WO2007036997A1 - 液体材料供給装置、液体材料供給装置のための制御方法 - Google Patents

液体材料供給装置、液体材料供給装置のための制御方法 Download PDF

Info

Publication number
WO2007036997A1
WO2007036997A1 PCT/JP2005/017835 JP2005017835W WO2007036997A1 WO 2007036997 A1 WO2007036997 A1 WO 2007036997A1 JP 2005017835 W JP2005017835 W JP 2005017835W WO 2007036997 A1 WO2007036997 A1 WO 2007036997A1
Authority
WO
WIPO (PCT)
Prior art keywords
liquid
filling container
liquid source
material supply
supply device
Prior art date
Application number
PCT/JP2005/017835
Other languages
English (en)
French (fr)
Inventor
Tadahiro Ohmi
Akinobu Teramoto
Hidetoshi Wakamatsu
Original Assignee
Tadahiro Ohmi
Akinobu Teramoto
Hidetoshi Wakamatsu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tadahiro Ohmi, Akinobu Teramoto, Hidetoshi Wakamatsu filed Critical Tadahiro Ohmi
Priority to PCT/JP2005/017835 priority Critical patent/WO2007036997A1/ja
Publication of WO2007036997A1 publication Critical patent/WO2007036997A1/ja

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C16/00Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes
    • C23C16/44Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes characterised by the method of coating
    • C23C16/448Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes characterised by the method of coating characterised by the method used for generating reactive gas streams, e.g. by evaporation or sublimation of precursor materials
    • C23C16/4481Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes characterised by the method of coating characterised by the method used for generating reactive gas streams, e.g. by evaporation or sublimation of precursor materials by evaporation using carrier gas in contact with the source material

Definitions

  • Liquid material supply device and control method for liquid material supply device are Liquid material supply device and control method for liquid material supply device
  • the present invention relates to a semiconductor manufacturing apparatus, and in particular, thermal chemical reaction, light irradiation chemical reaction, laser irradiation chemical reaction, catalytic chemical reaction, molecular chemical reaction, atomic chemical reaction, It is the source source of chemical reaction gas required for CVD (Chemical Vapor deposition) equipment that mainly forms thin films by chemical reactions such as on-irradiation chemical reactions or radical chemical reactions.
  • CVD Chemical Vapor deposition
  • the present invention relates to a liquid material supply device and its control method.
  • this gate insulating film can be controlled to a physical thickness limit of 2nm or less (several atomic layers) or can be controlled by a new material with a high relative dielectric constant. It has become necessary to increase the film thickness.
  • the leakage current in the gate insulating film increases remarkably.
  • MOS Metal Oxide Semiconductor
  • SiO 2 film silicon oxide film
  • the relative dielectric constant k is at least 10 or more.
  • a barrier of at least leV or more should be formed against the valence band and conduction band of silicon.
  • SiZrO, SiHf04, SiLa0, etc. silicates
  • oxide-based high dielectric constant film materials compared with SiO films, have a level caused by interface state defects and atomic layer order irregularities at the interface with the silicon substrate. Contains many.
  • the high dielectric constant film material with strong ionic bonding has a coordination number mainly determined by ionicity, and voids and interstitial atoms form defects.
  • defects in strongly ionic materials have a completely different defect structure from silicon, carbon, or SiO. Defects in crystalline silicon, amorphous silicon, and diamond are completely different from those of dangling bonds, which are mainly composed of covalent bonds.
  • the gate insulating film of a MIS (Metal Insulator Oxide Semiconductor) transistor is formed of an oxide-based high dielectric constant film material
  • the interface state defects present at the interface between the silicon substrate and the high dielectric constant film are It becomes a trap level that captures electrons moving through the channel.
  • This causes deterioration in switching characteristics, threshold voltage variation, or increase in lZf noise in MIS transistors, and has a profound effect on miniaturization.
  • the electrical characteristics deteriorate, and there arises a problem that the performance and reliability as required miniaturized transistor characteristics cannot be obtained.
  • methods for depositing a high dielectric constant film material on a silicon substrate include atomic layer chemical vapor deposition (ALCVD) technology and FUFSMA ENNOISTANCE STUDY.
  • ACVD atomic layer chemical vapor deposition
  • FUFSMA ENNOISTANCE STUDY atomic layer chemical vapor deposition
  • Penetration growth Pasma Enhanced Chemical Vapor Deposition: PEMOCVD
  • MOCVD metal organic chemical vapor deposition
  • the ALCVD method is considered to have the advantage of excellent controllability and uniformity of film thickness because the film is formed by almost complete surface reaction.
  • multi-component oxides can be handled relatively easily.
  • various raw material source materials in a liquid state at room temperature are used as the raw material source gas for forming various oxide insulating films.
  • This liquid source material has various properties depending on its physical properties. For example, some materials are almost gaseous at room temperature where the vapor pressure is high, while others are liquid source materials that can take vapor pressure only several times 133 Pa (ie, several Torr) at room temperature. Some are highly ignitable and some are not. Some are highly corrosive while others are less. Since there are various differences in chemical or physical properties in this way, the control method is selected according to the physical properties of the liquid material.
  • the publishing control method can be used under various pressure conditions.
  • a large amount of carrier gas is required, and the vaporization efficiency is extremely poor.
  • a second carrier gas also called push gas.
  • the temperature control of the liquid source material filled container (such as the heating method of the container or piping) and the bubbling efficiency (carrier gas solubility, carrier gas flow) Controllability, ceramic bubble filter performance, mist generation suppression control (size of container, distance to liquid level outlet, etc.)), pressure inside liquid source material filled container (high pressure pressure sensor, liquid level detector)
  • the stability of 10% or less is maintained, a fairly strict control of filling container management is required, and stable supply is difficult.
  • TiCl, TEOS, POC1, etc. are used as the liquid source material, and are controlled in this way.
  • the vapor pressure difference control method is very efficient because it does not require a carrier gas.
  • the pressure difference cannot be taken, the vapor pressure difference control method is relatively limited to a small flow rate.
  • the pressure in the process chamber is not a vacuum, it will not be gasified by vaporizing the liquid source material. Therefore, it is difficult to use for a normal pressure device.
  • Organometallic compound materials generally have a very low vapor pressure and are often below ⁇ at room temperature. For this reason, the MFC to be used must also be a high-temperature MFC.
  • the gas flow rate which can be controlled 10-6 several times the normal cubic per minute (i.e., the number sccm (Standa rd Cubic Centimeter per Minute : standard cubic centimeters per minute) becomes a degree-les
  • the control method directly vaporizes and uses the liquid source material, the most important is the temperature control of the liquid source material filling container. The material in the liquid state is directly vaporized. in order, it is necessary to heat of vaporization. If this vaporization heat is generated, if the need in the vaporization of the filling container temperature is lowered.
  • the liquid phase direct control method controls the transport of the raw material source in the liquid phase state, so that the liquid It is necessary to vaporize the source material in the gaseous state immediately before it is introduced into the process chamber.
  • the vaporization conditions must be determined from the relationship between the vapor pressure of the liquid source material and the pressure in the process chamber.
  • a vaporization method that matches the physical properties of the liquid source material and a vaporizer with a structure corresponding to the vaporization method .
  • the above-mentioned liquid source material in a solid phase must be dissolved in an organic solvent material in a liquid phase at room temperature such as THF or toluene. Les.
  • an organic solvent material in a liquid phase at room temperature such as THF or toluene.
  • the organic solvent component since the organic solvent component is contained in the liquid at the time of vaporization, it is vaporized in a state in which the organic component is contained in the vaporized gas, and is directly taken into the film being processed. There is a problem that the purity of the film is lowered.
  • the difference in physical properties due to the difference in vapor pressure between the organic solvent material and the liquid source material leads to a decrease in vaporization efficiency.
  • this control method is based on the configuration of the vaporizer (nozzle shape of the carrier gas introduction part and its blowing position, carrier gas mixing part structure and its shape, the shape of the vaporization chamber, the flow direction of the vaporized gas, The opening position of the vaporized gas outlet (hole shape, hole position, number of holes, etc.), heater division structure, etc.) is not fixed.
  • liquid source material For example, a liquid sensor with a constant temperature difference control power difference control method
  • Impurities in the liquid source material are also transported together and directly vaporized, which causes generation of particles.
  • the liquid source material and the carrier gas are mixed immediately before the vaporization chamber, if the moisture concentration in the carrier gas is not adequately controlled, a chemical reaction such as hydrolysis occurs and solid matter deposits are generated in the vaporization chamber. It accumulates and vaporization efficiency decreases. As a result, the reproducibility of process conditions decreases. Create a point. As a result, the wafer yield (non-defective product yield) after the wafer process process is greatly reduced.
  • Specific examples of liquid source materials include TEOS, TiCl, TEB, TEPO, TEA, and TMI, TEG, BTBAS, TDMAS, etc., which are controlled in this manner.
  • Non-Patent Document 1 describes a conventional technique using a liquid direct vaporization supply technique among the liquid material supply apparatuses described above. Further, Non-Patent Document 2 describes the conventional technology of a system that combines a liquid mass flow used in a liquid direct vaporizer and a liquid control vaporizer.
  • the publishing control method described above requires a large amount of carrier gas, and the vaporization efficiency is extremely poor.
  • temperature control of the liquid source material filling container heating method, etc.
  • publishing efficiency carrier gas solubility, ceramic filter performance, mist generation suppression control, etc.
  • liquid source material filling etc.
  • the stability of the internal pressure of the container is determined, and in practice, even if the stability is maintained within 10%, fairly strict control of the filled container is required. However, there is a problem that stable supply is difficult.
  • the vapor pressure difference control method described above does not require carrier gas, so it can be said that the vaporization efficiency is very good. However, since the pressure difference cannot be taken, it is relatively limited to a small flow rate. In order for the liquid to evaporate, heat of vaporization is required, and the temperature of the filling container decreases. If need in vaporization of a small amount, this temperature drop is negligible, 10-6 number 100 times the standard cubic meters per minute (i.e., the number LOOsccm) may become vaporization of about not negligible lowering of the filling container temperature Become. That is, there is a problem that the control becomes impossible because the vapor pressure is lowered due to the decrease in the temperature of the filling container, and the MF differential pressure cannot be secured.
  • the liquid-phase direct control method described above includes a vaporizer configuration (carrier gas introduction structure, carrier gas mixing structure, vaporization chamber structure, vaporized gas outlet structure, heater split structure, and Their shape, etc.) is not fixed.
  • a vaporizer configuration carrier gas introduction structure, carrier gas mixing structure, vaporization chamber structure, vaporized gas outlet structure, heater split structure, and Their shape, etc.
  • the process stage of phase change from liquid to gas is entered, the response speed until process processing becomes slow.
  • the raw material of the liquid source material itself flows directly, it takes a lot of time to purge the gas when the filling container is removed.
  • the vaporization efficiency is insufficient, deposits accumulate in the vaporization chamber, and it takes a lot of time for maintenance and maintenance. Also, impurities in the liquid source material are transported together and directly vaporized, causing particles to be generated.
  • the vapor pressure difference control method and the carrier gas control method are combined so that the process conditions can be controlled with a wide range of flow rates and concentrations.
  • pressure control plates are provided on the inlet side and the outlet side of the liquid source material filling container so that a process in a wide pressure range can be performed and precise control in the atomic layer order can be performed.
  • the pressure control plate can be attached by changing the arrangement and number of the apertures depending on the physical properties of the liquid source material.
  • shape of the hole in the pressure control plate is designed so that the liquid or droplet mist does not scatter or traps can be trapped.
  • a heater for generating a temperature gradient at the bottom of the filling container is installed.
  • Each heater zone is provided with a thermocouple in each heating zone so that temperature management and control can be performed.
  • the heater has a temperature gradient so that the temperature increases from the inlet side to the outlet side of the filling container.
  • the bottom of the filling container is designed in a convex shape so that convection of the liquid source material occurs smoothly.
  • a heater and a thermocouple are attached to the convex bottom as a set so that temperature control and control can be performed.
  • a supply pipe with a pressure release hole is inserted into the filling container so that the liquid source material in the filling container can be stably supplied at any time.
  • the filling container has a horizontally long rectangle so that the vaporized gas can be transported uniformly in the gas phase and does not cause a temperature difference.
  • the carrier gas can be introduced from four peripheral locations so that the vaporized gas can be transported uniformly in the gas phase and flows so as not to cause a temperature difference.
  • a liquid level sensor mounting window is provided on the upper surface of the replenishment pipe with a pressure release hole so that the liquid level in the filling container can be monitored in real time.
  • the shape of the opening hole of this replenishment pipe is designed to be a hole shape in a diagonally downward front direction so that liquid and droplet mist do not scatter.
  • the entire surface of the filling container is not oxidized or nitride-based so that the quality and composition of the raw material source material itself do not deteriorate due to chemical reaction with impurity components such as moisture in the filling container. It is covered with a dynamic membrane.
  • a high-temperature pressure sensor is provided in the vicinity of the carrier gas inlet side and the vaporized gas outlet pipe.
  • a flow control valve that controls the gas flow rate and the pressure in the pipe is provided near the vaporized gas outlet.
  • valves on the inlet side and the outlet side are made into block valves so that there is no dead space that becomes a gas reservoir in the pipe.
  • This valve block can be equipped with a heater so that the temperature can be controlled.
  • the piping on the inlet side and the outlet side of the filling container are connected by a connecting pipe so that the pipe connected to the process chamber from the vaporized gas outlet side can be efficiently purged.
  • the reaction gas can be supplied and controlled under a wide range of flow rate and concentration process conditions.
  • pressure control plates are provided on the inlet side and the outlet side of the liquid source material filling container, processing can be performed under a wide range of process conditions, and precise control in the atomic order is possible. Can do.
  • the liquid source material By causing convection of the liquid source material in the filled container, the liquid source material is always at the interface between the liquid phase and the gas phase. Therefore, the concentration gradient on the gas phase side near the interface can be kept constant, the temperature drop due to heat of vaporization can be suppressed, and the vaporization rate of the liquid source material can be stabilized. And stabilization of pressure and temperature in the container can be achieved.
  • the bottom of the filling container is processed into a convex shape and can be controlled and controlled in temperature, convection of the liquid source material can be generated smoothly.
  • the convex portion at the bottom of the filling container is provided with a thermocouple so as to monitor the heater and the liquid temperature, so that convection control and management in the liquid phase can be performed.
  • the shape of the opening hole of the pressure control plate in the filling container is designed to be a hole shape obliquely downward in the forward direction, so that liquid and droplet mist do not scatter or can be trapped. It ’s like that.
  • the inner surface of the constituent member of the liquid material supply device that combines the vapor pressure difference method and the carrier gas transport control method of the liquid source material can be resistant to corrosive liquid source material, for example, Cr 0, A1 0 Since it is on the surface of an oxide film passive film such as Y 0 or the like, or a nitride film passive film surface such as A1N, chemical reaction with moisture in the liquid source material or carrier gas (for example, Hydrolysis reaction) can be suppressed, and solid particles can be prevented from being generated in the container. In addition, deterioration of the quality and composition of the liquid source material itself can be prevented.
  • corrosive liquid source material for example, Cr 0, A1 0 Since it is on the surface of an oxide film passive film such as Y 0 or the like, or a nitride film passive film surface such as A1N, chemical reaction with moisture in the liquid source material or carrier gas (for example, Hydrolysis reaction) can be suppressed, and solid particles can be prevented from being generated in the container. In
  • Heating efficiency by heater is improved by coating the entire surface of the liquid contact part and the gas contact part with an oxide-based passivation film or a nitride-based passive film with good thermal conductivity on the inner surface of the filled container And soaking stability can be maintained.
  • FIG. 1 is a cross-sectional view of a supply device according to a first embodiment of the present invention.
  • FIG. 2 is a cross-sectional view of the liquid source filling container of the supply device of Fig. 1, and Fig. 2 (B) is cut along the line A-A 'of Fig. 2 (A).
  • FIG. 2C is a cross-sectional view illustrating a cross section perpendicular to the arrow B of the liquid source filling container of FIG. 2A.
  • FIG. 3 is a cross-sectional view of the supply device according to the second embodiment of the present invention.
  • Fig. 4 (A) is a cross-sectional view of the liquid source filling container of the supply device of Fig. 3, and Fig. 4 (B)
  • FIG. 4A is a cross-sectional view taken along the line AA ′ of FIG. 4 (A), and FIG. 4 (C) is a view showing a cross section perpendicular to the arrow B of the liquid source filling container of FIG. 4 (A). It is.
  • FIG. 5 is a cross-sectional view of the supply device according to the third embodiment of the present invention.
  • Fig. 6 (A) is a cross-sectional view of the liquid source filling container of the supply device of Fig. 5, and Fig. 6 (B)
  • Fig. 6 (A) is a cross-sectional view taken along the line AA 'in Fig. 6 (A), and Fig. 6 (C) is a diagram showing a cross section perpendicular to the arrow B of the liquid source filling container in Fig. 6 (A). It is.
  • FIG. 7 is a cross-sectional view of a supply device according to a fourth embodiment of the present invention.
  • Fig. 8 (A) is a cross-sectional view of the liquid source filling container of the supply device of Fig. 7, and Fig. 8 (B)
  • Fig. 8 (A) is a cross-sectional view taken along the line A-A 'in Fig. 8 (A), and Fig. 8 (C) is a diagram showing a cross section perpendicular to the arrow B of the liquid source filling container in Fig. 8 (A). It is.
  • FIG. 9 is a cross-sectional view of the supply device according to the fifth embodiment of the present invention.
  • FIG. 10 (A) is a cross-sectional view of the liquid source filling container of the supply device of FIG.
  • FIG. 10 (B) is a cross-sectional view taken along the line AA 'in FIG. 10 (A)
  • FIG. 10 (C) is a cross-sectional view of FIG.
  • FIG. 11 is a cross-sectional view of the supply device according to the sixth embodiment of the present invention.
  • FIG. 12 (A) is a cross-sectional view of the liquid source filling container of the supply device of FIG. 11, and FIG.
  • FIG. 12 (B) is a cross-sectional view taken along the line AA ′ in FIG. 12 (A), and FIG.
  • FIG. 13 is a cross-sectional view of a supply device according to a seventh embodiment of the present invention.
  • FIG. 14 (A) is a cross-sectional view of the liquid source filling container of the supply device of FIG.
  • FIG. 14 (B) is a cross-sectional view taken along the line AA 'in FIG. 14 (A)
  • FIG. 14 (C) is a cross-sectional view of FIG.
  • FIG. 15 is a cross-sectional view of a supply device according to an eighth embodiment of the present invention.
  • FIG. 16 (A) is a cross-sectional view of the liquid source filling container of the supply device of FIG. 15, and FIG.
  • FIG. 16 B) is a cross-sectional view taken along the line AA ′ in FIG. 16 (A)
  • FIG. 16 (C) is a cross section perpendicular to the arrow B of the liquid source filling container in FIG. 16 (A).
  • FIG. FIG. 17 is a view similar to FIG. 16C, showing a modification of the supply device according to the eighth embodiment.
  • FIG. 18 is a view similar to FIG. 16 (C), showing another modification of the supply device according to the eighth embodiment.
  • FIG. 19 is a view similar to FIG. 16 (C), showing another modification of the supply device according to the eighth embodiment.
  • FIG. 20 is a view similar to FIG. 16C, showing still another modification of the supply device according to the eighth embodiment.
  • FIG. 21 is a cross-sectional view of the supply device according to the ninth embodiment of the present invention.
  • FIG. 22 (A) is a cross-sectional view of the liquid source filling container of the supply device of FIG. 21, and FIG.
  • FIG. 22 (B) is a cross-sectional view taken along the line AA ′ in FIG. 22 (A).
  • FIG. 22 (C) is a cross-sectional view of FIG.
  • FIG. 23 is a cross-sectional view of the supply device according to the tenth embodiment of the present invention.
  • Fig. 24 (A) is a cross-sectional view of the liquid source filling container of the supply device of Fig. 23, and Fig. 24 (
  • FIG. 24 (B) is a cross-sectional view taken along the line AA ′ in FIG. 24 (A), and FIG.
  • FIG. 25 is a cross-sectional view of a supply device according to an eleventh embodiment of the present invention.
  • Fig. 26 (A) is a cross-sectional view of the liquid source filling container of the supply device of Fig. 25, and Fig. 26 (
  • FIG. 26 B) is a cross-sectional view taken along line AA ′ in FIG. 26 (A)
  • FIG. 26 (C) is a cross section perpendicular to arrow B of the liquid source filling container in FIG. FIG.
  • FIG. 27 is a cross-sectional view of a supply device according to a twelfth embodiment of the present invention.
  • FIG. 1 and FIG. 2 a supply device according to a combination of a vapor pressure difference control method and a carrier gas transport control method for a liquid material according to a first embodiment of the present invention and a control method thereof will be described.
  • FIG. 1 shows a cross section of the supply apparatus according to the first embodiment of the present invention
  • FIG. 2 (A) shows a cross section of the liquid source filling container of the supply apparatus of FIG. It is shown.
  • Fig. 2 (B) shows a cross-section taken along the line AA 'in Fig. 2 (A)
  • Fig. 2 (C) shows the arrow of the liquid source filling container in Fig. 2 ( ⁇ ).
  • a cross section perpendicular to the ridge is shown.
  • this supply device includes a carrier gas introduction pipe 11 having a carrier gas introduction port 11a, a purge gas introduction pipe 12 having a purge gas introduction port 12a, a liquid source Filling container 13 of liquid material, liquid source supply port pipe 14 having liquid source supply port 14a, pressure sensor (high temperature compatible pressure sensor) Pl for sensing the pressure in the container, vaporized gas outlet pipe having vaporized gas outlet 15a 15.
  • Pressure sensor for sensing the pressure in the vaporized gas outlet pipe 15 (High temperature pressure sensor) P2, Pneumatic valve 16 as on-off valve, flow control valve 17, heater built-in pneumatic block valve 19 and 20, many jackets It is a cylindrical supply device composed of a type heater JH, a heat insulating cover 21 with a heat insulating material, and a number of thermocouples TC.
  • the symbols JH and TC are representatively attached to only one jacket type heater and one thermocouple.
  • the filling container 13 is heated from the outer periphery by a heater (jacket type heater JH) so that the liquid source material does not become a liquefied state.
  • the heater CJH has a temperature gradient so that the temperature increases from the carrier gas introduction pipe 11 side through the filling container 13 toward the vaporized gas outlet pipe 15 side.
  • the heater JH at the bottom of the filling container 13 has a temperature near the center of the bottom of the cylindrical filling container 13 from the vicinity so that liquid convection occurs so that the liquid source material inside the filling container 13 is efficiently vaporized. It is set to be higher.
  • FIGS. 1 and 2 the carrier gas introduction pipe 11 shown, for example, pipe having a diameter (1 Z4) X (2.54 X 10- 2) m ( i.e., 1/4 inch) (1Z4SUS a pipe), FIG shows the vaporized gas outlet pipe 15 of, for example, a diameter (3/8) X (2.54 X 10- 2) m ( i.e., pipe having 3 8 inches) (3 / 8SUS pipe) is there.
  • increasing the size of the pipe on the outlet side reduces the variation in the pressure drop in the pipe due to the temperature drop of the vaporized gas in the gas phase due to the heat of vaporization, and the gas phase in the gas phase by the heater JH. This is effective in suppressing the reduction in heating efficiency caused by gas heating. That is, the piping of the filling container 13 is designed with an optimized ratio that balances between the gas flow velocity and the area of the gas contact inside the piping.
  • the heater zone of the filling container 13 is divided into two heating zones (heating zones) HZ-K and HZ-J at the bottom of the filling container 13, and three zones are formed around the filling container 13.
  • the heating zone (heating zone) is divided into HZ-A, HZ-B, and HZ—and the temperature of each heating zone is precisely controlled by thermocouple TC.
  • Each heater zone can be controlled from room temperature to 300 ° C.
  • the temperature gradient of this heater zone has a temperature gradient in which the temperature rises for each gradient temperature condition suitable for the properties of the liquid material in the range of + C to + 5 ° C for each zone toward the upstream side and downstream side.
  • the piping from the vicinity of the vaporized gas outlet piping section 15 to the vicinity of the inlet of the process chamber is designed to maintain a constant temperature condition at a set temperature that does not become a liquefied state.
  • the heater in the vicinity of the flow path of the carrier gas carrying the vaporized gas in the filling container 13 to the outlet pipe 15 is temperature-controlled so that the gas temperature in the gas phase is uniformly heated by the vaporization heat.
  • the temperature control of the heater in each heating zone is Sat 1.
  • C force is within ⁇ 0.1 ° C, and it can be freely set precisely to a certain temperature according to the properties of the liquid source material. Temperature control is possible with a quick response temperature controller and thermocouple. Has been.
  • the liquid source replenishing port pipe 14 is structured so that the liquid source is replenished from the lower part of the liquid level in the filling container 13. preferable.
  • the liquid source replenishment port pipe 14 is provided with a pipe having a pressure release hole (illustrated later), and the liquid source material is supplied from the vicinity of the bottom of the filling container 13 to provide a liquid source.
  • a structure that is designed so that it can be replenished from a location so as not to hinder the vaporization efficiency of the material is desirable.
  • this hole has an effect of not displacing the liquid surface in the filling container 13 when the liquid source material is replenished and an effect of suppressing vibration, the vaporization rate does not decrease (described later).
  • the structure is shown in the seventh embodiment (see FIG. 13).
  • this liquid material supply device combines the vapor pressure difference control method and the carrier gas control method, the supply and control of the reaction gas can be realized under a wide range of flow rate and concentration process conditions.
  • the liquid source material is always supplied with fresh liquid and gas to the interface between the liquid phase and the gas phase by causing convection in the filling container 13, the concentration gradient on the gas phase side in the vicinity of the interface
  • the temperature of the gas phase and the liquid phase due to the heat of vaporization can be kept constant, the vaporization rate of the liquid source material can be stabilized, and the pressure and temperature in the container can be stabilized.
  • a flow control valve 17 for controlling the gas flow rate and the pressure in the vaporized gas outlet pipe 15 is provided near the vaporized gas outlet, so that the pressure between the pressure in the filling container 13 and the pressure in the process chamber is between The force S can be adjusted and controlled.
  • the inner surface of the constituent member of the liquid material supply device that combines the vapor pressure difference method of the liquid source material and the carrier gas transport control method can be resistant to the corrosive liquid source material.
  • a nitride film such as A1N, which suppresses chemical reaction (for example, hydrolysis reaction) with moisture in the liquid source material or carrier gas, resulting in solid particles in the container. Generation of particles can be prevented. In addition, deterioration of the quality and composition of the liquid source material itself can be prevented.
  • the inner surface of the container 13 is coated with an oxide-based passivation film or a nitride-based passive film having good thermal conductivity on the entire surface of the wetted part and the wetted part, thereby improving the heating efficiency of the heater. Can maintain the top and soaking stability.
  • this supply apparatus is different from the first embodiment only in that the filling container 13 of the liquid source material has a convex 31 at the bottom.
  • the filling container 13 is optimized and designed to efficiently convect the liquid source material inside the filling container 13. It is a container of a structured.
  • the effect of the second embodiment will be described.
  • the following effects can be realized in addition to the effects of the first embodiment. This is because the bottom of the filling container 13 is processed into a convex shape 31 and can be controlled and controlled in temperature, so that convection of the liquid source material can be smoothly generated.
  • this supply device has a structure in which a thermocouple TC 31 is provided at the bottom of the container in order to control the temperature of the liquid source material, as compared with the second embodiment. ing.
  • the supply device is the same as that of the second embodiment except for this.
  • the bottom of the filling container is processed into a convex shape, and the temperature can be controlled and controlled, so that the convection of the liquid source material is generated more smoothly and the convection speed is increased. It can be controlled precisely.
  • the convex portion at the bottom of the filling container is provided with a thermocouple so as to monitor the heater and the liquid temperature, so that convection control and management in the liquid phase can be performed.
  • a carrier gas introduction pipe 11 having a carrier gas introduction port 11a communicates with a cylindrical filling container 13 through four peripheral ports of a peripheral port of the upper plate 30.
  • the structure is such that the direction of gas flow is uniform from the four carrier gas introduction pipes 11 through the central port of the upper plate 30 toward the central gas outlet pipe 15.
  • the supply device is the same as that of the third embodiment except for this.
  • the vaporized gas can be transported evenly to the outlet pipe 15 by the carrier gas. Therefore, it is possible to suppress the non-uniform heat property of the gas phase or liquid phase and the variation in the flow direction.
  • the shape of the filling container 13 of the liquid source material was cylindrical.
  • the supply device according to the fifth embodiment of the present invention is the same as the first embodiment except for the following points. That is, in the supply apparatus according to the fifth embodiment, the shape of the filling container 13 of the liquid source material is a rectangular shape that is a cylinder, which improves the convection direction and precise controllability, and the transport efficiency of the vaporized gas by the carrier gas. Is being stabilized.
  • the supply apparatus according to the sixth embodiment of the present invention includes the same parts indicated by the same reference numerals.
  • the supply device according to the sixth embodiment has a pipe with a pressure relief opening 41 (FIG. 12 (B)) as the liquid source replenishment port pipe 14.
  • the filling container 13 of the liquid source material has a convex 31 at the bottom as in the embodiment described above.
  • the supply device is the same as that of the fifth embodiment except for this.
  • the structure is optimized and designed to have a uniform gas flow so that there is no temperature gradient in the vaporized gas in the gas phase when the vaporized gas is transported by the carrier gas.
  • the arrangement of the heater JH at the bottom of the container 13 is optimized so that the convection direction of the liquid source material is symmetric with respect to the carrier gas transport direction.
  • the supply device according to the seventh embodiment of the present invention is the same as the sixth embodiment except for the following points. That is, in the supply device according to the seventh embodiment, the filling container 13 has the liquid source replenishment port pipe 14 extending to the vicinity of the bottom of the container 13 below the liquid source material liquid level, and the pressure release hole 41 is provided. It has an open structure. For this reason, the vaporization efficiency must not be reduced while the vapor phase temperature is kept constant even during vaporization. It is possible to replenish liquid source material. In addition, it is possible to prevent fluctuations in the liquid source material liquid level in the container 13, vibrations, and uneven heating of the liquid temperature.
  • the piping inside the filling container 13 of the liquid source replenishing port piping 14 is covered with an oxide-based passivation film or a nitride-based passive film having good thermal conductivity on both the inner surface and the outer surface. I want it. Furthermore, since the generation of bubbles from the pipe tip due to the pressure rise in the liquid source replenishment port pipe 14 can be suppressed, it is effective for stabilizing the vaporization rate.
  • the shape of the hole of the pressure release hole 41 is set so that the liquid or droplet mist is not scattered into the downstream gas phase together with the carrier gas in the shape of a horizontal hole parallel to the liquid surface. It is desirable that the hole has a forward and downward hole shape that flows down in the direction. In addition, it is desirable that the length and number of holes should be set to an optimal shape that matches the physical properties of the liquid source material. In addition, it is desirable to set the length and number of holes to the optimum shape according to the physical properties of the liquid source material.
  • the supply device according to the eighth embodiment of the present invention is the same as the seventh embodiment except for the following points.
  • the filling container 13 has a holed internal pressure control plate (pressure control plate) in order to maintain and control the pressure in the container 13 to be constant and stable.
  • 51 is provided on both the carrier gas inlet side and the vaporized gas outlet side.
  • the perforated internal pressure control plate (pressure control plate) 51 may be provided only on either the carrier gas inlet side or the vaporized gas outlet side.
  • the internal pressure control plate (pressure control plate) 51 it is desirable to use a control plate in which the number of holes (numerical aperture) is optimized according to the properties of the liquid source material.
  • FIG. 16C, FIG. 17, FIG. 18, FIG. 19, and FIG. 20 show internal pressure control plates (pressure control plates) having various numbers of holes.
  • the supply device according to the ninth embodiment of the present invention is the same as the eighth embodiment except for the following points. That is, in the supply device according to the ninth embodiment, the internal pressure control plate (pressure control plate) 51 provided in the filling container 13 is in contact with the liquid source material and has a hole (opening) in the portion. I have it. [0076] Also in the embodiments of Figs. 13 to 22, the inner surface of the constituent member of the liquid material supply apparatus that combines the vapor pressure difference method of the liquid source material and the carrier gas transport control method can withstand the corrosive liquid source material.
  • an oxidation passivated film for example, a surface of an oxide passivated film such as Cr 03, A1 03, Y 0 or a nitride passivated film such as A1N.
  • an oxide-based passivated film such as Cr 03, A1 03, Y 0 or a nitride passivated film such as A1N.
  • chemical reaction with water in the liquid source material or carrier gas for example, hydrolysis reaction
  • the container It is possible to prevent solid particles from being generated.
  • deterioration of the quality and composition of the liquid source material itself can be prevented.
  • the inner surface of the container is coated with an oxide-based passivation film or a nitride-based passive film with good thermal conductivity on the entire surface of the wetted part and wetted part to improve the heating efficiency and uniformity of the heater.
  • thermal stability can be maintained. This makes it possible to reduce the power consumption of the heater and save energy.
  • by installing the pressure control plate in a container near the vaporized gas outlet it is possible to prevent the generated particles from being transported to the process chamber by transporting with the carrier gas.
  • this control plate has a function to suppress and control the temperature decrease of the vaporized gas in the gas phase due to the heat of vaporization, it is possible to prevent the pressure in the container from decreasing and the vaporization efficiency from decreasing.
  • the opening shape of these control plates is a hole shape in a diagonally downward direction in which solid particles and droplet mist can be removed in a horizontal hole shape parallel to the liquid surface.
  • the supply device is the same as the ninth embodiment except for the following points. That is, in the supply device according to the tenth embodiment, the internal pressure control plate (pressure control plate) on the vaporized gas outlet side of the two internal pressure control plates (pressure control plate) 51 provided in the filling container 13. 51 is a perforated internal pressure control plate (pressure control plate). Furthermore, the supply apparatus according to the tenth embodiment uses a liquid source replenishing port pipe 14 to monitor the liquid level in the liquid source material filling container 13 in real time (liquid level sensor window). (Mounting window) 61 is provided.
  • the supply device according to the eleventh embodiment of the present invention is the same as the tenth embodiment except for the following points. That is, in the supply apparatus according to the eleventh embodiment, in addition to the high temperature pressure sensors P1 and P2 provided near the vaporized gas outlet pipe 15, the high temperature pressure sensor P3 is provided in the purge gas introduction pipe 12 as well. Therefore, the pressure in the carrier gas introduction pipe 11 of the filling container 13 of the liquid source material can be monitored.
  • the supply device according to the twelfth embodiment of the present invention is the same as the eleventh embodiment except for the following points. That is, the supply device according to the twelfth embodiment has a structure in which the carrier gas introduction pipe 11 and the vaporized gas outlet pipe 15 are connected and connected by the connecting portion 71 having a pipe and a valve.
  • the connecting portion 71 efficiently purges the inside of the vaporized gas outlet pipe 15 of the filling container 13 of the liquid source material with N purge gas,
  • the fifth and sixth embodiments have a structure in which the filling container 13 is simply changed from the cylindrical shape of the first to fourth embodiments to a horizontally long rectangular shape, and temperature management and control are further performed. Can be made precisely.
  • the convection direction and speed of the liquid source material can be stabilized, convection can be generated smoothly, and the convection speed can be precisely controlled.
  • the vaporized gas can be transported to the outlet pipe 15 more evenly by the carrier gas, the gas phase or liquid phase temperature due to the generation of heat of vaporization and the variation in the flow direction are suppressed, and Precise suppression can be realized to stabilize the efficiency.
  • the liquid source supply port pipe 14 is supplied from the lower part of the liquid level in the filling container 13.
  • this pipe 14 is provided with a pipe having an opening 41 for releasing pressure, and the liquid source material is supplied from the vicinity of the bottom of the filling container 13 to prevent the vaporization rate of the liquid source material liquid surface to the gas phase. It is designed so that it can be refilled from any position.
  • the opening 41 is also used for filling the container 13 when the liquid source material is replenished. Since there is an effect of not displacing the liquid level inside and an effect of suppressing vibration, a decrease in the vaporization rate can be suppressed.
  • the shape of the pressure release hole 41 of the replenishing port pipe 14 is designed to be an obliquely downward hole shape, the liquid or droplet mist is not scattered, or they are The trap can be captured.
  • a uniform gas flow is ensured so as not to generate a temperature gradient due to the generation of vaporization heat, which causes the vaporization of vaporized gas in the gas phase during transport of the vaporized gas by the carrier gas.
  • An optimized design of the flow path structure is planned.
  • the arrangement of the heater JH at the bottom of the container 13 is optimized so that the convection direction of the liquid source material is symmetric with respect to the carrier gas transport direction.
  • a perforated pressure control plate 51 is vaporized from the carrier gas inlet side in order to maintain and control the pressure in the container 13 constant and stably. It is provided on both or one of the gas outlet sides.
  • the ninth and tenth embodiments show that a control plate having an optimized numerical aperture can be used as the pressure control plate 51 depending on the properties of the liquid source material.
  • the liquid level sensor mounting window 61 is provided on the upper surface of the replenishing port pipe 14 with the pressure release hole, the liquid level in the filling container 13 can be adjusted in real time. Can be monitored.
  • the shape of the opening hole of the supply port pipe 14 is designed to be a hole shape obliquely downward in the forward direction, the liquid or droplet mist is mixed with the carrier gas in the downstream gas phase. It can be prevented from splashing in.
  • a film forming technique capable of controlling the atomic layer order in a semiconductor manufacturing apparatus is used to obtain a supply device that uses a liquid material as a source material source of a chemical reaction material in a wafer process. Can do. Furthermore, a control method of the liquid material supply device that enables heating temperature control and stable supply in a wide range from room temperature to high temperature can be obtained.

Abstract

 広範囲な流量と濃度でプロセス処理条件を制御できる液体材料供給装置を提供する。  液体ソース材料を入れる充填容器13を備えた液体材料供給装置であって、液体ソース材料の供給制御を、液体ソース材料を直接気化させ、その気化ガスをキャリアガスによって輸送することにより行う。充填容器は、充填容器内にキャリアガスを導入するキャリアガス導入配管11、キャリアガスによって輸送された気化ガスを出力する気化ガス出口配管15、充填容器内に液体ソース材料を補給する液体ソース補給配管12、充填容器内圧力をセンスするための圧力センサーP1、充填容器内の温度分布を与えるヒータJH、充填容器内の温度を検出する温度検出手段TCを備える。

Description

明 細 書
液体材料供給装置、液体材料供給装置のための制御方法
技術分野
[0001] 本発明は、半導体製造装置に関し、特に、熱的化学反応、光照射的化学反応、レ 一ザ一照射的化学反応、触媒的化学反応、分子的化学反応、原子的化学反応、ィ オン照射的化学反応、あるいはラジカル的化学反応などの化学的な反応により主に 薄膜を成膜させる CVD (Chemical Vapor deposition:化学的気相成長)装置に必要な 化学反応ガスの原料ソース源である液体材料の供給装置とその制御方法に関するも のである。
背景技術
[0002] 従来、半導体デバイスの微細化によって、半導体集積回路の高性能化と低価格化 が実現された。微細化された半導体デバイスのサイズの中で最小寸法は、トランジス タ構造のゲート絶縁膜の厚さである。今後、さらなるデバイスの高性能化を実現して いくには、このゲート絶縁膜は 2nm以下 (数原子層)の物理膜厚限界まで薄くするか 、あるいは比誘電率の高い新しい材料によって制御可能な膜厚まで厚くすることが必 要になってきている。
[0003] 前述したゲート絶縁膜の厚さが物理的限界に近くなると、ゲート絶縁膜におけるリー ク電流が著しく増大してくる。たとえば、 2nm以下のシリコン酸化膜 (SiO 膜)の膜厚 を有する MOS (Metal Oxide Semiconductor)トランジスタでは、トンネル電流によるゲ ート絶縁膜リーク電流密度が 0.1 X 104 A/m2までにも達し、回路動作および消費電力 の観点から、実際に用いることが非常に困難になる。そのため、顕在化したゲート絶 縁膜リーリ電流を低減させるために、 SiO 膜 (比誘電率 k = 3.9)と比較して比誘電率 の高レ、イオン結合性の強い材料(高誘電率膜材料)、たとえば遷移金属酸化物など を使った絶縁膜を採用することで、シリコン酸化膜換算の膜厚 (EOT)で膜厚が lnm 程度を実現する場合、電気的には薄い SiO 膜と同等の特性を維持することができる 材料が検討されている。つまり、ゲート絶縁膜リーク電流の発生を抑制する電界を軽 減するために、物理膜厚を厚くすることが検討されている。 [0004] 高誘電率ゲート絶縁膜の性質として、求められている必要不可決な条件は、以下 の通りである。
[0005] (1) 比誘電率 kが少なくとも 10以上であること。
(2) シリコンの価電子帯および伝導帯に対して少なくとも leV以上の障壁が形成さ れること。
(3) 非晶質もしくは単結晶であること。
(4) 熱的安定性に優れ、熱処理した場合にも界面で Si02が形成しにくいこと。
(5) 膜中の欠陥密度が小さいこと。
(6) 膜中の不純物成分濃度が少ないこと。
[0006] 最近、高誘電率膜材料としては、 SiO 膜よりも高い誘電率を有する A1 0 (k= 10)、
Zr〇(k= 19)、Hf〇 (k = 24) , La O (k = 27)等やそれらと SiO との化合物であるシリ ケート(SiZrO、 SiHf〇4、 SiLa 0 など)の比誘電率 kが 10以上の種々の酸化物系高 誘電率膜材料が広く実用化のために検討されている。
[0007] し力 ながら、これらの酸化物系高誘電率膜材料は、 SiO 膜と比較して、シリコン基 板との界面に界面準位の欠陥や原子層オーダーの凹凸に起因した準位を多数含ん でいる。イオン結合性の強い高誘電率膜材料は、イオン性によって配位数が主に決 められており、空孔ゃ格子間原子が欠陥を形成する。つまり、イオン性の強い物質に おける欠陥は、シリコンやカーボン、または SiO 等とは全く異なった欠陥構造を持つ ている。結晶シリコン、アモルファスシリコンやダイヤモンドの欠陥は、ダングリングボ ンドと呼ばれる共有結合の未結合手が主になる物質とは欠陥の構造や化学的な振る 舞いが全く違うものになる。
[0008] したがって、酸化物系高誘電率膜材料によって MIS (Metal Insulator Oxide Semico nductor)トランジスタのゲート絶縁膜を形成した場合、シリコン基板と高誘電率膜の 界面に存在する界面準位の欠陥は、チャネル中を移動する電子を捕獲してしまうトラ ップ準位になる。このため、 MISトランジスタにおけるスイッチング特性の劣化やしき い値電圧のばらつき、あるいは、 lZf雑音の増大をもたらす原因となり、微細化に深 刻な影響を与えてしまう。その結果として、電気的特性が劣化し、必要とする微細化ト ランジスタ特性としての性能や信頼性が得られなくなるという問題が発生する。 [0009] 半導体製造プロセスにおいて、高誘電率膜材料をシリコン基板上に成膜するため の方法としては、原子層化学気相成長(Atomic Layer Chemical Vapor Deposition : A LCVD)技術やフフズマエンノヽンストイ匕学気ネ目成長 (Plasma Enhanced Chemical Vapo r Deposition : PEMOCVD)技術、あるいは有機金属化学気相成長(Metal Organic C hemical Vapor D印 osition : MOCVD)技術が重要であり、実用的である。その中でも、 ALCVD法は、ほぼ完全な表面反応で膜が形成されるため、膜厚の制御性や均一性 に優れているという利点があると考えられている。また、多元系の酸化物にも比較的 容易に対応可能である。この成膜方法により、平坦かつ均一性に優れた A1 0 や ZrO
2 3
、 TiN膜などが形成されている。
2
[0010] そこで、各種の酸化物系絶縁膜を形成するための原料ソースガスには、常温で液 相状態である液体状の各種原料ソース材料が使用されてレ、る。この液体ソース材料 には、その物性によりいろいろな性質がある。例えば、蒸気圧が高ぐ常温付近では ほとんど気体のものもあれば、常温では、 133 Paの数倍(即ち、数 Torr)しか蒸気圧が とれない液体ソース材料もある。また、発火性の高いものもあれば、それほどでもない ものもある。また、腐食性の高いものもあれば、それほどでもないものもある。このよう に種々の化学的あるいは物理的な特性の違いがあるため、その制御方法は、液体材 料の物性に合わせた方式が選択されてレ、る。
[0011] 現在、液体ソース材料の供給制御をガス流量制御(Mass Flow Control: MFC)方法 で行う場合、次の 3種類の制御方法が使用されている。
[0012] (1) バブリング制御方式
(2) 蒸気圧差制御方式
(3) 液相直接制御方式
[0013] まず、パブリング制御方式は、種々の圧力条件下で使用可能である。しかし、キヤリ ァガスが大量に必要となり、気化効率が著しく悪い。また、気化ガスを効率よく輸送す るため、及び圧力差の小さい材料の輸送効率を上げるために、第 2のキャリアガス( 別名、プッシュガスという。)で気化ガスを押し出す必要があるという問題がある。また 、安定性の面では、液体ソース材料充填容器の温度制御 (容器あるいは配管のヒー ティング方式など)、およびバブリング効率(キャリアガスの溶解性、キャリアガスの流 路制御性、セラミック製バブルフィルター性能、ミスト発生抑制制御 (容器の大きさ、 液面レベル出口までの距離など) )、液体ソース材料充填容器内圧力(高温対応圧 力センサー、液面レベル検知計など)の安定性がその決めてとなり、実際上、 10%以 内の安定性を維持するだけでも、かなり厳密な充填容器管理制御が必要となり、安 定な供給は難しいという問題点がある。具体例としては、液体ソース材料として、例え ば、 TiCl、 TEOS、 POC1 等が使われ、この方式で制御されている。
4 3
[0014] 次に、蒸気圧差制御方式は、キャリアガスを必要としないため、非常に効率が良い と言えるが、圧力差をとれないため、比較的、小流量に限られることになる。また、プ ロセスチャンバ一の圧力が真空でなければ、液体ソース材料の気化によってガス化さ れない。したがって、常圧装置には使用するのは難しい。有機金属化合物材料は、 一般に非常に低蒸気圧であり、常温では ΙΤΟΓΓ以下であることが多い。そのため、使 用する MFCも、高温動作の MFCである必要がある。しかし、超低差圧動作を行うた め、制御できるガス流量は、 10— 6標準立方メートル毎分の数倍(即ち、数 sccm (Standa rd Cubic Centimeter per Minute :標準立方センチメートル毎分)程度になるとレ、う問 題点がある。また、この制御方式は、液体ソース材料を直接気化して使用するため、 最も重要なのは液体ソース材料充填容器の温度制御である。液体状態の材料が直 接気化するためには、気化熱が必要である。この気化熱が発生すると、充填容器温 度は低下する。微小量の気化ですむ場合、この温度低下は無視できるが、 10— 6標準 立方メートル毎分の数 100倍(即ち、数 lOOsccm )程度の気化になる場合、充填容器 温度の低下は無視できなくなる。つまり、充填容器温度の低下により、蒸気圧が下が り、 MFCの差圧が確保できなくなるため、制御不能になるという問題点がある。また、 有機金属化合物材料の制御などの場合、充填容器は加熱されており、充填容器以 降の配管の温度は、配管内の圧力変動を考慮に入れて、必ず使用材料の液化条件 を満たすことのないように温度制御をする必要があるという問題点がある。さらに、液 体ソース材料を加熱する場合、材料自身が熱的な化学反応を起こし、原料ソースの 液体材料の品質が劣化するという問題点もある。具体例としては、液体ソース材料と して、例えば、 BC1、 CC1、 CHC1、 SiCl 等が使われ、この方式で制御されている。
3 4 3 4
[0015] 最後に、液相直接制御方式は、液相状態で原料ソースを輸送制御するため、液体 ソース材料をプロセスチャンバ一に導入する直前でガス状に気化させる必要がある。 この気化の条件は、液体ソース材料の蒸気圧とプロセスチャンバ一圧力との関係から 決める必要があり、液体ソース材料の物性に合わせた気化方法とそれに対応した構 造持った気化器が必要である。また、液体ソース材料で室温で液相状態にならない 材料に関しては、例えば、 THFやトルエンなどの室温で液相状態の有機溶媒材料に 固相状態の前述の液体ソース材料を溶解させなければならなレ、。この場合、気化時 に液中に有機溶媒成分が含まれてレ、るため、気化ガス中に有機成分が含まれた状 態で気化され、そのままプロセス処理中の膜中に取り込まれてしまい、膜の純度を低 下させるという問題点がある。また、この有機溶媒材料と液体ソース材料の蒸気圧差 による物性の違いによって、気化効率の低下につながる。また、プロセスチャンバ一 の圧力が高真空の減圧処理条件下では、液体の沸騰を抑えるため、液体ソース材 料の注入口には、オリフィスをもうけ、圧力損失を付ける必要がある。また、常圧処理 条件下では、加熱し、キャリアガスで気化ガスを輸送する必要がある。つまり、この制 御方式は、気化器の構成 (キャリアガス導入部のノズノレ形状とその吹出し位置、キヤリ ァガス混合部の結合部構造とその形状と、気化室の形状、気化ガスの流路方向、気 化ガス出口部の開口位置 (穴の形状、穴の位置、穴の数等)、ヒータ分割構造、等) がー律に定められない。また、液体から気体への相変化のプロセス段階が入るため、 プロセス処理までの応答速度が遅くなる。また、液体ソース材料の原料そのものを液 相状態で直接流すため、充填容器の取り外し時のガスパージに多くの時間がかかる 。また、気化効率が不十分の場合、気化室内に付着物が堆積し、メンテナンスや保 守に多くの時間がかかる。また、気化室は、蒸気圧の変動を抑えるため比較的大きな 容積を必要とする。また、微少流量の液体を制御するためと、気泡の影響を除去する ために、安定度の高い液体センサーが必要である。 (例えば、定温度差制御電力差 制御方式の液体センサー)また、液体ソース材料中の不純物も一緒に輸送され直接 気化されるので、パーティクル発生の原因になる。さらに、液体ソース材料とキャリア ガスを気化室内直前で混合させる場合、キャリアガス中の水分濃度制御を十分に行 なわないと、加水分解などの化学反応が生じて気化室内に固形物系付着物が堆積 し、気化効率が低下する。そのために、プロセス条件の再現性が低下するという問題 点を生じる。結果として、ウェハプロセス処理後のウェハ歩留り(良品率)の歩留り低 下という大きな問題点に発展する。具体例としては、液体ソース材料として、例えば、 TEOS、 TiCl、 TEB、 TEPO、 TEAし、 TMI、 TEG、 BTBAS、 TDMAS等力 吏われ、この 方式で制御されている。
[0016] 前述した液体材料供給装置のうち、液体直接気化供給技術を用レ、た従来技術が、 非特許文献 1に記載されている。また、液体直接気化供給器に用いられる液体マス フローと液体制御気化器を組み合わせたシステムの従来技術が、非特許文献 2に記 載されている。
[0017] 非特許文献 1 Electronic Journal 2002年 12月号、小野弘文ら、 pp.114-115、 2002 非特許文献 2 Electronic Journal 2003年 3月号、磯田頼孝、 pp.88_89、 2003 発明の開示
発明が解決しょうとする課題
[0018] 前述のパブリング制御方式は、キャリアガスが大量に必要となり、気化効率が著しく 悪い。また、安定性の面では、液体ソース材料充填容器の温度制御(ヒーティング方 式など)、およびパブリング効率(キャリアガスの溶解性、セラミックフィルター性能、ミ スト発生抑制制御など)、液体ソース材料充填容器内圧力(高温対応圧力センサー 制御、液面レベル検知など)の安定性がその決めてとなり、実際上、 10%以内の安定 性を維持するだけでも、かなり厳密な充填容器管理制御が必要となり、安定な供給 は難しいという問題点がある。
[0019] 前述の蒸気圧差制御方式は、キャリアガスを必要としないため、非常に気化効率が 良いと言えるが、圧力差をとれないため、比較的、小流量に限られることになる。液体 が気化するためには、気化熱が必要であり、充填容器温度は低下する。微小量の気 化ですむ場合、この温度低下は無視できるが、 10— 6標準立方メートル毎分の数 100倍 (即ち、数 lOOsccm )程度の気化になる場合、充填容器温度の低下は無視できなくな る。つまり、充填容器温度の低下により、蒸気圧が下がり、 MFの差圧が確保できなく なるため、制御不能になるという問題点がある。
[0020] 前述の液相直接制御方式は、気化器の構成(キャリアガス導入部構造、キャリアガ ス混合部構造、気化室の構造、気化ガス出口部構造、ヒータ分割構造、およびそれ らの形状等)がー律に定められなレ、。また、液体から気体への相変化のプロセス段階 が入るため、プロセス処理までの応答速度が遅くなる。また、液体ソース材料の原料 そのものを直接流すため、充填容器の取り外し時のガスパージに多くの時間がかか る。また、気化効率が不十分の場合、気化室内に付着物が堆積し、メンテナンスや保 守に多くの時間がかかる。また、液体ソース材料中の不純物も一緒に輸送され直接 気化されるので、パーティクル発生の原因になる。さらに、液体ソース材料とキャリア ガスを気化室内直前で混合させる場合、キャリアガス中の水分濃度制御を十分に行 なわないと、加水分解などの化学反応が生じて気化室内に固形物系付着物が堆積 し、気化率が低下するという問題点がある。
課題を解決するための手段
[0021] 本発明では、広範囲な流量と濃度でプロセス処理条件を制御できるように、蒸気圧 差制御方式とキャリアガス制御方式を組み合わせている。
[0022] また、広範囲な圧力範囲のプロセス処理ができ、かつ原子層オーダーの精密制御 ができるように、液体ソース材料充填容器の入口側と出口側に圧力制御板を設けて いる。なお、この圧力制御板は、液体ソース材料の物性によって、開孔穴の配置と数 量を変更して取り付けることができる。また、この圧力制御板の開孔穴の形状は、液 体や液滴ミストが飛散しないように、あるいはそれらをトラップ捕獲できるように、斜め 下方向の穴形状になるように設計してある。
[0023] また、充填容器内で液体ソース材料の対流を起こすために、充填容器底部に温度 勾配を生じさせるヒータを設置している。なお、各ヒータゾーンには、温度管理と制御 ができるように、熱電対がそれぞれの加熱ゾーンに設けてある。また、ヒータは、充填 容器の入口側から出口側に向かって温度が高くなるように、温度勾配を持たせてある
[0024] また、充填容器の底部は、液体ソース材料の対流がスムーズに発生するように凸状 の形状に設計されている。なお、この凸状の底部には、温度管理と制御ができるよう に、ヒータと熱電対がセットで取り付けられるようにしてある。
[0025] また、充填容器内の液体ソース材料をいつでも安定的に補給することができるよう に、圧力抜き開孔穴つき補給配管を充填容器内に挿入している。 [0026] また、気化ガスが気相中を均一輸送でき、かつ温度差を生じないように流れるように 、充填容器を横長の長方形にしてある。また、円筒形の充填容器の場合、気化ガス が気相中を均一輸送でき、かつ温度差を生じないように流れるように周辺 4力所から キャリアガスを導入できるようにしてある。
[0027] また、充填容器内の液面レベルをリアルタイムでモニタできるように、圧力抜き開孔 穴つき補給配管の上面に液面レベルセンサー取り付け窓が設けられている。また、こ の補給配管の開孔穴の形状は、液体や液滴ミストが飛散しないように、前方斜め下 方向の穴形状になるように設計してある。
[0028] また、充填容器内で水分等の不純物成分と化学反応して、原料ソース材料自身の 品質や組成が劣化しないように、充填容器内表面をすベて酸化物系あるいは窒化物 系不動態膜で覆われている。
[0029] また、充填容器内の圧力を一定に維持するために、キャリアガス導入口側と気化ガ ス出口配管付近には、高温対応の圧力センサーが設けてある。また、充填容器内の 圧力とプロセスチャンバ一の圧力との間の圧力差を調整、制御するために、気化ガス 出口付近には、ガス流量と配管内圧力を制御する流調弁が設けてある。
[0030] また、配管内にガス溜まりになるデッドスペースがないように、入口側と出口側のバ ルブは、ブロックバルブ化している。なお、このバルブブロックは、温度制御ができる ように、ヒータが内蔵できるようになつている。
[0031] また、気化ガス出口側からプロセスチャンバ一につながる配管を効率よくパージで きるように、充填容器の入口側と出口側の配管を連結配管で接続してある。
発明の効果
[0032] 本発明によれば、蒸気圧差制御方式とキャリアガス制御方式を組み合わせている ため、広範囲な流量と濃度のプロセス処理条件下で反応ガスを供給および制御をす ること力 Sできる。
[0033] 液体ソース材料充填容器の入口側と出口側に圧力制御板を設けてレ、るため、広範 囲な圧力範囲のプロセス処理条件下で処理ができ、かつ原子オーダーの精密制御 をすることができる。
[0034] 液体ソース材料を充填容器内で対流を起こすことによって、液相と気相の界面に常 に新鮮な液体とガスを供給されてレ、るため、界面付近の気相側の濃度勾配を一定に 保ち、気化熱による温度低下を抑制することができ、液体ソース材料の気化率の安 定化および容器内の圧力と温度の安定化を図ることができる。
[0035] 充填容器の底部は、凸状に加工されており、かつ温度管理と制御ができるようにな つているため、液体ソース材料の対流をスムーズに発生させることができる。また、こ の充填容器の底部の凸状部には、ヒータと液温をモニタできるように熱電対が設けら れているため、液相内の対流制御と管理が可能である。
[0036] 充填容器内の圧力制御板の開孔穴の形状は、前方斜め下方向の穴形状になるよ うに設計してあるため、液体や液滴ミストが飛散しないように、あるいはトラップ捕獲で きるようになつている。
[0037] 気化ガス出口付近には、ガス流量と配管内圧力を制御する流調弁が設けてあるた め、充填容器内の圧力とプロセスチャンバ一の圧力との間の圧力差を調整、制御す ること力 Sできる。
[0038] 液体ソース材料の蒸気圧差方式とキャリアガス輸送制御方式を組み合わせた液体 材料供給装置の構成部材の内面は、腐食性の液体ソース材料にも耐えられるように 、たとえば、 Cr 0、 A1 0、 Y 0 等の酸化膜系不動態膜表面か、あるいは A1N等の窒 化膜系不動態膜表面になっているため、液体ソース材料中やキャリアガス中の水分 との化学反応、(たとえば、加水分解反応)が抑制され、容器中に固形粒子状のパー ティクルが発生することを防ぐことができる。また、液体ソース材料自身の品質や組成 の劣化も防ぐことができる。
[0039] 充填容器内表面を熱伝導性の良好な酸化物系不動態膜や窒化物系不動態膜に よって接液部、および接ガス部の全面コーティングすることで、ヒータによる加熱効率 の向上と均熱性の安定化を維持できる。
図面の簡単な説明
[0040] [図 1]図 1は、本発明の第 1の実施例による供給装置の断面図である。
[図 2]図 2 (A)は、図 1の供給装置の液体ソース充填容器の断面図であり、図 2 (B)は 、図 2 (A)の A— A'ラインに沿って切った断面図であり、図 2 (C)は、図 2 (A)の液体 ソース充填容器の矢印 Bに垂直な断面を説明するための図である。 園 3]図 3は、本発明の第 2の実施例による供給装置の断面図である。
園 4]図 4(A)は、図 3の供給装置の液体ソース充填容器の断面図であり、図 4(B)は
、図 4(A)の A—A'ラインに沿って切った断面図であり、図 4(C)は、図 4(A)の液体 ソース充填容器の矢印 Bに垂直な断面を示した図である。
園 5]図 5は、本発明の第 3の実施例による供給装置の断面図である。
園 6]図 6(A)は、図 5の供給装置の液体ソース充填容器の断面図であり、図 6(B)は
、図 6(A)の A—A'ラインに沿って切った断面図であり、図 6(C)は、図 6(A)の液体 ソース充填容器の矢印 Bに垂直な断面を示した図である。
園 7]図 7は、本発明の第 4の実施例による供給装置の断面図である。
園 8]図 8(A)は、図 7の供給装置の液体ソース充填容器の断面図であり、図 8(B)は
、図 8(A)の A— A'ラインに沿って切った断面図であり、図 8(C)は、図 8(A)の液体 ソース充填容器の矢印 Bに垂直な断面を示した図である。
園 9]図 9は、本発明の第 5の実施例による供給装置の断面図である。
園 10]図 10(A)は、図 9の供給装置の液体ソース充填容器の断面図であり、図 10(
B)は、図 10(A)の A—A'ラインに沿って切った断面図であり、図 10(C)は、図 10(
A)の液体ソース充填容器の矢印 Bに垂直な断面を示した図である。
園 11]図 11は、本発明の第 6の実施例による供給装置の断面図である。
[図 12]図 12(A)は、図 11の供給装置の液体ソース充填容器の断面図であり、図 12(
B)は、図 12(A)の A—A'ラインに沿って切った断面図であり、図 12(C)は、図 12(
A)の液体ソース充填容器の矢印 Bに垂直な断面を示した図である。
[図 13]図 13は、本発明の第 7の実施例による供給装置の断面図である。
園 14]図 14(A)は、図 13の供給装置の液体ソース充填容器の断面図であり、図 14(
B)は、図 14(A)の A—A'ラインに沿って切った断面図であり、図 14(C)は、図 14(
A)の液体ソース充填容器の矢印 Bに垂直な断面を示した図である。
[図 15]図 15は、本発明の第 8の実施例による供給装置の断面図である。
園 16]図 16(A)は、図 15の供給装置の液体ソース充填容器の断面図であり、図 16(
B)は、図 16(A)の A—A'ラインに沿って切った断面図であり、図 16(C)は、図 16( A)の液体ソース充填容器の矢印 Bに垂直な断面を示した図である。 [図 17]図 17は、前記第 8の実施例による供給装置の変形例を示した、図 16 (C)と同 様な図である。
[図 18]図 18は、前記第 8の実施例による供給装置のもう一つの変形例を示した、図 1 6 (C)と同様な図である。
[図 19]図 19は、前記第 8の実施例による供給装置の別の変形例を示した、図 16 (C) と同様な図である。
[図 20]図 20は、前記第 8の実施例による供給装置の更に別の変形例を示した、図 16 (C)と同様な図である。
園 21]図 21は、本発明の第 9の実施例による供給装置の断面図である。
園 22]図 22 (A)は、図 21の供給装置の液体ソース充填容器の断面図であり、図 22 (
B)は、図 22 (A)の A—A'ラインに沿って切った断面図であり、図 22 (C)は、図 22 (
A)の液体ソース充填容器の矢印 Bに垂直な断面を示した図である。
園 23]図 23は、本発明の第 10の実施例による供給装置の断面図である。
園 24]図 24 (A)は、図 23の供給装置の液体ソース充填容器の断面図であり、図 24 (
B)は、図 24 (A)の A—A'ラインに沿って切った断面図であり、図 24 (C)は、図 24 (
A)の液体ソース充填容器の矢印 Bに垂直な断面を示した図である。
園 25]図 25は、本発明の第 11の実施例による供給装置の断面図である。
園 26]図 26 (A)は、図 25の供給装置の液体ソース充填容器の断面図であり、図 26 (
B)は、図 26 (A)の A—A'ラインに沿って切った断面図であり、図 26 (C)は、図 26 ( A)の液体ソース充填容器の矢印 Bに垂直な断面を示した図である。
園 27]図 27は、本発明の第 12の実施例による供給装置の断面図である。
符号の説明
11 キャリアガス導入配管
12 パージガス導入配管
13 充填容器
14 液体ソース補給口配管
15 気化ガス出口配管
16 空圧弁 17 流調弁
19 ヒータ内蔵空圧ブロック弁
20 ヒータ内蔵空圧ブロック弁
21 保温カバー
PI 圧力センサー
P2 圧力センサー
JH ジャケット型ヒータ
TC 熱電対
31 凸状
TC- - 31 熱電対
30 上板
41 圧力抜き開孔
51 内圧制御用プレート (圧力制御板)
61 夜面レべノレセンサ窓 (ί夜面レべノレセン -取り付け窓)
P3 圧力センサー
71 連結部
発明を実施するための最良の形態
[0042] 次に本発明の実施例について図面を参照して説明する。
[0043] 『第 1の実施例』
図 1及び図 2を参照して、本発明の第 1の実施例に係る液体材料の蒸気圧差制御 方式とキャリアガス輸送制御方式の組合せによる供給装置とその制御方法を説明す る。
[0044] ここで、図 1には、本発明の第 1の実施例による供給装置の断面が示されており、図 2 (A)には、図 1の供給装置の液体ソース充填容器の断面が示されている。図 2 (B) には、図 2 (A)の A—A'ラインに沿って切った断面が示されており、図 2 (C)は、図 2 (Α)の液体ソース充填容器の矢印 Βに垂直な断面が示されている。
[0045] 図 1及び図 2において、この供給装置は、キャリアガス導入口 11aを有するキャリア ガス導入配管 11、パージガス導入口 12aを有するパージガス導入配管 12、液体ソ ース材料の充填容器 13、液体ソース補給口 14aを有する液体ソース補給口配管 14 、容器内圧力をセンスするための圧力センサー(高温対応圧力センサー) Pl、気化 ガス出口 15aを有する気化ガス出口配管 15、気化ガス出口配管 15内の圧力をセン スする圧力センサー(高温対応圧力センサー) P2、開閉弁としての空圧弁 16、流調 弁 17、ヒータ内蔵空圧ブロック弁 19及び 20、多数のジャケット型ヒータ JH、断熱材入 りの保温カバー 21、多数の熱電対 TCから構成されている円筒形の供給装置である 。なお、符号 JH及び TCは、一つのジャケット型ヒータ及び一つの熱電対にのみ代表 的に付した。
[0046] この充填容器 13は、液体ソース材料が液化状態にならないようにヒータ(ジャケット 型ヒータ JH)によって外周部から加熱してある。ヒータ CJH)は、キャリアガス導入配管 11側から充填容器 13を介して気化ガス出口配管 15側に向かって温度が高くなるよ うに温度勾配をもたせてある。特に、充填容器 13の底部のヒータ JHは、充填容器 13 内部の液体ソース材料が効率よく気化されるように液体の対流が生じるように、円筒 形充填容器 13底部中心付近が周辺付近より温度が高くなるように設定してある。こ のように液体ソース材料を充填容器 13内で対流を起こすことによって、液相と気相の 界面に常に新鮮な液体とガスを供給してレ、るため、界面付近の気相側の濃度勾配を 一定に保ち、気化熱による温度低下を抑制することができ、液体ソース材料の気化 率の安定化を図っている。なお、図 1及び図 2において、充填容器 13内の液体ソー ス材料中の矢印は、定常的な液体ソース材料の対流の発生方向を示している。また 、図 2 (B)において、 30は充填容器 13の上板、 100は気化ガスの流れ方向を示す。
[0047] また、図 1及び図 2において、図示のキャリアガス導入配管 11は、例えば、直径(1 Z4) X (2.54 X 10— 2)m (即ち、 1/4インチ)を有する配管(1Z4SUS配管)であり、図 示の気化ガス出口配管 15は、例えば、直径 (3/8) X (2.54 X 10— 2)m (即ち、 3 8イン チ)を有する配管(3/8SUS配管)である。このようにキャリアガス導入配管 11及び 気化ガス出口配管 15のサイズを選択することによって、気化後の反応ガスが効率よく 、かつ応答性よくプロセスチャンバ一内へ多量の反応ガスを流すことができるように設 計してある。なお、気化ガス出口配管 15のサイズは、キャリアガス導入配管 11のサイ ズより大きいサイズであれば、良ぐ例えば、直径(1/2) X (2.54 X 10— 2)m (即ち、 1/ 2インチ)を有する配管でも良い。つまり、この出口側の配管サイズを大きくすることは 、気化熱による気相中の気化ガス自信の温度低下が生じることが原因で配管内の圧 力低下のばらつき低減と、ヒータ JHによる気相中のガス加熱による加熱効率低下の 抑制に有効である。すなわち、この充填容器 13の配管は、ガス流速と配管のガス接 触内面積との間のバランスのとれた最適化比率で設計されている。
[0048] また、充填容器 13のヒータによるゾーンは、充填容器 13の底部において 2つの加 熱ゾーン(ヒーティングゾーン) HZ— K及び HZ—Jに分割され、充填容器 13の周辺 部において 3つの加熱ゾーン(ヒーティングゾーン) HZ—A、 HZ— B、及び HZ—じに 分割されており、それぞれの加熱ゾーンが熱電対 TCによって温度をモニタし、精密 よく温度制御されている。なお、この各ヒータゾーンは、それぞれ室温から 300°Cまで の範囲で制御できるようになつている。また、このヒータゾーンの温度勾配は、上流側 力 下流側に向かってゾーンごとに + Cから + 5°Cの範囲の液体材料の性質に適 した勾配温度条件ごとに温度が上がる温度勾配をもつように設計されている。また、 気化ガス出口配管部 15付近からプロセスチャンバ一入口付近までの配管は、液化 状態にならないある設定温度の一定温度の条件を維持するように設計されている。ま た、充填容器 13内の気化ガスを出口配管 15まで運ぶキャリアガスの流路付近のヒー タは、気化熱によって気相中のガス温度が均一に加熱されるように温度制御されて いる。また、各加熱ゾーンのヒータの温度制御は、土 1。C力 ±0.1°Cの範囲で、液体 ソース材料の性質に合わせた、ある一定温度になるように自由に精密設定が可能に なっており、応答性の速い温調器と熱電対によって温度制御されている。
[0049] なお、後述の第 7の実施例(図 13参照)に示すように、液体ソース補給口配管 14は 、液体ソースが充填容器 13内の液面下部から補給される構造にする方が好ましい。
[0050] なお、この液体ソース補給口配管 14としては、圧力抜きの開孔 (後に図示)のある 配管が設けられており、液体ソース材料を充填容器 13底部付近から供給し、液体ソ ース材料の気化効率の妨げにならないよう位置から補給できるように設計されている 構造が望ましい。また、この開孔は、液体ソース材料補給時に充填容器 13内の液面 を変位させない効果と、かつ振動も抑制するという効果があるので、気化率が低下す ることがなレ、(後述の第 7の実施例(図 13参照)でその構造を示す。)。 [0051] 『第 1の実施例の効果』
ここで、第 1の実施例の効果について説明しておく。まず、この液体材料供給装置 力 蒸気圧差制御方式とキャリアガス制御方式を組み合わせているため、広範囲な 流量と濃度のプロセス処理条件下で反応ガスの供給および制御を実現することがで きる。
[0052] また、液体ソース材料を充填容器 13内で対流を起こすことによって、液相と気相の 界面に常に新鮮な液体とガスを供給されているため、界面付近の気相側の濃度勾配 を一定に保ち、気化熱による気相および液相の温度低下を抑制することができ、液 体ソース材料の気化率の安定化および容器内の圧力と温度の安定化を実現すること ができる。
[0053] また、気化ガス出口付近には、ガス流量と気化ガス出口配管 15内圧力を制御する 流調弁 17が設けてあるため、充填容器 13内の圧力とプロセスチャンバ一の圧力との 間の圧力差を調整、制御すること力 Sできる。
[0054] また、液体ソース材料の蒸気圧差方式とキャリアガス輸送制御方式を組み合わせた 液体材料供給装置の構成部材の内面は、腐食性の液体ソース材料にも耐えられる ように、酸化不動態膜、たとえば、 Cr 0、 A1 0、 Y 0 等の酸化膜系不動態膜表面か
2 3 2 3 2 3
、あるいは A1N等の窒化膜系不動態膜表面になっているため、液体ソース材料中や キャリアガス中の水分との化学反応、(たとえば、加水分解反応)が抑制され、容器中 に固形粒子状のパーティクルが発生することを防ぐことができる。また、液体ソース材 料自身の品質や組成の劣化も防ぐことができる。
[0055] また、容器 13内面を熱伝導性の良好な酸化物系不動態膜や窒化物系不動態膜を 接液部、および接ガス部の全面コーティングすることで、ヒータによる加熱効率の向 上と均熱性の安定化を維持できる。
[0056] 『第 2の実施例』
図 3及び図 4を参照して、本発明の第 2の実施例による供給装置を説明する。
[0057] 図 3及び図 4において、この供給装置は、第 1の実施例と比べると、液体ソース材料 の充填容器 13が底部に凸状 31を有している点が違うのみである。この充填容器 13 は、充填容器 13内部の液体ソース材料を効率よく対流させるように、最適化設計さ れた構造の容器である。
[0058] 『第 2の実施例の効果』
ここで、第 2の実施例の効果について説明しておく。この実施例では、第 1の実施例 の効果の他に以下の効果が実現できる。それは、充填容器 13の底部が、凸状 31に 加工されており、かつ温度管理と制御ができるようになつているため、液体ソース材料 の対流をスムーズに発生させることが実現できる。
[0059] 『第 3の実施例』
図 5及び図 6を参照して、本発明の第 3の実施例による供給装置を説明する。
[0060] 図 5及び図 6において、この供給装置は、第 2の実施例と比べると、容器底部に液 体ソース材料の温度を制御するために、熱電対 TC 31が設けられた構造になって いる。この供給装置は、これ以外は第 2の実施例と同様である。
[0061] 『第 3の実施例の効果』
ここで、第 3の実施例の効果について説明しておく。この実施例は、充填容器の底 部は、凸状に加工されており、かつ温度管理と制御ができるようになつているため、液 体ソース材料の対流をよりスムーズに発生させ、対流速度を精密に制御することがで きる。そのために、この充填容器の底部の凸状部には、ヒータと液温をモニタできるよ うに熱電対が設けられているため、液相内の対流制御と管理ができるようになつてい る。
[0062] 『第 4の実施例』
図 7及び図 8を参照して、本発明の第 4の実施例による供給装置を説明する。
[0063] 図 7及び図 8において、この供給装置は、キャリアガス導入口 11aを有するキャリア ガス導入配管 11が円筒状の充填容器 13内に上板 30の周辺口 4力所を介して連通 する構造をしており、 4つのキャリアガス導入配管 11から上板 30の中心口を介して中 心の気化ガス出口配管 15に向かってガスの流れる方向が均等になるような構造をし ている。この供給装置は、これ以外は、第 3の実施例と同様である。
[0064] 『第 4の実施例の効果』
ここで、第 4の実施例の効果について説明しておく。この実施例は、気化ガスをキヤ リアガスによって均等に出口配管 15まで輸送することができるので、気化熱の発生に よる気相あるいは液相の温度の不均熱性と流路方向のばらつきを抑制することがで きる。
[0065] なお、上述した第 1から第 4の実施例では、液体ソース材料の充填容器 13の形状 は円筒形であった。
[0066] 『第 5の実施例』
図 9及び図 10を参照すると、本発明の第 5の実施例による供給装置は、以下の点 を除けば、第 1の実施例と同様である。即ち、第 5の実施例による供給装置では、液 体ソース材料の充填容器 13の形状が円筒形でなぐ長方形になっており、対流方向 と精密制御性の向上とキャリアガスによる気化ガスの輸送効率の安定化が図られて いる。
[0067] 『第 6の実施例』
図 11及び図 12を参照すると、本発明の第 6の実施例による供給装置は、同様の参 照符号で示された同様の部分を含んでいる。この第 6の実施例による供給装置は、 第 5の実施例とは異なり、液体ソース補給口配管 14として、圧力抜き開孔 41 (図 12 ( B) )のある配管を有している。また、この供給装置は、液体ソース材料の充填容器 13 が底部に上述した実施例と同様に凸状 31を有している。この供給装置は、これ以外 は第 5の実施例と同様である。
[0068] この第 6の実施例では、キャリアガスによる気化ガスの輸送時の気相中気化ガスに 温度勾配を持たないように均一のガス流れになるように構造の最適化設計が図られ ている。この場合、液体ソース材料の対流方向がキャリアガスの輸送方向に対して左 右対称になるように容器 13底部のヒータ JHの配置を左右対称になるように最適化設 計されている。
[0069] 『第 7の実施例』
図 13及び図 14を参照すると、本発明の第 7の実施例による供給装置は、以下の点 を除けば、第 6の実施例と同様である。即ち、第 7の実施例による供給装置では、充 填容器 13には、液体ソース補給口配管 14が液体ソース材料液面より下方の容器 13 底部付近まで伸びており、かつ圧力抜き開孔 41が開いている構造になっている。そ のため、気化中でも気相温度を一定に維持したままの状態で気化効率を低下させな いで液体ソース材料を追加補給することが可能である。また、容器 13内の液体ソース 材料液面の変動、振動や液温の不均熱性を防止することもできる。
[0070] なお、液体ソース補給口配管 14の充填容器 13内の配管は、内面も外面も熱伝導 性の良好な酸化物系不動態膜、あるいは窒化物系不動態膜で覆われていることが 望ましレ、。さらに、液体ソース補給口配管 14内の圧力上昇による配管先端からの気 泡の発生も抑制できるので、気化率の安定化に有効である。
[0071] なお、この圧力抜き開孔 41の穴の形状は、液面に平行な横穴形状でなぐ液体や 液滴ミストがキャリアガスと一緒に下流側の気相中へ飛散しないように、下方向に流 れ落ちるような前方斜め下向きの穴形状であることが望ましい。また、穴の長さや数 は、液体ソース材料の物性に整合させて、最適な形状に設定することが望ましい。ま た、穴の長さや数は、液体ソース材料の物性に合わせて、最適な形状に設定するこ とが望ましい。
[0072] 『第 8の実施例』
図 15及び図 16を参照すると、本発明の第 8の実施例による供給装置は、以下の点 を除けば、第 7の実施例と同様である。即ち、第 8の実施例による供給装置では、充 填容器 13内には、容器 13内の圧力を一定、かつ安定に維持制御するために、穴空 きの内圧制御用プレート (圧力制御板) 51がキャリアガス導入口側と気化ガス出口側 の両方に設けてある。この際、穴空きの内圧制御用プレート (圧力制御板) 51は、キ ャリアガス導入口側と気化ガス出口側のどちらか一方にだけ設けても良レ、。
[0073] なお、この内圧制御用プレート(圧力制御板) 51は、液体ソース材料の性質によつ て穴数(開口数)を最適化した制御板を使うことが望ましい。
[0074] 図 16 (C)、図 17、図 18、図 19、及び図 20には、種々の数の穴を有する内圧制御 用プレート (圧力制御板)が示されている。
[0075] 『第 9の実施例』
図 21及び図 22を参照すると、本発明の第 9の実施例による供給装置は、以下の点 を除けば、第 8の実施例と同様である。即ち、第 9の実施例による供給装置では、充 填容器 13内に設けられた内圧制御用プレート (圧力制御板) 51は、液体ソース材料 に接してレ、る部分には穴(開口)を有してレ、なレ、。 [0076] 図 13〜図 22の実施例においても、液体ソース材料の蒸気圧差方式とキャリアガス 輸送制御方式を組み合わせた液体材料供給装置の構成部材の内面は、腐食性の 液体ソース材料にも耐えられるように、酸化不動態膜、たとえば、 Cr 03、 A1 03、 Y 0 等の酸化膜系不動態膜表面か、あるいは A1N等の窒化膜系不動態膜表面になって レ、ることが望ましい。また、このような酸化物系不動態膜で覆われている容器を使うこ とで、液体ソース材料中やキャリアガス中の水分との化学反応、(たとえば、加水分解 反応)が抑制され、容器中に固形粒子状のパーティクルが発生することを防ぐことが できる。また、液体ソース材料自身の品質や組成の劣化を防ぐことができる。また、容 器内面を熱伝導性の良好な酸化物系不動態膜や窒化物系不動態膜を接液部、お よび接ガス部の全面コーティングすることで、ヒータによる加熱効率の向上と均熱性 の安定化を維持できる利点がある。このことは、ヒータの消費電力の低減が可能にな り、省エネルギー化が図れる。また、圧力制御板を気化ガス出口付近の容器内に設 けることによって、発生したパーティクルがキャリアガスによる輸送によってプロセスチ ヤンバーに運ばれるのを防ぐことができる。また、この制御板は、気化熱による気相中 気化ガスの温度低下を抑制制御する機能を持っているので、容器内の圧力が低下 することや、気化効率が低下することも防ぐことができる。なお、これらの制御板の開 孔形状は、液面に平行な横穴形状でなぐ固形物系粒子や液滴ミストの除去が可能 な前方斜め下方向の穴形状であることが望ましい。
[0077] 『第 10の実施例』
図 23及び図 24を参照すると、本発明の第 10の実施例による供給装置は、以下の 点を除けば、第 9の実施例と同様である。即ち、第 10の実施例による供給装置では、 充填容器 13内に設けられた 2つの内圧制御用プレート (圧力制御板) 51のうち、気 化ガス出口側の内圧制御用プレート (圧力制御板) 51が穴空きの内圧制御用プレー ト (圧力制御板)である。更に、第 10の実施例による供給装置は、液体ソース補給口 配管 14を使って、液体ソース材料の充填容器 13の内の液面レベルをリアルタイムで モニタできる液面レベルセンサ窓(液面レベルセンサ取り付け窓) 61が設けられてい る。
[0078] 『第 11の実施例』 図 25及び図 26を参照すると、本発明の第 11の実施例による供給装置は、以下の 点を除けば、第 10の実施例と同様である。即ち、第 11の実施例による供給装置では 、気化ガス出口配管 15付近に高温対応の圧力センサー P1及び P2が設けられてい る他に、パージガス導入配管 12部にも高温対応の圧力センサー P3が設けられてお り、液体ソース材料の充填容器 13のキャリアガス導入配管 11内の圧力をモニタでき るようになっている。
[0079] 『第 12の実施例』
図 27を参照すると、本発明の第 12の実施例による供給装置は、以下の点を除けば 、第 11の実施例と同様である。即ち、第 12の実施例による供給装置では、キャリアガ ス導入配管 11と気化ガス出口配管 15との間が配管とバルブとを有する連結部 71に よって連結接続された構造になっている。なお、この連結部 71は、液体ソース材料の 充填容器 13の気化ガス出口配管 15内を効率よく N パージガスによってパージし、
2
液体ソース材料が滞留、固化しないように防ぐための構造である。さらに、充填容器 1 3のメンテナンス周期を長期化できる利点も持っている。
[0080] 『第 5から第 12の実施例の効果』
ここで、第 5から第 12までの実施例の効果について説明しておく。まず、第 5と第 6 の実施例は、充填容器 13を、第 1から第 4までの実施例の円筒形から、単純に横長 の長方形の形状に変更した構造であり、さらに温度管理と制御が精密にできるように なっている。また、液体ソース材料の対流の方向と速度を安定化させ、さらに対流を スムーズに発生させ、対流速度も精密に制御することができる。また、気化されたガス をキャリアガスによってより均等に出口配管 15まで輸送することができるので、気化熱 の発生による気相あるいは液相の温度の不均熱性と流路方向のばらつきを抑え、気 化効率の安定化のために精密抑制を実現することができる。
[0081] また、第 7から第 12までの実施例は、液体ソース補給口配管 14が、充填容器 13内 の液面下部から補給される構造になっている。また、この配管 14は、圧力抜きの開孔 41のある配管が設けられており、液体ソース材料を充填容器 13底部付近から供給し 、液体ソース材料液面表面の気相への気化率の妨げにならなレ、位置から補給できる ように設計されている。また、この開孔 41は、液体ソース材料補給時に充填容器 13 内の液面を変位させない効果と、かつ振動も抑制するという効果があるので、気化率 の低下を抑制することができる。また、この補給口配管 14の圧力抜き開孔穴 41の形 状は、斜め下方向の穴形状になるように設計してあるため、液体や液滴ミストを飛散 しなレ、ように、あるいはそれらをトラップ捕獲することができる。
[0082] また、第 8の実施例は、キャリアガスによる気化ガスの輸送時の気相中気化ガス不 均熱化の原因となる気化熱発生による温度勾配が発生しないように均一のガス流れ になるような流路構造の最適化設計が図られている。また、液体ソース材料の対流方 向がキャリアガスの輸送方向に対して左右対称になるように容器 13底部のヒータ JH の配置を左右対称になるように最適化設計されている。また、これらの実施例の液体 ソース材料の充填容器 13内には、容器 13内の圧力を一定、かつ安定に維持制御す るために、穴空き圧力制御板 51がキャリアガス導入口側と気化ガス出口側の両方、 あるいはどちらか一方に設けてある。
[0083] また、第 9と第 10の実施例は、圧力制御板 51として、液体ソース材料の性質によつ て開口数を最適化した制御板を使うことができることを示している。
[0084] また、第 11の実施例は、圧力抜き開孔穴つき補給口配管 14の上面に液面レベル センサー取り付け窓 61が設けられているため、充填容器 13内の液面レベルをリアル タイムでモニタできる。
[0085] また、この補給口配管 14の開孔穴の形状は、前方斜め下方向の穴形状になるよう に設計してあるため、液体や液滴ミストがキャリアガスと一緒に下流側の気相中へ飛 散しないようにできる。
産業上の利用可能性
[0086] 本発明によれば、半導体製造装置おける原子層オーダー制御が可能な成膜技術 におレ、て、液体材料をウェハプロセスの化学反応材料の原料ソース源とする供給装 置を得ることができる。さらに、室温から高温までの広い範囲の加熱温度制御と安定 供給を可能にする液体材料供給装置の制御方法が得られる。

Claims

請求の範囲
[1] 液体ソース材料を直接気化させ、その気化ガスをキャリアガスによって輸送すること により液体ソース材料の供給制御を行うことを特徴とする液体材料供給装置。
[2] 請求項 1に記載の液体材料供給装置において、前記液体ソース材料の気化は、蒸 気圧制御方式によって行うことを特徴とする液体材料供給装置。
[3] 請求項 1に記載の液体材料供給装置において、前記液体ソース材料を入れる充填 容器と、前記充填容器内にキャリアガスを導入するキャリアガス導入配管と、圧力およ び流速又は流路制御が可能な制御板と、前記キャリアガスによって輸送された気化 ガスを出力する気化ガス出口配管と、前記充填容器内に液体ソース材料を補給する 液体ソース補給配管と、前記充填容器内圧力を検出する圧力センサーと、前記充填 容器内に温度分布を与える加熱手段と、前記充填容器内の温度を検出する温度検 出手段とを備えていることを特徴とする液体材料供給装置。
[4] 請求項 3に記載の液体材料供給装置において、前記充填容器の内表面は、酸化 物系あるいは窒化物系不動態膜でおおわれていることを特徴とする液体材料供給装 置。
[5] 請求項 3に記載の液体材料供給装置において、前記充填容器は、容器構造が円 筒形か、あるいは長方形の形状をしていることを特徴とする液体材料供給装置。
[6] 請求項 3に記載の液体材料供給装置において、前記充填容器の底部は、液体ソ ース材料が前記充填容器内でスムーズに対流が発生するような形状をしていることを 特徴とする液体材料供給装置。
[7] 請求項 3に記載の液体材料供給装置において、前記制御板は開孔を有し、該開孔 は、液体や液滴ミストが飛散されないように斜め下方向に延在した形状を有すること を特徴とする液体材料供給装置。
[8] 請求項 3に記載の液体材料供給装置において、前記充填容器は、凸状の底部を 有し、該底部を前記充填容器の外周部より高温とすることを特徴とする液体材料供 給装置。
[9] 請求項 3に記載の液体材料供給装置において、前記液体ソース補給配管は、前記 充填容器内部に蓄積された液体ソース材料の液面より下方に液体ソース補給口が 位置するように延在した構造を有し、かつ前記液体ソース補給配管には圧力抜き用 開孔が設けられていることを特徴とする液体材料供給装置。
[10] 請求項 9に記載の液体材料供給装置において、前記液体ソース補給配管には、液 面レベルをリアルタイムで管理.モニタするための液面レベルセンサー取り付け窓が 設けられてレヽることを特徴とする液体材料供給装置。
[11] 請求項 3に記載の液体材料供給装置において、前記充填容器には、該充填容器 内の圧力を制御するための圧力制御手段が設けられていることを特徴とする液体材 料供給装置。
[12] 請求項 3に記載の液体材料供給装置において、前記充填容器には、該充填容器 内にパージガスを導入するポートが設けられていることを特徴とする液体材料供給装 置。
[13] 請求項 12に記載の液体材料供給装置において、前記充填容器には、該充填容器 のパージによる置換効率を向上させるために、前記キャリアガス導入配管と前記気化 ガス出口配管とを接続する連結配管が設けられていることを特徴とする液体材料供 給装置。
[14] 請求項 3に記載の液体材料供給装置において、前記気化ガス出口配管は、前記キ ャリアガス導入配管より管サイズが大きいことを特徴とする液体材料供給装置。
[15] 請求項 3に記載の液体材料供給装置において、前記充填容器の外周部は、断熱 材によって保温されていることを特徴とする液体材料供給装置。
[16] 請求項 3に記載の液体材料供給装置において、前記充填容器の形状が円筒形で あり、前記キャリアガスを前記充填容器の外周部の 4力所以上から導入可能な構造を 有してレヽることを特徴とする液体材料供給装置。
[17] 請求項 3に記載の液体材料供給装置において、前記充填容器内部の圧力制御と 流速制御との両方を前記制御板で制御することを特徴とする液体材料供給装置。
[18] 請求項 1〜: 17のいずれかに記載の液体材料供給装置のための制御方法において 、前記キャリアガス導入配管あるいは気化ガス出口配管付近の前記充填容器内部に 制御板を設け、該制御板は、液体ソース材料の物性に適したサイズの開孔穴と、制 御可能な穴配置と穴個数を有することを特徴とする制御方法。
[19] 請求項 3〜: 17のいずれかに記載の液体材料供給装置のための制御方法において 、前記充填容器は、外周部にヒータを設けてあり、そのヒータの温度ゾーンは 2系統 力 5系統の範囲でゾーンが分割されており、それぞれのゾーンは 1°C力 5°Cの範 囲の液体材料の物性に適した最適な温度勾配の制御を行うことを特徴とする制御方 法。
[20] 請求項 19に記載の制御方法において、外周部のヒータゾーンは、ゾーンごとに熱 電対が取り付けてあり、液体ソース材料の蒸気圧を精密制御するための気化温度制 御を有することを特徴とする制御方法。
[21] 請求項 9に記載の液体材料供給装置のための制御方法において、前記圧力抜き 用開孔付きの前記液体ソース補給配管補給配管によって、液体ソース材料を補給中 に充填容器内の液面変動、振動を抑制制御し、かつ液温の不均熱性を抑制制御す ることを特徴とする制御方法。
PCT/JP2005/017835 2005-09-28 2005-09-28 液体材料供給装置、液体材料供給装置のための制御方法 WO2007036997A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2005/017835 WO2007036997A1 (ja) 2005-09-28 2005-09-28 液体材料供給装置、液体材料供給装置のための制御方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2005/017835 WO2007036997A1 (ja) 2005-09-28 2005-09-28 液体材料供給装置、液体材料供給装置のための制御方法

Publications (1)

Publication Number Publication Date
WO2007036997A1 true WO2007036997A1 (ja) 2007-04-05

Family

ID=37899436

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2005/017835 WO2007036997A1 (ja) 2005-09-28 2005-09-28 液体材料供給装置、液体材料供給装置のための制御方法

Country Status (1)

Country Link
WO (1) WO2007036997A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013515862A (ja) * 2009-12-31 2013-05-09 エスエヌユー プレシジョン カンパニー リミテッド 気化装置及びこの制御方法
WO2014087592A1 (ja) * 2012-12-06 2014-06-12 株式会社フジキン 原料気化供給装置
PL424592A1 (pl) * 2018-02-14 2019-08-26 Politechnika Łódzka Sposób zasilania w pary prekursora reaktorów do nakładania powłok metodami próżniowymi oraz układ do zasilania w pary prekursora reaktorów do nakładania powłok metodami próżniowymi

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003013233A (ja) * 2001-07-04 2003-01-15 Horiba Ltd 液体原料気化供給装置
WO2004007793A2 (en) * 2002-07-17 2004-01-22 Applied Materials, Inc. Method and apparatus for providing gas to a processing chamber
JP2005286054A (ja) * 2004-03-29 2005-10-13 Tadahiro Omi 液体材料供給装置、液体材料供給装置のための制御方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003013233A (ja) * 2001-07-04 2003-01-15 Horiba Ltd 液体原料気化供給装置
WO2004007793A2 (en) * 2002-07-17 2004-01-22 Applied Materials, Inc. Method and apparatus for providing gas to a processing chamber
JP2005286054A (ja) * 2004-03-29 2005-10-13 Tadahiro Omi 液体材料供給装置、液体材料供給装置のための制御方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013515862A (ja) * 2009-12-31 2013-05-09 エスエヌユー プレシジョン カンパニー リミテッド 気化装置及びこの制御方法
WO2014087592A1 (ja) * 2012-12-06 2014-06-12 株式会社フジキン 原料気化供給装置
JP2014114463A (ja) * 2012-12-06 2014-06-26 Fujikin Inc 原料気化供給装置
TWI503443B (zh) * 2012-12-06 2015-10-11 Fujikin Kk Raw material gasification supply device
KR101613141B1 (ko) * 2012-12-06 2016-04-18 가부시키가이샤 후지킨 원료 기화 공급 장치
CN104822858B (zh) * 2012-12-06 2017-08-01 株式会社富士金 原料气化供给装置
US9994955B2 (en) 2012-12-06 2018-06-12 Fujikin Incorporated Raw material vaporization and supply apparatus
PL424592A1 (pl) * 2018-02-14 2019-08-26 Politechnika Łódzka Sposób zasilania w pary prekursora reaktorów do nakładania powłok metodami próżniowymi oraz układ do zasilania w pary prekursora reaktorów do nakładania powłok metodami próżniowymi

Similar Documents

Publication Publication Date Title
KR101615585B1 (ko) 기판 처리 장치, 반도체 장치의 제조 방법 및 기화 장치
JP4480274B2 (ja) 化学気相堆積気化装置
US7883581B2 (en) Substrate processing apparatus and method of manufacturing semiconductor device
US7246796B2 (en) Carburetor, various types of devices using the carburetor, and method of vaporization
JP3831165B2 (ja) 液体運送装置
JP3390517B2 (ja) 液体原料用cvd装置
US20030033978A1 (en) High termperature filter
JP2004140328A (ja) ガス供給系及び処理システム
US20060127068A1 (en) Method and apparatus for silicon oxide deposition on large area substrates
WO2017009997A1 (ja) 基板処理装置、半導体装置の製造方法及び気化システム
JP2010087169A (ja) 気化器およびそれを用いた成膜装置
JP2005079141A (ja) プラズマcvd装置
WO2006098792A2 (en) High accuracy vapor generation and delivery for thin film deposition
JP4391413B2 (ja) 気化器、分散器、成膜装置、及び、気化方法
JP4537101B2 (ja) 液体材料供給装置、液体材料供給装置のための制御方法
WO2007036997A1 (ja) 液体材料供給装置、液体材料供給装置のための制御方法
KR20010062849A (ko) 지르콘산염 티탄산납 필름의 유기금속 화학기상증착
JP5016416B2 (ja) 気化器及び気化方法
KR20040007439A (ko) 강유전체 박막, 금속 박막 또는 산화물 박막 및 그제조방법, 제조장치 그리고 상기 박막을 사용한전자·전기 디바이스
KR20120011582A (ko) 기화기를 갖는 증착장치 및 증착방법
KR101066138B1 (ko) 기판 처리 장치 및 반도체 장치의 제조 방법
KR101490438B1 (ko) 증착장비의 기화기
KR20090054587A (ko) 증착장치의 기화기
KR100685798B1 (ko) 박막증착용 기화유니트
KR20010110909A (ko) 전구체 공급 장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 05788155

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP