾构到达辅助施工方法及结构
CN112762808A (zh) * 2020-12-29 2021-05-07 淮安市中球盾构技术服务有限公司 钢套筒位移检测系统
CN112846593A (zh) * 2021-01-29 2021-05-28 中交二公局第三工程有限公司 一种用于盾构工程用钢套筒始发装置
CN113137252A (zh) * 2021-05-31 2021-07-20 中铁二十四局集团有限公司 盾构机始发接收的洞门密封装置及施工方法
CN110552709B (zh) * 2019-09-27 2024-05-03 中铁十一局集团城市轨道工程有限公司 适用于大直径盾构机的自进式整体过站方法及装置

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201424941Y (zh) * 2009-06-15 2010-03-17 广东华隧建设股份有限公司 一种用于盾构机密闭始发及到达的装置
CN102352753B (zh) * 2011-06-29 2014-08-27 中铁第四勘察设计院集团有限公司 采用冻结加固和堆土灌水的盾构到达接收方法
CN102434718B (zh) * 2011-09-08 2013-07-03 广东省基础工程公司 一种顶管机始发的端头加固方法
CN102619527A (zh) * 2012-04-18 2012-08-01 中铁十三局集团第一工程有限公司 栓接式盾构始发托架
CN102748038A (zh) * 2012-07-11 2012-10-24 上海盾构设计试验研究中心有限公司 一种全回收式盾构进出洞止水装置
CN102797483A (zh) * 2012-08-07 2012-11-28 天津城建隧道股份有限公司 一种护筒及富水地层盾构护筒接收法
CN103266896B (zh) * 2013-05-24 2015-05-20 上海市城市建设设计研究总院 盾构机先就位后施工围护结构及开挖盾构井的施工工法
CN103352702B (zh) * 2013-07-09 2016-05-04 中铁第四勘察设计院集团有限公司 一种盾构洞内接收施工工法
CN103375171B (zh) * 2013-07-18 2016-06-08 中铁隧道集团有限公司 一种盾构洞内始发反力架
CN104806254A (zh) * 2014-01-26 2015-07-29 宏润建设集团股份有限公司 盾构机到达接收位置的辅助装置及辅助接收施工方法
CN104695967B (zh) * 2015-01-21 2017-10-10 广东华隧建设股份有限公司 用于盾构始发的环框梁装置及其安装方法
CN105464671A (zh) * 2015-12-16 2016-04-06 中铁工程装备集团机电工程有限公司 一种轻量化盾构接收用钢套筒
CN105715277A (zh) * 2016-02-17 2016-06-29 广州地铁设计研究院有限公司 一种盾构隧道的施工装置及施工方法
CN105927242B (zh) * 2016-07-11 2018-01-23 辽宁北铁建工有限责任公司 小型tbm岩石掘进机快速始发装置的始发方法
CN106640097B (zh) * 2016-08-31 2019-04-12 中铁二院工程集团有限责任公司 一种新型盾构平衡始发及接收套筒装置
CN107152285B (zh) * 2017-04-28 2017-12-26 淮安市中球盾构技术服务有限公司 用于盾构机始发及接收的辅助装置
CN108397206A (zh) * 2018-03-08 2018-08-14 中铁建大桥工程局集团第四工程有限公司 富水软土地层中短加固区工况下盾构到达接收方法
CN110259461A (zh) * 2019-05-24 2019-09-20 中交二公局第一工程有限公司 一种用于盾构机在小半径曲线始发的反力架
CN110529123A (zh) * 2019-08-28 2019-12-03 湖南科技大学 盾构机稳定接收装置

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003206691A (ja) * 2002-01-11 2003-07-25 Maeda Corp シールド到達工法
JP2006307455A (ja) * 2005-04-26 2006-11-09 Jfe Metal Products & Engineering Inc エントランス用シャッタ装置およびシールド掘削機の発進または到達方法
JP2007023770A (ja) * 2006-11-02 2007-02-01 Okumura Corp シールド機発進機構および発進方法
CN1995700A (zh) * 2006-12-30 2007-07-11 广东省基础工程公司 一种盾构机始发的施工方法
CN100343485C (zh) * 2004-12-09 2007-10-17 上海隧道工程股份有限公司 模拟盾构掘进机试验用的模拟土箱
EP1862637A1 (de) * 2006-05-30 2007-12-05 DYWIDAG Bau GmbH Vorrichtung und Verfahren für die Schildanfahrt und die Schildausfahrt
JP2008196260A (ja) * 2007-02-15 2008-08-28 Shimizu Corp シールド機の発進方法
CN101298836A (zh) * 2008-06-23 2008-11-05 沈阳重型机械集团有限责任公司 用于盾构机始发的加压平衡装置
CN101353965A (zh) * 2008-09-05 2009-01-28 上海隧道工程股份有限公司 盾构进洞接收装置及其进洞施工方法
CN201424941Y (zh) * 2009-06-15 2010-03-17 广东华隧建设股份有限公司 一种用于盾构机密闭始发及到达的装置

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05346093A (ja) * 1992-06-16 1993-12-27 Taisei Corp シールド掘進機の発進方法
JPH06158980A (ja) * 1992-11-17 1994-06-07 Daiho Constr Co Ltd シールド機の発進方法および発進装置並びに到達方法および到達装置
JP3085186B2 (ja) * 1996-04-16 2000-09-04 鹿島建設株式会社 シールド掘進機の発進坑口部の止水構造
JP3382183B2 (ja) * 1999-09-03 2003-03-04 誠 植村 地下構造物の構築方法およびそれに使用するルーフ用筒体
JP2008231729A (ja) 2007-03-19 2008-10-02 Tokyo Metro Co Ltd シールド到達工法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003206691A (ja) * 2002-01-11 2003-07-25 Maeda Corp シールド到達工法
CN100343485C (zh) * 2004-12-09 2007-10-17 上海隧道工程股份有限公司 模拟盾构掘进机试验用的模拟土箱
JP2006307455A (ja) * 2005-04-26 2006-11-09 Jfe Metal Products & Engineering Inc エントランス用シャッタ装置およびシールド掘削機の発進または到達方法
EP1862637A1 (de) * 2006-05-30 2007-12-05 DYWIDAG Bau GmbH Vorrichtung und Verfahren für die Schildanfahrt und die Schildausfahrt
JP2007023770A (ja) * 2006-11-02 2007-02-01 Okumura Corp シールド機発進機構および発進方法
CN1995700A (zh) * 2006-12-30 2007-07-11 广东省基础工程公司 一种盾构机始发的施工方法
JP2008196260A (ja) * 2007-02-15 2008-08-28 Shimizu Corp シールド機の発進方法
CN101298836A (zh) * 2008-06-23 2008-11-05 沈阳重型机械集团有限责任公司 用于盾构机始发的加压平衡装置
CN101353965A (zh) * 2008-09-05 2009-01-28 上海隧道工程股份有限公司 盾构进洞接收装置及其进洞施工方法
CN201424941Y (zh) * 2009-06-15 2010-03-17 广东华隧建设股份有限公司 一种用于盾构机密闭始发及到达的装置

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953353A (zh) * 2014-04-23 2014-07-30 中铁十五局集团有限公司 盾构始发反力架及其安装使用方法
CN106948829A (zh) * 2017-04-29 2017-07-14 中铁局集团有限公司 一种泥水盾构始发洞门密封结构及其施工方法
CN108086986A (zh) * 2018-01-24 2018-05-29 中铁工程装备集团机电工程有限公司 一种盾构接收用钢套筒
CN108755755A (zh) * 2018-06-19 2018-11-06 中交第二航务工程局有限公司 分片预制装配式管廊装备始发的反力装置
CN109372541B (zh) * 2018-11-27 2023-09-26 中铁第四勘察设计院集团有限公司 一种适用于盾构隧道的洞门临时封堵结构及其施工方法
CN109372541A (zh) * 2018-11-27 2019-02-22 中铁第四勘察设计院集团有限公司 一种适用于盾构隧道的洞门临时封堵结构及其施工方法
CN109736832A (zh) * 2019-01-07 2019-05-10 中铁十一局集团城市轨道工程有限公司 盾构机始发即下穿既有盾构隧道时始发端洞门密封装置及方法
CN109736832B (zh) * 2019-01-07 2024-03-08 中铁十一局集团城市轨道工程有限公司 盾构机始发即下穿既有盾构隧道时始发端洞门密封装置及方法
CN109915155A (zh) * 2019-04-28 2019-06-21 中铁隧道股份有限公司 盾构机主机过站装置及在不可吊移环境中的盾构机主机过站方法
CN110552709A (zh) * 2019-09-27 2019-12-10 中铁十一局集团城市轨道工程有限公司 适用于大直径盾构机的自进式整体过站方法及装置
CN110552709B (zh) * 2019-09-27 2024-05-03 中铁十一局集团城市轨道工程有限公司 适用于大直径盾构机的自进式整体过站方法及装置
CN112302669A (zh) * 2020-12-01 2021-02-02 长江勘测规划设计研究有限责任公司 一种复杂环境条件下地铁盾构到达辅助施工方法及结构
CN112762808A (zh) * 2020-12-29 2021-05-07 淮安市中球盾构技术服务有限公司 钢套筒位移检测系统
CN112846593B (zh) * 2021-01-29 2022-09-16 中交二公局第三工程有限公司 一种用于盾构工程用钢套筒始发装置
CN112846593A (zh) * 2021-01-29 2021-05-28 中交二公局第三工程有限公司 一种用于盾构工程用钢套筒始发装置
CN113137252A (zh) * 2021-05-31 2021-07-20 中铁二十四局集团有限公司 盾构机始发接收的洞门密封装置及施工方法
CN113137252B (zh) * 2021-05-31 2023-12-22 中铁二十四局集团有限公司 盾构机始发接收的洞门密封装置及施工方法

Also Published As

Publication number Publication date
JP2012516953A (ja) 2012-07-26
DE112010000017B4 (de) 2022-02-10
CN201424941Y (zh) 2010-03-17
DE112010000017T5 (de) 2011-06-22
JP5529892B2 (ja) 2014-06-25

Similar Documents

Publication Publication Date Title
WO2010145529A1 (zh) 一种用于盾构机密闭始发及到达的装置
CN100554646C (zh) 盾构法与浅埋暗挖法结合建造地铁车站的施工方法
CN107460888B (zh) 一种混凝土预制管廊的安装结构及方法
CN102022118B (zh) 一种盾构机平衡到达的方法
CN205000976U (zh) 一种用于深层排水隧道的盾构管片衬砌结构
CN210530835U (zh) 一种短距离始发井口盾构机渣土输送装置
CN205778905U (zh) 一种用于盾构机密闭始发及到达的装置
CN209100765U (zh) 一种顶管穿越工程中供热管道敷设设施
CN102444408A (zh) 地铁暗挖隧道二次衬砌拼装式挡头装置
CN114321494B (zh) 一种市政管线保护结构及其施工方法
CN216739705U (zh) 一种用于胶结卵石地质的锁扣钢管桩围堰
CN105240023A (zh) 一种曲线顶管支护结构扩建盾构施工地铁车站的方法
CN211038645U (zh) 一种用于辅助盾构机始发的钢套筒装置
CN212297912U (zh) 一种顶管接收井出洞口加固结构
CN213360180U (zh) 高瓦斯矿井切顶成巷采空区侧巷帮封堵预制件
CN113931640A (zh) 一种矿山法隧道内盾构空推及始发的施工方法
CN110761815B (zh) 一种隧道负压铺设防水板及其施工方法
CN209925759U (zh) 河道双管的敷设结构
CN204212153U (zh) 组合式钢护筒
CN218236415U (zh) 一种水利管道支撑连接结构
CN219508588U (zh) 一种深基坑边缘位置的坑中坑内支撑结构
CN207032299U (zh) 预制综合管廊
CN219953443U (zh) 一种富水砂层联络通道冻结开挖防护门
CN217872801U (zh) 一种运用砌砖的新形式tbm始发反力架
CN219317795U (zh) 一种埋地燃气管道保护结构

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10788925

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011546582

Country of ref document: JP

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 05/06/2012)

122 Ep: pct application non-entry in european phase

Ref document number: 10788925

Country of ref document: EP

Kind code of ref document: A1